ANALISA HARGA SATUAN BOWPEKERJAAN KAYUKODE ANALISA HARGA INDEK SAT URAIAN HARGA SATUAN (Rp) BAHAN ( Rp ) SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 2,00 M DICINCIN, DILANCIP DAN DITUMBUK UPAH ( Rp ) JUMLAH HARGA (Rp)

A. PEKERJAAN PONDASI KAYUA.1.BOW

0.0200 M3 0.5100 OH 0.8750 OH 0.0510 OH 0.0440 OH A.2

Balok ulin tukang kayu pekerja kepala tukang mandor

@ @ @ @ @

1,537,571.94 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH

30,751.44 28,050.00 39,375.00 3,060.00 2,640.00 30,751.44 73,125.00 103,876.44

SEBUAH TONGKAT ULIN UK.12/12 CM TINGGI 8,00 M

2 SAMBUNGAN DGN PIPA GALVANIS 0.0800 M3 0.5100 OH 0.8750 OH 0.0510 OH 0.0440 OH A.3 Balok ulin tukang kayu pekerja kepala tukang mandor @ @ @ @ @ 1,537,571.94 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAHSEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 4,00 M'

123,005.76 28,050.00 39,375.00 3,060.00 2,640.00 123,005.76 61,502.88 28,050.00 39,375.00 3,060.00 2,640.00 61,502.88 1,911,329.13 41,250.00 825,000.00 180,000.00 90,000.00 12,000.00 1,952,579.13 1,691,329.13 825,000.00 225,000.00 90,000.00 15,000.00 1,691,329.13 1,155,000.00 2,846,329.13 Hal : 496 1,107,000.00 3,059,579.13 73,125.00 134,627.88 73,125.00 196,130.76

0.0400 M3 0.5100 OH 0.8750 OH 0.0510 OH 0.0440 OH A. 4

Balok ulin tukang kayu pekerja kepala tukang mandor

@ @ @ @ @

1,537,571.94 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH

1 M3 MENGERJAKAN PAPAN SIRING KAYU ULIN 1.1000 M3 3.0000 kg 15.0000 OH 4.0000 OH 1.5000 OH 0.2000 OH papan siring kayu ulin paku ulin tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ 1,737,571.94 13,750.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH

A. 5

1 M3 RANGKA BAWAH KAYU ULIN ( tiang + kalang, sunduk ) 1.1000 M3 15.0000 OH 5.0000 OH 1.5000 OH 0.2500 OH balok ky ulin tukang kayu pekerja kepala tukang mandor @ @ @ @ @ 1,537,571.94 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH

ANALISA HARGA SATUAN BOWPEKERJAAN KAYUKODE ANALISA HARGA INDEK SAT URAIAN HARGA SATUAN (Rp) BAHAN ( Rp ) UPAH ( Rp ) JUMLAH HARGA (Rp)

B. PEKERJAAN LANTAI KAYU B. 1 1 M3 MENGERJAKAN SLOOF DAN GELAGAR KY ULIN 1.1000 M3 10.0000 Kg 15.0000 OH 5.0000 OH 1.5000 OH 0.2500 OH B. 2 balok ky ulin paku ulin tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ 1,537,571.94 13,750.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 1 M2 LANTAI PAPAN KAYU ULIN DIKETAM 0.0254 M3 0.2500 Kg 0.8000 OH 0.2800 OH 0.0800 OH 0.0140 OH B. 3 papan kayu ulin paku ulin tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ 1,737,571.94 13,750.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 1 M2 LANTAI PAPAN KAYU MERANTI DIKETAM 0.0254 M3 0.2500 Kg 0.8000 OH 0.2800 OH 0.0800 OH 0.0140 OH B. PEKERJAAN DINDING KAYU B. 4 1 M3 MENGERJAKAN RANGKA RUMAH KAYU ULIN (termasuk kusen) 1.1000 M3 5.0000 Kg 20.0000 OH 10.0000 OH 2.0000 OH 0.5000 OH balok ky ulin paku ulin tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ 1,537,571.94 13,750.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 1,760,079.13 1,691,329.13 68,750.00 1,100,000.00 450,000.00 120,000.00 30,000.00 1,700,000.00 3,460,079.13 Hal : 497 papan kayu meranti klas 1 paku biasa tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ 1,187,571.94 11,825.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 33,120.58 30,164.33 2,956.25 44,000.00 12,600.00 4,800.00 840.00 62,240.00 95,360.58 47,571.83 44,134.33 3,437.50 44,000.00 12,600.00 4,800.00 840.00 62,240.00 109,811.83 1,828,829.13 1,691,329.13 137,500.00 825,000.00 225,000.00 90,000.00 15,000.00 1,155,000.00 2,983,829.13

ANALISA HARGA SATUAN BOWKODE ANALISA HARGA INDEK SAT URAIAN HARGA SATUAN (Rp) BAHAN ( Rp ) 1 M3 MENGERJAKAN RANGKA RUMAH KAYU MERANTI (termasuk kusen) UPAH ( Rp ) JUMLAH HARGA (Rp)

B. 5

1.1000 M3 5.0000 Kg 20.0000 OH 10.0000 OH 2.0000 OH 0.5000 OH

balok ky meranti paku biasa tukang kayu pekerja kepala tukang mandor

@ @ @ @ @ @

1,037,571.94 11,825.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH

1,141,329.13 59,125.00 1,100,000.00 450,000.00 120,000.00 30,000.00 1,200,454.13 1,700,000.00 2,900,454.13

B. 6

1 M2 DINDING PAPAN ULIN DIKETAM 0.0240 M3 0.2000 Kg 0.8000 OH 0.2800 OH 0.0800 OH 0.0100 OH papan kayu ulin paku ulin tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ 1,737,571.94 13,750.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 44,451.73 41,701.73 2,750.00 44,000.00 12,600.00 4,800.00 600.00 62,000.00 106,451.73

B. 7

1 M2 DINDING PAPAN MERANTI DIKETAM 0.0240 M3 0.2000 Kg 0.8000 OH 0.2800 OH 0.0800 OH 0.0100 OH papan kayu meranti paku biasa tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ 1,187,571.94 11,825.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 30,866.73 28,501.73 2,365.00 44,000.00 12,600.00 4,800.00 600.00 62,000.00 92,866.73

B. 8

1 M2 DINDING SUSUN SIRIH PAPAN MERANTI 0.0250 M3 0.1500 Kg 0.4000 OH 0.1400 OH 0.0400 OH 0.0070 OH papan kayu meranti paku biasa tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ 1,187,571.94 11,825.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 31,463.05 29,689.30 1,773.75 22,000.00 6,300.00 2,400.00 420.00 31,120.00 62,583.05 Hal : 498

ANALISA HARGA SATUAN BOWKODE ANALISA HARGA INDEK SAT URAIAN HARGA SATUAN (Rp) BAHAN ( Rp ) UPAH ( Rp ) JUMLAH HARGA (Rp)

B. 9

1 M2 DINDING PAPAN MERANTI SUSUN SIRIH DIKETAM 0.0250 M3 0.2000 Kg 0.8000 OH 0.2800 OH 0.0800 OH 0.0100 OH papan kayu meranti paku biasa tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ 1,187,571.94 11,825.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 32,054.30 29,689.30 2,365.00 44,000.00 12,600.00 4,800.00 600.00 62,000.00 94,054.30

B. 10

1 M2 MENGERJAKAN DINDING PARTISI KAYU MERANTI DAN LAPISAN MULTIPLEK 9 MM 0.0210 M3 0.7000 LBR 0.0400 KG 0.0400 KG 0.0150 OH 0.8000 OH 0.0150 OH 0.0400 OH papan kayu meranti Multiplek 9 mm Paku biasa Paku plywood Tukang kayu Pekerja kepala tukang Mandor @ @ @ @ @ @ @ @ 1,187,571.94 150,000.00 11,825.00 20,000.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 131,212.01Penajam,

24,939.01 105,000.00 473.00 800.00 825.00 36,000.00 900.00 2,400.00 40,125.00 171,337.01 Hal : 499

Januari 2005

DAFTAR ONGKOS ANGKUT MATERIALBIDANG : CIPTA KARYA TAHUN : Juli 2006 NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 MATERIAL Balok Klas I Bangkirai Balok Klas I Ulin Balok Kayu Meranti Batu Gunung Kayu Klas 2 Kayu galam dia 10 - 12 cm Kerikil Beton / Split ( 2-3 cm ) Koral Papan Kayu Bangkirai Papan Kayu Ulin Papan Kayu kelas 2 Papan Kayu Meranti Pasir Beton Pasir Pasang sungai Pasir pasang putih Pasir Urug Sirtu Tanah Urug SAT m3 m3 m3 m3 m3 btg m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 HARGA MATERIAL 1,700,000.00 1,300,000.00 800,000.00 65,000.00 650,000.00 9,500.00 165,000.00 165,000.00 1,900,000.00 1,500,000.00 800,000.00 950,000.00 175,000.00 175,000.00 100,000.00 50,000.00 60,000.00 13,500.00 JARAK ANGKUT RATA-RATA 0 - 15ONGKOS ANGKUT

JARAK ANGKUT RATA-RATA 16 - 30ONGKOS ANGKUT

JARAK ANGKUT RATA-RATA 31 - 45ONGKOS ANGKUT

JARAK ANGKUT RATA-RATA 46 - 70ONGKOS ANGKUT

JUMLAH 1,823,950.58 1,423,950.58 923,950.58 100,945.67 773,950.58 133,450.58 200,945.67 200,945.67 2,023,950.58 1,623,950.58 923,950.58 1,073,950.58 210,945.67 210,945.67 135,945.67 85,945.67 95,945.67 48,639.99

JUMLAH 1,854,938.22 1,454,938.22 954,938.22 131,933.31 804,938.22 164,438.22 231,933.31 231,933.31 2,054,938.22 1,654,938.22 954,938.22 1,104,938.22 241,933.31 241,933.31 166,933.31 116,933.31 126,933.31 79,627.63

JUMLAH 1,885,925.86 1,485,925.86 985,925.86 162,920.96 835,925.86 195,425.86 262,920.96 262,920.96 2,085,925.86 1,685,925.86 985,925.86 1,135,925.86 272,920.96 272,920.96 197,920.96 147,920.96 157,920.96 110,615.28

JUMLAH 1,937,571.94 1,537,571.94 1,037,571.94 214,567.03 887,571.94 247,071.94 314,567.03 314,567.03 2,137,571.94 1,737,571.94 1,037,571.94 1,187,571.94 324,567.03 324,567.03 249,567.03 199,567.03 209,567.03 162,261.35

123,950.58 123,950.58 123,950.58 35,945.67 123,950.58 123,950.58 35,945.67 35,945.67 123,950.58 123,950.58 123,950.58 123,950.58 35,945.67 35,945.67 35,945.67 35,945.67 35,945.67 35,139.99

154,938.22 154,938.22 154,938.22 66,933.31 154,938.22 154,938.22 66,933.31 66,933.31 154,938.22 154,938.22 154,938.22 154,938.22 66,933.31 66,933.31 66,933.31 66,933.31 66,933.31 66,127.63

185,925.86 185,925.86 185,925.86 97,920.96 185,925.86 185,925.86 97,920.96 97,920.96 185,925.86 185,925.86 185,925.86 185,925.86 97,920.96 97,920.96 97,920.96 97,920.96 97,920.96 97,115.28

237,571.94 237,571.94 237,571.94 149,567.03 237,571.94 237,571.94 149,567.03 149,567.03 237,571.94 237,571.94 237,571.94 237,571.94 149,567.03 149,567.03 149,567.03 149,567.03 149,567.03 148,761.35

DAFTAR HARGA SATUAN UPAH DAN BAHANBIDANG TAHUN ANGGARAN NO1

: Cipta Karya : 2006 URAIAN2

SAT3

JUMLAH HARGA SATUAN4 = 6+5

BIAYA ANGKUT5

HARGA DASAR TANPA PAJAK6

KETERANGAN7

A

UPAH KERJA 1 Pekerja ( Buruh semi terlatih ) 2 Tukang Batu 3 Tukang Kayu 4 Tukang Besi 5 Tukang Cat 6 Kepala Tukang 7 Mandor 8 Sopir 9 Pembantu Sopir Hari Hari Hari Hari Hari Hari Hari Hari Hari 45,000.00 55,000.00 55,000.00 55,000.00 55,000.00 60,000.00 60,000.00 50,000.00 40,000.00 45,000.00 55,000.00 55,000.00 55,000.00 55,000.00 60,000.00 60,000.00 50,000.00 40,000.00

