RAP Kosong Penawaran Perumahan

75
PERUMAHAN KEBUN THA BUDGET 2012 KALTIM ( CIVIL WORK ) BOQ Infrastruktur THA Kubar Rumah Karyawan G2Divisi II Pondok I Sungai Kedang Estate PT. Harapan Rimba Raya 0 15-Jan-22 Untuk Tender REV. TANGGAL PENAWARAN CV. Dewi Sekar PROYEK : PENGGUNA : PERUMAHAN KEBUN THA BUDGET 2012 KALTIM TSANI HUTANI ABADI GROUP INFRASTRUKTUR NOMOR DOKUMEN : 0 REV.

description

RAB

Transcript of RAP Kosong Penawaran Perumahan

Page 1: RAP Kosong Penawaran Perumahan

PERUMAHAN KEBUN THA BUDGET 2012

KALTIM

( CIVIL WORK )BOQ

Infrastruktur THA Kubar

Rumah Karyawan G2Divisi II Pondok I

Sungai Kedang Estate

PT. Harapan Rimba Raya

0 17-Apr-23 Untuk Tender

REV. TANGGAL PENAWARAN CV. Dewi Sekar

PROYEK : PENGGUNA :

TSANI HUTANI ABADI GROUP

INFRASTRUKTUR

NOMOR DOKUMEN :

0

PERUMAHAN KEBUN THA BUDGET 2012 KALTIM

REV.

Page 2: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

2/63

REKAP HARGAKALTIM

harus diisi nama kontraktor

CV. DEWI SEKARNO BANGUNAN NO GBR JML

HARGA TOTAL

( RP ) ( RP )

STRUKTUR ATAS RANGKA KAYU

II RUMAH KARYAWAN1 Rumah G2 THA/R-G2/STD/KNV/11 26 182,562,462 4,746,624,000

Struktur Bangunan Atas 30,290,262 Bangunan Bawah 152,272,199

TOTAL 4,746,624,000 (ROUNDED) 4,746,620,000

Terbilang :

CATATAN BANGUNAN ATAS:Scope Struktur bangunan Atas Rangka kayu meliputi :1. Pekerjaan rangka atap kayu terpasang2. Pekerjaan penutup atap terpasang ( zincalum genteng / zincalum gelombang sesuai spek pada bangunanya )3. Pekerjaan rangka plafond kayu & penutup tripleks 4 mm ( terpasang )4. Pemasangan Lis plank

Diajukan Oleh:CV. DEWI SEKAR

( )

Page 3: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

3/63

REKAP HARGA BERDASARKAN HARGA MATERIAL DAN UPAHKALTIM

1,025,897,815.26

NO ITEM SATCV. DEWI SEKAR

HARGA VOL TOTAL

MATERIAL

1 Arde ( tembaga masif ) Set Rp 85,000.00 26.00 2,210,000

2 Bak Cuci Piring Plastik Warna Biru Tua Bh Rp 162,000.00 52.00 8,424,000

3 Bata Kerawang 8 x 20 x 20 cm Bh - -

4 Batako 10 x 20 x 40 cm Bh Rp 4,500.00 85,564.38 385,039,688

5 Batu Alam M³ - -

6 Batu kali M³ Rp 375,000.00 338.68 127,003,500

7 Benang Nylon Rol Rp 16,000.00 40.56 648,960

8 Besi Beton £ Ø 12 mm Kg Rp 11,000.00 24,112.29 265,235,168

9 Besi Beton > Ø 12 mm Kg - -

10 Cat Besi Platone 8000 Synthetic High Gloss Paint Kg - -

11 Cat Kayu Platone 8000 Synthetic High Gloss Paint Kg Rp 65,000.00 466.34 30,312,093

12 Cat Meni Besi Merk Bodelac 9000 Zinc Chromate Primer Kg - -

13 Cat Meni Kayu Merk kembang Kg Rp 25,000.00 237.32 5,932,917

14 Cat Tembok Putih Merk Vinilex 5000 Emulsion Paint Kg Rp 42,500.00 4,816.59 204,704,933

15 Cerucuk Kayu dia. 10 cm @ 3 m Btg - -

16 Closet Duduk Merk TOTO Type CW 420 J/S516 STD + Acessories Komplit Bh - -

17 Closet Jongkok Merk INA Bh Rp 250,000.00 52.00 13,000,000

18 Closet Jongkok Merk TOTO Type CE 6 Bh - -

19 Dempul Kayu Merk Kembang Kg Rp 28,500.00 48.13 1,371,614

20 Dinabolt Ø 1/2 " Bh - -

21 Engsel Gantung Kuningan Merk Arch 3" x 2,5" Bh Rp 10,000.00 832.00 8,320,000

22 Engsel Gantung Kuningan Merk Arch 4" x 3" Bh Rp 11,000.00 780.00 8,580,000

23 Engsel Pegas Bh - -

24 Fiber Gelombang M² - -

25 Floor Drain Plastik Warna Biru Muda + Syphon Bh Rp 25,000.00 52.00 1,300,000

26 Floor Drain Stainless Steel Merk TOTO Type TX 1 B Bh - -

27 Frame Aluminium + Kasa Nyamuk Fiber Polyester M² - -

28 Gate Valve Ø 3" Bh - -

29 Gate Valve Ø 4" Bh - -

30 Grendel Kuningan 2" Bh Rp 9,500.00 1,664.00 15,808,000

31 Grendel Kuningan 3" Bh Rp 10,000.00 156.00 1,560,000

32 Grendel Type Antik 2" Bh - -

33 Grendel Type Antik 4" Bh - -

34 Hak Angin Type Antik Bh - -

35 Hak Angin Type Polos Bh Rp 7,500.00 416.00 3,120,000

36 Handle Bh - -

37 Ijuk Kg Rp 12,000.00 130.00 1,560,000

38 Isolasi Unibel Rol Rp 8,500.00 338.00 2,873,000

39 Isolator Plastik Bh Rp 4,000.00 1,352.00 5,408,000

40 Rol Rp 8,500.00 49.92 424,320

41 Rol Rp 975,000.00 4.16 4,056,000

42 Kaca Ice/Buram 5 mm M² Rp 140,000.00 32.24 4,513,600

43 Kaca Rayban 5 mm Produk Asahi Type Panasaf (60 %) M² - -

44 Kawat Beton/Bendrat Kg Rp 18,500.00 435.73 8,060,934

45 Kawat Harmonika M² - -

46 Kawat Nyamuk M² Rp 6,500.00 57.66 374,774

47 Kayu Balok 4/6 - 4 m Kelas II (Bekisting/Bowplank) Btg Rp 16,500.00 2,585.11 42,654,373

48 Kayu Kelas II M³ Rp 2,200,000.00 47.64 104,802,325

49 Kayu Papan 2/20 - 4 m Kelas II (Bekisting/Bowplank) Btg Rp 35,200.00 3,172.76 111,681,294

50 Keramik 20 x 20 cm KW I Merk Roman Type Incision I 20950 Dus - -

51 Keramik 20 x 20 cm KW I Merk Roman Type W 20106 Dus - -

Diisi estimasi harga per

satuan oleh kontraktor

Kabel NYM 2 x 2.5 mm2

Kabel NYM 3 x 2.5 mm2

Page 4: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

4/63

REKAP HARGA BERDASARKAN HARGA MATERIAL DAN UPAHKALTIM

1,025,897,815.26

NO ITEM SATCV. DEWI SEKAR

HARGA VOL TOTAL

Diisi estimasi harga per

satuan oleh kontraktor

52 Keramik 20 x 25 cm KW I Merk Roman Type W 25301 Dus - -

53 Keramik 30 x 30 cm KW I Merk Roman Type Mable 33407 Dus - -

54 Keramik 8 x 30 cm KW I Merk Roman Dus - -

55 Keramik sudut/ nosing m - -

56 Kerikil/koral M³ Rp 400,000.00 128.70 51,480,000

57 Kitchen Zink Stainless Steel 1 Lubang Merk Meiwa Bh - -

58 Kitchen Zink Stainless Steel 2 Lubang Merk Meiwa Bh - -

59 Kran Air Biasa Merk Kitz Type Engkol Bh Rp 18,000.00 104.00 1,872,000

60 Kran Air Kitchen Zink Merk TOTO Type T 30 AR 13 V7 (N) Bh - -

61 Kran Air Mandi Merk TOTO Type T 23 B 13 V7 (N) Bh - -

62 Kunci Tanam 2 Slot 10" Merk DEKKSON (Kunci Gepeng) Bh - -

63 Kunci Tanam 2 Slot 10" Merk ISEO (Kunci Gepeng) Bh Rp 98,500.00 104.00 10,244,000

64 Kusen PVC Bh - -

65 L Kg - -

66 Lampu SL 11 W Merk Phillips + Fitting Bh Rp 45,250.00 260.00 11,765,000

67 Lampu SL 18 W Merk Phillips + Fitting Bh Rp 45,250.00 104.00 4,706,000

68 MCB 10 A 1 Phase + Box Merk Fuji Set - -

69 MCB 16 A 1 Phase + Box Merk Fuji Set - -

70 MCB 2 A 1 Phase + Box Merk Fuji Set Rp 148,500.00 26.00 3,861,000

71 MCB 4 A 1 Phase + Box Merk Fuji Set - -

72 MCB 6 A 1 Phase + Box Merk Fuji Set - -

73 Paku 2" Kg Rp 19,000.00 149.75 2,845,341

74 Paku 2,5" Kg Rp 19,000.00 24.14 458,714

75 Paku 3" Kg Rp 19,000.00 12.93 245,665

76 Paku Asbes 2,5" + Karet bh Rp 225.00 1,352.00 304,200

77 Pasir Beton/Cor M³ Rp 210,000.00 180.84 37,977,379

78 Pasir Pasang M³ Rp 210,000.00 527.37 110,747,671

79 Pasir Urug M³ Rp 125,000.00 191.49 23,936,250

80 Pegangan Jendela 3" Type Antik Bh - -

81 Pegangan Jendela 3" Type Polos Bh Rp 6,500.00 1,040.00 6,760,000

82 Pegangan Pintu 4" Type Polos Bh Rp 6,500.00 156.00 1,014,000

83 Pintu PVC PV-02 Bh - -

84 Pipa Conduit Ø 1/2" - 4 m Btg Rp 14,000.00 678.08 9,493,120

85 Pipa Galvanized Ø 1,5" Btg Rp 197,000.00 13.00 2,561,000

86 Pipa Hitam Medium Ø 1 1/2" - 6 M Btg - -

87 Pipa Hitam Medium Ø 2 1/2" - 6 M Btg - -

88 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 1/2" AW - 4 m Btg Rp 29,250.00 69.23 2,024,831

89 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 2" D - 4 m Btg Rp 52,500.00 65.00 3,412,500

90 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3" AW - 4 m Btg - -

91 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3" D - 4 m Btg Rp 64,000.00 52.00 3,328,000

92 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3/4" AW - 4 m Btg Rp 35,000.00 52.00 1,820,000

93 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 4" AW - 4 m Btg - -

94 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 4" D - 4 m Btg Rp 64,000.00 97.50 6,240,000

95 Plat £ 8 mm Kg - -

96 Plywood 6 mm M² Rp 35,700.00 431.29 15,396,982

97 Saklar Ganda Inbow Merk Broco Bh Rp 19,250.00 104.00 2,002,000

98 Saklar Tunggal Inbow Merk Broco Bh Rp 19,250.00 156.00 3,003,000

99 Semen PC Type 1 @ 50 Kg Zak Rp 75,500.00 6,237.24 470,911,718

100 Semen Putih Zak - -

101 Seng M² Rp 23,250.00 78.62 1,828,008

102 Split M³ Rp 355,000.00 146.22 51,909,705

103 Stop Kontak Merk Broco Inbow Bh Rp 19,000.00 52.00 988,000

Page 5: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

5/63

REKAP HARGA BERDASARKAN HARGA MATERIAL DAN UPAHKALTIM

1,025,897,815.26

NO ITEM SATCV. DEWI SEKAR

HARGA VOL TOTAL

Diisi estimasi harga per

satuan oleh kontraktor

104 Struktur Bangunan Atas G2 LS 26.00 -

105 Struktur Bangunan Atas R. Askep LS - -

106 Struktur Bangunan Atas R. Assisten LS - -

107 Struktur Bangunan Atas R. Manager LS - -

108 Tangki Fiber Kap 1100 L Bh - -

109 Tee 1,5"x1,5" Bh Rp 19,250.00 26.00 500,500

110 Tempat Sabun Inbow Merk TOTO Type S11N (Biru Muda) Bh - -

111 Thinner B Special Ltr Rp 24,000.00 237.32 5,695,600

112 Tipping screw Bh - -

113 Triplek 9 mm M² - -

114 Ventilasi Plastik Bh - -

115 Wastafel Merk TOTO Type L237 V1B + Acessories Komplit (Biru Muda) Bh - -

116 Wire Mesh M 6 M² - -

Material Utama ###

Material Pendukung 2,218,311,678

Total Material 2,218,311,678

UPAH

1 Bekisting Balok & Kolom M² Rp 35,000.00 2,860.52 100,118,200

2 Bekisting Dinding M² - -

3 Bekisting Setempat M² Rp 29,500.00 82.06 2,420,652

4 Cor Rabat Beton M³ Rp 240,000.00 156.98 37,674,000

5 Fabrikasi Jendela Bh Rp 25,500.00 1,040.00 26,520,000

6 Fabrikasi Jendela Kaca Bh - -

7 Fabrikasi Kusen M Rp 22,500.00 4,584.84 103,158,900

8 Fabrikasi Lemari Bh - -

9 Fabrikasi Pintu Garasi Bh - -

10 Fabrikasi Pintu Panel Bh Rp 145,000.00 260.00 37,700,000

11 Galian Tanah M³ Rp 60,000.00 559.26 33,555,600

12 Instalasi Air M' Rp 6,400.00 1,238.90 7,928,960

13 Instalasi Air Bersih M' - -

14 Instalasi Air Kotor M' - -

15 Instalasi Lampu Ttk Rp 45,000.00 624.00 28,080,000

16 Ttk Rp 45,000.00 52.00 2,340,000

17 Lantai Kerja M² - -

18 Pancang Cerucuk Kayu dia. 10 cm @ 3 m Btg - -

19 Pasang Atap Fiber Gelombang M² - -

20 Pasang Bak Cuci Piring Bh Rp 90,000.00 52.00 4,680,000

21 Pasang Bowplank M' Rp 7,500.00 2,028.00 15,210,000

22 Pasang Closet Duduk Bh - -

23 Pasang Closet Jongkok Tipe I Bh - -

24 Pasang Closet Jongkok Tipe II Bh Rp 95,000.00 52.00 4,940,000

25 Pasang Jendela Unit Rp 62,500.00 416.00 26,000,000

26 Pasang Jendela Kawat Nyamuk Unit Rp 25,000.00 624.00 15,600,000

27 Pasang Kawat Harmonika M² - -

28 Pasang Kitchen Zink 1 Lubang Bh - -

29 Pasang Kitchen Zink 2 Lubang Bh - -

30 Pasang Pintu Unit Rp 175,000.00 260.00 45,500,000

31 Pasang Sanitair Fixture Bh Rp 145,000.00 104.00 15,080,000

32 Pasang Sanitair Fixture Type A Bh - -

33 Pasang Wastafel Bh - -

34 Pasangan Bata Kerawang M² - -

Instalasi Stop Kontak (Kabel NYM 3 x 2.5 mm2)

