206
DAFTAR HARGA SATUAN BAHAN BANGUNAN SAMPLE NO JENIS BAHAN BANGUNAN SATUAN 1 2 3 1 Semen PPC (Gresik) /zak 3 2 Pasir pasang /m 3 3 Pasir urug /m 3 4 Tanah urug /m 5 Kapur /zak 6 Mill /zak 3 7 Batu kali /m 8 Batu bata /bh 9 Besi beton Polos U.24 (SNI) /kg 10 Besi beton Ulir U.39 (SNI) /kg 3 11 Batu split 2-3 cm (pecah man /m 3 12 Batu split 3-4 cm (pecah man /m 3 13 Koral 3-4 cm /m 14 Bendrat /kg 15 Taek wood 3 mm (90 x 210) cm /lembar Papan sengon (Bekesting) 2/20 x 200 16 cm /lembar 17 Bambu /batang 18 Dolken /batang 19 Minyak bekesting /liter 20 Paku (rata-rata) /kg 21 Paku Plepet /kg 22 Paku Zeng /bh 23 Lem Kayu /kg 3 24 Balok kayu Meranti /m 3

Transcript of Sample Hitungan RAB

Page 1: Sample Hitungan RAB

DAFTAR HARGA SATUAN BAHAN BANGUNAN SAMPLE

NO JENIS BAHAN BANGUNAN SATUAN

1 2 31 Semen PPC (Gresik) /zak

3

2 Pasir pasang /m 3

3 Pasir urug /m 3

4 Tanah urug /m 5 Kapur /zak 6 Mill /zak

3

7 Batu kali /m 8 Batu bata /bh 9 Besi beton Polos U.24 (SNI) /kg

10 Besi beton Ulir U.39 (SNI) /kg 3

11 Batu split 2-3 cm (pecah manual) /m 3

12 Batu split 3-4 cm (pecah manual) /m 3

13 Koral 3-4 cm /m 14 Bendrat /kg 15 Taek wood 3 mm (90 x 210) cm /lembar

Papan sengon (Bekesting) 2/20 x 200 16 cm /lembar 17 Bambu /batang 18 Dolken /batang 19 Minyak bekesting /liter 20 Paku (rata-rata) /kg 21 Paku Plepet /kg 22 Paku Zeng /bh 23 Lem Kayu /kg

3

24 Balok kayu Meranti /m 3

Page 2: Sample Hitungan RAB

25 Papan kayu Meranti /m 3

26 Balok kayu Jati kelas Politur /m 3

27 Papan kayu Jati kelas Politur /m 3

28 Balok kayu Bengkirai /m 3

29 Papan kayu Bengkirai /m 3

30 Balok kayu Kamper /m 3

31 Papan kayu Kamper /m 3

32 Balok kayu Kruing /m 3

33 Papan kayu Kruing /m 34 Genteng Beton eks Mutiara /buah 35 Nok genteng Beton Eks Mutiara /buah 36 Zeng Datar 90 cm /m'

2

37 Kaca bening 5 mm (ASAHI MAS) /m

Page 3: Sample Hitungan RAB

HARGA KETERANGAN (Rp.)

4 522000 1 zak = 40 Kg

50,000

27,000

22,5004,500 1 zak = 21,5 kg 4,500 1 zak = 22 kg

35,000180

4,5005,000

90,000

67,000

50,0008,000

45,000

3,0004,5004,0008,0007,0008,000

15013,000

1,200,000

Page 4: Sample Hitungan RAB

1,400,000

6,000,000

8,000,000

2,800,000

3,000,000

3,200,000

3,450,000

1,800,000

2,000,0002,1004,000

24,000

60,000

Page 5: Sample Hitungan RAB

2

38 Kaca Es untuk Boven t = 5 mm /m Kaca Rayband 50 %, t = 5 mm (ASAHI

2

39 MAS) /m

No. JENIS BAHAN BANGUNAN SATUAN

2

40 Keramik Lantai setara Hercules 30x30 /m 2

41 Keramik dinding Setara Asia 20x25 /m Keramik Serit (KM/WC) setara Asia

2

42 20x20 /m 43 Keramik assesoris 10x20 /buah 44 Semen grouting /kg 45 Kanstin Abu-abu ukr. 25.25.40 /m'

2

46 Conblock kelas biasa /m 47 Tripleks 3 mm (120x240) /lembar 48 Eternit Harflex 1x1 m, biasa (Kerang) /lembar

Eternit Harflex 1x1 m, biasa 49 (Djubesment) /lembar 50 Gypsium Board (120x240) cm /lembar 51 Calsiboard (120x240) cm /lembar 52 List Plafon Gypsium L = 10 Cm /m' 53 Cat kayu eks EMCO (bintang) /kg 54 Cat Catylac /5 Kg 55 Plamur tembok /kg 56 Plamur kayu /kg 57 Thiner /liter 58 Meni besi /liter 59 Meni kayu /liter 60 Amplas /lembar

61 Slot dan Handle Pintu (SES) /bh 62 Slot Pintu Kupu tarung (SES) /bh

63 Kunci KM/Wc ex. Alpha /bh 64 Engsel pintu kuningan ukr. 3\"x4\" (aiwa) /ps

65 Engsel H untuk Daun Jendela (Lokal) /ps 66 Grendel ukuran 8\" (RRT) /bh 67 Grendel Jalu untuk Jendela /bh

Page 6: Sample Hitungan RAB

70,000

85,000

HARGA KETERANGAN

(Rp)

30,000

33,000

35,0004,0007,500

27,400

14,00045,000

3,500

6,00035,00030,000

8,00033,00050,000

5,8009,7004,5009,0006,0001,250

125,00090,000

20,00016,900

5,0003,2003,000

Page 7: Sample Hitungan RAB

68 Hak angin kuningan ukr. 21 - 30 cm /bh 69 Handle Pintu (u/ pintu Kupu tarung) /ps

70 Closet duduk TOTO Monoblok /set 71 Closet jongkok Standart /set 72 Washtafel body standart INA /set 73 Wallshower /set 74 Floordrain /bh 75 Avor (kurasan Bak) /bh 76 Bathup Standart INA /set 77 Keran Air Standart (Rata-rata) /bh

78 Keran Dapur /bh 79 Soap Holder /bh 80 Isolasi /bh 81 Pipa PVC 3/4\" eks Wavin /bh 82 Pipa PVC 3\" eks Wavin /bh 83 Knee 3/4\" /bh 84 Sock 3/4\" /bh 85 Tee 3/4\" /bh 86 Knee 3\" /bh

No. JENIS BAHAN BANGUNAN SATUAN

87 Sock 3\" /bh 88 Tee 3\" /bh 89 Lem PVC (tube) /bh

2

90 Batu Candi ( Andesit) /m 2

91 Batu Belah /m 92 Baut /bh 93 Plate /bh 94 Begel /bh 95 Solar /ltr 96 Lis Kayu /m' 97 Roster Kayu 30x 30 /bh 98 Sirlak /kg 99 Spirtus /ltr

100 Batu Apung /kg

Page 8: Sample Hitungan RAB

1090050000

100000074500

2000005000010000

50001250000

15000

2500025000

10001400085000

2500200030007800

HARGA KETERANGAN

(Rp)

500082003500

65,000

65,0001,5001,0007,5002,3003,000

45,00060,000

6,0004,000

Page 9: Sample Hitungan RAB

NO. DAFTAR PEKERJA SATUAN

1 TUKANG BATU Hari

2 TUKANG KAYU Hari

3 TUKANG BESI Hari

4 TUKANG LISTRIK Hari

5 TUKANG PLAMBING Hari

6 TUKANG KERAMIK Hari

7 TUKANG BIKIN KUSEN Hari

8 TUKANG PAVING BLOK Hari

9 TENAGA Hari

10 TUKANG CAT Hari

Page 10: Sample Hitungan RAB

UPAH KET. (Rp.)

22000 per Hari

22000 per Hari

25000 per Hari

25000 per Hari

21000 per Hari

25000 per Hari

30000 per Hari

20000 per Hari

18000 per Hari

22000 per Hari

Page 11: Sample Hitungan RAB

DAFTAR UPAH BORONGAN/ BAS BORONG

DI KABUPATEN SLEMAN BULAN MARET 2005

No JENIS PEKERJAAN

A. PEKERJAAN PERSIAPAN

1 Uitzet & Bouwplank

2 Pembuatan Direksikit (Tripleks, Zeng, Lt. Rabat Beto

3 Pembuatan Gudang (Tripleks, Zeng, Lt. Rabat Beton)

4 Pembuatan Brak (Tripleks, Zeng, Lt. Rabat Beton)

5 Pembuatan Pagar Proyek (Balok Kayu & Zeng)

6 Pembuatan Pagar Proyek (Bambu & Gedek/Anyaman

7 Pembersihan Lokasi Proyek

B. PEKERJAAN TANAH DAN PASIR

1 Galian Tanah (untuk Pondasi Batu Kali)

2 Galian Tanah (untuk Pondasi Foot Plat)

3 Urugan Tanah Kembali (termasuk Pemadatan)

4 Urugan Tanah (termasuk Pemadatan).

5 Urugan Pasir

6 Urugan Pasir Di Bawah Pondasi ( t = 10 Cm)

7 Urugan Pasir Di Bawah Lantai ( t = 10 Cm)

8 Urugan Sirtu

9 Urugan Splite/Koral Untuk Jalan Lingkungan

Page 12: Sample Hitungan RAB

DAFTAR UPAH BORONGAN/ BAS BORONG

DI KABUPATEN SLEMAN BULAN MARET 2005

Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)

M` 3000 0 3,000.00 32.9

M2 36000 0 36,000.00 32.9

M2 36000 0 36,000.00 32.9

M2 30000 0 30,000.00 32.9

M` 5000 0 5,000.00 32.9

M` 5000 0 5,000.00 32.9

M2 2400 0 2,400.00 32.9

M3 8500 0 8,500.00 32.9

M3 10000 0 10,000.00 32.9

M3 4500 0 4,500.00 32.9

M3 6500 0 6,500.00 32.9

M3 4950 0 4,950.00 32.9

M2 1100 0 1,100.00 32.9

M2 1100 0 1,100.00 32.9

M2 1000 0 1,000.00 32.9

M2 1375 0 1,375.00 32.9

Page 13: Sample Hitungan RAB

Upah Total (Rp)

3986.95

47843.36

47843.36

39869.46

6644.91

6644.91

3189.56

11296.35

13289.82

5980.42

8638.38

6578.46

1461.88

1461.88

1328.98

1827.35

Page 14: Sample Hitungan RAB

No JENIS PEKERJAAN

C. PEKERJAAN PASANGAN DAN PLESTERAN

1 Pasangan Batu Kali Kosong untuk Pondasi

2 Pekerjaan Pondasi Batu Kali Pecah

3 Pasangan Bata 1/2 Batu (Trasram)

4 Pasangan Bata 1/2 Batu

5 Pasangan Rolag Bata (Diatas Pondasi & Kusen)

6 Plesteran Trasram

7 Plesteran

8 Sponengan Sudut (Tembok)

9 Sponengan Beton (pada Kolom. Balok dll.)

10 Penebalan Plesteran Sederhana

11 Penebalan Plesteran Rumit (Lengkung atau sudut > 4sudut)

12 Lantai Kerja (dengan spesi tebal + 3 Cm)

13 Lantai Kerja (dengan Rabat Beton tebal > 4 Cm)

14 Pasang Glass Blok (20/20 atau setara)

15 Pasang Roster Kayu

Page 15: Sample Hitungan RAB

Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)

M3 24000 0 24000 32.9

M3 35000 7.5 37625 32.9

M2 7200 12.5 8100 32.9

M2 6500 12.5 7312.5 32.9

M` 3500 12.5 3937.5 32.9

M2 8300 10 9130 32.9

M2 8300 10 9130 32.9

M` 2750 0 2750 32.9

M` 3250 0 3250 32.9

M` 7500 10 8250 32.9

Penebalan Plesteran Rumit (Lengkung atau sudut > 4sudut) M` 11250 10 12375 32.9

M2 3300 0 3300 32.9

M2 5200 10 5720 32.9

bh. 1900 0 1900 32.9

bh. 1000 0 1000 32.9

Page 16: Sample Hitungan RAB

Upah Total (Rp)

31895.57

50002.95

10764.76

9718.18

5232.87

12133.61

12133.61

3654.7

4319.19

10964.1

16446.15

4385.64

7601.78

2525.07

1328.98

Page 17: Sample Hitungan RAB

D PEKERJAAN ATAP & PLAFOND

1

2 Gording, Jurai, Murplate, Nog.

3 Usuk & Reng

4 Papan Ruiter

5 Lisjplank ( Tunggal )

6 Lisjplank ( Double )

7 Wenvir (Kayu Lapis Zeng)

8 Talang (Papan, Zeng, Cat Zeng & Meni Papan)

9 Plafond (Rangka Saja): 100 x 100

No JENIS PEKERJAAN

10 Plafond (Rangka Saja): 80 x 60

11 Plafond (Rangka Saja): 60 x 60

12 Plepet ( antar penutup plafond )

13 Profil Kayu ( Untuk Pertemuan Tembok & Plafond )

14 Pasang Penutup Plafond saja (Dengan Asbes/Ternit)

15 Pasang Penutup Plafond saja (Dengan Kayu Lapis)

E PEKERJAAN PENUTUP ATAP

1 Genteng Keramik

2 Genteng \"Plentong\" Kampung (Standar) 3 Genteng \"Kodok\"

Kuda Kuda Kayu ( Bentang < 9 M )

Page 18: Sample Hitungan RAB

M3 450000 35 607500 32.9

M3 430000 0 430000 32.9

M2 4000 0 4000 32.9

M` 1500 0 1500 32.9

M` 7250 0 7250 32.9

M` 14500 0 14500 32.9

M` 5000 0 5000 32.9

M` 7750 0 7750 32.9

M2 7200 0 7200 32.9

Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)

M2 11500 0 11500 32.9

M2 13000 0 13000 32.9

M` 1000 0 1000 32.9

Profil Kayu ( Untuk Pertemuan Tembok & Plafond ) M` 1900 0 1900 32.9

Pasang Penutup Plafond saja (Dengan Asbes/Ternit) M2 1300 0 1300 32.9

Pasang Penutup Plafond saja (Dengan Kayu Lapis) M2 1300 0 1300 32.9

M2 6000 17.5 7050 32.9

M2 7300 17.5 8577.5 32.9 M2 10000 17.5 11750 32.9

Page 19: Sample Hitungan RAB

807357

571462

5315.93

1993.47

9635.12

19270.24

6644.91

10299.61

9568.67

Upah Total (Rp)

15283.29

17276.77

1328.98

2525.07

1727.68

1727.68

9369.32

11399.3415615.54

Page 20: Sample Hitungan RAB

4 Kerpus Genteng Keramik

5 Kerpus Genteng Kampung

F PEKERJAAN PENUTUP LANTAI & DINDING

1 Keramik Lantai

2 Keramik Tangga

3 Keramik Dinding

4 Keramik Plin

5 Keramik Assesories

6 Pasang Dinding Batu Alam (Jenis Bt Alam Rata)

7 Pasang Dinding Batu Alam (Jenis Bt Alam Tidak Rata)

No JENIS PEKERJAAN

G

1 Bikin Kusen Pintu & Jendela (Kayu < Klas 2)

2 Bikin Kusen Pintu & Jendela ( Jati, Ulin, & Setara )

3 Bikin Krepyak untuk Kusen Pintu dan Jendela

4 Bikin Daun Pintu Panil

5 Bikin Daun Pintu Double Teakwood (Setara)

6 Bikin Daun Jendela ( Tidak Ber Regel/Teler )

7 Bikin Daun Jendela ( Termasuk Regel/Teler )

8 Stel Kusen Di Proyek

9 Stel Daun Pintu Panil

PEKERJAAN KUSEN & DAUN PINTU JENDELA

Page 21: Sample Hitungan RAB

M` 14500 17.5 17037.5 32.9

M` 14500 17.5 17037.5 32.9

M2 7400 25 9250 32.9

M2 13800 100 27600 32.9

M2 15000 100 30000 32.9

M` 3400 100 6800 32.9

bh 500 100 1000 32.9

M2 15000 200 45000 32.9

Pasang Dinding Batu Alam (Jenis Bt Alam Tidak Rata) M2 20000 50 30000 32.9

Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)

M3 575000 50 862500 32.9

M3 700000 75 1,730,000.00 32.9

M3 800000 75 1,620,000.00 32.9

bh. 48750 100 128500 32.9

bh. 26000 25 32500 32.9

bh. 30000 50 45000 32.9

bh. 32500 50 48750 32.9

M3 340000 0 340000 32.9

bh. 31000 0 31000 32.9

Page 22: Sample Hitungan RAB

22642.53

22642.53

12293.08

36679.91

39869.46

9037.08

1328.98

59804.19

39869.46

Upah Total (Rp)

1,146,247.07

2,299,139.05

2,152,951.02

170774.2

43191.92

59804.19

64787.88

451854

41198.45

Page 23: Sample Hitungan RAB

10 Stel Daun Pintu Double Teakwood (atau setara)

11 Stel Daun Jendela

12 Stel Daun Jendela BV

H PEKERJAAN SANITASI & DRAINASI

1 Pasang Closet Jongkok

2

3 Pasang Washtafel

4 Pasang Washtafel & Penyangga

5 Pasang Washbak (Tempat Cuci Piring)

6 Pasang WallShower

7 Pasang Double Hug

8 Pasang Tempat Sabun (di Dinding)

9 Pasang Kran

10 Pasang Stop Kran

11 Pasang Floor Drain

12 Pasang Avor

No JENIS PEKERJAAN

13 Bikin Bak Mandi (Standar)

14 Instalasi (PVC) Water Torn)

15 Saluran Air Bersih (PVC diameter: 1' ; 3/4' ; 1/2')

16 Saluran Air Sabun & Air Kotor dengan PVC

Pasang Closet Duduk Monoblok

Page 24: Sample Hitungan RAB

bh. 27000 0 27000 32.9

bh. 25000 0 25000 32.9

bh. 18000 0 18000 32.9

Unit 36300 0 36300 32.9

Unit 72600 0 72600 32.9

Unit 72600 0 72600 32.9

Unit 90750 0 90750 32.9

Unit 42350 0 42350 32.9

Unit 15125 0 15125 32.9

bh. 15125 0 15125 32.9

bh. 15125 0 15125 32.9

bh. 3600 0 3600 32.9

bh. 6000 0 6000 32.9

bh. 9000 0 9000 32.9

bh. 9000 0 9000 32.9

Faktor Upah Over Sat. Upah BoroAlat Langsung Head

Pekj (Rp) (%) (Rp) (%)

Unit 93750 0 93750 32.9

Unit 30000 0 30000 32.9

M' 2500 0 2500 32.9

M' 5000 0 5000 32.9

Page 25: Sample Hitungan RAB

35882.52

33224.55

23921.68

48242.05

96484.1

96484.1

120605

56282.39

20100.85

20100.85

20100.85

4784.34

7973.89

11960.84

11960.84

Upah Total

(Rp)