B

Harga Bahan 1 Aluminium foil single sided 2 Ampelas 3 Atap Asbes Gelombang Besar 4 Atap Genteng Kodok 5 Atap Metal Berkualitas ( 2 ssn, 8 daun ) 6 Atap Plastik gelombang 60 x 170 7 Atap Sirap 8 Atap Tilux 9 Bahan Plafond Asbes Semen 5 mm 10 Bahan Plafond eternit 4 mm 11 Bahan Plafond Hardplex 5 mm 120 x 130 12 Bahan Politur ( sirlak ) India 13 Bak Air Fiber (60 x 60 cm) 14 Bak Air Fiber (60 x 80 cm) 15 Bak Cuci Piring Stainles Lobang 1 16 Bak Cuci Piring Stainles Lobang 2 17 Bak Kontrol 50 x 50 x 40 cm 18 Bak air Traso Besar 19 Balok Klas I Bangkirai 20 Balok Klas I Ulin Roll Lbr Lbr Bh Lbr Lbr Ikat Bh M2 M2 Lbr Kg Bh Bh Bh Bh Bh Bh M3 M3 450,000.00 2,500.00 23,000.00 1,550.00 40,000.00 14,500.00 50,000.00 21,000.00 21,000.00 25,000.00 42,500.00 32,000.00 145,000.00 185,000.00 195,000.00 250,000.00 75,000.00 185,000.00 1,937,571.94 1,537,571.94 237,571.94 237,571.94 450,000.00 2,500.00 23,000.00 1,550.00 40,000.00 14,500.00 50,000.00 21,000.00 21,000.00 25,000.00 42,500.00 32,000.00 145,000.00 185,000.00 195,000.00 250,000.00 75,000.00 185,000.00 1,700,000.00 1,300,000.00 Jarak 46 - 70 Jarak 46 - 70isi 100 bh

T. A 2006

NO

URAIAN

SAT M3 Bh M2 Bh Kg M3 Bh Lt Kg Kg Kg Kg Unit Unit Bh Bh Bh Kg Kg Kg Kg Kg Bh Bh Bh Unit Bh Bh Bh Bh Kg Kg

JUMLAH HARGA SATUAN

BIAYA ANGKUT 237,571.94 149,567.03 -

HARGA DASAR TANPA PAJAK 800,000.00 1,500.00 120,000.00 550.00 15,125.00 65,000.00 2,000.00 4,500.00 11,000.00 16,000.00 11,000.00 18,000.00 150,000.00 250,000.00 20,000.00 364,000.00 450,000.00 15,400.00 25,000.00 22,500.00 35,000.00 13,000.00 120,000.00 125,000.00 80,000.00 1,200,000.00 250,000.00 200,000.00 350,000.00 60,000.00 25,000.00 12,500.00

KETERANGAN Jarak 46 - 70

21 Balok Kayu Meranti 22 Batako 23 Batu alam 24 Batu Bata 25 Batu apung 26 Batu Gunung 27 Baut 28 Bensin 29 Besi Beton Polos Dia 6 - 22 mm 30 Besi Beton Ulir Dia 6 - 22 mm 31 Besi penggantung plafond 32 Besi strip 33 Box MCB 2 group 34 Box MCB 4 group 35 Breaker 36 Buis Beton Dia 80 cm tanpa tulangan 39 Buis Beton Dia 100 cm tanpa tulangan 41 Cat Air / tembok 42 Cat besi 43 Cat Dasar / plamir 44 Cat Kilap / Kayu 45 Cat Menie kayu 46 Closed Jongkok Keramik berkualitas 47 Closed Jongkok Keramik Toto 48 Closed Jongkok Teraso 49 Closet Duduk Type Keramik Berkualitas 50 Daun Jendela Uk. Besar (Fabrikasi) Kc 5 mm 51 Daun Jendela Uk. Kecil (Fabrikasi) Kc 5 mm 52 Daun Pintu Plywood Bag. Dlm Lapis Aluminium Foil 53 Daun Ventilasi 54 Dempul Halus ( INFRA ) 55 Dempul kayuT. A 2006

1,037,571.94 1,500.00 120,000.00 550.00 15,125.00 214,567.03 2,000.00 4,500.00 11,000.00 16,000.00 11,000.00 18,000.00 150,000.00 250,000.00 20,000.00 364,000.00 450,000.00 15,400.00 25,000.00 22,500.00 35,000.00 13,000.00 120,000.00 125,000.00 80,000.00 1,200,000.00 250,000.00 200,000.00 350,000.00 60,000.00 25,000.00 12,500.00

Jarak 46 - 70

10.68 7022.47191 14513.10861

NO 56 Dempul Politur

URAIAN

SAT Kg Bh Bh Bh Bh Lbr Bh Bh Bh Bh Bh Lbr Bh Bh Bh Bh M' Rol Set M2 M2 M2 M2 Bh Kg Kg Kg m2 m2 m2 M3 Btg M2 M2

JUMLAH HARGA SATUAN

BIAYA ANGKUT -

HARGA DASAR TANPA PAJAK 12,500.00 20,000.00 25,000.00 125,000.00 17,500.00 75,000.00 8,500.00 18,500.00 7,500.00 12,500.00 25,000.00 45,000.00 8,000.00 5,000.00 16,500.00 425,000.00 15,000.00 155,000.00 150,000.00 32,000.00 48,000.00 80,000.00 95,000.00 325,000.00 10,000.00 27,500.00 11,000.00 37,500.00 10,000.00 5,000.00 650,000.00 9,500.00 35,000.00 44,000.00

KETERANGAN

12,500.00 20,000.00 25,000.00 125,000.00 17,500.00 75,000.00 8,500.00 18,500.00 7,500.00 12,500.00 25,000.00 45,000.00 8,000.00 5,000.00 16,500.00 425,000.00 15,000.00 155,000.00 150,000.00 32,000.00 48,000.00 80,000.00 95,000.00 325,000.00 10,000.00 27,500.00 11,000.00 37,500.00 10,000.00 5,000.00 650,000.00 9,500.00 35,000.00 44,000.00

57 Engsel Jendela Lokal 3 " 58 Engsel Pintu Lokal 5 " 59 Espagnolet 60 Floor Drain 61 Formika Ukuran Pintu 62 Genteng keramik 63 Glass block 64 Grendel Jendela 65 Grendel Pintu 66 Grendel tanam Pintu 67 Gypsum board, t = 9 mm 68 Hak Angin 69 Handle Jendela putih 70 Handle Pintu 71 Jalusi Atap 72 Jalusi Kayu Bangkirai 73 Kabel NGA 2,5 74 Kaca Naco ( kerangka/daun ) 5 mm 75 Kaca polos 2 mm 76 Kaca polos 3 mm 77 Kaca polos 5 mm 78 Kaca Rayben 5 mm 79 Kanopi Atap 80 Kawat Bendrat / Beton 81 Kawat Bronjong 82 Kawat Duri 83 Kawat Harmonika 84 Kawat nyamuk besi 85 Kawat nyamuk plastik 86 Kayu Klas 2 87 Kayu galam dia 10 - 12 cm 88 Keramik 10 x 20 cm 89 Keramik 20 x 25 cmT. A 2006

16,000.00

NO

URAIAN

SAT M2 M2 M2 M2 M' M3 M3 Bh Bh Bh Bh Bh Bh Bh

JUMLAH HARGA SATUAN

BIAYA ANGKUT 149,567.03 149,567.03 -

HARGA DASAR TANPA PAJAK 44,000.00 37,000.00 41,000.00 49,500.00 5,500.00 165,000.00 165,000.00 25,000.00 20,000.00 7,500.00 150,000.00 350,000.00 750,000.00 125,000.00

KETERANGAN

90 Keramik 20 x 20 cm 91 Keramik 30 x 30 cm Halus 92 Keramik 30 x 30 cm Kasar 93 Keramik 40 x 40 anti slip 94 Karet Talang 95 Kerikil Beton / Split ( ukuran 2-3 cm ) 96 Koral 97 Kran Air Dia 1" 98 Kran Air Dia 3/4 99 Kuas 3 " 100 Kunci Pintu 2 Slag berkualitas 101 Kunci Pintu Double Ex Cisa 102 Kunci Pintu Double Lengkap Dgn Accecories 103 Kunci Pintu Tanam antik 104 Kusen aluminium 1 105 Kusen aluminium 2 106 Kusen aluminium 3 107 Lampu 2 - TL 40 Watt Double + Instalasi 108 Lampu Merkury 250 wt 109 Lampu Pijar 10 Watt 110 Lampu Pijar 100 Watt 111 Lampu Pijar 15 Watt 112 Lampu Pijar 25 Watt 113 Lampu Pijar 40 Watt 114 Lampu Pijar 5 Watt 115 Lampu Pijar 60 Watt 116 Lampu Philip SL 20 Watt + Fitting 117 Lampu TL Philip + Fitting 20 Watt 118 Lampu TL 20 Watt Double (Trafo) 119 Lampu TL 40 Watt (Trafo) 120 Lampu TL 40 Watt Double (Trafo) 121 Lem Kayu ( Fox )T. A 2006

44,000.00 37,000.00 41,000.00 49,500.00 5,500.00 314,567.03 314,567.03 25,000.00 20,000.00 7,500.00 150,000.00 350,000.00 750,000.00 125,000.00 -

Jarak 46 - 70 Jarak 46 - 70

Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Ltr

150,000.00 165,000.00 3,500.00 15,000.00 3,850.00 4,500.00 10,000.00 3,500.00 5,500.00 50,000.00 37,000.00 125,000.00 85,000.00 160,000.00 9,500.00

150,000.00 165,000.00 3,500.00 15,000.00 3,850.00 4,500.00 10,000.00 3,500.00 5,500.00 50,000.00 37,000.00 125,000.00 85,000.00 160,000.00 9,500.00

NO 122 Lem Paralon

URAIAN

SAT Bh M' M' M' M' M' M' M' Bh Bh Bh Bh Bh m2 Ltr Ltr Lbr Lbr Lbr Lbr Lbr Lbr Bh Bh M' Bh Kg Ltr M' M' Kg Bh Kg Kg Kg

JUMLAH HARGA SATUAN

BIAYA ANGKUT -

HARGA DASAR TANPA PAJAK 5,000.00 15,000.00 30,000.00 1,500.00 4,250.00 3,750.00 37,692.62 31,250.00 3,500.00 2,000.00 5,000.00 6,500.00 11,000.00 12,500.00 5,000.00 67,000.00 100,000.00 150,000.00 250,000.00 300,000.00 200,000.00 2,000.00 19,500.00 35,000.00 18,000.00 15,000.00 24,750.00 297,916.67 343,750.00 16,000.00 250.00 25,000.00 27,500.00 11,825.00

KETERANGAN

5,000.00 15,000.00 30,000.00 1,500.00 4,250.00 3,750.00 37,692.62 31,250.00 3,500.00 2,000.00 5,000.00 6,500.00 11,000.00 12,500.00 5,000.00 67,000.00 100,000.00 150,000.00 250,000.00 300,000.00 200,000.00 2,000.00 19,500.00 35,000.00 18,000.00 15,000.00 24,750.00 297,916.67 343,750.00 16,000.00 250.00 25,000.00 27,500.00 11,825.00

123 List Cornice Gypsum 124 List Plafond Gypsum 125 List Plafond Plywood 126 List Profil Sudut 3/5 Ky Bangkirai 127 List Profil Sudut 3/5 Ky Meranti 128 Listplank kayu ukir 129 List plafond gypsum 130 Macam2 Sambungan PVC AW Dia 1 " 131 Macam2 Sambungan PVC AW Dia 1/2 " 132 Macam2 Sambungan PVC AW Dia 2 " 133 Macam2 Sambungan PVC AW Dia 3/4 " 134 Macam2 Sambungan PVC AW Dia 4 " 135 Marmer lokal 136 Minyak cat 137 Minyak bekisting 138 Multiplek 4 mm 139 Multiplek 6 mm 140 Multiplek 9 mm 141 Multiplek 15 mm 142 Multiplek 18 mm 143 Multiplex 12 mm 144 Nok Genteng Kodok 145 Nok Genteng keramik 146 Nok Model U ukuran 110 x 5 x 6 cm 147 Nok Model U Verza Roof 40 x 12 cm 148 Oker 149 Oli / pelumas 150 Pagar besi motif BRC 1,2 x 2,4 m' 151 Pagar besi motif BRC 1,75 x 2,4 m' 152 Paku Asbes + Karet 153 Paku Beton 154 Paku bor 155 Paku Genteng metal 156 Paku Kayu / biasaT. A 2006

32,692.62 5,000.00

66,666.67 100,000.00 16,666.67 250,000.00 300,000.00 200,000.00

NO 157 Paku Keling 158 Paku Seng 159 Paku Ulin 160 Paku Plywood 161 Paku Sekrup

URAIAN

SAT Kg Kg Kg Kg Kg M3 M3 M3 M3 Bh M' Unit Unit M3 M3 M3 M3 bh m2 unit Bh Bh Bh Bh Bh Bh Bh Bh M' M' M' M' Btg Btg Btg

