Tanah Check Dam Tinjomoyo

73
LAPORAN PENYELIDIKAN TANAH SOIL INVESTIGATION CONE PENETROMETER TEST (Sondir), HAND BORING, dan UJI LABORATORIUM Proyek : PEKERJAAN DETAIL DESAIN CHECK DAM DAS GARANG CHECK DAM TINJOMOYO (LOKASI 1), GUNUNG PATI – SEMARANG JAWA TENGAH AGUSTUS 2013 UNIT PRODUKSI DAN JASA (PROJAS) JURUSAN TEKNIK SIPIL Politeknik Negeri Semarang Jl. Prof . Sudarto , SH Tembalang Kotak Pos 6199/SMS Semarang 50275 Telp. 024-7478271, 024-7473417- Ps. 150. Fax. 024-7478271

description

laporan tanah

Transcript of Tanah Check Dam Tinjomoyo

  • LAPORAN

    PENYELIDIKAN TANAH SOIL INVESTIGATION

    CONE PENETROMETER TEST (Sondir),

    HAND BORING, dan UJI LABORATORIUM

    Proyek : PEKERJAAN DETAIL DESAIN CHECK DAM DAS GARANG

    CHECK DAM TINJOMOYO (LOKASI 1), GUNUNG PATI SEMARANG JAWA TENGAH

    AGUSTUS 2013

    UNIT PRODUKSI DAN JASA (PROJAS) JURUSAN TEKNIK SIPIL

    Politeknik Negeri Semarang

    Jl. Prof . Sudarto , SH Tembalang Kotak Pos 6199/SMS Semarang 50275 Telp. 024-7478271, 024-7473417- Ps. 150. Fax. 024-7478271

  • UNIT PRODUKSI DAN JASA (PROJAS) JURUSAN TEKNIK SIPIL

    Politeknik Negeri Semarang

    Jl. Prof. Sudarto, SH Tembalang Kotak Pos 6199/SMS Semarang 50275

    Telp. 024-7478271, 024-7473417- Ps. 150. Fax. 024-7478271

    KATA PENGANTAR

    Dengan ini kami laporkan hasil penyelidikan tanah di lapangan (Field Soil Investigation)

    dengan alat Sondir Cone Penetrometer Test (CPT) dan uji laboratorium (Laboratory Test) pada

    Proyek Pekerjaan Detail Desain Check Dam DAS Garang yang berlokasi di Check Dam

    Tinjomoyo (Lokasi 1), Gunung Pati Semarang, Jawa Tengah.

    Untuk hasil lengkap pengujian bisa dilihat pada lampiran dalam buku ini.

    Demikianlah laporan kami, untuk bisa digunakan sebagai bahan pertimbangan dalam

    perencanaan pekerjaan konstruksi di lapangan, atas kerjasama dan kepercayaan kepada kami,

    diucapkan terima kasih.

    Semarang, 19 Agustus 2013

    Projas Jurusan Teknik Sipil Lab. Mektan. Jurusan Teknik Sipil Politeknik Negeri Semarang Politeknik Negeri Semarang Ketua, Kepala,

    Drs. Supardjo Ir. Wahjoedi, M.T. NIP. 195409051984031002 NIP. 196009241990031001

  • 1

    I. PENDAHULUAN

    1.1. Latar Belakang

    Sehubungan dengan akan dibangunnya Proyek Pekerjaan Detail Desain Check Dam

    DAS Garang yang berlokasi di Check Dam Tinjomoyo (Lokasi 1), Gunung Pati

    Semarang, Jawa Tengah. Maka perlu dilakukan pekerjaan soil investigation, yang

    merupakan tinjauan teknis dalam menentukan daya dukung (bearing capacity) dan

    parameter mekanika tanah yang ada di lokasi tersebut. Penyelidikan tanah secara

    umum bertujuan untuk mendapatkan informasi mengenai kondisi dan karakteristik

    lapisan tanah. Laporan ini berisi hasil penyelidikan tanah dengan alat uji sondir (CPT)

    dan pemboran tangan (hand boring), uji laboratorium, serta analisa uji laboratorium

    mekanika tanah.

    1.2. Tujuan Penyelidikan Tanah

    Tujuan dari pekerjaan penyelidikan tanah ini untuk mendapatkan informasi mengenai

    kondisi dan karakteristik lapisan tanah pada lokasi proyek, jenis tanah, parameter

    tanah, dan muka air tanah, sehingga diketahui susunan lapisan tanah yang ada dilokasi.

    1. Kedalaman lapisan tanah keras untuk mengetahui daya dukung dari tanah tersebut.

    2. Sifat-sifat mekanis tanah

    3. Untuk bisa menentukan jenis pondasi yang dipilih.

    1.3. Lingkup Pekerjaan

    Lingkup pekerjaan yang dilakukan oleh Politeknik Negeri Semarang meliputi :

    Pekerjaan penyelidikan tanah dilapangan, dan pekerjaan test laboratorium.

    A. Pekerjaan Lapangan Terdiri dari :

    1. Pengujian sondir (CPT) sebanyak 2 titik sampai kedalaman 20,00 meter atau

    sampai diperoleh nilai conus resistant (qc) 200 kg/cm2

    2. Pemboran dengan tangan (hand boring) sampai tanah keras atau kedalaman

    3,00 meter 2 buah.

    3. Pengambilan contoh tanah tidak terganggu (undisturb sample) dan contoh tanah

    terganggu (disturb sample)

  • 2

    4. Deskripsi tanah sewaktu pemboran (bor log)

    5. Penyelidikan letak muka air tanah (ground water table) saat pemboran.

    B. Pekerjaan Laboratorium Terdiri dari :

    1. Penentuan sifat fisik tanah (Index Properties)

    2. Uji geser langsung (Direct Shear)

    3. Test batas-batas Atterberg (Atterberg Limit)

    4. Analisa Ayak (Grain Size Analysis)

    5. Uji Konsolidasi (Consolidation Test)

    6. Uji Permeabilitas (Permeability Test)

    II. METODOLOGI PENYELIDIKAN

    Pekerjaan penyelidikan tanah dan uji laboratorium yang dilakukan pada Proyek

    Pekerjaan Detail Desain Check Dam DAS Garang yang berlokasi di Check Dam

    Tinjomoyo (Lokasi 1), Gunung Pati Semarang, Jawa Tengah, meliputi kegiatan

    sebagai berikut:

    2.1. Sondir (CPT)

    Cone Penetration Test (CPT) dilakukan dengan menggunakan peralatan Dutch Cone

    Penetrometer. Pelaksanaan test sondir ini menggunakan prosedur Standart ASTM

    D3341 75T. Alat yang digunakan terdiri 1 buah mesin sondir dengan kapasitas 2,5

    ton, kedalaman pengujian dilakukan sampai tahanan ujung (Cone Resistance) atau qc

    mencapai kedalaman tanah keras (150 kg/cm2) atau sampai 20,00 meter. Tahanan

    ujung (Cone Resistance) qc dan gesekan selimut (Sleeve Friction) fs diamati setiap

    kenaikan kedalaman 20 cm. Hasil sondir ditampilkan dalam bentuk grafik dan tabel

    yang dapat dilihat pada lampiran.

    2.2. Bor Tangan (Hand Boring)

    Peralatan yang digunakan terdiri dari :

    Bor tangan yang digunakan bor Iwan digunakan untuk pengambilan contoh tanah

    terganggu (disturbed sample), tabung Shelby yang digunakan untuk pengambilan

    sample tanah tidak terganggu.

  • 3

    Metoda Pelaksanaan :

    Pemboran dilakukan dengan menggunakan bor tangan yang digunakan untuk

    mengambil contoh tanah yang terganggu (disturbed sample). Contoh ini

    digunakan untuk mendapatkan gambaran mengenai jenis tanah yang ada di

    lokasi pengujian.

    Pengambilan contoh tanah tidak terganggu (Undisturbed Soil Sampling)

    dilakukan dengan menggunakan tabung Shelby yang panjangnya 70 cm dan

    diameter 73 mm, sesuai dengan ASTM D-1587 (1983), dan dilakukan dengan

    cara mendorong tabung Shelby kedalam tanah secara perlahan-lahan atau

    dipukul. Setelah contoh tanah diperoleh kedua ujung dari tabung ditutup dengan

    parafin untuk melindungi tanah dari gangguan luar.

    2.3. Pekerjaan Sampling

    Pekerjaan sampling dilakukan untuk keperluan test tanah di laboratorium. Contoh

    tanah yang diambil dari lapangan terdiri dari Undisturb samples (UDS) dan Disturb

    samples (DS). Pengambilan contoh tanah UDS dilakukan dengan menggunakan tabung

    baja tipis standart (shelby tube). Untuk menjaga keaslian contoh tanah tersebut harus

    dilakukan dengan hati-hati, dan tabung ditutup dengan parafin pada kedua ujungnya

    lalu disimpan di tempat yang terlindung. Pelaksanaan pekerjaan sampling dilakukan

    sesuai standart ASTM 1587 83.

    2.4. Pekerjaan Laboratorium

    Pekerjaan Laboratorium dilakukan dengan menggunakan peralatan dan metode yang

    standart untuk mengetahui parameter tanah yaitu index properties, klasifikasi tanah,

    parameter kekuatan geser tanah. Pengujian laboratorium yang dilakukan meliputi :

    1. Index Properties

    Test ini meliputi penentuan :

    - Kadar air alami (Natural Water Content) (ASTM D 2216,1980)

    - Specific Gravity (ASTM D 854, 1983)

    - Density Test (ASTM D9254, 1983)

    2. Uji Geser Langsung (Direct Shear) ( ASTM D - 3080 72 )

  • 4

    Test untuk mengetahui sududut geser dalam dan kohesi tanah.

    3. Batas-batas Atterberg (Atterberg Limit) (ASTM D 423 & ASTM D 424)

    Test untuk mengetahui Batas Cair (LL), Batas Plastis (PL), Plastis Indeks (IP), dan

    klasifikasi tanah.

    4. Analisa Saringan (Grain Size Analysis) (ASTM D422,1972/1963)

    Test ini digunakan untuk mengetahui gradasi / pembagian besar butir dari tanah.

    5. Uji Konsolidasi (Consolidation Test)

    Pengujian ini untuk mengetahui besarnya penurunan tanah akibat pembebanan.

    6. Uji Permeabilitas (Permeability Test)

    Pengujian ini untuk mengetahui tingkat penyerapan tanah.

    III. LOKASI PENGUJIAN

    Lokasi pengujian Sondir dan Bor Tangan bisa dilihat pada gambar peta / foto.. IV. INTERPRETASI HASIL PENGUJIAN LAPANGAN

    A. Uji CPT

    Sesuai dengan grafik hasil sondir menunjukkan bahwa tanah pada umumnya terdiri

    dari lempung organik (organic clays and mixed soils) sampai dengan pasir padat

    (dense or cemented sands).

    Dari 2 lokasi penyelidikan dapat disimpulkan sbb :

    Lokasi Sondir 1 (S1)

    Lapisan bagian atas pada kedalaman 0,00 sampai 1,60 meter, mempunyai

    Average Cone Resistance (qc) sebesar 10,00 kg/cm2, dan nilai friction ratio

    sebesar 5,00, lapisan ini dapat didiskripsikan sesuai grafik klasifikasi

    Schmertmann dan Grafik USCS berupa lempung sedang (medium clays).

    Lapisan pada kedalaman 1,60 sampai 4,20 meter, mempunyai Average Cone

    Resistance (qc) sebesar 30,00 kg/cm2, dan nilai friction ratio sebesar 3,00, lapisan

    ini dapat didiskripsikan sesuai grafik klasifikasi Schmertmann dan Grafik USCS

    berupa pasir kelempungan (clayey sands and silts).

  • 5

    Lapisan pada kedalaman 4,20 sampai 8,00 meter, mempunyai Average Cone

    Resistance (qc) sebesar 65,00 kg/cm2, dan nilai friction ratio sebesar 2,31, lapisan

    ini dapat didiskripsikan sesuai grafik klasifikasi Schmertmann dan Grafik USCS

    berupa pasir kelempungan (clayey sands and silts).

    Lapisan pada kedalaman 8,00 sampai 15,00 meter, mempunyai Average Cone

    Resistance (qc) sebesar 70,00 kg/cm2, dan nilai friction ratio sebesar 2,14, lapisan

    ini dapat didiskripsikan sesuai grafik klasifikasi Schmertmann dan Grafik USCS

    berupa pasir kelempungan (clayey sands and silts).

    Lapisan pada kedalaman 15,00 sampai 16,00 meter, mempunyai Average Cone

    Resistance (qc) sebesar 150,00 kg/cm2, dan nilai friction ratio sebesar 1,67,

    lapisan ini dapat didiskripsikan sesuai grafik klasifikasi Schmertmann dan Grafik

    USCS berupa pasir padat (dense or cemented sands).

    Lokasi Sondir 2 (S2)

    Lapisan bagian atas pada kedalaman 0,00 sampai 4,00 meter, mempunyai

    Average Cone Resistance (qc) sebesar 10,00 kg/cm2, dan nilai friction ratio

    sebesar 7,00, lapisan ini dapat didiskripsikan sesuai grafik klasifikasi

    Schmertmann dan Grafik USCS berupa lempung organik (organic clays and mixed

    soils).

