Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

47
HARGA UPAH DAN BAHAN UPAH 1 Mandor Rp. 63,200.00 - Hari 2 Kepala Tukang Rp. 84,300.00 - Hari 3 Tukang Kayu Rp. 70,200.00 - Hari 4 Tukang Batu Rp. 70,200.00 - Hari 5 Tukang Besi Rp. 70,200.00 - Hari 6 Tukang Gali Rp. 70,200.00 - Hari 7 Tukang Las Rp. 70,200.00 - Hari 8 Pekerja Rp. 44,300.00 - Hari BAHAN 1 Batu Apung Rp. 121,306.00 - M3 2 Batu Belah 15/20 Rp. 188,600.00 - M3 3 Batu Adensit Hitam Rp. 130,000.00 - M2 4 Batu Bata Rp. 623.00 - Bh 5 Bata Berongga / Batako Rp. 4,104.00 - Bh 6 Besi Beton Polos Rp. 9,918.00 - Kg 7 Besi Plat Strip Rp. 9,918.00 - Kg 8 Bubungan Genteng Rp. 58,900.00 - M1 9 Cat Dasar Rp. 22,680.00 - Kg 10 Cat Penutup Rp. 23,112.00 - Kg 11 Cat Meni Rp. 20,952.00 - Kg 12 Cat Meni Besi Rp. 20,952.00 - Kg 13 Cat Minyak Rp. 35,964.00 - Kg 14 Dempul Rp. 16,848.00 - Kg 15 Dolken kayu Ø 8 - 10/400 cm Rp. 44,172.00 - Btg 16 Door holder Rp. 24,000.00 - Bh 17 Engsel Pintu Rp. 23,112.00 - Psg 18 Engsel Jendela Rp. 16,416.00 - Psg 19 Fluring Baja Ringan Rp. 18,000.00 - M1 20 Hak angin Rp. 13,716.00 - Bh 21 Floor Drain Rp. 34,992.00 - Bh 22 Genteng Metal Multiroof Rp. 67,000.00 - M2 23 Gip Sum (120 x 240 cm) t = 12 mm Rp. 54,970.00 - Lbr 24 Ijuk Rp. 12,204.00 - Glg 25 Kaca Polos tebal 5 mm Rp. 89,316.00 - M2 26 Kaca polos tebal 10 mm Rp. 140,000.00 - M2 27 Koral beton / kerikil Rp. 188,600.00 - M3 28 Kayu 5/7 Rp. 3,639,168.00 - M3 29 Kayu Klas I ( Seumantok / Ulin / dll ) Rp. 4,783,860.00 - M3 30 Kayu Klas II ( kamper/Kruing/ Dll ) Rp. 3,639,168.00 - M3 31 kayu Klas III ( Borneo, Dll ) Rp. 3,368,628.00 - M3 32 Kayu Bekisting Rp. 2,461,752.00 - M3 33 Kayu Papan Bouwplank Rp. 3,368,628.00 - M3 34 Kayu Klas II Papan Rp. 3,639,168.00 - Lbr 35 Kayu Profil Rp. 5,292.00 - M1 36 Kayu cetakan Rp. 2,461,752.00 - M3 37 Kawat Beton Rp. 9,396.00 - Kg 38 Kawat harmonika Rp. 14,040.00 - M2 39 Kunci Pintu 2 Slaag Rp. 113,600.00 - Bh 40 Kunci tanam antik Rp. 180,000.00 - Bh 41 Kunci tanam biasa Rp. 120,000.00 - Bh 42 Kunci tanam kamar mandi Rp. 70,000.00 - Bh 43 Kunci Selot/Grendel Rp. 35,000.00 - Bh 44 Kuas Rp. 12,000.00 - Bh 45 kloset Jongkok Keramik setara KIA Rp. 104,220.00 - Bh 46 Kran ¾" atau ½" Rp. 65,000.00 - Bh 47 kait Angin Rp. 13,700.00 - Bh 48 Keramik lantai 40 x 40 cm, setara Roman Rp. 65,000.00 - Bh 49 Keramik Lantai 20 x 20 cm anti slip, setar Rp. 63,000.00 - Bh

description

xzxz

Transcript of Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Page 1: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

HARGA UPAH DAN BAHAN

UPAH 1 Mandor Rp. 63,200.00 - Hari2 Kepala Tukang Rp. 84,300.00 - Hari3 Tukang Kayu Rp. 70,200.00 - Hari4 Tukang Batu Rp. 70,200.00 - Hari5 Tukang Besi Rp. 70,200.00 - Hari6 Tukang Gali Rp. 70,200.00 - Hari7 Tukang Las Rp. 70,200.00 - Hari8 Pekerja Rp. 44,300.00 - Hari

BAHAN1 Batu Apung Rp. 121,306.00 - M32 Batu Belah 15/20 Rp. 188,600.00 - M33 Batu Adensit Hitam Rp. 130,000.00 - M24 Batu Bata Rp. 623.00 - Bh5 Bata Berongga / Batako Rp. 4,104.00 - Bh6 Besi Beton Polos Rp. 9,918.00 - Kg7 Besi Plat Strip Rp. 9,918.00 - Kg8 Bubungan Genteng Rp. 58,900.00 - M19 Cat Dasar Rp. 22,680.00 - Kg

10 Cat Penutup Rp. 23,112.00 - Kg11 Cat Meni Rp. 20,952.00 - Kg12 Cat Meni Besi Rp. 20,952.00 - Kg13 Cat Minyak Rp. 35,964.00 - Kg14 Dempul Rp. 16,848.00 - Kg15 Dolken kayu Ø 8 - 10/400 cm Rp. 44,172.00 - Btg16 Door holder Rp. 24,000.00 - Bh17 Engsel Pintu Rp. 23,112.00 - Psg18 Engsel Jendela Rp. 16,416.00 - Psg19 Fluring Baja Ringan Rp. 18,000.00 - M120 Hak angin Rp. 13,716.00 - Bh21 Floor Drain Rp. 34,992.00 - Bh22 Genteng Metal Multiroof Rp. 67,000.00 - M223 Gip Sum (120 x 240 cm) t = 12 mm Rp. 54,970.00 - Lbr24 Ijuk Rp. 12,204.00 - Glg25 Kaca Polos tebal 5 mm Rp. 89,316.00 - M226 Kaca polos tebal 10 mm Rp. 140,000.00 - M227 Koral beton / kerikil Rp. 188,600.00 - M328 Kayu 5/7 Rp. 3,639,168.00 - M329 Kayu Klas I ( Seumantok / Ulin / dll ) Rp. 4,783,860.00 - M330 Kayu Klas II ( kamper/Kruing/ Dll ) Rp. 3,639,168.00 - M331 kayu Klas III ( Borneo, Dll ) Rp. 3,368,628.00 - M332 Kayu Bekisting Rp. 2,461,752.00 - M333 Kayu Papan Bouwplank Rp. 3,368,628.00 - M334 Kayu Klas II Papan Rp. 3,639,168.00 - Lbr35 Kayu Profil Rp. 5,292.00 - M136 Kayu cetakan Rp. 2,461,752.00 - M337 Kawat Beton Rp. 9,396.00 - Kg38 Kawat harmonika Rp. 14,040.00 - M239 Kunci Pintu 2 Slaag Rp. 113,600.00 - Bh40 Kunci tanam antik Rp. 180,000.00 - Bh41 Kunci tanam biasa Rp. 120,000.00 - Bh42 Kunci tanam kamar mandi Rp. 70,000.00 - Bh43 Kunci Selot/Grendel Rp. 35,000.00 - Bh44 Kuas Rp. 12,000.00 - Bh45 kloset Jongkok Keramik setara KIA Rp. 104,220.00 - Bh46 Kran ¾" atau ½" Rp. 65,000.00 - Bh47 kait Angin Rp. 13,700.00 - Bh48 Keramik lantai 40 x 40 cm, setara Roman Rp. 65,000.00 - Bh49 Keramik Lantai 20 x 20 cm anti slip, setara Roman Rp. 63,000.00 - Bh

Page 2: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

50 Keramik dinding 20 x 25 cm, Setara Roman Rp. 64,000.00 - Bh51 List kayu 2/4 Rp. 13,500.00 - Btg52 Lem Kayu Rp. 25,000.00 - Lt53 Minyak Bekisting ( Melamin ) Rp. 18,000.00 - Lt54 Minyak Cat Rp. 17,928.00 - Lt55 Nok Genteng Metal Rp. 45,000.00 - Lbr56 Pipa Galvanis Ø ½" Rp. 11,556.00 - M157 Pipa Galvanis Ø ¾ Rp. 15,000.00 - M158 Pipa Galvanis Ø 1" Rp. 20,300.00 - M159 Rp. 25,000.00 - M160 Pipa hawa Rp. 60,000.00 - Bh61 Pipa Penguras Bak Rp. 30,000.00 - Bh62 Rp. 35,260.00 - M163 Pipa PVC Ø 4" Rp. 29,730.00 - M164 Pipa PVC Ø 5" Rp. 36,660.00 - M165 Paku biasa 2" - 5" Rp. 10,368.00 - Kg66 Paku biasa 1/2" - 1" Rp. 10,368.00 - Kg67 Paku Seng Rp. 14,400.00 - Kg68 Paku Ulir 2,5" Rp. 340.00 - Bh69 Paku Skrup Rp. 23,000.00 - Kg70 Paku hak panjang 15 cm Rp. 30,000.00 - Kg71 Pasir urug Rp. 106,164.00 - M372 Pasir beton Rp. 127,000.00 - M373 Pasir pasang Rp. 115,560.00 - M374 Plamir Rp. 11,988.00 - Kg75 Plywood 4 mm Rp. 66,200.00 - Lbr76 Plywood 9 mm Rp. 138,670.00 - Lbr77 Residu Rp. 2,160.00 - Ltr78 Semen Portland 40 Kg Rp. 45,990.00 - zak ###79 Semen Warna 50 Kg Rp. 106,000.00 - Zak ###80 Seng Gelombang BJLS 0,20 Rp. 30,450.00 - M281 Seng Primadek Galvalum Span Rib 0,30 Rp. 52,000.00 - M182 Seng Plat BJLS 28 Rp. 55,000.00 - Lbr83 Seng Plat BJLS 24 Rp. 50,000.00 - Lbr84 Seng Gelombang BJLS 32 Rp. 60,000.00 - Lbr85 Seng Gelombang BJLS 28 Rp. 58,000.00 - Lbr86 Seal Teap Rp. 5,000.00 - Set87 Sealent/Perekat Rp. 9,000.00 - Kg88 Sirtu Rp. 234,684.00 - M389 Tanah Timbun Rp. 44,820.00 - M390 Wastafel Rp. 448,740.00 - Bh91 Water drain + Asesories Rp. 80,000.00 - Bh

