Rab Slb Kantor

67
HARGA SATUAN BAHAN DAN UPAH NO. JENIS UPAH/BAHAN HARGA / SATUA 1 2 3 A HARGA SATUAN UPAH 1 Pekerja Rp. 31,000.00 2 Mandor Rp. 55,000.00 3 Tukang batu Rp. 45,000.00 4 Kepala tukang batu Rp. 50,000.00 5 Tukang kayu Rp. 45,000.00 6 Kepala tukang kayu Rp. 50,000.00 7 Tukang besi Rp. 45,000.00 8 Kepala tukang besi Rp. 50,000.00 9 Pekerja terlatih Rp. 35,000.00 10 Beton molen Rp. 350,000.00 11 Tukang pipa Rp. 50,000.00 B. HARGA SATUAN BAHAN. B.1. Bahan Pasangan 1 Batu kali Rp. 78,000.00 2 Tanah urug Rp. 48,000.00 3 Pasir pasang Rp. 60,000.00 4 Pasir urug Rp. 48,000.00 5 Pasir beton Rp. 64,000.00 6 Sirtu Rp. 66,000.00 7 Kapur pasang Rp. 250,000.00 8 Semen/zak berat 50 kg Rp. 45,000.00 9 Bata merah Rp. 300.00 10 Krikil Rp. 105,000.00 11 Krikil pecah 2/3 cm Rp. 164,000.00 B.2 Bahan Besi & Paku 1 Besi beton Rp. 12,000.00 2 Kawat beton Rp. 12,500.00 3 Paku Rp. 13,000.00 4 Paku panjang 4-6 cm kg 15,000.00 5 Paku beton 3'' Rp. 15,000.00 6 Besi plat Rp. 12,000.00 7 Angker ø 22 mm p = 50 cm Rp. 33,000.00 8 Angker ø 16 mm p = 50 cm Rp. 16,500.00 9 Baut ø 16 mm Rp. 3,000.00 10 Baut ø 12 mm Rp. 2,500.00

description

.

Transcript of Rab Slb Kantor

harga JogjaHARGA SATUAN BAHAN DAN UPAHNO.JENIS UPAH/BAHANHARGA / SATUAN1234AHARGA SATUAN UPAH1PekerjaRp.31,000.00Hari2MandorRp.55,000.00Hari3Tukang batuRp.45,000.00Hari4Kepala tukang batuRp.50,000.00Hari5Tukang kayuRp.45,000.00Hari6Kepala tukang kayuRp.50,000.00Hari7Tukang besiRp.45,000.00Hari8Kepala tukang besiRp.50,000.00Hari9Pekerja terlatihRp.35,000.00Hari10Beton molenRp.350,000.00Hari11Tukang pipaRp.50,000.00HariB.HARGA SATUAN BAHAN.B.1.Bahan Pasangan1Batu kaliRp.78,000.00m32Tanah urugRp.48,000.00m33Pasir pasangRp.60,000.00m34Pasir urugRp.48,000.00m35Pasir betonRp.64,000.00m36SirtuRp.66,000.00m37Kapur pasangRp.250,000.00Tong8Semen/zak berat 50 kgRp.45,000.00Zak9Bata merahRp.300.00bh10KrikilRp.105,000.00m311Krikil pecah 2/3 cmRp.164,000.00m3B.2Bahan Besi & Paku1Besi betonRp.12,000.00kg2Kawat betonRp.12,500.00kg3PakuRp.13,000.00kg4Paku panjang 4-6 cmkg15,000.00bh5Paku beton 3''Rp.15,000.00kg6Besi platRp.12,000.00kg7Angker 22 mm p = 50 cmRp.33,000.00bh8Angker 16 mm p = 50 cmRp.16,500.00bh9Baut 16 mmRp.3,000.00bh10Baut 12 mmRp.2,500.00bhB.3Bahan Kayu1Papan kayu klas IIIRp.2,750,000.00m32Balok kayu klas IIRp.3,500,000.00m33Kayu / papan begistingRp.2,500,000.00m3B.4Bahan - Bahan Sanitasi1Pipa PVC 4" S-12,5Rp.147,000.00m'133,657.002Pipa PVC 8" S-12,5Rp.230,000.00m'208,293.003Sok PVC 6"Rp.359,000.00bh4Lem pipaRp.37,000.00kg5Asesories pipa PVC 6"Rp.15,500.00bh6Asesories pipa PVC 4"Rp.8,600.00bh7Asesories pipa PVC 2"Rp.5,000.00bh8Asesories pipa PVC 3"Rp.5,500.00bh9Bis beton diameter 30 cmRp.30,000.00m'10Besi corRp.12,000.00kgB.5Bahan - bahan Atap1Genteng tanahRp.1,500.00bh2Genteng krepusRp.3,500.00bh3Genteng pojokRp.7,500.00bh