124592

39869.46

3322.46

6644.91

Page 26: Sample Hitungan RAB

17 Bak Kontrol Tertutup (Air Sabun & Air Bersih) Stndar

18 Bikin Sumur Resapan

19 Bikin Septictank

I PEKERJAAN STRUKTUR BETON & BAJA

1 Besi Untuk Struktur Beton Bertulang Dia < 12 mm

2 Besi Untuk Struktur Beton Bertulang Dia > 12 mm

3 Bekesting Kolom Praktis, Sloof, Ring Balok, dll.

4 Cort Beton Kolom Praktis, Sloof, Ring Balok dll.

5 Perancah Bambu

J PEKERJAAN CAT ; MELAMIN ; POLITUR

1 Cat Tembok ( 3 Sapuan )

2 Meni Bidang Kayu Baru

3 Cat Kayu ( 3 Kali Sapuan )

4 Politur

5 Melamin

6 Cat Genteng, Asbes Gelombang.

K PERKERASAN JALAN LINGKUNGAN

1 Pasang Makadam / Bt. Kali Pecah (tebal < 28 Cm)

2 Batu Pecah 5/7 (tebal < 15 Cm)

3 Batu Pecah 2/3 (tebal < 6 Cm)

No JENIS PEKERJAAN

Page 27: Sample Hitungan RAB

Bak Kontrol Tertutup (Air Sabun & Air Bersih) Stndar Unit 52000 0 52000 32.9

Unit 100000 0 100000 32.9

Unit 350000 0 350000 32.9

Besi Untuk Struktur Beton Bertulang Dia < 12 mm Kg. 400 17.5 470 32.9

Besi Untuk Struktur Beton Bertulang Dia > 12 mm Kg. 330 17.5 387.75 32.9

M2 1750 0 1750 32.9

M3 35000 35 47250 32.9

M2 3000 0 3000 32.9

M2 4125 17.5 4846.88 32.9

M2 2900 10 3190 32.9

M2 9600 35 12960 32.9

M2 13750 35 18562.5 32.9

M2 25000 35 33750 32.9

M2 2400 15 2760 32.9

Pasang Makadam / Bt. Kali Pecah (tebal < 28 Cm) M2 3300 25 4125 32.9

M2 2000 25 2500 32.9

M2 2000 25 2500 32.9

Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)

Page 28: Sample Hitungan RAB

69107.07

132898

465144

624.62

515.31

2325.72

62794.4

3986.95

6441.41

4239.45

17223.61

24669.23

44853.15

3667.99

5482.05

3322.46

3322.46

Upah Total (Rp)

Page 29: Sample Hitungan RAB

4 Sirtu (tebal < 10 Cm)

5 Pasang Conblok

6 Pengasphalan

7 Pasang Kansten

L LISTRIK DAN PENANGKAL PETIR

1 Lampu (piting & Saklar)

2 Stop Kontak.

3 NCB

4 Penangkal Petir 1 speed dgn 2 Arde (Arde maks 5,0M)

Page 30: Sample Hitungan RAB

M2 1600 25 2000 32.9

M2 4600 0 4600 32.9

M2 2500 25 3125 32.9

M' 1900 0 1900 32.9

ttk. 24200 0 24200 32.9

ttk. 24200 0 24200 32.9

Unit 82500 0 82500 32.9

Unit 310000 0 310000 32.9

Besarnya Over Head (OH) 32.90 %

Page 31: Sample Hitungan RAB

2657.96

6113.32

4153.07

2525.07

32161.37

32161.37

109641

411984

Page 32: Sample Hitungan RAB

DAFTAR ANALISIS

HARGA SATUAN PEKERJAAN (HSP) - TANPA OVER HEAD

PROYEK : SAMPLE LOKASI : SAMPLE

A PEKERJAAN PERSIAPAN

1. MOBILISASI

Upah : 1 ls.

1M2 PEMBERSIHAN LOKASI 2. PROYEK

Upah : 1.00 M2 @

1 M' PEKERJAAN UITZET & 3. BOUWPLANK

Bahan :

Papan Sengon 0.5500 Lbr @

Balok Kayu 0.0060 M3 @

Paku 0.0200 Kg. @

Upah : 1 M` @

1 M' PEMAGARAN LOKASI PROYEK

Page 33: Sample Hitungan RAB

@ Rp. 200,000.00 . = Rp. 200,000.00

Rp. 2,800.00 . = Rp. 2,800.00

Rp. 3,000.00 . = Rp. 1,650.00

Rp. 1,200,000.00 . = Rp. 7,200.00

Rp. 7,000.00 . = Rp. 140.00

. = Rp. 8,990.00

Rp. 3,000.00 . = Rp. 3,000.00

Total . = Rp. 11,990.00

Page 34: Sample Hitungan RAB

4

Bahan :

Zeng 1.2500 Lbr @

Balok Kayu 0.0300 M3 @

Paku Zeng 12.5000 bh. @

Paku 0.0200 Kg. @

Upah : 1 M` @

1 M2 PEKERJAAN 5. DIREKSIKIT

Bahan & Upah : 1.00 M2 @

6. 1 M2 PEKERJAAN MEMBUAT BRAK UNTUK GUDANG

Bahan & Upah : 1.00 m2 @

7. ADMINISTRASI DAN DOKUMENTASI

Bahan & Upah : 1 ls.

B PEKERJAAN TANAH DAN PASIR

Page 35: Sample Hitungan RAB

Rp. 8,000.00 . = Rp. 10,000.00

Rp. 1,200,000.00 . = Rp. 36,000.00

Rp. 150.00 . = Rp. 1,875.00

Rp. 7,000.00 . = Rp. 140.00

. = Rp. 48,015.00

Rp. 5,000.00 . = Rp. 5,000.00

Total . = Rp. 53,015.00

Rp. 100,000.00 . = Rp. 100,000.00

Rp. 100,000.00 . = Rp. 100,000.00

@ Rp. 150,000.00 . = Rp. 150,000.00

Page 36: Sample Hitungan RAB

1 M3 PEKERJAAN GALIAN TANAH 1. BIASA Untuk Pondasi Batu Kali

Upah : 1 m3 @

2. 1 M3 PEKERJAAN GALIAN TANAH s.d. -2 M Untuk Foot Plate

Upah : 1 m3 @

1 M3 PEKERJAAN URUGAN TANAH 3. KEMBALI

Upah : *) 1 m3 @ *). Termasuk Pemadatan

4. 1 M3 PEKERJAAN URUGAN TANAH Dengan Mendatangkan Tanah dari Luar

Bahan :

Tanah Urug 1.2000 m3 @

Upah : *) 1 m3 @

*). Termasuk Pemadatan

5. 1 M3 PEKERJAAN URUGAN PASIR

Bahan :

Pasir 1.2000 m3 @

Page 37: Sample Hitungan RAB

Rp. 8,500.00 . = Rp. 8,500.00

Total . = Rp. 8,500.00

Rp. 10,000.00 . = Rp. 10,000.00

Total . = Rp. 10,000.00

Rp. 4,500.00 . = Rp. 4,500.00

Total . = Rp. 4,500.00

Rp. 22,500.00 . = Rp. 27,000.00

Rp. 6,500.00 . = Rp. 6,500.00

Total . = Rp. 33,500.00

Rp. 27,000.00 . = Rp. 32,400.00

Page 38: Sample Hitungan RAB

Upah : 1 m3 @

6. 1 M2 PEKERJAAN URUGAN PASIR TEBAL = 10 CM`

Bahan :

Pasir 0.1200 m3 @

Upah : 1 m3 @

C PEKERJAAN PASANGAN & PLESTERAN

1. 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS )

Bahan :

Batu Kali 1.2000 m3 @ Rp. 35,000.00

Semen (pc) 3.0698 zak @ Rp. 22,000.00

Kapur - zak @ Rp. 4,500.00

Pasir Pasang 0.6175 m3 @ Rp. 50,000.00

Upah : 1 m3 @ Rp. 37,625.00

1 M3 PEKERJAAN PASANGAN BATU KALI 2. KOSONG

Bahan :

Batu Kali 1.2000 m3 @ Rp. 35,000.00 Pasir Pasang 0.4500 m3 @

Page 39: Sample Hitungan RAB

Rp. 4,950.00 . = Rp. 4,950.00

Total . = Rp. 37,350.00

Rp. 27,000.00 . = Rp. 3,240.00

Rp. 1,243.13 . = Rp. 1,243.13

Total . = Rp. 4,483.13

1. 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS )

m3 @ Rp. 35,000.00 . = Rp. 42000

zak @ Rp. 22,000.00 . = Rp. 67535.08

. = Rp. -

m3 @ Rp. 50,000.00 . = Rp. 30873.18

. = Rp. 140408.26

m3 @ Rp. 37,625.00 . = Rp. 37625

Total : . = Rp. 178033.26

m3 @ Rp. 35,000.00 . = Rp. 42000 . = Rp.

Page 40: Sample Hitungan RAB

Rp. 27,000.00

Upah : 1 m3 @ Rp. 24,000.00

1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 PC : 3. 3 PS)

Bahan :

Batu Bata 77.0000 bh @ Rp. 180.00

Semen (pc) 0.6077 zak @ Rp. 22,000.00

Kapur - zak @ Rp. 4,500.00

Pasir Pasang (Ayak) 0.0611 m3 @ Rp. 50,000.00

Upah : 1 m2 @ Rp. 8,100.00

4. 1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS)

Bahan :

Batu Bata 70.0000 bh @ Rp. 180.00

Semen (pc) 0.4093 zak @ Rp. 22,000.00 Kapur - zak @

Page 41: Sample Hitungan RAB

Rp. 27,000.00 12150

. = Rp. 54150

m3 @ Rp. 24,000.00 . = Rp. 24000

Total : . = Rp. 78150

1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 PC :

bh @ Rp. 180.00 . = Rp. 13860

zak @ Rp. 22,000.00 . = Rp. 13369.32

zak @ Rp. 4,500.00 . = Rp. -

m3 @ Rp. 50,000.00 . = Rp. 3,055.84

. = Rp. 30285.16

m2 @ Rp. 8,100.00 . = Rp. 8,100.00

Total . = Rp. 38385.16

4. 1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS)

70.0000 bh @ Rp. 180.00 . = Rp. 12600

0.4093 zak @ Rp. 22,000.00 . = Rp. 9,004.49

. = Rp. -

Page 42: Sample Hitungan RAB

Pasir Pasang (Ayak) 0.0686 m3 @ Rp. 50,000.00

Upah : 1.0000 m2 @ Rp.

1 M' PEKERJAAN ROLLAG BATA (1 PC : 5. 3 PS)

Bahan :

Batu Bata 14 bh @ Rp.

Semen (pc) 0.2263 zak @ Rp.

Pasir Pasang (Ayak) 0.0122 m3 @ Rp.

Upah : 1 m' @ Rp.

1 M2 PEKERJAAN PLESTERAN (1PC : 5 PS), T = 20 6. MM

Bahan :

Semen (pc) 0.1428 zak @ Rp.

Kapur - zak @ Rp.

Pasir Pasang (Ayak) 0.0239 m3 @ Rp.

Upah : 1.0000 m2 @ Rp.

1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 7. MM

Bahan : Semen (pc) 0.2121 zak @

Page 43: Sample Hitungan RAB

Rp. 4,500.00

0.0686 m3 @ Rp. 50,000.00 . = Rp. 3,430.28

. = Rp. 25034.77

7312.5 . = Rp. 7,312.50

Total . = Rp. 32347.27

180 . = Rp. 2,520.00

22000 . = Rp. 4,978.82

50000 . = Rp. 611.68 . = Rp. 8,110.51

3937.5 . = Rp. 3,937.50

Total . = Rp. 12048.01

22000 . = Rp. 3,142.38

4500 . = Rp. -

50000 . = Rp. 1,197.10 . = Rp. 4,339.48

9130 . = Rp. 9,130.00

Total . = Rp. 13469.48

. = Rp. 4,665.62

Page 44: Sample Hitungan RAB

Kapur - zak @ Rp. 4,500.00

Pasir Pasang (Ayak) 0.0213 m3 @ Rp. 50,000.00

Upah : 1 m2 @ Rp. 9,130.00

1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6 8. MM

Bahan :

Semen (pc) 0.0943 zak @ Rp. 22,000.00

Kapur - zak @ Rp. 4,500.00

Pasir Pasang (Ayak) 0.0095 m3 @ Rp. 50,000.00

Upah : 1 m2 @ Rp. 9,130.00

1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC : 2 9. PS )

Bahan :

Semen (pc) 0.0249 zak @ Rp. 22,000.00

Kapur (Mill) - zak @ Rp. 4,500.00

Pasir Pasang (Ayak) 0.0017 m3 @ Rp. 50,000.00

Upah : 1 m2 @

Page 45: Sample Hitungan RAB

Rp. 22,000.00

zak @ Rp. 4,500.00 . = Rp. -

m3 @ Rp. 50,000.00 . = Rp. 1,066.43

. = Rp. 5,732.05

m2 @ Rp. 9,130.00 . = Rp. 9,130.00

Total . = Rp. 14862.05

1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6

zak @ Rp. 22,000.00 . = Rp. 2,073.61

zak @ Rp. 4,500.00 . = Rp. -

m3 @ Rp. 50,000.00 . = Rp. 473.97

. = Rp. 2,547.58

m2 @ Rp. 9,130.00 . = Rp. 9,130.00

Total . = Rp. 11677.58

zak @ Rp. 22,000.00 . = Rp. 547.39

zak @ Rp. 4,500.00 . = Rp. -

m3 @ Rp. 50,000.00 . = Rp. 83.41

. = Rp. 630.81

. = Rp. 2,750.00

Page 46: Sample Hitungan RAB

1 M2 PEKERJAAN PENEBALAN PLESTERAN 10. TYPE A

Bahan :

Semen (pc) 0.0071 zak @ Rp. 22,000.00

Pasir Pasang (Ayak) 0.0012 m3 @ Rp. 50,000.00

Upah : 1 m2 @ Rp. 8,250.00

1 M2 PEKERJAAN PENEBALAN PLESTERAN 11. TYPE B

Bahan :

Semen (pc) 0.0114 zak @ Rp. 22,000.00

Pasir Pasang (Ayak) 0.0019 m3 @ Rp. 50,000.00

Upah : 1 m2 @ Rp. 8,250.00

12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM

Bahan :

Semen (pc) 0.3414 zak @ Rp. 22,000.00

Pasir Pasang (Ayak) 0.0458 m3 @ Rp. 50,000.00

Upah : 1 m2 @ Rp. 3,300.00

Page 47: Sample Hitungan RAB

Rp. 2,750.00 Total . = Rp. 3,380.81

. = Rp. 157.12

. = Rp. 59.85

. = Rp. 216.97

. = Rp. 8,250.00

Total . = Rp. 8,466.97

. = Rp. 251.39

. = Rp. 95.77

. = Rp. 347.16

. = Rp. 8,250.00

Total . = Rp. 8,597.16

12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM

. = Rp. 7510.84

. = Rp. 2289.02

. = Rp. 9799.86

. = Rp. 3300

Total . = Rp. 13099.86

Page 48: Sample Hitungan RAB

3,380.81

157.12

59.85

216.97

8,250.00

8,466.97

251.39

95.77

347.16

8,250.00

8,597.16

Page 49: Sample Hitungan RAB

1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : 5 KR) TEBAL 13. 50 MM

Bahan :

Semen (pc) 0.3047 zak @ Rp. 22,000.00

Pasir 0.0292 m3 @ Rp. 50,000.00

Krikil 0.0266 m3 @ Rp. 50,000.00

Upah : 1 m2 @ Rp. 5,720.00

E PEKERJAAN PENUTUP LANTAI DAN DINDING

1. 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 30/30

Bahan :

Keramik Lantai 1.1000 m2 @

Semen (pc) 0.1730 zak @

Pasir 0.0206 m3 @

Semen Grouting 0.1833 m3 @

Page 50: Sample Hitungan RAB

zak @ Rp. 22,000.00 . = Rp. 6702.65

m3 @ Rp. 50,000.00 . = Rp. 1462.4

m3 @ Rp. 50,000.00 . = Rp. 1327.76

. = Rp. 9492.8

m2 @ Rp. 5,720.00 . = Rp. 5720

Total . = Rp. 15212.8

Rp. 30,000.00 . = Rp. 33000

Rp. 22,000.00 . = Rp. 3805.49

Rp. 50,000.00 . = Rp. 1030.06

Rp. 7,500.00 . = Rp. 1375

Page 51: Sample Hitungan RAB

Upah : 1 m2

2. 1M2 PEKERJAAN PASANGAN KERAMIK KM/WC 20/20

Bahan :

Keramik Serit 1.1000 m2

Semen (pc) 0.1730 zak

Pasir 0.0206 m3

Semen Grouting 0.1833 m3

Upah : 1 m2

3. 1M2 PEKERJAAN PASANGAN KERAMIK DINDING

Bahan :

Keramik Dinding 1.1000 m2

Semen (pc) 0.1297 zak

Pasir 0.0155 m3

Semen Grouting 0.1833 m3

Upah : 1 m2

Page 52: Sample Hitungan RAB

. = Rp. 39210.55

@ Rp. 9,250.00 . = Rp. 9250

Total . = Rp. 48460.55

@ Rp. 35,000.00 . = Rp. 38500

@ Rp. 22,000.00 . = Rp. 3805.49

@ Rp. 50,000.00 . = Rp. 1030.06

@ Rp. 7,500.00 . = Rp. 1375

. = Rp. 44710.55

@ Rp. 9,250.00 . = Rp. 9250

Total . = Rp. 53960.55

@ Rp. 33,000.00 . = Rp. 36300

@ Rp. 22,000.00 . = Rp. 2854.12

@ Rp. 50,000.00 . = Rp. 772.54

@ Rp. 7,500.00 . = Rp. 1375

. = Rp. 41301.66

@ Rp. 30,000.00 . = Rp. 30000

Total . = Rp. 71301.66

Page 53: Sample Hitungan RAB

4. 1M' PEKERJAAN PASANGAN KERAMIK PLINT T = 12 CM

Bahan :

Keramik Dinding 0.1667 m2

Semen (pc) 0.0156 zak

Pasir 0.0019 m3

Semen Grouting 0.0220 m3

Upah : 1 m2

5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM

Bahan :

Keramik Assesories 1.1000 bh

Semen (pc) 0.0021 zak

Pasir 0.0002 m3

Semen Grouting 0.0029 m3

Upah : 1 m2

6. 1M2 PEKERJAAN BATU ALAM PADA

Page 54: Sample Hitungan RAB

@ Rp. 30,000.00 . = Rp. 5001

@ Rp. 22,000.00 . = Rp. 342.49

@ Rp. 50,000.00 . = Rp. 92.71

@ Rp. 7,500.00 . = Rp. 165

. = Rp. 5601.2

@ Rp. 6,800.00 . = Rp. 6800

Total . = Rp. 12401.2

5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM

@ Rp. 4,000.00 . = Rp. 4400

@ Rp. 22,000.00 . = Rp. 45.67

@ Rp. 50,000.00 . = Rp. 12.36

@ Rp. 7,500.00 . = Rp. 22

. = Rp. 4480.03

@ Rp. 1,000.00 . = Rp. 1000

Total . = Rp. 5480.03

Page 55: Sample Hitungan RAB

DINDING

Bahan :

