DAFTAR HARGA SATUAN BAHAN BANGUNAN SAMPLE
NO JENIS BAHAN BANGUNAN SATUAN
1 2 31 Semen PPC (Gresik) /zak
3
2 Pasir pasang /m 3
3 Pasir urug /m 3
4 Tanah urug /m 5 Kapur /zak 6 Mill /zak
3
7 Batu kali /m 8 Batu bata /bh 9 Besi beton Polos U.24 (SNI) /kg
10 Besi beton Ulir U.39 (SNI) /kg 3
11 Batu split 2-3 cm (pecah manual) /m 3
12 Batu split 3-4 cm (pecah manual) /m 3
13 Koral 3-4 cm /m 14 Bendrat /kg 15 Taek wood 3 mm (90 x 210) cm /lembar
Papan sengon (Bekesting) 2/20 x 200 16 cm /lembar 17 Bambu /batang 18 Dolken /batang 19 Minyak bekesting /liter 20 Paku (rata-rata) /kg 21 Paku Plepet /kg 22 Paku Zeng /bh 23 Lem Kayu /kg
3
24 Balok kayu Meranti /m 3
25 Papan kayu Meranti /m 3
26 Balok kayu Jati kelas Politur /m 3
27 Papan kayu Jati kelas Politur /m 3
28 Balok kayu Bengkirai /m 3
29 Papan kayu Bengkirai /m 3
30 Balok kayu Kamper /m 3
31 Papan kayu Kamper /m 3
32 Balok kayu Kruing /m 3
33 Papan kayu Kruing /m 34 Genteng Beton eks Mutiara /buah 35 Nok genteng Beton Eks Mutiara /buah 36 Zeng Datar 90 cm /m'
2
37 Kaca bening 5 mm (ASAHI MAS) /m
HARGA KETERANGAN (Rp.)
4 522000 1 zak = 40 Kg
50,000
27,000
22,5004,500 1 zak = 21,5 kg 4,500 1 zak = 22 kg
35,000180
4,5005,000
90,000
67,000
50,0008,000
45,000
3,0004,5004,0008,0007,0008,000
15013,000
1,200,000
1,400,000
6,000,000
8,000,000
2,800,000
3,000,000
3,200,000
3,450,000
1,800,000
2,000,0002,1004,000
24,000
60,000
2
38 Kaca Es untuk Boven t = 5 mm /m Kaca Rayband 50 %, t = 5 mm (ASAHI
2
39 MAS) /m
No. JENIS BAHAN BANGUNAN SATUAN
2
40 Keramik Lantai setara Hercules 30x30 /m 2
41 Keramik dinding Setara Asia 20x25 /m Keramik Serit (KM/WC) setara Asia
2
42 20x20 /m 43 Keramik assesoris 10x20 /buah 44 Semen grouting /kg 45 Kanstin Abu-abu ukr. 25.25.40 /m'
2
46 Conblock kelas biasa /m 47 Tripleks 3 mm (120x240) /lembar 48 Eternit Harflex 1x1 m, biasa (Kerang) /lembar
Eternit Harflex 1x1 m, biasa 49 (Djubesment) /lembar 50 Gypsium Board (120x240) cm /lembar 51 Calsiboard (120x240) cm /lembar 52 List Plafon Gypsium L = 10 Cm /m' 53 Cat kayu eks EMCO (bintang) /kg 54 Cat Catylac /5 Kg 55 Plamur tembok /kg 56 Plamur kayu /kg 57 Thiner /liter 58 Meni besi /liter 59 Meni kayu /liter 60 Amplas /lembar
61 Slot dan Handle Pintu (SES) /bh 62 Slot Pintu Kupu tarung (SES) /bh
63 Kunci KM/Wc ex. Alpha /bh 64 Engsel pintu kuningan ukr. 3\"x4\" (aiwa) /ps
65 Engsel H untuk Daun Jendela (Lokal) /ps 66 Grendel ukuran 8\" (RRT) /bh 67 Grendel Jalu untuk Jendela /bh
70,000
85,000
HARGA KETERANGAN
(Rp)
30,000
33,000
35,0004,0007,500
27,400
14,00045,000
3,500
6,00035,00030,000
8,00033,00050,000
5,8009,7004,5009,0006,0001,250
125,00090,000
20,00016,900
5,0003,2003,000
68 Hak angin kuningan ukr. 21 - 30 cm /bh 69 Handle Pintu (u/ pintu Kupu tarung) /ps
70 Closet duduk TOTO Monoblok /set 71 Closet jongkok Standart /set 72 Washtafel body standart INA /set 73 Wallshower /set 74 Floordrain /bh 75 Avor (kurasan Bak) /bh 76 Bathup Standart INA /set 77 Keran Air Standart (Rata-rata) /bh
78 Keran Dapur /bh 79 Soap Holder /bh 80 Isolasi /bh 81 Pipa PVC 3/4\" eks Wavin /bh 82 Pipa PVC 3\" eks Wavin /bh 83 Knee 3/4\" /bh 84 Sock 3/4\" /bh 85 Tee 3/4\" /bh 86 Knee 3\" /bh
No. JENIS BAHAN BANGUNAN SATUAN
87 Sock 3\" /bh 88 Tee 3\" /bh 89 Lem PVC (tube) /bh
2
90 Batu Candi ( Andesit) /m 2
91 Batu Belah /m 92 Baut /bh 93 Plate /bh 94 Begel /bh 95 Solar /ltr 96 Lis Kayu /m' 97 Roster Kayu 30x 30 /bh 98 Sirlak /kg 99 Spirtus /ltr
100 Batu Apung /kg
1090050000
100000074500
2000005000010000
50001250000
15000
2500025000
10001400085000
2500200030007800
HARGA KETERANGAN
(Rp)
500082003500
65,000
65,0001,5001,0007,5002,3003,000
45,00060,000
6,0004,000
NO. DAFTAR PEKERJA SATUAN
1 TUKANG BATU Hari
2 TUKANG KAYU Hari
3 TUKANG BESI Hari
4 TUKANG LISTRIK Hari
5 TUKANG PLAMBING Hari
6 TUKANG KERAMIK Hari
7 TUKANG BIKIN KUSEN Hari
8 TUKANG PAVING BLOK Hari
9 TENAGA Hari
10 TUKANG CAT Hari
UPAH KET. (Rp.)
22000 per Hari
22000 per Hari
25000 per Hari
25000 per Hari
21000 per Hari
25000 per Hari
30000 per Hari
20000 per Hari
18000 per Hari
22000 per Hari
DAFTAR UPAH BORONGAN/ BAS BORONG
DI KABUPATEN SLEMAN BULAN MARET 2005
No JENIS PEKERJAAN
A. PEKERJAAN PERSIAPAN
1 Uitzet & Bouwplank
2 Pembuatan Direksikit (Tripleks, Zeng, Lt. Rabat Beto
3 Pembuatan Gudang (Tripleks, Zeng, Lt. Rabat Beton)
4 Pembuatan Brak (Tripleks, Zeng, Lt. Rabat Beton)
5 Pembuatan Pagar Proyek (Balok Kayu & Zeng)
6 Pembuatan Pagar Proyek (Bambu & Gedek/Anyaman
7 Pembersihan Lokasi Proyek
B. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah (untuk Pondasi Batu Kali)
2 Galian Tanah (untuk Pondasi Foot Plat)
3 Urugan Tanah Kembali (termasuk Pemadatan)
4 Urugan Tanah (termasuk Pemadatan).
5 Urugan Pasir
6 Urugan Pasir Di Bawah Pondasi ( t = 10 Cm)
7 Urugan Pasir Di Bawah Lantai ( t = 10 Cm)
8 Urugan Sirtu
9 Urugan Splite/Koral Untuk Jalan Lingkungan
DAFTAR UPAH BORONGAN/ BAS BORONG
DI KABUPATEN SLEMAN BULAN MARET 2005
Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)
M` 3000 0 3,000.00 32.9
M2 36000 0 36,000.00 32.9
M2 36000 0 36,000.00 32.9
M2 30000 0 30,000.00 32.9
M` 5000 0 5,000.00 32.9
M` 5000 0 5,000.00 32.9
M2 2400 0 2,400.00 32.9
M3 8500 0 8,500.00 32.9
M3 10000 0 10,000.00 32.9
M3 4500 0 4,500.00 32.9
M3 6500 0 6,500.00 32.9
M3 4950 0 4,950.00 32.9
M2 1100 0 1,100.00 32.9
M2 1100 0 1,100.00 32.9
M2 1000 0 1,000.00 32.9
M2 1375 0 1,375.00 32.9
Upah Total (Rp)
3986.95
47843.36
47843.36
39869.46
6644.91
6644.91
3189.56
11296.35
13289.82
5980.42
8638.38
6578.46
1461.88
1461.88
1328.98
1827.35
No JENIS PEKERJAAN
C. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Batu Kali Kosong untuk Pondasi
2 Pekerjaan Pondasi Batu Kali Pecah
3 Pasangan Bata 1/2 Batu (Trasram)
4 Pasangan Bata 1/2 Batu
5 Pasangan Rolag Bata (Diatas Pondasi & Kusen)
6 Plesteran Trasram
7 Plesteran
8 Sponengan Sudut (Tembok)
9 Sponengan Beton (pada Kolom. Balok dll.)
10 Penebalan Plesteran Sederhana
11 Penebalan Plesteran Rumit (Lengkung atau sudut > 4sudut)
12 Lantai Kerja (dengan spesi tebal + 3 Cm)
13 Lantai Kerja (dengan Rabat Beton tebal > 4 Cm)
14 Pasang Glass Blok (20/20 atau setara)
15 Pasang Roster Kayu
Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)
M3 24000 0 24000 32.9
M3 35000 7.5 37625 32.9
M2 7200 12.5 8100 32.9
M2 6500 12.5 7312.5 32.9
M` 3500 12.5 3937.5 32.9
M2 8300 10 9130 32.9
M2 8300 10 9130 32.9
M` 2750 0 2750 32.9
M` 3250 0 3250 32.9
M` 7500 10 8250 32.9
Penebalan Plesteran Rumit (Lengkung atau sudut > 4sudut) M` 11250 10 12375 32.9
M2 3300 0 3300 32.9
M2 5200 10 5720 32.9
bh. 1900 0 1900 32.9
bh. 1000 0 1000 32.9
Upah Total (Rp)
31895.57
50002.95
10764.76
9718.18
5232.87
12133.61
12133.61
3654.7
4319.19
10964.1
16446.15
4385.64
7601.78
2525.07
1328.98
D PEKERJAAN ATAP & PLAFOND
1
2 Gording, Jurai, Murplate, Nog.
3 Usuk & Reng
4 Papan Ruiter
5 Lisjplank ( Tunggal )
6 Lisjplank ( Double )
7 Wenvir (Kayu Lapis Zeng)
8 Talang (Papan, Zeng, Cat Zeng & Meni Papan)
9 Plafond (Rangka Saja): 100 x 100
No JENIS PEKERJAAN
10 Plafond (Rangka Saja): 80 x 60
11 Plafond (Rangka Saja): 60 x 60
12 Plepet ( antar penutup plafond )
13 Profil Kayu ( Untuk Pertemuan Tembok & Plafond )
14 Pasang Penutup Plafond saja (Dengan Asbes/Ternit)
15 Pasang Penutup Plafond saja (Dengan Kayu Lapis)
E PEKERJAAN PENUTUP ATAP
1 Genteng Keramik
2 Genteng \"Plentong\" Kampung (Standar) 3 Genteng \"Kodok\"
Kuda Kuda Kayu ( Bentang < 9 M )
M3 450000 35 607500 32.9
M3 430000 0 430000 32.9
M2 4000 0 4000 32.9
M` 1500 0 1500 32.9
M` 7250 0 7250 32.9
M` 14500 0 14500 32.9
M` 5000 0 5000 32.9
M` 7750 0 7750 32.9
M2 7200 0 7200 32.9
Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)
M2 11500 0 11500 32.9
M2 13000 0 13000 32.9
M` 1000 0 1000 32.9
Profil Kayu ( Untuk Pertemuan Tembok & Plafond ) M` 1900 0 1900 32.9
Pasang Penutup Plafond saja (Dengan Asbes/Ternit) M2 1300 0 1300 32.9
Pasang Penutup Plafond saja (Dengan Kayu Lapis) M2 1300 0 1300 32.9
M2 6000 17.5 7050 32.9
M2 7300 17.5 8577.5 32.9 M2 10000 17.5 11750 32.9
807357
571462
5315.93
1993.47
9635.12
19270.24
6644.91
10299.61
9568.67
Upah Total (Rp)
15283.29
17276.77
1328.98
2525.07
1727.68
1727.68
9369.32
11399.3415615.54
4 Kerpus Genteng Keramik
5 Kerpus Genteng Kampung
F PEKERJAAN PENUTUP LANTAI & DINDING
1 Keramik Lantai
2 Keramik Tangga
3 Keramik Dinding
4 Keramik Plin
5 Keramik Assesories
6 Pasang Dinding Batu Alam (Jenis Bt Alam Rata)
7 Pasang Dinding Batu Alam (Jenis Bt Alam Tidak Rata)
No JENIS PEKERJAAN
G
1 Bikin Kusen Pintu & Jendela (Kayu < Klas 2)
2 Bikin Kusen Pintu & Jendela ( Jati, Ulin, & Setara )
3 Bikin Krepyak untuk Kusen Pintu dan Jendela
4 Bikin Daun Pintu Panil
5 Bikin Daun Pintu Double Teakwood (Setara)
6 Bikin Daun Jendela ( Tidak Ber Regel/Teler )
7 Bikin Daun Jendela ( Termasuk Regel/Teler )
8 Stel Kusen Di Proyek
9 Stel Daun Pintu Panil
PEKERJAAN KUSEN & DAUN PINTU JENDELA
M` 14500 17.5 17037.5 32.9
M` 14500 17.5 17037.5 32.9
M2 7400 25 9250 32.9
M2 13800 100 27600 32.9
M2 15000 100 30000 32.9
M` 3400 100 6800 32.9
bh 500 100 1000 32.9
M2 15000 200 45000 32.9
Pasang Dinding Batu Alam (Jenis Bt Alam Tidak Rata) M2 20000 50 30000 32.9
Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)
M3 575000 50 862500 32.9
M3 700000 75 1,730,000.00 32.9
M3 800000 75 1,620,000.00 32.9
bh. 48750 100 128500 32.9
bh. 26000 25 32500 32.9
bh. 30000 50 45000 32.9
bh. 32500 50 48750 32.9
M3 340000 0 340000 32.9
bh. 31000 0 31000 32.9
22642.53
22642.53
12293.08
36679.91
39869.46
9037.08
1328.98
59804.19
39869.46
Upah Total (Rp)
1,146,247.07
2,299,139.05
2,152,951.02
170774.2
43191.92
59804.19
64787.88
451854
41198.45
10 Stel Daun Pintu Double Teakwood (atau setara)
11 Stel Daun Jendela
12 Stel Daun Jendela BV
H PEKERJAAN SANITASI & DRAINASI
1 Pasang Closet Jongkok
2
3 Pasang Washtafel
4 Pasang Washtafel & Penyangga
5 Pasang Washbak (Tempat Cuci Piring)
6 Pasang WallShower
7 Pasang Double Hug
8 Pasang Tempat Sabun (di Dinding)
9 Pasang Kran
10 Pasang Stop Kran
11 Pasang Floor Drain
12 Pasang Avor
No JENIS PEKERJAAN
13 Bikin Bak Mandi (Standar)
14 Instalasi (PVC) Water Torn)
15 Saluran Air Bersih (PVC diameter: 1' ; 3/4' ; 1/2')
16 Saluran Air Sabun & Air Kotor dengan PVC
Pasang Closet Duduk Monoblok
bh. 27000 0 27000 32.9
bh. 25000 0 25000 32.9
bh. 18000 0 18000 32.9
Unit 36300 0 36300 32.9
Unit 72600 0 72600 32.9
Unit 72600 0 72600 32.9
Unit 90750 0 90750 32.9
Unit 42350 0 42350 32.9
Unit 15125 0 15125 32.9
bh. 15125 0 15125 32.9
bh. 15125 0 15125 32.9
bh. 3600 0 3600 32.9
bh. 6000 0 6000 32.9
bh. 9000 0 9000 32.9
bh. 9000 0 9000 32.9
Faktor Upah Over Sat. Upah BoroAlat Langsung Head
Pekj (Rp) (%) (Rp) (%)
Unit 93750 0 93750 32.9
Unit 30000 0 30000 32.9
M' 2500 0 2500 32.9
M' 5000 0 5000 32.9
35882.52
33224.55
23921.68
48242.05
96484.1
96484.1
120605
56282.39
20100.85
20100.85
20100.85
4784.34
7973.89
11960.84
11960.84
Upah Total
(Rp)
124592
39869.46
3322.46
6644.91
17 Bak Kontrol Tertutup (Air Sabun & Air Bersih) Stndar
18 Bikin Sumur Resapan
19 Bikin Septictank
I PEKERJAAN STRUKTUR BETON & BAJA
1 Besi Untuk Struktur Beton Bertulang Dia < 12 mm
2 Besi Untuk Struktur Beton Bertulang Dia > 12 mm
3 Bekesting Kolom Praktis, Sloof, Ring Balok, dll.
4 Cort Beton Kolom Praktis, Sloof, Ring Balok dll.
5 Perancah Bambu
J PEKERJAAN CAT ; MELAMIN ; POLITUR
1 Cat Tembok ( 3 Sapuan )
2 Meni Bidang Kayu Baru
3 Cat Kayu ( 3 Kali Sapuan )
4 Politur
5 Melamin
6 Cat Genteng, Asbes Gelombang.
K PERKERASAN JALAN LINGKUNGAN
1 Pasang Makadam / Bt. Kali Pecah (tebal < 28 Cm)
2 Batu Pecah 5/7 (tebal < 15 Cm)
3 Batu Pecah 2/3 (tebal < 6 Cm)
No JENIS PEKERJAAN
Bak Kontrol Tertutup (Air Sabun & Air Bersih) Stndar Unit 52000 0 52000 32.9
Unit 100000 0 100000 32.9
Unit 350000 0 350000 32.9
Besi Untuk Struktur Beton Bertulang Dia < 12 mm Kg. 400 17.5 470 32.9
Besi Untuk Struktur Beton Bertulang Dia > 12 mm Kg. 330 17.5 387.75 32.9
M2 1750 0 1750 32.9
M3 35000 35 47250 32.9
M2 3000 0 3000 32.9
M2 4125 17.5 4846.88 32.9
M2 2900 10 3190 32.9
M2 9600 35 12960 32.9
M2 13750 35 18562.5 32.9
M2 25000 35 33750 32.9
M2 2400 15 2760 32.9
Pasang Makadam / Bt. Kali Pecah (tebal < 28 Cm) M2 3300 25 4125 32.9
M2 2000 25 2500 32.9
M2 2000 25 2500 32.9
Faktor Upah Over Sat. Upah BoroAlat Langsung Head Pekj (Rp) (%) (Rp) (%)
69107.07
132898
465144
624.62
515.31
2325.72
62794.4
3986.95
6441.41
4239.45
17223.61
24669.23
44853.15
3667.99
5482.05
3322.46
3322.46
Upah Total (Rp)
4 Sirtu (tebal < 10 Cm)
5 Pasang Conblok
6 Pengasphalan
7 Pasang Kansten
L LISTRIK DAN PENANGKAL PETIR
1 Lampu (piting & Saklar)
2 Stop Kontak.
3 NCB
4 Penangkal Petir 1 speed dgn 2 Arde (Arde maks 5,0M)
M2 1600 25 2000 32.9
M2 4600 0 4600 32.9
M2 2500 25 3125 32.9
M' 1900 0 1900 32.9
ttk. 24200 0 24200 32.9
ttk. 24200 0 24200 32.9
Unit 82500 0 82500 32.9
Unit 310000 0 310000 32.9
Besarnya Over Head (OH) 32.90 %
2657.96
6113.32
4153.07
2525.07
32161.37
32161.37
109641
411984
DAFTAR ANALISIS
HARGA SATUAN PEKERJAAN (HSP) - TANPA OVER HEAD
PROYEK : SAMPLE LOKASI : SAMPLE
A PEKERJAAN PERSIAPAN
1. MOBILISASI
Upah : 1 ls.
