RAB RUMAH TIPE 36

338
HARGA SATUAN BAHAN MATERIAL, BAHAN MATERIAL TERPASA UPAH TENAGA KERJA, UPAH TENAGA AHLI BERPENDIDIKA BERDASARKAN JURNAL HARGA SATUAN BAHAN DAN BANGUNAN, KO A. BAHAN MATERIAL / BAHAN MATERIAL TERPASANG NO. BAHAN / MATERIAL KODE 1 2 3 1. MATERIAL ALAM, BATU BATA Pasir Urug darat Tanah Urug untuk halaman jakarta Pasir Pasang Pasir Beton Abu batu Batu Kali adukan 1 pc: 4 pasir Batu Belah adukan 1 pc: 3 Psr G r a v e l Batu Pecah 5 - 7 cm Batu Pecah 3 - 5 cm Batu Pecah 2 - 3 cm (Mesin) Batu Pecah 1 - 2 cm (Mesin) Batu Pecah ½ - 1 cm (Mesin) S i r t u Bahan Agregat Base Kelas A Bahan Agregat Base Kelas B Agregat Kasar Agregat Halus Chipping ( kg ) Batu bata merah press mesin Rooster Kerawangan 11 x 12 x 24 cm Rooster Kerawangan 11 x 22 x 22 cm Rooster Beton 11 x 20 x 20 cm Batu tempel kasar/marmo (hitam dan kuning) Batu tempel halus (candi/hitam dan palimanan) Batu sirih/alur (hitam dan kuning) Batu alur andesit hitam Batu muka / batu paras List batu andesit p = 40 cm, lebar = 5 cm List batu candi p = 40 cm, lebar = 5 cm B a t a k o 10 x 20 x 40 cm

description

Perhitungan excel untuk menghitung rumah sederhana lengkap beserta harga satuan dan pekerja.

Transcript of RAB RUMAH TIPE 36

BAHAN DAN UPAHHARGA SATUANBAHAN MATERIAL, BAHAN MATERIAL TERPASANG,UPAH TENAGA KERJA, UPAH TENAGA AHLI BERPENDIDIKAN S1 / S2 / S3BERDASARKAN JURNAL HARGA SATUAN BAHAN DAN BANGUNAN, KONSTRUKSI & INTERIORA.BAHAN MATERIAL / BAHAN MATERIAL TERPASANGNO.BAHAN / MATERIALKODEHARGA SATUANSATUANKETERANGAN0.01234561.MATERIAL ALAM, BATU BATAPasir Urug darat170,100.00mTanah Urug untuk halaman jakarta42,656.00mPasir Pasang233,100.00mPasir Beton223,020.00mAbu batu137,500.00mBatu Kali adukan 1 pc: 4 pasir376,935.00mBatu Belah adukan 1 pc: 3 Psr436,373.00mG r a v e l278,500.00mBatu Pecah 5 - 7 cm171,250.00mBatu Pecah 3 - 5 cm182,000.00mBatu Pecah 2 - 3 cm (Mesin)210,000.00mBatu Pecah 1 - 2 cm (Mesin)216,000.00mBatu Pecah - 1 cm (Mesin)225,000.00mS i r t u162,000.00mBahan Agregat Base Kelas A162,500.00mBahan Agregat Base Kelas B142,500.00mAgregat Kasar185,000.00mAgregat Halus212,500.00mChipping ( kg )150.00KgBatu bata merah press mesin425.00BhRooster Kerawangan 11 x 12 x 24 cm6,250.00BhRooster Kerawangan 11 x 22 x 22 cm5,000.00BhRooster Beton 11 x 20 x 20 cm9,350.00BhBatu tempel kasar/marmo (hitam dan kuning)125,000.00mBatu tempel halus (candi/hitam dan palimanan)150,000.00mBatu sirih/alur (hitam dan kuning)173,750.00mBatu alur andesit hitam250,000.00mBatu muka / batu paras26,250.00mList batu andesit p = 40 cm, lebar = 5 cm181,250.00m'List batu candi p = 40 cm, lebar = 5 cm118,750.00m'B a t a k o 10 x 20 x 40 cm6,250.00BhGlass Blok Kaca 20 x 20 cm20,800.00BhBeton cetak bergaris81,250.00mRumput Lamur5,000.00mGebalan rumput4,100.00m2.S E M E NPortland Cement :a.PC Gresik 50 kg1,180.00Kg59000b.PC Tiga Roda 50 kg1,060.00Kg53000d.PC Holcim 50 kg1,100.00Kg55000e.Filler (semen)1,070.00Kg53500Semen Nat Warna13,100.00KgSemen Putih3,750.00KgSemen Merah212,500.00mK a p u r228,750.00m3.BESI / BAJA / MESHBesi Beton Polos10,126.00KgBesi Beton Ulir10,126.00KgBesi Profil WF13,300.00KgBesi Profil C11,500.00KgBesi Profil Siku11,500.00KgBesi Plat Strip10,604.00KgKawat / Tali Beton12,000.00KgKawat Harmonika11,000.00mKawat duri 10 kg6,000.00m'Kawat ayam (ayakan)19,500.00mPaku biasa16,000.00KgPaku anti karat22,500.00KgPaku kalsiboard25,000.00KgPaku Keling750.00BhSkrup Asbes / paku pancing1,350.00BhSkrup/Kayu Besi500.00BhDinabolt3,650.00BhAlat Bantu118,750.00SetWire mesh10,300.00KgPagar baja ( BRC ) 240 x 120338,750.00mPagar baja ( BRC ) 240 x 150389,600.00m4.K A Y UKayu Bakar225,000.00mKayu Meranti4,650,000.00mKayu Kruing7,010,000.00mKayu Jati Lokal9,000,000.00mKayu Jati Papan26,250,000.00mKayu Jati Usuk8,148,750.00mKayu Jati Reng6,240,000.00mKayu Jati Lokal :a.Kayu Balok ( A1 )13,500,000.00mb.Kayu Balok ( A2 )18,750,000.00mc.Kayu Balok ( A3 )23,134,400.00mKayu Jati Perhutani :a.Kayu Balok ( A1 )18,750,000.00mb.Kayu Balok ( A2 )22,500,000.00mc.Kayu Balok ( A3 )34,375,000.00mKayu Stoot lokal21,000.00BtgB a m b u china3,428.00BtgTali ijuk18,750.00KgKayu Perancah3,125,000.00mKayu kelapa / glugu3,375,000.00mKayu jawa3,400,000.00mBambu Anyam (Gedek)22,500.00m5.PENUTUP ATAPGenting Glazur11,250.00BhGenting Bubungan Glasur23,750.00BhAkhiran Genting Glasur37,500.00BhNok Glazur 2 arah62,500.00BhNok Glazur 3 arah92,500.00BhNok Glazur 4 arah212,500.00BhGenting Lokal2,200.00BhGenting Bubungan Lokal7,500.00BhGenting Kodokan (Gandusari)2,000.00BhGenting Bubungan Gandusari7,500.00BhGenting Kodokan KW I (Karangpilang)4,700.00BhGenting Bubungan Karangpilang17,500.00BhGenting Mantili2,800.00BhGenting Bubungan Mantili8,100.00BhGenting Beton Natural5,600.00BhGenting Beton finish Cat8,100.00BhGenting Bubungan Beton18,750.00BhGenting Kaca25,000.00BhGenting Metal ex. Multi Roof 0,77 m x 1 m117,500.00LbrGenting Metal ex Surya Roof 0,77 m x 0,80 m81,250.00LbrNok Stel Metal 90 cm62,500.00LbrAtap Sirap kayu Ulin T = 4 mm P = 58 cm L = 8 cm2,750.00BhAtap Zincalume T = 0,30 mm43,750.00m2Atap Zincalume T = 0,35 mm69,250.00m2Atap Zincalume T = 0,4 mm79,000.00m2Atap Zincalume T = 0,45 mm89,000.00m2Atap Zincalume T = 0,5 mm98,750.00m2Seng Gelombang BJLS 30 ( 0,80 x 3,00 ) m112,500.00LbrSeng Gelombang BJLS 20 ( 0,90 x 1,80 ) m62,500.00LbrBondex T = 0,75 mm lebar 1 m159,350.00m2Asbes Gelombang 0,35 x 180 x 8058,100.00LbrAsbes Gelombang 0,35 x 240 x 8078,100.00LbrAsbes Gelombang 0,4 x 210 x 10385,000.00LbrAsbes Gelombang 0,4 x 300 x 10391,250.00LbrAsbes Gelombang besar 0,5 x 240 x 105103,750.00LbrAsbes Gelombang besar 0,5 x 300 x 105131,250.00LbrNok Stel Gelombang Asbes37,500.00BhFiber Glass Gelombang 0,80 x 3,00 m87,500.00LbrSeng Talang 0,90 M ( BJLS 0,30)41,000.00m'Seng Talang 0,60 M ( BJLS 0,30)27,000.00m'Talang Karpet 0,90 M17,650.00m'Talang PVC U ( 4 m' )93,750.00LjAlumunium foil single side10,000.00m2Alumunium foil double side12,500.00m26.PENUTUP LANGIT-LANGITFiber semen rata ex Gresik Superata Exl20,300.00Lbr(1,00 X 1,00) t = 3 mmKalsiboard 1,00 x 1,00 m ex Gresik18,000.00LbrKalsiboard 1,20 x 2,40 m ex Gresik58,000.00LbrGypsum board 1,20 x 2,40 m ex Jayaboard67,500.00LbrList kayu jati profil28,000.00m'List kayu pelipit meranti7,500.00m'Papan GRC t = 9 mm lebar = 20 cm22,500.00m'Papan GRC t = 9 mm lebar = 30 cm27,500.00m'7.KAYU LAPISMultipleks t = 9 mm (1,20 x 2,40 ) m126,000.00LbrMultipleks t = 12 mm (1,20 x 2,40 ) m168,750.00LbrTripleks 3 mm ( 2,40 x 1,20 ) m53,100.00LbrTeaxwood t = 4 mm ( 2,40 x 1,20 ) m103,750.00LbrPlywood Besar t = 4 mm ( 2,40 x 1,20 ) m81,250.00Lbr8.K A C AKaca Bening 5 mm110,000.00mKaca Bening 3 mm102,500.00mKaca Rayband 5 mm arna bronze, blue, green118,650.00mKaca Rayband 3 mm87,500.00mKaca Es 5 mm126,250.00mKaca Es 3 mm106,250.00mKaca Tempered 10 mm421,500.00m9.PENGGANTUNG, PENGUNCIEngsel Jendela nylon13,000.00BhEngsel Pintu25,000.00BhKait / hak angin kuningan21,250.00PsGrendel pintu kuningan 3"12,500.00BhGrendel jendela kuningan15,600.00BhLock Set33,000.00BhHandle pintu160,000.00BhPull Handle Besar240,000.00BhHandle jendela15,600.00BhKerangka Nako109,350.00mKunci Tanam setara "Yale"165,000.00SetKunci Tanam setara "Beluci"187,500.00SetSealant37,500.00kalengRel pintu geser + acc322,650.00unitDoor closer DKs HO- NA/BA248,750.00unitFloor hinge781,250.00Set10.CAT MARKA JALANCat Thermoplastic28,750.00KgCat Non Thermoplastic22,850.00KgGlassbed Pottes21,350.00Kg11.CAT KAYU / BESI / TEMBOK / GENTINGCat Dempul / Plamir32,925.00KgCat Meni58,074.00KgCat Dasar Minyak34,350.00KgCat watter proofing52,500.00KgCoating batu alam75,000.00KgCat Kayu Halus :a.Emco 1 kg59,350.00kalengb.Altek 1 kg52,500.00kalengLem Kayu33,000.00KgMeni Besi (Flincote) 1 kg59,811.52kalengThinner / Minyak Cat :a.Thinner A Biasa 1 kg26,000.00kalengb.Thinner A Spesial 1 kg29,000.00kalengc.Thinner B 1 kg15,000.00kalengCat Tembok :a.Decolith 5 kg87,500.00kalengb.Paragon 5 kg85,000.00kalengc.Catylac 5 kg110,000.00kalengd.Aries 5 kg56,250.00kalenge.Dulux exterior 2,5 ltr1,250,000.00kalengf.Cat dasar exterior 2,5 ltr175,000.00kalengg.Cat exterior exs. Dana Paint 2,5 ltr230,000.00kalengCat Genting :a.Sanlex standar 5 kg156,250.00kalengb.Sanlex khusus 5 kg221,850.00kalengKuas besar16,675.00BhKuas kecil8,375.00BhS p i r t u s19,000.00LtrKertas Gosok4,250.00LbrR e s i d u50,505.00LtrPolitur dasar37,750.00LtrPolitur Jadi ex Impra68,750.00LtrVernish Jadi49,898.00LtrBatu Apung23,100.00Kg12.KERAMIK, UBIN, PAVING STONEList keramik (Kuku Macan) p = 10 cm1,250.00BhList keramik dinding t = 10 cm21,250.00m'Step Nosing 10x2015,600.00BhPlint keramik 10x4017,500.00BhUbin Keramik 20 x 20 Wafel76,000.00mUbin Keramik 20 x 20 Polos84,000.00mUbin Keramik 20 x 25 Polos140,000.00mUbin Keramik 20 x 25 Motif66,500.00mUbin Keramik 30 x 30 Polos ex Mulia144,000.00mUbin Keramik 30 x 30 Motif ex Asia Tile66,500.00mUbin Keramik 40 x 40 Polos ex Mulia138,000.00mUbin Keramik 40 x 40 Motif ex Platinium72,500.00mTegel Abu - Abu 20 x 20 cm25,000.00mMarmer Ujung Pandang :a.Marmer Brevia Premium / Marfil Lokal160,250.00mb.Marmer cream malaga premium162,500.00mc.Marmer cream malaga standart210,000.00mMarmer Tulung Agung :a.Warna putih ex Tulungagung338,000.00mMarmer Import :a.Trevertine Romano Turkey Sleb (Filled)825,000.00mb.Trevertine Romano Turkey Sleb (unFilled)980,000.00mc.Bade Seba China 60XPJG (Poles)980,000.00m'd.Bianco Sardo 60XPJG (Poles)393,750.00m'e.Black Galaxy SS Super India 60-80XJPG (Poles)718,750.00m'f.Black Galaxy India Slab (Poles)1,000,000.00mGranit :a.Granit Warna hitam / Hijau ex Tulungagung344,500.00mGranito :a.Granito 30 x 30 cm silver193,750.00mb.Granito 30 x 30 cm gold206,250.00mc.Granito 40 x 40 cm type Salsa unpolished237,500.00md.Granito 40 x 40 cm type Salsa polished268,750.00me.Granito 40 x 40 cm type Palazzo Silver polished281,250.00mf.Granito 40 x 40 cm type Palazzo Gold polished303,750.00mg.Granito 40 x 40 cm type Rasello Silver polished212,500.00mh.Granito 40 x 40 cm type Rasello Gold polished231,250.00mi.Granito 60 x 60 cm type Salsa Ivory polished275,000.00mj.Granito 60 x 60 cm type Salsa Butterstone polished320,000.00mk.Granito 60 x 60 cm type Palazzo Silver polished322,500.00ml.Granito 60 x 60 cm type Palazzo Gold