rencana anggaran biaya paud

download rencana anggaran biaya paud

of 285

Transcript of rencana anggaran biaya paud

  • 7/26/2019 rencana anggaran biaya paud

    1/285

    DAFTAR HARGA SATUAN PEKERJAAN

    KEGIATAN :

    PEKERJAAN :

    LOKASI :

    TAHUN ANGGARAN :

    NO. SNI KODE URAIAN PEKERJAAN SAT

    I 03-2835-2002 6 PEKERJAAN PERSIAPAN#REF! Pagar Sementara dar Seng Gelm"ang Tngg $%% m m&

    #REF! Peng'('ran dan Pema)angan *'+,lan( m&

    #REF! -em"er)(an La,angan dan Perataan m

    #REF! Pem"'atan Steger dar *am"' U(. /% 0 % 0 % 2m m

    #REF! *ng(aran *etn *ert'lang m3

    #REF! *ng(aran 4ndng Tem"( *ata -era m3

    II DT 91-0006 6 PEKERJAAN TANAH

    2007 #REF! Galan Tana *a)a Sedalam 1 m m3

    #REF! Galan Tana Kera) Sedalam 1 m m3

    #REF! Galan Tana 5ada) Sedalam 1 m m3

    #REF! Galan Tana L'm,'r Sedalam 1 m m3

    #REF! Pe(er6aan Str,ng Te"ng Setngg 1 m m

    #REF! -em"'angTana )e6a' 3% m& m3#REF! Ur'gan Kem"al 7dt'ng 183 (al nde() ,e(er6aan galan9 m3

    #REF! Pemadatan Tana 7,er % 2m9 m3

    #REF! Ur'gan Pa)r m3

    #REF! La,)an P'del 5m,. 1K, : 3P) : TL m3

    #REF! Pema)angan La,)an I6'( te"al 1% 2m m

    #REF! Ur'gan Srt' m3

    III DT 91-0007 6 PEKERJAAN PONDASI

    2007 #REF! Pa)ang Pnda) *at' Kal 1P2 : 3 PP m3

    #REF! Pa)ang Pnda) *at' Kal 1P2 : PP m3

    #REF! #REF! m3

    #REF! Pa)ang Pnda) *at' Kal$ 1 P2 : 3 K, : 1% PP m3

    #REF! Pa)ang Pnda) *at' K)ng m3

    #REF! Pa)ang Pnda) S(l,$ ;%< *etn 5am,. 1P5 : P* : 3KR = /%< *at' *ela m3#REF! Pa)ang Pnda) S'm'ran dameter 1%% 2m m3

    IV DT 91-0009 6 PEKERJAAN DINDING

    4.;. #REF! m

    4.;.3 #REF! m

    4.;./ #REF! m

    4.;. #REF! m

    4.;. #REF! m

    2007 #REF! Pa)ang *at' -era Te"al 18 "ata$ 1 P2 : P, m

    #REF! Pa)ang *at' -era Te"al 18 "ata$ 1 P2 : 3 P, m

    4.;.> #REF! m

    4.;.1% #REF! m

    4.;.11 #REF! m

    #REF! Pa)ang *at' -era Te"al 18 "ata$ 1 P2 : 3 K, : 1% P, m

    V DT 91-0010 6 PEKERJAAN PLESTERAN

    #REF! Ple)teran 1 P2 : 1 P, Te"al 1 mm m

    #REF! Ple)teran 1 P2 : P)r : Te"al 1 mm m

    2007 #REF! Ple)teran 1 P2 : 3 P, Te"al 1 mm m

    #REF! #REF! m

    #REF! #REF! m

    #REF! #REF! m

    #REF! Ple)teran 1 P2 : K, : ? P, Te"al 1 mm m

    #REF! Ple)teran 1P2 : 3P, Te"al % mm m

    #REF! #REF! m

    #REF! *era,en 1 P2 : P, Te"al 1 mm m

    #REF! Ple)teran S(nng 1 P2 : P,$ le"ar 1% mm m&

    #REF! Ple)teran 5,rat 1 P2 : P, m&

    #REF! Fn)ng Sar Pa).*at' Kal Ad'(an 1P2 : P, m

    #REF! A2an m

  • 7/26/2019 rencana anggaran biaya paud

    2/285

    NO. SNI KODE URAIAN PEKERJAAN SA

    VI DT 91-0011 6 PEKERJAAN KAYU

    2007 #REF! -em"'at K)en Pnt' = Jendela Ka@' (la) I m3

    #REF! -em"'at K)en Pnt' = Jendela Ka@' (la) II 7*eng(r9 m3

    #REF! -em"'at K)en Pnt' = Jendela Ka@' (la) III 7Kr'ng9 m3

  • 7/26/2019 rencana anggaran biaya paud

    3/285

    NO. SNI KODE URAIAN PEKERJAAN SA

    #REF! -em"'at Pnt' Klam,Standard Ka@' Kla) II 7Ka@' *eng(r9 m

    #REF! -em"'at Pnt' Klam,Standard Ka@' Kla) III 7Ka@' Kr'ng9 m

    #REF! -em"'at 4a'n Pnt' Panel Ka@' Kla) I 7Jat9 m

    #REF! -em"'at 4a'n Pnt' Panel Ka@' Kla) II 7*eng(r9 m

    #REF! -em"'at 4a'n Pnt' Panel Ka@' Kla) III 7Kr'ng9 m

    #REF! -em"'at Pnt' = Jendela Ka2a Ka@' Kla) I 7Jat9 m

    #REF! -em"'at Pnt' = Jendela Ka2a Ka@' Kla) II 7*eng(r9 m

    #REF! -em"'at Pnt' = Jendela Ka2a Ka@' Kla) III 7Kr'ng9 m

    #REF! -em"'at Pnt' (a@' la,) 7Pl@+d9 Rang(a, rang(a Ka@' Kla) II 7l"r )8d >% 2m9 m

    #REF! -em"'at Pnt' (a@' la,) 7Pl@+d9 Rang(a, rang(a Ka@' Kla) III 7l"r )8d >% 2m9 m

    #REF! -em"'at Pnt' Pl@+d rang(a,$ rang(a e0,)e (a@' (la) I m

    #REF! -em"'at Pnt' Pl@+d rang(a,$ rang(a e0,)e (a@' (la) II m

    #REF! -em"'at Pnt' Tea(+d Rang(a,$ Rang(a E0,)e Ka@' Kla) I m

    #REF! -em"'at Pnt' Tea(+d Rang(a, La,) Frm(a$Rang(a e0,)e Ka@' Kla) II m

    #REF! -ema)ang Kn)tr'() K'da('da KnBen)nal Ka@' Kela) I *entang ; meter m3

    #REF! -ema)ang Kn)tr'() K'da('da KnBen)nal Ka@' Kela) II *entang ; meter m3

    #REF! -ema)ang Kn)tr'() K'da('da KnBen)nal Ka@' Kela) III *entang ; meter m3

    #REF! -ema)ang Kn)tr'() K'da('da E0,)e$ Ka@' Kla) I m3

    #REF! -ema)ang (n)tr'() Grdng$ Ka@' Kla) I m3

    #REF! -ema)ang (n)tr'() Grdng$ Ka@' Kla) II m3

    #REF! -ema)ang (n)tr'() Grdng$ Ka@' Kla) III m3

    #REF! -ema)ang Rang(a Ata, Genteng Keram($ Ka@' Kla) III m#REF! #REF! m

    #REF! -ema)ang Rang(a Ata, Genteng *etn$ Ka@' Kla) III m

    #REF! -ema)ang Rang(a Ata, Sra,$ Ka@' Kla) III m

    #REF! -ema)ang Rang(a Langtlangt 71$%%01$%%9 m$ (a@' Kla) II m

    #REF! -ema)ang Rang(a Langtlangt 71$%%01$%%9 m$ (a@' Kla) III m

    #REF! -ema)ang Rang(a Langtlangt 7;%0;%9 2m$ (a@' Kla) II m

    #REF! -ema)ang Rang(a Langtlangt 7;%0;%9 2m$ (a@' Kla) III m

    #REF! -ema)ang L)t,lan( U(. 730%92m Ka@' (la) I m

    #REF! -ema)ang L)t,lan( U(. 730%92m Ka@' (la) II m

    F.;.12 -ema)ang L)t,lan( U(. 730%92m Ka@' (la) III m

    F.;.a -ema)ang L)t,lan( U(. 7303%92m Ka@' (la) III m

    #REF! -ema)ang Rang(a 4ndng Pem)a 7;%01%9 2m Ka@' (la) II m

    #REF! -ema)ang Rang(a 4ndng Pem)a 7;%01%9 2m Ka@' (la) III m

    #REF! -ema)ang 4ndng Pem)a Tea(+d Rang(a, Rang(a Ka@' Kla) II m#REF! -ema)ang 4ndng Pem)a Tea(+d Rang(a, Rang(a Ka@' Kla) III m

    #REF! -ema)ang 4ndng Lam"rCrng dar Pa,an (la) I m

    #REF! -ema)ang 4ndng Lam"rCrng dar Pl@+d '('ran 71%0/%9 2m m

    #REF! -ema)ang 4ndng *l($ Rang(a Ka@' Kla) III m

    #REF! -ema)ang 4ndng *l($ Rang(a Ka@' Kla) ID m

    VII DT 91-0008 6 PEKERJAAN ETON

    2007 #REF! -em"'at *etn m't' &2$/ -,a 7K1%%9$ )l'm 7192m$ +82 %$? m3

    #REF! -em"'at *etn m't' &2>$? -,a 7K19$ )l'm 7192m$ +82 %$? m3

    #REF! -em"'at *etn m't' &21$ -,a 7K1%9$ )l'm 7192m$ +82 %$ m3

    #REF! -em"'at Lanta Ker6a *etn m't' &2$/ -Pa 7K1%%9$ )l'm 73;92m$ +82 %$? m3

    #REF! -em"'at *etn m't' &21/$ -Pa 7K19$ )l'm 7192m$ +82 %$;; m3

    #REF! -em"'at *etn m't' &21;$> -Pa 7K%%9$ )l'm 7192m$ +82 %$;1 m3

    #REF! -em"'at *etn m't' &21>$3 -Pa 7K9$ )l'm 7192m$ +82 %$? m3

    #REF! -em"'at *etn m't' &21$ -Pa 7K%9$ )l'm 7192m$ +82 %$; m3

    #REF! -em"'at *etn m't' &2/$% -Pa 7K9$ )l'm 7192m$ +82 %$3 m3

    #REF! -em"'at *etn m't' &2;$/ -Pa 7K3%%9$ )l'm 7192m$ +82 %$ m3

    #REF! -em"'at *etn m't' &2?$? -Pa 7K39$ )l'm 7192m$ +82 %$/> m3

    #REF! Pem"e)an dg *e) Pl) Kg

    #REF! Pem"e)an dg *e) Ulr Kg

    #REF! Ka"el Pre))tre)ed Pl)8)trand Kg

    #REF! Jarng Ka+at "a6a8re -e) Kg

    #REF! -ema)ang *e()tng 'nt'( Pnda) m

    #REF! -ema)ang *e()tng 'nt'( Sl m

    #REF! -ema)ang *e()tng 'nt'( Klm m

    #REF! -ema)ang *e()tng 'nt'( *al( m

    #REF! -ema)ang *e()tng 'nt'( Lanta m

    #REF! -ema)ang *e()tng 'nt'( 4ndng m

    #REF! -ema)ang *e()tng 'nt'( Tangga m

    #REF! -ema)ang Jem"atan 5r m

  • 7/26/2019 rencana anggaran biaya paud

    4/285

    NO. SNI KODE URAIAN PEKERJAAN SA

    #REF! -em"'at Pnda) *etn *ert'lang 71% (g *e) *e()tng9 m3

    #REF! -em"'at Sl *etn *ert'lang 7%% (g *e) *e()tng9 m3

    #REF! -em"'at Klm *etn *ert'lang 73%% (g *e) *e()tng9 m3

    #REF! -em"'at *al( *etn *ert'lang 7%% (g *e) *e()tng9 m3

    #REF! -em"'at *al( *etn *ert'lang 71% (g *e) *e()tng9 m3

    #REF! -em"'at 4ndng *etn *ert'lang 71% (g *e) *e()tng9 m3

    #REF! -em"'at Tangga *etn *ert'lang 7%% (g *e) *e()tng9 m3

  • 7/26/2019 rencana anggaran biaya paud

    5/285

    NO. SNI KODE URAIAN PEKERJAAN SA

    #REF! -em"'at Klm Peng'at *etn *ert'lang 711 0 119 2m m

    #REF! -em"'at Rng *al( *etn *ert'lang 71% 0 19 2m m

    SPL.1 Sl 1 8 % T'langan da. 1%mm

    SPL.1a Sl 1 8 % T'langan da. 1mm

    SPL. S 1 8 T'langan da.1%mm

    SPL.a S 1 8 T'langan da.1mm

    SPL.3 Rng"al( 1 8 1 T'langan da.1%mm

    SPL.3a Rng"al( 1 8 1 T'langan da.1mm

    SPL./ Rng"al( 18% t'langan da. 1%mm

    SPL./a Rng"al( 18% t'langan da. 1mm

    SPL. Klm Pra(t) 181 t'langan da. 1%mm

    SPL.a Klm Pra(t) 181 t'langan da. 1mm

    SPL.; Klm 8 % T'langan da. 1mm

    SPL. Klm 8 t'langan da. 1mm

    SPL.? *al( % 8 /%

    SPL.> *al( 3% 8 %

    SPL.1% Plat "etn te"al 1 2m

    VIII 03-3!36-2002 6 PEKERJAAN PENUTUP ATAP

    #REF! Pa)ang Ata, Genteng Plentng Ke2l m

    #REF! Pa)ang Ata, Genteng Kd( 8 Gla)'r m

    #REF! Pa)ang Ata, Genteng Pre)) 7Ke"'men9 m#REF! Pa)ang Ata, Genteng Pre)) 7Jat+ang9 m