1M2 PEMBERSIHAN LOKASI 2. PROYEK
Upah : 1.00 M2 @
1 M' PEKERJAAN UITZET & 3. BOUWPLANK
Bahan :
Papan Sengon 0.5500 Lbr @
Balok Kayu 0.0060 M3 @
Paku 0.0200 Kg. @
Upah : 1 M` @
1 M' PEMAGARAN LOKASI PROYEK
@ Rp. 200,000.00 . = Rp. 200,000.00
Rp. 2,800.00 . = Rp. 2,800.00
Rp. 3,000.00 . = Rp. 1,650.00
Rp. 1,200,000.00 . = Rp. 7,200.00
Rp. 7,000.00 . = Rp. 140.00
. = Rp. 8,990.00
Rp. 3,000.00 . = Rp. 3,000.00
Total . = Rp. 11,990.00
4
Bahan :
Zeng 1.2500 Lbr @
Balok Kayu 0.0300 M3 @
Paku Zeng 12.5000 bh. @
Paku 0.0200 Kg. @
Upah : 1 M` @
1 M2 PEKERJAAN 5. DIREKSIKIT
Bahan & Upah : 1.00 M2 @
6. 1 M2 PEKERJAAN MEMBUAT BRAK UNTUK GUDANG
Bahan & Upah : 1.00 m2 @
7. ADMINISTRASI DAN DOKUMENTASI
Bahan & Upah : 1 ls.
B PEKERJAAN TANAH DAN PASIR
Rp. 8,000.00 . = Rp. 10,000.00
Rp. 1,200,000.00 . = Rp. 36,000.00
Rp. 150.00 . = Rp. 1,875.00
Rp. 7,000.00 . = Rp. 140.00
. = Rp. 48,015.00
Rp. 5,000.00 . = Rp. 5,000.00
Total . = Rp. 53,015.00
Rp. 100,000.00 . = Rp. 100,000.00
Rp. 100,000.00 . = Rp. 100,000.00
@ Rp. 150,000.00 . = Rp. 150,000.00
1 M3 PEKERJAAN GALIAN TANAH 1. BIASA Untuk Pondasi Batu Kali
Upah : 1 m3 @
2. 1 M3 PEKERJAAN GALIAN TANAH s.d. -2 M Untuk Foot Plate
Upah : 1 m3 @
1 M3 PEKERJAAN URUGAN TANAH 3. KEMBALI
Upah : *) 1 m3 @ *). Termasuk Pemadatan
4. 1 M3 PEKERJAAN URUGAN TANAH Dengan Mendatangkan Tanah dari Luar
Bahan :
Tanah Urug 1.2000 m3 @
Upah : *) 1 m3 @
*). Termasuk Pemadatan
5. 1 M3 PEKERJAAN URUGAN PASIR
Bahan :
Pasir 1.2000 m3 @
Rp. 8,500.00 . = Rp. 8,500.00
Total . = Rp. 8,500.00
Rp. 10,000.00 . = Rp. 10,000.00
Total . = Rp. 10,000.00
Rp. 4,500.00 . = Rp. 4,500.00
Total . = Rp. 4,500.00
Rp. 22,500.00 . = Rp. 27,000.00
Rp. 6,500.00 . = Rp. 6,500.00
Total . = Rp. 33,500.00
Rp. 27,000.00 . = Rp. 32,400.00
Upah : 1 m3 @
6. 1 M2 PEKERJAAN URUGAN PASIR TEBAL = 10 CM`
Bahan :
Pasir 0.1200 m3 @
Upah : 1 m3 @
C PEKERJAAN PASANGAN & PLESTERAN
1. 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS )
Bahan :
Batu Kali 1.2000 m3 @ Rp. 35,000.00
Semen (pc) 3.0698 zak @ Rp. 22,000.00
Kapur - zak @ Rp. 4,500.00
Pasir Pasang 0.6175 m3 @ Rp. 50,000.00
Upah : 1 m3 @ Rp. 37,625.00
1 M3 PEKERJAAN PASANGAN BATU KALI 2. KOSONG
Bahan :
Batu Kali 1.2000 m3 @ Rp. 35,000.00 Pasir Pasang 0.4500 m3 @
Rp. 4,950.00 . = Rp. 4,950.00
Total . = Rp. 37,350.00
Rp. 27,000.00 . = Rp. 3,240.00
Rp. 1,243.13 . = Rp. 1,243.13
Total . = Rp. 4,483.13
1. 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS )
m3 @ Rp. 35,000.00 . = Rp. 42000
zak @ Rp. 22,000.00 . = Rp. 67535.08
. = Rp. -
m3 @ Rp. 50,000.00 . = Rp. 30873.18
. = Rp. 140408.26
m3 @ Rp. 37,625.00 . = Rp. 37625
Total : . = Rp. 178033.26
m3 @ Rp. 35,000.00 . = Rp. 42000 . = Rp.
Rp. 27,000.00
Upah : 1 m3 @ Rp. 24,000.00
1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 PC : 3. 3 PS)
Bahan :
Batu Bata 77.0000 bh @ Rp. 180.00
Semen (pc) 0.6077 zak @ Rp. 22,000.00
Kapur - zak @ Rp. 4,500.00
Pasir Pasang (Ayak) 0.0611 m3 @ Rp. 50,000.00
Upah : 1 m2 @ Rp. 8,100.00
4. 1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS)
Bahan :
Batu Bata 70.0000 bh @ Rp. 180.00
Semen (pc) 0.4093 zak @ Rp. 22,000.00 Kapur - zak @
Rp. 27,000.00 12150
. = Rp. 54150
m3 @ Rp. 24,000.00 . = Rp. 24000
Total : . = Rp. 78150
1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 PC :
bh @ Rp. 180.00 . = Rp. 13860
zak @ Rp. 22,000.00 . = Rp. 13369.32
zak @ Rp. 4,500.00 . = Rp. -
m3 @ Rp. 50,000.00 . = Rp. 3,055.84
. = Rp. 30285.16
m2 @ Rp. 8,100.00 . = Rp. 8,100.00
Total . = Rp. 38385.16
4. 1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS)
70.0000 bh @ Rp. 180.00 . = Rp. 12600
0.4093 zak @ Rp. 22,000.00 . = Rp. 9,004.49
. = Rp. -
Pasir Pasang (Ayak) 0.0686 m3 @ Rp. 50,000.00
Upah : 1.0000 m2 @ Rp.
1 M' PEKERJAAN ROLLAG BATA (1 PC : 5. 3 PS)
Bahan :
Batu Bata 14 bh @ Rp.
Semen (pc) 0.2263 zak @ Rp.
Pasir Pasang (Ayak) 0.0122 m3 @ Rp.
Upah : 1 m' @ Rp.
1 M2 PEKERJAAN PLESTERAN (1PC : 5 PS), T = 20 6. MM
Bahan :
Semen (pc) 0.1428 zak @ Rp.
Kapur - zak @ Rp.
Pasir Pasang (Ayak) 0.0239 m3 @ Rp.
Upah : 1.0000 m2 @ Rp.
1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 7. MM
Bahan : Semen (pc) 0.2121 zak @
Rp. 4,500.00
0.0686 m3 @ Rp. 50,000.00 . = Rp. 3,430.28
. = Rp. 25034.77
7312.5 . = Rp. 7,312.50
Total . = Rp. 32347.27
180 . = Rp. 2,520.00
22000 . = Rp. 4,978.82
50000 . = Rp. 611.68 . = Rp. 8,110.51
3937.5 . = Rp. 3,937.50
Total . = Rp. 12048.01
22000 . = Rp. 3,142.38
4500 . = Rp. -
50000 . = Rp. 1,197.10 . = Rp. 4,339.48
9130 . = Rp. 9,130.00
Total . = Rp. 13469.48
. = Rp. 4,665.62
Kapur - zak @ Rp. 4,500.00
Pasir Pasang (Ayak) 0.0213 m3 @ Rp. 50,000.00
Upah : 1 m2 @ Rp. 9,130.00
1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6 8. MM
Bahan :
Semen (pc) 0.0943 zak @ Rp. 22,000.00
Kapur - zak @ Rp. 4,500.00
Pasir Pasang (Ayak) 0.0095 m3 @ Rp. 50,000.00
Upah : 1 m2 @ Rp. 9,130.00
1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC : 2 9. PS )
Bahan :
Semen (pc) 0.0249 zak @ Rp. 22,000.00
Kapur (Mill) - zak @ Rp. 4,500.00
Pasir Pasang (Ayak) 0.0017 m3 @ Rp. 50,000.00
Upah : 1 m2 @
Rp. 22,000.00
zak @ Rp. 4,500.00 . = Rp. -
m3 @ Rp. 50,000.00 . = Rp. 1,066.43
. = Rp. 5,732.05
m2 @ Rp. 9,130.00 . = Rp. 9,130.00
Total . = Rp. 14862.05
1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6
zak @ Rp. 22,000.00 . = Rp. 2,073.61
zak @ Rp. 4,500.00 . = Rp. -
m3 @ Rp. 50,000.00 . = Rp. 473.97
. = Rp. 2,547.58
m2 @ Rp. 9,130.00 . = Rp. 9,130.00
Total . = Rp. 11677.58
zak @ Rp. 22,000.00 . = Rp. 547.39
zak @ Rp. 4,500.00 . = Rp. -
m3 @ Rp. 50,000.00 . = Rp. 83.41
. = Rp. 630.81
. = Rp. 2,750.00
1 M2 PEKERJAAN PENEBALAN PLESTERAN 10. TYPE A
Bahan :
Semen (pc) 0.0071 zak @ Rp. 22,000.00
Pasir Pasang (Ayak) 0.0012 m3 @ Rp. 50,000.00
Upah : 1 m2 @ Rp. 8,250.00
1 M2 PEKERJAAN PENEBALAN PLESTERAN 11. TYPE B
Bahan :
Semen (pc) 0.0114 zak @ Rp. 22,000.00
Pasir Pasang (Ayak) 0.0019 m3 @ Rp. 50,000.00
Upah : 1 m2 @ Rp. 8,250.00
12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM
Bahan :
Semen (pc) 0.3414 zak @ Rp. 22,000.00
Pasir Pasang (Ayak) 0.0458 m3 @ Rp. 50,000.00
Upah : 1 m2 @ Rp. 3,300.00
Rp. 2,750.00 Total . = Rp. 3,380.81
. = Rp. 157.12
. = Rp. 59.85
. = Rp. 216.97
. = Rp. 8,250.00
Total . = Rp. 8,466.97
. = Rp. 251.39
. = Rp. 95.77
. = Rp. 347.16
. = Rp. 8,250.00
Total . = Rp. 8,597.16
12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM
. = Rp. 7510.84
. = Rp. 2289.02
. = Rp. 9799.86
. = Rp. 3300
Total . = Rp. 13099.86
3,380.81
157.12
59.85
216.97
8,250.00
8,466.97
251.39
95.77
347.16
8,250.00
8,597.16
1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : 5 KR) TEBAL 13. 50 MM
Bahan :
Semen (pc) 0.3047 zak @ Rp. 22,000.00
Pasir 0.0292 m3 @ Rp. 50,000.00
Krikil 0.0266 m3 @ Rp. 50,000.00
Upah : 1 m2 @ Rp. 5,720.00
E PEKERJAAN PENUTUP LANTAI DAN DINDING
1. 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 30/30
Bahan :
Keramik Lantai 1.1000 m2 @
Semen (pc) 0.1730 zak @
Pasir 0.0206 m3 @
Semen Grouting 0.1833 m3 @
zak @ Rp. 22,000.00 . = Rp. 6702.65
m3 @ Rp. 50,000.00 . = Rp. 1462.4
m3 @ Rp. 50,000.00 . = Rp. 1327.76
. = Rp. 9492.8
m2 @ Rp. 5,720.00 . = Rp. 5720
Total . = Rp. 15212.8
Rp. 30,000.00 . = Rp. 33000
Rp. 22,000.00 . = Rp. 3805.49
Rp. 50,000.00 . = Rp. 1030.06
Rp. 7,500.00 . = Rp. 1375
Upah : 1 m2
2. 1M2 PEKERJAAN PASANGAN KERAMIK KM/WC 20/20
Bahan :
Keramik Serit 1.1000 m2
Semen (pc) 0.1730 zak
Pasir 0.0206 m3
Semen Grouting 0.1833 m3
Upah : 1 m2
3. 1M2 PEKERJAAN PASANGAN KERAMIK DINDING
Bahan :
Keramik Dinding 1.1000 m2
Semen (pc) 0.1297 zak
Pasir 0.0155 m3
Semen Grouting 0.1833 m3
Upah : 1 m2
. = Rp. 39210.55
@ Rp. 9,250.00 . = Rp. 9250
Total . = Rp. 48460.55
@ Rp. 35,000.00 . = Rp. 38500
@ Rp. 22,000.00 . = Rp. 3805.49
@ Rp. 50,000.00 . = Rp. 1030.06
@ Rp. 7,500.00 . = Rp. 1375
. = Rp. 44710.55
@ Rp. 9,250.00 . = Rp. 9250
Total . = Rp. 53960.55
@ Rp. 33,000.00 . = Rp. 36300
@ Rp. 22,000.00 . = Rp. 2854.12
@ Rp. 50,000.00 . = Rp. 772.54
@ Rp. 7,500.00 . = Rp. 1375
. = Rp. 41301.66
@ Rp. 30,000.00 . = Rp. 30000
Total . = Rp. 71301.66
4. 1M' PEKERJAAN PASANGAN KERAMIK PLINT T = 12 CM
Bahan :
Keramik Dinding 0.1667 m2
Semen (pc) 0.0156 zak
Pasir 0.0019 m3
Semen Grouting 0.0220 m3
Upah : 1 m2
5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM
Bahan :
Keramik Assesories 1.1000 bh
Semen (pc) 0.0021 zak
Pasir 0.0002 m3
Semen Grouting 0.0029 m3
Upah : 1 m2
6. 1M2 PEKERJAAN BATU ALAM PADA
@ Rp. 30,000.00 . = Rp. 5001
@ Rp. 22,000.00 . = Rp. 342.49
@ Rp. 50,000.00 . = Rp. 92.71
@ Rp. 7,500.00 . = Rp. 165
. = Rp. 5601.2
@ Rp. 6,800.00 . = Rp. 6800
Total . = Rp. 12401.2
5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM
@ Rp. 4,000.00 . = Rp. 4400
@ Rp. 22,000.00 . = Rp. 45.67
@ Rp. 50,000.00 . = Rp. 12.36
@ Rp. 7,500.00 . = Rp. 22
. = Rp. 4480.03
@ Rp. 1,000.00 . = Rp. 1000
Total . = Rp. 5480.03
DINDING
Bahan :
Batu Alam 1.1200
Semen (pc) 0.1297
Pasir 0.0155
Upah : 1
7. 1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PADA PILAR
Bahan :
Batu Belah 275.0000
Semen (pc) 0.1297
Pasir 0.0155
Upah : 1
G PEKERJAAN RANGKA ATAP & PLAFOND
1. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING
m2 @ Rp. 65,000 . = Rp. 72800
zak @ Rp. 22,000 . = Rp. 2854.12
m3 @ Rp. 50,000 . = Rp. 772.54
. = Rp. 76426.66
m2 @ Rp. 45,000 . = Rp. 45000
Total . = Rp. 121426.66
bh @ Rp. 500.00 . = Rp. 137500
zak @ Rp. 22,000 . = Rp. 2854.12
m3 @ Rp. 50,000 . = Rp. 772.54
. = Rp. 141126.66
m2 @ Rp. 30,000 . = Rp. 30000
Total . = Rp. 171126.66
1. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING
(Jarak Usuk 40; Jarak Reng 36 cm)
Bahan :
Balok Kayu 0.0092 m3
Reng Kayu 0.0045 Kg
Paku 0.2000 Kg
Upah : 1 M2
2. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING (Jarak Usuk 45 cm; Jarak Reng 35 cm)
Bahan :
Balok Kayu 0.0092 m3
Reng Kayu 0.0064 Kg
Paku 0.2000 Kg
Upah : 1 M2
3. 1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI 8/12
Bahan : Balok Kayu m3
@ Rp. 2,800,000.00 . = Rp. 25,872.00
@ Rp. 1,800,000.00 . = Rp. 8,188.71
@ Rp. 7 . = Rp. 1,400.00
. = Rp. 35,460.71
@ Rp. 4 . = Rp. 4,000.00
Total : . = Rp. 39,460.71
2. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING
@ Rp. 2,800,000.00 . = Rp. 25,872.00
@ Rp. 1,800,000.00 . = Rp. 11,583.00
@ Rp. 7 . = Rp. 1,400.00
. = Rp. 38,855.00
@ Rp. 4 . = Rp. 4,000.00
Total : . = Rp. 42,855.00
3. 1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI 8/12
@ . = Rp. 3,080,000.00
1.1
Baut 50.0833 bh
Upah : 1 m3
1 M` PEKERJAAN PAPAN RUITER KAYU BANGKIRAI 4. 2/20
Bahan :
Papan Kayu 0.0044 m3
Paku 0.0200 bh
Upah : 1 m`
1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU BANGKIRAI 5. 2/25
Bahan :
Papan Kayu 0.0055 m3
Paku 0.0200 bh
Upah : 1 m`
6. 1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20; 2/25
Bahan :
Papan Kayu 0.0110 m3
Paku 0.0400 bh
Upah : 1 m`
Rp. 2,800,000.00
@ Rp. 1,500.00 . = Rp. 75,125.00
. = Rp. 3,155,125.00
@ Rp. 430,000.00 . = Rp. 430,000.00
Total : . = Rp. 3,585,125.00
@ Rp. 3,000,000.00 . = Rp. 13,200.00
@ Rp. 7,000.00 . = Rp. 140.00
. = Rp. 13,340.00
@ Rp. 1,500.00 . = Rp. 1,500.00
Total : . = Rp. 14,840.00
1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU BANGKIRAI
@ Rp. 3,000,000.00 . = Rp. 16,500.00
@ Rp. 7,000.00 . = Rp. 140.00
. = Rp. 16,640.00
@ Rp. 7,250.00 . = Rp. 7,250.00
Total : . = Rp. 23,890.00
6. 1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20; 2/25
@ Rp. 3,000,000.00 . = Rp. 33,000.00
@ Rp. 7,000.00 . = Rp. 280.00
. = Rp. 33,280.00
@ Rp. 14,500.00 . = Rp. 14,500.00
Total : . = Rp. 47,780.00
1M' PEKERJAAN TALANG ZENG; PAPAN KAYU 7. MERANTI
Bahan :
Seng BJLS 30 1.1000
Papan Kayu Meranti 0.0176
Paku Seng (Payung) 10.0000
Paku 0.2000
Upah : 1
1 M' PEKERJAAN WENVIR 8 DENGAN SENG
Bahan :
Seng 1.1
Papan Kayu Meranti 0.0026
Paku 0.02
Upah : 1
1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP 9. GYPSUM
Rangka = 60 x 60 CM
Bahan :
Gypsum 0.3819
Balok Kayu 0.0136
Paku 0.2000
Paku Plepet 0.0200
m' @ Rp. 24,000.00 . = Rp. 26,400.00
m3 @ Rp. 1,400,000.00 . = Rp. 24,640.00
buah @ Rp. 150.00 . = Rp. 1,500.00
kg @ Rp. 7,000.00 . = Rp. 1,400.00
. = Rp. 53,940.00
m' @ Rp. 7,750.00 . = Rp. 7,750.00
Total . = Rp. 61,690.00
m' @ Rp. 8,000.00 . = Rp. 8,800.00
m3 @ Rp. 1,400,000.00 . = Rp. 3,640.00
kg @ Rp. 7,000.00 . = Rp. 140.00
. = Rp. 12,580.00
m' @ Rp. 5,000.00 . = Rp. 5,000.00
Total . = Rp. 17,580.00
1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP
m3 @ Rp. 35,000.00 . = Rp. 13,368.06
m3 @ Rp. 1,800,000.00 . = Rp. 24,552.00
Kg @ Rp. 7,000.00 . = Rp. 1,400.00
Kg @ Rp. 8,000.00 . = Rp. 160.00
. = Rp. 39,480.06
Upah : 1
10. 1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP CALSIBOARD Rangka = 100 x 100 CM
Bahan :
Calsiboard 0.3819
Balok Kayu 0.0092
Paku 0.2000
Paku Plepet 0.0200
Upah : 1
1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 11. CM
Bahan dan Upah :
Lis Gypsium L=10 cm 1.0000
H PEKERJAAN PENUTUP ATAP & PLAFOND.
