  • REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN RUMAH BERSALIN BAHAGIA

    PEKERJAAN : PEMBANGUNAN RUMAH BERSALIN BAHAGIASUMBER DANA : ANGGARAN : TAHUN 2010

    NO. JENIS PEKERJAAN TOTAL HARGA (Rp.)

    BANGUNAN A I. Pekerjaan Persiapan Rp. 43,400,000.00 II. Pekerjaan Tanah & Pondasi Rp. 79,798,756.40 III. Pekerjaan Struktur Beton Bertulang Rp. 162,935,346.09 IV. Pekerjaan Dinding dan Plesteran Rp. 96,471,253.80 V. Pekerjaan Pintu dan Jendela Rp. 106,433,819.75 VI. Pekerjaan Atap dan Plafond Rp. 252,579,633.33 VII. Pekerjaan Pengecatan Rp. 64,218,568.06 VIII. Pekerjaan Lantai Rp. 106,254,587.83 IX. Pekerjaan Instalasi Air Rp. 39,201,450.00 X. Pekerjaan Instalasi Listrik Rp. 52,795,500.00 XI. Pekerjaan Lain-lain Rp. 8,608,887.53

    Rp. 1,012,697,802.78 BANGUNAN B

    I. Pekerjaan Persiapan Rp. 1,500,000.00 II. Pekerjaan Tanah & Pondasi Rp. 78,428,875.99 III. Pekerjaan Struktur Beton Bertulang Rp. 166,667,495.96 IV. Pekerjaan Dinding dan Plesteran Rp. 14,474,608.89 V. Pekerjaan Atap dan Plafond Rp. 247,383,138.06 VI. Pekerjaan Pengecatan Rp. 29,210,587.23 VII. Pekerjaan Lantai Rp. 110,020,296.55 VIII. Pekerjaan Instalasi Air Rp. 30,044,100.00 IX. Pekerjaan Instalasi Listrik Rp. 15,001,850.00 X. Pekerjaan Lain-lain Rp. 12,568,423.94

    Rp. 705,299,376.63 Real Cost Rp. 1,717,997,179.41 Dibulatkan Rp. 1,717,990,000.00 Terbilang : Satu Milyar Tujuh Ratus Tujuh Belas Juta Sembilan Ratus Sembilan Puluh Ribu Rupiah,-

    Makassar, April 2010

    Perencana,

    Ir. H. Mursyid Mustafa, M.Si.

  • RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN RUMAH BERSALIN BAHAGIA

    PEKERJAAN : PEMBANGUNAN RUMAH BERSALIN BAHAGIASUMBER DANA : ANGGARAN : TAHUN 2010

    NO. URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

    BANGUNAN AI. Pekerjaan Persiapan1. Pembersihan Lokasi & Pas. Bowplank 1.00 Ls 5,000,000.00 2. Pembuatan Direksi Keet dan Gudang Sementara 1.00 Ls 8,400,000.00 3. Pengurusan Izin Mendirikan Bangunan (IMB) 1.00 Ls 30,000,000.00 II. Pekerjaan Tanah & Pondasi1. Galian Tanah Pondasi (1m) 211.53 m3 27,375.00 2. Galian Tanah Pondasi (2m) 9.72 m3 33,525.00 3. Urugan Kembali 52.88 m3 10,150.00 4. Pasir Urug Bawah Pondasi 21.80 m3 109,350.00 5. Pas. Batu Kosong 43.00 m3 255,495.00 6. Pondasi Batu Gunung 101.70 m3 466,215.00 7. Lantai Kerja Pondasi Poer; Rabat t=7cm 6.00 m2 40,799.22 8. Pondasi Poer P1

    ~Beton K225 1.46 m3 669,837.86 ~Besi Beton 212.16 Kg 10,330.00 ~BeKisting 2x Pakai 6.44 m2 78,805.00

    9. Pondasi Poer P2~Beton K225 0.62 m3 669,837.86 ~Besi Beton 79.39 Kg 10,330.00 ~BeKisting 2x Pakai 2.94 m2 78,805.00

    10. Stek Pondasi Poer P1~Beton K225 1.58 m3 669,837.86 ~Besi Beton 177.00 Kg 10,330.00 ~BeKisting 2x Pakai 14.52 m2 78,805.00

    11. Stek Pondasi Poer P2~Beton K225 0.59 m3 669,837.86 ~Besi Beton 66.57 Kg 10,330.00 ~BeKisting 2x Pakai 5.94 m2 78,805.00

    12. Pondasi Trassram Tangga Teras 1 Bata 2.16 m2 137,941.00 13. Pondasi Trassram Tangga Teras 1/2 Bata 16.39 m2 66,357.60 III. Pekerjaan Struktur Beton Bertulang1. Sloof S1 (20/30)

    ~Beton K225 13.72 m3 669,837.86 ~Besi Beton 1,806.52 Kg 10,330.00 ~BeKisting 2x Pakai 137.17 m2 84,055.00

    2. Kolom Praktis (14/14)~Beton K225 7.36 m3 669,837.86 ~Besi Beton 1,364.14 Kg 10,330.00 ~BeKisting 2x Pakai 210.42 m2 149,865.00

    3. Kolom K1 (30/80)~Beton K225 5.50 m3 669,837.86 ~Besi Beton 582.08 Kg 10,330.00 ~BeKisting 2x Pakai 50.42 m2 149,865.00

    4. Kolom K2 (30/80)~Beton K225 1.60 m3 669,837.86 ~Besi Beton 171.80 Kg 10,330.00 ~BeKisting 2x Pakai 16.02 m2 149,865.00

    5. Balok Ringbalk Rb1 (15/25)~Beton K225 8.70 m3 669,837.86 ~Besi Beton 1,408.70 Kg 10,330.00 ~BeKisting 2x Pakai 232.01 m1 46,547.50