    #REF! Pa)ang Ata, Genteng Plentng S',er 8 *e)ar m

    #REF! Pa)ang Genteng *'"'ng Plentng m

    #REF! Pa)ang Genteng *'"'ng Kd( 8 Gla)'r m

    #REF! Pa)ang Genteng *'"'ng Plentng *e)ar m

    #REF! Pa)ang Genteng *'"'ng Pre) 7Ke"'men9 m

    #REF! Pa)ang Genteng *'"'ng Pre) 7Jat+ang9 m

    #REF! Pa)ang Ata, A)"e) Gelm"ang 7$0%$> m9 0 mm m

    #REF! Pa)ang Ata, A)"e) Gelm"ang 7$%%0%$> m9 0 mm m

    #REF! Pa)ang Ata, A)"e) Gelm"ang 73$%%01$% m9 0 / mm m

    #REF! Pa)ang Ata, A)"e) Gelm"ang 7$1%01$% m9 0 / mm m

    #REF! Pa)ang Ata, Seng Gelm"ang m

    #REF! Pa)ang Ata, N( Seng m

    #REF! Pa)ang All'm'n'm Fl 8 S)alatn m#REF! Pa)ang Ata, A)"e) -t Genteng m

    I" DT 91-0013 6 PEKERJAAN LANGIT-LANGIT

    2007 #REF! -ema)ang Langtlangt A)"e) 71$%%01$%%9 m$ te"al / mm$ mm = ; mm m

    #REF! -ema)ang Langtlangt Tr,le() U( 71%0/%9 2m$ Te"al 3 mm m

    #REF! -ema)ang Langtlangt Tr,le() U( 71%0/%9 2m$ / mm m

    #REF! -ema)ang Langtlangt Tr,le() U( 71%0/%9 2m$ ; mm m

    #REF! -ema)ang Langtlangt Lam"rCrng Ka@' Jat$ te"al ; mm m

    #REF! -ema)ng Langtlangt G@,)' *ard$ U( 71%0/%9 te"al > mm m

    #REF! L)t LangtLangt Ka@' Prl m

    " 03- 6 PEKERJAAN SANITASI

    #REF! -ema)ang 5l)et 4'd'( 8 -n *l( Un

    #REF! -ema)ang 5l)et Jng(( Pr)elen Un

    #REF! -ema)ang Urnr Un

    #REF! -ema)ang a)tael Un

    #REF! -ema)ang *a( -and *at' *ata Dl. %$3% m3 Un

    #REF! -ema)ang P,a *etn$ 1 2m % 2m m

    #REF! -ema)ang P,a *etn$ 3% 2m 1%% 2m m

    #REF! -ema)ang P,a *etn$ 3% 2m m

    #REF! -ema)ang P,a *etn$ /% 2m m

    #REF! -ema)ang P,a *etn$ % 2m m

    #REF! -ema)ang P,a *etn$ ;% 2m m

    #REF! -ema)ang P,a *etn$ ?% 2m m

    #REF! -ema)ang P,a GalBan) m

    #REF! -ema)ang P,a GalBan) 3 m

    #REF! -ema)ang P,a GalBan) / m#REF! -ema)ang P,a PD5 t@,e A M m

    #REF! -ema)ang P,a PD5 t@,e A m

    #REF! -ema)ang P,a PD5 t@,e A 3 m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

  • 7/26/2019 rencana anggaran biaya paud

    6/285

    NO. SNI KODE URAIAN PEKERJAAN SA

    #REF! -ema)ang *a( 5'2 Prng Stanle) Steel *'a

    J.;.3a -ema)ang Kran 18 *'a

    J.;.3" -ema)ang Kran 38/ *'a

    #REF! -ema)ang Flr 4ran *'a

  • 7/26/2019 rencana anggaran biaya paud

    7/285

    NO. SNI KODE URAIAN PEKERJAAN SA

    "I DT 91-001! 6 PEKERJAAN ESI # ALLU$UNIU$

    2007 #REF! -ema)ang *e) Prl Kg

    #REF! -ema)ang Rang(a K'da('da *a6a IF (g

    #REF! -enger6a(an Pe(er6aan Pera(tan 7K'da('da *a6a9 1%%

    #REF! -em"'at Pnt' *e) Plat *a6a te"al mm rang(a,$ rang(a "a6a S(' m

    #REF! -enger6a(an Pengela)an dengan La) L)tr( 2m

    #REF! -ema)ang Pnt' Rllng 4r *e) m

    #REF! -ema)ang Pnt' L,at 7Fldng 4r9 m

    #REF! -ema)ang Rllng 4r All'm'n'm m

    #REF! -ema)ang Teral *e) Str, 7039 2m m

    #REF! -ema)ang Ka+at N@am'( m

    #REF! -ema)ang Jendela Na( = Tral) m

    #REF! -ema)ang Talang 4atar8J'ra $ Seng *JLS ? Le"ar >% 2m m

    #REF! -ema)ang Talang 18 Lng(aran 1 2m$ Seng Plaat *JLS 3% Le"ar / 2m m

    "II 03- 6 PEKERJAAN KUN%I # KA%A

    #REF! -ema)ang K'n2 Tanam *a)a *'a

    #REF! -ema)ang K'n2 Kamar -and *'a

    #REF! -ema)ang K'n2 Selnder *'a

    #REF! -ema)ang Eng)el Pnt' *'a

    #REF! Pa)ang Eng)el Jendela K','(',' *'a

    #REF! Pa)ang Eng)el Angn *'a#REF! Pa)ang Kat Angn *'a

    #REF! Pa)ang 4r 5l)er *'a

    #REF! Pa)ang K'n2 Selt *'a

    #REF! Pa)ang 4r St, *'a

    #REF! Pa)ang Rel Pnt' 4rng *'a

    #REF! Pa)ang K'n2 Lemar *'a

    #REF! Pa)ang Ka2a te"al 3 mm m

    #REF! Pa)ang Ka2a te"al mm m

    #REF! Pa)ang Ka2a 5ermn te"al mm m

    "III DT 91-0012 6 PEKERJAAN PENUTUP LANTAI # DINDING

    #REF! -ema)ang lanta U"n Grant U(. /% 0 /% 2m m

    -.;.3/ -ema)ang Lanta Keram( +arna 3% 0 3% 2m m

    -.;.3/a -ema)ang Lanta Keram( +arna /% 0 /% 2m m#REF! -ema)ang Lanta Keram( 3% 0 3% 2m m

    -.;.3a -ema)ang Lanta Keram( /% 0 /% 2m m

    #REF! Pa)ang Lanta Keram( % 0 % 2m m

    #REF! -ema)ang Lanta Kar,et m

    #REF! -ema)ang 4ndng Keram( 1%0% 2m$ m

    #REF! -ema)ang 4ndng Keram( %0 2m$ m

    #REF! -ema)ang Plnt Ka@' Kla) II U('ran 01% 2m m

    "IV 03-2! 6 PEKERJAAN PENGE%ATAN

    #REF! -eng() 8 -enger( Perm'(aan 5at Tem"( Lama m

    #REF! -en2'2 *dang Perm'(aan Tem"( @ang Perna d2at m

    #REF! -enger( Karat 5at Lama ,erm'(aan *a6a dg 2ara man'al m

    #REF! Pen@a"'n Perm'(aan Tem"( Lama m

    #REF! -endem,'l dan -engg)( Ka@' m

    #REF! Penge2atan Ka@' *dang Lama m

    #REF! Penge2atan *dang Ka@' *ar' 71 la,.Plamr9 1 la,.5at 4a)ar = la,.5at Pen't', m

    #REF! Penge2atan *dang Ka@' *ar' 71 la,.Plamr9 1 la,.5at 4a)ar = 3 la,.5at Pen't', m

    #REF! Pela"'ran *dang Ka@' dg Tea( Ol m

    #REF! Pela"'ran *dang Ka@' dg Plt'r m

    #REF! Pela"'ran *dang Ka@' dg 5at Re)d' = Ter m

    #REF! Pela"'ran *dang Ka@' dg Dern) m

    #REF! Penge2at Tem"( *ar' 71la,.Plamr$ 1la, 5at 4a)ar la,. 5at Pen't',9 m

    #REF! Penge2at Tem"( *ar' E0terr 71 la, 5at 4a)ar la,. 5at Pen't',9 m

    #REF! Penge2at Tem"( Lama 71la,.Plamr$ la, 5at Pen't',9 m

    #REF! Penge2atan Perm'(aan *a6a dg -en *e) m

    #REF! Penge2atan Perm'(aan *a6a dg -en *e) = Peran2a m

    #REF! Penge2atan Perm'(aan *a6a la,) Seng 7GalBan)9 )e2ara m

    man'al ))tem 3 la,) 5at KnBen)nal dg te"al %% 'm

  • 7/26/2019 rencana anggaran biaya paud

    8/285

    NO. SNI KODE URAIAN PEKERJAAN SAT

    "V PAVING DAN LANGSIRAN

    A HASIL PERHITUN #REF! Pa)ang PaBng *l( A"'a"' Te"al ; 2m 7K.19 m

    #REF! Pa)ang PaBng *l( arna Te"al ; 2m 7K.19 m

    #REF! Pa)ang PaBng *l( A"'a"' Te"al ? 2m 7K.19 m

    #REF! Pa)ang PaBng *l( arna Te"al ? 2m 7K.19 m

    #REF! Pa)ang PaBng *l( A"'a"' 7L(al9 m

    #REF! Pa)ang PaBng *l( arna 7L(al9 m

    #REF! Pem"'angan tana )e6a' 3% m& m3

    #REF! Pem"'angan tana )e6a' 1%% m& m3

    #REF! Pem"'angan tana )e6a' %% m& m3

    #REF! -engang(at tana )edalam le" dar 1 m& m3

    #REF! Stt+er( "etn "ert'lang m3

    "VI PEKERJAAN JALAN

    K. 110 Membuat parit Galian tanah m3

    K. 111 Galian tanah untuk konstruksi (menggunakan alat) m3

    K. 210 Pengupasan tanah dan pembersihan semak pada Damija m2

    K. 220 Menggali dan mengangkut tanah untuk mengurug berm dipadatkan m3

    K. 22 Galian tanah untuk konstruksi m3

    K. 22! Penimbunan dan pemadatan m3

    K. 221." #rugan dan pemadatan tanah dasar (menggunakan alat) m3

    K. 221.$ #rugan sirtu dan pemadatan (menggunakan alat) m3

    K.22! a Penimbunan dan pemadatan ( #rugan kembali ) m3

    K. 10 Membentuk $ahu jalan keras ( menggunakan sirtu ) m3

    K. 22 Membersihkan rumput % tanaman dibahu jalan m2

    K. !11 Konstruksi &apis Pondasi $a'ah ( &P$ ) Klas " m3

    K. !1 Konstruksi lapis pondasi ba'ah ( &P$ ) el*ord m3

    K. !21 Konstruksi &apis Pondasi "tas ( &P" ) Klas " m3

    K. !2+ Menghampar &apis Pondasi "tas "spal $eton ( &aston atas ) on

    LAN SK.DIRJEN IN K. !2+ Menghampar &ap Pondasi "tas "spal $eton ( &aston atas,"$ ) lap perata m3

    K. 12 &aburan aspal pasir ( $uras ) m2

    1 K. 1! &aburan aspal satu lapis ( $urtu ) m2

    K. 1- &aburan aspal dua lapis ( $urda ) m2

    K. 1+ &apis penetrasi tebal ! m ( &apen ) m2

    3 K. 0 Pelapisan prime oat m2/ K. 21 a Menghampar dan memadatkan &atasir tebal 2 m ( $uruh ) /andsheet m2

    K. 3 Penghamparan dan pemadatan &ataston ( ) lapis perata (menggunakan m2

    K. 3- Perataan lapis permukaan m3

    K. -10 Peranah ( $egisting ) untuk beton bertulang m2

    K. -22 $eton struktur / untuk Konstruksi Klas K.22! m3

    456 *etn )tr'(t'r 8 'nt'( Kn)tr'() Kla) K.1 m3

    K. -2! $eton struktur / untuk Konstruksi Klas K.1-! m3

    K.;A *etn )tr'(t'r 8 'nt'( Kn)tr'() Kla) K.% m3

    K. 3%A *etn )tr'(t'r 8 'nt'( Kn)tr'() Kla) K.3%% m3

    ; K -30 $eton struktur / untuk Konstruksi Klas K.3!0 m3? K. +10 Konstruksi Pasangan $atu m3