1. 1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO SE, BESAR
Bahan :
Genteng Keramik 9.9000 bh @ Rp.
Upah : 1.0000 m2 @ Rp.
2. 1 M' PEKERJAAN KERPUS GENTENG KERAMIK SOKKA TYPE MORANDO SE, BESAR
Bahan :
m2 @ Rp. 13,000.00 . = Rp. 13,000.00
Total : . = Rp. 52,480.06
10. 1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP CALSIBOARD
m3 @ Rp. 30,000.00 . = Rp. 11,458.33
m3 @ Rp. 1,800,000.00 . = Rp. 16,632.00
Kg @ Rp. 7,000.00 . = Rp. 1,400.00
Kg @ Rp. 8,000.00 . = Rp. 160.00
. = Rp. 29,650.33
m2 @ Rp. 7,200.00 . = Rp. 7,200.00
Total : . = Rp. 36,850.33
m3 m' Rp. 8,000.00 . = Rp. 8,000.00
Total : . = Rp. 8,000.00
1. 1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO SE, BESAR
2,100.00 . = Rp. 20790
. = Rp. 20790
1.0000 m2 @ Rp. 7,050.00 . = Rp. 7050
Total : . = Rp. 27840
2. 1 M' PEKERJAAN KERPUS GENTENG KERAMIK SOKKA TYPE MORANDO SE, BESAR
Genteng Kerpus 3.3000 m3 @ Rp.
Semen 0.2601 m3 @ Rp.
Pasir 0.0366 Kg @ Rp.
Upah : 1.0000 m2 @ Rp.
F PEKERJAAN KUSEN DAN DAUN PINTU JENDELA
1. 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12
Bahan : Balok Kayu 1.1000 m3 Paku 5.0000 Kg
Upah : 1 m3
2. 1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12
Bahan : Balok Kayu 0.0087 m3 Paku 0.0360 Kg
Upah : 1 m'
3. 1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK KUSEN
Bahan : Papan Kayu 1.1000 m3 Paku 5.0000 Kg
Upah : 1 m3
1 BH DAUN PINTU PANIL 3,5 X 82 X 200 4. CM
Bahan :
Papan Kayu 0.0631 m3 Lem 0.1500 Kg
4,000.00 . = Rp. 13200
22,000.00 . = Rp. 5722.54
50,000.00 . = Rp. 1831.21
. = Rp. 20753.76
17,037.50 . = Rp. 17037.5
Total : . = Rp. 37791.26
1. 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12
@ Rp. 6,000,000.00 . = Rp. 6,600,000.00
@ Rp. 7,000.00 . = Rp. 35,000.00
. = Rp. 6,635,000.00
@ Rp. 1,730,000.00 . = Rp. 1,730,000.00
Total : . = Rp. 8,365,000.00
@ Rp. 6,000,000.00 . = Rp. 52,272.00
@ Rp. 7,000.00 . = Rp. 252.00
. = Rp. 52,524.00
@ Rp. 12,456.00 . = Rp. 12,456.00
Total : . = Rp. 64,980.00
@ Rp. 8,000,000.00 . = Rp. 8,800,000.00
@ Rp. 7,000.00 . = Rp. 35,000.00
. = Rp. 8,835,000.00
@ Rp. 1,620,000.00 . = Rp. 1,620,000.00
Total : . = Rp. 10,455,000.00
@ Rp. 8,000,000.00 . = Rp. 504,800.00
@ Rp. 8,000.00 . = Rp. 1,200.00
6,600,000.00
35,000.00
6,635,000.00
1,730,000.00
8,365,000.00
52,272.00
252.00
52,524.00
12,456.00
64,980.00
8,800,000.00
35,000.00
8,835,000.00
1,620,000.00
10,455,000.00
504,800.00
1,200.00
Upah : 1 bh
1 BH DAUN PINTU PANIL 3 X 74 5. X 200 CM
Bahan : Papan Kayu 0.0488 m3
Lem 0.1500 Kg
Upah : 1 bh
1 BH DAUN PINTU PANIL 3 X 61 6. X 200 CM
Bahan : Papan Kayu 0.0403 m3
Lem 0.1500 Kg
Upah : 1 bh
1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI 7. POLITUR
Bahan :
Ram Kayu 3,5 cm 0.0156 m3 @
Kaca Bening 5 mm 0.4725 m2 @
Upah : 1 bh @
1 BH DAUN JENDELA 62 X 116 CM; KAYU JATI 8. POLITUR
Bahan :
Ram Kayu 3,5 cm 0.0137 m3 @
Kaca Bening 5 mm 0.4500 m2 @
Upah : 1 bh @
. = Rp. 506,000.00
@ Rp. 184,740.00 . = Rp. 184,740.00
Total : . = Rp. 690,740.00
@ Rp. 8,000,000.00 . = Rp. 390,400.00
@ Rp. 8,000.00 . = Rp. 1,200.00
. = Rp. 391,600.00
@ Rp. 179,020.00 . = Rp. 179,020.00
Total : . = Rp. 570,620.00
@ Rp. 8,000,000.00 . = Rp. 322,400.00
@ Rp. 8,000.00 . = Rp. 1,200.00
. = Rp. 323,600.00
@ Rp. 175,620.00 . = Rp. 175,620.00
Total : . = Rp. 499,220.00
Rp. 8,000,000.00 . = Rp. 124,800.00
Rp. 60,00 . = Rp. 28,350.00
. = Rp. 153,150.00
Rp. 70,00 . = Rp. 70,000.00
Total : . = Rp. 223,150.00
Rp. 8,000,000.00 . = Rp. 109,600.00
Rp. 60,00 . = Rp. 27,000.00
. = Rp. 136,600.00
Rp. 70,00 . = Rp. 70,000.00
1 BH DAUN JENDELA 62 X 166 CM; KAYU JATI 9. POLITUR
Bahan :
Ram Kayu 3,5 cm 0.0176 m3 @
Kaca Bening 5 mm 0.6750 m2 @
Upah : 1 bh @
10. 1 BH ROSTER KAYU 30 X 40 CM
Bahan :
Roster Kayu 1.0000 bh @
Upah : 1 bh @
1 M2 PEKERJAAN KACA ES UNTUK 11. BOVEN
Bahan dan Upah :
Kaca Es 5mm 1.0000 m2 @
Lis Kayu 4.0000 m' @
J PEKERJAAN CAT DAN POLITUR
1. 1 M2 PENGECATAN KAYU BARU
Bahan :
Cat Kayu 0.2750 Kg @ Rp. 33,000.00
Plamur Kayu 0.1375 Kg @ Rp. 9,700.00
Dempul Jadi 0.5000 bh @ Rp. 1,000.00 Thiner ltr @
Total : . = Rp. 206,600.00
Rp. 8,000,000.00 . = Rp. 140,800.00
Rp. 60,000.00 . = Rp. 40,500.00
. = Rp. 181,300.00
Rp. 70,000.00 . = Rp. 70,000.00
Total : . = Rp. 251,300.00
Rp. 45,000.00 . = Rp. 45,000.00
. = Rp. 45,000.00
Rp. 1,000.00 . = Rp. 1,000.00
Total : . = Rp. 46,000.00
Rp. 70,000.00 . = Rp. 70,000.00
Rp. 3,000.00 . = Rp. 12,000.00
Total : . = Rp. 82,000.00
Kg @ Rp. 33,000.00 . = Rp. 9,075.00
Kg @ Rp. 9,700.00 . = Rp. 1,333.75
bh @ Rp. 1,000.00 . = Rp. 500.00
. = Rp. 1,125.00
0.25
Amplas 1.0000 lbr @ Rp. 1,250.00
Upah : 1 bh @ Rp. 12,960.00
1M2 PEKERJAAN MENI BIDANG KAYU 2 BARU
Bahan :
Menie Jadi 0.275 kg
Upah : 1.0000 m2 @ Rp. 3,190.00
1M2 PEKERJAAN PENGECATAN KAYU 3 BARU
Bahan dan Upah:
Cat-catan 1.0000 m2 @ Rp. 26,243.75
Menie 1.0000 m2 @ Rp. 4,840.00
4 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC (Untuk Eksterior dan Plafon)
Bahan :
Cat Tembok Catylac 0.183 kg
Plamur Jadi 0.046 kg
Amplas 0.25 lbr
Upah : 1.0000 m2 @ Rp. 4,846.88
5 1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA
Bahan :
Rp. 4,500.00
lbr @ Rp. 1,250.00 . = Rp. 1,250.00
. = Rp. 13,283.75
bh @ Rp. 12,960.00 . = Rp. 12,960.00
Total : . = Rp. 26,243.75
@ Rp. 6,000.00 . = Rp. 1,650.00
. = Rp. 1,650.00
1.0000 m2 @ Rp. 3,190.00 . = Rp. 3,190.00
Total . = Rp. 4,840.00
1.0000 m2 @ Rp. 26,243.75 . = Rp. 26,243.75
1.0000 m2 @ Rp. 4,840.00 . = Rp. 4,840.00
Total . = Rp. 31,083.75
1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC
@ Rp. 10,000.00 . = Rp. 1,830.00
@ Rp. 5,800.00 . = Rp. 266.80
@ Rp. 1,250.00 . = Rp. 312.50
. = Rp. 2,409.30
1.0000 m2 @ Rp. 4,846.88 . = Rp. 4,846.88
Total . = Rp. 7,256.18
1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA
Sirlak 0.0275 kg @ Rp. 60,000.00
Spirtus 0.55 kg @ Rp. 6,000.00
Batu Apung 0.3667 kg @ Rp. 4,000.00
Upah : 1.0000 m2 @ Rp. 18,562.50
D PEKERJAAN BETON BERTULANG
1. 1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN MOLEN
Bahan :
Semen (pc) 8.5150 zak @ Rp. 22,000.00
Pasir Beton 0.5450 m3 @ Rp. 50,000.00
Kerikil 0.8174 m3 @ Rp. 50,000.00
Upah : 1 m3 @ Rp. 47,250.00
2 1Kg. PEMBESIAN U-24 (Alat Gunting)
Bahan :
Besi Beton 1.1000 kg @ Rp. 4,500.00
Bendrat (kawat beton) 0.0200 kg @ Rp. 8,000.00
Upah : 1.0000 m3 @ Rp. 428.88
3 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK DENGAN PAPAN SENGON
Bahan :
@ Rp. 60,000.00 . = Rp. 1,650.00
@ Rp. 6,000.00 . = Rp. 3,300.00
@ Rp. 4,000.00 . = Rp. 1,466.80
. = Rp. 6,416.80
. = Rp. 18,562.50
Total . = Rp. 24,979.30
1. 1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN MOLEN
zak @ Rp. 22,000.00 . = Rp. 187329.7
m3 @ Rp. 50,000.00 . = Rp. 27247.96
m3 @ Rp. 50,000.00 . = Rp. 40871.93
. = Rp. 255449.59
m3 @ Rp. 47,250.00 . = Rp. 47250
Total . = Rp. 302699.59
. = Rp. 4950
. = Rp. 160
. = Rp. 5110
. = Rp. 428.88
Total . = Rp. 5538.88
1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK
Papan sengon 2.7500 lbr @ Rp. 3,000.00
Paku 0.2000 kg @ Rp. 7,000.00
Upah : 1.0000 m2 @ Rp. 1,750.00
1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 4 12 CM
Rangka (0,6 x 0,6) m. Bahan :
Balok Kayu/ Bambu 55.0000 btg @ Rp. 4,500.00
Paku 1.6600 kg @ Rp. 7,000.00
Upah : 1 ls
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK 5 SLOOF 15/20
(1pc : 2ps : 3 Kr) Bahan dan Upah :
Beton 1.0000 m3 @ Rp. 302,699.59
Besi Beton U-24 100.0000 kg @ Rp. 5,538.88
Bekesting 5.0000 m2 @ Rp. 11,400.00
6 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah :
Beton 1.0000 m3 @ Rp. 302,699.59 Besi Beton U-24 120.0000 kg
. = Rp. 8250
. = Rp. 1400
. = Rp. 9650
. = Rp. 1750
Total . = Rp. 11400
1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL
. = Rp. 247500
. = Rp. 11620
. = Rp. 259120
@ Rp. 24,990.00 . = Rp. 24990
Total . = Rp. 284110
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK
. = Rp. 302699.59
. = Rp. 553887.5
. = Rp. 57000
Total . = Rp. 913587.09
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15
. = Rp. 302699.59 . = Rp.