RAB_TPARENCANA ANGGARAN BIAYAPEKERJAAN: RENOVASI RUANG KELAS DAN KANTOR SLB TUNAS KASIHLOKASI: KECAMATAN NGAGLIK KABUPATEN SLEMANNOUraian PekerjaanSatuanVolumeKodeHargaHargaJumlahKeteranganAnalisaBahan (Rp)Upah (Rp)Harga (Rp)APEKERJAAN PERSIAPAN1Pengukuranls1.00750,000.00750,000.002Pembuatan Bowplankm132.00A.047,760.007,875.001,780,320.00B.PEKERJAAN TANAH1Galian Tanah Fondasim338.18A.119,199.00733,017.822Urugan Pasir Bawah Fondasi staalm32.70A.357,600.009,850.00182,115.003Urugan Tanah Fondasi staalm312.73A.27,008.0089,188.484Urugan Pasir Bawah lantaim312.80A.357,600.009,850.00863,360.005Urugan Tanah Bawah lantaim320.25A.27,008.00141,912.000.0C.PEKERJAAN PASANGAN0.01Fondasi Batu Kali ( 1 : 3 : 10 )m315.12C.2220,695.0080,625.004,555,958.402Pas. Bata 1 pc : 5 psm2109.20C.137,590.0015,745.005,824,182.003Plesteran 1 pc : 5 psm2218.40C.38,460.0014,250.004,959,864.004Acian Tembokm2218.40D.23,843.003,255.001,550,203.205Seponengan sudutm'58.50D.3682.505,127.00339,855.750.0D.PEKERJAAN BETON0.01Pondasi Fooplatm35.63B.1281,250.0020,250.001,695,937.502Sloof ( 15 / 20 ) 1: 2 : 3m33.60B.13,515,105.00314,310.0013,785,894.003Kolom 1 : 2 : 3 ( 15 / 15 )m313.39B.13,515,105.00314,310.0051,266,293.314Ring balk 1 : 2 : 3 ( 15 / 20 )m33.60B.13,515,105.00314,310.0013,785,894.005Balok+Plat lantai 1 : 2 : 3 ( 15 / 20 )m324.84B.13,515,105.00314,310.0095,122,668.600.0E.PEKERJAAN LANTAI0.01Pasang keramik lantai 30/30m2256.00D.142,195.0025,475.0017,323,520.000.0F.PEKERJAAN RANGKA ATAP0.01Kuda-kuda kayum31.15E.14,045,000.00735,000.005,506,560.002Rangka atap, nok, gording, murplat & juraim32.07E.24,045,000.00735,000.009,911,808.003Usuk dan rengm2160.00E.337,000.008,237.507,238,000.004Listplank ( 2 / 15 )m146.00E.418,000.002,547.50945,185.000.0G.PEKERJAAN ATAP0.01Atap gentengm2160.00F.116,500.0016,075.005,212,000.002Kerpus Gentengm116.00F.216,705.0016,075.00524,480.000.0HPEKER JAAN KUSEN + DAUN0.0PINTU & JENDELA0.01Pekerjaan Kusen Pintu jendelam31.73G.13,850,000.001,236,800.008,789,990.402Pekerjaan daun pintuunit6.00G.2140,000.00237,808.002,266,848.003Pekerjaan daun jendelaunit9.00G.359,800.00243,875.002,733,075.000.0IPEKERJAAN PLAFON0.01Plafon eternit + Rangka kayum2128.00G.634,022.5035,950.008,956,480.000.0JPEKERJAAN CAT0.01Pengecatan Listplankm146.00H.220,418.757,790.001,297,602.502Pengecatan Kusen jendelam230.24H.331,775.007,820.001,197,352.803Pengecatan Pintu jendelam26.00H.331,775.007,820.00237,570.004Cat Tembok + Plafon & Tritisanm2346.40H.19,700.004,266.504,837,995.600.0KPEKERJAAN SANITASI0.01Kran airunit4.00I.160,050.006,100.00264,600.002Saluran air hujanm125.0025,000.0012,000.00925,000.003Bak kontrolbj4.00I.221,600.00163,850.00741,800.000.0MPEKERJAAN LAIN - LAIN0.01Peralatan bantuLs1.00ls1,500,000.001,500,000.000.0Jumlah277,836,531.36Terbilang : Dua ratus tujuh puluh tujuh juta delapan ratus tiga puluh enam ribu lima ratus tiga puluh satu koma tiga puluh enam rupiahSleman, Agustus 2009Ketua Yayasan YKPBRKepala SLB Tunas KasihDrs. H. Waldjimin SiswowiratmoDrs. Sunarman