Batu Alam 1.1200

Semen (pc) 0.1297

Pasir 0.0155

Upah : 1

7. 1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PADA PILAR

Bahan :

Batu Belah 275.0000

Semen (pc) 0.1297

Pasir 0.0155

Upah : 1

G PEKERJAAN RANGKA ATAP & PLAFOND

1. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING

Page 56: Sample Hitungan RAB

m2 @ Rp. 65,000 . = Rp. 72800

zak @ Rp. 22,000 . = Rp. 2854.12

m3 @ Rp. 50,000 . = Rp. 772.54

. = Rp. 76426.66

m2 @ Rp. 45,000 . = Rp. 45000

Total . = Rp. 121426.66

bh @ Rp. 500.00 . = Rp. 137500

zak @ Rp. 22,000 . = Rp. 2854.12

m3 @ Rp. 50,000 . = Rp. 772.54

. = Rp. 141126.66

m2 @ Rp. 30,000 . = Rp. 30000

Total . = Rp. 171126.66

1. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING

Page 57: Sample Hitungan RAB

(Jarak Usuk 40; Jarak Reng 36 cm)

Bahan :

Balok Kayu 0.0092 m3

Reng Kayu 0.0045 Kg

Paku 0.2000 Kg

Upah : 1 M2

2. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING (Jarak Usuk 45 cm; Jarak Reng 35 cm)

Bahan :

Balok Kayu 0.0092 m3

Reng Kayu 0.0064 Kg

Paku 0.2000 Kg

Upah : 1 M2

3. 1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI 8/12

Bahan : Balok Kayu m3

Page 58: Sample Hitungan RAB

@ Rp. 2,800,000.00 . = Rp. 25,872.00

@ Rp. 1,800,000.00 . = Rp. 8,188.71

@ Rp. 7 . = Rp. 1,400.00

. = Rp. 35,460.71

@ Rp. 4 . = Rp. 4,000.00

Total : . = Rp. 39,460.71

2. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING

@ Rp. 2,800,000.00 . = Rp. 25,872.00

@ Rp. 1,800,000.00 . = Rp. 11,583.00

@ Rp. 7 . = Rp. 1,400.00

. = Rp. 38,855.00

@ Rp. 4 . = Rp. 4,000.00

Total : . = Rp. 42,855.00

3. 1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI 8/12

@ . = Rp. 3,080,000.00

Page 59: Sample Hitungan RAB

1.1

Baut 50.0833 bh

Upah : 1 m3

1 M` PEKERJAAN PAPAN RUITER KAYU BANGKIRAI 4. 2/20

Bahan :

Papan Kayu 0.0044 m3

Paku 0.0200 bh

Upah : 1 m`

1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU BANGKIRAI 5. 2/25

Bahan :

Papan Kayu 0.0055 m3

Paku 0.0200 bh

Upah : 1 m`

6. 1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20; 2/25

Bahan :

Papan Kayu 0.0110 m3

Paku 0.0400 bh

Upah : 1 m`

Page 60: Sample Hitungan RAB

Rp. 2,800,000.00

@ Rp. 1,500.00 . = Rp. 75,125.00

. = Rp. 3,155,125.00

@ Rp. 430,000.00 . = Rp. 430,000.00

Total : . = Rp. 3,585,125.00

@ Rp. 3,000,000.00 . = Rp. 13,200.00

@ Rp. 7,000.00 . = Rp. 140.00

. = Rp. 13,340.00

@ Rp. 1,500.00 . = Rp. 1,500.00

Total : . = Rp. 14,840.00

1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU BANGKIRAI

@ Rp. 3,000,000.00 . = Rp. 16,500.00

@ Rp. 7,000.00 . = Rp. 140.00

. = Rp. 16,640.00

@ Rp. 7,250.00 . = Rp. 7,250.00

Total : . = Rp. 23,890.00

6. 1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20; 2/25

@ Rp. 3,000,000.00 . = Rp. 33,000.00

@ Rp. 7,000.00 . = Rp. 280.00

. = Rp. 33,280.00

@ Rp. 14,500.00 . = Rp. 14,500.00

Total : . = Rp. 47,780.00

Page 61: Sample Hitungan RAB

1M' PEKERJAAN TALANG ZENG; PAPAN KAYU 7. MERANTI

Bahan :

Seng BJLS 30 1.1000

Papan Kayu Meranti 0.0176

Paku Seng (Payung) 10.0000

Paku 0.2000

Upah : 1

1 M' PEKERJAAN WENVIR 8 DENGAN SENG

Bahan :

Seng 1.1

Papan Kayu Meranti 0.0026

Paku 0.02

Upah : 1

1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP 9. GYPSUM

Rangka = 60 x 60 CM

Bahan :

Gypsum 0.3819

Balok Kayu 0.0136

Paku 0.2000

Paku Plepet 0.0200

Page 62: Sample Hitungan RAB

m' @ Rp. 24,000.00 . = Rp. 26,400.00

m3 @ Rp. 1,400,000.00 . = Rp. 24,640.00

buah @ Rp. 150.00 . = Rp. 1,500.00

kg @ Rp. 7,000.00 . = Rp. 1,400.00

. = Rp. 53,940.00

m' @ Rp. 7,750.00 . = Rp. 7,750.00

Total . = Rp. 61,690.00

m' @ Rp. 8,000.00 . = Rp. 8,800.00

m3 @ Rp. 1,400,000.00 . = Rp. 3,640.00

kg @ Rp. 7,000.00 . = Rp. 140.00

. = Rp. 12,580.00

m' @ Rp. 5,000.00 . = Rp. 5,000.00

Total . = Rp. 17,580.00

1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP

m3 @ Rp. 35,000.00 . = Rp. 13,368.06

m3 @ Rp. 1,800,000.00 . = Rp. 24,552.00

Kg @ Rp. 7,000.00 . = Rp. 1,400.00

Kg @ Rp. 8,000.00 . = Rp. 160.00

. = Rp. 39,480.06

Page 63: Sample Hitungan RAB

Upah : 1

10. 1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP CALSIBOARD Rangka = 100 x 100 CM

Bahan :

Calsiboard 0.3819

Balok Kayu 0.0092

Paku 0.2000

Paku Plepet 0.0200

Upah : 1

1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 11. CM

Bahan dan Upah :

Lis Gypsium L=10 cm 1.0000

H PEKERJAAN PENUTUP ATAP & PLAFOND.

1. 1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO SE, BESAR

Bahan :

Genteng Keramik 9.9000 bh @ Rp.

Upah : 1.0000 m2 @ Rp.

2. 1 M' PEKERJAAN KERPUS GENTENG KERAMIK SOKKA TYPE MORANDO SE, BESAR

Bahan :

Page 64: Sample Hitungan RAB

m2 @ Rp. 13,000.00 . = Rp. 13,000.00

Total : . = Rp. 52,480.06

10. 1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP CALSIBOARD

m3 @ Rp. 30,000.00 . = Rp. 11,458.33

m3 @ Rp. 1,800,000.00 . = Rp. 16,632.00

Kg @ Rp. 7,000.00 . = Rp. 1,400.00

Kg @ Rp. 8,000.00 . = Rp. 160.00

. = Rp. 29,650.33

m2 @ Rp. 7,200.00 . = Rp. 7,200.00

Total : . = Rp. 36,850.33

m3 m' Rp. 8,000.00 . = Rp. 8,000.00

Total : . = Rp. 8,000.00

1. 1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO SE, BESAR

2,100.00 . = Rp. 20790

. = Rp. 20790

1.0000 m2 @ Rp. 7,050.00 . = Rp. 7050

Total : . = Rp. 27840

2. 1 M' PEKERJAAN KERPUS GENTENG KERAMIK SOKKA TYPE MORANDO SE, BESAR

Page 65: Sample Hitungan RAB

Genteng Kerpus 3.3000 m3 @ Rp.

Semen 0.2601 m3 @ Rp.

Pasir 0.0366 Kg @ Rp.

Upah : 1.0000 m2 @ Rp.

F PEKERJAAN KUSEN DAN DAUN PINTU JENDELA

1. 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12

Bahan : Balok Kayu 1.1000 m3 Paku 5.0000 Kg

Upah : 1 m3

2. 1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12

Bahan : Balok Kayu 0.0087 m3 Paku 0.0360 Kg

Upah : 1 m'

3. 1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK KUSEN

Bahan : Papan Kayu 1.1000 m3 Paku 5.0000 Kg

Upah : 1 m3

1 BH DAUN PINTU PANIL 3,5 X 82 X 200 4. CM

Bahan :

Papan Kayu 0.0631 m3 Lem 0.1500 Kg

Page 66: Sample Hitungan RAB

4,000.00 . = Rp. 13200

22,000.00 . = Rp. 5722.54

50,000.00 . = Rp. 1831.21

. = Rp. 20753.76

17,037.50 . = Rp. 17037.5

Total : . = Rp. 37791.26

1. 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12

@ Rp. 6,000,000.00 . = Rp. 6,600,000.00

@ Rp. 7,000.00 . = Rp. 35,000.00

. = Rp. 6,635,000.00

@ Rp. 1,730,000.00 . = Rp. 1,730,000.00

Total : . = Rp. 8,365,000.00

@ Rp. 6,000,000.00 . = Rp. 52,272.00

@ Rp. 7,000.00 . = Rp. 252.00

. = Rp. 52,524.00

@ Rp. 12,456.00 . = Rp. 12,456.00

Total : . = Rp. 64,980.00

@ Rp. 8,000,000.00 . = Rp. 8,800,000.00

@ Rp. 7,000.00 . = Rp. 35,000.00

. = Rp. 8,835,000.00

@ Rp. 1,620,000.00 . = Rp. 1,620,000.00

Total : . = Rp. 10,455,000.00

@ Rp. 8,000,000.00 . = Rp. 504,800.00

@ Rp. 8,000.00 . = Rp. 1,200.00

Page 67: Sample Hitungan RAB

6,600,000.00

35,000.00

6,635,000.00

1,730,000.00

8,365,000.00

52,272.00

252.00

52,524.00

12,456.00

64,980.00

8,800,000.00

35,000.00

8,835,000.00

1,620,000.00

10,455,000.00

504,800.00

1,200.00

Page 68: Sample Hitungan RAB

Upah : 1 bh

1 BH DAUN PINTU PANIL 3 X 74 5. X 200 CM

Bahan : Papan Kayu 0.0488 m3

Lem 0.1500 Kg

Upah : 1 bh

1 BH DAUN PINTU PANIL 3 X 61 6. X 200 CM

Bahan : Papan Kayu 0.0403 m3

Lem 0.1500 Kg

Upah : 1 bh

1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI 7. POLITUR

Bahan :

Ram Kayu 3,5 cm 0.0156 m3 @

Kaca Bening 5 mm 0.4725 m2 @

Upah : 1 bh @

1 BH DAUN JENDELA 62 X 116 CM; KAYU JATI 8. POLITUR

Bahan :

Ram Kayu 3,5 cm 0.0137 m3 @

Kaca Bening 5 mm 0.4500 m2 @

Upah : 1 bh @

Page 69: Sample Hitungan RAB

. = Rp. 506,000.00

@ Rp. 184,740.00 . = Rp. 184,740.00

Total : . = Rp. 690,740.00

@ Rp. 8,000,000.00 . = Rp. 390,400.00

@ Rp. 8,000.00 . = Rp. 1,200.00

. = Rp. 391,600.00

@ Rp. 179,020.00 . = Rp. 179,020.00

Total : . = Rp. 570,620.00

@ Rp. 8,000,000.00 . = Rp. 322,400.00

@ Rp. 8,000.00 . = Rp. 1,200.00

. = Rp. 323,600.00

@ Rp. 175,620.00 . = Rp. 175,620.00

Total : . = Rp. 499,220.00

Rp. 8,000,000.00 . = Rp. 124,800.00

Rp. 60,00 . = Rp. 28,350.00

. = Rp. 153,150.00

Rp. 70,00 . = Rp. 70,000.00

Total : . = Rp. 223,150.00

Rp. 8,000,000.00 . = Rp. 109,600.00

Rp. 60,00 . = Rp. 27,000.00

. = Rp. 136,600.00

Rp. 70,00 . = Rp. 70,000.00

Page 70: Sample Hitungan RAB

1 BH DAUN JENDELA 62 X 166 CM; KAYU JATI 9. POLITUR

Bahan :

Ram Kayu 3,5 cm 0.0176 m3 @

Kaca Bening 5 mm 0.6750 m2 @

Upah : 1 bh @

10. 1 BH ROSTER KAYU 30 X 40 CM

Bahan :

Roster Kayu 1.0000 bh @

Upah : 1 bh @

1 M2 PEKERJAAN KACA ES UNTUK 11. BOVEN

Bahan dan Upah :

Kaca Es 5mm 1.0000 m2 @

Lis Kayu 4.0000 m' @

J PEKERJAAN CAT DAN POLITUR

1. 1 M2 PENGECATAN KAYU BARU

Bahan :

Cat Kayu 0.2750 Kg @ Rp. 33,000.00

Plamur Kayu 0.1375 Kg @ Rp. 9,700.00

Dempul Jadi 0.5000 bh @ Rp. 1,000.00 Thiner ltr @

Page 71: Sample Hitungan RAB

Total : . = Rp. 206,600.00

Rp. 8,000,000.00 . = Rp. 140,800.00

Rp. 60,000.00 . = Rp. 40,500.00

. = Rp. 181,300.00

Rp. 70,000.00 . = Rp. 70,000.00

Total : . = Rp. 251,300.00

Rp. 45,000.00 . = Rp. 45,000.00

. = Rp. 45,000.00

Rp. 1,000.00 . = Rp. 1,000.00

Total : . = Rp. 46,000.00

Rp. 70,000.00 . = Rp. 70,000.00

Rp. 3,000.00 . = Rp. 12,000.00

Total : . = Rp. 82,000.00

Kg @ Rp. 33,000.00 . = Rp. 9,075.00

Kg @ Rp. 9,700.00 . = Rp. 1,333.75

bh @ Rp. 1,000.00 . = Rp. 500.00

. = Rp. 1,125.00

Page 72: Sample Hitungan RAB

0.25

Amplas 1.0000 lbr @ Rp. 1,250.00

Upah : 1 bh @ Rp. 12,960.00

1M2 PEKERJAAN MENI BIDANG KAYU 2 BARU

Bahan :

Menie Jadi 0.275 kg

Upah : 1.0000 m2 @ Rp. 3,190.00

1M2 PEKERJAAN PENGECATAN KAYU 3 BARU

Bahan dan Upah:

Cat-catan 1.0000 m2 @ Rp. 26,243.75

Menie 1.0000 m2 @ Rp. 4,840.00

4 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC (Untuk Eksterior dan Plafon)

Bahan :

Cat Tembok Catylac 0.183 kg

Plamur Jadi 0.046 kg

Amplas 0.25 lbr

Upah : 1.0000 m2 @ Rp. 4,846.88

5 1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA

Bahan :

Page 73: Sample Hitungan RAB

Rp. 4,500.00

lbr @ Rp. 1,250.00 . = Rp. 1,250.00

. = Rp. 13,283.75

bh @ Rp. 12,960.00 . = Rp. 12,960.00

Total : . = Rp. 26,243.75

@ Rp. 6,000.00 . = Rp. 1,650.00

. = Rp. 1,650.00

1.0000 m2 @ Rp. 3,190.00 . = Rp. 3,190.00

Total . = Rp. 4,840.00

1.0000 m2 @ Rp. 26,243.75 . = Rp. 26,243.75

1.0000 m2 @ Rp. 4,840.00 . = Rp. 4,840.00

Total . = Rp. 31,083.75

1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC

@ Rp. 10,000.00 . = Rp. 1,830.00

@ Rp. 5,800.00 . = Rp. 266.80

@ Rp. 1,250.00 . = Rp. 312.50

. = Rp. 2,409.30

1.0000 m2 @ Rp. 4,846.88 . = Rp. 4,846.88

Total . = Rp. 7,256.18

1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA

Page 74: Sample Hitungan RAB

Sirlak 0.0275 kg @ Rp. 60,000.00

Spirtus 0.55 kg @ Rp. 6,000.00

Batu Apung 0.3667 kg @ Rp. 4,000.00

Upah : 1.0000 m2 @ Rp. 18,562.50

D PEKERJAAN BETON BERTULANG

1. 1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN MOLEN

Bahan :

Semen (pc) 8.5150 zak @ Rp. 22,000.00

Pasir Beton 0.5450 m3 @ Rp. 50,000.00

Kerikil 0.8174 m3 @ Rp. 50,000.00

Upah : 1 m3 @ Rp. 47,250.00

2 1Kg. PEMBESIAN U-24 (Alat Gunting)

Bahan :

Besi Beton 1.1000 kg @ Rp. 4,500.00

Bendrat (kawat beton) 0.0200 kg @ Rp. 8,000.00

Upah : 1.0000 m3 @ Rp. 428.88

3 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK DENGAN PAPAN SENGON

Bahan :

Page 75: Sample Hitungan RAB

@ Rp. 60,000.00 . = Rp. 1,650.00

@ Rp. 6,000.00 . = Rp. 3,300.00

@ Rp. 4,000.00 . = Rp. 1,466.80

. = Rp. 6,416.80

. = Rp. 18,562.50

Total . = Rp. 24,979.30

1. 1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN MOLEN

zak @ Rp. 22,000.00 . = Rp. 187329.7

m3 @ Rp. 50,000.00 . = Rp. 27247.96

m3 @ Rp. 50,000.00 . = Rp. 40871.93

. = Rp. 255449.59

m3 @ Rp. 47,250.00 . = Rp. 47250

Total . = Rp. 302699.59

. = Rp. 4950

. = Rp. 160

. = Rp. 5110

. = Rp. 428.88

Total . = Rp. 5538.88

1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK

Page 76: Sample Hitungan RAB

Papan sengon 2.7500 lbr @ Rp. 3,000.00

Paku 0.2000 kg @ Rp. 7,000.00

Upah : 1.0000 m2 @ Rp. 1,750.00

1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 4 12 CM

Rangka (0,6 x 0,6) m. Bahan :

Balok Kayu/ Bambu 55.0000 btg @ Rp. 4,500.00

Paku 1.6600 kg @ Rp. 7,000.00

Upah : 1 ls

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK 5 SLOOF 15/20

(1pc : 2ps : 3 Kr) Bahan dan Upah :

Beton 1.0000 m3 @ Rp. 302,699.59

Besi Beton U-24 100.0000 kg @ Rp. 5,538.88

Bekesting 5.0000 m2 @ Rp. 11,400.00

6 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah :

Beton 1.0000 m3 @ Rp. 302,699.59 Besi Beton U-24 120.0000 kg

Page 77: Sample Hitungan RAB

. = Rp. 8250

. = Rp. 1400

. = Rp. 9650

. = Rp. 1750

Total . = Rp. 11400

1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL

. = Rp. 247500

. = Rp. 11620

. = Rp. 259120

@ Rp. 24,990.00 . = Rp. 24990

Total . = Rp. 284110

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK

. = Rp. 302699.59

. = Rp. 553887.5

. = Rp. 57000

Total . = Rp. 913587.09

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15

. = Rp. 302699.59 . = Rp.