@ Rp. 5,538.88
Bekesting 5.0000 m2 @ Rp. 11,400.00
7 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah :
Beton 1.0000 m3 @ Rp. 302,699.59
Besi Beton U-24 120.0000 kg @ Rp. 5,538.88
Bekesting 5.0000 m2 @ Rp. 11,400.00
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK 8 CANOPY
(1pc : 2ps : 3 Kr) Bahan dan Upah :
Beton 1.0000 m3 @ Rp. 302,699.59
Besi Beton U-24 125.0000 kg @ Rp. 5,538.88
Bekesting 5.0000 m2 @ Rp. 11,400.00
Perancah Bambu 0.5000 ls @ Rp. 284,110.00
M PEKERJAAN SANITASI DAN DRAINASI
1 1 M' PEKERJAAN INSTALASI AIR BERSIH
Bahan :
Pipa PVC 3/4\" 0.275
Sock 0.275
Knee 0.1875
Lem PC 0.1
@ Rp. 5,538.88 664665
5.0000 m2 @ Rp. 11,400.00 . = Rp. 57000
Total . = Rp. 1,024,364.59
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15
1.0000 m3 @ Rp. 302,699.59 . = Rp. 302699.59
. = Rp. 664665
5.0000 m2 @ Rp. 11,400.00 . = Rp. 57000
Total . = Rp. 1,024,364.59
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK
1.0000 m3 @ Rp. 302,699.59 . = Rp. 302699.59
. = Rp. 692359.38
5.0000 m2 @ Rp. 11,400.00 . = Rp. 57000
0.5000 ls @ Rp. 284,110.00 . = Rp. 142055
Total . = Rp. 1,194,113.97
btg @ Rp. 14,000.00 . = Rp.
bh @ Rp. 2,000.00 . = Rp.
bh @ Rp. 2,500.00 . = Rp.
tube @ Rp. 3,500.00 . = Rp. . = Rp.
3,850.00
550.00
468.75
350.00
5,218.75
Upah : 1
2 1 M' PEKERJAAN INSTALASI AIR KOTOR DAN AIR BEKAS
Bahan :
Pipa PVC 3\ 0.275
Sock 0.275
Knee 0.1875
Lem PVC 0.2
Upah : 1
3 1 UNIT PEKERJAAN PASANG CLOSET DUDUK
Bahan :
Closet Duduk Monoblok 1
Upah : 1
4 1 UNIT PEKERJAAN PASANG CLOSET JONGKOK
Bahan :
Closet Jon 1
Dudukan cl 1
Upah : 1
5 1 UNIT PEKERJAAN PASANG WASHTAFEL
Bahan :
Washtafel 1
m' @ Rp. 2,500.00 . = Rp. Total . = Rp.
1 M' PEKERJAAN INSTALASI AIR KOTOR DAN AIR BEKAS
btg @ Rp. 85,000.00 . = Rp.
bh @ Rp. 5,000.00 . = Rp.
bh @ Rp. 7,800.00 . = Rp.
tube @ Rp. 3,500.00 . = Rp. . = Rp.
m' @ Rp. 5,000.00 . = Rp. Total . = Rp.
set @ Rp. 1,000,000.00 . = Rp. . = Rp.
unit @ Rp. 72,600.00 . = Rp.
Total . = Rp.
bh @ Rp. 74,500.00 . = Rp.
ls @ Rp. 25,000.00 . = Rp. . = Rp.
unit @ Rp. 36,300.00 . = Rp. Total . = Rp.
set @ Rp. 200,000.00 . = Rp.
2,500.00
7,718.75
23,375.00
1,375.00
1,462.50
700.00
26,912.50
5,000.00
31,912.50
1,000,000.00
1,000,000.00
72,600.00
1,072,600.00
74,500.00
25,000.00
99,500.00
36,300.00
135,800.00
200,000.00
Upah : 1
6 1 UNIT PEKERJAAN PASANG WALL SHOWER
Bahan :
Wallshower 1
Upah : 1
7 1 BH PEKERJAAN PASANG FLOOR DRAIN
Bahan :
Floordrain 1.0000 bh
Upah : 1 unit
1 BH PEKERJAAN PASANG AVOR (KURASAN 8 BAK)
Bahan :
Avor 1.0000 bh
Upah : 1 unit
1 BH PEKERJAAN KERAN 9 AIR
Bahan :
Keran Air (rata-rata) 1.0000 bh
Knee 1.0000 bh
. = Rp.
unit @ Rp. 72,600.00 . = Rp. Total . = Rp.
set @ Rp. 50,000.00 . = Rp. . = Rp.
unit @ Rp. 15,125.00 . = Rp. Total . = Rp.
@ Rp. 10,000.00 . = Rp. 10000
. = Rp. 10000
@ Rp. 9,000.00 . = Rp. 9000
Total . = Rp. 19000
@ Rp. 5,000.00 . = Rp. 5000
. = Rp. 5000
@ Rp. 9,000.00 . = Rp. 9000
Total . = Rp. 14000
@ Rp. 15,000.00 . = Rp. 15000
@ Rp. 2,500.00 . = Rp. 2500
200,000.00
72,600.00
272,600.00
50,000.00
50,000.00
15,125.00
65,125.00
Isolasi 1.0000 bh
Upah : 1 m'
1 BH PEKERJAAN KERAN AIR UNTUK 10 DAPUR
Bahan :
Keran Air (rata-rata) 1.0000 bh
Knee 1.0000 bh
Isolasi 1.0000 bh
Upah : 1 m'
1 BH PEKERJAAN PASANG SOAP HOLDER 11 TANAM
Bahan :
Soap Holder 1.0000 bh
Upah : 1 unit
1 UNIT PEKERJAAN PASANG BATH 12 UP
Bahan :
Bath Up 1.0000 set
@ Rp. 1,000.00 . = Rp. 1000
. = Rp. 18500
@ Rp. 3,600.00 . = Rp. 3600
Total . = Rp. 22100
@ Rp. 25,000.00 . = Rp. 25000
@ Rp. 2,500.00 . = Rp. 2500
@ Rp. 1,000.00 . = Rp. 1000
. = Rp. 28500
@ Rp. 3,600.00 . = Rp. 3600
Total . = Rp. 32100
@ Rp. 25,000.00 . = Rp. 25000
. = Rp. 25000
@ Rp. 15,125.00 . = Rp. 15125
Total . = Rp. 40125
@ Rp. 1,250,000.00 . = Rp. 1,250,000.00
. = Rp. 1,250,000.00
1,250,000.00
1,250,000.00
Upah : 1 unit
1 UNIT PEKERJAAN BIKIN BAK 13 KONTROL
Bahan :
Bak Kontrol 1.0000 unit
Upah : 1 ls
14 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON
Bahan :
Sumur Resapan 1.0000 unit
Upah : 1 ls
15 1 UNIT PEKERJAAN SEPTIC TANK
Bahan :
Septictank 1.0000 unit
Upah : 1 ls
16 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA
Bahan + Upah
@ Rp. 93,750.00 . = Rp. 93750
Total . = Rp. 1,343,750.00
@ Rp. 200,000.00 . = Rp. 200000
. = Rp. 200000
@ Rp. 52,000.00 . = Rp. 52000
Total . = Rp. 252000
1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON
@ Rp. 750,000.00 . = Rp. 750000
. = Rp. 750000
@ Rp. 100,000.00 . = Rp. 100000
Total . = Rp. 850000
@ Rp. 1,500,000.00 . = Rp. 1,500,000.00
. = Rp. 1,500,000.00
@ Rp. 350,000.00 . = Rp. 350000
Total . = Rp. 1,850,000.00
1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA
1,343,750.00
1,500,000.00
1,500,000.00
1,850,000.00
Instalasi sumur air bersih + pompa 1.0unit @ Rp. 1,000,000.00 . = Rp.
1 UNIT PEKERJAAN INSTALASI WATER 17 TORN
Bahan + Upah
Instalasi water torn 1 unit @ Rp. 1,000,000.00 . = Rp.
M PEKERJAAN PERKERASAN JALAN
1 1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOK (Dengan 2 lapis pondasi)
Bahan :
Paving Blok1.1000 m2 @ Rp. 14,000.00
Pasir Beton0.1200 m3 @ Rp. 50,000.00
Sirtu 0.1200 m3 @ Rp. 30,000.00
Pasir urug 0.1350 m3 @ Rp. 27,000.00
Batu Belah 0.3000 m3 @ Rp. 35,000.00
Upah : 1.0000 m2 @ Rp. 10,725.00
1M' PEKERJAAN KANSTEN 2 (25x25x40) CM
Bahan :
Kansten 1.1000 m' @ Rp. 27,400.00
Pasir Beton0.0300 m3 @ Rp. 50,000.00
Sirtu 0.0300 m3 @ Rp. 30,000.00
Pasir urug 0.0297 m3 @ Rp. 27,000.00
@ Rp. 1,000,000.00 . = Rp. 1,000,000.00
Total . = Rp. 1,000,000.00
@ Rp. 1,000,000.00 . = Rp. 1,000,000.00
Total . = Rp. 1,000,000.00
1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOK
. = 1.1000 m2 @ Rp. 14,000.00 Rp. 15,400.00
. = 0.1200 m3 @ Rp. 50,000.00 Rp. 6,000.00
. = 0.1200 m3 @ Rp. 30,000.00 Rp. 3,600.00
. = 0.1350 m3 @ Rp. 27,000.00 Rp. 3,645.00
. = 0.3000 m3 @ Rp. 35,000.00 Rp. 10,500.00
. = Rp. 39,145.00
. = 1.0000 m2 @ Rp. 10,725.00 Rp. 10,725.00
. = Total Rp. 49,870.00
. = 1.1000 m' @ Rp. 27,400.00 Rp. 30,140.00
. = 0.0300 m3 @ Rp. 50,000.00 Rp. 1,500.00
. = 0.0300 m3 @ Rp. 30,000.00 Rp. 900.00
. = 0.0297 m3 @ Rp. 27,000.00 Rp. 801.90
1,000,000.00
1,000,000.00
1,000,000.00
1,000,000.00
Batu Belah 0.0660 m3 @ Rp. 35,000.00
Upah : 1.0000 m2 @ Rp. 3,431.25
O PEKERJAAN PEMBERSIHAN AKHIR PROYEK
1 LS PEMBERSIHAN AKHIR 1 PROYEK
Upah : 1.00 ls. @ Rp. 200,000.00
DAFTAR ANALISIS
. = 0.0660 m3 @ Rp. 35,000.00 Rp. 2,310.00
. = Rp. 35,651.90
. = 1.0000 m2 @ Rp. 3,431.25 Rp. 3,431.25
. = Total Rp. 39,083.15
. = 1.00 ls. @ Rp. 200,000.00 Rp. 200,000.00
HARGA SATUAN PEKERJAAN (HSP) - DENGAN OVER HEAD
PROYEK : SAMPLE LOKASI : SAMPLE
A PEKERJAAN PERSIAPAN
1. MOBILISASI
Upah : 1 ls. @ Rp. 200,000.
1M2 PEMBERSIHAN LOKASI 2. PROYEK
Upah : 1 m2 @ Rp. 3,189.56
1 M' PEKERJAAN UITZET & 3. BOUWPLANK
Bahan :
Papan Sengon 0.5500 Lbr @ Rp. 3,000.0
Balok Kayu 0.0060 m3 @ Rp. 1,200,000.00 . = Rp.
Paku 0.0200 Kg. @ Rp. 7,000.0
Upah : 1 M` @ Rp. 3,986.95
4. 1 M' PEMAGARAN LOKASI PROYEK
Bahan :
Zeng 1.2500 Lbr @ Rp. 8,000.0
Balok Kayu 0.0300 m3 @ Rp. 1,200,000.00 . = Rp.
Paku Zeng 12.5000 bh. @ Rp. 150.00
Paku 0.0200 Kg. @ Rp. 7,000.0
ls. @ Rp. 200,000. . = Rp. 200,000.00
m2 @ Rp. 3,189.56 . = Rp. 3,189.56
Lbr @ Rp. 3,000.0 . = Rp. 1,650.00
m3 @ Rp. 1,200,000.00 . = Rp. 7,200.00
Kg. @ Rp. 7,000.0 . = Rp. 140.00
. = Rp. 8,990.00
M` @ Rp. 3,986.95 . = Rp. 3,986.95
Total . = Rp. 12,976.95
Lbr @ Rp. 8,000.0 . = Rp. 10,000.00
m3 @ Rp. 1,200,000.00 . = Rp. 36,000.00
Paku Zeng 12.5000 bh. @ Rp. 150.00 . = Rp. 1,875.00
Kg. @ Rp. 7,000.0 . = Rp. 140.00
. = Rp. 48,015.00
Upah : 1 M` @ Rp. 6,644.91
1 M2 PEKERJAAN DIREKSI 5. KIT
Bahan & Upah : 1 M2 @ Rp. 100,000
1 M2 PEKERJAAN PEMBUATAN BRAK UNTUK 6. GUDANG
Bahan & Upah : 1 m2 @ Rp. 100,000
7. ADMINISTRASI DAN DOKUMENTASI
Bahan & Upah : 1 ls. @ Rp. 150,000.B PEKERJAAN TANAH DAN PASIR
1 M3 PEKERJAAN GALIAN 1. TANAH BIASA
Untuk Pondasi Batu Kali
Upah : 1 m3 @ Rp. 11,296.3
1 M3 PEKERJAAN GALIAN TANAH s.d. 2. -2 M
Untuk Foot Plate
Upah : 1 m3 @ Rp. 13,289.8
1 M3 PEKERJAAN URUGAN TANAH 3. KEMBALI
Upah : *) 1 m3 @ Rp. 5,980.42
*). Termasuk Pemadatan
4. 1 M3 PEKERJAAN URUGAN
M` @ Rp. 6,644.91 . = Rp. 6,644.91
Total . = Rp. 54,659.91
M2 @ Rp. 100,000 . = Rp. 100,000.00
m2 @ Rp. 100,000 . = Rp. 100,000.00
ls. @ Rp. 150,000. . = Rp. 150,000.00
m3 @ Rp. 11,296.3 . = Rp. 11296.35
Total . = Rp. 11296.35
m3 @ Rp. 13,289.8 . = Rp. 13289.82
Total . = Rp. 13289.82
m3 @ Rp. 5,980.42 . = Rp. 5980.42
Total . = Rp. 5980.42
TANAH Dengan Mendatangkan Tanah dari Luar
Bahan :
Tanah Urug 1.2000 m3 @ Rp. 22,500.0
Upah : *) 1 m3 @ Rp. 8,638.38
*). Termasuk Pemadatan
1 M3 PEKERJAAN URUGAN 5. PASIR
Bahan :
Pasir 1.2000 m3 @ Rp. 27,000.0
Upah : 1 m3 @ Rp. 6,578.46
1 M2 PEKERJAAN URUGAN 6. PASIR
TEBAL = 10 CM` Bahan :
Pasir 0.1200 m3 @ Rp. 27,000.0
Upah : 1 m3 @ Rp. 1,461.88
C PEKERJAAN PASANGAN & PLESTERAN
1. 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS )
Bahan :
Batu Kali 1.2000 m3 @ Rp. 35,000.00
Semen (pc) 3.0698 zak @ Rp. 22,000.00
Kapur - zak @ Rp. 4,500.00 Pasir Pasang 0.6175
m3 @ Rp. 22,500.0 . = Rp. 27000
m3 @ Rp. 8,638.38 . = Rp. 8638.38
Total . = Rp. 35638.38
m3 @ Rp. 27,000.0 . = Rp. 32400
m3 @ Rp. 6,578.46 . = Rp. 6578.46
Total . = Rp. 38978.46
m3 @ Rp. 27,000.0 . = Rp. 3240
m3 @ Rp. 1,461.88 . = Rp. 1461.88
Total . = Rp. 4701.88
1. 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS )
Batu Kali 1.2000 m3 @ Rp. 35,000.00 . = Rp. 42000
Semen (pc) 3.0698 zak @ Rp. 22,000.00 . = Rp. 67535.08
zak @ Rp. 4,500.00 . = Rp. - . = Rp.
m3 @ Rp. 50,000.00
Upah : 1.0000 m3 @ Rp. 50,002.95
1 M3 PEKERJAAN PASANGAN BATU KALI 2. KOSONG
Bahan :
Batu Kali 1.2000 m3 @ Rp. 35,000.00
Pasir Pasang 0.4500 m3 @ Rp. 27,000.00
Upah : 1.0000 m3 @ Rp. 31,895.57
1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 3. PC : 3 PS)
Bahan :
Batu Bata 77.0000 bh @ Rp. 180.00
Semen (pc) 0.6077 zak @ Rp. 22,000.00
Kapur zak @ Rp. 4,500.00
Pasir Pasang (Ayak) 0.0611 m3 @ Rp. 50,000.00
Upah : 1.0000 m2 @ Rp. 10,764.76
4. 1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS)
Bahan :
Batu Bata 70.0000 bh @ Rp. 180.00
30873.18
. = Rp. 140408.26
1.0000 m3 @ Rp. 50,002.95 . = Rp. 50002.95
Total : . = Rp. 190411.22
Batu Kali 1.2000 m3 @ Rp. 35,000.00 . = Rp. 42000
Pasir Pasang 0.4500 m3 @ Rp. 27,000.00 . = Rp. 12150
. = Rp. 54150
1.0000 m3 @ Rp. 31,895.57 . = Rp. 31895.57
Total : . = Rp. 86045.57
Batu Bata 77.0000 bh @ Rp. 180.00 . = Rp. 13860
Semen (pc) 0.6077 zak @ Rp. 22,000.00 . = Rp. 13369.32
. = Rp. -
. = Rp. 3055.84
. = Rp. 30285.16
1.0000 m2 @ Rp. 10,764.76 . = Rp. 10764.76
Total . = Rp. 41049.92
4. 1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS)
Batu Bata 70.0000 bh @ Rp. 180.00 . = Rp. 12600
Semen (pc) 0.4093 zak @ Rp. 22,000.00
Kapur - zak @ Rp. 4,500.00
Pasir Pasang (Ayak) 0.0686 m3 @ Rp. 50,000.00
Upah : 1.0000 m2 @ Rp. 9,718.18
1 M' PEKERJAAN ROLLAG BATA (1 PC 5. : 3 PS)
Bahan :
Batu Bata 14.0000 bh @ Rp. 180.00
Semen (pc) 0.2263 zak @ Rp. 22,000.00
Pasir Pasang (Ayak) 0.0122 m3 @ Rp. 50,000.00
Upah : 1.0000 m' @ Rp. 5,232.87
6. 1 M2 PEKERJAAN PLESTERAN (1PC : 5 PS) T = 20 MM
Bahan : Semen (pc) zak @ Rp. 22,000.00 . = Rp.
