    ANALISA HARGA SATUAN PEKERJAAN

    PEKERJAAN PEMBANGUNAN RUMAH PRASARANANNYA

    DI LOKASI BUMI PALIR SEJAHTERA PERUM PERUMNAS CABANG SEMARANG I

    H. SATUAN HARGA UPAH

    NO. KOEF. SAT U R A I A N. BAHAN/UPAH BAHAN TENAGA H

    ( Rp ) ( Rp ) ( Rp )

    1 2 3 4 5 6 7

    1 1 M1 NORMALISASI SALURAN1.0000 Ls Alat Bantu 1,000.00 1,000.00

    0.0750 Uph Mandor 40,000.00 - 3,000.00

    0.5000 Uph Tukang batu 37,000.00 - 18,500.00

    0.7500 Uph Pekerja 35,000.00 - 26,250.00

    JUMLAH 1,000.00 47,750.00

    Dibulatkan

    2 1 M2 PAS.BATU BATA KOSONG

    80.0000 Bh Batu bata 350.00 28,000.00

    0.0100 Uph Mandor 40,000.00 - 400.00

    0.0500 Uph Tukang batu 37,000.00 - 1,850.00

    0.1000 Uph Pekerja 35,000.00 - 3,500.00

    JUMLAH 28,000.00 5,750.00

    Dibulatkan

    3 1 M3 BATU KOSONG (Memasukkan ke Sumur Resapan)

    1.1000 M3 Batu kali bulat 120,000.00 132,000.00

    0.1250 Uph Mandor 40,000.00 5,000.00

    0.2500 Uph Pekerja 35,000.00 8,750.00

    JUMLAH 132,000.00 13,750.00

    Dibulatkan

    4 1 M3 URUGAN SIRTU & PEMADATAN

    1.20 M3 Sirtu 72,500.00 87,000.00

    1.0000 Ls Gilas Pemadatan 10,000.00 10,000.00

    0.0250 Uph Mandor 40,000.00 1,000.00

    0.25 Upah Pekerja 35,000.00 8,750.00

    JUMLAH 87,000.00 19,750.00

    Dibulatkan

    1 m2 Urugan Sirtu tebal 20 cm =

    Dibulatkan

    5 1 M2 PEKERJAAN JALAN PAVING TEBAL 6 CM

    0.0600 m3 Pasir Urug & pengisi 60,000.00 3,600.00

    1.0000 m2 Paving tebal 6 cm 35,000.00 35,000.00

    1.0000 Ls Upah Pasang 3,000.00 3,000.00

    JUMLAH 38,600.00 3,000.00

    Dibulatkan

    6 1 M' PEKERJAAN JALAN PAVING DMJ 6(lebar Perkerasan 3 m)

    0.6000 m3 Galian Tanah 15,600.00 9,360.00

    2.8000 m2 Urugan Sirtu t = 20 cm 21,350.00 59,780.00

    2.8000 m2 Paving tebal 6 cm 41,600.00 116,480.00

    4.0000 Bh Beton Kanstein uk. 20 x 30 x 50 cm 12,000.00 48,000.00

    1.0000 Ls Pembersihan & Perataan 12,000.00 12,000.00

    JUMLAH 224,260.00 21,360.00

    Dibulatkan

    7 1 M2 PEKERJAAN JALAN PAVING TEBAL 8 CM

    0.0600 m3 Pasir Urug & pengisi 60,000.00 3,600.00

    1.0000 m2 Paving tebal 8 cm 45,000.00 45,000.00

    1.0000 Ls Upah Pasang 3,000.00 3,000.00

    JUMLAH 48,600.00 3,000.00

    Dibulatkan

    7 1 M' PEKERJAAN JALAN PAVING DMJ 7 (lebar Perkerasan 4 m)

    0.6000 m3 Galian Tanah 15,600.00 9,360.00

    3.1000 m2 Urugan Sirtu t = 20 cm 21,350.00 66,185.00

    3.1000 m2 Paving tebal 8 cm 51,600.00 159,960.00

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    2/50

    1 2 3 4 5 6 7

    8 1 M' PEKERJAAN JALAN PAVING DMJ 8 (lebar Perkerasan 4 m)

    0.8000 m3 Galian Tanah 15,600.00 12,480.00

    3.8000 m2 Urugan Sirtu t = 20 cm 21,350.00 81,130.00

    3.8000 m2 Paving tebal 8 cm 51,600.00 196,080.00

    4.0000 bh Beton Kanstein uk. 20 x 30 x 50 cm 12,000.00 48,000.00

    1.0000 Ls Pembersihan & Perataan 12,000.00 12,000.00

    JUMLAH 325,210.00 24,480.00

    Dibulatkan

    9 1 M' PEKERJAAN JALAN PAVING DMJ 10 (lebar Perkerasan 5 m)

    1.0000 m3 Galian Tanah 15,600.00 15,600.00

    4.8000 m2 Urugan Sirtu t = 20 cm 21,350.00 102,480.00

    4.8000 m2 Paving tebal 8 cm 51,600.00 247,680.00

    4.0000 bh Beton Kanstein uk. 20 x 30 x 50 cm 12,000.00 48,000.00

    1.0000 Ls Pembersihan & Perataan 12,000.00 12,000.00

    JUMLAH 398,160.00 27,600.00

    Dibulatkan

    10 1 M' PEKERJAAN JALAN PAVING DMJ 12 (lebar Perkerasan 6 m)

    1.2000 m3 Galian Tanah 15,600.00 18,720.00

    5.8000 m2 Urugan Sirtu t = 20 cm 21,350.00 123,830.00

    5.8000 m2 Paving tebal 8 cm 51,600.00 299,280.00

    4.0000 bh Beton Kanstein uk. 20 x 30 x 50 cm 12,000.00 48,000.00 1.0000 Ls Pembersihan & Perataan 4,000.00 4,000.00

    JUMLAH 471,110.00 22,720.00

    Dibulatkan

    11 1 M' PEK. SALURAN TYPE S.1 ( Pas. Dinding. 15 Cm )

    0.3450 M3 Galian Tanah 15,600.00 5,382.00

    0.0200 M3 Urugan Pasir 60,000.00 1,200.00

    0.2100 M3 Pas Batu belah kali 1 : 4 439,870.00 92,372.70

    0.3400 M2 Plesteran Ban-banan 1:3 24,480.00 8,323.20

    0.1000 M' Sulingan Pipa PVC 1" pj. 25 Cm 12,500.00 1,250.00

    0.0000 Ls Perapihan berm 1,000.00 -

    JUMLAH 108,527.90 -

    Dibulatkan

    ` 12 1 M' PEK. SALURAN TYPE S.2 ( Pas. Dinding. 15 Cm )

    0.5063 M3 Galian Tanah 15,600.00 7,897.50

    0.0275 M3 Urugan Pasir 60,000.00 1,650.00

    0.2355 M3 Pas Batu belah kali 1 : 4 439,870.00 103,589.39

    0.6000 M2 Plesteran Ban-banan 1:3 24,480.00 14,688.00

    0.4000 Ls Sulingan Pipa PVC 1" pj. 25 Cm 12,500.00 5,000.00

    1.0000 Ls Perapihan berm 1,000.00 1,000.00

    JUMLAH 125,927.39 7,897.50

    Dibulatkan

    13 1 M' PEK. SALURAN TYPE S.3 ( Pas. Dinding. 15 Cm )

    0.6588 M3 Galian Tanah 15,600.00 10,276.50

    0.0325 M3 Urugan Pasir 60,000.00 1,950.00

    0.2925 M3 Pas Batu kali 1 : 4 439,870.00 128,661.98

    0.5000 M2 Plesteran Ban-banan 1:3 24,480.00 12,240.00

    0.2500 Ls Sulingan Pipa PVC 1" pj. 25 Cm 12,500.00 3,125.00

    1.0000 Ls Perapihan berm 1,000.00 1,000.00

    JUMLAH 146,976.98 10,276.50

    Dibulatkan

    14 1 M' PEK. SALURAN TANAH TYPE S.3

    0.6588 M3 Galian Tanah 15,600.00 10,276.50

    1.0000 Ls Perapihan galian & Berm 3,500.00 3,500.00

    JUMLAH 3,500.00 10,276.50

    Dibulatkan

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    3/50

    1 2 3 4 5 6 7

    15 1 M' PEK. TERJUNAN SALURAN TYPE S.3 (Pas didnding 20 cm )

    0.9000 M3 Galian Tanah 15,600.00 14,040.00

    0.0500 M3 Urugan Pasir 60,000.00 3,000.00

    0.6100 M3 Pas Batu kali 1 : 4 439,870.00 268,320.70

    1.0800 M2 Plesteran Ban-banan 1:3 24,480.00 26,438.40

    0.2500 Ls Sulingan Pipa PVC 1" pj. 25 Cm 1,000.00 250.00

    1.0000 Ls Perapihan berm 1,000.00 1,000.00

    JUMLAH 299,009.10 14,040.00

    Dibulatkan

    16 1 M' PEK. SALURAN TYPE S.4 ( Pas. Dinding. 15 Cm )

    0.8750 M3 Galian Tanah 15,600.00 13,650.00

    0.0600 M3 Urugan Pasir 60,000.00 3,600.00

    0.4600 M3 Pas Batu kali 1 : 4 439,870.00 202,340.20

    0.6000 M2 Plesteran Ban-banan 1:3 24,480.00 14,688.00

    0.2500 Ls Sulingan Pipa PVC 1" pj. 25 Cm 1,000.00 250.00

    1.0000 Ls Perapihan berm 1,000.00 1,000.00

    JUMLAH 221,878.20 13,650.00

    Dibulatkan

    17 1 M' PEK. TERJUNAN SALURAN TYPE S.5 ( Pas. Dinding. 20 Cm )

    1.2000 M3 Galian Tanah 15,600.00 18,720.00

    0.0600 M3 Urugan Pasir 60,000.00 3,600.00 0.7100 M3 Pas Batu kali 1 : 4 439,870.00 312,307.70

    1.0800 M2 Plesteran Ban-banan 1:3 24,480.00 26,438.40

    0.2500 Ls Sulingan Pipa PVC 1" pj. 25 Cm 1,000.00 250.00

    1.0000 Ls Perapihan berm 1,000.00 1,000.00

    JUMLAH 343,596.10 18,720.00

    Dibulatkan

    18 1 M' PEK. GORONG-GORONG TYPE GR.1

    1.1480 M3 Galian Tanah 15,600.00 17,908.80

    0.0700 M3 Urugan Pasir 60,000.00 4,200.00

    0.5500 M3 Pas Batu kali 1 : 4 439,870.00 241,928.50

    1.3000 M2 Pleteran 1:3 24,480.00 31,824.00

    0.2520 M2 Urugan Tanah Kembali 7,480.00 1,884.96

    0.0960 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 288,840.00 1.0000 Ls Perapihan berm 2,000.00 2,000.00

    JUMLAH 570,677.46 17,908.80

    Dibulatkan

    19 1 M' PEK. GORONG-GORONG TYPE GR.2

    1.3500 M3 Galian Tanah 15,600.00 21,060.00

    0.0750 M3 Urugan Pasir 60,000.00 4,500.00

    0.6300 M3 Pas Batu kali 1 : 4 439,870.00 277,118.10

    1.5000 M2 Pleteran 1:3 24,480.00 36,720.00

    0.2940 M2 Urugan Tanah Kembali 7,480.00 2,199.12

    0.0900 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 270,787.50

    1.0000 Ls Perapihan berm 2,000.00 2,000.00

    JUMLAH 593,324.72 21,060.00

    Dibulatkan

    27 1 M'. PEK. GORONG-GORONG TYPE GR.3

    1.6320 M3 Galian Tanah 15,600.00 25,459.20

    0.0800 M3 Urugan Pasir 60,000.00 4,800.00

    0.7100 M3 Pas Batu kali 1 : 4 439,870.00 312,307.70

    1.9000 M2 Pleteran 1:3 24,480.00 46,512.00

    0.3360 M2 Urugan Tanah Kembali 7,480.00 2,513.28

    0.1200 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 361,050.00

    1.0000 Ls Perapihan berm 2,000.00 2,000.00

    JUMLAH 729,182.98 25,459.20

    Dibulatkan

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    4/50

    1 2 3 4 5 6 7

    20 1 BH PEK. GORONG-GORONG TYPE GR.1 DMJ 5 M'

    3.6000 BH Pekerjaan GR 1 588,580.00 2,118,000.00

    21 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 5 M'

    3.4000 BH Pekerjaan GR 2 754,640.00 2,565,000.00

    22 1 BH PEK. GORONG-GORONG TYPE GR.1 DMJ 6 M'

    4.3000 BH Pekerjaan GR 1 588,580.00 2,530,000.00

    23 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 6 M'

    4.6000 M' Pekerjaan GR 2 614,380.00 2,826,000.00

    24 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 7 M'

    5.0000 M' Pekerjaan GR 2 614,380.00 3,071,000.00

    26 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 8 M'

    6.0000 M' Pekerjaan GR 2 614,380.00 3,686,000.00

    27 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 12 M'

    7.5000 M' Pekerjaan GR 2 614,380.00 4,607,000.00

    27 1 BH PEK. GORONG-GORONG TYPE GR.3 DMJ 86.2000 M' Pekerjaan GR 3 754,640.00 4,678,768.00

    28 1 BH. JEMBATAN MASUK PLAT BETON BERTULANG 1:2:3 (S1)

    0.0448 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 134,792.00

    Dibulatkan

    29 1 BH. JEMBATAN MASUK PLAT BETON BERTULANG 1:2:3 (S2)

    0.0512 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 154,048.00

    Dibulatkan

    30 1 BH. JEMBATAN MASUK PLAT BETON BERTULANG 1:2:3 (S3)