Page 78: Sample Hitungan RAB

@ Rp. 5,538.88

Bekesting 5.0000 m2 @ Rp. 11,400.00

7 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah :

Beton 1.0000 m3 @ Rp. 302,699.59

Besi Beton U-24 120.0000 kg @ Rp. 5,538.88

Bekesting 5.0000 m2 @ Rp. 11,400.00

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK 8 CANOPY

(1pc : 2ps : 3 Kr) Bahan dan Upah :

Beton 1.0000 m3 @ Rp. 302,699.59

Besi Beton U-24 125.0000 kg @ Rp. 5,538.88

Bekesting 5.0000 m2 @ Rp. 11,400.00

Perancah Bambu 0.5000 ls @ Rp. 284,110.00

M PEKERJAAN SANITASI DAN DRAINASI

1 1 M' PEKERJAAN INSTALASI AIR BERSIH

Bahan :

Pipa PVC 3/4\" 0.275

Sock 0.275

Knee 0.1875

Lem PC 0.1

Page 79: Sample Hitungan RAB

@ Rp. 5,538.88 664665

5.0000 m2 @ Rp. 11,400.00 . = Rp. 57000

Total . = Rp. 1,024,364.59

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15

1.0000 m3 @ Rp. 302,699.59 . = Rp. 302699.59

. = Rp. 664665

5.0000 m2 @ Rp. 11,400.00 . = Rp. 57000

Total . = Rp. 1,024,364.59

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK

1.0000 m3 @ Rp. 302,699.59 . = Rp. 302699.59

. = Rp. 692359.38

5.0000 m2 @ Rp. 11,400.00 . = Rp. 57000

0.5000 ls @ Rp. 284,110.00 . = Rp. 142055

Total . = Rp. 1,194,113.97

btg @ Rp. 14,000.00 . = Rp.

bh @ Rp. 2,000.00 . = Rp.

bh @ Rp. 2,500.00 . = Rp.

tube @ Rp. 3,500.00 . = Rp. . = Rp.

Page 80: Sample Hitungan RAB

3,850.00

550.00

468.75

350.00

5,218.75

Page 81: Sample Hitungan RAB

Upah : 1

2 1 M' PEKERJAAN INSTALASI AIR KOTOR DAN AIR BEKAS

Bahan :

Pipa PVC 3\ 0.275

Sock 0.275

Knee 0.1875

Lem PVC 0.2

Upah : 1

3 1 UNIT PEKERJAAN PASANG CLOSET DUDUK

Bahan :

Closet Duduk Monoblok 1

Upah : 1

4 1 UNIT PEKERJAAN PASANG CLOSET JONGKOK

Bahan :

Closet Jon 1

Dudukan cl 1

Upah : 1

5 1 UNIT PEKERJAAN PASANG WASHTAFEL

Bahan :

Washtafel 1

Page 82: Sample Hitungan RAB

m' @ Rp. 2,500.00 . = Rp. Total . = Rp.

1 M' PEKERJAAN INSTALASI AIR KOTOR DAN AIR BEKAS

btg @ Rp. 85,000.00 . = Rp.

bh @ Rp. 5,000.00 . = Rp.

bh @ Rp. 7,800.00 . = Rp.

tube @ Rp. 3,500.00 . = Rp. . = Rp.

m' @ Rp. 5,000.00 . = Rp. Total . = Rp.

set @ Rp. 1,000,000.00 . = Rp. . = Rp.

unit @ Rp. 72,600.00 . = Rp.

Total . = Rp.

bh @ Rp. 74,500.00 . = Rp.

ls @ Rp. 25,000.00 . = Rp. . = Rp.

unit @ Rp. 36,300.00 . = Rp. Total . = Rp.

set @ Rp. 200,000.00 . = Rp.

Page 83: Sample Hitungan RAB

2,500.00

7,718.75

23,375.00

1,375.00

1,462.50

700.00

26,912.50

5,000.00

31,912.50

1,000,000.00

1,000,000.00

72,600.00

1,072,600.00

74,500.00

25,000.00

99,500.00

36,300.00

135,800.00

200,000.00

Page 84: Sample Hitungan RAB

Upah : 1

6 1 UNIT PEKERJAAN PASANG WALL SHOWER

Bahan :

Wallshower 1

Upah : 1

7 1 BH PEKERJAAN PASANG FLOOR DRAIN

Bahan :

Floordrain 1.0000 bh

Upah : 1 unit

1 BH PEKERJAAN PASANG AVOR (KURASAN 8 BAK)

Bahan :

Avor 1.0000 bh

Upah : 1 unit

1 BH PEKERJAAN KERAN 9 AIR

Bahan :

Keran Air (rata-rata) 1.0000 bh

Knee 1.0000 bh

Page 85: Sample Hitungan RAB

. = Rp.

unit @ Rp. 72,600.00 . = Rp. Total . = Rp.

set @ Rp. 50,000.00 . = Rp. . = Rp.

unit @ Rp. 15,125.00 . = Rp. Total . = Rp.

@ Rp. 10,000.00 . = Rp. 10000

. = Rp. 10000

@ Rp. 9,000.00 . = Rp. 9000

Total . = Rp. 19000

@ Rp. 5,000.00 . = Rp. 5000

. = Rp. 5000

@ Rp. 9,000.00 . = Rp. 9000

Total . = Rp. 14000

@ Rp. 15,000.00 . = Rp. 15000

@ Rp. 2,500.00 . = Rp. 2500

Page 86: Sample Hitungan RAB

200,000.00

72,600.00

272,600.00

50,000.00

50,000.00

15,125.00

65,125.00

Page 87: Sample Hitungan RAB

Isolasi 1.0000 bh

Upah : 1 m'

1 BH PEKERJAAN KERAN AIR UNTUK 10 DAPUR

Bahan :

Keran Air (rata-rata) 1.0000 bh

Knee 1.0000 bh

Isolasi 1.0000 bh

Upah : 1 m'

1 BH PEKERJAAN PASANG SOAP HOLDER 11 TANAM

Bahan :

Soap Holder 1.0000 bh

Upah : 1 unit

1 UNIT PEKERJAAN PASANG BATH 12 UP

Bahan :

Bath Up 1.0000 set

Page 88: Sample Hitungan RAB

@ Rp. 1,000.00 . = Rp. 1000

. = Rp. 18500

@ Rp. 3,600.00 . = Rp. 3600

Total . = Rp. 22100

@ Rp. 25,000.00 . = Rp. 25000

@ Rp. 2,500.00 . = Rp. 2500

@ Rp. 1,000.00 . = Rp. 1000

. = Rp. 28500

@ Rp. 3,600.00 . = Rp. 3600

Total . = Rp. 32100

@ Rp. 25,000.00 . = Rp. 25000

. = Rp. 25000

@ Rp. 15,125.00 . = Rp. 15125

Total . = Rp. 40125

@ Rp. 1,250,000.00 . = Rp. 1,250,000.00

. = Rp. 1,250,000.00

Page 89: Sample Hitungan RAB

1,250,000.00

1,250,000.00

Page 90: Sample Hitungan RAB

Upah : 1 unit

1 UNIT PEKERJAAN BIKIN BAK 13 KONTROL

Bahan :

Bak Kontrol 1.0000 unit

Upah : 1 ls

14 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON

Bahan :

Sumur Resapan 1.0000 unit

Upah : 1 ls

15 1 UNIT PEKERJAAN SEPTIC TANK

Bahan :

Septictank 1.0000 unit

Upah : 1 ls

16 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA

Bahan + Upah

Page 91: Sample Hitungan RAB

@ Rp. 93,750.00 . = Rp. 93750

Total . = Rp. 1,343,750.00

@ Rp. 200,000.00 . = Rp. 200000

. = Rp. 200000

@ Rp. 52,000.00 . = Rp. 52000

Total . = Rp. 252000

1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON

@ Rp. 750,000.00 . = Rp. 750000

. = Rp. 750000

@ Rp. 100,000.00 . = Rp. 100000

Total . = Rp. 850000

@ Rp. 1,500,000.00 . = Rp. 1,500,000.00

. = Rp. 1,500,000.00

@ Rp. 350,000.00 . = Rp. 350000

Total . = Rp. 1,850,000.00

1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA

Page 92: Sample Hitungan RAB

1,343,750.00

1,500,000.00

1,500,000.00

1,850,000.00

Page 93: Sample Hitungan RAB

Instalasi sumur air bersih + pompa 1.0unit @ Rp. 1,000,000.00 . = Rp.

1 UNIT PEKERJAAN INSTALASI WATER 17 TORN

Bahan + Upah

Instalasi water torn 1 unit @ Rp. 1,000,000.00 . = Rp.

M PEKERJAAN PERKERASAN JALAN

1 1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOK (Dengan 2 lapis pondasi)

Bahan :

Paving Blok1.1000 m2 @ Rp. 14,000.00

Pasir Beton0.1200 m3 @ Rp. 50,000.00

Sirtu 0.1200 m3 @ Rp. 30,000.00

Pasir urug 0.1350 m3 @ Rp. 27,000.00

Batu Belah 0.3000 m3 @ Rp. 35,000.00

Upah : 1.0000 m2 @ Rp. 10,725.00

1M' PEKERJAAN KANSTEN 2 (25x25x40) CM

Bahan :

Kansten 1.1000 m' @ Rp. 27,400.00

Pasir Beton0.0300 m3 @ Rp. 50,000.00

Sirtu 0.0300 m3 @ Rp. 30,000.00

Pasir urug 0.0297 m3 @ Rp. 27,000.00

Page 94: Sample Hitungan RAB

@ Rp. 1,000,000.00 . = Rp. 1,000,000.00

Total . = Rp. 1,000,000.00

@ Rp. 1,000,000.00 . = Rp. 1,000,000.00

Total . = Rp. 1,000,000.00

1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOK

. = 1.1000 m2 @ Rp. 14,000.00 Rp. 15,400.00

. = 0.1200 m3 @ Rp. 50,000.00 Rp. 6,000.00

. = 0.1200 m3 @ Rp. 30,000.00 Rp. 3,600.00

. = 0.1350 m3 @ Rp. 27,000.00 Rp. 3,645.00

. = 0.3000 m3 @ Rp. 35,000.00 Rp. 10,500.00

. = Rp. 39,145.00

. = 1.0000 m2 @ Rp. 10,725.00 Rp. 10,725.00

. = Total Rp. 49,870.00

. = 1.1000 m' @ Rp. 27,400.00 Rp. 30,140.00

. = 0.0300 m3 @ Rp. 50,000.00 Rp. 1,500.00

. = 0.0300 m3 @ Rp. 30,000.00 Rp. 900.00

. = 0.0297 m3 @ Rp. 27,000.00 Rp. 801.90

Page 95: Sample Hitungan RAB

1,000,000.00

1,000,000.00

1,000,000.00

1,000,000.00

Page 96: Sample Hitungan RAB

Batu Belah 0.0660 m3 @ Rp. 35,000.00

Upah : 1.0000 m2 @ Rp. 3,431.25

O PEKERJAAN PEMBERSIHAN AKHIR PROYEK

1 LS PEMBERSIHAN AKHIR 1 PROYEK

Upah : 1.00 ls. @ Rp. 200,000.00

DAFTAR ANALISIS

Page 97: Sample Hitungan RAB

. = 0.0660 m3 @ Rp. 35,000.00 Rp. 2,310.00

. = Rp. 35,651.90

. = 1.0000 m2 @ Rp. 3,431.25 Rp. 3,431.25

. = Total Rp. 39,083.15

. = 1.00 ls. @ Rp. 200,000.00 Rp. 200,000.00

Page 98: Sample Hitungan RAB

HARGA SATUAN PEKERJAAN (HSP) - DENGAN OVER HEAD

PROYEK : SAMPLE LOKASI : SAMPLE

A PEKERJAAN PERSIAPAN

1. MOBILISASI

Upah : 1 ls. @ Rp. 200,000.

1M2 PEMBERSIHAN LOKASI 2. PROYEK

Upah : 1 m2 @ Rp. 3,189.56

1 M' PEKERJAAN UITZET & 3. BOUWPLANK

Bahan :

Papan Sengon 0.5500 Lbr @ Rp. 3,000.0

Balok Kayu 0.0060 m3 @ Rp. 1,200,000.00 . = Rp.

Paku 0.0200 Kg. @ Rp. 7,000.0

Upah : 1 M` @ Rp. 3,986.95

4. 1 M' PEMAGARAN LOKASI PROYEK

Bahan :

Zeng 1.2500 Lbr @ Rp. 8,000.0

Balok Kayu 0.0300 m3 @ Rp. 1,200,000.00 . = Rp.

Paku Zeng 12.5000 bh. @ Rp. 150.00

Paku 0.0200 Kg. @ Rp. 7,000.0

Page 99: Sample Hitungan RAB

ls. @ Rp. 200,000. . = Rp. 200,000.00

m2 @ Rp. 3,189.56 . = Rp. 3,189.56

Lbr @ Rp. 3,000.0 . = Rp. 1,650.00

m3 @ Rp. 1,200,000.00 . = Rp. 7,200.00

Kg. @ Rp. 7,000.0 . = Rp. 140.00

. = Rp. 8,990.00

M` @ Rp. 3,986.95 . = Rp. 3,986.95

Total . = Rp. 12,976.95

Lbr @ Rp. 8,000.0 . = Rp. 10,000.00

m3 @ Rp. 1,200,000.00 . = Rp. 36,000.00

Paku Zeng 12.5000 bh. @ Rp. 150.00 . = Rp. 1,875.00

Kg. @ Rp. 7,000.0 . = Rp. 140.00

. = Rp. 48,015.00

Page 100: Sample Hitungan RAB

Upah : 1 M` @ Rp. 6,644.91

1 M2 PEKERJAAN DIREKSI 5. KIT

Bahan & Upah : 1 M2 @ Rp. 100,000

1 M2 PEKERJAAN PEMBUATAN BRAK UNTUK 6. GUDANG

Bahan & Upah : 1 m2 @ Rp. 100,000

7. ADMINISTRASI DAN DOKUMENTASI

Bahan & Upah : 1 ls. @ Rp. 150,000.B PEKERJAAN TANAH DAN PASIR

1 M3 PEKERJAAN GALIAN 1. TANAH BIASA

Untuk Pondasi Batu Kali

Upah : 1 m3 @ Rp. 11,296.3

1 M3 PEKERJAAN GALIAN TANAH s.d. 2. -2 M

Untuk Foot Plate

Upah : 1 m3 @ Rp. 13,289.8

1 M3 PEKERJAAN URUGAN TANAH 3. KEMBALI

Upah : *) 1 m3 @ Rp. 5,980.42

*). Termasuk Pemadatan

4. 1 M3 PEKERJAAN URUGAN

Page 101: Sample Hitungan RAB

M` @ Rp. 6,644.91 . = Rp. 6,644.91

Total . = Rp. 54,659.91

M2 @ Rp. 100,000 . = Rp. 100,000.00

m2 @ Rp. 100,000 . = Rp. 100,000.00

ls. @ Rp. 150,000. . = Rp. 150,000.00

m3 @ Rp. 11,296.3 . = Rp. 11296.35

Total . = Rp. 11296.35

m3 @ Rp. 13,289.8 . = Rp. 13289.82

Total . = Rp. 13289.82

m3 @ Rp. 5,980.42 . = Rp. 5980.42

Total . = Rp. 5980.42

Page 102: Sample Hitungan RAB

TANAH Dengan Mendatangkan Tanah dari Luar

Bahan :

Tanah Urug 1.2000 m3 @ Rp. 22,500.0

Upah : *) 1 m3 @ Rp. 8,638.38

*). Termasuk Pemadatan

1 M3 PEKERJAAN URUGAN 5. PASIR

Bahan :

Pasir 1.2000 m3 @ Rp. 27,000.0

Upah : 1 m3 @ Rp. 6,578.46

1 M2 PEKERJAAN URUGAN 6. PASIR

TEBAL = 10 CM` Bahan :

Pasir 0.1200 m3 @ Rp. 27,000.0

Upah : 1 m3 @ Rp. 1,461.88

C PEKERJAAN PASANGAN & PLESTERAN

1. 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS )

Bahan :

Batu Kali 1.2000 m3 @ Rp. 35,000.00

Semen (pc) 3.0698 zak @ Rp. 22,000.00

Kapur - zak @ Rp. 4,500.00 Pasir Pasang 0.6175

Page 103: Sample Hitungan RAB

m3 @ Rp. 22,500.0 . = Rp. 27000

m3 @ Rp. 8,638.38 . = Rp. 8638.38

Total . = Rp. 35638.38

m3 @ Rp. 27,000.0 . = Rp. 32400

m3 @ Rp. 6,578.46 . = Rp. 6578.46

Total . = Rp. 38978.46

m3 @ Rp. 27,000.0 . = Rp. 3240

m3 @ Rp. 1,461.88 . = Rp. 1461.88

Total . = Rp. 4701.88

1. 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS )

Batu Kali 1.2000 m3 @ Rp. 35,000.00 . = Rp. 42000

Semen (pc) 3.0698 zak @ Rp. 22,000.00 . = Rp. 67535.08

zak @ Rp. 4,500.00 . = Rp. - . = Rp.

Page 104: Sample Hitungan RAB

m3 @ Rp. 50,000.00

Upah : 1.0000 m3 @ Rp. 50,002.95

1 M3 PEKERJAAN PASANGAN BATU KALI 2. KOSONG

Bahan :

Batu Kali 1.2000 m3 @ Rp. 35,000.00

Pasir Pasang 0.4500 m3 @ Rp. 27,000.00

Upah : 1.0000 m3 @ Rp. 31,895.57

1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 3. PC : 3 PS)

Bahan :

Batu Bata 77.0000 bh @ Rp. 180.00

Semen (pc) 0.6077 zak @ Rp. 22,000.00

Kapur zak @ Rp. 4,500.00

Pasir Pasang (Ayak) 0.0611 m3 @ Rp. 50,000.00

Upah : 1.0000 m2 @ Rp. 10,764.76

4. 1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS)

Bahan :

Batu Bata 70.0000 bh @ Rp. 180.00

Page 105: Sample Hitungan RAB

30873.18

. = Rp. 140408.26

1.0000 m3 @ Rp. 50,002.95 . = Rp. 50002.95

Total : . = Rp. 190411.22

Batu Kali 1.2000 m3 @ Rp. 35,000.00 . = Rp. 42000

Pasir Pasang 0.4500 m3 @ Rp. 27,000.00 . = Rp. 12150

. = Rp. 54150

1.0000 m3 @ Rp. 31,895.57 . = Rp. 31895.57

Total : . = Rp. 86045.57

Batu Bata 77.0000 bh @ Rp. 180.00 . = Rp. 13860

Semen (pc) 0.6077 zak @ Rp. 22,000.00 . = Rp. 13369.32

. = Rp. -

. = Rp. 3055.84

. = Rp. 30285.16

1.0000 m2 @ Rp. 10,764.76 . = Rp. 10764.76

Total . = Rp. 41049.92

4. 1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS)

Batu Bata 70.0000 bh @ Rp. 180.00 . = Rp. 12600

Page 106: Sample Hitungan RAB

Semen (pc) 0.4093 zak @ Rp. 22,000.00

Kapur - zak @ Rp. 4,500.00

Pasir Pasang (Ayak) 0.0686 m3 @ Rp. 50,000.00

Upah : 1.0000 m2 @ Rp. 9,718.18

1 M' PEKERJAAN ROLLAG BATA (1 PC 5. : 3 PS)

Bahan :

Batu Bata 14.0000 bh @ Rp. 180.00

Semen (pc) 0.2263 zak @ Rp. 22,000.00

Pasir Pasang (Ayak) 0.0122 m3 @ Rp. 50,000.00

Upah : 1.0000 m' @ Rp. 5,232.87

6. 1 M2 PEKERJAAN PLESTERAN (1PC : 5 PS) T = 20 MM

Bahan : Semen (pc) zak @ Rp. 22,000.00 . = Rp.

