      AFTAR ANALISA

    (BERDASARKAN STANDAR NASIONAL INDONESIA )

    WILAYAH KABUPATEN MAROS

    I. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

    1 1 M PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER

      1.0000 Btg Dolken Kayu D 8-10 / 400 cm @ Rp. 75,000.00 = Rp.2.0000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.

    25.0000 Kg Ka$at Du"% @ Rp. 20,000.00 = Rp.

    0.0050 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    0.00)0 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    0.0*00 Kg !aku +%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.'000 !eke"a @ Rp. 55,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0200 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    2 1 M PENGUKURAN DAN PEMASANGAN BOUWPLANK

      0.0120 &' kayu 5/7 @ Rp. ',*'0,000.00 = Rp.

    0.0200 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.0070 &' Kayu !apan '/20 @ Rp. ',)50,000.00 = Rp.

    0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    3 1 M PEMBUATAN KANTOR SEMENTARA

      1.2500 Btg Dolken Kayu D 8-10 / 400 cm @ Rp. 75,000.00 = Rp.0.1500 &' Kayu @ Rp. ',*80,000.00 = Rp.

    0.8500 kg !aku B%a(a @ Rp. 17,000.00 = Rp.

    1.1000 kg Be(% t"%p @ Rp. 22,000.00 = Rp.

    20.0000 kg emen !o"tlan# @ Rp. 1,200.00 = Rp.

    0.1500 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.1000 &' !a(%" Beton @ Rp. '50,000.00 = Rp.

    0.1500 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    '00.0000 B Bata &e"a @ Rp. 550.00 = Rp.

    0.2500 +" eng !lat @ Rp. 54,800.00 = Rp.

    2.0000 B en#ela 3ako @ Rp. 75,000.00 = Rp.

    0.0800 &2 Kaca !olo( @ Rp. 80,000.00 = Rp.

    0.1500 B Kunc% anam @ Rp. 1)0,000.00 = Rp.

    0.0*00 +" "%plek( 4 mm @ Rp. *0,000.00 = Rp.

    2.0000 ukang kayu @ Rp. 77,000.00 = Rp.

    1.0000 ukang Batu @ Rp. 77,000.00 = Rp.

    2.0000 !eke"a @ Rp. 55,000.00 = Rp.

    0.'000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    4 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN MANUAL

      0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    II. ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    2/219

    5 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER

      0.4000 !eke"a @ Rp. 55,000.00 = Rp.

    0.0400 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    6 1 M3 GALIAN TANAH BIASA SEDALAM 2 METER

      0.52*0 !eke"a @ Rp. 55,000.00 = Rp.

    0.0520 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp. 1 M3 GALIAN TANAH KERAS SEDALAM 1 METER

      0.*250 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*20 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    8 1 M3 GALIAN TANAH !ADAS SEDALAM 1 METER

      1.2500 !eke"a @ Rp. 55,000.00 = Rp.

    0.1250 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp." 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER

      0.82'0 !eke"a @ Rp. 55,000.00 = Rp.0.8'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1# 1 M2 PEKERJAAN STRIPING TANAH SETINGGI 1 METER

      0.0500 !eke"a @ Rp. 55,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.11 1 M3 PEKERJAAN PEMBUANGAN TANAH SEJAUH 15# METER

      0.51*0 !eke"a @ Rp. 55,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.12 1 M3 URUGAN KEMBALI

      0.1)20 !eke"a @ Rp. 55,000.00 = Rp.

    0.01)0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.13 1 M3 PEMADATAN TANAH

      0.5000 !eke"a @ Rp. 55,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.14 1 M3 URUGAN PASIR

      1.2000 &' !a(%" "ug @ Rp. 145,000.00 = Rp.

    0.'000 !eke"a @ Rp. 55,000.00 = Rp.

    0.0100 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    15 1 M3 URUGAN SIRTU

      1.2000 &' %"tu @ Rp. 145,000.00 = Rp.

    0.2500 !eke"a @ Rp. 55,000.00 = Rp.

    0.0250 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    16 1 M3 TIMBUNAN TANAH

      1.2000 &' ana "ugan @ Rp. 12',000.00 = Rp.

    0.'000 !eke"a @ Rp. 55,000.00 = Rp.

    0.0100 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

    1 1 M3 PASANG PONDASI BATU KALI$BT. GUNUNG, 1 P! % 2 PS

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    3/219

      1.1000 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.

    2*7.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.4270 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.5000 !eke"a @ Rp. 55,000.00 = Rp.

    0.*000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.18 1 M3 PASANG PONDASI BATU KALI$BT. GUNUNG, 1 P! % 3 PS

      1.1000 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.

    202.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.4850 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.5000 !eke"a @ Rp. 55,000.00 = Rp.

    0.*000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1" 1 M3 PASANG PONDASI BATU KALI$BT. GUNUNG, 1 P! % 4 PS

      1.1000 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.

    1*'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5200 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.5000 !eke"a @ Rp. 55,000.00 = Rp.

    0.*000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    2# 1 M3 PASANG PONDASI BATU KALI$BT. GUNUNG, 1 P! % 5 PS

      1.1000 &' Batu Bela 15/20 cm @ Rp. 157,500.00 = Rp.

    1'*.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5440 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.5000 !eke"a @ Rp. 55,000.00 = Rp.

    0.*000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    21 1 M3 PASANG PONDASI BATU KOSONG

      1.2000 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.

    0.'000 &' !a(%" "ug @ Rp. 145,000.00 = Rp.

    0.7800 !eke"a @ Rp. 55,000.00 = Rp.0.')00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0')0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0')0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    22 1 M3 PASANG PONDASI SIKLOP 4# & BATU KALI

      75.000 Kg Be(% +eton @ Rp. 18,000.00 = Rp.

    202.000 Kg emen po"tlan# @ Rp. 1,'00.00 = Rp.

    0.'200 &' !a(%" +eton @ Rp. 2)0,000.00 = Rp.

    0.4)00 &' Ko"al +eton @ Rp. '50,000.00 = Rp.

    0.8000 Kg Ka$at +eton @ Rp. 17,000.00 = Rp.

    '.0000 !eke"a @ Rp. 55,000.00 = Rp.

    0.8500 ukang +atu @ Rp. 77,000.00 = Rp.

    0.0850 kepala tukang @ Rp. 110,000.00 = Rp.

    0.1500 &an#o" @ Rp. 110,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    4/219

    Jumlah Rp.

    23 1 M3 PASANG PONDASI SUMURAN DIAMETER 1## !M

      0.450 &' Batu Bela 15/20 cm @ Rp. 170,500.00 = Rp.

    280.000 Kg emen po"tlan# @ Rp. 1,'00.00 = Rp.

    0.4500 &' !a(%" +eton @ Rp. 2)0,000.00 = Rp.

    0.*700 &' Ko"al +eton @ Rp. '50,000.00 = Rp.

    2.'800 !eke"a @ Rp. 55,000.00 = Rp.

    0.'000 ukang +atu @ Rp. 77,000.00 = Rp.0.0'00 kepala tukang @ Rp. 110,000.00 = Rp.

    0.0800 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    I'. ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING

    24 1 M2 PASANG BATA MERAH TEBAL 1BATA, 1 P! % 2 PS

      140.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.

    4'.5000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0800 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.*500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0'00 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M3 PASANG BATA MERAH TEBAL 1BATA, 1 PC : 2 PS ………………… RP.

    25 1 M2 PASANG BATA MERAH TEBAL 1BATA, 1 P! % 3 PS

      140.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.

    '2.)500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0)10 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.*500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Batu @ Rp. 77,000.00 = Rp.0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0'00 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M3 PASANG BATA MERAH TEBAL 1BATA, 1 PC : 3 PS ………………… RP.

    26 1 M2 PASANG BATA MERAH TEBAL 1BATA, 1 P! % 5 PS

      140.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.

    22.2000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.1020 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.*500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0'00 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M3 PASANG BATA MERAH TEBAL 1BATA, 1 PC : 5 PS ………………… RP.

    2 1 M2 PASANG BATA MERAH TEBAL 1$2 BATA, 1 P! % 2 PS

      70.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.

    18.)500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0'80 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.'200 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0150 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    5/219

    1 M3 PASANG BATA MERAH TEBAL 1/2BATA, 1 PC : 2 PS ……………… RP.

    28 1 M2 PASANG BATA MERAH TEBAL 1$2 BATA, 1 P! % 3 PS

      70.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.

    14.'700 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0400 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.'200 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Batu @ Rp. 77,000.00 = Rp.0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0150 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M3 PASANG BATA MERAH TEBAL 1/2BATA, 1 PC : 3 PS ……………… RP.

    2" 1 M2 PASANG BATA MERAH TEBAL 1$2 BATA, 1 P! % 5 PS

      70.0000 B Bata &e"a 51122 @ Rp. 550.00 = Rp.

    ).*800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0450 &' !a(%" !a(ang @ Rp. 157,000.00 = Rp.