    6. Pek. List Profil Beton 77.26 m1 250,000.00

  • NO. URAIAN PEKERJAAN VOL. SAT. HARGA SAT.IV. Pekerjaan Dinding dan Plesteran1. Pas. Dinding Tembok 1/2 Bata 625.00 m2 63,845.00 2. Plesteran Biasa (1:4) Dinding 1,219.63 m2 24,365.20 3. Plesteran Finishing Siar/Motif Garis (1:4) 93.95 m2 37,251.04 4. Plesteran Finishing Skoneng/Motif Kotak (1:4) 3.49 m2 37,251.04 5. Plesteran Beton (1:3) 175.56 m2 25,770.48 6. Pekerjaan Acian Semen 1,328.79 m2 14,071.00 V. Pekerjaan Pintu dan Jendela1. Pintu Type P1 =3 Unit

    ~Kusen Kayu Kls I 0.27 m3 10,363,500.00 ~Daun Pintu Panel Kayu Kls I 14.52 m2 517,250.00 ~Pas. Kaca Mati 5mm 3.52 m2 151,958.75 ~Engsel Pintu 24 Buah 33,600.00 ~Kunci Pintu 4 Buah 191,945.00 ~Expanyolet/Door Closer 6 Buah 165,000.00

    2. Pintu Type P2 = 8 Unit~Kusen Kayu Kls I 0.50 m3 10,363,500.00 ~Daun Pintu Panel Kayu Kls I 23.63 m2 517,250.00 ~Pas. Kaca Mati 5mm 5.70 m2 151,958.75 ~Engsel Pintu 48 Buah 33,600.00 ~Kunci Pintu 8 Buah 191,945.00 ~Expanyolet/Door Closer 8 Buah 165,000.00

    3. Pintu Type P3 = 7 Unit~Kusen Kayu Kls I 0.37 m3 10,363,500.00 ~Daun Pintu Panel Kayu Kls I 12.79 m2 517,250.00 ~Pas. Kaca Mati 5mm 3.18 m2 151,958.75 ~Engsel Pintu 21 Buah 33,600.00 ~Kunci Pintu 7 Buah 191,945.00 ~Expanyolet/Door Closer 7 Buah 165,000.00

    4. Pintu Type P4 = 7 Unit (Pintu PVC KM) 7 Unit 607,500.00 5. Jendela Type J1 = 4 Unit

    ~Kusen Aluminium 4" x 1 3/4" 58.52 m1 88,082.50 ~Pas. Kaca Mati 5mm 17.11 m2 151,958.75

    6. Jendela Type J2 = 3 Unit ~Kusen Aluminium 4" x 1 3/4" 35.48 m1 88,082.50 ~Pas. Kaca Mati 5mm 4.18 m2 151,958.75 ~Pas. Daun Jendela Kaca Rangka Aluminium (0.5x1.25)m2 6 Buah 357,589.71

    7. Jendela Type J3 = 1 Unit ~Kusen Aluminium 4" x 1 3/4" 9.90 m1 88,082.50 ~Pas. Kaca Mati 5mm 1.12 m2 151,958.75 ~Pas. Daun Jendela Kaca Rangka Aluminium (0.5x0.9) m2 2 Buah 290,958.98

    8. Jendela Type J4 = 1 Unit ~Kusen Aluminium 4" x 1 3/4" 14.08 m1 88,082.50 ~Pas. Kaca Mati 5mm 1.77 m2 151,958.75 ~Pas. Daun Jendela Kaca Rangka Aluminium (0.5x1.45) m2 2 Buah 395,664.41

    9. Jendela Type J5 = 1 Unit ~Kusen Aluminium 4" x 1 3/4" 14.52 m1 88,082.50 ~Pas. Kaca Mati 5mm 3.33 m2 151,958.75 ~Pas. Daun Jendela Kaca Rangka Aluminium (0.5x1.35) m2 2 Buah 376,627.06

    10. Jendela Type J6 = 2 Unit ~Kusen Aluminium 4" x 1 3/4" 44.55 m1 88,082.50 ~Pas. Kaca Mati 5mm 6.00 m2 151,958.75 ~Pas. Daun Jendela Kaca Rangka Aluminium (0.5x0.83) m2 8 Buah 276,700.94 ~Pas. Alucopan Rangka Hollow 2.75 m2 560,000.00

    11. Jendela Type J7 = 1 Unit ~Kusen Aluminium 4" x 1 3/4" 15.25 m1 88,082.50 ~Pas. Kaca Mati 5mm 2.11 m2 151,958.75 ~Pas. Daun Jendela Kaca Rangka Aluminium (0.5x0.33) m2 4 Buah 145,708.23 ~Pas. Alucopan Rangka Hollow 1.38 m2 560,000.00

  • NO. URAIAN PEKERJAAN VOL. SAT. HARGA SAT.12. Jendela Type J8 = 1 Unit

    ~Kusen Aluminium 4" x 1 3/4" 12.00 m1 88,082.50 ~Pas. Kaca Mati 5mm 0.91 m2 151,958.75

    13. Jendela Type J9 = 2 Unit ~Kusen Aluminium 4" x 1 3/4" 59.40 m1 88,082.50 ~Pas. Kaca Mati 5mm 17.87 m2 151,958.75 ~Pas. Alucopan Rangka Hollow 1.38 m2 560,000.00

    14. Jendela Type J10 = 1 Unit ~Kusen Aluminium 4" x 1 3/4" 22.15 m1 88,082.50 ~Pas. Kaca Mati 5mm 4.73 m2 151,958.75 ~Pas. Daun Jendela Kaca Rangka Aluminium (0.84x1.05) m2 1 Buah 400,112.37