    1% K. 011 a Plesteran P 7 m2

    11 K. 01- Produksi batu peah tersaring m3

    K. 02 Produksi lapis aspal beton ( &aston ) onK. 01 Pengeatan kembali besi m2

    K. 02 Pengeatan besi baru m2

    K. 03 Pengeatan besi dengan at dasar / menie m2

    K. 0! Pembuatan dan pemasangan konstruksi baja / besi kg

    K. 0 Pemasangan dekplank jembatan ka8u jati m2

    K. 03! Memproduksi lapis tipis aspal beton on

    K. 0 a Pemasangan dekplank jembatan ka8u bengkire m2

    K. 322 tabilisasi tanah / &P$ dengan kapur ( $uruh ) m3

    K. 32! tabilisasi tanah / &P$ dengan semen ( $uruh ) m3K. T%a Pem"'atan dan ,ema)angan (n)tr'() "a6a 8 "e) 7(anal 1%9 (g

    K. T%" Pem"'atan dan ,ema)angan (n)tr'() "a6a 8 "e) 7L %.%.9 (g

    K. T%2 Pem"'atan dan ,ema)angan (n)tr'() "a6a 8 "e) 7L %.%.9 (g

    *O.G." *rn6ng Penaan m3

    3.1.719a Galian tanah biasa untuk konstruksi (menggunakan alat) m3

    "VII PEKERJAAN JARINGAN LISTRIK

  • 7/26/2019 rencana anggaran biaya paud

    9/285Hal. >

    NO. SNI KODE URAIAN PEKERJAAN SAT

    1 5A1 Pas. 7"1 #nit

    5A1& Pas. 7"19 #nit

    3 5A1 Pas. 7"2,1 #nit/ 5A Pas. 7"2 #nit

    5A& Pas. 7"29 #nit

    ; 5A3 Pas. 7"3 #nit

  • 7/26/2019 rencana anggaran biaya paud

    10/285

    NO. SNI KODE URAIAN PEKERJAAN SAT

    5A3& Pas. 7"39 #ni? 5A/ Pas. 7" #ni

    > 5A/& Pas. 7"9 #ni1% 5A Pas. 7"! #ni11 5A& Pas. 7"!9 #ni1 5A1 Pas. 7"!,1 #ni

    13 5A1& Pas. 7"!,19 #ni1/ 5A; Pa). 5A; #ni

    1 5A;& Pa). 5A;& #ni

    1; SE 1 7 -9 Pa). SE 1 7 -9 #ni

    1 E 1 7 - 9 Pa). E 1 7 - 9 #ni

    1? SE 1 7 > -9 Pa). SE 1 7 > -9 #ni

    1> E 1 7 > - 9 Pa). E 1 7 > - 9 #ni

    % SE 1 7 11 -9 Pa). SE 1 7 11 -9 #ni

    1 E 1 7 11 - 9 Pa). E 1 7 11 - 9 #ni

    SE 1 7 1 -9 Pa). SE 1 7 1 -9 #ni

    3 E 1 7 1 - 9 Pa). E 1 7 1 - 9 #ni

    / SE 1 7 -9 Pa). SE 1 7 -9 #ni

    E 1 7 - 9 Pa). E 1 7 - 9 #ni

    ; SE 1 7 > -9 Pa). SE 1 7 > -9 #ni

    E 1 7 > - 9 Pa). E 1 7 > - 9 #ni

    ? SE 1 7 11 -9 Pa). SE 1 7 11 -9 #ni> E 1 7 11 - 9 Pa). E 1 7 11 - 9 #ni

    3% SE 1 7 1 -9 Pa). SE 1 7 1 -9 #ni

    31 E 1 7 1 - 9 Pa). E 1 7 1 - 9 #ni

    3 SE13 711 -9 Pa). SE13 711 -9 #ni

    33 E13711 -9 Pa). E13711 -9 #ni

    3/ SE13 71 -9 Pa). SE13 71 -9 #ni

    3 E13 71 -9 Pa). E13 71 -9 #ni

    3; SE Pa). SE #ni

    3 SE3 Pa). SE3 #ni

    3? E3 Pa). E3 #ni

    3> F 1 Pa). F 1 #ni

    /% F 13 Pa). F 13 #ni

    /1 JT 75J9 Pa). JT 75J9 #ni

    / J T 75J39 Pa). J T 75J39 #ni/3 J; T 75J/9 Pa). J; T 75J/9 #ni

    // -J; T 75J/9 Pa). -J; T 75J/9 #ni

    / 5G1% % Pa). 5G1% % #ni

    /; P.1 Pa). P.1 #ni

    / P1.5 Pa). P1.5 #ni

    /? P1.5& Pa). P1.5& #ni

    /> 5- Pa). 5- #ni

    % 5-11 Pa). 5-11 #ni

    1 5- 1 Pa). 5- 1 #ni

    5- 1A Pa). 5- 1A #ni

    3 5-1 Pa). 5-1 #ni

    / 5-3/ Pa). 5-3/ #ni

    5-11 - Pa). 5-11 - #ni

    ; 5-3 Pa). 5-3 #ni 5-/ Pa). 5-/ #ni

    ? 5- Pa). 5- #ni

    > 5-; Pa). 5-; #ni

    ;% 5-? Pa). 5-? #ni

    ;1 5-> Pa). 5-> #ni

    ; 5-1 Pa). 5-1 #ni

    ;3 5-13 Pa). 5-13 #ni

    ;/ 5-1; Pa). 5-1; #ni

    ; 5-% Pa). 5-% #ni

    ;; 5J Pa). 5J #ni

    ; 5J; Pa). 5J; #ni

    ;? 5J; 8 SJ; Pa). 5J; 8 SJ; #ni

    ;> 5J Pa). 5J #ni

    % 5J? Pa). 5J? #ni

    1 5J1% Pa). 5J1% #ni

    SJ Pa). SJ #ni

  • 7/26/2019 rencana anggaran biaya paud

    11/285

    NO. SNI KODE URAIAN PEKERJAAN SA

    3 SJ; Pa). SJ; #n

    / SJ Pa). SJ #n

    SJ? Pa). SJ? #n

    ; SJ1% Pa). SJ1% #n

    SA1 Pa). SA1 #n

    ? SA1& Pa). SA1& #n

  • 7/26/2019 rencana anggaran biaya paud

    12/285

    NO. SNI KODE URAIAN PEKERJAAN SA

    > SA Pa). SA #n

    ?% SA& Pa). SA& #n

    ?1 SA3 Pa). SA3 #n

    ? SA3& Pa). SA3& #n

    ?3 SA/ Pa). SA/ #n

    ?/ SA/& Pa). SA/& #n

    ? SA Pa). SA #n

    ?; SA& Pa). SA& #n

    ? SA1 Pa). SA1 #n

    ?? SA1& Pa). SA1& #n

    ?> SA; Pa). SA; #n

    >% SA;& Pa). SA;& #n

    >1 *1 Pa). *1 #n

    > *1A Pa). *1A #n

    >3 * Pa). * #n

    >/ *3 Pa). *3 #n

    > */ Pa). */ #n

    >; * Pa). * #n

    > 551 Pa). 551 #n

    >? 551& Pa). 551& #n

    >> 5511 Pa). 5511 #n

    1%% 551A Pa). 551A #n1%1 55.1A& Pa). 55.1A& #n

    1% 55. Pa). 55. #n

    1%3 55.& Pa). 55.& #n

    1%/ 55 A Pa). 55 A #n

    1% 551 Pa). 551 #n

    1%; 55 A& Pa). 55 A& #n

    1% 55.3 Pa). 55.3 #n

    1%? 55.3& Pa). 55.3& #n

    1%> 55 Pa). 55 #n

    11% 55 & Pa). 55 & #n

    111 55 A Pa). 55 A #n

    11 55 A& Pa). 55 A& #n

    113 55 ? Pa). 55 ? #n

    11/ 55 ? A Pa). 55 ? A #n11 55 ? A& Pa). 55 ? A& #n

    11; S5 . 1 Pa). S5 . 1 #n

    11 S5. 1& Pa). S5. 1& #n

    11? S5 . 1 A Pa). S5 . 1 A #n

    11> S5 1 A & Pa). S5 1 A & #n

    1% S5 Pa). S5 #n

    11 S5 & Pa). S5 & #n

    1 S5A Pa). S5A #n

    13 S5A& Pa). S5A& #n

    1/ S53 Pa). S53 #n

    1 S53& Pa). S53& #n

    1; S5 Pa). S5 #n

    1 S5& Pa). S5& #n

    1? S5A Pa). S5A #n

    1> S5A& Pa). S5A& #n

    13% S5? Pa). S5? #n

    131 S5?A Pa). S5?A #n

    13 S5?A& Pa). S5?A& #n

    133 S5> Pa). S5> #n

    13/ S51% Pa). S51% #n

    13 S5 11 Pa). S5 11 #n

  • 7/26/2019 rencana anggaran biaya paud

    13/285

    NO. SNI KODE URAIAN PEKERJAAN SA

    13; S51 Pa). S51 #n

    13 451 Pa). 451 #n

    13? 45 Pa). 45 #n

    13> 453 Pa). 453 #n

    1/% 45/ Pa). 45/ #n

    1/1 45 Pa). 45 #n

    KEPALA 4INAS PE

    %

    %

    0

    %

    %

  • 7/26/2019 rencana anggaran biaya paud

    14/285

    Hal.

    HARGA SATUAN

    PEKERJAAN

    'R()

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!#REF!

  • 7/26/2019 rencana anggaran biaya paud

    15/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    #NA-E

    #NA-E

    #NA-E

  • 7/26/2019 rencana anggaran biaya paud

    16/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E#NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E#NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

  • 7/26/2019 rencana anggaran biaya paud

    17/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

  • 7/26/2019 rencana anggaran biaya paud

    18/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    #REF!

    #REF!

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E#NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E#NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

  • 7/26/2019 rencana anggaran biaya paud

    19/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    #NA-E

    #NA-E

    #NA-E

    #NA-E

  • 7/26/2019 rencana anggaran biaya paud

    20/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E#NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E#NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

  • 7/26/2019 rencana anggaran biaya paud

    21/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #NA-E

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!#REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!#REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #REF!

    #NA-E

    #REF!

  • 7/26/2019 rencana anggaran biaya paud

    22/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    //>$%1%.%%

    33$1;.%%

    ;$;.%%

    /%$%/.%%

    ;$;/.%%

    %$%?.%%

  • 7/26/2019 rencana anggaran biaya paud

    23/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    />$;%.%%

    1$?$/>%.%%

    ??$?3>.%%

    ;%/$/?/.%%

    /%?$>>3.%%

    ;?$/?/.%%

    /1;$;/.%%

    1$1/;$/;.%%

    $?1.%%

    1$%/%.%%

    1>$>%.%%

    3$>/%.%%

    1/$/>%.%%

    /$?/%.%%

    31$3>%.%%

    ;3$>%.%%

    3>$?/%.%%

    1$?>%.%%

    $/%.%%

    %$%/%.%%

    %$%/%.%%

    3%1$/>%.%%/$?/%.%%

    /3$%>%.%%

    /%?$//%.%%

    /1$>%.%%

    3?$>%.%%

    //3$;;1.%%

    /1$%11.%%

    /3$;;1.%%

    ;/$;%%.%%

    ;11$//.%%

    %>$%%;.%%

    1%$;.%%

    >$//>.%%

    1?$;>.%%;?$/%.%%

    ;>;$3%.%%

    #REF!

    ;;;$>.%%

    /33$>/?.%%

    ?/$//?.%%

    /31$;>.%%

    %$>%;.%%

    1$;1.%%

    ?>$3??.%%

    $/%$?.%%

    #REF!

    ;;$3;.%%

    ;$/>.%%

    3$1.%%

    %$>;1.%%

    ?3$/1.%%

    /;1$.%%

    #REF!

    33$1??.%%

    113$;.%%

    ;13$/3?.%%

    3>>$;3.%%

    ?$>3?.%%

    1/$?1;.%%

    1/$//.%%

    11;$/;.%%

    ?>$1?.%%

    1%%$>?.%%

    1/ >% %%

  • 7/26/2019 rencana anggaran biaya paud

    24/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    1>$3.%%

    1/$%.%%

    11%$/%>.%%

    113$3?.%%

    />%$3;.%%

    3>?$>.%%

  • 7/26/2019 rencana anggaran biaya paud

    25/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    ?3$>?.%%

    /3$%%.%%

    ?%$>1.%%

    /;>$/%?.%%

    1$3%1$1/.%%

    ?1>$//.%%

    ;%$>>>.%%

    /3;$>?.%%

    >$;.%%

    ;>/$/.%%

    1$%?$??1.%%

    1$%;?$;.%%

    1$%;$??%.%%

    /$>.%%

    1$?1$3.%%

    $?$%3.%%

    3$1$>.%%

    1$;;3$?3.%%

    1$1$?/.%%

    1$%3$;>.%%

    1$33$;>.%%

    1$33?$.%%1$;3$?/.%%

    1$3;%$>>>.%%

    ;3;$%>.%%

    $3%$3>.%%

    3$1$?>.%%

    $/>>$3%>.%%

    1$;$%;/.%%

    1$313$/;.%%

    1$?1$?;?.%%

    $/$>?.%%

    $?$?/.%%

    1$>>/$;3.%%

    /$/%;$?>.%%

    $>/$>.%%$;$3>/.%%

    1$1;$3.%%

    1$%%$>.%%

    1$/1/$;.%%

    1$;3$?/.%%

    1$1;$;;.%%

    ?/?$>.%%

    $/3$?/.%%

    $/$3>.%%

    1$;3;$1;.%%

    1$;3$11?.%%

    $3;$1;?.%%

    $1;$?.%%

    $3;$//.%%

    $%;?$>.%%

    3$;>$%>>.%%

    /$>%$%;.%%

    $?$%%%.%%

    1$/;$?>%.%%

    1$//$3>%.%%

    $?>$?3%.%%

  • 7/26/2019 rencana anggaran biaya paud

    26/285

    HARGA SATUAN

    PEKERJAAN

    'R()

    $?1$;.%%

    $??1$1.%%

    $1>1$/.%%

    $??>$3.%%

    ?$/1$.%%

    3$;>%$/;.%%

    JAAN U-U-

  • 7/26/2019 rencana anggaran biaya paud

    27/285

    D:;" P4K4

  • 7/26/2019 rencana anggaran biaya paud

    28/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    29/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    asher Euare 2 1/ B bh 2.00 [email protected] @00.00

    hakle "nhor !/+ bh 1.00 [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 3! s/d -0 mm2 bh 1.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 40",993

    12 CA!1 Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 1.00 [email protected] [email protected]

    pool :nsulator "nsi !3, bh 1.00 [email protected] [email protected] 'inging eondar8 bh 1.00 1A@0!0.00 1A@0!0.00

