RENCANA PENGEMBANGAN GRID PULAU KECIL · PDF fileSISTEM ADONARA D. MAMPU : 2,70 MW B. MALAM :...

31
RENCANA PENGEMBANGAN GRID PULAU KECIL SOLAR PV DAN PV DIESEL DI PROVINSI NUSA TENGGARA TIMUR

Transcript of RENCANA PENGEMBANGAN GRID PULAU KECIL · PDF fileSISTEM ADONARA D. MAMPU : 2,70 MW B. MALAM :...

RENCANA PENGEMBANGAN GRID PULAU KECIL SOLAR PV DAN PV DIESEL

DI PROVINSI NUSA TENGGARA TIMUR

PETA PROVINSI NUSA TENGGARA TIMUR

Kotamadya

Kabupaten

Kecamatan

Desa/Kelurahan

1

21

306

3268

Jumlah Jiwa 5.356.567

GEOGRAFIS : KEPULAUAN

NAMA PULAU TERDEPAN DI PROPINSI NUSA TENGGARA TIMUR

(Perbatasan T.leste & Australia)

Pulau Dana Rote (Kab. Rote Ndao) Pulau Dana Sabu ( Kab. Sabu Raijua)

Pulau Manggudu (Kab. Sumba Timur) Pulau Batek (Kab. Kupang)