Lhokseumawe, Juni 2008 Konsultan Perencana

PT. SUAR SEJATI KONSULT

RUSLI H. ISHAK, A.Md Direktur

Pipa Galvanis Ø 1¼

Pipa PVC Ø 3"

Page 3: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

ANALISA RENCANA ANGGARAN BIAYA

SNI 03-2835-2002-1-d1 m Pengukuran dan Pemasangan BouwplankBahan- Kayu 5/7 0.012 M3 x Rp. 3,639,168.00 = Rp. 43,670.016 - Paku biasa 2" - 5" 0.020 Kg x Rp. 10,368.00 = Rp. 207.360 - Kayu papan Bouwplank 3/20 0.007 M3 x Rp. 3,368,628.00 = Rp. 23,580.396

Jumlah (1) = Rp. 67,457.772 Tenaga- Tukang Kayu 0.100 Oh x Rp. 70,200.00 = Rp. 7,020.000 - Pekerja 0.100 Oh x Rp. 44,300.00 = Rp. 4,430.000 - Kepala Tukang 0.010 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.005 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah (2) = Rp. 12,609.000 Jumlah (1) + (2) = Rp. 80,066.772

SNI 03-2835-2002-1-h1 m Membersihkan lapangan dan perataanTenaga- Pekerja 0.100 Oh x Rp. 44,300.00 = Rp. 4,430.000 - Mandor 0.050 Oh x Rp. 63,200.00 = Rp. 3,160.000

Jumlah = Rp. 7,590.000

SNI 03-2835-2002-2-a1 m3 galian tanah biasa sedalam 1 meterTenaga- Pekerja 0.400 Oh x Rp. 44,300.00 = Rp. 17,720.000 - Tukang gali - Oh x Rp. 70,200.00 = Rp. - - Kepala tukang - Oh x Rp. 84,300.00 = Rp. - - Mandor 0.040 Oh x Rp. 63,200.00 = Rp. 2,528.000

Jumlah = Rp. 20,248.000

SNI 03-2835-2002-2-b1 m3 galian tanah biasa sedalam 2 meterTenaga- Pekerja 0.526 Oh x Rp. 44,300.00 = Rp. 23,301.800 - Tukang gali - Oh x Rp. 70,200.00 = Rp. - - Kepala tukang - Oh x Rp. 84,300.00 = Rp. - - Mandor 0.052 Oh x Rp. 63,200.00 = Rp. 3,286.400

Jumlah = Rp. 26,588.200

SNI 03-2835-2002-2-i1 m3 Urugan kembaliTenaga- Pekerja 0.192 Oh x Rp. 44,300.00 = Rp. 8,505.600 - Tukang gali - Oh x Rp. 70,200.00 = Rp. - - Kepala tukang - Oh x Rp. 84,300.00 = Rp. - - Mandor 0.019 Oh x Rp. 63,200.00 = Rp. 1,200.800

Jumlah = Rp. 9,706.400

SNI 03-2835-2002-2-j1 m3 Timbunan dan pemadatan tanahBahan- Tanah Timbun 1.200 M3 x Rp. 44,820.00 = Rp. 53,784.000

Jumlah (1) = Rp. 53,784.000 Tenaga- Pekerja 0.500 Oh x Rp. 44,300.00 = Rp. 22,150.000 - Tukang gali - Oh x Rp. 70,200.00 = Rp. - - Kepala tukang - Oh x Rp. 84,300.00 = Rp. - - Mandor 0.050 Oh x Rp. 63,200.00 = Rp. 3,160.000

Jumlah (2) = Rp. 25,310.000 Jumlah (1) + (2) = Rp. 79,094.000

SNI 03-2835-2002-2-k1 m3 Urugan pasirBahan- Pasir urug 1.200 M3 x Rp. 106,164.00 = Rp. 127,396.800

Jumlah (1) = Rp. 127,396.800 Tenaga- Pekerja 0.300 Oh x Rp. 44,300.00 = Rp. 13,290.000 - Tukang gali - Oh x Rp. 70,200.00 = Rp. - - Kepala tukang - Oh x Rp. 84,300.00 = Rp. - - Mandor 0.010 Oh x Rp. 63,200.00 = Rp. 632.000

Jumlah (2) = Rp. 13,922.000

Page 4: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Jumlah (1) + (2) = Rp. 141,318.800

SNI 03-2836-2002-d1 m3 Pasang pondasi batu kali, 1 Pc : 3 PsBahan- Batu belah 15/20 cm 1.100 M3 x Rp. 188,600.00 = Rp. 207,460.000 - Sement Portland 202.000 Kg x Rp. 1,149.75 = Rp. 232,249.500 - Pasir pasang 0.485 M3 x Rp. 115,560.00 = Rp. 56,046.600

Jumlah (1) = Rp. 495,756.100 Tenaga- Pekerja 1.500 Oh x Rp. 44,300.00 = Rp. 66,450.000 - Tukang Batu 0.600 Oh x Rp. 70,200.00 = Rp. 42,120.000 - Kepala tukang 0.060 Oh x Rp. 84,300.00 = Rp. 5,058.000 - Mandor 0.075 Oh x Rp. 63,200.00 = Rp. 4,740.000

Jumlah (2) = Rp. 118,368.000 Jumlah (1) + (2) = Rp. 614,124.100

SNI 03-2836-2002-n1 m3 Pasang pondasi batu kosongBahan- Batu belah 15/20 cm 1.200 M3 x Rp. 188,600.00 = Rp. 226,320.000 - Pasir urug 0.300 M3 x Rp. 106,164.00 = Rp. 31,849.200

Jumlah (1) = Rp. 258,169.200 Tenaga- Pekerja 0.780 Oh x Rp. 44,300.00 = Rp. 34,554.000 - Tukang Batu 0.390 Oh x Rp. 70,200.00 = Rp. 27,378.000 - Kepala tukang 0.039 Oh x Rp. 84,300.00 = Rp. 3,287.700 - Mandor 0.039 Oh x Rp. 63,200.00 = Rp. 2,464.800

Jumlah (2) = Rp. 67,684.500 Jumlah (1) + (2) = Rp. 325,853.700

SNI 03-2836-2002-n11 m3 Pasang batu apung kosongBahan- Batu belah 15/20 cm 1.200 M3 x Rp. 188,600.00 = Rp. 226,320.000 - Pasir urug 0.300 M3 x Rp. 5,000.00 = Rp. 1,500.000

Jumlah (1) = Rp. 227,820.000 Tenaga- Pekerja 0.780 Oh x Rp. 44,300.00 = Rp. 34,554.000 - Tukang Batu 0.390 Oh x Rp. 70,200.00 = Rp. 27,378.000 - Kepala tukang 0.039 Oh x Rp. 84,300.00 = Rp. 3,287.700 - Mandor 0.039 Oh x Rp. 63,200.00 = Rp. 2,464.800

Jumlah (2) = Rp. 67,684.500 Jumlah (1) + (2) = Rp. 295,504.500

SNI 03-2837-2002-1-b1 m2 Pasang bata merah tebal 1 bata, 1 Pc : 2 PsBahan- Bata merah 5 x 11 x 22 140.000 Bh x Rp. 623.00 = Rp. 87,220.000 - Semen Portland 43.500 Kg x Rp. 1,149.75 = Rp. 50,014.125 - Pasir pasang 0.080 M3 x Rp. 115,560.00 = Rp. 9,244.800

Jumlah (1) = Rp. 146,478.925 Tenaga- Pekerja 0.650 Oh x Rp. 44,300.00 = Rp. 28,795.000 - Tukang Batu 0.200 Oh x Rp. 70,200.00 = Rp. 14,040.000 - Kepala tukang 0.020 Oh x Rp. 84,300.00 = Rp. 1,686.000 - Mandor 0.030 Oh x Rp. 63,200.00 = Rp. 1,896.000

Jumlah (2) = Rp. 46,417.000 Jumlah (1) + (2) = Rp. 192,895.925

SNI 03-2837-2002-1-d1 m2 Pasang bata merah tebal 1 bata, 1 Pc : 4 PsBahan- Bata merah 5 x 11 x 22 140.000 Bh x Rp. 623.00 = Rp. 87,220.000 - Semen Portland 26.550 Kg x Rp. 1,149.75 = Rp. 30,525.863 - Pasir pasang 0.093 M3 x Rp. 115,560.00 = Rp. 10,747.080

Jumlah (1) = Rp. 128,492.943 Tenaga- Pekerja 0.650 Oh x Rp. 44,300.00 = Rp. 28,795.000 - Tukang Batu 0.200 Oh x Rp. 70,200.00 = Rp. 14,040.000 - Kepala tukang 0.020 Oh x Rp. 84,300.00 = Rp. 1,686.000 - Mandor 0.030 Oh x Rp. 63,200.00 = Rp. 1,896.000