analisa hrg satuanANALISA HARGA SATUANPekerjaan: 1 m' Pasangan Uetzet dan Bowplanhk: Kode Analisa: A0HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Pekerjaoh0.10031,000.003,100.00Mandoroh0.00555,000.00275.00Tukang Kayuoh0.10045,000.004,500.007,875.000MATERIAL :Pakukg0.02013,000.00260.00Kayum0.0192,500,000.0047,500.00PERALATAN :47,760.00TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN55,635.00Pekerjaan: 1 m3 Galian Tanah Biasa Pondasi: Kode analisaA.1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Pekerjaoh0.52631,000.0016,306.002.Mandoroh0.05355,000.002,893.0019,199.000MATERIAL :PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN19,199.00Pekerjaan: 1 m3 Urugan kembali: Kode analisaA.2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Pekerjaoh0.19231,000.005,952.002.Mandoroh0.01955,000.001,056.007,008.000MATERIAL :PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN7,008.00Pekerjaan: 1 m3 Urugan pasir: Kode analisaA.3HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Pekerjaoh0.30031,000.009,300.004.Mandoroh0.01055,000.00550.009,850.000MATERIAL :1. Pasir urugM31.200048,000.0057,600.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN67,450.00Pekerjaan: 1 m3 Beton Bertulang 1PC : 2 PS : 3 KRL (PLAT ATAP): Kode analisa: B.1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Pekerjaoh5.600031,000.00173,600.002.Mandoroh0.202055,000.0011,110.003.Tukang kayuoh0.230045,000.0010,350.004.Tukang batuoh0.350045,000.0015,750.005.Kepala tukang kayuoh0.405050,000.0020,250.006.Tukang besioh1.400045,000.0063,000.007.Kepala tukang batuoh0.405050,000.0020,250.00314,310.000MATERIAL :1. Besi betonkg170.000012,000.002,040,000.002.Kawat betonkg2.250012,500.0028,125.003.Pakukg3.200013,000.0041,600.004.Kayu klas IIIm30.35502,750,000.00976,250.005.pasir pasangm30.670064,000.0042,880.006.krikilm31.0000105,000.00105,000.007.semen/zakzak6.250045,000.00281,250.003,515,105.00TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN3,829,415.00Pekerjaan: 1 m3 Membuat lantai kerja beton tumbuk, 1 pc : 3 ps : 5 kr: Kode Analisa: B.2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Pekerjaoh1.650031,000.0051,150.002.Tukang batuoh0.250045,000.0011,250.003. Kepala tukang batuoh0.025050,000.001,250.004. Mandoroh0.080055,000.004,400.0068,050.000MATERIAL :1. Semen PortlandKg218.0000900.00196,200.002. Pasir betonM30.520064,000.0033,280.003. Kerikil pecah 2/3 cmM30.8700105,000.0091,350.00320830.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN388,880.00Pekerjaan: 1 m2 Pasangan Batu Bata 1pc:5ps: Kode Analisa: C1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang Batuoh0.100045,000.004,500.00Kepala Tukang Batuoh0.010050,000.00500.00Pekerjaoh0.320031,000.009,920.00Mandoroh0.015055,000.00825.0015,745.000MATERIAL :Bata Merahbj80.0000300.0024,000.00Portland Cemen (PC)zak0.242045,000.0010,890.00Pasir Pasangm0.045060,000.002,700.0037590.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN53,335.00Pekerjaan: 1 m3 Pasangan Batu Kali 1pc:3 Kp : 10 ps: Kode Analisa: C.2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Tukang Batuoh0.600045,000.0027,000.002. Kepala Tukang Batuoh0.060050,000.003,000.003. Pekerjaoh1.500031,000.0046,500.004. Mandoroh0.075055,000.004,125.0080,625.000MATERIAL :Batu Kali Belahm1.100078,000.0085,800.00Portland Cemen (PC)zak1.525045,000.0068,625.00Kapurm0.1470250,000.0036,750.00Pasir Pasangm0.492060,000.0029,520.00220695.