Page 6: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

6/63

REKAP HARGA BERDASARKAN HARGA MATERIAL DAN UPAHKALTIM

1,025,897,815.26

NO ITEM SATCV. DEWI SEKAR

HARGA VOL TOTAL

Diisi estimasi harga per

satuan oleh kontraktor

35 Pasangan Batu Alam M³ - -

36 Pasangan Batu Kali M³ Rp 147,500.00 282.23 41,628,925

37 Pasangan Dinding Batako M² Rp 37,000.00 5,597.54 207,108,980

38 Pasangan Dinding Batako ( Trasram ) M² Rp 37,000.00 651.30 24,098,100

39 Pasangan Dinding Batako Type A M² - -

40 Pekerjaan Baja Pipa (Fabrikasi/Erection) Btg - -

41 Pekerjaan Baja Plat < 8 mm (Fabrikasi/Erection) Kg - -

42 Pekerjaan Baja Siku (Fabrikasi/Erection) Kg - -

43 Pemasangan Acesories Jendela Bh Rp 14,500.00 3,952.00 57,304,000

44 Pemasangan Acesories Jendela Type A Bh - -

45 Pemasangan Acesories Pintu Bh Rp 17,500.00 1,196.00 20,930,000

46 Pemasangan Acesories Pintu Type A Bh - -

47 Pemasangan Kaca M² Rp 17,000.00 32.24 548,080

48 Pemasangan Keramik Dapur 20 x 20 cm Type A M² - -

49 Pemasangan Keramik Dinding 20 x 25 cm Type A M² - -

50 Pemasangan Keramik Lantai 20 x 20 cm Type A M² - -

51 Pemasangan Keramik Lantai 30 x 30 cm Type A M² - -

52 Pemasangan Keramik Sudut/ nosing M² - -

53 Pemasangan Kusen M² Rp 35,000.00 977.21 34,202,350

54 Pemasangan Skirting Lantai Type A M' - -

55 Pemasangan Tangki Fiber Bh - -

56 Pembersihan M² Rp 1,200.00 2,860.00 3,432,000

57 Pembesian > dia. 12 mm Kg - -

58 Pembesian £ dia. 12 mm Kg Rp 950.00 21,786.31 20,696,994

59 Pembesian Wiremesh M 6 M² - -

60 Pembuatan Jerajak Kg - -

61 Pengecatan Baja M² - -

62 Pengecatan Baja Type A M² - -

63 Pengecatan Dinding M² Rp 5,000.00 12,343.76 61,718,800

64 Pengecatan Dinding Type A M² - -

65 Pengecatan Kusen M² Rp 7,500.00 1,364.51 10,233,834

66 Pengecatan Kusen Type A M² - -

67 Pengecatan Listplank M² Rp 6,500.00 854.88 5,556,720

68 Pengecatan Listplank Type A M² - -

69 Pengecatan Pintu & Jendela M² Rp 8,000.00 1,511.33 12,090,624

70 Pengecatan Pintu & Jendela Type A M² - -

71 Pengecatan Plafond M² Rp 7,500.00 2,106.00 15,795,000

72 Pengecatan Plafond Type A M² - -

73 Pengecoran 1:1 1/2:2 1/2 M³ - -

74 Pengecoran 1:2:3 M³ Rp 200,000.00 169.87 33,974,850

75 Pengecoran 1:3:5 M³ - -

76 Plesteran 1:2 + Acian M² Rp 29,000.00 307.84 8,927,360

77 Plesteran 1:2 + Acian Type A M² - -

78 Plesteran 1:4 + Acian M² Rp 27,500.00 12,343.76 339,453,400

79 Plesteran 1:4 + Acian Type A M² - -

80 Pondasi Rollag Batako M² Rp 37,500.00 254.80 9,555,000

81 Septictank (lkp dg. Rmbsn,bk ktrl, p. hawa) Batako Unit Rp 1,450,000.00 26.00 37,700,000

82 Stek Pondasi Menerus Kg Rp 900.00 673.26 605,933

83 Urug Pasir M³ Rp 67,000.00 156.98 10,517,325

84 Urugan Tanah & Pemadatan M³ Rp 80,000.00 497.87 39,829,920

Upah Utama ###

Upah Pendukung 1,502,414,507

Page 7: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

7/63

REKAP HARGA BERDASARKAN HARGA MATERIAL DAN UPAHKALTIM

1,025,897,815.26

NO ITEM SATCV. DEWI SEKAR

HARGA VOL TOTAL

Diisi estimasi harga per

satuan oleh kontraktor

Total Upah 1,502,414,507

Total 3,720,726,185

Page 8: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

8/63

ANALISA SATUAN PEKERJAANKALTIM

ESTIMASI CV. DEWI SEKAREST

NO URAIAN PEKERJAAN SAT VOL

SAT. BAHAN BAHAN SAT. UPAH UPAH JUMLAH OWNER

00 PEKERJAAN TANAH & PONDASI

Pasang Bowplank M' 1.00 13,237 7,500 7,500 20,737 1.00

Kayu Papan 2/20 - 4 m Kelas II (Bekisting/Bowplank) Btg 0.26 35,200 9,263 0.26

Kayu Balok 4/6 - 4 m Kelas II (Bekisting/Bowplank) Btg 0.21 16,500 3,428 0.21

Paku 2,5" Kg 0.01 19,000 226 0.01

Benang Nylon Rol 0.02 16,000 320 0.02

Galian Tanah M³ 1.00 60,000 60,000 60,000 1.00

Urugan Tanah & Pemadatan M³ 1.00 80,000 80,000 80,000 1.00

Urug Pasir M³ 1.00 150,000 67,000 67,000 217,000 1.00

Pasir Urug M³ 1.20 125,000 150,000 1.20

Pondasi Rollag Batako M' 1.00 68,069 37,500 37,500 105,569 1.00

Batako 10 x 20 x 40 cm Bh 12.50 4,500 56,250 12.50

Semen PC Type 1 @ 50 Kg Zak 0.14 75,500 10,419 0.14

Pasir Pasang M³ 0.01 210,000 1,400 0.01

Pasangan Batu Kali M³ 1.00 822,130 147,500 147,500 969,630 1.00

Batu kali M³ 1.20 375,000 450,000 1.20

Semen PC Type 1 @ 50 Kg Zak 3.26 75,500 246,130 3.26

Pasir Pasang M³ 0.60 210,000 126,000 0.60

Pancang Cerucuk Kayu dia. 10 cm @ 3 m Btg 1.00 - - - 1.00

Cerucuk Kayu dia. 10 cm @ 3 m Btg 1.00 - 1.00

10 PEKERJAAN KONSTRUKSI BETON

Bekisting Setempat M² 1.00 64,634 29,500 29,500 94,134 1.00

Kayu Papan 2/20 - 4 m Kelas II (Bekisting/Bowplank) Btg 1.32 35,200 46,316 1.32

Kayu Balok 4/6 - 4 m Kelas II (Bekisting/Bowplank) Btg 1.05 16,500 17,368 1.05

Paku 2" Kg 0.05 19,000 950 0.05

Bekisting Balok & Kolom M² 1.00 43,406 35,000 35,000 78,406 1.00

Kayu Papan 2/20 - 4 m Kelas II (Bekisting/Bowplank) Btg 0.88 35,200 30,877 0.88

Kayu Balok 4/6 - 4 m Kelas II (Bekisting/Bowplank) Btg 0.70 16,500 11,579 0.70

Paku 2" Kg 0.05 19,000 950 0.05

Bekisting Dinding M² 1.00 43,406 - 43,406 1.00

Kayu Papan 2/20 - 4 m Kelas II (Bekisting/Bowplank) Btg 0.88 35,200 30,877 0.88

Kayu Balok 4/6 - 4 m Kelas II (Bekisting/Bowplank) Btg 0.70 16,500 11,579 0.70

Paku 2" Kg 0.05 19,000 950 0.05

Stek Pondasi Menerus Kg 1.00 11,550 900 900 12,450 1.00

Kg 1.05 11,000 11,550 1.05

Pengecoran 1:3:5 M³ 1.00 821,480 - 821,480 1.00

Semen PC Type 1 @ 50 Kg Zak 4.36 75,500 329,180 4.36

Pasir Beton/Cor M³ 0.63 210,000 132,300 0.63

Kerikil/koral M³ 0.90 400,000 360,000 0.90

Kg 1.00 11,920 950 950 12,870 1.00

Kg 1.05 11,000 11,550 1.05

Kawat Beton/Bendrat Kg 0.02 18,500 370 0.02

Pembesian > dia. 12 mm Kg 1.00 370 - 370 1.00

Besi Beton > Ø 12 mm Kg 1.05 - 1.05

Kawat Beton/Bendrat Kg 0.02 18,500 370 0.02

Pembesian Wiremesh M 6 M² 1.00 - - - 1.00

Wire Mesh M 6 M² 1.10 - 1.10

Pengecoran 1:2:3 M³ 1.00 908,960 200,000 200,000 1,108,960 1.00

Semen PC Type 1 @ 50 Kg Zak 6.72 75,500 507,360 6.72

Pasir Beton/Cor M³ 0.56 210,000 117,600 0.56

Split M³ 0.80 355,000 284,000 0.80

Pengecoran 1:1 1/2:2 1/2 M³ 1.00 1,005,600 - 1,005,600 1.00

Semen PC Type 1 @ 50 Kg Zak 8.00 75,500 604,000 8.00

Pasir Beton/Cor M³ 0.56 210,000 117,600 0.56

Split M³ 0.80 355,000 284,000 0.80

Lantai Kerja M² 1.00 45,997 - 45,997 1.00

Semen PC Type 1 @ 50 Kg Zak 0.22 75,500 16,459 0.22

Pasir Beton/Cor M³ 0.04 210,000 7,938 0.04

Kerikil/koral M³ 0.05 400,000 21,600 0.05

20 PEKERJAAN KONSTRUKSI BAJA

Pekerjaan Pipa Hitam Medium Ø 2 1/2" Btg 1.00 - - - 1.00

PekPipa Hitam Medium Ø 2 1/2" - 6 M Btg 1.00 - - 1.00

Pekerjaan Pipa Hitam Medium Ø 1 1/2" Btg 1.00 - - - 1.00

PekPipa Hitam Medium Ø 1 1/2" - 6 M Btg 1.00 - - 1.00

Pekerjaan Baja Siku (Fabrikasi/Erection) Kg 1.00 - - - 1.00

L Kg 1.05 - 1.05

Pekerjaan Baja Plat < 8 mm (Fabrikasi/Erection) Kg 1.00 - - - 1.00

Kg 1.05 - 1.05

Pemasangan Tangki Fiber Bh 1.00 - - - 1.00

Tangki Fiber Kap 1100 L Bh 1.00 - 1.00

30 PEKERJAAN PASANGAN

Pasangan Dinding Batako Type A M² 1.00 68,069 - 68,069 1.00

Batako 10 x 20 x 40 cm Bh 12.50 4,500 56,250 12.50

Semen PC Type 1 @ 50 Kg Zak 0.14 75,500 10,419 0.14

diisi estimasi volume material oleh kontraktor

Volume versi Owner. Kontraktor boleh sama dg vol

ini

VOL EST CV. DEWI SEKAR

Besi Beton £ Ø 12 mm

Pembesian £ dia. 12 mm

Besi Beton £ Ø 12 mm

Plat £ 8 mm

Page 9: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

9/63

ANALISA SATUAN PEKERJAANKALTIM

ESTIMASI CV. DEWI SEKAREST

NO URAIAN PEKERJAAN SAT VOL

SAT. BAHAN BAHAN SAT. UPAH UPAH JUMLAH OWNER

diisi estimasi volume material oleh kontraktor

Volume versi Owner. Kontraktor boleh sama dg vol

ini

VOL EST CV. DEWI SEKAR

Pasir Pasang M³ 0.01 210,000 1,400 0.01

Pasangan Dinding Batako ( Trasram ) M² 1.00 78,488 37,000 37,000 115,488 1.00

Batako 10 x 20 x 40 cm Bh 12.50 4,500 56,250 12.50

Semen PC Type 1 @ 50 Kg Zak 0.28 75,500 20,838 0.28

Pasir Pasang M³ 0.01 210,000 1,400 0.01

Pasangan Dinding Batako M² 1.00 68,069 37,000 37,000 105,069 1.00

Batako 10 x 20 x 40 cm Bh 12.50 4,500 56,250 12.50

Semen PC Type 1 @ 50 Kg Zak 0.14 75,500 10,419 0.14

Pasir Pasang M³ 0.01 210,000 1,400 0.01

Plesteran 1:4 + Acian Type A M² 1.00 18,857 - 18,857 1.00

Semen PC Type 1 @ 50 Kg Zak 0.18 75,500 13,817 0.18

Pasir Pasang M³ 0.02 210,000 5,040 0.02

Plesteran 1:4 + Acian M² 1.00 18,857 27,500 27,500 46,357 1.00

Semen PC Type 1 @ 50 Kg Zak 0.18 75,500 13,817 0.18

Pasir Pasang M³ 0.02 210,000 5,040 0.02

Plesteran 1:2 + Acian Type A M² 1.00 26,603 - 26,603 1.00

Semen PC Type 1 @ 50 Kg Zak 0.29 75,500 21,563 0.29

Pasir Pasang M³ 0.02 210,000 5,040 0.02

Plesteran 1:2 + Acian M² 1.00 26,288 29,000 29,000 55,288 1.00

Semen PC Type 1 @ 50 Kg Zak 0.29 75,500 21,563 0.29

Pasir Pasang M³ 0.02 210,000 4,725 0.02

Pasangan Bata Kerawang M² 1.00 11,819 - 11,819 1.00

Bata Kerawang 8 x 20 x 20 cm Bh 25.00 - 25.00

Semen PC Type 1 @ 50 Kg Zak 0.14 75,500 10,419 0.14

Pasir Pasang M³ 0.01 210,000 1,400 0.01 Pasang Kawat Harmonika M² 1.00 - - - 1.00

Kawat Harmonika M² 1.05 - 1.05

Pasangan Batu Alam M² 1.00 15,443 - 15,443 1.00

Batu Alam M² 1.10 - 1.10

Semen PC Type 1 @ 50 Kg Zak 0.19 75,500 14,043 0.19

Pasir Pasang M³ 0.01 210,000 1,400 0.01

40 PEKERJAAN KUDA-KUDA DAN ATAP

Pasang Atap Fiber Gelombang M² 1.00 - - - 1.00

Fiber Gelombang M² 1.19 - 1.19

Tipping screw Bh 6.00 - 6.00

50 PEKERJAAN KUSEN, PINTU, & PENGGANTUNG Kusen Type K-01 K Unit 1.00 291,341 622,725 914,066 1.00

Pemasangan Kusen M² 4.31 35,000 150,675 4.31 Fabrikasi Kusen M 20.98 22,500 472,050 20.98

Kayu Kelas II 0.13 2,200,000 280,944 0.13

Besi Beton £ Ø 12 mm Kg 0.74 11,000 8,138 0.74

Paku 3" Kg 0.12 19,000 2,259 0.12 Kusen Type K-02 K Unit 1.00 332,525 676,725 1,009,250 1.00

Pemasangan Kusen M² 4.31 35,000 150,675 4.31 Fabrikasi Kusen M 23.38 22,500 526,050 23.38

Kayu Kelas II 0.15 2,200,000 322,128 0.15

Besi Beton £ Ø 12 mm Kg 0.74 11,000 8,138 0.74

Paku 3" Kg 0.12 19,000 2,259 0.12 Kusen Type K-02 aK Unit 1.00 213,148 460,313 673,461 1.00

Pemasangan Kusen M² 3.32 35,000 116,287 3.32 Fabrikasi Kusen M 15.29 22,500 344,025 15.29

Kayu Kelas II 0.09 2,200,000 206,366 0.09

Besi Beton £ Ø 12 mm Kg 0.62 11,000 6,782 0.62 Kusen Type K-03 K Unit 1.00 406,362 842,288 1,248,650 1.00

Pemasangan Kusen M² 5.38 35,000 188,213 5.38 Fabrikasi Kusen M 29.07 22,500 654,075 29.07

Kayu Kelas II 0.18 2,200,000 396,705 0.18

Besi Beton £ Ø 12 mm Kg 0.62 11,000 6,782 0.62

Paku 3" Kg 0.15 19,000 2,876 0.15 Kusen Type K-09 K Unit 1.00 139,927 294,750 434,677 1.00

Pemasangan Kusen M² 2.25 35,000 78,750 2.25 Fabrikasi Kusen M 9.60 22,500 216,000 9.60

Kayu Kelas II 0.06 2,200,000 131,789 0.06

Besi Beton £ Ø 12 mm Kg 0.74 11,000 8,138 0.74 Kusen Type K-10 K Unit 1.00 140,749 291,600 432,349 1.00

Pemasangan Kusen M² 2.16 35,000 75,600 2.16 Fabrikasi Kusen M 9.60 22,500 216,000 9.60

Kayu Kelas II 0.06 2,200,000 131,789 0.06

Besi Beton £ Ø 12 mm Kg 0.74 11,000 8,138 0.74

Paku 3" Kg 0.04 19,000 822 0.04 Kusen Type K-11 K Unit 1.00 110,646 224,061 334,706 1.00

Pemasangan Kusen M² 2.16 35,000 75,600 2.16 Fabrikasi Kusen M 6.40 22,500 144,000 6.40

Kayu Kelas II 0.05 2,200,000 109,824 0.05

Paku 3" Kg 0.04 19,000 822 0.04 Pemasangan Kaca M² 0.26 17,000 4,461 0.26

Kaca Rayban 5 mm Produk Asahi Type Panasaf (60 %) M² 0.26 - 0.26 Kusen Type K-13 K Unit 1.00 89,510 177,975 267,485 1.00

Pemasangan Kusen M² 1.94 35,000 67,725 1.94 Fabrikasi Kusen M 4.90 22,500 110,250 4.90

M3

M3

M3

M3

M3

M3

M3

Page 10: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

10/63

ANALISA SATUAN PEKERJAANKALTIM

ESTIMASI CV. DEWI SEKAREST

NO URAIAN PEKERJAAN SAT VOL

SAT. BAHAN BAHAN SAT. UPAH UPAH JUMLAH OWNER

diisi estimasi volume material oleh kontraktor

Volume versi Owner. Kontraktor boleh sama dg vol

ini

VOL EST CV. DEWI SEKAR

Kayu Kelas II 0.04 2,200,000 84,084 0.04

Besi Beton £ Ø 12 mm Kg 0.49 11,000 5,426 0.49 Kusen Type K-15 K Unit 1.00 182,894 371,138 554,032 1.00

Pemasangan Kusen M² 2.23 35,000 77,963 2.23 Fabrikasi Kusen M 13.03 22,500 293,175 13.03

Kayu Kelas II 0.08 2,200,000 177,469 0.08

Besi Beton £ Ø 12 mm Kg 0.49 11,000 5,426 0.49 Kusen Type K-16 K Unit 1.00 162,302 325,238 487,540 1.00

Pemasangan Kusen M² 1.69 35,000 59,063 1.69 Fabrikasi Kusen M 11.83 22,500 266,175 11.83

Kayu Kelas II 0.07 2,200,000 156,877 0.07

Besi Beton £ Ø 12 mm Kg 0.49 11,000 5,426 0.49 Kusen Type K-22 K Unit 1.00 88,204 165,400 253,604 1.00

Pemasangan Kusen M² 1.64 35,000 57,400 1.64 Fabrikasi Kusen M 4.80 22,500 108,000 4.80

Kayu Kelas II 0.04 2,200,000 82,368 0.04

Besi Beton £ Ø 12 mm Kg 0.49 11,000 5,426 0.49

Paku 3" Kg 0.02 19,000 411 0.02 Kusen Type K-23 K Unit 1.00 208,385 385,500 593,885 1.00

Pemasangan Kusen M² 3.30 35,000 115,500 3.30 Fabrikasi Kusen M 12.00 22,500 270,000 12.00

Kayu Kelas II 0.09 2,200,000 205,920 0.09

Paku 3" Kg 0.13 19,000 2,465 0.13 Kusen Type K-33 K Unit 1.00 488,618 1,032,773 1,521,391 1.00

Pemasangan Kusen M² 6.64 35,000 232,313 6.64 Fabrikasi Kusen M 34.76 22,500 782,100 34.76

Kayu Kelas II 0.22 2,200,000 480,480 0.22

Besi Beton £ Ø 12 mm Kg 0.74 11,000 8,138 0.74 Pemasangan Kaca M² 1.08 17,000 18,360 1.08