Jumlah (2) = Rp. 46,417.000 Jumlah (1) + (2) = Rp. 174,909.943

Page 5: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

SNI 03-2837-2002-1-i1 m2 Pasang bata merah tebal 1/2 bata, 1 Pc : 2 PsBahan- Bata merah 5 x 11 x 22 70.000 Bh x Rp. 623.00 = Rp. 43,610.000 - Semen Portland 18.950 Kg x Rp. 1,149.75 = Rp. 21,787.763 - Pasir pasang 0.038 M3 x Rp. 115,560.00 = Rp. 4,391.280

Jumlah (1) = Rp. 69,789.043 Tenaga- Pekerja 0.320 Oh x Rp. 44,300.00 = Rp. 14,176.000 - Tukang Batu 0.100 Oh x Rp. 70,200.00 = Rp. 7,020.000 - Kepala tukang 0.010 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.015 Oh x Rp. 63,200.00 = Rp. 948.000

Jumlah (2) = Rp. 22,987.000 Jumlah (1) + (2) = Rp. 92,776.043

SNI 03-2837-2002-1-k1 m2 Pasang bata merah tebal 1/2 bata, 1 Pc : 4 PsBahan- Bata merah 5 x 11 x 22 70.000 Bh x Rp. 623.00 = Rp. 43,610.000 - Semen Portland 11.500 Kg x Rp. 1,149.75 = Rp. 13,222.125 - Pasir pasang 0.043 M3 x Rp. 115,560.00 = Rp. 4,969.080

Jumlah (1) = Rp. 61,801.205 Tenaga- Pekerja 0.320 Oh x Rp. 44,300.00 = Rp. 14,176.000 - Tukang Batu 0.100 Oh x Rp. 70,200.00 = Rp. 7,020.000 - Kepala tukang 0.010 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.015 Oh x Rp. 63,200.00 = Rp. 948.000

Jumlah (2) = Rp. 22,987.000 Jumlah (1) + (2) = Rp. 84,788.205

SNI 03-2837-2002-2-b1 m2 Plesteran, 1 Pc : 2 Ps, tebal 15 mmBahan- Semen Portland 8.520 Kg x Rp. 1,149.75 = Rp. 9,795.870 - Pasir pasang 0.017 M3 x Rp. 115,560.00 = Rp. 1,964.520

Jumlah (1) = Rp. 11,760.390 Tenaga- Pekerja 0.200 Oh x Rp. 44,300.00 = Rp. 8,860.000 - Tukang Batu 0.150 Oh x Rp. 70,200.00 = Rp. 10,530.000 - Kepala tukang 0.015 Oh x Rp. 84,300.00 = Rp. 1,264.500 - Mandor 0.010 Oh x Rp. 63,200.00 = Rp. 632.000

Jumlah (2) = Rp. 21,286.500 Jumlah (1) + (2) = Rp. 33,046.890

SNI 03-2837-2002-2-d1 m2 Plesteran, 1 Pc : 4 Ps, tebal 15 mmBahan- Semen Portland 5.200 Kg x Rp. 1,149.75 = Rp. 5,978.700 - Pasir pasang 0.020 M3 x Rp. 115,560.00 = Rp. 2,311.200

Jumlah (1) = Rp. 8,289.900 Tenaga- Pekerja 0.200 Oh x Rp. 44,300.00 = Rp. 8,860.000 - Tukang Batu 0.150 Oh x Rp. 70,200.00 = Rp. 10,530.000 - Kepala tukang 0.015 Oh x Rp. 84,300.00 = Rp. 1,264.500 - Mandor 0.010 Oh x Rp. 63,200.00 = Rp. 632.000

Jumlah (2) = Rp. 21,286.500 Jumlah (1) + (2) = Rp. 29,576.400

SNI 03-3434-2002-b1 m3 Pasang kusen pintu dan jendela kayu klas IBahan- Kayu klas I, Balok 1.200 M3 x Rp. 4,783,860.00 = Rp. 5,740,632.000

Jumlah (1) = Rp. 5,740,632.000 Tenaga- Pekerja 6.000 Oh x Rp. 44,300.00 = Rp. 265,800.000 - Tukang Kayu 18.000 Oh x Rp. 70,200.00 = Rp. 1,263,600.000 - Kepala tukang 2.000 Oh x Rp. 84,300.00 = Rp. 168,600.000 - Mandor 0.300 Oh x Rp. 63,200.00 = Rp. 18,960.000

Jumlah (2) = Rp. 1,716,960.000 Jumlah (1) + (2) = Rp. 7,457,592.000

Page 6: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

SNI 03-3434-2002-h1 m3 Pasang pintu panel kayu klas IIBahan- Kayu klas II, papan 0.040 M3 x Rp. 3,639,168.00 = Rp. 145,566.720

Jumlah (1) = Rp. 145,566.720 Tenaga- Pekerja 1.000 Oh x Rp. 44,300.00 = Rp. 44,300.000 - Tukang Kayu 2.500 Oh x Rp. 70,200.00 = Rp. 175,500.000 - Kepala tukang 0.250 Oh x Rp. 84,300.00 = Rp. 21,075.000 - Mandor 0.050 Oh x Rp. 63,200.00 = Rp. 3,160.000

Jumlah (2) = Rp. 244,035.000 Jumlah (1) + (2) = Rp. 389,601.720

SNI 03-3434-2002-j1 m3 Pasang pintu dan jendela kaca kayu klas IIBahan- Kayu klas II, papan 0.035 M3 x Rp. 3,639,168.00 = Rp. 127,370.880

Jumlah (1) = Rp. 127,370.880 Tenaga- Pekerja 0.800 Oh x Rp. 44,300.00 = Rp. 35,440.000 - Tukang Kayu 2.000 Oh x Rp. 70,200.00 = Rp. 140,400.000 - Kepala tukang 0.200 Oh x Rp. 84,300.00 = Rp. 16,860.000 - Mandor 0.040 Oh x Rp. 63,200.00 = Rp. 2,528.000

Jumlah (2) = Rp. 195,228.000 Jumlah (1) + (2) = Rp. 322,598.880

SNI 03-3434-2002-q1 m2 Pasang jalusi mati kusen kayu klas IIBahan- Kayu klas II, papan 0.060 M3 x Rp. 3,639,168.00 = Rp. 218,350.080 - Paku biasa 1/2" - 1" 0.150 Kg x Rp. 10,368.00 = Rp. 1,555.200

Jumlah (1) = Rp. 219,905.280 Tenaga- Pekerja 0.500 Oh x Rp. 44,300.00 = Rp. 22,150.000 - Tukang Kayu 2.000 Oh x Rp. 70,200.00 = Rp. 140,400.000 - Kepala tukang 0.200 Oh x Rp. 84,300.00 = Rp. 16,860.000 - Mandor 0.025 Oh x Rp. 63,200.00 = Rp. 1,580.000

Jumlah (2) = Rp. 180,990.000 Jumlah (1) + (2) = Rp. 400,895.280

SNI 03-3434-2002-ab1 m3 Pasang konstruksi kuda - kuda kayu klas IIBahan- Kayu klas II, balok 1.100 M3 x Rp. 3,639,168.00 = Rp. 4,003,084.800 - Besi strip 15.000 Kg x Rp. 9,918.00 = Rp. 148,770.000 - Paku biasa 2" - 5" 0.800 Kg x Rp. 10,368.00 = Rp. 8,294.400

Jumlah (1) = Rp. 4,160,149.200 Tenaga- Pekerja 0.500 Oh x Rp. 44,300.00 = Rp. 22,150.000 - Tukang Kayu 2.000 Oh x Rp. 70,200.00 = Rp. 140,400.000 - Kepala tukang 0.200 Oh x Rp. 84,300.00 = Rp. 16,860.000 - Mandor 0.025 Oh x Rp. 63,200.00 = Rp. 1,580.000

Jumlah (2) = Rp. 180,990.000 Jumlah (1) + (2) = Rp. 4,341,139.200

SNI 03-3434-2002-an1 m2 Pasang rangka Furing/Baja RinganBahan- Rangka Furing/Baja ringan 2.600 M1 x Rp. 18,000.00 = Rp. 46,800.000 - Baut kecil 0.150 Kg x Rp. 23,000.00 = Rp. 3,450.000

Jumlah (1) = Rp. 50,250.000 Tenaga- Pekerja 0.150 Oh x Rp. 44,300.00 = Rp. 6,645.000 - Tukang Kayu 0.250 Oh x Rp. 70,200.00 = Rp. 17,550.000 - Kepala tukang 0.025 Oh x Rp. 84,300.00 = Rp. 2,107.500 - Mandor 0.075 Oh x Rp. 63,200.00 = Rp. 4,740.000

Page 7: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Jumlah (2) = Rp. 31,042.500 Jumlah (1) + (2) = Rp. 81,292.500

SNI 03-3434-2002-av1 m2 Pasang lisplang ukuran ( 3 x 30 ) cm, kayu klas IBahan- Kayu klas I, Papan 0.0180 M3 x Rp. 4,783,860.00 = Rp. 86,109.480 - Paku biasa 2" - 5" 0.050 Kg x Rp. 23,000.00 = Rp. 1,150.000

Jumlah (1) = Rp. 87,259.480 Tenaga- Pekerja 0.100 Oh x Rp. 44,300.00 = Rp. 4,430.000 - Tukang Kayu 0.200 Oh x Rp. 70,200.00 = Rp. 14,040.000 - Kepala tukang 0.020 Oh x Rp. 84,300.00 = Rp. 1,686.000 - Mandor 0.005 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah (2) = Rp. 20,472.000 Jumlah (1) + (2) = Rp. 107,731.480