JUMLAH HARGA SATUAN

BIAYA ANGKUT 237,571.94 237,571.94 237,571.94 237,571.94 149,567.03 149,567.03 149,567.03 149,567.03 -

HARGA DASAR TANPA PAJAK 25,000.00 14,300.00 13,750.00 20,000.00 14,300.00 1,900,000.00 1,500,000.00 800,000.00 950,000.00 350,000.00 26,900.00 375,000.00 450,000.00 175,000.00 175,000.00 100,000.00 50,000.00 2,000.00 75,000.00 5,500,000.00 700,000.00 250,000.00 425,000.00 350,000.00 350,000.00 300,000.00 335,000.00 200,000.00 15,000.00 30,000.00 93,000.00 110,000.00 25,000.00 12,500.00 45,000.00

KETERANGAN

25,000.00 14,300.00 13,750.00 20,000.00 14,300.00 2,137,571.94 1,737,571.94 1,037,571.94 1,187,571.94 350,000.00 26,900.00 375,000.00 450,000.00 324,567.03 324,567.03 249,567.03 199,567.03 2,000.00 75,000.00 5,500,000.00 700,000.00 250,000.00 425,000.00 350,000.00 350,000.00 300,000.00 335,000.00 200,000.00 15,000.00 30,000.00 93,000.00 110,000.00 25,000.00 12,500.00 45,000.00

162 Papan Kayu Bangkirai 163 Papan Kayu Ulin 164 Papan Kayu kelas 2 165 Papan Kayu Meranti 166 Papan Nama Proyek 167 Papan Reuter Bengkirai 168 Pas. Lampu Baret + Instalasi 169 Pas. Lampu Gantung 170 Pasir Beton 171 Pasir Pasang sungai 172 Pasir pasang putih 173 Pasir Urug 174 Paving blok biasa 175 Paving block K - 127 176 Penangkal Petir + Instalasi 177 Pintu Panel Double ky Bangkirai 178 Pintu Double Plywood 179 Pintu Panel ky Bangkirai Uk. Besar L 80 cm 180 Pintu Panel ky Bangkirai Uk. Kecil L 70 cm 181 Pintu Panel kayu Ulin Ukuran Besar L 80 cm 182 Pintu Panel kayu Ulin Ukuran Kecil L 70 cm 183 Pintu Panel Lapis Formika (Fabrikasi) 184 Pintu Skat 185 Pipa Galvanis AW Dia 1 " 186 Pipa Galvanis AW Dia 2 " 187 Pipa Galvanis AW Dia 3 " 188 Pipa Galvanis AW Dia 4 " 189 Pipa PVC AW Dia 1 " 190 Pipa PVC AW Dia 1/2 " 191 Pipa PVC AW Dia 2 "T. A 2006

Jarak 46 - 70 Jarak 46 - 70 Jarak 46 - 70 Jarak 46 - 70

Jarak 46 - 70 Jarak 46 - 70 Jarak 46 - 70 Jarak 46 - 70

4 m' / btg 4 m' / btg 4 m' / btg

NO

URAIAN

SAT Btg Btg M' M' Bh Kg Kg Bh Bh Lbr Lbr Lbr Lbr Lbr Lbr Bh M' Bh Bh Bh Bh M2 Bh Bh Unit Zak Kg Kg Lbr Lbr Unit Unit

JUMLAH HARGA SATUAN

BIAYA ANGKUT -

HARGA DASAR TANPA PAJAK 15,000.00 85,000.00 30,250.00 37,812.00 6,000.00 28,000.00 8,500.00 3,500.00 12,500.00 46,000.00 61,500.00 92,000.00 184,000.00 230,000.00 276,000.00 2,500.00 60,000.00 20,000.00 3,000.00 4,000.00 60,000.00 25,000.00 19,250.00 16,500.00 100,000.00 43,000.00 1,600.00 1,200.00 30,000.00 35,000.00 4,550,000.00 1,650,000.00

KETERANGAN 4 m' / btg 4 m' / btg

192 Pipa PVC AW Dia 3/4 " 193 Pipa PVC AW Dia 4 " 194 Pipa stainless steel 2 " 195 Pipa stainless steel 3 " 196 Pitting 197 Plamir 198 Plitur 199 Plint / list lantai keramik 200 Plint marmer 10 x 40 cm 201 Plywood 3 mm 202 Plywood 4 mm 203 Plywood 6 mm 204 Plywood 12 mm 205 Plywood 15 mm 206 Plywood 18 mm 207 Porselen 20 x 20 cm 208 Polycarbonat 209 Rangka besi hollow 210 Rol Cat Tembok 211 Rolling door 212 Roster beton 20 x 20 cm 213 Roster beton 20 x 30 cm 214 Roster kayu bangkirai 20 x 20 cm 215 Rumput Hias 216 Saklar Ganda 217 Saklar Tunggal 218 Sekering Kas 3 Group + Instalasi 219 Semen Abu - Abu / PC ( 50 kg/Zak ) 220 Semen Warna 221 Semen putih 222 Seng gelombang Besar / kecil 223 Seng Plat 224 Septictank ( 3 x 1,5 )+Resapan (1,5 x 1,5 ) 225 Septictank KayuT. A 2006

15,000.00 85,000.00 30,250.00 37,812.00 6,000.00 28,000.00 8,500.00 3,500.00 12,500.00 46,000.00 61,500.00 92,000.00 184,000.00 230,000.00 276,000.00 2,500.00 60,000.00 20,000.00 3,000.00 4,000.00 60,000.00 25,000.00 19,250.00 16,500.00 100,000.00 43,000.00 1,600.00 1,200.00 30,000.00 35,000.00 4,550,000.00 1,650,000.00

15,333.33 61,333.33 92,000.00 184,000.00 230,000.00 276,000.00

NO 226 Sirlak 227 Sirtu 228 Solar 229 Spritus 230 Stop Kontak

URAIAN

SAT Kg m3 Ltr Ltr Bh M' Wt M3 Unit Unit Bh Bh Bh Bh Lbr Lbr Lbr Kg Ltr Bt Bt Bt Bt Ltr Ttk Bh Bh Bh Bh Bh

JUMLAH HARGA SATUAN

BIAYA ANGKUT 149,567.03 148,761.35 -

HARGA DASAR TANPA PAJAK 27,000.00 60,000.00 6,321.00 5,000.00 18,000.00 25,000.00 2,500.00 13,500.00 3,950,000.00 1,975,000.00 210,000.00 850,000.00 1,850,000.00 650,000.00 85,000.00 113,500.00 170,000.00 5,000.00 2,500.00 1,950,000.00 1,280,000.00 2,300,000.00 1,510,000.00 12,000.00 130,000.00 130,000.00 312,500.00 250,000.00 1,500,000.00 450,000.00

KETERANGAN

27,000.00 209,567.03 6,321.00 5,000.00 18,000.00 25,000.00 2,500.00 162,261.35 3,950,000.00 1,975,000.00 210,000.00 850,000.00 1,850,000.00 650,000.00 85,000.00 113,500.00 170,000.00 5,000.00 2,500.00 1,950,000.00 1,280,000.00 2,300,000.00 1,510,000.00 12,000.00 130,000.00 130,000.00 312,500.00 250,000.00 1,500,000.00 450,000.00

Jarak 46 - 70

231 Talang Air PVC Maspion 232 Tambah daya Listrik 233 Tanah Urug 234 Tandon Air 2 x 1200 ltr + Menara + Atap 235 Tandon Air 1 x 1200 ltr + Menara + Atap 236 Tangga Naik Tinggi 1 m 237 Tanki Air Viberglass 1200 Ltr 238 Tanki Air Viberglass 2500 Ltr 239 Tanki Air Viberglass 550 Ltr 240 Teakwood 3 mm 241 Teakwood 4 mm 242 Teakwood 6 mm 243 Ter / Residu 244 Terpentin 245 Tiang Lampu Tunggal 11 m' 246 Tiang Lampu Tunggal 9 m' 247 Tiang Lampu Ganda 11 m' 248 Tiang Lampu ganda 9 m' 249 Tinner A 250 Titik Mata Lampu 251 Trap Depan Papan Tulis Bak Lapis Keramik 252 Ukiran jamang pada puncak 253 Ukiran jamang pada listplank 254 Urinoir 255 Washtafel + CerminT. A 2006

Perbatang 4 m'

Jarak 46 - 70

28,333.33 113,333.33 170,000.00

1. 2. 3. 4. 5.

Catatan : Harga diatas adalah harga disumber material ( disungai, dilokasi penggalian) khusus utk bahan lokal Untuk bahan-bahan non lokal harga tersebut adalah harga toko / harga yang berlaku dipasaran Harga sudah terrmasuk keuntungan kontraktor dan ongkos angkut Ongkos angkut tergantung jarak lokasi pekerjaan ke Quary ( sampel jarak angkut 46 - 70 ) Harga belum termasuk PPn

ANALISA HARGA SATUAN SNI 2006KODE ANALISA HARGA INDEK SATUAN URAIAN HARGA SATUAN ( Rp ) BAHAN ( Rp ) UPAH ( Rp ) JUMLAH HARGA ( Rp )

A. PEKERJAAN PERSIAPAN A. 6.6.1 1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 M 1.2500 btg 2.5000 kg 0.0050 m3 0.0090 m3 0.0720 m3 0.0600 kg 0.4000 lt 0.2000 oh 0.4000 oh 0.0200 oh 0.0200 oh A. 6.6.2 Dolken kayu dia 8-10/4 m' Semen portland Pasir beton Koral beton Kayu 5/7 Paku biasa 2'-5' Residu Tukang kayu Pekerja Kepala tukang Mandor @ @ @ @ @ @ @ @ @ @ @ 9,500.00 860.00 324,567.03 314,567.03 650,000.00 11,825.00 5,000.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M 1.2500 btg 2.5000 kg 1.2000 Lbr 0.0050 m3 0.0090 m3 0.0720 kg 0.0600 kg 0.4500 Kg 0.2000 oh 0.4000 oh 0.0200 oh 0.0200 oh A. 6.6.3 Dolken kayu dia 8-10/4 m' Semen portland Seng gelombang 3" - 5 " Pasir Beton Koral beton Kayu 5/7 Paku biasa 2'-5' Meni besi Tukang kayu Pekerja Kepala tukang Mandor @ @ @ @ @ @ @ @ @ @ @ @ 9,500.00 860.00 30,000.00 324,567.03 314,567.03 650,000.00 11,825.00 25,000.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 1 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 M 1.2500 btg 2.5000 kg 25.0000 kg 0.0050 m3 0.0090 m3 0.0720 kg 0.2000 oh 0.3000 oh 0.0200 oh 0.0200 oh Dolken kayu dia 8-10/4 m' Semen portland Kawat Duri Pasir Beton Koral beton Paku biasa 2'-5' Tukang kayu Pekerja Kepala tukang Mandor @ @ @ @ @ @ @ @ @ @ 9,500.00 860.00 11,000.00 324,567.03 314,567.03 11,825.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 294,330.34 11,875.00 2,150.00 275,000.00 1,622.84 2,831.10 851.40 11,000.00 13,500.00 1,200.00 1,200.00 26,900.00 321,230.34 Hal : 393 113,238.44 11,875.00 2,150.00 36,000.00 1,622.84 2,831.10 46,800.00 709.50 11,250.00 11,000.00 18,000.00 1,200.00 1,200.00 31,400.00 144,638.44 67,988.44 11,875.00 2,150.00 1,622.84 2,831.10 46,800.00 709.50 2,000.00 11,000.00 18,000.00 1,200.00 1,200.00 31,400.00 99,388.44

A. 6.6.4

1 M' MENGUKUR DAN MEMASANG BOUWPLANK 0.0120 m3 0.0200 kg 0.0070 m3 0.1000 oh 0.1000 oh 0.0100 oh 0.0050 oh kayu meranti, balok Paku Biasa 2' - 5' kayu papan 3/20 tukang kayu pekerja kepala tukang mandor @ @ @ @ @ @ @ 1,037,571.94 11,825.00 1,037,571.94 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 19,950.37 9,500.00 1,037,571.94 1,037,571.94 18,000.00 860.00 249,567.03 324,567.03 314,567.03 550.00 30,000.00 150,000.00 80,000.00 125,000.00 61,500.00 55,000.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 1,583,515.91 9,500.00 1,037,571.94 11,825.00 860.00 324,567.03 314,567.03 30,000.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 317,082.97 16,150.00 217,890.11 3,547.50 9,030.00 9,737.01 15,728.35 45,000.00 110,000.00 45,000.00 12,000.00 3,000.00 170,000.00 487,082.97 Hal : 394 11,875.00 186,762.95 881,936.15 19,800.00 30,100.00 37,435.05 32,456.70 47,185.05 16,500.00 7,500.00 300,000.00 6,400.00 1,875.00 3,690.00 110,000.00 55,000.00 90,000.00 18,000.00 3,000.00 276,000.00 1,859,515.91 12,450.86 236.50 7,263.00 5,500.00 4,500.00 600.00 300.00 10,900.00 30,850.37