Kaca Rayban 5 mm Produk Asahi Type Panasaf (60 %) M² 1.08 - 1.08 Kusen Type K-34 K Unit 1.00 359,850 874,325 1,234,175 1.00

Pemasangan Kusen M² 7.86 35,000 274,925 7.86 Fabrikasi Kusen M 26.64 22,500 599,400 26.64

Kayu Kelas II 0.16 2,200,000 351,711 0.16

Besi Beton £ Ø 12 mm Kg 0.74 11,000 8,138 0.74 Pintu Type P-01 Unit 1.00 163,659 320,000 483,659 1.00

Pasang Pintu Unit 1.00 175,000 175,000 1.00 Fabrikasi Pintu Panel Bh 1.00 145,000 145,000 1.00

Kayu Kelas II 0.07 2,200,000 163,659 0.07 Pintu Type P-01a K Unit 1.00 327,318 640,000 967,318 1.00

Pasang Pintu Unit 2.00 175,000 350,000 2.00 Fabrikasi Pintu Panel Bh 2.00 145,000 290,000 2.00

Kayu Kelas II 0.15 2,200,000 327,318 0.15 Pintu Type P-02 Unit 1.00 116,658 320,000 436,658 1.00

Pasang Pintu Unit 1.00 175,000 175,000 1.00 Fabrikasi Pintu Panel Bh 1.00 145,000 145,000 1.00

Kayu Kelas II 0.04 2,200,000 82,115 0.04 Plywood 6 mm M² 0.97 35,700 34,543 0.97

Pintu Type P-04 Unit 1.00 143,790 320,000 463,790 1.00

Pasang Pintu Unit 1.00 175,000 175,000 1.00 Fabrikasi Pintu Panel Bh 1.00 145,000 145,000 1.00

Kayu Kelas II 0.04 2,200,000 79,948 0.04

Plywood 6 mm M² 0.80 35,700 28,689 0.80 Seng M² 1.51 23,250 35,154 1.51

Pintu Type P-05 Unit 1.00 116,658 320,000 436,658 1.00

Pasang Pintu Unit 1.00 175,000 175,000 1.00 Fabrikasi Pintu Panel Bh 1.00 145,000 145,000 1.00

Kayu Kelas II 0.04 2,200,000 82,115 0.04 Plywood 6 mm M² 0.97 35,700 34,543 0.97

Pintu Type P-07a K Unit 1.00 242,458 640,000 882,458 1.00 Pasang Pintu Unit 2.00 175,000 350,000 2.00 Fabrikasi Pintu Panel Bh 2.00 145,000 290,000 2.00

Kayu Kelas II 0.11 2,200,000 242,458 0.11 Pintu Type PV-02 Unit 1.00 - 232,400 232,400 1.00

Pemasangan Kusen M² 1.64 35,000 57,400 1.64

Kusen PVC Bh 1.00 - 1.00 Pasang Pintu Unit 1.00 175,000 175,000 1.00

Pintu PVC PV-02 Bh 1.00 - 1.00

Pintu Garasi Unit 1.00 22,657 - 22,657 1.00

Fabrikasi Pintu Garasi Bh 1.00 - 1.00 Pipa Hitam Medium Ø 1 1/2" - 6 M Btg 4.28 - 4.28

Kg 60.03 - 60.03

L Kg 18.00 - 18.00

Kg 2.06 11,000 22,657 2.06 Jendela Type J-04 Unit 1.00 28,265 71,850 100,115 1.00

Pasang Jendela Unit 1.00 62,500 62,500 1.00 Fabrikasi Jendela Kaca Bh 1.00 - 1.00

Kayu Kelas II 0.01 2,200,000 28,265 0.01 Pemasangan Kaca M² 0.55 17,000 9,350 0.55

Kaca Rayban 5 mm Produk Asahi Type Panasaf (60 %) M² 0.55 - 0.55 Jendela Type J-04a Unit 1.00 28,265 71,850 100,115 1.00

Pasang Jendela Unit 1.00 62,500 62,500 1.00 Fabrikasi Jendela Kaca Bh 1.00 - 1.00

Kayu Kelas II 0.01 2,200,000 28,265 0.01 Pemasangan Kaca M² 0.55 17,000 9,350 0.55

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Plat £ 8 mm

Besi Beton £ Ø 12 mm

M3

M3

Page 11: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

11/63

ANALISA SATUAN PEKERJAANKALTIM

ESTIMASI CV. DEWI SEKAREST

NO URAIAN PEKERJAAN SAT VOL

SAT. BAHAN BAHAN SAT. UPAH UPAH JUMLAH OWNER

diisi estimasi volume material oleh kontraktor

Volume versi Owner. Kontraktor boleh sama dg vol

ini

VOL EST CV. DEWI SEKAR

Kaca Rayban 5 mm Produk Asahi Type Panasaf (60 %) M² 0.55 - 0.55 Jendela Type J-05 Unit 1.00 20,519 68,450 88,969 1.00

Pasang Jendela Unit 1.00 62,500 62,500 1.00 Fabrikasi Jendela Kaca Bh 1.00 - 1.00

Kayu Kelas II 0.01 2,200,000 20,519 0.01 Pemasangan Kaca M² 0.35 17,000 5,950 0.35

Kaca Rayban 5 mm Produk Asahi Type Panasaf (60 %) M² 0.35 - 0.35 Jendela Type J-06 K Unit 1.00 47,134 88,000 135,134 1.00

Pasang Jendela Unit 1.00 62,500 62,500 1.00

Fabrikasi Jendela Bh 1.00 25,500 25,500 1.00

Kayu Kelas II 0.01 2,200,000 29,462 0.01 Plywood 6 mm M² 0.50 35,700 17,672 0.50

Jendela Type J-07 K Unit 1.00 32,093 88,000 120,093 1.00 Pasang Jendela Unit 1.00 62,500 62,500 1.00 Fabrikasi Jendela Bh 1.00 25,500 25,500 1.00

Kayu Kelas II 0.01 2,200,000 20,491 0.01

Plywood 6 mm M² 0.33 35,700 11,603 0.33 Kawat Nyamuk Type KN-04 K Unit 1.00 10,674 50,500 61,174 1.00

Pasang Jendela Kawat Nyamuk Unit 1.00 25,000 25,000 1.00 Fabrikasi Jendela Bh 1.00 25,500 25,500 1.00

Kayu Kelas II 0.00 2,200,000 10,112 0.00 Kawat Nyamuk M² 0.09 6,500 562 0.09

Kawat Nyamuk Type KN-05 K Unit 1.00 13,569 50,500 64,069 1.00 Pasang Jendela Kawat Nyamuk Unit 1.00 25,000 25,000 1.00 Fabrikasi Jendela Bh 1.00 25,500 25,500 1.00

Kayu Kelas II 0.01 2,200,000 12,773 0.01 Kawat Nyamuk M² 0.12 6,500 796 0.12

Kawat Nyamuk Type KN-06 Unit 1.00 - 25,000 25,000 1.00 Pasang Jendela Kawat Nyamuk Unit 1.00 25,000 25,000 1.00

Frame Aluminium + Kasa Nyamuk Fiber Polyester M² 1.23 - 1.23 Kawat Nyamuk Type KN-07 Unit 1.00 - 25,000 25,000 1.00

Pasang Jendela Kawat Nyamuk Unit 1.00 25,000 25,000 1.00 Frame Aluminium + Kasa Nyamuk Fiber Polyester M² 0.83 - 0.83

Kawat Nyamuk Type KN-08 Unit 1.00 - 25,000 25,000 1.00 Pasang Jendela Kawat Nyamuk Unit 1.00 25,000 25,000 1.00

Frame Aluminium + Kasa Nyamuk Fiber Polyester M² 0.57 - 0.57 Kawat Nyamuk Type KN-09 Unit 1.00 - 25,000 25,000 1.00

Pasang Jendela Kawat Nyamuk Unit 1.00 25,000 25,000 1.00 Frame Aluminium + Kasa Nyamuk Fiber Polyester M² 0.31 - 0.31

Kawat Nyamuk Type KN-10 Unit 1.00 - 25,000 25,000 1.00 Pasang Jendela Kawat Nyamuk Unit 1.00 25,000 25,000 1.00

Frame Aluminium + Kasa Nyamuk Fiber Polyester M² 0.24 - 0.24 Jerajak Besi Type JB-01 Unit 1.00 51,898 - 51,898 1.00

Pembuatan Jerajak Kg 6.84 - 6.84

Kg 2.12 - 2.12

Kg 4.72 11,000 51,898 4.72 Jerajak Besi Type JB-01a K Unit 1.00 43,404 - 43,404 1.00

Pembuatan Jerajak Kg 5.83 - 5.83

Kg 1.88 - 1.88

Kg 3.95 11,000 43,404 3.95 Jerajak Besi Type JB-02 Unit 1.00 34,599 - 34,599 1.00

Pembuatan Jerajak Kg 4.79 - 4.79

Kg 1.65 - 1.65

Kg 3.15 11,000 34,599 3.15 Jerajak Besi Type JB-03 K Unit 1.00 12,975 - 12,975 1.00

Pembuatan Jerajak Kg 2.24 - 2.24

Kg 1.06 - 1.06

Kg 1.18 11,000 12,975 1.18 Jerajak Besi Type JB-03 Unit 1.00 12,975 - 12,975 1.00

Pembuatan Jerajak Kg 2.24 - 2.24

Kg 1.06 - 1.06

Kg 1.18 11,000 12,975 1.18 Jerajak Besi Type JB-04 Unit 1.00 33,595 - 33,595 1.00

Pembuatan Jerajak Kg 4.35 - 4.35

Kg 1.30 - 1.30

Kg 3.05 11,000 33,595 3.05 Bovenlight Type BV-03 K Unit 1.00 77,720 60,070 137,790 1.00

Pemasangan Kusen M² 0.28 35,000 9,800 0.28 Fabrikasi Kusen M 2.00 22,500 45,000 2.00

Kayu Kelas II 0.02 2,200,000 34,320 0.02 Pemasangan Kaca M² 0.31 17,000 5,270 0.31

Kaca Ice/Buram 5 mm M² 0.31 140,000 43,400 0.31 Bovenlight Type BV-03 aK Unit 1.00 48,048 89,149 137,197 1.00

Pemasangan Kusen M² 0.54 35,000 18,900 0.54 Fabrikasi Kusen M 2.80 22,500 63,000 2.80

Kayu Kelas II 0.02 2,200,000 48,048 0.02 Pemasangan Kaca M² 0.43 17,000 7,249 0.43

Kaca Rayban 5 mm Produk Asahi Type Panasaf (60 %) M² 0.43 - 0.43 Bovenlight Type BV-04 K Unit 1.00 154,956 121,915 276,871 1.00

Pemasangan Kusen M² 0.68 35,000 23,625 0.68 Fabrikasi Kusen M 3.90 22,500 87,750 3.90

Kayu Kelas II 0.03 2,200,000 66,924 0.03

Paku 3" Kg 0.06 19,000 1,232 0.06 Pemasangan Kaca M² 0.62 17,000 10,540 0.62

Kaca Ice/Buram 5 mm M² 0.62 140,000 86,800 0.62 Pemasangan Acesories Jendela Bh 1.00 14,500 14,500 14,500 1.00 Pemasangan Acesories Pintu Bh 1.00 17,500 17,500 17,500 1.00 Pemasangan Acesories Jendela Type A Bh 1.00 - - 1.00

M3

M3

M3

M3

M3

Plat £ 8 mm

Besi Beton £ Ø 12 mm

Plat £ 8 mm

Besi Beton £ Ø 12 mm

Plat £ 8 mm

Besi Beton £ Ø 12 mm

Plat £ 8 mm

Besi Beton £ Ø 12 mm

Plat £ 8 mm

Besi Beton £ Ø 12 mm

Plat £ 8 mm

Besi Beton £ Ø 12 mm

M3

M3

M3

Page 12: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

12/63

ANALISA SATUAN PEKERJAANKALTIM

ESTIMASI CV. DEWI SEKAREST

NO URAIAN PEKERJAAN SAT VOL

SAT. BAHAN BAHAN SAT. UPAH UPAH JUMLAH OWNER

diisi estimasi volume material oleh kontraktor

Volume versi Owner. Kontraktor boleh sama dg vol

ini

VOL EST CV. DEWI SEKAR

Pemasangan Acesories Pintu Type A Bh 1.00 - - 1.00 Lemari Dapur Rumah Manager Unit 1.00 - - - 1.00

Fabrikasi Lemari Bh 1.00 - 1.00

Triplek 9 mm M² 13.11 - 13.11 Engsel Pegas Bh 26.00 - 26.00 Handle Bh 13.00 - 13.00 Ventilasi Plastik Bh 7.00 - 7.00

Lemari Dapur Rumah Askep Unit 1.00 - - - 1.00 Fabrikasi Lemari Bh 1.00 - 1.00

Triplek 9 mm M² 7.60 - 7.60 Engsel Pegas Bh 24.00 - 24.00 Handle Bh 12.00 - 12.00 Ventilasi Plastik Bh 8.00 - 8.00

Lemari Dapur Rumah Asisten Unit 1.00 - - - 1.00 Fabrikasi Lemari Bh 1.00 - 1.00

Triplek 9 mm M² 7.70 - 7.70 Engsel Pegas Bh 22.00 - 22.00 Handle Bh 11.00 - 11.00 Ventilasi Plastik Bh 7.00 - 7.00

70 PEKERJAAN LANTAI & KERAMIK

Cor Rabat Beton M³ 1.00 754,180 240,000 240,000 994,180 1.00

Semen PC Type 1 @ 50 Kg Zak 4.36 75,500 329,180 4.36

Pasir Beton/Cor M³ 0.50 210,000 105,000 0.50

Kerikil/koral M³ 0.80 400,000 320,000 0.80

Pemasangan Keramik Lantai 30 x 30 cm Type A M² 1.00 23,185 - 23,185 1.00

Keramik 30 x 30 cm KW I Merk Roman Type Mable 33407 Dus 1.06 - 1.06

Semen PC Type 1 @ 50 Kg Zak 0.20 75,500 15,465 0.20

Semen Putih Zak 0.00 - 0.00

Pasir Pasang M³ 0.04 210,000 7,560 0.04

Benang Nylon Rol 0.01 16,000 160 0.01

Pemasangan Keramik Dinding 20 x 25 cm Type A M² 1.00 23,185 - 23,185 1.00

Keramik 20 x 25 cm KW I Merk Roman Type W 25301 Dus 1.06 - 1.06

Semen PC Type 1 @ 50 Kg Zak 0.20 75,500 15,465 0.20

Semen Putih Zak 0.00 - 0.00

Pasir Pasang M³ 0.04 210,000 7,560 0.04

Benang Nylon Rol 0.01 16,000 160 0.01

Pemasangan Keramik Lantai 20 x 20 cm Type A M² 1.00 23,185 - 23,185 1.00

Keramik 20 x 20 cm KW I Merk Roman Type Incision I 20950 Dus 1.06 - 1.06

Semen PC Type 1 @ 50 Kg Zak 0.20 75,500 15,465 0.20

Semen Putih Zak 0.00 - 0.00

Pasir Pasang M³ 0.04 210,000 7,560 0.04

Benang Nylon Rol 0.01 16,000 160 0.01

Pemasangan Keramik Dapur 20 x 20 cm Type A M² 1.00 23,185 - 23,185 1.00

Keramik 20 x 20 cm KW I Merk Roman Type W 20106 Dus 1.06 - 1.06

Semen PC Type 1 @ 50 Kg Zak 0.20 75,500 15,465 0.20

Semen Putih Zak 0.00 - 0.00

Pasir Pasang M³ 0.04 210,000 7,560 0.04

Benang Nylon Rol 0.01 16,000 160 0.01

Pemasangan Keramik Sudut/ nosing 0 M' 1.00 1,510 #N/A #N/A #N/A 1.00

Keramik sudut/ nosing m 1.05 - 1.05

Semen PC Type 1 @ 50 Kg Zak 0.02 75,500 1,510 0.02

Pemasangan Skirting Lantai Type A M' 1.00 4,765 - 4,765 1.00

Keramik 8 x 30 cm KW I Merk Roman Dus 0.10 - 0.10

Semen PC Type 1 @ 50 Kg Zak 0.03 75,500 2,242 0.03

Semen Putih Zak 0.00 - 0.00

Pasir Pasang M³ 0.01 210,000 2,363 0.01

Benang Nylon Rol 0.01 16,000 160 0.01

80 PEKERJAAN PENGECATAN Pengecatan Dinding M² 1.00 14,167 5,000 5,000 19,167 1.00

Cat Tembok Putih Merk Vinilex 5000 Emulsion Paint Kg 0.33 42,500 14,167 0.33 Pengecatan Plafond M² 1.00 14,167 7,500 7,500 21,667 1.00

Cat Tembok Putih Merk Vinilex 5000 Emulsion Paint Kg 0.33 42,500 14,167 0.33 Pengecatan Kusen M² 1.00 9,583 7,500 7,500 17,083 1.00

Dempul Kayu Merk Kembang Kg 0.00 28,500 17 0.00 Cat Meni Kayu Merk kembang Kg 0.03 25,000 735 0.03 Cat Kayu Platone 8000 Synthetic High Gloss Paint Kg 0.13 65,000 8,125 0.13 Thinner B Special Ltr 0.03 24,000 706 0.03

Pengecatan Pintu & Jendela M² 1.00 12,778 8,000 8,000 20,778 1.00 Dempul Kayu Merk Kembang Kg 0.02 28,500 570 0.02 Cat Meni Kayu Merk kembang Kg 0.08 25,000 2,083 0.08 Cat Kayu Platone 8000 Synthetic High Gloss Paint Kg 0.13 65,000 8,125 0.13 Thinner B Special Ltr 0.08 24,000 2,000 0.08

Pengecatan Listplank M² 1.00 12,778 6,500 6,500 19,278 1.00 Dempul Kayu Merk Kembang Kg 0.02 28,500 570 0.02 Cat Meni Kayu Merk kembang Kg 0.08 25,000 2,083 0.08 Cat Kayu Platone 8000 Synthetic High Gloss Paint Kg 0.13 65,000 8,125 0.13 Thinner B Special Ltr 0.08 24,000 2,000 0.08