Analisa biaya konstruksi pekerjaan betonSNI 03 - 3435 - 2002 - a1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 KrBahan- Semen Portland 248.000 Kg x Rp. 1,149.75 = Rp. 285,138.000 - Pasir beton 0.520 M3 x Rp. 127,000.00 = Rp. 66,040.000 - Koral beton 0.870 M3 x Rp. 188,600.00 = Rp. 164,082.000

Jumlah ( 1 ) Rp. 515,260.000 Tenaga- Pekerja 1.650 Oh x Rp. 44,300.00 = Rp. 73,095.000 - Tukang batu 0.250 Oh x Rp. 70,200.00 = Rp. 17,550.000 - Kepala tukang 0.025 Oh x Rp. 84,300.00 = Rp. 2,107.500 - Mandor 0.080 Oh x Rp. 63,200.00 = Rp. 5,056.000

Jumlah ( 2 ) = Rp. 97,808.500 Jumlah (1) + (2) = Rp. 613,068.500

SNI 03 - 3435 - 2002 - d1 m3 Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 KrBahan- Semen Portland 10.000 Kg x Rp. 1,149.75 = Rp. 11,497.500 - Pasir beton 0.026 M3 x Rp. 127,000.00 = Rp. 3,302.000 - Koral beton 0.044 M3 x Rp. 188,600.00 = Rp. 8,298.400

Jumlah ( 1 ) = Rp. 23,097.900 Tenaga- Pekerja 1.150 Oh x Rp. 44,300.00 = Rp. 50,945.000 - Tukang batu 0.020 Oh x Rp. 70,200.00 = Rp. 1,404.000 - Kepala tukang 0.002 Oh x Rp. 84,300.00 = Rp. 168.600 - Mandor 0.006 Oh x Rp. 63,200.00 = Rp. 379.200

Jumlah ( 2 ) = Rp. 52,896.800 Jumlah (1) + (2) = Rp. 75,994.700

SNI 03 - 3435 - 2002 - ai1 m3 Membuat beton dengan mutu K 225Bahan- Semen Portland 340.000 Kg x Rp. 1,149.75 = Rp. 390,915.000 - Pasir beton 0.540 M3 x Rp. 127,000.00 = Rp. 68,580.000 - Koral beton 0.850 M3 x Rp. 188,600.00 = Rp. 160,310.000

Jumlah ( 1 ) = Rp. 619,805.000 Tenaga- Pekerja 6.000 Oh x Rp. 44,300.00 = Rp. 265,800.000 - Tukang batu 1.000 Oh x Rp. 70,200.00 = Rp. 70,200.000 - Kepala tukang 0.100 Oh x Rp. 84,300.00 = Rp. 8,430.000 - Mandor 0.300 Oh x Rp. 63,200.00 = Rp. 18,960.000

Jumlah ( 2 ) = Rp. 363,390.000 Jumlah (1) + (2) = Rp. 983,195.000

SNI 03 - 3435 - 2002 - y1 Kg Pembesian dengan besi polosBahan- Besi beton ( polos ) 1.100 Kg x Rp. 9,918.00 = Rp. 10,909.800 - Kawat beton 0.015 Kg x Rp. 9,396.00 = Rp. 140.940

Page 8: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Jumlah ( 1 ) = Rp. 11,050.740 Tenaga- Pekerja 0.0070 Oh x Rp. 44,300.00 = Rp. 310.100 - Tukang besi 0.0070 Oh x Rp. 70,200.00 = Rp. 491.400 - Kepala tukang 0.0007 Oh x Rp. 84,300.00 = Rp. 59.010 - Mandor 0.0003 Oh x Rp. 63,200.00 = Rp. 18.960

Jumlah ( 2 ) = Rp. 879.470 Jumlah (1) + (2) = Rp. 11,930.210

SNI 03 - 3435 - 2002 - ab1 m2 Pasang bekisting untuk pondasiBahan- Kayu Bekisting 0.040 M3 x Rp. 2,461,752.00 = Rp. 98,470.080 - Paku biasa 2" - 5" 0.300 Kg x Rp. 23,000.00 = Rp. 6,900.000 - Minyak bekisting 0.100 Lt x Rp. 18,000.00 = Rp. 1,800.000

Jumlah ( 1 ) = Rp. 107,170.080 Tenaga- Pekerja 0.300 Oh x Rp. 44,300.00 = Rp. 13,290.000 - Tukang kayu 0.260 Oh x Rp. 70,200.00 = Rp. 18,252.000 - Kepala tukang 0.026 Oh x Rp. 84,300.00 = Rp. 2,191.800 - Mandor 0.005 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah ( 2 ) = Rp. 34,049.800 Jumlah (1) + (2) = Rp. 141,219.880

SNI 03 - 3435 - 2002 - ac1 m2 Pasang bekisting untuk sloofBahan- Kayu Bekisting 0.045 M3 x Rp. 2,461,752.00 = Rp. 110,778.840 - Paku biasa 2" - 5" 0.300 Kg x Rp. 23,000.00 = Rp. 6,900.000 - Minyak bekisting 0.100 Lt x Rp. 18,000.00 = Rp. 1,800.000

Jumlah ( 1 ) = Rp. 119,478.840 Tenaga- Pekerja 0.300 Oh x Rp. 44,300.00 = Rp. 13,290.000 - Tukang kayu 0.260 Oh x Rp. 70,200.00 = Rp. 18,252.000 - Kepala tukang 0.026 Oh x Rp. 84,300.00 = Rp. 2,191.800 - Mandor 0.005 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah ( 2 ) = Rp. 34,049.800 Jumlah (1) + (2) = Rp. 153,528.640

SNI 03 - 3435 - 2002 - ad1 m2 Pasang bekisting untuk kolomBahan- Kayu Bekisting 0.040 M3 x Rp. 2,461,752.00 = Rp. 98,470.080 - Paku biasa 2" - 5" 0.400 Kg x Rp. 23,000.00 = Rp. 9,200.000 - Minyak bekisting 0.200 Lt x Rp. 18,000.00 = Rp. 3,600.000 - Balok kayu borneo 0.015 M3 x Rp. 3,368,628.00 = Rp. 50,529.420 - Plywood tebal 9 mm 0.350 Lbr x Rp. 138,670.00 = Rp. 48,534.500 - 2.000 Btg x Rp. 44,172.00 = Rp. 88,344.000

Jumlah ( 1 ) = Rp. 298,678.000 Tenaga- Pekerja 0.300 Oh x Rp. 44,300.00 = Rp. 13,290.000 - Tukang kayu 0.260 Oh x Rp. 70,200.00 = Rp. 18,252.000 - Kepala tukang 0.026 Oh x Rp. 84,300.00 = Rp. 2,191.800 - Mandor 0.005 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah ( 2 ) = Rp. 34,049.800 Jumlah (1) + (2) = Rp. 332,727.800

SNI 03 - 3435 - 2002 - ae1 m2 Pasang bekisting untuk balokBahan- Kayu Bekisting 0.040 M3 x Rp. 2,461,752.00 = Rp. 98,470.080 - Paku biasa 2" - 5" 0.400 Kg x Rp. 23,000.00 = Rp. 9,200.000 - Minyak bekisting 0.200 Lt x Rp. 18,000.00 = Rp. 3,600.000 - Balok kayu borneo 0.018 M3 x Rp. 3,368,628.00 = Rp. 60,635.304 - Plywood tebal 9 mm 0.350 Lbr x Rp. 138,670.00 = Rp. 48,534.500 - 2.000 Btg x Rp. 44,172.00 = Rp. 88,344.000

Jumlah ( 1 ) = Rp. 308,783.884 Tenaga- Pekerja 0.320 Oh x Rp. 44,300.00 = Rp. 14,176.000 - Tukang kayu 0.330 Oh x Rp. 70,200.00 = Rp. 23,166.000 - Kepala tukang 0.033 Oh x Rp. 84,300.00 = Rp. 2,781.900 - Mandor 0.006 Oh x Rp. 63,200.00 = Rp. 379.200

Jumlah ( 2 ) = Rp. 40,503.100 Jumlah (1) + (2) = Rp. 349,286.984

Dolken kayu Ø 8 - 10/4 m

Dolken kayu Ø 8 - 10/4 m

Page 9: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

SNI 03 - 3435 - 2002 - af1 m2 Pasang bekisting untuk lantaiBahan- Kayu Bekisting 0.040 M3 x Rp. 2,461,752.00 = Rp. 98,470.080 - Paku biasa 2" - 5" 0.400 Kg x Rp. 23,000.00 = Rp. 9,200.000 - Minyak bekisting 0.200 Lt x Rp. 18,000.00 = Rp. 3,600.000 - Balok kayu borneo 0.015 M3 x Rp. 3,368,628.00 = Rp. 50,529.420 - Plywood tebal 9 mm 0.350 Lbr x Rp. 138,670.00 = Rp. 48,534.500 - 3.000 Btg x Rp. 44,172.00 = Rp. 132,516.000

Jumlah ( 1 ) = Rp. 342,850.000 Tenaga- Pekerja 0.320 Oh x Rp. 44,300.00 = Rp. 14,176.000 - Tukang kayu 0.330 Oh x Rp. 70,200.00 = Rp. 23,166.000 - Kepala tukang 0.033 Oh x Rp. 84,300.00 = Rp. 2,781.900 - Mandor 0.006 Oh x Rp. 63,200.00 = Rp. 379.200

Jumlah ( 2 ) = Rp. 40,503.100 Jumlah (1) + (2) = Rp. 383,353.100

Pekerjaan lai-lainUntuk membongkar cetakan dan menyiram beton diperlukan- Pekerja 4.000 Oh x Rp. 44,300.00 = Rp. 177,200.00

