AFTAR ANALISA
(BERDASARKAN STANDAR NASIONAL INDONESIA )
WILAYAH KABUPATEN MAROS
I. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
1 1 M PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER
1.0000 Btg Dolken Kayu D 8-10 / 400 cm @ Rp. 75,000.00 = Rp.2.0000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.
25.0000 Kg Ka$at Du"% @ Rp. 20,000.00 = Rp.
0.0050 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
0.00)0 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
0.0*00 Kg !aku +%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.'000 !eke"a @ Rp. 55,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0200 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
2 1 M PENGUKURAN DAN PEMASANGAN BOUWPLANK
0.0120 &' kayu 5/7 @ Rp. ',*'0,000.00 = Rp.
0.0200 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.0070 &' Kayu !apan '/20 @ Rp. ',)50,000.00 = Rp.
0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
3 1 M PEMBUATAN KANTOR SEMENTARA
1.2500 Btg Dolken Kayu D 8-10 / 400 cm @ Rp. 75,000.00 = Rp.0.1500 &' Kayu @ Rp. ',*80,000.00 = Rp.
0.8500 kg !aku B%a(a @ Rp. 17,000.00 = Rp.
1.1000 kg Be(% t"%p @ Rp. 22,000.00 = Rp.
20.0000 kg emen !o"tlan# @ Rp. 1,200.00 = Rp.
0.1500 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.1000 &' !a(%" Beton @ Rp. '50,000.00 = Rp.
0.1500 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
'00.0000 B Bata &e"a @ Rp. 550.00 = Rp.
0.2500 +" eng !lat @ Rp. 54,800.00 = Rp.
2.0000 B en#ela 3ako @ Rp. 75,000.00 = Rp.
0.0800 &2 Kaca !olo( @ Rp. 80,000.00 = Rp.
0.1500 B Kunc% anam @ Rp. 1)0,000.00 = Rp.
0.0*00 +" "%plek( 4 mm @ Rp. *0,000.00 = Rp.
2.0000 ukang kayu @ Rp. 77,000.00 = Rp.
1.0000 ukang Batu @ Rp. 77,000.00 = Rp.
2.0000 !eke"a @ Rp. 55,000.00 = Rp.
0.'000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
4 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN MANUAL
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
II. ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
2/219
5 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER
0.4000 !eke"a @ Rp. 55,000.00 = Rp.
0.0400 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
6 1 M3 GALIAN TANAH BIASA SEDALAM 2 METER
0.52*0 !eke"a @ Rp. 55,000.00 = Rp.
0.0520 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp. 1 M3 GALIAN TANAH KERAS SEDALAM 1 METER
0.*250 !eke"a @ Rp. 55,000.00 = Rp.
0.0*20 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
8 1 M3 GALIAN TANAH !ADAS SEDALAM 1 METER
1.2500 !eke"a @ Rp. 55,000.00 = Rp.
0.1250 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp." 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER
0.82'0 !eke"a @ Rp. 55,000.00 = Rp.0.8'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1# 1 M2 PEKERJAAN STRIPING TANAH SETINGGI 1 METER
0.0500 !eke"a @ Rp. 55,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.11 1 M3 PEKERJAAN PEMBUANGAN TANAH SEJAUH 15# METER
0.51*0 !eke"a @ Rp. 55,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.12 1 M3 URUGAN KEMBALI
0.1)20 !eke"a @ Rp. 55,000.00 = Rp.
0.01)0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.13 1 M3 PEMADATAN TANAH
0.5000 !eke"a @ Rp. 55,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.14 1 M3 URUGAN PASIR
1.2000 &' !a(%" "ug @ Rp. 145,000.00 = Rp.
0.'000 !eke"a @ Rp. 55,000.00 = Rp.
0.0100 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
15 1 M3 URUGAN SIRTU
1.2000 &' %"tu @ Rp. 145,000.00 = Rp.
0.2500 !eke"a @ Rp. 55,000.00 = Rp.
0.0250 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
16 1 M3 TIMBUNAN TANAH
1.2000 &' ana "ugan @ Rp. 12',000.00 = Rp.
0.'000 !eke"a @ Rp. 55,000.00 = Rp.
0.0100 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI
1 1 M3 PASANG PONDASI BATU KALI$BT. GUNUNG, 1 P! % 2 PS
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
3/219
1.1000 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.
2*7.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.4270 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.5000 !eke"a @ Rp. 55,000.00 = Rp.
0.*000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.18 1 M3 PASANG PONDASI BATU KALI$BT. GUNUNG, 1 P! % 3 PS
1.1000 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.
202.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.4850 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.5000 !eke"a @ Rp. 55,000.00 = Rp.
0.*000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1" 1 M3 PASANG PONDASI BATU KALI$BT. GUNUNG, 1 P! % 4 PS
1.1000 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.
1*'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5200 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.5000 !eke"a @ Rp. 55,000.00 = Rp.
0.*000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
2# 1 M3 PASANG PONDASI BATU KALI$BT. GUNUNG, 1 P! % 5 PS
1.1000 &' Batu Bela 15/20 cm @ Rp. 157,500.00 = Rp.
1'*.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5440 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.5000 !eke"a @ Rp. 55,000.00 = Rp.
0.*000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
21 1 M3 PASANG PONDASI BATU KOSONG
1.2000 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.
0.'000 &' !a(%" "ug @ Rp. 145,000.00 = Rp.
0.7800 !eke"a @ Rp. 55,000.00 = Rp.0.')00 ukang Batu @ Rp. 77,000.00 = Rp.
0.0')0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0')0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
22 1 M3 PASANG PONDASI SIKLOP 4# & BATU KALI
75.000 Kg Be(% +eton @ Rp. 18,000.00 = Rp.
202.000 Kg emen po"tlan# @ Rp. 1,'00.00 = Rp.
0.'200 &' !a(%" +eton @ Rp. 2)0,000.00 = Rp.
0.4)00 &' Ko"al +eton @ Rp. '50,000.00 = Rp.
0.8000 Kg Ka$at +eton @ Rp. 17,000.00 = Rp.
'.0000 !eke"a @ Rp. 55,000.00 = Rp.
0.8500 ukang +atu @ Rp. 77,000.00 = Rp.
0.0850 kepala tukang @ Rp. 110,000.00 = Rp.
0.1500 &an#o" @ Rp. 110,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
4/219
Jumlah Rp.
23 1 M3 PASANG PONDASI SUMURAN DIAMETER 1## !M
0.450 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.
280.000 Kg emen po"tlan# @ Rp. 1,'00.00 = Rp.
0.4500 &' !a(%" +eton @ Rp. 2)0,000.00 = Rp.
0.*700 &' Ko"al +eton @ Rp. '50,000.00 = Rp.
2.'800 !eke"a @ Rp. 55,000.00 = Rp.
0.'000 ukang +atu @ Rp. 77,000.00 = Rp.0.0'00 kepala tukang @ Rp. 110,000.00 = Rp.
0.0800 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
I'. ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
24 1 M2 PASANG BATA MERAH TEBAL 1BATA, 1 P! % 2 PS
140.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.
4'.5000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0800 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.*500 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0'00 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M3 PASANG BATA MERAH TEBAL 1BATA, 1 PC : 2 PS ………………… RP.
25 1 M2 PASANG BATA MERAH TEBAL 1BATA, 1 P! % 3 PS
140.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.
'2.)500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0)10 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.*500 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Batu @ Rp. 77,000.00 = Rp.0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0'00 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M3 PASANG BATA MERAH TEBAL 1BATA, 1 PC : 3 PS ………………… RP.
26 1 M2 PASANG BATA MERAH TEBAL 1BATA, 1 P! % 5 PS
140.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.
22.2000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.1020 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.*500 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0'00 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M3 PASANG BATA MERAH TEBAL 1BATA, 1 PC : 5 PS ………………… RP.
2 1 M2 PASANG BATA MERAH TEBAL 1$2 BATA, 1 P! % 2 PS
70.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.
18.)500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0'80 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.'200 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0150 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
5/219
1 M3 PASANG BATA MERAH TEBAL 1/2BATA, 1 PC : 2 PS ……………… RP.
28 1 M2 PASANG BATA MERAH TEBAL 1$2 BATA, 1 P! % 3 PS
70.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.
14.'700 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0400 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.'200 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Batu @ Rp. 77,000.00 = Rp.0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0150 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M3 PASANG BATA MERAH TEBAL 1/2BATA, 1 PC : 3 PS ……………… RP.
2" 1 M2 PASANG BATA MERAH TEBAL 1$2 BATA, 1 P! % 5 PS
70.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.
).*800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0450 &' !a(%" !a(ang @ Rp. 157,000.00 = Rp.
0.'200 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0150 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M3 PASANG BATA MERAH TEBAL 1/2BATA, 1 PC : 5 PS ……………… RP.