Pengecatan Baja M² 1.00 600 - 600 1.00 Cat Besi Platone 8000 Synthetic High Gloss Paint Kg 0.10 - 0.10 Cat Meni Besi Merk Bodelac 9000 Zinc Chromate Primer Kg 0.13 - 0.13 Thinner B Special Ltr 0.03 24,000 600 0.03

Pengecatan Dinding Type A M² 1.00 14,167 - 14,167 1.00 Cat Tembok Putih Merk Vinilex 5000 Emulsion Paint Kg 0.33 42,500 14,167 0.33

Page 13: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

13/63

ANALISA SATUAN PEKERJAANKALTIM

ESTIMASI CV. DEWI SEKAREST

NO URAIAN PEKERJAAN SAT VOL

SAT. BAHAN BAHAN SAT. UPAH UPAH JUMLAH OWNER

diisi estimasi volume material oleh kontraktor

Volume versi Owner. Kontraktor boleh sama dg vol

ini

VOL EST CV. DEWI SEKAR

Pengecatan Plafond Type A M² 1.00 14,167 - 14,167 1.00 Cat Tembok Putih Merk Vinilex 5000 Emulsion Paint Kg 0.33 42,500 14,167 0.33

Pengecatan Kusen Type A M² 1.00 9,583 - 9,583 1.00 Dempul Kayu Merk Kembang Kg 0.00 28,500 17 0.00 Cat Meni Kayu Merk kembang Kg 0.03 25,000 735 0.03 Cat Kayu Platone 8000 Synthetic High Gloss Paint Kg 0.13 65,000 8,125 0.13 Thinner B Special Ltr 0.03 24,000 706 0.03

Pengecatan Pintu & Jendela Type A M² 1.00 12,778 - 12,778 1.00 Dempul Kayu Merk Kembang Kg 0.02 28,500 570 0.02 Cat Meni Kayu Merk kembang Kg 0.08 25,000 2,083 0.08 Cat Kayu Platone 8000 Synthetic High Gloss Paint Kg 0.13 65,000 8,125 0.13 Thinner B Special Ltr 0.08 24,000 2,000 0.08

Pengecatan Listplank Type A M² 1.00 12,778 - 12,778 1.00 Dempul Kayu Merk Kembang Kg 0.02 28,500 570 0.02 Cat Meni Kayu Merk kembang Kg 0.08 25,000 2,083 0.08 Cat Kayu Platone 8000 Synthetic High Gloss Paint Kg 0.13 65,000 8,125 0.13 Thinner B Special Ltr 0.08 24,000 2,000 0.08

Pengecatan Baja Type A M² 1.00 600 - 600 1.00 Cat Besi Platone 8000 Synthetic High Gloss Paint Kg 0.10 - 0.10 Cat Meni Besi Merk Bodelac 9000 Zinc Chromate Primer Kg 0.13 - 0.13 Thinner B Special Ltr 0.03 24,000 600 0.03

Pembersihan M² 1.00 1,200 1,200 1,200 1.00

90 PEKERJAAN SANITAIR Pasang Closet Duduk Bh 1.00 - - - 1.00

Closet Duduk Merk TOTO Type CW 420 J/S516 STD + Acessories Kompli Bh 1.00 - 1.00 Pasang Closet Jongkok Tipe I Bh 1.00 - - - 1.00

Closet Jongkok Merk TOTO Type CE 6 Bh 1.00 - 1.00 Pasang Closet Jongkok Tipe II Bh 1.00 250,000 95,000 95,000 345,000 1.00

Closet Jongkok Merk INA Bh 1.00 250,000 250,000 1.00 Pasang Wastafel Bh 1.00 - - - 1.00

Wastafel Merk TOTO Type L237 V1B + Acessories Komplit (Biru Muda) Bh 1.00 - 1.00 Pasang Kitchen Zink 2 Lubang Bh 1.00 - - - 1.00

Kitchen Zink Stainless Steel 2 Lubang Merk Meiwa Bh 1.00 - 1.00 Kran Air Kitchen Zink Merk TOTO Type T 30 AR 13 V7 (N) Bh 1.00 - 1.00

Pasang Kitchen Zink 1 Lubang Bh 1.00 - - - 1.00 Kitchen Zink Stainless Steel 1 Lubang Merk Meiwa Bh 1.00 - 1.00 Kran Air Kitchen Zink Merk TOTO Type T 30 AR 13 V7 (N) Bh 1.00 - 1.00

Pasang Bak Cuci Piring Bh 1.00 180,000 90,000 90,000 270,000 1.00 Bak Cuci Piring Plastik Warna Biru Tua Bh 1.00 162,000 162,000 1.00 Kran Air Biasa Merk Kitz Type Engkol Bh 1.00 18,000 18,000 1.00

Pasang Sanitair Fixture Bh 1.00 145,000 145,000 145,000 1.00 Pasang Sanitair Fixture Type A Bh 1.00 - - 1.00 Instalasi Air M' 1.00 6,400 6,400 6,400 1.00 Instalasi Air Bersih M' 1.00 16,063 - 16,063 1.00

Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3/4" AW - 4 m Btg 0.25 35,000 8,750 0.25 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 1/2" AW - 4 m Btg 0.25 29,250 7,313 0.25

Instalasi Air Kotor M' 1.00 32,000 - 32,000 1.00 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 4" D - 4 m Btg 0.25 64,000 16,000 0.25 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3" D - 4 m Btg 0.25 64,000 16,000 0.25

Septictank (lkp dg. Rmbsn,bk ktrl, p. hawa) Batako Unit 1.00 1,995,310 1,450,000 1,450,000 3,445,310 1.00 Pelat dasar t = 8 cm Pengecoran 1 : 3 : 5 M³ 0.20 0.20

Semen PC Type 1 @ 50 Kg Zak 0.81 75,500 61,246 0.81 Pasir Beton/Cor M³ 0.13 210,000 26,830 0.13 Split M³ 0.18 355,000 64,795 0.18

Pasang Batako M² 12.24 12.24 Batako 10 x 20 x 40 cm Bh 152.94 4,500 688,219 152.94 Semen PC Type 1 @ 50 Kg Zak 1.09 75,500 82,102 1.09 Pasir Pasang M³ 0.08 210,000 17,127 0.08

Plesteran 1 : 2 + Acian M² 14.45 14.45 Semen PC Type 1 @ 50 Kg Zak 2.41 75,500 181,829 2.41 Pasir Pasang M³ 0.33 210,000 68,276 0.33

Rembesan Unit 1.00 1.00 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 4" D - 4 m Btg 1.00 64,000 64,000 1.00 Pasir Urug M³ 0.12 125,000 15,000 0.12 Kerikil/koral M³ 0.12 400,000 48,000 0.12 Ijuk Kg 5.00 12,000 60,000 5.00

Pelat penutup atas t = 8 cm

Bekisting M² 2.02 2.02 Kayu Papan 2/20 - 4 m Kelas II (Bekisting/Bowplank) Btg 0.84 35,200 29,627 0.84 Kayu Balok 4/6 - 4 m Kelas II (Bekisting/Bowplank) Btg 2.69 16,500 44,440 2.69 Paku 2" Kg 0.10 19,000 1,919 0.10

Pembesian < dia. 12 mm Kg 10.94 10.94 Besi Beton £ Ø 12 mm Kg 10.94 11,000 120,293 10.94 Pipa Conduit Ø 1/2" - 4 m Btg 0.04 14,000 560 0.04

Pengecoran 1 : 2 : 3 M³ 0.20 0.20 Semen PC Type 1 @ 50 Kg Zak 1.14 75,500 85,744 1.14 Pasir Beton/Cor M³ 0.11 210,000 23,849 0.11 Split M³ 0.16 355,000 57,595 0.16

Pipa hawa Pipa Galvanized Ø 1,5" Btg 0.50 197,000 98,500 0.50 Tee 1,5"x1,5" Bh 1.00 19,250 19,250 1.00

Bak Kontrol Septicktank Unit 1.00 1.00

Pengecoran 1 : 3 : 5 M³ 0.03 0.03 Semen PC Type 1 @ 50 Kg Zak 0.12 75,500 9,302 0.12 Pasir Beton/Cor M³ 0.02 210,000 4,075 0.02 Split M³ 0.03 355,000 9,841 0.03

Pasang Batako M² 0.90 0.90 Batako 10 x 20 x 40 cm Bh 11.25 4,500 50,625 11.25

Page 14: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

14/63

ANALISA SATUAN PEKERJAANKALTIM

ESTIMASI CV. DEWI SEKAREST

NO URAIAN PEKERJAAN SAT VOL

SAT. BAHAN BAHAN SAT. UPAH UPAH JUMLAH OWNER

diisi estimasi volume material oleh kontraktor

Volume versi Owner. Kontraktor boleh sama dg vol

ini

VOL EST CV. DEWI SEKAR

Semen PC Type 1 @ 50 Kg Zak 0.08 75,500 6,039 0.08 Pasir Pasang M³ 0.01 210,000 1,260 0.01

Plesteran 1 : 2 + Acian M² 1.32 1.32 Semen PC Type 1 @ 50 Kg Zak 0.22 75,500 16,610 0.22 Pasir Pasang M³ 0.03 210,000 6,237 0.03

Pelat penutup atas t = 8 cm 0.39 0.39

Pembesian < dia. 12 mm Kg 0.56 0.56 Besi Beton £ Ø 12 mm Kg 0.56 11,000 6,169 0.56 Pipa Conduit Ø 1/2" - 4 m Btg 0.04 14,000 560 0.04

Pengecoran 1 : 2 : 3 M³ 0.03 0.03 Semen PC Type 1 @ 50 Kg Zak 0.17 75,500 13,022 0.17 Pasir Beton/Cor M³ 0.02 210,000 3,622 0.02 Split M³ 0.02 355,000 8,747 0.02

100 PEKERJAAN INSTALASI LISTRIK

Instalasi Lampu Ttk 1.00 27,380 45,000 45,000 72,380 1.00

Rol 0.08 8,500 680 0.08 Isolator Plastik Bh 2.00 4,000 8,000 2.00 Paku Asbes 2,5" + Karet Bh 2.00 225 450 2.00 Pipa Conduit Ø 1/2" - 4 m Btg 1.00 14,000 14,000 1.00 Isolasi Unibel Rol 0.50 8,500 4,250 0.50

Ttk 1.00 104,700 45,000 45,000 149,700 1.00

Rol 0.08 975,000 78,000 0.08 Isolator Plastik Bh 2.00 4,000 8,000 2.00 Paku Asbes 2,5" + Karet Bh 2.00 225 450 2.00 Pipa Conduit Ø 1/2" - 4 m Btg 1.00 14,000 14,000 1.00 Isolasi Unibel Rol 0.50 8,500 4,250 0.50

0

M2

Kabel NYM 2 x 2.5 mm2

Instalasi Stop Kontak (Kabel NYM 3 x 2.5 mm2)

Kabel NYM 3 x 2.5 mm2

Page 15: RAP Kosong Penawaran Perumahan

BILL OF QUANTITY 97.00 BANGUNAN : RUMAH G-2 PERMANEN Dinding : Batako Dinding :LOKASI : KALTIM Atap : Zincalume Gelombang Atap :NO. GBR. : THA/R-G2/STD/KNV/11HARGA : Rp 152,272,199.11 KONTRAKTOR : CV. DEWI SEKAR

harus diisi harus diisi

HARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

00 PEKERJAAN TANAH & PONDASI 31,485,455

01 Pasang Bowplank M' 78.00 78.00 20,737 1,617,511

Pasang Bowplank M' 78.00 78.00 20,737 1,617,511

02 Pondasi Batu Kali M³ 10.86 10.86 1,191,329 12,931,881

Galian Tanah M³ 20.04 20.04 60,000 1,202,400

Urugan Tanah & Pemadatan M³ 11.02 11.02 80,000 881,760

Stek Pondasi Menerus Kg 25.89 25.89 12,450 322,387

Pasangan Batu Kali M³ 10.86 10.86 969,630 10,525,334

03 Pondasi Rollag M² 9.80 9.80 121,769 1,193,335

Galian Tanah M³ 1.47 1.47 60,000 88,200

Urugan Tanah & Pemadatan M³ 0.88 0.88 80,000 70,560

Pondasi Rollag Batako M² 9.80 9.80 105,569 1,034,575

10 PEKERJAAN KONSTRUKSI BETON 27,667,325

11 Sloof M³ 2.51 2.51 3,546,415 8,883,770

Bekisting Balok & Kolom M² 33.40 33.40 78,406 2,618,765

Pembesian

PBesi Beton Ø 10 mm Kg 205.92 205.92 12,870 2,650,236

PBesi Beton Ø 6 mm Kg 65.02 65.02 12,870 836,824

Pengecoran 1:2:3 M³ 2.51 2.51 1,108,960 2,777,945

12 Kolom Praktis M³ 1.93 1.93 5,119,144 9,899,785

Bekisting Balok & Kolom M² 51.57 51.57 78,406 4,043,405

Pembesian

PBesi Beton Ø 10 mm Kg 211.97 211.97 12,870 2,727,997

PBesi Beton Ø 6 mm Kg 76.44 76.44 12,870 983,793

Pengecoran 1:2:3 M³ 1.93 1.93 1,108,960 2,144,590

13 Ring Balok Praktis M³ 1.88 1.88 3,946,798 7,415,046

Bekisting Balok & Kolom M² 25.05 25.05 78,406 1,964,074

Pembesian

PBesi Beton Ø 10 mm Kg 205.92 205.92 12,870 2,650,236

PBesi Beton Ø 6 mm Kg 55.73 55.73 12,870 717,278

Pengecoran 1:2:3 M³ 1.88 1.88 1,108,960 2,083,459

14 Meja Dapur M³ 0.22 0.22 3,492,972 754,482

Bekisting Setempat M² 3.16 3.16 94,134 297,088

Pembesian

PBesi Beton Ø 8 mm Kg 16.93 16.93 12,870 217,859

Pengecoran 1:2:3 M³ 0.22 0.22 1,108,960 239,535

20 PEKERJAAN PASANGAN 48,176,065 21 Pasangan Dinding Batako M² 240.34 240.34 106,155 25,513,246 22 Plesteran 1:4 + Acian M² 474.76 474.76 46,357 22,008,212 23 Plesteran 1:2 + Acian M² 11.84 11.84 55,288 654,608

*) Pasangan Dinding

Pasangan Dinding Batako M² 209.45 209.45 105,069 22,006,673

Pasangan Dinding Batako ( Trasram ) M² 25.05 25.05 115,488 2,892,971

Plesteran 1:4 + Acian M² 469.00 469.00 46,357 21,741,199

*) Pasangan Bak Kamar Mandi

Pasangan Dinding Batako M² 2.96 2.96 105,069 311,004 Plesteran 1:2 + Acian M² 11.84 11.84 55,288 654,608

*) Pasangan Meja Dapur

Pasangan Dinding Batako M² 2.88 2.88 105,069 302,598

Plesteran 1:4 + Acian M² 5.76 5.76 46,357 267,013

40 PEKERJAAN KUSEN, PINTU, & PENGGANTUNG 22,303,676 41 Kusen Unit 16.00 16.00 472,273 7,556,367

Kusen Type K-01 K Unit 1.00 1.00 914,066 914,066 Kusen Type K-02 K Unit 1.00 1.00 1,009,250 1,009,250 Kusen Type K-10 K Unit 2.00 2.00 432,349 864,697 Kusen Type K-13 K Unit 4.00 4.00 267,485 1,069,938 Kusen Type K-15 K Unit 4.00 4.00 554,032 2,216,127 Kusen Type K-16 K Unit 2.00 2.00 487,540 975,080 Kusen Type K-22 K Unit 2.00 2.00 253,604 507,209

42 Pintu Unit 10.00 10.00 652,282 6,522,823 Pintu Type P-02 Unit 4.00 4.00 436,658 1,746,632 Pintu Type P-04 Unit 2.00 2.00 463,790 927,580 Pintu Type P-05 Unit 4.00 4.00 436,658 1,746,632

43 Jendela Unit 16.00 16.00 131,374 2,101,979 Jendela Type J-06 K Unit 12.00 12.00 135,134 1,621,607 Jendela Type J-07 K Unit 4.00 4.00 120,093 480,372

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Page 16: RAP Kosong Penawaran Perumahan

44 Bovenlight Unit 2.00 2.00 276,871 553,743 Bovenlight Type BV-04 K Unit 2.00 2.00 276,871 553,743

45 Kawat Nyamuk Unit 24.00 24.00 61,656 1,479,753 Kawat Nyamuk Type KN-04 K Unit 20.00 20.00 61,174 1,223,477 Kawat Nyamuk Type KN-05 K Unit 4.00 4.00 64,069 256,276

46 Acessories Pintu & Jendela Bh 198.00 198.00 25,960 5,140,000 Pemasangan Acesories Pintu Bh 46.00 46.00 17,500 805,000

Kunci Tanam 2 Slot 10" Merk ISEO (Kunci Gepeng) Bh 4.00 4.00 98,500 394,000 Engsel Gantung Kuningan Merk Arch 4" x 3" Bh 30.00 30.00 11,000 330,000 Grendel Kuningan 3" Bh 6.00 6.00 10,000 60,000 Pegangan Pintu 4" Type Polos Bh 6.00 6.00 6,500 39,000

Pemasangan Acesories Jendela Bh 152.00 152.00 14,500 2,204,000 Engsel Gantung Kuningan Merk Arch 3" x 2,5" Bh 32.00 32.00 10,000 320,000

Grendel Kuningan 2" Bh 64.00 64.00 9,500 608,000 Hak Angin Type Polos Bh 16.00 16.00 7,500 120,000 Pegangan Jendela 3" Type Polos Bh 40.00 40.00 6,500 260,000