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN301,320.00Pekerjaan: 1 m2 Plesteran 1pc : 5 ps: Kode Analisa: C.3HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Tukang Batuoh0.150045,000.006,750.002. Kepala Tukang Batuoh0.015050,000.00750.003. Pekerjaoh0.200031,000.006,200.004. Mandoroh0.010055,000.00550.0014,250.000MATERIAL :Portland Cemen (PC)zak0.160045,000.007,200.00Pasir Pasangm0.021060,000.001,260.008,460.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN22,710.00Pekerjaan: 1 m2 Pasang Keramik 30x30 cm: Kode Analisa: D.1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Tukang Batuoh0.400045,000.0018,000.002. Kepala Tukang Batuoh0.040050,000.002,000.003. Pekerjaoh0.150031,000.004,650.004. Mandoroh0.015055,000.00825.0025,475.000MATERIAL :Keramik 30/30 (standart roman/setara)m1.000030,000.0030,000.00Portland Cemen (PC)zak0.204045,000.009,180.00Pasir Pasangm0.019060,000.001,140.00Semen Warnazak0.025075,000.001,875.0042195.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN67,670.00Pekerjaan: 1 m2 Acian: Kode Analisa: D.2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Mandoroh0.022055,000.001,210.00Kepala Tukang Batuoh0.001050,000.0050.00Tukang Batuoh0.003045,000.00135.00Pekerjaoh0.060031,000.001,860.003,255.000MATERIAL :Portland Cemen (PC)kg4.2700900.003,843.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN7,098.00Pekerjaan: 1 m' Sponengan Sudut: Kode Analisa: D.3HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang Batuoh0.030045,000.001,350.00Kepala Tukang Batuoh0.038050,000.001,900.00Pekerjaoh0.057031,000.001,767.00Mandoroh0.002055,000.00110.005,127.000MATERIAL :Portland Cemen (PC)zak0.012545,000.00562.50Pasir Pasangm0.002060,000.00120.00682.50PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN5,809.50Pekerjaan: Bak mandi 60x60x70: Kode Analisa: D.4HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Pekerjaoh0.716845,000.0032,256.002.Tukang batuoh0.224050,000.0011,200.003. Kepala tukang batuoh0.022431,000.00694.404. Mandoroh0.033655,000.001,848.0045,998.400MATERIAL :Batu Batabj115.0000300.0034,500.00Portland Cemen (PC)Zak1.000045,000.0045,000.00Pasir Pasangm30.040060,000.002,400.0081,900.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN127,898.40Pekerjaan: 1M Pasangan Keramik lantai 20/20: Kode Analisa: D.6HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang Batuoh0.400045,000.0018,000.00Kepala Tukang Batuoh0.040050,000.002,000.00Pekerjaoh0.150031,000.004,650.00Mandoroh0.015055,000.00825.0025,475.000MATERIAL :Keramik 20/20 (standart roman/setara)m1.000040,000.0040,000.00Portland Cemen (PC)zak0.204045,000.009,180.00Pasir Pasangm0.019060,000.001,140.00Semen Warnazak0.025075,000.001,875.0052195.