    0.0648 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 194,967.00

    Dibulatkan

    31 1 M2. PEK. GEBALAN RUMPUT

    0.1800 M3 Urugan Tanah digemburkan 69,750.00 12,555.00

    1.0000 M2 Gebalan rumput gajah 7,500.00 7,500.00

    1.0000 Ls Pemupukan 2,000.00 2,000.00

    1.0000 Ls Perapihan berm 500.00 500.00

    JUMLAH 22,555.00 -

    Dibulatkan

    32 1 BH SUMUR RESAPAN t = 1,5 m

    1.9311 M3 Galian Tanah 15,600.00 30,125.16

    0.4760 M3 Urugan Tanah kembali 7,480.00 3,560.48

    3.2000 m2 Pas. batu-bata ad. 1 : 5 56,380.00 180,416.00

    9.0000 Bh Suling 2 PVC 1 1/4" 17,500.00 157,500.00

    0.7041 M3 batu kali kosong 145,750.00 102,629.13

    1.0000 kg Pas. lapisan ijuk 7,500.00 7,500.00

    0.0471 M3 Tutup Beton Bertulang 3,008,750.00 141,712.13

    JUMLAH 440,545.13 182,897.77

    Dibulatkan

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    5/50

    1 2 3 4 5 6 7

    33 1 BH. PEK . PENANAMAN POHON PELINDUNG

    0.1250 M3 Galian Tanah 15,600.00 1,950.00

    0.0750 M3 Urugan Tanah Kembali 7,480.00 561.00

    0.0250 M3 Pupuk Kandang 75,000.00 1,875.00

    1.0000 Bh. Pohon Angsana t. 1,5 m' 25,000.00 25,000.00

    1.0000 Ls Steger / Pengaman 2,000.00 2,000.00

    1.0000 Ls Upah 2,200.00 2,200.00

    JUMLAH 28,875.00 4,711.00

    Dibulatkan

    34 1 BH. PEK . PAPAN NAMA JALAN

    0.0450 M3 Galian Tanah 15,600.00 702.00

    0.0030 M3 Urugan pasir 60,000.00 180.00

    0.0720 M3 Cor beton 1:3:5 469,200.00 33,782.40

    0.0145 M3 Urugan Tanah Kembali 7,480.00 108.46

    1.0000 Bh. Papan Nama Jalan 200,000.00 200,000.00

    JUMLAH 233,962.40 810.46

    Dibulatkan

    35 1 M3 PEKERJAAN CUT TANAH KERAS

    0.0386 Jam Boldozer D5 250,000 9,638.55

    0.0634 Jam Excavator PC 200 225,000 14,267.60

    0.0096 Jam Mandor 40,000 385.54 0.0386 Jam Pekerja 35,000 1,349.40

    1.0000 Ls Alat bantu 75 75.00

    JUMLAH 23,906.15 1,809.94

    Dibulatkan

    36 1 M3 PEKERJAAN FILL

    0.0193 Jam Boldozer D5 250,000 4,819.28

    0.0843 Jam Dump Truck 60,000 5,060.24

    0.0386 Jam Pekerja 35,000 1,349.40

    0.0096 Jam Mandor 40,000 385.54

    1.0000 Ls Alat bantu 50 50.00

    JUMLAH 9,879.52 1,784.94

    Dibulatkan

    1.2000 m3 Tanah Urug 50,000 60,000.00 JUMLAH 69,879.52 2,220.48

    Dibulatkan

    \\vboxsrv\conversion_tmp\scratch_4\[146701492.xls.ms_office.xls]RS 36 Cempaka

    Semarang, Maret 2011

    Ass Man Produksi & PLPP

    AMAT IMRON

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    6/50

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    7/50

    1 2 3 4 5 6 7

    10 1 M2 PERATAAN TANAH

    1.0000 Unit Alat bantu 500.00 500.00

    0.0125 Uph Mandor 40,000.00 500.00

    0.0400 Uph Pekerja 35,000.00 1,400.00

    JUMLAH 500.00 1,900.00

    Dibulatkan

    11 1 M3 URUGAN SIRTU BAWAH LANTAI

    1.1000 M3 Sirtu 72,500.00 79,750.00 -

    0.0250 Uph Mandor 40,000.00 - 1,000.00

    0.2500 Uph Pekerja 35,000.00 - 8,750.00

    JUMLAH 79,750.00 9,750.00

    Dibulatkan

    12 1 M3 URUGAN SIRTU & PEMADATAN

    1.2000 M3 Sirtu 72,500.00 87,000.00 -

    1.0000 Ls Gilas Pemadatan 10,000.00 - 10,000.00

    0.0250 Uph Mandor 40,000.00 - 1,000.00

    0.2500 Upah Pekerja 35,000.00 - 8,750.00

    JUMLAH 87,000.00 19,750.00

    Dibulatkan

    0.2000 m3 1 M2 URUGAN SIRTU TEBAL 20 Cm 106,750.00

    Dibulatkan

    13 1 M3 URUGAN PADAS BAWAH LANTAI

    1.2000 M3 Padas urug 45,000.00 54,000.00 -

    0.0250 Uph Mandor 40,000.00 - 1,000.00

    0.2500 Uph Pekerja 35,000.00 - 8,750.00

    JUMLAH 54,000.00 9,750.00

    Dibulatkan

    14 1 M3 URUGAN PASIR BAWAH LANTAI & PONDASI

    1.2000 M3 Pasir urug 60,000.00 72,000.00 -

    0.0100 Uph Mandor 40,000.00 - 400.00

    0.3000 Uph Pekerja 35,000.00 - 10,500.00

    JUMLAH 72,000.00 10,900.00

    Dibulatkan

    15 1 M3 PAS.BATUKALI AD. 1 Pc : 5 Ps

    3.4000 Zak PC (Portland Cement ) 40 kg 45,000.00 153,000.00 -

    1.1000 M3 Batu kali 120,000.00 132,000.00 -

    0.5440 M3 Pasir pasang 90,000.00 48,960.00 -

    0.0750 Uph Mandor 40,000.00 - 3,000.00

    0.6000 Uph Tukang batu 37,000.00 - 22,200.00

    1.5000 Uph Pekerja 35,000.00 - 52,500.00

    JUMLAH 333,960.00 77,700.00 Dibulatkan

    16 1 M3 PAS.BATUKALI AD. 1 Pc : 4 Ps

    4.0750 Zak PC (Portland Cement ) 40 kg 45,000.00 183,375.00 -

    1.1000 M3 Batu kali 120,000.00 132,000.00 -

    0.5200 M3 Pasir pasang 90,000.00 46,800.00 -

    0.0750 Uph Mandor 40,000.00 - 3,000.00

    0.6000 Uph Tukang batu 37,000.00 - 22,200.00

    1.5000 Uph Pekerja 35,000.00 - 52,500.00

    JUMLAH 362,175.00 77,700.00

    Dibulatkan

    17 1 M3 PAS. BATU KALI ad. 1 Pc : 3 Kp : 10 Ps1.5250 Zak PC (Portland Cement ) 40 kg 45,000.00 68,625.00 -

    1.1000 M3 Batu kali 120,000.00 132,000.00 -

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    8/50

    1 2 3 4 5 6 7

    18 1 M3 PAS. PONDASI BATU KALI KOSONG

    1.1000 M3 Batu kali 120,000.00 132,000.00 -

    0.3000 M3 Pasir Urug 60,000.00 18,000.00 -

    0.0390 Uph Mandor 40,000.00 - 1,560.00

    0.3900 Uph Tukang batu 37,000.00 - 14,430.00

    0.7800 Uph Pekerja 35,000.00 - 27,300.00

    JUMLAH 150,000.00 43,290.00

    Dibulatkan

    19 1 M2 PAS. BATU BATA TEBAL BATA AD. 1 Pc : 3 Ps

    0.3593 Zak PC (Portland Cement ) 40 kg 45,000.00 16,166.25 -

    70.0000 Bh Batu bata uk. 5 x 11 x 22 cm 350.00 24,500.00 -

    0.0430 M3 Pasir pasang 90,000.00 3,870.00 -

    0.0150 Uph Mandor 40,000.00 - 600.00

    0.1000 Uph Tukang batu 37,000.00 - 3,700.00

    0.3200 Uph Pekerja 35,000.00 - 11,200.00

    JUMLAH 44,536.25 15,500.00

    Dibulatkan

    20 1 M2 PAS. BATU BATA TEBAL BATA AD. 1 Pc : 5 Ps

    0.2680 Zak PC (Portland Cement ) 40 kg 45,000.00 12,060.00 -

    70.0000 Bh Batu bata uk. 5 x 11 x 22 cm 350.00 24,500.00 -

    0.0480 M3 Pasir pasang 90,000.00 4,320.00 -

    0.0150 Uph Mandor 40,000.00 - 600.00

    0.1000 Uph Tukang batu 37,000.00 - 3,700.00

    0.3200 Uph Pekerja 35,000.00 - 11,200.00

    JUMLAH 40,880.00 15,500.00

    Dibulatkan

    21 1 M' PAS. PONDASI TERAS ROLAAG BATU BATA TEBAL BATA AD. 1 Pc : 3 Ps

    0.0330 M3 Galian Tanah 15,600.00 - 514.80

    0.2000 M2 Pas. Batu Bata Ad. 1 Pc : 3 Ps 60,030.00 12,006.00

    JUMLAH 12,006.00 514.80

    Dibulatkan

    22 1 M2 PAS.BATUBATA TEBAL AD. 1 Pc : 3 Kpr : 10 Ps

    0.1125 Zak PC (Portland Cement ) 40 kg 45,000.00 5,062.50 -

    70.0000 Bh Batu bata uk. 5 x 11 x 22 cm 350.00 24,500.00 -

    0.0500 M3 Pasir pasang 90,000.00 4,500.00 -

    0.0150 M3 Kapur 220,000.00 3,300.00 -

    0.0250 Uph Mandor 40,000.00 - 1,000.00

    0.1000 Uph Tukang batu 37,000.00 - 3,700.00

    0.3200 Uph Pekerja 35,000.00 - 11,200.00

    JUMLAH 37,362.50 15,900.00

    Dibulatkan

    23 1 M2 PAS. DINDING CONBLOCK 1:5

    0.0816 zak PC (Portland Cement ) 40 kg 45,000.00 3,672.00 -

    12.5000 bh Conblock 2,800.00 35,000.00 -

    0.0150 m3 Pasir pasang 90,000.00 1,350.00 -

    0.0150 upah Mandor 40,000.00 - 600.00

    0.1650 upah Tukang batu 37,000.00 - 6,105.00

    0.1500 upah Pekerja 35,000.00 - 5,250.00

    JUMLAH 40,022.00 11,955.00

    Dibulatkan

    24 1 M' PAS. PONDASI TERAS ROLAAG CONBLOCK AD. 1 Pc : 5 Ps

    0.0330 M3 Galian Tanah 15,600.00 - 514.80

    0.2000 M2 Pas. Conblock Ad. 1 Pc : 5 Ps 51,970.00 10,394.00 - JUMLAH 10,394.00 514.80

    Dibulatkan

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    9/50

    1 2 3 4 5 6 7

    26 1 M2 PLESTERAN DINDING AD. 1 Pc : 3 Ps, TEBAL 15 MM

    0.1620 Zak PC (Portland Cement ) 40 kg 45,000.00 7,290.00 -

    0.0190 M3 Pasir pasang 90,000.00 1,710.00 -

    0.0120 OH Mandor 40,000.00 - 480.00

    0.1100 OH Tukang batu 37,000.00 - 4,070.00

    0.1200 OH Pekerja 35,000.00 - 4,200.00

    JUMLAH 9,000.00 8,750.00

    Dibulatkan

    27 1 M2 PLESTERAN DINDING AD. 1 Pc : 4 Ps, TEBAL 15 MM

    0.1300 Zak PC (Portland Cement ) 40 kg 45,000.00 5,850.00 -

    0.0200 M3 Pasir pasang 90,000.00 1,800.00 -

    0.0200 OH Mandor 40,000.00 - 800.00

    0.1500 OH Tukang batu 37,000.00 - 5,550.00

    0.2000 OH Pekerja 35,000.00 - 7,000.00

    JUMLAH 7,650.00 13,350.00

    Dibulatkan

    28 1 M2 PLESTERAN DINDING AD. 1 Pc : 5 Ps, TEBAL 15 MM

    0.1080 Zak PC (Portland Cement ) 40 kg 45,000.00 4,860.00 -

    0.0220 M3 Pasir pasang 90,000.00 1,980.00 -

    0.0200 OH Mandor 40,000.00 - 800.00

    0.1500 OH Tukang batu 37,000.00 - 5,550.00

    0.2000 OH Pekerja 35,000.00 - 7,000.00

    JUMLAH 6,840.00 13,350.00

    Dibulatkan

    29 1 M2 PLESTERAN DINDING AD. 1 Pc : 3 Kp : 10 Ps, TEBAL 15 MM

    0.0460 Zak PC (Portland Cement ) 40 kg 45,000.00 2,070.00 -

    0.0060 M3 Kapur 220,000.00 1,320.00 -

    0.0140 M3 Pasir pasang 90,000.00 1,260.00 -

    0.0200 OH Mandor 40,000.00 - 800.00

    0.1500 OH Tukang batu 37,000.00 - 5,550.00

    0.2000 OH Pekerja 35,000.00 - 7,000.00

    JUMLAH 4,650.00 13,350.00

    Dibulatkan

    30 1 M2 PLESTERAN DINDING AD. 1 Pc : 3 Ps, TEBAL 20 MM

    0.2700 Zak PC (Portland Cement ) 40 kg 45,000.00 12,150.00 -

    0.0260 M3 Pasir pasang 90,000.00 2,340.00 -

    0.0075 Uph Mandor 40,000.00 - 300.00

    0.1200 Uph Tukang batu 37,000.00 - 4,440.00

    0.1500 Uph Pekerja 35,000.00 - 5,250.00

    JUMLAH 14,490.00 9,990.00

    Dibulatkan

    31 1 M2 PLESTERAN DINDING AD. 1 Pc : 4 Ps, TEBAL 20 MM

    0.2170 Zak PC (Portland Cement ) 40 kg 45,000.00 9,765.00 -

    0.0280 M3 Pasir pasang 90,000.00 2,520.00 -

    0.0075 Uph Mandor 40,000.00 - 300.00

    0.1200 Uph Tukang batu 37,000.00 - 4,440.00

    0.1500 Uph Pekerja 35,000.00 - 5,250.00

    JUMLAH 12,285.00 9,990.00

    Dibulatkan

    32 1 M2 PLESTERAN DINDING AD. 1 Pc : 5 Ps, TEBAL 20 MM

    0.1823 Zak PC (Portland Cement ) 40 kg 45,000.00 8,201.25 -

    0.0280 M3 Pasir pasang 90,000.00 2,520.00 -

    0.0075 Uph Mandor 40,000.00 - 300.00 0.1200 Uph Tukang batu 37,000.00 - 4,440.00

    0.1500 Uph Pekerja 35,000.00 - 5,250.00

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    10/50

    1 2 3 4 5 6 7

    33 1 M2 PLESTERAN DINDING AD. 1 Pc : 3 Kp : 10 Ps, TEBAL 20 MM

    0.0818 Zak PC (Portland Cement ) 40 kg 45,000.00 3,678.75 -

    0.0080 M3 Kapur 220,000.00 1,760.00 -

    0.0187 M3 Pasir pasang 90,000.00 1,683.00 -

    0.0075 Uph Mandor 40,000.00 - 300.00

    0.1200 Uph Tukang batu 37,000.00 - 4,440.00

    0.1500 Uph Pekerja 35,000.00 - 5,250.00

    JUMLAH 7,121.75 9,990.00

    Dibulatkan

    34 1 M2 PLESTERAN BAN-BANAN AD. 1 Pc : 5 Ps, LEBAR 10 CM

    0.0125 Zak PC (Portland Cement ) 40 kg 45,000.00 562.50 -

    0.0013 M3 Pasir pasang 90,000.00 117.00 -

    0.0030 Uph Mandor 40,000.00 - 120.00

    0.3800 Uph Tukang batu 37,000.00 - 14,060.00

    0.0570 Uph Pekerja 35,000.00 - 1,995.00

    JUMLAH 679.50 16,175.00

    Dibulatkan

    35 1 M2 ACIAN

    0.0813 Zak PC (Portland Cement ) 40 kg 45,000.00 3,656.25 -

    0.0075 Uph Mandor 40,000.00 - 300.00

    0.0750 Uph Tukang batu 37,000.00 - 2,775.00

    0.0500 Uph Pekerja 35,000.00 - 1,750.00

    JUMLAH 3,656.25 4,825.00

    Dibulatkan

    36 1 M3 MEMBUAT BETON AD. 1 Pc : 3 Ps : 5 KrL

    5.4500 Zak PC (Portland Cement ) 40 kg 45,000.00 245,250.00 -

    0.5200 M3 Pasir beton 120,000.00 62,400.00 -

    0.8700 M3 Koral beton 105,000.00 91,350.00 -

    0.0800 Uph Mandor 40,000.00 - 3,200.00

    0.2500 Uph Tukang batu 37,000.00 - 9,250.00

    1.6500 Uph Pekerja 35,000.00 - 57,750.00

    JUMLAH 399,000.00 70,200.00

    Dibulatkan

    37 1 M2 PAS. LANTAI BETON AD. 1 Pc : 3 Ps : 5 KrL Tbl. 5 Cm (DI ACI)