    15. Jendela Type J11 = 1 Unit ~Kusen Aluminium 4" x 1 3/4" 22.73 m1 88,082.50 ~Pas. Kaca Mati 5mm 5.17 m2 151,958.75 ~Pas. Daun Jendela Kaca Rangka Aluminium (0.84x1.05) m2 1 Buah 400,112.37

    16. Ventilasi Type V1 = 3 Unit ~Kusen Aluminium 4" x 1 3/4" 13.86 m1 88,082.50 ~Pas. Kaca Mati 5mm 2.28 m2 151,958.75

    17. Ventilasi Type V2 = 4 Unit ~Kusen Aluminium 4" x 1 3/4" 10.12 m1 88,082.50 ~Pas. Kaca Mati 5mm 1.38 m2 151,958.75

    18. Ventilasi Type V3 = 2 Unit ~Kusen Aluminium 4" x 1 3/4" 7.55 m1 88,082.50 ~Pas. Kaca Mati 5mm 1.37 m2 151,958.75

    19. Pas. Ventilasi Loster Beton 6 Buah 75,000.00 VI. Pekerjaan Atap dan Plafond1. Rangka Atap Baja Ringan 578.79 m2 180,000.00 2. Penutup Atap Long Spandek 578.79 m2 99,280.00 3. Listplank Woodplank 113.00 m1 173,350.00 4. Pas. Plafond Gypsum Rangka Hollow 329.59 m2 123,914.25 5. Pas. Plafond GRC Rangka Hollow 128.51 m2 122,262.65 6. List Plafond Gypsum 341.36 m1 32,188.10 7. List Plafond Kayu 242.68 m1 15,688.10

    VII. Pekerjaan Pengecatan1. Cat Tembok 1,328.79 m2 32,521.50 2. Cat Plafond 478.58 m2 32,521.50 3. Cat (Listplank, List Plafond Kayu, Pintu/Jendela) 257.24 m2 21,147.50

    VIII. Pekerjaan Lantai1. Urugan Tanah di Bawah Lantai 97.14 m3 109,350.00 2. Urugan Pasir di Bawah Lantai 38.85 m3 109,350.00 3. Rabat Beton Bawah Lantai t=7cm 346.92 m2 40,799.22 4. Rabat Beton Keliling Bangunan t=7cm 41.60 m2 40,799.22 5. Pas. Lantai Keramik 60/60 292.32 m2 174,206.33 6. Pas. Lantai Keramik 40/40 (teras) 36.41 m2 114,831.33 7. Pas. Lantai Keramik 20/20 (WC/KM, Tempat Wudhu) 18.19 m2 108,623.00 8. Pas. Keramik 30/30 (Tangga Teras) 15.95 m2 112,143.00 9. Pas. Keramik Dinding 20/25 (WC/KM) 66.40 m2 110,439.00

    10. Pas. Plint Dinding Keramik (10/60) 200.48 m1 46,540.12 IX. Pekerjaan Instalasi Air1. Kran Air 1/2" 13 Buah 35,000.00 2. Pas. Bak Mandi Fiber 7 Buah 300,000.00 3. Pas. Wastafel 1 Buah 270,000.00 4. Pas. Kloset Duduk 7 Buah 750,000.00 5. Pas. Floor Drain 7 Buah 100,000.00 6. Pipa PVC 1" (Air Bersih) 8.00 m1 6,750.00 7. Pipa PVC 3/4" (Air Bersih) 47.50 m1 6,075.00 8. Pipa PVC 1/2" (Air Bersih) 6.00 m1 3,881.25 9. Pipa PVC 3" (Air Kotor) 54.40 m1 28,687.50

    10. Pompa Air 1.00 Unit 3,000,000.00 11. Septic Tank 3.00 Unit 8,500,000.00

  • NO. URAIAN PEKERJAAN VOL. SAT. HARGA SAT.X. Pekerjaan Instalasi Listrik1. Instalasi Titik Lampu 85 Titik 178,650.00 2. Instalasi Titik Stop Kontak 15 Titik 142,050.00 3. Lampu TL (2x20) Watt 8 Buah 85,000.00 4. Lampu RM (2x18) Watt 17 Buah 500,000.00 5. Lampu Downlight 18Watt 29 Buah 160,000.00 6. Lampu SL 20Watt 29 Buah 55,500.00 7. Stop Kontak 15 Buah 40,000.00 8. Saklar Tunggal 13 Buah 40,000.00 9. Saklar Ganda 12 Buah 40,000.00

    10. Pas. MCB 3 Buah 150,000.00 11. Input Daya dari PLN 1 Ls 10,000,000.00 12. Penangkal Petir 1 Ls 8,000,000.00 XI. Pekerjaan Lain-lain1. Saluran Keliling Gedung

    ~Galian Tanah 21.31 m3 27,375.00 ~Urugan Kembali 4.99 m3 10,150.00 ~Pasir Bawah Pondasi 3.35 m3 109,350.00 ~Pondasi Trassram 1/2 Bata 63.75 m2 66,357.60 ~Plesteran Trassram 93.60 m2 25,770.48 ~Acian Saluran 68.64 m2 14,071.00

    BANGUNAN BI. Pekerjaan Persiapan1. Pembersihan Lokasi & Pas. Bowplank 1.00 Ls 1,500,000.00 II. Pekerjaan Tanah & Pondasi1. Galian Tanah Pondasi (1m) 244.86 m3 27,375.00 2. Urugan Kembali 61.21 m3 10,150.00 3. Pasir Urug Bawah Pondasi 25.17 m3 109,350.00 4. Pas. Batu Kosong 50.33 m3 255,495.00 5. Pondasi Batu Gunung 119.03 m3 466,215.00 III. Pekerjaan Struktur Beton Bertulang1. Sloof S1 (20/30)