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN77,670.00Pekerjaan: 1M Pasangan Dinding Keramik 20/25 bak mandi: Kode Analisa: D.7HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang Batuoh0.400045,000.0018,000.00Kepala Tukang Batuoh0.040050,000.002,000.00Pekerjaoh0.150031,000.004,650.00Mandoroh0.015055,000.00825.0025,475.000MATERIAL :Keramik 20/25 (standart roman/setara)m1.000045,000.0045,000.00Portland Cemen (PC)zak0.204045,000.009,180.00Pasir Pasangm0.019060,000.001,140.00Semen Warnazak0.02503,000.0075.0055,395.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN80,870.00Pekerjaan: 1 m3 kuda-kuda kayu: Kode Analisa: E.1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang kayuoh12.000045,000.00540,000.00Kepala Tukang kayuoh1.200050,000.0060,000.00Pekerjaoh4.000031,000.00124,000.00Mandoroh0.200055,000.0011,000.00735,000.000MATERIAL :Balok kayum31.10003,500,000.003,850,000.00Paku mur baut & begelkg15.000013,000.00195,000.004,045,000.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN4,780,000.00Pekerjaan: 1m3 Pekerjaan rangka atap, nok, gording, jurai & murplat: Kode Analisa: E.2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGAMandor0.200(Rp.)(Rp.)Kepala Tukang Kayu1.200Tukang Kayu12.000TENAGA:Pekerja4.000Tukang kayuoh12.000045,000.00540,000.00Kepala Tukang kayuoh1.200050,000.0060,000.00Pekerjaoh4.000031,000.00124,000.00Mandoroh0.200055,000.0011,000.00735,000.000MATERIAL :Balok Kayum31.10003,500,000.003,850,000.00Paku mur baut & begelkg15.000013,000.00195,000.004,045,000.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN4,780,000.00Pekerjaan: 1m2 Pekerjaan Usuk & Reng: Kode Analisa: E.3HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang kayu Kasaroh0.100045,000.004,500.00Kepala Tukang kayuoh0.010050,000.00500.00Pekerjaoh0.100031,000.003,100.00Mandoroh0.002555,000.00137.508,237.500MATERIAL :Usukm0.00773,500,000.0026,950.00Reng 2/3m'3.00002,100.006,300.00Pakukg0.250015,000.003,750.0037000.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN45,237.50Pekerjaan: 1m' Pekerjaan Lisplang 2/20: Kode Analisa: E.4HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang kayu Kasaroh0.040045,000.001,800.00Kepala Tukang kayuoh0.004050,000.00200.00Pekerjaoh0.015031,000.00465.00Mandoroh0.001555,000.0082.502,547.500MATERIAL :Papan kayum30.00602,750,000.0016,500.00Pakukg0.100015,000.001,500.0018,000.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN20,547.50Pekerjaan: 1m2 genteng beton: Kode Analisa: F.1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Mandoroh0.008055,000.00440.00Kepala Tukangoh0.008050,000.00400.00Tukang batuoh0.080045,000.003,600.00Pekerjaoh0.160031,000.004,960.009,400.000MATERIAL :Genteng Betonm211.00001,500.0016,500.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN25,900.00Pekerjaan: 1m' genteng kerpus: Kode Analisa: F.2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Mandoroh0.015055,000.00825.00Kepala Tukangoh0.015050,000.00750.00Tukang batuoh0.150045,000.006,750.00Pekerjaoh0.250031,000.007,750.0016,075.00MATERIAL :Genteng kerpusbj3.50003,500.0012,250.00Pasirm30.033060,000.001,980.00SemenZak0.055045,000.002,475.0016,705.