    0.0500 M3 Beton Rabat ad. 1 Pc : Ps : 5 Krl 469,200.00 23,460.00

    1.0000 M2 Acian 8,480.00 8,480.00

    JUMLAH 31,940.00 -

    Dibulatkan

    38 1 M2 PAS. BETON AD. 1 Pc : 3 Ps : 5 KrL Tbl. 6 Cm

    0.0800 M3 Beton Rabat ad. 1 Pc : Ps : 5 Krl 469,200.00 37,536.00

    Dibulatkan

    39 1 M2 PAS. BETON AD. 1 Pc : 3 Ps : 5 KrL Tbl. 8 Cm

    0.0800 M3 Beton Rabat ad. 1 Pc : Ps : 5 Krl 469,200.00 37,536.00

    Dibulatkan

    40 1 M3 MEMBUAT BETON BERTULANG AD. 1 Pc : 2 Ps : 3 KrL

    8.4000 Zak PC (Portland Cement ) 40 kg 45,000.00 378,000.00 -

    0.5400 M3 Pasir beton 120,000.00 64,800.00 -

    0.8100 M3 Koral beton 105,000.00 85,050.00 -

    1.0000 Uph Mandor 40,000.00 - 40,000.00

    0.3500 Uph Tukang batu 37,000.00 - 12,950.00

    2.0000 Uph Pekerja 35,000.00 - 70,000.00

    JUMLAH 527,850.00 122,950.00 Dibulatkan

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    11/50

    1 2 3 4 5 6 7

    42 PEKERJAAN PEMBESIAN SLOOF 120 KG BESI ( 8 mm & 6 mm)

    120.0000 KG Besi beton (polos/ulir) 14,560.00 1,747,200.00 -

    JUMLAH 1,747,200.00 -

    Dibulatkan

    43 PEKERJAAN PEMBESIAN RING BALK 120 KG BESI ( 7 mm & 4 mm)

    120.0000 KG Besi beton (polos/ulir) 14,560.00 1,747,200.00 -

    JUMLAH 1,747,200.00 -

    Dibulatkan

    44 PEKERJAAN PEMBESIAN KOLOM 140 KG BESI ( 7 mm & 4 mm)

    140.0000 KG Besi beton (polos/ulir) 14,560.00 2,038,400.00 -

    JUMLAH 2,038,400.00 -

    Dibulatkan

    45 PEKERJAAN PEMBESIAN JEMBATAN MASUK RUMAH 40 KG BESI ( 8 mm & 6 mm)

    40.0000 KG Besi beton (polos/ulir) 14,560.00 582,400.00 -

    JUMLAH 582,400.00 -

    Dibulatkan

    46 PEKERJAAN PEMBESIAN TUTUP BEERPUT 40 KG BESI ( 8 mm & 6 mm)

    40.0000 KG Besi beton (polos/ulir) 14,560.00 582,400.00 -

    JUMLAH 582,400.00 -

    Dibulatkan

    47 1 M2 PAPAN BEGESTING

    0.1000 Ltr Minyak Bekesting 4,500.00 450.00 -

    0.3000 Kg Paku biasa uk. 2" - 5" 9,000.00 2,700.00 -

    0.0440 M3 Kayu Bekisting 900,000.00 39,600.00 -

    0.0260 OH Mandor 40,000.00 1,040.00

    0.2600 OH Tukang Kayu 37,000.00 9,620.00

    0.3000 OH Pekerja Biasa 35,000.00 10,500.00

    JUMLAH 42,750.00 21,160.00

    Dibulatkan

    Pasangan Bekisting untuk 1 M3 Beton

    5.0000 x Bekisting 63,910.00

    Dibulatkan

    48 1 M3 PEK. BETON TULANG 100 kg

    1.0000 M3 PAS. COR BETON AD. 1:2:3 Rp.

    1.0000 Ls PEMBESIAN 140 KG Rp.

    1.0000 Ls PAPAN BEGESTING 1M3 BETON Rp.

    JUMLAH Rp.

    Dibulatkan

    49 1 M3 PEK. BETON TULANG 110 kg1.0000 M3 PAS. COR BETON AD. 1:2:3 Rp.

    1.0000 Ls PEMBESIAN 110 KG Rp.

    1.0000 Ls PAPAN BEGESTING 1M3 BETON Rp.

    JUMLAH Rp.

    Dibulatkan

    50 1 M3 PEK. BETON TULANG 125 kg

    1.0000 M3 PAS. COR BETON AD. 1:2:3 Rp.

    1.0000 Ls PEMBESIAN 125 KG Rp.

    1.0000 Ls PAPAN BEGESTING 1M3 BETON Rp.

    JUMLAH Rp.

    Dibulatkan `

    51 1 M3 PEK. BETON TULANG 160 kg

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    12/50

    1 2 3 4 5 6 7

    52 1 M3 PEK. BETON BERTULANG 70 kg

    1.0000 m3 PAS. COR BETON AD. 1:2:3 Rp.

    1.0000 LS PEMBESIAN 70 KG Rp.

    1.0000 LS PAPAN BEGESTING 1 m3 BETON Rp.

    JUMLAH Rp.

    Dibulatkan

    1 BH PLAT JEMBATAN MASUK RUMAH UK. 09 X0.8 X 0.008 : Rp.

    53 1 M2 LANTAI KERAMIK WARNA 30/30

    0.2845 Zak PC (Portland Cement ) 40 kg 45,000.00 12,802.50 -

    0.0360 M3 Pasir Pasang 120,000.00 4,320.00 -

    1.0500 M2 Keramik 30/30 (Motif) 29,000.00 30,450.00 -

    0.0375 Kg PC Warna u/ Naad 6,000.00 225.00 -

    0.0450 Uph Mandor 40,000.00 - 1,800.00

    0.1500 Uph Tukang batu 37,000.00 - 5,550.00

    0.3000 Uph Pekerja 35,000.00 - 10,500.00

    JUMLAH 47,797.50 17,850.00

    Dibulatkan

    54 1 M2 LANTAI KERAMIK POLOS 30/30

    0.2845 Zak PC (Portland Cement ) 40 kg 45,000.00 12,802.50 -

    0.0360 M3 Pasir Pasang 90,000.00 3,240.00 -

    1.0500 m2 Keramik 30/30 45,000.00 47,250.00 -

    0.0375 Kg PC Warna u/ Naad 6,000.00 225.00 -

    0.0300 Uph Mandor 40,000.00 - 1,200.00

    0.1500 Uph Tukang batu 37,000.00 - 5,550.00

    0.3000 Uph Pekerja 35,000.00 - 10,500.00

    JUMLAH 63,517.50 17,250.00

    Dibulatkan

    55 1 M2 LANTAI KERAMIK POLOS / WARNA 20/20

    0.2845 Zak PC (Portland Cement ) 40 kg 45,000.00 12,802.50 -

    0.0360 M3 Pasir Pasang 90,000.00 3,240.00 -

    1.0500 m2 Keramik 20/20 35,000.00 36,750.00 -

    0.0375 Zak PC Warna u/ Naad 6,000.00 225.00 -

    0.0300 Uph Mandor 40,000.00 - 1,200.00

    0.1500 Uph Tukang batu 37,000.00 - 5,550.00

    0.3000 Uph Pekerja 35,000.00 - 10,500.00

    JUMLAH 53,017.50 17,250.00

    Dibulatkan

    56 1 M2 DINDING KERAMIK 10/20 & 20/25

    0.2325 Zak PC (Portland Cement ) 40 kg 45,000.00 10,462.50 -

    0.0180 M3 Pasir Pasang 45,000.00 810.00 -

    1.0250 m2 Keramik 10/20 40,000.00 41,000.00 -

    1.0500 Zak PC Warna u/ Naad 45,000.00 47,250.00 - 0.0350 Uph Mandor 6,000.00 - 210.00

    0.1750 Uph Tukang batu 40,000.00 - 7,000.00

    0.3500 Uph Pekerja 37,000.00 - 12,950.00

    JUMLAH 99,522.50 20,160.00

    Dibulatkan

    57 1 M2 DINDING BATU ALAM

    0.2938 Zak PC (Portland Cement ) 40 kg 45,000.00 13,218.75 -

    0.0350 M3 Pasir Pasang 90,000.00 3,150.00 -

    1.0500 m2 Batu Paros/Palimanan 130,000.00 136,500.00 -

    0.0500 Uph Mandor 40,000.00 - 2,000.00

    0.2500 Uph Tukang batu 37,000.00 - 9,250.00

    0.5000 Uph Pekerja 35,000.00 - 17,500.00 JUMLAH 152,868.75 28,750.00

    Dibulatkan

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    13/50

    1 2 3 4 5 6 7

    59 1 BH PEKERJAAN KOZEN - KOZEN P.1

    0.0350 M3 Kayu lokal Keras 6/12 5,459,250.00 191,030.08 -

    6.0000 bh Angkur 3,000.00 18,000.00 -

    0.0088 Uph Mandor 40,000.00 - 350.00

    0.3500 Uph Tukang kayu 37,000.00 - 12,950.00

    0.0875 Uph Pekerja 35,000.00 - 3,062.50

    JUMLAH 209,030.08 16,362.50

    Dibulatkan

    60 1 BH PEKERJAAN KOZEN - KOZEN P.2

    0.0343 M3 Kayu lokal Keras 6/12 5,459,250.00 187,099.42 -

    6.0000 bh Angkur 3,000.00 18,000.00 -

    0.0088 Uph Mandor 40,000.00 - 350.00

    0.3500 Uph Tukang kayu 37,000.00 - 12,950.00

    0.0875 Uph Pekerja 35,000.00 - 3,062.50

    JUMLAH 205,099.42 16,362.50

    Dibulatkan

    61 1 BH PEKERJAAN KOZEN - KOZEN PJ.1

    0.0491 M3 Kayu lokal Keras 6/12 5,459,250.00 268,071.01

    6.0000 bh Angkur 3,000.00 18,000.00

    0.0113 Uph Mandor 40,000.00 - 450.00

    0.4500 Uph Tukang kayu 37,000.00 - 16,650.00

    0.1125 Uph Pekerja 35,000.00 - 3,937.50

    JUMLAH 286,071.01 21,037.50

    Dibulatkan

    62 1 BH PEKERJAAN KOZEN - KOZEN PJ.2

    0.0870 M3 Kayu lokal Keras 6/12 5,459,250.00 474,954.75

    6.0000 bh Angkur 3,000.00 18,000.00

    0.0800 Uph Mandor 40,000.00 - 3,200.00

    0.4000 Uph Tukang kayu 37,000.00 - 14,800.00

    0.4000 Uph Pekerja 35,000.00 - 14,000.00

    JUMLAH 492,954.75 32,000.00

    Dibulatkan

    63 1 BH PEKERJAAN KOZEN - KOZEN J.2

    0.0419 M3 Kayu lokal Keras 6/12 5,459,250.00 228,764.41 -

    4.0000 bh Angkur 3,000.00 12,000.00 -

    0.0563 Uph Mandor 40,000.00 - 2,250.00

    0.4500 Uph Tukang kayu 37,000.00 - 16,650.00

    0.1125 Uph Pekerja 35,000.00 - 3,937.50

    JUMLAH 240,764.41 22,837.50

    Dibulatkan

    64 1 BH PEKERJAAN KOZEN - KOZEN J.1

    0.0308 M3 Kayu lokal Keras 6/12 5,459,250.00 168,232.25 -

    4.0000 bh Angkur 3,000.00 12,000.00 -

    0.0400 Uph Mandor 40,000.00 - 1,600.00

    0.3200 Uph Tukang kayu 37,000.00 - 11,840.00

    0.0800 Uph Pekerja 35,000.00 - 2,800.00

    JUMLAH 180,232.25 16,240.00

    Dibulatkan

    65 1 BH PEKERJAAN KOZEN - KOZEN BV. 1

    0.0173 M3 Kayu lokal Keras 6/12 5,459,250.00 94,335.84 -

    4.0000 bh Angkur 3,000.00 12,000.00 -

    0.0256 Uph Mandor 40,000.00 - 1,025.00 0.1000 Uph Tukang kayu 37,000.00 - 3,700.00

    0.1563 Uph Pekerja 35,000.00 - 5,468.75

    VOLUME DISESUAIKAN DG

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    14/50

    1 2 3 4 5 6 7

    67 1 BH PEKERJAAN KOZEN - KOZEN BV.1 ( T.70 )

    0.0162 M3 Kayu lokal Keras 6/12 5,459,250.00 88,204.01 -

    4.0000 bh Angkur 500.00 2,000.00 -

    0.0063 Uph Mandor 40,000.00 - 250.00

    0.0400 Uph Tukang kayu 37,000.00 - 1,480.00

    0.0625 Uph Pekerja 35,000.00 - 2,187.50

    JUMLAH 90,204.01 3,917.50

    Dibulatkan

    68 1BH.PAS.DAUN PINTU DBL TRIPLEK. ( P.1 ) uk. 82 x 201 cm

    0.0240 M3 Kayu lokal Keras 4/10 3,500,000.00 83,947.54 -

    2.0000 lb Triplex 3 mm 32,500.00 65,000.00 -

    0.0500 KG Paku 9,000.00 450.00 -

    0.1000 KG Lem 7,500.00 750.00 -

    1.0000 set Engsel 4" 7,000.00 7,000.00 -

    0.0750 Uph Mandor 40,000.00 - 3,000.00

    1.5000 Uph Tukang kayu 37,000.00 - 55,500.00

    0.7500 Uph Pekerja 35,000.00 - 26,250.00

    JUMLAH 157,147.54 84,750.00

    Dibulatkan

    69 1BH.PAS.DAUN PINTU DBL TRIPLEK. ( P.2 ) uk. 72 x 201 cm

    0.0211 M3 Kayu lokal Keras 6/12 3,500,000.00 73,941.00 -

    2.0000 lb Triplex 32,500.00 65,000.00 -

    0.0500 KG Paku 9,000.00 450.00 -

    0.1000 KG Lem 7,500.00 750.00 -

    1.0000 set Engsel 4" 7,000.00 7,000.00 -

    0.0875 Uph Mandor 40,000.00 3,500.00

    1.7500 Uph Tukang kayu 37,000.00 - 64,750.00

    0.8750 Uph Pekerja 35,000.00 - 30,625.00

    JUMLAH 147,141.00 98,875.00

    Dibulatkan

    70 1 BH. PAS. DAUN PINTU PANIL TRIPLEK 6 MM ( P1) UK. 82 X 201 Cm

    0.0360 M3 Kayu lokal Keras 6/12 3,500,000.00 126,152.95 -

    0.5000 lb Triplex 6 mm 65,000.00 32,500.00 -

    0.0500 KG Paku biasa uk. 2" - 5" 9,000.00 450.00 -

    1.0000 set Engsel 4" 7,000.00 7,000.00 -

    0.1000 Uph Mandor 40,000.00 - 4,000.00

    2.0000 Uph Tukang kayu 37,000.00 - 74,000.00

    1.0000 Uph Pekerja 35,000.00 - 35,000.00

    JUMLAH 166,102.95 113,000.00

    Dibulatkan

    71 1 BH. PAS. DAUN PINTU PANIL KAYU LOKAL (P1) UK. 82 X 201 Cm1.0000 bh Daun Pintu Panil kayu lokal 320,000.00 320,000.00 -

    1.0000 set Engsel 4" 7,000.00 7,000.00 -

    1.0000 bh Grendel 2,500.00 2,500.00 -

    1.0000 bh Handel Pintu 3,500.00 3,500.00 1.00

    0.0417 Uph Mandor 40,000.00 - 1,666.67

    1.2500 Uph Tukang kayu 37,000.00 - 46,250.00

    0.4167 Uph Pekerja 35,000.00 - 14,583.33

    JUMLAH 333,000.00 62,501.00

    Dibulatkan

    72 1 BH. PAS. KUNCI 2 SLAAG SETARA YALE/BELUCI

    1.0000 bh Kunci 2 slaag 60,000.00 60,000.00 -

    0.0050 Uph Mandor 40,000.00 - 200.00 0.5000 Uph Tukang kayu 37,000.00 - 18,500.00

    0.0100 Uph Pekerja 35,000.00 - 350.00

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    15/50

    1 2 3 4 5 6 7

    74 1BH.PAS.DAUN PINTU PVC KM/WC ( LENGKAP)