    ~Beton K225 12.58 m3 669,837.86 ~Besi Beton 1,955.57 Kg 10,330.00 ~BeKisting 2x Pakai 150.99 m2 84,055.00

    2. Kolom K3 (25/30)~Beton K225 9.72 m3 669,837.86 ~Besi Beton 1,607.66 Kg 10,330.00 ~BeKisting 2x Pakai 142.56 m2 149,865.00

    3. Balok Ringbalk Rb2 (20/35)~Beton K225 17.62 m3 669,837.86 ~Besi Beton 2,914.36 Kg 10,330.00 ~BeKisting 2x Pakai 251.65 m1 154,815.00

    IV. Pekerjaan Dinding dan Plesteran1. Plesteran Beton 1:3 (Kolom, Ringbalk) 363.31 m2 25,770.48 2. Pekerjaan Acian Semen 363.31 m2 14,071.00 V. Pekerjaan Atap dan Plafond1. Rangka Atap Baja Ringan 586.92 m2 180,000.00 2. Penutup Atap Long Spandek 586.92 m2 99,280.00 3. Listplank Woodplank 111.98 m1 173,350.00 4. Pas. Plafond GRC Rangka Hollow 508.29 m2 122,262.65 5. List Plafond Kayu 121.92 m1 15,688.10 VI. Pekerjaan Pengecatan1. Cat Tembok 363.31 m2 32,521.50 2. Cat Plafond 508.29 m2 32,521.50 3. Cat Kayu (Listplank, List Plafond Kayu) 40.91 m2 21,147.50

    VII. Pekerjaan Lantai1. Urugan Tanah di Bawah Lantai 134.67 m3 109,350.00 2. Urugan Pasir di Bawah Lantai 48.10 m3 109,350.00 3. Rabat Beton Bawah Lantai t=7cm 480.95 m2 40,799.22 4. Pas. Lantai Keramik 60/60 404.19 m2 174,206.33

  • NO. URAIAN PEKERJAAN VOL. SAT. HARGA SAT.VIII. Pekerjaan Instalasi Air1. Pipa PVC 3" (Air Kotor) 158.40 m1 28,687.50 2. Septic Tank 3.00 Unit 8,500,000.00 IX. Pekerjaan Instalasi Listrik1. Instalasi Titik Lampu 45 Titik 178,650.00 2. Instalasi Titik Stop Kontak 12 Titik 142,050.00 3. Lampu TL (2x20) Watt 19 Buah 85,000.00 4. Lampu SL 20Watt 26 Buah 55,500.00 5. Stop Kontak 12 Buah 40,000.00 6. Saklar Tunggal 24 Buah 40,000.00 7. Saklar Ganda 4 Buah 40,000.00 8. Pas. MCB 4 Buah 150,000.00 X. Pekerjaan Lain-lain1. Saluran Keliling Gedung

    ~Galian Tanah 31.11 m3 27,375.00 ~Urugan Kembali 7.29 m3 10,150.00 ~Pasir Bawah Pondasi 4.89 m3 109,350.00 ~Pondasi Trassram 1/2 Bata 93.07 m2 66,357.60 ~Plesteran Trassram 136.65 m2 25,770.48 ~Acian Saluran 100.21 m2 14,071.00

  • REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN RUMAH BERSALIN BAHAGIA

    TOTAL HARGA (Rp.)

    BANGUNAN A 43,400,000.00 79,798,756.40 162,935,346.09 96,471,253.80 106,433,819.75 252,579,633.33 64,218,568.06 106,254,587.83 39,201,450.00 52,795,500.00 8,608,887.53 1,012,697,802.78

    BANGUNAN B 1,500,000.00 78,428,875.99 166,667,495.96 14,474,608.89 247,383,138.06 29,210,587.23 110,020,296.55 30,044,100.00 15,001,850.00 12,568,423.94 705,299,376.63 1,717,997,179.41 1,717,990,000.00

    Makassar, April 2010

    Perencana,

    Ir. H. Mursyid Mustafa, M.Si.

  • RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN RUMAH BERSALIN BAHAGIA

    JML. HARGA

    BANGUNAN A

    5,000,000.00 8,400,000.00 30,000,000.00

    5,790,502.80 325,863.00 536,745.24 2,383,944.82 10,986,821.54 47,414,049.88 244,795.30

    976,623.60 2,191,623.13 507,504.20

    415,969.31 820,067.32 231,686.70

    1,061,023.17 1,828,459.58 1,144,248.60

    397,883.69 687,621.00 468,101.70 297,952.56 1,087,269.28

    9,187,918.05 18,661,318.50 11,529,513.35

    4,933,154.87 14,091,566.20 31,534,593.30

    3,684,644.08 6,012,932.68 7,556,792.76

    1,073,080.25 1,774,730.36 2,400,837.30

    5,827,853.11 14,551,902.54 10,799,508.75 19,315,000.00

  • JML. HARGA

    39,903,109.04 29,716,565.42 3,499,865.59 129,913.00 4,524,336.34 18,697,464.41

    2,785,708.80 7,511,607.95 534,894.80 806,400.00 767,780.00 990,000.00

    5,223,204.00 12,223,858.90 866,128.40 1,612,800.00 1,535,560.00 1,320,000.00

    3,808,586.25 6,613,480.91 483,361.03 705,600.00 1,343,615.00 1,155,000.00 4,252,500.00