    0.'200 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0150 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M3 PASANG BATA MERAH TEBAL 1/2BATA, 1 PC : 5 PS ……………… RP.

    3# 1 M2 PASANG DINDING ROSTER$TERAWANG, (2#)2#)11*

      25.0000 B Ro(te"/e"a$ang @ Rp. 5,500.00 = Rp.

    12.8000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.

    0.0'50 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.'200 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0150 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    31 1 M2 PASANGAN DINDING !ONBLO!K (!B. 2#*

      12.5000 B 6onc"ete Block 6B. 20 @ Rp. 5,500.00 = Rp.

    14.0500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0040 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    0.0420 &' !a(%" !a(angan @ Rp. 157,500.00 = Rp.

    '.8700 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    0.00*0 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.0010 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    0.0'00 Kg Ka$at Beton @ Rp. 17,000.00 = Rp.

    0.0050 Kg Ko"al Beton @ Rp. '50,000.00 = Rp.

    0.'700 !eke"a @ Rp. 55,000.00 = Rp.

    0.1570 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0070 ukang Be(% @ Rp. 88,000.00 = Rp.

    0.01*4 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0185 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    32 1 M2 PASANGAN DINDING !ONBLO!K (!B. 15*

      12.5000 B 6onc"ete Block 6B. 15 @ Rp. 5,500.00 = Rp.

    10.4*00 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.00'0 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    0.0'20 &' !a(%" !a(angan @ Rp. 157,500.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    6/219

      0.8700 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    0.0040 Kg !aku B%a(a 2 - 5 @ Rp. 17,'00.00 = Rp.

    0.0010 Kg Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    0.0200 Kg Ka$at Beton @ Rp. 17,000.00 = Rp.

    0.0040 Kg Ko"al Beton @ Rp. '50,000.00 = Rp.

    0.'400 !eke"a @ Rp. 55,000.00 = Rp.

    0.1'00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0070 ukang Be(% @ Rp. 77,000.00 = Rp.0.01'7 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0170 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    33 1 M2 PASANGAN DINDING !ONBLO!K (!B. 1#*

      12.5000 B 6onc"ete Block 6B. 10 @ Rp. 7,000.00 = Rp.

    7.2000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.

    0.0020 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    0.0210 &' !a(%" !a(angan @ Rp. 157,500.00 = Rp.

    2.5400 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    0.00'0 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.0010 Kg Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    0.0150 Kg Ka$at Beton @ Rp. 17,000.00 = Rp.

    0.00'0 Kg Ko"al Beton @ Rp. '50,000.00 = Rp.

    0.'400 !eke"a @ Rp. 55,000.00 = Rp.

    0.1070 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0070 ukang Be(% @ Rp. 77,000.00 = Rp.

    0.0114 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0170 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    '. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

    34 1 M2 PLESTERAN 1 P! % 2 PS, TEBAL 15 MM

      8.5200 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0170 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.2000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0100 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    35 1 M2 PLESTERAN 1 P! % 3 PS, TEBAL 15 MM

      *.4800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.01)0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.2000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0100 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    36 1 M2 PLESTERAN 1 P! % 5 PS, TEBAL 15 MM

      4.'200 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0220 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.2000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0100 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    3 1 M2 PLESTERAN 1 P! % 2 PS, TEBAL 2# MM

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    7/219

      14.2800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.02'0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.2500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0125 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    38 1 M2 PLESTERAN 1 P! % 3 PS, TEBAL 2# MM  10.8000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.02*0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.2500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0125 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    3" 1 M2 PLESTERAN 1 P! % 5 PS, TEBAL 2# MM

      7.2)00 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0280 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.2500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0125 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    4# 1 M2 PLESTERAN BETON 1 P! % 2 PS, TEBAL 15 MM

      ).'000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0180 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.2*00 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.0.01'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    41 1 M2 PLESTERAN SKONING 1 P! % 2 PS

      0.5000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0020 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.0570 !eke"a @ Rp. 55,000.00 = Rp.

    0.0'80 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0'80 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0020 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    42 1 M2 PLESTERAN SIAR ADUKAN 1 P! % 2 PS

      4.'200 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.01*0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.0700 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0070 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0080 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    43 1 M2 PLESTERAN WATER+ROO+ BATA!OTE 3 LAPIS

      0.5000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    2.)000 Kg Batacote @ Rp. 2,500.00 = Rp.0.00*0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.'000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Batu @ Rp. 77,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    8/219

      0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0150 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    'I. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

    44 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KLS. I

      1.1000 &' Kayu Kl(. 9 (eta"a Bayam , Balok @ Rp. 10,450,000.00 = Rp.

    *.0000 !eke"a @ Rp. 55,000.00 = Rp.20.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    2.0000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.'000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    45 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KLS. II

      1.1000 &' Kayu Kl(. 99 Balok @ Rp. ',*80,000.00 = Rp.

    *.0000 !eke"a @ Rp. 55,000.00 = Rp.

    18.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    2.0000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.'000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    46 1 M2 PASANG PINTU PANIL KAYU KLS.I

      0.0400 &' Kayu Kl(. 9 (eta"a Bayam , papan@ Rp. 1',000,000.00 = Rp.

    1.0000 !eke"a @ Rp. 55,000.00 = Rp.

    2.5000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.2500 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    4 1 M2 PASANG PINTU PANIL KAYU KLS.II

      0.0100 &' Kayu Kl(. 99 , papan @ Rp. 4,000,000.00 = Rp.

    1.0000 !eke"a @ Rp. 55,000.00 = Rp.1.7500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.2500 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    48 1 M2 PASANG PINTU DAN JENDELA KA!A KAYU KLS. I

      0.0100 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.

    1.1000 &2 Kaca Ben%ng 5 mm @ Rp. 75,000.00 = Rp.

    0.0800 !eke"a @ Rp. 55,000.00 = Rp.

    1.7500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0400 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    4" 1 M3 PASANG PINTU DAN JENDELA KA!A KAYU KLS. II

      0.0100 &' Kayu Kl( 99, !apan @ Rp. 4,000,000.00 = Rp.

    1.0000 !eke"a @ Rp. 55,000.00 = Rp.

    1.7500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.2500 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    5# 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KLS I

      0.0*40 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.1.0000 !eke"a @ Rp. 55,000.00 = Rp.

    '.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.'000 Kepala ukang @ Rp. 110,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    9/219

      0.'000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    51 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KLS II

      0.0*40 &' Kayu Kl( 99, !apan @ Rp. 4,000,000.00 = Rp.

    1.0000 !eke"a @ Rp. 55,000.00 = Rp.

    '.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.'000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.5000 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.

    52 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU KLS I

      0.01)* &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.0'00 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.'000 t em kayu @ Rp. 25,000.00 = Rp.

    1.0000 +" eak$oo# 4 mm @ Rp. )0,000.00 = Rp.

    0.*000 !eke"a @ Rp. 55,000.00 = Rp.

    2.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0'00 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    53 1M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU KLS II

      0.01)* &' Kayu kl( 99, !apan @ Rp. 4,000,000.00 = Rp.

    0.0'00 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.'000 t em kayu @ Rp. 25,000.00 = Rp.

    1.0000 +" eak$oo# 4 mm @ Rp. )0,000.00 = Rp.

    0.*000 !eke"a @ Rp. 55,000.00 = Rp.

    2.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0'00 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.54 1 M2 PASANG JALUSI MATI KUSEN KAYU KLS I

      0.0*00 &' Kayu kl( 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.1500 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.5000 !eke"a @ Rp. 55,000.00 = Rp.

    2.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0250 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    55 1 M2 PASANG JALUSI MATI KUSEN KAYU KLS II

      0.0*00 &' Kayu kl( 99, !apan @ Rp. ',)50,000.00 = Rp.

    0.1500 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.5000 !eke"a @ Rp. 55,000.00 = Rp.

    2.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0250 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    56 1 M3 PASANG KONSTRUKSI KUDA KUDA KAYU KLS. I

    1.1000 &' Kayu Kl( 9, Balok @ Rp. 10,450,000.00 = Rp.

    15.0000 Kg Be(% t"%p @ Rp. 22,000.00 = Rp.

    0.8000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    4.0000 !eke"a @ Rp. 55,000.00 = Rp.12.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    1.2000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.2000 &an#o" @ Rp. 110,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    10/219

    Jumlah Rp.

    5 1 M3 PASANG KONSTRUKSI KUDA KUDA KAYU KLS. II

    1.1000 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.

    15.0000 Kg Be(% t"%p @ Rp. 22,000.00 = Rp.

    0.8000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    4.0000 !eke"a @ Rp. 55,000.00 = Rp.