    1.0000 Set Daun Pintu PVC lengkap 140,000.00 140,000.00 -

    0.0150 Uph Mandor 40,000.00 - 600.00

    0.7500 Uph Tukang kayu 37,000.00 - 27,750.00

    0.1500 Uph Pekerja 35,000.00 - 5,250.00

    JUMLAH 140,000.00 33,600.00

    Dibulatkan

    75 1 BH. PAS. DAUN JENDELA. Uk. 0.62 x 1,02 ( J1 )

    0.0105 M3 Kayu lokal Keras 6/12 3,800,000.00 39,995.76 -

    0.0600 kg Paku biasa uk. 2" - 5" 9,000.00 540.00 -

    0.8000 M2 Kaca polos tbl. 3 mm 40,000.00 32,000.00 -

    1.0000 set Engsel 3" 4,500.00 4,500.00 -

    1.0000 bh Grendel 2,500.00 2,500.00 -

    2.0000 bh Hak angin 3,000.00 6,000.00 -

    0.0225 Uph Mandor 40,000.00 - 900.00

    0.9000 Uph Tukang kayu 37,000.00 - 33,300.00

    0.2250 Uph Pekerja 35,000.00 - 7,875.00

    JUMLAH 85,535.76 42,075.00

    Dibulatkan

    76 1 BH. PAS. DAUN JENDELA. Uk.0,62 x 1,40 ( PJ2)

    0.0125 M3 Kayu lokal Keras 6/12 3,800,000.00 47,369.28 -

    0.0600 kg Paku biasa uk. 2" - 5" 9,000.00 540.00 -

    1.0000 M2 Kaca polos tbl. 3 mm 40,000.00 40,000.00 -

    1.0000 set Engsel 3" 4,500.00 4,500.00 -

    1.0000 bh Grendel 2,500.00 2,500.00 -

    2.0000 bh Hak angin 3,000.00 6,000.00 -

    0.0250 Uph Mandor 40,000.00 - 1,000.00

    1.0000 Uph Tukang kayu 37,000.00 - 37,000.00

    0.2500 Uph Pekerja 35,000.00 - 8,750.00

    JUMLAH 100,909.28 46,750.00

    Dibulatkan

    77 1 M2 PASANG KACA POLOS t = 3 mm

    4.0000 M' List kaca kayu lokal 1,500.00 6,000.00 -

    1.0000 M2 Kaca polos tbl. 3 mm 40,000.00 40,000.00 -

    0.0500 set Paku triplek 350.00 17.50 -

    0.0050 Uph Mandor 40,000.00 - 200.00

    0.1000 Uph Tukang kayu 37,000.00 - 3,700.00

    0.0500 Uph Pekerja 35,000.00 - 1,750.00

    JUMLAH 46,017.50 5,650.00

    Dibulatkan

    78 1 M2 PASANG KACA BURAM/ES t = 3 mm

    4.0000 M' List kaca kayu lokal 1,500.00 6,000.00 - 1.0000 M2 Kaca Es tbl. 3 mm 40,000.00 40,000.00 -

    0.0500 set Paku triplek 350.00 17.50 -

    0.0050 Uph Mandor 40,000.00 - 200.00

    0.1000 Uph Tukang kayu 37,000.00 - 3,700.00

    0.0500 Uph Pekerja 35,000.00 - 1,750.00

    JUMLAH 46,017.50 5,650.00

    Dibulatkan

    79 1 M3 PASANG BALOK GORDING / NOCK / JURAI / SOPI 6/12

    1.1000 M3 Kayu lokal Keras 6/12 3,500,000.00 3,850,000.00 -

    15.0000 kg Besi Strip 10,000.00 150,000.00 -

    3.0000 kg Paku biasa uk. 2" - 5" 10,000.00 30,000.00

    0.2000 Uph Mandor 40,000.00 - 8,000.00 7.9000 Uph Tukang kayu 37,000.00 - 292,300.00

    2.4000 Uph Pekerja 35,000.00 - 84,000.00

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    16/50

    1 2 3 4 5 6 7

    80 1 M' PAS. LISTPLANK KAYU 3/20

    0.0072 M3 Kayu Papan lokal Keras 2,200,000.00 15,840.00 -

    0.0375 Kg. Paku biasa uk. 2" - 5" 9,000.00 337.50 -

    0.0050 Uph Mandor 40,000.00 - 200.00

    0.2000 Uph Tukang Kayu 37,000.00 - 7,400.00

    0.1000 Uph Pekerja 35,000.00 - 3,500.00

    JUMLAH 16,177.50 11,100.00

    Dibulatkan

    81 1 M' PAS. LISTPLANK KAYU 2/20

    0.0044 M3 Kayu Papan lokal Keras 2,200,000.00 9,680.00 -

    0.0500 Kg. Paku biasa uk. 2" - 5" 9,000.00 450.00 -

    0.0500 Uph Mandor 40,000.00 - 2,000.00

    0.1000 Uph Tukang Kayu 37,000.00 - 3,700.00

    0.1000 Uph Pekerja 35,000.00 - 3,500.00

    JUMLAH 10,130.00 9,200.00

    Dibulatkan

    82 1 M' PAS. LISTPLANK CEMENT SILICA UK. 0.8/20

    1.0000 M' Kalsiplank/Woodplank 12,500.00 12,500.00 -

    0.0100 Kg. Paku biasa Triplek 10,000.00 100.00 -

    0.0025 Uph Mandor 40,000.00 - 100.00

    0.0250 Uph Tukang Kayu 37,000.00 - 925.00

    0.0125 Uph Pekerja 35,000.00 - 437.50

    JUMLAH 12,600.00 1,462.50

    Dibulatkan

    83 1 M' PASANG PAPAN NOK 4/6

    0.0026 M3 Kayu Kaso lokal uk 4/6 3,500,000.00 9,240.00 -

    0.0250 kg Paku biasa uk. 2" - 5" 9,000.00 225.00 -

    0.0075 Uph Mandor 40,000.00 - 300.00

    0.0500 Uph Tukang Kayu 37,000.00 - 1,850.00

    0.0250 Uph Pekerja 35,000.00 - 875.00

    JUMLAH 9,465.00 3,025.00

    Dibulatkan

    84 1 M' PASANG PAPAN NOK 3/20

    0.0066 M3 Kayu lokal Keras 2,200,000.00 14,520.00 -

    0.0250 kg Paku biasa uk. 2" - 5" 9,000.00 225.00 -

    0.0050 Uph Mandor 40,000.00 - 200.00

    0.2000 Uph Tukang Kayu 37,000.00 - 7,400.00

    0.1000 Uph Pekerja 35,000.00 - 3,500.00

    JUMLAH 14,745.00 11,100.00

    Dibulatkan

    85 1 M' PASANG PAPAN TALANG 2 X 2/20 LAPIS SENG BJLS 200.0088 M3 Kayu Papan lokal Keras 900,000.00 7,920.00 -

    0.5000 M' Seng BJLS 22 17,500.00 8,750.00 -

    0.0500 kg Paku biasa uk. 2" - 5" 9,000.00 450.00 -

    0.0500 Uph Mandor 40,000.00 - 2,000.00

    0.1500 Uph Tukang Kayu 37,000.00 - 5,550.00

    0.1000 Uph Pekerja 35,000.00 - 3,500.00

    JUMLAH 17,120.00 11,050.00

    Dibulatkan

    86 1 M2 PAS.RANGKA ATAP KY. LOKAL 4/6 & 2/3 U/ GENTENG PALENTONG 25 BH/M2

    0.0036 M3 Reng Kayu Lokal 2/3 3,500,000.00 12,705.00 -

    0.0079 M3 Kaso Kayu Lokal 4/6 3,500,000.00 27,720.00 -

    0.0500 kg Paku biasa uk. 2" - 5" 9,000.00 450.00 - 0.0500 kg Paku 1,5 " 9,000.00 450.00 -

    0.0050 Uph Mandor 40,000.00 - 200.00

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    17/50

    1 2 3 4 5 6 7

    87 1 M2 PAS.RANGKA ATAP KAYU Uk. 5/7 & 3/4 UNTUK GENTENG BETON 12 BH./ M2

    0.0046 M3 Reng Kayu Lokal 3/4 3,500,000.00 16,170.00 -

    0.0096 kg Kaso Kayu Lokal 5/7 3,500,000.00 33,687.50 -

    0.0500 kg Paku biasa uk. 2" - 5" 9,000.00 450.00 -

    0.0500 kg Paku 1,5 " 9,000.00 450.00 -

    0.0050 Uph Mandor 40,000.00 - 200.00

    0.1000 Uph Tukang Kayu 37,000.00 - 3,700.00

    0.1000 Uph Pekerja 35,000.00 - 3,500.00

    JUMLAH 50,757.50 7,400.00

    Dibulatkan

    88 1 M2 PAS.RANGKA ATAP KAYU Uk. 5/7 & 3/4 UNTUK GENTENG METAL 1,62 LB/M2

    0.0034 M3 Reng Kayu Lokal 3/4 3,500,000.00 12,012.00 -

    0.0077 kg Kaso Kayu Lokal 5/7 3,500,000.00 26,950.00 -

    0.0400 kg Paku biasa uk. 2" - 5" 9,000.00 360.00 -

    0.0400 kg Paku 1,5 " 9,000.00 360.00 -

    0.0050 Uph Mandor 40,000.00 - 200.00

    0.1000 Uph Tukang Kayu 37,000.00 - 3,700.00

    0.1000 Uph Pekerja 35,000.00 - 3,500.00

    JUMLAH 39,682.00 7,400.00

    Dibulatkan

    89 1 M2 PAS.GENTENG PALENTONG 25 BH/M2

    25.0000 Bh. Genteng Palentong 600.00 15,000.00 -

    0.0080 Uph Mandor 40,000.00 - 320.00

    0.0750 Uph Tukang Batu 37,000.00 - 2,775.00

    0.1500 Uph Pekerja 35,000.00 - 5,250.00

    JUMLAH 15,000.00 8,345.00

    Dibulatkan

    90 1 M' PAS.NOK GENTENG PALENTONG 5 BH/M'

    5.0000 Bh. Nok Genteng Palentong 3,500.00 17,500.00 -

    0.1250 Sak PC (Portland Cement ) 40 kg 45,000.00 5,625.00 -

    0.0325 M3 Pasir 90,000.00 2,925.00 -

    0.0020 Uph Mandor 40,000.00 - 80.00

    0.2000 Uph Tukang Batu 37,000.00 - 7,400.00

    0.2000 Uph Pekerja 35,000.00 - 7,000.00

    JUMLAH 26,050.00 14,480.00

    Dibulatkan

    91 1 M2 PAS.GENTENG MORANDO GLAZUR 12 BH/M2

    12.0000 Bh. Genteng Marando glazur 2,800.00 33,600.00 -

    0.0075 Uph Mandor 40,000.00 - 300.00

    0.0600 Uph Tukang Batu 37,000.00 - 2,220.00

    0.1500 Uph Pekerja 35,000.00 - 5,250.00

    JUMLAH 33,600.00 7,770.00 Dibulatkan

    92 1 M' PAS.NOCK GENTENG MORANDO GLAZUR 4 BH/M'

    4.0000 Bh. Nock Genteng Morando glazur 4,000.00 16,000.00 -

    0.2000 Sak PC (Portland Cement ) 40 kg 45,000.00 9,000.00 -

    0.0325 M3 Pasir 90,000.00 2,925.00 -

    0.0020 Uph Mandor 40,000.00 - 80.00

    0.2000 Uph Tukang Batu 37,000.00 - 7,400.00

    0.2000 Uph Pekerja 35,000.00 - 7,000.00

    JUMLAH 27,925.00 14,480.00

    Dibulatkan

    93 1 M2 PAS.GENTENG METAL 1.62 LB/M21.6200 lb Genteng Metal 25,000.00 40,500.00 -

    0.0250 kg Paku genteng metal 22,500.00 - 562.50

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    18/50

    1 2 3 4 5 6 7

    94 1 M' PAS.NOCK GENTENG METAL 1 LB/M'

    1.0000 Lb Nock Genteng Metal 20,000.00 20,000.00 -

    0.0100 kg Paku genteng metal 22,500.00 225.00 -

    0.0020 Uph Mandor 40,000.00 - 80.00

    0.2000 Uph Tukang Batu 37,000.00 - 7,400.00

    0.2000 Uph Pekerja 35,000.00 - 7,000.00

    JUMLAH 20,225.00 14,480.00

    Dibulatkan

    95 1 M2 PAS. ATAP ASBES GELOMBANG (2.1 x 1.05 x 4 mm)

    0.5100 Lbr Asbes Gelombang mini 27,500.00 14,025.00

    4.0000 bh Paku asbes ulir 350.00 1,400.00

    0.0070 Uph Mandor 40,000.00 - 280.00

    0.1400 Uph Tukang Batu 37,000.00 - 5,180.00

    0.1400 Uph Pekerja 35,000.00 - 4,900.00

    JUMLAH 15,425.00 10,360.00

    Dibulatkan

    96 1 M' PAS. NOK STEL ASBES GELOMBANG 1,05 M'