0.1428 Kapur - zak @ Rp. 4,500.00 . = Rp. Pasir Pasang (Ayak) m3 @ Rp. 50,000.00 . = Rp.

0.0239

Upah : m2 @ Rp. 12,133.61 . = Rp. 1

7. 1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 MM

Bahan : Semen (pc)

0.2121

Page 107: Sample Hitungan RAB

. = Rp. 9004.49

. = Rp. -

. = Rp. 3430.28

. = Rp. 25034.77

. = Rp. 9718.18

Total . = Rp. 34752.95

. = Rp. 2520

. = Rp. 4978.82

. = Rp. 611.68

. = Rp. 8110.51

. = Rp. 5232.87

Total . = Rp. 13343.37

3,142.38

- 1,197.10

. = Rp. 4,339.48

12,133.61

Total . = Rp. 16,473.09

7. 1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 MM

zak @ Rp. . = Rp. 22000

Page 108: Sample Hitungan RAB

3,142.38

- 1,197.10

4,339.48

12,133.61

16,473.09

4665.62

Page 109: Sample Hitungan RAB
Page 110: Sample Hitungan RAB

Kapur - zak @ Rp. 4,500.00 . = Rp.

Pasir Pasang (Ayak)

Upah :

8. 1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6 MM

Bahan : Semen (pc)

Kapur - zak @ Rp. 4,500.00 . = Rp.

Pasir Pasang (Ayak)

Upah :

9. 1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC : 2 PS )

Bahan : Semen (pc)

Kapur (Mill) - zak @ Rp. 4,500.00 . = Rp.

Pasir Pasang (Ayak)

Upah :

10. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYPE A

Page 111: Sample Hitungan RAB

Kapur - zak @ Rp. 4,500.00 . = Rp. -

m3 @ Rp. . = Rp. 0.0213 50000 1066.43

. = Rp. 5732.05

m2 @ Rp. . = Rp. 1 12133.61 12133.61

Total . = Rp. 17865.65

8. 1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6 MM

zak @ Rp. . = Rp. 0.0943 22000 2073.61

Kapur - zak @ Rp. 4,500.00 . = Rp. -

m3 @ Rp. . = Rp. 0.0095 50000 473.97

. = Rp. 2547.58

m2 @ Rp. . = Rp. 1 12133.61 12133.61

Total . = Rp. 14681.18

9. 1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC :

zak @ Rp. . = Rp. 0.0249 22000 547.39

Kapur (Mill) - zak @ Rp. 4,500.00 . = Rp. -

m3 @ Rp. . = Rp. 0.0017 50000 83.41

. = Rp. 630.81

m2 @ Rp. 3,654.70 . = Rp. 1 3654.7

Total . = Rp. 4285.51

10. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYPE A

Page 112: Sample Hitungan RAB
Page 113: Sample Hitungan RAB

Bahan : Semen (pc)

Pasir Pasang (Ayak)

Upah :

11. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYPE B

Bahan : Semen (pc)

Pasir Pasang (Ayak)

Upah :

12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM

Bahan : Semen (pc)

Pasir Pasang (Ayak)

Upah :

13. 1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : 5 KR) TEBAL 50 MM

Bahan : Semen (pc)

Pasir

Page 114: Sample Hitungan RAB

zak @ Rp. . = Rp. 0.0071 22000 157.12

m3 @ Rp. . = Rp. 0.0012 50000 59.85

. = Rp. 216.97

m2 @ Rp. . = Rp. 1 10964.1 10964.1

Total . = Rp. 11181.08

11. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYPE B

zak @ Rp. . = Rp. 0.0114 22000 251.39

m3 @ Rp. . = Rp. 0.0019 50000 95.77

. = Rp. 347.16

m2 @ Rp. . = Rp. 1 10964.1 10964.1

Total . = Rp. 11311.26

12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM

zak @ Rp. . = Rp. 0.3414 22000 7510.84

m3 @ Rp. . = Rp. 0.0458 50000 2289.02

. = Rp. 9799.86

m2 @ Rp. 4,385.64 . = Rp. 1 4385.64

Total . = Rp. 14185.5

13. 1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : 5 KR) TEBAL 50 MM

zak @ Rp. . = Rp. 0.3047 22000 6702.65

m3 @ Rp. . = Rp. 0.0292 50000 1462.4

Page 115: Sample Hitungan RAB
Page 116: Sample Hitungan RAB

Krikil

Upah :

E PEKERJAAN PENUTUP LANTAI DAN DINDING

1. 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 30/30

Bahan : Keramik Lantai

Semen (pc)

Pasir

Semen Grouting

Upah :

2. 1M2 PEKERJAAN PASANGAN KERAMIK KM/ WC 20X20 CM

Bahan : Keramik Serit

Semen (pc)

Pasir

Semen Grouting

Upah :

Page 117: Sample Hitungan RAB

m3 @ Rp. . = Rp. 0.0266 50000 1327.76

. = Rp. 9492.8

m2 @ Rp. 7,601.78 . = Rp. 1 7601.78

Total . = Rp. 17094.58

E PEKERJAAN PENUTUP LANTAI DAN DINDING

1. 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 30/30

m2 @ Rp. . = Rp. 1.1 30000 33000

zak @ Rp. . = Rp. 0.173 22000 3805.49

m3 @ Rp. . = Rp. 0.0206 50000 1030.06

m3 @ Rp. 7,500.00 . = Rp. 0.1833 1375

. = Rp. 39210.55

m2 @ Rp. . = Rp. 1 12293.08 12293.08

Total . = Rp. 51503.63

2. 1M2 PEKERJAAN PASANGAN KERAMIK KM/ WC 20X20 CM

m2 @ Rp. . = Rp. 1.1 35000 38500

zak @ Rp. . = Rp. 0.173 22000 3805.49

m3 @ Rp. . = Rp. 0.0206 50000 1030.06

m3 @ Rp. 7,500.00 . = Rp. 0.1833 1375

. = Rp. 44710.55

m2 @ Rp. . = Rp. 1 12293.08 12293.08

Total . = Rp. 57003.63

Page 118: Sample Hitungan RAB
Page 119: Sample Hitungan RAB

3. 1M2 PEKERJAAN PASANGAN KERAMIK DINDING ASIA 20X25

Bahan : Keramik Dinding

Semen (pc)

Pasir

Semen Grouting

Upah :

4. 1M' PEKERJAAN PASANGAN KERAMIK PLINT T = 12 CM

Bahan : Keramik Dinding

Semen (pc)

Pasir

Semen Grouting

Upah :

5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM

Bahan : Keramik Assesories

Semen (pc)

Pasir

Page 120: Sample Hitungan RAB

3. 1M2 PEKERJAAN PASANGAN KERAMIK DINDING ASIA 20X25

m2 @ Rp. . = Rp. 1.1 33000 36300

zak @ Rp. . = Rp. 0.1297 22000 2854.12

m3 @ Rp. . = Rp. 0.0155 50000 772.54

m3 @ Rp. 7,500.00 . = Rp. 0.1833 1375

. = Rp. 41301.66

m2 @ Rp. . = Rp. 1 39869.46 39869.46

Total . = Rp. 81171.13

4. 1M' PEKERJAAN PASANGAN KERAMIK

m2 @ Rp. . = Rp. 0.1667 30000 5001

zak @ Rp. . = Rp. 0.0156 22000 342.49

m3 @ Rp. . = Rp. 0.0019 50000 92.71

m3 @ Rp. 7,500.00 . = Rp. 0.022 165

. = Rp. 5601.2

m2 @ Rp. 9,037.08 . = Rp. 1 9037.08

Total . = Rp. 14638.28

5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM

bh @ Rp. 4,000.00 . = Rp. 1.1 4400

zak @ Rp. . = Rp. 0.0021 22000 45.67

m3 @ Rp. . = Rp.

0.0002 50000 12.36

Page 121: Sample Hitungan RAB
Page 122: Sample Hitungan RAB

Semen Grouting

Upah :

1M2 PEKERJAAN BATU ALAM PADA 6. DINDING

Bahan :

Batu Alam 1.1200

Semen (pc) 0.1297

Pasir 0.0155

Upah :

7. 1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PADA PILAR

Bahan :

Batu Belah 275.0000

Semen (pc) 0.1297

Pasir 0.0155

Upah :

G PEKERJAAN RANGKA ATAP & PLAFOND

1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. 1. KRUING (Jarak Usuk 40; Jarak Reng 36

cm) Bahan :

Page 123: Sample Hitungan RAB

Semen Grouting m3 @ Rp. 7,500.00 . = Rp. 0.0029 22

. = Rp. 4480.03

m2 @ Rp. 1,328.98 . = Rp. 1 1328.98

Total . = Rp. 5809.01

1M2 PEKERJAAN BATU ALAM PADA

Batu Alam 1.1200 m2 @ Rp. 65 . = Rp. 72800

Semen (pc) 0.1297 zak @ Rp. 22,000.0 . = Rp. 2,854.12

Pasir 0.0155 m3 @ Rp. 50 . = Rp. 772.54

. = Rp. 76426.66

1 m2 @ Rp. 59 . = Rp. 59804.19

Total . = Rp. 136230.86

7. 1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PADA PILAR

Batu Belah 275.0000 bh @ Rp. 50 . = Rp. 137500

Semen (pc) 0.1297 zak @ Rp. 22,000.0 . = Rp. 2,854.12

Pasir 0.0155 m3 @ Rp. 50 . = Rp. 772.54

. = Rp. 141126.66

1 m2 @ Rp. 39 . = Rp. 39869.46

Total . = Rp. 180996.13G PEKERJAAN RANGKA ATAP & PLAFOND

1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY.

(Jarak Usuk 40; Jarak Reng 36

Page 124: Sample Hitungan RAB

2,854.12

772.54

2,854.12

772.54

Page 125: Sample Hitungan RAB

Balok Kayu 0.0092

Reng Kayu 0.0045

Paku 0.2000

Upah : 1

1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. 2. KRUING (Jarak Usuk 45 cm; Jarak Reng 35 cm)

Bahan :

Balok Kayu 0.0092

Reng Kayu 0.0064

Paku 0.2000

Upah : 1

1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI 3. 8/12

Bahan :

Balok Kayu 1.1000

Baut 50.0833 bh @ Rp. 1,500.00

Upah : 1

Page 126: Sample Hitungan RAB

m3 @ Rp. 2,800,000.00 . = Rp. 25872

Kg @ Rp. 1,800,000.00 . = Rp. 8188.71

Kg @ Rp. 7,000.00 . = Rp. 1400

. = Rp. 35460.71

M2 @ Rp. 5,315.93 . = Rp. 5315.93

Total : . = Rp. 40776.64

1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY.

m3 @ Rp. 2,800,000.00 . = Rp. 25872

Kg @ Rp. 1,800,000.00 . = Rp. 11583

Kg @ Rp. 7,000.00 . = Rp. 1400

. = Rp. 38855

M2 @ Rp. 5,315.93 . = Rp. 5315.93

Total : . = Rp. 44170.93

1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI

m3 @ Rp. 2,800,000.00 . = Rp. 3,080,000.00

Baut 50.0833 bh @ Rp. 1,500.00 . = Rp. 75125

. = Rp. 3,155,125.00

m3 @ Rp. 571,462.31 . = Rp. 571462.31

Total : . = Rp. 3,726,587.31

Page 127: Sample Hitungan RAB

1 M` PEKERJAAN PAPAN RUITER KAYU 4. BANGKIRAI 2/20

Bahan :

Papan Kayu 0.0044

Paku 0.0200

Upah : 1

1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU 5. BANGKIRAI 2/25

Bahan :

Papan Kayu 0.0055

Paku 0.0200

Upah : 1

1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20; 6. 2/25

Bahan :

Papan Kayu 0.0110

Paku 0.0400

Upah : 1

7. 1M' PEKERJAAN TALANG ZENG; PAPAN KAYU

Page 128: Sample Hitungan RAB

1 M` PEKERJAAN PAPAN RUITER KAYU

m3 @ Rp. 3,000,000.00 . = Rp. 13200

bh @ Rp . = Rp. 140

. = Rp. 13340

m` @ Rp . = Rp. 1993.47

Total : . = Rp. 15333.47

1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU

m3 @ Rp. 3,000,000.00 . = Rp. 16500

bh @ Rp . = Rp. 140

. = Rp. 16640

m` @ Rp . = Rp. 9635.12

Total : . = Rp. 26275.12

1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20;

m3 @ Rp. 3,000,000.00 . = Rp. 33000

bh @ Rp . = Rp. 280

. = Rp. 33280

m` @ Rp . = Rp. 19270.24

Total : . = Rp. 52550.24

7. 1M' PEKERJAAN TALANG ZENG; PAPAN KAYU

Page 129: Sample Hitungan RAB

MERANTI

Seng BJLS 30 1.1000

Papan Kayu Meranti 0.0176

Paku Seng (Payung) 10.0000 buah @ Rp. 150.00

1 M' PEKERJAAN WENVIR 8. DENGAN SENG

Papan Kayu Meranti

1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP 9. GYPSUM Rangka = 60 x 60 CM

Balok Kayu 0.0136

Paku Plepet

Page 130: Sample Hitungan RAB

Bahan :

Seng BJLS 30 1.1000 m' @ Rp. 24,000.00 . = Rp. 26400

Papan Kayu Meranti 0.0176 m3 @ Rp. 1,400,000.00 . = Rp. 24640

Paku Seng (Payung) 10.0000 buah @ Rp. 150.00 . = Rp. 1500

Paku 0.0200 kg @ Rp. 7,000.00 . = Rp. 140

. = Rp. 52680

Upah : 1 m' @ Rp. 10 . = Rp. 10299.61

Total . = Rp. 62979.61

Bahan :

Seng 1.1 m' @ Rp. 8, . = Rp. 8800

Papan Kayu Meranti 0.0026 m3 @ Rp. 1,400,000.00 . = Rp. 3640

Paku 0.02 kg @ Rp. 7, . = Rp. 140

. = Rp. 12580

Upah : 1 m' @ Rp. 6, . = Rp. 6644.91

Total . = Rp. 19224.91

1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP

Bahan :

Gypsum 0.3819 m3 @ Rp. 35,000.0 . = Rp. 13368.06

Balok Kayu 0.0136 m3 @ Rp. 1,800,000.00 . = Rp. 24552

Paku 0.2000 Kg @ Rp. 7,000.00 . = Rp. 1400 Paku Plepet Kg . = Rp.

Page 131: Sample Hitungan RAB

1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP 10. CALSIBOARD

Rangka = 100 x 100 CM

11 1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 CM

Bahan dan Upah :

Lis Gypsium L=10 cm 1.0000

H PEKERJAAN PENUTUP ATAP

1. 1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO SE

Bahan :

Genteng Keramik 9.9000

Page 132: Sample Hitungan RAB

0.02 @ Rp. 8,000.00

. = Rp.

Upah : 1 m2 @ Rp. 17,276.77 . = Rp.

Total : . = Rp.

1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP

Rangka = 100 x 100

Bahan :

Calsiboard 0.3819 m3 @ Rp. 30,000.00 . = Rp.

Balok Kayu 0.0092 m3 @ Rp. 1,800,000.00 . = Rp.

Paku 0.2000 Kg @ Rp. 7,000.00 . = Rp.

Paku Plepet 0.0200 Kg @ Rp. 8,000.00 . = Rp.

. = Rp.

Upah : 1 m2 @ Rp. 9,568.67 . = Rp.

Total : . = Rp.

1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 CM

Bahan dan Upah :

Lis Gypsium L=10 cm 1.0000 m3 m' Rp. 8,000.00 . = Rp.

Total : . = Rp.

1. 1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO SE

Genteng Keramik 9.9000 bh @ Rp. 2,100.00 . = Rp.

. = Rp.

Page 133: Sample Hitungan RAB

160

39480.06

17276.77

56756.82

11458.33

16632

1400

160

29650.33

9568.67

39219

8000

8000

20790

20790

Page 134: Sample Hitungan RAB

Upah :

1 M' PEKERJAAN KERPUS GENTENG KERAMIK 2. SOKKA

Bahan :

Genteng Kerpus 3.3000

Semen 0.2601

Pasir 0.0366

Upah :

F PEKERJAAN KUSEN DAN DAUN PINTU JENDELA

1 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12

Bahan :

Balok Kayu 1.1000

Paku 5.0000

Upah : 1

2. 1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12

Bahan :

Balok Kayu 0.0087

Paku 0.0360

Upah : 1

Page 135: Sample Hitungan RAB

1 m2 @ Rp. 9,369.32 . = Rp.

Total : . = Rp.

1 M' PEKERJAAN KERPUS GENTENG KERAMIK

Genteng Kerpus 3.3000 m3 @ Rp. 4,000.00 . = Rp.

m3 @ Rp. 22,000.00 . = Rp.

Kg @ Rp. 50,000.00 . = Rp.

. = Rp.

1 m2 @ Rp. 22,642.53 . = Rp.

Total : . = Rp.