    Pole $and ingle rak - 1/2B bh 1.00 2A@!00.00 2A@!00.00

    >Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    asher Euare 2 1/ B bh 2.00 [email protected] @00.00

    >Fal 48e ;ut !/+B bh 1.00 [email protected] [email protected]

    "rmour od *or """7 -0 mm2 set 1.00 0@!00.00 0@!00.00

    7ompression 7onnetor t8pe -0/1!0 bh 2.00 [email protected] [email protected]

    hakle "nhor !/+ bh 1.00 [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 3! s/d -0 mm2 bh 1.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh 2.00 [email protected] !1@!0.00

    #pah Pemasangan #nit 1.00 2A@A+.00 2A@A+.00 67",4"4

    13 CA!1' Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 1.00 [email protected] [email protected]

    >Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00asher Euare 2 1/ B bh 2.00 [email protected] @00.00

    7ompression 7onnetor t8pe -0/1!0 bh 1.00 [email protected] [email protected]

  • 7/26/2019 rencana anggaran biaya paud

    30/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    31/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal e8e bolt !/+B C 10B bh 2.00 1@-!0.00 33@!00.00

    asher Euare 2 1/ B bh .00 [email protected] 12@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 1,146,746

    1! CA6' Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 2.00 [email protected] [email protected]

    >Fal 48e ;ut !/+B bh 1.00 [email protected] [email protected]

    hakle "nhor !/+ bh 2.00 [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 3! s/d -0 mm2 bh 2.00 [email protected] [email protected]

    >Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    asher Euare 2 1/ B bh 2.00 [email protected] @00.00

    #pah Pemasangan #nit 1.00 !@!-1.00 !@!-1.00 7!7,"17

    16 SE 12 # 7 $% Unit 1.00

    Pole $and Double ak -B atau - 1/2B bh 1.00 [email protected] [email protected]

    hree $olt 7lamp bh 2.00 [email protected] [email protected]

    Gu8 ire 22 mm2 mtr -.00 +@!0.00 !A@1!0.00

    Gu8 "ttahment / Gu8 hok bh 1.00 12@+00.00 12@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 221,040

    17 E 12 # 7 $ % Unit 1.00

    $olt Mahine !/+B C 10 B bh 1.00 1A@0!0.00 1A@0!0.00

    hree $olt 7lamp bh 2.00 [email protected] [email protected]

    asher Euare 2 1/ B bh 1.00 [email protected] [email protected]

    Gu8 ire 22 mm2 mtr -.00 +@!0.00 !A@1!0.00

    Gu8 "ttahment / Gu8 hok bh 1.00 12@+00.00 12@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 197,!90

    1" SE 12 # 9 $% Unit 1.00Pole $and Double ak -B atau - 1/2B bh 1.00 [email protected] [email protected]

    hree $olt 7lamp bh 2.00 [email protected] [email protected]

    Gu8 ire 22 mm2 mtr A.00 +@!0.00 -@0!0.00

    Gu8 "ttahment / Gu8 hok bh 1.00 12@+00.00 12@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 237,940

    19 E 12 # 9 $ % Unit 1.00

    $olt Mahine !/+B C 10 B bh 1.00 1A@0!0.00 1A@0!0.00

    hree $olt 7lamp bh 2.00 [email protected] [email protected]

    asher Euare 2 1/ B bh 1.00 [email protected] [email protected]

    Gu8 ire 22 mm2 mtr A.00 +@!0.00 -@0!0.00

    Gu8 "ttahment / Gu8 hok bh 1.00 12@+00.00 12@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 214,490

    20 SE 12 # 11 $% Unit 1.00Pole $and Double ak -B atau - 1/2B bh 1.00 [email protected] [email protected]

    hree $olt 7lamp bh 2.00 [email protected] [email protected]

    Gu8 ire 22 mm2 mtr +@!0.00 A2@A!0.00

    Gu8 "ttahment / Gu8 hok bh 1.00 12@+00.00 12@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 2!4,"40

    21 E 12 # 11 $ % Unit 1.00

    $olt Mahine !/+B C 10 B bh 1.00 1A@0!0.00 1A@0!0.00

    hree $olt 7lamp bh 2.00 [email protected] [email protected]

    asher Euare 2 1/ B bh 1.00 [email protected] [email protected]

    Gu8 ire 22 mm2 mtr +@!0.00 A2@A!0.00

    Gu8 "ttahment / Gu8 hok bh 1.00 12@+00.00 12@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 231,390

    22 SE 12 # 12 $% Unit 1.00

    Pole $and Double ak -B atau - 1/2B bh 1.00 [email protected] [email protected] $olt 7lamp bh 2.00 [email protected] [email protected]

    Gu8 ire 22 mm2 mtr +@!0.00 [email protected]

  • 7/26/2019 rencana anggaran biaya paud

    32/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    33/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    34/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    43 J6 T #CJ4% Unit 1.00

    Dead 4nd "ssembl8 (7

  • 7/26/2019 rencana anggaran biaya paud

    35/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    36/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    37/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    38/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    39/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00asher Euare 2 1/ B bh 1.00 [email protected] [email protected]

    7leFis 'inging eondar8 bh 1.00 1A@0!0.00 1A@0!0.00

    pool :nsulator "nsi !3, bh 1.00 [email protected] [email protected]

    "rmour tipe 1/B 'ide bh 1.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh 1.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 142,"16

    6" CJ6) * SJ6) Unit 1.00

    >Fal 48e ;ut !/+B bh 1.00 [email protected] [email protected]

    "rmour tipe 1/B 'ide bh 1.00 [email protected] [email protected]

    7leFis 'inging eondar8 bh 1.00 1A@0!0.00 1A@0!0.00

    pool :nsulator "nsi !3, bh 1.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh 2.00 [email protected] !1@!0.00

    #pah Pemasangan bh 1.00 1-@++.00 1-@++.00 1!4,474

    69 CJ7 Unit 1.00

    >Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    asher Euare 2 1/ B bh 1.00 [email protected] [email protected]

    7leFis 'inging eondar8 bh 1.00 1A@0!0.00 1A@0!0.00

    pool :nsulator "nsi !3, bh 1.00 [email protected] [email protected]

    ie ire / "luminium $onding ire 2 mtr 0.+0 @00.00 !@2+0.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 116,426

    70 CJ" Unit 1.00

    $olt single #pset !/+B C 10B bh 1.00 [email protected] [email protected]

    pool :nsulator "nsi !3,2 bh 1.00 3@0!0.00 3@0!0.00

    ie ire / "luminium $onding ire 2 mtr 0.+0 @00.00 !@2+0.00

    #pah Pemasangan #nit 1.00 1-@++.00 1-@++.00 "9,21"

    71 CJ10 Unit 1.00

    $olt mahine !/+B C 10B bh 1.00 1A@0!0.00 1A@0!0.00asher Euare 2 1/ B bh 1.00 [email protected] [email protected]

    pool :nsulator "nsi !3,2 bh 1.00 3@0!0.00 3@0!0.00

    $raket eondar8 / braket :nsulated bh 1.00 1+@!0.00 1+@!0.00

    ie ire / "luminium $onding ire 2 mtr 0.+0 @00.00 !@2+0.00

    #pah Pemasangan #nit 1.00 1+@+2.00 1+@+2.00 100,9"2

    72 SJ! Unit 1.00

    Pole $and ingle #p et -B atau - 1/2B bh 1.00 [email protected] [email protected]

    pool :nsulator "nsi !3,2 bh 1.00 3@0!0.00 3@0!0.00

    ie ire / "luminium $onding ire 2 mtr 0.+0 @00.00 !@2+0.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 124,907

    73 SJ6 Unit 1.00

    Pole $and ingle rak - 1/2B bh 1.00 2A@!00.00 2A@!00.00

    >Fal 48e ;ut !/+B bh 1.00 [email protected] [email protected] 'inging eondar8 bh 1.00 1A@0!0.00 1A@0!0.00

    pool :nsulator "nsi !3, bh 1.00 [email protected] [email protected]

    "rmour tipe 1/B 'ide set 1.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh 2.00 [email protected] !1@!0.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 197,232

    74 SJ7 Unit 1.00

    Pole $and ingle rak - 1/2B bh 1.00 2A@!00.00 2A@!00.00

    >Fal 48e ;ut !/+B bh 1.00 [email protected] [email protected]

    7leFis 'inging eondar8 bh 1.00 1A@0!0.00 1A@0!0.00

    pool :nsulator "nsi !3, bh 1.00 [email protected] [email protected]

    ie ire / "luminium $onding ire 2 mtr 0.+0 @00.00 !@2+0.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 14!,072

    7! SJ" Unit 1.00

    Pole $and ingle #p et -B atau - 1/2B bh 1.00 [email protected] [email protected] :nsulator "nsi !3,2 bh 1.00 3@0!0.00 3@0!0.00

    ie ire / "luminium $onding ire 2 mtr 0.+0 @00.00 !@2+0.00

  • 7/26/2019 rencana anggaran biaya paud

    40/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    41/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal 48e ;ut !/+B bh .00 [email protected] -@3+.00

    7ompression 7onnetor t8pe -0/1!0 bh 2.00 [email protected] [email protected]

    "rmour od *or """7 -0 mm2 set 2.00 0@!00.00 [email protected]

    Primar8 Dead 4nd 7lamp 3! s/d -0 mm2 bh 2.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh .00 [email protected] 103@0+0.00

    hakle "nhor !/+ bh 2.00 [email protected] [email protected]

    #pah Pemasangan unit 1.00 [email protected] [email protected] 1,301,1!4

    "4 SA4' Unit 1.00:solator arik 20 K? ( 2 ps ) bh 2.00 [email protected] [email protected]

    Pole $and ingle rak - 1/2B bh 2.00 2A@!00.00 [email protected]

  • 7/26/2019 rencana anggaran biaya paud

    42/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    43/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal 48e ;ut !/+B bh 1.00 [email protected] [email protected] Dead 4nd 7lamp 3! s/d -0 mm2 bh 1.00 [email protected] [email protected]

    hakle "nhor !/+ bh 1.00 [email protected] [email protected]

    7ompression 7onnetor t8pe -0/1!0 bh 1.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 2-+@-+.00 2-+@-+.00 694,!74

    "9 SA6 Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 2.00 [email protected] [email protected]

    pool insulator ansi !3, bh 2.00 [email protected] [email protected]

    7leFis 'inging eondar8 bh 2.00 1A@0!0.00 [email protected]

    >Fal 48e ;ut !/+B bh .00 [email protected] -@3+.00

    Primar8 Dead 4nd 7lamp 3! s/d -0 mm2 bh 2.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh .00 [email protected] 103@0+0.00

    "rmour od *or """7 -0 mm2 set 2.00 0@!00.00 [email protected]

    Pole $and ingle rak - 1/2B bh 2.00 2A@!00.00 [email protected] "nhor !/+ bh 2.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 1,20",""1

    90 SA6' Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 2.00 [email protected] [email protected]

    >Fal 48e ;ut !/+B bh 2.00 [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 3! s/d -0 mm2 bh 2.00 [email protected] [email protected]

    Pole $and ingle rak - 1/2B bh 1.00 2A@!00.00 2A@!00.00

    hakle "nhor !/+ bh 2.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 33A@!+.00 33A@!+.00 1,06",276

    91 +1 Unit 1.00

    :solator tumpu (line post) 20 K? bh 2.00 [email protected] [email protected]

    7ross "rm tell 1!00 bh 1.00 [email protected] [email protected]

    $rae steel !!0 mm bh 2.00 21@A!0.00 [email protected]

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh 2.00 @000.00 [email protected] ire / "luminium $onding ire 2 mtr @00.00 [email protected]

    asher Euare 2 1/ B bh .00 [email protected] 12@+00.00

  • 7/26/2019 rencana anggaran biaya paud

    44/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal 48e ;ut !/+B bh .00 [email protected] -@3+.00

    hakle "nhor !/+ bh .00 [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 3! s/d -0 mm2 bh .00 [email protected] [email protected]

    7ompression 7onnetor t8pe -0/1!0 bh .00 [email protected] [email protected]

    ie ire / "luminium $onding ire 2 mtr !.20 @00.00 [email protected]

    #pah Pemasangan #nit 1.00 !-@+A1.00 !-@+A1.00 3,!1!,!9!96 +! Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 2.00 [email protected] [email protected]

    7ross "rm tell 1!00 bh 2.00 [email protected] [email protected]

    $rae steel !!0 mm bh .00 21@A!0.00 +-@+00.00

    Pole $and Double ak -B atau - 1/2B bh 2.00 [email protected] [email protected]

    $olt Double "rming !/+B C 12B bh 2.00 [email protected] [email protected]

    $olt Mahine !/+B C +B bh 2.00 [email protected] 33@+00.00

    asher Euare 2 1/ B bh .00 [email protected] 12@+00.00

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh .00 @000.00 [email protected]

    >Fal 48e ;ut !/+B bh 2.00 [email protected] [email protected]

    hakle "nhor !/+ bh 2.00 [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 3! s/d -0 mm2 bh 3.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 !-@+A1.00 !-@+A1.00 1,663,7"3

    97 CC1 Unit 1.00:solator arik 20 K? ( 2 ps ) bh 3.00 [email protected] [email protected]

    pool :nsulator ansi !3,2 bh 1.00 3@0!0.00 3@0!0.00

  • 7/26/2019 rencana anggaran biaya paud

    45/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    46/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    47/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    48/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    49/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    >Fal 48e ;ut !/+B bh 3.00 [email protected] !-@2++.00

    asher Euare 2 1/ B bh [email protected] [email protected]

    "rrmour tipe 1/B 'ide set 1.00 [email protected] [email protected]

    7leFis 'inging eondar8 bh 1.00 1A@0!0.00 1A@0!0.00

    Primar8 Dead 4nd 7lamp 1!0 s/d 20 mm bh 3.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh 2.00 [email protected] !1@!0.00