    2.1000 Lbr Nok Asbes Gelombang 22,000.00 46,200.00

    4.0000 bh Paku asbes ulir 350.00 1,400.00

    0.0040 Uph Mandor 40,000.00 - 160.00

    0.1250 Uph Tukang Kayu 37,000.00 - 4,625.00

    0.0840 Uph Pekerja 35,000.00 - 2,940.00

    JUMLAH 47,600.00 7,725.00

    Dibulatkan

    97 1 M2 PAS.PENUTUP ATAP GENTENG TILUX

    1.2500 Lbr Genteng tiluk 22,000.00 27,500.00

    4.0000 Bh Paku asbes ulir 350.00 1,400.00

    0.0004 Uph Mandor 40,000.00 - 14.00

    0.0350 Uph Tukang Kayu 37,000.00 - 1,295.00

    0.0035 Uph Pekerja 35,000.00 - 122.50

    JUMLAH 28,900.00 1,431.50

    Dibulatkan

    98 1 M' PAS.NOK PENUTUP ATAP GENTENG TILUX

    1.1000 Lbr Nok Genteng tiluk 18,000.00 19,800.00

    3.0000 Bh Paku asbes ulir 350.00 1,050.00

    0.0003 Uph Mandor 40,000.00 - 10.00

    0.0250 Uph Tukang Kayu 37,000.00 - 925.00

    0.0025 Uph Pekerja 35,000.00 - 87.50

    JUMLAH 20,850.00 1,022.50

    Dibulatkan

    99 1 M2 PAS.RANGKA PLAFOND 4/60.0108 M3 Kayu 3,500,000.00 37,632.00 -

    0.1000 kg Paku biasa uk. 2" - 5" 9,000.00 900.00 -

    0.0025 Uph Mandor 40,000.00 - 100.00

    0.1000 Uph Tukang kayu 37,000.00 - 3,700.00

    0.0500 Uph Pekerja 35,000.00 - 1,750.00

    JUMLAH 38,532.00 5,550.00

    Dibulatkan

    100 1 M' LIST PLAFOND 3 x 3 Cm

    1.1000 m' Kayu List uk. 3 x 3 cm 2,000.00 2,200.00 -

    0.0250 kg Paku biasa uk. 2" - 5" 9,000.00 225.00 -

    0.0010 Uph Mandor 40,000.00 - 40.00

    0.0210 Uph Tukang kayu 37,000.00 - 777.00 0.0210 Uph Pekerja 35,000.00 - 735.00

    JUMLAH 2,425.00 1,552.00

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    19/50

    1 2 3 4 5 6 7

    102 1 M2 PAS.PLAFOND ETERNIT

    1.1000 LB Eternit 12,000.00 13,200.00 -

    0.0100 kg Paku triplek 10,000.00 100.00 -

    0.0025 Uph Mandor 40,000.00 - 100.00

    0.0750 Uph Tukang kayu 37,000.00 - 2,775.00

    0.0375 Uph Pekerja 35,000.00 - 1,312.50

    JUMLAH 13,300.00 4,187.50

    Dibulatkan

    103 SEPTICTANK LENGKAP REMBESAN/BH

    2.7700 m3 Galian tanah 24,370.00 67,504.90

    0.2400 m3 Urugan tanah kembali 7,480.00 1,795.20

    2.0000 bh Buis beton 100 cm 105,000.00 210,000.00 -

    0.0628 m3 Beton bertulng 1:2:3 (Ttp. Septick.) 2,717,550.00 170,662.14 -

    0.0628 m3 Cor Beton 1:2:3 ( Dsr. Septick.) 650,800.00 40,870.24 -

    0.3600 m3 Koral 115,000.00 41,400.00 -

    0.6000 m3 Batu kali 120,000.00 72,000.00 -

    4.0000 ikat Ijuk 3,500.00 14,000.00 -

    1.0000 ls Pipa hawa PVC 1.1/4" + Accesssories 11,500.00 11,500.00 -

    0.7500 btg Pipa rembesan PVC 4" 40,000.00 30,000.00 -

    1.0000 bh Pipa Tee PVC 4" 5,000.00 5,000.00 -

    0.0750 Uph Mandor 40,000.00 - 3,000.00

    0.7200 Uph Tukang Batu 37,000.00 - 26,640.00

    1.5000 Uph Pekerja 35,000.00 - 52,500.00

    JUMLAH 664,732.48 82,140.00

    Dibulatkan

    104 PEK. PEMBUATAN 1 Bh BEERPUT/CUBLUK ( Dalam 1.5 m)

    1.4248 m3 Galian Tanah 24,370.00 34,721.77

    0.2475 m3 Urugan tanah kembali 7,480.00 1,851.30

    0.3825 Sak PC (Portland Cement ) 40 Kg 45,000.00 17,212.50

    3.0000 bh buis beton 100 x 50 CM 105,000.00 315,000.00

    0.0563 m3 tutup beton bertulang 1 : 2 : 3 30,625.00 1,724.19

    1.0000 ls Pipa hawa PVC 1.1/4" + Accesssories 11,500.00 11,500.00

    0.0450 Uph Mandor 40,000.00 1,800.00

    0.4500 Uph Tukang batu 37,000.00 16,650.00

    0.9000 Uph Pekerja 35,000.00 31,500.00

    JUMLAH 345,436.69 86,523.07

    Dibulatkan

    105 PEK. PEMBUATAN 1 Bh BEERPUT/CUBLUK ( Dalam 2 m)

    1.8997 m3 Galian Tanah 24,370.00 46,295.69

    0.2475 m3 Urugan tanah kembali 7,480.00 1,851.30

    0.5100 Sak PC (Portland Cement ) 40 Kg 45,000.00 22,950.00

    4.0000 bh buis beton 100 x 50 CM 105,000.00 420,000.00

    0.0563 m3 tutup beton bertulang 1 : 2 : 3 30,625.00 1,724.19

    1.0000 ls Pipa hawa PVC 1.1/4" + Accesssories 11,500.00 11,500.00 0.0500 Uph Mandor 40,000.00 2,000.00

    0.5000 Uph Tukang batu 37,000.00 18,500.00

    1.0000 Uph Pekerja 35,000.00 35,000.00

    JUMLAH 456,174.19 103,646.99

    Dibulatkan

    106 1 BH MEMBUAT CETAKAN BEERPUT COR SETEMPAT

    0.4222 M3 Kayu bekisting 900,000.00 379,980.00

    6.7000 M' Seng Plat BJLS 22 lbr. 90 cm 32,000.00 214,400.00

    2.0000 Kg Paku biasa uk. 2" - 5" 9,000.00 18,000.00

    0.0800 Uph Mandor 40,000.00 3,200.00

    1.3250 Uph Tukang kayu 37,000.00 49,025.00

    0.8000 Uph Pekerja 35,000.00 28,000.00

    JUMLAH 612,380.00 80,225.00

    Dib l k

    JENIS TANAH DISESUAIKANDG KONDISI DI LAPANGAN

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    20/50

    1 2 3 4 5 6 7

    107 1 BH BEERPUT BETON 1:3:5 (COR SETEMPAT)

    1.1775 M3 Galian tanah dalam 2 m 15,600.00 18,369.00

    1.1775 M3 Perataan tanah kembali 7,480.00 8,807.70

    0.4239 M3 Cor beton tumbuk 1:3:5 469,200.00 198,893.88

    1.0000 Ls Cetakan beerput 69,260.00 69,260.00

    0.0785 M3 Beton Bertulang Ad.1:2:3 3,008,750.00 236,186.88

    1.0000 Ls Pipa Hawa PVC O 11/2" + Accessories 11,500.00 11,500.00

    JUMLAH 543,017.46 -

    Dibulatkan

    108 BAK MANDI PAS. BATU-BATA DIPLESTER BAG. DLM LAPIS KERAMIK/BH

    1.6000 M2 keramik 20x20 70,260.00 112,416.00 -

    1.0000 M2 Pas Bata Merah 1 Pc : 5 Ps + dudukan 56,380.00 56,380.00 -

    1.2000 M2 Plesteran 20,710.00 24,852.00 -

    1.0000 bh Afur Bak Mandi 5,000.00 5,000.00 -

    0.3000 org Mandor 40,000.00 12,000.00

    2.0000 org tukang batu 37,000.00 74,000.00

    1.0000 org Pekerja 35,000.00 35,000.00

    JUMLAH 198,648.00 121,000.00

    Dibulatkan

    109 BAK MANDI FIBERGLASS 120 LITER TANAM LENGKAP DUDUKAN / BH

    1.0000 Bh Fiber glas uk. 53 x 58 cm 100,000.00 100,000.00

    62.0000 Bh Batu bata miring 350.00 21,700.00

    0.3000 zak PC (Portland Cement ) 40 kg 45,000.00 13,500.00

    0.0273 M3 Pasir pasang 90,000.00 2,457.00

    0.8400 M2 Plesteran 1 Pc : 5 Ps 20,710.00 17,396.40

    0.1500 org Mandor 40,000.00 6,000.00

    1.0000 org tukang batu 37,000.00 37,000.00

    0.5000 org Pekerja 35,000.00 17,500.00

    JUMLAH 155,053.40 60,500.00

    Dibulatkan

    110 BAK MANDI FIBERGLASS 120 LITER TANAM LAPIS KERAMIK + DUDUKAN / BH

    1.0000 Bh Fiber glas uk. 53 x 58 cm 100,000.00 100,000.00

    62.0000 Bh Batu bata miring 350.00 21,700.00

    0.8400 M2 Pas Keramik didnding uk. 20 x 20 cm 70,260.00 59,018.40

    0.3000 zak PC (Portland Cement ) 40 kg 45,000.00 13,500.00

    0.0273 M3 Pasir pasang 90,000.00 2,457.00

    0.8400 M2 Plesteran 1 Pc : 5 Ps 20,710.00 17,396.40

    0.1500 org Mandor 40,000.00 6,000.00

    1.0000 org tukang batu 37,000.00 37,000.00

    0.5000 org Pekerja 35,000.00 17,500.00

    JUMLAH 214,071.80 60,500.00

    Dibulatkan

    111 BAK MANDI FIBERGLASS OVAL 100 LITER LENGKAP DUDUKAN/BH

    1.0000 bh Bak mandi fiberglass Oval 155,000.00 155,000.00 -

    0.2500 zak PC (Portland Cement ) 40 kg 45,000.00 11,250.00 -

    0.0344 m3 pasir pasang 90,000.00 3,096.00 -

    30.0000 bh batubata 350.00 10,500.00 -

    0.0375 org Mandor 40,000.00 - 1,500.00

    0.3750 org tukang batu 37,000.00 - 13,875.00

    0.1875 org Pekerja 35,000.00 - 6,562.50

    JUMLAH 179,846.00 21,937.50

    Dibulatkan

    112 PASANG BAK MANDI TERASO 50 x 50 CM LENGKAPAN DUDUKAN / BH

    1.0000 bh Bak Teraso 70,000.00 70,000.00 - 0.3000 zak PC (Portland Cement ) 40 kg 45,000.00 13,500.00 -

    0.0344 m3 pasir pasang 90,000.00 3,096.00 -

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    21/50

    1 2 3 4 5 6 7

    113 CLOSET JONGKOK PORSELIN SETARA INA LENGKAP DUDUKAN/BH

    1.0000 bh closet jongkok poselin 75,000.00 75,000.00 -

    0.0900 m3 pasir urug 60,000.00 5,400.00 -

    0.1760 zak PC (Portland Cement ) 40 kg 45,000.00 7,920.00 -

    0.0288 m3 pasir pasang 90,000.00 2,592.00 -

    20.0000 bh batubata 350.00 7,000.00 -

    0.1500 org Mandor 40,000.00 - 6,000.00

    1.5000 org tukang batu 37,000.00 - 55,500.00

    1.0000 org Pekerja 35,000.00 - 35,000.00

    JUMLAH 97,912.00 96,500.00

    Dibulatkan

    114 CLOSET JONGKOK TERASO LENGKAP DUDUKAN/BH

    1.0000 bh closet jongkok teraso 1,000.00 1,000.00 -

    0.0900 m3 pasir urug 60,000.00 5,400.00 -

    0.1760 zak PC (Portland Cement ) 40 kg 45,000.00 7,920.00 -

    0.0288 m3 pasir pasang 90,000.00 2,592.00 -

    20.0000 bh batubata 350.00 7,000.00 -

    0.1500 org Mandor 40,000.00 - 6,000.00

    1.5000 org tukang batu 37,000.00 - 55,500.00

    1.0000 org Pekerja 35,000.00 - 35,000.00

    JUMLAH 23,912.00 96,500.00

    Dibulatkan

    115 1 M' PIPA PEMBUANGAN KE SEPTIKTANK PVC 10 CM/M'

    0.2750 bt pipa PVC 10 CM' 40,000.00 11,000.00 -

    0.2500 bh Knee/Sock PVC 10 CM' 5,000.00 1,250.00 -

    0.2500 tb lem pipa PVC 5,000.00 1,250.00 -

    0.0021 org Mandor 40,000.00 - 85.00

    0.0850 org tukang batu 37,000.00 - 3,145.00

    0.0213 org Pekerja 35,000.00 - 743.75

    JUMLAH 13,500.00 3,973.75

    Dibulatkan

    116 1 M' PIPA SALURAN BAWAH LANTAI PVC 7.5 CM/M'

    0.2750 bt pipa PVC 7.5 CM' 32,500.00 8,937.50 -

    0.2500 bh Knee/Sock PVC 7.5 CM' 4,000.00 1,000.00 -

    0.2500 tb lem pipa PVC 5,000.00 1,250.00 -

    0.0021 org Mandor 40,000.00 - 85.00

    0.0800 org tukang batu 37,000.00 - 2,960.00

    0.0200 org Pekerja 35,000.00 - 700.00

    JUMLAH 11,187.50 3,745.00

    Dibulatkan

    117 SALURAN AIR BUIS BETON 1/2 20 CM/M'

    1.0000 bh Buis beton 1/2 20 cm 25,000.00 25,000.00 0.0110 m3 Pasir urug 60,000.00 660.00

    0.0250 zak PC (Portland Cement ) 40 kg 45,000.00 1,125.00

    0.0021 m3 Pasir pasang 90,000.00 187.20

    2.0000 bh Batubata 350.00 700.00

    0.0030 org Mandor 40,000.00 120.00

    0.0300 org tukang batu 37,000.00 1,110.00

    0.0300 org Pekerja 35,000.00 1,050.00

    JUMLAH 27,672.20 2,160.00

    Dibulatkan

    118 MEMASANG PIPA LEIDING PVC / M'

    0.2750 bt Pipa PVC 1/2" AW 12,500.00 3,437.50 -

    0.4000 bh Knee Siku PVC 1/2" 1,500.00 600.00 - 0.1000 bh Lem PVC 5,000.00 500.00 -

    0.4000 bh Socket PVC 1/2" 1,500.00 600.00 -

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    22/50

    1 2 3 4 5 6 7

    119 MEMASANG KRAN AIR KUNINGAN / BH.

    1.0000 BH Kran Air Kuningan 1/2" 10,000.00 10,000.00 -

    0.1000 rol Siltip 2,500.00 250.00 -

    0.0008 org Mandor 40,000.00 - 30.00

    0.0750 org Tukang leiding 37,000.00 - 2,775.00

    0.0075 org Pekerja 35,000.00 - 262.50

    JUMLAH 10,250.00 3,067.50

    Dibulatkan

    120 MEMASANG KRAN AIR VERNEKEL / BH.

    1.0000 BH Kran Air Vernekel 1/2" 17,000.00 17,000.00 -

    0.1000 rol Siltip 2,500.00 250.00 -

    0.0008 org Mandor 40,000.00 - 30.00

    0.0750 org Tukang leiding 37,000.00 - 2,775.00

    0.0075 org Pekerja 35,000.00 - 262.50

    JUMLAH 17,250.00 3,067.50

    Dibulatkan

    121 PAS LOCIS KUSEN / BH

    0.0011 m3 Beton tak betulang 1:2:3 pakai cetakan 970,350.00 1,047.98 -

    1.0000 Ls Finishing / Acian 1,500.00 1,500.00 -

    JUMLAH 2,547.98 -

    Dibulatkan

    122 1 M2 PEKERJAAN CAT KAYU (1 lapis plamir, 1 lapis cat menie & 2 lapis cat penutup)

    0.2000 kg Cat menie 16,000.00 3,200.00 -

    0.0750 kg Plamur 7,000.00 525.00 -

    0.2600 kg Cat Kayu 26,000.00 6,760.00 -

    0.0200 BH Kwas 3" 5,000.00 100.00 -

    0.1000 Ltr Minyak cat 7,000.00 700.00 -

    0.0400 lbr Amplas 2,000.00 80.00 -

    0.0025 Uph Mandor 40,000.00 - 100.00

    0.0900 Uph Tukang Cat 37,000.00 - 3,330.00 0.0700 Uph Pekerja 35,000.00 - 2,450.00

    JUMLAH 11,365.00 5,880.00

    Dibulatkan

    123 1 M2 PEKERJAAN CAT GENTENG (2 lapis cat penutup dg Cat Genteng/Kolam)

    0.2500 kg Cat Genteng/Kolam 6,000.00 1,500.00 -

    0.0500 bh Kwas 3" 5,000.00 250.00 -

    0.0025 Uph Mandor 40,000.00 - 100.00

    0.0250 Uph Pekerja 35,000.00 - 875.00

    JUMLAH 1,750.00 975.00

    Dibulatkan

    124 1 M2 PEKERJAAN CAT DINDING KM (1 lapis plamur & 2 lapis cat penutup dg Cat Genteng/Kolam)0.2500 kg Cat Genteng/Kolam 6,000.00 1,500.00 -

    0.0500 bh Kwas 3" 5,000.00 250.00 -

    0.0900 kg Dempul Tembok 7,000.00 630.00 -

    0.0500 lbr Amplas 2,000.00 100.00 -

    0.0063 Uph Mandor 40,000.00 - 252.00

    0.0630 Uph Tukang Cat 37,000.00 - 2,331.00

    0.0200 Uph Pekerja 35,000.00 - 700.00

    JUMLAH 2,480.00 3,283.00

    Dibulatkan

    125 1 M2 PEKERJAAN CAT TEMBOK & PLAFOND (1 lapis plamur & 2 lapis cat penutup)

    0.2600 kg Cat tembok 25,000.00 6,500.00 -

    0.0500 bh Kwas 3" 5,000.00 250.00 - 0.1000 kg Dempul Tembok 7,000.00 700.00 -

    0.0500 lbr Amplas 2,000.00 100.00 -

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    23/50

    NO. UPAH DAN BHN BANGUNAN SATUAN HARGA SATUAN

    A UPAH TENAGA KERJA.