    12.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    1.2000 Kepala ukang @ Rp. 110,000.00 = Rp.0.2000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    5 1 M3 PASANG KONSTRUKSI KUDA KUDA KAYU KAYU LAMA

      1.1000 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.

    15.0000 Kg Be(% t"%p @ Rp. 20,000.00 = Rp.

    0.8000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    4.0000 !eke"a @ Rp. 55,000.00 = Rp.

    12.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    1.2000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.2000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M3 PASANG KONSTRUKS KU!A " KU!A KA#U KA#U LAMA Rp.

    58 1 M2 PASANG KASO - RENG GENTENG KODOK KAYU KLS I

    0.0120 &' Kayu Kl( 9, Balok @ Rp. 10,450,000.00 = Rp.

    0.1500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.5" 1 M2 PASANG KASO - RENG GENTENG KODOK KAYU KLS II

    0.0120 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.

    0.1500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    6# 1 M2 PASANG KASO - RENG GENTENG BETON KAYU KLS II

    0.0140 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.

    0.1500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    61 1 M2 PASANG RANGKA LANGIT LANGIT$PLA+ON (1)1*M, KAYU KLS II

    0.0120 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.

    0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Kayu @ Rp. 77,000.00 = Rp.0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    11/219

    1 M3 PASANG RANGKA LANGT" LANGT $1%1&M, KA#U KLS R'(

    61 1 M2 PASANG RANGKA LANGIT LANGIT (1)1*M, KAYU LAMA

      0.0120 &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.

    0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG RANGKA LANGT" LANGT $1%1&M, KA#U LAMA R'(

    1 M3 PASANG RANGKA LANGT" LANGT $1%1&M, KA#U LAMA R'(

    62 1 M PASANG LISTPLANK UKURAN 2)2# !M, KAYU KLS I PAPAN

      0.0040 &' Kayu Kl(. 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 2%2) CM, KA#U KLS PAPAN RP(

    62 1 M PASANG LISTPLANK UKURAN 2)2# !M, KAYU KLS I PAPAN

      1.1000 &1 e( 6al(%+o"# @ Rp. 80,000.00 = Rp.

    0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 2%2) CM, KA#U KLS PAPAN RP(

    62 1 M PASANG LISTPLANK UKURAN 2)2# !M, KAYU KLS II PAPAN

      0.0040 &' Kayu Kl(. 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 2%2) CM, KA#U KLS PAPAN RP(

    62 1 M PASANG LISTPLANK UKURAN 3)2# !M, KAYU KLS I PAPAN

      0.0072 &' Kayu Kl(. 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 3%2) CM, KA#U KLS PAPAN RP(

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    12/219

    63 1 M PASANG LISTPLANK UKURAN 3)2# !M, KAYU KLS II PAPAN

      0.0072 &' Kayu Kl( 99, !apan @ Rp. ',*'0,000.00 = Rp.

    0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.1 M2 PASANG LSTPLANK UKURAN 3%2) CM, KA#U KLS PAPAN RP(

    64 1 M PASANG LISTPLANK UKURAN 3)3# !M, KAYU KLS I PAPAN

      0.0110 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1100 !eke"a @ Rp. 55,000.00 = Rp.

    0.2200 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0220 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 3%3) CM, KA#U KLS PAPAN RP(

    65 1 M PASANG LISTPLANK UKURAN 3)3# !M, KAYU KLS II PAPAN

      0.0110 &' Kayu Kl( 99, !apan @ Rp. ',*'0,000.00 = Rp.

    0.0500 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1100 !eke"a @ Rp. 55,000.00 = Rp.

    0.2200 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0220 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 3%3) CM, KA#U KLS PAPAN RP(66 1 M PASANG LISTPLANK UKURAN 2(3)2#* !M, KAYU KLS I PAPAN

      0.0145 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.0*00 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 2$3%2)& CM, KA#U KLS PAPAN RP(

    6 1 M PASANG LISTPLANK UKURAN 2(2)2#* !M, KAYU KLS I PAPAN

      0.008* &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.0*00 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 2$2%2)& CM, KA#U KLS PAPAN RP(

    68 1 M PASANG LISTPLANK UKURAN 2(2)2#* !M, KAYU KLS II PAPAN  0.0088 &' Kayu Kl( 99, !apan @ Rp. ',*'0,000.00 = Rp.

    0.0*00 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    13/219

      0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 2$2%2)& CM, KA#U KLS PAPAN RP(

    6 1M PASANG TOPI LISTPLANK UKURAN (2)1#* !M, KAYU KLS I PAPAN

      0.0040 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.0.0400 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    6" 1M2 PASANG DINDIG PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KL

    0.01)5 &' Kayu Kl( 9, Balok @ Rp. 10,500,000.00 = Rp.

    0.0070 &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.4500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0450 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    # 1 M2 PASANG DINDING PAPAN KAYU KLS II,

    - &' Kayu Kl( 99, Balok @ Rp. ',*80,000.00 = Rp.

    0.0070 &' Kayu Kl( 99, !apan @ Rp. ',)50,000.00 = Rp.

    0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.0.4500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0450 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 1 M PASANG LIST PLA+OND KAYU PRO+IL

      1.0500 &1 Kayu p"o:%l 4 cm @ Rp. 21,000.00 = Rp.

    0.0210 !eke"a @ Rp. 55,000.00 = Rp.

    0.0210 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0020 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0010 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    'II. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

    2 1 M3 MEMBUAT BETON TUMBUK, 1 P! % 3 PS % 5 KRK

      218.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

    0.8700 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    1.*500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0800 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.3 1 M3 MEMBUAT BETON TUMBUK, 1 P! % 4 PS % 6 KRK

      17'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5700 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    14/219

      0.8700 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    1.*500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0800 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    4 1M2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 P! % 3 PS % 5 KRK, TEBA

    10.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.0.02*0 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

    0.0440 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    1.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.0200 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0020 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    5 1 M3 MEMBUAT BETON BERTULANG 1 P! % 2 PS % 3 KRK

      2'2.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

    0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    1.*500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0800 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    6 1 M3 MEMBUAT BETON BERTULANG 1 P! % 1,5 PS % 2,5 KRK

      '8*.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.4700 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

    0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    1.*500 !eke"a @ Rp. 55,000.00 = Rp.0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0800 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M3 MEMBUAT BETON BERTULANG 1 P! % 2 PS % 3 KRK

      ''*.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5400 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

    0.8100 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    2.0000 !eke"a @ Rp. 55,000.00 = Rp.

    0.'500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0'50 Kepala ukang @ Rp. 110,000.00 = Rp.

    1.0000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    8 1 M2 PASANG BEKISTING UNTUK PONDASI

      0.0400 &' Kayu te"entang @ Rp. ',*'0,000.00 = Rp.

    0.'000 Kg !aku +%a(a 2 - 5 @ Rp. 17,000.00 = Rp.

    0.1000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.

    0.'000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2*00 ukang kayu @ Rp. 77,000.00 = Rp.

    0.02*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.

    " 1 M2 PASANG BEKISTING UNTUK SLOO+

      0.0450 &' Kayu te"entang @ Rp. 2,*00,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    15/219

      0.'000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.1000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.

    0.'000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2*00 ukang kayu @ Rp. 77,000.00 = Rp.

    0.02*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    8# 1 M2 PASANG BEKISTING UNTUK KOLOM  0.0400 &' Kayu te"entang @ Rp. ',*80,000.00 = Rp.

    0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.2000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.

    0.0150 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.

    0.'500 +" !ly$oo# te+al ) mm @ Rp. 105,800.00 = Rp.

    2.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.

    0.'000 !eke"a @ Rp. 55,000.00 = Rp.

    0.''00 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    81 1 M2 PASANG BEKISTING UNTUK BALOK

      0.0400 &' Kayu te"entang @ Rp. ',*'0,000.00 = Rp.

    0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.2000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.

    0.0180 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.

    0.'500 +" !ly$oo# te+al ) mm @ Rp. 105,800.00 = Rp.

    2.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.

    0.'200 !eke"a @ Rp. 55,000.00 = Rp.

    0.''00 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    82 1 M2 PASANG BEKISTING UNTUK LANTAI

      0.0400 &' Kayu te"entang @ Rp. ',*'0,000.00 = Rp.

    0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.2000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.

    0.0150 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.

    0.'500 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.

    *.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.

    0.'200 !eke"a @ Rp. 55,000.00 = Rp.

    0.''00 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    83 1 M2 PASANG BEKISTING UNTUK DINDING

      0.0'00 &' Kayu te"entang @ Rp. ',*80,000.00 = Rp.

    0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.2000 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.

    0.0200 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.

    0.'500 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.

    '.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.4.0000 B ;omt%e/penaga a"ak +ek%(t%ng @ Rp. 1,500.00 = Rp.

    0.'200 !eke"a @ Rp. 55,000.00 = Rp.