3# 1 M2 PASANG DINDING ROSTER$TERAWANG, (2#)2#)11*
25.0000 B Ro(te"/e"a$ang @ Rp. 5,500.00 = Rp.
12.8000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.
0.0'50 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.'200 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0150 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
31 1 M2 PASANGAN DINDING !ONBLO!K (!B. 2#*
12.5000 B 6onc"ete Block 6B. 20 @ Rp. 5,500.00 = Rp.
14.0500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0040 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
0.0420 &' !a(%" !a(angan @ Rp. 157,500.00 = Rp.
'.8700 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
0.00*0 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.0010 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.
0.0'00 Kg Ka$at Beton @ Rp. 17,000.00 = Rp.
0.0050 Kg Ko"al Beton @ Rp. '50,000.00 = Rp.
0.'700 !eke"a @ Rp. 55,000.00 = Rp.
0.1570 ukang Batu @ Rp. 77,000.00 = Rp.
0.0070 ukang Be(% @ Rp. 88,000.00 = Rp.
0.01*4 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0185 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
32 1 M2 PASANGAN DINDING !ONBLO!K (!B. 15*
12.5000 B 6onc"ete Block 6B. 15 @ Rp. 5,500.00 = Rp.
10.4*00 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.00'0 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
0.0'20 &' !a(%" !a(angan @ Rp. 157,500.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
6/219
0.8700 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
0.0040 Kg !aku B%a(a 2 - 5 @ Rp. 17,'00.00 = Rp.
0.0010 Kg Kayu e"entang @ Rp. ',*80,000.00 = Rp.
0.0200 Kg Ka$at Beton @ Rp. 17,000.00 = Rp.
0.0040 Kg Ko"al Beton @ Rp. '50,000.00 = Rp.
0.'400 !eke"a @ Rp. 55,000.00 = Rp.
0.1'00 ukang Batu @ Rp. 77,000.00 = Rp.
0.0070 ukang Be(% @ Rp. 77,000.00 = Rp.0.01'7 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0170 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
33 1 M2 PASANGAN DINDING !ONBLO!K (!B. 1#*
12.5000 B 6onc"ete Block 6B. 10 @ Rp. 7,000.00 = Rp.
7.2000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.
0.0020 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
0.0210 &' !a(%" !a(angan @ Rp. 157,500.00 = Rp.
2.5400 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
0.00'0 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.0010 Kg Kayu e"entang @ Rp. ',*80,000.00 = Rp.
0.0150 Kg Ka$at Beton @ Rp. 17,000.00 = Rp.
0.00'0 Kg Ko"al Beton @ Rp. '50,000.00 = Rp.
0.'400 !eke"a @ Rp. 55,000.00 = Rp.
0.1070 ukang Batu @ Rp. 77,000.00 = Rp.
0.0070 ukang Be(% @ Rp. 77,000.00 = Rp.
0.0114 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0170 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
'. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
34 1 M2 PLESTERAN 1 P! % 2 PS, TEBAL 15 MM
8.5200 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0170 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.2000 !eke"a @ Rp. 55,000.00 = Rp.
0.1500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0100 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
35 1 M2 PLESTERAN 1 P! % 3 PS, TEBAL 15 MM
*.4800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.01)0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.2000 !eke"a @ Rp. 55,000.00 = Rp.
0.1500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0100 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
36 1 M2 PLESTERAN 1 P! % 5 PS, TEBAL 15 MM
4.'200 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0220 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.2000 !eke"a @ Rp. 55,000.00 = Rp.
0.1500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0100 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
3 1 M2 PLESTERAN 1 P! % 2 PS, TEBAL 2# MM
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
7/219
14.2800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.02'0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.2500 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0125 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
38 1 M2 PLESTERAN 1 P! % 3 PS, TEBAL 2# MM 10.8000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.02*0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.2500 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0125 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
3" 1 M2 PLESTERAN 1 P! % 5 PS, TEBAL 2# MM
7.2)00 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0280 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.2500 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0125 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
4# 1 M2 PLESTERAN BETON 1 P! % 2 PS, TEBAL 15 MM
).'000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0180 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.2*00 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.0.01'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
41 1 M2 PLESTERAN SKONING 1 P! % 2 PS
0.5000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0020 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.0570 !eke"a @ Rp. 55,000.00 = Rp.
0.0'80 ukang Batu @ Rp. 77,000.00 = Rp.
0.0'80 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0020 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
42 1 M2 PLESTERAN SIAR ADUKAN 1 P! % 2 PS
4.'200 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.01*0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.0700 ukang Batu @ Rp. 77,000.00 = Rp.
0.0070 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0080 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
43 1 M2 PLESTERAN WATER+ROO+ BATA!OTE 3 LAPIS
0.5000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
2.)000 Kg Batacote @ Rp. 2,500.00 = Rp.0.00*0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.'000 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Batu @ Rp. 77,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
8/219
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0150 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
'I. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
44 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KLS. I
1.1000 &' Kayu Kl(. 9 (eta"a Bayam , Balok @ Rp. 10,450,000.00 = Rp.
*.0000 !eke"a @ Rp. 55,000.00 = Rp.20.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
2.0000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.'000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
45 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KLS. II
1.1000 &' Kayu Kl(. 99 Balok @ Rp. ',*80,000.00 = Rp.
*.0000 !eke"a @ Rp. 55,000.00 = Rp.
18.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
2.0000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.'000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
46 1 M2 PASANG PINTU PANIL KAYU KLS.I
0.0400 &' Kayu Kl(. 9 (eta"a Bayam , papan@ Rp. 1',000,000.00 = Rp.
1.0000 !eke"a @ Rp. 55,000.00 = Rp.
2.5000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.2500 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
4 1 M2 PASANG PINTU PANIL KAYU KLS.II
0.0100 &' Kayu Kl(. 99 , papan @ Rp. 4,000,000.00 = Rp.
1.0000 !eke"a @ Rp. 55,000.00 = Rp.1.7500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.2500 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
48 1 M2 PASANG PINTU DAN JENDELA KA!A KAYU KLS. I
0.0100 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.
1.1000 &2 Kaca Ben%ng 5 mm @ Rp. 75,000.00 = Rp.
0.0800 !eke"a @ Rp. 55,000.00 = Rp.
1.7500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0400 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
4" 1 M3 PASANG PINTU DAN JENDELA KA!A KAYU KLS. II
0.0100 &' Kayu Kl( 99, !apan @ Rp. 4,000,000.00 = Rp.
1.0000 !eke"a @ Rp. 55,000.00 = Rp.
1.7500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.2500 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
5# 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KLS I
0.0*40 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.1.0000 !eke"a @ Rp. 55,000.00 = Rp.
'.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.'000 Kepala ukang @ Rp. 110,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
9/219
0.'000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
51 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KLS II
0.0*40 &' Kayu Kl( 99, !apan @ Rp. 4,000,000.00 = Rp.
1.0000 !eke"a @ Rp. 55,000.00 = Rp.
'.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.'000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.5000 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.
52 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU KLS I
0.01)* &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.
0.0'00 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.'000 t em kayu @ Rp. 25,000.00 = Rp.
1.0000 +" eak$oo# 4 mm @ Rp. )0,000.00 = Rp.
0.*000 !eke"a @ Rp. 55,000.00 = Rp.
2.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0'00 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
53 1M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU KLS II
0.01)* &' Kayu kl( 99, !apan @ Rp. 4,000,000.00 = Rp.
0.0'00 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.'000 t em kayu @ Rp. 25,000.00 = Rp.
1.0000 +" eak$oo# 4 mm @ Rp. )0,000.00 = Rp.
0.*000 !eke"a @ Rp. 55,000.00 = Rp.
2.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0'00 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.54 1 M2 PASANG JALUSI MATI KUSEN KAYU KLS I
0.0*00 &' Kayu kl( 9, !apan @ Rp. 1',000,000.00 = Rp.
0.1500 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.5000 !eke"a @ Rp. 55,000.00 = Rp.
2.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0250 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
55 1 M2 PASANG JALUSI MATI KUSEN KAYU KLS II
0.0*00 &' Kayu kl( 99, !apan @ Rp. ',)50,000.00 = Rp.
0.1500 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.5000 !eke"a @ Rp. 55,000.00 = Rp.
2.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0250 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
56 1 M3 PASANG KONSTRUKSI KUDA KUDA KAYU KLS. I
1.1000 &' Kayu Kl( 9, Balok @ Rp. 10,450,000.00 = Rp.
15.0000 Kg Be(% t"%p @ Rp. 22,000.00 = Rp.
0.8000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
4.0000 !eke"a @ Rp. 55,000.00 = Rp.12.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
1.2000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.2000 &an#o" @ Rp. 110,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
10/219
Jumlah Rp.
5 1 M3 PASANG KONSTRUKSI KUDA KUDA KAYU KLS. II
1.1000 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.
15.0000 Kg Be(% t"%p @ Rp. 22,000.00 = Rp.
0.8000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
4.0000 !eke"a @ Rp. 55,000.00 = Rp.
