RENCANA ANGGARAN BIAYA (RAB) TYPE 36/84
NO URAIAN PEKERJAAN VOLUME SATHARGA SATUAN JUMLAH
(Rp) (Rp)
I. PEKERJAAN PONDASI
1.1. Pekerjaan Persiapan
1.1.1. Pembersihan Lapangan 58.80 5,600 329,280
1.1.2. Pemasangan Bouplank/Pengukuran 20.80 M' 22,810 474,441
1.1.3. Pengadaan Air Kerja 1.00 Ls 75,000 75,000
JUMLAH 878,721
1.2. Pekerjaan Galian
1.2.1. Galian Tanah Biasa 1 Meter 5.96 28,000 166,747
1.2.7. Urugan Kembali Galian 1.49 13,440 20,010
1.2.8. Urugan Tanah 33.60 m3 20,000 672,000
JUMLAH 858,757
1.3. Pemasangan Pondasi Batu Kali
1.3.1. Urugan Pasir Bawah Pondasi 0.79 107,100 84,341
1.3.3. Pasangan Pondasi Batu Kali 2.50 498,900 1,245,254
JUMLAH 1,329,596
II. PEKERJAAN BETON
2.1. Beton Bertulang
2.1.1. Sloof 15/20 0.84 #NAME? #NAME?
2.1.2. Kolom 15/15 0.82 #NAME? #NAME?
2.1.3. Ring Balok 0.84 #NAME? #NAME?
2.1.4.Cor plat teras 0.27 1,599,153 431,771
2.1.5.Cor plat level 0.10 1,599,153 161,195
JUMLAH #NAME?
III. PEKERJAAN DINDING
3.1. Dinding
2.2.1. Pasangan Dinding Batubata (1:4) 94.50 M2 64,520 6,097,140
JUMLAH 6,097,140
3.2. Kusen
3.2.1. Kusen Pintu 4.00 Bh 250,000 1,000,000
3.2.2. Kusen Jendela 7.00 Bh 175,000 1,225,000
JUMLAH 2,225,000
IV. PEKERJAAN KAP DAN ATAP
4.1. Kap dan Rangka Atap
4.1.2. Pekerjaan Kuda-Kuda 0.25 3,116,163 779,041
4.1.3. Pekerjaan Rangka Atap 48.00 32,300 1,550,400
4.1.4. Pekerjaan Listplank 3/25 1.32 42,120 55,598
4.1.5. Gording 8/12 0.20 1,251,881 250,376
JUMLAH 2,635,415
4.2. Atap
4.2.1. Pemasangan Atap 41.76 M2 55,781 2,329,406
JUMLAH 2,329,406
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
5.1.1. Rangka Plafon 33.60 M2 45,271 1,521,120
JUMLAH 1,521,120
M2
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum 33.60 M2 93,370 3,137,232
5.2.2. Memasang Lis Plafond 46.00 M' 12,018 552,828
JUMLAH 3,690,060
VI. PEKERJAAN PLASTERAN
6.1. Plasteran
6.1.2. Plesteran Dinding (1:4) 175.13 M2 36,780 6,441,098
6.1.3. Acian 186.80 M2 5,574 1,041,298
JUMLAH 7,482,395
VII. PEKERJAAN LANTAI
7.1. Urugan Bawah Lantai
7.1.1. Urugan Pasir 1.80 153,000 275,400
JUMLAH 275,400
7.2. Pasangan Lantai
7.2.1. Pasangan Lantai Kramik 40 x 40 28.80 M2 88,970 2,562,336
7.2.2. Pasangan Lantai Kramik 20 x 20 2.25 M2 148,710 334,598
7.2.3. Pasangan Lantai Kramik 20 x 25 6.80 M2 133,710 909,228
JUMLAH 3,806,162
VIII. PEKERJAAN PINTU DAN JENDELA
8.1. Pintu dan Jendela
8.1.1. Pasangan Pintu 4.00 Bh 350,000 1,400,000
8.1.2. Pasangan Jendela kaca 7.00 Bh 250,000 1,750,000