Ikonik PROVINSI NUSA TENGGARA TIMUR

AREA KUPANG

AREA SUMBA

AREA FBT

AREA FBB

SEKTOR NTT

Tarif

Pembangkit

Unit Area 2008 2009 2010 2011 2012 2013

Kupang 120.595 122.331 130.331 176.808 243.029 269.821

Growth (%) 8,9% 1,4% 6,5% 35,7% 37,5% 11,0%

Flores Bagian Barat 58.807 60.539 65.729 89.881 127.962 145.835

Growth (%) 9,8% 2,9% 8,6% 36,7% 42,4% 14,0%

Sumba 21.037 21.581 24.341 31.866 57.449 48.348

Growth (%) 11,8% 2,6% 12,8% 30,9% 80,3% -15,8%

Flores Bagian Timur 45.917 49.104 54.041 77.471 95.603 99.842

Growth (%) 12,7% 6,9% 10,1% 43,4% 23,4% 4,4%

Wilayah NTT 246.356 253.555 274.442 376.026 524.043 563.846

Growth (%) 10,0% 2,9% 8,2% 37,0% 39,4% 7,6%

PELANGGAN

PT. PLN (Persero) Wil. NTT

Kondisi Kelistrikan PLN Wilayah NTT 02 FEBRUARI 2016

D

D

D

D

D

SISTEM RUTENG

D. MAMPU : 7,28 MW

B. MALAM : 8,47 MW

DEFISIT : -1,19 MW

SISTEM AESESA

D. MAMPU : 2,55 MW

B. MALAM : 2,29 MW

CAD. : 0,26 MW

D

D D

D D

D

D

D

D

D

D

D

D

D

SISTEM LARANTUKA

D. MAMPU : 3,70 MW

B. MALAM : 4,17 MW

DEFISIT : -0,47 MW

SISTEM ADONARA

D. MAMPU : 2,70 MW

B. MALAM : 3,39 MW

DEFISIT : -0,69 MW

SISTEM LEMBATA

D. MAMPU : 3,10 MW

B. MALAM : 2,91 MW

CAD. : 0,19 MW

SISTEM KALABAHI

D. MAMPU : 4,92 MW

B. MALAM : 4,16 MW

CAD. : 0,76 MW

SISTEM ATAMBUA

D. MAMPU : 7,60 MW

B. MALAM : 7,90 MW

DEFISIT : - 0,30 MW

SISTEM KEFAMENANU

D. MAMPU : 4,77 MW

B. MALAM : 4,41 MW

CAD. : 0,36 MW

SISTEM SO’E

D. MAMPU : 5,12 MW

B. MALAM : 5,00 MW

CAD. : 0,12 MW

SISTEM KUPANG

D. MAMPU : 49,23 MW

B. MALAM : 53,40 MW

DEFISIT : -4,17 MW

SISTEM ROTE

D. MAMPU : 3,50 MW

B. MALAM : 3,28 MW

CAD. : 0,22 MW

SISTEM SABU

D. MAMPU : 1,28 MW

B. MALAM : 1,16 MW

CAD. : 0,12 MW

SISTEM MAUMERE

D. MAMPU : 11,50 MW

B. MALAM : 10,95 MW

CAD. : 0,55 MW

SISTEM ENDE

D. MAMPU : 7,35 MW

B. MALAM : 9,49 MW

DEFISIT : -2,14 MW

SISTEM WAINGAPU

D. MAMPU : 6,35 MW

B. MALAM : 5,64 MW

CAD. : 0,71 MW

SISTEM WAIKABUBAK + WAITABULA

D. MAMPU : 5,32 MW

B. MALAM : 6,52 MW

DEFISIT : -1,20 MW

SISTEM BAJAWA

D. MAMPU : 5,00 MW

B. MALAM : 5,60 MW

DEFISIT : -0,60 MW

SISTEM LABUAN BAJO

D. MAMPU : 4,40 MW

B. MALAM : 4,20 MW

CAD. : 0,20 MW

AREA FBB

AREA FBT

AREA KUPANG

AREA SUMBA

SISTEM BETUN

D. MAMPU : 2,59 MW

B. MALAM : 2,39 MW

CAD. : 0,20 MW

1. Berdasarkan Pembangkit

2. Berdasarkan Area Kerja

• Pasokan energi primer didominasi bahan

bakar fosil : 59,12 % dari BBM PLTD Sewa, 20,49 % dari BBM PLTD sendiri, 13,98 % dari PLTU, 3,53 % dari PLTP, 2,80 % dari PLTM/PLTMH, 0,07 % dari PLTS

Status Komposisi Pembangkit PLN NTT ( Desember 2015)

• Pasokan Energi Listrik Berdasarkan Area

Kerja yang didominasi oleh : 1. Area Kupang : 58,28 % 2. Area FBB : 20,07 % 3. Area FBT : 14,44 % 4. Area Sumba : 7,21 %

2010

26,40%

2011

41,55%

2012

53,22%

2013

54,77%

2014

58,53%

Okt 2015

58,44%

2016

63,2%

2017

65,7%

2018

68,7%

2019

70,9%

2020

73,2%

~

~

PEMETAAN PER KABUPATEN

Sumba Barat Daya

57,051 KK

5,254 plg RT

66 Desa

Sumba Barat&Tengah

37,361 KK

5,107 plg RT

53 Desa

Sumba Timur

49,549 KK

12,259 plg RT

86 Desa

Manggarai Barat

45,706 KK

2,990 plg RT

96 Desa

Manggarai&Manggarai Timur

112,225 KK

14,865 plg RT

175 Desa

Nagekeo

27,730 KK

5,299 plg RT

42 Desa

Ngada

29,172 KK

15,172 plg RT

36 Desa

Ende

51,716 KK

27,154 plg RT

97 Desa

Sikka

60,583 KK

22,400 plg RT

65 Desa

Flores Timur

51,560 KK

22,490 plg RT

117 Desa

Lembata

23,210 KK

8,642 plg RT

67 Desa

Alor

39,549 KK

10,354 plg RT

112 Desa

Rote Ndao

25,812 KK

7,604 plg RT

36 Desa

TTS

90,712 KK

15,071 plg RT

125 Desa

Kupang&Sabu

85,509 KK

14,625 plg RT

72 Desa

Kota Kupang

63,518 KK

56,532 plg RT

-

Belu

95,954 KK

11,782 plg RT

123 Desa

TTU

47,212 KK

10,210 plg RT

72 Desa

Proyeksi KK 2011 menurut BPS Jml plg Rumah Tangga (III-09 Juni 2011)