polished334,800.00mm.Granitile ex. Cina 60 x 60 cm Polos115,000.00mPaving Stone :a.Paving Bata Abu-abu 8 cm kw I ( K - 400 )77,500.00mb.Paving Bata Abu-abu 8 cm kw II ( K - 150 )70,000.00mc.Paving Bata Abu-abu 6 cm kw I ( K - 300 )63,750.00md.Paving Bata Abu-abu 6 cm kw II ( K - 125 )56,250.00me.Paving segi 6 Abu-abu 8 cm kw I ( K - 400 )77,500.00mf.Paving segi 6 Abu-abu 8 cm kw II ( K - 150 )70,000.00mg.Paving segi 6 Abu-abu 6 cm kw I ( K - 300 )63,750.00mh.Paving segi 6 Abu-abu 6 cm kw II ( K - 125 )56,250.00mi.Paving Variasi Besar Abu-abu 6 cm kw I (K-300)63,750.00mj.Paving Uskup Abu-abu 7 cm kw I73,750.00mKanstein :a.Kanstein 20 x 10 x 40 cm40,800.00bjb.Kanstein 20 x 15 x 50 cm Profil39,000.00bjc.Kanstein 35 x 15 x 50 cm Profil45,600.00bjd.Kanstein 30 x 15 x 60 cm Profil45,600.00bje.Kanstein Taman4,350.00bjBataco 10 x 20 x 40 cm6,250.00bjGrass block 10 x 36 x 53 cm22,500.00bj13.PIPA + ACCESSORIESKnee GI 2"28,750.00BhTee GI 2"37,500.00BhPipa Besi 4" Galvanis (6 m' t = 2 mm)645,750.00LjPipa Besi 3" Galvanis (6 m' t = 2 mm)489,950.00LjPipa Besi 2 " Galvanis (6 m' t = 2 mm)375,000.00LjPipa Besi 2" Galvanis (6 m' t = 2 mm)250,000.00LjPipa Besi 1" Galvanis (6 m' t = 2 mm)131,250.00LjPipa Besi " Galvanis (6 m' t = 2 mm)125,000.00LjPipa PVC AW 4" ( 4 m' ) Maspion262,500.00LjPipa PVC AW 3" ( 4 m' ) Maspion187,500.00LjPipa PVC AW 2" ( 4 m' ) Maspion100,000.00LjPipa PVC AW 1 " ( 4 m' ) Maspion68,750.00LjPipa PVC AW 1" ( 4 m' ) Maspion36,500.00LjPipa PVC AW " ( 4 m' ) Maspion29,350.00LjPipa PVC D 6" ( 4 m' ) Maspion262,500.00LjPipa PVC D 4" ( 4 m' ) Maspion145,000.00LjPipa PVC D 3" ( 4 m' ) Maspion102,500.00LjPipa PVC D 2" ( 4 m' ) Maspion68,750.00LjPipa PVC D 2" ( 4 m' ) Maspion50,000.00LjPipa PVC D 1" ( 4 m' ) Maspion41,250.00LjPipa PVC D " ( 4 m' ) Maspion28,100.00Lj14.BETON BUIS1Beton Buis = 15 cm x 10022,275.00Bh2Beton Buis U = 15 cm x 10022,825.00Bh3Beton Buis = 20 cm x 10030,800.00Bh4Beton Buis U = 20 cm x 10022,825.00Bh5Beton Buis = 30 cm x 10041,250.00Bh6Beton Buis U = 30 cm x 10025,162.50Bh7Beton Buis = 40 cm x 10065,450.00Bh8Beton Buis = 50 cm x 10096,800.00Bh9Beton Buis = 60 cm x 100115,500.00Bh10Beton Buis = 60 cm x 50118,250.00Bh11Beton Buis = 80 cm x 100206,800.00Bh12Beton Buis = 80 cm x 50146,025.00Bh13Beton Buis = 100 cm x 100244,750.00Bh14Beton Buis = 100 cm x 50233,750.00Bh15.ASPAL, MINYAK DAN PELUMASAspal Drum pen 40/6011,300.00KgA s p a l11,000.00KgAspal Emulsi11,100.00KgMinyak tanah industri/kerosin8,500.00LtrSolar Subsidi6,500.00LtrSolar Non Subsidi12,450.00LtrBensin Subsidi6,500.00LtrBensin Non Subsidi12,450.00LtrOlie ( Minyak Pelumas )30,850.00LtrGemuk / Stenped24,700.00KgMinyak Bekisting4,600.00LtrL P G ( tabung 12 kg )105,000.00Tabung16.SANITAIRBak cuci piring 60 x 90 cm ex Metako243,750.00BhBak cuci ex Visa tebal281,250.00BhBak mandi fiber glass kotak181,250.00BhBak mandi fiber glass sudut237,400.00BhFloor Drain plastic12,500.00BhFloor Drain stainless steel21,250.00BhClosed duduk (Ex TOTO) + watertank + klep2,062,500.00UnitClosed duduk Ex INA + accesoris1,125,000.00UnitClosed Jongkok Ex INA131,250.00BhClosed Jongkok Ex TOTO231,250.00BhWastafel besar + acc (Ex INA)350,000.00BhWastafel kecil + acc (Ex INA)259,350.00BhUrinoir Ex TOTO1,875,000.00BhKran air logam32,500.00BhSeal Tape3,100.00BhShower standar81,250.00BhTandon air 250 ltr ex "Pura"531,250.00BhTandon air 320 ltr ex "Pura"593,750.00BhTandon air 550 ltr ex "Pura"875,000.00BhTandon air 700 ltr ex "Pura"937,500.00BhTandon air 1.200 ltr ex "Pura"2,062,500.00BhTandon air 2.000 ltr ex "Pura"2,875,000.00BhPintu KM/WC PVC 200 x 70 cm293,750.00UnitPintu Alluminium KM/WC 185 x 65 cm275,000.00Unit17.PERALATAN LISTRIKLampu TL 20 watt ex Phillips17,700.00BhLampu TL 40 watt ex Phillips23,550.00BhLampu SL 14 watt ex Philips34,350.00BhLampu SL 18 watt ex Philips38,750.00BhLampu SL 23 watt ex Philips42,500.00BhLampu Dop (bolamp) ex Phillips 40 watt7,500.00BhDownlight ex Philips 4"60,000.00BhDownlight ex Philips 5"68,750.00BhDownlight ex Cina 4"34,350.00BhDownlight ex Cina 5"38,750.00BhSaklar tunggal ex Brocco13,750.00BhSaklar ganda ex Brocco19,350.00BhStop kontak17,000.00BhStop kontak AC64,500.00BhStop kontak outlet TV50,000.00BhStop kontak outlet telepon59,650.00BhExhaust fan kecil "Maspion"193,750.00BhExhaust fan besar "Maspion"365,250.00BhLampu emergency250,000.00Bh18.BAHAN / MATERIAL TERPASANGAuning + rangka hollow18.1300,000.00mPolycarbonat exs twinlite rangka hollow18.2375,000.00mPolycarbonat exs twinlite rangka stainless18.1503,750.00mKuda-kuda baja ringan dibawah 35 tebal 1,00 mma.bentang 6 meter175,000.00mb.bentang 6 meter s/d 8 meter187,500.00mc.bentang 8 meter s/d 10 meter200,000.00md.bentang 10 meter s/d 12 meter210,000.00me.bentang 12 meter s/d 14 meter223,100.00mf.bentang 14 meter s/d 16 meter232,800.00mg.bentang 16 meter s/d 18 meter250,000.00mh.bentang 18 meter257,200.00mPasang reng usuk baja ringan116,000.00mKusen Alluminium 3" Putih ex alexindo85,000.00m'Kusen Alluminium 3" Warna ex alexindo93,750.00m'Kusen Alluminium 4" Putih ex alexindo90,000.00m'Kusen Alluminium 4" Warna ex alexindo97,500.00m'Kusen Alluminium 3" Putih ex indall88,000.00m'Kusen Alluminium 3" Warna ex indall100,000.00m'Kusen Alluminium 4" Putih ex indall95,000.00m'Kusen Alluminium 4" Warna ex indall102,700.00m'Jalusi aluminium487,500.00mAllumunium composite panel 4 mm( exs. China) + Rangka578,350.00mPlafond rangka hollow galvanis112,500.00mPlafond rangka hollow + penutup gypsum 9mm93,000.00mPlafond rangka hollow + penutup kalsiboard 3.5mm90,500.00mDaun pintu + acc Alpha/ATT lengkap warna700,000.00mDaun pintu + acc Alpha/ATT lengkap putih668,750.00mDaun jendela Kaca + acc Alpha/ATT lengkap warna462,500.00mDaun jendela Kaca + acc Alpha/ATT lengkap putih425,000.00mPintu kaca 1 cm + acc, lebar 1 m3,125,000.00UnitBeton sikat / batu sikat312,500.00mWatter proofing membran100,000.00mPartisi rangka profil C + penutup175,000.00mWallpaper71,250.00mPintu harmonika exs. Jombang843,750.00mRollingdoor434,350.00mPagar hollow 4 cm jarak 6 cm437,500.00mRailling Tangga Stainless734,500.00mCat melamin- daun pintu doof37,500.00m- daun pintu gloss33,750.00m- daun kusen / daun jendela doof14,250.00m'- daun kusen / daun jendela gloss54,750.00m'Cat duko- daun pintu doof433,750.00m- daun pintu gloss396,250.00m- daun kusen / daun jendela doof93,750.00m'- daun kusen / daun jendela gloss87,500.00m'Cat motif marmer / serat kayu- dinding218,750.00m- listplank112,500.00m'- pilar318,750.00m'Cat dekoratif- dinding683,750.00m- plafound81,250.00m- listplank65,600.00m'List gypsum lebar 7 cm13,000.00m'List gypsum lebar 12 cm16,000.00m'List gypsum lebar 15 cm23,150.00m'Kaca Patri / stain timah1,214,600.00mKaca Patri / stain timah triple1,518,250.00mKaca Stain Kuningan Triple2,025,000.00mKaca Painting 5 mm437,500.00mKaca Gravir Warna 5 mm562,500.00mKaca Gravir Polos 5 mm625,000.00mSewa sklafolding43,750.00set/bulanSewa bor pile6,250.00jamPasang Instalasi Listrika.Pas instalasi listrik indoor + fitting110,000.00TtkKbl NYA 2x2,5 mm2 (non saklar/stop kontak)b.Pas titik stop kontak (reguler) Kbl NYA (2) 2,5 mm283,750.00Ttkc.Pasang titik stop kontak (khusus/laboratorium)106,250.00TtkKbl NYA (3) 2,5 mm2d.Pasang titik stop kontak AC Kbl NYA (3) 4 mm290,000.00TtkMobilisasi peralatan dan testing pekerjaan Hotmixa.Mobilisasi peralatan hotmix1,950,000.00LsNO.BAHAN / MATERIALKODEHARGA SATUANSATUANKETERANGANb.Testing pekerjaan hotmix70,000.00Ttk123456BETON K225800,000.00m^3B.UPAH TENAGA KERJANO.U R A I A NKODEHARGA SATUANSATUANHARIAN (OH)abcdef1.Pekerja(L01)10,000.00Jam70,000.002.Tukang(L02)10,714.29Jam75,000.003.M a n d o r(L03)12,142.86Jam85,000.004.Operator(L04)7,457.14Jam52,200.005.Pembantu Operator(L05)6,214.29Jam43,500.006.Sopir / Driver(L06)6,835.71Jam47,850.007.Pembantu Sopir / Driver(L07)6,214.29Jam43,500.008.Mekanik(L08)7,457.14Jam52,200.009.Pembantu Mekanik(L09)6,835.71Jam47,850.0010.Kepala Tukang(L10)11,428.57Jam80,000.00Asumsi : lama kerja dalam 1 hari adalah 7 jam efektif

ANALISA HARGA SATUANANALISA HARGA SAT KEGIATAN KONSTRUKSITAHUN ANGGARAN 2014A.Analisa Biaya Konstruksi Pekerjaan Persiapan dan Tanah1.1 m' Sewa pagar sementara dari seng gelombang, tinggi 2 meterKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBambu 10 - 12 cmBtg1.00003,428.003,428.00PCKg2.50001,180.002,950.00Seng gelombang bjls 20Lbr0.750062,500.0046,875.00Pasir betonm0.0050223,020.001,115.10Batu pecah 2 - 3m0.0090210,000.001,890.00Kayu Lokal 5/7m0.01053,400,000.0035,700.00Paku biasaKg0.060016,000.00960.002TENAGATukang kayuOh0.200075,000.0015,000.00PekerjaOh0.400070,000.0028,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0092,918.10Diasumsikan Pemakaian bahan sebesar 25 %23,229.5346,300.0069,529.53DIBULATKAN69,500.002.1 m' Pengukuran dan pemasangan bouwplankKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu Lokal 5/7m0.00393,400,000.0013,260.00Paku biasaKg0.020016,000.00320.00Kayu papan 2/20m0.00423,400,000.0014,280.002TENAGATukang kayuOh0.100075,000.007,500.00PekerjaOh0.100070,000.007,000.