12.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
1.2000 Kepala ukang @ Rp. 110,000.00 = Rp.0.2000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
5 1 M3 PASANG KONSTRUKSI KUDA KUDA KAYU KAYU LAMA
1.1000 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.
15.0000 Kg Be(% t"%p @ Rp. 20,000.00 = Rp.
0.8000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
4.0000 !eke"a @ Rp. 55,000.00 = Rp.
12.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
1.2000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.2000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M3 PASANG KONSTRUKS KU!A " KU!A KA#U KA#U LAMA Rp.
58 1 M2 PASANG KASO - RENG GENTENG KODOK KAYU KLS I
0.0120 &' Kayu Kl( 9, Balok @ Rp. 10,450,000.00 = Rp.
0.1500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.5" 1 M2 PASANG KASO - RENG GENTENG KODOK KAYU KLS II
0.0120 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.
0.1500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
6# 1 M2 PASANG KASO - RENG GENTENG BETON KAYU KLS II
0.0140 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.
0.1500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
61 1 M2 PASANG RANGKA LANGIT LANGIT$PLA+ON (1)1*M, KAYU KLS II
0.0120 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.
0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Kayu @ Rp. 77,000.00 = Rp.0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
11/219
1 M3 PASANG RANGKA LANGT" LANGT $1%1&M, KA#U KLS R'(
61 1 M2 PASANG RANGKA LANGIT LANGIT (1)1*M, KAYU LAMA
0.0120 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.
0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG RANGKA LANGT" LANGT $1%1&M, KA#U LAMA R'(
1 M3 PASANG RANGKA LANGT" LANGT $1%1&M, KA#U LAMA R'(
62 1 M PASANG LISTPLANK UKURAN 2)2# !M, KAYU KLS I PAPAN
0.0040 &' Kayu Kl(. 9, !apan @ Rp. 1',000,000.00 = Rp.
0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 2%2) CM, KA#U KLS PAPAN RP(
62 1 M PASANG LISTPLANK UKURAN 2)2# !M, KAYU KLS I PAPAN
1.1000 &1 e( 6al(%+o"# @ Rp. 80,000.00 = Rp.
0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 2%2) CM, KA#U KLS PAPAN RP(
62 1 M PASANG LISTPLANK UKURAN 2)2# !M, KAYU KLS II PAPAN
0.0040 &' Kayu Kl(. 9, !apan @ Rp. 1',000,000.00 = Rp.
0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 2%2) CM, KA#U KLS PAPAN RP(
62 1 M PASANG LISTPLANK UKURAN 3)2# !M, KAYU KLS I PAPAN
0.0072 &' Kayu Kl(. 9, !apan @ Rp. 1',000,000.00 = Rp.
0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 3%2) CM, KA#U KLS PAPAN RP(
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
12/219
63 1 M PASANG LISTPLANK UKURAN 3)2# !M, KAYU KLS II PAPAN
0.0072 &' Kayu Kl( 99, !apan @ Rp. ',*'0,000.00 = Rp.
0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.1 M2 PASANG LSTPLANK UKURAN 3%2) CM, KA#U KLS PAPAN RP(
64 1 M PASANG LISTPLANK UKURAN 3)3# !M, KAYU KLS I PAPAN
0.0110 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.
0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1100 !eke"a @ Rp. 55,000.00 = Rp.
0.2200 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0220 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 3%3) CM, KA#U KLS PAPAN RP(
65 1 M PASANG LISTPLANK UKURAN 3)3# !M, KAYU KLS II PAPAN
0.0110 &' Kayu Kl( 99, !apan @ Rp. ',*'0,000.00 = Rp.
0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1100 !eke"a @ Rp. 55,000.00 = Rp.
0.2200 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0220 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 3%3) CM, KA#U KLS PAPAN RP(66 1 M PASANG LISTPLANK UKURAN 2(3)2#* !M, KAYU KLS I PAPAN
0.0145 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.
0.0*00 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 2$3%2)& CM, KA#U KLS PAPAN RP(
6 1 M PASANG LISTPLANK UKURAN 2(2)2#* !M, KAYU KLS I PAPAN
0.008* &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.
0.0*00 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 2$2%2)& CM, KA#U KLS PAPAN RP(
68 1 M PASANG LISTPLANK UKURAN 2(2)2#* !M, KAYU KLS II PAPAN 0.0088 &' Kayu Kl( 99, !apan @ Rp. ',*'0,000.00 = Rp.
0.0*00 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
13/219
0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 2$2%2)& CM, KA#U KLS PAPAN RP(
6 1M PASANG TOPI LISTPLANK UKURAN (2)1#* !M, KAYU KLS I PAPAN
0.0040 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.0.0400 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
6" 1M2 PASANG DINDIG PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KL
0.01)5 &' Kayu Kl( 9, Balok @ Rp. 10,500,000.00 = Rp.
0.0070 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.
0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.4500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0450 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
# 1 M2 PASANG DINDING PAPAN KAYU KLS II,
- &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.
0.0070 &' Kayu Kl( 99, !apan @ Rp. ',)50,000.00 = Rp.
0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.0.4500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0450 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 1 M PASANG LIST PLA+OND KAYU PRO+IL
1.0500 &1 Kayu p"o:%l 4 cm @ Rp. 21,000.00 = Rp.
0.0210 !eke"a @ Rp. 55,000.00 = Rp.
0.0210 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0020 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0010 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
'II. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
2 1 M3 MEMBUAT BETON TUMBUK, 1 P! % 3 PS % 5 KRK
218.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
0.8700 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
1.*500 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0800 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.3 1 M3 MEMBUAT BETON TUMBUK, 1 P! % 4 PS % 6 KRK
17'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5700 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
14/219
0.8700 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
1.*500 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0800 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
4 1M2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 P! % 3 PS % 5 KRK, TEBA
10.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.0.02*0 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
0.0440 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
1.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.0200 ukang Batu @ Rp. 77,000.00 = Rp.
0.0020 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
5 1 M3 MEMBUAT BETON BERTULANG 1 P! % 2 PS % 3 KRK
2'2.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
1.*500 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0800 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
6 1 M3 MEMBUAT BETON BERTULANG 1 P! % 1,5 PS % 2,5 KRK
'8*.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.4700 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
1.*500 !eke"a @ Rp. 55,000.00 = Rp.0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0800 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M3 MEMBUAT BETON BERTULANG 1 P! % 2 PS % 3 KRK
''*.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5400 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
0.8100 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
2.0000 !eke"a @ Rp. 55,000.00 = Rp.
0.'500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0'50 Kepala ukang @ Rp. 110,000.00 = Rp.
1.0000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
8 1 M2 PASANG BEKISTING UNTUK PONDASI
0.0400 &' Kayu te"entang @ Rp. ',*'0,000.00 = Rp.
0.'000 Kg !aku +%a(a 2 - 5 @ Rp. 17,000.00 = Rp.
0.1000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.
0.'000 !eke"a @ Rp. 55,000.00 = Rp.
0.2*00 ukang kayu @ Rp. 77,000.00 = Rp.
0.02*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.
" 1 M2 PASANG BEKISTING UNTUK SLOO+
0.0450 &' Kayu te"entang @ Rp. 2,*00,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
15/219
0.'000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.1000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.
0.'000 !eke"a @ Rp. 55,000.00 = Rp.
0.2*00 ukang kayu @ Rp. 77,000.00 = Rp.
0.02*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
8# 1 M2 PASANG BEKISTING UNTUK KOLOM 0.0400 &' Kayu te"entang @ Rp. ',*80,000.00 = Rp.
0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.2000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.
0.0150 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.
0.'500 +" !ly$oo# te+al ) mm @ Rp. 105,800.00 = Rp.
2.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.
0.'000 !eke"a @ Rp. 55,000.00 = Rp.
0.''00 ukang kayu @ Rp. 77,000.00 = Rp.
0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
81 1 M2 PASANG BEKISTING UNTUK BALOK
0.0400 &' Kayu te"entang @ Rp. ',*'0,000.00 = Rp.
0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.2000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.
0.0180 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.
0.'500 +" !ly$oo# te+al ) mm @ Rp. 105,800.00 = Rp.
2.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.
0.'200 !eke"a @ Rp. 55,000.00 = Rp.
0.''00 ukang kayu @ Rp. 77,000.00 = Rp.
0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
82 1 M2 PASANG BEKISTING UNTUK LANTAI
0.0400 &' Kayu te"entang @ Rp. ',*'0,000.00 = Rp.
0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.2000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.
0.0150 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.
0.'500 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.
*.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.
0.'200 !eke"a @ Rp. 55,000.00 = Rp.
0.''00 ukang kayu @ Rp. 77,000.00 = Rp.
0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
83 1 M2 PASANG BEKISTING UNTUK DINDING
0.0'00 &' Kayu te"entang @ Rp. ',*80,000.00 = Rp.