60 PEKERJAAN LANTAI & KERAMIK 15,784,199

61 Lantai 1:3:5 M³ 6.04 6.04 1,307,180 7,892,099

Urugan Tanah & Pemadatan M³ 7.25 7.25 80,000 579,600

Urug Pasir M³ 6.04 6.04 217,000 1,310,138

Cor Rabat Beton M³ 6.04 6.04 994,180 6,002,362

70 PEKERJAAN PENGECATAN 13,724,774 71 Cat Dinding + Plafond (1 kg = 4 m2) M² 555.76 555.76 19,531 10,854,567

Pengecatan Dinding M² 474.76 474.76 19,167 9,099,567 Pengecatan Plafond M² 81.00 81.00 21,667 1,755,000

72 Cat Minyak (1 kg = 8 m2) M² 143.49 143.49 19,083 2,738,208 Pengecatan Kusen M² 52.48 52.48 17,083 896,533 Pengecatan Pintu & Jendela M² 58.13 58.13 20,778 1,207,803 Pengecatan Listplank M² 32.88 32.88 19,278 633,872

73 Pembersihan M² 110.00 110.00 1,200 132,000 Pembersihan M² 110.00 110.00 1,200 132,000

80 PEKERJAAN SANITAIR 6,229,398 81 Sanitair Fixture Bh 12.00 12.00 158,000 1,896,000

Pasang Closet Jongkok Tipe II Bh 2.00 2.00 345,000 690,000 Pasang Bak Cuci Piring Bh 2.00 2.00 270,000 540,000 Pasang Sanitair Fixture Bh 4.00 4.00 145,000 580,000

Kran Air Biasa Merk Kitz Type Engkol Bh 2.00 2.00 18,000 36,000 Floor Drain Plastik Warna Biru Muda + Syphon Bh 2.00 2.00 25,000 50,000

82 Instalasi Air M' 47.65 47.65 18,638 888,088 Instalasi Air M' 47.65 47.65 6,400 304,960

Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 1/2" AW - 4 m Btg 2.66 2.66 29,250 77,878 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3/4" AW - 4 m Btg 2.00 2.00 35,000 70,000 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 2" D - 4 m Btg 2.50 2.50 52,500 131,250 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3" D - 4 m Btg 2.00 2.00 64,000 128,000 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 4" D - 4 m Btg 2.75 2.75 64,000 176,000

83 Septicktank Unit 1.00 1.00 3,445,310 3,445,310 Septictank (lkp dg. Rmbsn,bk ktrl, p. hawa) Batako Unit 1.00 1.00 3,445,310 3,445,310

90 PEKERJAAN INSTALASI LISTRIK 3,134,020 91 Instalasi Titik Lampu Ttk 24.00 24.00 72,380 1,737,120

Instalasi Lampu Ttk 24.00 24.00 72,380 1,737,120 92 Pemasangan Saklar Bh 10.00 10.00 19,250 192,500

Saklar Ganda Inbow Merk Broco Bh 4.00 4.00 19,250 77,000 Saklar Tunggal Inbow Merk Broco Bh 6.00 6.00 19,250 115,500

93 Pemasangan Stop Kontak Ttk 4.00 4.00 84,350 337,400

Ttk 2.00 2.00 149,700 299,400 Stop Kontak Merk Broco Inbow Bh 2.00 2.00 19,000 38,000

94 Pemasangan MCB Bh 1.00 1.00 233,500 233,500 MCB 2 A 1 Phase + Box Merk Fuji Bh 1.00 1.00 148,500 148,500 Arde ( tembaga masif ) Set 1.00 1.00 85,000 85,000

95 Pemasangan Lampu Bh 14.00 14.00 45,250 633,500 Lampu SL 11 W Merk Phillips + Fitting Bh 10.00 10.00 45,250 452,500 Lampu SL 18 W Merk Phillips + Fitting Bh 4.00 4.00 45,250 181,000

100 BANGUNAN ATAS - 101 Struktur Bangunan Atas Ls 1.00 1.00 - -

Struktur Bangunan Atas G2 Ls 1.00 1.00 -

TOTAL BANGUNAN 152,272,199

Note = Volume di atas hanya sebagai panduan, kontraktor harus tetap menghitung ulang

Instalasi Stop Kontak (Kabel NYM 3 x 2.5 mm2)

Page 17: RAP Kosong Penawaran Perumahan

BILL OF QUANTITY Luas ( m2 ) :

BANGUNAN : RUMAH MANAGER + MENARA AIR Dinding :LOKASI : KALTIM Atap :NO. GBR. : INF/THA/R.MGR/II/11 Type :HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisi

NO URAIAN PEKERJAAN SAT.

I RUMAH MANAGER00 PEKERJAAN TANAH & PONDASI

01 Pasang Bowplank M' 75.08 -

Pasang Bowplank M' 75.08

02 Pondasi Batu Kali M³ 17.04 -

Galian Tanah M³ 31.47

Urugan Tanah & Pemadatan M³ 17.31

Stek Pondasi Menerus Kg 40.59

Pasangan Batu Kali M³ 17.04

03 Pondasi P1 M³ 0.14 -

Galian Tanah M³ 0.70

Urugan Tanah & Pemadatan M³ 0.60

Lantai Kerja M² 1.28

Bekisting Setempat M² 1.20

Pembesian

PeBesi Beton Ø 12 mm Kg 20.47

PeBesi Beton Ø 6 mm Kg 1.07

Pengecoran 1:2:3 M³ 0.14

04 Pondasi Rollag M² 15.02 -

Galian Tanah M³ 2.25

Urugan Tanah & Pemadatan M³ 1.35

Pondasi Rollag Batako M² 15.02

10 PEKERJAAN KONSTRUKSI BETON

11 Sloof M³ 3.93 -

Bekisting Balok & Kolom M² 52.45

Pembesian

PeBesi Beton Ø 10 mm Kg 323.35

PeBesi Beton Ø 6 mm Kg 102.02

Pengecoran 1:2:3 M³ 3.93

12 Kolom praktis M³ 3.34 -

Bekisting Balok & Kolom M² 89.11

Pembesian

PeBesi Beton Ø 10 mm Kg 366.28

PeBesi Beton Ø 6 mm Kg 99.04

Pengecoran 1:2:3 M³ 3.34

13 Ring balok praktis M³ 2.86 -

Bekisting Balok & Kolom M² 38.19

Pembesian

PeBesi Beton Ø 10 mm Kg 313.95

PeBesi Beton Ø 6 mm Kg 84.91

Pengecoran 1:2:3 M³ 2.86

14 Dak Teras M³ 4.50 - Bekisting Setempat M² 10.20 Pembesian Wiremesh M 6 M² 90.00 Pengecoran 1:2:3 M³ 4.50

15 Balok Dak M³ 5.04 -

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Page 18: RAP Kosong Penawaran Perumahan

Bekisting Balok & Kolom M² 63.00

PembesianPeBesi Beton Ø 12 mm Kg 372.88 PeBesi Beton Ø 6 mm Kg 112.46 Pengecoran 1:2:3 M³ 5.04

16 Kolom Teras M³ 0.28 -

0 Bekisting Balok & Kolom M² 5.60

0 Pembesian

0 PeBesi Beton Ø 12 mm Kg 17.26

0 PeBesi Beton Ø 6 mm Kg 8.46

0 Pengecoran 1:2:3 M³ 0.17

17 Beton Meja Dapur 1:2:3 M³ 0.39 -

Bekisting Balok & Kolom M² 8.33

Pembesian

PeBesi Beton Ø 8 mm Kg 104.30

Pengecoran 1:2:3 M³ 0.39

Plesteran 1:4 + Acian M² 2.42

20 PEKERJAAN PASANGAN21 Pasangan Dinding Batako M² 396.54 - 22 Plesteran 1:4 + Acian M² 775.37 - 23 Plesteran 1:2 + Acian M² 17.72 -

*) Pasangan Dinding

Pasangan Dinding Batako Type A M² 348.35

Pasangan Dinding Batako ( Trasram ) M² 39.33

Plesteran 1:4 + Acian Type A M² 775.37

*) Pasangan Bak Km. Mandi

Pasangan Dinding Batako Type A M² 8.86

Plesteran 1:2 + Acian Type A M² 17.72

24 Pasangan Batu Alam M² 3.36 -

Pasangan Batu Alam M² 3.36

25 Pasangan bata kerawang M² 12.80 -

0 Pasangan Bata Kerawang M² 12.80

40 PEKERJAAN KUSEN, PINTU, & PENGGANTUNG41 Kusen Kayu Unit 15.00 -

Kusen Type K-02 aK Unit 1.00 Kusen Type K-09 K Unit 3.00 Kusen Type K-11 K Unit 1.00 Kusen Type K-13 K Unit 2.00 Kusen Type K-15 K Unit 4.00 Kusen Type K-16 K Unit 1.00 Kusen Type K-23 K Unit 1.00 Kusen Type K-34 K Unit 2.00

42 Pintu Unit 13.00 -

Pintu Type P-01 Unit 1.00

Pintu Type P-02 Unit 6.00

Pintu Type P-07a K Unit 2.00

Pintu Type PV-02 Unit 3.00

0 Pintu Garasi Unit 1.00

43 Jendela Unit 18.00 - Jendela Type J-04 Unit 12.00 Jendela Type J-05 Unit 2.00 Jendela Type J-06 K Unit 4.00

44 Jerajak Unit 22.00 - Jerajak Besi Type JB-01 Unit 12.00 Jerajak Besi Type JB-02 Unit 2.00

` Jerajak Besi Type JB-03 Unit 4.00 Jerajak Besi Type JB-04 Unit 4.00

45 Bovenlight Unit 4.00 - Bovenlight Type BV-03 K Unit 4.00

46 Kawat Nyamuk Unit 44.00 - Kawat Nyamuk Type KN-07 Unit 11.00

Page 19: RAP Kosong Penawaran Perumahan

Kawat Nyamuk Type KN-08 Unit 2.00 Kawat Nyamuk Type KN-10 Unit 19.00 Kawat Nyamuk Type KN-09 Unit 8.00 Kawat Nyamuk Type KN-06 Unit 4.00

47 Acessories Pintu & Jendela Bh 130.00 - Pemasangan Acesories Pintu Type A Bh 40.00

Kunci Tanam 2 Slot 10" Merk DEKKSON (Kunci Gepeng) Bh 9.00 Engsel Gantung Kuningan Merk Arch 4" x 3" Bh 27.00

Grendel Type Antik 4" Bh 4.00 Pemasangan Acesories Jendela Type A Bh 90.00

Engsel Gantung Kuningan Merk Arch 3" x 2,5" Bh 36.00

Grendel Type Antik 2" Bh 18.00 Hak Angin Type Antik Bh 18.00 Pegangan Jendela 3" Type Antik Bh 18.00

48 Acessories Dapur Unit 1.00 - Lemari Dapur Rumah Manager Unit 1.00

60 PEKERJAAN LANTAI & KERAMIK

61 Beton Plat Lantai 1:3:5 M³ 12.85 -

Urug Pasir M³ 10.11

Cor Rabat Beton M³ 12.85

62 Pemasangan Keramik M² 283.46 -

Pemasangan Keramik Lantai 30 x 30 cm Type A M² 160.30

Pemasangan Keramik Lantai 20 x 20 cm Type A M² 13.06

Pemasangan Keramik Dinding 20 x 25 cm Type A M² 100.45

Pemasangan Keramik Dapur 20 x 20 cm Type A M² 9.66

Pemasangan Keramik Sudut/ nosing M² 4.20

63 Skirting Lantai M' 115.61 - Pemasangan Skirting Lantai Type A M' 115.61

70 PEKERJAAN PENGECATAN71 Cat Dinding + Plafond (1 kg = 4 m2) M² 1,015.87 -

Pengecatan Dinding Type A M² 775.37 Pengecatan Plafond Type A M² 240.50

72 Cat Minyak (1 kg = 8 m2) M² 148.87 - Pengecatan Kusen Type A M² 57.89 Pengecatan Listplank Type A M² 30.00 Pengecatan Pintu & Jendela Type A M² 60.98

73 Cat Baja (1 kg = 8 m2) M² 18.64 - Pengecatan Baja Type A M² 18.64

74 Pembersihan M² 204.10 - Pembersihan M² 204.10

80 PEKERJAAN SANITAIR81 Sanitair Fixture Bh 24.00 -

Pasang Closet Duduk Bh 2.00 Pasang Closet Jongkok Tipe I Bh 1.00

0 Pasang Wastafel Bh 2.00 Pasang Kitchen Zink 2 Lubang Bh 1.00 Pasang Sanitair Fixture Bh 9.00

Kran Air Biasa Merk Kitz Type Engkol Bh 1.00 Kran Air Mandi Merk TOTO Type T 23 B 13 V7 (N) Bh 3.00 Tempat Sabun Inbow Merk TOTO Type S11N (Biru Muda) Bh 2.00 Floor Drain Stainless Steel Merk TOTO Type TX 1 B Bh 3.00

82 Instalasi Air M' 107.80 - Instalasi Air M' 107.80

Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 1/2" AW - 4 m Btg 6.30 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3/4" AW - 4 m Btg 11.63 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 2" D - 4 m Btg 3.93 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3" D - 4 m Btg 2.06 Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 4" D - 4 m Btg 3.04

83 Septicktank Unit 2.00 - Septictank (lkp dg. Rmbsn,bk ktrl, p. hawa) Batako Unit 2.00

90 PEKERJAAN INSTALASI LISTRIK 91 Instalasi Titik Lampu Ttk 23.00 -

Page 20: RAP Kosong Penawaran Perumahan

Instalasi Lampu Ttk 23.00 92 Pemasangan Saklar Bh 11.00 -

Saklar Ganda Inbow Merk Broco Bh 7.00 Saklar Tunggal Inbow Merk Broco Bh 4.00

93 Pemasangan Stop Kontak Ttk 24.00 -

Ttk 12.00 Stop Kontak Merk Broco Inbow Bh 12.00

94 Pemasangan MCB Set 6.00 - MCB 6 A 1 Phase + Box Merk Fuji Set 5.00 MCB 16 A 1 Phase + Box Merk Fuji Set 1.00 Arde ( tembaga masif ) Set 1.00

95 Pemasangan Lampu Bh 24.00 - Lampu SL 11 W Merk Phillips + Fitting Bh 12.00 Lampu SL 18 W Merk Phillips + Fitting Bh 12.00

100 BANGUNAN ATAS101 Struktur Bangunan Atas Ls 1.00 -

Struktur Bangunan Atas R. Manager Ls 1.00

II MENARA AIR00 PEKERJAAN TANAH & PONDASI

01 Pasang Bowplank M' 14.00 -

Pasang Bowplank M' 14.00

02 Pondasi (1:2:3) M³ 0.26 -

Galian Tanah M³ 1.08

Urugan Tanah & Pemadatan M³ 0.98

Bekisting Setempat M² 2.96

Pembesian

PeBesi Beton Ø 10 mm Kg 37.65

PeBesi Beton Ø 6 mm Kg 3.31

Pengecoran 1:2:3 M³ 0.26

03 Pondasi Tangga M³ 0.12 -

Galian Tanah M³ 0.28

Urugan Tanah & Pemadatan M³ 0.11

Urug Pasir M² 0.06

Lantai Kerja M² 0.55

Bekisting Setempat M² 1.34

Pembesian

PeBesi Beton Ø 10 mm Kg 10.30

PeBesi Beton Ø 6 mm Kg 2.13

Pengecoran 1:2:3 M³ 0.12

10 PEKERJAAN KONSTRUKSI BETON

11 Sloof (1:2:3) M³ 0.09 -

Bekisting Balok & Kolom M² 1.80

Pembesian

PeBesi Beton Ø 12 mm Kg 21.31

PeBesi Beton Ø 8 mm Kg 8.09

Pengecoran 1:2:3 M³ 0.09

12 Balok 1 (1:2:3) M³ 0.09 -

Bekisting Balok & Kolom M² 2.40

Pembesian

PeBesi Beton Ø 12 mm Kg 21.31

PeBesi Beton Ø 8 mm Kg 8.09

Pengecoran 1:2:3 M³ 0.09

13 Balok 2 (1:2:3) M³ 0.12 -

Bekisting Balok & Kolom M² 3.00

Pembesian

PeBesi Beton Ø 12 mm Kg 21.31

PeBesi Beton Ø 8 mm Kg 9.71

Pengecoran 1:2:3 M³ 0.12

Instalasi Stop Kontak (Kabel NYM 3 x 2.5 mm2)

Page 21: RAP Kosong Penawaran Perumahan

14 Kolom Praktis (1:2:3) M³ 0.05 -

Bekisting Balok & Kolom M² 1.20

Pembesian

PeBesi Beton Ø 10 mm Kg 4.93

PeBesi Beton Ø 6 mm Kg 1.91

Pengecoran 1:2:3 M³ 0.05

15 Kolom (1:2:3) M³ 0.58 -

Bekisting Balok & Kolom M² 11.52

Pembesian

PeBesi Beton Ø 10 mm Kg 35.51

PeBesi Beton Ø 6 mm Kg 17.22

Pengecoran 1:2:3 M³ 0.58

16 Lantai (1:2:3) M³ 0.22 -

Bekisting Setempat M² 2.72

Pembesian

PeBesi Beton Ø 8 mm Kg 47.78

Pengecoran 1:2:3 M³ 0.22

30 PEKERJAAN KONSTRUKSI BAJA31 Konstruksi Tangga Btg 1.67 0.00

Tangga PePlat 5 mm Kg 0.04 PePekerjaan Pipa Hitam Medium Ø 1 1/2" Btg 1.67 PeBesi Beton D 19 mm Kg 8.75

20 PEKERJAAN PASANGAN & TANGKI21 Pasangan Dinding Batako M² 2.25 - 22 Plesteran 1:4 + Acian M² 4.50 - 23 Cat Dinding + Plafond (1 kg = 4 m2) M² 4.50 -

*) Pasangan Dinding

Pasangan Dinding Batako M² 2.25

Plesteran 1:4 + Acian M² 4.50 Pengecatan Dinding M² 4.50

24 Tangki Air Bh 1.00 - Pemasangan Tangki Fiber Bh 1.00

TOTAL BANGUNAN

Note = Volume di atas hanya sebagai panduan, kontraktor harus tetap menghitung ulang

Page 22: RAP Kosong Penawaran Perumahan

207.5

Batako Dinding : Zincalume Genteng Atap :A (R. Staff)

harus diisiHARGA JUMLAHSATUAN HARGA

Rp. Rp.