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0027,860.0015,725.0043,585.00DIBULATKAN43,550.002.a1 M2 Membersihkan Lapangan dan PerataanKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)2TENAGAPekerjaOh0.100070,000.007,000.00MandorOh0.050085,000.004,250.000.0011,250.0011,250.00DIBULATKAN11,250.003.Pembuatan kisdam tinggi 1 m tebal 0,6 mKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBambu 10 - 12 cmbtg1.00003,428.003,428.00Gedegm2.000022,500.0045,000.00Kawat ikat betonkg0.150012,000.001,800.002TENAGAPekerjaOh0.300070,000.0021,000.00Kepala tukangOh0.033080,000.002,640.00MandorOh0.020085,000.001,700.0050,228.0025,340.0075,568.00DIBULATKAN75,550.004.1 m Bongkaran beton bertulangKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh6.667070,000.00466,690.00MandorOh0.333085,000.0028,305.000.0494,995.00494,995.00DIBULATKAN494,950.005.1 m Bongkaran pasangan batu kaliKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh2.048070,000.00143,360.00MandorOh0.205085,000.0017,425.000.0160,785.00160,785.00DIBULATKAN160,750.006.1 m Bongkaran dinding tembok batu bataKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh2.000070,000.00140,000.00MandorOh0.100085,000.008,500.000.0148,500.00148,500.00DIBULATKAN148,500.007.1 m Menurunkan genting, genting dipakai lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.020070,000.001,400.00MandorOh0.010085,000.00850.000.02,250.002,250.00DIBULATKAN2,250.008.1 m Menurunkan genting, genting tidak dipakai lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.010070,000.00700.00MandorOh0.005085,000.00425.000.01,125.001,125.00DIBULATKAN1,100.009.1 m Menurunkan/membongkar rangka penutup atap (usuk+reng), bongkaran dipakai lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGATukangOh0.025075,000.001,875.00PekerjaOh0.100070,000.007,000.00Kepala tukangOh0.002580,000.00200.00MandorOh0.050085,000.004,250.000.013,325.0013,325.00DIBULATKAN13,300.0010.1 m Menurunkan/membongkar rangka penutup atap (usuk+reng), bongkaran tidak dipakai lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.100070,000.007,000.00MandorOh0.050085,000.004,250.000.011,250.0011,250.00DIBULATKAN11,250.0011.1 m Menurunkan/membongkar kayu ( kuda - kuda ), bongkaran dipakai lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGATukangOh4.000075,000.00300,000.00PekerjaOh2.666770,000.00186,669.00Kepala tukangOh0.400080,000.0032,000.00MandorOh0.133385,000.0011,330.500.0529,999.50529,999.50DIBULATKAN529,950.0012.1 m Menurunkan/membongkar kayu ( kuda - kuda ), bongkaran tidak dipakai lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGATukangOh4.000075,000.00300,000.00Kepala tukangOh0.400080,000.0032,000.000.0332,000.00332,000.00DIBULATKAN332,000.0013.1 m Pembuatan stegger bambu untuk andangKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBambu 6 - 8 cm/600 cmBtg1.00003,428.003,428.00Tali ijukKg0.250018,750.004,687.502TENAGATukang kayuOh0.017075,000.001,275.00PekerjaOh0.250070,000.0017,500.00Kepala tukangOh0.002080,000.00160.00MandorOh0.013085,000.001,105.008,115.5020,040.0028,155.50DIBULATKAN28,150.00141 m Galian tanah biasa sedalam 1 meterKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.750070,000.0052,500.00MandorOh0.025085,000.002,125.000.054,625.0054,625.00DIBULATKAN54,600.0015.1 m Galian tanah biasa sedalam 2 meterKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.900070,000.0063,000.00MandorOh0.045085,000.003,825.000.066,825.0066,825.00DIBULATKAN66,800.0016.1 m Galian tanah biasa sedalam 3 meterKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh1.050070,000.0073,500.00MandorOh0.067085,000.005,695.000.079,195.0079,195.00DIBULATKAN79,150.0017.1 m Galian tanah keras sedalam 1 meterKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh1.000070,000.0070,000.00MandorOh0.032085,000.002,720.000.072,720.0072,720.00DIBULATKAN72,700.0018.1 m Galian tanah lumpur sedalam 1 meterKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh1.200070,000.0084,000.00MandorOh0.045085,000.003,825.000.087,825.0087,825.00DIBULATKAN87,800.0019.1 m' Pembuatan lubang strous pile diameter 20Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.150070,000.0010,500.00MandorOh0.015085,000.001,275.002PERALATANSewa bor pileJam1.20006,250.007,500.007,500.0011,775.0019,275.00DIBULATKAN19,250.0020.1 m' Pembuatan lubang strous pile diameter 25Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.200070,000.0014,000.00MandorOh0.020085,000.001,700.002PERALATANSewa bor pileJam1.20006,250.007,500.007,500.0015,700.0023,200.00DIBULATKAN23,200.0021.1 m' Pembuatan lubang strous pile diameter 30Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.250070,000.0017,500.00MandorOh0.025085,000.002,125.002PERALATANSewa bor pileJam1.20006,250.007,500.007,500.0019,625.0027,125.00DIBULATKAN27,100.00221 m Urugan kembaliKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.250070,000.0017,500.00MandorOh0.008385,000.00708.330.018,208.3318,208.33DIBULATKAN18,200.00231 m Urugan pasir dengan penyiramanKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPasir urugm1.2000170,100.00204,120.002TENAGAPekerjaOh0.300070,000.0021,000.00MandorOh0.010085,000.00850.00204,120.0021,850.00225,970.00DIBULATKAN225,950.0023.a1 m Urugan abu batuKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANAbu Batum1.2000137,500.00165,000.002TENAGAPekerjaOh0.300070,000.0021,000.00MandorOh0.010085,000.00850.00165,000.0021,850.00186,850.00DIBULATKAN186,850.00241 m Urugan tanah dipadatkan dengan tenaga buruhKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANTanah urugm1.200042,656.0051,187.202TENAGAPekerjaOh0.800070,000.0056,000.00MandorOh0.060085,000.005,100.0051,187.2061,100.00112,287.20DIBULATKAN112,250.0025.1 m Urugan tanah dipadatkan dengan alat (mekanis)Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANTanah urugm1.200042,656.0051,187.202TENAGAPekerjaOh0.006770,000.00469.00MandorOh0.000985,000.0076.503ALATAlat bantuLs1.0000831.35831.35Water Tankerjam0.0141270,050.003,807.71Vibratory rollerjam0.0574417,450.0023,961.6351,187.2029,146.1980,333.39DIBULATKAN80,300.0026.1 m Tanam rumput lamurKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANRumput Lamurm1.00005,000.005,000.002TENAGAPekerjaOh0.144070,000.0010,080.00MandorOh0.010085,000.00850.005,000.0010,930.0015,930.00DIBULATKAN15,900.00B.Analisa Biaya Kontruksi Pekerjaan Pondasi Batu Kali1.1 m Pasang pondasi batu kali, 1 PC : 4 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20 cmm1.2000436,373.00523,647.60PCKg163.00001,180.00192,340.00Pasir pasangm0.5200233,100.00121,212.002TENAGAPekerjaOh1.500070,000.00105,000.00Tukang batuOh0.750075,000.0056,250.00Kepala tukangOh0.075080,000.006,000.00MandorOh0.075085,000.006,375.00837,199.60173,625.001,010,824.60DIBULATKAN1,010,800.0021 m Pasang pondasi batu kali, 1 PC : 6 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20 cmm1.2000436,373.00523,647.60PCKg117.00001,180.00138,060.00Pasir pasangm0.5610233,100.00130,769.102TENAGAPekerjaOh1.500070,000.00105,000.00Tukang batuOh0.750075,000.0056,250.00Kepala tukangOh0.075080,000.006,000.00MandorOh0.075085,000.006,375.00792,476.70173,625.00966,101.70DIBULATKAN966,100.003.1 m Pasang pondasi batu kali, 1 PC : 3 Kp : 10 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20 cmm1.2000436,373.00523,647.60PCKg61.00001,180.0071,980.00Kapur pasangm0.1470228,750.0033,626.25Pasir pasangm0.4920233,100.00114,685.202TENAGAPekerjaOh1.500070,000.00105,000.00Tukang batuOh0.750075,000.0056,250.00Kepala tukangOh0.075080,000.006,000.00MandorOh0.075085,000.006,375.00743,939.05173,625.00917,564.05DIBULATKAN917,550.0041 m Pasang pondasi batu kosong / anstampengKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20 cmm1.2000436,373.00523,647.60Pasir urugm0.4320170,100.0073,483.202TENAGAPekerjaOh0.780070,000.0054,600.00Tukang batuOh0.390075,000.0029,250.00Kepala tukangOh0.039080,000.003,120.00MandorOh0.039085,000.003,315.00597,130.8090,285.00687,415.80DIBULATKAN687,400.005.1 m Pembangunan penempatan bronjong termasuk penyediaan batu dan kawat bronjongKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20 cmm1.0000436,373.00436,373.00Kawat anyaman 3 mmkg8.333311,000.0091,666.672TENAGAPekerjaOh2.033370,000.00142,333.33TukangOh0.666775,000.0050,000.00MandorOh0.051785,000.004,391.67528,039.67196,725.00724,764.67DIBULATKAN724,750.00C.Analisa Biaya Kontruksi Pekerjaan Pasangan Dinding1.1 m Pasangan batu bata tebal 1 bata, 1 PC : 3 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu bataBh140.0000425.0059,500.00PCKg32.95001,180.0038,881.00Pasir pasangm0.0910233,100.0021,212.102TENAGAPekerjaOh0.600070,000.0042,000.00Tukang batuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.030085,000.002,550.00119,593.1061,150.00180,743.10DIBULATKAN180,700.0021 m Pasangan batu bata tebal 1 bata, 1 PC : 6 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu bataBh140.0000425.0059,500.00PCKg18.50001,180.0021,830.00Pasir pasangm0.1220233,100.0028,438.202TENAGAPekerjaOh0.600070,000.0042,000.00Tukang batuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.030085,000.002,550.00109,768.2061,150.00170,918.20DIBULATKAN170,900.003.1 m Pasangan batu bata tebal 1 bata, 1 PC : 3 Kp : 10 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu bataBh140.0000425.0059,500.00PCKg10.08001,180.0011,894.40Pasir pasangm0.0925233,100.0021,561.75Kapur pasangm0.0275228,750.006,290.632TENAGAPekerjaOh0.600070,000.0042,000.00Tukang batuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.030085,000.002,550.0099,246.7861,150.00160,396.78DIBULATKAN160,350.004.1 m Pasangan batu bata tebal bata, 1 PC : 3 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu bataBh70.0000425.0029,750.00PCKg14.37001,180.0016,956.60Pasir pasangm0.0400233,100.009,324.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.0056,030.6030,575.0086,605.60DIBULATKAN86,600.005.1 m Pasangan batu bata tebal bata, 1 PC : 6 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu bataBh70.0000425.0029,750.00PCKg8.32001,180.009,817.60Pasir pasangm0.0490233,100.0011,421.902TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.0050,989.5030,575.0081,564.50DIBULATKAN81,550.006.1 m Pasangan batu bata tebal bata, 1 PC : 3 Kp : 10 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu bataBh70.0000425.0029,750.00PCKg4.50001,180.005,310.00Kapur pasangm0.0150228,750.003,431.25Pasir pasangm0.0500233,100.0011,655.