A. 6.6.5

1 M2 PEMBUATAN KANTOR SEMENTARA DENGAN LANTAI PLESTERAN 1.2500 btg 0.1800 kg 0.8500 m3 1.1000 m3 35.0000 kg 0.1500 kg 0.1000 m3 0.1500 m3 30.0000 Bh 0.2500 Lbr 2.0000 Bh 0.0800 m2 0.0150 Bh 0.0600 Lbr 2.0000 oh 1.0000 oh 2.0000 oh 0.3000 oh 0.0500 oh Dolken kayu dia 8-10/4 m' Kayu Kayu Biasa Besi Strip Semen portland Pasir Pasang Pasir Beton Koral beton Bata merah Seng Plat Jendela Nako Kaca Polos Kunci Tanam Plywood 4 mm tukang kayu Tukang Batu pekerja Kepala tukang Mandor @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @

A. 6.6.6

1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT 1.7000 btg 0.2100 kg 0.3000 kg 10.5000 kg 0.0300 m3 0.0500 m3 1.5000 Lbr 2.0000 oh 1.0000 oh 0.2000 oh 0.0500 oh Dolken kayu dia 8-10/4 m' Kayu Paku biasa 2'-5' Semen portland Pasir Beton Koral beton Seng gelombang Tukang kayu Pekerja Kepala tukang Mandor @ @ @ @ @ @ @ @ @ @ @

A. 6.6.7

1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU 3.0000 btg 0.2760 kg 0.7000 kg 1.5000 Lbr 1.5000 oh 1.0000 oh 0.1500 oh 0.0500 oh Dolken kayu dia 8-10/4 m' Kayu Paku biasa 2'-5' Seng gelombang bljs 32 Tukang kayu Pekerja Kepala tukang Mandor @ @ @ @ @ @ @ @ 9,500.00 1,037,571.94 11,825.00 30,000.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 368,147.35 28,500.00 286,369.85 8,277.50 45,000.00 82,500.00 45,000.00 9,000.00 3,000.00 139,500.00 4,500.00 18,200.00 9,500.00 1,037,571.94 11,825.00 860.00 324,567.03 314,567.03 30,000.00 61,500.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH 377,381.24 37,352.59 946.00 25,000.00 16,500.00 90.00 63,298.59 10,000.00 6,250.00 935.00 11,250.00 120.00 780.00 16,250.00 13,085.00 29,335.00 Hal : 395 16,590.00 79,888.59 11,875.00 192,988.38 3,547.50 15,480.00 9,737.01 15,728.35 45,000.00 83,025.00 110,000.00 45,000.00 12,000.00 3,000.00 170,000.00 547,381.24 22,700.00 22,700.00 507,647.35

A. 6.6.8

1 M' MEMBERSIHKAN LAPANGAN DAN PERATAAN 0.1000 oh 0.0500 oh pekerja mandor @ @ 45,000.00 364,000.00 JUMLAH

A. 6.6.9

1 M2 PEMBUATAN BEDENG BURUH 1.2500 btg 0.1860 kg 0.3000 Kg 18.0000 kg 0.0300 m3 0.0500 m3 1.5000 Lbr 1.3500 Lbr 2.0000 oh 1.0000 oh 0.2000 oh 0.0500 oh Dolken kayu dia 8-10/4 m' Kayu Paku biasa 2'-5' Semen portland Pasir Beton Koral beton Seng gelombang bljs 32 Plywood 4 mm Tukang kayu Pekerja Kepala tukang Mandor @ @ @ @ @ @ @ @ @ @ @ @

A. 6.6.10

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40 X 50 X 20) CM 0.0360 m3 0.0800 kg 1.0000 btg 0.3000 oh 0.0015 oh Kayu Terentang Paku biasa 2'-5' kaso 5/7 Tukang kayu Mandor @ @ @ @ @ 1,037,571.94 11,825.00 25,000.00 55,000.00 60,000.00 JUMLAH

A. 6.6.11

1 M2 PEMBUATAN STEGGER DARI BAMBU,UKURAN (40X50X20) CM 1.0000 btg 0.2500 kg 0.0170 oh 0.2500 oh 0.0020 oh 0.0130 oh Bambu dia. 6 - 8 / 600 cm Tali Ijuk Tukang kayu Pekerja Kepala tukang Mandor @ @ @ @ @ @ 10,000.00 25,000.00 55,000.00 45,000.00 60,000.00 60,000.00 JUMLAH

A. 6.6.12

1 M2 PEMBUATAN JALAN SEMENTARA 0.1500 m3 0.0900 m3 0.0100 m3 1.0000 oh 0.0500 oh Batu Belah 15/20 Batu Pecah 5/7 Pasir pasang pekerja mandor @ @ @ @ @ 165,000.00 170,000.00 1,500,000.00 150,000.00 10,000.00 JUMLAH 55,050.00 24,750.00 15,300.00 15,000.00 150,000.00 500.00 150,500.00 300,015.00 19,980.00 319,995.00 300,015.00 19,980.00 16,275.00 1,890.00 240.00 2,310.00 120.00 16,275.00 324,567.03 314,567.03 43,000.00 55,000.00 60,000.00 45,000.00 60,000.00 JUMLAH 2,004,944.75 24,017.9601 45,926.7862 1,935,000.0000 6,875.00 720.00 16,875.00 1,140.00 25,610.00 2,030,554.75 4,560.00 20,835.00 319,995.00 319,995.00 319,995.00 205,550.00

A. 6.6.13

1 M3 BONGKARAN BETON BERTULANG 6.6670 oh 0.3330 oh pekerja Mandor @ @ 45,000.00 60,000.00 JUMLAH

A. 6.6.14

1 M3 BONGKARAN DINDING TEMBOK BATA MERAH 6.6670 oh 0.3330 oh pekerja Mandor @ @ 45,000.00 60,000.00 JUMLAH

A. 6.6.15

1 M' PASANG PAGAR KAWAT JARING GALVANIS.TINGGI 1,00 M 0.4340 m2 0.0420 oh 0.0040 oh 0.0420 oh 0.0020 oh Pagar Kawat jaring Pekerja Kepala tukang Tukang Mandor @ @ @ @ @ 37,500.00 45,000.00 60,000.00 55,000.00 60,000.00 JUMLAH

A. 6.6.16

1 M' PASANG PAGAR BETON PRACETAK ( 5X50X213) CM 0.9860 lbr 0.5250 btg 0.0740 m3 0.1460 m3 45.0000 kg 0.1250 oh 0.0120 oh 0.3750 oh 0.0190 oh Panel Beton Pracetak Kolom Beton Pracetak Pasir Beton Koral Semen Abu- abu Tukang batu Kepala tukang pekerja mandor @ @ @ @ @ @ @ @ @

B. PEKERJAAN TANAH B. 6.6.1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M' 0.4000 oh oh oh pekerja tukang gali kepala tukang mandor @ @ @ 92.4000 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 18,000.00 2,400.00 20,400.00 20,400.00 Hal : 396

0.0400 oh

B. 6.6.2

1 M3 GALIAN TANAH BIASA SEDALAM 2 M' 0.5260 oh oh oh pekerja tukang gali kepala tukang mandor @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 23,670.00 3,120.00 26,790.00 33,075.00 4,380.00 37,455.00 28,125.00 3,720.00 31,845.00 56,250.00 7,500.00 63,750.00 37,035.00 4,980.00 42,015.00 2,250.00 300.00 2,550.00 23,220.00 3,000.00 26,220.00 26,220.00 Hal : 397 2,550.00 42,015.00 63,750.00 31,845.00 37,455.00 26,790.00

0.0520 oh B. 6.6.3

1 M3 GALIAN TANAH BIASA SEDALAM 3 M' 0.7350 oh oh oh pekerja tukang gali kepala tukang mandor @ @ @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

0.0730 oh B. 6.6.4

1 M3 GALIAN TANAH KERAS SEDALAM 1 M' 0.6250 oh oh oh pekerja tukang gali kepala tukang mandor @ @ @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

0.0620 oh B. 6.6.5

1 M3 GALIAN TANAH CADAS SEDALAM 1 M 1.2500 oh oh oh pekerja tukang gali kepala tukang mandor @ @ @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

0.1250 oh B. 6.6.6

1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M' 0.8230 oh oh oh pekerja tukang gali kepala tukang mandor @ @ @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

0.0830 oh B. 6.6.7

1 M2 PEKERJAAN STRIPPING SETINGGI 1 M 0.0500 oh oh oh pekerja tukang gali kepala tukang mandor @ @ @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

0.0050 oh B. 6.6.8

1 M3 PEMBUANGAN TANAH SEJAUH 150 M 0.5160 oh oh oh pekerja tukang gali kepala tukang mandor @ @ @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

0.0500 oh

B. 6.6.9

1 M3 URUGAN KEMBALI 0.1920 oh oh oh pekerja tukang gali kepala tukang mandor @ @ @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 8,640.00 1,140.00 9,780.00 22,500.00 3,000.00 25,500.00 194,713.62 11,250.00 1,500.00 25,500.00 194,713.62 239,480.43 13,500.00 600.00 25,500.00 239,480.43 65,857.12 39,600.00 279,080.43 38,250.00 232,963.62 25,500.00 9,780.00

0.0190 oh B. 6.6.10 PEMADATAN TANAH 0.5000 oh oh oh

pekerja tukang gali kepala tukang mandor

@ @ @ @

45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

0.0500 oh B. 6.6.11 1 M3 URUGAN TANAH 1.2000 M3 0.2500 oh 0.0250 oh 1.0000 oh B. 6.6.11.a 1 M3 URUGAN PASIR 1.2000 M3 0.3000 oh 0.0100 oh 1.0000 oh B. 6.6.12

Tanah urug pekerja mandor Ls biaya pemadatan

@ @ @ @

162,261.35 45,000.00 60,000.00 25,500.00 JUMLAH

pasir urug pekerja mandor Ls biaya pemadatan

@ @ @ @

199,567.03 45,000.00 60,000.00 25,500.00 JUMLAH

1 M3 LAPISAN PUDEL CAMP 1 Kp : 3 Ps : 7 TL 0.3300 M3 0.1090 M3 0.7630 M3 0.8330 oh 0.4160 oh 0.0400 oh 0.0830 oh pasir urug kapur padam tanah liat pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 65,857.12 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 37,485.00 22,880.00 2,460.00 4,860.00 67,685.00 67,685.00 Hal : 398 37,485.00 22,880.00 2,400.00 4,980.00 67,745.00 133,602.12 199,567.03

B. 6.6.13

1 M3 LAPISAN PUDEL CAMP 1 Kp : 5 TL 0.2000 M3 1.0000 M3 0.8330 oh 0.4160 oh 0.0410 oh 0.0810 oh kapur padam tanah liat pekerja tukang batu kepala tukang mandor @ @ @ @ @ @

B. 6.6.14

1 M3 PEMASANGAN LAPISAN IJUK 1.2000 m3 0.1500 oh oh oh ijuk pekerja tukang gali kepala tukang mandor @ @ @ @ @ 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 251,480.43 11,250.00 1,500.00 251,480.43 59,005.9329 9,437.0109 12,478.3514 45,000.00 6,000.00 80,921.30 51,000.00 131,921.30 12,750.00 264,230.43 6,750.00 900.00 7,650.00 7,650.00

0.0150 oh B. 6.6.15 1 M3 URUGAN SIRTU 1.2000 M3 0.2500 oh oh oh

Sirtu pekerja tukang gali kepala tukang mandor

@ @ @ @ @

209,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

0.0250 oh B. 6.6.16

1 M2 PEMBUATAN JALAN SEMENTARA. TEBAL 25 CM 0.2750 m3 0.0300 m3 0.0500 m3 1.0000 oh oh oh batu belah kerikil pasir pekerja tukang gali kepala tukang mandor @ @ @ @ @ @ @ 214,567.03 314,567.03 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

0.1000 oh C. PEKERJAAN PONDASI C.6.6.1

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1 Ps 1.1000 m3 392.0000 kg 0.3140 m3 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 214,567.03 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 651,507.78 236,023.7318 229,620.0000 106,565.1213 67500.00 33000.00 3600.00 4500.00 572,208.85 108,600.00 680,808.85 Hal : 399 236,023.7318 337,120.0000 78,364.0471 67500.00 33000.00 3600.00 4500.00 108,600.00 760,107.78

C.6.6.2

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2 Ps 1.1000 m3 267.0000 kg 0.4270 m3 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 214,567.03 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C.6.6.3

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2,5 Ps 1.1000 m3 392.0000 kg 0.3140 m3 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 214,567.03 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 651,507.78 236,023.73 173,720.00 121,040.01 67,500.00 33,000.00 3,600.00 4,500.00 530,783.74 236,023.73 140,180.00 129,774.86 67,500.00 33,000.00 3,600.00 4,500.00 505,978.59 236,023.73 116,960.00 135,764.46 67,500.00 33,000.00 3,600.00 4,500.00 488,748.20 236,023.73 100,620.00 140,007.10 67,500.00 33,000.00 3,600.00 4,500.00 476,650.83 108,600.00 585,250.83 Hal : 400 108,600.00 597,348.20 108,600.00 614,578.59 108,600.00 639,383.74 236,023.73 337,120.00 78,364.05 67500.00 33000.00 3600.00 4500.00 108,600.00 760,107.78