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh .00 @000.00 [email protected]

    hakle "nhor !/+B bh 3.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 1,"!1,"6"

    && CC 7' Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 3.00 [email protected] [email protected]

    7ross arm steel 2.000 mm (#;P 10 ) galF bh 2.00 3!A@!00.00 [email protected]

    $rae steel !!0 mm2 bh .00 21@A!0.00 +-@+00.00

    Pole $and Double ak -B atau - 1/2B bh 1.00 [email protected] [email protected]

    $olt Double "rming !/+B C 1B bh 3.00 [email protected] [email protected]

    >Fal 48e ;ut !/+B bh 3.00 [email protected] !-@2++.00

    asher Euare 2 1/ B bh [email protected] [email protected]

    hakle "nhor !/+B set 3.00 [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 1!0 s/d 20 mm bh 3.00 [email protected] [email protected]

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh .00 @000.00 [email protected]

    >Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 2,274,97"

    && CC 7 A Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 3.00 [email protected] [email protected]

    pool insulator ansi !3 , bh 1.00 [email protected] [email protected] arm steel 1!00 mm (#;P 10 ) galFa bh 2.00 [email protected] [email protected]

    $rae steel !!0 mm2 bh .00 21@A!0.00 +-@+00.00

    Pole $and Double ak -B atau - 1/2B bh 2.00 [email protected] [email protected]

    $olt Double "rming !/+B C 1B bh 3.00 [email protected] [email protected]

    >Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    >Fal 48e ;ut !/+B bh 3.00 [email protected] !-@2++.00

    "rrmour tipe 1/B 'ide set 1.00 [email protected] [email protected]

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh .00 @000.00 [email protected]

    asher Euare 2 1/ B bh [email protected] [email protected]

    7leFis 'inging eondar8 bh 1.00 1A@0!0.00 1A@0!0.00

    hakle "nhor !/+B bh 3.00 [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 1!0 s/d 20 mm bh 3.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh 2.00 [email protected] !1@!0.00#pah Pemasangan #nit 1.00 [email protected] [email protected] 2,2!","42

    && CC 7 A' Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 3.00 [email protected] [email protected]

    7ross arm steel 1!00 mm (#;P 10 ) galFa bh 2.00 [email protected] [email protected]

    $rae steel !!0 mm2 bh .00 21@A!0.00 +-@+00.00

    Pole $and Double ak -B atau - 1/2B bh 1.00 [email protected] [email protected]

    $olt Double "rming !/+B C 1B bh 3.00 [email protected] [email protected]

    >Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    >Fal 48e ;ut !/+B bh 2.00 [email protected] [email protected]

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh .00 @000.00 [email protected]

    asher Euare 2 1/ B bh [email protected] [email protected]

    hakle "nhor !/+B bh 3.00 [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 1!0 s/d 20 mm bh 3.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 !!@A!.00 !!@A!.00 1,994,637

  • 7/26/2019 rencana anggaran biaya paud

    50/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh .00 @000.00 [email protected]

    7enter $raket 12@! K; bh 1.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh .00 [email protected] 103@0+0.00

    7leFis 'inging eondar8 bh 2.00 1A@0!0.00 [email protected]

    7ompression 7onnetor t8pe 1!0/20 bh .00 3@2+0.00 [email protected]

    7ross arm steel 1!00 mm (#;P 10 ) galFa bh 2.00 [email protected] [email protected]

    >Fal 48e ;ut !/+B bh -.00 [email protected] [email protected]

    Pole $and Double ak -B atau - 1/2B bh 2.00 [email protected] [email protected]

    hakle "nhor !/+B bh .00 [email protected] [email protected]

    pool insulator ansi !3 , bh 2.00 [email protected] [email protected]

    asher Euare 2 1/ B bh [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 1!0 s/d 20 mm bh .00 [email protected] !!@+00.00

    #pah Pemasangan #nit 1.00 !!@A!.00 !!@A!.00 4,406,"97

    && CC " A Unit 1.00

    :solator tumpu (pin post) 20 K? bh 3.00 [email protected] @+00.00

    :solator arik 20 K? ( 2 ps ) bh .00 [email protected]

    ie ire / "luminium $onding ire 2 mtr -.+0 @00.00 !1@+0.00

    $rae steel --0 mm2 bh +.00 [email protected] [email protected]

    "rrmour tipe 1/B 'ide set 1.00 [email protected] [email protected]

    $olt Double "rming !/+B C 1B bh !.00 [email protected] [email protected]

    >Fal e8e bolt !/+B C 10B bh 1.00 1@-!0.00 1@-!0.00

    $olt Mahine !/+B C +B bh 2.00 [email protected] 33@+00.00

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh +.00 @000.00 [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh .00 [email protected] 103@0+0.00

    7leFis 'inging eondar8 bh 2.00 1A@0!0.00 [email protected] 7onnetor t8pe 1!0/20 bh .00 3@2+0.00 [email protected]

    7ross arm steel 1!00 mm (#;P 10 ) galFa bh .00 [email protected]

    >Fal 48e ;ut !/+B bh -.00 [email protected] [email protected]

    Pole $and Double ak -B atau - 1/2B bh .00 [email protected] [email protected]

    hakle "nhor !/+B bh .00 [email protected] [email protected]

    pool insulator ansi !3 , bh 2.00 [email protected] [email protected]

    asher Euare 2 1/ B bh [email protected] [email protected]

    Primar8 Dead 4nd 7lamp 1!0 s/d 20 mm bh .00 [email protected] !!@+00.00

    #pah Pemasangan #nit 1.00 !!@A!.00 !!@A!.00 !,294,797

    && CC " A' Unit 1.00

    :solator tumpu 20 K? bh 3.00 [email protected] @+00.00

    :solator arik 20 K? ( 2 ps ) bh .00 [email protected]

    7ross arm steel 2000 mm (#;P 10 ) galFa bh .00 3!A@!00.00 $rae steel --0 mm2 bh +.00 [email protected] [email protected]

    $olt Double "rming !/+B C 1B bh .00 [email protected] 11@+00.00

    >Fal e8e bolt !/+B C +B bh 1.00 1@-!0.00 1@-!0.00

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh +.00 @000.00 [email protected]

    Pole $and Double ak -B atau - 1/2B bh .00 [email protected] 1+2@+00.00

    >Fal 48e ;ut !/+B bh !.00 [email protected] A!@+0.00

    asher Euare 2 1/ B bh [email protected] [email protected]

    hakle "nhor !/+B bh .00 [email protected] [email protected]

    ie ire / "luminium $onding ire 2 mtr -.+0 @00.00 !1@+0.00

    7ompression 7onnetor t8pe 1!0/20 bh .00 3@2+0.00 [email protected]

    Primar8 Dead 4nd 7lamp 1!0 s/d 20 mm bh .00 [email protected] !!@+00.00

    $olt Mahine !/+B C +B bh 2.00 [email protected] 33@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] !,26!,394

    && SC . 1 Unit 1.00:solator tumpu (line post) 20 K? bh 3.00 [email protected] @+00.00

    pool :nsulator "nsi !3 , 2 bh 1.00 3@0!0.00 3@0!0.00

  • 7/26/2019 rencana anggaran biaya paud

    51/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    52/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    53/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    54/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal e8e bolt !/+B C +B bh 3.00 1@-!0.00 !0@2!0.00

    Pole band single rak +B C + 1/2B bh .00 [email protected] [email protected]

    hakle "nhor !/+ bh 3.00 [email protected] [email protected]

    "rrmour rod *or """7 1!0 mm2 set 1.00 +0@+00.00 +0@+00.00

    #pah Pemasangan #nit 1.00 +3@1+.00 +3@1+.00 1,673,11"

    && SC7 Unit 1.00:solator arik 20 K? ( 2 ps ) bh 3.00 [email protected] [email protected]

    hakle "nhor !/+ bh 3.00 [email protected] [email protected]

    pool insulator ansi !3, bh 1.00 [email protected] [email protected]

    7ross arm steel 1!00 mm (#;P 10 ) galFa bh 2.00 [email protected] [email protected]

    $rae steel !!0 mm2 bh .00 21@A!0.00 +-@+00.00

    Pole $and ingle rak -B atau - 1/2B bh 1.00 2A@!00.00 2A@!00.00

    Pole $and Double ak -B atau - 1/2B bh 2.00 [email protected] [email protected]

    $olt mahine !/+B C 10B bh 2.00 1A@0!0.00 [email protected]

    $olt Double "rming !/+B C 1B bh 3.00 [email protected] [email protected]

    >Fal e8e bolt !/+B C +B bh 1.00 1@-!0.00 1@-!0.00

    >Fal 48e ;ut !/+B bh 3.00 [email protected] !-@2++.00

    asher Euare 2 1/ B bh [email protected] [email protected]

    "rmour tape 1/B 'ide set 1.00 [email protected] [email protected] 'inging eondar8 bh 1.00 1A@0!0.00 1A@0!0.00

    Primar8 dead end lamp(1!0 s/d 20)mm bh 3.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh 2.00 [email protected] !1@!0.00

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh .00 @000.00 [email protected]

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 2,326,16"

    && SC7' Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh 3.00 [email protected] [email protected]

    7ross arm steel 1!00 mm (#;P 10 ) galFa bh 2.00 [email protected] [email protected]

    $rae steel !!0 mm2 bh .00 21@A!0.00 +-@+00.00

    Pole $and Double ak -B atau - 1/2B bh 2.00 [email protected] [email protected]

    $olt mahine !/+B C 10B bh 2.00 1A@0!0.00 [email protected]

    $olt Double "rming !/+B C 1B bh 3.00 [email protected] [email protected]

    >Fal 48e ;ut !/+B bh 3.00 [email protected] !-@2++.00

    asher Euare 2 1/ B bh [email protected] [email protected] "nhor !/+ bh 3.00 [email protected] [email protected]

    Primar8 dead end lamp(1!0 s/d 20)mm bh 3.00 [email protected] [email protected]

  • 7/26/2019 rencana anggaran biaya paud

    55/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal e8e bolt !/+B C +B bh 1.00 1@-!0.00 1@-!0.00

    >Fal 48e ;ut !/+B bh 2.00 [email protected] [email protected]

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh .00 @000.00 [email protected]

    asher Euare 2 1/ B bh .00 [email protected] 12@+00.00

    hakle "nhor !/+ bh 3.00 [email protected] [email protected]

    Primar8 dead end lamp (1!0 s/d 20)m bh 3.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 2,06",2!9

    && SC" Unit 1.00:solator tumpu (line post) 20 K? bh 1.00 [email protected] [email protected]

    :solator tumpu (pin post) 20 K? bh 2.00 [email protected] [email protected]

    :solator arik 20 K? ( 2 ps ) bh 2.00 [email protected] [email protected]

    ie ire / "luminium $onding ire 2 mtr -.+0 @00.00 !1@+0.00

    $rae steel --0 mm2 bh .00 [email protected] [email protected]

    "rmour tape 1/B 'ide set 2.00 [email protected] 11@+00.00

    Pole $and Double ak -B atau - 1/2B bh 3.00 [email protected] [email protected]

    $olt mahine !/+B C 10B bh 2.00 1A@0!0.00 [email protected]

    $olt Double "rming !/+B C 1B bh !.00 [email protected] [email protected]

    >Fal e8e bolt !/+B C +B bh 1.00 1@-!0.00 1@-!0.00

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh +.00 @000.00 [email protected]

    7enter $raket 12@! K; bh 1.00 [email protected] [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh .00 [email protected] 103@0+0.007leFis 'inging eondar8 bh 2.00 1A@0!0.00 [email protected]

    7ompression 7onnetor t8pe 1!0/20 bh .00 [email protected] [email protected]

    7ross arm steel 2.000 mm (#;P 10 ) galF bh 2.00 3!A@!00.00 [email protected]

    >Fal 48e ;ut !/+B bh -.00 [email protected] [email protected]

    hakle "nhor !/+ bh .00 [email protected] [email protected]

    pool insulator ansi !3, bh 2.00 [email protected] [email protected]

    asher Euare 2 1/ B bh [email protected] [email protected]

    Primar8 dead end lamp (1!0 s/d 20) m bh .00 [email protected] !!@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 3,769,099

  • 7/26/2019 rencana anggaran biaya paud

    56/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal e8e bolt !/+B C +B bh 1.00 1@-!0.00 1@-!0.00

    $olt mahine !/+B C 10B bh 2.00 1A@0!0.00 [email protected]

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh +.00 @000.00 [email protected]

    &oop Dead 4nd 7lamp/&7 3! s/d 20 mm2 bh .00 [email protected] 103@0+0.00

    7leFis 'inging eondar8 bh 2.00 1A@0!0.00 [email protected]

    7ompression 7onnetor t8pe 1!0/20 bh .00 [email protected] [email protected]

    7ross arm steel 2.000 mm (#;P 10 ) galF bh 2.00 3!A@!00.00 [email protected]

    >Fal 48e ;ut !/+B bh -.00 [email protected] [email protected]

    Pole $and Double ak -B atau - 1/2B bh .00 [email protected] 1+2@+00.00

    Pole band single rak +B C + 1/2B bh 2.00 [email protected] 1@+00.00

    hakle "nhor !/+ bh .00 [email protected] [email protected]

    pool insulator ansi !3, bh 2.00 [email protected] [email protected]

    asher Euare 2 1/ B bh [email protected] [email protected]

    Primar8 dead end lamp (1!0 s/d 20) m bh .00 [email protected] !!@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 4,907,206

    && SC"A' Unit 1.00

    :solator tumpu (pin post) 20 K? bh 3.00 [email protected] @+00.00

    :solator arik 20 K? ( 2 ps ) bh .00 [email protected]

    7ross arm steel 2.000 mm (#;P 10 ) galF bh .00 3!A@!00.00

    $rae steel --0 mm2 bh +.00 [email protected] [email protected]

