    KODE JENIS PEKERJAAN

    ( a ) ( b )

    A PEKERJAAN PERSIAPAN

    A-02 1 m' PEKERJAAN PENGUKURAN DAN PEMASANGAN BOUWPLANK 55,46

    Dihitung 1 m2 PEMBUATAN KANTOR SEMENTARA /DIREKSI 831,79

    A-04 1 m2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT 930,84

    A-05 1 m2 PEKERJAAN MEMBERSIHKAN DAN PERATAAN LAPANGAN 6,60

    A-06 1 m2 PEMBUATAN BEDENG BURUH 1,582,87

    A-07 1 m2 PEMBUATAN BAK ADUKAN, UKURAN (40 x 50 x 20) cm 85,92

    A-08 1 m2 PEMBUATAN STEGGER DARI BAMBU, UKURAN (40 x 50 x 20) cm 28,37

    A-09 1 m2 PEMBUATAN JALAN SEMENTARA, TEBAL 25 cm 80,27

    A-10 1 m3 BONGKARAN BETON BERTULANG 274,99

    A-11 1 m3 BONGKARAN BATA MERAH 27,49

    Dihitung 1 m2 BONGKARAN PLESTER DINDING 3,30

    Dihitung 1 m2 BONGKARAN GENTENG 20,90

    Dihitung 1 m2 BONGKARAN RANGKA ATAP /RENG+KASO 5,30

    Dihitung 1 m3 BONGKARAN KUDA-KUDA, GORDING /BALOK 290,40

    Dihitung 1 m2 BONGKARAN PLAFOND 5,08

    B PEKERJAAN TANAH

    B-01 1 m3 GALIAN TANAH BIASA SEDALAM 1 METER 17,60

    B-02 1 m3 GALIAN TANAH BIASA SEDALAM 2 METER 23,11

    B-03 1 m3 GALIAN TANAH BIASA SEDALAM 3 METER 32,31

    B-04 1 m3 GALIAN TANAH KERAS SEDALAM 1 METER 27,47

    B-05 1 m3 GALIAN TANAH CADAS SEDALAM 1 METER 55,00

    B-06 1 m3 GALIAN TANAH LUMPUR SEDALAM 1 METER 36,25

    B-07 1 m2 PEKERJAAN STRIPPING SETINGGI 1 METER 2,20

    B-08 1 m3 PEMBUANGAN TANAH SEJAUH 150 METER 22,61

    B-09 1 m3 URUGAN KEMBALI 8,43

    B-10 1 m3 PEMADATAN TANAH 22,00

    B-11 1 m3 URUGAN PASIR 97,90

    B-12 1 m3 PEMASANGAN LAPISAN IJUK 25,08

    B-13 1 m3 URUGAN TANAH 70,40

    C PEKERJAAN PONDASI

    C-01 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 2 Ps 571,37

    C-02 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Ps 504,36

    C-03 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 4 Ps 464,18

    C-04 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 5 Ps 436,33

    C-05 1 m3 PASANGAN PONDASI BATU KOSONG 169,78

    C-06 1 m3 PASANGAN PONDASI SIKLOP 40% BATU KALI 1,277,30C-07 1 m3 PASANGAN PONDASI SUMURAN DIAMETER 100 cm 585,74

    ( c

    HARGA SATUAN PEKERJAAN

    WILAYAH KOTA TASIKMALAYA

    TAHUN ANGGARAN 2011

    HAR

    SAT

    (R

  • 7/22/2019 Rab Reklame

    2/34

    F PEKERJAAN KAYU

    Dihitung 1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU GUNUNG KELAS II 5,017,2

    F-04 1 m2 PASANG PINTU KLAMP KAYU KAMPER 124,3

    Dihitung 1 m2 PASANG PINTU KLAMP KAYU GUNUNG KELAS II 182,1

    Dihitung 1 m2 PASANG PINTU PANEL KAYU GUNUNG KELAS II 289,7

    Dihitung 1 m2 PASANG PINTU DAN JENDELA KACA KAYU GUNUNG KELAS II (Tanpa Kaca) 241,5