    0.''00 ukang kayu @ Rp. 77,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    16/219

      0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    84 1 M2 PASANG BEKISTING UNTUK TANGGA

      0.0'00 &' Kayu te"entang @ Rp. ',*80,000.00 = Rp.

    0.4000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.1500 t &%nyak +ek%(t%ng @ Rp. 1,500.00 = Rp.

    0.0150 &' Balok kayu Bo"neo @ Rp. ',*80,000.00 = Rp.0.'500 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.

    2.0000 Btg Dolken kayu galam 8 - 10/4 m @ Rp. *5,000.00 = Rp.

    0.'200 !eke"a @ Rp. 55,000.00 = Rp.

    0.''00 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0''0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    85 1 M3 MEMBUAT BETON DENGAN MUTU K 225

      '88.0000 Kg emen po"tlan# @ Rp. 1,'00.00 = Rp.

    0.*500 &' !a(%" +eton @ Rp. 2)0,000.00 = Rp.

    0.*500 &' Ko"al +eton @ Rp. '50,000.00 = Rp.

    *.0000 !eke"a @ Rp. 55,000.00 = Rp.

    1.0000 ukang +atu @ Rp. 77,000.00 = Rp.

    0.1000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.'000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    86 1 M3 MEMBUAT PONDASI BETON BERTULANG (15# KG BESI - BEKISTING*

      0.2000 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    1.5000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.4000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.

    150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.2.2500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.

    '2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

    0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    '.)000 !eke"a @ Rp. 55,000.00 = Rp.

    0.'500 ukang +atu @ Rp. 77,000.00 = Rp.

    1.0400 ukang Kayu @ Rp. 77,000.00 = Rp.

    1.0500 ukang Be(% @ Rp. 77,000.00 = Rp.

    0.2450 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.1*50 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    8 1M3 MEMBUAT SLOO+ BETON BERTULANG (2## KG BESI - BEKISTING*

      0.2700 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    0.2000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.*000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.

    200.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    '.0000 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.

    '2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

    0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    4.8500 !eke"a @ Rp. 55,000.00 = Rp.0.'500 ukang +atu @ Rp. 77,000.00 = Rp.

    1.5*00 ukang Kayu @ Rp. 77,000.00 = Rp.

    1.4000 ukang Be(% @ Rp. 77,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    17/219

      0.''10 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.1700 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    88 1M3 MEMBUAT KOLOM BETON BERTULANG (15# KG BESI - BEKISTING*

      0.4000 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    4.0000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    2.0000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.

    150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.4.5000 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.

    '2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

    0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    0.1500 &' Kayu Kela( 999 +alok @ Rp. ',*'0,000.00 = Rp.

    '.5000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.

    17.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.

    7.'000 !eke"a @ Rp. 55,000.00 = Rp.

    0.'500 ukang +atu @ Rp. 77,000.00 = Rp.

    '.'000 ukang Kayu @ Rp. 77,000.00 = Rp.

    2.1000 ukang Be(% @ Rp. 77,000.00 = Rp.

    0.5700 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.2500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    8" 1M3 MEMBUAT BALOK BETON BERTULANG (2## KG BESI - BEKISTING*

      0.'200 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    '.2000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    1.*000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.

    200.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    '.0000 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.

    '2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.0.5200 &' !a(%" Beton @ Rp. 157,500.00 = Rp.

    0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    0.1400 &' Kayu Kl(. 99 +alok @ Rp. ',*80,000.00 = Rp.

    2.8000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.

    15.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.

    5.)*00 !eke"a @ Rp. 55,000.00 = Rp.

    0.'500 ukang +atu @ Rp. 77,000.00 = Rp.

    2.8000 ukang Kayu @ Rp. 77,000.00 = Rp.

    1.4000 ukang Be(% @ Rp. 77,000.00 = Rp.

    0.4550 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.2080 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    "# 1 M3 MEMBUAT BALOK DAN LANTAI BETON BERTULANG (15# KG BESI - B

      0.'200 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    '.2000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    1.*000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.

    150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    2.2500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.

    '2'.0000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.

    0.5200 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.0.1200 &' Kayu Bo"neo +alok @ Rp. ',*80,000.00 = Rp.

    2.8000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.

    20.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    18/219

      5.8000 !eke"a @ Rp. 55,000.00 = Rp.

    0.'500 ukang +atu @ Rp. 77,000.00 = Rp.

    2.8000 ukang Kayu @ Rp. 77,000.00 = Rp.

    1.0500 ukang Be(% @ Rp. 77,000.00 = Rp.

    0.4200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.1850 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    "1 1M3 MEMBUAT BALOK GANTUNG BETON BERTULANG (15# KG BESI - BE  0.4000 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    '.2000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    1.*000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.

    150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    2.2500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.

    '2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5200 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    0.1700 &' Kayu Bo"neo +alok @ Rp. ',*80,000.00 = Rp.

    2.0000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.

    20.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.

    5.*000 !eke"a @ Rp. 55,000.00 = Rp.

    0.'500 ukang +atu @ Rp. 77,000.00 = Rp.

    2.*400 ukang Kayu @ Rp. 77,000.00 = Rp.

    1.0500 ukang Be(% @ Rp. 77,000.00 = Rp.

    0.4000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.1)'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    "2 1 M3 MEMBUAT TANGGA BETON BERTULANG (15# KG BESI - BEKISTING*

      0.2500 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    '.0000 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.1.2000 t" &%nyak Bek%(t%ng @ Rp. 1,'00.00 = Rp.

    150.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    '.0000 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.

    '2'.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.5200 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    0.7800 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    0.1200 &' Kayu Bo"neo +alok @ Rp. ',*80,000.00 = Rp.

    2.5000 +" !ly$oo# te+al ) mm @ Rp. 110,000.00 = Rp.

    14.0000 Btg Dolken Kayu galam #m-8-cm/4m @ Rp. *5,000.00 = Rp.

    5.*000 !eke"a @ Rp. 55,000.00 = Rp.

    0.'500 ukang +atu @ Rp. 77,000.00 = Rp.

    2.'000 ukang Kayu @ Rp. 77,000.00 = Rp.

    1.4000 ukang Be(% @ Rp. 77,000.00 = Rp.

    0.4050 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.2020 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    "3 1 M MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 ) 11*!M

      0.0020 &' Kayu e"entang @ Rp. ',*80,000.00 = Rp.

    0.0100 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    '.0000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    0.4500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.4.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.00*0 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    0.00)0 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    19/219

      0.0*00 !eke"a @ Rp. 55,000.00 = Rp.

    0.0200 ukang +atu @ Rp. 77,000.00 = Rp.

    0.0200 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0200 ukang Be(% @ Rp. 77,000.00 = Rp.

    0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    "4 1 M MEMBUAT RING BALOK BETON BERTULANG (1# ) 15*!M  0.00'0 &' Kayu Kl(. 999 @ Rp. ',000,000.00 = Rp.

    0.0200 Kg !aku B%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    '.*000 Kg Be(% Beton !olo( @ Rp. 18,000.00 = Rp.

    0.0500 Kg Ka$at Beton @ Rp. 18,000.00 = Rp.

    5.5000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.00)0 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    0.0150 &' Ko"al Beton @ Rp. '50,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.0''0 ukang +atu @ Rp. 77,000.00 = Rp.

    0.0''0 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0''0 ukang Be(% @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    'III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

    "5 1 M MEMASANG BUBUNGAN ATAP

      0.*)00 &2 3ok

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    20/219

      0.0020 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    "" 1 M2 PASANG ATAP GENTENG BETON

      11.0000 B enteng +eton @ Rp. '7,000.00 = Rp.

    0.0'00 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.2000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala tukang @ Rp. 110,000.00 = Rp.0.0100 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1## 1 M2 PASANG ATAP GENTENG METAL ROO+

      1.0200 +" enteng metal @ Rp. )5,200.00 = Rp.

    0.2000 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    0.2000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.0010 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1#1 1 M2 PASANG NOK GENTENG BETON

      '.5000 B 3ok genteng +eton @ Rp. 40,800.00 = Rp.

    0.0500 Kg !aku +%a(a 2 - 5 @ Rp. 18,000.00 = Rp.

    10.8000 Kg emen a+u - a+u @ Rp. 2,000.00 = Rp.

    0.0'20 &' !a(%" pa(angan @ Rp. 157,500.00 = Rp.

    1.0000 Kg emen $a"na @ Rp. 2,000.00 = Rp.

    0.4000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.0200 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.1#2 1 M2 PASANG NOK GENTENG METAL 0  

      1.1000 B enteng &etal Roo: @ Rp. )5,200.00 = Rp.

    0.0500 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.2500 !eke"a @ Rp. 55,000.00 = Rp.

    0.1500 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0150 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.01'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1#3 1 M2 PASANG ATAP SENG GELOMBANG SENG BJLS #,35

      0.7000 KK eng gelom+ang '*+l( 0.'5 @ Rp. 18,400.00 = Rp.

    0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.1200 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*00 ukang kayu @ Rp. 77,000.00 = Rp.