Jumlah ( 1 ) = Rp. 177,200.00

SUPLEMEN SNI 03-3435-2002 a1 M3 Sloof ukuran 18 x 25 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 137.158 Kg x Rp. 11,930.21 = Rp. 1,636,323.743 Cetakan beton 12.089 M2 x Rp. 153,528.64 = Rp. 1,856,007.729 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 4,652,726.472

SUPLEMEN SNI 03-3435-2002 b1 M3 Kolom 30/40 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 161.000 Kg x Rp. 11,930.21 = Rp. 1,920,763.810 Cetakan beton 11.760 M2 x Rp. 332,727.80 = Rp. 3,912,878.928 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 6,994,037.738

SUPLEMEN SNI 03-3435-2002 c1 M3 Kolom 30/30 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 174.000 Kg x Rp. 11,930.21 = Rp. 2,075,856.540 Cetakan beton 14.400 M2 x Rp. 332,727.80 = Rp. 4,791,280.320 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 8,027,531.860

SUPLEMEN SNI 03-3435-2002 d1 M3 Kolom 13/13 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 241.000 Kg x Rp. 11,930.21 = Rp. 2,875,180.610 Cetakan beton 15.385 M2 x Rp. 332,727.80 = Rp. 5,119,017.203 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 9,154,592.813

SUPLEMEN SNI 03-3435-2002 e1 M3 Ring balk 15 x 40 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 143.000 Kg x Rp. 11,930.21 = Rp. 1,706,020.030 Cetakan beton 15.385 M2 x Rp. 349,286.98 = Rp. 5,373,780.249 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 8,240,195.279

Dolken kayu Ø 8 - 10/4 m

Page 10: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

SUPLEMEN SNI 03-3435-2002 f1 M3 Balok lantai 13 x 13 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 259.811 Kg x Rp. 11,930.21 = Rp. 3,099,599.790 Cetakan beton 15.385 M2 x Rp. 349,286.98 = Rp. 5,373,780.249 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 9,633,775.039

SUPLEMEN SNI 03-3435-2002 g1 M3 Balok lantai 30 x 40 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 173.880 Kg x Rp. 11,930.21 = Rp. 2,074,424.915 Cetakan beton 7.224 M2 x Rp. 349,286.98 = Rp. 2,523,249.172 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 5,758,069.087

SUPLEMEN SNI 03-3435-2002 h1 M3 Balok lantai 30 x 50 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 148.880 Kg x Rp. 11,930.21 = Rp. 1,776,169.665 Cetakan beton 7.420 M2 x Rp. 349,286.98 = Rp. 2,591,709.421 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 5,528,274.086

SUPLEMEN SNI 03-3435-2002 i1 M3 Balok lantai 25 x 40 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 166.320 Kg x Rp. 11,930.21 = Rp. 1,984,232.527 Cetakan beton 8.100 M2 x Rp. 349,286.98 = Rp. 2,829,224.570 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 5,973,852.098

SUPLEMEN SNI 03-3435-2002 j1 M3 Balok lantai 25 x 35 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 137.670 Kg x Rp. 11,930.21 = Rp. 1,642,432.011 Cetakan beton 9.720 M2 x Rp. 349,286.98 = Rp. 3,395,069.484 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 6,197,896.495

SUPLEMEN SNI 03-3435-2002 k1 M3 Ring Balok 20 x 30 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 176.000 Kg x Rp. 11,930.21 = Rp. 2,099,716.960 Cetakan beton 10.880 M2 x Rp. 349,286.98 = Rp. 3,800,242.386 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 7,060,354.346

SUPLEMEN SNI 03-3435-2002 l1 M3 Top gevel 13 x 15 cm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 230.563 Kg x Rp. 11,930.21 = Rp. 2,750,665.008 Cetakan beton 15.385 M2 x Rp. 349,286.98 = Rp. 5,373,780.249 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 9,284,840.257

SUPLEMEN SNI 03-3435-2002 m1 M3 Sun Wearing / plat lantai t = 12 mm

Beton Cor K 225 1.000 M3 x Rp. 983,195.00 = Rp. 983,195.000 Pekerjaan besi 112.037 Kg x Rp. 11,930.21 = Rp. 1,336,624.938 Cetakan beton 8.380 M2 x Rp. 383,353.10 = Rp. 3,212,498.978 Pekerjaan lain-lain 1.000 Oh x Rp. 177,200.00 = Rp. 177,200.000

= Rp. 5,709,518.916

SNI 03-3436-2002-am1 M2 Pasang atap seng primadekBahan

Page 11: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

- Seng Primadek Galvalum Span Rib 0,30 1.500 M1 x Rp. 52,000.00 = Rp. 78,000.000 - Paku Ulir 2,5" 4.000 Bh x Rp. 340.00 = Rp. 1,360.000

Jumlah (1) = Rp. 79,360.000 Tenaga- Pekerja 0.120 Oh x Rp. 44,300.00 = Rp. 5,316.000 - Tukang kayu 0.060 Oh x Rp. 70,200.00 = Rp. 4,212.000 - Kepala tukang 0.006 Oh x Rp. 84,300.00 = Rp. 505.800 - Mandor 0.006 Oh x Rp. 63,200.00 = Rp. 379.200

Jumlah (2) = Rp. 10,413.000 Jumlah (1) + (2) = Rp. 89,773.000

SNI 03-3436-2002-an1 M2 Pasang atap Genteng SupersteelBahan- Genteng Multiroof 1.000 M2 x Rp. 67,000.00 = Rp. 67,000.000 - Paku Seng 0.030 Kg x Rp. 14,400.00 = Rp. 432.000

Jumlah (1) = Rp. 67,432.000 Tenaga- Pekerja 0.100 Oh x Rp. 44,300.00 = Rp. 4,430.000 - Tukang kayu 0.200 Oh x Rp. 70,200.00 = Rp. 14,040.000 - Kepala tukang 0.020 Oh x Rp. 84,300.00 = Rp. 1,686.000 - Mandor 0.005 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah (2) = Rp. 20,472.000 Jumlah (1) + (2) = Rp. 87,904.000

SNI 03-3436-2002-ao1 M1 Pasang Bubungan Genteng MultiroofBahan- Bubungan Genteng Multiroof 1.000 M1 x Rp. 58,900.00 = Rp. 58,900.000 - Paku Seng 0.020 Kg x Rp. 14,400.00 = Rp. 288.000

Jumlah (1) = Rp. 59,188.000 Tenaga- Pekerja 0.120 Oh x Rp. 44,300.00 = Rp. 5,316.000 - Tukang kayu 0.060 Oh x Rp. 70,200.00 = Rp. 4,212.000 - Kepala tukang 0.006 Oh x Rp. 84,300.00 = Rp. 505.800 - Mandor 0.006 Oh x Rp. 63,200.00 = Rp. 379.200

Jumlah (2) = Rp. 10,413.000 Jumlah (1) + (2) = Rp. 69,601.000

SNI 03-2838-2002-1-j1 M2 Pekerjaan pasang Gypsum tebal 12 mmBahan- Gypsum 12 mm 0.350 Lbr x Rp. 54,970.00 = Rp. 19,239.500 - Paku skrup 0.030 Kg x Rp. 23,000.00 = Rp. 690.000

Jumlah (1) = Rp. 19,929.500 Tenaga- Pekerja 0.070 Oh x Rp. 44,300.00 = Rp. 3,101.000 - Tukang kayu 0.100 Oh x Rp. 70,200.00 = Rp. 7,020.000 - Kepala tukang 0.010 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.004 Oh x Rp. 63,200.00 = Rp. 252.800

Jumlah (2) = Rp. 11,216.800 Jumlah (1) + (2) = Rp. 31,146.300

SNI 03-2838-2002-2-bMemasang 1 buah kloset jongkok porselenBahan- Kloset jongkok porselen 1.000 Bh x Rp. 104,220.00 = Rp. 104,220.000 - Semen portland 6.000 Kg x Rp. 1,149.75 = Rp. 6,898.500 - Pasir pasang 0.010 M3 x Rp. 115,560.00 = Rp. 1,155.600

Jumlah (1) = Rp. 112,274.100 Tenaga- Pekerja 1.000 Oh x Rp. 44,300.00 = Rp. 44,300.000 - Tukang batu 1.500 Oh x Rp. 70,200.00 = Rp. 105,300.000 - Kepala tukang 1.500 Oh x Rp. 84,300.00 = Rp. 126,450.000 - Mandor 0.160 Oh x Rp. 63,200.00 = Rp. 10,112.000

Jumlah (2) = Rp. 286,162.000 Jumlah (1) + (2) = Rp. 398,436.100

Page 12: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

SNI 03-2838-2002-2-o

Bahan- Pipa galvanis 1.200 M1 x Rp. 11,556.00 = Rp. 13,867.200 - Perlengkapan 35.000 % x Rp. 11,556.00 = Rp. 404,460.000

Jumlah (1) = Rp. 418,327.200 Tenaga- Pekerja 0.054 Oh x Rp. 44,300.00 = Rp. 2,392.200 - Tukang batu 0.090 Oh x Rp. 70,200.00 = Rp. 6,318.000 - Kepala tukang 0.009 Oh x Rp. 84,300.00 = Rp. 758.700 - Mandor 0.027 Oh x Rp. 63,200.00 = Rp. 1,706.400

Jumlah (2) = Rp. 11,175.300 Jumlah (1) + (2) = Rp. 429,502.500

SNI 03-2838-2002-2-pMemasang 1 m1 pipa galvanis diameter ¾"Bahan- Pipa galvanis 1.200 M1 x Rp. 15,000.00 = Rp. 18,000.000 - Perlengkapan 35.000 % x Rp. 15,000.00 = Rp. 525,000.000