Desa Belum Berlistrik

KENDALA :

1

• Banyaknya KK tidak sebanding dengan banyaknya rumah, misalnya : 2-3 KK dalam 1 rumah

2

• Pelanggan Tersambung untuk 1 kms SUTM sebanyak : 105 pelanggan (investasi = ± Rp. 300 jt)

3 •Pelanggan Tersambung untuk 1 kms SUTR sebanyak : 104 pelanggan (investasi = ± Rp. 200 jt)

4 •Pelanggan Tersambung untuk 1 Transformator sebanyak : 174 pelanggan (investasi = ± Rp. 125 jt)

5 •Sumber daya ekomomi masyarakat (Pertanian, pedangan tenun ikat, pabriakan es batu)

6 •Banyak daerah yang harus melintasi atau melewati kawasan hutan yang membutuhkan proses perijinan

• Rasio Elektrifikasi s/d OKTOBER 2015

DUKUNGAN :

1

• Penguatan / Penambahan Alokasi Anggaran

2 • Kemudahan dan percepatan perijinan

3 • Komunikasi politik anggaran

RE (%) JUML. PEL. JUML. PEL. JUML. PEL. RE (%) RE (%)

TOTAL RT PLN RT NON PLN RT TOTAL PLN TOTAL

1 2 8=6/3 9 10 11 12=10+11 13=10/9 14=12/9

Kota Kupang 99.32 93,090 90,137 447 90,584 96.83 97.31

Kupang 55.90 69,217 33,299 2,592 35,891 48.11 51.85

Sabu Raijua 23.97 25,028 4,946 916 5,862 19.76 23.42

Timor Tengah Selatan 49.16 109,322 43,705 4,670 48,375 39.98 44.25

Timor Tengah Utara 69.25 57,132 30,309 6,600 36,909 53.05 64.60

Belu & Malaka 45.43 81,484 33,945 3,510 37,455 41.66 45.97

Alor 68.30 46,063 27,670 3,160 30,830 60.07 66.93

Rote Ndao 81.42 32,184 22,974 2,309 25,283 71.38 78.56

Ende 79.28 56,436 39,986 3,119 43,105 70.85 76.38

Ngada 97.87 33,247 26,068 2,015 28,083 78.41 84.47

Nagekeo 57.37 27,122 14,445 1,613 16,058 53.26 59.21

Manggarai 59.49 68,790 27,576 4,312 31,888 40.09 46.36

Manggarai Timur 39.94 57,311 19,116 6,892 26,008 33.36 45.38

Manggarai Barat 46.28 53,982 14,928 6,568 21,496 27.65 39.82

Sikka 66.38 68,902 39,658 3,246 42,904 57.56 62.27

Flores Timur 92.20 56,477 43,977 7,543 51,520 77.87 91.22

Lembata 75.17 30,984 17,018 4,842 21,860 54.92 70.55

Sumba Timur 50.99 51,599 21,712 3,305 25,017 42.08 48.48

Sumba Barat 42.83 21,876 7,670 692 8,362 35.06 38.22

Sumba tengah 29.75 12,859 3,302 653 3,955 25.68 30.76

Sumba Barat Daya 29.63 51,734 13,225 953 14,178 25.56 27.41

61.81 1,104,837 575,666 69,957 645,623 52.10 58.44

NUSA

TENGGARA

TIMUR

TOTAL

JUMLAH RUMAH

TANGGA

PROPINSI KABUPATEN

TARGET

2015

REALISASI

Oct-15

============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========

Calendar Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========

Total Population (10^3) 5,037 5,120 5,204 5,287 5,372 5,456 5,541 5,627 5,713 5,799 5,885 5,971

Jumlah KK (10^3) 1,104.51 1,131.61 1,158.70 1,185.52 1,212.34 1,238.60 1,264.87 1,291 1,317 1,343 1,369 1,394