    0.00*0 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1#3 1 M2 PASANG ATAP SENG GELOMBANG BJLS #,3#

      0.7000 KK eng gelom+ang '*+l( 0.'0 @ Rp. 1',400.00 = Rp.

    0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.1200 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*00 ukang kayu @ Rp. 77,000.00 = Rp.0.00*0 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    21/219

    1#3 1 M2 PASANG ATAP SENG GELOMBANG BJLS #,2#

      *.0000 kk eng gelom+ang '*+l( 0.20 @ Rp. 1',400.00 = Rp.

    0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.1200 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*00 ukang kayu @ Rp. 77,000.00 = Rp.

    0.00*0 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.1#4 1 M2 PASANG ATAP SPANDEK

      1.0500 &2 pan#ek @ Rp. )0,000.00 = Rp.

    *.0000 + !aku ek"up @ Rp. 450.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.7500 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0080 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1#5 1 M1 PASANG ATAP NOK SPANDEK

      1.2000 +" 3ok pan#ek @ Rp. 75,000.00 = Rp.

    *.0000 Kg !aku pan#ek @ Rp. 1),000.00 = Rp.

    0.0100 !eke"a @ Rp. 55,000.00 = Rp.

    0.0700 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0080 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1#6 1 M2 PASANG ATAP SENG GELOMBANG LAMA

      *.0000 kk eng gelom+ang '*+l( 0.20 @ Rp. 1',400.00 = Rp.

    0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.1200 !eke"a @ Rp. 18,000.00 = Rp.0.0*00 ukang kayu @ Rp. 55,000.00 = Rp.

    0.00*0 Kepala tukang @ Rp. 77,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1# 1 M2 PASANG ATAP NOK SENG

      0.'000 KK eng plat '* +l( 0.'5 @ Rp. 18,400.00 = Rp.

    0.0400 Kg !aku +%a(a 1/2 - 1 @ Rp. 18,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.0700 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0080 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1#8 1 M2 PASANG ALUMINIUM +OIL$SISALATION

      1.0500 &2 %(alat%on/ alu%n%um :o%l @ Rp. 5,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.0500 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0050 Kepala tukang @ Rp. 110,000.00 = Rp.

    0.0080 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    I). ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT LANGIT

    1#" 1M2 LANGIT LANGIT ETERNIT (1,## ) 1,##* M, TEBAL 5 MM,

      1.1000 +" !elat a(+e( te+al 5 mm @ Rp. 55,000.00 = Rp.

    0.0100 Kg !aku B%a(a @ Rp. 18,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    22/219

      0.0'00 !eke"a @ Rp. 55,000.00 = Rp.

    0.0700 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0070 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0015 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    11# 1 M2 LANGIT LANGIT ASBES (1,## ) 1,##* M, TEBAL 4 MM,

      1.1000 +" !elat a(+e( te+al 4 mm @ Rp. 55,000.00 = Rp.

    0.0100 Kg !aku B%a(a @ Rp. 18,000.00 = Rp.0.0'00 !eke"a @ Rp. 55,000.00 = Rp.

    0.0700 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0070 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0015 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    111 1M2 LANGIT LANGIT ASBES (1,## ) 1,##* M, TEBAL 3.5 MM,

      1.1000 +" !elat a(+e( te+al '.5 mm @ Rp. 50,000.00 = Rp.

    0.0100 Kg !aku B%a(a @ Rp. 18,000.00 = Rp.

    0.0'00 !eke"a @ Rp. 55,000.00 = Rp.

    0.0700 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0070 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0015 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    112 1M2 LANGIT LANGIT AKUSTIK 6# ) 12# !M - RANGKA ALUMINIUM

      '.*000 & !"o:%l

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    23/219

      0.4000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0400 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.01'5 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    116 1 M2 LANGIT LANGIT !ALSI BOARD TEBAL " MM

      0.'*40 +" yp(um +oa"# 120240)mm @ Rp. )0,000.00 = Rp.

    0.1100 Kg !aku (ek"up @ Rp. 45,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.0.0500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0050 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    ) ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

    11 MEMASANG 1 BUAH KLOSET DUDUK$ MONOBBLOK

      1.0000 B Klo(et Du#uk/ &ono+lok @ Rp. 2,100,000.00 = Rp.

    0.0*00 !e"lengkapan @ Rp. 50,000.00 = Rp.

    '.'000 !eke"a @ Rp. 55,000.00 = Rp.

    1.1000 ukang +atu @ Rp. 77,000.00 = Rp.

    0.0010 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.1*00 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    118 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN$KERAMIK

      1.0000 B Klo(et ongkok !o"(elen @ Rp. 250,000.00 = Rp.

    *.0000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.

    0.0100 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.0000 !eke"a @ Rp. 55,000.00 = Rp.

    1.5000 ukang +atu @ Rp. 77,000.00 = Rp.

    1.5000 Kepala ukang @ Rp. 110,000.00 = Rp.0.1*00 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    11" MEMASANG 1 BUAH URINOIR

      1.0000 B "%no%" B%a(a @ Rp. 500,000.00 = Rp.

    0.'000 - !e"lengkapan @ Rp. 50,000.00 = Rp.

    *.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0100 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.0000 !eke"a @ Rp. 55,000.00 = Rp.

    1.0000 ukang +atu @ Rp. 77,000.00 = Rp.

    0.1000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.1000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    12# MEMASANG 1 BUAH WASTA+EL LENGKAP PLANT SET

      1.0000 et >a(ta:el @ Rp. 1,500,000.00 = Rp.

    0.1200 !e"lengkapan @ Rp. 10,000.00 = Rp.

    *.0000 Kg emen

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    24/219

      0.1800 !e"lengkapan @ Rp. 10,000.00 = Rp.

    0.5000 !em+antu ukang @ Rp. 55,000.00 = Rp.

    1.5000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.1500 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.1100 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    122 MEMASANG 1 BUAH BAK MANDI BATU BATA, 'OLUME #.3# M3

      0.4000 &' Batu Bata @ Rp. 550.00 = Rp.120.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.'000 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.8000 Do( !o"(elen 2025cm @ Rp. 42,000.00 = Rp.

    *.0000 Kg emen nat @ Rp. 5,000.00 = Rp.

    *.0000 !eke"a @ Rp. 55,000.00 = Rp.

    '.0000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.'000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.'000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    123 MEMASANG 1 M PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIAMETER 15 !M

      1.*000 B !%pa tana @ Rp. 27,000.00 = Rp.

    0.*800 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.

    0.01'0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.0110 &' !a(%" "ug @ Rp. 12',000.00 = Rp.

    0.0*00 !eke"a @ Rp. 55,000.00 = Rp.

    0.0'00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00'0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    124 MEMASANG 1 M PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIAMETER 2# !M

      1.*000 B !%pa tana @ Rp. '0,000.00 = Rp.0.8700 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0140 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.0140 &' !a(%" "ug @ Rp. 12',000.00 = Rp.

    0.0800 !eke"a @ Rp. 40,000.00 = Rp.

    0.0400 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0040 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0070 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    125 MEMASANG 1 M PIPA BETON DIAMETER 3# 1## !M

      1.1000 B !%pa tana @ Rp. 27,000.00 = Rp.

    0.5500 &' Batu Bata @ Rp. 550.00 = Rp.

    10.'000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0*10 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.0*)0 &' !a(%" "ug @ Rp. 12',000.00 = Rp.

    0.'800 !eke"a @ Rp. 55,000.00 = Rp.

    0.1)00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.01)0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.01)0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    126 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (3# ) 3#* !M,

    TINGGI 35 !M  0.1450 &' Batu Bata @ Rp. 550.00 = Rp.

    44.0000 Kg emen !o"tlan# @ Rp. 1,200.00 = Rp.

    0.0700 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    25/219

      0.0700 &' Batu Ke"%k%l @ Rp. 1*5,000.00 = Rp.

    1.*000 Kg Be(% Beton @ Rp. 20,000.00 = Rp.

    0.0*00 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    '.2000 !eke"a @ Rp. 55,000.00 = Rp.

    1.0150 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0015 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.01*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.12 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45 ) 45* !M,

    TINGGI 5# M

      0.2500 &' Batu Bata @ Rp. 550.00 = Rp.

    77.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.1'00 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.0200 &' Batu Ke"%k%l @ Rp. 1*5,000.00 = Rp.

    2.*000 Kg Be(% Beton @ Rp. 20,000.00 = Rp.

    0.0)00 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.

    1.4200 !eke"a @ Rp. 55,000.00 = Rp.

    0.47'0 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0470 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0710 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    128 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (6# ) 6#* !M,

    TINGGI 66 !M

      0.'710 &' Batu Bata @ Rp. 550.00 = Rp.