C.6.6.4

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Ps 1.1000 m3 202.0000 kg 0.4850 m3 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 214,567.03 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C.6.6.5

1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps 1.1000 m3 163.0000 kg 0.5200 m3 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 214,567.03 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C.6.6.6

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 5 Ps 1.1000 m3 136.0000 kg 0.5440 m3 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 214,567.03 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C.6.6.7

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 6 Ps 1.1000 m3 117.0000 kg 0.5610 m3 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 214,567.03 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C.6.6.8

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 8 Ps 1.1000 m3 91.0000 kg 0.5610 m3 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 214,567.03 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 454,290.83 236,023.73 1,145.00 366.40 135,764.46 67,500.00 33,000.00 3,600.00 4,500.00 373,299.60 236,023.73 850.00 272.00 84,852.79 67,500.00 33,000.00 3,600.00 4,500.00 321,998.52 236,023.73 134,160.00 160.00 136,762.73 67,500.00 33,000.00 3,600.00 4,500.00 507,106.46 108,600.00 615,706.46 Hal : 401 108,600.00 430,598.52 108,600.00 481,899.60 236,023.73 78,260.00 140,007.10 67,500.00 33,000.00 3,600.00 4,500.00 108,600.00 562,890.83

C.6.6.9

1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 1 Ps 1.1000 m3 0.2290 kg 0.2290 m3 0.5440 oh 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm kapur pasang semen merah pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 214,567.03 5,000.00 1,600.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C.6.6.10

1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 2 Ps 1.1000 m3 0.1700 kg 0.1700 m3 0.3400 oh 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm kapur pasang semen merah pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 214,567.03 5,000.00 1,600.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C.6.6.11

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1/4 Kp ; 4 Ps 1.1000 m3 156.0000 kg 0.0320 m3 0.5480 oh 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen portland kapur pasang pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 214,567.03 860.00 5,000.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C.6.6.12

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Kp ; 10 Ps 1.1000 m3 61.0000 kg 0.1470 m3 0.4920 oh 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen portland kapur pasang pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 214,567.03 860.00 5,000.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 412,005.71 236,023.73 35,260.00 655.00 130,523.56 67,500.00 33,000.00 3,600.00 4,500.00 402,462.29 257,480.43 59,870.11 35,100.00 21,450.00 2,340.00 2,340.00 317,350.54 61,230.00 378,580.54 108,600.00 511,062.29 236,023.73 52,460.00 735.00 122,786.98 67,500.00 33,000.00 3,600.00 4,500.00 108,600.00 520,605.71

C.6.6.13

1 M3 PASANG PONDASI BATU KALI, 1/4 Pc ; 1 Kp ; 4 Ps 1.1000 m3 41.0000 kg 0.1310 m3 0.5230 oh 1.5000 oh 0.6000 oh 0.0600 oh 0.0750 oh batu belah 15/20 cm semen portland kapur pasang pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 214,567.03 860.00 5,000.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C. 6.6.14

1 M3 PASANGAN BATU KOSONG (AANSTAMPING) 1.2000 m3 0.3000 m3 0.7800 oh 0.3900 oh 0.0390 oh 0.0390 oh batu gunung pasir urug pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 214,567.03 199,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C. 6.6.15

1 M3 PASANG PONDASI SIKLOP 40 % BATU KALI 75.0000 kg 202.0000 kg 0.3200 m3 0.4900 m3 0.8000 kg 3.0000 oh 0.8500 oh 0.0850 oh 0.1500 oh besi beton semen portland pasir beton koral beton kawat beton pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ @ 11,000.00 860.00 324,567.03 314,567.03 10,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1,264,719.29 825,000.00 173,720.00 103,861.45 154,137.84 8,000.00 135,000.00 46,750.00 5,100.00 9,000.00 195,850.00 1,460,569.29 Hal : 402

C. 6.6.16

1 M3 PASANG PONDASI SUMURAN DIA 100 CM 0.4500 kg 280.0000 kg 0.4500 m3 0.6700 m3 2.3800 oh 0.3000 oh 0.0300 oh 0.0800 oh batu belah 15/20 semen portland pasir beton koral beton pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 214,567.03 860.00 324,567.03 314,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 694,170.24 3,791.77 30,509.30 47,185.05 52,030.00 495,000.00 9,000.00 33,202.30 1,419.00 450.00 6,720.00 45,000.00 36,850.00 4,020.00 3,000.00 679,307.43 3,193.07 25,965.36 39,320.88 42,140.00 379,500.00 7,000.00 28,014.44 1,419.00 450.00 5,600.00 36,000.00 27,500.00 3,000.00 2,400.00 532,602.76 68,900.00 601,502.76 Hal : 403 88,870.00 768,177.43 96,555.16 240,800.00 146,055.16 210,759.91 107,100.00 16,500.00 1,800.00 4,800.00 130,200.00 824,370.24

C. 6.6.17

PEMBUATAN TIANG PANCANG (40X40) CM, BETON BERTULANG 0.0190 m3 0.0940 m3 0.1500 m3 60.5000 kg 45.0000 kg 0.9000 kg 0.0320 m3 0.1200 kg 0.0900 lt 0.2400 kg 1.0000 oh 0.6700 oh 0.0670 oh 0.0500 oh pasir urug darat pasir beton koral beton semen portland besi beton kawat beton kayu kaso 5/7 paku minyak bekisting plamur tembok pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ @ @ @ @ @ @ 199,567.03 324,567.03 314,567.03 860.00 11,000.00 10,000.00 1,037,571.94 11,825.00 5,000.00 28,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

C. 6.6.18

PEMBUATAN TIANG PANCANG (35X35) CM, BETON BERTULANG 0.0160 m3 0.0800 m3 0.1250 m3 49.0000 kg 34.5000 kg 0.7000 kg 0.0270 m3 0.1200 kg 0.0900 lt 0.2000 kg 0.8000 oh 0.5000 oh 0.0500 oh 0.0400 oh pasir urug darat pasir beton koral beton semen portland besi beton kawat beton kayu kaso 5/7 paku minyak bekisting plamur tembok pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ @ @ @ @ @ @ 199,567.03 324,567.03 314,567.03 860.00 11,000.00 10,000.00 1,037,571.94 11,825.00 5,000.00 28,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

D. PEKERJAAN DINDING D.6.6.1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 1 Ps 120.0000 bh 64.0300 kg 0.0590 m3 0.6500 oh 0.2000 oh 0.0200 oh 0.0300 oh bata merah semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH D.6.6.2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 2 Ps 120.0000 bh 43.5000 kg 0.0800 m3 0.6500 oh 0.2000 oh 0.0200 oh 0.0300 oh D.6.6.3 bata merah semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Ps 120.0000 bh 32.9500 kg 0.0910 m3 0.6500 oh 0.2000 oh 0.0200 oh 0.0300 oh D.6.6.4 bata merah semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps 120.0000 bh 26.5500 kg 0.0930 m3 0.6500 oh 0.2000 oh 0.0200 oh 0.0300 oh D.6.6.5 bata merah semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 5 Ps 120.0000 bh 22.2000 kg 0.1020 m3 0.6500 oh 0.2000 oh 0.0200 oh 0.0300 oh bata merah semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 110,547.84 66,000.00 19,092.00 25,455.84 29,250.00 11,000.00 1,200.00 1,800.00 43,250.00 153,797.84 Hal : 404 112,042.73 66,000.00 22,833.00 23,209.73 29,250.00 11,000.00 1,200.00 1,800.00 43,250.00 155,292.73 117,047.60 66,000.00 28,337.00 22,710.60 29,250.00 11,000.00 1,200.00 1,800.00 43,250.00 160,297.60 123,375.36 66,000.00 37,410.00 19,965.36 29,250.00 11,000.00 1,200.00 1,800.00 43,250.00 166,625.36 135,790.25 66,000.00 55,065.80 14,724.45 29,250.00 11,000.00 1,200.00 1,800.00 43,250.00 179,040.25

D.6.6.6

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 6 Ps 120.0000 bh 22.2000 kg 0.1020 m3 0.6500 oh 0.2000 oh 0.0200 oh 0.0300 oh bata merah semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ 550.00 860.00 249,567.03 5,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 97,891.25 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 63,895.88 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 58,780.55 33,000.00 12,358.20 9,982.68 14,400.00 5,500.00 600.00 900.00 55,340.88 21,400.00 76,740.88 Hal : 405 33,000.00 16,297.00 9,483.55 14,400.00 5,500.00 600.00 900.00 21,400.00 80,180.55 33,000.00 23,908.00 6,987.88 14,400.00 5,500.00 600.00 900.00 21,400.00 85,295.88 66,000.00 8,668.80 23,084.95 137.50 29,250.00 11,000.00 1,200.00 1,800.00 43,250.00 141,141.25 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 110,547.84 66,000.00 19,092.00 25,455.84 29,250.00 11,000.00 1,200.00 1,800.00 43,250.00 153,797.84

D.6.6.7

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Kp ; 10 Ps 120.0000 bh 10.0800 kg 0.0925 m3 0.0275 m3 0.6500 oh 0.2000 oh 0.0200 oh 0.0300 oh bata merah semen portland pasir pasang kapur pasang pekerja tukang batu kepala tukang mandor

D.6.6.8

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc ; 1 Ps 60.0000 bh 27.8000 kg 0.0280 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @

D. 6.6.9

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 2 ps 60.0000 bh 18.9500 kg 0.0380 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah 8 x 8 x 15 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @

D. 6.6.10

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 ps 60.0000 bh 14.3700 kg 0.0400 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah 8 x 8 x 15 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

D. 6.6.11

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps 60.0000 bh 11.5000 kg 0.0430 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah 8 x 8 x 15 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 53,621.38 33,000.00 9,890.00 10,731.38 14,400.00 5,500.00 600.00 900.00 21,400.00 75,021.38

D. 6.6.12

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 5 ps 60.0000 bh 9.6800 kg 0.0450 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah 8 x 8 x 15 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 52,555.32 33,000.00 7,155.20 12,228.78 14,400.00 5,500.00 600.00 900.00 52,383.98 21,400.00 73,783.98 33,000.00 8,324.80 11,230.52 14,400.00 5,500.00 600.00 900.00 21,400.00 73,955.32

D. 6.6.13

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 6 ps 60.0000 bh 8.3200 kg 0.0490 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah 8 x 8 x 15 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

D. 6.6.14

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 8 ps 60.0000 bh 6.5000 kg 0.0500 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah 8 x 8 x 15 cm semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 51,068.35 33,000.00 5,590.00 12,478.35 14,400.00 5,500.00 600.00 900.00 21,400.00 72,468.35 Hal : 406

D. 6.6.15

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 Kp ; 10 ps 60.0000 bh 4.5000 kg 0.0500 m3 0.0150 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah 8 x 8 x 15 cm semen porland pasir pasang kapur padam pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 550.00 860.00 249,567.03 5,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 49,348.35 33,000.00 3,870.00 12,478.35 75.00 14,400.00 5,500.00 600.00 900.00 21,475.00 70,823.35

D. 6.6.16

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 1 Sm ; 1 ps 60.0000 bh 0.0180 kg 0.0180 m3 0.0180 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah semen merah/bata merah tumbuk pasir pasang kapur padam pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 550.00 1,600.00 249,567.03 5,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 37,611.01 33,000.00 22.40 6,987.88 70.00 14,400.00 5,500.00 600.00 900.00 40,080.28 21,400.00 61,480.28 33,000.00 28.80 4,492.21 90.00 14,400.00 5,500.00 600.00 900.00 21,400.00 59,011.01

D. 6.6.17

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Kp ; 1 Sm ; 2 Ps 60.0000 bh 0.0140 kg 0.0280 m3 0.0140 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh bata merah semen merah/bata merah tumbuk pasir pasang kapur padam pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 550.00 1,600.00 249,567.03 5,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

D. 6.6.18

1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.20) 12.5000 bh 13.5000 kg 0.0480 m3 1.9500 m3 0.3500 oh 0.1500 oh 0.0150 oh 0.0170 oh Hollow block semen portland pasir pasang besi beton polos pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 6,000.00 860.00 249,567.03 11,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 120,039.22 75,000.00 11,610.00 11,979.22 21,450.00 15,750.00 8,250.00 900.00 1,020.00 25,920.00 145,959.22 Hal : 407

D. 6.6.19

1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.15) 12.5000 bh 10.4500 kg 0.0380 m3 1.9500 m3 0.3200 oh 0.1200 oh 0.0120 oh 0.0150 oh Hollow block semen portland pasir pasang besi beton polos pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 5,000.00 860.00 249,567.03 11,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 102,420.55 62,500.00 8,987.00 9,483.55 21,450.00 14,400.00 6,600.00 720.00 900.00 22,620.00 125,040.55