    Dihitung 1 m3 PASANG KONSTRUKSI KUDA-KUDA KAYU GUNUNG KELAS II 4,082,6

    Dihitung 1 m2 PASANG KASO + RENG GENTENG PALENTONG KAYU GUNUNG KELAS II 53,4

    Dihitung 1 m' PASANG LISTPLANK UKURAN 2 x ( 2x20 ) cm, KAYU GUNUNG KELAS II 40,9

    G PEKERJAAN BETON

    G-01 1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 5 Kr 543,3

    G-02 1 m2 MEMBUAT LANTAI KERJA BETON TUMBUK TEBAL 5 cm, 1 PC : 3 Ps : 5 Kr 67,7

    G-03 1 m3 MEMBUAT BETON BERTULANG, 1 PC : 2 Ps : 4 Kr 611,5

    G-04 1 m3 MEMBUAT BETON BERTULANG, 1 PC : 1,5 Ps : 2,5 Kr 722,2

    G-05 1 m3 MEMBUAT BETON BERTULANG, 1 PC : 2 Ps : 3 Kr 496,7

    G-05.a 1 m3 MEMBUAT BETON BERTULANG K-175 546,4

    G-06 1 m3 MEMBUAT BETON BERTULANG, 1 PC : 2 Ps : 4 Split 700,4

    G-07 1 m3 MEMBUAT BETON BERTULANG, 1 PC : 1,5 Ps : 3 Split 778,9

    G-08 1 m3 MEMBUAT BETON BERTULANG, 1 PC : 1,5 Ps : 2,5 Split 811,8

    G-09 1 m3 MEMBUAT BETON DENGAN MUTU K-225 857,5

    G-10 1 m3 MEMBUAT BETON DENGAN MUTU K 275 947,4

    G-11 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR 11,8

    G-12 1 Kg KABEL PRESSTRESSED POLOS /STRANDS 11,0

    G-13 1 m2 PASANG BEKISTING UNTUK PONDASI 95,1

    G-14 1 m2 PASANG BEKISTING UNTUK SLOOF 103,4

    G-15 1 m2 PASANG BEKISTING UNTUK KOLOM 141,5

    G-16 1 m2 PASANG BEKISTING UNTUK BALOK 150,5

    G-17 1 m2 PASANG BEKISTING UNTUK LANTAI 164,1

    G-19 1 m2 PASANG BEKISTING UNTUK TANGGA 125,7

    G-21 1 m3 MEMBUAT PONDASI BETON BERTULANG (150 Kg Besi + Bekisting) 2,742,1

    G-29.a 1 m2 PASANG BEKISTING UNTUK SLOOF 2 KALI PAKAI 105,4

    G-30.a 1 m2 PASANG BEKISTING UNTUK KOLOM 2X PAKAI 101,8

    G-31.a 1 m2 PASANG BEKISTING UNTUK BALOK 2X PAKAI 102,6

    Dihitung.a 1 m3 MEMBUAT KOLOM BETON BERTULANG 15/20 5,291,0

    Dihitung 1 m3 MEMBUAT KOLOM BETON BERTULANG 20/20 3,951,0

    Dihitung 1 m3 MEMBUAT KOLOM BETON BERTULANG 20/30 4,221,4

    Dihitung 1 m3 MEMBUAT KOLOM BETON BERTULANG 25/40 3,436,7

    Dihitung 1 m3 MEMBUAT BALOK BETON BERTULANG 20/30 4,582,4

    Dihitung 1 m3 MEMBUAT BALOK BETON BERTULANG 20/40 546,4

    Dihitung 1 m3 MEMBUAT BALOK BETON BERTULANG 25/40 3,938,8

    Dihitung 1 m3 MEMBUAT BALOK BETON BERTULANG 25/50 546,4

    Dihitung 1 m3 MEMBUAT RING BALOK BETON BERTULANG 15/15 4,624,0

    Dihitung 1 m3 MEMBUAT SLOOF BETON BERTULANG 15/20 4,062,4

    Dihitung 1 m3 MEMBUAT BALOK BETON BERTULANG 15/30 4,564,9

    Dihitung 1 m3 PLAT BETON T=12 CM 2,628,2

    Dihitung 1 m3 PLAT BETON T= 8 CM 4,261,4

    Dihitung 1 m3 LISTPANK BETON T= 5 CM 6,020,3

  • 7/22/2019 Rab Reklame

    3/34

  • 7/22/2019 Rab Reklame

    4/34

    1 2 3 4 5

    1 Pekerja setengah terampil HOK 35,000

    2 Pekerja terampil HOK 37,500

    3 Tukang Gali Sumur HOK 38,000

    4 Tukang Batu setengah terampil HOK 35,000

    5 Tukang Batu terampil HOK 45,000

    6 Kepala Tukang terampil HOK 50,000

    7 Tukang Kayu setengah terampil HOK 38,000

    8 Tukang Kayu terampil HOK 45,000

    9 Kepala Tukang Kayu HOK 50,000

    10 Tukang Cat / Plitur setengah terampil HOK 35,000

    11 Tukang Cat / Plitur terampil HOK 40,000

    12 Kepala Tukang Cat / Plitur HOK 50,000

    13 Tukang Besi Beton setengah terampil HOK 43,500

    14 Tukang Besi Beton terampil HOK 45,000

    15 Kepala Tukang Besi Beton HOK 50,000

    16 Tukang Besi Frofil setengah terampil HOK 45,000

    17 Tukang Besi Frofil terampil HOK 45,000

    18 Kepala Tukang Besi Frofi l HOK 50,000

    19 Mandor HOK 50,000

    20 Operator Alat Besar HOK 44,500

    21 Pembantu Operator / Mekanik HOK 41,000

    22 Supir Truk HOK 40,000

    23 Kenek Truk / Pembantu Supir Truk HOK 35,000

    24 Penjaga Malam HOK 35,000

    B. BAHAN

    NO JENIS BARANG/JASA SPESIFIKASISATUA

    N

    HARGA

    R

    1 2 3 4 5

    1 Pengelasan ttk 500.00

    2 Spoon Karet m2 250,000.00

    3 Plat Steenlissteel m2 630,000.00

    4 Kotak Saran Aklirik bh 250,000.00

    5 Stiker Imformasi m2 50,000.00

    6 Karet bh 15,000.00

    7 Plat Besi Kg 14,000.00

    8 Pipa Hitam 2" m 54,600.00

    9 Pipa Hitam 3" m 76,700.00

    10 Pipa Hollow # 40 x 40 m 23,833.33

    11 Pipa Hollow # 20 x20 m 13,000.00

    KOTA TASIKMALAYA

    DAFTAR HARGA BARANG/BAHAN

    TAHUN 2012

    HARGA(Rp)