    114.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.1840 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.0''0 &' Batu Ke"%k%l @ Rp. 1*5,000.00 = Rp.

    4.8500 Kg Be(% Beton @ Rp. 20,000.00 = Rp.

    0.1200 &' !a(%" Beton @ Rp. 2)0,000.00 = Rp.2.1*00 !eke"a @ Rp. 55,000.00 = Rp.

    0.7200 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0720 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.1080 &an#o" @ Rp. 110,000.00 = Rp.

    0.1000 ukang al% @ Rp. 55,000.00 = Rp.

    Jumlah Rp.

    12" MEMASANG 1 M PIPA GAL'ANIS DIAMETER 1$2

      1.2000 & !%pa gal?an%( @ Rp. 1),000.00 = Rp.

    0.'500 - !e"lengkapan @ Rp. 1),000.00 = Rp.

    0.0540 !eke"a @ Rp. 55,000.00 = Rp.

    0.0)00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00)0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0270 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    13# MEMASANG 1 M PIPA GAL'ANIS DIAMETER 3$4

      1.2000 & !%pa gal?an%( @ Rp. '0,000.00 = Rp.

    0.'500 - !e"lengkapan @ Rp. '0,000.00 = Rp.

    0.0540 !eke"a @ Rp. 55,000.00 = Rp.

    0.0)00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00)0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0270 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.

    131 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 1$2

      1.2000 & !%pa !6 @ Rp. 15,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    26/219

      0.'500 !e"lengkapan @ Rp. 2,000.00 = Rp.

    0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0018 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    132 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 3$4

      1.2000 & !%pa !6 @ Rp. 15,000.00 = Rp.0.'500 !e"lengkapan @ Rp. ',000.00 = Rp.

    0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0018 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    133 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 1

      1.2000 & !%pa !6 @ Rp. 8,750.00 = Rp.

    0.'500 !e"lengkapan @ Rp. 4,000.00 = Rp.

    0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0018 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    134 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 11$2

      1.2000 & !%pa !6 @ Rp. 1*,250.00 = Rp.

    0.'500 !e"lengkapan @ Rp. 5,000.00 = Rp.

    0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0018 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.

    135 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 2

      1.2000 & !%pa !6 @ Rp. 50,000.00 = Rp.

    0.'500 !e"lengkapan @ Rp. *,000.00 = Rp.

    0.0540 !eke"a @ Rp. 55,000.00 = Rp.

    0.0)00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00)0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0027 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    136 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 21$2

      1.2000 & !%pa !6 @ Rp. '0,000.00 = Rp.

    0.'500 !e"lengkapan @ Rp. 7,000.00 = Rp.

    0.0'*0 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0018 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    13 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 3

      1.2000 & !%pa !6 @ Rp. 87,500.00 = Rp.

    0.'500 !e"lengkapan @ Rp. 8,000.00 = Rp.

    0.0810 !eke"a @ Rp. 55,000.00 = Rp.0.1'50 ukang Batu @ Rp. 77,000.00 = Rp.

    0.01'5 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0041 &an#o" @ Rp. 110,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    27/219

    Jumlah Rp.

    138 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 4

      1.2000 & !%pa !6 @ Rp. 112,500.00 = Rp.

    0.'500 !e"lengkapan @ Rp. ),000.00 = Rp.

    0.0810 !eke"a @ Rp. 55,000.00 = Rp.

    0.1'50 ukang Batu @ Rp. 77,000.00 = Rp.

    0.01'5 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0041 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.

    13" MEMASANG 1 BH BAK !U!I PIRING STAINLESS STELL

      1.0000 B Bak cuc% (ta%nle( (teel @ Rp. 750,000.00 = Rp.

    1.0000 et $ate" #"a%n A a((e(o"%e( @ Rp. 50,000.00 = Rp.

    0.0'00 !eke"a @ Rp. 55,000.00 = Rp.

    0.'000 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0'00 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0015 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    14# MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 2

      1.2000 & !%pa !6 @ Rp. 200,000.00 = Rp.

    0.'500 !e"lengkapan @ Rp. 200,000.00 = Rp.

    0.0540 !eke"a @ Rp. 55,000.00 = Rp.

    0.0)00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00)0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0027 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    141 MEMASANG 1 M PIPA P'! TIPE AW DIAMETER 4

      1.2000 & !%pa !6 @ Rp. 450,000.00 = Rp.

    0.'500 !e"lengkapan @ Rp. 500.00 = Rp.

    0.0810 !eke"a @ Rp. 55,000.00 = Rp.0.1'50 ukang Batu @ Rp. 77,000.00 = Rp.

    0.01'5 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0041 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    142 MEMASANG 1 BH KRAN DIAMETER 3$4 ATAU 1$2

      1.0000 B K"an

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    28/219

      0.0050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    )I ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM

    145 1 KG PASANG RANGKA ATAP BAJA

      1.1000 Kg Be(% p"o:%l >; @ Rp. 25,000.00 = Rp.

    0.0800 Kg &en% +e(% @ Rp. 15,000.00 = Rp.

    0.00*0 ukang +e(% @ Rp. 77,000.00 = Rp.

    0.0*00 !eke"a @ Rp. 55,000.00 = Rp.0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.000' &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    146 1 M2 PASANG PINTU BESI BAJA

      1.0000 &2 !%ntu +e(% +aa @ Rp. '50,000.00 = Rp.

    0.*500 ukang +e(% kon(t"uk(% @ Rp. 77,000.00 = Rp.

    0.*500 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*50 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0'20 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    14 1 M2 PASANG JENDELA BESI

      1.0000 &2 en#ela +e(% @ Rp. '00,000.00 = Rp.

    1.0500 ukang Be(% Kon(t"uk(% @ Rp. 77,000.00 = Rp.

    1.0500 !eke"a @ Rp. 55,000.00 = Rp.

    0.1050 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00525 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    148 1 M2 PASANG JENDELA BESI TAHAN API

      1.0000 &2 en#ela +e(% taan ap% @ Rp. 1,500,000.00 = Rp.

    1.2000 ukang Be(% Kon(t"uk(% @ Rp. 77,000.00 = Rp.

    1.0220 !eke"a @ Rp. 55,000.00 = Rp.0.1200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    14" 1 M2 PASANG PINTU GULUNG BESI

    1.0000 &2 !%ntu +e(% +aa @ Rp. 400,000.00 = Rp.

    1.2000 ukang +e(% kon(t"uk(% @ Rp. 77,000.00 = Rp.

    1.2000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00*0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    15# 1 M2 PASANG PINTU LIPAT

    1.0000 &2 !%ntu %pat @ Rp. '25,000.00 = Rp.

    1.0500 ukang +e(% kon(t"uk(% @ Rp. 77,000.00 = Rp.

    1.0500 !eke"a @ Rp. 55,000.00 = Rp.

    0.1050 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0052 &an#o" @ Rp. 110,000.00 = Rp.

    . Jumlah Rp.

    151 1 M2 PASANG ROLLING DOOR

    1.0000 &2 Rool #oo" @ Rp. '00,000.00 = Rp.

    1.5000 ukang +e(% kon(t"uk(% @ Rp. 77,000.00 = Rp.

    1.0500 !eke"a @ Rp. 55,000.00 = Rp.0.1050 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0052 &an#o" @ Rp. 110,000.00 = Rp.

    . Jumlah Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    29/219

    152 1 M2 PASANG PLA+ON BAJA HOLO

      1.0000 &2 Baa Colo/R%ngan @ Rp. 100,000.00 = Rp.

    0.1050 ukang Be(% Kon(t"uk(% @ Rp. 77,000.00 = Rp.

    1.0000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1050 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0052 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    153 1 M2 PASANG TERALI BESI11.5000 & Be(% t"%p 2 ' @ Rp. 15,000.00 = Rp.

    1.2000 ukang la( @ Rp. 77,000.00 = Rp.

    1.2000 !eke"a @ Rp. 55,000.00 = Rp.

    0.0120 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.000* &an#o" @ Rp. 110,000.00 = Rp.

    . Jumlah Rp.

    154 1 M2 PASANG KAWAT NYAMUK

    1.1000 &2 Ka$at nyamuk @ Rp. 20,000.00 = Rp.

    0.0200 Kg !aku +%a(a 1/2 - 1 @ Rp. 20,500.00 = Rp.

    0.0018 &' Kayu kampe", papan @ Rp. 17,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0005 &an#o" @ Rp. 110,000.00 = Rp.

    . Jumlah Rp.

    155 1 M2 PASANG JENDELA NAKO DAN TRALIS

      1.1000 &2 en#ela 3ako @ Rp. 75,000.00 = Rp.

    0.0200 Kg !aku B%a(a 1/2 atau k"up @ Rp. 45,000.00 = Rp.

    0.0250 &2 Be(% t"%p @ Rp. 22,000.00 = Rp.

