RAB Sumurbor

download RAB Sumurbor

of 83

  • date post

    01-Mar-2018
  • Category

    Documents

  • view

    226
  • download

    0

Embed Size (px)

Transcript of RAB Sumurbor

  • 7/26/2019 RAB Sumurbor

    1/83

    PASWORD * ****************** *******

    . 353,000,000.00 *******

    . ****************** ******* ******* ******* *******

    Tiga ratus lima puluh tiga juta rupiah.

    ******* ****************** ******* ******* ******* ************** satu dua tiga empat lima enam ***

    ******* riu juta mil!ar ***

    ******* 000353000000 ***

    ******* ****************** ******* ******* ******* *******

    ******* 000 " ***

    ******* 0 ***

    ******* sepuluh ***

    ******* 0 ***

    ******* 0 ***

    ******* ********** ***

    ******* ***

    ******* ***

    ******* 000 # ***

    ******* 0 ***

    ******* sepuluh ***

    ******* 0 ***

    ******* 0 ***

    ******* ***

    ******* ********** ***

    ******* ***

    ******* 353 3 ***

    ******* 3 lima puluh ***

    ******* tiga ratus tiga elas ***

    ******* 5 tiga ***

    ******* 3 lima puluh tiga ***

    ******* lima puluh tiga lima puluh tiga ***

    ******* tiga ratus lima puluh tiga juta ***

    ******* ***

    ******* ***

    ******* 000 $ ***

    ******* 0 ***

    ******* sepuluh ***

    ******* 0 ***

    ******* 0 ***

    ******* ***

  • 7/26/2019 RAB Sumurbor

    2/83

    ******* ***

    ******* ***

    ******* 000 " ***

    ******* 0 ***

    ******* sepuluh ***

    ******* 0 *********** 0 ***

    ******* ***

    ******* ***

    ******* ***

    ******* ****************** ******* ******* ******* *******

    ******* rupiah 3% 00

    == ******* tiga ratus lima pul tiga ratus lima puluh tiga juta

    == ******* tiga ratus lima puluh tiga juta rupiah

    == ******* Tiga ratus lima puluh tiga juta rupiah.

    ******* ****************** ******* ******* ******* *******

  • 7/26/2019 RAB Sumurbor

    3/83

    BADAN PENGUSAHAAN KAWASANPERDAGANGAN BEBAS DAN PELABUHAN BEBAS

    SABANG

    SATUAN KERJA

    PENGEMBANGAN KAWASAN PERDAGANGAN BEBAS

    DAN PELABUHAN BEBAS SABANG

    PROGRAM PENANGANAN DAERAH KHUSUS

    KEGIATAN PENGEMBANGAN KAWASAN

    PERDAGANGAN BEBAS DAN PELABUHAN BEBAS SABANG

    TAHUN 2011

    HARGA PERKIRAAN SENDIRI

    KODE : 4070.07

    KEGIATAN :

    SUB KEGIATAN : PENGEMBANGAN KAWASAN WISATA

    :

    HARGA : Rp.353,000,000.00

    WAKTU : 150 !"#$%&! '()$ p&'&*+ *$#(

    S$$-, D"!")"# 2010

    PEMBANGUNAN/ PENGADAAN/ PENINGKATANSARANA DAN PRASARANA

    RINIANKEGIATAN PEMBANGUNAN ASILITAS SANITASIKAWASAN GAPANG IBOIH

  • 7/26/2019 RAB Sumurbor

    4/83

    REKAPITULASI

    NAMA PROYEK : PEMBANGUNAN FASILITAS SANITASI KAWASAN GAPAN

    LOKASI PEKERJAAN : KAWASAN GAPANG - IBOIH

    PROPINSI : KOTA SABANG

    PROPINSI : ACEH

    NO. URAIAN PEKERJAAN VOL SATHARGA SATUAN

    ( Rp. )

    III PEKERJAAN SUMUR BOR 1.00 !"# $%&'$%$'1$$.

    IV TOWER AIR RANGKA BAJA TINGGI * M $.00 !"# %*'%%'$%%.$$

    V WATER TANK $000 LITER $.00 !"# +',00'000.00

    4

    (B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)

    (C) JUMLAH !AL HA"#A P$$"JAAN = (A) & (B)

    (') P$MBULAAN

    Terbilang : Tiga ratus lima puluh tiga juta rupiah.

    aban* +0 'e,ember

    Ba-an Pen.,ahaan a/a,an Per

    -an Pelab.han Beba,

    Plt 'e.ti 2

    2r P.--. "a3ak* MB

    (A) J.mlah Hara Pekerjaan ( termasu

  • 7/26/2019 RAB Sumurbor

    5/83

    - IBOIH

    JUMLAH HARGA

    ( Rp. )

    $%&'$%$'1$$.