    A. UPAH TENAGA KERJA

    No JENIS TENAGA KERJA SPESIFIKASI SATUAN

  • 7/22/2019 Rab Reklame

    5/34

  • 7/22/2019 Rab Reklame

    6/34

    Page 6

    RINCIAN RENCANA ANGGARAN BIAYA

    ESTIMATE ENGINEERING (EE)

    PEKERJAAN : PEKERJAAN POJOK INFORMASI

    LOKASI : KECAMATAN KOTA TASIKMALAYA

    TAHUN ANGGARAN : 2012

    HARGA JUMLAH JUMLAHNO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN HARGA BIAYA

    Rp. Rp. Rp.

    1 2 4 5 6 7 8

    I. PEKERJAAN POJOK INFORMASI

    1 Pek. Pipa Hitam 3" J-18 m' 2.30 116,715.50 268,445.65

    2 Pek. Pipa Hitam 2" J-19 m' 4.95 76,197.00 377,175.15

    3 Pek. Plat 22x20x8 Uph-Bhn kg 5.53 14,000.00 77,420.00

    4 Pas. Karet ( Untuk Kaki ) Uph-Bhn m' 8.00 15,000.00 120,000.00

    5 Pek. Besi Hollow 40 x 40 Uph-Bhn m' 12.32 23,833.33 293,626.67

    6 Pek. Besi Hollow 20 x 20 Uph-Bhn m' 7.04 13,000.00 91,520.00

    7 Pek. Pengelasan Uph-Bhn ttk 1,294.00 500.00 647,000.00

    8 Pas. Plat Stenlees Steel Uph-Bhn m2 1.53 630,000.00 963,900.00

    9 Pas. Multiplek 9 mm ph-Bhn/2.8 m2 3.34 53,090.28 177,321.53

    10 Pas. Spoon Karet Uph-Bhn m2 1.80 250,000.00 450,000.00

    11 Pas. Kaca 5 mm L-12 m2 2.00 86,363.75 172,727.50

    12 Pas. Kotak Saran Dari Aklirik Uph-Bhn bh 2.00 250,000.00 500,000.00

    13 Pas. Stiker Imformasi Uph-Bhn m2 0.31 50,000.00 15,500.00

    14 Cat Plitur ls ls 1.00 120,000.00 120,000.00

    15 Pas. Lampu TL 40 Watt Uph-Bhn bh 1.00 180,000.00 180,000.00

    JUMLAH 4,454,636.49 4,454,636.49

    PPN 10% 445,463.65

    Jumlah Total 4,900,100.14

    Dibulatkan 4,900,000.00

    EMPAT JUTA SEMBILAN RATUS RIBU RUPIAH

  • 7/22/2019 Rab Reklame

    7/34

    simpan angka anda disini =========> 4,900,000.00

    Terbilang :

    EMPAT JUTA

    Cara Pake : 1. Hubungkan cell angka yang akan diterjemahka

    2. Hubungkan hasil "terbilang" pada worksheet re

  • 7/22/2019 Rab Reklame

    8/34

    apitulasi

  • 7/22/2019 Rab Reklame

    9/34

    PERHITUNGAN BESI BETON DAN BEKISTING / M3

    DENGAN PENDEKATAN PERHITUNGAN DI LAPANGAN

    E022 1 M3 KOLOM 30 X 30 0.3 X 0.3

    Panjang 1 : 0.3 : 0.3 = M1

    Besi dia 13 8 dia 12

    Besi dia 10 0 dia 0

    Begel dia 8 - 0.15

    Besi dia 13 = 11.63 X 8 X 0.89 KG = =

    Besi dia 10 = 0.00 X 0 X 0.62 KG = =

    Begel dia 8 = ( 11.11 : 0.15 ) X ( 0.25 + 0.25 + 0.25 + 0.25 )] X 0.4 =

    Bekisting 11.11 X ( 0.3 + 0.3 + 0.36 + 0.36 ) = m2

    E023 1 M3 KOLOM 40 X 80 0.4 X 0.8

    Panjang 1 : 0.4 : 0.8 = M1

    Besi dia 12 10 dia 12

    Besi dia 10 2 dia 10Begel dia 8 - 0.2

    Besi dia 12 = 3.13 X 10 X 0.89 KG = =

    Besi dia 10 = 3.13 X 2 X 0.62 KG = =

    Begel dia 8 = ( 3.13 : 0.2 ) X ( 0.4 + 0.8 + 0.4 + 0.8 )] X 0.4 =

    Bekisting 3.13 X ( 0.4 + 0.8 + 0.4 + 0.8 ) = m2

    Beton K225 1.00 X =

    Besi 46.500 X =

    Bekisting 7.500 X =

    JumlahKeuntungan

    Jumlah Total

    DIBULATKAN

    E024 1 M3 KOLOM 80 X 80 0.8 X 0.8

    Panjang 1 : 0.8 : 0.8 = M1

    11.11

    14.667

    3.13

    7.500

    571,316.25 571,316.25

    10,320.50 479,903.25

    1.56

    126,039.25 945,294.38

    1,996,513.88199,651.39

    2,196,165.26

    2,196,000.00

  • 7/22/2019 Rab Reklame

    10/34

    Besi dia 12 16 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 1.56 X 16 X 0.89 KG = =