    Lapisan pada kedalaman 4,00 sampai 7,00 meter, mempunyai Average Cone

    Resistance (qc) sebesar 30,00 kg/cm2, dan nilai friction ratio sebesar 4,33, lapisan

    ini dapat didiskripsikan sesuai grafik klasifikasi Schmertmann dan Grafik USCS

    berupa lempung kepasiran (sandy and silty clays).

    Lapisan pada kedalaman 7,00 sampai 11,60 meter, mempunyai Average Cone

    Resistance (qc) sebesar 55,00 kg/cm2, dan nlai friction ratio sebesar 5,45, lapisan

    ini dapat didiskripsikan sesuai grafik klasifikasi Schmertmann dan Grafik USCS

    berupa lempung kepasiran (sandy and silty clays).

  • 6

    Lapisan pada kedalaman 11,60 sampai 14,60 meter, mempunyai Average Cone

    Resistance (qc) sebesar 65,00 kg/cm2, dan nilai friction ratio sebesar 3,85, lapisan

    ini dapat didiskripsikan sesuai grafik klasifikasi Schmertmann dan Grafik USCS

    berupa lempung kepasiran (sandy and silty clays).

    Lapisan pada kedalaman 14,60 sampai 16,60 meter, mempunyai Average Cone

    Resistance (qc) sebesar 125,00 kg/cm2, dan nilai friction ratio sebesar 2,00,

    lapisan ini dapat didiskripsikan sesuai grafik klasifikasi Schmertmann dan Grafik

    USCS berupa pasir padat (dense or cemented).

    Diskripsi tanah menurut USCS (1983) dapat dilihat gambar 4.1, dan diskripsi tanah

    menurut Schmertmann seperti terlihat pada gambar 4.2.

    Gambar 4.1. Klasifikasi tanah dari hubungan nilai (Cone Resistance) qc

    dan (Friction Ratio) FR menurut USCS (1983)

  • 7

    Gambar 4.2. Klasifikasi tanah dari hubungan nilai Cone Resistance (qc)

    dan Friction Ratio (Fr) menurut Schmertmann

    B. Uji Bor Tangan

    Hasil uji bor tangan secara lengkap pada lokasi secara lengkap bisa dilihat pada bor

    log. Dari hasil bor tersebut bisa disimpulkan sbb :

    Bore Hole 1 (BH 1)

    Pada kedalaman 0,00 1,0 m, diperoleh lempung, coklat muda.

    Pada kedalaman 1,00 2,00 m, diperoleh lempung berbatu, coklat muda.

    Bor berhenti pada kedalaman 2,00 m, batuan.

    Bore Hole 2 (BH 2)

    Pada kedalaman 0,00 1,00 m, diperoleh lempung, kepasiran.

    Pada kedalaman 1,00 2,00 m, diperoleh lempung abu-abu.

    Pada kedalaman 2,00 3,00 m, diperoleh lempung, abu-abu.

    Pada kedalaman 3,00 4,00 m, diperoleh lempung.

    Bor berhenti pada kedalaman 4,00 m, tanah tidak terbawa.

    C. Stratifikasi Lapisan Tanah

    Dari hasil uji lapangan yang berupa CPT dan Bor Tangan bisa ditentukan ketebalan

    masing masing lapisan tanah yang ada di lokasi pengujian.

  • 8

    V. APLIKASI HASIL SONDIR UNTUK DESAIN PONDASI (BEARING CAPACITY)

    Daya dukung pondasi dangkal (Shallow Foundation)

    Daya dukung untuk pondasi dangkal bisa dihitung dengan rumus Terzaghi :

    BNqNCQ qcult 5,0.. N

    Dari hasil uji sondir, apabila pondasi bangunan akan diletakan pada kedalaman 2,00

    meter, dimana qc berkisar 10,00 kg/cm2 (sondir 1) dan jenis tanahnya berupa

    lempung organik dengan 0 akan diperoleh faktor daya dukung Terzaghi Nc = 5,7

    , Nq = 1 dan N = 0, sehingga rumus Terzaghi diatas akan menjadi sebagai berikut :

    0.. qcult NqNCQ (1)

    karena nilai efektif overburden pressure kecil (q), bisa diabaikan maka rumus

    Terzaghi bisa dituliskan dalam bentuk sebagai berikut :

    cult NCQ . (2)

    Untuk mencari besarnya nilai undrained shear strength (Su) dengan data sondir

    jenis Dutch Penetrometer seperti yang dipakai pada lokasi pengujian menurut

    Sanglerat besarnya sebagai berikut :

    20

    qcCu (Sanglerat) (3)

    Sehingga besarnya ultQ pondasi dangkal pada persamaan (2) adalah :

    207,5

    qcQult

    CuQult 7,5 (Sanglerat - for strip foundation)

    CuQult 8,6 (Sanglerat - for pad foundation)

    dimana qc = Tahanan konus (cone Resistance)

    a. Pondasi Menerus

    207,5

    qcxQult ( for strip foundation )

    Qult = 5,7 x (20

    10)

    = 2,85 kg/cm2

    Apabila digunakan SF (Safety Factor) = 3 diperoleh Qallowable sebesar

  • 9

    3ult

    all

    QQ

    Qall = 3

    85,2

    Qall = 0,95 kg/cm2

    b. Pondasi Setempat

    20

    8,6qc

    xQult ( for pad foundation)

    = 6,8 x (20

    10)

    = 3,40 kg/cm2

    Apabila digunakan SF (Safety Factor) = 3 diperoleh Qallowable sebesar

    3ult

    all

    QQ

    Qall = 3

    40,3

    Qall = 1,133 kg/cm2

    VI. INTERPRETASI HASIL PENGUJIAN LABORATORIUM

    Hasil keseluruhan test laboratorium dapat dilihat pada lampiran, data data pada

    lampiran dapat dilihat pada ringkasan di bawah ini / halaman berikut:

    Jenis Pengujian Unit

    BH. 01 BH. 02 Ket.

    Parameter 1,40 1,80 m 1,80 2,10 m 3,20 3,50 m

    INDEX PROPERTIES Natural Water Content (w) (%) 27,56 35,98 39,45 Wet Density (m) (gr/cm3) 1,85 1,82 1,82 Dry Density (d) (gr/cm3) 1,45 1,34 1,30 Void Ratio (e) - 0,78 0,98 1,01 Porosity (n) - 0,44 0,49 0,50 Degree of Saturation (Sr) (%) 91,40 97,49 100,00 Spesific Gravity (Gs) - 2,57 2,66 2,62

    TRIAXIAL TEST

    Sudut Geser Dalam ( ) o 14,436 9,630 16,203 Kohesi ( C ) kg/cm2 0,5998 0,3732 0,6700

  • 10

    ATTERBERG LIMIT

    LL (%) 41,00 60,50 60,50

    PL (%) 21,79 25,09 29,91

    IP (%) 19,21 35,41 30,59

    Soil classification CL CH CH

    GRAIN SIZE ANALYSIS Lolos Saringan no. 200 (0,075) (%) 54,61 87,40 93,69 Butiran < 2m (0,002mm) (%) 26,89 57,81 65,38 Gravel (%) 19,04 3,51 1,37 Sand (%) 26,35 9,09 4,94 Silt (%) 27,73 29,58 28,31 Clay (%) 26,89 57,81 65,38

    Activity - 0,714 0,612 0,468

    CONSOLIDATION TEST

    Cv m2/year 7,426 3,636 9,860

    Cc - 0,204 0,197 0,193

    PERMEABILITY TEST

    K20c m/det 1,11 x 10-6 9,45 x 10-8 8,54 x 10-9

  • LAMPIRAN 1

    TABEL & GRAFIK SONDIR

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Depth of CPT : 16.00 m

    Location : Tinjomoyo Lokasi 1, Semarang Elev. Of Ground Surface : - m

    No. of CPT : S - 1 Elev. Of Ground Water Table : -2.00 m

    Date : 14-Jul-13 Operator : Ukiman, ST., MT.

    Analysis : Ir. Suparman, MT.

    : Drs. Supardjo

    (m) (kg/cm2) (kg/cm

    2) (kg/cm

    2) (kg/cm') (kg/cm') (kg/cm

    2) (%)

    A B C D E F G H

    0.00 0 0 0 0 0 0.00 0.00

    -0.20 0 0 0 0 0 0.00 0.00

    -0.40 0 0 0 0 0 0.00 0.00

    -0.60 0 0 0 0 0 0.00 0.00

    -0.80 8 11 3 6 6 0.30 3.75

    -1.00 10 15 5 10 16 0.50 5.00

    -1.20 5 8 3 6 22 0.30 6.00

    -1.40 12 17 5 10 32 0.50 4.17

    -1.60 16 23 7 14 46 0.70 4.38

    -1.80 25 35 10 20 66 1.00 4.00

    -2.00 34 45 11 22 88 1.10 3.24

    -2.20 30 42 12 24 112 1.20 4.00

    -2.40 25 35 10 20 132 1.00 4.00

    -2.60 30 39 9 18 150 0.90 3.00

    -2.80 30 38 8 16 166 0.80 2.67

    -3.00 32 41 9 18 184 0.90 2.81

    -3.20 29 38 9 18 202 0.90 3.10

    -3.40 33 42 9 18 220 0.90 2.73

    -3.60 35 47 12 24 244 1.20 3.43

    -3.80 38 50 12 24 268 1.20 3.16

    -4.00 31 41 10 20 288 1.00 3.23

    -4.20 25 34 9 18 306 0.90 3.60

    -4.40 40 52 12 24 330 1.20 3.00

    -4.60 45 60 15 30 360 1.50 3.33

    -4.80 50 62 12 24 384 1.20 2.40

    -5.00 55 68 13 26 410 1.30 2.36

    -5.20 70 85 15 30 440 1.50 2.14

    -5.40 65 80 15 30 470 1.50 2.31

    -5.60 75 90 15 30 500 1.50 2.00

    -5.80 80 90 10 20 520 1.00 1.25

    -6.00 70 80 10 20 540 1.00 1.43

    -6.20 75 90 15 30 570 1.50 2.00

    -6.40 70 80 10 20 590 1.00 1.43

    -6.60 80 95 15 30 620 1.50 1.88

    -6.80 85 100 15 30 650 1.50 1.76

    -7.00 100 120 20 40 690 2.00 2.00

    -7.20 85 100 15 30 720 1.50 1.76

    -7.40 80 95 15 30 750 1.50 1.88

    -7.60 70 80 10 20 770 1.00 1.43

    -7.80 50 65 15 30 800 1.50 3.00

    -8.00 45 60 15 30 830 1.50 3.33

    Friction

    (Fr)Fr*20/10

    Local

    Friction

    (LF)

    Total

    Cumulative

    Friction

    (TCF)

    Friction Ratio

    (FR)

    Standart Test : ASTM D 3441 - 94

    Depth

    Manometer Reading

    CONE PENETROMETER TEST / SONDIR

    Total

    Resistance

    (TR)

    Cone

    Resistance

    (qc)

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Depth of CPT : 16.00 m

    Location : Tinjomoyo Lokasi 1, Semarang Elev. Of Ground Surface : - m

    No. of CPT : S - 1 Elev. Of Ground Water Table : -2.00 m

    Date : 14-Jul-13 Operator : Ukiman, ST., MT.

    Analysis : Ir. Suparman, MT.

    : Drs. Supardjo

    (m) (kg/cm2) (kg/cm

    2) (kg/cm

    2) (kg/cm') (kg/cm') (kg/cm

    2) (%)

    A B C D E F G H

    Friction

    (Fr)Fr*20/10

    Local

    Friction

    (LF)

    Total

    Cumulative

    Friction

    (TCF)

    Friction Ratio

    (FR)

    Standart Test : ASTM D 3441 - 94

    Depth

    Manometer Reading

    CONE PENETROMETER TEST / SONDIR

    Total

    Resistance

    (TR)

    Cone

    Resistance

    (qc)

    -8.20 40 50 10 20 850 1.00 2.50

    -8.40 52 65 13 26 876 1.30 2.50

    -8.60 65 80 15 30 906 1.50 2.31

    -8.80 75 95 20 40 946 2.00 2.67

    -9.00 60 75 15 30 976 1.50 2.50

    -9.20 70 85 15 30 1006 1.50 2.14

    -9.40 80 95 15 30 1036 1.50 1.88

    -9.60 60 75 15 30 1066 1.50 2.50

    -9.80 50 60 10 20 1086 1.00 2.00

    -10.00 45 56 11 22 1108 1.10 2.44

    -10.20 55 70 15 30 1138 1.50 2.73

    -10.40 65 80 15 30 1168 1.50 2.31

    -10.60 80 95 15 30 1198 1.50 1.88

    -10.80 90 105 15 30 1228 1.50 1.67

    -11.00 80 100 20 40 1268 2.00 2.50

    -11.20 90 110 20 40 1308 2.00 2.22

    -11.40 75 90 15 30 1338 1.50 2.00

    -11.60 70 85 15 30 1368 1.50 2.14

    -11.80 60 70 10 20 1388 1.00 1.67

    -12.00 65 75 10 20 1408 1.00 1.54

    -12.20 70 85 15 30 1438 1.50 2.14

    -12.40 90 105 15 30 1468 1.50 1.67

    -12.60 80 95 15 30 1498 1.50 1.88

    -12.80 75 90 15 30 1528 1.50 2.00

    -13.00 80 90 10 20 1548 1.00 1.25

    -13.20 75 85 10 20 1568 1.00 1.33

    -13.40 85 100 15 30 1598 1.50 1.76

    -13.60 80 90 10 20 1618 1.00 1.25

    -13.80 70 80 10 20 1638 1.00 1.43

    -14.00 75 90 15 30 1668 1.50 2.00

    -14.20 75 90 15 30 1698 1.50 2.00

    -14.40 80 95 15 30 1728 1.50 1.88

    -14.60 80 95 15 30 1758 1.50 1.88

    -14.80 85 100 15 30 1788 1.50 1.76

    -15.00 85 100 15 30 1818 1.50 1.76

    -15.20 140 155 15 30 1848 1.50 1.07

    -15.40 130 150 20 40 1888 2.00 1.54

    -15.60 150 175 25 50 1938 2.50 1.67

    -15.80 165 190 25 50 1988 2.50 1.52

    -16.00 170 200 30 60 2048 3.00 1.76

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Depth of CPT : 16.00 m

    Location : Tinjomoyo Lokasi 1, Semarang Elev. Of Ground Surface : - m

    No. of CPT : S - 1 Elev. Of Ground Water Table : -2.00 m

    Date : 14-Jul-13 Operator : Ukiman, ST., MT.