0.1428 Kapur - zak @ Rp. 4,500.00 . = Rp. Pasir Pasang (Ayak) m3 @ Rp. 50,000.00 . = Rp.
0.0239
Upah : m2 @ Rp. 12,133.61 . = Rp. 1
7. 1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 MM
Bahan : Semen (pc)
0.2121
. = Rp. 9004.49
. = Rp. -
. = Rp. 3430.28
. = Rp. 25034.77
. = Rp. 9718.18
Total . = Rp. 34752.95
. = Rp. 2520
. = Rp. 4978.82
. = Rp. 611.68
. = Rp. 8110.51
. = Rp. 5232.87
Total . = Rp. 13343.37
3,142.38
- 1,197.10
. = Rp. 4,339.48
12,133.61
Total . = Rp. 16,473.09
7. 1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 MM
zak @ Rp. . = Rp. 22000
3,142.38
- 1,197.10
4,339.48
12,133.61
16,473.09
4665.62
Kapur - zak @ Rp. 4,500.00 . = Rp.
Pasir Pasang (Ayak)
Upah :
8. 1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6 MM
Bahan : Semen (pc)
Kapur - zak @ Rp. 4,500.00 . = Rp.
Pasir Pasang (Ayak)
Upah :
9. 1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC : 2 PS )
Bahan : Semen (pc)
Kapur (Mill) - zak @ Rp. 4,500.00 . = Rp.
Pasir Pasang (Ayak)
Upah :
10. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYPE A
Kapur - zak @ Rp. 4,500.00 . = Rp. -
m3 @ Rp. . = Rp. 0.0213 50000 1066.43
. = Rp. 5732.05
m2 @ Rp. . = Rp. 1 12133.61 12133.61
Total . = Rp. 17865.65
8. 1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6 MM
zak @ Rp. . = Rp. 0.0943 22000 2073.61
Kapur - zak @ Rp. 4,500.00 . = Rp. -
m3 @ Rp. . = Rp. 0.0095 50000 473.97
. = Rp. 2547.58
m2 @ Rp. . = Rp. 1 12133.61 12133.61
Total . = Rp. 14681.18
9. 1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC :
zak @ Rp. . = Rp. 0.0249 22000 547.39
Kapur (Mill) - zak @ Rp. 4,500.00 . = Rp. -
m3 @ Rp. . = Rp. 0.0017 50000 83.41
. = Rp. 630.81
m2 @ Rp. 3,654.70 . = Rp. 1 3654.7
Total . = Rp. 4285.51
10. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYPE A
Bahan : Semen (pc)
Pasir Pasang (Ayak)
Upah :
11. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYPE B
Bahan : Semen (pc)
Pasir Pasang (Ayak)
Upah :
12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM
Bahan : Semen (pc)
Pasir Pasang (Ayak)
Upah :
13. 1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : 5 KR) TEBAL 50 MM
Bahan : Semen (pc)
Pasir
zak @ Rp. . = Rp. 0.0071 22000 157.12
m3 @ Rp. . = Rp. 0.0012 50000 59.85
. = Rp. 216.97
m2 @ Rp. . = Rp. 1 10964.1 10964.1
Total . = Rp. 11181.08
11. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYPE B
zak @ Rp. . = Rp. 0.0114 22000 251.39
m3 @ Rp. . = Rp. 0.0019 50000 95.77
. = Rp. 347.16
m2 @ Rp. . = Rp. 1 10964.1 10964.1
Total . = Rp. 11311.26
12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM
zak @ Rp. . = Rp. 0.3414 22000 7510.84
m3 @ Rp. . = Rp. 0.0458 50000 2289.02
. = Rp. 9799.86
m2 @ Rp. 4,385.64 . = Rp. 1 4385.64
Total . = Rp. 14185.5
13. 1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : 5 KR) TEBAL 50 MM
zak @ Rp. . = Rp. 0.3047 22000 6702.65
m3 @ Rp. . = Rp. 0.0292 50000 1462.4
Krikil
Upah :
E PEKERJAAN PENUTUP LANTAI DAN DINDING
1. 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 30/30
Bahan : Keramik Lantai
Semen (pc)
Pasir
Semen Grouting
Upah :
2. 1M2 PEKERJAAN PASANGAN KERAMIK KM/ WC 20X20 CM
Bahan : Keramik Serit
Semen (pc)
Pasir
Semen Grouting
Upah :
m3 @ Rp. . = Rp. 0.0266 50000 1327.76
. = Rp. 9492.8
m2 @ Rp. 7,601.78 . = Rp. 1 7601.78
Total . = Rp. 17094.58
E PEKERJAAN PENUTUP LANTAI DAN DINDING
1. 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 30/30
m2 @ Rp. . = Rp. 1.1 30000 33000
zak @ Rp. . = Rp. 0.173 22000 3805.49
m3 @ Rp. . = Rp. 0.0206 50000 1030.06
m3 @ Rp. 7,500.00 . = Rp. 0.1833 1375
. = Rp. 39210.55
m2 @ Rp. . = Rp. 1 12293.08 12293.08
Total . = Rp. 51503.63
2. 1M2 PEKERJAAN PASANGAN KERAMIK KM/ WC 20X20 CM
m2 @ Rp. . = Rp. 1.1 35000 38500
zak @ Rp. . = Rp. 0.173 22000 3805.49
m3 @ Rp. . = Rp. 0.0206 50000 1030.06
m3 @ Rp. 7,500.00 . = Rp. 0.1833 1375
. = Rp. 44710.55
m2 @ Rp. . = Rp. 1 12293.08 12293.08
Total . = Rp. 57003.63
3. 1M2 PEKERJAAN PASANGAN KERAMIK DINDING ASIA 20X25
Bahan : Keramik Dinding
Semen (pc)
Pasir
Semen Grouting
Upah :
4. 1M' PEKERJAAN PASANGAN KERAMIK PLINT T = 12 CM
Bahan : Keramik Dinding
Semen (pc)
Pasir
Semen Grouting
Upah :
5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM
Bahan : Keramik Assesories
Semen (pc)
Pasir
3. 1M2 PEKERJAAN PASANGAN KERAMIK DINDING ASIA 20X25
m2 @ Rp. . = Rp. 1.1 33000 36300
zak @ Rp. . = Rp. 0.1297 22000 2854.12
m3 @ Rp. . = Rp. 0.0155 50000 772.54
m3 @ Rp. 7,500.00 . = Rp. 0.1833 1375
. = Rp. 41301.66
m2 @ Rp. . = Rp. 1 39869.46 39869.46
Total . = Rp. 81171.13
4. 1M' PEKERJAAN PASANGAN KERAMIK
m2 @ Rp. . = Rp. 0.1667 30000 5001
zak @ Rp. . = Rp. 0.0156 22000 342.49
m3 @ Rp. . = Rp. 0.0019 50000 92.71
m3 @ Rp. 7,500.00 . = Rp. 0.022 165
. = Rp. 5601.2
m2 @ Rp. 9,037.08 . = Rp. 1 9037.08
Total . = Rp. 14638.28
5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM
bh @ Rp. 4,000.00 . = Rp. 1.1 4400
zak @ Rp. . = Rp. 0.0021 22000 45.67
m3 @ Rp. . = Rp.
0.0002 50000 12.36
Semen Grouting
Upah :
1M2 PEKERJAAN BATU ALAM PADA 6. DINDING
Bahan :
Batu Alam 1.1200
Semen (pc) 0.1297
Pasir 0.0155
Upah :
7. 1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PADA PILAR
Bahan :
Batu Belah 275.0000
Semen (pc) 0.1297
Pasir 0.0155
Upah :
G PEKERJAAN RANGKA ATAP & PLAFOND
1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. 1. KRUING (Jarak Usuk 40; Jarak Reng 36
cm) Bahan :
Semen Grouting m3 @ Rp. 7,500.00 . = Rp. 0.0029 22
. = Rp. 4480.03
m2 @ Rp. 1,328.98 . = Rp. 1 1328.98
Total . = Rp. 5809.01
1M2 PEKERJAAN BATU ALAM PADA
Batu Alam 1.1200 m2 @ Rp. 65 . = Rp. 72800
Semen (pc) 0.1297 zak @ Rp. 22,000.0 . = Rp. 2,854.12
Pasir 0.0155 m3 @ Rp. 50 . = Rp. 772.54
. = Rp. 76426.66
1 m2 @ Rp. 59 . = Rp. 59804.19
Total . = Rp. 136230.86
7. 1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PADA PILAR
Batu Belah 275.0000 bh @ Rp. 50 . = Rp. 137500
Semen (pc) 0.1297 zak @ Rp. 22,000.0 . = Rp. 2,854.12
Pasir 0.0155 m3 @ Rp. 50 . = Rp. 772.54
. = Rp. 141126.66
1 m2 @ Rp. 39 . = Rp. 39869.46
Total . = Rp. 180996.13G PEKERJAAN RANGKA ATAP & PLAFOND
1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY.
(Jarak Usuk 40; Jarak Reng 36
2,854.12
772.54
2,854.12
772.54
Balok Kayu 0.0092
Reng Kayu 0.0045
Paku 0.2000
Upah : 1
1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. 2. KRUING (Jarak Usuk 45 cm; Jarak Reng 35 cm)
Bahan :
Balok Kayu 0.0092
Reng Kayu 0.0064
Paku 0.2000
Upah : 1
1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI 3. 8/12
Bahan :
Balok Kayu 1.1000
Baut 50.0833 bh @ Rp. 1,500.00
Upah : 1
m3 @ Rp. 2,800,000.00 . = Rp. 25872
Kg @ Rp. 1,800,000.00 . = Rp. 8188.71
Kg @ Rp. 7,000.00 . = Rp. 1400
. = Rp. 35460.71
M2 @ Rp. 5,315.93 . = Rp. 5315.93
Total : . = Rp. 40776.64
1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY.
m3 @ Rp. 2,800,000.00 . = Rp. 25872
Kg @ Rp. 1,800,000.00 . = Rp. 11583
Kg @ Rp. 7,000.00 . = Rp. 1400
. = Rp. 38855
M2 @ Rp. 5,315.93 . = Rp. 5315.93
Total : . = Rp. 44170.93
1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI
m3 @ Rp. 2,800,000.00 . = Rp. 3,080,000.00
Baut 50.0833 bh @ Rp. 1,500.00 . = Rp. 75125
. = Rp. 3,155,125.00
m3 @ Rp. 571,462.31 . = Rp. 571462.31
Total : . = Rp. 3,726,587.31
1 M` PEKERJAAN PAPAN RUITER KAYU 4. BANGKIRAI 2/20
Bahan :
Papan Kayu 0.0044
Paku 0.0200
Upah : 1
1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU 5. BANGKIRAI 2/25
Bahan :
Papan Kayu 0.0055
Paku 0.0200
Upah : 1
1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20; 6. 2/25
Bahan :
Papan Kayu 0.0110
Paku 0.0400
Upah : 1
7. 1M' PEKERJAAN TALANG ZENG; PAPAN KAYU
1 M` PEKERJAAN PAPAN RUITER KAYU
m3 @ Rp. 3,000,000.00 . = Rp. 13200
bh @ Rp . = Rp. 140
. = Rp. 13340
m` @ Rp . = Rp. 1993.47
Total : . = Rp. 15333.47
1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU
m3 @ Rp. 3,000,000.00 . = Rp. 16500
bh @ Rp . = Rp. 140
. = Rp. 16640
m` @ Rp . = Rp. 9635.12
Total : . = Rp. 26275.12
1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20;
m3 @ Rp. 3,000,000.00 . = Rp. 33000
bh @ Rp . = Rp. 280
. = Rp. 33280
m` @ Rp . = Rp. 19270.24
Total : . = Rp. 52550.24
7. 1M' PEKERJAAN TALANG ZENG; PAPAN KAYU
MERANTI
Seng BJLS 30 1.1000
Papan Kayu Meranti 0.0176
Paku Seng (Payung) 10.0000 buah @ Rp. 150.00
1 M' PEKERJAAN WENVIR 8. DENGAN SENG
Papan Kayu Meranti
1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP 9. GYPSUM Rangka = 60 x 60 CM
Balok Kayu 0.0136
Paku Plepet
Bahan :
Seng BJLS 30 1.1000 m' @ Rp. 24,000.00 . = Rp. 26400
Papan Kayu Meranti 0.0176 m3 @ Rp. 1,400,000.00 . = Rp. 24640
Paku Seng (Payung) 10.0000 buah @ Rp. 150.00 . = Rp. 1500
Paku 0.0200 kg @ Rp. 7,000.00 . = Rp. 140
. = Rp. 52680
Upah : 1 m' @ Rp. 10 . = Rp. 10299.61
Total . = Rp. 62979.61
Bahan :
Seng 1.1 m' @ Rp. 8, . = Rp. 8800
Papan Kayu Meranti 0.0026 m3 @ Rp. 1,400,000.00 . = Rp. 3640
Paku 0.02 kg @ Rp. 7, . = Rp. 140
. = Rp. 12580
Upah : 1 m' @ Rp. 6, . = Rp. 6644.91
Total . = Rp. 19224.91
1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP
Bahan :
Gypsum 0.3819 m3 @ Rp. 35,000.0 . = Rp. 13368.06
Balok Kayu 0.0136 m3 @ Rp. 1,800,000.00 . = Rp. 24552
Paku 0.2000 Kg @ Rp. 7,000.00 . = Rp. 1400 Paku Plepet Kg . = Rp.
1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP 10. CALSIBOARD
Rangka = 100 x 100 CM
11 1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 CM
Bahan dan Upah :
Lis Gypsium L=10 cm 1.0000
H PEKERJAAN PENUTUP ATAP
1. 1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO SE
Bahan :
Genteng Keramik 9.9000
0.02 @ Rp. 8,000.00
. = Rp.
Upah : 1 m2 @ Rp. 17,276.77 . = Rp.
Total : . = Rp.
1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP
Rangka = 100 x 100
Bahan :
Calsiboard 0.3819 m3 @ Rp. 30,000.00 . = Rp.
Balok Kayu 0.0092 m3 @ Rp. 1,800,000.00 . = Rp.
Paku 0.2000 Kg @ Rp. 7,000.00 . = Rp.
Paku Plepet 0.0200 Kg @ Rp. 8,000.00 . = Rp.
. = Rp.
Upah : 1 m2 @ Rp. 9,568.67 . = Rp.
Total : . = Rp.
1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 CM
Bahan dan Upah :
Lis Gypsium L=10 cm 1.0000 m3 m' Rp. 8,000.00 . = Rp.
Total : . = Rp.
1. 1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO SE
Genteng Keramik 9.9000 bh @ Rp. 2,100.00 . = Rp.
. = Rp.
160
39480.06
17276.77
56756.82
11458.33
16632
1400
160
29650.33
9568.67
39219
8000
8000
20790
20790
Upah :
1 M' PEKERJAAN KERPUS GENTENG KERAMIK 2. SOKKA
Bahan :
Genteng Kerpus 3.3000
Semen 0.2601
Pasir 0.0366
Upah :
F PEKERJAAN KUSEN DAN DAUN PINTU JENDELA
1 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12
Bahan :
Balok Kayu 1.1000
Paku 5.0000
Upah : 1
2. 1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12
Bahan :
Balok Kayu 0.0087
Paku 0.0360
Upah : 1
1 m2 @ Rp. 9,369.32 . = Rp.
Total : . = Rp.
1 M' PEKERJAAN KERPUS GENTENG KERAMIK
Genteng Kerpus 3.3000 m3 @ Rp. 4,000.00 . = Rp.
m3 @ Rp. 22,000.00 . = Rp.
Kg @ Rp. 50,000.00 . = Rp.
. = Rp.
1 m2 @ Rp. 22,642.53 . = Rp.
Total : . = Rp.
PEKERJAAN KUSEN DAN DAUN PINTU JENDELA
1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12
Balok Kayu 1.1000 m3 @ Rp. 6,000,000.00
Kg @ Rp. 7,000.00
m3 @ Rp. 2,299,139.05 Total :
2. 1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12
Balok Kayu 0.0087 m3 @ Rp. 6,000,000.00
Kg @ Rp. 7,000.00
m' @ Rp. 16,553.80 Total :
9369.32
30159.32
13200
5722.54
1831.21
20753.76
22642.53
43396.29
. = Rp. 6,600,000.00
. = Rp. 35,000.00
. = Rp. 6,635,000.00
. = Rp. 2,299,139.05
. = Rp. 8,934,139.05
. = Rp. 52,272.00
. = Rp. 252.00
. = Rp. 52,524.00
. = Rp. 16,553.80
. = Rp. 69,077.80
1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK 3. KUSEN
Bahan :
Papan Kayu 1.1000
Paku 5.0000
Upah : 1
1 BH DAUN PINTU PANIL 3,5 X 82 X 200 4. CM
Bahan :
Papan Kayu 0.0631
Lem 0.1500
Upah : 1
1 BH DAUN PINTU PANIL 3 X 74 X 5. 200 CM
Bahan :
Papan Kayu 0.0488
Lem 0.1500
Upah : 1
1 BH DAUN PINTU PANIL 3 X 61 X 6. 200 CM
Bahan :
Papan Kayu 0.0403
Lem 0.1500
1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK
m3 @ Rp. 8,000,000.00 . = Rp. 8,800,000.00
Kg @ Rp. 7,000.00 . = Rp. 35,000.00
. = Rp. 8,835,000.00
m3 @ Rp. 2,152,951.02 . = Rp. 2,152,951.02
Total : . = Rp. 10,987,951.02
m3 @ Rp. 8,000,000.00 . = Rp. 504,800.00
Kg @ Rp. 8,000.00 . = Rp. 1,200.00
. = Rp. 506,000.00
bh @ Rp. 245,516.15 . = Rp. 245,516.15
Total : . = Rp. 751,516.15
m3 @ Rp. 8,000,000.00 . = Rp. 390,400.00
Kg @ Rp. 8,000.00 . = Rp. 1,200.00
. = Rp. 391,600.00
bh @ Rp. 237,914.38 . = Rp. 237,914.38
Total : . = Rp. 629,514.38
m3 @ Rp. 8,000,000.00 . = Rp. 322,400.00
Kg @ Rp. 8,000.00 . = Rp. 1,200.00
8,800,000.00
35,000.00
8,835,000.00
2,152,951.02
10,987,951.02
504,800.00
1,200.00
506,000.00
245,516.15
751,516.15
390,400.00
1,200.00
391,600.00
237,914.38
629,514.38
322,400.00
1,200.00
Upah : 1
7 1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI POLITUR
Bahan :
Ram Kayu 3,5 cm 0.0156
Kaca Bening 5 mm 0.4725
Upah : 1
8. 1 BH DAUN JENDELA 62 X 116 CM; KAYU JATI POLITUR
Bahan :
Ram Kayu 3,5 cm 0.0137
Kaca Bening 5 mm 0.4500
Upah : 1
9. 1 BH DAUN JENDELA 62 X 166 CM; KAYU JATI POLITUR
Bahan :
Ram Kayu 3,5 cm 0.0176
Kaca Bening 5 mm 0.6750
Upah : 1
10. 1 BH ROSTER KAYU 30 X 40 CM
bh @ Rp. 233,395.84 Total :
1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI POLITUR
m3 @ Rp.
m2 @ Rp.
bh @ Rp.
m3 @ Rp.
m2 @ Rp.
bh @ Rp.
m3 @ Rp.
m2 @ Rp.
bh @ Rp.