PEKERJAAN KUSEN DAN DAUN PINTU JENDELA

1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12

Balok Kayu 1.1000 m3 @ Rp. 6,000,000.00

Kg @ Rp. 7,000.00

m3 @ Rp. 2,299,139.05 Total :

2. 1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12

Balok Kayu 0.0087 m3 @ Rp. 6,000,000.00

Kg @ Rp. 7,000.00

m' @ Rp. 16,553.80 Total :

Page 136: Sample Hitungan RAB

9369.32

30159.32

13200

5722.54

1831.21

20753.76

22642.53

43396.29

. = Rp. 6,600,000.00

. = Rp. 35,000.00

. = Rp. 6,635,000.00

. = Rp. 2,299,139.05

. = Rp. 8,934,139.05

. = Rp. 52,272.00

. = Rp. 252.00

. = Rp. 52,524.00

. = Rp. 16,553.80

. = Rp. 69,077.80

Page 137: Sample Hitungan RAB

1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK 3. KUSEN

Bahan :

Papan Kayu 1.1000

Paku 5.0000

Upah : 1

1 BH DAUN PINTU PANIL 3,5 X 82 X 200 4. CM

Bahan :

Papan Kayu 0.0631

Lem 0.1500

Upah : 1

1 BH DAUN PINTU PANIL 3 X 74 X 5. 200 CM

Bahan :

Papan Kayu 0.0488

Lem 0.1500

Upah : 1

1 BH DAUN PINTU PANIL 3 X 61 X 6. 200 CM

Bahan :

Papan Kayu 0.0403

Lem 0.1500

Page 138: Sample Hitungan RAB

1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK

m3 @ Rp. 8,000,000.00 . = Rp. 8,800,000.00

Kg @ Rp. 7,000.00 . = Rp. 35,000.00

. = Rp. 8,835,000.00

m3 @ Rp. 2,152,951.02 . = Rp. 2,152,951.02

Total : . = Rp. 10,987,951.02

m3 @ Rp. 8,000,000.00 . = Rp. 504,800.00

Kg @ Rp. 8,000.00 . = Rp. 1,200.00

. = Rp. 506,000.00

bh @ Rp. 245,516.15 . = Rp. 245,516.15

Total : . = Rp. 751,516.15

m3 @ Rp. 8,000,000.00 . = Rp. 390,400.00

Kg @ Rp. 8,000.00 . = Rp. 1,200.00

. = Rp. 391,600.00

bh @ Rp. 237,914.38 . = Rp. 237,914.38

Total : . = Rp. 629,514.38

m3 @ Rp. 8,000,000.00 . = Rp. 322,400.00

Kg @ Rp. 8,000.00 . = Rp. 1,200.00

Page 139: Sample Hitungan RAB

8,800,000.00

35,000.00

8,835,000.00

2,152,951.02

10,987,951.02

504,800.00

1,200.00

506,000.00

245,516.15

751,516.15

390,400.00

1,200.00

391,600.00

237,914.38

629,514.38

322,400.00

1,200.00

Page 140: Sample Hitungan RAB

Upah : 1

7 1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI POLITUR

Bahan :

Ram Kayu 3,5 cm 0.0156

Kaca Bening 5 mm 0.4725

Upah : 1

8. 1 BH DAUN JENDELA 62 X 116 CM; KAYU JATI POLITUR

Bahan :

Ram Kayu 3,5 cm 0.0137

Kaca Bening 5 mm 0.4500

Upah : 1

9. 1 BH DAUN JENDELA 62 X 166 CM; KAYU JATI POLITUR

Bahan :

Ram Kayu 3,5 cm 0.0176

Kaca Bening 5 mm 0.6750

Upah : 1

10. 1 BH ROSTER KAYU 30 X 40 CM

Page 141: Sample Hitungan RAB

bh @ Rp. 233,395.84 Total :

1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI POLITUR

m3 @ Rp.

m2 @ Rp.

bh @ Rp.

m3 @ Rp.

m2 @ Rp.

bh @ Rp.

m3 @ Rp.

m2 @ Rp.

bh @ Rp.

Page 142: Sample Hitungan RAB

. = Rp. 323,600.00

. = Rp. 233,395.84

. = Rp. 556,995.84

. = 8,000,000.00 Rp. 124,800.00

. = 60,000.00 Rp. 28,350.00

. = Rp. 153,150.00

. = 93,028.75 Rp. 93,028.75

. = Total : Rp. 246,178.75

. = 8,000,000.00 Rp. 109,600.00

. = 60,000.00 Rp. 27,000.00

. =

Rp. 136,600.00

. = 93,028.75 Rp. 93,028.75

. = Total : Rp. 229,628.75

. = 8,000,000.00 Rp. 140,800.00

. = 60,000.00 Rp. 40,500.00

. = Rp. 181,300.00

. = 93,028.75 Rp. 93,028.75

. = Total : Rp. 274,328.75

Page 143: Sample Hitungan RAB

Bahan :

Roster Kayu 1.0000

Upah : 1

11. 1 M2 PEKERJAAN KACA ES UNTUK BOVEN

Bahan dan Upah :

Kaca Es 5mm 1.0000

Lis Kayu 4.0000

J PEKERJAAN CAT DAN POLITUR

1. 1 M2 PENGECATAN KAYU BARU

Bahan :

Cat Kayu 0.2750 Kg

Plamur Kayu 0.1375 Kg

Dempul Jadi 0.5000 bh

Thiner 0.2500 ltr

Amplas 1.0000 lbr

Upah : 1 bh

2. 1M2 PEKERJAAN MENI BIDANG KAYU BARU

Bahan :

Menie Jadi 0.275 kg

Upah : 1 m2

Page 144: Sample Hitungan RAB

bh @ Rp. 45,000.00

bh @ Rp. 1,328.98

Total :

m2 @ Rp. 70,000.00

m' @ Rp. 3,000.00

Total :

@ Rp. 33,000.00 . = Rp. 9,075.00

@ Rp. 9,700.00 . = Rp. 1,333.75

@ Rp. 1,000.00 . = Rp. 500.00

@ Rp. 4,500.00 . = Rp. 1,125.00

@ Rp. 1,250.00 . = Rp. 1,250.00

. = Rp. 13,283.75

@ Rp. 17,223.61 . = Rp. 17,223.61

Total : . = Rp. 30,507.36

@ Rp. 6,000.00 . = Rp. 1,650.00

. = Rp. 1,650.00

@ Rp. . = Rp. 4,239.45

Page 145: Sample Hitungan RAB

. = Rp. 45,000.00

. = Rp. 45,000.00

. = Rp. 1,328.98

. = Rp. 46,328.98

. = Rp. 70,000.00

. = Rp. 12,000.00

. = Rp. 82,000.00

Page 146: Sample Hitungan RAB

1M2 PEKERJAAN PENGECATAN KAYU 3. BARU

Bahan dan Upah:

Cat-catan 1 m2

Menie 1 m2

4. 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC (Untuk Dinding dan Plafon)

Bahan :

Cat Tembok Catylac 0.183 kg

Plamur Jadi 0.046 kg

Amplas 0.25 lbr

Upah : 1 m2

5. 1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA

Bahan :

Sirlak 0.0275 kg

Spirtus 0.55 kg

Batu Apung 0.3667 kg

Upah : 1 m2

D PEKERJAAN BETON BERTULANG

1. 1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN MOLEN

Bahan : Semen (pc) 8.5150 zak

Page 147: Sample Hitungan RAB

4239.45 Total . = Rp. 5,889.45

@ Rp. 30,507.36 . = Rp. 30,507.36

@ Rp. 5,889.45 . = Rp. 5,889.45

Total . = Rp. 36,396.81

4. 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC

@ Rp. 10,000.00 . = Rp. 1,830.00

@ Rp. 5,800.00 . = Rp. 266.80

@ Rp. 1,250.00 . = Rp. 312.50

. = Rp. 2,409.30

@ Rp. 6,441.41 . = Rp. 6,441.41

Total . = Rp. 8,850.71

5. 1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA

@ Rp. 60,000.00 . = Rp. 1,650.00

@ Rp. 6,000.00 . = Rp. 3,300.00

@ Rp. 4,000.00 . = Rp. 1,466.80

. = Rp. 6,416.80

@ Rp. 24,669.23 . = Rp. 24,669.23

Total . = Rp. 31,086.03

1. 1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN MOLEN

Rp. . = Rp. 187,329.70

Page 148: Sample Hitungan RAB

Pasir Beton 0.5450 m3

Kerikil 0.8174 m3

Upah : 1 m3

2. 1Kg. PEMBESIAN U-24 (Alat Gunting)

Bahan :

Besi Beton 1.1 kg

Bendrat (kawat beton) 0.02 kg

Upah : 1 m3

3. 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK DENGAN PAPAN SENGON

Bahan :

Papan sengon 2.75 lbr

Paku 0.2 kg

Upah : 1 m2

4. 1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 12 CM Rangka (0,6 x 0,6) m.

Bahan :

Balok Kayu/ Bambu 55 btg

Paku 1.66 kg

Upah : 1 ls

Page 149: Sample Hitungan RAB

@ 22000

@ Rp. 50,000.00 . = Rp. 27,247.96

@ Rp. 50,000.00 . = Rp. 40,871.93

. = Rp. 255,449.59

@ Rp. 62,794.40 . = Rp. 62,794.40

Total . = Rp. 318,244.00

@ Rp. 4,500.00 . = Rp. 4,950.00

@ Rp. 8,000.00 . = Rp. 160.00

. = Rp. 5,110.00

@ Rp. 569.97 . = Rp. 569.97

Total . = Rp. 5,679.97

3. 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK

@ Rp. 3,000.00 . = Rp. 8,250.00

@ Rp. 7,000.00 . = Rp. 1,400.00

. = Rp. 9,650.00

@ Rp. 2,325.72 . = Rp. 2,325.72

Total . = Rp. 11,975.72

4. 1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 12 CM

@ Rp. 4,500.00 . = Rp. 247,500.00

@ Rp. 7,000.00 . = Rp. 11,620.00

. = Rp. 259,120.00

@ Rp. 33,211.26 . = Rp. 33,211.26

Page 150: Sample Hitungan RAB

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SLOOF 5. 15/20 (1pc : 2ps : 3 Kr) Bahan dan Upah :

Beton 1 m3

Besi Beton U-24 100 kg

Bekesting 5 m2

6. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah :

Beton 1 m3

Besi Beton U-24 120 kg

Bekesting 5 m2

7. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah :

Beton 1 m3

Besi Beton U-24 120 kg

Bekesting 5 m2

8. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK CANOPY (1pc : 2ps : 3 Kr) Bahan dan Upah :

Beton 1 m3

Besi Beton U-24 125 kg Bekesting 5 m2

Page 151: Sample Hitungan RAB

Total . = Rp. 292,331.26

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SLOOF

@ Rp. 318,244.00 . = Rp. 318,244.00

@ Rp. 5,679.97 . = Rp. 567,996.72

@ Rp. 11,975.72 . = Rp. 59,878.59

Total . = Rp. 946,119.31

6. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15

@ Rp. 318,244.00 . = Rp. 318,244.00

@ Rp. 5,679.97 . = Rp. 681,596.06

@ Rp. 11,975.72 . = Rp. 59,878.59

Total . = Rp. 1,059,718.65

7. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15

@ Rp. 318,244.00 . = Rp. 318,244.00

@ Rp. 5,679.97 . = Rp. 681,596.06

@ Rp. 11,975.72 . = Rp. 59,878.59

Total . = Rp. 1,059,718.65

8. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK CANOPY

@ Rp. 318,244.00 . = Rp. 318,244.00

@ Rp. 5,679.97 . = Rp. 709,995.90

Rp. . = Rp. 59,878.59

Page 152: Sample Hitungan RAB

Perancah Bambu 0.5000 ls

M PEKERJAAN SANITASI DAN DRAINASI

1 M' PEKERJAAN INSTALASI AIR 1 BERSIH

Bahan :

Pipa PVC 3/4\" 0.275 btg

Sock 0.275 bh

Knee 0.1875 bh

Lem PC 0.2 tube

Upah : 1 m'

1 M' PEKERJAAN INSTALASI AIR 2 KOTOR

Bahan :

Pipa PVC 3\ 0.275 btg

Sock 0.275 bh

Knee 0.1875 bh

Lem PC 0.2 tube

Upah : 1 m'

1 UNIT PEKERJAAN PASANG CLOSET 3 DUDUK

Bahan :

Closet Duduk 1 set

Page 153: Sample Hitungan RAB

@ 11975.72

@ Rp. 292,331.26 . = Rp. 146,165.63

Total . = Rp. 1,234,284.12

@ Rp. 14,000.00 . = Rp. 3,850.00

@ Rp. 2,000.00 . = Rp. 550.00

@ Rp. 2,000.00 . = Rp. 375.00

@ Rp. 3,500.00 . = Rp. 700.00

. = Rp. 5,475.00

@ Rp. 3,322.46 . = Rp. 3,322.46

Total . = Rp. 8,797.46

@ Rp. 85,000.00 . = Rp. 23,375.00

@ Rp. 5,000.00 . = Rp. 1,375.00

@ Rp. 7,800.00 . = Rp. 1,462.50

@ Rp. 3,500.00 . = Rp. 700.00

. = Rp. 26,912.50

@ Rp. 6,644.91 . = Rp. 6,644.91

Total . = Rp. 33,557.41

@ Rp. 1,000,000.00 . = Rp. 1,000,000.00

. = Rp. 1,000,000.00

Page 154: Sample Hitungan RAB

Upah : 1 unit

4 1 UNIT PEKERJAAN PASANG CLOSET JONGKOK

Bahan :

Closet Jongkok 1 bh

Dudukan closet 1 ls

Upah : 1 unit

5 1 UNIT PEKERJAAN PASANG WASHTAFEL

Bahan :

Washtafel 1 set

Upah : 1 unit

1 UNIT PEKERJAAN PASANG WALL 6 SHOWER

Bahan :

Wallshower 1 set

Upah : 1 unit

7 1 BH PEKERJAAN PASANG FLOOR DRAIN

Bahan :

Floordrain 1.0000 bh

Upah : 1 unit

8 1 BH PEKERJAAN PASANG AVOR (KURASAN

Page 155: Sample Hitungan RAB

@ Rp. 96,484.10 . = Rp. 96,484.10

Total . = Rp. 1,096,484.10

@ Rp. 74,500.00 . = Rp. 74,500.00

@ Rp. 25,000.00 . = Rp. 25,000.00

. = Rp. 99,500.00

@ Rp. 48,242.05 . = Rp. 48,242.05

Total . = Rp. 147,742.05

@ Rp. 200,000.00 . = Rp. 200,000.00

. = Rp. 200,000.00

@ Rp. 96,484.10 . = Rp. 96,484.10

Total . = Rp. 296,484.10

@ Rp. 50,000.00 . = Rp. 50,000.00

. = Rp. 50,000.00

@ Rp. 21,125.00 . = Rp. 21,125.00

Total . = Rp. 71,125.00

@ Rp. 10,000.00 . = Rp. 10,000.00

. = Rp. 10,000.00

@ Rp. 11,960.84 . = Rp. 11,960.84

Total . = Rp. 21,960.84

Page 156: Sample Hitungan RAB

BAK)

Bahan :

Avor 1.0000 bh

Upah : 1 unit

1 BH PEKERJAAN KERAN 9 AIR

Bahan :

Keran Air (rata-rata) 1.0000 bh

Knee 1.0000 bh

Isolasi 1.0000 bh

Upah : 1 m'

1 BH PEKERJAAN KERAN AIR UNTUK 10. DAPUR

Bahan :

Keran Air (rata-rata) 1.0000 bh

Knee 1.0000 bh

Isolasi 1.0000 bh

Upah : 1 m'

1 BH PEKERJAAN PASANG SOAP HOLDER 11. TANAM

Bahan :

Soap Holder 1.0000 bh

Page 157: Sample Hitungan RAB

@ Rp. 5,000.00 . = Rp. 5,000.00

. = Rp. 5,000.00

@ Rp. 11,960.84 . = Rp. 11,960.84

Total . = Rp. 16,960.84

@ Rp. 15,000.00 . = Rp. 15,000.00

@ Rp. 2,500.00 . = Rp. 2,500.00

@ Rp. 1,000.00 . = Rp. 1,000.00

. = Rp. 18,500.00

@ Rp. 4,784.34 . = Rp. 4,784.34

Total . = Rp. 23,284.34

@ Rp. 25,000.00 . = Rp. 25,000.00

@ Rp. 2,500.00 . = Rp. 2,500.00

@ Rp. 1,000.00 . = Rp. 1,000.00

. = Rp. 28,500.00

@ Rp. 4,784.34 . = Rp. 4,784.34

Total . = Rp. 33,284.34

@ Rp. 25,000.00 . = Rp. 25,000.00

. = Rp. 25,000.00

Page 158: Sample Hitungan RAB

Upah : 1 bh

1 UNIT PEKERJAAN PASANG BATH 12. UP

Bahan :

Bath Up 1.0000 set

Upah : 1 unit

1 UNIT PEKERJAAN BIKIN BAK 13. KONTROL

Bahan :

Bak Kontrol 1.0000 unit

Upah : 1 ls

14. 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON

Bahan :

Sumur Resapan 1.0000 unit

Upah : 1 ls

15. 1 UNIT PEKERJAAN SEPTIC TANK

Bahan :

Septic tank 1.0000 unit

Upah : 1 ls

Page 159: Sample Hitungan RAB

@ Rp. 20,100.85 . = Rp. 20,100.85

Total . = Rp. 45,100.85

@ Rp. 1,250,000.00 . = Rp. 1,250,000.00

. = Rp. 1,250,000.00

@ Rp. 124,592.07 . = Rp. 124,592.07

Total . = Rp. 1,374,592.07

@ Rp. 200,000.00 . = Rp. 200,000.00

. = Rp. 200,000.00

@ Rp. 73,125.00 . = Rp. 73,125.00

Total . = Rp. 273,125.00

14. 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON

@ Rp. 750,000.00 . = Rp. 750,000.00

. = Rp. 750,000.00

@ Rp. 132,898.21 . = Rp. 132,898.21

Total . = Rp. 882,898.21

@ Rp. 1,500,000.00 . = Rp. 1,500,000.00

. = Rp. 1,500,000.00

@ Rp. 465,143.74 . = Rp. 465,143.74

Total . = Rp. 1,965,143.74

Page 160: Sample Hitungan RAB

16. 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA

Bahan + Upah Instalasi sumur air bersih +

pompa 1.0unit @ Rp. 1,000,000.00 . = Rp.

1 UNIT PEKERJAAN INSTALASI WATER 17. TORN

Bahan + Upah

Instalasi water torn 1 unit @ Rp. 1,000,000.00 . = Rp.