    $olt mahine !/+B C 10B bh 2.00 1A@0!0.00 [email protected]

    $olt Double "rming !/+B C 1B bh .00 [email protected] 11@+00.00

    >Fal e8e bolt !/+B C +B bh 1.00 1@-!0.00 1@-!0.00

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh +.00 @000.00 [email protected]

    Pole $and Double ak -B atau - 1/2B bh .00 [email protected] 1+2@+00.00

    >Fal 48e ;ut !/+B bh !.00 [email protected] A!@+0.00

    asher Euare 2 1/ B bh [email protected] [email protected] "nhor !/+ bh .00 [email protected] [email protected]

    ie ire / "luminium $onding ire 2 mtr -.+0 @00.00 !1@+0.00

    7ompression 7onnetor t8pe 1!0/20 bh .00 [email protected] [email protected]

    Primar8 dead end lamp (1!0 s/d 20) m bh .00 [email protected] !!@+00.00

    #pah Pemasangan #nit 1.00 [email protected] [email protected] !,2"2,000

    && SC9

    :solator tumpu (line post) 20 K? bh 1.00 [email protected] [email protected]

    :solator tumpu (pin post) 20 K? bh 2.00 [email protected] [email protected]

    7enter $raket 12@! K; bh 1.00 [email protected] [email protected]

    $olt mahine !/+B C 10B bh 3.00 1A@0!0.00 !-@1!0.00

    asher Euare 2 1/ B bh 3.00 [email protected] [email protected]

    7ross arm steel 1.!00 mm (#;P 10 ) galF bh 1.00 [email protected] [email protected]

    teel & -0C-0C-C1.+2 mm GalFanis bh 1.00 [email protected] [email protected]$olt Mahine / bolt 7arriage 1/2B C 3/B bh 1.00 @000.00 @000.00

    Pole band single rak +B C + 1/2B bh 1.00 [email protected] [email protected]

    Pole $and ingle #p set -B atau - 1/2B bh 1.00 [email protected] [email protected]

    pool insulator ansi !3,2 bh 1.00 3@0!0.00 3@0!0.00

    #pah Pemasangan bh 1.00 [email protected] [email protected] 1,476,"90

    && SC10 Unit 1.00

    :solator tumpu (pin post) 20 K? bh 3.00 [email protected] @+00.00

    $olt mahine !/+B C 10B bh 1.00 1A@0!0.00 1A@0!0.00

    asher Euare 2 1/ B bh 1.00 [email protected] [email protected]

    7ross arm steel 2.000 mm (#;P 10 ) galF bh 1.00 3!A@!00.00 3!A@!00.00

    teel & -0C-0C-C1.+2 mm GalFanis bh 1.00 [email protected] [email protected]

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh 1.00 @000.00 @000.00

    Pole band single rak +B C + 1/2B bh 1.00 [email protected] [email protected]

    Pole $and ingle #p set -B atau - 1/2B bh 1.00 [email protected] [email protected] insulator ansi !3,2 bh 1.00 3@0!0.00 3@0!0.00

    #pah Pemasangan bh 1.00 [email protected] [email protected] 1,442,390

  • 7/26/2019 rencana anggaran biaya paud

    57/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    58/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

  • 7/26/2019 rencana anggaran biaya paud

    59/285

    ;o #raian pekerjaan atuanarga atuan

    p p p

    ?olum

    e

    Fal 48e ;ut !/+B bh [email protected] [email protected]

    >Fal e8e bolt !/+B C +B bh 1@-!0.00 [email protected]

    Primar8 dead end lamp (1!0 s/d 20) m bh [email protected]

    hakle "nhor !/+ bh [email protected] [email protected]

    ie ire / "luminium $onding ire 2 mtr @00.00 [email protected]

    asher Euare 2 1/ B bh 1.00 [email protected] [email protected]

    pool insulator ansi !3, bh 1.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 [email protected] [email protected] ",241,77!

    && DC! Unit 1.00

    :solator arik 20 K? ( 2 ps ) bh .00 [email protected]

    $olt Mahine / bolt 7arriage 1/2B C 3/B bh .00 @000.00 [email protected]

    $olt double arming !/+B C (1B s/d 2B) bh -.00 [email protected] [email protected]

    $rae steel --0 mm2 bh .00 [email protected] [email protected]

    Pole $and Double ak +B atau + 1/2B bh 2.00 !1@!!0.00 [email protected]

    Primar8 dead end lamp (1!0 s/d 20) m bh .00 [email protected] !!@+00.00

    >Fal 48e ;ut !/+B bh -.00 [email protected] [email protected]

    7ross arm steel 3.000 mm (#;P 10 ) galF bh 2.00 [email protected]

    "rmour tape 1/B 'ide bh 1.00 [email protected] [email protected]

    #pah Pemasangan #nit 1.00 [email protected] [email protected] 3,690,462

    K4P"&" D:;" P4K4

  • 7/26/2019 rencana anggaran biaya paud

    60/285

    Daftar Harga Satuan Peralatan Page 60 of 285

    DINAS PEKERJAAN U$U$

    K-(t/n T/

    DAFTAR SATUAN PERALATAN

    K/itn PE$+ANGUNAN PAUD PER$ATA +UNDA PAL$ ASRI 1

    P//5n PE$+ANGUNAN PAUD PER$ATA +UNDA PAL$ ASRI 1

    Li PERU$A8AN PAL$ ASRI 1

    TA 2016

    +IAA

    N. URAIAN K: 8P KAP. SE;A

    DE ALAT*JA$

    #I4 100,1!0 P 40 , , -+@-++.-

    ! 7>MP4> 000,!00 &JM 40! 0.0 [email protected] 7PM/(&/m) [email protected]

    7>;744 M:H4 0.3,0. M3 40 20.0 !00.0 &iter [email protected]

    - 7";4 10,1! >; 40- 1!.0 on 3@AA.!

    + D#MP #7K 3.! >; 40+ 3.! on 311@-!-.

    A D#MP #7K 10 >; 40A 10.0 on 0@2A.!2

    10 4H7"?"> +0,10 P 410 0.A M3 !A2@1!!.-!

    11 5&" $4D #7K 3, M3 411 10.0 ton 21@11.+

    12 G4;4"> 4 412 13!.0 K?" 3@+!0.-

    13 M>> G"D4 100 P 413 10@+00.0 , [email protected]

    1 "7K &>"D4 -!,100 P 41 -0.0 0.+ M3 2A!@113.

    1! 44& &>"D4 1.0,1. M3 41! A.0 1.! M3 11@-!.!A

    1 44 44& >&&4 ,+ 41 !!.0 +.0 on 22!@21-.+-

    1- ";D4M >&&4 ,+ . 41- +2.0 +.1 on 32@A++.2-

    1+ :4 >&&4 +,10 . 41+ A.0 on [email protected]

    1A ?:$"> >&&4 !,+ . 41A +2.0 -.1 on [email protected]

    20 7>;744 ?:$"> 420 !.! 2!.0 , 3+@12+.0

    21 >;4 7#4 421 0.0 /&&4 42 +.+ +3!.00 on --@A++.0

    2! "MP4 42! .- 121.00 on 3+@0!1.2-

    2 ;744 P#MP 42+ +.00 M3 !03@!.22

    2A ":&4 20 >; 42A 20.00 on !0@3!+.!+

    30 P:&4 D:?4 L "MM4 430 2!.0 2.!0 on 1-@A0!.AA

    31 7";4 >; "7K 3! >; 431 3!.0 on [email protected]

    32 4&D:;G 4 432 0.0 2!0.0 "mp A0@-1.++

    33 $>4 P:&4 M"7:;4 433 [email protected] Meter 1@[email protected]

    3 "P"& &:#:D M:H4 43 !.0 [email protected] &iter [email protected]

    3! >;>; 43! 1!.0 on A@2!+.31

    3 7>&D M:&&:;G 43 [email protected] m A!0@13.+

    3- >7K D:&& $4"K4 43- 3.0 , , [email protected]

    3+ 7>&D 477&4 43+ [email protected] M 1@[email protected]

    3A > 477&4 43A 3.0 M -0-@A-.+2

  • 7/26/2019 rencana anggaran biaya paud

    61/285

    Daftar Harga Satuan Peralatan Page 61 of 285

    +IAA

    N. URAIAN K: 8P KAP. SE;A

    DE ALAT*JA$

    #;744 P"; M:H4 43 00.0 &iter 3-@+21.A2 7>;744 $4"K4 4 20.0 m3/jam [email protected]!

    ! "P"& ";K4 4! @000.0 liter 3A@!3.A

    74M4; ";K4 4 @000.0 liter 33+@1.+

    - 7>;D44 M:H4 (3!0) 4- 20.0 3!0.0 liter [email protected]+

    + ?:$":;G "MM4 4+ .2 +0.0 KG [email protected]+

    A #K M:H4 ("G:">) 4A !.0 M3 1@A12.!A

    !0 $>4 P:&4 M"7:;4 4!0 0.0 7M 2--@3!3.!0

    !1 7";4 >; "7K -!,100 >; 4!1 -!.0 on 3!!@12.+

    !2 $&4;D:;G 4#:PM4; 4!2 !0.0 30.0 on 201@!A+.3!

    !3 "P"& &:#:D M:H4 43a 0.0 [email protected] &iter A0@+20.-

    ! $" $4;D4 4!3 3.0 0.0 0 1-@0!.0

    !! $" 7#4 4! 3.0 0.0 0 1-@0!.0! $4"K4 4!! +0.0 3.0 m3/jam [email protected]

    !- G>#:;G P#MP 4! 1!.0 on [email protected]

    !+

  • 7/26/2019 rencana anggaran biaya paud

    62/285

    ";"&:" "G" "#"; K > D 4

    PR:PELERING PENETRASI $AKADA$K. 637

    ( M4;GG#;"K"; $## )

    PR:PINSI K:DE KA+UPATEN K:DE DISIAPKAN :LE8 PERI:DE

  • 7/26/2019 rencana anggaran biaya paud

    63/285

    PERALATAN 3,4!3,"0!.7"

    T:TAL #R.% &&&

    :?/>/< @ P?it 1! &&&

    JU$LA8 &&&

    =:LU$E*BUANTIT 70 3 8 St(n R &&& / 3

  • 7/26/2019 rencana anggaran biaya paud

    64/285

    ";"&:" "G" "#"; K > D 4

    LAPIS PENETRASI $AKADA$ ! C$ # LAPEN %K. 61"

    ( M4;GG#;"K"; $## )

    PR:PINSI K:DE KA+UPATEN K:DE DISIAPKAN :LE8 PERI:DE

  • 7/26/2019 rencana anggaran biaya paud

    65/285

    PERALATAN 3,4!3,"0!.7"

    T:TAL #R.% &&&

    :?/>/< @ P?it 1! &&&

    JU$LA8 &&&

    =:LU$E*BUANTIT 1400 2 8 St(n R "2,47".91 / 2

  • 7/26/2019 rencana anggaran biaya paud

    66/285

    ";"&:" "G" "#"; K > D 4

    LA+URAN ASPAL SATU LAPIS # +URTU % K. 61!( M4;GG#;"K"; $## )

    PR:PINSI K:DE KA+UPATEN K:DE DISIAPKAN :LE8 PERI:DE

  • 7/26/2019 rencana anggaran biaya paud

    67/285

    JU$LA8 &&&

    =:LU$E*BUANTIT 1"00 $2 8 St(n 3",222."4 / $2

  • 7/26/2019 rencana anggaran biaya paud

    68/285

    ";"&:" "G" "#"; K > D 4

    LA+URAN ASPAL DUA LAPIS # +URDA % K. 617( M4;GG#;"K"; $## )

    PR:PINSI K:DE KA+UPATEN K:DE DISIAPKAN :LE8 PERI:DE

    perator terlatih 2 &0 + [email protected] [email protected]

    K upir 2 &0 + ,, ,,

    E $uruh tak terlatih 1! &101 0 [email protected] 2@[email protected]

    R $uruh terlatih 2 &10 + [email protected] [email protected]

    J $uruh semi terlatih 2 &103 + [email protected] [email protected]

    A

    -((> 4,"40,000.00

    $ A T E R I A L ********* ATUA K:DE T:TAL 8ARGA + I A A SU+ T:TAL

    ********* =:L #R.*(nit% #R.% #R.%

    $ $atu peah tersaring ////////// m3 , !.00 22@++.A 22@[email protected]

    A "spal ////////// kg M10a [email protected] !+@[email protected]

    T Ka8u $akar ////////// m3 M10b 1.00 [email protected] 1@[email protected]

    E "lat bantu ////////// set M1-0 2.!0 [email protected] 112@!00.00R

    I

    A

    L

    $ATERIAL &&&

    P E R A L A T A N U$LA 8ARI K:DE JA$ + I A A + I A A SU+ T:TAL

    KERJA KERJA #R. * 5 % #R.% #R.%

    P Peralatan traktor dll 1 3 401 1! ,, ,,

    E oller heeed +,10 !1 P 1 3 40+0 1! 230@2!3.-2 3@!3@+0!.-+

    R "spal pa8er o'ed 3!0 & - P 1 3 41!3 1! ,, ,,

    A Dump truk 3@!0 one 1 3 4211 1! ,, ,,L heel raktor 0 P 1 3 40!3 1! ,, ,,

    A 7hipspreader 2 3 4130 30 ,, ,,

    T

    A

    N PERALATAN 3,4!3,"0!.7"

    T:TAL #R.% &&&

    :?/>/< @ P?it 1! &&&

    JU$LA8 &&&

  • 7/26/2019 rencana anggaran biaya paud

    69/285

    =:LU$E*BUANTIT 1"00 $2 8 St(n !",432.63 / $2

  • 7/26/2019 rencana anggaran biaya paud

    70/285

    ";"&:" "G" "#"; K > D 4

    K:NSTRUKSI LAPIS P:NDASI ATAS # LP+ % TELF:RD K. !16( M4;GG#;"K"; $## )

    PR:PINSI K:DE KA+UPATEN K:DE DISIAPKAN :LE8 PERI:DE

    JA;A TENGA8 #33% TEGAL #2"% +INA PR:GRA$ JANUARI 2016

    URAIAN : ANGGAPAN/ASUMSI :

    1. Matrial "isiapkan "ilokasi #uru!an 1. Menggunakan tenaga manusia '00 m2 per/!ari

    2. Meng!ampar pasir sete#al 5 cm 2. Matrial -matrial "ikirim ke tempat #uru!an ole! le$elansir

    3. atu peca! #erukuran 15 - 20 cm 3. atu su"a! "ipeca!