. = Rp. 323,600.00
. = Rp. 233,395.84
. = Rp. 556,995.84
. = 8,000,000.00 Rp. 124,800.00
. = 60,000.00 Rp. 28,350.00
. = Rp. 153,150.00
. = 93,028.75 Rp. 93,028.75
. = Total : Rp. 246,178.75
. = 8,000,000.00 Rp. 109,600.00
. = 60,000.00 Rp. 27,000.00
. =
Rp. 136,600.00
. = 93,028.75 Rp. 93,028.75
. = Total : Rp. 229,628.75
. = 8,000,000.00 Rp. 140,800.00
. = 60,000.00 Rp. 40,500.00
. = Rp. 181,300.00
. = 93,028.75 Rp. 93,028.75
. = Total : Rp. 274,328.75
Bahan :
Roster Kayu 1.0000
Upah : 1
11. 1 M2 PEKERJAAN KACA ES UNTUK BOVEN
Bahan dan Upah :
Kaca Es 5mm 1.0000
Lis Kayu 4.0000
J PEKERJAAN CAT DAN POLITUR
1. 1 M2 PENGECATAN KAYU BARU
Bahan :
Cat Kayu 0.2750 Kg
Plamur Kayu 0.1375 Kg
Dempul Jadi 0.5000 bh
Thiner 0.2500 ltr
Amplas 1.0000 lbr
Upah : 1 bh
2. 1M2 PEKERJAAN MENI BIDANG KAYU BARU
Bahan :
Menie Jadi 0.275 kg
Upah : 1 m2
bh @ Rp. 45,000.00
bh @ Rp. 1,328.98
Total :
m2 @ Rp. 70,000.00
m' @ Rp. 3,000.00
Total :
@ Rp. 33,000.00 . = Rp. 9,075.00
@ Rp. 9,700.00 . = Rp. 1,333.75
@ Rp. 1,000.00 . = Rp. 500.00
@ Rp. 4,500.00 . = Rp. 1,125.00
@ Rp. 1,250.00 . = Rp. 1,250.00
. = Rp. 13,283.75
@ Rp. 17,223.61 . = Rp. 17,223.61
Total : . = Rp. 30,507.36
@ Rp. 6,000.00 . = Rp. 1,650.00
. = Rp. 1,650.00
@ Rp. . = Rp. 4,239.45
. = Rp. 45,000.00
. = Rp. 45,000.00
. = Rp. 1,328.98
. = Rp. 46,328.98
. = Rp. 70,000.00
. = Rp. 12,000.00
. = Rp. 82,000.00
1M2 PEKERJAAN PENGECATAN KAYU 3. BARU
Bahan dan Upah:
Cat-catan 1 m2
Menie 1 m2
4. 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC (Untuk Dinding dan Plafon)
Bahan :
Cat Tembok Catylac 0.183 kg
Plamur Jadi 0.046 kg
Amplas 0.25 lbr
Upah : 1 m2
5. 1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA
Bahan :
Sirlak 0.0275 kg
Spirtus 0.55 kg
Batu Apung 0.3667 kg
Upah : 1 m2
D PEKERJAAN BETON BERTULANG
1. 1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN MOLEN
Bahan : Semen (pc) 8.5150 zak
4239.45 Total . = Rp. 5,889.45
@ Rp. 30,507.36 . = Rp. 30,507.36
@ Rp. 5,889.45 . = Rp. 5,889.45
Total . = Rp. 36,396.81
4. 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC
@ Rp. 10,000.00 . = Rp. 1,830.00
@ Rp. 5,800.00 . = Rp. 266.80
@ Rp. 1,250.00 . = Rp. 312.50
. = Rp. 2,409.30
@ Rp. 6,441.41 . = Rp. 6,441.41
Total . = Rp. 8,850.71
5. 1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA
@ Rp. 60,000.00 . = Rp. 1,650.00
@ Rp. 6,000.00 . = Rp. 3,300.00
@ Rp. 4,000.00 . = Rp. 1,466.80
. = Rp. 6,416.80
@ Rp. 24,669.23 . = Rp. 24,669.23
Total . = Rp. 31,086.03
1. 1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN MOLEN
Rp. . = Rp. 187,329.70
Pasir Beton 0.5450 m3
Kerikil 0.8174 m3
Upah : 1 m3
2. 1Kg. PEMBESIAN U-24 (Alat Gunting)
Bahan :
Besi Beton 1.1 kg
Bendrat (kawat beton) 0.02 kg
Upah : 1 m3
3. 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK DENGAN PAPAN SENGON
Bahan :
Papan sengon 2.75 lbr
Paku 0.2 kg
Upah : 1 m2
4. 1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 12 CM Rangka (0,6 x 0,6) m.
Bahan :
Balok Kayu/ Bambu 55 btg
Paku 1.66 kg
Upah : 1 ls
@ 22000
@ Rp. 50,000.00 . = Rp. 27,247.96
@ Rp. 50,000.00 . = Rp. 40,871.93
. = Rp. 255,449.59
@ Rp. 62,794.40 . = Rp. 62,794.40
Total . = Rp. 318,244.00
@ Rp. 4,500.00 . = Rp. 4,950.00
@ Rp. 8,000.00 . = Rp. 160.00
. = Rp. 5,110.00
@ Rp. 569.97 . = Rp. 569.97
Total . = Rp. 5,679.97
3. 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK
@ Rp. 3,000.00 . = Rp. 8,250.00
@ Rp. 7,000.00 . = Rp. 1,400.00
. = Rp. 9,650.00
@ Rp. 2,325.72 . = Rp. 2,325.72
Total . = Rp. 11,975.72
4. 1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 12 CM
@ Rp. 4,500.00 . = Rp. 247,500.00
@ Rp. 7,000.00 . = Rp. 11,620.00
. = Rp. 259,120.00
@ Rp. 33,211.26 . = Rp. 33,211.26
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SLOOF 5. 15/20 (1pc : 2ps : 3 Kr) Bahan dan Upah :
Beton 1 m3
Besi Beton U-24 100 kg
Bekesting 5 m2
6. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah :
Beton 1 m3
Besi Beton U-24 120 kg
Bekesting 5 m2
7. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah :
Beton 1 m3
Besi Beton U-24 120 kg
Bekesting 5 m2
8. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK CANOPY (1pc : 2ps : 3 Kr) Bahan dan Upah :
Beton 1 m3
Besi Beton U-24 125 kg Bekesting 5 m2
Total . = Rp. 292,331.26
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SLOOF
@ Rp. 318,244.00 . = Rp. 318,244.00
@ Rp. 5,679.97 . = Rp. 567,996.72
@ Rp. 11,975.72 . = Rp. 59,878.59
Total . = Rp. 946,119.31
6. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15
@ Rp. 318,244.00 . = Rp. 318,244.00
@ Rp. 5,679.97 . = Rp. 681,596.06
@ Rp. 11,975.72 . = Rp. 59,878.59
Total . = Rp. 1,059,718.65
7. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15
@ Rp. 318,244.00 . = Rp. 318,244.00
@ Rp. 5,679.97 . = Rp. 681,596.06
@ Rp. 11,975.72 . = Rp. 59,878.59
Total . = Rp. 1,059,718.65
8. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK CANOPY
@ Rp. 318,244.00 . = Rp. 318,244.00
@ Rp. 5,679.97 . = Rp. 709,995.90
Rp. . = Rp. 59,878.59
Perancah Bambu 0.5000 ls
M PEKERJAAN SANITASI DAN DRAINASI
1 M' PEKERJAAN INSTALASI AIR 1 BERSIH
Bahan :
Pipa PVC 3/4\" 0.275 btg
Sock 0.275 bh
Knee 0.1875 bh
Lem PC 0.2 tube
Upah : 1 m'
1 M' PEKERJAAN INSTALASI AIR 2 KOTOR
Bahan :
Pipa PVC 3\ 0.275 btg
Sock 0.275 bh
Knee 0.1875 bh
Lem PC 0.2 tube
Upah : 1 m'
1 UNIT PEKERJAAN PASANG CLOSET 3 DUDUK
Bahan :
Closet Duduk 1 set
@ 11975.72
@ Rp. 292,331.26 . = Rp. 146,165.63
Total . = Rp. 1,234,284.12
@ Rp. 14,000.00 . = Rp. 3,850.00
@ Rp. 2,000.00 . = Rp. 550.00
@ Rp. 2,000.00 . = Rp. 375.00
@ Rp. 3,500.00 . = Rp. 700.00
. = Rp. 5,475.00
@ Rp. 3,322.46 . = Rp. 3,322.46
Total . = Rp. 8,797.46
@ Rp. 85,000.00 . = Rp. 23,375.00
@ Rp. 5,000.00 . = Rp. 1,375.00
@ Rp. 7,800.00 . = Rp. 1,462.50
@ Rp. 3,500.00 . = Rp. 700.00
. = Rp. 26,912.50
@ Rp. 6,644.91 . = Rp. 6,644.91
Total . = Rp. 33,557.41
@ Rp. 1,000,000.00 . = Rp. 1,000,000.00
. = Rp. 1,000,000.00
Upah : 1 unit
4 1 UNIT PEKERJAAN PASANG CLOSET JONGKOK
Bahan :
Closet Jongkok 1 bh
Dudukan closet 1 ls
Upah : 1 unit
5 1 UNIT PEKERJAAN PASANG WASHTAFEL
Bahan :
Washtafel 1 set
Upah : 1 unit
1 UNIT PEKERJAAN PASANG WALL 6 SHOWER
Bahan :
Wallshower 1 set
Upah : 1 unit
7 1 BH PEKERJAAN PASANG FLOOR DRAIN
Bahan :
Floordrain 1.0000 bh
Upah : 1 unit
8 1 BH PEKERJAAN PASANG AVOR (KURASAN
@ Rp. 96,484.10 . = Rp. 96,484.10
Total . = Rp. 1,096,484.10
@ Rp. 74,500.00 . = Rp. 74,500.00
@ Rp. 25,000.00 . = Rp. 25,000.00
. = Rp. 99,500.00
@ Rp. 48,242.05 . = Rp. 48,242.05
Total . = Rp. 147,742.05
@ Rp. 200,000.00 . = Rp. 200,000.00
. = Rp. 200,000.00
@ Rp. 96,484.10 . = Rp. 96,484.10
Total . = Rp. 296,484.10
@ Rp. 50,000.00 . = Rp. 50,000.00
. = Rp. 50,000.00
@ Rp. 21,125.00 . = Rp. 21,125.00
Total . = Rp. 71,125.00
@ Rp. 10,000.00 . = Rp. 10,000.00
. = Rp. 10,000.00
@ Rp. 11,960.84 . = Rp. 11,960.84
Total . = Rp. 21,960.84
BAK)
Bahan :
Avor 1.0000 bh
Upah : 1 unit
1 BH PEKERJAAN KERAN 9 AIR
Bahan :
Keran Air (rata-rata) 1.0000 bh
Knee 1.0000 bh
Isolasi 1.0000 bh
Upah : 1 m'
1 BH PEKERJAAN KERAN AIR UNTUK 10. DAPUR
Bahan :
Keran Air (rata-rata) 1.0000 bh
Knee 1.0000 bh
Isolasi 1.0000 bh
Upah : 1 m'
1 BH PEKERJAAN PASANG SOAP HOLDER 11. TANAM
Bahan :
Soap Holder 1.0000 bh
@ Rp. 5,000.00 . = Rp. 5,000.00
. = Rp. 5,000.00
@ Rp. 11,960.84 . = Rp. 11,960.84
Total . = Rp. 16,960.84
@ Rp. 15,000.00 . = Rp. 15,000.00
@ Rp. 2,500.00 . = Rp. 2,500.00
@ Rp. 1,000.00 . = Rp. 1,000.00
. = Rp. 18,500.00
@ Rp. 4,784.34 . = Rp. 4,784.34
Total . = Rp. 23,284.34
@ Rp. 25,000.00 . = Rp. 25,000.00
@ Rp. 2,500.00 . = Rp. 2,500.00
@ Rp. 1,000.00 . = Rp. 1,000.00
. = Rp. 28,500.00
@ Rp. 4,784.34 . = Rp. 4,784.34
Total . = Rp. 33,284.34
@ Rp. 25,000.00 . = Rp. 25,000.00
. = Rp. 25,000.00
Upah : 1 bh
1 UNIT PEKERJAAN PASANG BATH 12. UP
Bahan :
Bath Up 1.0000 set
Upah : 1 unit
1 UNIT PEKERJAAN BIKIN BAK 13. KONTROL
Bahan :
Bak Kontrol 1.0000 unit
Upah : 1 ls
14. 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON
Bahan :
Sumur Resapan 1.0000 unit
Upah : 1 ls
15. 1 UNIT PEKERJAAN SEPTIC TANK
Bahan :
Septic tank 1.0000 unit
Upah : 1 ls
@ Rp. 20,100.85 . = Rp. 20,100.85
Total . = Rp. 45,100.85
@ Rp. 1,250,000.00 . = Rp. 1,250,000.00
. = Rp. 1,250,000.00
@ Rp. 124,592.07 . = Rp. 124,592.07
Total . = Rp. 1,374,592.07
@ Rp. 200,000.00 . = Rp. 200,000.00
. = Rp. 200,000.00
@ Rp. 73,125.00 . = Rp. 73,125.00
Total . = Rp. 273,125.00
14. 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON
@ Rp. 750,000.00 . = Rp. 750,000.00
. = Rp. 750,000.00
@ Rp. 132,898.21 . = Rp. 132,898.21
Total . = Rp. 882,898.21
@ Rp. 1,500,000.00 . = Rp. 1,500,000.00
. = Rp. 1,500,000.00
@ Rp. 465,143.74 . = Rp. 465,143.74
Total . = Rp. 1,965,143.74
16. 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA
Bahan + Upah Instalasi sumur air bersih +
pompa 1.0unit @ Rp. 1,000,000.00 . = Rp.
1 UNIT PEKERJAAN INSTALASI WATER 17. TORN
Bahan + Upah
Instalasi water torn 1 unit @ Rp. 1,000,000.00 . = Rp.