    %'+**'+**.+,

    '000'000.00

    +0*567*8764+

    +*056*78764

    8+*990*00000

    8*000*00000

    +010

    aanan Beba,

    ban

    A

  • 7/26/2019 RAB Sumurbor

    6/83

    REKAPITULASI

    NAMA PROYEK : PEMBANGUNAN FASILITAS SANITASI KAWASAN GAPANG - IBOIH

    LOKASI PEKERJAAN : KAWASAN GAPANG - IBOIH

    PROPINSI : KOTA SABANG

    PROPINSI : ACEH

    NO. URAIAN PEKERJAAN VOL SATHARGA SATUAN

    ( Rp. )

    I PEKERJAAN SUMUR BOR

    1 PEKERJAAN PERSIAPAN

    1 #e:li,trik 100 L, +0*000*00000

    + M:bili,a,i eralatan kerja 100 L, 14*800*00000

    SUB TOTAL

    $ PEMBORAN AN KONTSRUKSI SUMUR

    1 P$MB!"AN P2L! H!L$

    ; 'ari ke-alaman 0 ,a?e* Ca,,in -ll )

    ; 'ari ke-alaman 0 ,

  • 7/26/2019 RAB Sumurbor

    7/83

    8 P$NCUC2AN* P$MB$"2HAN LUBAN# UMU"

    ; Dater Jettin* terma,.k ene-iaan bahan kimia 100 Unit 451*09858

    ; Air Li>t* terma,.k ene-iaan bahan kimia 100 L, 60*16949

    5 PUMP2N# $

    Pem:maan .ji* terma,.k te 'ra/ ':/n e,t* L:n 11000 Jam 1+7*+119

    Peri:- e,t* "e?:er e,t

    9 2N2H2N# UMU"

    Penele,aian ,.m.r* ,amlin;,amlin* -:k.menta,i 100 L, 4*815*00000

    la:ran* te,t lab:rat:ri.m* i-le time

    SUB TOTAL

    % PEKERJAAN PENYEIAAN MEKANIKAL ELEKTRIKAL

    1 Pene-iaan P:ma -an Panel C:ntr:l

    ; P:ma .bmer,ible* E = +*8 llane C2 -ia 80 mm x 60F 100 B.ah +50*00000

    ; Ben- >lane C2 -ia 80 mm x 48F +00 B.ah 00*00000

    ; #ate Gale C2 -ia 80 mm 100 B.ah 990*00000

    ; Cha?k Gale C2 -ia 80 mm 100 B.ah 600*00000

    ; Air Gale inle C2 -ia +8 mm 100 B.ah 780*00000

    ; Man:meter 100 B.ah 5+0*00000

    ; abel N@@ x 5 mm 8000 Meter +4*+8000; abel N@@ x 4 mm 8000 Meter +1*70000

    ; $lektr:-a 100 Unit 148*00000

    Pema,anan P:ma* Lenka -enan Panel* A??e,,,:rie,* 100 Unit 8*800*00000

    abel

    SUB TOTAL

  • 7/26/2019 RAB Sumurbor

    8/83

    II TOWER AIR RANGKA BAJA TINGGI * M

    1 P/!2"

    1 1 Ba.t Anker 1500 bh 8*00000

    + + Bet:n P:n-a,i 185 m 1*995*00000

    Beki,tin Bet:n :n-a,i 1085 m+ 118*+7100

    4 4 #alian anah P:n-a,i 067 m 45*01800

    8 8 Ur.an embali Beka, #alian P:n-a,i 0+8 m 9*+5960

    5 5 Ur.an Pa,ir Ba/ah P:n-a,i 0+0 m 98*6100

    SUB TOTAL

    $ R!34 B5

    1 Be,i ik. L 90 x 90 x 9 mm 554+0 16*46869

    + Plat 'a,ar 6 mm 46+7 16*46869

    Plat J:int 6 mm 18+ 16*46869

    4 Ba.t I +4700 ?, 8*00000

    8 ana L 0x0x 954 16*46869

    SUB TOTAL

    % L"!-6"!

    1 Pekerjaan $re?ti:n 75591 1*00000

    + Pene?atan 861 m+ 61*48050

    Pa,anan Pia #alani, !.t

  • 7/26/2019 RAB Sumurbor

    9/83

    JUMLAH HARGA

    ( Rp. )

    $%&'$%$'1$$.