- Growth Rate (%) 1.3 1.7 1.6 1.6 1.6 1.6 1.6 1.5 1.5 1.5 1.5 1.5

Growth of Total GDP (%) 5.0 5.8 6.6 7.1 7.5 8.0 6.4 6.4 6.4 6.4 6.4 6.4

Electrification Ratio (% ) 55.5 57.8 63.2 65.7 68.7 70.9 73.2 76.3 79.3 82.4 85.5 88.6

Energy Sales (GWh) 702.3 772.1 851.0 941.4 1,044.2 1,156.9 1,259.3 1,369.0 1,485.2 1,608.3 1,738.6 1,876.7

- Growth Rate (%) 9.8 9.9 10.2 10.6 10.9 10.8 8.8 8.7 8.5 8.3 8.1 7.9

-- Residential 424.6 466.9 511.4 560.7 617.1 676.5 730.2 790.1 853.1 919.4 989.3 1,062.9

-- Commercial 178.9 196.8 217.6 240.8 266.5 295.5 321.2 348.3 377.0 407.3 439.2 473.0

-- Public 73.4 80.3 89.3 100.1 112.7 127.6 140.3 154.0 168.9 185.1 202.6 221.4

-- Industrial 25.4 28.0 32.7 39.8 47.9 57.3 67.6 76.5 86.2 96.5 107.6 119.4

Power Contracted (MVA) 613.6 683.6 754.1 831.6 921.3 1,012.3 1,095.9 1,191.9 1,292.7 1,398.5 1,509.8 1,626.8

-- Residential PLN 437.1 492.7 545.5 603.3 671.0 737.2 798.8 871.6 947.9 1,027.7 1,111.5 1,199.4

-- Commercial 107.5 116.1 125.6 136.0 147.2 159.4 170.7 182.4 194.6 207.3 220.6 234.5

-- Public 54.1 57.8 62.3 67.6 73.7 80.8 86.9 93.5 100.5 108.1 116.3 125.0

-- Industrial 15.0 17.1 20.6 24.6 29.4 34.9 39.5 44.4 49.6 55.3 61.4 67.9

- Growth Rate (%) 16.6 11.4 10.3 10.3 10.8 9.9 8.3 8.8 8.5 8.2 8.0 7.8

Number of Customer 730,287 778,656 864,864 919,568 982,097 1,035,550 1,090,571 1,157,658 1,226,200 1,296,153 1,367,729 1,440,939

-- Total Residential 613,354 653,818 732,100 778,839 833,364 878,767 925,688 984,649 1,045,035 1,106,822 1,170,224 1,235,241

-- Commercial 30,104 31,616 33,132 34,655 36,186 37,725 39,274 40,828 42,388 43,949 45,512 47,079

-- Public 86,692 93,084 99,492 105,931 112,400 118,907 125,453 132,022 138,615 145,214 151,822 158,445

-- Industrial 137 137 140 143 147 151 156 159 163 167 171 175

- Growth Rate (%) 15.2 6.6 11.1 6.3 6.8 5.4 5.3 6.2 5.9 5.7 5.5 5.4

Total Production (GWh) 783.8 873.6 975.4 1,088.1 1,215.0 1,346.9 1,453.0 1,566.8 1,701.9 1,844.4 1,980.1 2,132.6

Energy Requirement (GWh) 749.5 820.6 903.6 998.6 1,106.7 1,224.9 1,332.0 1,446.7 1,568.1 1,697.1 1,833.7 1,979.4

Station Use (%) 3.3 6.1 7.4 8.2 8.9 9.1 8.3 7.7 7.9 8.0 7.4 7.2

T & D Losses (%) +) 6.30 5.91 5.82 5.73 5.65 5.55 5.46 5.37 5.29 5.24 5.19 5.19

Load Factor (%) 55.4 55.1 55.2 55.3 55.3 55.4 55.5 55.5 55.6 55.7 55.7 55.8

Peak Load (MW) 161.4 180.8 201.7 224.71 250.6 277.5 299.0 322.02 349.4 378.2 405.5 436.21