-

-

20,737 -

-

60,000 -

80,000 -

12,450 -

969,630 -

-

60,000 -

80,000 -

45,997 -

94,134 -

12,870 -

12,870 -

1,108,960 -

-

60,000 -

80,000 -

105,569 -

-

-

78,406 -

12,870 -

12,870 -

1,108,960 -

-

78,406 -

12,870 -

12,870 -

1,108,960 -

-

78,406 -

12,870 -

12,870 -

1,108,960 -

- 94,134 - - - 1,108,960 -

-

Page 23: RAP Kosong Penawaran Perumahan

78,406 -

12,870 - 12,870 - 1,108,960 -

-

78,406 -

12,870 -

12,870 -

1,108,960 -

-

78,406 -

12,870 -

1,108,960 -

46,357 -

- - - -

68,069 -

115,488 -

18,857 -

68,069 -

26,603 -

-

15,443 -

-

11,819 -

- -

673,461 - 434,677 - 334,706 - 267,485 - 554,032 - 487,540 - 593,885 - 1,234,175 -

-

483,659 -

436,658 -

882,458 -

232,400 -

22,657 -

- 100,115 - 88,969 - 135,134 -

- 51,898 - 34,599 - 12,975 - 33,595 -

- 137,790 -

- 25,000 -

Page 24: RAP Kosong Penawaran Perumahan

25,000 - 25,000 - 25,000 - 25,000 -

- - -

- 11,000 -

- - - 10,000 -

- - -

- - -

#N/A

-

217,000 -

994,180 -

#N/A #N/A

23,185 -

23,185 -

23,185 -

23,185 -

#N/A #N/A

- 4,765 -

- -

14,167 - 14,167 -

- 9,583 - 12,778 - 12,778 -

- 600 -

- 1,200 -

- -

- - - - - - - - 145,000 - 18,000 -

- - -

- 6,400 - 29,250 - 35,000 - 52,500 - 64,000 - 64,000 -

- 3,445,310 -

- -

Page 25: RAP Kosong Penawaran Perumahan

72,380 - -

19,250 - 19,250 -

-

149,700 - 19,000 -

- - -

85,000 - -

45,250 - 45,250 -

- -

-

-

-

20,737 -

-

60,000 -

80,000 -

94,134 -

12,870 -

12,870 -

1,108,960 -

-

60,000 -

80,000 -

217,000 -

45,997 -

94,134 -

12,870 -

12,870 -

1,108,960 -

-

-

78,406 -

12,870 -

12,870 -

1,108,960 -

-

78,406 -

12,870 -

12,870 -

1,108,960 -

-

78,406 -

12,870 -

12,870 -

1,108,960 -

O206
Jangan diisi
P206
Jangan diisi
O207
Jangan diisi
P207
Jangan diisi
Page 26: RAP Kosong Penawaran Perumahan

-

78,406 -

12,870 -

12,870 -

1,108,960 -

-

78,406 -

12,870 -

12,870 -

1,108,960 -

-

94,134 -

12,870 -

1,108,960 -

- -

- - - - 370 -

- - - -

105,069 -

46,357 - 19,167 -

- - -

#N/A

Page 27: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

27/63

BILL OF QUANTITY 180.25 BANGUNAN : RUMAH ASKEP + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/R.ASK/4/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

I RUMAH ASKEP00 PEKERJAAN TANAH & PONDASI -

01 Pasang Bowplank M' 63.00 - -

Pasang Bowplank M' 63.00 20,737 -

02 Pondasi Batu Kali M³ 14.63 - -

Galian Tanah M³ 27.00 60,000 -

Urugan Tanah & Pemadatan M³ 14.85 80,000 -

Stek Pondasi Menerus Kg 34.83 12,450 -

Pasangan Batu Kali M³ 14.63 969,630 -

03 Pondasi P1 (1:2:3) M³ 0.14 - - -

Galian Tanah M³ 0.70 60,000 -

Urugan Tanah & Pemadatan M³ 0.60 80,000 -

Lantai Kerja M² 1.28 45,997 -

Bekisting Setempat M² 1.20 94,134 -

Pembesian

PBesi Beton Ø 10 mm Kg 20.47 12,870 -

PBesi Beton Ø 6 mm Kg 1.07 12,870 -

Pengecoran 1:2:3 M³ 0.14 1,108,960 -

04 Pondasi Rollag M² 12.20 - - -

Galian Tanah M³ 1.83 60,000 -

Urugan Tanah & Pemadatan M³ 1.10 80,000 -

Pondasi Rollag Batako M² 12.20 105,569 -

10 PEKERJAAN KONSTRUKSI BETON -

11 Sloof (1:2:3) M³ 3.68 - -

Bekisting Balok & Kolom M² 49.00 78,406 -

Pembesian

PBesi Beton Ø 10 mm Kg 302.10 12,870 -

PBesi Beton Ø 6 mm Kg 95.32 12,870 -

Pengecoran 1:2:3 M³ 3.68 1,108,960 -

12 Kolom praktis (1:2:3) M³ 2.44 - -

Bekisting Balok & Kolom M² 65.10 78,406 -

Pembesian

PBesi Beton Ø 10 mm Kg 267.58 12,870 -

PBesi Beton Ø 6 mm Kg 96.46 12,870 -

Pengecoran 1:2:3 M³ 2.44 1,108,960 -

13 Ring balok praktis (1:2:3) M³ 2.53 - -

Bekisting Balok & Kolom M² 33.75 78,406 -

Pembesian

PBesi Beton Ø 10 mm Kg 277.44 12,870 -

PBesi Beton Ø 6 mm Kg 75.04 12,870 -

Pengecoran 1:2:3 M³ 2.53 1,108,960 -

14 Dak Teras M³ 3.00 - - Bekisting Setempat M² 6.80 94,134 - Pembesian Wiremesh M 6 M² 42.50 - - Pengecoran 1:2:3 M³ 3.00 1,108,960 -

15 Balok Dak M³ 2.52 - - Bekisting Balok & Kolom M² 42.00 78,406 - PembesianPBesi Beton Ø 12 mm Kg 248.59 12,870 - PBesi Beton Ø 6 mm Kg 74.98 12,870 - Pengecoran 1:2:3 M³ 2.52 1,108,960 -

16 Balok I (1:2:3) M³ 0.18 - - Bekisting Balok & Kolom M² 2.40 78,406 - PembesianPBesi Beton Ø 12 mm Kg 7.10 12,870 - PBesi Beton Ø 10 mm Kg 8.63 12,870 - PBesi Beton Ø 6 mm Kg 2.87 12,870 - Pengecoran 1:2:3 M³ 0.18 1,108,960 -

17 Balok II (1:2:3) M³ 0.28 - - Bekisting Balok & Kolom M² 3.70 78,406 - PembesianPBesi Beton Ø 12 mm Kg 3.55 12,870 - PBesi Beton Ø 10 mm Kg 19.73 12,870 - PBesi Beton Ø 6 mm Kg 8.44 12,870 - Pengecoran 1:2:3 M³ 0.28 1,108,960 -

18 Kolom Teras (1:2:3) M³ 0.28 - -

Bekisting Balok & Kolom M² 5.60 78,406 -

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Page 28: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

28/63

BILL OF QUANTITY 180.25 BANGUNAN : RUMAH ASKEP + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/R.ASK/4/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Pembesian

PBesi Beton Ø 12 mm Kg 17.26 12,870 -

PBesi Beton Ø 6 mm Kg 8.46 12,870 -

Pengecoran 1:2:3 M³ 0.28 1,108,960 -

19 Beton Meja Dapur (1:2:3) M³ 0.47 - -

Bekisting Setempat M² 6.21 94,134 -

Pembesian

PBesi Beton Ø 8 mm Kg 86.38 12,870 -

Pengecoran 1:2:3 M³ 0.47 1,108,960 -

Plesteran 1:4 + Acian M² 2.43 46,357 -

20 PEKERJAAN PASANGAN - 21 Pasangan Dinding Batako M² 345.35 - - 22 Plesteran 1:4 + Acian M² 682.24 - - 23 Plesteran 1:2 + Acian M² 8.46 - -

*) Pasangan Dinding

Pasangan Dinding Batako Type A M² 304.37 68,069 -

Pasangan Dinding Batako ( Trasram ) M² 36.75 115,488 -

Plesteran 1:4 + Acian Type A M² 682.24 18,857 -

*) Pasangan Bak Km. Mandi

Pasangan Dinding Batako Type A M² 4.23 68,069 -

Plesteran 1:2 + Acian Type A M² 8.46 26,603 -

24 Pasangan bata kerawang M² 2.56 - -

Pasangan Bata Kerawang M² 2.56 11,819 -

25 Pasangan Batu Alam M² 3.36 - -

Pasangan Batu Alam M² 3.36 15,443 -

40 PEKERJAAN KUSEN, PINTU, & PENGGANTUNG - 41 Kusen Kayu Unit 15.00 - -

Kusen Type K-09 K Unit 4.00 434,677 - Kusen Type K-13 K Unit 4.00 267,485 - Kusen Type K-15 K Unit 4.00 554,032 - Kusen Type K-16 K Unit 1.00 487,540 - Kusen Type K-33 K Unit 2.00 1,521,391 -

42 Pintu Unit 14.00 - -

Pintu Type P-01 Unit 3.00 483,659 -

Pintu Type P-02 Unit 7.00 436,658 -

Pintu Type PV-02 Unit 3.00 232,400 -

Pintu Garasi Unit 1.00 22,657 -

43 Jendela Unit 14.00 - - Jendela Type J-04 Unit 8.00 100,115 - Jendela Type J-05 Unit 2.00 88,969 - Jendela Type J-06 K Unit 4.00 135,134 -

44 Kawat Nyamuk Unit 46.00 - - Kawat Nyamuk Type KN-06 Unit 4.00 25,000 - Kawat Nyamuk Type KN-07 Unit 8.00 25,000 - Kawat Nyamuk Type KN-04 K Unit 8.00 61,174 - Kawat Nyamuk Type KN-09 Unit 6.00 25,000 - Kawat Nyamuk Type KN-10 Unit 20.00 25,000 -

45 Jerajak Unit 16.00 - - Jerajak Besi Type JB-01 Unit 8.00 51,898 - Jerajak Besi Type JB-02 Unit 2.00 34,599 - Jerajak Besi Type JB-03 Unit 3.00 12,975 - Jerajak Besi Type JB-04 Unit 3.00 33,595 -

46 Bovenlight Unit 5.00 - - Bovenlight Type BV-03 K Unit 4.00 137,790 - Bovenlight Type BV-03 aK Unit 1.00 137,197 -

47 Acessories Pintu & Jendela Bh 110.00 - - Pemasangan Acesories Pintu Type A Bh 40.00 - -

Kunci Tanam 2 Slot 10" Merk DEKKSON (Kunci Gepeng) Bh 10.00 - Engsel Gantung Kuningan Merk Arch 4" x 3" Bh 30.00 11,000 -

Pemasangan Acesories Jendela Type A Bh 70.00 - - Engsel Gantung Kuningan Merk Arch 3" x 2,5" Bh 28.00 10,000 -

Grendel Type Antik 2" Bh 14.00 - Hak Angin Type Antik Bh 14.00 - Pegangan Jendela 3" Type Antik Bh 14.00 -

49 Acessories Dapur Unit 1.00 - - Lemari Dapur Rumah Askep Unit 1.00 - -

60 PEKERJAAN LANTAI & KERAMIK #N/A

61 Beton Plat Lantai (1:3:5) M³ 10.38 - -

Page 29: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

29/63

BILL OF QUANTITY 180.25 BANGUNAN : RUMAH ASKEP + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/R.ASK/4/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Urug Pasir M³ 10.38 217,000 -

Urugan Tanah & Pemadatan M³ 20.76 80,000 -

Cor Rabat Beton M³ 10.38 994,180 -

62 Pemasangan Keramik M² 206.05 - #N/A #N/A

Pemasangan Keramik Lantai 30 x 30 cm Type A M² 134.50 23,185 -

Pemasangan Keramik Dinding 20 x 25 cm Type A M² 50.31 23,185 -

Pemasangan Keramik Lantai 20 x 20 cm Type A M² 12.00 23,185 -

Pemasangan Keramik Dapur 20 x 20 cm Type A M² 9.23 23,185 -

Pemasangan Keramik Sudut/ nosing M² 9.80 #N/A #N/A

63 Skirting Lantai M' 96.45 - - Pemasangan Skirting Lantai Type A M' 96.45 4,765 -

70 PEKERJAAN PENGECATAN - 71 Cat Dinding + Plafond (1 kg = 4 m2) M² 948.41 - -

Pengecatan Dinding Type A M² 712.16 14,167 - Pengecatan Plafond Type A M² 236.25 14,167 -

72 Cat Minyak (1 kg = 8 m2) M² 137.08 - - Pengecatan Kusen Type A M² 65.31 9,583 - Pengecatan Listplank Type A M² 28.30 12,778 - Pengecatan Pintu & Jendela Type A M² 43.47 12,778 -

73 Cat Baja (1 kg = 8 m2) M² 17.59 - - Pengecatan Baja Type A M² 17.59 600 -

74 Pembersihan M² 189.00 - - Pembersihan M² 189.00 1,200 -

80 PEKERJAAN SANITAIR - 81 Sanitair Fixture Bh 26.00 - -

Pasang Closet Duduk Bh 2.00 - - Pasang Closet Jongkok Tipe I Bh 1.00 - - Pasang Wastafel Bh 2.00 - - Pasang Kitchen Zink 1 Lubang Bh 1.00 - - Pasang Sanitair Fixture Type A Bh 10.00 - -

Kran Air Biasa Merk Kitz Type Engkol Bh 1.00 18,000 - Kran Air Mandi Merk TOTO Type T 23 B 13 V7 (N) Bh 3.00 - Tempat Sabun Inbow Merk TOTO Type S11N (Biru Muda) Bh 3.00 - Floor Drain Stainless Steel Merk TOTO Type TX 1 B Bh 3.00 -

82 Instalasi Air M' 77.35 #REF! - Instalasi Air M' 77.35 6,400 -

Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 1/2" AW - 4 Btg 3.90 29,250 - Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3/4" AW - 4 m Btg 9.13 35,000 - Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 2" D - 4 m Btg 2.69 52,500 - Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3" D - 4 m Btg 0.88 64,000 - Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 4" D - 4 m Btg 2.75 64,000 -

83 Septicktank Unit 2.00 - - Septictank (lkp dg. Rmbsn,bk ktrl, p. hawa) Batako Unit 2.00 3,445,310 -

90 PEKERJAAN INSTALASI LISTRIK - 91 Instalasi Titik Lampu Ttk 32.00 - -

Instalasi Lampu Ttk 32.00 72,380 - 92 Pemasangan Saklar Bh 10.00 - -

Saklar Ganda Inbow Merk Broco Bh 4.00 19,250 - Saklar Tunggal Inbow Merk Broco Bh 6.00 19,250 -

93 Pemasangan Stop Kontak Ttk 18.00 - -

Ttk 9.00 149,700 - Stop Kontak Merk Broco Inbow Bh 9.00 19,000 -

94 Pemasangan MCB Set 5.00 - - MCB 4 A 1 Phase + Box Merk Fuji Set 4.00 - MCB 10 A 1 Phase + Box Merk Fuji Set 1.00 - Arde ( tembaga masif ) Set 1.00 85,000 -

95 Pemasangan Lampu Bh 22.00 - - Lampu SL 11 W Merk Phillips + Fitting Bh 14.00 45,250 - Lampu SL 18 W Merk Phillips + Fitting Bh 8.00 45,250 -

100 BANGUNAN ATAS - 101 Struktur Bangunan Atas Ls 1.00 - -

Struktur Bangunan Atas R. Askep Ls 1.00 -

II MENARA AIR00 PEKERJAAN TANAH & PONDASI -

01 Pasang Bowplank M' 14.00 - -

Pasang Bowplank M' 14.00 20,737 -

02 Pondasi (1:2:3) M³ 0.26 - -

Galian Tanah M³ 1.08 60,000 -

Instalasi Stop Kontak (Kabel NYM 3 x 2.5 mm2)

O217
Jangan diisi
P217
Jangan diisi
O218
Jangan diisi
P218
Jangan diisi
Page 30: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

30/63

BILL OF QUANTITY 180.25 BANGUNAN : RUMAH ASKEP + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/R.ASK/4/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Urugan Tanah & Pemadatan M³ 0.98 80,000 -