M PEKERJAAN PERKERASAN JALAN
1 1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOCK
(Dengan 2 lapis pondasi) Bahan :
Paving Blok1.1000 m2 @ Rp. 14,000.00
Pasir Beton0.1200 m3 @ Rp. 50,000.00
Sirtu 0.1200 m3 @ Rp. 30,000.00
Pasir urug 0.1350 m3 @ Rp. 27,000.00
Batu Belah 0.3000 m3 @ Rp. 35,000.00
Upah : 1.0000 m2 @ Rp. 14,253.33
1M' PEKERJAAN KANSTEN 2 (25x25x40) CM
Bahan :
Kansten 1.1000 m' @ Rp. 27,400.00
Pasir Beton0.0300 m3 @ Rp. 50,000.00
Sirtu 0.0300 m3 @ Rp. 30,000.00
16. 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA
@ Rp. 1,000,000.00 . = Rp. 1,000,000.00
Total . = Rp. 1,000,000.00
@ Rp. 1,000,000.00 . = Rp. 1,000,000.00
Total . = Rp. 1,000,000.00
1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOCK
1.1000 m2 @ Rp. 14,000.00 . = Rp. 15400
0.1200 m3 @ Rp. 50,000.00 . = Rp. 6000
0.1200 m3 @ Rp. 30,000.00 . = Rp. 3600
0.1350 m3 @ Rp. 27,000.00 . = Rp. 3645
0.3000 m3 @ Rp. 35,000.00 . = Rp. 10500
. = Rp. 39145
1.0000 m2 @ Rp. 14,253.33 . = Rp. 14253.33
Total . = Rp. 53398.33
1.1000 m' @ Rp. 27,400.00 . = Rp. 30140
0.0300 m3 @ Rp. 50,000.00 . = Rp. 1500
0.0300 m3 @ Rp. 30,000.00 . = Rp. 900
Pasir urug 0.0297 m3 @ Rp. 27,000.00
Batu Belah 0.0660 m3 @ Rp. 35,000.00
Upah : 1.0000 m2 @ Rp. 4,560.07
O PEKERJAAN PEMBERSIHAN AKHIR PROYEK
1 LS PEMBERSIHAN AKHIR 1 PROYEK
Upah : 1 ls. @ Rp. 200,000.00
Analisa Harga satuan pekerjaan menggunakan metode Modern Yang Dikembangkan oleh
dunia)
0.0297 m3 @ Rp. 27,000.00 . = Rp. 801.9
0.0660 m3 @ Rp. 35,000.00 . = Rp. 2310
. = Rp. 35651.9
1.0000 m2 @ Rp. 4,560.07 . = Rp. 4560.07
Total . = Rp. 40211.97
ls. @ Rp. 200,000.00 . = Rp. 200000
Analisa Harga satuan pekerjaan menggunakan metode Modern Yang Dikembangkan oleh Pelatihan Jasa Konstruksi Sensa Yogy (metode modern merupakan standar yang berlaku untuk seluruh
(metode modern merupakan standar yang berlaku untuk seluruh
PROYEK : sample LOKASI : sample
No. URAIAN PEKERJAAN
A Pekerjaan Persiapan
1 Mobilisasi
2 Direksikit (2,5x2,5) m
3 Gudang (4x3) m 4 Pemagaran Proyek 5 Unizet & Bouwplank 6 Dokumentasi
B Pekerjaan Tanah dan Pasir
1 Galian Tanah u/ Pondasi
2 Urugan Tanah Kembali
3 Urugan Tanah untuk Leveling Lantai
4 Urugan Pasir Bawah Pondasi dan Lantai
C Pekerjaan Pasangan & Plesteran
1 Pasangan Batu Kali Pecah (1 pc. : 6 ps.)
2 Pasangan Batu Kali kosong
3 Pasangan Bata 1/2 Batu Tasram (1 pc. : 3 ps.)
4 Pasangan Bata 1/2 Batu (1 pc. : 5 ps.) 5 Rolaag Bata (1 pc. : 3 ps.)
6 Plesteran Dinding (1pc : 5ps) t = 20 mm
7 Plesteran Trasram (1pc : 3ps) t = 20 mm
8 Plesteran Trasram (1pc : 3ps) t = 6 mm 9 Sponengan sudut ( 1pc. : 2 ps.)
RENCANA ANGGARAN BIAYA (RAB) TANPA OVER HEAD
Harga Satuan
SAT. Pekerjaan JUMLAH
PEKJ. VOLUME Bahan Upah Bahan Upah
(Rp) (Rp) (Rp) (Rp)
ls. 1 200000 - 200,000.00 2
m 6.25 100,000 625,000 2
m 12 100,000 1,200,000.00 m' 26 48,015 5,000 1,248,390.00 130,000m' 40.8 8,990 3,000 366,792 122,400ls. 1 150,000 150,000
3m 52.4711 8,500 - 446,004.35
3m 27.5767 4,500 - 124,095.15
3m 1.9256 27,000 6,500 51,991.2 12,516.4
3m 2.349 32,400 4,950 76,107.6 11,627.55
3m 22.1193 140,408.26 37,625 3,105,732.51 832,238.66
3m 10.409 54,150 24,000 563,647.35 249,816
2m 40.4513 30,285.16 8,100 1,225,074.21 327,655.53
2m 196.3907 25,034.77 7,312.5 4,916,595.49 1,436,106.99 m' 10 8,110.51 3,937.5 81,105.07 39,375
2m 404.0258 4,339.48 9,130 1,753,261.90 3,688,755.55
2m 73.3026 5,732.05 9,130 420,173.92 669,252.74
2m 47.6 2,547.58 9,130 121,264.63 434,588m' 433.28 630.81 2,750 273,315.49 1,191,520.00
RENCANA ANGGARAN BIAYA (RAB) TANPA OVER HEAD
TOTAL BOBOT
( Rp) ( % )
200000 0.1904
625,000 .5951
1,200,000.00 1.14261,378,390.00 1.3125
489,192 .4658150,000 .1428
4,042,582.00 3.8493
446,004.35 .4247
124,095.15 .1182
64,507.6 .0614
87,735.15 .0835722,342.25 .6878
3,937,971.18 3.7496
813,463.35 .7746
1,552,729.74 1.4785
6,352,702.49 6.0489120,480.07 .1147
5,442,017.45 5.1818
1,089,426.66 1.0373
555,852.63 .52931,464,835.49 1.3948
10 Penebalan Plesteran type A
11 Penebalan Plesteran type B
12 Lantai Kerja untuk Lantai
No. URAIAN PEKERJAAN
D Pekerjaan Beton Bertulang ( 1pc. : 2ps. : 3kr.)
1 Beton Bertulang untuk Sloof
1 Beton Bertulang untuk Kolom Praktis (Skelet)
2 Beton Bertulang untuk Ring Balok
3 Beton Bertulang untuk Ring Balok Gunung-gunung
4 Beton Bertulang untuk Luifel/ Canopy
E Pekerjaan Penutup Lantai dan Dinding
1 Keramik Lantai 30/ 30 Eks IKAD
2 Keramik Lantai Km/Wc Eks Asia
3 Keramik Dinding Dapur dan Km/Wc Eks Asia 3 Keramik Plint t = 12 cm
4 Batu Belah Susun Sirih untuk pilar teras
5 Batu Alam penutup dinding 6 Keramik Assesoris Km/Wc
F Pekerjaan Kusen & Daun Pintu Jendela
1 Pekj. Kusen Pintu & Jendela kayu Jati
2 Pekj. Krepyak untuk Jendela kayu Jati 3 Daun Pintu Type P1 (3x61x200) cm 4 Daun Pintu Type P2 (3,5x82x200)cm 5 Daun Pintu Type P3 (KM/WC) (3x74x200)cm 6 Daun Jendela J1 (52x150) cm 7 Daun Jendela J2 (62x116) cm
m' 31.5 216.97 8250 6834.68 259875 266709.68
m' 10.6 347.16 8250 3679.88 87450 91129.882m 74.5 9,492.8 5,720 707,213.9 426,140 1,133,353.90
22,820,672.53 Harga Satuan
SAT. Pekerjaan JUMLAH TOTAL
PEKJ. VOLUME Bahan Upah Bahan Upah ( Rp)
(Rp) (Rp) (Rp) (Rp)
3m 2.283 814,699.59 98,887.5 1,859,959.17 225,760.16 2,085,719.33 3m 1.9125 916,899.59 107,465 1,753,570.47 205,526.81 1,959,097.28 3m 1.494 916,899.59 107,465 1,369,847.99 160,552.71 1,530,400.70 3m 1.7387 916,899.59 107,465 1,594,213.32 186,849.4 1,781,062.71 3m .4992 1,072,009.59 122,104.38 535,147.19 60,954.5 596,101.69
7,952,381.72
2m 68.5 39,210.55 9,250 2,685,922.62 633,625 3,319,547.62 2m 6 44,710.55 9,250 268,263.29 55,500 323,763.292m 31.808 41,301.66 30,000 1,313,723.26 954,240 2,267,963.26 m' 39.7 5,601.2 6,800 222,367.62 269,960 492,327.622m 16 141,126.66 30,000 2,258,026.59 480,000 2,738,026.59 2m 12.5565 76,426.66 45,000 959,651.38 565,042.5 1,524,693.88 pcs. 56 4,480.03 1,000 250,881.49 56,000 306,881.49
10,973,203.75
3m .7013 6,635,000.00 1,730,000.00 4,653,125.50 1,213,249.00 5,866,374.50 3m .0498 8,835,000.00 1,620,000.00 439,983.00 80,676 520,659bh. 2 323,600 175,620 647,200 351,240 998,440bh. 5 506,000 184,740 2,530,000.00 923,700 3,453,700.00 bh. 2 391,600 179,020 783,200 358,040 1,141,240.00 bh. 2 153,150 70,000 306,300 140,000 446,300bh.
0.254
0.0868
1,133,353.90 1.079222,820,672.53 21.7293
BOBOT
( % )
2,085,719.33 1.986
1,959,097.28 1.8654
1,530,400.70 1.4572
1,781,062.71 1.6959
.56767,952,381.72 7.5721
3,319,547.62 3.1608
.3083
2,267,963.26 2.1595.4688
2,738,026.59 2.6071
1,524,693.88 1.4518.2922
10,973,203.75 10.4484
-
5,866,374.50 5.5858
.4958
.95073,453,700.00 3.28851,141,240.00 1.0867
.425
8 Daun Jendela PJ2 (62x166) cm
SAT.
No. URAIAN PEKERJAAN PEKJ.
Pekerjaan Kayu, Rangka Atap & Rangka G Plafon
1 Nog, Gording, Murplate dengan kayu Bangkirai. m
2 Pekj. Usuk: 5/7, Reng: 3/5 dengan Kayu Bangkirai & Kruim 3 Pekj. Lisjplank Kayu Bangkirai 2/25 m' 4 Pekj. Ruiter dengan Kayu Bangkirai 2/20 m'
5 Pekj. Papan Wenvir 2/12 m'
6 Pekj. Plafon (60 x 60) Cm dgn Kayu 4/6 & 5/7 Ky Merantim
7 Pekj. Plafon (100 x 100) Cm dgn Kayu 4/6 & 5/7 Ky Meranm 8 Pekerjaan Talang m'
*) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti Rayap
H Pekerjaan Penutup Atap & Lis Plafond
1 Pekj. Atap Genteng Sokka Morando SE Glazur m 2 Kerpus Genteng Sokka Morando SE Glazur m'
5 Lis sudut - Gypsum m'
I Pekerjaan Kaca & Rilling Kayu
1 Kaca Es untuk Boven tebal 5 mm. m
J Pekerjaan Cat & Melamin
1 Cat Tembok untuk Dinding Merk Catylac m
2 Cat Tembok untuk Plafond Merk Catylac m
2 Cat Kayu untuk lisjplank Standart EMCO m
3 Politur untuk Kusen Pintu Jendela & BV m
4 Politur untuk Daun Pintu dan Jendela m
7 136600 70000 956200 490000
bh. 2 181300 70000 362600 140000
Harga Satuan JUMLAH Pekerjaan
VOLUME Bahan Upah Bahan Upah (Rp) (Rp) (Rp) (Rp)
31.0952 3,155,125.00 430,000 3,455,492.90 470,936
2137.0915 35,460.71 4,000 4,861,362.51 548,36634.6035 16,640 7,250 575,802.24 250,875.3828.3299 13,340 1,500 377,920.87 42,494.85
12.3035 12,580 5,000 154,778.03 61,517.52
68.5 39,480.06 13,000 2,704,383.81 890,5002
37.9052 29,650.33 7,200 1,123,901.82 272,917.4422.5165 53,940 7,750 1,214,540.01 174,502.88
2137.0915 20,790 7,050 2,850,132.29 966,495.0828.3299 20,753.76 17,037.5 587,951.87 482,670.67
72 8,000 576,000
2.78 82,000 63,960
2503.1195 2,409.3 4,846.88 1,212,165.81 2,438,557.33
2106.4052 2,409.3 4,846.88 256,362.05 515,732.7
28.6509 14,933.75 16,150 129,190.38 139,712.04
227.7159 6,416.8 18,562.5 177,847.39 514,476.39
2
1,446,200.00 1.377
502600 0.4786
14,375,513.50 13.688
TOTAL BOBOT
( Rp) ( % )
3,926,428.90 3.7387
5,409,728.51 5.151826,677.62 .7871420,415.72 .4003
216,295.53 .206
3,594,883.81 3.423
1,396,819.26 1.331,389,042.89 1.322617,180,292.22 16.3587
-
-
3,816,627.36 3.63411,070,622.54 1.0194
576,000 .5485
5,463,249.90 5.202
63,960 .060963,960 .0609
3,650,723.14 3.4761
772,094.75 .7352
268,902.41 .256
692,323.78 .6592
K Pekerjaan Instalasi Listrik
1 Stop kontak
2 Piting Lampu & Sakelar 3 Penangkal Petir (1speed 2 Arde)
No. URAIAN PEKERJAAN
L Pekerjaan Penggantung & Pengunci
1 Slot & Handel Pintu ex. SES 2 Slot Pintu Kupu Tarung ex. SES
3 Slot Pintu Km/Wc 4 Handle Pintu Kupu Tarung
5 Engsel Pintu
6 Engsel Jendela 7 Grendel Jalu untuk Jendela
8 Grendel Pintu 9 Hag Angin ( Win Hag )
M Pekerjaan Drainasi & Sanitasi
1 Closet Duduk 'Monoblok' ex. Toto 2 Closest Jongkok
3 Wall Shower 4 Wastafel ( Komplit ) ex. INA
5 Floor Drain 6 Avor (Kurasan Bak)
7 Kran Air
37.4094 6416.8 18562.5 240048.64 694411.99
titik 5 75000 375000 -
titik 16 75000 1,200,000.00 - unit. 1 125000 125000 -
Harga Satuan
SAT. Pekerjaan JUMLAH
PEKJ. VOLUME Bahan Upah Bahan Upah
(Rp) (Rp) (Rp) (Rp)
bh. 6 125000 750000 - bh. 1 90000 90000 -
bh. 2 20000 40000 - ps. 2 50000 100000 -
ps. 9 16900 152100 -
ps. 11 5000 55000 - bh. 22 3000 66000 -
bh. 16 3200 51200 - bh. 22 10900 239800 -
unit 1 1,000,000.00 72600 1,000,000.00 72600bh. 1 99500 36300 99500 36300
unit 1 50000 15125 50000 15125unit 1 200000 72600 200000 72600
bh. 2 10000 9000 20000 18000bh. 1 5000 9000 5000 9000
bh. 5 18500 3600 92500 18000
934460.63 0.8898
6,318,504.71 6.0163
375000 0.3571
1,200,000.00 1.1426125000 0.119
1,700,000.00 1.6187
TOTAL BOBOT
( Rp) ( % )
750000 0.714190000 0.0857
40000 0.0381100000 0.0952
152100 0.1448
55000 0.052466000 0.0628
51200 0.0488239800 0.2283
1,544,100.00 1.4703
1,072,600.00 1.0213135800 0.1293
65125 0.062272600 0.2596
38000 0.036214000 0.0133
110500 0.1052
8 Kran Air untuk Dapur
9 Soap Holder Tanam 10 Bath Up (Komplit) ex INA
11 Instalasi Sumur Air Bersih + Pompa 12 Instalasi & Water Torn Stainleesteel
13 Pemipaan Air bersih
14 Pemipaan Air kotor 15 Pemipaan Air bekas
16 Bak Kontrol 17 Bak Lemak
18 Sumur Resapan 19 Septictank
No. URAIAN PEKERJAAN
N Pekerjaan Perkerasan Jalan
1 Perkerasan Jalan dengan Conblock 2 Pekj. Kansten 25x25x40
O Pekerjaan Pembersihan Lokasi
1 Pembersihan Lokasi Akhir Proyek
TOTAL
bh. 1 28500 3600 28500 3600 32100
bh. 2 25000 15125 50000 30250 80250bh. 1 1,250,000.00 93750 1,250,000.00 93750 1,343,750.00
bh. 1 1,000,000.00 1,000,000.00 1,000,000.00 bh. 1 1,000,000.00 1,000,000.00 1,000,000.00
m' 18.2 5218.75 2500 94981.25 45500 140481.25
m' 20.2 26912.5 5000 543632.5 101000 644632.5m' 14.7 26912.5 5000 395613.75 73500 469113.75
unit 1 200000 52000 200000 52000 252000unit 1 200000 52000 200000 52000 252000
unit 2 750000 100000 1,500,000.00 200000 1,700,000.00 unit 1 1,500,000.00 350000 1,500,000.00 350000 1,850,000.00
10,472,952.50
Harga Satuan
SAT. Pekerjaan JUMLAH TOTAL
PEKJ. VOLUME Bahan Upah Bahan Upah ( Rp)
(Rp) (Rp) (Rp) (Rp)
2m 20 39,145 10,725 782,900 214,500 997,400m' 5 35,651.9 3,431.25 178,259.5 17,156.25 195,415.75
1,192,815.75
ls 1 200,000 - 200,000.00 200,000200,000
76,643,190.3228,379,380.50105,022,570.8
0.0306
0.07641.2795
0.95220.9522
0.1338
0.61380.4467
0.23990.2399
1.61871.7615
9.9721
BOBOT
( % )
.9497
.1861
1.1358
.1904
.1904
100
REKAPITULASI RENCANA ANGGARAN
BIAYA (SEMENTARA)
PROYEK : sample LOKASI : sample
NO MACAM PEKERJAAN
A Pekerjaan Persiapan
B Pekerjaan Tanah dan Pasir
C Pekerjaan Pasangan & Plesteran
D Pekerjaan Beton Bertulang ( 1pc. : 2ps. : 3kr.)