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.0050,146.2530,575.0080,721.25DIBULATKAN80,700.007.1 m Pasangan batu bata, 1 PC : 3 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu bataBh560.0000425.00238,000.00PCKg114.96001,180.00135,652.80Pasir pasangm0.3200233,100.0074,592.002TENAGAPekerjaOh2.560070,000.00179,200.00Tukang batuOh0.800075,000.0060,000.00Kepala tukangOh0.080080,000.006,400.00MandorOh0.120085,000.0010,200.00448,244.80255,800.00704,044.80DIBULATKAN704,000.008.1 m Pasangan batu bata, 1 PC : 6 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu bataBh560.0000425.00238,000.00PCKg66.56001,180.0078,540.80Pasir pasangm0.3920233,100.0091,375.202TENAGAPekerjaOh2.560070,000.00179,200.00Tukang batuOh0.800075,000.0060,000.00Kepala tukangOh0.080080,000.006,400.00MandorOh0.120085,000.0010,200.00407,916.00255,800.00663,716.00DIBULATKAN663,700.009.1 m Pasang dinding roster / terawang 11 x 12 x 24Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANRoster / terawang 11 x 12 x 24Bh30.00006,250.00187,500.00PCKg14.00001,180.0016,520.00Pasir pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.00211,479.2030,575.00242,054.20DIBULATKAN242,050.0010.1 m Pasang dinding roster / terawang 11 x 22 x 22Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANRoster / terawang 11 x 22 x 22Bh18.00005,000.0090,000.00PCKg8.60221,180.0010,150.54Pasir pasangm0.0203233,100.004,737.192TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.00104,887.7330,575.00135,462.73DIBULATKAN135,450.0011.1 m Pasang dinding roster beton 11 x 20 x 20Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANRoster beton 11 x 20 x 20Bh25.00009,350.00233,750.00PCKg14.33691,180.0016,917.56Pasir pasangm0.0282233,100.006,579.442TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.00257,247.0030,575.00287,822.00DIBULATKAN287,800.0012.1 m Pasang dinding batako 10 x 20 x 40Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatako 10 x 20 x 40Bh12.50006,250.0078,125.00PCKg5.00001,180.005,900.00Pasir pasangm0.0410233,100.009,557.102TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.0093,582.1030,575.00124,157.10DIBULATKAN124,150.0013.1 m Pasang glass blockKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGlass blockBh25.000020,800.00520,000.00PCKg5.00001,180.005,900.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.00525,900.0030,575.00556,475.00DIBULATKAN556,450.00D.Analisa Biaya Konstruksi Pekerjaan Plesteran1.1 m Plesteran 1 PC : 3 Ps tebal 20 mmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg10.36801,180.0012,234.24Pasir pasangm0.0310233,100.007,226.102TENAGAPekerjaOh0.260070,000.0018,200.00Tukang batuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.013085,000.001,105.0019,460.3435,905.0055,365.34DIBULATKAN55,350.002.1 m Plesteran 1 PC : 6 Ps tebal 20 mmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg5.88801,180.006,947.84Pasir pasangm0.0360233,100.008,391.602TENAGAPekerjaOh0.260070,000.0018,200.00Tukang batuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.013085,000.001,105.0015,339.4435,905.0051,244.44DIBULATKAN51,200.003.1 m Berapen 1 PC : 5 Ps tebal 15 mmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg5.18401,180.006,117.12Pasir pasangm0.0260233,100.006,060.602TENAGAPekerjaOh0.150070,000.0010,500.00Tukang batuOh0.075075,000.005,625.00Kepala tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.0012,177.7217,445.0029,622.72DIBULATKAN29,600.004.1 m Plesteran beton 1 PC : 3 Ps tebal 15 mmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg7.77601,180.009,175.68Pasir pasangm0.0230233,100.005,361.302TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.150075,000.0011,250.00Kepala tukangOh0.015080,000.001,200.00MandorOh0.015085,000.001,275.0014,536.9834,725.0049,261.98DIBULATKAN49,250.005.1 m' Plesteran skoning ( benangan ) 1 PC : 2 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg0.50001,180.00590.00Pasir pasangm0.0130233,100.003,030.302TENAGAPekerjaOh0.080070,000.005,600.00Tukang batuOh0.040075,000.003,000.00Kepala tukangOh0.040080,000.003,200.00MandorOh0.004085,000.00340.003,620.3012,140.0015,760.30DIBULATKAN15,750.006.1 m Plesteran ciprat 1 PC : 2 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg4.32001,180.005,097.60Pasir pasangm0.0060233,100.001,398.602TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.006,496.2030,575.0037,071.20DIBULATKAN37,050.007.1 m Siar 1 PC : 2 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg4.32001,180.005,097.60Pasir pasangm0.0160233,100.003,729.602TENAGAPekerjaOh0.150070,000.0010,500.00Tukang batuOh0.075075,000.005,625.00Kepala tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.008,827.2017,445.0026,272.20DIBULATKAN26,250.00E.Analisa Biaya Konstruksi Pekerjaan Kayu1.1 m Pasang kusen pintu dan jendela kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati balok A2m1.100018,750,000.0020,625,000.00Pakukg1.250016,000.0020,000.00Lem kayukg1.000033,000.0033,000.002TENAGAPekerjaOh7.000070,000.00490,000.00Tukang kayuOh21.000075,000.001,575,000.00Kepala tukangOh2.100080,000.00168,000.00MandorOh0.350085,000.0029,750.0020,678,000.002,262,750.0022,940,750.00DIBULATKAN22,940,750.002.1 m Pasang kusen pintu dan jendela kayu Jati LokalKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu Jati Lokalm1.20009,000,000.0010,800,000.00Pakukg1.250016,000.0020,000.00Lem kayukg1.000033,000.0033,000.002TENAGAPekerjaOh6.000070,000.00420,000.00Tukang kayuOh18.000075,000.001,350,000.00Kepala tukangOh1.800080,000.00144,000.00MandorOh0.300085,000.0025,500.0010,853,000.001,939,500.0012,792,500.00DIBULATKAN12,792,500.003.1 m Pasang kusen pintu dan jendela kayu kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing balokm1.20007,010,000.008,412,000.00Pakukg1.250016,000.0020,000.00Lem kayukg1.000033,000.0033,000.002TENAGAPekerjaOh6.000070,000.00420,000.00Tukang kayuOh18.000075,000.001,350,000.00Kepala tukangOh1.800080,000.00144,000.00MandorOh0.300085,000.0025,500.008,465,000.001,939,500.0010,404,500.00DIBULATKAN10,404,500.004.1 m Pasang pintu panel kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati A2m0.040018,750,000.00750,000.00Lem kayukg0.500033,000.0016,500.002TENAGAPekerjaOh1.000070,000.0070,000.00Tukang kayuOh3.000075,000.00225,000.00Kepala tukangOh0.300080,000.0024,000.00MandorOh0.050085,000.004,250.00766,500.00323,250.001,089,750.00DIBULATKAN1,089,750.005.1 m Pasang pintu panel kayu Jati LokalKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamperm0.04009,000,000.00360,000.00Lem kayukg0.500033,000.0016,500.002TENAGAPekerjaOh1.000070,000.0070,000.00Tukang kayuOh3.000075,000.00225,000.00Kepala tukangOh0.300080,000.0024,000.00MandorOh0.050085,000.004,250.00376,500.00323,250.00699,750.00DIBULATKAN699,750.006.1 m Pasang pintu dan jendela kaca kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati A2m0.024018,750,000.00450,000.00Lem kayukg0.300033,000.009,900.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang kayuOh2.400075,000.00180,000.00Kepala tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00459,900.00258,600.00718,500.00DIBULATKAN718,500.007.1 m Pasang pintu dan jendela kaca kayu Jati LokalKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu Jati Lokalm0.02409,000,000.00216,000.00Lem kayukg0.300033,000.009,900.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang kayuOh2.400075,000.00180,000.00Kepala tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00225,900.00258,600.00484,500.00DIBULATKAN484,500.008.1 m Pasang pintu dan jendela kaca kayu kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruingm0.02407,010,000.00168,240.00Lem kayukg0.300033,000.009,900.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang kayuOh2.400075,000.00180,000.00Kepala tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00178,140.00258,600.00436,740.00DIBULATKAN436,700.009.1 m Pasang pintu dan jendela jalusi kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati A2m0.064018,750,000.001,200,000.00Lem kayukg0.500033,000.0016,500.002TENAGAPekerjaOh1.000070,000.0070,000.00Tukang kayuOh3.000075,000.00225,000.00Kepala tukangOh0.300080,000.0024,000.00MandorOh0.050085,000.004,250.001,216,500.00323,250.001,539,750.00DIBULATKAN1,539,750.0010.1 m Pasang pintu dan jendela jalusi kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamperm0.06409,000,000.00576,000.00Lem kayukg0.500033,000.0016,500.002TENAGAPekerjaOh1.000070,000.0070,000.00Tukang kayuOh3.000075,000.00225,000.00Kepala tukangOh0.300080,000.0024,000.00MandorOh0.050085,000.004,250.00592,500.00323,250.00915,750.00DIBULATKAN915,750.0011.1 m Pasang pintu plywood rangkap, rangka kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati papanm0.025626,250,000.00672,000.00Paku biasaKg0.030016,000.00480.00Lem kayuLtr0.500033,000.0016,500.00Plywood t = 4 mmLbr1.000081,250.0081,250.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang kayuOh2.400075,000.00180,000.00Kepala tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00770,230.00258,600.001,028,830.00DIBULATKAN1,028,800.0012.1 m Pasang pintu plywood rangkap, rangka kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamperm0.02569,000,000.00230,400.00Paku biasaKg0.030016,000.00480.00Lem kayuLtr0.500033,000.0016,500.00Plywood t = 4 mmLbr1.000081,250.0081,250.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang kayuOh2.400075,000.00180,000.00Kepala tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00328,630.00258,600.00587,230.00DIBULATKAN587,200.0013.1 m Pasang pintu plywood rangkap, rangka kayu kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruingm0.02567,010,000.00179,456.00Paku biasaKg0.030016,000.00480.00Lem kayuLtr0.500033,000.0016,500.00Plywood t = 4 mmLbr1.000081,250.0081,250.