M PEKERJAAN PERKERASAN JALAN

1 1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOCK

(Dengan 2 lapis pondasi) Bahan :

Paving Blok1.1000 m2 @ Rp. 14,000.00

Pasir Beton0.1200 m3 @ Rp. 50,000.00

Sirtu 0.1200 m3 @ Rp. 30,000.00

Pasir urug 0.1350 m3 @ Rp. 27,000.00

Batu Belah 0.3000 m3 @ Rp. 35,000.00

Upah : 1.0000 m2 @ Rp. 14,253.33

1M' PEKERJAAN KANSTEN 2 (25x25x40) CM

Bahan :

Kansten 1.1000 m' @ Rp. 27,400.00

Pasir Beton0.0300 m3 @ Rp. 50,000.00

Sirtu 0.0300 m3 @ Rp. 30,000.00

Page 161: Sample Hitungan RAB

16. 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA

@ Rp. 1,000,000.00 . = Rp. 1,000,000.00

Total . = Rp. 1,000,000.00

@ Rp. 1,000,000.00 . = Rp. 1,000,000.00

Total . = Rp. 1,000,000.00

1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOCK

1.1000 m2 @ Rp. 14,000.00 . = Rp. 15400

0.1200 m3 @ Rp. 50,000.00 . = Rp. 6000

0.1200 m3 @ Rp. 30,000.00 . = Rp. 3600

0.1350 m3 @ Rp. 27,000.00 . = Rp. 3645

0.3000 m3 @ Rp. 35,000.00 . = Rp. 10500

. = Rp. 39145

1.0000 m2 @ Rp. 14,253.33 . = Rp. 14253.33

Total . = Rp. 53398.33

1.1000 m' @ Rp. 27,400.00 . = Rp. 30140

0.0300 m3 @ Rp. 50,000.00 . = Rp. 1500

0.0300 m3 @ Rp. 30,000.00 . = Rp. 900

Page 162: Sample Hitungan RAB

Pasir urug 0.0297 m3 @ Rp. 27,000.00

Batu Belah 0.0660 m3 @ Rp. 35,000.00

Upah : 1.0000 m2 @ Rp. 4,560.07

O PEKERJAAN PEMBERSIHAN AKHIR PROYEK

1 LS PEMBERSIHAN AKHIR 1 PROYEK

Upah : 1 ls. @ Rp. 200,000.00

Analisa Harga satuan pekerjaan menggunakan metode Modern Yang Dikembangkan oleh

dunia)

Page 163: Sample Hitungan RAB

0.0297 m3 @ Rp. 27,000.00 . = Rp. 801.9

0.0660 m3 @ Rp. 35,000.00 . = Rp. 2310

. = Rp. 35651.9

1.0000 m2 @ Rp. 4,560.07 . = Rp. 4560.07

Total . = Rp. 40211.97

ls. @ Rp. 200,000.00 . = Rp. 200000

Analisa Harga satuan pekerjaan menggunakan metode Modern Yang Dikembangkan oleh Pelatihan Jasa Konstruksi Sensa Yogy (metode modern merupakan standar yang berlaku untuk seluruh

Page 164: Sample Hitungan RAB

(metode modern merupakan standar yang berlaku untuk seluruh

Page 165: Sample Hitungan RAB

PROYEK : sample LOKASI : sample

No. URAIAN PEKERJAAN

A Pekerjaan Persiapan

1 Mobilisasi

2 Direksikit (2,5x2,5) m

3 Gudang (4x3) m 4 Pemagaran Proyek 5 Unizet & Bouwplank 6 Dokumentasi

B Pekerjaan Tanah dan Pasir

1 Galian Tanah u/ Pondasi

2 Urugan Tanah Kembali

3 Urugan Tanah untuk Leveling Lantai

4 Urugan Pasir Bawah Pondasi dan Lantai

C Pekerjaan Pasangan & Plesteran

1 Pasangan Batu Kali Pecah (1 pc. : 6 ps.)

2 Pasangan Batu Kali kosong

3 Pasangan Bata 1/2 Batu Tasram (1 pc. : 3 ps.)

4 Pasangan Bata 1/2 Batu (1 pc. : 5 ps.) 5 Rolaag Bata (1 pc. : 3 ps.)

6 Plesteran Dinding (1pc : 5ps) t = 20 mm

7 Plesteran Trasram (1pc : 3ps) t = 20 mm

8 Plesteran Trasram (1pc : 3ps) t = 6 mm 9 Sponengan sudut ( 1pc. : 2 ps.)

RENCANA ANGGARAN BIAYA (RAB) TANPA OVER HEAD

Page 166: Sample Hitungan RAB

Harga Satuan

SAT. Pekerjaan JUMLAH

PEKJ. VOLUME Bahan Upah Bahan Upah

(Rp) (Rp) (Rp) (Rp)

ls. 1 200000 - 200,000.00 2

m 6.25 100,000 625,000 2

m 12 100,000 1,200,000.00 m' 26 48,015 5,000 1,248,390.00 130,000m' 40.8 8,990 3,000 366,792 122,400ls. 1 150,000 150,000

3m 52.4711 8,500 - 446,004.35

3m 27.5767 4,500 - 124,095.15

3m 1.9256 27,000 6,500 51,991.2 12,516.4

3m 2.349 32,400 4,950 76,107.6 11,627.55

3m 22.1193 140,408.26 37,625 3,105,732.51 832,238.66

3m 10.409 54,150 24,000 563,647.35 249,816

2m 40.4513 30,285.16 8,100 1,225,074.21 327,655.53

2m 196.3907 25,034.77 7,312.5 4,916,595.49 1,436,106.99 m' 10 8,110.51 3,937.5 81,105.07 39,375

2m 404.0258 4,339.48 9,130 1,753,261.90 3,688,755.55

2m 73.3026 5,732.05 9,130 420,173.92 669,252.74

2m 47.6 2,547.58 9,130 121,264.63 434,588m' 433.28 630.81 2,750 273,315.49 1,191,520.00

RENCANA ANGGARAN BIAYA (RAB) TANPA OVER HEAD

Page 167: Sample Hitungan RAB

TOTAL BOBOT

( Rp) ( % )

200000 0.1904

625,000 .5951

1,200,000.00 1.14261,378,390.00 1.3125

489,192 .4658150,000 .1428

4,042,582.00 3.8493

446,004.35 .4247

124,095.15 .1182

64,507.6 .0614

87,735.15 .0835722,342.25 .6878

3,937,971.18 3.7496

813,463.35 .7746

1,552,729.74 1.4785

6,352,702.49 6.0489120,480.07 .1147

5,442,017.45 5.1818

1,089,426.66 1.0373

555,852.63 .52931,464,835.49 1.3948

Page 168: Sample Hitungan RAB

10 Penebalan Plesteran type A

11 Penebalan Plesteran type B

12 Lantai Kerja untuk Lantai

No. URAIAN PEKERJAAN

D Pekerjaan Beton Bertulang ( 1pc. : 2ps. : 3kr.)

1 Beton Bertulang untuk Sloof

1 Beton Bertulang untuk Kolom Praktis (Skelet)

2 Beton Bertulang untuk Ring Balok

3 Beton Bertulang untuk Ring Balok Gunung-gunung

4 Beton Bertulang untuk Luifel/ Canopy

E Pekerjaan Penutup Lantai dan Dinding

1 Keramik Lantai 30/ 30 Eks IKAD

2 Keramik Lantai Km/Wc Eks Asia

3 Keramik Dinding Dapur dan Km/Wc Eks Asia 3 Keramik Plint t = 12 cm

4 Batu Belah Susun Sirih untuk pilar teras

5 Batu Alam penutup dinding 6 Keramik Assesoris Km/Wc

F Pekerjaan Kusen & Daun Pintu Jendela

1 Pekj. Kusen Pintu & Jendela kayu Jati

2 Pekj. Krepyak untuk Jendela kayu Jati 3 Daun Pintu Type P1 (3x61x200) cm 4 Daun Pintu Type P2 (3,5x82x200)cm 5 Daun Pintu Type P3 (KM/WC) (3x74x200)cm 6 Daun Jendela J1 (52x150) cm 7 Daun Jendela J2 (62x116) cm

Page 169: Sample Hitungan RAB

m' 31.5 216.97 8250 6834.68 259875 266709.68

m' 10.6 347.16 8250 3679.88 87450 91129.882m 74.5 9,492.8 5,720 707,213.9 426,140 1,133,353.90

22,820,672.53 Harga Satuan

SAT. Pekerjaan JUMLAH TOTAL

PEKJ. VOLUME Bahan Upah Bahan Upah ( Rp)

(Rp) (Rp) (Rp) (Rp)

3m 2.283 814,699.59 98,887.5 1,859,959.17 225,760.16 2,085,719.33 3m 1.9125 916,899.59 107,465 1,753,570.47 205,526.81 1,959,097.28 3m 1.494 916,899.59 107,465 1,369,847.99 160,552.71 1,530,400.70 3m 1.7387 916,899.59 107,465 1,594,213.32 186,849.4 1,781,062.71 3m .4992 1,072,009.59 122,104.38 535,147.19 60,954.5 596,101.69

7,952,381.72

2m 68.5 39,210.55 9,250 2,685,922.62 633,625 3,319,547.62 2m 6 44,710.55 9,250 268,263.29 55,500 323,763.292m 31.808 41,301.66 30,000 1,313,723.26 954,240 2,267,963.26 m' 39.7 5,601.2 6,800 222,367.62 269,960 492,327.622m 16 141,126.66 30,000 2,258,026.59 480,000 2,738,026.59 2m 12.5565 76,426.66 45,000 959,651.38 565,042.5 1,524,693.88 pcs. 56 4,480.03 1,000 250,881.49 56,000 306,881.49

10,973,203.75

3m .7013 6,635,000.00 1,730,000.00 4,653,125.50 1,213,249.00 5,866,374.50 3m .0498 8,835,000.00 1,620,000.00 439,983.00 80,676 520,659bh. 2 323,600 175,620 647,200 351,240 998,440bh. 5 506,000 184,740 2,530,000.00 923,700 3,453,700.00 bh. 2 391,600 179,020 783,200 358,040 1,141,240.00 bh. 2 153,150 70,000 306,300 140,000 446,300bh.

Page 170: Sample Hitungan RAB

0.254

0.0868

1,133,353.90 1.079222,820,672.53 21.7293

BOBOT

( % )

2,085,719.33 1.986

1,959,097.28 1.8654

1,530,400.70 1.4572

1,781,062.71 1.6959

.56767,952,381.72 7.5721

3,319,547.62 3.1608

.3083

2,267,963.26 2.1595.4688

2,738,026.59 2.6071

1,524,693.88 1.4518.2922

10,973,203.75 10.4484

-

5,866,374.50 5.5858

.4958

.95073,453,700.00 3.28851,141,240.00 1.0867

.425

Page 171: Sample Hitungan RAB

8 Daun Jendela PJ2 (62x166) cm

SAT.

No. URAIAN PEKERJAAN PEKJ.

Pekerjaan Kayu, Rangka Atap & Rangka G Plafon

1 Nog, Gording, Murplate dengan kayu Bangkirai. m

2 Pekj. Usuk: 5/7, Reng: 3/5 dengan Kayu Bangkirai & Kruim 3 Pekj. Lisjplank Kayu Bangkirai 2/25 m' 4 Pekj. Ruiter dengan Kayu Bangkirai 2/20 m'

5 Pekj. Papan Wenvir 2/12 m'

6 Pekj. Plafon (60 x 60) Cm dgn Kayu 4/6 & 5/7 Ky Merantim

7 Pekj. Plafon (100 x 100) Cm dgn Kayu 4/6 & 5/7 Ky Meranm 8 Pekerjaan Talang m'

*) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti Rayap

H Pekerjaan Penutup Atap & Lis Plafond

1 Pekj. Atap Genteng Sokka Morando SE Glazur m 2 Kerpus Genteng Sokka Morando SE Glazur m'

5 Lis sudut - Gypsum m'

I Pekerjaan Kaca & Rilling Kayu

1 Kaca Es untuk Boven tebal 5 mm. m

J Pekerjaan Cat & Melamin

1 Cat Tembok untuk Dinding Merk Catylac m

2 Cat Tembok untuk Plafond Merk Catylac m

2 Cat Kayu untuk lisjplank Standart EMCO m

3 Politur untuk Kusen Pintu Jendela & BV m

4 Politur untuk Daun Pintu dan Jendela m

Page 172: Sample Hitungan RAB

7 136600 70000 956200 490000

bh. 2 181300 70000 362600 140000

Harga Satuan JUMLAH Pekerjaan

VOLUME Bahan Upah Bahan Upah (Rp) (Rp) (Rp) (Rp)

31.0952 3,155,125.00 430,000 3,455,492.90 470,936

2137.0915 35,460.71 4,000 4,861,362.51 548,36634.6035 16,640 7,250 575,802.24 250,875.3828.3299 13,340 1,500 377,920.87 42,494.85

12.3035 12,580 5,000 154,778.03 61,517.52

68.5 39,480.06 13,000 2,704,383.81 890,5002

37.9052 29,650.33 7,200 1,123,901.82 272,917.4422.5165 53,940 7,750 1,214,540.01 174,502.88

2137.0915 20,790 7,050 2,850,132.29 966,495.0828.3299 20,753.76 17,037.5 587,951.87 482,670.67

72 8,000 576,000

2.78 82,000 63,960

2503.1195 2,409.3 4,846.88 1,212,165.81 2,438,557.33

2106.4052 2,409.3 4,846.88 256,362.05 515,732.7

28.6509 14,933.75 16,150 129,190.38 139,712.04

227.7159 6,416.8 18,562.5 177,847.39 514,476.39

2

Page 173: Sample Hitungan RAB

1,446,200.00 1.377

502600 0.4786

14,375,513.50 13.688

TOTAL BOBOT

( Rp) ( % )

3,926,428.90 3.7387

5,409,728.51 5.151826,677.62 .7871420,415.72 .4003

216,295.53 .206

3,594,883.81 3.423

1,396,819.26 1.331,389,042.89 1.322617,180,292.22 16.3587

-

-

3,816,627.36 3.63411,070,622.54 1.0194

576,000 .5485

5,463,249.90 5.202

63,960 .060963,960 .0609

3,650,723.14 3.4761

772,094.75 .7352

268,902.41 .256

692,323.78 .6592

Page 174: Sample Hitungan RAB

K Pekerjaan Instalasi Listrik

1 Stop kontak

2 Piting Lampu & Sakelar 3 Penangkal Petir (1speed 2 Arde)

No. URAIAN PEKERJAAN

L Pekerjaan Penggantung & Pengunci

1 Slot & Handel Pintu ex. SES 2 Slot Pintu Kupu Tarung ex. SES

3 Slot Pintu Km/Wc 4 Handle Pintu Kupu Tarung

5 Engsel Pintu

6 Engsel Jendela 7 Grendel Jalu untuk Jendela

8 Grendel Pintu 9 Hag Angin ( Win Hag )

M Pekerjaan Drainasi & Sanitasi

1 Closet Duduk 'Monoblok' ex. Toto 2 Closest Jongkok

3 Wall Shower 4 Wastafel ( Komplit ) ex. INA

5 Floor Drain 6 Avor (Kurasan Bak)

7 Kran Air

Page 175: Sample Hitungan RAB

37.4094 6416.8 18562.5 240048.64 694411.99

titik 5 75000 375000 -

titik 16 75000 1,200,000.00 - unit. 1 125000 125000 -

Harga Satuan

SAT. Pekerjaan JUMLAH

PEKJ. VOLUME Bahan Upah Bahan Upah

(Rp) (Rp) (Rp) (Rp)

bh. 6 125000 750000 - bh. 1 90000 90000 -

bh. 2 20000 40000 - ps. 2 50000 100000 -

ps. 9 16900 152100 -

ps. 11 5000 55000 - bh. 22 3000 66000 -

bh. 16 3200 51200 - bh. 22 10900 239800 -

unit 1 1,000,000.00 72600 1,000,000.00 72600bh. 1 99500 36300 99500 36300

unit 1 50000 15125 50000 15125unit 1 200000 72600 200000 72600

bh. 2 10000 9000 20000 18000bh. 1 5000 9000 5000 9000

bh. 5 18500 3600 92500 18000

Page 176: Sample Hitungan RAB

934460.63 0.8898

6,318,504.71 6.0163

375000 0.3571

1,200,000.00 1.1426125000 0.119

1,700,000.00 1.6187

TOTAL BOBOT

( Rp) ( % )

750000 0.714190000 0.0857

40000 0.0381100000 0.0952

152100 0.1448

55000 0.052466000 0.0628

51200 0.0488239800 0.2283

1,544,100.00 1.4703

1,072,600.00 1.0213135800 0.1293

65125 0.062272600 0.2596

38000 0.036214000 0.0133

110500 0.1052

Page 177: Sample Hitungan RAB

8 Kran Air untuk Dapur

9 Soap Holder Tanam 10 Bath Up (Komplit) ex INA

11 Instalasi Sumur Air Bersih + Pompa 12 Instalasi & Water Torn Stainleesteel

13 Pemipaan Air bersih

14 Pemipaan Air kotor 15 Pemipaan Air bekas

16 Bak Kontrol 17 Bak Lemak

18 Sumur Resapan 19 Septictank

No. URAIAN PEKERJAAN

N Pekerjaan Perkerasan Jalan

1 Perkerasan Jalan dengan Conblock 2 Pekj. Kansten 25x25x40

O Pekerjaan Pembersihan Lokasi

1 Pembersihan Lokasi Akhir Proyek

TOTAL

Page 178: Sample Hitungan RAB

bh. 1 28500 3600 28500 3600 32100

bh. 2 25000 15125 50000 30250 80250bh. 1 1,250,000.00 93750 1,250,000.00 93750 1,343,750.00

bh. 1 1,000,000.00 1,000,000.00 1,000,000.00 bh. 1 1,000,000.00 1,000,000.00 1,000,000.00

m' 18.2 5218.75 2500 94981.25 45500 140481.25

m' 20.2 26912.5 5000 543632.5 101000 644632.5m' 14.7 26912.5 5000 395613.75 73500 469113.75

unit 1 200000 52000 200000 52000 252000unit 1 200000 52000 200000 52000 252000

unit 2 750000 100000 1,500,000.00 200000 1,700,000.00 unit 1 1,500,000.00 350000 1,500,000.00 350000 1,850,000.00

10,472,952.50

Harga Satuan

SAT. Pekerjaan JUMLAH TOTAL

PEKJ. VOLUME Bahan Upah Bahan Upah ( Rp)

(Rp) (Rp) (Rp) (Rp)

2m 20 39,145 10,725 782,900 214,500 997,400m' 5 35,651.9 3,431.25 178,259.5 17,156.25 195,415.75

1,192,815.75

ls 1 200,000 - 200,000.00 200,000200,000

76,643,190.3228,379,380.50105,022,570.8

Page 179: Sample Hitungan RAB

0.0306

0.07641.2795

0.95220.9522

0.1338

0.61380.4467

0.23990.2399

1.61871.7615

9.9721

BOBOT

( % )

.9497

.1861

1.1358

.1904

.1904

100

Page 180: Sample Hitungan RAB

REKAPITULASI RENCANA ANGGARAN

BIAYA (SEMENTARA)

PROYEK : sample LOKASI : sample

NO MACAM PEKERJAAN

A Pekerjaan Persiapan

B Pekerjaan Tanah dan Pasir

C Pekerjaan Pasangan & Plesteran

D Pekerjaan Beton Bertulang ( 1pc. : 2ps. : 3kr.)