    1 M a n d o r 1 Org./Hr 40,000

    2 Tukang Aspal 1 Org./Hr 37,000

    3 Tukang Batu 1 Org./Hr 37,000

    4 Tukang Besi 1 Org./Hr 37,000

    5 Tukang Cat 1 Org./Hr 37,000

    6 Tukang Kayu 1 Org./Hr 37,000

    7 Tukang Las 1 Org./Hr 37,000

    8 Tukang Listrik 1 Org./Hr 37,000

    9 Operator 1 Org./Hr 35,000

    10 Pekerja / Laden 1 Org./Hr 35,000

    11 Pembantu Operator 1 Org./Hr 35,000

    12 Penjaga api aspal 1 Org./Hr 35,000

    13 Penjaga Malam 1 Org./Hr 35,000

    14 Tukang Gali 1 Org./Hr 35,000

    B. HARGA BAHAN-BANGUNAN.

    1 Afur bak mandi Bh 5,000

    2 Ampelas (Kertas Gosok) Lbr 2,000

    3 Asbes Gelombang uk. 105 x 210 cm Lbr 27,500

    4 Asbes Gelombang Nok. Stel uk. 1,05 cm Lbr 22,000

    4 Asbes Tilux uk. 0.8 x 1,05 cm Lbr 22,000

    5 Asbes Tilux Nok Paten Lbr 18,000

    6 Aspal Kg 5,000

    7 Bak Mandi fibreglass Tanam uk. 53 x 55 cm Bh 100,0008 Bak Mandi fibreglass Oval kap. 100 liter uk. 53 x 58 cm Bh 155,000

    9 Bak Mandi Terazo 50 x 50 Bh 70,000

    10 Besi angkur ( kusen ) Bh 3,000

    11 Batu Koral M3 105,000

    12 Batu Bata Bh 350

    13 Batu Bata Press Bh 2,500

    14 Batu Kali M3 120,000

    15 Batu Kali Belah M3 90,000

    16 Batu pecah 3/5 M3 75,000

    17 Batu pecah 5/7 M3 75,000

    18 Batu pecah 0,5/1 M3 135,000

    19 Batu pecah 1/1 M3 125,000

    20 Batu pecah 2/3 M3 105,000

    21 Beerput (RSS) Unit 300,000

    22 Besi Beton Kg 13,000

    DAFTAR HARGA BAHAN DAN UPAH TAHUN 2010

    DI LOKASI BUMI PALIR SEJAHTERA PERUM PERUMNAS CABANG SEMARANG I

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    24/50

    NO. UPAH DAN BHN BANGUNAN SATUAN HARGA SATUAN

    23 Besi klaam ( kuda-kuda ) Kg 10,000

    24 Beton Kanstein 10 x 20 x 50 cm Kg 12,000

    25 Buis Beton 1/2 O 0.15 Bh 20,000

    26 Buis Beton 1/2 O 0.20 Bh 25,000

    27 Buis Beton O 0.15 ;L 1.00 M Bh 45,000

    28 Buis Beton O 0.20 ;L 1.00 M Bh 55,00029 Buis Beton O 0.30 ;L 1.00 M Bh 65,000

    21 Buis Beton O 0.50 ;L 1.00 M Bh 55,000

    22 Buis Beton O 0.80 ;L 1.00 M Bh 130,000

    23 Buis Beton O 1.00 ;L 50 cm Bh 105,000

    24 Buis Beton O 1.00 ;L 1.00 M Bh 215,000

    22 Cat Genteng Kg 6,000

    23 Cat Kayu Kg 26,000

    24 Cat Menie Kg 16,000

    25 Cat Tembok Kg 25,000

    26 Closet Jongkok Porselein Bh 75,000

    27 Alat Bantu Bh 1,000

    28 Conblock 9,5x19.5x39 Bh 2,800

    27 Dempul/Plamur Kayu Kg 7,000

    28 Dempul/Plamur Tembok Kg 7,000

    29 Engsel - H dia. 3" Ps 4,500

    30 Engsel - H dia. 4" Ps 7,000

    31 Eternit Plaat uk.1x1 M Lb 12,000

    32 Genteng Morando Bh 2,800

    33 Genteng Morando Nok Bh 4,000

    34 Genteng Plentong Bh 600

    35 Genteng Plentong Nok Bh 3,500

    36 Genteng Metal Lb 25,000

    37 Genteng Metal Nock Lb 20,000

    38 Grendel Bh 2,500

    39 Hak Angin Bh 3,000

    40 Handel Pintu Bh 3,500

    41 Ijuk Kg 7,500

    42 Kaca Biasa tebal 3 MM M2 40,000

    43 Kaca Biasa tebal 5 MM M2 -

    44 Kaca Buram tebal 3 MM M2 68,000

    45 Kaca Buram tebal 5 MM M2 -

    46 Kapur M3 220,000

    47 Kawat Beton Kg 12,000

    48 Kayu Bakar aspal M3 -

    49 Kayu Balok 2/3,3/4,4/6 & 5/7 Lokal M3 3,500,00050 Kayu Balok Lokal 6/12 Gording/Kuda-kuda M3 3,500,000

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    25/50

    NO. UPAH DAN BHN BANGUNAN SATUAN HARGA SATUAN

    51 Kayu Balok Lokal Uk. 6/12 untuk Kusen M3 3,800,000

    51 Kayu Bekisting M3 900,000

    52 Kayu Papan Bekisting M3 900,000

    53 Kayu Papan Lisplank 2/20 M3 2,200,000

    54 Keramik Tile 20/20 M2 35,000

    55 Keramik Tile 30/30 Motif M2 29,00056 Keramik Tile 30/30 polos M2 45,000

    57 Knie GIP 1/2" Bh 2,500

    58 Knie PVC 1/2" AW Bh 1,500

    59 Knie PVC 1" Bh 1,750

    60 Knie PVC 2" Bh 2,500

    61 Knie PVC 3" Bh 4,000

    62 Knie PVC 4" Bh 5,000

    63 Kran air dia 1/2" kuningan Bh 10,000

    64 Kran air dia 1/2" vernekel Bh 17,000

    65 Krikil / Split M3 115,000

    65 Kunci-2 Slaag Setara Yale/Beluci Bh 60,000

    66 Kunci-2 Slaag setra Royal/Kuda Terbang Bh 30,000

    67 Kuwas Bh 5,000

    68 Lem Kayu Kg 7,500

    69 Lem PVC Tube 5,000

    70 Lis kaca kayu uk. 1 x 3 cm M' 1,500

    71 Lis plafond kayu 3 x 3 cm M' 2,000

    72 Lisplank Cement Silica uk. 0.8x20 cm M' 12,500

    73 Minyak Bikesting Kg 4,500

    74 Minyak cat Kg 7,000

    75 Padas Urug M3 45,000

    76 Paku Biasa Kg 9,000

    77 Paku ulir + ring Karet Bh 350

    78 Paku Triplek Kg 10,000

    79 Paku Genteng Metal Kg 22,500

    80 Papan Nama Jalan Lengkap Unit 200,000

    81 Pasir Urug M3 60,000

    82 Pasir Batu (Sirtu) M3 72,500

    83 Pasir Beton M3 120,000

    84 Pasir Pasang M3 90,000

    85 Paving Block tb 6 cm Cetak Mesin M2 35,000

    86 Paving Block tb 8 cm Cetak Mesin M2 45,000

    87 PC (Portland Cement) berat 40 kg Zak 45,000

    88 PC (Portland Cement) berwarna untuk nuud Kg 6,000

    89 Pengukuran,Pematokan Lapangan M2 500

    91 Pintu doubel triplex Bh 250,000

    90 Pintu Panil kayu lokal Bh 320,000

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    26/50

    NO. UPAH DAN BHN BANGUNAN SATUAN HARGA SATUAN

    92 Pintu PVC lengkap Bh 140,000

    91 Pipa GIP Medium " Bt 82,000

    93 Pipa PVC 1/2" AW Bt 12,500

    92 Pipa PVC 1" Bt 12,500

    94 Pipa PVC 1 1/4" Bt 17,500

    93 Pipa PVC 2" Bt 22,50095 Pipa PVC 3" Bt 32,500

    96 Pipa PVC 4" Bt 40,000

    97 Pipa Hawa PVC 1 1/4 " + Accessories Bh 11,500

    98 Pohon Penghijauan (Angsana t : 1,5 m) Bt 25,000

    99 Pupuk Kandang M3 75,000

    100 Rooster/lubang angin (terpasang) Bh 15,000

    101 Saringan Air Mangkok Bh 12,000

    102 Saringan air plat kuningan Bh -

    103 Seltipe Roll 2,500

    104 Semen Putih Z a k 80,000

    105 Seng Plaat BJLS.22 lb. 40 cm Lb 17,500

    106 Seng Plaat BJLS.22 lb. 90 cm Lb 32,000

    106 Soket Gip 1/2 Bh 2,500

    107 Soket PVC 1/2 Bh 1,500

    107 Tanah U r u g M3 50,000

    108 Tee Pipa PVC 1 " Lb 2,250

    109 Triplex t.3 MM uk.0,9 x2,10M Lb 32,500

    110 Triplex t.4 MM uk.0,9 x2,10M Lb 45,000

    111 Triplex t.6 MM uk.1.22x2.44M Lb 65,000

    112 Pek. Sumur Pantek + lengkap dengan pompa listrik & Accessories Lb 1,550,000

    C. DAFTAR HARGA SEWA ALAT :

    112 Sewa Alat (Bulldozer) 1/ Per Jam 250,000

    113 Sewa Alat (Concrete Mixer) 1/hari 175,000

    114 Sewa Alat (Concrete Vibrator) 1/hari 225,000

    115 Sewa Alat (Dump Truck) 1/hari 60,000

    116 Sewa Alat (Escavator) 1/ Per Jam 225,000

    117 Sewa Alat (Motor Grader) 1/ Per Jam 200,000

    118 Sewa Alat (Sheep Roller) 1/ Per Jam 175,000

    119 Sewa Alat (Stamper) 1/hari 45,000

    120 Sewa Alat (Stone Walles) 1/hari 110,000

    121 Sewa Alat (Wheel Loader) 1/hari 225,000

    Semarang, Maret 2011

    Ass Man Produksi & PLPP

    AMAT IMRON

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    27/50

    Pekerjaan : Pembangunan Rumah

    Lokasi : Bumi Palir Sejahtera

    Type Rumah : RSh 27 Melati

    (Dinding Bataco diplester depan, Atap genteng)

    SA HARGA JMLH HARGA JMLH HARGA

    NO. TU SATUAN KOPPEL TUNGGAL

    AN KOPEL TUNGGAL ( Rp. ) ( Rp. ) ( Rp. )

    1. 3. 4. 5. 6. 7. 8.

    I PEKERJAAN PERSIAPAN :

    2. Air Kerja Ls 1.000 1.000 100,000.00 100,000.00 100,000.003. Pengukuran, Pemat.& Pembers. Lapangan. Ls 1.000 1.000 100,000.00 100,000.00 100,000.00

    4. Pemasangan Bouwplank 2 x pakai M' 28.500 32.500 6,520.00 185,820.00 211,900.00

    5. Keamanan Ls 1.000 1.000 50,000.00 50,000.00 50,000.00

    435,820.00 461,900.00

    I I PEKERJAAN PONDASI :

    1. Galian tanah pondasi M3 4.627 4.857 15,600.00 72,181.20 75,769.20

    2. Urugan tanah kembali & pemadatan bekas galian pondasi M3 1.667 1.724 7,480.00 12,467.29 12,897.39

    3. Urugan pasir bwh pondasi & lantai. M3 0.907 0.964 82,900.00 75,169.58 79,936.33

    4. Pas.pondasi Umpak batu kali t. 45 cm & menerus t. 25 cm M3 2.054 2.169 411,660.00 845,343.81 892,684.71

    5. Pas.pond. rolak teras Conblock ad. 1 Pc : 5 Ps M' 4.700 4.700 10,900.00 51,230.00 51,230.00

    1,056,391.88 1,112,517.63

    III PEKERJAAN DINDING

    A. DINDING MASIF :

    1. Pasangan Dinding Conblock ad. 1Pc : 5 Psr M2 76.905 85.930 51,970.00 3,996,752.85 4,465,782.10

    2. Pasangan beton bertulang ad. 1 Pc: 2 Ps : 3 Krl

    - Sloof beton 10/15 cm M3 0.471 0.534 3,008,750.00 1,417,121.25 1,606,672.50

    - Sloof beton teras 10/15 cm (Besi 7 mm) M3 0.053 0.053 3,008,750.00 157,959.38 157,959.38

    - Ring Balk uk 10/12 cm M3 0.377 0.427 3,008,750.00 1,133,697.00 1,285,338.00

    - Ring Balk sopi uk 10/12 cm M3 0.225 0.250 3,008,750.00 676,427.18 750,984.00

    - Balk Sofi uk 10/10 cm M3 0.078 0.094 2,717,550.00 212,512.41 256,264.97

    - Kolom tiang teras uk.12/12 cm M3 0.037 0.037 2,717,550.00 101,745.07 101,745.07

    - Kolom Praktis 10/10 cm M3 0.393 0.445 2,717,550.00 1,067,453.64 1,208,766.24

    - Beton Teras t = 7 cm M3 0.187 0.187 3,008,750.00 563,914.97 563,914.97

    - Beton Kantilever = 6 cm (diatas pintu belakang) M3 0.048 0.048 3,008,750.00 145,773.94 145,773.94

    3. Pekerjaan Plesteran ad. 1 Pc : 5 Psr

    - Plesteran dinding depan luar M2 14.060 14.060 17,070.00 240,004.20 240,004.20

    Pekerjaan Plesteran ad. 1 Pc : 5 Psr

    - Plesteran ornamen minimalis Ls 1.000 1.000 17,070.00 17,070.00 17,070.00

    - Plesteran Tiang Teras M2 1.248 1.248 17,070.00 21,303.36 21,303.36

    - Plesteran dinding KM/WC tinggi 1.60 m M2 7.120 7.120 17,070.00 121,538.40 121,538.40- Plesteran Ban-banan diatas genteng batas unit M' 6.000 6.000 17,070.00 102,420.00 102,420.00

    4 Pasang Roster beton :

    - uk.15 x 25 cm Bh 19.000 19.000 15,000.00 285,000.00 285,000.00

    5 Pas. locis kusen 1:2:3 Bh 10.000 10.000 1,650.00 16,500.00 16,500.00

    10,277,193.65 11,347,037.13

    B. DINDING KOMPONEN :

    1. Pas. Kusen Kayu lokal keras 5/11 bersih

    - Kusen Type PJ - 2 (0.0846 M/bh) BH 1.000 1.000 524,950.00 524,950.00 524,950.00

    - Kusen Type P - 1 (0.0377 M/bh) BH 3.000 3.000 225,390.00 676,170.00 676,170.00

    - Kusen Type J - 2 (0.0469 M/bh) BH 2.000 2.000 196,470.00 392,940.00 392,940.00

    - Kusen Type BV-1 BH 1.000 1.000 116,520.00 116,520.00 116,520.00

    2. Pas. Daun Jendela +kaca polos tebal 3 mm lengkap

    - ukuran : 1.02 x 0.52 m' ( J.2 ) BH 6.000 6.000 127,610.00 765,660.00 765,660.00

    3. Pas. Kaca Es tebal 3 mm pada kusen BV-1 M2 0.185 0.185 51,660.00 9,546.77 9,546.77

    4. Pas. Daun Pintu panil triplek lengk. engsel+grendel Bh 1.000 1.000 279,100.00 279,100.00 279,100.00

    4. Pas. Daun Pintu doubel triplek 3 mm lengk. engsel+grendel Bh 3.000 3.000 246,010.00 738,030.00 738,030.006. Pas. Kunci tanam 2 slaag (Pintu dpn) BH 4.000 4.000 43,440.00 173,760.00 173,760.00

    7. Pas. Kusen & daun pintu PVC lengkap (KM/WC) BH 1.000 1.000 173,600.00 173,600.00 173,600.00

    3,850,276.77 3,850,276.77

    RENCANA ANGGARAN BIAYA

    VOLUMEURAIAN PEKERJAAN

    2.