    Analysis : Ir. Suparman, MT.

    : Drs. Supardjo

    2

    qc

    Standart Test : ASTM D 3441 - 94

    CONE PENETROMETER TEST / SONDIR

    -17.00

    -16.00

    -15.00

    -14.00

    -13.00

    -12.00

    -11.00

    -10.00

    -9.00

    -8.00

    -7.00

    -6.00

    -5.00

    -4.00

    -3.00

    -2.00

    -1.00

    0.00

    0 50 100 150 200 250

    ked

    ala

    man

    (m

    )

    Local Friction*10 (kg/cm2)

    qc (kg/cm2)

    TCF / 10 (kg/cm')

    -17.00

    -16.00

    -15.00

    -14.00

    -13.00

    -12.00

    -11.00

    -10.00

    -9.00

    -8.00

    -7.00

    -6.00

    -5.00

    -4.00

    -3.00

    -2.00

    -1.00

    0.00

    0 2 4 6 8 10 12

    Friction Ratio (%)

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Depth of CPT : 16.60 m

    Location : Tinjomoyo Lokasi 1, Semarang Elev. Of Ground Surface : - m

    No. of CPT : S - 2 (Ki) Elev. Of Ground Water Table : -1.00 m

    Date : 14-Jul-13 Operator : Ukiman, ST., MT.

    Analysis : Ir. Suparman, MT.

    : Drs. Supardjo

    (m) (kg/cm2) (kg/cm

    2) (kg/cm

    2) (kg/cm') (kg/cm') (kg/cm

    2) (%)

    A B C D E F G H

    0.00 0 0 0 0 0 0.00 0.00

    -0.20 0 0 0 0 0 0.00 0.00

    -0.40 0 0 0 0 0 0.00 0.00

    -0.60 5 7 2 4 4 0.20 4.00

    -0.80 5 7 2 4 8 0.20 4.00

    -1.00 6 9 3 6 14 0.30 5.00

    -1.20 10 16 6 12 26 0.60 6.00

    -1.40 8 11 3 6 32 0.30 3.75

    -1.60 5 8 3 6 38 0.30 6.00

    -1.80 10 15 5 10 48 0.50 5.00

    -2.00 10 17 7 14 62 0.70 7.00

    -2.20 9 14 5 10 72 0.50 5.56

    -2.40 12 18 6 12 84 0.60 5.00

    -2.60 10 16 6 12 96 0.60 6.00

    -2.80 7 10 3 6 102 0.30 4.29

    -3.00 8 13 5 10 112 0.50 6.25

    -3.20 7 12 5 10 122 0.50 7.14

    -3.40 14 21 7 14 136 0.70 5.00

    -3.60 13 18 5 10 146 0.50 3.85

    -3.80 15 20 5 10 156 0.50 3.33

    -4.00 18 24 6 12 168 0.60 3.33

    -4.20 22 30 8 16 184 0.80 3.64

    -4.40 25 31 6 12 196 0.60 2.40

    -4.60 35 42 7 14 210 0.70 2.00

    -4.80 30 40 10 20 230 1.00 3.33

    -5.00 30 43 13 26 256 1.30 4.33

    -5.20 27 40 13 26 282 1.30 4.81

    -5.40 25 33 8 16 298 0.80 3.20

    -5.60 26 33 7 14 312 0.70 2.69

    -5.80 29 36 7 14 326 0.70 2.41

    -6.00 35 41 6 12 338 0.60 1.71

    -6.20 32 40 8 16 354 0.80 2.50

    -6.40 40 52 12 24 378 1.20 3.00

    -6.60 45 60 15 30 408 1.50 3.33

    -6.80 30 41 11 22 430 1.10 3.67

    -7.00 45 62 17 34 464 1.70 3.78

    -7.20 40 60 20 40 504 2.00 5.00

    -7.40 45 70 25 50 554 2.50 5.56

    -7.60 70 90 20 40 594 2.00 2.86

    -7.80 55 80 25 50 644 2.50 4.55

    -8.00 55 75 20 40 684 2.00 3.64

    Cone

    Resistance

    (qc)

    Total

    Resistance

    (TR)

    CONE PENETROMETER TEST / SONDIR

    Standart Test : ASTM D 3441 - 94

    Depth

    Manometer Reading

    Friction

    (Fr)Fr*20/10

    Total

    Cumulative

    Friction

    (TCF)

    Local

    Friction

    (LF)

    Friction Ratio

    (FR)

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Depth of CPT : 16.60 m

    Location : Tinjomoyo Lokasi 1, Semarang Elev. Of Ground Surface : - m

    No. of CPT : S - 2 (Ki) Elev. Of Ground Water Table : -1.00 m

    Date : 14-Jul-13 Operator : Ukiman, ST., MT.

    Analysis : Ir. Suparman, MT.

    : Drs. Supardjo

    (m) (kg/cm2) (kg/cm

    2) (kg/cm

    2) (kg/cm') (kg/cm') (kg/cm

    2) (%)

    A B C D E F G H

    Cone

    Resistance

    (qc)

    Total

    Resistance

    (TR)

    CONE PENETROMETER TEST / SONDIR

    Standart Test : ASTM D 3441 - 94

    Depth

    Manometer Reading

    Friction

    (Fr)Fr*20/10

    Total

    Cumulative

    Friction

    (TCF)

    Local

    Friction

    (LF)

    Friction Ratio

    (FR)

    -8.20 45 72 27 54 738 2.70 6.00

    -8.40 40 61 21 42 780 2.10 5.25

    -8.60 50 75 25 50 830 2.50 5.00

    -8.80 55 80 25 50 880 2.50 4.55

    -9.00 60 85 25 50 930 2.50 4.17

    -9.20 55 80 25 50 980 2.50 4.55

    -9.40 53 75 22 44 1024 2.20 4.15

    -9.60 60 87 27 54 1078 2.70 4.50

    -9.80 55 85 30 60 1138 3.00 5.45

    -10.00 50 75 25 50 1188 2.50 5.00

    -10.20 60 83 23 46 1234 2.30 3.83

    -10.40 65 85 20 40 1274 2.00 3.08

    -10.60 60 85 25 50 1324 2.50 4.17

    -10.80 55 85 30 60 1384 3.00 5.45

    -11.00 50 75 25 50 1434 2.50 5.00

    -11.20 60 83 23 46 1480 2.30 3.83

    -11.40 70 95 25 50 1530 2.50 3.57

    -11.60 65 90 25 50 1580 2.50 3.85

    -11.80 75 95 20 40 1620 2.00 2.67

    -12.00 70 90 20 40 1660 2.00 2.86

    -12.20 70 93 23 46 1706 2.30 3.29

    -12.40 65 87 22 44 1750 2.20 3.38

    -12.60 70 95 25 50 1800 2.50 3.57

    -12.80 65 90 25 50 1850 2.50 3.85

    -13.00 60 85 25 50 1900 2.50 4.17

    -13.20 65 85 20 40 1940 2.00 3.08

    -13.40 60 85 25 50 1990 2.50 4.17

    -13.60 65 90 25 50 2040 2.50 3.85

    -13.80 60 85 25 50 2090 2.50 4.17

    -14.00 58 78 20 40 2130 2.00 3.45

    -14.20 62 85 23 46 2176 2.30 3.71

    -14.40 80 105 25 50 2226 2.50 3.13

    -14.60 90 115 25 50 2276 2.50 2.78

    -14.80 100 125 25 50 2326 2.50 2.50

    -15.00 110 135 25 50 2376 2.50 2.27

    -15.20 115 140 25 50 2426 2.50 2.17

    -15.40 110 140 30 60 2486 3.00 2.73

    -15.60 125 150 25 50 2536 2.50 2.00

    -15.80 140 165 25 50 2586 2.50 1.79

    -16.00 130 155 25 50 2636 2.50 1.92

    -16.20 145 165 20 40 2676 2.00 1.38

    -16.40 155 180 25 50 2726 2.50 1.61

    -16.60 165 185 20 40 2766 2.00 1.21

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Depth of CPT : 16.60 m

    Location : Tinjomoyo Lokasi 1, Semarang Elev. Of Ground Surface : - m

    No. of CPT : S - 2 (Ki) Elev. Of Ground Water Table : -1.00 m

    Date : 14-Jul-13 Operator : Ukiman, ST., MT.

    Analysis : Ir. Suparman, MT.

    : Drs. Supardjo

    2

    qc

    CONE PENETROMETER TEST / SONDIR

    Standart Test : ASTM D 3441 - 94

    -17.00

    -16.00

    -15.00

    -14.00

    -13.00

    -12.00

    -11.00

    -10.00

    -9.00

    -8.00

    -7.00

    -6.00

    -5.00

    -4.00

    -3.00

    -2.00

    -1.00

    0.00

    0 50 100 150 200 250 300

    ked

    ala

    man

    (m

    )

    Local Friction*10 (kg/cm2)

    qc (kg/cm2)

    TCF / 10 (kg/cm')

    -17.00

    -16.00

    -15.00

    -14.00

    -13.00

    -12.00

    -11.00

    -10.00

    -9.00

    -8.00

    -7.00

    -6.00

    -5.00

    -4.00

    -3.00

    -2.00

    -1.00

    0.00

    0 2 4 6 8 10 12

    Friction Ratio (%)

  • LAMPIRAN 2

    BOR LOG

  • Project : Check Dam Tinjomoyo Kedalaman Boring : 2.00 m

    Location : Tinjomoyo Lokasi 1, Semarang Elevasi muka air : - 2.00 m

    No. of Bore : BH - 1 Operator : Ukiman, ST., MT.

    Date : Analysis : Ir. Suparman, MT.

    : Drs. Supardjo

    m0.00

    1.00

    1.00

    m.a.t

    2.00

    Simbol DS UDS

    Sampel Tanah

    Sim

    bol

    Diskripsi

    NS

    PT

    Pukula

    n/

    30 c

    m

    LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    14-Jul-13

    BORING LOG

    Kedala

    man

    (m)Kedala

    man m

    Tebal Lapis

    an m Tanah

    Bor berhenti, batuan

    Sim

    bol

    Sam

    pel

    m

    1.00

    1.00 Lempung berbatu, coklat muda

    Lempung, coklat muda

  • Project : Check Dam Tinjomoyo Kedalaman Boring : 4.00 m

    Location : Tinjomoyo Lokasi 1, Semarang Elevasi muka air : - 1.00 m

    No. of Bore : BH - 2 Operator : Ukiman, ST., MT.

    Date : Analysis : Ir. Suparman, MT.

    : Drs. Supardjo

    m0.00

    m.a.t

    1.00

    1.00

    2.00

    2.00

    3.00

    3.00

    4.00

    Simbol DS UDS

    1.00 Lempung, kepasiran

    1.00 Lempung, abu - abu

    LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    14-Jul-13

    BORING LOG

    Sampel Tanah

    Sim

    bol

    Diskripsi

    NS

    PT

    Pukula

    n/

    30 c

    m

    Kedala

    man

    (m)

    Sim

    bol

    Sam

    pel

    Bor berhenti

    m

    Kedala

    man m

    Tebal Lapis

    an m Tanah

    1.00 Lempung, abu - abu

    1.00 Lempung

  • LAMPIRAN 3 UJI LABORATORIUM

    1. INDEX PROPERTIES

    2. TRIAXIAL TEST 3. ATTERBERG LIMITS

    4. GRAIN SIZE ANALYSIS 5. CONSOLIDATION TEST

    6. PERMEABILTY TES

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo

    : Tinjomoyo Lokasi 1, Semarang :

    : BH. 01 : Tulus, A.Md

    : Ir. Suparman, MT.