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN32,780.00Pekerjaan: 1bh genteng kerpus ujung: Kode Analisa: F.3HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Mandoroh0.005055,000.00275.00Kepala Tukang Kayuoh0.005050,000.00250.00Tukang Kayuoh0.050045,000.002,250.00Pekerjaoh0.083331,000.002,583.335,358.33MATERIAL :Genteng kerpus ujungbj1.00007,500.007,500.00Pasirm30.000360,000.0018.00SemenZak0.001945,000.0085.647,603.64PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN12,961.97Pekerjaan: 1m3 kusen pintu dan jendela: Kode Analisa: G1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang kayu halusoh20.200045,000.00909,000.00Kepala Tukang kayuoh2.020050,000.00101,000.00Pekerjaoh6.720031,000.00208,320.00Mandoroh0.336055,000.0018,480.001,236,800.00MATERIAL :Balok kayum31.10003,500,000.003,850,000.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN5,086,800.00Pekerjaan: 1m2 Daun pintu panil: Kode Analisa: G2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang kayuoh3.450045,000.00155,250.00Kepala Tukang kayuoh0.345050,000.0017,250.00Pekerjaoh1.160031,000.0035,960.00Mandoroh0.533655,000.0029,348.00237,808.00MATERIAL :Balok kayum30.0403,500,000.00140,000.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN377,808.00Pekerjaan: 1m2 Daun pintu kaca: Kode Analisa: G3HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang kayu halusoh4.000045,000.00180,000.00Kepala Tukang kayuoh0.400050,000.0020,000.00Pekerjaoh1.300031,000.0040,300.00Mandoroh0.065055,000.003,575.00243,875.00MATERIAL :Papan kayum30.01693,500,000.0059,150.00Lem kayukg0.01065,000.00650.0059,800.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN303,675.00Pekerjaan: 1m2 Daun jundela kaca: Kode Analisa: G4HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang kayu halusoh1.500045,000.0067,500.00Kepala Tukang kayuoh0.150050,000.007,500.00Pekerjaoh0.350031,000.0010,850.00Mandoroh0.035055,000.001,925.0087,775.00MATERIAL :Papan kayum30.04953,500,000.00173,250.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN261,025.00Pekerjaan: Bovenlight: Kode Analisa: G5HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)Pas. Kusenm30.01443,500,000.0050,400.00Kaca bening 5mmm0.240060,000.0014,400.00Cat kayum0.480027,383.7513,144.20PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN77,944.20Pekerjaan: 1 m2 Plafond eternit 1x1: Kode Analisa: G6HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang kayuoh0.500045,000.0022,500.00Kepala Tukang kayuoh0.080050,000.004,000.00Pekerjaoh0.280031,000.008,680.00Mandoroh0.014055,000.00770.0035,950.00MATERIAL :Eternit 1x1 m'm1.00009,500.009,500.00Balok kayu 5/7m0.0092,750,000.0024,062.50Pakukg0.020011,000.00220.00Paku Triplekkg0.020012,000.00240.0034022.50PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN69,972.50Pekerjaan: 1 m2 Cat dinding & plafond: Kode Analisa: H.1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang catoh0.063050,000.003,150.00Pekerjaoh0.020031,000.00620.00Kep. tukangoh0.006355,000.00346.50Mandoroh0.002560,000.00150.004,266.50MATERIAL :Cat tembokm0.360025,000.009,000.00Plamuur tembokbh0.1006,000.00600.00Kertas gosokbh0.05002,000.00100.009700.