    '. atu peca! ang le#i! kecil mengisi rongga " '. %ana! "asar su"a! "isiapkan

    se!ingga rata kemu"ian "ipa"atkan/"igilas " 5. ipa"atkan sampai te#al 20 cm

    mesin gilas

    P E K E R J A =:L 8 A R I K:DE :TAL =: U P A 8 + I A A SU+ T:TAL

    (org.hari)p./hari/orang (p.) (p.)

    P Mandor 3 1 &03 3 [email protected] [email protected]

    E >perator terlatih 1 1 &0 1 [email protected] [email protected]

    K $uruh tak terlatih AA 1 &101 AA [email protected] @[email protected]

    E

    R

    J

    A

    -((> 4,79!,000.00

    $ A T E R I A L ********* ATUA K:DE T:TAL 8ARGA + I A A SU+ T:TAL

    ********* =:L #R.*(nit% #R.% #R.%

    $ $atu belah uk. 1! , 20 m ////////// m3 M0 !0.00 [email protected] 11@[email protected]

    A $atu peah tangan uk. ! , - m ////////// m3 , 20.00 [email protected] @[email protected]

    T Pasir urug ////////// m3 M 30.00 13@+00.00 @[email protected]

    E "lat bantu ////////// set , .00 [email protected] [email protected]

    I

    A

    L

    $ATERIAL &&&

    P E R A L A T A N U$LA 8ARI K:DE JA$ + I A A + I A A SU+ T:TAL

    KERJA KERJA #R. * 5 % #R.% #R.%

    P oller 3 heled +,10 !1 P 1 1 41 ! 230@2!3.-2 1@1!1@2+.!A

    E

    R

    AL

    A

    T

    A

    N PERALATAN 1,1!1,26".!9

    T:TAL #R.% &&&

    :?/>/< @ P?it 1! &&&

    JU$LA8 &&&

  • 7/26/2019 rencana anggaran biaya paud

    71/285

    =:LU$E*BUANTIT "0 $3 8 St(n 3"1,0"!.11 3

  • 7/26/2019 rencana anggaran biaya paud

    72/285

    ";"&:" "G" "#"; K > D 4

    E$+UAT CA$PURAN, $ENG8A$PAR DAN PE$ADATAN LATASIR 2 C K. 621-( M4;GG#;"K"; $## )

    PR:PINSI K:DE KA+UPATEN K:DE DISIAPKAN :LE8 TANGGAL

    1,"9!,000.00

    $ A T E R I A L ********* ATUA K:DE T:TAL 8ARGA + I A A SU+ T:TAL

    ********* =:L #R.*(nit% #R.% #R.%

    $ "spal untuk ampuran ////////// kg M10a [email protected] 13@1A2@++.00

    A $atu peah mesin 0.! ////////// m3 , .+ [email protected] 1@A11@-23.!!

    T "bu batu (Nller) ////////// m3 , 1.!- [email protected] [email protected]

    E "spal untuk prime oat ////////// kg M10a 100.!- [email protected] A-@+3.0

    R Ka8u bakar ////////// m3 M10b 1.00 [email protected] 1@[email protected]

    I "lat bantu ////////// set , 1.00 [email protected] [email protected]

    L

    $ATERIAL &&&

    P E R A L A T A N U$LA 8ARI K:DE JA$ + I A A + I A A SU+ T:TAL

    KERJA KERJA #R. * 5 % #R.% #R.%

    P oller 3 heled +,10 !1 P 1 1 41 ! 230@2!3.-2 1@1!1@2+.!A

    E "spal pra8er o'ed 3!0 & - P 1 1 , ! ,, ,,

    R

    A

    L

    AT

    A

    N PERALATAN 1,1!1,26".!9

    T:TAL #R.% &&&

    :?/>/< @ P?it 1! &&&

    JU$LA8 &&&

    =:LU$E*BUANTIT 400 $2 8 St(n 60,"07.94 / $2

  • 7/26/2019 rencana anggaran biaya paud

    73/285

  • 7/26/2019 rencana anggaran biaya paud

    74/285

    ";"&:" "G" "#"; K > D 4

    PENGUPASAN TANA8 DAN PE$+ERSI8AN SE$AK PADA DA$IJA K. 210( M4;GG#;"K"; $## )

    PR:PINSI K:DE KA+UPATEN K:DE DISIAPKAN :LE8 TANGGAL

    i .*>i*n #R.% #R.%

    P Mandor 1 1 &03 1 [email protected] [email protected]

    E $uruh tak terlatih 3 1 &101 3 [email protected] 1@[email protected]

    K

    E

    R

    J

    A

    -((> 1,70!,000.00

    $ A T E R I A L ********* ATUA K:DE T:TAL 8ARGA + I A A SU+ T:TAL

    ////////// ?>& (p./unit) (p.) (p.)

    $ "lat bantu ////////// set , 1.!0 [email protected] -@!00.00

    A

    T

    ER

    I

    A

    L

    $ATERIAL 67,!00.00

    P E R A L A T A N U$LA 8ARI K:DE JA$ + I A A + I A A SU+ T:TAL

    KERJA KERJA #R. * 5 % #R.% #R.%

    P

    E

    R

    AL

    A

    T

    A

    N PERALATAN 0.00

    T:TAL #R.% 1,772,!00.00

    :?/>/< @ P?it 1! 26!,"7!.00

    JU$LA8 &&&

  • 7/26/2019 rencana anggaran biaya paud

    75/285

    =:LU$E*BUANTIT 900 2 8 St(n 2,264."6 2

  • 7/26/2019 rencana anggaran biaya paud

    76/285

    ";"&:" "G" "#"; K > D 4

    PELAPISAN PRI$E C:AT K. T04( M4;GG#;"K"; $## )

    PR:PINSI K:DE KA+UPATEN K:DE DISIAPKAN :LE8 TANGGAL

  • 7/26/2019 rencana anggaran biaya paud

    77/285

    =:LU$E*BUANTIT "00 2 8 St(n 12,!49.3" 2

    la'i@ 1!

  • 7/26/2019 rencana anggaran biaya paud

    78/285

    Daftar Harga Satuan Upah Tenaga (age &8 of 285

    DINAS PEKERJAAN U$U$

    K-(t/n T/

    DAFTAR 8ARGA SATUAN UPA8 TENAGA

    K/itn PE$+ANGUNAN PAUD PER$ATA +UNDA PAL$ ASRI 1

    P//5n PE$+ANGUNAN PAUD PER$ATA +UNDA PAL$ ASRI 1

    Li PERU$A8AN PAL$ ASRI 1

    TA 2016

    N: U R A I A N SATUAN 8ARGA # R %

    1 Pekerja > [email protected]

    2 ukang gali > [email protected]

    3 Mandor > [email protected]

    ukang at/ plitur / batu > [email protected]

    ! Kepala tukang at/ plitur / batu > [email protected]

    ukang ka8u > [email protected]

    - Kepala tukang ka8u > [email protected]

    + ukang $esi / ledeng > [email protected]

    A Kepala ukang besi / ledeng > [email protected]

    10 ukang $esi ProNl > [email protected]

    11 Kepala ukang besi ProNl > [email protected]

    12 Mekanik > [email protected]

    13 Mekanik Pembantu > [email protected]

    1 >perator terlatih/ masinis > [email protected]

    1! >perator kurang terlatih > [email protected]

    1 Pembantu operator/ pemb. masinis > [email protected]

    1- opir truk > [email protected]

    1+ opir personil > [email protected]

    1A Pembantu sopir > [email protected]

    20 $uruh lapangan tak terlatih > [email protected]

    21 $uruh lapangan semi terlatih > [email protected]

    22 $uruh lapangan terlatih > [email protected]

    23 ukang masak aspal > [email protected]

    2 Penjaga malam > [email protected]

    la'i@ 1!

  • 7/26/2019 rencana anggaran biaya paud

    79/285

    Daftar Harga Bahan(age & of 285

    DINAS PEKERJAAN U$U$

    K-(t/n T/

    DAFTAR 8ARGA +A8AN

    K/itn PE$+ANGUNAN PAUD PER$ATA +UNDA PAL$ ASRI 1

    P//5n PE$+ANGUNAN PAUD PER$ATA +UNDA PAL$ ASRI 1

    Li PERU$A8AN PAL$ ASRI 1TA 2016

    N: U R A I A N SAT.

    +A8AN DASAR

    1 "bu $atu [email protected]

    2 "bu $atu kg 13.A

    2 $atu $ata 3 C 11 C 22 (20) $h [email protected]

    3 $ata ebel (10C20C0) $h [email protected]

    $atako $erlubang ollo' $lok $,20 $h [email protected]

    ! $atako $erlubang ollo' $lok $,1! $h 1@+00.00

    $atako $erlubang ollo' $lok $,10 $h [email protected]

    - $atu kali peah [email protected]

    + $atu $lonos [email protected]

    A $atu peah dg mesin (0@!,O1 m) (reening) [email protected]

    10 $atu peah dg mesin (1,2m) 2@3!1.2-

    11 $atu peah dg mesin (2,3 m) 21@+A0.-

    12 $atu peah dg mesin (3,! m) 22-@1++.!

    13 $atu peah dg tangan (!,- m) [email protected]

    1 $atu peah dg mesin (2/3 m) per kg Kg 200.00

    1! atu/erikil (eca! %ersaring M3 '22,88'.'

    1 5iller Kg [email protected]

    1- Kerikil ungai M3 211@+00.00

    1+ Pasir 1+@+00.00

    1A Pasir (arga pasir per kg) Kg 130.00

    20 Pasir #rug 13@+00.00

    21 Pasir $eton M3 [email protected]

    22 P7 emen "bu , abu ( !0 Kg ) Kg [email protected]

    23 P7 emen arna ( 0 Kg ) Kg [email protected]

    2 Mortar Perekat ebel (0 kg) setara M#,3+0 ak [email protected]

    2! Sirtu 150,&00.00

    2 anah #rug pilihan [email protected]

    2- emen Grouting M# kg 3@!0.00

    PENUTUP ATAP

    1 "sbes Gelombang (3@00C1@0!)C mm (gelombang keil) &br [email protected]

    2 "sbes Gelombang (2@-0C1@0!)C mm (gelombang keil) &br [email protected]

    3 "sbes Gelombang (2@0C1@0!)C mm (gelombang keil) &br 0@2!0.00

    "sbes Gelombang (2@10C1@0!)C mm (gelombang keil) &br [email protected]

    ! "sbes Gelombang (1@!0C1@0!)C mm (gelombang keil) &br 1@!0.00

    "sbes Gelombang (2@!0C0@A2)C! mm &br [email protected]

    - "sbes Gelombang (2@2!C0@A2)C! mm &br [email protected]

    + "sbes Gelombang (2@00C0@A2)C! mm &br -1@+-!.00

    A "sbes Gelombang (1@+0C0@A2)C! mm &br [email protected]

    10 "sbes Gelombang (2@0C1@0+)C mm (gelombang keil) &br [email protected]

    11 "sbes Gelombang (2@10C1@0+)C mm (gelombang keil) &br [email protected]

    8ARGA SATUAN#R%

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

  • 7/26/2019 rencana anggaran biaya paud

    80/285

    Daftar Harga Bahan(age 80 of 285

    N: U R A I A N SAT.8ARGA SATUAN

    #R%

    12 "sbes Gelombang (1@+0C1@0+)C mm (gelombang keil) &br [email protected]

    13 "sbes Gelombang (2@0C0@+)C3@! mm (gelombang keil) &br @+!0.00

    1 "sbes Gelombang (2@10C0@+)C3@! mm (gelombang keil) &br [email protected]

    1! "sbes Gelombang (1@+0C0@+)C3@! mm (gelombang keil) &br [email protected]

    1 $ubungan "sbes gelombang besar m9 [email protected] $ubungan "sbes gelombang keil m9 2-@+00.00

    1+ $ubungan Genteng keramik BK:"B $h A@!00.00

    1A $ubungan Genteng Morando $h @000.00

    20 $ubungan genteng pres jt' isi /m2 $h @+0.00

    21 $ubungan genteng pres kebumen $h @+!0.00

    22 $ubungan genteng kodok $h @000.00

    23 $ubungan genteng kodok glaur $h @!00.00

    2 $ubungan genteng plentong $h @000.00

    2! $ubungan genteng plentong super / besar $h @-00.00

    2 ;ok Genteng $eton $h !@!00.00

    2- ;ok Genteng Metal bh 42,5!