D. 6.6.20

1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.10) 12.5000 bh 7.5000 kg 0.0270 m3 1.9500 m3 0.3200 oh 0.1000 oh 0.0100 oh 0.0150 oh Hollow block semen portland pasir pasang besi beton polos pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 3,000.00 860.00 249,567.03 11,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 72,138.31 75,000.00 12,083.00 1,298.27 10,481.82 42,570.00 70.95 55.00 300.00 1,572.84 16,650.00 8,635.00 385.00 984.00 1,110.00 143,431.87 27,764.00 171,195.87 Hal : 408 37,500.00 6,450.00 6,738.31 21,450.00 14,400.00 5,500.00 600.00 900.00 21,400.00 93,538.31

D. 6.6.21

1 M2 PASANGAN DINDING CON BLOCK (HB.20) 12.5000 bh 14.0500 kg 0.0040 m3 0.0420 m3 3.8700 kg 0.0060 kg 0.0010 kg 0.0300 kg 0.0050 kg 0.3700 oh 0.1570 oh 0.0070 oh 0.0164 oh 0.0185 oh concrete block semen portland pasir beton pasir pasang besi beton polos paku biasa 2" - 5" kayu terentang kawat beton koral beton pekerja tukang batu tukang besi kepala tukang mandor @ @ @ @ @ @ @ @ @ @ @ @ @ @ 6,000.00 860.00 324,567.03 249,567.03 11,000.00 11,825.00 55,000.00 10,000.00 314,567.03 45,000.00 55,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

D. 6.6.22

1 M2 PASANGAN DINDING CON BLOCK (HB.15) 12.5000 bh 10.4600 kg 0.0300 m3 0.0320 m3 0.8700 kg 0.0040 kg 0.0010 kg 0.0200 kg 0.0040 kg 0.3400 oh 0.1300 oh 0.0070 oh 0.0137 oh 0.0170 oh concrete block semen portland pasir beton pasir pasang besi beton polos paku biasa 2" - 5" kayu terentang kawat beton koral beton pekerja tukang batu tukang besi kepala tukang mandor @ @ @ @ @ @ @ @ @ @ @ @ @ @ 5,000.00 860.00 324,567.03 249,567.03 11,000.00 11,825.00 55,000.00 10,000.00 314,567.03 45,000.00 55,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 100,349.32 3,000.00 860.00 324,567.03 249,567.03 11,000.00 11,825.00 55,000.00 10,000.00 314,567.03 45,000.00 55,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 78,706.22 37,500.00 6,192.00 649.13 5,240.91 27,940.00 35.48 55.00 150.00 943.70 15,300.00 5,885.00 385.00 684.00 1,020.00 23,274.00 101,980.22 62,500.00 8,995.60 9,737.01 7,986.14 9,570.00 47.30 55.00 200.00 1,258.27 15,300.00 7,150.00 385.00 822.00 1,020.00 24,677.00 125,026.32

D. 6.6.23

1 M2 PASANGAN DINDING CON BLOCK (HB.10) 12.5000 bh 7.2000 kg 0.0020 m3 0.0210 m3 2.5400 kg 0.0030 kg 0.0010 kg 0.0150 kg 0.0030 kg 0.3400 oh 0.1070 oh 0.0070 oh 0.0114 oh 0.0170 oh concrete block semen portland pasir beton pasir pasang besi beton polos paku biasa 2" - 5" kayu terentang kawat beton koral beton pekerja tukang batu tukang besi kepala tukang mandor @ @ @ @ @ @ @ @ @ @ @ @ @ @

D. 6.6.24

1 M2 PASANGAN DINDING LATAI 2.5000 bh 5.1000 kg 0.0800 m3 1.5000 kg 0.1500 m3 0.1000 oh 0.0300 oh 0.0300 oh 0.0060 oh0.005 oh

bondbeam 40x20x20 cm semen portland pasir beton besi beton polos koral beton pekerja tukang batu tukang besi kepala tukang mandor

@ @ @ @ @ @ @ @ @ @

860.00 324,567.03 11,000.00 314,567.03 45,000.00 55,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

4,386.00 25,965.36 16,500.00 47,185.05 4,500.00 1,650.00 1,650.00 360.00 300.00 94,036.42 8,460.00 102,496.42 Hal : 409

D. 6.6.25 0.04 25

1 M2 PASANGAN DINDING ROSTER 20 X 20 26.0000 bh 12.8000 kg 0.0350 m3 0.3000 oh 0.1000 oh 0.0150 oh 0.0150 oh roster / terawang semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 3,000.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 97,742.85 44,000.00 20,339.00 142,253.21 14,400.00 8,250.00 900.00 900.00 206,592.21 24,450.00 231,042.21 78,000.00 11,008.00 8,734.85 13,500.00 5,500.00 900.00 900.00 20,800.00 118,542.85

D. 6.6.26 0.04 25

1 M2 PASANG BATA BERONGGA UKURAN ( 5x11x24 ) cm 80.0000 bh 23.6500 kg 0.5700 m3 0.3200 oh 0.1500 oh 0.0150 oh 0.0150 oh bata berongga semen porland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 550.00 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

D. 6.6.27 0.04 25

1 M2 PASANG DINDING ANYAMAN BAMBU RANGKA KAYU 1.5000 m2 0.0140 m3 0.0120 kg 0.0030 m3 0.1000 oh 0.0500 oh 0.0050 oh 0.0020 oh bilik bambu kayu paku list kayu 2/4 pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ @ 2,500.00 1,037,571.94 11,825.00 1,037,571.94 45,000.00 55,000.00 60,000.00 60,000.00 21,530.62 3,750.00 14,526.01 141.90 3,112.72 4,500.00 2,750.00 300.00 120.00 7,670.00 29,200.62

D. 6.6.28

1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP RANGKA KAYU MERANTI 0.0195 m3 0.0070 m3 0.1000 kg 1.0000 lbr 0.2000 oh 0.6000 oh 0.0600 oh 0.0100 oh balok kayu meranti papan kayu meranti paku biasa 2' - 5' plywood 4 mm pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ 1,037,571.94 1,187,571.94 11,825.00 61,500.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 91,228.16 20,232.65 8,313.00 1,182.50 61,500.00 9,000.00 33,000.00 3,600.00 600.00 46,200.00 137,428.16 Hal : 410

E. PEKERJAAN PLESTERAN E. 6.6.1 1 M2 PLESTERAN 1 pc ; 1 ps, TEBAL 15 MM 12.9200 kg 0.0130 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh E. 6.6.2 semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 14,355.57 1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 15 MM 8.5200 kg 0.0170 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh E. 6.6.3 semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 15 MM 6.4800 kg 0.0190 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh E. 6.6.4 semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM 5.2000 kg 0.0200 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh E. 6.6.5 semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 15 MM 4.3200 kg 0.0220 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh semen portland pasir pasang putih pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 9,205.67 3,715.20 5,490.47 9,000.00 8,250.00 900.00 600.00 18,750.00 27,955.67 Hal : 411 9,463.34 4,472.00 4,991.34 9,000.00 8,250.00 900.00 600.00 18,750.00 28,213.34 10,314.57 5,572.80 4,741.77 9,000.00 8,250.00 900.00 600.00 18,750.00 29,064.57 11,569.84 7,327.20 4,242.64 9,000.00 8,250.00 900.00 600.00 18,750.00 30,319.84 11,111.20 3,244.37 9,000.00 8,250.00 900.00 600.00 18,750.00 33,105.57

E. 6.6.6

1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 15 MM 3.6800 kg 0.0230 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh semen portland pasir pasang putih pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 8,904.84 2,476.80 5,989.61 9,000.0000 8,250.0000 900.0000 600.0000 8,466.41 860.00 5,000.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 8,212.97 1,582.40 30.00 3,493.94 9,000.00 8,250.00 900.00 600.00 5,106.34 2,580.00 25.00 4,741.77 9,000.00 8,250.00 900.00 600.00 7,346.77 18,750.00 26,096.77 Hal : 412 18,750.00 23,856.34 4,953.60 15.00 3,244.37 9,000.00 8,250.00 900.00 600.00 18,750.00 26,962.97 18,750.00 27,216.41 3,164.80 5,740.04 9,000.00 8,250.00 900.00 600.00 18,750.00 27,654.84

E. 6.6.7

1 M2 PLESTERAN 1 pc ; 8 ps, TEBAL 15 MM 2.8800 kg 0.0240 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.8

1 M2 PLESTERAN 1 pc ; 0,5 Kp ; 3 Ps, TEBAL 15 MM 5.7600 kg 0.0030 m3 0.0130 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh semen portland Kapur padam pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @

E. 6.6.9

1 M2 PLESTERAN 1 pc ; 3 Kp ; 10 Ps, TEBAL 15 MM 1.8400 kg 0.0060 m3 0.0140 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh semen portland Kapur padam pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 860.00 5,000.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.10

1 M2 PLESTERAN 0,5 pc ; 1 Kp ; 4 Ps, TEBAL 15 MM 3.0000 kg 0.0050 m3 0.0190 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh semen portland Kapur padam pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 860.00 5,000.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.11

1 M2 PLESTERAN 1 Kp ; 1 Sm ; 1 Ps, TEBAL 15 MM 0.0090 kg 0.0090 m3 0.0090 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh semen merah Kapur padam pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 860.00 5,000.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 2,298.84 6.02 35.00 3,743.51 9,000.00 8,250.00 900.00 600.00 3,784.53 12,280.80 5,740.04 11,250.00 11,000.00 1,200.00 750.00 18,020.84 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 15,776.74 7,464.80 6,987.88 11,250.00 11,000.00 1,200.00 750.00 14,452.68 24,200.00 38,652.68 Hal : 413 9,288.00 6,488.74 11,250.00 11,000.00 1,200.00 750.00 24,200.00 39,976.74 24,200.00 42,220.84 18,750.00 22,534.53 7.74 45.00 2,246.10 9,000.00 8,250.00 900.00 600.00 18,750.00 21,048.84

E. 6.6.12

1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 15 MM 0.0070 kg 0.0070 m3 0.0150 m3 0.2000 oh 0.1500 oh 0.0150 oh 0.0100 oh semen merah Kapur padam pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 860.00 5,000.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.13

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 20 MM 14.2800 kg 0.0230 m3 0.2500 oh 0.2000 oh 0.0200 oh 0.0125 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.14

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 20 MM 10.8000 kg 0.0260 m3 0.2500 oh 0.2000 oh 0.0200 oh 0.0125 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @

E. 6.6.15

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 20 MM 8.6800 kg 0.0280 m3 0.2500 oh 0.2000 oh 0.0200 oh 0.0125 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.16

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 20 MM 7.2900 kg 0.0280 m3 0.2500 oh 0.2000 oh 0.0200 oh 0.0125 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 13,257.28 5,366.40 7,487.01 11,250.00 11,000.00 1,200.00 750.00 12,853.41 7.74 45.00 4,492.21 11,250.00 11,000.00 1,200.00 750.00 4,544.95 13,330.00 3,244.37 13,500.00 11,000.00 1,200.00 780.00 16,574.37 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 18,839.85 10,105.00 8,734.85 13,500.00 11,000.00 1,200.00 780.00 26,480.00 45,319.85 Hal : 414 26,480.00 43,054.37 24,200.00 28,744.95 24,200.00 37,053.41 6,269.40 6,987.88 11,250.00 11,000.00 1,200.00 750.00 24,200.00 37,457.28

E. 6.6.17

1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 20 MM 6.2400 kg 0.0300 m3 0.2500 oh 0.2000 oh 0.0200 oh 0.0125 oh semen portland pasir pasang putih pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.18

1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 20 MM 0.0090 kg 0.0090 m3 0.0180 m3 0.2500 oh 0.2000 oh 0.0200 oh 0.0125 oh semen merah Kapur padam pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ @ 860.00 5,000.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.19

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 25 MM 15.5000 kg 0.0130 m3 0.3000 oh 0.2000 oh 0.0200 oh 0.0130 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.20

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 25 MM 11.7500 kg 0.0350 m3 0.3000 oh 0.2000 oh 0.0200 oh 0.0130 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @

E. 6.6.21

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 25 MM 9.4800 kg 0.0380 m3 0.3000 oh 0.2000 oh 0.0200 oh 0.0130 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 17,636.35 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 16,561.51 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 24,773.85 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 21,902.11 12,169.00 9,733.11 14,400.00 13,750.00 1,500.00 900.00 30,550.00 52,452.11 16,039.00 8,734.85 14,400.00 13,750.00 1,500.00 900.00 30,550.00 55,323.85 6,828.40 9,733.11 13,500.00 11,000.00 1,200.00 780.00 26,480.00 43,041.51 8,152.80 9,483.55 13,500.00 11,000.00 1,200.00 780.00 26,480.00 44,116.35

E. 6.6.22

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 25 MM 7.9400 kg 0.0390 m3 0.3000 oh 0.2000 oh 0.0200 oh 0.0130 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @

E. 6.6.23

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 30 MM 18.6500 kg 0.0350 m3 0.3200 oh 0.2500 oh 0.0250 oh 0.0150 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @

E. 6.6.24

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 30 MM 14.1500 kg 0.0390 m3 0.3200 oh 0.2500 oh 0.0250 oh 0.0150 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @

E. 6.6.25

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 30 MM 11.3800 kg 0.0420 m3 0.3200 oh 0.2500 oh 0.0250 oh 0.0150 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 20,268.62 9,786.80 10,481.82 14,400.00 13,750.00 1,500.00 900.00 30,550.00 50,818.62 Hal : 415

E. 6.6.26

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 30 MM 8.1900 kg 0.0450 m3 0.3200 oh 0.2500 oh 0.0250 oh 0.0150 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 18,273.92 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 11,321.11 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 10,616.24 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 12,490.21 6,080.20 5,240.91 1,170.00 11,000.00 1,200.00 780.00 11,321.11 14,150.00 25,471.11 Hal : 416 7,998.00 4,492.21 1,170.00 11,000.00 1,200.00 780.00 14,150.00 26,640.21 4,876.20 5,740.04 6,750.00 3,850.00 420.00 480.00 11,500.00 22,116.24 6,080.20 5,240.91 6,750.00 3,850.00 420.00 480.00 11,500.00 22,821.11 7,043.40 11,230.52 14,400.00 13,750.00 1,500.00 900.00 30,550.00 48,823.92

E. 6.6.27

1 M2 BERAPEN 1 pc ; 3 ps, TEBAL 30 MM 7.0700 kg 0.0210 m3 0.1500 oh 0.0700 oh 0.0070 oh 0.0080 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @

E. 6.6.28

1 M2 BERAPEN 1 pc ; 5 ps, TEBAL 15 MM 5.6700 kg 0.0230 m3 0.1500 oh 0.0700 oh 0.0070 oh 0.0080 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @

E. 6.6.29

1 M2 PLESTERAN BETON 1 pc ; 2 ps, TEBAL 15 MM 9.3000 kg 0.0180 m3 0.0260 oh 0.2000 oh 0.0200 oh 0.0130 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @

E. 6.6.30

1 M2 PLESTERAN BETON 1 pc ; 3 ps, TEBAL 15 MM 7.0700 kg 0.0210 m3 0.0260 oh 0.2000 oh 0.0200 oh 0.0130 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.31

1 M2 PLESTERAN SKONING 1 pc ; 2ps 0.5000 kg 0.0020 m3 0.0570 oh 0.0380 oh 0.0380 oh 0.0020 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor @ @ @ @ @ @ 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 929.13 230.40 150,000.00 2,250.00 1,100.00 120.00 300.00 150,230.40 704.00 86,250.00 20,250.00 11,000.00 1,200.00 1,500.00 86,954.00 3,715.20 3,993.07 11,250.00 5,500.00 600.00 900.00 7,708.27 3,715.20 3,993.07 675.00 3,850.00 420.00 480.00 7,708.27 5,425.00 13,133.27 Hal : 417 18,250.00 25,958.27 33,950.00 120,904.00 3,770.00 154,000.40 430.00 499.13 2,565.00 2,090.00 2,280.00 120.00 7,055.00 7,984.13

E. 6.6.32

1 M2 PLESTERAN GRANITO 1 pc WARNA ; 2 GRANITO, TEBAL 10 MM 0.1440 kg 15.0000 kg 0.0500 oh 0.0200 oh 0.0020 oh 0.0050 oh Pc Warna Batu Granito pekerja tukang batu kepala tukang mandor 1,600.00 10,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.33

1 M2 PLESTERAN TERASO 1 pc WARNA ; 2 BATU TERASO, TEBAL 10 MM 0.4400 kg 11.5000 kg 0.4500 oh 0.2000 oh 0.0200 oh 0.0250 oh Pc Warna Batu teraso pekerja tukang batu kepala tukang mandor 1,600.00 7,500.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.34

1 M2 PLESTERAN CIPRAT 1 pc ; 2ps 4.3200 kg 0.0160 m3 0.2500 oh 0.1000 oh 0.0100 oh 0.0150 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.35

1 M2 PLESTERAN SIAR ADUKAN 1 pc ; 2ps 4.3200 kg 0.0160 m3 0.0150 oh 0.0700 oh 0.0070 oh 0.0080 oh semen portland pasir pasang pekerja tukang batu kepala tukang mandor 860.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

E. 6.6.36

1 M2 PLESTERAN WATERPROOF BATACOTE 3 LAPIS 0.5000 kg 2.9000 kg 0.0060 m3 0.3000 oh 0.2000 oh 0.0200 oh 0.0150 oh semen portland Batacote pasir pasang pekerja tukang batu kepala tukang mandor 860.00 1,500.00 249,567.03 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 6,277.40 430.00 4,350.00 1,497.40 13,500.00 11,000.00 1,200.00 900.00 26,600.00 32,877.40

F. PEKERJAAN KAYU F.6.6.1 1 M PASANG KUSEN PINTU DAN JENDELA KAYU JATI 1.1000 m3 6.0000 oh 20.0000 oh 2.0000 oh 0.3000 oh F.6.6.2 kayu jati, balok pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 5,000,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M PASANG KUSEN PINTU DAN JENDELA KAYU BENGKIRAI 1.2000 m3 6.0000 oh 18.0000 oh 2.0000 oh 0.3000 oh F.6.6.3 kayu bengkirai, balok pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 1,937,571.94 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M PASANG KUSEN PINTU DAN JENDELA KAYU ULIN 1.2000 m3 6.0000 oh 18.0000 oh 2.0000 oh 0.3000 oh F.6.6.4 kayu ulin, balok pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 1,537,571.94 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M PASANG KUSEN PINTU DAN JENDELA KAYU MERANTI MERAH 1.2000 m3 6.0000 oh 18.0000 oh 2.0000 oh 0.3000 oh F.6.6.5 kayu meranti, balok pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 1,037,571.94 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1 M2 PASANG PINTU KLAMP KAYU BENGKIRAI 0.0360 m3 0.0500 kg 0.3500 oh 1.0500 oh 0.1050 oh 0.0180 oh Kayu bengkirai, papan Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 2,137,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 77,543.84 76,952.59 591.2500 15,750.00 57,750.00 6,300.00 1,080.00 80,880.00 158,423.84 Hal : 418 1,245,086.33 1,245,086.33 270,000.00 990,000.00 120,000.00 18,000.00 1,398,000.00 2,643,086.33 1,845,086.33 1,845,086.33 270,000.00 990,000.00 120,000.00 18,000.00 1,398,000.00 3,243,086.33 2,325,086.33 2,325,086.33 270,000.00 990,000.00 120,000.00 18,000.00 1,398,000.00 3,723,086.33 5,500,000.00 5,500,000.00 270,000.00 1,100,000.00 120,000.00 18,000.00 1,508,000.00 7,008,000.00

F.6.6.6

1 M2 PASANG PINTU KLAMP KAYU ULIN 0.0360 m3 0.0500 kg 0.3500 oh 1.0500 oh 0.1050 oh 0.0180 oh Kayu ulin, papan Paku ulin pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,737,571.94 13,750.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 63,240.09 280,000.00 45,000.00 137,500.00 15,000.00 3,000.00 280,000.00 85,502.88 45,000.00 137,500.00 15,000.00 3,000.00 85,502.88 245,000.00 36,000.00 110,000.00 12,000.00 2,400.00 245,000.00 74,815.02 36,000.00 110,000.00 12,000.00 2,400.00 74,815.02 60,815.02 36,000.00 110,000.00 12,000.00 2,400.00 60,815.02 160,400.00 221,215.02 Hal : 419 160,400.00 235,215.02 160,400.00 405,400.00 200,500.00 286,002.88 200,500.00 480,500.00 62,552.59 687.5 15,750.00 57,750.00 6,300.00 1,080.00 80,880.00 144,120.09

F.6.6.7

1 M2 PASANG PINTU PANEL KAYU JATI 0.0400 m3 1.0000 oh 2.5000 oh 0.2500 oh 0.0500 oh Kayu Jati, papan pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 7,000,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.8

1 M2 PASANG PINTU PANEL KAYU BENGKIRAI 0.0400 m3 1.0000 oh 2.5000 oh 0.2500 oh 0.0500 oh Kayu bengkirai, papan pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 2,137,571.94 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.9

1 M2 PASANG PINTU DAN JENDELA KACA KAYU JATI 0.0350 m3 0.8000 oh 2.0000 oh 0.2000 oh 0.0400 oh Kayu Jati, papan pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 7,000,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.10

1 M2 PASANG PINTU DAN JENDELA KACA KAYU BENGKIRAI 0.0350 m3 0.8000 oh 2.0000 oh 0.2000 oh 0.0400 oh Kayu Bengkirai, papan pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 2,137,571.94 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.11

1 M2 PASANG PINTU DAN JENDELA KACA KAYU ULIN 0.0350 m3 0.8000 oh 2.0000 oh 0.2000 oh 0.0400 oh Kayu Ulin, papan pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 1,737,571.94 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.12

1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU JATI 0.0640 m3 1.0000 oh 3.0000 oh 0.3000 oh 0.3000 oh Kayu Jati, papan pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 7,000,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 448,000.00 136,804.60 45,000.00 165,000.00 18,000.00 18,000.00 136,804.60 137,200.00 354.75 2,850.00 61,500.00 27,000.00 110,000.00 12,000.00 1,800.00 201,904.75 41,896.41 354.75 2,850.00 61,500.00 27,000.00 110,000.00 12,000.00 1,800.00 106,601.16 420,000.00 1,773.75 22,500.00 110,000.00 12,000.00 1,500.00 421,773.75 146,000.00 567,773.75 Hal : 420 150,800.00 257,401.16 150,800.00 352,704.75 246,000.00 382,804.60 448,000.00 45,000.00 165,000.00 18,000.00 18,000.00 246,000.00 694,000.00

F.6.6.13

1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU BENGKIRAI 0.0640 m3 1.0000 oh 3.0000 oh 0.3000 oh 0.0250 oh Kayu bengkirai, papan pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 2,137,571.94 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.14

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI 0.0196 m3 0.0300 Kg 0.3000 ltr 1.0000 lbr 0.6000 oh 2.0000 oh 0.2000 oh 0.0300 oh Kayu jati, papan paku biasa 1/2" - 1" lem kayu plywood 4' x 3' x 4 mm pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ 7,000,000.00 11,825.00 9,500.00 61,500.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.15

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU BENGKIRAI 0.0196 m3 0.0300 Kg 0.3000 ltr 1.0000 lbr 0.6000 oh 2.0000 oh 0.2000 oh 0.0300 oh Kayu bangkirai, papan paku biasa 1/2" - 1" lem kayu plywood 4' x 3' x 4 mm pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ 2,137,571.94 11,825.00 9,500.00 61,500.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.16

1 M2 PASANG JALUSI MATI KUSEN KAYU JATI 0.0600 m3 0.1500 Kg 0.5000 oh 2.0000 oh 0.2000 oh 0.0250 oh Kayu jati, papan paku biasa 1/2" - 1" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 7,000,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.17

1 M2 PASANG JALUSI MATI KUSEN KAYU BENGKIRAI 0.0600 m3 0.1500 Kg 0.5000 oh 2.0000 oh 0.2000 oh 0.0250 oh Kayu bengkirai, papan paku biasa 1/2" - 1" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 2,137,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 130,028.07 34,056.41 412.50 2,850.00 61,500.00 27,000.00 110,000.00 12,000.00 1,800.00 98,818.91 137,200.00 3,547.50 2,850.00 113,500.00 27,000.00 110,000.00 12,000.00 1,800.00 257,097.50 41,896.41 354.75 2,850.00 113,500.00 27,000.00 110,000.00 12,000.00 1,800.00 158,601.16 150,800.00 309,401.16 Hal : 421 150,800.00 407,897.50 150,800.00 249,618.91 128,254.32 1,773.75 22,500.00 110,000.00 12,000.00 1,500.00 146,000.00 276,028.07

F.6.6.18

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU ULIN 0.0196 m3 0.0300 Kg 0.3000 ltr 1.0000 lbr 0.6000 oh 2.0000 oh 0.2000 oh 0.0300 oh Kayu ulin, papan paku ulin lem kayu plywood 4' x 3' x 4 mm pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ 1,737,571.94 13,750.00 9,500.00 61,500.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.19

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU JATI 0.0196 m3 0.3000 Kg 0.3000 ltr 1.0000 lbr 0.6000 oh 2.0000 oh 0.2000 oh 0.0300 oh Kayu jati, papan paku biasa 1/2" - 1" lem kayu teakwood 4 mm pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ 7,000,000.00 11,825.00 9,500.00 113,500.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.20

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU BENGKIRAI 0.0196 m3 0.0300 Kg 0.3000 ltr 1.0000 lbr 0.6000 oh 2.0000 oh 0.2000 oh 0.0300 oh kayu Bengkirai, papan paku biasa 1/2" - 1" lem kayu teakwood 4 mm pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ 2,137,571.94 11,825.00 9,500.00 113,500.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.21