Jumlah (1) = Rp. 543,000.000 Tenaga- Pekerja 0.054 Oh x Rp. 44,300.00 = Rp. 2,392.200 - Tukang batu 0.090 Oh x Rp. 70,200.00 = Rp. 6,318.000 - Kepala tukang 0.009 Oh x Rp. 84,300.00 = Rp. 758.700 - Mandor 0.027 Oh x Rp. 63,200.00 = Rp. 1,706.400

Jumlah (2) = Rp. 11,175.300 Jumlah (1) + (2) = Rp. 554,175.300

SNI 03-2838-2002-2-af 2Memasang Pipa hawaBahan- Pipa hawa 1.000 Bh x Rp. 60,000.00 = Rp. 60,000.000

Jumlah (1) = Rp. 60,000.000 Tenaga- Pekerja 0.010 Oh x Rp. 44,300.00 = Rp. 443.000 - Tukang batu 0.100 Oh x Rp. 70,200.00 = Rp. 7,020.000 - Kepala tukang 0.010 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.005 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah (2) = Rp. 8,622.000 Jumlah (1) + (2) = Rp. 68,622.000

SNI 03-2838-2002-4-b1 buah pasang kunci tanam biasaBahan- Kunci tanam biasa 1.000 Bh x Rp. 120,000.00 = Rp. 120,000.000

Jumlah (1) = Rp. 120,000.000 Tenaga- Pekerja 0.010 Oh x Rp. 44,300.00 = Rp. 443.000 - Tukang kayu 0.500 Oh x Rp. 70,200.00 = Rp. 35,100.000 - Kepala tukang 0.010 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.005 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah (2) = Rp. 36,702.000 Jumlah (1) + (2) = Rp. 156,702.000

SNI 03-2838-2002-4-c1 buah pasang kunci tanam kamar mandiBahan- Kunci tanam kamar mandi 1.000 Bh x Rp. 70,000.00 = Rp. 70,000.000

Jumlah (1) = Rp. 70,000.000 Tenaga- Pekerja 0.005 Oh x Rp. 44,300.00 = Rp. 221.500 - Tukang kayu 0.500 Oh x Rp. 70,200.00 = Rp. 35,100.000 - Kepala tukang 0.005 Oh x Rp. 84,300.00 = Rp. 421.500 - Mandor 0.0025 Oh x Rp. 63,200.00 = Rp. 158.000

Jumlah (2) = Rp. 35,901.000 Jumlah (1) + (2) = Rp. 105,901.000

SNI 03-2838-2002-4-e1 buah pasang engsel pintuBahan- Engsel pintu 1.000 Bh x Rp. 23,112.00 = Rp. 23,112.000

Jumlah (1) = Rp. 23,112.000

Memasang 1 m1 pipa galvanis diameter ½"

Page 13: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Tenaga- Pekerja 0.015 Oh x Rp. 44,300.00 = Rp. 664.500 - Tukang kayu 0.150 Oh x Rp. 70,200.00 = Rp. 10,530.000 - Kepala tukang 0.015 Oh x Rp. 84,300.00 = Rp. 1,264.500 - Mandor 0.00075 Oh x Rp. 63,200.00 = Rp. 47.400

Jumlah (2) = Rp. 12,506.400 Jumlah (1) + (2) = Rp. 35,618.400

SNI 03-2838-2002-4-f1 buah pasang engsel jendela kupu-kupuBahan- Engsel jendela 1.000 Bh x Rp. 16,416.00 = Rp. 16,416.000

Jumlah (1) = Rp. 16,416.000 Tenaga- Pekerja 0.010 Oh x Rp. 44,300.00 = Rp. 443.000 - Tukang kayu 0.100 Oh x Rp. 70,200.00 = Rp. 7,020.000 - Kepala tukang 0.010 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.0005 Oh x Rp. 63,200.00 = Rp. 31.600

Jumlah (2) = Rp. 8,337.600 Jumlah (1) + (2) = Rp. 24,753.600

SNI 03-2838-2002-2-yMemasang 1 m1 pipa PVC tipe AW diameter 2"Bahan- Pipa PVC 1.200 M1 x Rp. 35,260.00 = Rp. 42,312.000 - Perlengkapan 35.000 % x Rp. 35,260.00 = Rp. 1,234,100.000

Jumlah (1) = Rp. 1,276,412.000 Tenaga- Pekerja 0.081 Oh x Rp. 44,300.00 = Rp. 3,588.300 - Tukang batu 0.135 Oh x Rp. 70,200.00 = Rp. 9,477.000 - Kepala tukang 0.0135 Oh x Rp. 84,300.00 = Rp. 1,138.050 - Mandor 0.0041 Oh x Rp. 63,200.00 = Rp. 259.120

Jumlah (2) = Rp. 14,462.470 Jumlah (1) + (2) = Rp. 1,290,874.470

SNI 03-2838-2002-2-abMemasang 1 m1 pipa PVC tipe AW diameter 4"Bahan- Pipa PVC 1.200 M1 x Rp. 29,730.00 = Rp. 35,676.000 - Perlengkapan 35.000 % x Rp. 29,730.00 = Rp. 1,040,550.000

Jumlah (1) = Rp. 1,076,226.000 Tenaga- Pekerja 0.081 Oh x Rp. 44,300.00 = Rp. 3,588.300 - Tukang batu 0.135 Oh x Rp. 70,200.00 = Rp. 9,477.000 - Kepala tukang 0.0135 Oh x Rp. 84,300.00 = Rp. 1,138.050 - Mandor 0.0041 Oh x Rp. 63,200.00 = Rp. 259.120

Jumlah (2) = Rp. 14,462.470 Jumlah (1) + (2) = Rp. 1,090,688.470

SNI 03-2838-2002-2-ae

Bahan- Kran air 1.000 M1 x Rp. 65,000.00 = Rp. 65,000.000 - Seal teap 0.025 Set x Rp. 5,000.00 = Rp. 125.000

Jumlah (1) = Rp. 65,125.000 Tenaga- Pekerja 0.010 Oh x Rp. 44,300.00 = Rp. 443.000 - Tukang batu 0.100 Oh x Rp. 70,200.00 = Rp. 7,020.000 - Kepala tukang 0.0100 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.0050 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah (2) = Rp. 8,622.000 Jumlah (1) + (2) = Rp. 73,747.000

SNI 03-2838-2002-2-afMemasang 1 bh floor drainBahan- Floor drain 1.000 Bh x Rp. 34,992.00 = Rp. 34,992.000

Jumlah (1) = Rp. 34,992.000 Tenaga- Pekerja 0.010 Oh x Rp. 44,300.00 = Rp. 443.000 - Tukang batu 0.100 Oh x Rp. 70,200.00 = Rp. 7,020.000 - Kepala tukang 0.0100 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.0050 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah (2) = Rp. 8,622.000 Jumlah (1) + (2) = Rp. 43,614.000

SNI 03-2838-2002-2-af 1Memasang pipa penguras bak

Memasang 1 bh kran diameter ¾" atau ½"

Page 14: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Bahan- Pipa penguras bak 1.000 Bh x Rp. 30,000.00 = Rp. 30,000.000

Jumlah (1) = Rp. 30,000.000 Tenaga- Pekerja 0.010 Oh x Rp. 44,300.00 = Rp. 443.000 - Tukang batu 0.100 Oh x Rp. 70,200.00 = Rp. 7,020.000 - Kepala tukang 0.0100 Oh x Rp. 84,300.00 = Rp. 843.000 - Mandor 0.0050 Oh x Rp. 63,200.00 = Rp. 316.000

Jumlah (2) = Rp. 8,622.000 Jumlah (1) + (2) = Rp. 38,622.000

SNI 03-2838-2002-4-i1 buah pasang kait anginBahan- Kait angin 1.000 Bh x Rp. 13,700.00 = Rp. 13,700.000

Jumlah (1) = Rp. 13,700.000 Tenaga- Pekerja 0.015 Oh x Rp. 44,300.00 = Rp. 664.500 - Tukang kayu 0.150 Oh x Rp. 70,200.00 = Rp. 10,530.000 - Kepala tukang 0.0150 Oh x Rp. 84,300.00 = Rp. 1,264.500 - Mandor 0.00075 Oh x Rp. 63,200.00 = Rp. 47.400

Jumlah (2) = Rp. 12,506.400 Jumlah (1) + (2) = Rp. 26,206.400

SNI 03-2838-2002-4-k1 buah pasang kunci selotBahan- Kunci selot 1.000 Bh x Rp. 35,000.00 = Rp. 35,000.000

Jumlah (1) = Rp. 35,000.000 Tenaga- Pekerja 0.015 Oh x Rp. 44,300.00 = Rp. 664.500 - Tukang kayu 0.150 Oh x Rp. 70,200.00 = Rp. 10,530.000 - Kepala tukang 0.0150 Oh x Rp. 84,300.00 = Rp. 1,264.500 - Mandor 0.00075 Oh x Rp. 63,200.00 = Rp. 47.400

Jumlah (2) = Rp. 12,506.400 Jumlah (1) + (2) = Rp. 47,506.400

SNI 03-2838-2002-4-l1 buah pasang pegangan pintu / door holderBahan- Door holder 1.000 Bh x Rp. 24,000.00 = Rp. 24,000.000

Jumlah (1) = Rp. 24,000.000 Tenaga- Pekerja 0.050 Oh x Rp. 44,300.00 = Rp. 2,215.000 - Tukang kayu 0.500 Oh x Rp. 70,200.00 = Rp. 35,100.000 - Kepala tukang 0.0500 Oh x Rp. 84,300.00 = Rp. 4,215.000 - Mandor 0.0025 Oh x Rp. 63,200.00 = Rp. 158.000

Jumlah (2) = Rp. 41,688.000 Jumlah (1) + (2) = Rp. 65,688.000

SNI 03-2838-2002-4-q1 M2 pasang kaca, tebal 5 mmBahan- Kaca 1.100 M2 x Rp. 89,316.00 = Rp. 98,247.600