============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========

RENCANA PENGEMBANGAN SISTEM KELISTRIKAN PLN NTT

2016 - 2025

PERKEMBANGAN DAN TARGET ENERGY MIX PEMBANGKIT TENAGA LISTRIK PLN WILAYAH NTT TAHUN 2015 – 2020

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2013 2014 2015 2016 2017 2018 2019 2020

URAIAN 2013 2014 2015 2016 2017 2018 2019 2020

BBM 96% 83% 80% 72% 54% 27% 16% 17%

Batubara 0% 10% 14% 16% 24% 42% 42% 38%

PLTMG 0% 0% 0% 0% 6% 11% 21% 22%

Panas Bumi 2% 4% 4% 5% 6% 7% 8% 10%

PLTA / PLTMH 2% 3% 3% 7% 8% 12% 12% 11%

PLTS 0.02% 0.05% 0.07% 0.5% 1.0% 1.3% 1.5% 1.8%

s/d

2008

s/d

2009

s/d

2011

s/d 2013

s/d 2015

2 PLTS hybrid (BPPT& PEMDA)

1 PLTS on grid (Lembata)

1 PLTS smart grid (Bilacenge)

6 PLTS Off grid

5 PLTS IPP On grid

94 PLTS Off grid

PERENCANAAN DAN PENGEMBANGAN PLTS

S

PENGEMBANGAN PLTS DI PLN WILAYAH NTT

S

S

S

S

S

S

S

S

S

S

S

S

S

S

PLTS IPP ON GRID ATAMBUA KAP. 1 MWp

PLTS OFF GRID PURA - ALOR KAP. 175 KWp

PLTS OFF GRID WINI

KAP. 60 KWp

PLTS OFF GRID NULE - ALOR KAP. 250 KWp

PLTS ON GRID LEMBATA

KAP. 200 KWp

PLTS IPP ON GRID MAUMERE

KAP. 1 MWp

PLTS IPP ON GRID LABUAN BAJO KAP. 1 MWp

PLTS OFF GRID SOLOR BARAT KAP. 275 KWp

PLTS IPP ON GRID ENDE

KAP. 1 MWp

PLTS ON GRID BILACENGE

KAP. 500 KWp

PLTS IPP ON GRID SUMBA TIMUR KAP. 1 MWp

PLTS IPP ON GRID KUPANG KAP. 5 MWp

PLTS OFF GRID SEMAU KAP. 450 KWp

PLTS OFF GRID RAIJUA KAP. 150 KWp

PLTS OFF GRID NEMBERALA KAP. 50 KWp

PLTS ON GRID SALURA KAP. 150 KWp

S BEROPERASI

RENCANA

L/O/G/O

PT PLN (PERSERO) WILAYAH NTT

EVALUASI PENGOPERASIAN PLTS IPP KUPANG 5 MWp

www.themegallery.com

LATAR BELAKANG

PROSES PEMBANGUNAN PLTS IPP KUPANG 5 MWP 1

2

EVALUASI PEMBEBANAN PLTS IPP KUPANG 3

HASIL PRODUKSI PLTS IPP KUPANG 4

HAL-HAL YANG DIPERHATIKAN PENGOPERASIAN PLTS

KESIMPULAN DAN SARAN 5

IMPLEMENTASI P2MS 6

www.themegallery.com

Proses Pembangunan PLTS IPP Kupang 5 MWp

No Kegiatan Pelaksana Aktual Ket

1 Penetapan pemenang EBTKE 24-Jan-14

2 Penugasan Pembelian Tenaga Listrik Kepada PT

PLN (Persero) MESDM 20-Okt-14

3 Pengurusan Izin-izin yang dibutuhkan (Status Tanah,