    5,154,587.90 2,599,588.73

    3,124,726.69 635,126.79 2,145,538.23

    872,016.75 169,695.38 581,917.96

    1,240,201.60 268,985.22 791,328.81

    1,278,957.90 506,511.94 753,254.11

    3,924,075.38 912,481.90 2,213,607.54 1,540,000.00

    1,343,258.13 321,338.05 582,832.92 770,000.00

  • JML. HARGA

    1,056,990.00 139,005.79

    5,232,100.50 2,715,126.00 770,000.00

    1,951,379.71 718,430.58 400,112.37

    2,002,247.35 785,626.74 400,112.37

    1,220,823.45 346,611.83

    891,394.90 209,678.76

    665,251.89 208,809.56 450,000.00

    104,181,353.84 57,461,804.49 19,588,363.13 40,841,086.17 15,712,073.97 10,987,710.54 3,807,241.20

    43,214,383.40 15,564,266.63 5,439,918.04

    10,621,945.10 4,248,429.18 14,153,995.68 1,697,177.88 50,924,540.38 4,180,745.87 1,975,578.74 1,788,680.85 7,333,145.54 9,330,348.63

    455,000.00 2,100,000.00 270,000.00 5,250,000.00 700,000.00 54,000.00 288,562.50 23,287.50 1,560,600.00 3,000,000.00 25,500,000.00

  • JML. HARGA

    15,185,250.00 2,130,750.00 680,000.00 8,500,000.00 4,640,000.00 1,609,500.00 600,000.00 520,000.00 480,000.00 450,000.00 10,000,000.00 8,000,000.00

    583,350.30 50,668.80 366,486.96 4,230,431.10 2,412,116.93 965,833.44

    BANGUNAN B

    1,500,000.00

    6,702,917.94 621,320.70 2,751,792.75 12,859,063.35 55,493,781.25

    8,428,234.84 20,201,060.31 12,691,464.45

    6,510,823.97 16,607,109.62 21,364,754.40

    11,799,528.77 30,105,324.85 38,959,194.75

    9,362,544.24 5,112,064.66

    105,645,560.72 58,269,395.93 19,410,882.89 62,144,540.15 1,912,758.37

    11,815,223.56 16,530,262.21 865,101.47

    14,725,745.81 5,259,194.93 19,622,408.19 70,412,947.60

  • JML. HARGA

    4,544,100.00 25,500,000.00

    8,039,250.00 1,704,600.00 1,615,000.00 1,443,000.00 480,000.00 960,000.00 160,000.00 600,000.00

    851,654.04 73,973.20 535,047.47 6,176,158.22 3,521,536.09 1,410,054.91

  • No. Uraian Pekerjaan Perhitungan Volume Satuan1. Galian Tanah Pondasi

    ~Pondasi Garis Penampang Panjang Jumlah0.973 85.198 1 82.898

    26.4 1 25.68712.325 1 11.99216.4 1 15.95711.2 1 10.8983.9 3 11.3844.4 2 8.5624.7 1 4.5733.9 3 11.3842.7 2 5.2542.4 1 2.3353.4 1 3.3082.4 1 2.3351.9 1 1.8491.9 1 1.8491.6 1 1.5571.9 2 3.6970.9 1 0.876

    0.375 1 0.3650.275 6 1.6050.2875 3 0.839

    209.205 m3~Pondasi Poer P1 Penampang Kedalaman Jumlah

    1.500 1.620 4 9.720 m3~Pondasi Poer P2 Penampang Kedalaman Jumlah

    1.300 1.620 2 4.212 m32. Pasir Urug Bawah Pondasi

    ~Pondasi Garis Penampang Panjang Jumlah0.1 215.011 1 21.50 m3

    ~Pondasi Poer P1 Penampang Tebal Jumlah1.5 0.050 4 0.30 m3

    ~Pondasi Poer P2 Penampang Tebal Jumlah1.300 0.050 2 0.13 m3

    3. Pondasi Batu KosongPondasi Garis Penampang Panjang Jumlah

    0.2 215.011 1 43.00 m34. Pondasi Batu Gunung

    Pondasi Garis Penampang Panjang Jumlah0.473 215.011 1 101.70 m3

    5. Lantai Kerja Poer t=7cm Penampang Tebal Jumlah~Poer P1 1.5 0.07 4 6.00 m2~Poer P2 1.3 0.07 2 2.60 m2

    6. Pondasi Poer P1~Beton K225 Vol. Bawah Vol. Atas Jumlah

    0.252 0.113 4 1.46 m3~Besi Beton Diameter Panjang Kg/m'

    16 54.000 1.58 85.3212 143.000 0.887 126.84

    212.16 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    0.35 4.600 4 6.44 m27. Pondasi Poer P2

    ~Beton K225 Vol. Bawah Vol. Atas Jumlah0.216 0.095 2 0.62 m3

    ~Besi Beton Diameter Panjang Kg/m'16 21.880 1.58 34.5712 50.526 0.887 44.82

    79.39 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    0.35 4.200 2 2.94 m28. Stek Pondasi Poer P1

    ~Beton K225 Penampang Tinggi Jumlah0.24 1.650 4 1.58 m3

    ~Besi Beton Diameter Panjang Kg/m'14 115.200 1.209 139.288 96.000 0.393 37.73

    177.00 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    2.2 1.650 4 14.52 m29. Stek Pondasi Poer P2

  • ~Beton K225 Penampang Tinggi Jumlah0.18 1.650 2 0.59 m3

    ~Besi Beton Diameter Panjang Kg/m'14 43.200 1.209 52.238 36.480 0.393 14.34

    66.57 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    1.8 1.650 2 5.94 m210. Sloof S1 (20/30)

    ~Beton K225 Penampang Panjang Jumlah0.06 228.6105 1 13.71663 m3

    ~Besi Beton Diameter Panjang Jumlah12 1160.053 0.887 1028.96710 464.021 0.62 287.6938 1246.456 0.393 489.857

    1806.517 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    0.6 228.6105 1 137.17 m211. Kolom Praktis (14/14)