    : Drs. Supardjo

    (g) w2

    (g) w1

    (g) w2-w1

    (cm3) v

    (g/cm3) g(g/cm3) g

    (g) A

    (g) B

    (g) C

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    (C) t

    - a

    (g) m1

    (g) m2

    (g) m3

    (g) m4

    - Gs

    - Gs

    (g/cm3) gde

    n

    (%) S

    INDEX PROPERTIES

    Project

    Lokasi Operator Lap Ngatman

    DensityDept / Boring no. 1.40 - 1.80 m / BH. 01

    No. Boring Operator Lab

    Test standart : ASTM D - 2216 & ASTM D - 854 Analisator

    Cylinder 43.9 43.9

    Cylinder + Soil 165.39 165.04

    Volume of Cylinder 65.67 65.67

    Wet Soil 121.49 121.14

    Wet Soil + Container 38.69 37.15

    Container no. 22

    Average Wet Density 1.85

    Wet Density 1.85 1.84

    23

    Moisture contentDept / Boring no. 1.40 - 1.80 m / BH. 01

    Container 16.03 16.01

    Dry Soil + Container 33.85 32.53

    Moisture loss 4.84 4.62

    Dry Soil 17.82 16.52

    Specific GravityDept / Test no. 1.40 - 1.80 m / BH. 01

    Average Moisture Content 27.56

    Moisture content 27.16 27.97

    Temperature Water 28 28

    Pycnometer no. A B

    Pycnometer 29.81 29.63

    Temperature Factor 0.998 0.998

    Pycno + Dry Soil +water 84.56 83.98

    Pycnometer + Dry Soil 36.46 36.35

    Specific Gravity 2.57 2.57

    Pycnometer + water 80.49 79.87

    Average Specific Gravity 2.57

    Dry Density 1.45

    Degree of Saturation 91.40

    Void Ratio 0.78

    Porosity 0.44

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo

    : Tinjomoyo Lokasi 1, Semarang :

    : BH. 02 : Tulus, A.Md

    : Ir. Suparman, MT.

    : Drs. Supardjo

    (g) w2

    (g) w1

    (g) w2-w1

    (cm3) v

    (g/cm3) g(g/cm3) g

    (g) A

    (g) B

    (g) C

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    (C) t

    - a

    (g) m1

    (g) m2

    (g) m3

    (g) m4

    - Gs

    - Gs

    (g/cm3) gde

    n

    (%) S

    Porosity 0.49 0.50

    Degree of Saturation 97.49 100.00

    Dry Density 1.34 1.30

    Void Ratio 0.98 1.01

    Specific Gravity 2.67 2.65 2.62 2.62

    Average Specific Gravity 2.66 2.62

    Pycno + Dry Soil +water 78.81 81.89 84.57 85.24

    Pycnometer + water 74.45 77.48 80.26 80.75

    Pycnometer 22.81 27.74 30.05 30.81

    Pycnometer + Dry Soil 29.78 34.82 37.01 38.07

    Temperature Water 28 28 28 28

    Temperature Factor 0.998 0.998 0.998 0.998

    Specific GravityDept / Test no. 1.80 - 2.10 m / BH. 02 3.20 - 3.50 m / BH. 02

    Pycnometer no. G H I J

    Moisture content 36.46 35.51 39.12 39.77

    Average Moisture Content 35.98 39.45

    Dry Soil 20.60 19.32 15.21 14.18

    Moisture loss 7.51 6.86 5.95 5.64

    Dry Soil + Container 36.63 35.33 31.38 30.58

    Container 16.03 16.01 16.17 16.40

    Container no. 24 25 37 39

    Wet Soil + Container 44.14 42.19 37.33 36.22

    Average Wet Density 1.82 1.82

    Moisture contentDept / Boring no. 1.80 - 2.10 m / BH. 02 3.20 - 3.50 m / BH. 02

    Volume of Cylinder 65.67 65.67 65.67 65.67

    Wet Density 1.82 1.83 1.81 1.82

    Cylinder 43.9 43.9 43.9 43.9

    Wet Soil 119.55 119.98 119.1 119.38

    Cylinder + Soil 163.45 163.88 163 163.28

    No. Boring Operator Lab

    Test standart : ASTM D - 2216 & ASTM D - 854 Analisator

    Density

    INDEX PROPERTIES

    Project

    Lokasi Operator Lap Ngatman

    Dept / Boring no. 1.80 - 2.10 m / BH. 02 3.20 - 3.50 m / BH. 02

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo : Tulus Setiawan, A.Md

    : Tinjomoyo Lokasi 1, Semarang : Ir. Suparman, MT.

    : 1.40 - 1.80 m / BH. 01 : Drs. Supardjo

    Diameter : 3.80 cm Diameter : 3.80 cm Diameter : 3.80 cm

    Tinggi : 7.60 cm Tinggi : 7.60 cm Tinggi : 7.60 cm

    Berat : 165.82 gr Berat : 166.26 gr Berat : 166.41 gr

    DL Regangan Koreksi Luas Beban Tegangan Beban Tegangan Beban Tegangan

    (cm) e =DL/L0 (%) (1-e) A=A0/(1-e) P(kg) (P/A) P(kg) (P/A) P(kg) (P/A)

    0.0 0.00 0.0 1.000 11.346 0.0 0.000 0.000 0.0 0.000 0.000 0.0 0.000 0.000

    38.0 0.04 0.5 0.995 11.403 22.5 3.013 0.264 26.0 3.482 0.305 28.0 3.750 0.329

    76.0 0.08 1.0 0.990 11.460 46.0 6.161 0.538 50.5 6.763 0.590 54.5 7.299 0.637

    152.0 0.15 2.0 0.980 11.577 84.5 11.317 0.978 93.0 12.455 1.076 101.0 13.527 1.168

    228.0 0.23 3.0 0.970 11.697 116.0 15.536 1.328 128.0 17.143 1.466 141.0 18.884 1.614

    304.0 0.30 4.0 0.960 11.818 138.0 18.482 1.564 155.0 20.759 1.757 170.5 22.835 1.932

    380.0 0.38 5.0 0.950 11.943 150.5 20.156 1.688 168.0 22.500 1.884 192.0 25.715 2.153

    456.0 0.46 6.0 0.940 12.070 158.0 21.161 1.753 178.0 23.840 1.975 208.0 27.857 2.308

    532.0 0.53 7.0 0.930 12.200 164.0 21.965 1.800 186.5 24.978 2.047 220.0 29.465 2.415

    608.0 0.61 8.0 0.920 12.332 168.5 22.567 1.830 193.0 25.848 2.096 228.5 30.603 2.482

    684.0 0.68 9.0 0.910 12.468 172.5 23.103 1.853 198.0 26.518 2.127 235.0 31.474 2.524

    760.0 0.76 10.0 0.900 12.606 176.0 23.572 1.870 203.0 27.188 2.157 240.0 32.143 2.550

    836.0 0.84 11.0 0.890 12.748 179.0 23.973 1.881 207.0 27.724 2.175 243.5 32.612 2.558

    912.0 0.91 12.0 0.880 12.893 182.0 24.375 1.891 210.0 28.125 2.181 245.5 32.880 2.550

    988.0 0.99 13.0 0.870 13.041 184.5 24.710 1.895 212.5 28.460 2.182 247.0 33.081 2.537

    1066.0 1.07 14.0 0.860 13.197 186.0 24.911 1.888 215.0 28.795 2.182 248.0 33.215 2.517

    1142.0 1.14 15.0 0.850 13.352 186.5 24.978 1.871 216.5 28.996 2.172 248.5 33.282 2.493

    1218.0 1.22 16.0 0.840 13.511 186.5 24.978 1.849 217.0 29.063 2.151 247.0 33.081 2.448

    1294.0 1.29 17.0 0.830 13.674 184.0 24.643 1.802 217.0 29.063 2.125

    1370.0 1.37 18.0 0.820 13.841 216.0 28.929 2.090

    1446.0 1.45 19.0 0.810 14.012

    1522.0 1.52 20.0 0.800 14.187

    UJI TRIAXIAL UU

    Proyek Diuji oleh

    Lokasi Dianalisis oleh

    Kedalaman/ No. Bor

    Sample 1 Sample 2 Sample 3

    Deformasi vertikal Luas penampang s3 = 0,5 kg/cm2

    s3 = 1,0 kg/cm2

    s3 = 1,5kg/cm2

    Bacaan Bacaan Bacaan Bacaan

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Proyek : Check Dam Tinjomoyo : Tulus Setiawan, A.Md

    Lokasi : Tinjomoyo Lokasi 1, Semarang : Ir. Suparman, MT.

    Kedalaman/ No. Bor : 1.40 - 1.80 m / BH. 01 : Drs. Supardjo

    1 2 3

    Berat benda uji W gram 165.82 166.26 165.60

    Tinggi awal H cm 7.60 7.60 7.60

    Diameter D cm 3.80 3.80 3.80

    Berat volume basah gt g/cm3 1.92 1.93 1.92

    Kadar air w % 27.56 27.56 27.56

    Berat volume kering gd g/cm3 1.51 1.51 1.51

    Tegangan kekang s3 kg/cm2 0.50 1.00 1.50

    Tegangan normal maksimum s1 kg/cm2 2.39 3.18 4.06

    Kohesi c kg/cm2

    Sudut geser dalam f derajat

    TRIAXIAL UNCONSOLIDATED-UNDRAINED TEST

    Diuji oleh

    Dianalisis oleh

    Nomor uji

    0.5998

    14.436

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    1.20

    1.40

    1.60

    1.80

    2.00

    2.20

    2.40

    2.60

    0 5 10 15 20

    Te

    ga

    ng

    an

    de

    via

    tori

    k (

    kg

    /cm

    2)

    Regangan aksial (%)

    s3=1.5kg/cm2

    s3=1 kg/cm2

    s3=0.5 kg/cm2

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    1.20

    1.40

    1.60

    1.80

    2.00

    2.20

    2.40

    2.60

    0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5

    Teg

    an

    ga

    n g

    eser

    (kg

    /cm

    2)

    Tegangan Normal (kg/cm2)

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo : Tulus Setiawan, A.Md

    : Tinjomoyo Lokasi 1, Semarang : Ir. Suparman, MT.

    : 1.80 - 2.10 m / BH. 02 : Drs. Supardjo

    Diameter : 3.80 cm Diameter : 3.80 cm Diameter : 3.80 cm

    Tinggi : 7.60 cm Tinggi : 7.60 cm Tinggi : 7.60 cm

    Berat : 164.47 gr Berat : 163.80 gr Berat : 163.66 gr

    DL Regangan Koreksi Luas Beban Tegangan Beban Tegangan Beban Tegangan

    (cm) e =DL/L0 (%) (1-e) A=A0/(1-e) P(kg) (P/A) P(kg) (P/A) P(kg) (P/A)

    0.0 0.00 0.0 1.000 11.346 0.0 0.000 0.000 0.0 0.000 0.000 0.0 0.000 0.000

    38.0 0.04 0.5 0.995 11.403 12.5 1.674 0.147 12.0 1.607 0.141 16.0 2.143 0.188

    76.0 0.08 1.0 0.990 11.460 25.0 3.348 0.292 24.5 3.281 0.286 31.0 4.152 0.362

    152.0 0.15 2.0 0.980 11.577 44.0 5.893 0.509 47.0 6.295 0.544 54.0 7.232 0.625

    228.0 0.23 3.0 0.970 11.697 58.5 7.835 0.670 63.5 8.505 0.727 74.0 9.911 0.847

    304.0 0.30 4.0 0.960 11.818 69.0 9.241 0.782 78.0 10.447 0.884 88.5 11.853 1.003

    380.0 0.38 5.0 0.950 11.943 77.5 10.380 0.869 90.5 12.121 1.015 100.0 13.393 1.121

    456.0 0.46 6.0 0.940 12.070 84.0 11.250 0.932 99.0 13.259 1.099 110.0 14.732 1.221

    532.0 0.53 7.0 0.930 12.200 88.0 11.786 0.966 107.0 14.331 1.175 118.0 15.804 1.295

    608.0 0.61 8.0 0.920 12.332 91.5 12.255 0.994 114.5 15.335 1.243 124.5 16.674 1.352

    684.0 0.68 9.0 0.910 12.468 95.0 12.723 1.020 120.0 16.072 1.289 130.0 17.411 1.396

    760.0 0.76 10.0 0.900 12.606 98.0 13.125 1.041 123.0 16.473 1.307 134.0 17.947 1.424

    836.0 0.84 11.0 0.890 12.748 100.5 13.460 1.056 125.0 16.741 1.313 138.0 18.482 1.450

    912.0 0.91 12.0 0.880 12.893 102.5 13.728 1.065 127.0 17.009 1.319 140.5 18.817 1.460

    988.0 0.99 13.0 0.870 13.041 104.0 13.929 1.068 128.5 17.210 1.320 143.0 19.152 1.469

    1066.0 1.07 14.0 0.860 13.197 105.0 14.063 1.066 129.5 17.344 1.314 144.5 19.353 1.466

    1142.0 1.14 15.0 0.850 13.352 106.0 14.197 1.063 130.0 17.411 1.304 146.0 19.554 1.464

    1218.0 1.22 16.0 0.840 13.511 106.5 14.264 1.056 130.0 17.411 1.289 147.0 19.688 1.457

    1294.0 1.29 17.0 0.830 13.674 107.0 14.331 1.048 130.0 17.411 1.273 147.5 19.755 1.445

    1370.0 1.37 18.0 0.820 13.841 107.0 14.331 1.035 129.0 17.277 1.248 147.5 19.755 1.427

    1446.0 1.45 19.0 0.810 14.012 106.5 14.264 1.018 147.0 19.688 1.405

    1522.0 1.52 20.0 0.800 14.187

    UJI TRIAXIAL UU

    Proyek Diuji oleh

    Lokasi Dianalisis oleh

    Kedalaman/ No. Bor

    Sample 1 Sample 2 Sample 3

    Deformasi vertikal Luas penampang s3 = 0,5 kg/cm2

    s3 = 1,0 kg/cm2

    s3 = 1,5kg/cm2

    Bacaan Bacaan Bacaan Bacaan

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Proyek : Check Dam Tinjomoyo : Tulus Setiawan, A.Md

    Lokasi : Tinjomoyo Lokasi 1, Semarang : Ir. Suparman, MT.