E Pekerjaan Penutup Lantai dan Dinding

F Pekerjaan Kusen & Daun Pintu Jendela

G Pekerjaan Kayu, Rangka Atap & Rangka Plafon

H Pekerjaan Penutup Atap & Lis Plafond

I Pekerjaan Kaca & Rilling Kayu

J Pekerjaan Cat & Melamin

K Pekerjaan Instalasi Listrik

L Pekerjaan Penggantung & Pengunci

M Pekerjaan Drainasi & Sanitasi

N Pekerjaan Perkerasan Jalan

O Pekerjaan Pembersihan Lokasi

Page 181: Sample Hitungan RAB

BOBOT JUMLAH TOTAL

(%) (Rp)

3.8493 4,042,582.00

0.6878 722342.25

21.7293 22,820,672.53

7.5721 7,952,381.72

10.4484 10,973,203.75

13.688 14,375,513.50

16.3587 17,180,292.22

5.202 5,463,249.90

0.0609 63960

6.0163 6,318,504.71

1.6187 1,700,000.00

1.4703 1,544,100.00

9.9721 10,472,952.50

1.1358 1,192,815.75

0.1904 200000100 105,022,570.81

Jumlah Nominal Rp 105,022,570.81 Jasa Konstruksi 10% Rp 10,502,257.08 Jumlah Rp 115,524,827.90 P P N 10% Rp 11,552,482.79 Jumlah Rp 127,077,310.68 Dibulatkan Rp

Page 182: Sample Hitungan RAB

Rp 105,022,570.81 Rp 10,502,257.08 Rp 115,524,827.90 Rp 11,552,482.79 Rp 127,077,310.68 Rp

Page 183: Sample Hitungan RAB

PROYEK : sample LOKASI : sample

No. URAIAN PEKERJAAN

A Pekerjaan Persiapan

1 Mobilisasi

2 Direksikit (2,5 x 2,5) m

3 Gudang (4 x 3) m 4 Pemagaran Proyek 5 Unizet & Bouwplank

6 Dokumentasi

B Pekerjaan Tanah dan Pasir

1 Galian Tanah u/ Pondasi

2 Urugan Tanah Kembali

3 Urugan Tanah untuk Leveling Lantai

4 Urugan Pasir Bawah Pondasi dan Lantai

C Pekerjaan Pasangan & Plesteran

1 Pasangan Batu Kali Pecah (1 pc : 6 ps)

2 Pasangan Batu Kali kosong

3 Pasangan Bata 1/2 Batu Tasram (1 pc : 3 ps)

4 Pasangan Bata 1/2 Batu (1 pc : 5 ps) 5 Rolaag Bata (1 pc : 3 ps)

6 Plesteran Dinding (1pc : 5ps) t = 20 mm

7 Plesteran Trasram (1pc : 3ps) t = 20 mm

8 Plesteran Trasram (1pc : 3ps) t = 6 mm

RENCANA ANGGARAN BIAYA (RAB) DENGAN OVER HEAD

Page 184: Sample Hitungan RAB

Harga Satuan

SAT Pekerjaan JUMLAH 0 TOTAL

PEK VOLUME Bahan Upah Bahan Upah

J. (Rp.) (Rp.) (Rp. (Rp.) (Rp.)

ls. 1 200000 - 200,000.00 2000002

m 6.25 100,000 625,000 625,0002

m 12 100,000 1,200,000.00 1,200,000.00 m' 26 48,015 6,644.91 1,248,390.00 172,767.67 1,421,157.67 m' 40.8 8,990 3,986.95 366,792 162,667.41 529,459.41

ls. 1 150,000 150,000 150,0004,125,617.08

3m 52.4711 11,296.35 - 592,731.80 592,731.8

3m 27.5767 5,980.42 - 164,920.23 164,920.23

3m 1.9256 27,000 8,638.38 51,991.2 16,634.07 68,625.27

3m 2.349 32,400 6,578.46 76,107.6 15,452.81 91,560.41

917,837.71

3m 22.1193 140,408.26 50,002.95 3,105,732.51 1,106,030.29 4,211,762.81

3m 10.409 54,150 31,895.57 563,647.35 332,000.99 895,648.34

2m 40.4513 30,285.16 10,764.76 1,225,074.21 435,448.34 1,660,522.55

2m 196.3907 25,034.77 9,718.18 4,916,595.49 1,908,560.50 6,825,155.99 m' 10 8,110.51 5,232.87 81,105.07 52,328.67 133,433.74

2m 404.0258 4,339.48 12,133.61 1,753,261.90 4,902,290.13 6,655,552.03

2m 73.3026 5,732.05 12,133.61 420,173.92 889,424.91 1,309,598.84

2m 47.6 2,547.58 12,133.61 121,264.63 577,559.68 698,824.31

RENCANA ANGGARAN BIAYA (RAB) DENGAN OVER HEAD

Page 185: Sample Hitungan RAB

BOBOT

( % )

0.1751

0.5472

1.0507 1.2443 0.4636

0.1313 3.6122

0.5190

0.1444

0.0601

0.0802 0.8036

3.6877

0.7842

1.4539

5.9758 0.1168

5.8273

1.1466

0.6119

Page 186: Sample Hitungan RAB

9 Sponengan sudut ( 1pc : 2 ps)

10 Penebalan Plesteran type A 11 Penebalan Plesteran type B

12 Lantai Kerja Rabat Beton untuk Lantai Keramik

No. URAIAN PEKERJAAN

D Pekerjaan Beton Bertulang ( 1pc : 2ps : 3kr)

1 Beton Bertulang untuk Sloof

1 Beton Bertulang untuk Kolom Praktis (Skelet)

2 Beton Bertulang untuk Ring Balok

3 Beton Bertulang untuk Ring Balok Gunung-gunung

4 Beton Bertulang untuk Luifel/Canopy

E Pekerjaan Penutup Lantai dan Dinding

1 Keramik Lantai 30/ 30 Eks IKAD

2 Keramik Lantai Km/Wc Eks Asia

3 Keramik Dinding Dapur dan Km/Wc Eks Asia 3 Keramik Plint t = 12 cm

4 Batu Belah Susun Sirih untuk pilar teras

5 Batu Alam penutup dinding 6 Keramik Assesoris Km/Wc

F Pekerjaan Kusen & Daun Pintu Jendela

1 Pekj. Kusen Pintu & Jendela kayu Jati

2 Pekj. Krepyak Jendela kayu Jati 3 Daun Pintu Type P1 (3x61x200) cm 4 Daun Pintu Type P2 (3,5x82x200)cm 5 Daun Pintu Type P3 (KM/WC) (3x74x200)cm

Page 187: Sample Hitungan RAB

m' 433.28 630.81 3654.7 273315.49 1,583,508.76

m' 31.5 216.97 10964.1 6834.68 345369.23m' 10.6 347.16 10964.1 3679.88 116219.49

2m 74.5 9,492.8 7,601.78 707,213.9 566,332.44

Harga Satuan JUMLAH SAT Pekerjaan

0.0

PEK VOLUME Bahan Upah Bahan Upah

J. (Rp) (Rp) (Rp) (Rp)

3m 2.283 814,699.59 131,419.72 1,859,959.17 300,031.22

3m 1.9125 916,899.59 142,819.06 1,753,570.47 273,141.46

3m 1.494 916,899.59 142,819.06 1,369,847.99 213,371.68

3m 1.7387 916,899.59 142,819.06 1,594,213.32 248,319.5

3m .4992 1,072,009.59 162,274.53 535,147.19 81,007.45

2m 68.5 39,210.55 12,293.08 2,685,922.62 842,076.29

2m 6 44,710.55 12,293.08 268,263.29 73,758.51

2m 31.808 41,301.66 39,869.46 1,313,723.26 1,268,167.89 m' 39.7 5,601.2 9,037.08 222,367.62 358,772.01

2m 16 141,126.66 39,869.46 2,258,026.59 637,911.41

2m 12.5565 76,426.66 59,804.19 959,651.38 750,931.37pcs. 56 4,480.03 1,328.98 250,881.49 74,423

3m .7013 6,635,000.00 2,299,139.05 4,653,125.50 1,612,386.21

3m .0498 8,835,000.00 2,152,951.02 439,983.00 107,216.96bh. 2 323,600 233,395.84 647,200 466,791.68bh. 5 506,000 245,516.15 2,530,000.00 1,227,580.77 bh. 2 391,600 237,914.38 783,200 475,828.75

Page 188: Sample Hitungan RAB

1,856,824.25 1.6258

352203.91 0.3084 119899.36 0.1050

1,273,546.34 1.1151 25,992,972.47 22.7584

TOTAL BOBOT

( Rp) ( % )

2,159,990.38 1.8912

2,026,711.92 1.7745

1,583,219.67 1.3862

1,842,532.82 1.6132

616,154.63 0.5395 8,228,609.43 7.2046

3,527,998.90 3.0890

342,021.8 0.2995

2,581,891.15 2.2606 581,139.63 0.5088

2,895,938.00 2.5356

1,710,582.75 1.4977 325,304.49 0.2848

11,964,876.72 10.476

-

6,265,511.71 5.4858

547,199.96 0.4791 1,113,991.68 0.9754 3,757,580.77 3.2900 1,259,028.75 1.1024

Page 189: Sample Hitungan RAB

6 Daun Jendela J1 (52x150) cm bh.

7 Daun Jendela J2 (62x116) cm bh. 8 Daun Jendela PJ2 (62x166) cm bh.

Page 190: Sample Hitungan RAB

2 153150 93028.75 306300 186057.5 492357.5

7 136600 93028.75 956200 651201.23 1,607,401.23 2 181300 93028.75 362600 186057.5 548657.5

15,591,729.10

Page 191: Sample Hitungan RAB

0.4311

1.4074 0.4804

13.6515

Page 192: Sample Hitungan RAB

SAT

0

No. URAIAN PEKERJAAN PEK

J.

Pekerjaan Kayu, Rangka Atap & Rangka G Plafon

1 Nog, Gording, Murplate dengan kayu Bangkm

2 Pekj. Usuk: 5/7, Reng: 3/5 dengan Kayu Bam 3 Pekj. Lisjplank Kayu Bangkirai 2/25 m' 4 Pekj. Ruiter dengan Kayu Bangkirai 2/20 m'

5 Pekj. Papan Wenvir 2/12 m'

6 Pekj. Plafon Gypsium Rangka (60x60) Cm m

7 Pekj. Plafon Calsiboard Rangka (100x100)m 8 Pekerjaan Talang m'

*) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti Rayap

H Pekerjaan Penutup Atap & Lis Plafond

1 Pekj. Atap Genteng Sokka Morando SE Glm 2 Kerpus Genteng Sokka Morando SE Glazum' 3 Lis sudut - Gypsum m'

I Pekerjaan Kaca & Rilling Kayu

1 Kaca Es untuk Boven tebal 5 mm. m

J Pekerjaan Cat & Melamin

1 Cat Tembok untuk Dinding Merk Catylac m

2 Cat Tembok untuk Plafond Merk Catylac m

3 Cat Kayu untuk lisjplank Standart EMCO m

4 Politur untuk Kusen Pintu Jendela & BV m

5 Politur untuk Daun Pintu dan Jendela m

K Pekerjaan Instalasi Listrik

Page 193: Sample Hitungan RAB

Harga Satuan JUMLAH Pekerjaan

TOTAL

VOLUME Bahan Upah Bahan Upah

( Rp) (Rp) (Rp) (Rp) (Rp)

31.0952 3,155,125.00 571,462.31 3,455,492.90 625,865.52 4,081,358.42

2137.0915 35,460.71 5,315.93 4,861,362.51 728,768.6 5,590,131.12 34.6035 16,640 9,635.12 575,802.24 333,408.88 909,211.1228.3299 13,340 1,993.47 377,920.87 56,474.9 434,395.76

12.3035 12,580 6,644.91 154,778.03 81,755.66 236,533.692

68.5 39,480.06 17,276.77 2,704,383.81 1,183,458.57 3,887,842.37 2

37.9052 29,650.33 9,568.67 1,123,901.82 362,702.39 1,486,604.21 22.5165 52,680 10,299.61 1,186,169.22 231,911.2 1,418,080.42

*) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti 18,044,157.11

2137.0915 20,790 9,369.32 2,850,132.29 1,284,454.66 4,134,586.95 28.3299 20,753.76 22,642.53 587,951.87 641,460.69 1,229,412.55

72 8,000 576,000 576,000

5,939,999.50

2.78 82,000 63,960 63,960

63,960

2503.1195 2,409.3 6,441.41 1,212,165.81 3,240,799.06 4,452,964.87

2106.4052 2,409.3 6,441.41 256,362.05 685,399.54 941,761.58

28.6509 14,933.75 21,463.06 129,190.38 185,674.79 314,865.17

227.7159 6,416.8 24,669.23 177,847.39 683,729.92 861,577.31

237.4094 6,416.8 24,669.23 240,048.64 922,861.11 1,162,909.75

7,734,078.68

Page 194: Sample Hitungan RAB

BOBOT

( % )

3.5735

4.8945 0.7961 0.3803

0.2071

3.4040

1.3016 1.2416

15.7987

3.6201 1.0764 0.5043

5.2008

0.0560 0.0560

3.8988

0.8246

0.2757

0.7544

1.0182 6.7716

Page 195: Sample Hitungan RAB

1 Stop kontak

2 Piting Lampu & Sakelar 3 Penangkal Petir (1speed 2 Arde)

No. URAIAN PEKERJAAN

L Pekerjaan Penggantung & Pengunci 1 Slot & Handel Pintu ex. SES

2 Slot Pintu Kupu Tarung ex. SES 3 Slot Pintu Km/Wc

4 Handle Pintu Kupu Tarung 5 Engsel Pintu

6 Engsel Jendela 7 Grendel Jalu untuk Jendela

8 Grendel Pintu

9 Hag Angin ( Win Hag )

M Pekerjaan Drainasi & Sanitasi

1 Closet Duduk 'Monoblok' ex. Toto

2 Closest Jongkok 3 Wall Shower

4 Wastafel (komplit) ex. INA 5 Floor Drain

6 Avor (kurasan bak) 7 Kran Air

8 Kran Air untuk Dapur 9 Soap Holder Tanam

Page 196: Sample Hitungan RAB

titik 5 75000 375000 375000

titik 16 75000 1,200,000.00 1,200,000.00 unit. 1 125000 125000 125000

1,700,000.00

Harga Satuan

SAT Pekerjaan JUMLAH 0 TOTAL

PEK VOLUME Bahan Upah Bahan Upah

J. ( Rp) (Rp) (Rp) (Rp) (Rp)

bh. 6 125000 750000 750000

bh. 1 90000 90000 90000bh. 2 20000 40000 40000

ps. 2 50000 100000 100000ps. 9 16900 152100 152100

ps. 11 5000 55000 55000bh. 22 3000 66000 66000

bh. 16 3200 51200 51200

bh. 22 10900 239800 2398001,544,100.00

unit 1 1,000,000.00 96484.1 1,000,000.00 96484.1 1,096,484.10

bh. 1 99500 48242.05 99500 48242.05 147742.05unit 1 50000 21125 50000 21125 71125

unit 1 200000 96484.1 200000 96484.1 296484.1bh. 2 10000 11960.84 20000 23921.68 43921.68

bh. 1 5000 11960.84 5000 11960.84 16960.84bh. 5 18500 4784.34 92500 23921.68 116421.68

bh. 1 28500 4784.34 28500 4784.34 33284.34bh.

Page 197: Sample Hitungan RAB

0.3283

1.0507 0.1094

1.4885

BOBOT

( % )

0.6567

0.0788 0.0350

0.0876 0.1332

0.0482 0.0578

0.0448

0.2100 1.3520

0.9600

0.1294 0.0623

0.2596 0.0385

0.0149 0.1019

0.0291 0.0790

Page 198: Sample Hitungan RAB

10 Bath Up (komplit) ex INA

11 Instalasi Sumur Air Bersih 12 Instalasi & Water Torn Stainleesteel

13 Pemipaan Air bersih 14 Pemipaan Air kotor

15 Pemipaan Air bekas

16 Bak Kontrol 17 Bak Lemak

18 Sumur Resapan 19 Septictank

No. URAIAN PEKERJAAN

N Pekerjaan Perkerasan Jalan

1 Perkerasan Jalan dengan Conblock 2 Pekj. Kansten 25x25x40

O Pekerjaan Pembersihan Lokasi

1 Pembersihan Lokasi Akhir Proyek

TOTAL

Page 199: Sample Hitungan RAB

2 25000 20100.85 50000 40201.71 90201.71

bh. 1 1,250,000.00 124592.07 1,250,000.00 124592.07 1,374,592.07

bh. 1 1,000,000.00 1,000,000.00 1,000,000.00 bh. 1 1,000,000.00 1,000,000.00 1,000,000.00

m' 18.2 5475 3322.46 99645 60468.69 160113.69m' 20.2 26912.5 6644.91 543632.5 134227.19 677859.69

m' 14.7 26912.5 6644.91 395613.75 97680.18 493293.93

unit 1 200000 73125 200000 73125 273125unit 1 200000 73125 200000 73125 273125

unit 2 750000 132898.21 1,500,000.00 265796.42 1,765,796.42 unit 1 1,500,000.00 465143.74 1,500,000.00 465143.74 1,965,143.74

10,895,675.04

Harga Satuan

SAT Pekerjaan JUMLAH 0 TOTAL

PEK VOLUME Bahan Upah Bahan Upah

J. ( Rp) (Rp) (Rp) (Rp) (Rp)

2m 20 39,145 14,253.33 782,900 285,066.66 1,067,966.66 m' 5 35,651.9 4,560.07 178,259.5 22,800.35 201,059.85

1,269,026.51

ls 1 200,000 - 200,000.00 200,000200,000

76,619,483.2837,593,156.09114,212,639.3

Page 200: Sample Hitungan RAB

1.2035

0.8756 0.8756

0.1402 0.5935

0.4319

0.2391 0.2391

1.5461 1.7206

9.5398

BOBOT

( % )

0.9351 0.1760

1.1111

0.1751 0.1751

100.00

Page 201: Sample Hitungan RAB

REKAPITULASI RENCANA ANGGARAN BIAYA (FINAL/REAL)

PROYEK : sample

LOKASI : sample

NO MACAM PEKERJAAN

A Pekerjaan Persiapan

B Pekerjaan Tanah dan Pasir

C Pekerjaan Pasangan & Plesteran D Pekerjaan Beton Bertulang ( 1pc : 2ps : 3kr)

E Pekerjaan Penutup Lantai dan Dinding

F Pekerjaan Kusen & Daun Pintu Jendela G Pekerjaan Kayu, Rangka Atap & Rangka Plafon

H Pekerjaan Penutup Atap & Lis Plafond

I Pekerjaan Kaca & Rilling Kayu J Pekerjaan Cat & Melamin

K Pekerjaan Instalasi Listrik L Pekerjaan Penggantung & Pengunci

M Pekerjaan Drainasi & Sanitasi

N Pekerjaan Perkerasan Jalan O Pekerjaan Pembersihan Lokasi

Page 202: Sample Hitungan RAB

REKAPITULASI RENCANA ANGGARAN BIAYA (FINAL/REAL)

BOBOT JUMLAH TOTAL

(%) (Rp)

3.6122 4,125,617.08

0.8036 917,837.71

22.7584 25,992,972.47

7.2046 8,228,609.43

10.476 11,964,876.72

13.6515 15,591,729.10

15.7987 18,044,157.11

5.2008 5,939,999.50

0.056 63,960.00

6.7716 7,734,078.68

1.4885 1,700,000.00

1.352 1,544,100.00

9.5398 10,895,675.04

1.1111 1,269,026.51

0.1751 200,000.00

100 114,212,639.36

Jumlah Nominal Rp 114,212,639.36 Jasa Konst 10% Rp 11,421,263.94

Jumlah Rp 125,633,903.30 P P N 10% Rp 12,563,390.33

Jumlah Rp 138,197,293.63 Dibulatkan Rp 138,190,000.00

Page 203: Sample Hitungan RAB

114,212,639.36

Rp 114,212,639.36 Rp 11,421,263.94

Rp 125,633,903.30 Rp 12,563,390.33

Rp 138,197,293.63 Rp 138,190,000.00

Page 204: Sample Hitungan RAB

Copyright @2008

contact: e-mail :

mobile : 6281804298940,622747848678

http://kontraktorrumah.blogspot.com

[email protected]