    ~Beton K225 Penampang Tinggi Jumlah0.0196 4.05 86 7.3647 m30.0196 3.05 9

    ~Besi Beton Diameter Panjang Jumlah10 1541 0.62 955.428 1040 0.393 408.72

    1364.14 Kg~Bekisting 2x Pakai Lebar Tinggi Jumlah

    0.56 4.05 86 210.42 m20.56 3.05 9

    ~Plesteran Beton Lebar Tinggi Jumlahdlm 0.15 4.05 19 11.54dlm 0.30 4.05 12 14.58luar 0.15 7.55 1 1.13luar 0.15 3.5 38 19.95luar 0.45 3.05 9 12.35

    59.56 m212. Kolom K1 (30/80)

    ~Beton K225 Penampang Tinggi Jumlah0.24 5.730 4 5.50 m3

    ~Besi Beton Diameter Panjang Kg/m'14 379.520 1.209 458.848 313.600 0.393 123.24

    582.08 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    2.2 5.730 4 50.42 m213. Kolom K2 (30/60)

    ~Beton K225 Penampang Tinggi Jumlah0.18 4.450 2 1.60 m3

    ~Besi Beton Diameter Panjang Kg/m'14 111.600 1.209 134.928 93.840 0.393 36.88

    171.80 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    1.8 4.450 2 16.02 m214. Ringbalk Rb1 (15/25)

    ~Beton K225 Penampang Panjang Jumlah0.0375 232.0105 1 8.70 m3

    ~Besi Beton Diameter Panjang Jumlah12 941.642 0.887 835.23645410 470.821 0.62 291.909028 716.432 0.393 281.5575795

    1408.70305 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    0.5 232.0105 1 232.01 m1~Plesteran Beton 116.01 m2

    15. Dinding 1/2 Bata Panjang Tinggi Kosong0.85 3.8 2.25 0.982.15 3.8 0 8.171.55 3.8 3.4875 2.40252.35 3.8 0.93 82.35 3.8 0.93 80.85 3.8 0 3.230.85 3.8 2.25 0.98

  • 1 3.8 2.5 1.30.35 3.8 0 1.331.69 3.8 0 6.4220.35 3.8 0 1.333.85 3.8 8.6625 5.96750.35 3.8 0 1.331.35 3.8 0.385 4.7453.85 3.8 8.6625 5.96750.15 3.8 0 0.571.05 3.8 0.385 3.6050.65 3.8 0 2.472.65 3.8 6.103 3.9671.85 3.8 4.845 2.1852.6 3.8 5.85 4.030.65 3.8 0 2.471.35 3.8 0.385 4.7451.35 3.8 0.385 4.7450.65 3.8 0 2.471.6 3.8 3.6 2.480.85 3.8 2.25 0.980.85 3.8 2.25 0.982.1 3.8 0.73 7.251.1 3.8 0 4.182.85 3.8 4.845 5.9852.1 3.8 0.73 7.250.85 3.8 2.25 0.980.85 3.8 2.25 0.981.85 3.8 4.1625 2.86753.85 3.8 6.4125 8.21750.35 3.8 0 1.331.35 3.8 0.81 4.320.35 3.8 0 1.333.85 3.8 6.4125 8.21750.85 3.8 2.25 0.980.35 3.8 0 1.330.85 3.8 0 3.230.35 3.8 0 1.333.85 3.8 8.3625 6.26750.35 3.8 0 1.330.85 3.8 0 3.230.35 3.8 0 1.331.35 3.8 3.0375 2.09252.85 3.8 4.845 5.9851.85 3.8 3.0375 3.99250.85 3.8 2.25 0.982.85 3.8 5.25 5.58

    1 3.8 2.85 0.951.69 3.8 0 6.4221.775 3.8 0 6.7452.85 3.8 2.85 7.983.15 3.8 0 11.972.35 3.8 0 8.932.35 3.8 0 8.931.85 3.8 2.85 4.182.85 3.8 5.25 5.582.85 3.8 0 10.835.35 3.8 0 20.333.15 3.8 0 11.972.35 3.8 5.25 3.684.275 3.8 0 16.2450.85 3.8 0 3.231.35 3.8 0 5.130.45 3.8 0 1.713.15 3.8 0 11.971.524 3.8 4.3434 1.44781.676 3.8 0 6.36880.85 3.8 1.72 1.510.35 3.8 0 1.331.775 3.8 5.05875 1.686252.35 3.8 0 8.931.925 3.8 4.3434 2.97163.85 3.8 4.3434 10.28661.676 3.8 0 6.36881.35 3.8 0 5.13

  • 3.85 3.8 0 14.631.05 3.8 0 3.990.85 3.8 1.72 1.514.35 3.8 0 16.533.85 3.8 4.3434 10.28664.35 3.8 0 16.531.35 3.8 1.72 3.411.35 3.8 0 5.131.35 3.8 0 5.134.35 3.8 0 16.531.35 3.8 0 5.131.35 3.8 0 5.131.35 3.8 1.72 3.414.1 3.8 4.3434 11.23661.35 3.8 0 5.131.35 3.8 1.72 3.411.35 3.8 0 5.133.85 3.8 4.3434 10.28660.85 3.8 1.72 1.511.35 3.8 0 5.133.35 3.8 0 12.731.65 3.8 0 6.274.1 3.8 4.3434 11.23661.35 3.8 0 5.133.1 3.8 0 11.781.1 3.8 0 4.182.85 3.8 0 10.832.85 3.8 0 10.830.85 3.8 1.72 1.510.35 2.9 0 1.0150.35 2.9 0 1.0150.35 2.9 0 1.0150.35 2.9 0 1.0150.35 2.9 0 1.0150.35 2.9 0 1.0150.35 2.9 0 1.0150.35 2.9 0 1.0150.35 2.9 0 1.015