0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.2000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.
0.0200 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.
0.'500 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.
'.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.4.0000 B ;omt%e/penaga a"ak +ek%(t%ng @ Rp. 1,500.00 = Rp.
0.'200 !eke"a @ Rp. 55,000.00 = Rp.
0.''00 ukang kayu @ Rp. 77,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
16/219
0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
84 1 M2 PASANG BEKISTING UNTUK TANGGA
0.0'00 &' Kayu te"entang @ Rp. ',*80,000.00 = Rp.
0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.1500 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.
0.0150 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.0.'500 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.
2.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.
0.'200 !eke"a @ Rp. 55,000.00 = Rp.
0.''00 ukang kayu @ Rp. 77,000.00 = Rp.
0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
85 1 M3 MEMBUAT BETON DENGAN MUTU K 225
'88.0000 Kg emen po"tlan# @ Rp. 1,'00.00 = Rp.
0.*500 &' !a(%" +eton @ Rp. 2)0,000.00 = Rp.
0.*500 &' Ko"al +eton @ Rp. '50,000.00 = Rp.
*.0000 !eke"a @ Rp. 55,000.00 = Rp.
1.0000 ukang +atu @ Rp. 77,000.00 = Rp.
0.1000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.'000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
86 1 M3 MEMBUAT PONDASI BETON BERTULANG (15# KG BESI - BEKISTING*
0.2000 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.
1.5000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.4000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.
150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.2.2500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.
'2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
'.)000 !eke"a @ Rp. 55,000.00 = Rp.
0.'500 ukang +atu @ Rp. 77,000.00 = Rp.
1.0400 ukang Kayu @ Rp. 77,000.00 = Rp.
1.0500 ukang Be(% @ Rp. 77,000.00 = Rp.
0.2450 Kepala ukang @ Rp. 110,000.00 = Rp.
0.1*50 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
8 1M3 MEMBUAT SLOO+ BETON BERTULANG (2## KG BESI - BEKISTING*
0.2700 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.
0.2000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.*000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.
200.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
'.0000 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.
'2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
4.8500 !eke"a @ Rp. 55,000.00 = Rp.0.'500 ukang +atu @ Rp. 77,000.00 = Rp.
1.5*00 ukang Kayu @ Rp. 77,000.00 = Rp.
1.4000 ukang Be(% @ Rp. 77,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
17/219
0.''10 Kepala ukang @ Rp. 110,000.00 = Rp.
0.1700 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
88 1M3 MEMBUAT KOLOM BETON BERTULANG (15# KG BESI - BEKISTING*
0.4000 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.
4.0000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
2.0000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.
150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.4.5000 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.
'2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
0.1500 &' Kayu Kela( 999 +alok @ Rp. ',*'0,000.00 = Rp.
'.5000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.
17.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.
7.'000 !eke"a @ Rp. 55,000.00 = Rp.
0.'500 ukang +atu @ Rp. 77,000.00 = Rp.
'.'000 ukang Kayu @ Rp. 77,000.00 = Rp.
2.1000 ukang Be(% @ Rp. 77,000.00 = Rp.
0.5700 Kepala ukang @ Rp. 110,000.00 = Rp.
0.2500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
8" 1M3 MEMBUAT BALOK BETON BERTULANG (2## KG BESI - BEKISTING*
0.'200 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.
'.2000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
1.*000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.
200.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
'.0000 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.
'2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.
0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
0.1400 &' Kayu Kl(. 99 +alok @ Rp. ',*80,000.00 = Rp.
2.8000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.
15.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.
5.)*00 !eke"a @ Rp. 55,000.00 = Rp.
0.'500 ukang +atu @ Rp. 77,000.00 = Rp.
2.8000 ukang Kayu @ Rp. 77,000.00 = Rp.
1.4000 ukang Be(% @ Rp. 77,000.00 = Rp.
0.4550 Kepala ukang @ Rp. 110,000.00 = Rp.
0.2080 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
"# 1 M3 MEMBUAT BALOK DAN LANTAI BETON BERTULANG (15# KG BESI - B
0.'200 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.
'.2000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
1.*000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.
150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
2.2500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.
'2'.0000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.
0.5200 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.0.1200 &' Kayu Bo"neo +alok @ Rp. ',*80,000.00 = Rp.
2.8000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.
20.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
18/219
5.8000 !eke"a @ Rp. 55,000.00 = Rp.
0.'500 ukang +atu @ Rp. 77,000.00 = Rp.
2.8000 ukang Kayu @ Rp. 77,000.00 = Rp.
1.0500 ukang Be(% @ Rp. 77,000.00 = Rp.
0.4200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.1850 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
"1 1M3 MEMBUAT BALOK GANTUNG BETON BERTULANG (15# KG BESI - BE 0.4000 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.
'.2000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
1.*000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.
150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
2.2500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.
'2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5200 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
0.1700 &' Kayu Bo"neo +alok @ Rp. ',*80,000.00 = Rp.
2.0000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.
20.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.
5.*000 !eke"a @ Rp. 55,000.00 = Rp.
0.'500 ukang +atu @ Rp. 77,000.00 = Rp.
2.*400 ukang Kayu @ Rp. 77,000.00 = Rp.
1.0500 ukang Be(% @ Rp. 77,000.00 = Rp.
0.4000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.1)'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
"2 1 M3 MEMBUAT TANGGA BETON BERTULANG (15# KG BESI - BEKISTING*
0.2500 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.
'.0000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.1.2000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.
150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
'.0000 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.
'2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.5200 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
0.1200 &' Kayu Bo"neo +alok @ Rp. ',*80,000.00 = Rp.
2.5000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.
14.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.
5.*000 !eke"a @ Rp. 55,000.00 = Rp.
0.'500 ukang +atu @ Rp. 77,000.00 = Rp.
2.'000 ukang Kayu @ Rp. 77,000.00 = Rp.
1.4000 ukang Be(% @ Rp. 77,000.00 = Rp.
0.4050 Kepala ukang @ Rp. 110,000.00 = Rp.
0.2020 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
"3 1 M MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 ) 11*!M
0.0020 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.
0.0100 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
'.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
0.4500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.4.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.00*0 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
0.00)0 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
19/219
0.0*00 !eke"a @ Rp. 55,000.00 = Rp.
0.0200 ukang +atu @ Rp. 77,000.00 = Rp.
0.0200 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0200 ukang Be(% @ Rp. 77,000.00 = Rp.
0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
"4 1 M MEMBUAT RING BALOK BETON BERTULANG (1# ) 15*!M 0.00'0 &' Kayu Kl(. 999 @ Rp. ',000,000.00 = Rp.
0.0200 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
'.*000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.
0.0500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.
5.5000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.00)0 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
0.0150 &' Ko"al Beton @ Rp. '50,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.0''0 ukang +atu @ Rp. 77,000.00 = Rp.
0.0''0 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0''0 ukang Be(% @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
'III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
"5 1 M MEMASANG BUBUNGAN ATAP
0.*)00 &2 3ok
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
20/219
0.0020 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
"" 1 M2 PASANG ATAP GENTENG BETON
11.0000 B enteng +eton @ Rp. '7,000.00 = Rp.
0.0'00 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.2000 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala tukang @ Rp. 110,000.00 = Rp.0.0100 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1## 1 M2 PASANG ATAP GENTENG METAL ROO+
1.0200 +" enteng metal @ Rp. )5,200.00 = Rp.
0.2000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
0.2000 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala tukang @ Rp. 110,000.00 = Rp.
0.0010 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1#1 1 M2 PASANG NOK GENTENG BETON
'.5000 B 3ok genteng +eton @ Rp. 40,800.00 = Rp.
0.0500 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.
10.8000 Kg emen a+u - a+u @ Rp. 2,000.00 = Rp.
0.0'20 &' !a(%" pa(angan @ Rp. 157,500.00 = Rp.
1.0000 Kg emen $a"na @ Rp. 2,000.00 = Rp.
0.4000 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang kayu @ Rp. 77,000.00 = Rp.
0.0200 Kepala tukang @ Rp. 110,000.00 = Rp.
0.0200 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.1#2 1 M2 PASANG NOK GENTENG METAL 0
1.1000 B enteng &etal Roo: @ Rp. )5,200.00 = Rp.
0.0500 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.2500 !eke"a @ Rp. 55,000.00 = Rp.
0.1500 ukang kayu @ Rp. 77,000.00 = Rp.
0.0150 Kepala tukang @ Rp. 110,000.00 = Rp.
0.01'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1#3 1 M2 PASANG ATAP SENG GELOMBANG SENG BJLS #,35
0.7000 KK eng gelom+ang '*+l( 0.'5 @ Rp. 18,400.00 = Rp.
0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.1200 !eke"a @ Rp. 55,000.00 = Rp.
0.0*00 ukang kayu @ Rp. 77,000.00 = Rp.