    Kedalaman/ No. Bor : 1.80 - 2.10 m / BH. 02 : Drs. Supardjo

    1 2 3

    Berat benda uji W gram 164.47 163.80 165.60

    Tinggi awal H cm 7.60 7.60 7.60

    Diameter D cm 3.80 3.80 3.80

    Berat volume basah gt g/cm3 1.91 1.90 1.92

    Kadar air w % 35.98 35.98 35.98

    Berat volume kering gd g/cm3 1.40 1.40 1.41

    Tegangan kekang s3 kg/cm2 0.50 1.00 1.50

    Tegangan normal maksimum s1 kg/cm2 1.57 2.32 2.97

    Kohesi c kg/cm2

    Sudut geser dalam f derajat

    TRIAXIAL UNCONSOLIDATED-UNDRAINED TEST

    Diuji oleh

    Dianalisis oleh

    Nomor uji

    0.3732

    9.630

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    1.20

    1.40

    1.60

    0 5 10 15 20

    Te

    ga

    ng

    an

    de

    via

    tori

    k (

    kg

    /cm

    2)

    Regangan aksial (%)

    s3=1.5kg/cm2

    s3=1 kg/cm2

    s3=0.5 kg/cm2

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    1.20

    1.40

    1.60

    0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5

    Teg

    an

    ga

    n g

    eser

    (kg

    /cm

    2)

    Tegangan Normal (kg/cm2)

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo : Tulus Setiawan, A.Md

    : Tinjomoyo Lokasi 1, Semarang : Ir. Suparman, MT.

    : 3.20 - 3.50 m / BH. 02 : Drs. Supardjo

    Diameter : 3.80 cm Diameter : 3.80 cm Diameter : 3.80 cm

    Tinggi : 7.60 cm Tinggi : 7.60 cm Tinggi : 7.60 cm

    Berat : 165.38 gr Berat : 165.55 gr Berat : 164.82 gr

    DL Regangan Koreksi Luas Beban Tegangan Beban Tegangan Beban Tegangan

    (cm) e =DL/L0 (%) (1-e) A=A0/(1-e) P(kg) (P/A) P(kg) (P/A) P(kg) (P/A)

    0.0 0.00 0.0 1.000 11.346 0.0 0.000 0.000 0.0 0.000 0.000 0.0 0.000 0.000

    38.0 0.04 0.5 0.995 11.403 23.5 3.147 0.276 28.0 3.750 0.329 24.5 3.281 0.288

    76.0 0.08 1.0 0.990 11.460 45.0 6.027 0.526 53.5 7.165 0.625 53.0 7.098 0.619

    152.0 0.15 2.0 0.980 11.577 86.0 11.518 0.995 101.0 13.527 1.168 106.5 14.264 1.232

    228.0 0.23 3.0 0.970 11.697 120.0 16.072 1.374 142.0 19.018 1.626 155.0 20.759 1.775

    304.0 0.30 4.0 0.960 11.818 148.5 19.889 1.683 171.5 22.969 1.943 188.0 25.179 2.130

    380.0 0.38 5.0 0.950 11.943 168.0 22.500 1.884 194.0 25.982 2.176 212.5 28.460 2.383

    456.0 0.46 6.0 0.940 12.070 180.0 24.107 1.997 214.0 28.661 2.375 233.0 31.206 2.585

    532.0 0.53 7.0 0.930 12.200 188.5 25.246 2.069 228.0 30.536 2.503 247.0 33.081 2.712

    608.0 0.61 8.0 0.920 12.332 194.0 25.982 2.107 237.5 31.808 2.579 258.0 34.554 2.802

    684.0 0.68 9.0 0.910 12.468 198.0 26.518 2.127 243.0 32.545 2.610 267.0 35.759 2.868

    760.0 0.76 10.0 0.900 12.606 201.0 26.920 2.135 247.0 33.081 2.624 272.5 36.496 2.895

    836.0 0.84 11.0 0.890 12.748 203.5 27.255 2.138 250.0 33.483 2.626 277.0 37.099 2.910

    912.0 0.91 12.0 0.880 12.893 206.0 27.590 2.140 252.0 33.750 2.618 280.0 37.500 2.909

    988.0 0.99 13.0 0.870 13.041 207.5 27.790 2.131 254.0 34.018 2.609 282.5 37.835 2.901

    1066.0 1.07 14.0 0.860 13.197 208.0 27.857 2.111 255.0 34.152 2.588 284.0 38.036 2.882

    1142.0 1.14 15.0 0.850 13.352 206.5 27.657 2.071 255.5 34.219 2.563 284.5 38.103 2.854

    1218.0 1.22 16.0 0.840 13.511 253.0 33.884 2.508 283.0 37.902 2.805

    1294.0 1.29 17.0 0.830 13.674

    1370.0 1.37 18.0 0.820 13.841

    1446.0 1.45 19.0 0.810 14.012

    1522.0 1.52 20.0 0.800 14.187

    UJI TRIAXIAL UU

    Proyek Diuji oleh

    Lokasi Dianalisis oleh

    Kedalaman/ No. Bor

    Sample 1 Sample 2 Sample 3

    Deformasi vertikal Luas penampang s3 = 0,5 kg/cm2

    s3 = 1,0 kg/cm2

    s3 = 1,5kg/cm2

    Bacaan Bacaan Bacaan Bacaan

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Proyek : Check Dam Tinjomoyo : Tulus Setiawan, A.Md

    Lokasi : Tinjomoyo Lokasi 1, Semarang : Ir. Suparman, MT.

    Kedalaman/ No. Bor : 3.20 - 3.50 m / BH. 02 : Drs. Supardjo

    1 2 3

    Berat benda uji W gram 165.38 165.55 165.60

    Tinggi awal H cm 7.60 7.60 7.60

    Diameter D cm 3.80 3.80 3.80

    Berat volume basah gt g/cm3 1.92 1.92 1.92

    Kadar air w % 39.45 39.45 39.45

    Berat volume kering gd g/cm3 1.38 1.38 1.38

    Tegangan kekang s3 kg/cm2 0.50 1.00 1.50

    Tegangan normal maksimum s1 kg/cm2 2.64 3.63 4.41

    Kohesi c kg/cm2

    Sudut geser dalam f derajat

    TRIAXIAL UNCONSOLIDATED-UNDRAINED TEST

    Diuji oleh

    Dianalisis oleh

    Nomor uji

    0.6700

    16.203

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    0 5 10 15 20

    Te

    ga

    ng

    an

    de

    via

    tori

    k (

    kg

    /cm

    2)

    Regangan aksial (%)

    s3=1.5kg/cm2

    s3=1 kg/cm2

    s3=0.5 kg/cm2

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5

    Teg

    an

    ga

    n g

    eser

    (kg

    /cm

    2)

    Tegangan Normal (kg/cm2)

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo :

    : Tinjomoyo Lokasi 1, Semarang :

    :

    :

    :

    (g) C

    (g) A

    (g) B

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    (g) C

    (g) A

    (g) B

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    (g) C

    (g) A

    (g) B

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    Drs. Supardjo

    Average Moisture Content 21.79

    Moisture content 21.62 21.96

    Dry Soil 4.07 4.28

    Moisture loss 0.88 0.94

    Dry Soil + Container 20.51 20.24

    Wet Soil + Container 21.39 21.18

    Container 16.44 15.96

    Container no. 19 20

    Plastic limitDept / Boring no. 0.70 - 1.30 m/ BH. 01

    39.45

    Average Moisture Content 41.08 39.47

    Moisture content 41.10 41.07 39.49

    5.12

    Moisture loss 2.10 2.07 2.01 2.02

    Dry Soil 5.11 5.04 5.09

    23.28

    Dry Soil + Container 21.17 21.19 21.26

    Wet Soil + Container 23.24 23.2023.18

    21.08

    18

    Container 16.13 16.10 16.14

    Container no. 15 16 17

    15.97

    Moisture content 30X 44XDept / Boring no. 0.70 - 1.30 m/ BH. 01 0.70 - 1.30 m/ BH. 01

    42.69

    Average Moisture Content 45.21 42.65

    Moisture content 45.38 45.03 42.61

    4.99

    Moisture loss 2.26 2.22 2.19 2.13

    Dry Soil 4.98 4.93 5.14

    23.42

    Dry Soil + Container 20.84 21.36 20.93 21.29

    Wet Soil + Container 23.10 23.58 23.12

    14

    Container 15.86 16.43 15.79 16.30

    Container no. 11 12 13

    Moisture content 10X 20XDept / Boring no. 0.70 - 1.30 m/ BH. 01 0.70 - 1.30 m/ BH. 01

    Operator Lab Tulus, A.Md

    Test standart : ASTM D - 423 & ASTM D- 424 Analisator Ir. Suparman, MT.

    Boring No. : BH. 01 Depth : 1.30 m

    Location Operator Lap Ngatman

    ATTERBERG LIMIT

    Project Site Name

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project

    Location

    : BH. 01 Depth 1.30 m

    Test standart : ASTM D - 423 & ASTM D- 424 : Drs. Supardjo

    Liquid Limit, LL (%) = 41.00 Plastic Index, IP (%) = 19.21

    Plastic Limit,PL (%) = 21.79 Soil Classification = CL

    Boring No. Analisator : Ir. Suparman, MT.

    LIQUID AND PLASTIC LIMIT DETERMINATION

    ASTM D - 423 & ASTM D - 424

    : Check Dam Tinjomoyo Operator Lap : Ngatman

    : Tinjomoyo Lokasi 1, Semarang Operator Lab : Tulus S, A.Md.

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    10 100

    WA

    TE

    R C

    ON

    TE

    NT

    (%

    )

    NUMBER OF BLOWS

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo :

    : Tinjomoyo Lokasi 1, Semarang :

    :

    :

    :

    (g) C

    (g) A

    (g) B

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    (g) C

    (g) A

    (g) B

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    (g) C

    (g) A

    (g) B

    (g) B-C

    (g) A-B

    (%) w

    (%) wAverage Moisture Content 25.09

    Moisture loss 1.04 1.05

    Moisture content 25.12 25.06

    Dry Soil + Container 20.17 20.30

    Dry Soil 4.14 4.19

    Container 16.03 16.11

    Wet Soil + Container 21.21 21.35

    Dept / Boring no. 1.30 - 1.80 m/ BH. 02

    Container no. 29 30

    Average Moisture Content 60.15 58.59

    Plastic limit

    Moisture loss 2.73 2.72 2.64 2.68

    Moisture content 60.13 60.18 58.67 58.52

    Dry Soil + Container 20.39 20.38 20.67 20.40

    Dry Soil 4.54 4.52 4.50 4.58

    Container 15.85 15.86 16.17 15.82

    Wet Soil + Container 23.12 23.10 23.31 23.08

    Dept / Boring no. 1.30 - 1.80 m/ BH. 02 1.30 - 1.80 m/ BH. 02

    Container no. 25 26 27 28

    Average Moisture Content 64.05 61.86

    Moisture content 30X 45X

    Moisture loss 2.81 2.82 2.71 2.74

    Moisture content 64.16 63.95 61.73 61.99

    Dry Soil + Container 20.35 20.39 20.63 20.45

    Dry Soil 4.38 4.41 4.39 4.42

    Container 15.97 15.98 16.24 16.03

    Wet Soil + Container 23.16 23.21 23.34 23.19

    Dept / Boring no. 1.30 - 1.80 m/ BH. 02 1.30 - 1.80 m/ BH. 02

    Container no. 21 22 23 24

    Test standart : ASTM D - 423 & ASTM D- 424 Analisator Ir. Suparman, MT.