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN13,966.50Pekerjaan: 1m2 cat lisplank: Kode Analisa: H.2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Tukang catoh0.105050,000.005,250.00Pekerjaoh0.070031,000.002,170.00Kep. tukangoh0.004055,000.00220.00Mandoroh0.002560,000.00150.007,790.00MATERIAL :Cat kayukg0.430035,625.0015,318.75Meni kayukg0.20015,000.003,000.00Plamuur kayukg0.150014,000.002,100.0020418.75PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN28,208.75Pekerjaan: 1m2 cat kayu: Kode Analisa: H.3HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)PlamurKg0.1500TENAGA:AmplasLbr2.0000Tukang catoh0.105050,000.005,250.00Cat Kayu / BesiKg0.5200Pekerjaoh0.070031,000.002,170.00MeniKg0.2000Kep. tukangoh0.004055,000.00220.00Minyak CatLtr0.0500Mandoroh0.003060,000.00180.007,820.00MATERIAL :Cat kayukg0.520035,625.0018,525.00Meni kayuLtr0.20025,000.005,000.00Plamuur kayukg0.150015,000.002,250.00AmplasLbr2.00003,000.006,000.0031,775.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN39,595.00Pekerjaan: 1unit kran 1/2" - 3/4": Kode Analisa: I.1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:Mandoroh0.004060,000.00240.00Kepala Tukang Batuoh0.010055,000.00550.00Tukang Batuoh0.100050,000.005,000.00Pekerjaoh0.010031,000.00310.006,100.00MATERIAL :Kran Pendek Ex. INABh1.000060,000.0060,000.00Seal Tapem'0.02502,000.0050.0060050.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN66,150.00Pekerjaan: 1 unit bak kontrol 50x50x50 + plat penutup: Kode Analisa: I.2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:1. Pekerjaoh3.200031,000.0099,200.002.Tukang batuoh1.000055,000.0055,000.003. Kepala tukang batuoh0.100050,000.005,000.004. Mandoroh0.150031,000.004,650.00163,850.00MATERIAL :batubatabiji45.0000300.0013,500.00PCzak0.180045000.008,100.00pasirm30.050060000.00besi 6mmbtg0.250018000.0021600.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN185,450.00Pekerjaan: 1 unit titik lampu: Kode Analisa: J.1HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:25,000.000MATERIAL :Pipa 5/8btg1.50003,000.004,500.00Kabel NYM 2x2,5 ex Masterindo/setaram'8.00003,000.0024,000.00Saklar ex brocobh1.00008,500.008,500.00Fiting tempelbh1.00005,000.005,000.00lampu SL 14 Watt Ex Bess/setarabh1.00006,500.006,500.0048500.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN73,500.00Pekerjaan: 1 unit titik stopkontak: Kode Analisa: J.2HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:25,000.000MATERIAL :Pipa 5/8btg1.50003,000.004,500.00Kabel NYM 2x2,5 ex Masterindo/setaram'10.00003,000.0030,000.00Stop kontak ex Brocobh1.000010,000.0010,000.0044500.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN69,500.00Pekerjaan: 1 unit Box sekering: Kode Analisa: J.3HARGAURAIAN PEKERJAANSATUANKUANTITASSATUANJUMLAH HARGA(Rp.)(Rp.)TENAGA:50,000.000MATERIAL :Fuse boxbh1.000020,000.0020,000.00Arde + kawat BCls1.000025000.0025,000.0045000.00PERALATAN :TOTAL UNTUK TENAGA, MATERIAL DAN PERALATAN95,000.00

Sheet2

Sheet334000034000034000374000209.670.0000.4032.0152.020.030.1000