    Diatas Entrance 12.96624.99975 m2

    16. Plesteran Biasa 1219.6 m217. Plesteran Siar (Dinding Luar) Panjang Tinggi Jumlah

    0.85 0.83 1 0.70552.15 0.83 1 1.78451.55 0.83 1 1.28652.35 0.83 1 1.95050.85 0.83 1 0.70550.85 0.83 1 0.70553.85 0.83 1 3.19552.65 0.83 1 2.19952.60 0.83 1 2.1581.6 0.83 1 1.3280.85 0.83 1 0.70550.85 0.83 1 0.70552.1 0.83 1 1.7431.1 0.83 1 0.913

    0.575 0.83 1 0.477250.625 0.83 1 0.518751.1 0.83 1 0.9130.85 0.83 1 0.70550.85 0.83 1 0.70551.85 0.83 1 1.53553.85 0.83 1 3.19553.85 0.83 1 3.19550.85 0.83 1 0.70551.35 0.83 1 1.12051.85 0.83 1 1.53550.85 0.83 1 0.70552.35 0.83 1 1.9505

    37.35Kolom Teras 54.736

    Kolom Praktis 1.867593.9535 m2

  • 18. Plesteran Skoneng 3.488 m219. Rangka Atap Baja Ringan 166.6089556 m2

    189.062930442.7112847342.7112847348.0355871648.0355871619.1745241311.2225726311.22257263

    578.785 m220. Atap Spandek 578.785 m221. Nok Atap Spandek 22.983957

    5.0149155.0149155.0149155.0149154.46207810.2085986.22466563.938958 m1

    22. Listplank Woodplank 1454.9771454.977

    14621480.00221020.85981020.8598862.0022

    720435.8995435.90068.707868.7078

    815112.999 m1

    23. Plafond Gypsum 61175.8759135337.142

    216824.9898170962.5

    122280.17858669.8224

    155475.1159163350.5041163349.4959

    88350167475167475

    89774.972489775.00078274.978

    957349.9288114312.5

    295702.2103329.591521 m2

    24. Plafond GRC/Calsiboard 1822517324.8088

    222752227518225

    18225.00024975

    KM 14.15248088Overstek Atap 114.3583437

    128.510825 m225. List Plafond Gypsum 1039.9948

    1924.99862060.00021925.0001074.77831405.2217

    16401690.00231689.9977

  • 7839.99911200

    1199.99981200.000

    1640164011901595

    2180.9477341.359401 m1

    26. List Plafond Kayu 540539.9977

    600600540540640

    10565.952

  • 9702.3887242.683384 m1

    27. Keramik 60/60 283.35387368.96925496292.323129 m2

    Keramik 40/40 5900016604.527

    94285.0716194187.5

    36.4077099 m2Keramik20/20 19275

    18374.8088233252332526025192751927533000

    18.1874809 m228. Dinding Keramik 4.6

    4.6005.25.24.64.65.67.1

    66.4000 m229. Pekerjaan Pintu dan Jendela

    ~Pintu P1 = 4 unit Kusen Pintu Aluminium Penampang Panjang Jumlah

    0.007 9.6 4 0.2688 m3 Daun Pintu Panel Kayu Kls I Luas Jumlah

    3.63055 4 14.5222 m2 Pas Kaca mati Luas Jumlah

    0.8 4 3.5200 m2 Kunci Pintu 4.0000 Buah Engsel Pintu 24.0000 Buah~Pintu P2 = 8 unit Kusen kayu kls I Penampang Panjang Jumlah

    0.007 9 8 0.5040 m3 Daun Pintu Panel Kayu Kls I Luas Jumlah

    2.95405 8 23.6324 m2 Pas Kaca mati Luas Jumlah

    0.6477 8 5.6998 m2 Kunci Pintu 8.0000 Buah Engsel Pintu 48.0000 Buah

    Bangunan B1. Galian Tanah Pondasi

    ~Pondasi Garis Penampang Panjang Jumlah0.973 82.2 1 79.981

    22.8 2 44.3693.65 1 3.5515.6 1 5.4495.7 12 66.553

  • 3.85 12 44.953244.855 m3

    ~Pondasi Poer P3 Penampang Kedalaman Jumlah0.765 1.620 32 m3

    2. Pasir Urug Bawah Pondasi~Pondasi Garis Penampang Panjang Jumlah

    0.1 251.650 1 25.17 m3~Pondasi Poer P3 Penampang Tebal Jumlah

    0.765 0.050 32 m33. Pondasi Batu Kosong

    Pondasi Garis Penampang Panjang Jumlah0.2 251.650 1 50.33 m3

    4. Pondasi Batu GunungPondasi Garis Penampang Panjang Jumlah

    0.473 251.650 1 119.03 m35. Lantai Kerja Poer t=7cm Penampang Tebal Jumlah

    ~Poer P3 0.765 0.07 32 m26. Pondasi Poer P3

    ~Beton K225 Vol. Bawah Vol. Atas Jumlah0.12 0.051 32 m3

    ~Besi Beton Diameter Panjang Kg/m'16 210.240 1.58 332.1812 531.520 0.887 471.46

    Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    0.35 3.100 32 m27. Stek Pondasi Poer P3

    ~Beton K225 Penampang Tinggi Jumlah0.075 1.650 32 m3

    ~Besi Beton Diameter Panjang Kg/m'12 460.800 0.887 408.738 353.280 0.393 138.84

    Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    1.1 1.650 32 m28. Sloof S1 (20/30)

    ~Beton K225 Penampang Panjang Jumlah0.05 251.650 1 12.5825 m3

    ~Besi Beton Diameter Panjang Jumlah12 1258.250 0.887 1116.06810 503.300 0.62 312.0468 1342.133 0.393 527.458

    1955.572 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    0.6 251.65 1 150.99 m29. Kolom K3 (25/30)