8.1.3 Pasangan Pintu KM 1.00 Bh 200,000 200,000
JUMLAH 3,350,000
8.2. Penggantung/Kunci
8.3.1. Pasangan Engsel Pintu 8.00 Bh 15,700 125,600
8.3.2. Pasangan Engsel Jendela 14.00 Bh 8,000 112,000
JUMLAH 237,600
IX. PEKERJAAN PENGECATAN
9.1. Mengecat Tembok Baru 186.80 M2 11,040 2,062,272
JUMLAH 2,062,272
X. PEK. INSTALASI DAN SANITASI
10.1 Listrik
10.1.1 Pemasangan Listrik Baru 1.00 Ls 1,300,000 1,300,000
JUMLAH 1,300,000
10.2. Sanitair dan Instalasi Air
10.2.1. Pemasangna Kloset Jongkok 1.00 Bh 313,540 313,540
10.2.3. Pemasangan Floor Draine 1.00 Bh 25,700 25,700
10.2.6. Pem. Pipa Air Ø 3" Per M' 7.00 M' 105,970 741,790
10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 8.00 M' 32,404 259,232
10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 8.00 M' 25,460 203,680
10.2.9. Pem. Kran Air Ø 3/4" atau 1/2" 2.00 Bh 21,038 42,075
JUMLAH 1,586,017
XI. PEK. PERLENGKAPAN LUAR
11.1 Septictank 1.00 Bh 1,129,496 1,129,496
JUMLAH #NAME?
M3
REKAPITULASI HARGA TYPE 36 / 84
JENIS PEKERJAAN HARGA PEKERJAAN
A. BANGUNAN
I. PEKERJAAN PONDASI Rp 3,067,073
II. PEKERJAAN BETON Rp #NAME?
III. PEKERJAAN DINDING Rp 8,322,140
IV. PEKERJAAN KAP DAN ATAP Rp 4,964,821
V. PEKERJAAN PLAFOND Rp 5,211,180
VI. PEKERJAAN PLASTERAN DAN ACIAN Rp 7,482,395
VII. PEKERJAAN LANTAI Rp 4,081,562
VIII. PEKERJAAN PINTU DAN JENDELA Rp 3,587,600
IX. PEKERJAAN PENGECATAN Rp 2,062,272
X. PEK. INSTALASI DAN SANITASI Rp 2,886,017
XI. PEK. PERLENGKAPAN LUAR Rp #NAME?
JUMLAH NILAI BANGUNAN Rp #NAME?
DIGENAPKAN Rp 49,000,000
TERBILANG :
Empat Puluh Sembilan Juta Rupiah.
NO JENIS PEKERJAAN
WAKTU PELAKSANAAN
MINGGU KE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
I PEK. PONDASI ### ### ### ### ### ###
II PEK. BETON ### ### ### ### ### ### ###
III PEK. DINDING ### ### ### ### ### ### ### ###
IV PEK. KAP DAN ATAP ### ### ### ### ### ### ###
V PEK. PLAFOND ### ### ### ### ### ### ###
VI PEK. PLASTERAN DAN ACIAN ### ### ### ### ### ### ### ### ###
VII PEK. LANTAI ### ### ### ### ### ### ###
VIII PEK. PINTU DAN JENDELA ### ### ### ### ### ### ### ### ###
IX PEK. PENGECATAN ### ### ### ### ###
X PEK. INSTALASI & SANITASI ### ### ### ###
XI PEK. PERLENGKAPAN LUAR ### ### ### ### ###
Total (%) ###
Rencana fisik per minggu ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
Rencana fisik komulatif ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
BO-BOT (%)
Gambar 4.7 Hasil Out Put Time Schedule dan Kurva "S" Dengan Menggunakan Microsoft Excel