    +0*000*00000

    14*800*00000

    %+',00'000.00

    1*487*44814

    18*71*07015

    +*000*00000

    8*7*9705

    8*716*75719

    +*000*00000

    8*950*00000

    +*+00*00000

    7*900*00000

    80*577*00000

    +0*00000

    6+5*+8000

    1*980*00000

  • 7/26/2019 RAB Sumurbor

    10/83

    451*09858

    60*16949

    14*118*+7

    4*815*00000

    1,,'+0'*$$.

    +4*800*00000

    5*800*00000

    8*98*00000

    +50*00000

    500*00000

    990*00000

    600*00000

    780*00000

    5+0*00000

    1*+1+*800001*060*00000

    148*00000

    8*800*00000

    +&'%$$',00.00

  • 7/26/2019 RAB Sumurbor

    11/83

    %*'%%'$%%.$$

    70*00000

    +*990*85000

    1*+19*595

    48*06490

    1*97054

    14*77+47

    +'1$'*&,.1

    1+*646*+++9

    650*95140

    +*679*5947

    1*+40*00000

    1*460*09566

    1'*$'+$.1,

    755*91000

    4*60*10178

    1*607*59500

    +90*5105

    '*'11&.1

    ,'000'000.00

    ,'000'000.00

  • 7/26/2019 RAB Sumurbor

    12/83

    AFTAR ANALISA HARGA SATUAN

    1 Untuk 1 m Membersihkan lapangan dan perataan

    0100 !H Pekerja " +*80000

    0080 !H Man-:r " 84*10000

    J.mlah$ 1 M' engukuran dan emasangan B!u"plank

    001+ M a. 8

  • 7/26/2019 RAB Sumurbor

    13/83

    060 !H .kan bat. " 45*70000

    006 !H eala t.kan " 88*+0000

    0970 !H Pekerja " +*80000

    006 !H Man-:r " 84*10000

    J.mlah

  • 7/26/2019 RAB Sumurbor

    14/83

    10 1 M* asangan Bata Merah Tebal 1 Bata+ 1 ( : % s

    140000 Bh Bata merah 8 x 11 x ++ ?m " 84+80

    +++00 emen P:rtlan- " 1*7980

    010+ M Pa,ir a,an " 75*50000

    0580 0r

  • 7/26/2019 RAB Sumurbor

    15/83

    000 !H .kan bat. " 45*70000

    000+ !H eala t.kan " 88*+0000

    01+0 !H Pekerja " +*80000

    001+ !H Man-:r " 84*10000

    J.mlah

  • 7/26/2019 RAB Sumurbor

    16/83

    1* 1 m* asang k!nstruksi kudakuda ka/u b!rne!

    1100 M a. b:rne:* bal:k " +*0*00000

    18000 Be,i ,tri " 8*00000

    0700 Pak. bia,a + ; 8 " 7*60000

    1+000 !H .kan ka. " 45*70000

    1+00 !H eala t.kan " 88*+0000

    4000 !H Pekerja " +*800000+00 !H Man-:r " 84*10000

    J.mlah

    1 1 m* asang kas! - reng genteng bet!n ka/u b!rne!

    0014 M a. b:rne:* bal:k " +*0*00000

    0180 Pak. bia,a + ; 8 " 7*60000

    0100 !H .kan ka. " 45*70000

    0010 !H eala t.kan " 88*+0000

    0100 !H Pekerja " +*80000

    0008 !H Man-:r " 84*10000

    J.mlah

    1& 1 m* asang atap genteng metal

    10+0 Lbr #enten metal " 90*7000

    0+00 Pak. bia,a + ; 8 " 7*60000

    0050 !H .kan ka. " 45*70000

    0005 !H eala t.kan " 88*+0000

    0180 !H Pekerja " +*80000

    0007 !H Man-:r " 84*10000

    J.mlah

    1 1 m' asang n!k genteng metal

    1100 Bh #enten -e?ra b:n- " ++*980000080 !H Pak. bia,a ; 1 " 45*70000

    0180 !H .kan ka. " 45*70000

    0018 !H eala t.kan " 88*+0000

    0+80 !H Pekerja " +*80000

    001 !H Man-:r " 84*10000

    J.mlah

    $0 1 m' asang lisplang ukuran *0* 0 *&2 (m+ ka/u b!rne!

    0006 M a. b:rne:* aan " +*0*00000

    0050 Pak. bia,a + ; 8 " 7*60000

    0100 !H .kan ka. " 45*700000010 !H eala t.kan " 88*+0000

    0100 !H Peke