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang kayuOh2.400075,000.00180,000.00Kepala tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00277,686.00258,600.00536,286.00DIBULATKAN536,250.0014.1 m Pasang pintu teakwood rangkap, rangka kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati A 2m0.025018,750,000.00468,750.00Paku biasaKg0.030016,000.00480.00Lem kayuLtr0.300033,000.009,900.00Teakwood t = 4 mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang kayuOh2.400075,000.00180,000.00Kepala tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00582,880.00258,600.00841,480.00DIBULATKAN841,450.0015.1 m Pasang pintu teakwood rangkap, rangka kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamperm0.02509,000,000.00225,000.00Paku biasaKg0.030016,000.00480.00Lem kayuLtr0.300033,000.009,900.00Teakwood t = 4 mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang kayuOh2.400075,000.00180,000.00Kepala tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00339,130.00258,600.00597,730.00DIBULATKAN597,700.0016.1 m Pasang konstruksi kuda-kuda kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati, balok A 2m1.100018,750,000.0020,625,000.00Besi stripKg15.000010,604.00159,060.00Paku biasaKg5.600016,000.0089,600.002TENAGAPekerjaOh4.000070,000.00280,000.00Tukang kayuOh12.000075,000.00900,000.00Kepala tukangOh1.200080,000.0096,000.00MandorOh0.200085,000.0017,000.0020,873,660.001,293,000.0022,166,660.00DIBULATKAN22,166,650.0017.1 m Pasang konstruksi kuda-kuda kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamperm1.10009,000,000.009,900,000.00Besi stripKg15.000010,604.00159,060.00Paku biasaKg5.600016,000.0089,600.002TENAGAPekerjaOh4.000070,000.00280,000.00Tukang kayuOh12.000075,000.00900,000.00Kepala tukangOh1.200080,000.0096,000.00MandorOh0.200085,000.0017,000.0010,148,660.001,293,000.0011,441,660.00DIBULATKAN11,441,650.0018.1 m Pasang konstruksi kuda-kuda kayu kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruingm1.10007,010,000.007,711,000.00Besi stripKg15.000010,604.00159,060.00Paku biasaKg5.600016,000.0089,600.002TENAGAPekerjaOh4.000070,000.00280,000.00Tukang kayuOh12.000075,000.00900,000.00Kepala tukangOh1.200080,000.0096,000.00MandorOh0.200085,000.0017,000.007,959,660.001,293,000.009,252,660.00DIBULATKAN9,252,650.0019.1 m Pasang kaso jati 5/7 + reng jati genteng kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati usuk 5/7m0.00808,148,750.0065,190.00Kayu jati reng 2/3m0.00306,240,000.0018,720.00Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0086,310.0015,725.00102,035.00DIBULATKAN102,000.0020.1 m Pasang kaso kamper 5/7+ reng jati genteng kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper 5/7m0.00809,000,000.0072,000.00Kayu jati reng 2/3m0.00306,240,000.0018,720.00Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0093,120.0015,725.00108,845.00DIBULATKAN108,800.0021.1 m Pasang kaso kruing 5/7 + reng jati genteng kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing 5/7m0.00807,010,000.0056,080.00Kayu jati reng 2/3m0.00306,240,000.0018,720.00Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0077,200.0015,725.0092,925.00DIBULATKAN92,900.0022.1 m Pasang kaso jati 4/6 + reng jati genteng kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati usuk 4/6m0.00608,148,750.0048,892.50Kayu jati reng 2/3m0.00306,240,000.0018,720.00Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0070,012.5015,725.0085,737.50DIBULATKAN85,700.0023.1 m Pasang kaso kamper 4/6 + reng jati genteng kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper 4/6m0.00609,000,000.0054,000.00Kayu jati reng 2/3m0.00306,240,000.0018,720.00Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0075,120.0015,725.0090,845.00DIBULATKAN90,800.0024.1 m Pasang kaso kruing 4/6 + reng jati genteng kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing 4/6m0.00607,010,000.0042,060.00Kayu jati reng 2/3m0.00306,240,000.0018,720.00Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0063,180.0015,725.0078,905.00DIBULATKAN78,900.0025.1 m Pasang kaso jati 5/7+ reng jati genteng beton / keramikKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati usuk 5/7m0.00808,148,750.0065,190.00Kayu jati reng 3/5m0.00606,240,000.0037,440.00Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.00105,030.0015,725.00120,755.00DIBULATKAN120,750.0026.1 m Pasang kaso kamper 5/7+ reng jati genteng beton / keramikKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper 5/7m0.00809,000,000.0072,000.00Kayu jati reng 3/5m0.00606,240,000.0037,440.00Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.00111,840.0015,725.00127,565.00DIBULATKAN127,550.0027.1 m Pasang kaso kruing 5/7 + reng jati genteng beton / keramikKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing 5/7m0.00807,010,000.0056,080.00Kayu jati reng 3/5m0.00606,240,000.0037,440.00Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0095,920.0015,725.00111,645.00DIBULATKAN111,600.0028.1 m Pasang rangka langit-langit 1 x 1 m + balok hanger, kayu JatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu Jati usuk 5/7, balok hanger 8/10m0.01208,148,750.0097,785.00Cat meniKg0.220058,074.0012,776.28Paku biasaKg0.100016,000.001,600.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.250075,000.0018,750.00Kepala tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.00112,161.2837,625.00149,786.28DIBULATKAN149,750.0029.1 m Pasang rangka langit-langit 1 x 1 m + balok hanger, kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper 5/7, balok hanger 8/10m0.01209,000,000.00108,000.00Cat meniKg0.220058,074.0012,776.28Paku biasaKg0.100016,000.001,600.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.250075,000.0018,750.00Kepala tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.00122,376.2837,625.00160,001.28DIBULATKAN160,000.0030.1 m Pasang rangka langit-langit 1 x 1 m + balok hanger, kayu kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing 5/7, balok hanger 8/10m0.01207,010,000.0084,120.00Cat meniKg0.220058,074.0012,776.28Paku biasaKg0.100016,000.001,600.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.250075,000.0018,750.00Kepala tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.0098,496.2837,625.00136,121.28DIBULATKAN136,100.0031.1 m Pasang rangka langit-langit 60 x 120 cm + balok hanger, kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati usuk 5/7, balok hanger 8/10m0.01408,148,750.00114,082.50Cat meniKg0.275058,074.0015,970.35Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang kayuOh0.300075,000.0022,500.00Kepala tukangOh0.030080,000.002,400.00MandorOh0.010085,000.00850.00132,452.8539,750.00172,202.85DIBULATKAN172,200.0032.1 m Pasang rangka langit-langit 60 x 120 cm + balok hanger, kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper 5/7, balok hanger 8/10m0.01409,000,000.00126,000.00Cat meniKg0.275058,074.0015,970.35Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang kayuOh0.300075,000.0022,500.00Kepala tukangOh0.030080,000.002,400.00MandorOh0.010085,000.00850.00144,370.3539,750.00184,120.35DIBULATKAN184,100.0033.1 m Pasang rangka langit-langit 60 x 120 cm + balok hanger, kayu kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing 5/7, balok hanger 8/10m0.01407,010,000.0098,140.00Cat meniKg0.275058,074.0015,970.35Paku biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang kayuOh0.300075,000.0022,500.00Kepala tukangOh0.030080,000.002,400.00MandorOh0.010085,000.00850.00116,510.3539,750.00156,260.35DIBULATKAN156,250.0034.1 m' Pasang lisplang uk. 3 x 25 cm, kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati papanm0.009026,250,000.00236,250.00Paku biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.025080,000.002,000.00MandorOh0.005085,000.00425.00237,050.0024,425.00261,475.00DIBULATKAN261,450.0035.1 m' Pasang listplang uk. 3 x 25 cm, kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamperm0.00909,000,000.0081,000.00Paku biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.025080,000.002,000.00MandorOh0.005085,000.00425.0081,800.0024,425.00106,225.00DIBULATKAN106,200.0036.1 m' Pasang listplang uk. 3 x 30 cm, kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati papanm0.011026,250,000.00288,750.00Paku biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.005085,000.00425.00289,550.0024,025.00313,575.00DIBULATKAN313,550.0037.1 m' Pasang listplang uk. 3 x 30 cm, kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamperm0.01109,000,000.0099,000.00Paku biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.005085,000.00425.0099,800.0024,025.00123,825.00DIBULATKAN123,800.0038.1 m' Pasang listplang uk. 2 x 3 x 25 cm, kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati papanm0.018026,250,000.00472,500.00Paku biasaKg0.060016,000.00960.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.250075,000.0018,750.00Kepala tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.00473,460.0037,625.00511,085.00DIBULATKAN511,050.0039.1 m' Pasang listplang uk. 2 x 3 x 25 cm, kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamperm0.01809,000,000.00162,000.00Paku biasaKg0.060016,000.00960.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.250075,000.0018,750.00Kepala tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.00162,960.0037,625.00200,585.00DIBULATKAN200,550.0040.1 m' Pasang listplang GRC t = 9 mm, lebar 20 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPapan GRC 9 mm lebar 20 cmm'1.050022,500.0023,625.00Reng pengaku 3/5 kruingm0.00157,010,000.0010,515.00Paku biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.110070,000.007,700.00Tukang kayuOh0.220075,000.0016,500.00Kepala tukangOh0.022080,000.001,760.00MandorOh0.005085,000.00425.0034,940.0026,385.0061,325.00DIBULATKAN61,300.0041.1 m' Pasang listplang GRC t = 9 mm, lebar 30 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPapan GRC 9 mm lebar 30 cmm'1.050027,500.0028,875.00Reng pengaku 3/5 kruingm0.00157,010,000.0010,515.00Paku biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.110070,000.007,700.00Tukang kayuOh0.220075,000.0016,500.00Kepala tukangOh0.022080,000.001,760.00MandorOh0.005085,000.00425.0040,190.0026,385.0066,575.00DIBULATKAN66,550.0042.1 m' Pasang listplang GRC t = 9 mm, rangkap 30/15 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPapan GRC 9 mm lebar 20 cmm'1.000022,500.0022,500.00Papan GRC 9 mm lebar 30 cmm'1.000027,500.0027,500.00Reng pengaku 3/5 kruingm0.00157,010,000.0010,515.00Paku biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.110070,000.007,700.00Tukang kayuOh0.220075,000.0016,500.00Kepala tukangOh0.022080,000.001,760.00MandorOh0.005085,000.00425.0061,315.0026,385.0087,700.00DIBULATKAN87,700.0043.1 m Pasang dinding pemisah teaxwood rangkap, rangka kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati balok 8/10m0.019518,750,000.00365,625.00Kayu jati papan 2/8m0.007026,250,000.00183,750.00Paku biasaKg0.100016,000.001,600.00Lem kayuLtr0.560033,000.0018,480.00Teaxwood t = 4 mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang kayuOh0.600075,000.0045,000.00Kepala tukangOh0.060080,000.004,800.00MandorOh0.010085,000.00850.00673,205.0064,650.00737,855.00DIBULATKAN737,850.0044.1 m Pasang dinding pemisah teaxwood rangkap, rangka kayu kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper balok 8/10m0.01959,000,000.00175,500.00Kayu kamper papan 2/8m0.00709,000,000.0063,000.00Paku biasaKg0.100016,000.001,600.00Lem kayuLtr0.560033,000.0018,480.00Teaxwood t = 4 mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang kayuOh0.600075,000.0045,000.00Kepala tukangOh0.060080,000.004,800.00MandorOh0.010085,000.00850.00362,330.0064,650.00426,980.00DIBULATKAN426,950.0045.1 