0.00*0 Kepala tukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1#3 1 M2 PASANG ATAP SENG GELOMBANG BJLS #,3#
0.7000 KK eng gelom+ang '*+l( 0.'0 @ Rp. 1',400.00 = Rp.
0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.1200 !eke"a @ Rp. 55,000.00 = Rp.
0.0*00 ukang kayu @ Rp. 77,000.00 = Rp.0.00*0 Kepala tukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
21/219
1#3 1 M2 PASANG ATAP SENG GELOMBANG BJLS #,2#
*.0000 kk eng gelom+ang '*+l( 0.20 @ Rp. 1',400.00 = Rp.
0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.1200 !eke"a @ Rp. 55,000.00 = Rp.
0.0*00 ukang kayu @ Rp. 77,000.00 = Rp.
0.00*0 Kepala tukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.1#4 1 M2 PASANG ATAP SPANDEK
1.0500 &2 pan#ek @ Rp. )0,000.00 = Rp.
*.0000 + !aku ek"up @ Rp. 450.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.7500 ukang kayu @ Rp. 77,000.00 = Rp.
0.0080 Kepala tukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1#5 1 M1 PASANG ATAP NOK SPANDEK
1.2000 +" 3ok pan#ek @ Rp. 75,000.00 = Rp.
*.0000 Kg !aku pan#ek @ Rp. 1),000.00 = Rp.
0.0100 !eke"a @ Rp. 55,000.00 = Rp.
0.0700 ukang kayu @ Rp. 77,000.00 = Rp.
0.0080 Kepala tukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1#6 1 M2 PASANG ATAP SENG GELOMBANG LAMA
*.0000 kk eng gelom+ang '*+l( 0.20 @ Rp. 1',400.00 = Rp.
0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.1200 !eke"a @ Rp. 18,000.00 = Rp.0.0*00 ukang kayu @ Rp. 55,000.00 = Rp.
0.00*0 Kepala tukang @ Rp. 77,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1# 1 M2 PASANG ATAP NOK SENG
0.'000 KK eng plat '* +l( 0.'5 @ Rp. 18,400.00 = Rp.
0.0400 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.0700 ukang kayu @ Rp. 77,000.00 = Rp.
0.0080 Kepala tukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1#8 1 M2 PASANG ALUMINIUM +OIL$SISALATION
1.0500 &2 %(alat%on/ alu%n%um :o%l @ Rp. 5,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.0500 ukang kayu @ Rp. 77,000.00 = Rp.
0.0050 Kepala tukang @ Rp. 110,000.00 = Rp.
0.0080 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
I). ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT LANGIT
1#" 1M2 LANGIT LANGIT ETERNIT (1,## ) 1,##* M, TEBAL 5 MM,
1.1000 +" !elat a(+e( te+al 5 mm @ Rp. 55,000.00 = Rp.
0.0100 Kg !aku B%a(a @ Rp. 18,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
22/219
0.0'00 !eke"a @ Rp. 55,000.00 = Rp.
0.0700 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0070 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0015 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
11# 1 M2 LANGIT LANGIT ASBES (1,## ) 1,##* M, TEBAL 4 MM,
1.1000 +" !elat a(+e( te+al 4 mm @ Rp. 55,000.00 = Rp.
0.0100 Kg !aku B%a(a @ Rp. 18,000.00 = Rp.0.0'00 !eke"a @ Rp. 55,000.00 = Rp.
0.0700 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0070 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0015 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
111 1M2 LANGIT LANGIT ASBES (1,## ) 1,##* M, TEBAL 3.5 MM,
1.1000 +" !elat a(+e( te+al '.5 mm @ Rp. 50,000.00 = Rp.
0.0100 Kg !aku B%a(a @ Rp. 18,000.00 = Rp.
0.0'00 !eke"a @ Rp. 55,000.00 = Rp.
0.0700 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0070 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0015 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
112 1M2 LANGIT LANGIT AKUSTIK 6# ) 12# !M - RANGKA ALUMINIUM
'.*000 & !"o:%l
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
23/219
0.4000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0400 Kepala ukang @ Rp. 110,000.00 = Rp.
0.01'5 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
116 1 M2 LANGIT LANGIT !ALSI BOARD TEBAL " MM
0.'*40 +" yp(um +oa"# 120240)mm @ Rp. )0,000.00 = Rp.
0.1100 Kg !aku (ek"up @ Rp. 45,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.0.0500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0050 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
) ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI
11 MEMASANG 1 BUAH KLOSET DUDUK$ MONOBBLOK
1.0000 B Klo(et Du#uk/ &ono+lok @ Rp. 2,100,000.00 = Rp.
0.0*00 !e"lengkapan @ Rp. 50,000.00 = Rp.
'.'000 !eke"a @ Rp. 55,000.00 = Rp.
1.1000 ukang +atu @ Rp. 77,000.00 = Rp.
0.0010 Kepala ukang @ Rp. 110,000.00 = Rp.
0.1*00 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
118 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN$KERAMIK
1.0000 B Klo(et ongkok !o"(elen @ Rp. 250,000.00 = Rp.
*.0000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.
0.0100 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.0000 !eke"a @ Rp. 55,000.00 = Rp.
1.5000 ukang +atu @ Rp. 77,000.00 = Rp.
1.5000 Kepala ukang @ Rp. 110,000.00 = Rp.0.1*00 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
11" MEMASANG 1 BUAH URINOIR
1.0000 B "%no%" B%a(a @ Rp. 500,000.00 = Rp.
0.'000 - !e"lengkapan @ Rp. 50,000.00 = Rp.
*.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0100 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.0000 !eke"a @ Rp. 55,000.00 = Rp.
1.0000 ukang +atu @ Rp. 77,000.00 = Rp.
0.1000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.1000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
12# MEMASANG 1 BUAH WASTA+EL LENGKAP PLANT SET
1.0000 et >a(ta:el @ Rp. 1,500,000.00 = Rp.
0.1200 !e"lengkapan @ Rp. 10,000.00 = Rp.
*.0000 Kg emen
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
24/219
0.1800 !e"lengkapan @ Rp. 10,000.00 = Rp.
0.5000 !em+antu ukang @ Rp. 55,000.00 = Rp.
1.5000 ukang Batu @ Rp. 77,000.00 = Rp.
0.1500 Kepala ukang @ Rp. 110,000.00 = Rp.
0.1100 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
122 MEMASANG 1 BUAH BAK MANDI BATU BATA, 'OLUME #.3# M3
0.4000 &' Batu Bata @ Rp. 550.00 = Rp.120.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.'000 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.8000 Do( !o"(elen 2025cm @ Rp. 42,000.00 = Rp.
*.0000 Kg emen nat @ Rp. 5,000.00 = Rp.
*.0000 !eke"a @ Rp. 55,000.00 = Rp.
'.0000 ukang Batu @ Rp. 77,000.00 = Rp.
0.'000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.'000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
123 MEMASANG 1 M PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIAMETER 15 !M
1.*000 B !%pa tana @ Rp. 27,000.00 = Rp.
0.*800 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.
0.01'0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.0110 &' !a(%" "ug @ Rp. 12',000.00 = Rp.
0.0*00 !eke"a @ Rp. 55,000.00 = Rp.
0.0'00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00'0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
124 MEMASANG 1 M PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIAMETER 2# !M
1.*000 B !%pa tana @ Rp. '0,000.00 = Rp.0.8700 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0140 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.0140 &' !a(%" "ug @ Rp. 12',000.00 = Rp.
0.0800 !eke"a @ Rp. 40,000.00 = Rp.
0.0400 ukang Batu @ Rp. 77,000.00 = Rp.
0.0040 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0070 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
125 MEMASANG 1 M PIPA BETON DIAMETER 3# 1## !M
1.1000 B !%pa tana @ Rp. 27,000.00 = Rp.
0.5500 &' Batu Bata @ Rp. 550.00 = Rp.
10.'000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0*10 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.0*)0 &' !a(%" "ug @ Rp. 12',000.00 = Rp.
0.'800 !eke"a @ Rp. 55,000.00 = Rp.
0.1)00 ukang Batu @ Rp. 77,000.00 = Rp.
0.01)0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.01)0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
126 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (3# ) 3#* !M,
TINGGI 35 !M 0.1450 &' Batu Bata @ Rp. 550.00 = Rp.
44.0000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.
0.0700 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
25/219
0.0700 &' Batu Ke"%k%l @ Rp. 1*5,000.00 = Rp.
1.*000 Kg Be(% Beton @ Rp. 20,000.00 = Rp.
0.0*00 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
'.2000 !eke"a @ Rp. 55,000.00 = Rp.
1.0150 ukang Batu @ Rp. 77,000.00 = Rp.
0.0015 Kepala ukang @ Rp. 110,000.00 = Rp.
0.01*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.12 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45 ) 45* !M,
TINGGI 5# M
0.2500 &' Batu Bata @ Rp. 550.00 = Rp.