    Drs. Supardjo

    Moisture content 10X 19X

    Boring No. : BH. 02 Depth : 1.80 m Operator Lab Tulus, A.Md

    ATTERBERG LIMIT

    Project Site Name

    Location Operator Lap Ngatman

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project

    Location

    : BH. 02 Depth 1.80 m

    Test standart : ASTM D - 423 & ASTM D- 424 : Drs. Supardjo

    Liquid Limit, LL (%) = 60.50 Plastic Index, IP (%) = 35.41

    Plastic Limit,PL (%) = 25.09 Soil Classification = CH

    Boring No. Analisator : Ir. Suparman, MT.

    LIQUID AND PLASTIC LIMIT DETERMINATION

    ASTM D - 423 & ASTM D - 424

    : Check Dam Tinjomoyo Operator Lap : Ngatman

    : Tinjomoyo Lokasi 1, Semarang Operator Lab : Tulus S, A.Md.

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    10 100

    WA

    TE

    R C

    ON

    TE

    NT

    (%

    )

    NUMBER OF BLOWS

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo :

    : Tinjomoyo Lokasi 1, Semarang :

    :

    :

    :

    (g) C

    (g) A

    (g) B

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    (g) C

    (g) A

    (g) B

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    (g) C

    (g) A

    (g) B

    (g) B-C

    (g) A-B

    (%) w

    (%) w

    ATTERBERG LIMIT

    Project Site Name

    Location Operator Lap Ngatman

    Boring No. : BH. 02 Depth : 3.00 m Operator Lab Tulus, A.Md

    Test standart : ASTM D - 423 & ASTM D- 424 Analisator Ir. Suparman, MT.

    Drs. Supardjo

    Moisture content 13X 21XDept / Boring no. 2.80 - 3.00 m/ BH. 02 2.80 - 3.00 m/ BH. 02

    Container no. 31 32 33 34

    Container 16.07 16.04 16.06 15.97

    Wet Soil + Container 23.20 23.18 23.25 23.15

    Dry Soil + Container 20.14 20.11 20.22 20.12

    Dry Soil 4.07 4.07 4.16 4.15

    Moisture loss 3.06 3.07 3.03 3.03

    Moisture content 75.18 75.43 72.84 73.01

    Average Moisture Content 75.31 72.92

    Moisture content 31X 45XDept / Boring no. 2.80 - 3.00 m/ BH. 02 2.80 - 3.00 m/ BH. 02

    Container no. 35 36 37 38

    Container 16.02 15.94 16.12 15.80

    Wet Soil + Container 23.18 23.10 23.29 23.15

    Dry Soil + Container 20.21 20.13 20.35 20.13

    Dry Soil 4.19 4.19 4.23 4.33

    Moisture loss 2.97 2.97 2.94 3.02

    Moisture content 70.88 70.88 69.50 69.75

    Average Moisture Content 70.88 69.62

    Plastic limit

    21.04

    Dept / Boring no. 2.80 - 3.00 m/ BH. 02

    Container no. 39 40

    3.83

    Container 15.79 16.06

    Wet Soil + Container 20.93

    30.03

    Dry Soil + Container 19.75 19.89

    Dry Soil 3.96

    Average Moisture Content 29.91

    Moisture loss 1.18 1.15

    Moisture content 29.80

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project

    Location

    : BH. 02 Depth 3.00 m

    Test standart : ASTM D - 423 & ASTM D- 424 : Drs. Supardjo

    Liquid Limit, LL (%) = 60.50 Plastic Index, IP (%) = 30.59

    Plastic Limit,PL (%) = 29.91 Soil Classification = CH

    LIQUID AND PLASTIC LIMIT DETERMINATION

    ASTM D - 423 & ASTM D - 424

    : Check Dam Tinjomoyo Operator Lap : Ngatman

    : Tinjomoyo Lokasi 1, Semarang Operator Lab : Tulus S, A.Md.

    Boring No. Analisator : Ir. Suparman, MT.

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    10 100

    WA

    TE

    R C

    ON

    TE

    NT

    (%

    )

    NUMBER OF BLOWS

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo

    : Tinjomoyo Lokasi 1, Semarang

    : BH. 01 Depth : 1.40 - 1.80 m

    : Drs. Supardjo

    Keterangan :

    D 60 : 0.22 #DIV/0!

    D 30 : 0.0032

    D 10 : #DIV/0!

    Gravel : 19.04 %

    Sand : 26.35 % gravel, sand, clay and silt mixtures

    Silt : 27.73 %

    Clay : 26.89 % 0.714 Activiy :

    Textureral Classification :

    Coefficient of Curvature :

    Unformity Coefficient (Cu) :

    Project

    Location

    No. Boring

    Operator Lap. Test

    Operator Lab. Test

    Analysis

    Hydrometer Analysis and Sieve Analysis

    : -

    : Tulus Setiawan, A.Md.

    Standart Test : Ir. Suparman, MT.: ASTM D - 421 - 72, D - 422 - 72

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0.0010.0100.1001.00010.000100.000

    Pers

    en

    Lo

    los (

    %)

    Ukuran Butir , D (mm)

    Grafik Hubungan Persen Lolos vs Ukuran Butir

    Medium sand Fine Sand

    Gravel

    Silt

    Clay

    Coarse sand

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : BH. 01 Depth : 1.40 - 1.80 m

    Hydrometer Analysis

    Location : Tinjomoyo Lokasi 1, Semarang Operator Lab. Test

    Project : Check Dam Tinjomoyo Operator Lap. Test : -

    Standart Test : ASTM D - 421 - 72, D - 422 - 72 : Drs. Supardjo

    : Tulus Setiawan, A.Md.

    No. Boring Analysis : Ir. Suparman, MT.

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0.0010.0100.100

    Pers

    en

    Lo

    los (

    %)

    Ukuran Butir , D (mm)

    Grafik Hubungan Persen Lolos vs Ukuran Butir

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo

    Location : Tinjomoyo Lokasi 1, Semarang Operator Lap. Test

    Boring No. : BH. 01 Depth : 1.40 - 1.80 m Operator Lab. Test

    Standart Test : ASTM D - 421 - 72 Analysis

    Sample : 500 gr : Drs. Supardjo

    Discription :

    Saringan Tertahan % Tertahan Commulative Tertahan % Lolos

    (mm) (gr) (%) (%) (%)

    19 44.55 8.910 8.910 91.09

    9.5 15.65 3.130 12.040 87.96

    4.75 34.98 6.996 19.036 80.96

    2.36 22.49 4.498 23.534 76.47

    1.18 31.44 6.288 29.822 70.18

    0.6 18.48 3.696 33.518 66.48

    0.3 20.53 4.106 37.624 62.38

    0.15 21.96 4.392 42.016 57.98

    0.075 16.85 3.370 45.386 54.61

    : Ir. Suparman, MT.

    Prosentase lolos ayakan no. 200 (0,075 mm) Lebih besar 50 % ( Tanah berbutir halus )

    SIEVE ANALYSIS

    : Tulus Setiawan, A.Md.

    : -

    gravel, sand, clay and silt mixtures

    50

    60

    70

    80

    90

    100

    0.0100.1001.00010.000100.000

    Pers

    en

    Lo

    los

    (%

    )

    Ukuran Butir , D (mm)

    Grafik Hubungan Persen Lolos vs Ukuran Butir

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project :

    Location : Tinjomoyo Lokasi 1, Semarang : 50 gram

    No. Bor : BH. 01 : 28 C

    Depth : 1.40 - 1.80 m : 1.00

    Standart : ASTM D - 422 - 72 Zero Corerection (Fz) : 2.00

    Lab. Test : Tulus Setiawan, A.Md Temperature Correction (Ft) : 2.15

    Analysis : Ir. Suparman, MT. : 2.57

    : Drs. Supardjo

    Time Hydrometer Percent L A D Combination

    (min) Reading (R) finer(%) (cm) (mm) Percent finer

    1 2 3 4 5 6 7 8 9

    0.5 44.5 44.7 91.02 45.5 8.9 0.0127 0.0536 49.71

    1 42.5 42.7 86.94 43.5 9.2 0.0127 0.0385 47.48

    2 40 40.2 81.84 41 9.6 0.0127 0.0278 44.70

    4 37 37.2 75.73 38 10.1 0.0127 0.0202 41.36

    9 35 35.2 71.65 36 10.4 0.0127 0.0137 39.13

    16 33.5 33.7 68.59 34.5 10.6 0.0127 0.0103 37.46

    25 32 32.2 65.54 33 10.9 0.0127 0.0084 35.79

    36 31 31.2 63.50 32 11.1 0.0127 0.0071 34.68

    49 30.5 30.7 62.48 31.5 11.2 0.0127 0.0061 34.12

    60 30 30.2 61.46 31 11.2 0.0127 0.0055 33.57

    120 28 28.2 57.38 29 11.5 0.0127 0.0039 31.34

    240 26 26.2 53.31 27 11.9 0.0127 0.0028 29.11

    480 24 24.2 49.23 25 12.2 0.0127 0.0020 26.89

    1440 22.5 22.7 46.17 23.5 12.5 0.0127 0.0012 25.22

    : Check Dam Tinjomoyo

    Gambar Grafik Gabungan Hidrometer dan Analisa Ayak pada Lembar berikutnya

    Meniscus Correction (Fm)

    HIDROMETER ANALYSIS

    RcL

    Specific Gravity (Gs)

    ASTM 152 HHydrometer Type

    Berat Tanah Kering

    Temperature

    Rcp

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo

    : Tinjomoyo Lokasi 1, Semarang

    : BH. 02 Depth : 1.80 - 2.10 m

    : Drs. Supardjo

    Keterangan :

    D 60 : 0.0024 #DIV/0!

    D 30 :

    D 10 : #DIV/0!

    Gravel : 3.51 %

    Sand : 9.09 % gravelly sandy silty clays

    Silt : 29.58 %

    Clay : 57.81 % 0.612

    Coefficient of Curvature :

    Textureral Classification :

    Activiy :

    Unformity Coefficient (Cu) :

    Standart Test : ASTM D - 421 - 72, D - 422 - 72 Analysis : Ir. Suparman, MT.

    Location Operator Lap. Test : -

    No. Boring Operator Lab. Test : Tulus Setiawan, A.Md.

    Project

    Hydrometer Analysis and Sieve Analysis

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0.0010.0100.1001.00010.000100.000

    Pers

    en

    Lo

    los (

    %)

    Ukuran Butir , D (mm)

    Grafik Hubungan Persen Lolos vs Ukuran Butir

    Medium sand Fine Sand

    Gravel

    Silt

    Clay

    Coarse sand

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : BH. 02 Depth : 1.80 - 2.10 m

    Standart Test : ASTM D - 421 - 72, D - 422 - 72 : Drs. Supardjo

    Location : Tinjomoyo Lokasi 1, Semarang Operator Lab. Test : Tulus Setiawan, A.Md.

    No. Boring Analysis : Ir. Suparman, MT.

    Hydrometer Analysis

    Project : Check Dam Tinjomoyo Operator Lap. Test : -

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0.0010.0100.100

    Pers

    en

    Lo

    los (

    %)

    Ukuran Butir , D (mm)

    Grafik Hubungan Persen Lolos vs Ukuran Butir

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project

    Location Operator Lap. Test

    Boring No. : BH. 02 Depth : 1.80 - 2.10 m Operator Lab. Test

    Standart Test : ASTM D - 421 - 72 Analysis

    Sample : 500 gr : Drs. Supardjo

    Discription :

    Saringan Tertahan % Tertahan Commulative Tertahan % Lolos

    (mm) (gr) (%) (%) (%)

    19 0.00 0.000 0.000 100.00

    9.5 12.88 2.576 2.576 97.42

    4.75 4.67 0.934 3.510 96.49

    2.36 5.01 1.002 4.512 95.49

    1.18 8.38 1.676 6.188 93.81

    0.6 5.86 1.172 7.360 92.64

    0.3 8.46 1.692 9.052 90.95

    0.15 9.00 1.800 10.852 89.15

    0.075 8.75 1.750 12.602 87.40

    Prosentase lolos ayakan no. 200 (0,075 mm) Lebih besar 50 % ( Tanah berbutir halus )

    gravelly sandy silty clays

    : Tulus Setiawan, A.Md.

    : Ir. Suparman, MT.