Bekisting Setempat M² 2.96 94,134 -

Pembesian

PBesi Beton Ø 10 mm Kg 37.65 12,870 -

PBesi Beton Ø 6 mm Kg 3.31 12,870 -

Pengecoran 1:2:3 M³ 0.26 1,108,960 -

03 Pondasi Tangga M³ 0.12 - -

Galian Tanah M³ 0.28 60,000 -

Urugan Tanah & Pemadatan M³ 0.11 80,000 -

Urug Pasir M² 0.06 217,000 -

Lantai Kerja M² 0.55 45,997 -

Bekisting Setempat M² 1.34 94,134 -

Pembesian

PBesi Beton Ø 10 mm Kg 10.30 12,870 -

PBesi Beton Ø 6 mm Kg 2.13 12,870 -

Pengecoran 1:2:3 M³ 0.12 1,108,960 -

10 PEKERJAAN KONSTRUKSI BETON -

11 Sloof (1:2:3) M³ 0.09 - -

Bekisting Balok & Kolom M² 1.80 78,406 -

Pembesian

PBesi Beton Ø 12 mm Kg 21.31 12,870 -

PBesi Beton Ø 8 mm Kg 8.09 12,870 -

Pengecoran 1:2:3 M³ 0.09 1,108,960 -

12 Balok 1 (1:2:3) M³ 0.09 - -

Bekisting Balok & Kolom M² 2.40 78,406 -

Pembesian

PBesi Beton Ø 12 mm Kg 21.31 12,870 -

PBesi Beton Ø 8 mm Kg 8.09 12,870 -

Pengecoran 1:2:3 M³ 0.09 1,108,960 -

13 Balok 2 (1:2:3) M³ 0.12 - -

Bekisting Balok & Kolom M² 3.00 78,406 -

Pembesian

PBesi Beton Ø 12 mm Kg 21.31 12,870 -

PBesi Beton Ø 8 mm Kg 9.71 12,870 -

Pengecoran 1:2:3 M³ 0.12 1,108,960 -

14 Kolom Praktis (1:2:3) M³ 0.05 - -

Bekisting Balok & Kolom M² 1.20 78,406 -

Pembesian

PBesi Beton Ø 10 mm Kg 4.93 12,870 -

PBesi Beton Ø 6 mm Kg 1.91 12,870 -

Pengecoran 1:2:3 M³ 0.05 1,108,960 -

15 Kolom (1:2:3) M³ 0.58 - -

Bekisting Balok & Kolom M² 11.52 78,406 -

Pembesian

PBesi Beton Ø 10 mm Kg 35.51 12,870 -

PBesi Beton Ø 6 mm Kg 17.22 12,870 -

Pengecoran 1:2:3 M³ 0.58 1,108,960 -

16 Lantai (1:2:3) M³ 0.22 - -

Bekisting Setempat M² 2.72 94,134 -

Pembesian

PBesi Beton Ø 8 mm Kg 47.78 12,870 -

Pengecoran 1:2:3 M³ 0.22 1,108,960 -

30 PEKERJAAN KONSTRUKSI BAJA - 31 Konstruksi Tangga Btg 1.67 0.00 -

Tangga PPlat 5 mm Kg 0.04 - - PPekerjaan Pipa Hitam Medium Ø 1 1/2" Btg 1.67 - - PBesi Beton D 13 mm Kg 8.75 370 -

20 PEKERJAAN PASANGAN & TANGKI - 21 Pasangan Dinding Batako M² 2.25 - - 22 Plesteran 1:4 + Acian M² 4.50 - - 23 Cat Dinding + Plafond (1 kg = 4 m2) M² 4.50 - -

*) Pasangan Dinding

Page 31: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

31/63

BILL OF QUANTITY 180.25 BANGUNAN : RUMAH ASKEP + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/R.ASK/4/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Pasangan Dinding Batako M² 2.25 105,069 -

Plesteran 1:4 + Acian M² 4.50 46,357 - Pengecatan Dinding M² 4.50 19,167 -

24 Tangki Air Bh 1.00 - - Pemasangan Tangki Fiber Bh 1.00 - -

TOTAL BANGUNAN #N/A

Note = Volume di atas hanya sebagai panduan, kontraktor harus tetap menghitung ulang

Page 32: RAP Kosong Penawaran Perumahan

BILL OF QUANTITY 126.50 BANGUNAN : RUMAH ASISTEN + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/THA/R.AST/II/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

I RUMAH ASISTEN00 PEKERJAAN TANAH & PONDASI -

01 Pasang Bowplank M' 61.75 - -

Pasang Bowplank M' 61.75 20,737 -

02 Pondasi Batu Kali M³ 11.34 - -

Galian Tanah M³ 20.94 60,000 -

Urugan Tanah & Pemadatan M³ 11.52 80,000 -

Stek Pondasi Menerus Kg 27.05 12,450 -

Pasangan Batu Kali M³ 11.34 969,630 -

03 Pondasi P1 M³ 0.14 - -

Galian Tanah M³ 0.70 60,000 -

Urugan Tanah & Pemadatan M³ 0.60 80,000 -

Lantai Kerja M² 1.28 45,997 -

Bekisting Setempat M² 1.20 94,134 -

Pembesian

PeBesi Beton Ø 10 mm Kg 20.47 12,870 -

PeBesi Beton Ø 6 mm Kg 1.07 12,870 -

Pengecoran 1:2:3 M³ 0.14 1,108,960 -

04 Pondasi Rollag M² 12.74 - -

Galian Tanah M³ 1.91 60,000 -

Urugan Tanah & Pemadatan M³ 1.15 80,000 -

Pondasi Rollag Batako M² 12.74 105,569 -

10 PEKERJAAN KONSTRUKSI BETON -

11 Sloof M³ 2.83 - -

Bekisting Balok & Kolom M² 37.70 78,406 -

Pembesian

PeBesi Beton Ø 10 mm Kg 232.43 12,870 -

PeBesi Beton Ø 6 mm Kg 73.37 12,870 -

Pengecoran 1:2:3 M³ 2.83 1,108,960 -

12 Kolom praktis M³ 2.36 - -

Bekisting Balok & Kolom M² 63.00 78,406 -

Pembesian

PeBesi Beton Ø 10 mm Kg 258.95 12,870 -

PeBesi Beton Ø 6 mm Kg 70.05 12,870 -

Pengecoran 1:2:3 M³ 2.36 1,108,960 -

13 Ring balok praktis M³ 2.12 - -

Bekisting Balok & Kolom M² 28.28 78,406 -

Pembesian

PeBesi Beton Ø 10 mm Kg 232.43 12,870 -

PeBesi Beton Ø 6 mm Kg 62.89 12,870 -

Pengecoran 1:2:3 M³ 2.12 1,108,960 -

14 Kolom 20 x 20 M³ 0.28 - -

Bekisting Balok & Kolom M² 5.60 78,406 -

Pembesian

PeBesi Beton Ø 12 mm Kg 17.26 12,870 -

PeBesi Beton Ø 6 mm Kg 8.46 12,870 -

Pengecoran 1:2:3 M³ 0.17 1,108,960 -

15 Dak Teras M³ 1.50 - - Bekisting Setempat M² 3.40 94,134 - Pembesian Wiremesh M 6 M² 30.00 - - Pengecoran 1:2:3 M³ 1.50 1,108,960 -

16 Balok Dak M³ 1.26 - - Bekisting Balok & Kolom M² 21.00 78,406 - PembesianPeBesi Beton Ø 12 mm Kg 124.29 12,870 - PeBesi Beton Ø 6 mm Kg 37.49 12,870 - Pengecoran 1:2:3 M³ 1.26 1,108,960 -

17 Beton Meja Dapur 1:2:3 M³ 0.39 - -

Bekisting Balok & Kolom M² 6.75 78,406 -

Pembesian

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Page 33: RAP Kosong Penawaran Perumahan

BILL OF QUANTITY 126.50 BANGUNAN : RUMAH ASISTEN + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/THA/R.AST/II/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

PeBesi Beton Ø 8 mm Kg 95.49 12,870 -

Pengecoran 1:2:3 M³ 0.39 1,108,960 -

Plesteran 1:4 + Acian M² 2.85 46,357 -

20 PEKERJAAN PASANGAN - 21 Pasangan Dinding Batako M² 265.27 - - 22 Plesteran 1:4 + Acian M² 522.08 - - 23 Plesteran 1:2 + Acian M² 8.45 - -

*) Pasangan Dinding

Pasangan Dinding Batako Type A M² 232.76 68,069 -

Pasangan Dinding Batako ( Trasram ) M² 28.28 115,488 -

Plesteran 1:4 + Acian Type A M² 522.08 18,857 -

*) Pasangan Bak Km. Mandi

Pasangan Dinding Batako Type A M² 4.23 68,069 -

Plesteran 1:2 + Acian Type A M² 8.45 26,603 -

24 Pasangan Batu Alam M² 3.36 - -

Pasangan Batu Alam M² 3.36 15,443 -

40 PEKERJAAN KUSEN, PINTU, & PENGGANTUNG - 41 Kusen Kayu Unit 14.00 - -

Kusen Type K-03 K Unit 1.00 1,248,650 - Kusen Type K-09 K Unit 5.00 434,677 - Kusen Type K-15 K Unit 6.00 554,032 - Kusen Type K-16 K Unit 1.00 487,540 - Kusen Type K-22 K Unit 1.00 253,604 -

42 Pintu Unit 10.00 - -

Pintu Type P-01 Unit 2.00 483,659 -

Pintu Type P-01a K Unit 1.00 967,318 -

Pintu Type P-02 Unit 4.00 436,658 -

Pintu Type PV-02 Unit 3.00 232,400 -

43 Jendela Unit 17.00 - - Jendela Type J-04 Unit 12.00 100,115 - Jendela Type J-04a Unit 3.00 100,115 - Jendela Type J-05 Unit 2.00 88,969 -

44 Jerajak Unit 19.00 - - Jerajak Besi Type JB-01 Unit 12.00 51,898 - Jerajak Besi Type JB-01a K Unit 3.00 43,404 - Jerajak Besi Type JB-02 Unit 2.00 34,599 - Jerajak Besi Type JB-03 K Unit 2.00 12,975 -

45 Bovenlight Unit 3.00 - - Bovenlight Type BV-03 K Unit 3.00 137,790 -

46 Kawat Nyamuk Unit 41.00 - -

Kawat Nyamuk Type KN-07 Unit 12.00 25,000 -

Kawat Nyamuk Type KN-06 Unit 3.00 25,000 -

Kawat Nyamuk Type KN-10 Unit 19.00 25,000 -

Kawat Nyamuk Type KN-09 Unit 5.00 25,000 - Kawat Nyamuk Type KN-08 Unit 2.00 25,000 -

47 Acessories Pintu & Jendela Bh 113.00 - - Pemasangan Acesories Pintu Type A Bh 28.00 - -

Kunci Tanam 2 Slot 10" Merk DEKKSON (Kunci Gepeng) Bh 7.00 - Engsel Gantung Kuningan Merk Arch 4" x 3" Bh 21.00 11,000 -

Pemasangan Acesories Jendela Type A Bh 85.00 - - Engsel Gantung Kuningan Merk Arch 3" x 2,5" Bh 34.00 10,000 -

Grendel Type Antik 2" Bh 17.00 - Hak Angin Type Antik Bh 17.00 - Pegangan Jendela 3" Type Antik Bh 17.00 -

48 Acessories Dapur Unit 1.00 - - Lemari Dapur Rumah Asisten Unit 1.00 - -

60 PEKERJAAN LANTAI & KERAMIK #N/A

61 Beton Plat Lantai 1:3:5 M³ 7.18 - -

Urug Pasir M³ 7.18 217,000 -

Urugan Tanah & Pemadatan M³ 14.35 80,000 -

Cor Rabat Beton M³ 7.18 994,180 -

62 Pemasangan Keramik M² 175.39 - #N/A #N/A

Pemasangan Keramik Lantai 30 x 30 cm Type A M² 115.25 23,185 -

Pemasangan Keramik Lantai 20 x 20 cm Type A M² 11.25 23,185 -

Page 34: RAP Kosong Penawaran Perumahan

BILL OF QUANTITY 126.50 BANGUNAN : RUMAH ASISTEN + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/THA/R.AST/II/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Pemasangan Keramik Dinding 20 x 25 cm Type A M² 40.55 23,185 -

Pemasangan Keramik Dapur 20 x 20 cm Type A M² 8.34 23,185 -

Pemasangan Keramik Sudut/ nosing M² 2.80 #N/A #N/A

63 Skirting Lantai M' 122.50 - - Pemasangan Skirting Lantai Type A M' 122.50 4,765 -

70 PEKERJAAN PENGECATAN - 71 Cat Dinding + Plafond (1 kg = 4 m2) M² 689.08 - -

Pengecatan Dinding Type A M² 522.08 14,167 - Pengecatan Plafond Type A M² 167.00 14,167 -

72 Cat Minyak (1 kg = 8 m2) M² 128.04 - - Pengecatan Kusen Type A M² 56.23 9,583 - Pengecatan Listplank Type A M² 22.60 12,778 - Pengecatan Pintu & Jendela Type A M² 49.22 12,778 -

73 Cat Baja (1 kg = 8 m2) 10.73 - - Pengecatan Baja Type A M² 10.73 600 -

74 Pembersihan 167.00 - - Pembersihan M² 167.00 1,200 -

80 PEKERJAAN SANITAIR - 81 Sanitair Fixture Bh 24.00 - -

Pasang Closet Duduk Bh 2.00 - - Pasang Closet Jongkok Tipe I Bh 1.00 - -

0 Pasang Wastafel Bh 2.00 - - Pasang Kitchen Zink 1 Lubang Bh 1.00 - - Pasang Sanitair Fixture Bh 9.00 145,000 -

Kran Air Biasa Merk Kitz Type Engkol Bh 1.00 18,000 - Kran Air Mandi Merk TOTO Type T 23 B 13 V7 (N) Bh 3.00 - Tempat Sabun Inbow Merk TOTO Type S11N (Biru Muda) Bh 2.00 - Floor Drain Stainless Steel Merk TOTO Type TX 1 B Bh 3.00 -

82 Instalasi Air M' 80.50 - - Instalasi Air M' 80.50 6,400 -

Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 1/2" AW - 4 m Btg 5.25 29,250 - Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3/4" AW - 4 m Btg 7.00 35,000 - Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 2" D - 4 m Btg 2.50 52,500 - Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3" D - 4 m Btg 0.75 64,000 - Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 4" D - 4 m Btg 4.63 64,000 -

82 Instalasi Air M' 82.00 - - Instalasi Air Bersih M' 53.00 16,063 - Instalasi Air Kotor M' 29.00 32,000 -

83 Septicktank Unit 2.00 - - Septictank (lkp dg. Rmbsn,bk ktrl, p. hawa) Batako Unit 2.00 3,445,310 -

90 PEKERJAAN INSTALASI LISTRIK - 91 Instalasi Titik Lampu Ttk 19.00 - -

Instalasi Lampu Ttk 19.00 72,380 - 92 Pemasangan Saklar Bh 9.00 - -

Saklar Ganda Inbow Merk Broco Bh 4.00 19,250 - Saklar Tunggal Inbow Merk Broco Bh 5.00 19,250 -

93 Pemasangan Stop Kontak Ttk 18.00 - -

Ttk 9.00 149,700 - Stop Kontak Merk Broco Inbow Bh 9.00 19,000 -

94 Pemasangan MCB Set 5.00 - - MCB 4 A 1 Phase + Box Merk Fuji Set 4.00 - MCB 6 A 1 Phase + Box Merk Fuji Set 1.00 - Arde ( tembaga masif ) Set 1.00 85,000 -

95 Pemasangan Lampu Bh 18.00 - - Lampu SL 11 W Merk Phillips + Fitting Bh 10.00 45,250 - Lampu SL 18 W Merk Phillips + Fitting Bh 8.00 45,250 -

100 BANGUNAN ATAS - 101 Struktur Bangunan Atas Ls 1.00 - -

Struktur Bangunan Atas R. Assisten Ls 1.00 -

CARPORT00 PEKERJAAN LANTAI -

61 Beton Plat Lantai 1:3:5 M³ 0.63 - -

Urug Pasir M³ 0.72 217,000 -

Cor Rabat Beton M³ 0.63 994,180 -

01 PEKERJAAN RANGKA CANOPY M' -

Instalasi Stop Kontak (Kabel NYM 3 x 2.5 mm2)

O203
Jangan diisi
P203
Jangan diisi
O204
Jangan diisi
P204
Jangan diisi
Page 35: RAP Kosong Penawaran Perumahan

BILL OF QUANTITY 126.50 BANGUNAN : RUMAH ASISTEN + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/THA/R.AST/II/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

31 Rangka Pipa Medium Btg 7.25 - Pekerjaan ProfilPePekerjaan Pipa Hitam Medium Ø 1,5 " Btg 6.42 - - PePekerjaan Pipa Hitam Medium Ø 2,5 " Btg 0.83 - - PeL 40 x 40 x 4 mm Kg 0.87 - - PePlat 6 mm Kg 8.02 - -

Dinabolt Ø 1/2 " Bh 10.00 -

02 Penutup Canopy M³ 13.23 - -

Pasang Atap Fiber Gelombang M³ 13.23 - -

II MENARA AIR00 PEKERJAAN TANAH & PONDASI -

01 Pasang Bowplank M' 14.00 - -

Pasang Bowplank M' 14.00 20,737 -

02 Pondasi (1:2:3) M³ 0.26 - -

Galian Tanah M³ 1.08 60,000 -

Urugan Tanah & Pemadatan M³ 0.98 80,000 -

Bekisting Setempat M² 2.96 94,134 -

Pembesian

PeBesi Beton Ø 10 mm Kg 37.65 12,870 -

PeBesi Beton Ø 6 mm Kg 3.31 12,870 -

Pengecoran 1:2:3 M³ 0.26 1,108,960 -

03 Pondasi Tangga M³ 0.12 - -

Galian Tanah M³ 0.28 60,000 -

Urugan Tanah & Pemadatan M³ 0.11 80,000 -

Urug Pasir M² 0.06 217,000 -

Lantai Kerja M² 0.55 45,997 -

Bekisting Setempat M² 1.34 94,134 -

Pembesian

PeBesi Beton Ø 10 mm Kg 10.30 12,870 -

PeBesi Beton Ø 6 mm Kg 2.13 12,870 -

Pengecoran 1:2:3 M³ 0.12 1,108,960 -

10 PEKERJAAN KONSTRUKSI BETON -

11 Sloof (1:2:3) M³ 0.09 - -

Bekisting Balok & Kolom M² 1.80 78,406 -

Pembesian

PeBesi Beton Ø 12 mm Kg 21.31 12,870 -

PeBesi Beton Ø 8 mm Kg 8.09 12,870 -

Pengecoran 1:2:3 M³ 0.09 1,108,960 -

12 Balok 1 (1:2:3) M³ 0.09 - -

Bekisting Balok & Kolom M² 2.40 78,406 -

Pembesian

PeBesi Beton Ø 12 mm Kg 21.31 12,870 -

PeBesi Beton Ø 8 mm Kg 8.09 12,870 -

Pengecoran 1:2:3 M³ 0.09 1,108,960 -

13 Balok 2 (1:2:3) M³ 0.12 - -

Bekisting Balok & Kolom M² 3.00 78,406 -

Pembesian

PeBesi Beton Ø 12 mm Kg 21.31 12,870 -

PeBesi Beton Ø 8 mm Kg 9.71 12,870 -

Pengecoran 1:2:3 M³ 0.12 1,108,960 -

14 Kolom Praktis (1:2:3) M³ 0.05 - -

Bekisting Balok & Kolom M² 1.20 78,406 -

Pembesian

PeBesi Beton Ø 10 mm Kg 4.93 12,870 -

PeBesi Beton Ø 6 mm Kg 1.91 12,870 -

Pengecoran 1:2:3 M³ 0.05 1,108,960 -

15 Kolom (1:2:3) M³ 0.58 - -

Bekisting Balok & Kolom M² 11.52 78,406 -

Pembesian

Page 36: RAP Kosong Penawaran Perumahan

BILL OF QUANTITY 126.50 BANGUNAN : RUMAH ASISTEN + MENARA AIR Dinding : Batako LOKASI : KALTIM Atap : Zincalume Genteng NO. GBR. : INF/THA/R.AST/II/11 Type : A (R. Staff)HARGA : #N/AKONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