m Pasang dinding pemisah teaxwood rangkap, rangka kayu kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing balok 8/10m0.01957,010,000.00136,695.00Kayu kruing papan 2/8m0.00707,010,000.0049,070.00Paku biasaKg0.100016,000.001,600.00Lem kayuLtr0.560033,000.0018,480.00Teaxwood t = 4 mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang kayuOh0.600075,000.0045,000.00Kepala tukangOh0.060080,000.004,800.00MandorOh0.010085,000.00850.00309,595.0064,650.00374,245.00DIBULATKAN374,200.0046.1 m' Pasang list plafond kayu jati profilKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati profilm'1.050028,000.0029,400.00Cat kayukg0.016759,350.00991.152TENAGAPekerjaOh0.021070,000.001,470.00Tukang kayuOh0.021075,000.001,575.00Kepala tukangOh0.002080,000.00160.00MandorOh0.001085,000.0085.0030,391.153,290.0033,681.15DIBULATKAN33,650.0047.1 m' Pasang list plafond kayu pelipit merantiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu pelipit merantim'1.05007,500.007,875.00Cat kayukg0.016759,350.00991.152TENAGAPekerjaOh0.021070,000.001,470.00Tukang kayuOh0.021075,000.001,575.00Kepala tukangOh0.002080,000.00160.00MandorOh0.001085,000.0085.008,866.153,290.0012,156.15DIBULATKAN12,150.00F.Analisa Biaya Konstruksi Pekerjaan Beton1.1 m Membuat lantai kerja beton Mutu K 100Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg230.00001,180.00271,400.00Pasir betonm0.6300223,020.00140,502.60Batu pecah 2 - 3m0.7600210,000.00159,600.002TENAGAPekerjaOh1.200070,000.0084,000.00Tukang BatuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.060085,000.005,100.00571,502.60105,700.00677,202.60DIBULATKAN677,200.0021 m Beton rabatKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg230.00001,180.00271,400.00Pasir betonm0.6300223,020.00140,502.60Batu pecah 2 - 3m0.7600210,000.00159,600.002TENAGAPekerjaOh1.200070,000.0084,000.00TukangOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.060085,000.005,100.00571,502.60105,700.00677,202.601 m Beton rabat tebal 5 cm5 / 100 x677,202.6033,860.13Dibulatkan33,850.001 m Beton rabat tebal 7 cm7 / 100 x677,202.6047,404.18Dibulatkan47,400.003.1 m Membuat beton bertulang praktis Mutu K 175Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg326.00001,180.00384,680.00Pasir betonm0.5400223,020.00120,430.80Batu pecah 2 - 3m0.7600210,000.00159,600.002TENAGAPekerjaOh1.650070,000.00115,500.00Tukang BatuOh0.276075,000.0020,700.00Kepala tukangOh0.028080,000.002,240.00MandorOh0.083085,000.007,055.00664,710.80145,495.00810,205.80DIBULATKAN810,200.004.1 m Membuat beton dengan mutu K 225Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg371.00001,180.00437,780.00Pasir betonm0.4980223,020.00111,063.96Batu pecah 2 - 3m0.7760210,000.00162,960.002TENAGAPekerjaOh1.650070,000.00115,500.00Tukang BatuOh0.275075,000.0020,625.00Kepala tukangOh0.028080,000.002,240.00MandorOh0.083085,000.007,055.00711,803.96145,420.00857,223.96DIBULATKAN857,200.0051 m Membuat beton dengan mutu K 250Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg384.00001,180.00453,120.00Pasir betonm0.4910223,020.00109,502.82Batu pecah 2 - 3m0.7400210,000.00155,400.002TENAGAPekerjaOh1.650070,000.00115,500.00Tukang BatuOh0.275075,000.0020,625.00Kepala tukangOh0.028080,000.002,240.00MandorOh0.083085,000.007,055.00718,022.82145,420.00863,442.82DIBULATKAN863,400.0061 m Membuat beton dengan mutu K 275Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg406.00001,180.00479,080.00Pasir betonm0.4880223,020.00108,833.76Batu pecah 2 - 3m0.7600210,000.00159,600.002TENAGAPekerjaOh1.650070,000.00115,500.00Tukang batuOh0.275075,000.0020,625.00Kepala tukangOh0.028080,000.002,240.00MandorOh0.083085,000.007,055.00747,513.76145,420.00892,933.76DIBULATKAN892,900.00100071 m Membuat beton dengan mutu K 350Kode:1350NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL0.7407407407(Rp)BAHANUPAH(Rp)1BAHANPCKg448.00001,180.00528,640.00Pasir betonm0.6670223,020.00148,754.34Batu pecah 2 - 3m0.7400210,000.00155,400.002TENAGAPekerjaOh2.100070,000.00147,000.00Tukang batuOh0.350075,000.0026,250.00Kepala tukangOh0.035080,000.002,800.00MandorOh0.105085,000.008,925.00832,794.34184,975.001,017,769.34DIBULATKAN1,017,750.0081 kg Pembesian dengan besi polos atau besi ulirKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBesi beton (polos/ulir)Kg1.050010,126.0010,632.30Kawat betonKg0.015012,000.00180.002TENAGAPekerjaOh0.007070,000.00490.00Tukang besiOh0.007075,000.00525.00Kepala tukangOh0.000780,000.0056.00MandorOh0.000385,000.0025.5010,812.301,096.5011,908.80DIBULATKAN11,900.0091 m Pasang bekisting untuk pondasi 4x PakaiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu lokalm0.01003,400,000.0034,000.00Paku biasaKg0.075016,000.001,200.00Minyak bekistingLtr0.02504,600.00115.002TENAGAPekerjaOh0.130070,000.009,100.000.5200Tukang kayuOh0.065075,000.004,875.000.2600Kepala tukangOh0.006580,000.00520.000.0260MandorOh0.006585,000.00552.500.026035,315.0015,047.5050,362.50DIBULATKAN50,350.00101 m Pasang bekisting untuk sloof + struktur praktis 4x PakaiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu lokalm0.01133,400,000.0038,250.000.0450Paku biasaKg0.075016,000.001,200.000.3000Minyak bekistingLtr0.02504,600.00115.000.10002TENAGAPekerjaOh0.130070,000.009,100.000.5200Tukang kayuOh0.065075,000.004,875.000.2600Kepala tukangOh0.006580,000.00520.000.0260MandorOh0.006585,000.00552.500.026039,565.0015,047.5054,612.50DIBULATKAN54,600.00111 m Pasang bekisting untuk kolom 3x PakaiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu lokalm0.01333,400,000.0045,333.330.0400Paku biasaKg0.133316,000.002,133.330.4000Minyak bekistingLtr0.06674,600.00306.670.2000Balok kayu lokalm0.00503,400,000.0017,000.000.0150Multipleks tebal 9 mmLbr0.1167126,000.0014,700.000.3500Kayu stootBtg0.666721,000.0014,000.002.00002TENAGAPekerjaOh0.220070,000.0015,400.000.6600Tukang kayuOh0.110075,000.008,250.000.3300Kepala tukangOh0.011080,000.00880.000.0330MandorOh0.011085,000.00935.000.033093,473.3325,465.00118,938.33DIBULATKAN118,900.00121 m Pasang bekisting untuk balok 3x PakaiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu lokalm0.01333,400,000.0045,333.330.0400Paku biasaKg0.133316,000.002,133.330.4000Minyak bekistingLtr0.06674,600.00306.670.2000Balok kayu lokalm0.00603,400,000.0020,400.000.0180Multipleks tebal 9 mmLbr0.1167126,000.0014,700.000.3500Kayu stootBtg0.666721,000.0014,000.002.00002TENAGAPekerjaOh0.220070,000.0015,400.000.6600Tukang kayuOh0.110075,000.008,250.000.3300Kepala tukangOh0.011080,000.00880.000.0330MandorOh0.011085,000.00935.000.033096,873.3325,465.00122,338.33DIBULATKAN122,300.00131 m Pasang bekisting untuk lantai 3x PakaiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu lokalm0.01003,400,000.0034,000.000.0400Paku biasaKg0.100016,000.001,600.000.4000Minyak bekistingLtr0.05004,600.00230.000.2000Balok kayu lokalm0.00383,400,000.0012,750.000.0150Multipleks tebal 9 mmLbr0.0875126,000.0011,025.000.3500Kayu stootBtg1.500021,000.0031,500.006.00002TENAGAPekerjaOh0.165070,000.0011,550.000.6600Tukang kayuOh0.082575,000.006,187.500.3300Kepala tukangOh0.008380,000.00660.000.0330MandorOh0.008385,000.00701.250.033091,105.0019,098.75110,203.75DIBULATKAN110,200.00141 m Pasang bekisting untuk plat tutup saluranKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu lokalm0.01003,400,000.0034,000.00Paku biasaKg0.400016,000.006,400.002TENAGAPekerjaOh0.320070,000.0022,400.00Tukang kayuOh0.330075,000.0024,750.00Kepala tukangOh0.033080,000.002,640.00MandorOh0.006085,000.00510.0040,400.0050,300.0090,700.00DIBULATKAN90,700.00151 m Pasang bekisting untuk plat tutup gorong - gorongKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu lokalm0.04003,400,000.00136,000.00Paku biasaKg0.400016,000.006,400.00Balok kayu lokalm0.01803,400,000.0061,200.002TENAGAPekerjaOh0.320070,000.0022,400.00Tukang kayuOh0.330075,000.0024,750.00Kepala tukangOh0.033080,000.002,640.00MandorOh0.006085,000.00510.00203,600.0050,300.00253,900.00DIBULATKAN253,900.00161 m Pasang bekisting untuk tangga 3x PakaiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu lokalm0.01003,400,000.0034,000.000.0300Paku biasaKg0.133316,000.002,133.330.4000Minyak bekistingLtr0.05004,600.00230.000.1500Balok kayu lokalm0.00503,400,000.0017,000.000.0150Multipleks tebal 9 mmLbr0.1167126,000.0014,700.000.3500Kayu stootBtg0.666721,000.0014,000.002.00002TENAGAPekerjaOh0.220070,000.0015,400.000.6600Tukang kayuOh0.110075,000.008,250.000.3300Kepala tukangOh0.011080,000.00880.000.0330MandorOh0.011085,000.00935.000.033082,063.3325,465.00107,528.33DIBULATKAN107,500.00171 m Membuat kolom praktis 15/15Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200 mmKg233.275710,812.302,522,247.21Bekisting praktism7.260039,565.00287,241.902TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200 mmKg240.85001,096.50264,092.03Bekisting praktism7.260015,047.50109,244.853,474,199.91518,831.883,993,031.79DIBULATKAN3,993,000.00181 m Membuat beton ring balok praktis 11/15Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200 mmKg165.622010,812.301,790,754.75Bekisting praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200 mmKg165.62201,096.50181,604.52Bekisting praktism7.270015,047.50109,395.332,743,103.10436,494.853,179,597.95DIBULATKAN3,179,550.00191 m Membuat beton ring balok praktis 15/60Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200 mmKg295.201610,812.303,191,807.78Bekisting praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200 mmKg295.20161,096.50323,688.51Bekisting praktism7.270015,047.50109,395.334,144,156.13578,578.834,722,734.96DIBULATKAN4,722,700.00201 m Membuat beton ring balok praktis 15/40Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200 mmKg365.537010,812.303,952,295.71Bekisting praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200 mmKg365.53701,096.50400,811.32Bekisting praktism7.270015,047.50109,395.334,904,644.06655,701.655,560,345.70DIBULATKAN5,560,300.00211 m Membuat beton ring balok praktis 15/30Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200 mmKg230.785310,812.302,495,320.26Bekisting praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200 mmKg230.78531,096.50253,056.12Bekisting