    Besi dia 10 = 1.56 X 0 X 0.62 KG = =

    Begel dia 8 = ( 1.56 : 0.2 ) X ( 0.8 + 0.8 + 0.8 + 0.8 )] X 0.4 =

    Bekisting 1.56 X ( 0.8 + 0.8 + 0.8 + 0.8 ) = m2

    Beton K225 1.00 X =

    Besi 33.094 X =

    Bekisting 5.000 X =

    Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    E024 1 M3 KOLOM 12 X 12 0.12 X 0.12

    Panjang 1 : 0.12 : 0.12 = M1

    Besi dia 12 0 dia 12

    Besi dia 10 4 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 69.72 X 0 X 0.89 KG = =

    Besi dia 10 = 69.92 X 4 X 0.62 KG = =

    Begel dia 8 = ( 69.44 : 0.2 ) X ( 0.13 + 0.08 + 0.13 + 0.08 )] X 0.4 =

    Bekisting 69.44 X ( 0 + 0.12 + 0 + 0.12 ) = 16.667 m2

    E025 1 M3 KOLOM 15 X 20 0.15 X 0.2

    Panjang 1 : 0.15 : 0.2 = M1

    Besi dia 12 4 dia 12

    Besi dia 10 0 dia 10

    5.000

    571,316.25 571,316.25

    10,320.50 341,544.05

    126,039.25 630,196.25

    1,543,056.55

    154,305.65

    1,697,362.20

    1,697,000.00

    69.44

    33.33

  • 7/22/2019 Rab Reklame

    11/34

    Begel dia 8 - 0.15

    Besi dia 12 = 33.81 X 4 X 0.89 KG = =

    Besi dia 10 = 0.00 X 0 X 0.62 KG = =

    Begel dia 8 = ( 33.33 : 0.15 ) X ( 0.11 + 0.16 + 0.11 + 0.16 )] X 0.4 =

    Bekisting 33.33 X ( 0 + 0.20 + 0 + 0.20 ) = m2

    E026 1 M3 KOLOM 15 X 15 0.15 X 0.15

    Panjang 1 : 0.15 : 0.15 = M1

    Besi dia 12 0 dia 12

    Besi dia 10 4 dia 10

    Begel dia 8 - 0.15

    Besi dia 12 = 44.92 X 0 X 0.89 KG = =Besi dia 10 = 44.84 X 4 X 0.62 KG = =

    Begel dia 8 = ( 44.44 : 0.15 ) X ( 0.13 + 0.13 + 0.13 + 0.13 )] X 0.4 =

    Bekisting 44.44 X ( 0 + 0.15 + 0 + 0.15 ) = m2

    E027 1 M3 KOLOM 20 X 25 0.2 X 0.25

    Panjang 1 : 0.2 : 0.25 = M1

    Besi dia 12 4 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 20.00 X 4 X 0.89 KG = =

    Besi dia 10 = 20.00 X 0 X 0.62 KG = =

    Begel dia 8 = ( 20.00 : 0.2 ) X ( 0.2 + 0.25 + 0.2 + 0.25 )] X 0.4 =

    Bekisting 20.00 X ( 0.2 + 0.25 + 0.2 + 0.25 ) = m2

    Beton K225 1.00 X =

    Besi 106.750 X =

    Bekisting 18.000 X =

    Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    E027 1 M3 KOLOM 20 X 25 0.2 X 0.2

    20.00

    18.000

    13.333

    44.44

    13.333

    571,316.25 571,316.25

    10,320.50 1,101,713.38

    126,039.25 2,268,706.50

    3,941,736.13

    394,173.61

    4,335,909.74

    4,335,000.00

  • 7/22/2019 Rab Reklame

    12/34

    Panjang 1 : 0.2 : 0.2 = M1

    Besi dia 12 4 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 25.00 X 4 X 0.89 KG = =Besi dia 10 = 25.00 X 0 X 0.62 KG = =

    Begel dia 8 = ( 25.00 : 0.2 ) X ( 0.16 + 0.16 + 0.16 + 0.16 )] X 0.4 =

    Bekisting 25.00 X ( 0.2 + 0.2 + 0.26 + 0.26 ) = m2

    Beton K225 1.00 X =

    Besi 120.600 X =

    Bekisting 23.000 X =

    Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    E028 1 M3 KOLOM 25 X 25 0.25 X 0.25

    Panjang 1 : 0.25 : 0.25 = M1

    Besi dia 13 4 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 13 = 16.00 X 4 X 1.04 KG = =