    0.2000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang kayu @ Rp. 77,000.00 = Rp.0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0010 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    156 1 M2 PASANG TALANG DATAR, SENG BJLS #.35

    0.5000 KK eng plat ' * +l( 0.'5 @ Rp. 25,000.00 = Rp.

    0.0150 Kg !aku +%a(a 1/2 - 1 @ Rp. 17,000.00 = Rp.

    0.00)* &' Kayu +o"neo, papan @ Rp. 4,000,000.00 = Rp.

    0.2500 Kg ;l%ncote/ men% +e(% @ Rp. 15,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.4000 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00125 &an#o" @ Rp. 110,000.00 = Rp.

    . Jumlah Rp.

    15 1 M2 PASANG TALANG MIRING, SENG BJLS #.35

      0.5000 +" eng plat ' * +l( 0.'5 @ Rp. 25,000.00 = Rp.

    0.0150 Kg !aku +%a(a 1/2 - 1 @ Rp. 17,000.00 = Rp.

    0.01)0 &' Kayu +o"neo, papan @ Rp. 4,000,000.00 = Rp.

    0.'000 Kg ;l%ncote/ men% +e(% @ Rp. 15,000.00 = Rp.

    0.0400 !eke"a @ Rp. 55,000.00 = Rp.

    0.4000 ukang kayu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.0.00125 &an#o" @ Rp. 110,000.00 = Rp.

    . Jumlah Rp.

    )II ANALISA BIAYA KONSTRUKSI PEKERJAAN KUN!I DAN KA!A

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    30/219

    158 1 BUAH PASANG KUN!I TANAM ANTIK

      1.0000 B Kunc% anam

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    31/219

      0.0500 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00250 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    166 1 BUAH PASANG KUN!I SELOT

      1.0000 B Kunc% elot @ Rp. 25,000.00 = Rp.

    0.0200 !eke"a @ Rp. 55,000.00 = Rp.

    0.2000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.0.00100 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    16 1 BUAH PASANG PEGANGAN PINTU$ DOOR HOLDER

      1.0000 B Doo" Col#e" @ Rp. 150,000.00 = Rp.

    0.0500 !eke"a @ Rp. 55,000.00 = Rp.

    0.5000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0500 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00250 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    168 1 BUAH PASANG DOOR STOP

      1.0000 B Doo" top @ Rp. 50,000.00 = Rp.

    0.0100 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00050 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    16" 1 BUAH PASANG REL PINTU DORONG

      1.0000 B Rel !%ntu Do"ong @ Rp. 200,000.00 = Rp.

    0.0*00 !eke"a @ Rp. 55,000.00 = Rp.

    0.*000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0*00 Kepala ukang @ Rp. 110,000.00 = Rp.0.00'00 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1# 1 M2 PASANG KA!A, TEBAL 3 MM

      1.1000 &2 Kaca @ Rp. *0,000.00 = Rp.

    0.0150 !eke"a @ Rp. 55,000.00 = Rp.

    0.1500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00075 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    11 1 M2 PASANG KA!A, TEBAL 5 MM

      1.1000 &2 Kaca @ Rp. 75,000.00 = Rp.

    0.0150 !eke"a @ Rp. 55,000.00 = Rp.

    0.1500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00075 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    12 1 M2 PASANG KA!A, TEBAL 8 MM

      1.1000 &2 Kaca @ Rp. 110,000.00 = Rp.

    0.01*5 !eke"a @ Rp. 55,000.00 = Rp.

    0.1*50 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.01*5 Kepala ukang @ Rp. 110,000.00 = Rp.0.00080 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    13 1 M2 PASANG KA!A !ERMIN, TEBAL 5 MM

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    32/219

      1.1000 &2 kaca ce"m%n @ Rp. )0,000.00 = Rp.

    0.0150 !eke"a @ Rp. 55,000.00 = Rp.

    0.1500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0150 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00075 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    )III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI14 1 M2 PASANG LANTAI UBIN P! ABU ABU 2# ) 2# !M

      2*.5000 B +%n a+u - a+u 20 20 cm @ Rp. 2,500.00 = Rp.

    10.4000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.01'5 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.2700 !eke"a @ Rp. 55,000.00 = Rp.

    0.1'00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.01'0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.01'5 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    15 1 M2 PASANG LANTAI UBIN 4# ) 4# !M

      *.)'00 B !ut% !olo( 40 40 cm @ Rp. 15,000.00 = Rp.

    ).8000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0215 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.'000 Kg emen >a"na @ Rp. 5,000.00 = Rp.

    0.2500 !eke"a @ Rp. 55,000.00 = Rp.

    0.1200 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0120 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0125 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    16 1 M2 PASANG LANTAI UBIN GRANITO 3# ) 3# !M

      11.8700 B +%n "an%to '0 '0 cm @ Rp. 8,000.00 = Rp.10.0000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0215 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.5000 Kg emen >a"na @ Rp. 5,000.00 = Rp.

    0.2*00 !eke"a @ Rp. 55,000.00 = Rp.

    0.1250 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0125 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.01'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 1 M PASANG PLINT UBIN P! WARNA 1# ) 2# !M

      5.'000 B !l%nt egel !c >a"na 1020 cm @ Rp. 5,000.00 = Rp.

    1.2000 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.00'0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    0.1)00 Kg emen >a"na @ Rp. 15,000.00 = Rp.

    0.0*00 !eke"a @ Rp. 55,000.00 = Rp.

    0.0'00 ukang Batu @ Rp. 77,000.00 = Rp.

    0.00'0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    18 1 M2 PASANG LANTAI KERAMIK MOTI+ 2# ) 2# !M

      1.0000 D( egel Ke"am%k 20 20 cm @ Rp. 50,000.00 = Rp.

    11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.

    0.5000 !eke"a @ Rp. 55,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    33/219

      0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1" 1 M2 PASANG LANTAI KERAMIK 33 ) 33 !M ANTI SLIP

      1.0000 D( egel Ke"am%k '' ''cm ant% (l%p @ Rp. *5,000.00 = Rp.

    11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.

    0.5000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    18# 1 M2 PASANG LANTAI KERAMIK 1# ) 33 !M

    1.0000 D( egel Ke"am%k 10 '' @ Rp. 50,000.00 = Rp.

    11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.

    0.5000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    181 1 M2 PASANG LANTAI KERAMIK 3# ) 3# !M

      1.0000 D( egel Ke"am%k '0 '0 cm @ Rp. 55,000.00 = Rp.

    11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.0.5000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    182 1 M2 PASANG LANTAI KERAMIK 3# ) 3# !M ANTI SLIP

      1.0000 D( egel Ke"am%k '0 '0 cm ant% (l%p @ Rp. 40,000.00 = Rp.

    11.'800 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0420 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    1.5000 Kg emen $a"na @ Rp. 15,000.00 = Rp.

    0.5000 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    183 1 M2 PASANG LANTAI MARMER

      1.0000 &2 &a"me" @ Rp. 150,000.00 = Rp.

    14.1500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.0')0 &' !a(%" !a(ang @ Rp. 157,500.00 = Rp.

    2.0000 Kg emen $a"na @ Rp. 15,000.00 = Rp.

    0.5000 !eke"a @ Rp. 55,000.00 = Rp.0.2500 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.00'0 &an#o" @ Rp. 110,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    34/219

    Jumlah Rp.

    184 1 M2 PASANG DINDING KERAMIK ARTISTIK 5 ) 2# !M

      1.0000 &2 Ke"am%k

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    35/219

      0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1"1 1 M2 MENGEROK KARAT !AT LAMA PERMUKAAN BAJA DENGAN !ARA MANUAL

      0.0500 Kg a+un @ Rp. 15,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.1"2 1 M2 MENGEROK KARAT ATAU !AT LAMA PERMUKAAN BAJA DENGAN PAN!AR

      PASIR (SANBLAST* DENGAN TINGKAT KEBERSIHAN S 2 1$2

    40.0000 Kg !a(%" %l%ka @ Rp. 500.00 = Rp.

    10.0000 t" BB& @ Rp. *,500.00 = Rp.

    0.'000 C" Komp"e(o", @ Rp. 150,000.00 = Rp.

    1.*000 !eke"a @ Rp. 55,000.00 = Rp.

    1.*000 ukang 6at @ Rp. 77,000.00 = Rp.

    0.8000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.5000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1"3 1 M2 MENDEMPUL DAN MENGGGOSOK KAYU

      0.0800 Kg Dempul a#% @ Rp. '5,000.00 = Rp.

    0.0200 Kg &%nyak 6at @ Rp. 15,000.00 = Rp.

    0.0100 Kg Batu apung @ Rp. 8,000.00 = Rp.

    0.0400 !eke"a @ Rp. 55,000.00 = Rp.

    0.0400 ukang 6at @ Rp. 77,000.00 = Rp.