praktism7.270015,047.50109,395.333,447,668.61507,946.443,955,615.05DIBULATKAN3,955,600.00221 m Membuat beton ring balok praktis 20/30Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200 mmKg238.053310,812.302,573,904.06Bekisting praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200 mmKg238.05331,096.50261,025.48Bekisting praktism7.270015,047.50109,395.333,526,252.41515,915.814,042,168.21DIBULATKAN4,042,150.00231 m Membuat beton ring balok praktis 15/25Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200 mmKg265.355710,812.302,869,105.80Bekisting praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200 mmKg265.35571,096.50290,962.56Bekisting praktism7.270015,047.50109,395.333,821,454.15545,852.894,367,307.03DIBULATKAN4,367,300.00241 m Membuat beton sloof praktis 15/20Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200 mmKg107.270010,812.301,159,835.42Bekisting praktism5.330039,565.00210,881.452TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200 mmKg107.27001,096.50117,621.56Bekisting praktism5.330015,047.5080,203.182,035,427.67343,319.732,378,747.40DIBULATKAN2,378,700.00251 m Membuat beton straus 20 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 5 10, 6 - 150 mmKg126.220010,812.301,364,728.512TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 5 10, 6 - 150 mmKg126.22001,096.50138,400.232,029,439.31283,895.232,313,334.54DIBULATKAN2,313,300.00261 m Membuat beton straus 25 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 6 10, 6 - 150 mmKg98.330010,812.301,063,173.462TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 6 10, 6 - 150 mmKg98.33001,096.50107,818.851,727,884.26253,313.851,981,198.10DIBULATKAN1,981,150.00271 m Membuat beton straus 30 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang praktism1.0000664,710.80664,710.80Besi polos 7 10, 6 - 150 mmKg80.670010,812.30872,228.242TENAGABeton bertulang 1 : 2 : 3m1.0000145,495.00145,495.00Besi polos 7 10, 6 - 150 mmKg80.67001,096.5088,454.661,536,939.04233,949.661,770,888.70DIBULATKAN1,770,850.00281 m Membuat beton Plat Beton Saluran T 10 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang K 225m1.0000800,000.00800,000.00Pembesian Plat Beton 10-150, 10-150Kg202.070010,812.302,184,841.46Pekerjaan Begestingm2.500090,700.00226,750.003,211,591.463,211,591.46DIBULATKAN3,211,550.00291 m Membuat Beton Kolom 15/40 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang K 225m1.0000800,000.00800,000.00Pembesian 812, 8-150Kg186.409410,812.302,015,514.36Pekerjaan Begesting 2xm9.166739,565.00362,679.173,178,193.523,178,193.52DIBULATKAN3,178,150.00301 m Membuat Beton Kolom 20/40 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang K 225m1.0000800,000.00800,000.00Pembesian 812, 8-150Kg113.107210,812.301,222,948.98Pekerjaan Begesting 2xm5.000039,565.00197,825.002,220,773.982,220,773.98DIBULATKAN2,220,750.00311 m Pasang Paving BlokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPavingstonk abu2 Kw II 8 cm (K 150)m1.050070,000.0073,500.00Pasir urugm0.0250170,100.004,252.50Pavingstonk abu2 Kw II 6 cm (K 125)m1.050056,250.0059,062.50Pasir urugm0.0250170,100.004,252.50Pavingstonk abu2 Kw I 8 cm (K 400)m1.050077,500.0081,375.00Pasir urugm0.0250170,100.004,252.50Pavingstonk abu2 Kw I 6 cm (K 300)m1.050063,750.0066,937.50Pasir urugm0.0250170,100.004,252.502TENAGAMandorOh0.003085,000.00255.00Kepala tukangOh0.010080,000.00800.00TukangOh0.150075,000.0011,250.00PekerjaOh0.025070,000.001,750.00Jumlah Bahan + Upah ( Paving Kw II 8 cm )77,752.5014,055.0091,807.50Dibulatkan91,800.00Jumlah Bahan + Upah ( Paving Kw II 6 cm )63,315.0014,055.0077,370.00Dibulatkan77,350.00Jumlah Bahan + Upah ( Paving Kw I 8 cm )85,627.5014,055.0099,682.50Dibulatkan99,650.00Jumlah Bahan + Upah ( Paving Kw I 6 cm )71,190.0014,055.0085,245.00Dibulatkan85,200.00321 m' Pasang kansteinKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg5.00001,180.005,900.00Pasir pasangm0.0010233,100.00233.10Kanstein 20 x 15 x 50 cmBj2.000039,000.0078,000.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.001085,000.0085.0084,133.1022,385.00106,518.10DIBULATKAN106,500.00331 m Pasang grass block uk. 10 x 36 x 53 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGrass block 10 x 36 x 53 cmBj5.250022,500.00118,125.00Pasir urugm0.0250170,100.004,252.502TENAGAPekerjaOh0.025070,000.001,750.00Tukang batuOh0.150075,000.0011,250.00Kepala tukangOh0.010080,000.00800.00MandorOh0.003085,000.00255.00122,377.5014,055.00136,432.50DIBULATKAN136,400.00GAnalisa Biaya Konstruksi Pekerjaan Penutup Atap1.1 m Pasang atap genteng lokalKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng lokalBh30.00002,200.0066,000.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.075075,000.005,625.00Kepala tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.0066,000.0017,445.0083,445.00DIBULATKAN83,400.002.1 m Pasang atap genteng kodokan (Gandusari)Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng kodok (Gandusari)Bh25.00002,000.0050,000.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.075075,000.005,625.00Kepala tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.0050,000.0017,445.0067,445.00DIBULATKAN67,400.0031 m Pasang atap genteng kodokan KW I (Karangpilang)Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng kodok (Karangpilang)Bh25.00004,700.00117,500.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.075075,000.005,625.00Kepala tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.00117,500.0017,445.00134,945.00DIBULATKAN134,900.004.1 m Pasang atap genteng keramik/glazurKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng keramik/glazurBh14.500011,250.00163,125.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.060075,000.004,500.00Kepala tukangOh0.006080,000.00480.00MandorOh0.008085,000.00680.00163,125.0016,160.00179,285.00DIBULATKAN179,250.005.1 m Pasang atap genteng MantiliKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng MantiliBh20.00002,800.0056,000.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.075075,000.005,625.00Kepala tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.0056,000.0017,445.0073,445.00DIBULATKAN73,400.006.1 m Pasang atap genteng betonKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng betonBh10.50005,600.0058,800.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.010085,000.00850.0058,800.0023,150.0081,950.00DIBULATKAN81,950.006.b1 m' Pasang kembali genteng lamaKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)2TENAGAPekerjaOh0.150070,000.0010,500.00Tukang kayuOh0.075075,000.005,625.00Kepala tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.000.0017,445.0017,445.00DIBULATKAN17,400.007.1 m' Pasang atap genteng bubungan lokalKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan lokalBh5.00007,500.0037,500.00PCKg8.00001,180.009,440.00Pasir pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0054,399.2046,300.00100,699.20DIBULATKAN100,650.008.1 m' Pasang atap genteng bubungan GandusariKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan GandusariBh3.50007,500.0026,250.00PCKg8.00001,180.009,440.00Pasir pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0043,149.2046,300.0089,449.20DIBULATKAN89,400.009.1 m' Pasang atap genteng bubungan KarangpilangKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan KarangpilangBh4.000017,500.0070,000.00PCKg8.00001,180.009,440.00Pasir pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0086,899.2046,300.00133,199.20DIBULATKAN133,150.0010.1 m' Pasang atap genteng bubungan keramik / glasurKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan keramik/glasurBh4.000023,750.0095,000.00PCKg8.00001,180.009,440.00Pasir pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.00111,899.2046,300.00158,199.20DIBULATKAN158,150.0011.1 m' Pasang atap genteng bubungan MantiliKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan MantiliBh3.50008,100.0028,350.00PCKg8.00001,180.009,440.00Pasir pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0045,249.2046,300.0091,549.20DIBULATKAN91,500.0012.1 m' Pasang atap genteng bubungan betonKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan betonBh3.500018,750.0065,625.00PCKg10.80001,180.0012,744.00Pasir pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang kayuOh0.200075,000.0015,000.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0085,828.2046,300.00132,128.20DIBULATKAN132,100.0013.1 m Pasang atap asbes gelombang 0,4 x 300 x 103Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANAsbes gelombang 0,4 x 300 x 103Lbr0.350091,250.0031,937.50Paku pancingBh6.00001,350.008,100.002TENAGAPekerjaOh0.140070,000.009,800.00Tukang kayuOh0.070075,000.005,250.00Kepala tukangOh0.007080,000.00560.00MandorOh0.007085,000.00595.0040,037.5016,205.0056,242.50DIBULATKAN56,200.0014.1 m Pasang atap asbes gelombang 0,35 x 240 x 80Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANAsbes gelombang 0,35 x 240 x 80Lbr0.650078,100.0050,765.00Paku pancingBh6.00001,350.008,100.002TENAGAPekerjaOh0.140070,000.009,800.00Tukang kayuOh0.070075,000.005,250.00Kepala tukangOh0.007080,000.00560.00MandorOh0.007085,000.00595.0058,865.0016,205.0075,070.00DIBULATKAN75,050.0015.1 m' Pasang nok stel gelombang asbesKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANNok stel gelombang asbesLbr2.100037,500.0078,750.00Paku sekrupBh6.00001,350.008,100.002TENAGAPekerjaOh0.084070,000.005,880.00Tukang kayuOh0.125075,000.009,375.00Kepala tukangOh0.013080,000.001,040.00MandorOh0.004085,000.00340.0086,850.0016,635.00103,485.00DIBULATKAN103,450.0016.1 m Pasang atap fiber gelombang ( 0,8 x 3,0 m )Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANFiber gelombangm0.450087,500.0039,375.00Paku pancingBh6.00001,350.008,100.002TENAGAPekerjaOh0.140070,000.009,800.00Tukang kayuOh0.070075,000.005,250.00Kepala tukangOh0.007080,000.00560.00MandorOh0.007085,000.00595.0047,475.0016,205.0063,680.00DIBULATKAN63,650.0017.1 m Pasang atap genteng metal ex. Multi Roof 0,77 m x 1 mKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng metal Multi Roof 0,77m x 1mLbr1.3000117,500.00152,750.00Paku anti karatKg0.200022,500.004,500.