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    28/50

    IV PEKERJAAN RANGKA ATAP.

    1. Pas Gording Kayu lokal ukuran 6/12 M' 32.000 32.000 31,780.00 1,016,960.00 1,016,960.0

    2. Pas & Balok Nok Kayu lokal ukuran 6/12 M' 5.500 5.500 31,780.00 174,790.00 174,790.0

    3. Pas. Kayu Ruiter ukuran 4/6 M' 5.500 5.500 12,490.00 68,695.00 68,695.0

    4. Pas Kasau 4/6 dan Reng 2/3 M2 40.496 40.496 48,720.00 1,972,965.12 1,972,965.1

    5. Pas. Papan Lisplang Cemen Silica 0.8/20 M' 18.830 18.830 14,060.00 264,749.80 264,749.8

    3,498,159.92 3,498,159.9

    V PEK.PENUTUP ATAP DAN PLAFON

    1. Pas. Penutup atap genteng palentong M2 40.496 40.496 23,340.00 945,176.64 945,176.6

    2. Pas. Nok/bubungan genteng m' 5.500 5.500 42,400.00 233,200.00 233,200.0

    3. Pas.Rangka Plafond kayu lokal ukuran 4/6 :

    -Bagian luar M2 9.235 9.235 44,080.00 407,078.80 407,078.8

    -Bagian Dalam M2 24.174 24.174 44,080.00 1,065,572.29 1,065,572.24. Penutup Plafond Eternit tebal 4 mm :

    - Bagian luar M2 9.235 9.235 17,480.00 161,427.80 161,427.8

    - Bagian Dalam M2 24.174 24.174 17,480.00 422,554.53 422,554.5

    3,235,010.06 3,235,010.0

    VI PEKERJAAN LANTAI.

    1. Pas. Lantai Keramik uk. 30 x 30 cm :

    - R.Tamu + R.Kel / R.Makan + K. tidur + Dapur M2 22.749 22.749 80,760.00 1,837,225.39 1,837,225.3

    - Teras Belakang M2 0.720 0.720 80,760.00 58,147.20 58,147.2

    - Teras depan M2 2.500 2.500 80,760.00 201,900.00 201,900.0

    2. Lantai KM / WC ,Keramik Mulia KW.I 20x20 M2 1.640 1.640 70,260.00 115,226.40 115,226.4

    2,212,498.99 2,212,498.9

    VII PEKERJAAN SANITAIR.

    1. Pas. Pipa Leiding PVC dia 1/2" + Accessories M' 7.000 7.000 8,460.00 59,220.00 59,220.0

    2. Pas. Kran Leiding 0 1/2" BH 1.000 1.000 13,310.00 13,310.00 13,310.0

    3. Pas. Pipa pembuangan :- Sal Tinja pipa PVC dia 4" M' 5.500 5.500 22,380.00 123,090.00 123,090.0

    - Sal air kotor bawah lantai PVC dia 3" M' 7.000 7.000 17,470.00 122,290.00 122,290.0

    4. Pas. Bak Mandi Fiberglass + dudukan BH 1.000 1.000 201,780.00 201,780.00 201,780.0

    5. Pas. Closet jongkok Porselin + dudukan BH 1.000 1.000 194,410.00 194,410.00 194,410.0

    6. Pas. beerput lengkap BH 1.000 1.000 543,010.00 543,010.00 543,010.0

    7. Pas. Saringan air plastik Bh 1.000 1.000 12,000.00 12,000.00 12,000.0

    1,269,110.00 1,269,110.0

    VIII PEKERJAAN PENGECATAN.

    1. Pengecatan Kayu pada Kusen, daun pintu, daun jendela & Lisplank M2 30.368 30.368 17,240.00 523,544.32 523,544.3

    2. Pengecatan Metrolite pada dinding luar M2 14.060 14.060 10,830.00 152,269.80 152,269.8

    3. Pengecatan Metrolite pada dinding KM/WC M2 7.120 7.120 10,830.00 77,109.60 77,109.6

    4. Pengecatan Metrolite pada plafond luar & dalam M2 33.409 33.409 10,830.00 361,815.14 361,815.1

    1,114,738.86 1,114,738.8

    IX PEKERJAAN LAIN-LAIN.

    1. Pembersihan lapangan setelah selesai pembangunan Ls 1.000 1.000 100,000.00 100,000.00 100,000.02. Jl. Masuk Rumah, Rabat Beton ad. 1 Ps : 3 Ps : 5 Krl uk. 80x300x8 cm M2 2.400 2.400 26,190.00 62,856.00 62,856.0

    162,856.00 162,856.0

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    29/50

    (Dinding Bataco diplester depan, Atap genteng).

    JMLH HARGA JMLH HARGA

    NO. KOPPEL TUNGGAL

    ( Rp. ) ( Rp. )

    1 3. 4.

    I PEKERJAAN PERSIAPAN : 435,820.00 461,900.00

    II PEKERJAAN PONDASI : 1,056,391.88 1,112,517.63

    III PEKERJAAN DINDING

    A. DINDING MASIF : 10,277,193.65 11,347,037.13

    B. DINDING KOMPONEN : 3,850,276.77 3,850,276.77

    IV PEKERJAAN RANGKA ATAP. 3,498,159.92 3,498,159.92

    V PEK.PENUTUP ATAP DAN PLAFON 3,235,010.06 3,235,010.06

    VI PEKERJAAN LANTAI. 2,212,498.99 2,212,498.99

    VII PEKERJAAN SANITAIR. 1,269,110.00 1,269,110.00

    VIII PEKERJAAN PENGECATAN. 1,114,738.86 1,114,738.86

    X PEKERJAAN LAIN-LAIN. 162,856.00 162,856.00

    JUMLAH SUB TOTAL 27,112,056.13 28,264,105.36

    JASA KONTRAKTOR 10 % 2,711,205.61 2,826,410.54

    JUMLAH TOTAL 29,823,261.74 31,090,515.90

    DIBULATKAN 29,823,000.00 31,090,000.00

    HARGA / M2 1,104,555.56 1,151,481.48

    Mengetahui/Menyetujui Semarang, Maret 2011Manager Cabang Ass Man Produksi & PLPP

    AKHMAD RUKHIMAN AMAT IMRON

    RENCANA ANGGARAN BIAYA

    REKAPITULASI

    URAIAN PEKERJAAN

    2

    DI LOKASI BUMI PALIR SEJAHTERA PERUM PERUMNAS CABANG SEMARANG I

    PEKERJAAN PEMBANGUNAN RUMAH TYPE RSh. 27/72 Melati

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    30/50

    PEKERJAAN : PEMBANGUNAN RUMAH RSh. 29

    LOKASI : BUMI PALIR SEJAHTERA PERUM PERUMNAS CABANG SEMARANG I

    TYPE RUMAH : RSh. 29 (Pelana) (Dinding Conblo

    SA HARGA JMLH HARGANO. TU SATUAN KOPPEL

    AN KOPEL TUNGGAL ( Rp. ) ( Rp. )

    1. 3. 4. 5. 6. 7.

    I PEKERJAAN PERSIAPAN :

    1. Air Kerja Ls 1.000 1.000 100,000.00 100,000.002. Pengukuran, Pemat.& Pembers. Lapangan. m2 1.000 1.000 100,000.00 100,000.00

    3. Pemasangan Bouwplank 2 x pakai M' 22.000 30.000 6,520.00 143,440.004. Keamanan Ls 1.000 1.000 50,000.00 50,000.00

    393,440.00

    II PEKERJAAN PONDASI :

    1. Galian tanah pondasi M3 2.243 3.044 15,600.00 34,990.802. Urugan tanah kembali & pemadatan bekas galian pondasi M3 0.702 0.838 7,480.00 5,250.963. Urugan pasir bwh pondasi & lantai. M3 1.976 2.056 82,900.00 163,810.404. Pas.pondasi menerus batu kali Ad.1 Pc :5 Ps t. 45 cm M3 1.780 2.732 411,660.00 732,754.805. Pas.pond. rolak teras conblock ad. 1 Pc : 5 Ps M' 5.200 5.200 10,900.00 56,680.00

    993,486.96

    I II PEKERJAAN DINDINGA. DINDING MASIF :

    1. Pasangan Dinding Conblock ad. 1 Pc : 5 Ps M2 80.000 87.000 51,970.00 4,157,600.002. Pasangan beton bertulang ad. 1 Pc: 2 Ps : 3 Krl

    - Sloof beton 10/15 cm M3 0.453 0.517 3,008,750.00 1,362,963.75- Ring Balk uk 10/12 cm M3 0.366 0.407 3,008,750.00 1,101,202.50- Balk Sofi uk 10/12 cm M3 0.210 0.327 3,008,750.00 631,837.50- Kolom tiang teras uk.12/12 cm M3 0.038 0.038 2,717,550.00 103,266.90- Kolom Praktis 10/10 cm M3 0.345 0.417 2,717,550.00 937,554.75

    3. Pekerjaan Plesteran ad. 1 Pc : 5 Psr- Plesteran dinding luar M2 10.716 10.716 17,070.00 182,922.12- Plesteran Tiang Teras M2 1.699 1.699 17,070.00 29,001.93- Plesteran dinding KM/WC tinggi 1.60 m M2 7.680 7.680 17,070.00 131,097.60

    4 Pasang Roster beton :- uk.20 x 20 cm / 15 x 25 cm Bh 16.000 16.000 15,000.00 240,000.00

    5 Pas. locis kusen 1:2:3 Bh 10.000 10.000 1,650.00 16,500.008,893,947.05

    B. DINDING KOMPONEN :

    1. Pas. Kusen Kayu Lokal keras 5/11 bersih- Kusen Type P - 1 (0.038 M/bh) BH 3.000 3.000 225,390.00 676,170.00- Kusen Type PJ-2 (0.087 M/bh) BH 1.000 1.000 524,950.00 524,950.00- Kusen Type J - 1 (0.030 M/bh) BH 2.000 2.000 196,470.00 392,940.00- Kusen Type BV-1 BH 1.000 1.000 116,520.00 116,520.00

    2. Pas. Daun Jendela +kaca polos tebal 5 mm lengkap- ukuran : 1.02 m' x 0.62 m' ( J.1 ) BH 2.000 2.000 127,610.00 255,220.00- ukuran : 1.02 m' x 0.62 m' ( PJ.2 ) BH 1.000 1.000 127,610.00 127,610.00

    3. Pasang Kaca mati polos tebal 5 mm :- ukuran : 0.8 m' x 1.02 m' = 1 bh ( PJ.2 ) M2 0.840 0.840 127,610.00 107,192.40

    4. Pas. Kaca Es tebal 3 mm pada kusen BV-1 M2 0.273 0.273 51,660.00 14,092.85

    5. Pas. Daun Pintu panil triplek lengk. engsel+grendel Bh 1.000 1.000 279,100.00 279,100.006. Pas. Daun Pintu doubel triplek 3 mm lengk. engsel+grendel Bh 3.000 3.000 246,010.00 738,030.00

    7. Pas. kunci tanam 2 slaag (Pintu dpn & Blk) BH 2.000 2.000 43,440.00 86,880.008. Pas. Kusen & daun pintu PVC lengkap (KM/WC) - P2 BH 1.000 1.000 173,600.00 173,600.00

    3,492,305.25

    IV PEKERJAAN RANGKA ATAP.

    1. Pas Gording Kayu lokal ukuran 6/12 M' 34.800 34.800 31,780.00 1,105,944.002. Pas Balok Nok Kayu lokal ukuran 6/12 M' 5.800 5.800 31,780.00 184,324.00

    3. Pas. Kayu Ruiter ukuran. 4/6 M' 5.800 5.800 12,490.00 72,442.004. Pas Kasau 4/6 dan Reng 2/3 M2 52.200 52.200 48,720.00 2,543,184.005. Pas. Papan Lisplang Cemen Silica 0.8/20 M' 21.000 21.000 14,060.00 295,260.00

    4,201,154.00

    RENCANA ANGGARAN BIAYA (RAB)

    VOLUMEURAIAN PEKERJAAN

    2.

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    31/50

    V PEK.PENUTUP ATAP DAN PLAFON

    1. Pas. Penutup atap genteng palentong M2 52.200 52.200 23,340.00 1,218,348.002. Pas. Nok/bubungan genteng m' 5.800 5.800 42,400.00 245,920.003. Pas.Rangka Plafond kayu lokal ukuran 4/6 : -

    -Bagian Dalam M2 25.300 25.300 44,080.00 1,115,224.00-Bagian Luar M2 18.980 18.980 44,080.00 836,638.40

    4. Penutup Plafond Eternit tebal 4 mm : --Bagian Dalam M2 25.300 25.300 17,480.00 442,244.00-Bagian Luar M2 18.980 18.980 17,480.00 331,770.40

    4,190,144.80

    VI PEKERJAAN LANTAI.

    1. Pas. Lantai Keramik uk. 30 x 30 cm (polos)- R.Tamu + R.Kel / R.Makan + K. tidur + Dapur M2 23.340 23.340 80,760.00 1,884,938.40- Teras Belakang M2 0.720 0.540 80,760.00 58,147.20

    - Teras depan M2 2.500 2.500 80,760.00 201,900.002. Lantai KM / WC ,Keramik Mulia KW.I 20x20 M2 1.780 1.780 70,260.00 125,062.80

    2,270,048.40

    VII PEKERJAAN SANITAIR.

    1. Pas. Pipa Leiding PVC dia 1/2" + Accessories M' 10.000 10.000 8,460.00 84,600.002. Pas. Kran Leiding 0 1/2" BH 1.000 1.000 13,310.00 13,310.003. Pas. Pipa pembuangan : -

    - Sal Tinja pipa PVC dia 4" M' 9.000 9.000 22,380.00 201,420.00

    - Sal air kotor bawah lantai PVC dia 3" M' 11.000 11.000 17,470.00 192,170.004. Pas. Bak Mandi Fiberglass Oval 100 ltr + dudukan BH 1.000 1.000 201,780.00 201,780.00

    5. Pas. Closet jongkok Porselin + dudukan BH 1.000 1.000 194,410.00 194,410.006. Pas. beerput lengkap sedalam 1,5 m BH 1.000 1.000 543,010.00 543,010.00

    7. Pas. Saringan air plastik Bh 1.000 1.000 12,000.00 12,000.001,442,700.00

    VIII PEKERJAAN PENGECATAN.

    1. Pengecatan Kayu pada Kusen, daun pintu, daun jendela & Lisplank M2 31.284 31.284 17,240.00 539,336.162. Pengecatan Metrolite pada dinding luar M2 12.415 12.415 10,830.00 134,454.453. Pengecatan Metrolite pada dinding KM/WC M2 7.680 7.680 10,830.00 83,174.404. Pengecatan Metrolite pada plafond luar & dalam M2 44.280 44.280 10,830.00 479,552.40

    1,236,517.41

    IX PEKERJAAN LAIN-LAIN.