Luas (M2): Luas (M2):

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

PeBesi Beton Ø 10 mm Kg 35.51 12,870 -

PeBesi Beton Ø 6 mm Kg 17.22 12,870 -

Pengecoran 1:2:3 M³ 0.58 1,108,960 -

16 Lantai (1:2:3) M³ 0.22 - -

Bekisting Setempat M² 2.72 94,134 -

Pembesian

PeBesi Beton Ø 8 mm Kg 47.78 12,870 -

Pengecoran 1:2:3 M³ 0.22 1,108,960 -

30 PEKERJAAN KONSTRUKSI BAJA - 31 Konstruksi Tangga Btg 1.67 0.00 -

Tangga PePlat 5 mm Kg 0.04 - - PePekerjaan Pipa Hitam Medium Ø 1 1/2" Btg 1.67 - - PeBesi Beton D 13 mm Kg 8.75 370 -

20 PEKERJAAN PASANGAN & TANGKI - 21 Pasangan Dinding Batako M² 2.25 - - 22 Plesteran 1:4 + Acian M² 4.50 - - 23 Cat Dinding + Plafond (1 kg = 4 m2) M² 4.50 - -

*) Pasangan Dinding

Pasangan Dinding Batako M² 2.25 105,069 -

Plesteran 1:4 + Acian M² 4.50 46,357 - Pengecatan Dinding M² 4.50 19,167 -

24 Tangki Air Bh 1.00 - - Pemasangan Tangki Fiber Bh 1.00 - -

TOTAL BANGUNAN #N/A

Note = Volume di atas hanya sebagai panduan, kontraktor harus tetap menghitung ulang

Page 37: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

37/63

BILL OF QUANTITYBANGUNAN : MENARA AIR BETON 20 TONLOKASI : KALTIMNO. GBR. : INF/MA-20T/STD/BT/09HARGA : Rp - KONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

I MENARA AIR00 PEKERJAAN TANAH & PONDASI -

01 Pasang Bowplank M' 25.00 - -

Pasang Bowplank M' 25.00 20,737 -

02 Pondasi P1 (1:1 1/2:2 1/2) M³ 2.09 - -

Galian Tanah M³ 12.14 60,000 -

Urugan Tanah & Pemadatan M³ 11.52 80,000 -

Lantai Kerja M² 9.00 45,997 -

Bekisting Setempat M² 8.64 94,134 -

Pembesian

PeBesi Beton D 16 mm Kg 50.51 370 -

PeBesi Beton Ø 12 mm Kg 265.63 12,870 -

PeBesi Beton Ø 8 mm Kg 12.00 12,870 -

Pengecoran 1:1 1/2:2 1/2 M³ 2.09 1,005,600 -

Pancang Cerucuk Kayu dia. 10 cm @ 3 m Btg 100.00 - -

03 Pondasi P2 (1:1 1/2:2 1/2) M³ 1.44 - -

Galian Tanah M³ 8.40 60,000 -

Urugan Tanah & Pemadatan M³ 7.96 80,000 -

Lantai Kerja M² 6.48 45,997 -

Bekisting Setempat M² 4.80 94,134 -

Pembesian

PeBesi Beton D 16 mm Kg 25.25 370 -

PeBesi Beton Ø 12 mm Kg 156.26 12,870 -

PeBesi Beton Ø 8 mm Kg 6.00 12,870 -

Pengecoran 1:1 1/2:2 1/2 M³ 1.44 1,005,600 -

Pancang Cerucuk Kayu dia. 10 cm @ 3 m Btg 72.00 - -

10 PEKERJAAN KONSTRUKSI BETON -

11 Sloof (1:1 1/2:2 1/2) M³ 1.23 - -

Bekisting Balok & Kolom M² 12.30 78,406 -

Pembesian

PeBesi Beton D 16 mm Kg 129.42 370 -

PeBesi Beton Ø 12 mm Kg 36.40 12,870 -

PeBesi Beton Ø 8 mm Kg 54.32 12,870 -

Pengecoran 1:1 1/2:2 1/2 M³ 1.23 1,005,600 -

12 Kolom 30 x 30 (1:1 1/2:2 1/2) M³ 4.05 - -

Bekisting Balok & Kolom M² 54.00 78,406 -

Pembesian

PeBesi Beton D 16 mm Kg 568.20 370 -

PeBesi Beton Ø 8 mm Kg 142.52 12,870 -

Pengecoran 1:1 1/2:2 1/2 M³ 4.05 1,005,600 -

13 Kolom 10 x 10 (1:1 1/2:2 1/2) M³ 0.10 - -

Bekisting Balok & Kolom M² 4.16 78,406 -

Pembesian

PeBesi Beton Ø 8 mm Kg 16.41 12,870 -

PeBesi Beton Ø 6 mm Kg 6.24 12,870 -

Pengecoran 1:1 1/2:2 1/2 M³ 0.10 1,005,600 -

14 Balok 20/30 (1:1 1/2:2 1/2) M³ 1.23 - -

Bekisting Balok & Kolom M² 16.40 78,406 -

Pembesian

PeBesi Beton Ø 12 mm Kg 145.60 12,870 -

PeBesi Beton Ø 8 mm Kg 54.32 12,870 -

Pengecoran 1:1 1/2:2 1/2 M³ 1.23 1,005,600 -

15 Balok 20/40 (1:1 1/2:2 1/2) M³ 2.20 - -

Bekisting Balok & Kolom M² 27.50 78,406 -

Pembesian

PeBesi Beton D 16 mm Kg 260.43 370 -

PeBesi Beton Ø 12 mm Kg 48.83 12,870 -

PeBesi Beton Ø 8 mm Kg 120.11 12,870 -

Pengecoran 1:1 1/2:2 1/2 M³ 2.20 1,005,600 -

16 Lantai Tangki (1:1 1/2:2 1/2) M³ 4.70 - -

Bekisting Setempat M² 34.75 94,134 -

Pembesian

PeBesi Beton Ø 10 mm Kg 543.83 12,870 -

Pengecoran 1:1 1/2:2 1/2 M³ 4.70 1,005,600 -

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

Page 38: RAP Kosong Penawaran Perumahan

Printed On 04/17/2023Prepared by QS

38/63

BILL OF QUANTITYBANGUNAN : MENARA AIR BETON 20 TONLOKASI : KALTIMNO. GBR. : INF/MA-20T/STD/BT/09HARGA : Rp - KONTRAKTOR : CV. DEWI SEKAR

harus diisiHARGA JUMLAH

NO URAIAN PEKERJAAN SAT. SATUAN HARGARp. Rp.

I MENARA AIR

VOLUME kerja estimasi Owner

VOLUME kerja estimasi kontraktor

17 Dinding Tangki (1:1 1/2:2 1/2) M³ 3.83 - -

Bekisting Dinding M² 51.00 43,406 -

Pembesian

PeBesi Beton Ø 10 mm Kg 477.45 12,870 -

Pengecoran 1:1 1/2:2 1/2 M³ 3.83 1,005,600 -

30 PEKERJAAN PENGECATAN - 31 Cat Dinding + Plafond (1 kg = 4 m2) M² 180.81 - -

Pengecatan Dinding M² 180.81 19,167 - 32 Cat Baja (1 kg = 8 m2) M² 8.23 - -

Pengecatan Baja M² 8.23 600 - 33 Pembersihan M² 31.36 - -

Pembersihan M² 31.36 1,200 -

40 PEKERJAAN SANITAIR - 41 Sanitair Fixture Bh 4.00 - -

Pasang Sanitair Fixture Bh 2.00 145,000 - Gate Valve Ø 3" Bh 1.00 - Gate Valve Ø 4" Bh 1.00 -

42 Instalasi Air M' 14.60 - - Instalasi Air M' 14.60 6,400 -

Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 3" AW - 4 m Btg 1.75 - Pipa PVC Merk Sagita, Vinilon, Unilon, Maspion 4" AW - 4 m Btg 1.90 -

II PAGAR MENARA

00 PEKERJAAN TANAH DAN PONDASI -

01 Pondasi Pagar Harmonika - Beton Cor 1:2:3 M3 0.18 -

Galian Tanah M3 0.72 60,000 -

Bekisting Setempat M2 3.60 94,134 -

Pembesian Kg -

PeBesi Beton Ø 12 mm Kg 3.60 12,870 -

Pengecoran 1:3:5 M3 0.18 821,480 -

-

10 PEKERJAAN PAGAR -

11 Pagar Harmonika M' 29.00 -

Pasang Kawat Harmonika M² 46.40 - -

Pekerjaan Profil -

PeL 50 x 50 x 5 mm Kg 97.88 - -

PeL 40 x 40 x 4 mm Kg 140.17 - -

Pengecatan Baja M² 14.50 600 -

TOTAL BANGUNAN -

Note = Volume di atas hanya sebagai panduan, kontraktor harus tetap menghitung ulang

Page 39: RAP Kosong Penawaran Perumahan

REKAP MATERIAL & UPAH BANGUNAN ATAS RUMAH G2KALTIM

No Item Pekerjaan Sat Hrg Sat Volume Total BobotA Material

1 Atap Zincalume Gelombang Hi - Ten, TCT 0.3 mm, ex BlueScope Steel 22,500 5217.88 117,402,188 15.02%

2 Kayu Kelas II 2,200,000 128.16 281,962,395 36.08%3 Kayu Papan 3/25 - 4 m Kelas II Btg 35,200 412.44 14,517,962 1.86%4 Kayu Balok 5/7 - 4 m Kelas II Btg 35,200 2482.40 87,380,526 11.18%5 Kayu Balok 5/5 - 4 m Kelas II Btg 35,200 346.38 12,192,632 1.56%6 List Kayu 1 x 5 cm M' 17,000 2340.00 39,780,000 5.09%7 Nok/Rabung Zincalume Gelombang Hi - Ten, TCT 0.3 mm, ex BlueScope Steel M' 15,800 457.60 7,230,080 0.93%8 Paku 2,5" Kg 19,000 77.62 1,474,794 0.19%9 Paku 3" Kg 19,000 55.35 1,051,581 0.13%

10 Paku 4" Kg 19,000 476.89 9,060,948 1.16%11 Paku Asbes 2,5" + Karet bh 225 1078.00 242,550 0.03%12 Paku Triplek kg 19,000 47.55 903,498 0.12%13 Triplek 4 mm M2 40,000 2106.00 84,240,000 10.78%

Total Material 657,439,154

B Upah

1 Pasang Perkayuan Kap 40,000 119.22 4,768,920 0.61%

2 Pasangan atap 7,500 4394.00 32,955,000 4.22%3 Pasangan Nok/ rabung M' 10,000 416.00 4,160,000 0.53%4 Pasangan list plank M' 12,500 1424.80 17,810,000 2.28%

5 Pasang Plafond 25,000 2106.00 52,650,000 6.74%6 Pasang List plafond 1x5 cm M' 5,000 2340.00 11,700,000 1.50%

Total Upah 124,043,920

TOTAL 781,483,074 100.00%

M2

M3

M3

M2

M2

Page 40: RAP Kosong Penawaran Perumahan

KALTIM

Page 41: RAP Kosong Penawaran Perumahan

KALTIM

Page 42: RAP Kosong Penawaran Perumahan

KALTIM

Page 43: RAP Kosong Penawaran Perumahan

KALTIM

Page 44: RAP Kosong Penawaran Perumahan

KALTIM

Page 45: RAP Kosong Penawaran Perumahan

KALTIM

Page 46: RAP Kosong Penawaran Perumahan

KALTIM

Page 47: RAP Kosong Penawaran Perumahan

KALTIM

Page 48: RAP Kosong Penawaran Perumahan

KALTIM

Page 49: RAP Kosong Penawaran Perumahan

KALTIM

Page 50: RAP Kosong Penawaran Perumahan

KALTIM

Page 51: RAP Kosong Penawaran Perumahan

KALTIM

Page 52: RAP Kosong Penawaran Perumahan

KALTIM

Page 53: RAP Kosong Penawaran Perumahan

KALTIM

Page 54: RAP Kosong Penawaran Perumahan

KALTIM

Page 55: RAP Kosong Penawaran Perumahan

KALTIM

Page 56: RAP Kosong Penawaran Perumahan

KALTIM

Page 57: RAP Kosong Penawaran Perumahan

KALTIM

Page 58: RAP Kosong Penawaran Perumahan

KALTIM

Page 59: RAP Kosong Penawaran Perumahan

KALTIM

Page 60: RAP Kosong Penawaran Perumahan

KALTIM

Page 61: RAP Kosong Penawaran Perumahan

ANALISA SATUAN PEKERJAAN BANGUNAN ATAS RUMAH G2

No Uraian pekerjaanESTIMASI SEPTEMBER 2012

ESTSAT VOL

SAT. BAHAN BAHAN SAT. UPAH UPAH JUMLAH OWNER

40 PEKERJAAN KUDA-KUDA DAN ATAP 0.000

Perkayuan Kap M³ 1.000 2,441,000 40,000 40,000 2,481,000 1.000

Kayu Kelas II M³ 1.075 2,200,000 2,365,000 1.075

Paku 4" Kg 4.000 19,000 76,000 4.000

Pasang Atap Zincalume Gelombang M² 1.000 28,069 7,500 7,500 35,569 1.000

atap Zincalume Gelombang Hi - Ten, M² 1.188 22,500 26,719 1.188

Paku Asbes 2,5" + Karet Bh 6.000 225 1,350 6.000

Pasang Rabung Zincalume Gelombang M' 1.000 18,280 10,000 10,000 28,280 1.000

Nok/Rabung Zincalume Gelombang HiM' 1.100 15,800 17,380 1.100

Paku Asbes 2,5" + Karet Bh 4.000 225 900 4.000

Pasang Lisplank M' 1.000 10,531 12,500 12,500 23,031 1.000

Kayu Papan 3/25 - 4 m Kelas II Btg 0.289 35,200 10,189 0.289

Paku 3" Kg 0.011 19,000 205 0.011

Paku 2,5" Kg 0.007 19,000 136 0.007

PEKERJAAN PLAFOND Pasang Plafond 4 mm M² 1.00 88,477 25,000 25,000 113,477 1.00

Kayu Balok 5/7 - 4 m Kelas II Btg 1.18 35,200 41,491 1.18 Kayu Balok 5/5 - 4 m Kelas II Btg 0.16 35,200 5,789 0.16 Paku 3" Kg 0.02 19,000 360 0.02 Paku 2,5" Kg 0.03 19,000 608 0.03 Triplek 4 mm M² 1.00 40,000 40,000 1.00 Paku Triplek Kg 0.01 19,000 228 0.01

Pasang List Plafond M' 1.00 17,181 5,000 5,000 22,181 1.00 List Kayu 1 x 5 cm M' 1.00 17,000 17,000 1.00 Paku Triplek Kg 0.01 19,000 181 0.01

Vol Kontraktor

L25
Agus Pristiwanto: sample hitungan ukuran 2,4 x 2, 4 m2 = 5,76 m2
Page 62: RAP Kosong Penawaran Perumahan

KONSTRUKSI ATAS (RANGKA ATAP STRUKTUR KAYU)

Vol Vol Harga JumlahNO URAIAN PEKERJAAN SAT. Estimasi Kontraktor Satuan Harga

Owner Harus di isi Rp. Rp.

D RUMAH G2 KARYAWAN1 Perkayuan Kap M³ 4.59 4.59 2,481,000.00 11,376,625.50

Perkayuan Kap (Kuda-kuda, Gording) M³ 4.59 4.59 2,481,000.00 11,376,625.50

2 Pasang Atap M² 169.00 169.00 38,246.15 6,463,598.75 Pasang atap Zincalume Gelombang M² 169.00 169.00 35,568.75 6,011,118.75 Pasang Rabung/ Nok Zincalume M' 16.00 16.00 28,280.00 452,480.00

3 Lisplank M' 54.80 54.80 23,030.59 1,262,076.52 Pasang Lisplank M' 54.80 54.80 23,030.59 1,262,076.52

4 Plafond M² 81.00 81.00 138,122.98 11,187,961.68 Pasang Plafond 4 mm M² 81.00 81.00 113,477.48 9,191,675.96 Pasang List Plafond M' 90.00 90.00 22,180.95 1,996,285.71

TOTAL BANGUNAN ATAS RUMAH G2 KARYAWAN 30,290,262.45

Page 63: RAP Kosong Penawaran Perumahan

Run on 08-11-2012 00:52

Minor loss of fidelity # of occurrences

21

6

Compatibility Report for RAP Kosong Penawaran Perumahan G2 SKDE PT.HRR THA Kaltim.xls

The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.

Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.

'Sat. Bangunan atas'!G7:G8

'Sat. Bangunan atas'!I7

'Sat. Bangunan atas'!I9

'Sat. Bangunan atas'!G11

'Sat. Bangunan atas'!I12:I13

'Sat. Bangunan atas'!G15

'Sat. Bangunan atas'!G18

'Sat. Bangunan atas'!I19:I21

'Sat. Bangunan atas'!I25:I30

'Sat. Bangunan atas'!G31

'Sat. Bangunan atas'!I32:I33

Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.

8Defined Names

Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available.