    ~Beton K225 Penampang Tinggi Jumlah0.075 4.050 32 9.72 m3

    ~Besi Beton Diameter Panjang Kg/m'14 1088.000 1.209 1315.398 743.680 0.393 292.27

    1607.66 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    1.1 4.050 32 142.56 m2~Plesteran Beton 136.82 m2

    10. Ringbalk Rb2 (20/35)~Beton K225 Penampang Panjang Jumlah

    0.07 251.650 1 17.62 m3~Besi Beton Diameter Panjang Jumlah

    12 2264.85 0.887 2008.9219510 503.3 0.62 312.0468 1509.900 0.393 593.3907

    2914.35865 Kg~Bekisting 2x Pakai Lebar Panjang Jumlah

    0.5 251.650 1 251.65 m1~Plesteran Beton 226.49 m2

    11. Atap 2231197.2142395749.258508899.9467508899.9467112225.7263112225.7263

  • 586.919782 m212. Rangka Atap Baja Ringan 586.919782 m213. Nok Atap Spandek 2298.398

    478.575478.575478.5753478.5753446.207846.589 m1

    14. Listplank Woodplank 29251465705

    68.7168.71

    1720.001720.00631.2735631.2735631.2735631.2735111.98 m1

    15. Keramik 60/60 480.950611 m216. Plafond GRC 508.287201 m217. List Plafond Kayu 121.924157 m1

  • Data Berat Besiberat d19/m 2.25 kg/m2berat d16/m 1.58 kg/m1berat d14/m 1.209 kg/m1berat d12/m 0.887 kg/m1berat d10/m 0.62 kg/m1berat d8/m 0.393 kg/m1

  • Bangunan B

  • -----

    B12----

    C1234

    No.56789

    1011121314

  • Kayu Kelas III (Papan) RpAl Coteks RpSungaki 4 mm RpBambu RpKayu Dolken dia 8 - 10/4 meter Rp

    BAHAN LANTAITegel Granit 60x60 cm RpTegel Keramik Warna 60x60 cm RpTegel Keramik Warna 40x40 cm RpTegel Keramik Warna 30x30 cm RpTegel Keramik Warna 20x20 cm RpTegel Keramik Warna 20x25 cm Rp

    BAHAN ATAP / PLAFONDSeng Plat BJLS 0.30 mm RpSeng Plat BJLS 0.28 mm RpSeng Gelombang BJLS 34" BJLS 0.18 mm RpSeng Gelombang BJLS 33" BJLS 0.22 mm Rp

    NAMA BAHAN HARGA BAHANSeng Gelombang BJLS 32" BJLS 0.35 mm RpSeng Gelombang BJLS 28" BJLS 0.30 mm RpGenteng Beton RpAtap Zingalume (motif sirap) RpNok Atap Zik Alume RpAtap Metal Sheel zinkalum (Als, Pan Single, 07 TCT, Alum Embosed) RpNok Atap metal Sheet RpGenteng Keramik RpNok Genteng Beton RpNok Genteng Keramik Rp

  • 2,100,000.00 /m3479,800.00 /M2110,000.00 /Lbr

    15,000.00 /Batang15,000.00 /Batang

    37,500.00 /Buah35,375.00 /Buah

    8,833.33 /Buah4,727.27 /Bh1,960.00 /Bh2,475.00 /Bh

    69,000.00 /Lbr71,200.00 /Lbr45,500.00 /Lbr52,500.00 /Lbr

    HARGA BAHAN SATUAN63,000.00 /Lbr56,000.00 /Lbr

    5,400.00 /Bh377,143.80 /M2

    99,000.00 /M1145,750.00 /M2

    73,370.00 /Bh6,500.00 /Bh4,950.00 /Bh

    15,500.00 /Bh

  • RENCANA ANGGARAN BIAYA (RAB)

  • RENCANA ANGGARAN BIAYA (RAB)

  • JADWAL PELAKSANAAN PEKERJAAN ( Time Schedule)PROYEK PEMBANGUNAN SYAHRUL YASIN LIMPO (SYL) CENTRE

    TAHUN 2010

    No. Uraian Pekerjaan Bobot

    Maret April Mei Juni Juli Agustus

    III IV I II III IV I II III IV I II III IV I II III IV I II III

    I. PEK. PERSIAPAN #REF! #REF!

    II. PEK. TANAH DAN PONDASI #REF! #REF! #REF! #REF!

    III. PEK. STRUKTUR BETON BERTULANG #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

    IV. PEK. DINDING & PLESTERAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

    V. PEK. PINTU & JENDELA #REF! #REF! #REF! #REF!

    VI. PEK. ATAP & PLAFOND #REF! #REF! #REF! #REF! #REF! #REF!

    VII. PEK. PENGECATAN #REF! #REF!

    VIII. PEK. LANTAI #REF! #REF! #REF! #REF! #REF!

    IX. PEK. INTALASI AIR #REF!

    X. PEK. INSTALASI LISTRIK #REF!

    XI. PEK. LAIN-LAIN #REF!

    Rencana #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

    Akumelatif Rencana #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

    Realisasi

    Akumulatif Realisasi

    Deviasi +/-

  • JADWAL PELAKSANAAN PEKERJAAN ( Time Schedule)PROYEK PEMBANGUNAN SYAHRUL YASIN LIMPO (SYL) CENTRE

    TAHUN 2010

    Agustus September

    Keterangan

    IV I II

    #REF!

    #REF! #REF!

    #REF! #REF!

    #REF! #REF!

    #REF!

    #REF! #REF! #REF!

    #REF! #REF! #REF!

    Makassar, Maret 2010Perencana,

    Ir. H. MURSYID MUSTAFA, M. Si.

  • Makassar, Maret 2010Perencana,

    Ir. H. MURSYID MUSTAFA, M. Si.