1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU JATI 0.0196 m3 0.0300 Kg 0.8000 ltr 1.0000 lbr 0.5000 lbr 0.8000 oh 2.0000 oh 0.2500 oh 0.0400 oh kayu jati, papan paku biasa 1/2" - 1" lem kayu plywood 4' x 3' x 4 mm Formika pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ @ 7,000,000.00 11,825.00 9,500.00 61,500.00 75,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 244,154.75 41,896.41 354.75 7,600.00 61,500.00 37,500.00 36,000.00 110,000.00 15,000.00 2,400.00 148,851.16 137,200.00 354.75 7,600.00 56,750.00 37,500.00 36,000.00 110,000.00 15,000.00 2,400.00 239,404.75 41,896.41 354.75 7,600.00 56,750.00 4,250.00 37,500.00 36,000.00 110,000.00 15,000.00 2,400.00 148,351.16 163,400.00 311,751.16 Hal : 422 163,400.00 402,804.75 163,400.00 312,251.16 137,200.00 354.75 7,600.00 61,500.00 37,500.00 36,000.00 110,000.00 15,000.00 2,400.00 163,400.00 407,554.75

F.6.6.22

1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU BENGKIRAI 0.0196 m3 0.0300 Kg 0.8000 ltr 1.0000 lbr 0.5000 lbr 0.8000 oh 2.0000 oh 0.2500 oh 0.0400 oh kayu bengkirai, papan paku biasa 1/2" - 1" lem kayu plywood 4' x 3' x 4 mm Formika pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ 2,137,571.94 11,825.00 9,500.00 61,500.00 75,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.23

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI 0.0196 m3 0.0300 Kg 0.8000 ltr 0.5000 lbr 0.5000 lbr 0.8000 oh 2.0000 oh 0.2500 oh 0.0400 oh kayu jati, papan paku biasa 1/2" - 1" lem kayu teakwood 4' x 8' x 4 mm Formika 4' x 3' pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ @ 7,000,000.00 11,825.00 9,500.00 113,500.00 75,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.24

1 M2 PASANG PINTU TEAKWOOD & FORMIKA, RANGKA KAYU BENGKIRAI 0.0196 m3 0.0300 Kg 0.8000 ltr 0.5000 lbr 0.5000 ltr 0.5000 lbr 0.8000 oh 2.0000 oh 0.2500 oh 0.0400 oh kayu bengkirai, papan paku biasa 1/2" - 1" lem kayu teakwood 4' x 8' x 4 mm vernis Formika 4' x 8' pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ @ @ 2,137,571.94 11,825.00 9,500.00 113,500.00 8,500.00 75,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.25

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI 0.0196 m3 0.0300 Kg 1.2000 ltr 1.0000 lbr 1.0000 lbr 1.0000 oh 2.6000 oh 0.2600 oh 0.0500 oh kayu jati, papan paku biasa 1/2" - 1" lem kayu plywood 4' x 8' x 4 mm Formika 4' x 8' pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ @ 7,000,000.00 11,825.00 9,500.00 61,500.00 75,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 285,454.75 41,896.41 354.75 11,400.00 61,500.00 75,000.00 45,000.00 143,000.00 15,600.00 3,000.00 190,151.16 5,500,000.00 270,000.00 9,460.00 180,000.00 660,000.00 72,000.00 12,000.00 5,779,460.00 2,131,329.13 270,000.00 9,460.00 180,000.00 660,000.00 72,000.00 12,000.00 2,410,789.13 924,000.00 3,334,789.13 Hal : 423 924,000.00 6,703,460.00 206,600.00 396,751.16 137,200.00 354.75 11,400.00 61,500.00 75,000.00 45,000.00 143,000.00 15,600.00 3,000.00 206,600.00 492,054.75

F.6.6.26

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU BENGKIRAI 0.0196 m3 0.0300 Kg 1.2000 ltr 1.0000 lbr 1.0000 lbr 1.0000 oh 2.6000 oh 0.2600 oh 0.0500 oh kayu bengkirai, papan paku biasa 1/2" - 1" lem kayu plywood 4' x 8' x 4 mm Formika 4' x 8' pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ @ 2,137,571.94 11,825.00 9,500.00 61,500.00 75,000.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.27

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU JATI 1.1000 m3 15.0000 Kg 0.8000 Kg 4.0000 oh 12.0000 oh 1.2000 oh 0.2000 oh kayu jati, balok besi strip Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ 5,000,000.00 18,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.28

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BENGKIRAI 1.1000 m3 15.0000 Kg 0.8000 Kg 4.0000 oh 12.0000 oh 1.2000 oh 0.2000 oh kayu bengkirai, balok besi strip Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ 1,937,571.94 18,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.29

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU ULIN 1.1000 m3 15.0000 Kg 0.8000 Kg 4.0000 oh 12.0000 oh 1.2000 oh 0.2000 oh kayu ulin, balok besi strip Paku ulin pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ 1,537,571.94 18,000.00 13,750.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 1,972,329.13 1,141,329.13 270,000.00 9,460.00 180,000.00 660,000.00 72,000.00 12,000.00 1,420,789.13 23,250.86 1,773.75 4,500.00 5,500.00 600.00 300.00 25,024.61 18,450.86 2,062.50 4,500.00 5,500.00 600.00 300.00 20,513.36 70,000.00 1,773.75 4,500.00 5,500.00 600.00 300.00 71,773.75 10,900.00 82,673.75 Hal : 424 10,900.00 31,413.36 10,900.00 35,924.61 924,000.00 2,344,789.13 1,691,329.13 270,000.00 11,000.00 180,000.00 660,000.00 72,000.00 12,000.00 924,000.00 2,896,329.13

F.6.6.30

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU MERANTI 1.1000 m3 15.0000 Kg 0.8000 Kg 4.0000 oh 12.0000 oh 1.2000 oh 0.2000 oh kayu meranti, balok besi strip Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ @ 1,037,571.94 18,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.31

1M2 PASANG KASO + RENG GENTENG KODOK KAYU BENGKIRAI 0.0120 m3 0.1500 Kg 0.1000 oh 0.1000 oh 0.0100 oh 0.0050 oh kayu bengkirai, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,937,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.32

1M2 PASANG KASO + RENG GENTENG KODOK KAYU ULIN 0.0120 m3 0.1500 Kg 0.1000 oh 0.1000 oh 0.0100 oh 0.0050 oh kayu ulin, balok Paku ulin pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,537,571.94 13,750.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.33

1M2 PASANG KASO + RENG GENTENG MONIER KAYU JATI 0.0140 m3 0.1500 Kg 0.1000 oh 0.1000 oh 0.0100 oh 0.0050 oh kayu jati, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 5,000,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.34

1M2 PASANG KASO + RENG GENTENG MONIER KAYU BENGKIRAI 0.0140 m3 0.1500 Kg 0.1000 oh 0.1000 oh 0.0100 oh 0.0050 oh kayu bengkirai, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,937,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 28,899.76 27,126.01 1,773.75 4,500.00 5,500.00 600.00 300.00 28,899.76 319,699.37 2,365.00 5,400.00 6,600.00 720.00 360.00 322,064.37 253,699.37 2,750.00 5,400.00 6,600.00 720.00 360.00 256,449.37 60,000.00 1,182.50 6,750.00 13,750.00 1,500.00 4,500.00 61,182.50 26,500.00 87,682.50 Hal : 425 13,080.00 269,529.37 13,080.00 335,144.37 10,900.00 39,799.76 27,126.01 1,773.75 4,500.00 5,500.00 600.00 300.00 10,900.00 39,799.76

F.6.6.35

1M2 PASANG KASO + RENG GENTENG BETON KAYU BENGKIRAI 0.0140 m3 0.1500 Kg 0.1000 oh 0.1000 oh 0.0100 oh 0.0050 oh kayu bengkirai, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,937,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.36

1M2 PASANG KASO + RENG ATAP SIRAP KAYU BENGKIRAI 0.1650 m3 0.2000 Kg 0.1200 oh 0.1200 oh 0.0120 oh 0.0060 oh kayu bengkirai, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,937,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.37

1M2 PASANG KASO + RENG ATAP SIRAP KAYU ULIN 0.1650 m3 0.2000 Kg 0.1200 oh 0.1200 oh 0.0120 oh 0.0060 oh kayu ulin, balok Paku ulin pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,537,571.94 13,750.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.38

1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU JATI 0.0120 m3 0.1000 Kg 0.1500 oh 0.2500 oh 0.0250 oh 0.0750 oh kayu jati, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 5,000,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.39

1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU BENGKIRAI 0.0120 m3 0.1000 Kg 0.1500 oh 0.2500 oh 0.0250 oh 0.0750 oh kayu bengkirai, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,937,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 24,433.36 18,450.86 1,375.00 6,750.00 13,750.00 1,500.00 4,500.00 19,825.86 115,000.00 1,773.75 9,000.00 16,500.00 1,800.00 600.00 116,773.75 44,564.15 1,773.75 9,000.00 16,500.00 1,800.00 600.00 46,337.90 23,864.15 1,773.75 9,000.00 16,500.00 1,800.00 600.00 25,637.90 27,900.00 53,537.90 Hal : 426 27,900.00 74,237.90 27,900.00 144,673.75 26,500.00 46,325.86 23,250.86 1,182.50 6,750.00 13,750.00 1,500.00 4,500.00 26,500.00 50,933.36

F.6.6.40

1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU ULIN 0.0120 m3 0.1000 Kg 0.1500 oh 0.2500 oh 0.0250 oh 0.0750 oh kayu ulin, balok Paku ulin pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,537,571.94 13,750.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.41

1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU JATI 0.0230 m3 0.1500 Kg 0.2000 oh 0.3000 oh 0.0300 oh 0.0100 oh Kayu jati, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 5,000,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.42

1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU BENGKIRAI 0.0230 m3 0.1500 Kg 0.2000 oh 0.3000 oh 0.0300 oh 0.0100 oh kayu bengkirai, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,937,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.43

1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU MERANTI 0.0230 m3 0.1500 Kg 0.2000 oh 0.3000 oh 0.0300 oh 0.0100 oh kayu meranti, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ 1,037,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.44

1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU JATI 0.0270 m3 0.2000 Kg 0.2500 oh 0.3500 oh 0.0350 oh 0.0125 oh kayu jati, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 5,000,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 137,365.00 52,314.44 2,365.00 11,250.00 19,250.00 2,100.00 750.00 54,679.44 28,014.44 2,365.00 11,250.00 19,250.00 2,100.00 750.00 30,379.44 50,400.00 591.25 4,500.00 11,000.00 1,500.00 300.00 50,991.25 15,390.52 591.25 4,500.00 11,000.00 1,500.00 300.00 15,981.77 17,300.00 33,281.77 Hal : 427 17,300.00 68,291.25 33,350.00 63,729.44 33,350.00 88,029.44 135,000.00 2,365.00 11,250.00 19,250.00 2,100.00 750.00 33,350.00 170,715.00

F.6.6.45

1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU BENGKIRAI 0.0270 m3 0.2000 Kg 0.2500 oh 0.3500 oh 0.0350 oh 0.0125 oh kayu bengkirai, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,937,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.46

1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU MERANTI 0.0270 m3 0.2000 Kg 0.2500 oh 0.3500 oh 0.0350 oh 0.0125 oh kayu meranti, balok Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 1,037,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.47

1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU JATI 0.0072 m3 0.0500 Kg 0.1000 oh 0.2000 oh 0.0250 oh 0.0050 oh kayu jati, papan Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 7,000,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.48

1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU BENGKIRAI 0.0072 m3 0.0500 Kg 0.1000 oh 0.2000 oh 0.0250 oh 0.0050 oh kayu bengkirai, papan Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 2,137,571.94 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH

F.6.6.49

1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU JATI 0.0110 m3 0.0500 Kg 0.1100 oh 0.2200 oh 0.0220 oh 0.0050 oh kayu jati, papan Paku Biasa 2" - 5" pekerja tukang kayu kepala tukang mandor @ @ @ @ @ @ 7,000,000.00 11,825.00 45,000.00 55,000.00 60,000.00 60,000.00 JUMLAH 77,591.25 23,513.29 591.25 4,950.00 12,100.00 1,320.00 18,370.00 24,104.54 30,994.79 709.50 6,750.00 13,750.00 1,500.00 4,500.00 31,704.29 18,383.12 709.50 4,500.00 5,500.00 600.00 3,000.00 19,092.62 14,943.12 709.50 4,500.00 5,500.00 600.00 3,000.00 15,652.62 13,600.00 29,252.62 Hal : 428 13,600.00 32,692.62 26,500.00 58,204.29 36,740.00 60,844.54 77,000.00 591.25 4,950.00 12,100.00 1,320.00 300.00 18,670.00 96,261.25

F.6.6.50

1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU BENGKIRAI 0.0110 m3 0.0500 Kg 0.1100 oh 0.2200 oh 0.0220 oh 0