77.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.1'00 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.0200 &' Batu Ke"%k%l @ Rp. 1*5,000.00 = Rp.
2.*000 Kg Be(% Beton @ Rp. 20,000.00 = Rp.
0.0)00 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.
1.4200 !eke"a @ Rp. 55,000.00 = Rp.
0.47'0 ukang Batu @ Rp. 77,000.00 = Rp.
0.0470 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0710 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
128 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (6# ) 6#* !M,
TINGGI 66 !M
0.'710 &' Batu Bata @ Rp. 550.00 = Rp.
114.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.1840 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.0''0 &' Batu Ke"%k%l @ Rp. 1*5,000.00 = Rp.
4.8500 Kg Be(% Beton @ Rp. 20,000.00 = Rp.
0.1200 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.2.1*00 !eke"a @ Rp. 55,000.00 = Rp.
0.7200 ukang Batu @ Rp. 77,000.00 = Rp.
0.0720 Kepala ukang @ Rp. 110,000.00 = Rp.
0.1080 &an#o" @ Rp. 110,000.00 = Rp.
0.1000 ukang al% @ Rp. 55,000.00 = Rp.
Jumlah Rp.
12" MEMASANG 1 M PIPA GAL'ANIS DIAMETER 1$2
1.2000 & !%pa gal?an%( @ Rp. 1),000.00 = Rp.
0.'500 - !e"lengkapan @ Rp. 1),000.00 = Rp.
0.0540 !eke"a @ Rp. 55,000.00 = Rp.
0.0)00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00)0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0270 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
13# MEMASANG 1 M PIPA GAL'ANIS DIAMETER 3$4
1.2000 & !%pa gal?an%( @ Rp. '0,000.00 = Rp.
0.'500 - !e"lengkapan @ Rp. '0,000.00 = Rp.
0.0540 !eke"a @ Rp. 55,000.00 = Rp.
0.0)00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00)0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0270 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.
131 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 1$2
1.2000 & !%pa !6 @ Rp. 15,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
26/219
0.'500 !e"lengkapan @ Rp. 2,000.00 = Rp.
0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.
0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0018 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
132 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 3$4
1.2000 & !%pa !6 @ Rp. 15,000.00 = Rp.0.'500 !e"lengkapan @ Rp. ',000.00 = Rp.
0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.
0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0018 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
133 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 1
1.2000 & !%pa !6 @ Rp. 8,750.00 = Rp.
0.'500 !e"lengkapan @ Rp. 4,000.00 = Rp.
0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.
0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0018 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
134 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 11$2
1.2000 & !%pa !6 @ Rp. 1*,250.00 = Rp.
0.'500 !e"lengkapan @ Rp. 5,000.00 = Rp.
0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.
0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0018 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.
135 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 2
1.2000 & !%pa !6 @ Rp. 50,000.00 = Rp.
0.'500 !e"lengkapan @ Rp. *,000.00 = Rp.
0.0540 !eke"a @ Rp. 55,000.00 = Rp.
0.0)00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00)0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0027 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
136 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 21$2
1.2000 & !%pa !6 @ Rp. '0,000.00 = Rp.
0.'500 !e"lengkapan @ Rp. 7,000.00 = Rp.
0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.
0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0018 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
13 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 3
1.2000 & !%pa !6 @ Rp. 87,500.00 = Rp.
0.'500 !e"lengkapan @ Rp. 8,000.00 = Rp.
0.0810 !eke"a @ Rp. 55,000.00 = Rp.0.1'50 ukang Batu @ Rp. 77,000.00 = Rp.
0.01'5 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0041 &an#o" @ Rp. 110,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
27/219
Jumlah Rp.
138 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 4
1.2000 & !%pa !6 @ Rp. 112,500.00 = Rp.
0.'500 !e"lengkapan @ Rp. ),000.00 = Rp.
0.0810 !eke"a @ Rp. 55,000.00 = Rp.
0.1'50 ukang Batu @ Rp. 77,000.00 = Rp.
0.01'5 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0041 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.
13" MEMASANG 1 BH BAK !U!I PIRING STAINLESS STELL
1.0000 B Bak cuc% (ta%nle( (teel @ Rp. 750,000.00 = Rp.
1.0000 et $ate" #"a%n A a((e(o"%e( @ Rp. 50,000.00 = Rp.
0.0'00 !eke"a @ Rp. 55,000.00 = Rp.
0.'000 ukang Batu @ Rp. 77,000.00 = Rp.
0.0'00 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0015 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
14# MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 2
1.2000 & !%pa !6 @ Rp. 200,000.00 = Rp.
0.'500 !e"lengkapan @ Rp. 200,000.00 = Rp.
0.0540 !eke"a @ Rp. 55,000.00 = Rp.
0.0)00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00)0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0027 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
141 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 4
1.2000 & !%pa !6 @ Rp. 450,000.00 = Rp.
0.'500 !e"lengkapan @ Rp. 500.00 = Rp.
0.0810 !eke"a @ Rp. 55,000.00 = Rp.0.1'50 ukang Batu @ Rp. 77,000.00 = Rp.
0.01'5 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0041 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
142 MEMASANG 1 BH KRAN DIAMETER 3$4 ATAU 1$2
1.0000 B K"an
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
28/219
0.0050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
)I ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM
145 1 KG PASANG RANGKA ATAP BAJA
1.1000 Kg Be(% p"o:%l >; @ Rp. 25,000.00 = Rp.
0.0800 Kg &en% +e(% @ Rp. 15,000.00 = Rp.
0.00*0 ukang +e(% @ Rp. 77,000.00 = Rp.
0.0*00 !eke"a @ Rp. 55,000.00 = Rp.0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.000' &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
146 1 M2 PASANG PINTU BESI BAJA
1.0000 &2 !%ntu +e(% +aa @ Rp. '50,000.00 = Rp.
0.*500 ukang +e(% kon(t"uk(% @ Rp. 77,000.00 = Rp.
0.*500 !eke"a @ Rp. 55,000.00 = Rp.
0.0*50 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0'20 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
14 1 M2 PASANG JENDELA BESI
1.0000 &2 en#ela +e(% @ Rp. '00,000.00 = Rp.
1.0500 ukang Be(% Kon(t"uk(% @ Rp. 77,000.00 = Rp.
1.0500 !eke"a @ Rp. 55,000.00 = Rp.
0.1050 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00525 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
148 1 M2 PASANG JENDELA BESI TAHAN API
1.0000 &2 en#ela +e(% taan ap% @ Rp. 1,500,000.00 = Rp.
1.2000 ukang Be(% Kon(t"uk(% @ Rp. 77,000.00 = Rp.
1.0220 !eke"a @ Rp. 55,000.00 = Rp.0.1200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
14" 1 M2 PASANG PINTU GULUNG BESI
1.0000 &2 !%ntu +e(% +aa @ Rp. 400,000.00 = Rp.
1.2000 ukang +e(% kon(t"uk(% @ Rp. 77,000.00 = Rp.
1.2000 !eke"a @ Rp. 55,000.00 = Rp.
0.1200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00*0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
15# 1 M2 PASANG PINTU LIPAT
1.0000 &2 !%ntu %pat @ Rp. '25,000.00 = Rp.
1.0500 ukang +e(% kon(t"uk(% @ Rp. 77,000.00 = Rp.
1.0500 !eke"a @ Rp. 55,000.00 = Rp.
0.1050 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0052 &an#o" @ Rp. 110,000.00 = Rp.
. Jumlah Rp.
151 1 M2 PASANG ROLLING DOOR
1.0000 &2 Rool #oo" @ Rp. '00,000.00 = Rp.
1.5000 ukang +e(% kon(t"uk(% @ Rp. 77,000.00 = Rp.
1.0500 !eke"a @ Rp. 55,000.00 = Rp.0.1050 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0052 &an#o" @ Rp. 110,000.00 = Rp.
. Jumlah Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
29/219
152 1 M2 PASANG PLA+ON BAJA HOLO
1.0000 &2 Baa Colo/R%ngan @ Rp. 100,000.00 = Rp.
0.1050 ukang Be(% Kon(t"uk(% @ Rp. 77,000.00 = Rp.
1.0000 !eke"a @ Rp. 55,000.00 = Rp.
0.1050 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0052 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
153 1 M2 PASANG TERALI BESI11.5000 & Be(% t"%p 2 ' @ Rp. 15,000.00 = Rp.
1.2000 ukang la( @ Rp. 77,000.00 = Rp.
1.2000 !eke"a @ Rp. 55,000.00 = Rp.
0.0120 Kepala ukang @ Rp. 110,000.00 = Rp.
0.000* &an#o" @ Rp. 110,000.00 = Rp.
. Jumlah Rp.
154 1 M2 PASANG KAWAT NYAMUK
1.1000 &2 Ka$at nyamuk @ Rp. 20,000.00 = Rp.
0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 20,500.00 = Rp.