Izin Lokasi, Izin Lingkungan, dll) PT LEN

4 Studi Interkoneksi PLTS IPP Kupang 5 MWp PT LEN

5 Rekomendasi Studi Interkoneksi PLTS IPP Kupang

5 MWp PT PLN Wil NTT 21-Nov-14

6 Izin Usaha Penyedian Tenaga Listrik Sementara

untuk PT Len DJK 03-Des-14

7 Izin Prinsip Pembelian Tenaga Listrik PLTS IPP

Kupang 5 MWp DIREKSI PLN 22-Des-14

8 Penyerahan Jaminan Pelaksanaan Tahap I PT LEN 22-Des-14

9 TTD Perjanjian Pembelian Energi Listrik PT PLN NTT –

PT LEN 09-Jan-15

10 Ujicoba Operasi dengan Sistem Kupang PT PLN NTT –

PT LEN 08-Des-15

11 Peresmian PLTS IPP Kupang 5 MWp Presiden RI 27-Des-15

www.themegallery.com

1. Asumsi Interpolasi Dari 20 kW Menjadi 5 MW

Perbedaan output daya

selama 1 menit dapat

mencapai 44.4%

Pada sistem 5 MW, perbedaan

ini setara dengan fluktuasi

sebesar 2,22 MW dalam waktu

1 menit

Dimungkinkan adanya

perubahan yang lebih besar

Hal-hal yang harus diperhatikan Pada Pengoperasian PLTS IPP Kupang 5 MWp

2. Pembahasan Standard Operating Procedure (SOP)

www.themegallery.com

1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00

PLTU BOLOK 13,410 13,400 13,500 13,700 13,420 13,520 13,340 13,500 13,550 13,650 13,500 13,240 13,500 13,500 13,200 13,200 13,100 13,050 13,200 13,380 13,500 13,300 13,000 13,420

PLTD KUANINO - - - - - - - - - - - - - - 1,200 1,200 - - 2,200 2,200 2,200 2,200 2,200 -

PLTS TENAU 2,000 2,300 2,300 2,500 2,300 2,300 2,300 2,500 2,300 2,500 2,100 3,300 2,100 3,200 2,200 2,000 2,300 4,400 4,500 4,500 4,500 4,500 4,100 4,300

PLTD SEWA 25,823 25,289 22,401 21,262 21,285 20,085 20,048 20,425 23,030 23,176 23,150 23,090 23,663 23,591 24,650 25,900 27,110 28,565 30,750 30,750 30,750 30,750 26,647 26,359

PLTS IPP KUPANG - - - - - - 1,000 1,200 900 1,800 2,600 2,300 4,300 3,400 2,900 1,200 700 - - - - - - -

TOTAL BEBAN 41,233 40,989 38,201 37,462 37,005 35,905 36,688 37,625 39,780 41,126 41,350 41,930 43,563 43,691 44,150 43,500 43,210 46,015 50,650 50,830 50,950 50,750 45,947 44,079

FREKUENSI (HZ) 50.07 50.13 50.11 50.03 50.03 50.10 50.18 50.22 50.11 50.00 50.23 50.31 50.11 50.17 50.21 49.81 50.22 49.99 49.81 50.00 49.88 50.01 50.01 49.83