    2+ Genteng Keramik Glaur K:" isi 1!/m2 'arna muda $h [email protected] Genteng Keramik Glaur K:" isi 1/m2 'arna tua $h @+!0.00

    30 Genteng Morando Glaur isi 20/m2 1!!0C20 $h @!00.00

    31 Genteng Pres

  • 7/26/2019 rencana anggaran biaya paud

    81/285

    Daftar Harga Bahan(age 81 of 285

    N: U R A I A N SAT.8ARGA SATUAN

    #R%

    Ka8u $engkir +/12 m 10@[email protected]

    - Ka8u $engkir / m @AA@!00.00

    + Ka8u $engkir 3/ m @AA@!00.00

    A Ka8u $engkir 2/ 3 m @[email protected]

    + Ka8u $engkir 3/20 m 12@[email protected] Ka8u $engkir 10/20 m 12@[email protected]

    10 Ka8u Papan bengkirai 2C20C00 11@[email protected]

    11 Ka8u Papan jati 10@[email protected]

    12 Ka8u

  • 7/26/2019 rencana anggaran biaya paud

    82/285

    Daftar Harga Bahan(age 82 of 285

    N: U R A I A N SAT.8ARGA SATUAN

    #R%

    1 $atu segi tebal 10 m abu , abu keil

    1 $atu segi tebal 10 m abu , abu sedang

    1 $atu segi tebal 10 m abu , abu besar

    2 $atu empel ukabumi hijau [email protected]

    3 $atu empel Palimanan kuning [email protected] $atu empel ( idak $eraturan ) keil [email protected]

    ! $atu empel ( idak $eraturan ) besar [email protected]

    $atu 7andi 20/20@ !/20 [email protected]

    - $atu usun sirih "ndesit (

  • 7/26/2019 rencana anggaran biaya paud

    83/285

    Daftar Harga Bahan(age 83 of 285

    N: U R A I A N SAT.8ARGA SATUAN

    #R%

    + A 8 A N C E T A K

    1 $uis $eton 1/2 dia 20 m m9 [email protected]

    2 $uis $eton 1/2 dia 30 m m9 [email protected]

    3 $uis $eton Q 20 m m9 [email protected]

    $uis $eton Q 30 m m9 @2!0.00! $uis $eton Q 0 m m9 [email protected]

    $uis $eton Q !0 m m9 [email protected]

    - $uis $eton Q 0 m m9 [email protected]

    + $uis $eton Q +0 m m9 [email protected]

    A PaFing $lok tebal m abu , abu K1-! (ekelas Muntilan) [email protected]

    10 PaFing $lok tebal m 'arna K1-! (ekelas Muntilan) [email protected]

    11 PaFing $lok tebal + m abu , abu K1-! (ekelas Muntilan) [email protected]

    12 PaFing $lok tebal + m 'arna K1-! (ekelas Muntilan) [email protected]

    13 PaFing $lok tebal m abu , abu lokal @!00.00

    1 PaFing $lok tebal m 'arna lokal @000.00

    1! =rass lock '0 9 '0 9 8 m2 208,000.00

    1 ooster bata $h [email protected] Kansteen beton 10.20.!0 $h [email protected]

    1+ Kansteen beton +.10.2!.!0 $h 22@!00.00

    1A Kansteen beton +.1!.30.!0 $h 2@!00.00

    20 Kansteen beton +.1!.30.!0 $h 2@!00.00

    21 Kansteen beton taman $h 2!@!00.00

    22 #,Dith #k. 0 C 0 C 120 K.2!0 eC.

  • 7/26/2019 rencana anggaran biaya paud

    84/285

    Daftar Harga Bahan(age 8' of 285

    N: U R A I A N SAT.8ARGA SATUAN

    #R%

    A Kolom $eton $ertulang uk 320 C 1+ C 1- m tebal + m (inggi 2@ m) $tg [email protected]

    !0 Kolom $eton $ertulang uk 3-0 C 1+ C 1- m tebal + m (inggi 2@+ m) $tg [email protected]

    !1 Kolom $eton $ertulang uk 2! C 1+ C 1- m tebal + m (inggi 3@2 m) $tg [email protected]

    !2 Ka'at Duri iku 0 C 0 C 3 mm inggi 0 m m9 -@22!.00

    !3 Ka'at Duri iku 0 C 0 C 3 mm inggi !0 m m9 +1@12!.00! Ka'at Duri iku 0 C 0 C 3 mm inggi 0 m m9 A@0-!.00

    + A 8 A N + E S I D A N A L U $ I N I U $

    1 $esi $eton polos Kg [email protected]

    2 $esi $eton ulir Kg A@2!0.00

    3 $esi ProNl :5 Kg 11@!00.00

    $esi ProNl iku / # Kg A@+!0.00

    ! $esi ProNl kanal 7;P Kg [email protected]

    $esi 'iremash Kg A@!0.00

    - ProNl "luminium m9 [email protected]

    + amset / Dina $olt bh [email protected]

    A $esi trip ( tebal !mm@ lebar ! m ) Kg [email protected]

    10 $esi Plat $aja Kg 11@!00.0010 $esi plat bordes R 2@3 mm (1@2 m9 C 2@ m9) lbr [email protected]

    11 $esi plat bordes R 3 mm (1@2 m9 C 2@ m9) lbr 1@[email protected]

    12 $esi plat bordes R ! mm (1@2 m9 C 2@ m9) lbr 1@[email protected]

    13 $esi plat bordes R mm (1@2 m9 C 2@ m9) lbr 2@[email protected]

    12 $esi ollo' C m@ tbl. 0.+ mm Pjg m m9 [email protected]

    13 $esi ollo' 2C m@ tbl. 0.+ mm Pjg m m9 -@3!0.00

    1 $esi ollo' 2C m@ tbl. 2mm Pjg m m9 A@!0.00

    1! $esi ollo' 2C m@ tbl. 2mm Pjg m Kg 12@+00.00

    1 $esi ollo' 3 C 3 m@ tbl. 2mm Pjg m m9 A@!0.00

    1- $esi ollo' 3 C 3 m@ tbl. 2mm Pjg m Kg 12@+00.00

    1+ $esi ollo' Panjang m (emua ukuran) Kg 12@+00.00

    1A Ka'at &as &istrik Kg [email protected] Ka'at $eton Kg 1!@+00.00

    21 Ka'at $ronjong dmm galFanis Kg [email protected]

    22 Kusen "luminium uk. B ilFer M9 A+@!00.00

    23 Kusen aluminium ul. B $ro'n M9 A@!00.00

    2 angka Pintu "luminium M9 [email protected]

    2! Plat alumunium 0@ mm [email protected]

    2 Plat alumunium ( "luminium heet ) 0@3 mm @000.00

    2- Plat alumunium trip lbr 10 m M9 [email protected]

    2+ el pintu sleeding #! 150,000.00

    2A a*olding set/bln [email protected]

    30 a*olding set/hr [email protected]

    31 Pipe support bh/bln [email protected] Pipe support bh/hr 1@-!0.00

    33 Pintu olling door besi m2 [email protected]

    3 Pintu olling Door GalFalum m2 [email protected]

    3! Pintu olling Door "luminium m2 [email protected]

    + A 8 A N P I P A D A N P I P A A I R + E R S I 8

    1 Knee GalFanis 1/2B $h [email protected]

    2 Knee GalFanis 3/B $h [email protected]

    3 Knee GalFanis 1B $h [email protected]

    Knee GalFanis 11/2B $h [email protected]

    M2

    M2

  • 7/26/2019 rencana anggaran biaya paud

    85/285

    Daftar Harga Bahan(age 85 of 285

    N: U R A I A N SAT.8ARGA SATUAN

    #R%

    ! Knee GalFanis 2B $h [email protected]

    Knee GalFanis 2 1/2B $h [email protected]

    - Knee GalFanis 3B $h [email protected]

    + Knee GalFanis B $h 1@+00.00

    A >Ferstok GalFanis 1B C 3/B $h [email protected] Knee P?7 S 1/2B $h [email protected]

    11 Knee P?7 S 3/B $h [email protected]

    12 Knee P?7 S 1B $h @300.00

    13 Knee P?7 S 1 1/2B $h !@1!0.00

    1 Knee P?7 S 2B $h [email protected]

    1! Knee P?7 S 2 1/2B $h [email protected]

    1 Knee P?7 S 3B ( " ) $h 10@2!0.00

    1- Knee P?7 S B ( " ) $h [email protected]

    1+ Knee pipa p?7 (hitam) Q B $h 13@!!0.00

    1A Pipa P?7 S 1/2B M9 [email protected]

    20 Pipa P?7 S 3/B M9 [email protected]

    21 Pipa P?7 S 1B M9 [email protected] Pipa P?7 S 1 1/2B M9 [email protected]

    22 Pipa P?7 S 2B M9 0@!00.00

    23 Pipa P?7 S 2 1/2B M9 [email protected]

    2 Pipa P?7 S 3B ( " ) M9 11!@2!0.00

    2! Pipa P?7 S B ( " ) M9 [email protected]

    2 Pipa P?7 ( hitam ) B M9 [email protected]

    2- Klem P?7 Q 3/B " $h [email protected]

    2+ Pipa GalFanis 1/2B M9 [email protected]

    2A Pipa GalFanis 3/B M9 2@+00.00

    30 Pipa GalFanis 1B M9 [email protected]

    31 Pipa GalFanis 11/2B M9 [email protected]

    32 Pipa GalFanis 2B M9 [email protected] Pipa GalFanis 2 1/2B M9 [email protected]

    3 Pipa GalFanis 3B M9 [email protected]

    3! Pipa GalFanis B M9 2+3@!0.00

    3 Pipa = uning dia 3/B $h [email protected]

    3- Pipa = $7 dia !0 mm2 $h [email protected]

    3+ Pipa = Klem $7 dia !0 mm2 $h A@+00.00

    3A Pipa = epatu Kabel dia !0 mm2 $h 10@3!0.00

    0 eal tape $h [email protected]

    PIPA AIR B"RSIH

    PIPA P#$ % S & '2,5 (

    1 Pipa uP?7 Q 1B ( , 12@! ) M9 [email protected]

    2 Pipa uP?7 Q 1 1/2B ( , 12@! ) M9 1A@!0.003 Pipa uP?7 Q 2B ( , 12@! ) M9 [email protected]

    Pipa uP?7 Q 3B ( , 12@! ) M9 0@!!0.00

    ! Pipa uP?7 Q B ( , 12@! ) M9 ++@+!0.00

    Pipa uP?7 Q B ( , 12@! ) M9 [email protected]

    - Pipa uP?7 Q +B ( , 12@! ) M9 2A@+00.00

    + Pipa uP?7 Q 10B ( , 12@! ) M9 [email protected]

    PIPA P)*+"T+*IN" % P" & PN! ' & SDR ' (

    1 Pipa P4 Q 1B M9 [email protected]

    2 Pipa P4 Q 1 1/B M9 13@A!0.00

  • 7/26/2019 rencana anggaran biaya paud

    86/285

    Daftar Harga Bahan(age 86 of 285

    N: U R A I A N SAT.8ARGA SATUAN

    #R%

    3 Pipa P4 Q 1 1/2B M9 [email protected]

    Pipa P4 Q 2B M9 33@+!0.00

    ! Pipa P4 Q 2 1/2B M9 [email protected]

    Pipa P4 Q 3B M9 [email protected]

    - Pipa P4 Q B M9 11@!00.00+ Pipa P4 Q !B M9 [email protected]

    A Pipa P4 Q B M9 [email protected]

    10 Pipa P4 Q +B M9 [email protected]

    11 Pipa P4 Q AB M9 [email protected]

    12 Pipa P4 Q 10B M9 +22@A!0.00

    PIPA M"DIUM GA*#ANI-"D %GIP(

    1 Pipa Medium GalFanied Q 1/2 B M9 @-00.00

    2 Pipa Medium GalFanied Q 3/ B M9 !@3!0.00

    3 Pipa Medium GalFanied Q 1 B M9 [email protected]

    Pipa Medium GalFanied Q 1 1/2 B M9 [email protected]

    ! Pipa Medium GalFanied Q 2 B M9 [email protected]

    Pipa Medium GalFanied Q 3 B M9 [email protected] Pipa Medium GalFanied Q B M9 [email protected]

    + Pipa Medium GalFanied Q B M9 [email protected]

    A Pipa Medium GalFanied Q + B M9 1@[email protected]

    A$$"SS)RI"S PIPA

    1 5itting P?7 D; 3 C 3 mm $h [email protected]

    2 5itting P?7 D; A0 C A0 mm $h [email protected]

    3 5itting P?7 D; A0 C 3 mm $h [email protected]

    5itting P?7 D; 110 C 110 mm $h 1+@3!0.00

    ! 5itting P?7 D; 110 C A0 mm $h [email protected]

    5itting P?7 D; 110 C 3 mm $h [email protected]

    - 5itting P?7 D; 10 C 10 mm $h [email protected]

    + 5itting P?7 D; 10 C 110 mm $h -0@!0.00A 5itting P?7 D; 10 C A0 mm $h [email protected]

    10 5itting P?7 D; 10 C 3 mm $h [email protected]

    11 5itting P?7 D; 200 C 200 mm $h 1@[email protected]

    12 5itting P?7 D; 200 C 10 mm $h 1@[email protected]

    13 5itting P?7 D; 200 C 110 mm $h 1@[email protected]

    1 5itting P?7 D; 200 C A0 mm $h 1@[email protected]

    1! 5itting P?7 D; 2!0 C 2!0 mm $h 1@[email protected]

    1 P?7 eduer oket

  • 7/26/2019 rencana anggaran biaya paud

    87/285

    Daftar Harga Bahan(age 8& of 285

    N: U R A I A N SAT.8ARGA SATUAN

    #R%

    30 &ong $end "ll oket

  • 7/26/2019 rencana anggaran biaya paud

    88/285

    Daftar Harga Bahan(age 88 of 285

    N: U R A I A N SAT.8ARGA SATUAN

    #R%

    +0 "ll 5lange ee uk. 7ast :ron ( 7: ) $h 1@3@+00.00

    +1 "ll 5lange $end A0 7ast :ron ( 7: ) $h 21@!00.00

    +2 "ll 5lange $end A0 7ast :ron ( 7: ) $h 31-@!00.00

    +3 "ll 5lange $end A0 7ast :ron ( 7: ) $