    : Tinjomoyo Lokasi 1, Semarang : -

    SIEVE ANALYSIS

    : Check Dam Tinjomoyo

    85

    90

    95

    100

    0.0100.1001.00010.000100.000

    Pers

    en

    Lo

    los

    (%

    )

    Ukuran Butir , D (mm)

    Grafik Hubungan Persen Lolos vs Ukuran Butir

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project :

    Location : Tinjomoyo Lokasi 1, Semarang : 50 gram

    No. Bor : BH. 02 : 28 C

    Depth : 1.80 - 2.10 m : 1.00

    Standart : ASTM D - 422 - 72 Zero Corerection (Fz) : 2.00

    Lab. Test : Tulus Setiawan, A.Md Temperature Correction (Ft) : 2.15

    Analysis : Ir. Suparman, MT. : 2.66

    : Drs. Supardjo

    Time Hydrometer Percent L A D Combination

    (min) Reading (R) finer(%) (cm) (mm) Percent finer

    1 2 3 4 5 6 7 8 9

    0.5 48 48.2 96.08 49 8.3 0.0124 0.0505 83.97

    1 47 47.2 94.09 48 8.4 0.0124 0.0359 82.23

    2 45.5 45.7 91.09 46.5 8.7 0.0124 0.0259 79.61

    4 43.5 43.7 87.10 44.5 9.0 0.0124 0.0186 76.13

    9 42 42.2 84.11 43 9.2 0.0124 0.0125 73.51

    16 41 41.2 82.11 42 9.4 0.0124 0.0095 71.77

    25 40.5 40.7 81.12 41.5 9.5 0.0124 0.0076 70.89

    36 40 40.2 80.12 41 9.6 0.0124 0.0064 70.02

    49 39.5 39.7 79.12 40.5 9.7 0.0124 0.0055 69.15

    60 39 39.2 78.12 40 9.7 0.0124 0.0050 68.28

    120 37 37.2 74.13 38 10.1 0.0124 0.0036 64.79

    240 35 35.2 70.14 36 10.4 0.0124 0.0026 61.30

    480 33 33.2 66.15 34 10.7 0.0124 0.0019 57.81

    1440 30.5 30.7 61.16 31.5 11.2 0.0124 0.0011 53.45

    Rcp RcL

    Gambar Grafik Gabungan Hidrometer dan Analisa Ayak pada Lembar berikutnya

    Specific Gravity (Gs)

    Temperature

    Meniscus Correction (Fm)

    Berat Tanah Kering

    HIDROMETER ANALYSIS

    : Check Dam Tinjomoyo Hydrometer Type ASTM 152 H

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo

    : Tinjomoyo Lokasi 1, Semarang

    : BH. 02 Depth : 3.20 - 3.50 m

    : Drs. Supardjo

    Keterangan :

    D 60 : 0.0012 #DIV/0!

    D 30 :

    D 10 : #DIV/0!

    Gravel : 1.37 %

    Sand : 4.94 % gravelly sandy silty clays

    Silt : 28.31 %

    Clay : 65.38 % 0.468

    Hydrometer Analysis and Sieve Analysis

    Project

    Location Operator Lap. Test : -

    No. Boring Operator Lab. Test : Tulus Setiawan, A.Md.

    Standart Test : ASTM D - 421 - 72, D - 422 - 72 Analysis : Ir. Suparman, MT.

    Unformity Coefficient (Cu) :

    Coefficient of Curvature :

    Textureral Classification :

    Activiy :

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0.0010.0100.1001.00010.000100.000

    Pers

    en

    Lo

    los (

    %)

    Ukuran Butir , D (mm)

    Grafik Hubungan Persen Lolos vs Ukuran Butir

    Medium sand Fine Sand

    Gravel

    Silt

    Clay

    Coarse sand

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : BH. 02 Depth : 3.20 - 3.50 m

    Hydrometer Analysis

    Project : Check Dam Tinjomoyo Operator Lap. Test : -

    Location : Tinjomoyo Lokasi 1, Semarang Operator Lab. Test : Tulus Setiawan, A.Md.

    No. Boring Analysis : Ir. Suparman, MT.

    Standart Test : ASTM D - 421 - 72, D - 422 - 72 : Drs. Supardjo

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0.0010.0100.100

    Pers

    en

    Lo

    los (

    %)

    Ukuran Butir , D (mm)

    Grafik Hubungan Persen Lolos vs Ukuran Butir

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project

    Location Operator Lap. Test

    Boring No. : BH. 02 Depth : 3.20 - 3.50 m Operator Lab. Test

    Standart Test : ASTM D - 421 - 72 Analysis

    Sample : 500 gr : Drs. Supardjo

    Discription :

    Saringan Tertahan % Tertahan Commulative Tertahan % Lolos

    (mm) (gr) (%) (%) (%)

    19 0.00 0.000 0.000 100.00

    9.5 3.28 0.656 0.656 99.34

    4.75 3.58 0.716 1.372 98.63

    2.36 4.33 0.866 2.238 97.76

    1.18 8.06 1.612 3.850 96.15

    0.6 3.82 0.764 4.614 95.39

    0.3 3.38 0.676 5.290 94.71

    0.15 2.62 0.524 5.814 94.19

    0.075 2.47 0.494 6.308 93.69

    SIEVE ANALYSIS

    : Check Dam Tinjomoyo

    : Tinjomoyo Lokasi 1, Semarang : -

    : Tulus Setiawan, A.Md.

    : Ir. Suparman, MT.

    gravelly sandy silty clays

    Prosentase lolos ayakan no. 200 (0,075 mm) Lebih besar 50 % ( Tanah berbutir halus )

    90

    92

    94

    96

    98

    100

    0.0100.1001.00010.000100.000

    Pers

    en

    Lo

    los

    (%

    )

    Ukuran Butir , D (mm)

    Grafik Hubungan Persen Lolos vs Ukuran Butir

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project :

    Location : Tinjomoyo Lokasi 1, Semarang : 50 gram

    No. Bor : BH. 02 : 28 C

    Depth : 3.20 - 3.50 m : 1.00

    Standart : ASTM D - 422 - 72 Zero Corerection (Fz) : 2.00

    Lab. Test : Tulus Setiawan, A.Md Temperature Correction (Ft) : 2.15

    Analysis : Ir. Suparman, MT. : 2.62

    : Drs. Supardjo

    Time Hydrometer Percent L A D Combination

    (min) Reading (R) finer(%) (cm) (mm) Percent finer

    1 2 3 4 5 6 7 8 9

    0.5 44.5 44.7 89.92 45.5 8.9 0.0126 0.0532 84.25

    1 44.5 44.7 89.92 45.5 8.9 0.0126 0.0376 84.25

    2 44 44.2 88.92 45 8.9 0.0126 0.0266 83.31

    4 43.5 43.7 87.91 44.5 9.0 0.0126 0.0189 82.36

    9 43 43.2 86.90 44 9.1 0.0126 0.0127 81.42

    16 42.5 42.7 85.90 43.5 9.2 0.0126 0.0096 80.48

    25 42 42.2 84.89 43 9.2 0.0126 0.0076 79.53

    36 41.5 41.7 83.88 42.5 9.3 0.0126 0.0064 78.59

    49 41 41.2 82.88 42 9.4 0.0126 0.0055 77.65

    60 40.5 40.7 81.87 41.5 9.5 0.0126 0.0050 76.70

    120 39 39.2 78.85 40 9.7 0.0126 0.0036 73.87

    240 37 37.2 74.82 38 10.2 0.0126 0.0026 70.10

    480 34.5 34.7 69.78 35.5 10.5 0.0126 0.0019 65.38

    1440 32 32.2 64.75 33 10.9 0.0126 0.0011 60.66

    HIDROMETER ANALYSIS

    : Check Dam Tinjomoyo Hydrometer Type ASTM 152 H

    Berat Tanah Kering

    Temperature

    Meniscus Correction (Fm)

    Specific Gravity (Gs)

    Rcp RcL

    Gambar Grafik Gabungan Hidrometer dan Analisa Ayak pada Lembar berikutnya

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo : 6.5 cm

    Location : Tinjomoyo Lokasi 1, Semarang : 2 cm

    No. Boring : BH. 01 : 94.26 gr

    Depth : 1.40 - 1.80 m : 27.40 %

    : 26.68 %

    : 1.11 cm

    : 2.57

    Pressure Final dial Change in Final Height Final Average height Fitting time Cv from Average

    p Reading Specimen Specimen of Void void during (mnt) Cv from

    Height Height(Ht) (Hv) ratio consolidation, Ht(av) m^2/year m^2/year

    (kg/cm2) (cm) (cm) (cm) (cm) (mm) t90

    1 2 3 4 5 6 7 8 9 10

    0.00 0 2 0.89414562 0.809

    0.058 19.713 6.25 6.963

    0.25 0.0575 1.943 0.83664562 0.757

    0.022 19.315 3.61 11.574

    0.50 0.0795 1.9205 0.81464562 0.737

    0.039 19.010 4.84 8.363

    1.00 0.1185 1.8815 0.77564562 0.701

    0.048 18.575 3.61 10.705

    2.00 0.1665 1.8335 0.72764562 0.658

    0.069 17.993 7.84 4.625

    4.00 0.235 1.765 0.65914562 0.596

    0.068 17.310 14.44 2.324

    8.00 0.303 1.697 0.59114562 0.535

    CONSOLIDATION TEST

    7.426

    Moisture content beginning

    Moisture content End of test

    Height of Solids (Hs)

    Gs

    Specimen diameter

    Initial Specimen Height

    Weight of Dry Specimen

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Operator Lab. : Tulus Setiawan, A Md.

    Location : Tinjomoyo Lokasi 1, Semarang Analysis :

    No. Boring : BH. 01 : Drs. Supardjo

    Depth : 1.40 - 1.80 m Comp. Index Cc : 0.204

    CONSOLIDATION TEST

    Ir. Suparman, MT.

    0.500

    0.600

    0.700

    0.800

    0.1 1.0 10.0 100.0

    Fin

    al

    vo

    id r

    ati

    o (

    e)

    Log P (kg/cm2)

    Plot of Void Ratio and Pressure

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Operator Lap : Ngatman

    Location : Tinjomoyo Lokasi 1, Semarang Operator Lab : Tulus Setiawan, A.Md.

    No. Boring : BH. 01 Analisator : Ir. Suparman, MT.

    Depth : 1.40 - 1.80 m : Drs. Supardjo

    0.25 0.5 1 2 4 8

    0 0.00 0 0.0575 0.0795 0.1185 0.1665 0.235

    0.25 0.50 0.04 0.065 0.093 0.137 0.1885 0.251

    1 1.00 0.0445 0.068 0.097 0.1415 0.1935 0.255

    2.25 1.50 0.047 0.07 0.1 0.144 0.198 0.258

    4 2.00 0.049 0.071 0.102 0.146 0.201 0.261

    6.25 2.50 0.0505 0.072 0.1035 0.1475 0.204 0.2635

    9 3.00 0.0515 0.0725 0.105 0.149 0.206 0.266

    12.25 3.50 0.052 0.073 0.106 0.15 0.208 0.268

    16 4.00 0.0525 0.0735 0.107 0.151 0.21 0.27

    25 5.00 0.054 0.075 0.109 0.1535 0.214 0.274

    36 6.00 0.0545 0.0755 0.1105 0.1555 0.217 0.278

    49 7.00 0.055 0.076 0.112 0.157 0.22 0.2815

    64 8.00 0.0555 0.0765 0.113 0.1585 0.2225 0.285

    81 9.00 0.056 0.077 0.114 0.1595 0.225 0.288

    100 10.00 0.056 0.0775 0.1145 0.1605 0.227 0.291

    121 11.00 0.0565 0.078 0.115 0.1615 0.2285 0.293

    144 12.00 0.0565 0.0785 0.1155 0.1625 0.2295 0.295

    1440 37.95 0.0575 0.0795 0.1185 0.1665 0.235 0.303

    SQR TIME (menit)Time ( t ) Pressure ( kg/cm2)

    CONSOLIDATION TEST

    ( Time vs Vertical Dial Reading )

    Vertical Dial Reading (cm)

    Ket

  • 4.1

    4.715

    3.7

    4.255

    0

    0.01

    0.02

    0.03

    0.04

    0.05

    0.060 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 0,25

    0.055

    0.06

    0.065

    0.07

    0.075

    0.080 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode Beban 0,5

  • 4.8

    5.52

    5.4

    6.21

    0.07

    0.08

    0.09

    0.1

    0.11

    0.120 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Pe

    nu

    runa

    n (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode Beban 1

    0.11

    0.12

    0.13

    0.14

    0.15

    0.16

    0.170 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Pen

    uru

    nan

    (cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 2

  • 6.8

    7.82

    8.3

    9.545

    0.16

    0.17

    0.18

    0.19

    0.2

    0.21

    0.22

    0.23

    0.240 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 4

    0.23

    0.24

    0.25

    0.26

    0.27

    0.28

    0.29

    0.30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 8

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo : 6.5 cm

    Location : Tinjomoyo Lokasi 1, Semarang : 2 cm

    No. Boring : BH. 02 : 88.36 gr

    Depth : 1.80 - 2.10 m : 33.73 %

    : 30.05 %

    : 1.00 cm

    : 2.66

    Pressure Final dial Change in Final Height Final Average height Fitting time Cv from Average

    p Reading Specimen Specimen of Void void during (mnt) Cv from

    Height Height(Ht) (Hv) ratio consolidation, Ht(av) m^2/year m^2/year

    (kg/cm2) (cm) (cm) (cm) (cm) (mm) t90

    1 2 3 4 5 6 7 8 9 10

    0.00 0 2 0.99843832 0.997

    0.041 19.795 7.84 5.598

    0.25 0.041 1.959 0.95743832 0.956

    0.037 19.408 9.61 4.390

    0.50 0.0775 1.9225 0.92093832 0.920

    0.038 19.038 9.00 4.510

    1.00 0.115 1.885 0.88343832 0.882

    0.045 18.625 14.44 2.691

    2.00 0.16 1.84 0.83843832 0.837

    0.054 18.130 12.96 2.841

    4.00 0.214 1.786 0.78443832 0.783

    0.060 17.563 19.36 1.784

    8.00 0.2735 1.7265 0.72493832 0.724

    Height of Solids (Hs)

    Gs

    3.636

    CONSOLIDATION TEST

    Specimen diameter

    Initial Specimen Height

    Weight of Dry Specimen

    Moisture content beginning

    Moisture content End of test

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Operator Lab. : Tulus Setiawan, A Md.