0.0018 &' Kayu kampe", papan @ Rp. 17,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0005 &an#o" @ Rp. 110,000.00 = Rp.
. Jumlah Rp.
155 1 M2 PASANG JENDELA NAKO DAN TRALIS
1.1000 &2 en#ela 3ako @ Rp. 75,000.00 = Rp.
0.0200 Kg !aku B%a(a 1/2 atau k"up @ Rp. 45,000.00 = Rp.
0.0250 &2 Be(% t"%p @ Rp. 22,000.00 = Rp.
0.2000 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang kayu @ Rp. 77,000.00 = Rp.0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0010 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
156 1 M2 PASANG TALANG DATAR, SENG BJLS #.35
0.5000 KK eng plat ' * +l( 0.'5 @ Rp. 25,000.00 = Rp.
0.0150 Kg !aku +%a(a 1/2 - 1 @ Rp. 17,000.00 = Rp.
0.00)* &' Kayu +o"neo, papan @ Rp. 4,000,000.00 = Rp.
0.2500 Kg ;l%ncote/ men% +e(% @ Rp. 15,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.4000 ukang kayu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00125 &an#o" @ Rp. 110,000.00 = Rp.
. Jumlah Rp.
15 1 M2 PASANG TALANG MIRING, SENG BJLS #.35
0.5000 +" eng plat ' * +l( 0.'5 @ Rp. 25,000.00 = Rp.
0.0150 Kg !aku +%a(a 1/2 - 1 @ Rp. 17,000.00 = Rp.
0.01)0 &' Kayu +o"neo, papan @ Rp. 4,000,000.00 = Rp.
0.'000 Kg ;l%ncote/ men% +e(% @ Rp. 15,000.00 = Rp.
0.0400 !eke"a @ Rp. 55,000.00 = Rp.
0.4000 ukang kayu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.0.00125 &an#o" @ Rp. 110,000.00 = Rp.
. Jumlah Rp.
)II ANALISA BIAYA KONSTRUKSI PEKERJAAN KUN!I DAN KA!A
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
30/219
158 1 BUAH PASANG KUN!I TANAM ANTIK
1.0000 B Kunc% anam
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
31/219
0.0500 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00250 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
166 1 BUAH PASANG KUN!I SELOT
1.0000 B Kunc% elot @ Rp. 25,000.00 = Rp.
0.0200 !eke"a @ Rp. 55,000.00 = Rp.
0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.0.00100 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
16 1 BUAH PASANG PEGANGAN PINTU$ DOOR HOLDER
1.0000 B Doo" Col#e" @ Rp. 150,000.00 = Rp.
0.0500 !eke"a @ Rp. 55,000.00 = Rp.
0.5000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0500 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00250 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
168 1 BUAH PASANG DOOR STOP
1.0000 B Doo" top @ Rp. 50,000.00 = Rp.
0.0100 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00050 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
16" 1 BUAH PASANG REL PINTU DORONG
1.0000 B Rel !%ntu Do"ong @ Rp. 200,000.00 = Rp.
0.0*00 !eke"a @ Rp. 55,000.00 = Rp.
0.*000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.0.00'00 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1# 1 M2 PASANG KA!A, TEBAL 3 MM
1.1000 &2 Kaca @ Rp. *0,000.00 = Rp.
0.0150 !eke"a @ Rp. 55,000.00 = Rp.
0.1500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00075 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
11 1 M2 PASANG KA!A, TEBAL 5 MM
1.1000 &2 Kaca @ Rp. 75,000.00 = Rp.
0.0150 !eke"a @ Rp. 55,000.00 = Rp.
0.1500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00075 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
12 1 M2 PASANG KA!A, TEBAL 8 MM
1.1000 &2 Kaca @ Rp. 110,000.00 = Rp.
0.01*5 !eke"a @ Rp. 55,000.00 = Rp.
0.1*50 ukang Kayu @ Rp. 77,000.00 = Rp.
0.01*5 Kepala ukang @ Rp. 110,000.00 = Rp.0.00080 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
13 1 M2 PASANG KA!A !ERMIN, TEBAL 5 MM
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
32/219
1.1000 &2 kaca ce"m%n @ Rp. )0,000.00 = Rp.
0.0150 !eke"a @ Rp. 55,000.00 = Rp.
0.1500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00075 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
)III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI14 1 M2 PASANG LANTAI UBIN P! ABU ABU 2# ) 2# !M
2*.5000 B +%n a+u - a+u 20 20 cm @ Rp. 2,500.00 = Rp.
10.4000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.01'5 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.2700 !eke"a @ Rp. 55,000.00 = Rp.
0.1'00 ukang Batu @ Rp. 77,000.00 = Rp.
0.01'0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.01'5 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
15 1 M2 PASANG LANTAI UBIN 4# ) 4# !M
*.)'00 B !ut% !olo( 40 40 cm @ Rp. 15,000.00 = Rp.
).8000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0215 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.'000 Kg emen >a"na @ Rp. 5,000.00 = Rp.
0.2500 !eke"a @ Rp. 55,000.00 = Rp.
0.1200 ukang Batu @ Rp. 77,000.00 = Rp.
0.0120 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0125 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
16 1 M2 PASANG LANTAI UBIN GRANITO 3# ) 3# !M
11.8700 B +%n "an%to '0 '0 cm @ Rp. 8,000.00 = Rp.10.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0215 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.5000 Kg emen >a"na @ Rp. 5,000.00 = Rp.
0.2*00 !eke"a @ Rp. 55,000.00 = Rp.
0.1250 ukang Batu @ Rp. 77,000.00 = Rp.
0.0125 Kepala ukang @ Rp. 110,000.00 = Rp.
0.01'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 1 M PASANG PLINT UBIN P! WARNA 1# ) 2# !M
5.'000 B !l%nt egel !c >a"na 1020 cm @ Rp. 5,000.00 = Rp.
1.2000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.00'0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
0.1)00 Kg emen >a"na @ Rp. 15,000.00 = Rp.
0.0*00 !eke"a @ Rp. 55,000.00 = Rp.
0.0'00 ukang Batu @ Rp. 77,000.00 = Rp.
0.00'0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
18 1 M2 PASANG LANTAI KERAMIK MOTI+ 2# ) 2# !M
1.0000 D( egel Ke"am%k 20 20 cm @ Rp. 50,000.00 = Rp.
11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.
0.5000 !eke"a @ Rp. 55,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
33/219
0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1" 1 M2 PASANG LANTAI KERAMIK 33 ) 33 !M ANTI SLIP
1.0000 D( egel Ke"am%k '' ''cm ant% (l%p @ Rp. *5,000.00 = Rp.
11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.
0.5000 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
18# 1 M2 PASANG LANTAI KERAMIK 1# ) 33 !M
1.0000 D( egel Ke"am%k 10 '' @ Rp. 50,000.00 = Rp.
11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.
0.5000 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
181 1 M2 PASANG LANTAI KERAMIK 3# ) 3# !M
1.0000 D( egel Ke"am%k '0 '0 cm @ Rp. 55,000.00 = Rp.
11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.0.5000 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
182 1 M2 PASANG LANTAI KERAMIK 3# ) 3# !M ANTI SLIP
1.0000 D( egel Ke"am%k '0 '0 cm ant% (l%p @ Rp. 40,000.00 = Rp.
11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.
0.5000 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
183 1 M2 PASANG LANTAI MARMER
1.0000 &2 &a"me" @ Rp. 150,000.00 = Rp.
14.1500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.0')0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.
2.0000 Kg emen $a"na @ Rp. 15,000.00 = Rp.
0.5000 !eke"a @ Rp. 55,000.00 = Rp.0.2500 ukang Batu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.00'0 &an#o" @ Rp. 110,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
34/219
Jumlah Rp.
184 1 M2 PASANG DINDING KERAMIK ARTISTIK 5 ) 2# !M
1.0000 &2 Ke"am%k
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
35/219
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1"1 1 M2 MENGEROK KARAT !AT LAMA PERMUKAAN BAJA DENGAN !ARA MANUAL
0.0500 Kg a+un @ Rp. 15,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.1"2 1 M2 MENGEROK KARAT ATAU !AT LAMA PERMUKAAN BAJA DENGAN PAN!AR
PASIR (SANBLAST* DENGAN TINGKAT KEBERSIHAN S 2 1$2
40.0000 Kg !a(%" %l%ka @ Rp. 500.00 = Rp.
10.0000 t" BB& @ Rp. *,500.00 = Rp.
0.'000 C" Komp"e(o", @ Rp. 150,000.00 = Rp.
1.*000 !eke"a @ Rp. 55,000.00 = Rp.
1.*000 ukang 6at @ Rp. 77,000.00 = Rp.