Jumlah (1) = Rp. 98,247.600 Tenaga- Pekerja 0.015 Oh x Rp. 44,300.00 = Rp. 664.500 - Tukang kayu 0.150 Oh x Rp. 70,200.00 = Rp. 10,530.000 - Kepala tukang 0.015 Oh x Rp. 84,300.00 = Rp. 1,264.500 - Mandor 0.00075 Oh x Rp. 63,200.00 = Rp. 47.400

Jumlah (2) = Rp. 12,506.400 Jumlah (1) + (2) = Rp. 110,754.000

SNI 03-2838-2002-5-at 1

Page 15: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

1 M2 pasang lantai keramik 40 x 40 cmBahan- Keramik 40 x 40 cm 1.000 M2 x Rp. 65,000.00 = Rp. 65,000.000 - Semen Portlsnd 11.380 Kg x Rp. 1,149.75 = Rp. 13,084.155 - Pasir pasang 0.042 M3 x Rp. 115,560.00 = Rp. 4,853.520 - Semen warna 1.500 Kg x Rp. 2,650.00 = Rp. 3,975.000

Jumlah (1) = Rp. 86,912.675 Tenaga- Pekerja 0.620 Oh x Rp. 44,300.00 = Rp. 27,466.000 - Tukang batu 0.350 Oh x Rp. 70,200.00 = Rp. 24,570.000 - Kepala tukang 0.035 Oh x Rp. 84,300.00 = Rp. 2,950.500 - Mandor 0.030 Oh x Rp. 63,200.00 = Rp. 1,896.000

Jumlah (2) = Rp. 56,882.500 Jumlah (1) + (2) = Rp. 143,795.175

SNI 03-2838-2002-5-au 11 M2 pasang lantai keramik 20 x 20 cm anti slipBahan- Keramik 20 x 20 cm anti slip 1.000 M2 x Rp. 63,000.00 = Rp. 63,000.000 - Semen Portlsnd 11.380 Kg x Rp. 1,149.75 = Rp. 13,084.155 - Pasir pasang 0.042 M3 x Rp. 115,560.00 = Rp. 4,853.520 - Semen warna 1.500 Kg x Rp. 2,650.00 = Rp. 3,975.000

Jumlah (1) = Rp. 84,912.675 Tenaga- Pekerja 0.620 Oh x Rp. 44,300.00 = Rp. 27,466.000 - Tukang batu 0.350 Oh x Rp. 70,200.00 = Rp. 24,570.000 - Kepala tukang 0.035 Oh x Rp. 84,300.00 = Rp. 2,950.500 - Mandor 0.030 Oh x Rp. 63,200.00 = Rp. 1,896.000

Jumlah (2) = Rp. 56,882.500 Jumlah (1) + (2) = Rp. 141,795.175

SNI 03-2838-2002-5-bn1 M2 pasang dinding keramik 20 x 25 cmBahan- Keramik dinding 20 x 20 cm 1.000 M2 x Rp. 64,000.00 = Rp. 64,000.000 - Semen abu-abu 9.300 Kg x Rp. 1,149.75 = Rp. 10,692.675 - Pasir pasang 0.018 M3 x Rp. 115,560.00 = Rp. 2,080.080 - Semen warna 1.500 Kg x Rp. 2,650.00 = Rp. 3,975.000

Jumlah (1) = Rp. 80,747.755 Tenaga- Pekerja 0.600 Oh x Rp. 44,300.00 = Rp. 26,580.000 - Tukang batu 0.450 Oh x Rp. 70,200.00 = Rp. 31,590.000 - Kepala tukang 0.045 Oh x Rp. 84,300.00 = Rp. 3,793.500 - Mandor 0.030 Oh x Rp. 63,200.00 = Rp. 1,896.000

Jumlah (2) = Rp. 63,859.500 Jumlah (1) + (2) = Rp. 144,607.255

SNI 03-2838-2002-5-bt 11 M2 pasang dinding/lantai pasangan batu tempelBahan- Batu andesit 1.050 M2 x Rp. 130,000.00 = Rp. 136,500.000 - Semen abu-abu 11.750 Kg x Rp. 1,149.75 = Rp. 13,509.563 - Pasir pasang 0.035 M3 x Rp. 115,560.00 = Rp. 4,044.600

Jumlah (1) = Rp. 154,054.163 Tenaga- Pekerja 0.620 Oh x Rp. 44,300.00 = Rp. 27,466.000 - Tukang batu 0.350 Oh x Rp. 70,200.00 = Rp. 24,570.000 - Kepala tukang 0.035 Oh x Rp. 84,300.00 = Rp. 2,950.500 - Mandor 0.030 Oh x Rp. 63,200.00 = Rp. 1,896.000

Jumlah (2) = Rp. 56,882.500 Jumlah (1) + (2) = Rp. 210,936.663

SNI 03-2838-2002-6-h1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis penutupBahan

Page 16: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

- Cat meni 0.200 Kg x Rp. 20,952.00 = Rp. 4,190.400 - Plamir 0.150 Kg x Rp. 11,988.00 = Rp. 1,798.200 - Cat dasar 0.170 Kg x Rp. 22,680.00 = Rp. 3,855.600 - Cat penutup 0.260 Kg x Rp. 23,112.00 = Rp. 6,009.120

Jumlah (1) = Rp. 15,853.320 Tenaga- Pekerja 0.070 Oh x Rp. 44,300.00 = Rp. 3,101.000 - Tukang cat 0.009 Oh x Rp. 70,200.00 = Rp. 631.800 - Kepala tukang 0.006 Oh x Rp. 84,300.00 = Rp. 505.800 - Mandor 0.003 Oh x Rp. 63,200.00 = Rp. 189.600

Jumlah (2) = Rp. 4,428.200 Jumlah (1) + (2) = Rp. 20,281.520

SNI 03-2838-2002-6-i1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis penutupBahan- Cat meni 0.200 Kg x Rp. 20,952.00 = Rp. 4,190.400 - Plamir 0.150 Kg x Rp. 11,988.00 = Rp. 1,798.200 - Cat dasar 0.170 Kg x Rp. 22,680.00 = Rp. 3,855.600 - Cat penutup 0.350 Kg x Rp. 23,112.00 = Rp. 8,089.200

Jumlah (1) = Rp. 17,933.400 Tenaga- Pekerja 0.070 Oh x Rp. 44,300.00 = Rp. 3,101.000 - Tukang cat 0.105 Oh x Rp. 70,200.00 = Rp. 7,371.000 - Kepala tukang 0.004 Oh x Rp. 84,300.00 = Rp. 337.200 - Mandor 0.003 Oh x Rp. 63,200.00 = Rp. 189.600

Jumlah (2) = Rp. 10,998.800 Jumlah (1) + (2) = Rp. 28,932.200

SNI 03-2838-2002-6-l1 M2 Pelaburan bidang kayu dengan cat residu dan terBahan- Residu atau ter 0.350 Ltr x Rp. 2,160.00 = Rp. 756.000

Jumlah (1) = Rp. 756.000 Tenaga- Pekerja 0.100 Oh x Rp. 44,300.00 = Rp. 4,430.000 - Tukang cat - Oh x Rp. 70,200.00 = Rp. - - Kepala tukang - Oh x Rp. 84,300.00 = Rp. - - Mandor 0.006 Oh x Rp. 63,200.00 = Rp. 379.200

Jumlah (2) = Rp. 4,809.200 Jumlah (1) + (2) = Rp. 5,565.200

SNI 03-2838-2002-6-n1 M2 Pengecatan tembok baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis penutupBahan- Plamir 0.100 Kg x Rp. 11,988.00 = Rp. 1,198.800 - Cat dasar 0.100 Kg x Rp. 22,680.00 = Rp. 2,268.000 - Cat penutup 0.260 Kg x Rp. 23,112.00 = Rp. 6,009.120

Jumlah (1) = Rp. 9,475.920 Tenaga- Pekerja 0.020 Oh x Rp. 44,300.00 = Rp. 886.000 - Tukang cat 0.063 Oh x Rp. 70,200.00 = Rp. 4,422.600 - Kepala tukang 0.006 Oh x Rp. 84,300.00 = Rp. 505.800 - Mandor 0.003 Oh x Rp. 63,200.00 = Rp. 189.600

Jumlah (2) = Rp. 6,004.000 Jumlah (1) + (2) = Rp. 15,479.920

SNI 03-2838-2002-6-t 11 M2 Pengecatan meniBahan- Cat meni besi 0.100 Kg x Rp. 20,952.00 = Rp. 2,095.200

Page 17: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

- Kuas 0.010 Kg x Rp. 12,000.00 = Rp. 120.000 Jumlah (1) = Rp. 2,215.200

Tenaga- Pekerja 0.020 Oh x Rp. 44,300.00 = Rp. 886.000 - Tukang cat 0.200 Oh x Rp. 70,200.00 = Rp. 14,040.000 - Kepala tukang 0.020 Oh x Rp. 84,300.00 = Rp. 1,686.000 - Mandor 0.010 Oh x Rp. 63,200.00 = Rp. 632.000

Jumlah (2) = Rp. 17,244.000 Jumlah (1) + (2) = Rp. 19,459.200

Lhokseumawe, Juni 2008 Konsultan Perencana

PT. SUAR SEJATI KONSULT

RUSLI H. ISHAK, A.Md Direktur

Page 18: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

PERHITUNGAN TULANGAN

Kolom Ukuran 30/40 cmDia 16 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m216 256 36 0.22 1.564 10 11.5 15.644 19.34044 0.12

8 64 36 0.22 0.391 7 1.35 3.696

Kolom Ukuran 30/30 cmDia 16 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m216 256 36 0.22 1.564 8 11.5 12.516 15.664 0.09