    Location : Tinjomoyo Lokasi 1, Semarang Analysis :

    No. Boring : BH. 02 : Drs. Supardjo

    Depth : 1.80 - 2.10 m Comp. Index Cc : 0.197

    CONSOLIDATION TEST

    Ir. Suparman, MT.

    0.700

    0.800

    0.900

    1.000

    0.1 1.0 10.0 100.0

    Fin

    al

    vo

    id r

    ati

    o (

    e)

    Log P (kg/cm2)

    Plot of Void Ratio and Pressure

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Operator Lap : Ngatman

    Location : Tinjomoyo Lokasi 1, Semarang Operator Lab : Tulus Setiawan, A.Md.

    No. Boring : BH. 02 Analisator : Ir. Suparman, MT.

    Depth : 1.80 - 2.10 m : Drs. Supardjo

    0.25 0.5 1 2 4 8

    0 0.00 0 0.041 0.0775 0.115 0.16 0.214

    0.25 0.50 0.0275 0.0575 0.091 0.13 0.1715 0.225

    1 1.00 0.03 0.0605 0.0945 0.134 0.1765 0.229

    2.25 1.50 0.032 0.0625 0.0975 0.1375 0.181 0.233

    4 2.00 0.0335 0.064 0.1 0.14 0.185 0.2365

    6.25 2.50 0.0345 0.0655 0.102 0.1425 0.189 0.2395

    9 3.00 0.0355 0.067 0.1035 0.145 0.192 0.2425

    12.25 3.50 0.036 0.068 0.105 0.1465 0.1945 0.2455

    16 4.00 0.0365 0.069 0.106 0.148 0.1965 0.248

    25 5.00 0.0375 0.07 0.108 0.151 0.201 0.253

    36 6.00 0.038 0.071 0.1095 0.1525 0.204 0.257

    49 7.00 0.0385 0.072 0.1105 0.1535 0.2065 0.26

    64 8.00 0.039 0.073 0.111 0.1545 0.208 0.2625

    81 9.00 0.0395 0.074 0.1115 0.1555 0.209 0.265

    100 10.00 0.0395 0.075 0.112 0.156 0.21 0.2665

    121 11.00 0.04 0.076 0.1125 0.1565 0.2105 0.2675

    144 12.00 0.04 0.0765 0.1125 0.157 0.211 0.268

    1440 37.95 0.041 0.0775 0.115 0.16 0.214 0.2735

    CONSOLIDATION TEST

    ( Time vs Vertical Dial Reading )

    Time ( t ) SQR TIME (menit)

    Vertical Dial Reading (cm)

    KetPressure ( kg/cm2)

  • 6.3

    7.245

    6

    6.9

    0

    0.01

    0.02

    0.03

    0.04

    0.050 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 0,25

    0.04

    0.05

    0.06

    0.07

    0.080 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode Beban 0,5

  • 5.8

    6.67

    5

    5.75

    0.07

    0.08

    0.09

    0.1

    0.11

    0.120 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Pe

    nu

    runa

    n (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode Beban 1

    0.11

    0.12

    0.13

    0.14

    0.15

    0.160 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Pen

    uru

    nan

    (cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 2

  • 66.9

    8

    9.2

    0.16

    0.17

    0.18

    0.19

    0.2

    0.21

    0.220 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 4

    0.21

    0.22

    0.23

    0.24

    0.25

    0.26

    0.27

    0.280 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 8

  • LABORATORIUM MEKANIKA TANAH

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo : 6.5 cm

    Location : Tinjomoyo Lokasi 1, Semarang : 2 cm

    No. Boring : BH. 02 : 84.49 gr

    Depth : 3.20 - 3.50 m : 39.29 %

    : 38.25 %

    : 0.97 cm

    : 2.62

    Pressure Final dial Change in Final Height Final Average height Fitting time Cv from Average

    p Reading Specimen Specimen of Void void during (mnt) Cv from

    Height Height(Ht) (Hv) ratio consolidation, Ht(av) m^2/year m^2/year

    (kg/cm2) (cm) (cm) (cm) (cm) (mm) t90

    1 2 3 4 5 6 7 8 9 10

    0.00 0 2 1.02768352 1.057

    0.030 19.853 4.84 9.120

    0.25 0.0295 1.971 0.99818352 1.027

    0.028 19.568 3.24 13.236

    0.50 0.057 1.943 0.97068352 0.998

    0.033 19.265 5.76 7.217

    1.00 0.09 1.91 0.93768352 0.964

    0.038 18.910 4.00 10.012

    2.00 0.128 1.872 0.89968352 0.925

    0.048 18.483 4.00 9.565

    4.00 0.1755 1.8245 0.85218352 0.876

    0.057 17.963 3.61 10.010

    8.00 0.232 1.768 0.79568352 0.818

    Height of Solids (Hs)

    Gs

    9.860

    CONSOLIDATION TEST

    Specimen diameter

    Initial Specimen Height

    Weight of Dry Specimen

    Moisture content beginning

    Moisture content End of test

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Operator Lab. : Tulus Setiawan, A Md.

    Location : Tinjomoyo Lokasi 1, Semarang Analysis :

    No. Boring : BH. 02 : Drs. Supardjo

    Depth : 3.20 - 3.50 m Comp. Index Cc : 0.193

    CONSOLIDATION TEST

    Ir. Suparman, MT.

    0.700

    0.800

    0.900

    1.000

    1.100

    0.1 1.0 10.0 100.0

    Fin

    al

    vo

    id r

    ati

    o (

    e)

    Log P (kg/cm2)

    Plot of Void Ratio and Pressure

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    Project : Check Dam Tinjomoyo Operator Lap : Ngatman

    Location : Tinjomoyo Lokasi 1, Semarang Operator Lab : Tulus Setiawan, A.Md.

    No. Boring : BH. 02 Analisator : Ir. Suparman, MT.

    Depth : 3.20 - 3.50 m : Drs. Supardjo

    0.25 0.5 1 2 4 8

    0 0.00 0 0.0295 0.057 0.09 0.128 0.1755

    0.25 0.50 0.0185 0.041 0.071 0.1045 0.147 0.196

    1 1.00 0.021 0.044 0.0745 0.109 0.152 0.202

    2.25 1.50 0.0225 0.046 0.0765 0.1115 0.155 0.2055

    4 2.00 0.0235 0.0475 0.078 0.1135 0.1575 0.2085

    6.25 2.50 0.0245 0.049 0.0795 0.115 0.159 0.2105

    9 3.00 0.025 0.05 0.0805 0.1165 0.1605 0.2125

    12.25 3.50 0.0255 0.0505 0.0815 0.1175 0.1615 0.2145

    16 4.00 0.0255 0.051 0.082 0.1185 0.1625 0.216

    25 5.00 0.026 0.052 0.0835 0.12 0.1645 0.2185

    36 6.00 0.0265 0.053 0.0845 0.1215 0.166 0.2205

    49 7.00 0.027 0.0535 0.0855 0.1225 0.1675 0.222

    64 8.00 0.0275 0.054 0.086 0.1235 0.1685 0.2235

    81 9.00 0.0275 0.0545 0.0865 0.124 0.1695 0.2245

    100 10.00 0.028 0.0545 0.087 0.1245 0.17 0.225

    121 11.00 0.028 0.055 0.0875 0.125 0.1705 0.226

    144 12.00 0.0285 0.055 0.0875 0.1255 0.171 0.2265

    1440 37.95 0.0295 0.057 0.09 0.128 0.1755 0.232

    CONSOLIDATION TEST

    ( Time vs Vertical Dial Reading )

    Time ( t ) SQR TIME (menit)

    Vertical Dial Reading (cm)

    KetPressure ( kg/cm2)

  • 3.7

    4.255

    4.4

    5.06

    0

    0.005

    0.01

    0.015

    0.02

    0.025

    0.030 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 0,25

    0.02

    0.03

    0.04

    0.05

    0.060 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode Beban 0,5

  • 4.5

    5.175

    4.3

    4.945

    0.05

    0.06

    0.07

    0.08

    0.090 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Pe

    nu

    runa

    n (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode Beban 1

    0.09

    0.1

    0.11

    0.12

    0.130 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Pen

    uru

    nan

    (cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 2

  • 4.6

    5.29

    4.2

    4.83

    0.12

    0.13

    0.14

    0.15

    0.16

    0.17

    0.180 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 4

    0.17

    0.18

    0.19

    0.2

    0.21

    0.22

    0.230 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    Penuru

    nan (

    cm

    )

    Akar Waktu (menit)

    Penentuan t 90 dng Square-root-of-time methode

    Beban 8

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo Operator Lab : Tulus Setiawan, A.Md

    : Tinjomoyo Lokasi 1, Semarang Analisator : Ir. Suparman, MT.

    No. Boring : BH - 01 Depth : 1.40 - 1.80 m : Drs. Supardjo

    : ASTM D 2434 - 68

    Panjang sampel (L) : 2.00 cm

    Diameter tabung (D) : 6.35 cm

    Luas penampang (A) : 31.68 cm2

    Berat tabung : 820.54 gr

    Berat tabung + tanah sebelum uji : 933.72 gr

    Berat tabung + tanah setelah uji : 944.05 gr

    No. TestVolume air q

    (cm3)

    k =q.L/A.h.t (cm/det)

    1 8.00 1.38894E-06

    2 7.80 1.35422E-06

    3 15.80 1.37158E-06

    4 15.60 1.35422E-06

    1.36724E-06

    =k 20o

    C = k rata-rata x 0.814

    k rata-rata

    1.11293E-06 cm/det

    1.00

    2.00

    1.00

    302.00 101

    PERMEABILITY

    Proyek

    Lokasi

    Test standart

    Waktu uji t (jam) Suhu air T

    (oC)

    Beda tinggi h

    (cm)

    29

    28

    28

    101

    101

    101

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo Operator Lab : Tulus Setiawan, A.Md

    : Tinjomoyo Lokasi 1, Semarang Analisator : Ir. Suparman, MT.

    No. Boring : BH - 02 Depth : 1.80 - 2.10 m : Drs. Supardjo

    Panjang sampel (L) : 2.00 cm

    Diameter tabung (D) : 6.35 cm

    Luas penampang (A) : 31.68 cm2

    Berat tabung : 820.54 gr

    Berat tabung + tanah sebelum uji : 936.43 gr

    Berat tabung + tanah setelah uji : 938.93 gr

    No. TestVolume air q

    (cm3)

    k =q.L/A.h.t (cm/det)

    1 2.10 1.21532E-07

    2 2.00 1.15745E-07

    3 11.50 1.10922E-07

    1.16067E-07

    cm/det

    k rata-rata

    k 20o

    C = k rata-rata x 0.814 = 9.44783E-08

    3.00 30 101

    18.00 29 101

    Waktu uji t

    (jam)

    Suhu air T

    (oC)

    Beda tinggi h

    (cm)

    3.00 29 101

    PERMEABILITY

    Proyek

    Test standart : ASTM D 2434 - 68

  • LABORATORIUM MEKANIKA TANAHJURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI SEMARANG

    : Check Dam Tinjomoyo Operator Lab : Tulus Setiawan, A.Md

    : Tinjomoyo Lokasi 1, Semarang Analisator : Ir. Suparman, MT.

    No. Boring : BH - 02 Depth : 3.20 - 3.50 m : Drs. Supardjo

    Panjang sampel (L) : 2.00 cm

    Diameter tabung (D) : 6.35 cm

    Luas penampang (A) : 31.68 cm2

    Berat tabung : 820.54 gr

    Berat tabung + tanah sebelum uji : 936.43 gr

    Berat tabung + tanah setelah uji : 938.93 gr

    No. TestVolume air q

    (cm3)

    k =q.L/A.h.t (cm/det)

    1 0.25 1.08511E-08

    2 0.25 1.08511E-08

    3 0.90 9.766E-09

    1.04894E-08

    PERMEABILITY

    Proyek

    Test standart : ASTM D 2434 - 68

    Waktu uji t

    (jam)

    Suhu air T

    (oC)

    Beda tinggi h

    (cm)

    4.00 29 101

    4.00 30 101

    16.00 28 101

    k rata-rata

    k 20o

    C = k rata-rata x 0.814 = 8.53837E-09 cm/det

  • LAMPIRAN 4

    SITUASI TITIK TITIK & FOTO SONDIR

  • FOTO SONDIR 1 FOTO SONDIR 2

    FOTO BORING 1 FOTO BORING 2

    FOTO LOKASI CONE PENETROMETER TEST (CPT) / SONDIR DAN BORING PEKERJAAN DETAIL DESAIN CHECK DAM DAS GARANG

    CHECK DAM TINJOMOYO (LOKASI 1), GUNUNG PATI SEMARANG, JAWA TENGAH

  • LAMPIRAN 5

    SERTIFIKAT PROFESIONAL DAN KALIBRASI