    1. Pembersihan lapangan setelah selesai pembangunan Ls 1.000 1.000 100,000.00 100,000.002. Pek. Jalan masuk rumah beton ad. 1:3:5 ( 5 x 0.06 x 0,90 m) M2 4.500 4.500 26,190.00 117,855.00

    217,855.00

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    32/50

    JMLH HARGANO. KOPPEL

    ( Rp. )1 3.

    I PEKERJAAN PERSIAPAN : 393,440.00

    II PEKERJAAN PONDASI : 993,486.96

    I II PEKERJAAN DINDINGA. DINDING MASIF : 8,893,947.05

    B. DINDING KOMPONEN : 3,492,305.25

    IV PEKERJAAN RANGKA ATAP. 4,201,154.00

    V PEK.PENUTUP ATAP DAN PLAFON 4,190,144.80

    VI PEKERJAAN LANTAI. 2,270,048.40

    VII PEKERJAAN SANITAIR. 1,442,700.00

    VIII PEKERJAAN PENGECATAN. 1,236,517.41

    IX PEKERJAAN LAIN-LAIN. 217,855.00

    JUMLAH SUB TOTAL ` 27,331,598.87

    JASA KONTRAKTOR 10 % 2,733,159.89

    JUMLAH TOTAL 30,064,758.76

    DIBULATKAN 30,064,000.00

    HARGA / M2 1,036,689.66

    Mengetahui/Menyetujui Semarang, Maret 2011Manager Cabang Ass Man Produksi & PLPP

    AKHMAD RUKHIMAN AMAT IMRON

    PEKERJAAN PEMBANGUNAN RUMAH RsH. 29

    DI LOKASI BUMI PALIR SEJAHTERA PERUM PERUMNAS CABANG SEMARANG I

    URAIAN PEKERJAAN

    2

    REKAPITULASI

    RENCANA ANGGARAN BIAYA

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    33/50

    ck, Atap genteng Palentong).

    JMLH HARGATUNGGAL

    ( Rp. )

    8.

    100,000.00100,000.00195,600.0050,000.00

    445,600.00

    47,486.406,268.24

    170,442.401,124,655.12

    56,680.001,405,532.16

    4,521,390.00

    1,555,523.751,224,561.25

    983,861.25103,266.90

    1,133,218.35

    182,922.1229,001.93

    131,097.60

    240,000.0016,500.00

    10,121,343.15

    676,170.00524,950.00392,940.00116,520.00

    255,220.00127,610.00

    107,192.4014,092.85

    279,100.00738,030.00

    86,880.00173,600.00

    3,492,305.25

    1,105,944.00184,324.0072,442.00

    2,543,184.00295,260.00

    4,201,154.00

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    34/50

    1,218,348.00245,920.00

    1,115,224.00836,638.40

    442,244.00331,770.40

    4,190,144.80

    1,884,938.4043,610.40

    201,900.00125,062.80

    2,255,511.60

    84,600.0013,310.00

    201,420.00

    192,170.00201,780.00

    194,410.00543,010.00

    12,000.001,442,700.00

    539,336.16134,454.45

    83,174.40479,552.40

    1,236,517.41

    100,000.00117,855.00217,855.00

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    35/50

    RsH. 29 (Pelana)

    JMLH HARGATUNGGAL

    ( Rp. )4.

    445,600.00

    1,405,532.16

    10,121,343.15

    3,492,305.25

    4,201,154.00

    4,190,144.80

    2,255,511.60

    1,442,700.00

    1,236,517.41

    217,855.00

    29,008,663.37

    2,900,866.34

    31,909,529.71

    31,909,000.00

    1,100,310.34

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    36/50

    Pekerjaan : PEMBANGUNAN RUMAH RS 36

    Lokasi : BUKIT BERINGIN LESTARI

    Type Rumah : RS 36 Type Cempaka

    (Dinding Bata Merah diplester, Atap g

    SA HARGA JMLH HARGA JMLH H

    NO. TU SATUAN KOPPEL TUNG

    AN KOPEL TUNGGAL ( Rp. ) ( Rp. ) ( Rp

    1. 3. 4. 5. 6. 7. 8.

    I PEKERJAAN PERSIAPAN :

    1 Air Kerja Ls 1.000 1.000 100,000.00 100,000.00 1002 Pengukuran, Pemat.& Pembers. Lapangan. m2 1.000 1.000 100,000.00 100,000.00 1003 Pemasangan Bouwplank 2 x pakai M' 34.000 36.700 6,520.00 221,680.00 2394 Keamanan Ls 1.000 1.000 50,000.00 50,000.00 50

    471,680.00 489

    I I PEKERJAAN PONDASI :1. Galian tanah pondasi M3 4.940 5.170 15,600.00 77,064.00 80

    2. Urugan tanah kembali & pemadatan bekas galian pondasi M3 1.745 1.803 7,480.00 13,052.60 133. Urugan pasir bwh pondasi & lantai. M3 0.985 1.043 82,900.00 81,656.50 864. Pas.pondasi umpak batu kali t. 45 cm & menerus t. 25 cm M3 2.210 2.325 411,660.00 909,768.60 9575. Pas.pond. rolak teras bata merah ad. 1 Pc : 3 Ps M' 6.200 6.200 10,900.00 67,580.00 67

    1,149,121.70 1,205

    III PEKERJAAN DINDING

    A. DINDING MASIF :

    1. Pasangan Dinding Bata Merah ad. 1Pc : 6 Psr M2 98.326 114.058 56,380.00 5,543,619.88 6,430- Pas. Bata Tiang teras M3 0.840 0.840 56,380.00 47,359.20 47

    2. Pasangan beton bertulang ad. 1 Pc: 2 Ps : 3 Krl1.10 - Sloof beton 10/15 cm M3 0.681 0.678 3,008,750.00 2,048,657.88 2,039

    - Sloof beton teras 10/15 cm M3 0.060 0.060 3,008,750.00 180,525.00 180

    - Ring Balk uk 10/12 cm M3 0.402 0.470 3,008,750.00 1,209,517.50 1,415- Ring Balk Sopi uk 10/12 cm M3 0.257 0.257 3,008,750.00 773,369.10 773- Balk Sofi uk 10/12 cm M3 0.103 0.123 3,008,750.00 310,051.69 369- Kolom tiang teras uk.12/12 cm M3 0.040 0.040 3,008,750.00 121,312.80 121- Kolom Praktis 10/10 cm M3 0.391 0.447 2,717,550.00 1,062,562.05 1,214

    - Dak Beton Teras t = 7 cm M3 0.381 0.381 3,008,750.00 1,145,732.00 1,145- Balk Pengaku Dak Teras 10/12 cm M3 0.054 0.054 3,008,750.00 162,472.50 162

    - Dak Beton Kantilever t : 5 cm (diatas pintu belakang & Jendela) M3 0.118 0.118 3,008,750.00 355,634.25 355

    3. Pekerjaan Plesteran ad. 1 Pc : 5 Psr- Plesteran dinding luar M2 64.463 94.013 17,070.00 1,100,380.00 1,604- Plesteran dinding dalam M2 115.765 115.765 17,070.00 1,976,105.14 1,976Pekerjaan Plesteran ad. 1 Pc : 5 Psr- Plesteran ornamen minimalis Ls 1.000 1.000 250,000.00 250,000.00 250- Plesteran Tiang Teras M2 3.360 3.360 17,070.00 57,355.20 57

    4. - Plesteran dinding KM/WC tinggi 1.60 m M2 7.120 7.120 17,070.00 121,538.40 1215. Pasang Roster Beton :

    - uk.15 x 35 cm Bh 19.000 19.000 25,000.00 475,000.00 4756. Pas. locis kusen 1:2:3 Bh 10.000 10.000 1,650.00 16,500.00 16

    16,957,692.57 18,757

    B. DINDING KOMPONEN :1. Pas. Kusen Kayu Meranti 5/11 bersih

    - Kusen Type P - Utama (0.0377 M/bh) BH 1.000 1.000 524,950.00 524,950.00 524- Kusen Type P - 1 (0.0377 M/bh) BH 3.000 3.000 225,390.00 676,170.00 676- Kusen Type J - 2 (0.0469 M/bh) BH 3.000 3.000 196,470.00 589,410.00 589

    - Kusen Type BV-1 BH 1.000 1.000 116,520.00 116,520.00 1162. Pas. Daun Jendela +kaca polos tebal 5 mm lengkap

    - ukuran : 1.25 x 0.52 m' ( J.2 ) BH 6.000 6.000 127,610.00 765,660.00 7653. Pas. Kaca Es tebal 3 mm pada kusen BV-1 M2 0.185 0.185 51,660.00 9,546.77 94. Pas. Daun Pintu panil kayu Suren/Johar + lengk. engsel+grendel Bh 1.000 1.000 395,500.00 395,500.00 3955. Pas. Daun Pintu Panil Triplex lengk. engsel+grendel Bh 3.000 3.000 279,100.00 837,300.00 837

    6. Pas. Kunci tanam 2 slaag (Pintu dpn) Setara beluci/yale BH 1.000 1.000 79,050.00 79,050.00 797. Pas. Kunci tanam 2 slaag BH 3.000 3.000 43,440.00 130,320.00 1308. Pas. Kusen & daun pintu PVC lengkap (KM/WC) (P2) BH 1.000 1.000 173,600.00 173,600.00 173

    4,298,026.77 3,773

    RENCANA ANGGARAN BIAYA (RAB)

    VOLUMEURAIAN PEKERJAAN

    2.

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    37/50

    IV PEKERJAAN RANGKA ATAP.

    1. Pas Gording Kayu lokal ukuran 6/12 M' 48.500 48.500 31,780.00 1,541,330.00 1,542. Pas & Balok Nok Kayu lokal ukuran 6/12 M' 6.500 6.500 31,780.00 206,570.00 206

    3. Pas. Kayu Ruiter kayu ukuran 4/6 M' 6.500 6.500 12,490.00 81,185.00 84. Pas Kasau 4/6 dan Reng 2/3 M2 50.974 50.974 48,720.00 2,483,453.28 2,483

    5. Pas. Papan Lisplang Cemen Silica 0.8/20 M' 19.400 19.400 14,060.00 272,764.00 2724,585,302.28 4,585

    V PEK.PENUTUP ATAP DAN PLAFON

    1. Pas. Penutup atap genteng Mantili Besar M2 52.974 54.974 41,370.00 2,191,534.38 2,274

    2. Pas. Nok/bubungan genteng Mantili m' 6.500 6.500 42,400.00 275,600.00 2753. Pas.Rangka Plafond kayu lokal ukuran 4/6 :

    -Bagian Luar M2 9.425 9.425 44,080.00 415,454.00 415-Bagian Dalam M2 30.724 30.724 44,080.00 1,354,296.29 1,354

    4. Penutup Plafond Eternit tebal 4 mm :- Bagian Luar M2 9.425 9.425 17,480.00 164,749.00 164

    - Bagian Dalam M2 30.724 30.724 17,480.00 537,048.53 534,938,682.20 5,021

    VI PEKERJAAN LANTAI.1. Urugan Pasir bawah lantai tebal 5 cm M 1.800 1.800 9,750.00 17,550.00 12. Pas. Lantai Keramik uk. 30 x 30 cm (polos)

    - R.Tamu + R.Kel / R.Makan + K. tidur + Dapur M2 32.299 32.299 80,760.00 2,608,483.39 2,608- Teras Belakang M2 1.000 1.000 80,760.00 80,760.00 80

    Pas. Lantai Keramik uk. 30 x 30 cm (Warna)- Teras depan M2 3.750 3.750 80,760.00 302,850.00 302

    3. Lantai KM / WC ,Keramik Mulia KW.I 20x20 M2 1.780 1.780 70,260.00 125,062.80 125

    3,134,706.19 3,134

    VII PEKERJAAN SANITAIR.

    1. Pas. Pipa Leiding PVC dia 1/2" + Accessories M' 7.000 7.000 8,460.00 59,220.00 592. Pas. Kran Leiding 0 1/2" BH 1.000 1.000 13,310.00 13,310.00 13. Pas. Pipa pembuangan :

    - Sal Tinja pipa PVC dia 4" M' 5.500 5.500 22,380.00 123,090.00 12- Sal air kotor bawah lantai PVC dia 3" M' 7.000 7.000 17,470.00 122,290.00 122

    4. Pas. Bak Mandi Fiberglass oval + dudukan BH 1.000 1.000 201,780.00 201,780.00 205. Pas. Closet jongkok Porselin + dudukan BH 1.000 1.000 194,410.00 194,410.00 194

    6. Pas. Beerput lengkap sedalam = 2 m BH 1.000 1.000 543,010.00 543,010.00 547. Pas. Saringan air plastik Bh 1.000 1.000 12,000.00 12,000.00 12

    1,269,110.00 1,269

    VIII PEKERJAAN PENGECATAN.1. Pengecatan Kayu Kusen, dn pintu, dn jendela & Lisplank M2 30.368 32.368 17,240.00 523,551.22 5582. Pengecatan Metrolite pada dinding luar M2 76.463 94.013 10,830.00 828,092.12 1,018

    3. Pengecatan Metrolite pada dinding dalam M2 115.765 115.765 10,830.00 1,253,732.78 1,2534. Pengecatan Metrolite pada dinding KM/WC M2 7.120 7.120 10,830.00 77,109.60 7

    5. Pengecatan Metrolite pada plafond luar & dalam M2 40.149 40.149 10,830.00 434,809.34 4343,117,295.06 3,341

    IX PEKERJAAN LAIN-LAIN.

    1. Pembersihan lapangan setelah selesai pembangunan Ls 1.000 1.000 100,000.00 100,000.00 1002. Pek. Jalan masuk rumah beton ad. 1:3:5 ( 6 x 0.06 x 0,90 m) M2 5.400 5.400 38,500.00 207,900.00 20

    307,900.00 30

  • 7/30/2019 RAB-RS-Rumah Tipe 36 Oke

    38/50

    (Dinding Bata Merah diplester, Atap g

    JMLH HARGA JMLH H

    NO. KOPPEL TUNG

    ( Rp. ) ( Rp

    1 3. 4

    I PEKERJAAN PERSIAPAN : 471,680.00 489

    II PEKERJAAN PONDASI : 1,149,121.70 1,205

    II I PEKERJAAN DINDING

    A. DINDING MASIF : 16,957,692.57 18,757

    B. DINDING KOMPONEN : 4,298,026.77 3,773

    IV PEKERJAAN RANGKA ATAP. 4,585,302.28 4,585

    V PEK.PENUTUP ATAP DAN PLAFON 4,938,682.20 5,021

    VI PEKERJAAN LANTAI. 3,134,706.19 3,134

    VII PEKERJAAN SANITAIR. 1,269,110.00 1,269

    VIII PEKERJAAN PENGECATAN. 3,117,295.06 3,341

    IX PEKERJAAN LAIN-LAIN. 307,900.00 30

    JUMLAH SUB TOTAL 40,229,516.77 41,885

    JASA KONTRAKTOR 10 % 4,022,951.68 4,188

    JUMLAH TOTAL 44,252,468.45 46,074

    PPN 10 % -

    JUMLAH TOTAL 44,252,468.45 46,074

    DIBULATKAN 44,252,000.00 46,074

    HARGA / M2 1,229,222.22 1,279

    21,741,000.00 23,071Mengetahui/Menyetujui Semarang, Maret 2011

    Manager Cabang Ass Man Produksi & PLPP

    AKHMAD RUKHIMAN AMAT IMRON

    REKAPITULASI

    RENCANA ANGGARAN BIAYA

    PEKERJAAN PEMBANGUNAN RUMAH RS 36

    DI LOKASI BKIT BERINGIN LESTARIA PERUM PERUMNAS CABANG SEMARANG I

    URAIAN PEKERJAAN

    2