    Besi dia 10 = 16.00 X 0 X 0.62 KG = =

    Begel dia 8 = ( 16.00 : 0.2 ) X ( 0.25 + 0.25 + 0.25 + 0.25 )] X 0.4 =

    Bekisting 16.00 X ( 0.25 + 0.25 + 0.25 + 0.25 ) = m2

    Beton K225 1.00 X =

    Besi 98.281 X =

    Bekisting 16.000 X =

    Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    E029 1 M3 KOLOM 15 X 20 0.15 X 0.2

    Panjang 1 : 0.15 : 0.2 = M1

    Besi dia 12 4 dia 12

    16.000

    4,714,871.30

    471,487.13

    5,186,358.43

    25.00

    23.000

    571,316.25 571,316.25

    5,186,000.00

    10,320.50 1,014,305.35

    126,039.25 2,016,628.00

    16.00

    571,316.25 571,316.25

    10,320.50 1,244,652.30

    126,039.25 2,898,902.75

    3,602,249.60

    360,224.96

    3,962,474.55

    3,962,000.00

    33.33

  • 7/22/2019 Rab Reklame

    13/34

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 33.33 X 4 X 0.89 KG = =

    Besi dia 10 = 33.33 X 0 X 0.62 KG = =

    Begel dia 8 = ( 33.33 : 0.2 ) X ( 0.15 + 0.2 + 0.15 + 0.2 )] X 0.4 =

    Bekisting 33.33 X ( 0.15 + 0.2 + 0.15 + 0.2 ) = m2

    E029 1 M3 KOLOM 100 X 20 1 X 0.2

    Panjang 1 : 1 : 0.2 = M1

    Besi dia 12 7.6666667 dia 12

    Besi dia 10 34.333333 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 5.00 X 7.6667 X 0.89 KG = =

    Besi dia 10 = 5.00 X 34.333 X 0.62 KG = =

    Begel dia 8 = ( 5.00 : 0.2 ) X ( 1 + 0.2 + 1 + 0.2 )] X 0.4 =

    Bekisting 5.00 X ( 1.04 + 0.2 + 1.04 + 0.2 ) = m2

    E029 1 M3 BALOK 15 X 25 0.15 X 0.25

    Panjang 1 : 0.15 : 0.25 = M1

    Besi dia 12 5 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.15

    Besi dia 12 = 26.97 X 5 X 0.89 KG = =

    Besi dia 10 = 0.00 X 0 X 0.62 KG = =

    Begel dia 8 = ( 26.67 : 0.15 ) X ( 0.19 + 0.25 + 0.19 + 0.25 )] X 0.4 =

    Bekisting 26.67 X ( 0.19 + 0.25 + 0 + 0.25 ) = m2

    E030 1 M3 BALOK 15 X 30 0.15 X 0.3

    5.00

    12.400

    26.67

    18.400

    23.333

  • 7/22/2019 Rab Reklame

    14/34

    Panjang 1 : 0.15 : 0.3 = M1

    Besi dia 12 6 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.15

    Besi dia 12 = 22.22 X 6 X 0.89 KG = =

    Besi dia 10 = 22.22 X 0 X 0.62 KG = =

    Begel dia 8 = ( 22.22 : 0.15 ) X ( 0.15 + 0.3 + 0.15 + 0.3 )] X 0.4 =

    Bekisting 22.22 X ( + 0.3 + 0 + 0.3 ) = m2

    E031 1 M3 BALOK 15 X 15 0.15 X 0.15

    Panjang 1 : 0.15 : 0.15 = M1

    Besi dia 12 4 dia 12

    Besi dia 10 2 dia 10

    Begel dia 8 - 0.15

    Besi dia 12 = 44.44 X 4 X 0.89 KG = =

    Besi dia 10 = X 2 X 0.62 KG = =

    Begel dia 8 = ( 44.44 : 0.15 ) X ( 0.15 + 0.15 + 0.15 + 0.15 )] X 0.4 =

    Bekisting 44.44 X ( + 0.15 + 0 + 0.15 ) = m2

    E032 1 M3 BALOK 40 X 60 0.4 X 0.6

    Panjang 1 : 0.4 : 0.6 = M1

    Besi dia 12 12 dia 12

    Besi dia 10 2 dia 10

    Begel dia 8 - 0.15

    Besi dia 12 = 4.17 X 12 X 0.89 KG = =

    Besi dia 10 = 4.17 X 2 X 0.62 KG = =

    Begel dia 8 = ( 4.17 : 0.15 ) X ( 0.4 + 0.6 + 0.4 + 0.6 )] X 0.4 =

    Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = m2

    Beton K225 1.00 X =

    Besi 71.611 X =

    Bekisting 8.333 X =

    Jumlah

    Keuntungan

    22.22

    13.333

    44.44

    13.333

    4.17

    8.333

    571,316.25 571,316.25

    10,320.50 739,062.47

    142,200.00 1,185,000.00

    2,495,378.72

    249,537.87

  • 7/22/2019 Rab Reklame

    15/34

    Jumlah Total

    DIBULATKAN

    E033 1 M3 BALOK 25 X 30 0.25 X 0.3

    Panjang 1 : 0.25 : 0.3 = M1

    Besi dia 12 6 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.15

    Besi dia 12 = 13.33 X 6 X 0.89 KG = =

    Besi dia 10 = 13.33 X 0 X 0.62 KG = =

    Begel dia 8 = ( 13.33 : 0.15 ) X ( 0.25 + 0.3 + 0.25 + 0.3 )] X 0.4 =

    Bekisting 13.33 X ( 0.25 + 0.3 + 0.25 + 0.3 ) = m2

    Beton K225 1.00 X =Besi 118.089 X =

    Bekisting 14.667 X =

    Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    E033 1 M3 BALOK 20 X 20 0.2 X 0.2