0.8000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.5000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1"3 1 M2 MENDEMPUL DAN MENGGGOSOK KAYU
0.0800 Kg Dempul a#% @ Rp. '5,000.00 = Rp.
0.0200 Kg &%nyak 6at @ Rp. 15,000.00 = Rp.
0.0100 Kg Batu apung @ Rp. 8,000.00 = Rp.
0.0400 !eke"a @ Rp. 55,000.00 = Rp.
0.0400 ukang 6at @ Rp. 77,000.00 = Rp.
0.0040 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1"4 1 M2 PENGE!ATAN BIDANG KAYU LAMA
0.1500 Kg !lam%" @ Rp. 75,000.00 = Rp.0.1700 Kg 6at Da(a" @ Rp. )),500.00 = Rp.
0.1700 Kg 6at !enutup @ Rp. *5,000.00 = Rp.
0.0700 !eke"a @ Rp. 55,000.00 = Rp.
0.0750 ukang 6at @ Rp. 77,000.00 = Rp.
0.0075 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1"5 1 M2 PENGE!ATAN BIDANG KAYU BARU (1 LAPIS PLAMIR*, 1 LAPIS !AT DASAR,
2 LAPIS !AT PENUTUP (3)JLN*
0.2000 t" 6at &en% @ Rp. 15,000.00 = Rp.
0.1500 Kg !lam%" @ Rp. 150,000.00 = Rp.
0.1700 Kg 6at Da(a" @ Rp. *0,800.00 = Rp.
0.2*00 Kg 6at !enutup 2 kal% @ Rp. *0,000.00 = Rp.
0.0700 !eke"a @ Rp. 55,000.00 = Rp.
0.00)0 ukang 6at @ Rp. 77,000.00 = Rp.
0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1"6 1 M2 PENGE!ATAN BIDANG KAYU BARU (1 LAPIS PLAMIR*, 1 LAPIS !AT DASAR, 3 LAPI
!AT PENUTUP (4)JLN*
0.2000 t" 6at &en% @ Rp. 5*,000.00 = Rp.0.1500 Kg !lam%" @ Rp. '5,000.00 = Rp.
0.1700 Kg 6at Da(a" @ Rp. *0,000.00 = Rp.
0.'500 Kg 6at !enutup ' kal% @ Rp. *0,800.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
36/219
0.0700 !eke"a @ Rp. 55,000.00 = Rp.
0.1050 ukang 6at @ Rp. 77,000.00 = Rp.
0.0040 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1" 1 M2 PELABURAN BIDANG KAYU DENGAN TEAK OIL
0.'*00 t" eak %l @ Rp. 10,000.00 = Rp.
0.0400 !eke"a @ Rp. 55,000.00 = Rp.0.0*'0 ukang 6at @ Rp. 77,000.00 = Rp.
0.0*'0 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1"8 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR
0.1500 t" !ol%tu" @ Rp. 15,000.00 = Rp.
0.'720 t" !ol%tu" a#% @ Rp. 15,000.00 = Rp.
2.0000 +"
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
37/219
Jumlah Rp.
2#3 1 M2 PENGE!ATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERAN!AH
0.1000 Kg &en% Be(% @ Rp. 5*,000.00 = Rp.
0.0100 B Kua( @ Rp. 7,500.00 = Rp.
0.0020 &' !e"anca Kayu @ Rp. 750,000.00 = Rp.
0.2500 !eke"a @ Rp. 55,000.00 = Rp.
0.2250 ukang 6at @ Rp. 77,000.00 = Rp.
0.0225 Kepala ukang @ Rp. 110,000.00 = Rp.0.0075 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
)'. ANALISA BIAYA KONSTRUKSI PEKERJAAN LISTRIK
2#4 1 TITIK PASANGAN TITIK !AHAYA, LAMPU, SAKLAR, STOP KONTAK
1.0000 B ampu !%a" 40 >att @ Rp. 85,000.00 = Rp.
1.0000 B ampu 18 >att eta"a !%l%p( @ Rp. 75,000.00 = Rp.
1.0000 B akla" unggal @ Rp. *0,000.00 = Rp.
1.0000 B akla" an#a @ Rp. *5,000.00 = Rp.
1.0000 B top Kontak @ Rp. *5,000.00 = Rp.
1.0000 B %t%k ampu @ Rp. 75,000.00 = Rp.
1.0000 B ek"%ng Ka(t
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
38/219
2# 1 M2 PEKERJAAN HALAMAN DENGAN PA'ING BLOK (MD. BATA*
50.0000 B !a?%ng Block @ Rp. 2,500.00 = Rp.
1.0000 (
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
39/219
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0100 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
213 1.#### M2 PEKERJAAN A!IAN SEMEN
1.0500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.
0.1200 ukang Batu @ Rp. 77,000.00 = Rp.
0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0125 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.
214 1.#### M3 PASANG RANGKA TIANG KAYU KLS I ( ULIN *
1.1000 &' Kayu Kl(. 9 (eta"a Bayam , Balok @ Rp. 10,450,000.00 = Rp.
*.0000 !eke"a @ Rp. 55,000.00 = Rp.
20.0000 ukang Kayu @ Rp. 77,000.00 = Rp.
2.0000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.'000 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah R'(
215 1.#### M2 PASANG RANGKA DINDING (1)1*M, KAYU KLS II
0.0110 &' Kayu Kl( 99, Balok @ Rp. ',850,000.00 = Rp.
0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 20,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.2500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M3 PASANG RANGKA !N!NG , KA#U KLS R'(
216 1.#### M2 PASANG DINDING TRIPLEKS 4MM
0.0*00 Kg !aku B%a(a @ Rp. 20,000.00 = Rp.0.')00 +" %plek( 4 mm @ Rp. 50,000.00 = Rp.
0.2700 !eke"a @ Rp. 55,000.00 = Rp.
0.4000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0400 Kepala ukang @ Rp. 110,000.00 = Rp.
0.01'5 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
21 1.#### M2 PENGE!ATAN ATAP SENG 2 ) DAN 3 )
0.2*00 Kg 6at
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
40/219
0.2*00 Kg 6at !enutup 2 kal% @ Rp. '5,000.00 = Rp.
0.0200 !eke"a @ Rp. 55,000.00 = Rp.
0.0*'0 ukang 6at @ Rp. 77,000.00 = Rp.
0.00*' Kepala ukang @ Rp. 110,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
J79 Rp.
22# 1.#### M2 PENGE!ATAN PLAPON 3 )JLN
0.'800 Kg 6at !enutup @ Rp. '5,000.00 = Rp.0.0200 !eke"a @ Rp. 55,000.00 = Rp.
0.0*'0 ukang 6at @ Rp. 77,000.00 = Rp.
0.00*' Kepala ukang @ Rp. 110,000.00 = Rp.
0.0025 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
221 1.#### M PASANG LISTPLANK UKURAN KALSIBORD
1.1000 +" Kal(%+o"# @ Rp. 80,000.00 = Rp.
0.0*00 Kg !aku B%a(a 2 - 5 @ Rp. 20,000.00 = Rp.
0.1000 !eke"a @ Rp. 55,000.00 = Rp.
0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0500 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
1 M2 PASANG LSTPLANK UKURAN 2$2%2)& CM, KA#U KLS PAPAN RP(
222 1.#### M2 PASANG DINDING PAPAN KAYU KLS II ( PAPAN LAMA *
0.1100 &' Kayu Kl( 99, !apan @ Rp. ',850,000.00 = Rp.
0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 20,000.00 = Rp.
0.1500 !eke"a @ Rp. 55,000.00 = Rp.
0.4500 ukang Kayu @ Rp. 77,000.00 = Rp.
0.0450 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0750 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.
223 1.#### BH PASANG PINTU SENG PLAT, RANGKA KAYU KLS II
0.01)* &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.
0.0'00 Kg Baa 6 @ Rp. 20,000.00 = Rp.
1.2500 +" eng !lat B 0.22 @ Rp. 45,000.00
0.*000 !eke"a @ Rp. 55,000.00 = Rp.
1.2000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.0'00 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
224 1 B:; PEMASANGAN BAJA IW+ 2# MM
1.0000 Btg Baa 9>; E 12 m @ Rp. 5,000,000.00 = Rp.
'.2000 Kg !aku Baut @ Rp. 17,000.00 = Rp.
7.0000 !eke"a @ Rp. 55,000.00 = Rp.
2.0000 ukang Be(% @ Rp. 77,000.00 = Rp.
1.*000 ukang Kayu @ Rp. 77,000.00 = Rp.
0.4000 Kepala ukang @ Rp. 110,000.00 = Rp.
0.1)'0 &an#o" @ Rp. 110,000.00 = Rp.
Jumlah Rp.
U:>0 P?.@ IW+ %
225 1 B:; PEMASANGAN BAJA ! GORDING
1.0000 Btg Baa E * m @ Rp. 400,000.00 = Rp.
-
8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx
41/219
2.0000 !eke"a @ Rp. 55,000.00 = Rp.
1.0000 ukang Be(% @ Rp. 77,000.00 = Rp.