BEBAN SISTEM KUPANG pada TANGGAL 19 DESEMBER 2015

DM : 46,1 MW

BP Siang : 43,9 MW

BT Siang : 37,2 MW

Beban

Waktu

PLTS PLTU

PLTD SEWA

www.themegallery.com

Evaluasi Pembebanan PLTS IPP KUPANG 5 MWp Tanggal, 19 Desember 2015

Waktu P ( KW ) F ( Hz ) KET

6:00 278 50.10 5 MWp

6:15 352 50.10 5 MWp

6:30 690 50.10 5 MWp

6:45 1,003 50.10 5 MWp

7:00 1,300 50.20 5 MWp

7:15 914 50.20 5 MWp

7:30 2,210 50.20 5 MWp

7:45 1,800 50.20 5 MWp

8:00 1,300 50.20 5 MWp

8:15 1,200 50.20 5 MWp

8:30 900 50.10 5 MWp

8:45 635 50.10 5 MWp

9:00 937 50.10 5 MWp

9:15 1,700 50.10 5 MWp

9:30 2,100 50.10 5 MWp

9:45 2,100 50.10 5 MWp

10:00 2,600 50.10 5 MWp

10:15 2,600 50.20 5 MWp

10:30 2,600 50.00 5 MWp

10:45 4,000 50.00 5 MWp

11:00 4,200 50.20 5 MWp

11:15 4,600 50.20 5 MWp

11:30 4,200 50.30 5 MWp

11:45 4,200 50.10 5 MWp

12:00 3,500 50.20 5 MWp

12:15 4,100 50.10 5 MWp

12:30 4,100 50.20 5 MWp

12:45 4,200 50.20 5 MWp

13:00 4,200 50.20 5 MWp

13:15 3,900 50.10 5 MWp

13:30 3,900 50.10 5 MWp

13:45 3,800 50.20 5 MWp

14:00 3,400 50.30 5 MWp

14:15 2,000 50.10 5 MWp

14:30 1,500 49.80 5 MWp

14:45 2,520 50.20 5 MWp

15:00 3,300 50.30 5 MWp

15:15 2,130 50.20 5 MWp

15:30 1,850 50.10 5 MWp

15:45 1,210 50.20 5 MWp

16:00 1,820 50.30 5 MWp

16:15 936 49.90 5 MWp

16:30 916 50.00 5 MWp

16:45 880 50.00 5 MWp

17:00 705 50.10 5 MWp

17:15 418 50.20 5 MWp

17:30 278 50.10 5 MWp

Catatan :

- DM : 46,1 MW

- BP Siang : 43,9 MW

- BT Siang : 37,2 MW

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 19 Des. 2015

- Total Produksi : 27.540 kWh

- Radiasi Matahari : 5,5 kWh/m2/hari

- Jadi dalam setahun : 9,914 MWh

www.themegallery.com

Catatan :

- DM : 52,25 MW

- BP Siang : 50,60 MW

- BT Siang : 40,11 MW

Waktu P ( KW ) F ( Hz ) KET

6:00 2 MWp

6:15 2 MWp

6:30 2 MWp

6:45 150 50.20 2 MWp

7:00 232 50.30 2 MWp

7:15 350 50.30 2 MWp

7:30 450 50.20 2 MWp

7:45 572 50.00 2 MWp

8:00 789 50.10 2 MWp

8:15 907 50.10 2 MWp

8:30 988 49.90 2 MWp

8:45 1,079 50.20 2 MWp

9:00 1,167 50.00 2 MWp

9:15 1,234 50.10 2 MWp

9:30 1,337 50.10 2 MWp

9:45 1,339 50.10 2 MWp

10:00 1,371 50.00 2 MWp

10:15 1,448 50.20 2 MWp

10:30 1,482 50.10 2 MWp

10:45 1,529 50.10 2 MWp

11:00 1,584 50.10 2 MWp

11:15 1,590 50.10 2 MWp

11:30 1,604 50.00 2 MWp

11:45 1,620 50.00 2 MWp

12:00 1,648 50.00 2 MWp

12:15 1,629 50.20 2 MWp

12:30 1,653 50.20 2 MWp

12:45 1,653 50.10 2 MWp

13:00 1,576 50.10 2 MWp

13:15 1,595 50.10 2 MWp

13:30 1,546 50.10 2 MWp

13:45 1,512 50.10 2 MWp

14:00 1,449 50.00 2 MWp

14:15 1,393 50.00 2 MWp

14:30 1,313 50.00 2 MWp

14:45 1,308 50.00 2 MWp

15:00 1,256 49.90 2 MWp

15:15 1,220 50.00 2 MWp

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 20 Jan. 2016

- Total Produksi : 10.261 kWh

- Radiasi Matahari : 5,12 kWh/m2/hari

- Jadi dalam setahun : 3,687 MWh

Evaluasi Pembebanan PLTS IPP KUPANG 2 MWp Tanggal, 20 Januari 2016

www.themegallery.com

Catatan :