    0.0040 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1"4 1 M2 PENGE!ATAN BIDANG KAYU LAMA

      0.1500 Kg !lam%" @ Rp. 75,000.00 = Rp.0.1700 Kg 6at Da(a" @ Rp. )),500.00 = Rp.

    0.1700 Kg 6at !enutup @ Rp. *5,000.00 = Rp.

    0.0700 !eke"a @ Rp. 55,000.00 = Rp.

    0.0750 ukang 6at @ Rp. 77,000.00 = Rp.

    0.0075 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1"5 1 M2 PENGE!ATAN BIDANG KAYU BARU (1 LAPIS PLAMIR*, 1 LAPIS !AT DASAR,

    2 LAPIS !AT PENUTUP (3)JLN*

      0.2000 t" 6at &en% @ Rp. 15,000.00 = Rp.

    0.1500 Kg !lam%" @ Rp. 150,000.00 = Rp.

    0.1700 Kg 6at Da(a" @ Rp. *0,800.00 = Rp.

    0.2*00 Kg 6at !enutup 2 kal% @ Rp. *0,000.00 = Rp.

    0.0700 !eke"a @ Rp. 55,000.00 = Rp.

    0.00)0 ukang 6at @ Rp. 77,000.00 = Rp.

    0.00*0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1"6 1 M2 PENGE!ATAN BIDANG KAYU BARU (1 LAPIS PLAMIR*, 1 LAPIS !AT DASAR, 3 LAPI

    !AT PENUTUP (4)JLN*

      0.2000 t" 6at &en% @ Rp. 5*,000.00 = Rp.0.1500 Kg !lam%" @ Rp. '5,000.00 = Rp.

    0.1700 Kg 6at Da(a" @ Rp. *0,000.00 = Rp.

    0.'500 Kg 6at !enutup ' kal% @ Rp. *0,800.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    36/219

      0.0700 !eke"a @ Rp. 55,000.00 = Rp.

    0.1050 ukang 6at @ Rp. 77,000.00 = Rp.

    0.0040 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1" 1 M2 PELABURAN BIDANG KAYU DENGAN TEAK OIL

      0.'*00 t" eak %l @ Rp. 10,000.00 = Rp.

    0.0400 !eke"a @ Rp. 55,000.00 = Rp.0.0*'0 ukang 6at @ Rp. 77,000.00 = Rp.

    0.0*'0 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1"8 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR

      0.1500 t" !ol%tu" @ Rp. 15,000.00 = Rp.

    0.'720 t" !ol%tu" a#% @ Rp. 15,000.00 = Rp.

    2.0000 +"

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    37/219

    Jumlah Rp.

    2#3 1 M2 PENGE!ATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERAN!AH

      0.1000 Kg &en% Be(% @ Rp. 5*,000.00 = Rp.

    0.0100 B Kua( @ Rp. 7,500.00 = Rp.

    0.0020 &' !e"anca Kayu @ Rp. 750,000.00 = Rp.

    0.2500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2250 ukang 6at @ Rp. 77,000.00 = Rp.

    0.0225 Kepala ukang @ Rp. 110,000.00 = Rp.0.0075 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    )'. ANALISA BIAYA KONSTRUKSI PEKERJAAN LISTRIK

    2#4 1 TITIK PASANGAN TITIK !AHAYA, LAMPU, SAKLAR, STOP KONTAK

      1.0000 B ampu !%a" 40 >att @ Rp. 85,000.00 = Rp.

    1.0000 B ampu 18 >att eta"a !%l%p( @ Rp. 75,000.00 = Rp.

    1.0000 B akla" unggal @ Rp. *0,000.00 = Rp.

    1.0000 B akla" an#a @ Rp. *5,000.00 = Rp.

    1.0000 B top Kontak @ Rp. *5,000.00 = Rp.

    1.0000 B %t%k ampu @ Rp. 75,000.00 = Rp.

    1.0000 B ek"%ng Ka(t

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    38/219

    2# 1 M2 PEKERJAAN HALAMAN DENGAN PA'ING BLOK (MD. BATA*

      50.0000 B !a?%ng Block @ Rp. 2,500.00 = Rp.

    1.0000 (

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    39/219

      0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0100 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    213 1.#### M2 PEKERJAAN A!IAN SEMEN

      1.0500 Kg emen !o"tlan# @ Rp. 1,'00.00 = Rp.

    0.1200 ukang Batu @ Rp. 77,000.00 = Rp.

    0.0200 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0125 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.

    214 1.#### M3 PASANG RANGKA TIANG KAYU KLS I ( ULIN *

      1.1000 &' Kayu Kl(. 9 (eta"a Bayam , Balok @ Rp. 10,450,000.00 = Rp.

    *.0000 !eke"a @ Rp. 55,000.00 = Rp.

    20.0000 ukang Kayu @ Rp. 77,000.00 = Rp.

    2.0000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.'000 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah R'(

    215 1.#### M2 PASANG RANGKA DINDING (1)1*M, KAYU KLS II

    0.0110 &' Kayu Kl( 99, Balok @ Rp. ',850,000.00 = Rp.

    0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 20,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.2500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0250 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M3 PASANG RANGKA !N!NG , KA#U KLS R'(

    216 1.#### M2 PASANG DINDING TRIPLEKS 4MM

    0.0*00 Kg !aku B%a(a @ Rp. 20,000.00 = Rp.0.')00 +" %plek( 4 mm @ Rp. 50,000.00 = Rp.

    0.2700 !eke"a @ Rp. 55,000.00 = Rp.

    0.4000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0400 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.01'5 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    21 1.#### M2 PENGE!ATAN ATAP SENG 2 ) DAN 3 )

      0.2*00 Kg 6at

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    40/219

      0.2*00 Kg 6at !enutup 2 kal% @ Rp. '5,000.00 = Rp.

    0.0200 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*'0 ukang 6at @ Rp. 77,000.00 = Rp.

    0.00*' Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    J79 Rp.

    22# 1.#### M2 PENGE!ATAN PLAPON 3 )JLN

    0.'800 Kg 6at !enutup @ Rp. '5,000.00 = Rp.0.0200 !eke"a @ Rp. 55,000.00 = Rp.

    0.0*'0 ukang 6at @ Rp. 77,000.00 = Rp.

    0.00*' Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0025 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    221 1.#### M PASANG LISTPLANK UKURAN KALSIBORD

      1.1000 +" Kal(%+o"# @ Rp. 80,000.00 = Rp.

    0.0*00 Kg !aku B%a(a 2 - 5 @ Rp. 20,000.00 = Rp.

    0.1000 !eke"a @ Rp. 55,000.00 = Rp.

    0.1000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0100 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0500 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    1 M2 PASANG LSTPLANK UKURAN 2$2%2)& CM, KA#U KLS PAPAN RP(

    222 1.#### M2 PASANG DINDING PAPAN KAYU KLS II ( PAPAN LAMA *

      0.1100 &' Kayu Kl( 99, !apan @ Rp. ',850,000.00 = Rp.

    0.1000 Kg !aku B%a(a 2 - 5 @ Rp. 20,000.00 = Rp.

    0.1500 !eke"a @ Rp. 55,000.00 = Rp.

    0.4500 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.0450 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0750 &an#o" @ Rp. 110,000.00 = Rp.Jumlah Rp.

    223 1.#### BH PASANG PINTU SENG PLAT, RANGKA KAYU KLS II

      0.01)* &' Kayu Kl( 9, !apan @ Rp. 1',000,000.00 = Rp.

    0.0'00 Kg Baa 6 @ Rp. 20,000.00 = Rp.

    1.2500 +" eng !lat B 0.22 @ Rp. 45,000.00

    0.*000 !eke"a @ Rp. 55,000.00 = Rp.

    1.2000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.2000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.0'00 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    224 1 B:; PEMASANGAN BAJA IW+ 2# MM

      1.0000 Btg Baa 9>; E 12 m @ Rp. 5,000,000.00 = Rp.

    '.2000 Kg !aku Baut @ Rp. 17,000.00 = Rp.

    7.0000 !eke"a @ Rp. 55,000.00 = Rp.

    2.0000 ukang Be(% @ Rp. 77,000.00 = Rp.

    1.*000 ukang Kayu @ Rp. 77,000.00 = Rp.

    0.4000 Kepala ukang @ Rp. 110,000.00 = Rp.

    0.1)'0 &an#o" @ Rp. 110,000.00 = Rp.

    Jumlah Rp.

    U:>0 P?.@ IW+ %

    225 1 B:; PEMASANGAN BAJA ! GORDING

      1.0000 Btg Baa E * m @ Rp. 400,000.00 = Rp.

  • 8/17/2019 RAB_GEDUNG TEKNISI TSP.xlsx

    41/219

      2.0000 !eke"a @ Rp. 55,000.00 = Rp.

    1.0000 ukang Be(% @ Rp. 77,000.00 = Rp.