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.001085,000.0085.00157,250.0022,385.00179,635.00DIBULATKAN179,600.0018.1 m Pasang atap atap zincalume tbl. 0,5 mmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANMetal atap zincalume tbl. 0,5 mmm21.333098,750.00131,633.75Paku sekrupBh6.00001,350.008,100.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang kayuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.001085,000.0085.00139,733.7522,385.00162,118.75DIBULATKAN162,100.0019.1 m' Pasang nok genteng metalKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANNok stel metalBh1.100062,500.0068,750.00Paku anti karatKg0.050022,500.001,125.002TENAGAPekerjaOh0.250070,000.0017,500.00Tukang kayuOh0.150075,000.0011,250.00Kepala tukangOh0.015080,000.001,200.00MandorOh0.013085,000.001,105.0069,875.0031,055.00100,930.00DIBULATKAN100,900.0020.1 m Pasang atap seng gelombang BJLS 0,30Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANSeng gelombang BJLS 0,30Lbr0.4500112,500.0050,625.00PakuKg0.020016,000.00320.002TENAGAPekerjaOh0.120070,000.008,400.00Tukang kayuOh0.060075,000.004,500.00Kepala tukangOh0.006080,000.00480.00MandorOh0.006085,000.00510.0050,945.0013,890.0064,835.00DIBULATKAN64,800.0021.1 m Pasang atap sirapKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANAtap sirapBh60.00002,750.00165,000.00Paku biasaKg0.200016,000.003,200.002TENAGAPekerjaOh0.166070,000.0011,620.00Tukang kayuOh0.250075,000.0018,750.00Kepala tukangOh0.025080,000.002,000.00MandorOh0.008085,000.00680.00168,200.0033,050.00201,250.00DIBULATKAN201,250.0022.1 m Pasang nok sirapKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANSeng talang 0,60 M ( BJLS 0,30)Lbr0.400027,000.0010,800.00Paku biasaKg0.110016,000.001,760.00Papan kayu merantim0.00404,650,000.0018,600.002TENAGAPekerjaOh0.125070,000.008,750.00Tukang kayuOh0.250075,000.0018,750.00Kepala tukangOh0.025080,000.002,000.00MandorOh0.006085,000.00510.0031,160.0030,010.0061,170.00DIBULATKAN61,150.00HAnalisa Biaya Konstruksi Pekerjaan Langit-Langit1.1 m Langit-langit fiber semen rataKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANFiber semen rata t = 3 mmLbr1.100020,300.0022,330.00PakuKg0.010016,000.00160.002TENAGAPekerjaOh0.030070,000.002,100.00Tukang kayuOh0.070075,000.005,250.00Kepala tukangOh0.007080,000.00560.00MandorOh0.004085,000.00340.0022,490.008,250.0030,740.00DIBULATKAN30,700.002.1 m Langit-langit kalsiboard ukuran 1,20 x 2,40 mKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKalsiboard ukuran 1,20 x 2,40 mLbr0.364058,000.0021,112.00Paku kalsiboardKg0.010025,000.00250.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.050075,000.003,750.00Kepala tukangOh0.005080,000.00400.00MandorOh0.005085,000.00425.0021,362.0011,575.0032,937.00DIBULATKAN32,900.003.1 m Langit-langit kalsiboard ukuran 1 x 1 mKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKalsiboard ukuran 1 x 1 mLbr1.100018,000.0019,800.00Paku kalsiboardKg0.010025,000.00250.002TENAGAPekerjaOh0.030070,000.002,100.00Tukang kayuOh0.070075,000.005,250.00Kepala tukangOh0.007080,000.00560.00MandorOh0.001585,000.00127.5020,050.008,037.5028,087.50DIBULATKAN28,050.0041 m Langit-langit gypsum board 1,20 x 2,40 mKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGypsum board 1,20 x 2,40 mLbr0.364067,500.0024,570.00Paku kalsiboardKg0.010025,000.00250.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang kayuOh0.050075,000.003,750.00Kepala tukangOh0.005080,000.00400.00MandorOh0.005085,000.00425.0024,820.0011,575.0036,395.00DIBULATKAN36,350.0051 m List Langit-langit gypsum 12 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANList Gypsum 12 cmLbr1.050016,000.0016,800.00Paku kalsiboardKg0.150025,000.003,750.002TENAGAPekerjaOh0.060070,000.004,200.00Tukang kayuOh0.060075,000.004,500.00Kepala tukangOh0.006080,000.00480.00MandorOh0.003085,000.00255.0020,550.009,435.0029,985.00DIBULATKAN29,950.00IAnalisa Biaya Konstruksi Pekerjaan Pipa dan Sanitasi1.Memasang 1 buah kloset duduk + accKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKloset duduk + acesoriesUnit1.00002,062,500.002,062,500.002TENAGAPekerjaOh0.330070,000.0023,100.00Tukang batuOh1.100075,000.0082,500.00Kepala tukangOh0.001080,000.0080.00MandorOh0.160085,000.0013,600.002,062,500.00119,280.002,181,780.00DIBULATKAN2,181,750.002.Memasang 1 buah kloset jongkok porselen ex INAKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKloset jongkokBh1.0000131,250.00131,250.00PCKg6.00001,180.007,080.00Pasir pasangm0.0100233,100.002,331.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang batuOh1.100075,000.0082,500.00Kepala tukangOh0.110080,000.008,800.00MandorOh0.010085,000.00850.00140,661.00106,150.00246,811.00DIBULATKAN246,800.003.Memasang 1 buah wastafel besar ex INA + accKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANWastafel besar + accBh1.0000350,000.00350,000.00PCKg6.00001,180.007,080.00Pasir pasangm0.0100233,100.002,331.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang batuOh1.100075,000.0082,500.00Kepala tukangOh0.110080,000.008,800.00MandorOh0.010085,000.00850.00359,411.0099,150.00458,561.00DIBULATKAN458,550.004.Memasang 1 buah bak cuci piring 60 x 90 cm ex MetakoKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBak cuci piring 60 x 90 cmBh1.0000243,750.00243,750.002TENAGAPekerjaOh0.030070,000.002,100.00Tukang batuOh0.300075,000.0022,500.00Kepala tukangOh0.030080,000.002,400.00MandorOh0.001585,000.00127.50243,750.0027,127.50270,877.50DIBULATKAN270,850.005.Memasang 1 buah kran air logam diameter " atau "Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKran airBh1.000032,500.0032,500.00Seal tapeBh0.02503,100.0077.502TENAGAPekerjaOh0.010070,000.00700.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0032,577.509,425.0042,002.50DIBULATKAN42,000.006Memasang 1 buah floor drain stainlessteelKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANFloor drain stainlessteelBh1.000021,250.0021,250.002TENAGAPekerjaOh0.010070,000.00700.00TukangOh0.100075,000.007,500.00Kepala tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0021,250.009,425.0030,675.00DIBULATKAN30,650.007Memasang 1 m' pipa galvanis "Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPipa galvanis "m'1.050020,833.3321,875.00Accessories ( 35 % harga pipa )Hrg0.350020,833.337,291.672TENAGAPekerjaOh0.054070,000.003,780.00TukangOh0.090075,000.006,750.00Kepala tukangOh0.009080,000.00720.00MandorOh0.027085,000.002,295.0029,166.6713,545.0042,711.67DIBULATKAN42,700.008.Memasang 1 m' pipa PVC AW "Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPipa PVC AW "m'1.05007,337.507,704.38Accessories ( 35 % harga pipa )Hrg0.35007,337.502,568.132TENAGAPekerjaOh0.036070,000.002,520.00TukangOh0.060075,000.004,500.00Kepala tukangOh0.006080,000.00480.00MandorOh0.001885,000.00153.0010,272.507,653.0017,925.50DIBULATKAN17,900.009.Memasang 1 m' pipa PVC klas D 4"Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPipa PVC klas D 4"m'1.050036,250.0038,062.50Accessories ( 35 % harga pipa )Hrg0.350036,250.0012,687.502TENAGAPekerjaOh0.081070,000.005,670.00TukangOh0.135075,000.0010,125.00Kepala tukangOh0.001480,000.00108.00MandorOh0.041085,000.003,485.0050,750.0019,388.0070,138.00DIBULATKAN70,100.0010.Memasang 1 m' pipa PVC klas D 6"Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPipa PVC klas D 6"m'1.050065,625.0068,906.25Accessories ( 35 % harga pipa )Hrg0.350065,625.0022,968.752TENAGAPekerjaOh0.081070,000.005,670.00TukangOh0.135075,000.0010,125.00Kepala tukangOh0.001480,000.00108.00MandorOh0.041085,000.003,485.0091,875.0019,388.00111,263.00DIBULATKAN111,250.0011.1 m' Pasang gorong-gorong U 30 cm x 100 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis U = 30 cm x 100 cmBh1.000025,162.5025,162.502TENAGAPekerjaOh0.150070,000.0010,500.00Tukang batuOh0.050075,000.003,750.00Kepala tukangOh0.010080,000.00800.00MandorOh0.007085,000.00595.0025,162.5015,645.0040,807.50DIBULATKAN40,800.0012.1 m' Pasang gorong-gorong O , 30 cm x 100 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis O , 30 cm x 100 cmBh1.000041,250.0041,250.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.014085,000.001,190.0041,250.0031,290.0072,540.00DIBULATKAN72,500.0013.1 m' Pasang gorong-gorong O , 40 cm x 100 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis O , 40 cm x 100 cmBh1.000065,450.0065,450.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.014085,000.001,190.0065,450.0031,290.0096,740.00DIBULATKAN96,700.0014.1 m' Pasang gorong-gorong O , 50 cm x 100 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis O , 50 cm x 100 cmBh1.000096,800.0096,800.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.014085,000.001,190.0096,800.0031,290.00128,090.00DIBULATKAN128,050.0015.1 m' Pasang gorong-gorong O , 60 cm x 100 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis O , 60 cm x 100 cmBh1.0000115,500.00115,500.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang batuOh0.100075,000.007,500.00Kepala tukangOh0.020080,000.001,600.00MandorOh0.014085,000.001,190.00115,500.0031,290.00146,790.00DIBULATKAN146,750.00JAnalisa Biaya Konstruksi Pekerjaan Besi dan Allumunium1.1 Kg Pasang rangka atap bajaKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBesi profil WF/SikuKg1.100013,300.0014,630.00Meni besi (flincotk)Kg0.080059,811.524,784.92Besi profil C (Cannal)Kg1.100011,500.0012,650.00Meni besi (flincotk)Kg0.080059,811.524,784.922TENAGATukang besiOh0.006070,000.00420.00PekerjaOh0.060075,000.004,500.00Kepala tukangOh0.006080,000.00480.00MandorOh0.000385,000.0025.50Jumlah bahan profil WF/Siku19,414.925,425.5024,840.42Dibulatkan24,800.00Jumlah bahan profil C (Cannal)17,434.925,425.5022,860.42Dibulatkan22,850.002.1 m Pasang teralis besiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBesi strip 2 cm x 3 mmkg6.177010,604.0065,500.912TENAGATukang besiOh1.670070,000.00116,900.00PekerjaOh1.670075,000.00125,250.00Kepala tukangOh0.167080,000.0013,360.00MandorOh0.083085,000.007,055.0065,500.91262,565.00328,065.91DIBULATKAN328,050.003.1 m Pasang kawat harmonikaKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKawat harmonikam1.100011,000.0012,100.00Paku biasaKg0.020016,000.00320.00Kayu papan kamperm0.00189,000,000.0016,200.002TENAGAPekerjaOh0.