E Pekerjaan Penutup Lantai dan Dinding
F Pekerjaan Kusen & Daun Pintu Jendela
G Pekerjaan Kayu, Rangka Atap & Rangka Plafon
H Pekerjaan Penutup Atap & Lis Plafond
I Pekerjaan Kaca & Rilling Kayu
J Pekerjaan Cat & Melamin
K Pekerjaan Instalasi Listrik
L Pekerjaan Penggantung & Pengunci
M Pekerjaan Drainasi & Sanitasi
N Pekerjaan Perkerasan Jalan
O Pekerjaan Pembersihan Lokasi
BOBOT JUMLAH TOTAL
(%) (Rp)
3.8493 4,042,582.00
0.6878 722342.25
21.7293 22,820,672.53
7.5721 7,952,381.72
10.4484 10,973,203.75
13.688 14,375,513.50
16.3587 17,180,292.22
5.202 5,463,249.90
0.0609 63960
6.0163 6,318,504.71
1.6187 1,700,000.00
1.4703 1,544,100.00
9.9721 10,472,952.50
1.1358 1,192,815.75
0.1904 200000100 105,022,570.81
Jumlah Nominal Rp 105,022,570.81 Jasa Konstruksi 10% Rp 10,502,257.08 Jumlah Rp 115,524,827.90 P P N 10% Rp 11,552,482.79 Jumlah Rp 127,077,310.68 Dibulatkan Rp
Rp 105,022,570.81 Rp 10,502,257.08 Rp 115,524,827.90 Rp 11,552,482.79 Rp 127,077,310.68 Rp
PROYEK : sample LOKASI : sample
No. URAIAN PEKERJAAN
A Pekerjaan Persiapan
1 Mobilisasi
2 Direksikit (2,5 x 2,5) m
3 Gudang (4 x 3) m 4 Pemagaran Proyek 5 Unizet & Bouwplank
6 Dokumentasi
B Pekerjaan Tanah dan Pasir
1 Galian Tanah u/ Pondasi
2 Urugan Tanah Kembali
3 Urugan Tanah untuk Leveling Lantai
4 Urugan Pasir Bawah Pondasi dan Lantai
C Pekerjaan Pasangan & Plesteran
1 Pasangan Batu Kali Pecah (1 pc : 6 ps)
2 Pasangan Batu Kali kosong
3 Pasangan Bata 1/2 Batu Tasram (1 pc : 3 ps)
4 Pasangan Bata 1/2 Batu (1 pc : 5 ps) 5 Rolaag Bata (1 pc : 3 ps)
6 Plesteran Dinding (1pc : 5ps) t = 20 mm
7 Plesteran Trasram (1pc : 3ps) t = 20 mm
8 Plesteran Trasram (1pc : 3ps) t = 6 mm
RENCANA ANGGARAN BIAYA (RAB) DENGAN OVER HEAD
Harga Satuan
SAT Pekerjaan JUMLAH 0 TOTAL
PEK VOLUME Bahan Upah Bahan Upah
J. (Rp.) (Rp.) (Rp. (Rp.) (Rp.)
ls. 1 200000 - 200,000.00 2000002
m 6.25 100,000 625,000 625,0002
m 12 100,000 1,200,000.00 1,200,000.00 m' 26 48,015 6,644.91 1,248,390.00 172,767.67 1,421,157.67 m' 40.8 8,990 3,986.95 366,792 162,667.41 529,459.41
ls. 1 150,000 150,000 150,0004,125,617.08
3m 52.4711 11,296.35 - 592,731.80 592,731.8
3m 27.5767 5,980.42 - 164,920.23 164,920.23
3m 1.9256 27,000 8,638.38 51,991.2 16,634.07 68,625.27
3m 2.349 32,400 6,578.46 76,107.6 15,452.81 91,560.41
917,837.71
3m 22.1193 140,408.26 50,002.95 3,105,732.51 1,106,030.29 4,211,762.81
3m 10.409 54,150 31,895.57 563,647.35 332,000.99 895,648.34
2m 40.4513 30,285.16 10,764.76 1,225,074.21 435,448.34 1,660,522.55
2m 196.3907 25,034.77 9,718.18 4,916,595.49 1,908,560.50 6,825,155.99 m' 10 8,110.51 5,232.87 81,105.07 52,328.67 133,433.74
2m 404.0258 4,339.48 12,133.61 1,753,261.90 4,902,290.13 6,655,552.03
2m 73.3026 5,732.05 12,133.61 420,173.92 889,424.91 1,309,598.84
2m 47.6 2,547.58 12,133.61 121,264.63 577,559.68 698,824.31
RENCANA ANGGARAN BIAYA (RAB) DENGAN OVER HEAD
BOBOT
( % )
0.1751
0.5472
1.0507 1.2443 0.4636
0.1313 3.6122
0.5190
0.1444
0.0601
0.0802 0.8036
3.6877
0.7842
1.4539
5.9758 0.1168
5.8273
1.1466
0.6119
9 Sponengan sudut ( 1pc : 2 ps)
10 Penebalan Plesteran type A 11 Penebalan Plesteran type B
12 Lantai Kerja Rabat Beton untuk Lantai Keramik
No. URAIAN PEKERJAAN
D Pekerjaan Beton Bertulang ( 1pc : 2ps : 3kr)
1 Beton Bertulang untuk Sloof
1 Beton Bertulang untuk Kolom Praktis (Skelet)
2 Beton Bertulang untuk Ring Balok
3 Beton Bertulang untuk Ring Balok Gunung-gunung
4 Beton Bertulang untuk Luifel/Canopy
E Pekerjaan Penutup Lantai dan Dinding
1 Keramik Lantai 30/ 30 Eks IKAD
2 Keramik Lantai Km/Wc Eks Asia
3 Keramik Dinding Dapur dan Km/Wc Eks Asia 3 Keramik Plint t = 12 cm
4 Batu Belah Susun Sirih untuk pilar teras
5 Batu Alam penutup dinding 6 Keramik Assesoris Km/Wc
F Pekerjaan Kusen & Daun Pintu Jendela
1 Pekj. Kusen Pintu & Jendela kayu Jati
2 Pekj. Krepyak Jendela kayu Jati 3 Daun Pintu Type P1 (3x61x200) cm 4 Daun Pintu Type P2 (3,5x82x200)cm 5 Daun Pintu Type P3 (KM/WC) (3x74x200)cm
m' 433.28 630.81 3654.7 273315.49 1,583,508.76
m' 31.5 216.97 10964.1 6834.68 345369.23m' 10.6 347.16 10964.1 3679.88 116219.49
2m 74.5 9,492.8 7,601.78 707,213.9 566,332.44
Harga Satuan JUMLAH SAT Pekerjaan
0.0
PEK VOLUME Bahan Upah Bahan Upah
J. (Rp) (Rp) (Rp) (Rp)
3m 2.283 814,699.59 131,419.72 1,859,959.17 300,031.22
3m 1.9125 916,899.59 142,819.06 1,753,570.47 273,141.46
3m 1.494 916,899.59 142,819.06 1,369,847.99 213,371.68
3m 1.7387 916,899.59 142,819.06 1,594,213.32 248,319.5
3m .4992 1,072,009.59 162,274.53 535,147.19 81,007.45
2m 68.5 39,210.55 12,293.08 2,685,922.62 842,076.29
2m 6 44,710.55 12,293.08 268,263.29 73,758.51
2m 31.808 41,301.66 39,869.46 1,313,723.26 1,268,167.89 m' 39.7 5,601.2 9,037.08 222,367.62 358,772.01
2m 16 141,126.66 39,869.46 2,258,026.59 637,911.41
2m 12.5565 76,426.66 59,804.19 959,651.38 750,931.37pcs. 56 4,480.03 1,328.98 250,881.49 74,423
3m .7013 6,635,000.00 2,299,139.05 4,653,125.50 1,612,386.21
3m .0498 8,835,000.00 2,152,951.02 439,983.00 107,216.96bh. 2 323,600 233,395.84 647,200 466,791.68bh. 5 506,000 245,516.15 2,530,000.00 1,227,580.77 bh. 2 391,600 237,914.38 783,200 475,828.75
1,856,824.25 1.6258
352203.91 0.3084 119899.36 0.1050
1,273,546.34 1.1151 25,992,972.47 22.7584
TOTAL BOBOT
( Rp) ( % )
2,159,990.38 1.8912
2,026,711.92 1.7745
1,583,219.67 1.3862
1,842,532.82 1.6132
616,154.63 0.5395 8,228,609.43 7.2046
3,527,998.90 3.0890
342,021.8 0.2995
2,581,891.15 2.2606 581,139.63 0.5088
2,895,938.00 2.5356
1,710,582.75 1.4977 325,304.49 0.2848
11,964,876.72 10.476
-
6,265,511.71 5.4858
547,199.96 0.4791 1,113,991.68 0.9754 3,757,580.77 3.2900 1,259,028.75 1.1024
6 Daun Jendela J1 (52x150) cm bh.
7 Daun Jendela J2 (62x116) cm bh. 8 Daun Jendela PJ2 (62x166) cm bh.
2 153150 93028.75 306300 186057.5 492357.5
7 136600 93028.75 956200 651201.23 1,607,401.23 2 181300 93028.75 362600 186057.5 548657.5
15,591,729.10
0.4311
1.4074 0.4804
13.6515
SAT
0
No. URAIAN PEKERJAAN PEK
J.
Pekerjaan Kayu, Rangka Atap & Rangka G Plafon
1 Nog, Gording, Murplate dengan kayu Bangkm
2 Pekj. Usuk: 5/7, Reng: 3/5 dengan Kayu Bam 3 Pekj. Lisjplank Kayu Bangkirai 2/25 m' 4 Pekj. Ruiter dengan Kayu Bangkirai 2/20 m'
5 Pekj. Papan Wenvir 2/12 m'
6 Pekj. Plafon Gypsium Rangka (60x60) Cm m
7 Pekj. Plafon Calsiboard Rangka (100x100)m 8 Pekerjaan Talang m'
*) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti Rayap
H Pekerjaan Penutup Atap & Lis Plafond
1 Pekj. Atap Genteng Sokka Morando SE Glm 2 Kerpus Genteng Sokka Morando SE Glazum' 3 Lis sudut - Gypsum m'
I Pekerjaan Kaca & Rilling Kayu
1 Kaca Es untuk Boven tebal 5 mm. m
J Pekerjaan Cat & Melamin
1 Cat Tembok untuk Dinding Merk Catylac m
2 Cat Tembok untuk Plafond Merk Catylac m
3 Cat Kayu untuk lisjplank Standart EMCO m
4 Politur untuk Kusen Pintu Jendela & BV m
5 Politur untuk Daun Pintu dan Jendela m
K Pekerjaan Instalasi Listrik
Harga Satuan JUMLAH Pekerjaan
TOTAL
VOLUME Bahan Upah Bahan Upah
( Rp) (Rp) (Rp) (Rp) (Rp)
31.0952 3,155,125.00 571,462.31 3,455,492.90 625,865.52 4,081,358.42
2137.0915 35,460.71 5,315.93 4,861,362.51 728,768.6 5,590,131.12 34.6035 16,640 9,635.12 575,802.24 333,408.88 909,211.1228.3299 13,340 1,993.47 377,920.87 56,474.9 434,395.76
12.3035 12,580 6,644.91 154,778.03 81,755.66 236,533.692
68.5 39,480.06 17,276.77 2,704,383.81 1,183,458.57 3,887,842.37 2
37.9052 29,650.33 9,568.67 1,123,901.82 362,702.39 1,486,604.21 22.5165 52,680 10,299.61 1,186,169.22 231,911.2 1,418,080.42
*) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti 18,044,157.11
2137.0915 20,790 9,369.32 2,850,132.29 1,284,454.66 4,134,586.95 28.3299 20,753.76 22,642.53 587,951.87 641,460.69 1,229,412.55
72 8,000 576,000 576,000
5,939,999.50
2.78 82,000 63,960 63,960
63,960
2503.1195 2,409.3 6,441.41 1,212,165.81 3,240,799.06 4,452,964.87
2106.4052 2,409.3 6,441.41 256,362.05 685,399.54 941,761.58
28.6509 14,933.75 21,463.06 129,190.38 185,674.79 314,865.17
227.7159 6,416.8 24,669.23 177,847.39 683,729.92 861,577.31
237.4094 6,416.8 24,669.23 240,048.64 922,861.11 1,162,909.75
7,734,078.68
BOBOT
( % )
3.5735
4.8945 0.7961 0.3803
0.2071
3.4040
1.3016 1.2416
15.7987
3.6201 1.0764 0.5043
5.2008
0.0560 0.0560
3.8988
0.8246
0.2757
0.7544
1.0182 6.7716
1 Stop kontak
2 Piting Lampu & Sakelar 3 Penangkal Petir (1speed 2 Arde)
No. URAIAN PEKERJAAN
L Pekerjaan Penggantung & Pengunci 1 Slot & Handel Pintu ex. SES
2 Slot Pintu Kupu Tarung ex. SES 3 Slot Pintu Km/Wc
4 Handle Pintu Kupu Tarung 5 Engsel Pintu
6 Engsel Jendela 7 Grendel Jalu untuk Jendela
8 Grendel Pintu
9 Hag Angin ( Win Hag )
M Pekerjaan Drainasi & Sanitasi
1 Closet Duduk 'Monoblok' ex. Toto
2 Closest Jongkok 3 Wall Shower
4 Wastafel (komplit) ex. INA 5 Floor Drain
6 Avor (kurasan bak) 7 Kran Air
8 Kran Air untuk Dapur 9 Soap Holder Tanam
titik 5 75000 375000 375000
titik 16 75000 1,200,000.00 1,200,000.00 unit. 1 125000 125000 125000
1,700,000.00
Harga Satuan
SAT Pekerjaan JUMLAH 0 TOTAL
PEK VOLUME Bahan Upah Bahan Upah
J. ( Rp) (Rp) (Rp) (Rp) (Rp)
bh. 6 125000 750000 750000
bh. 1 90000 90000 90000bh. 2 20000 40000 40000
ps. 2 50000 100000 100000ps. 9 16900 152100 152100
ps. 11 5000 55000 55000bh. 22 3000 66000 66000
bh. 16 3200 51200 51200
bh. 22 10900 239800 2398001,544,100.00
unit 1 1,000,000.00 96484.1 1,000,000.00 96484.1 1,096,484.10
bh. 1 99500 48242.05 99500 48242.05 147742.05unit 1 50000 21125 50000 21125 71125
unit 1 200000 96484.1 200000 96484.1 296484.1bh. 2 10000 11960.84 20000 23921.68 43921.68
bh. 1 5000 11960.84 5000 11960.84 16960.84bh. 5 18500 4784.34 92500 23921.68 116421.68
bh. 1 28500 4784.34 28500 4784.34 33284.34bh.
0.3283
1.0507 0.1094
1.4885
BOBOT
( % )
0.6567
0.0788 0.0350
0.0876 0.1332
0.0482 0.0578
0.0448
0.2100 1.3520
0.9600
0.1294 0.0623
0.2596 0.0385
0.0149 0.1019
0.0291 0.0790
10 Bath Up (komplit) ex INA
11 Instalasi Sumur Air Bersih 12 Instalasi & Water Torn Stainleesteel
13 Pemipaan Air bersih 14 Pemipaan Air kotor
15 Pemipaan Air bekas
16 Bak Kontrol 17 Bak Lemak
18 Sumur Resapan 19 Septictank
No. URAIAN PEKERJAAN
N Pekerjaan Perkerasan Jalan
1 Perkerasan Jalan dengan Conblock 2 Pekj. Kansten 25x25x40
O Pekerjaan Pembersihan Lokasi
1 Pembersihan Lokasi Akhir Proyek
TOTAL
2 25000 20100.85 50000 40201.71 90201.71
bh. 1 1,250,000.00 124592.07 1,250,000.00 124592.07 1,374,592.07
bh. 1 1,000,000.00 1,000,000.00 1,000,000.00 bh. 1 1,000,000.00 1,000,000.00 1,000,000.00
m' 18.2 5475 3322.46 99645 60468.69 160113.69m' 20.2 26912.5 6644.91 543632.5 134227.19 677859.69
m' 14.7 26912.5 6644.91 395613.75 97680.18 493293.93
unit 1 200000 73125 200000 73125 273125unit 1 200000 73125 200000 73125 273125
unit 2 750000 132898.21 1,500,000.00 265796.42 1,765,796.42 unit 1 1,500,000.00 465143.74 1,500,000.00 465143.74 1,965,143.74
10,895,675.04
Harga Satuan
SAT Pekerjaan JUMLAH 0 TOTAL
PEK VOLUME Bahan Upah Bahan Upah
J. ( Rp) (Rp) (Rp) (Rp) (Rp)
2m 20 39,145 14,253.33 782,900 285,066.66 1,067,966.66 m' 5 35,651.9 4,560.07 178,259.5 22,800.35 201,059.85
1,269,026.51
ls 1 200,000 - 200,000.00 200,000200,000
76,619,483.2837,593,156.09114,212,639.3
1.2035
0.8756 0.8756
0.1402 0.5935
0.4319
0.2391 0.2391
1.5461 1.7206
9.5398
BOBOT
( % )
0.9351 0.1760
1.1111
0.1751 0.1751
100.00
REKAPITULASI RENCANA ANGGARAN BIAYA (FINAL/REAL)
PROYEK : sample
LOKASI : sample
NO MACAM PEKERJAAN
A Pekerjaan Persiapan
B Pekerjaan Tanah dan Pasir
C Pekerjaan Pasangan & Plesteran D Pekerjaan Beton Bertulang ( 1pc : 2ps : 3kr)
E Pekerjaan Penutup Lantai dan Dinding
F Pekerjaan Kusen & Daun Pintu Jendela G Pekerjaan Kayu, Rangka Atap & Rangka Plafon
H Pekerjaan Penutup Atap & Lis Plafond
I Pekerjaan Kaca & Rilling Kayu J Pekerjaan Cat & Melamin
K Pekerjaan Instalasi Listrik L Pekerjaan Penggantung & Pengunci
M Pekerjaan Drainasi & Sanitasi
N Pekerjaan Perkerasan Jalan O Pekerjaan Pembersihan Lokasi
REKAPITULASI RENCANA ANGGARAN BIAYA (FINAL/REAL)
BOBOT JUMLAH TOTAL
(%) (Rp)
3.6122 4,125,617.08
0.8036 917,837.71
22.7584 25,992,972.47
7.2046 8,228,609.43
10.476 11,964,876.72
13.6515 15,591,729.10
15.7987 18,044,157.11
5.2008 5,939,999.50
0.056 63,960.00
6.7716 7,734,078.68
1.4885 1,700,000.00
1.352 1,544,100.00
9.5398 10,895,675.04
1.1111 1,269,026.51
0.1751 200,000.00
100 114,212,639.36
Jumlah Nominal Rp 114,212,639.36 Jasa Konst 10% Rp 11,421,263.94
Jumlah Rp 125,633,903.30 P P N 10% Rp 12,563,390.33
Jumlah Rp 138,197,293.63 Dibulatkan Rp 138,190,000.00
114,212,639.36
Rp 114,212,639.36 Rp 11,421,263.94
Rp 125,633,903.30 Rp 12,563,390.33
Rp 138,197,293.63 Rp 138,190,000.00