    Panjang 1 : 0.2 : 0.2 = M1

    Besi dia 12 4 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.15

    Besi dia 12 = 25.48 X 4 X 0.89 KG = =

    Besi dia 10 = 0.00 X 0 X 0.62 KG = =

    Begel dia 8 = ( 25.00 : 0.15 ) X ( 0.2 + 0.2 + 0.2 + 0.2 )] X 0.4 =

    Bekisting 25.00 X ( 0.22 + 0.2 + 0.22 + ) = m2

    E034 1 M3 PLAT LANTAI T = 12 CM 1 : 0.12 = M'

    1 M2

    Panjang 8.33 M1

    Lebar 1.00 M1

    Besi dia 8 - 10 84.33 dia 10

    Besi dia 10 - 10 10.52 dia 8

    16.000

    14.667

    571,316.25 571,316.2510,320.50 1,218,736.38

    142,200.00 2,085,600.00

    2,744,916.59

    2,744,000.00

    13.33

    3,875,652.63

    387,565.26

    4,263,217.89

    4,263,000.00

    8.333

    25.00

  • 7/22/2019 Rab Reklame

    16/34

    Besi dia 8 = 1.00 X 84.333 X 0.39 KG = =

    Besi dia 10 = 8.33 X 10.524 X 0.62 KG = =

    Tulangan Double 87.263 X 2 1 M3 =

    Bekisting 1.28 X 8.61 = m2

    E034 1 M3 LISPLANK BETON T = 8 CM 1 : 0.08 = M'

    1 M2

    Panjang 12.50 M1

    Lebar 1.00 M1

    Besi dia 8 - 10 126.00 dia 8

    Besi dia 8 - 10 11.00 dia 8

    Besi dia 8 = 1.00 X 126 X 0.39 KG = =Besi dia 8 = 12.50 X 11 X 0.39 KG = =

    Tulangan Double 102.765 X 1 1 M3 =

    Bekisting 1.20 X 12.70 = m2

    E035 1 M3 PLAT LANTAI T = 5 CM 1 : 0.05 = M2

    1 M2

    Panjang 1.00 M1

    Lebar 1.00 M1

    Besi dia 12 - 10 10 dia 12

    Besi dia 10 - 10 10 dia 10

    Besi dia 12 = 1.00 X 10 X 0.89 KG = =

    Besi dia 10 = 1.00 X 10 X 0.62 KG = =

    1 M3 =

    Bekisting 1.00 : 0.05 = m2

    Beton K225 1.00 X =

    Besi 190.400 X =

    Bekisting 20.000 X =

    Jumlah

    Keuntungan

    11.025

    12.500

    15.240

    10,320.50 1,965,023.20

    167,700.00 3,354,000.00

    5,890,339.45

    589,033.95

    20.000

    20.000

    571,316.25 571,316.25

  • 7/22/2019 Rab Reklame

    17/34

    Jumlah Total

    DIBULATKAN

    E035a 1 M3 PLAT LANTAI T = 8 CM 1 : 0.08 = M2

    1 M2

    Panjang 1.00 M1Lebar 1.00 M1

    Besi dia 12 - 10 11.00 dia 12

    Besi dia 10 - 10 11.00 dia 10

    Besi dia 12 = 1.00 X 11 X 0.89 KG = =

    Besi dia 10 = 1.00 X 11 X 0.62 KG = =

    1 M3 =

    Bekisting 1.00 : 0.08 = m2

    Beton K225 1.00 X =Besi 130.125 X =

    Bekisting 12.500 X =

    Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    E035a 1 M3 PLAT LANTAI T = 10 CM 1 : 0.1 = M2

    1 M2

    Panjang 10.00 M1

    Lebar 1.00 M1

    Besi dia 12 - 15 7.67 dia 12

    Besi dia 10 - 15 67.67 dia 10

    Besi dia 12 = 10.00 X 7.6667 X 0.89 KG = =

    Besi dia 10 = 1.00 X 67.667 X 0.62 KG = =

    Bekisting 1.00 : 0.1 = m2

    E035a 1 M3 ANAK TANGGA

    1 M2 0.03 X 1 0.03 M3

    Panjang - M1

    Lebar 1.00 M1

    Besi dia 12 - 15 5.00 dia 12

    Besi dia 10 - 15 1.00 dia 10

    571,316.25 571,316.2510,320.50 1,342,955.06

    167,700.00 2,096,250.00

    6,479,373.40

    6,479,000.00

    12.500

    12.500

    10.000

    10.000

    4,010,521.31

    401,052.13

    4,411,573.44

    4,411,000.00

  • 7/22/2019 Rab Reklame

    18/34

    Besi dia 12 = 1.12 X 5 X 0.89 KG = =

    Besi dia 10 = 0.49 X 7.6667 X 0.62 KG = =

    Bekisting 0.20 X 1 = 0.200 m2 6.6667

    E036 1 M3 SLOOF 40 X 60 0.4 X 0.6

    Panjang 1 : 0.4 : 0.6 = M1

    Besi dia 12 10 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 4.17 X 10 X 0.89 KG = =