- DM : 52,25 MW

- BP Siang : 50,60 MW

- BT Siang : 40,11 MW

Waktu P ( KW ) F ( Hz ) KET

6:00 2 MWp

6:15 2 MWp

6:30 2 MWp

6:45 164 50.40 2 MWp

7:00 229 50.30 2 MWp

7:15 317 50.20 2 MWp

7:30 450 50.00 2 MWp

7:45 583 49.90 2 MWp

8:00 688 50.10 2 MWp

8:15 800 50.00 2 MWp

8:30 900 50.10 2 MWp

8:45 1,010 50.00 2 MWp

9:00 1,100 50.00 2 MWp

9:15 1,176 50.00 2 MWp

9:30 1,258 50.00 2 MWp

9:45 1,336 50.10 2 MWp

10:00 1,423 50.20 2 MWp

10:15 1,486 50.10 2 MWp

10:30 1,806 50.30 2 MWp

10:45 1,853 50.20 2 MWp

11:00 1,827 50.00 2 MWp

11:15 1,750 50.10 2 MWp

11:30 596 50.10 2 MWp

11:45 1,820 50.30 2 MWp

12:00 1,010 50.20 2 MWp

12:15 1,902 50.10 2 MWp

12:30 1,823 50.00 2 MWp

12:45 1,822 50.00 2 MWp

13:00 1,829 50.20 2 MWp

13:15 649 50.20 2 MWp

13:30 450 50.00 2 MWp

13:45 1,543 50.10 2 MWp

14:00 640 49.80 2 MWp

14:15 1,553 50.00 2 MWp

14:30 1,470 49.90 2 MWp

14:45 1,796 50.00 2 MWp

15:00 1,495 49.90 2 MWp

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 21 Jan. 2016

- Total Produksi : 10.261 kWh

- Radiasi Matahari : 5,12 kWh/m2/hari

- Jadi dalam setahun : 3,687 MWh

Evaluasi Pembebanan PLTS IPP KUPANG 2 MWp Tanggal, 21 Januari 2016

www.themegallery.com

Proyeksi Produksi PLTS KUPANG 5 MWp

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 19 Des. 2015

- Total Produksi : 27.540 kWh

- Radiasi Matahari : 5,5 kWh/m2/hari

- Jadi dalam setahun : 9,914 MWh

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 20 Jan. 2016

- Total Produksi : 11.027 kWh

- Radiasi Matahari : 5,54 kWh/m2/hari

- Jadi dalam setahun : 3,986 MWh

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 21 Jan. 2016

- Total Produksi : 10.261 kWh

- Radiasi Matahari : 5,12 kWh/m2/hari

- Jadi dalam setahun : 3,687 MWh

www.themegallery.com

Total Produksi Bulan Januari 2016 : 231,834 KWH

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

PRODUKSI

Hasil Produksi PLTS KUPANG 5 MWp untuk Operasi 2 MWp

www.themegallery.com

Kesimpulan dan Saran PLTS IPP Kupang 5 MWp

Pengoperasian PLTS IPP Kupang 5 MWp tercapai apa bila sistem Kupang pada siang hari tidak mengalami pemadaman bergilir.

Pembangkit pada sistem Kupang harus memenuhi N-1, sehingga PLTS 5 MWp dapat dioperasikan secara optimal.

Diusulkan untuk menjaga keandalan sistem Kupang pada saat cuaca mendung harus mempunyai back up daya (batere)

www.themegallery.com

IMPLEMENTASI P2MS

TERIMA KASIH