    Besi dia 10 = 4.17 X 0 X 0.62 KG = =

    Begel dia 8 = ( 4.17 : 0.2 ) X ( 0.4 + 0.6 + 0.4 + 0.6 )] X 0.4 =

    Bekisting 4.17 X ( 0.4 + 0.6 + 0 + 0 ) = m2

    Beton K225 1.00 X =

    Besi 56.125 X =

    Bekisting 4.167 X =

    Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    E037 1 M3 SLOOF 20 X 25 0.2 X 0.25

    Panjang 1 : 0.2 : 0.25 = M1

    Besi dia 12 4 dia 12

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 20.00 X 4 X 0.89 KG = =

    Besi dia 10 = 20.00 X 0 X 0.62 KG = =

    Begel dia 8 = ( 20.00 : 0.2 ) X ( 0.2 + 0.25 + 0.2 + 0.25 )] X 0.4 =

    Bekisting 20.00 X ( 0.2 + 0.25 + 0 + 0 ) = m2

    Beton K225 1.00 X =

    Besi 119.150 X =

    Bekisting 9.000 X =

    Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    571,316.25 571,316.25

    4.17

    4.167

    9.000

    571,316.25 571,316.25

    10,320.50 579,238.06

    69,800.00 290,833.33

    1,441,387.65

    144,138.76

    10,320.50 1,229,687.58

    69,800.00 628,200.00

    2,429,203.83

    242,920.38

    1,585,526.41

    1,585,000.00

    20.00

    2,672,124.21

    2,672,000.00

  • 7/22/2019 Rab Reklame

    19/34

    E038 1 M3 SLOOF 20 X 30 0.2 X 0.3

    Panjang 1 : 0.2 : 0.3 = M1

    Besi dia 12 6 dia 12Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 16.67 X 6 X 0.89 KG = =

    Besi dia 10 = 16.67 X 0 X 0.62 KG = =

    Begel dia 8 = ( 16.67 : 0.2 ) X ( 0.2 + 0.3 + 0.2 + 0.3 )] X 0.4 =

    Bekisting 16.67 X ( 0.2 + 0.3 + 0 + 0 ) = m2

    Beton K225 1.00 X =

    Besi 132.250 X =

    Bekisting 8.333 X =Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    E039 1 M3 SLOOF 15 X 20 0.15 X 0.2

    Panjang 1 : 0.15 : 0.2 = M1

    Besi dia 12 4 dia 10

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 33.33 X 4 X 0.89 KG = =

    Besi dia 10 = 33.33 X 0 X KG = =

    Begel dia 8 = ( 33.33 : 0.2 ) X ( 0.11 + 0.16 + 0.11 + 0.16 )] X 0.4 =

    Bekisting 33.33 X ( 0.2 + 0.2 + 0 + 0 ) = m2

    E039 1 M3 SLOOF 20 X 25 0.2 X 0.25

    Panjang 1 : 0.2 : 0.25 = M1

    Besi dia 12 0 dia 10

    Besi dia 10 7 dia 10

    Begel dia 8 - 0.15

    Besi dia 12 = 20.00 X 0 X 0.89 KG = =

    Besi dia 10 = 20.00 X 7 X 0.62 KG = =

    581,666.672,517,869.04

    251,786.90

    16.67

    8.333

    571,316.25 571,316.25

    2,769,655.95

    2,769,000.00

    10,320.50 1,364,886.13

    69,800.00

    33.33

    20.00

    13.333

  • 7/22/2019 Rab Reklame

    20/34

    Besi dia 10 = 0.50 X 2 X 0.62 KG = OVERLEEP =

    Begel dia 8 = ( 20.00 : 0.15 ) X ( 0.21 + 0.21 + 0.21 + 0.21 )] X 0.4 =

    Bekisting 20.00 X ( 0.25 + 0.25 + 0 + 0 ) = m2

    E039 1 M3 RING BALK 15 X 20 0.15 X 0.2

    Panjang 1 : 0.15 : 0.2 = M1

    Besi dia 12 0 dia 10

    Besi dia 10 4 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 33.33 X 0 X 0.39 KG = =

    Besi dia 10 = 33.73 X 4 X 0.62 KG = =

    Begel dia 8 = ( 33.33 : 0.2 ) X ( 0.15 + 0.16 + 0.15 + 0.16 )] X 0.4 =

    Bekisting 33.33 X ( 0.2 + 0.2 + 0 + 0 ) = m2

    E039 1 M3 RING BALK 15 X 25 0.15 X 0.25

    Panjang 1 : 0.15 : 0.25 = M1

    Besi dia 12 0 dia 12

    Besi dia 10 4 dia 10

    Begel dia 8 - 0.2

    Besi dia 12 = 26.67 X 0 X 0.62 KG = =

    Besi dia 10 = 27.07 X 4 X 0.62 KG = =

    Begel dia 8 = ( 26.67 : 0.2 ) X ( 0.15 + 0.21 + 0.15 + 0.21 )] X 0.4 =

    Bekisting 26.67 X ( 0.25 + 0.25 + 0 + 0 ) = m2

    Panjang 1.00 M1

    Lebar 1.00 M1

    Besi dia 12 - 10 10 dia 12

    Besi dia 10 - 10 10 dia 10

    Besi dia 12 = 1.00 X 10 X 0.89 KG = =

    Besi dia 10 = 1.00 X 10 X 0.62 KG = =

    1 M3 =

    Bekisting 1.00 : 0 = m2#DIV/0!

    33.33

    26.67

    10.000

    13.333

    13.333

  • 7/22/2019 Rab Reklame

    21/34

    Beton K225 1.00 X =

    Besi 0.000 X =

    Bekisting #DIV/0! X =

    Jumlah

    Keuntungan

    Jumlah TotalDIBULATKAN

    E041 1 M3 RINGBALK 15 X 20 0.15 X 0.2

    Panjang 1 : 0.15 : 0.2 = M1

    Besi dia 10 4 dia 10

    Besi dia 10 0 dia 10

    Begel dia 8 - 0.2

    Besi dia 10 = 33.33 X 4 X 0.62 KG = =Besi dia 10 = 33.33 X 0 X 0 KG = =

    Begel dia 8 = ( 33.33 : 0.2 ) X ( 0.15 + 0.2 + 0.15 + 0.2 )] X 0.4 =

    Bekisting 33.33 X ( 0.15 + 0.2 + 0 + 0 ) = m2

    Beton K225 1.00 X =

    Besi 128.750 X =

    Bekisting 11.667 X =

    Jumlah

    Keuntungan

    Jumlah Total

    DIBULATKAN

    10,320.50 1,328,764.38

    69,800.00 814,333.33

    #DIV/0!#DIV/0!

    33.33

    10,320.50 -

    128,100.00 #DIV/0!

    #DIV/0!

    571,316.25 571,316.25

    11.667

    571,316.25

    2,985,000.00

    2,714,413.96

    271,441.40

    571,316.25

    2,985,855.35

    #DIV/0!

  • 7/22/2019 Rab Reklame

    22/34

    82.814 0.52

    0.000

    29.259

    112.073 Kg

    1.32 14.666667

    852,216.50

    27.813

    3.875

    14.813

    46.500 Kg

  • 7/22/2019 Rab Reklame

    23/34

    22.250

    0.969

    9.87533.094 Kg

    0.000

    43.353

    57.604

    100.957 Kg

    33.333333

    0.82

  • 7/22/2019 Rab Reklame

    24/34

    27.333333

    120.375 33.33

    0.000 223.22222

    47.400 0.54

    167.775 Kg 120.54 0.4

    48.216

    0.000111.214

    60.859

    172.073 Kg

    71.200

    0.000

    35.550

    106.750 Kg

  • 7/22/2019 Rab Reklame

    25/34

    89.0000.000

    31.600

    120.600 Kg

    66.681

    0.000

    31.600

    98.281 Kg

  • 7/22/2019 Rab Reklame

    26/34

    118.667

    20.667

    46.083

    185.417 Kg

    34.117

    106.433

    0.000

    140.550 Kg

    120.002

    0.000

    61.796

    181.797 Kg

  • 7/22/2019 Rab Reklame

    27/34

  • 7/22/2019 Rab Reklame

    28/34

    71.200

    8.267

    38.622

    118.089 Kg

    90.709

    0.000

    52.667

    143.375 Kg

    10

    1.0008

  • 7/22/2019 Rab Reklame

    29/34

    32.890

    54.373

    87.263 Kg

    174.526 Kg

    49.14053.625

    102.765 Kg

    102.765 Kg

    8.900

    0.620

    9.520 Kg

    190.400 Kg

  • 7/22/2019 Rab Reklame

    30/34

    12.5

    126 1 0.62 78.1211 12.5 0.62 138.12

    216.24

    9.790

    0.620

    10.410 Kg

    130.125 Kg

    10

    68.233

    41.953

    110.187 Kg

  • 7/22/2019 Rab Reklame

    31/34

    4.984

    2.329

    7.313 Kg

    243.771

    37.083

    2.583

    16.458

    56.125 Kg

    71.200

    12.400

    35.550

    119.150 Kg

  • 7/22/2019 Rab Reklame

    32/34

    89.000

    10.333

    32.917

    132.250 Kg

    118.667

    0.000

    35.550

    154.217 Kg

    0.000

    86.800

  • 7/22/2019 Rab Reklame

    33/34

    0.620

    44.240

    131.660 Kg

    0.000

    20.915

    40.81761.731 Kg

    0.000

    67.125

    37.920

    105.045 Kg

    8.900

    0.620

    9.520 Kg

    0.000 Kg