8 64 36 0.22 0.391 7 1.15 3.148

Balok 30/40 cmDia 16 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m216 256 36 0.22 1.564 8 1 12.52 20.86578 0.1214 196 36 0.22 1.198 4 1 4.79

8 64 36 0.22 0.391 7 1.3 3.56

Balok 30/50 cmDia 16 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m216 256 36 0.22 1.564 12 1 18.77 22.33 0.15

8 64 36 0.22 0.391 7 1.3 3.56

Balok 25/40 cmDia 16 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m216 256 36 0.22 1.564 7 1 10.95 16.632 0.114 196 36 0.22 1.198 2 1 2.40

8 64 36 0.22 0.391 7 1.2 3.29

Balok 25/35 cmDia 16 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m20 0 36 0.22 0.000 0 1 0.00 12.04622 0.0875

14 196 36 0.22 1.198 8 1 9.588 64 36 0.22 0.391 7 0.9 2.46

Ring Balok 20/30 cmDia 16 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m20 0 36 0.22 0.000 0 1 0.00 10.57467 0.06

14 196 36 0.22 1.198 7 1 8.388 64 36 0.22 0.391 7 0.8 2.19

Balok Latai 13/15 cmDia 10 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Page 19: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Kg Btg m Kg/m' kg m210 100 36 0.22 0.611111 4 1 2.444444 3.152844 0.0195

6 36 36 0.22 0.22 7 0.46 0.7084

Balok Latai 15/40 cmDia 12 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m212 144 36 0.22 0.88 8 1 7.04 8.58 0.06

6 36 36 0.22 0.22 7 1 1.54

Kolom Praktis 13/13 cmDia 12 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m212 144 36 0.22 0.88 4 1 3.52 4.1668 0.0169

6 36 36 0.22 0.22 7 0.42 0.6468

Sloof 25/30 cmDia 16, 14 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m216 256 36 0.22 1.56 7 1 10.95 16.08 0.07514 196 36 0.22 1.20 2 1 2.40

8 64 36 0.22 0.39 7 1 2.74

Pondasi Tapak 200/200 cmDia 16 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m214 196 36 0.22 1.20 14 1.2 16.76889 36.89156 0.314 196 36 0.22 1.20 14 1.2 20.12267

Plat Lantai t = 12 cmDia 11 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m210 100 36 0.22 0.61 10 1.2 6.111111 13.44444 0.1210 100 36 0.22 0.61 10 1.2 7.333333

Dinding Sumuran t = 10 cmDia 10 mm Koef Bj Berat Jlh Pjng Brt/m' Jlh Brt Dimensi

Kg Btg m Kg/m' kg m210 100 36 0.22 0.61 10 1.2 6.111111 6.111111 0.12

0 0 36 0.22 0.00 10 1.2 0

Kuda-kuda23.2 0.06 0.12 0.16704

19 0.05 0.16 0.15212 0.04 0.14 0.0672

0.38624 10 3.8624Ikatan Angin

9 0.05 0.1 0.045 9 0.405

Page 20: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Goding420 0.05 0.1 2.1

6.3674

Page 21: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Jlh Besi Kg

161.1704

Jlh Besi Kg

174.0444

Jlh Besi Kg

173.8815

Jlh Besi Kg

148.883

Jlh Besi Kg166.32

Jlh Besi Kg

137.6711

Jlh Besi Kg

176.2444

Jlh Besi

Page 22: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

Kg161.6843

Jlh Besi Kg

143

Jlh Besi Kg

246.5562

Jlh Besi Kg

214.4593

Jlh Besi Kg

122.9719

Jlh Besi Kg

112.037

Jlh Besi Kg

50.92593

Page 23: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

R E K A P I T U L A S I

PEKERJAAN : PEMBANGUNAN LANJUTAN SMAN 1 KOTA LHOKSEUMAWE (OTSUS)

LOKASI : KECAMATAN BANDA SAKTI KOTA LHOKSEUMAWE

TAHUN ANGGARAN : 2008

NO. U R A I A N P E K E R J A A N JUMLAH HARGA

1 2 3

A. PEKERJAAN PERSIAPAN Rp. 16,250,000.00 B. LANJUTAN PEMBANGUNAN 6 (ENAM) RKB BLOCK AI PEKERJAAN PASANGAN/ BETON Rp. 434,902,371.76 II PEKERJAAN LANTAI Rp. 80,633,298.00 III PEK. KOSEN PINTU/JENDELA & VENTILASI Rp. 53,797,519.84 IV PEKERJAAN ORNAMEN Rp. 83,850,000.00 V PEKERJAAN ATAP DAN PLAFOND Rp. 316,562,105.00 VI PEKERJAAN INSTALASI LISTRIK Rp. 9,695,000.00 VII PEKERJAAN PENGECATAN Rp. 45,317,026.88 VIII PEK. PENGUNCI DAN PENGGANTUNG Rp. 7,193,376.00 IX PEKERJAAN ANTI PETIR Rp. 28,000,000.00

C. LANJUTAN PEMBANGUNAN 4 (EMPAT) RUANG LAB BLOCK BI PEKERJAAN PASANGAN/ BETON Rp. 415,945,172.83 II PEKERJAAN LANTAI Rp. 80,633,298.00 III PEK. KOSEN PINTU/JENDELA & VENTILASI Rp. 72,127,519.84 IV PEKERJAAN ORNAMEN Rp. 83,850,000.00 V PEKERJAAN ATAP DAN PLAFOND Rp. 316,562,105.00 VI PEKERJAAN INSTALASI LISTRIK Rp. 14,084,000.00 VII PEKERJAAN PENGECATAN Rp. 45,317,026.88 VIII PEK. PENGUNCI DAN PENGGANTUNG Rp. 6,706,976.00 IX PEKERJAAN ANTI PETIR Rp. 28,000,000.00

D. LANJUTAN PEMBANGUNAN 4 (EMPAT) RKB, RUANG PUSTAKA DAN LAB. BAHASA BLOCK CI PEKERJAAN PASANGAN/ BETON Rp. 588,485,504.54 II PEKERJAAN LANTAI Rp. 118,773,409.36 III PEK. KOSEN PINTU/JENDELA & VENTILASI Rp. 96,882,933.92 IV PEKERJAAN ORNAMEN Rp. 95,430,000.00 V PEKERJAAN ATAP DAN PLAFOND Rp. 415,801,552.80 VI PEKERJAAN INSTALASI LISTRIK Rp. 15,402,000.00 VII PEKERJAAN PENGECATAN Rp. 57,979,504.28 VIII PEK. PENGUNCI DAN PENGGANTUNG Rp. 10,864,128.00 IX PEKERJAAN SANITASI Rp. 13,444,376.46 X PEKERJAAN ANTI PETIR Rp. 36,000,000.00

JUMLAH Rp. 3,588,490,205.40 Biaya Perencanaan 3,43 % Rp. 123,085,214.05 Biaya Pengawasan 2,38 % Rp. 85,406,066.89 Biaya Pengelolaan 0,53 % Rp. 19,018,998.09 TOTAL BIAYA Rp. 3,816,000,484.42 DIBULATKAN Rp. 3,816,000,000.00

Terbilang : Tiga milyar delapan ratus enam belas juta rupiah,-

Mengetahui : Lhokseumawe, Juni 2008Kuasa Pengguna Anggaran Konsultan Perencana

Bidang Pendidikan Menengah PT. SUAR SEJATI KONSULT

Drs. RUSDI ARIES RUSLI H. ISHAK, A.MdPembina Tk. I / Nip. 131 637 874 Direktur

Page 24: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

BILL OF QUANTITY ( BQ )

PEKERJAAN : PEMBANGUNAN LANJUTAN SMAN 1 KOTA LHOKSEUMAWE (OTSUS)LOKASI : KECAMATAN BANDA SAKTI KOTA LHOKSEUMAWETAHUN ANGGARAN : 2008

NO NAMA PEKERJAAN VOLUME SATUAN ANALISA HARGA SATUAN

( RP ) A. PEKERJAAN PERSIAPAN

1 Pembersihan Lapangan Ls - Taksir 1,500,000.00 2 Gudang Kerja/Direksiket Ls - Taksir 6,500,000.00 3 Penyediaan Air Ls - Taksir 3,700,000.00 4 Administrasi / Dokumentasi Ls - Taksir 1,350,000.00 5 Progres dan Pelaporan Ls - Taksir 1,500,000.00 6 Pembersihan Akhir Ls - Taksir 850,000.00 7 Keamanan / P3K Ls - Taksir 850,000.00

Jumlah B. LANJUTAN PEMBANGUNAN 6 (ENAM) RKB BLOCK AI PEKERJAAN PASANGAN/ BETON

1 Pasangan Batu Bata 1 : 4 648.00 M3 SNI 03-2837-2002-1-k 84,788.21 2 Plesteran 1 : 4 1,296.00 M2 SNI 03-2837-2002-2-d 29,576.40 3 Beton Bertulang Ring Balok 20 / 30 cm 15.24 M3 SNI 03-3435-2002 k 7,060,354.35 4 Beton Bertulang Kolom Induk 30 / 40 cm 17.28 M3 SNI 03-3435-2002 b 6,994,037.74 5 Beton Bertulang Kolom Induk 30 / 30 cm 5.04 M3 SNI 03-3435-2002 c 8,027,531.86 6 Beton Bertulang Balok Thoi 25/40 cm 0.82 M3 SNI 03-3435-2002 i 5,973,852.10 7 Beton Bertulang Balok latai, Top Gevel 13 / 15 cm 2.77 M3 SNI 03-3435-2002 l 9,284,840.26 8 Beton Bertulang Balok Ornamen Teras 15/40 cm 4.20 M3 SNI 03-3435-2002 e 8,240,195.28 9 Pasangan Batu Kerawang 6.00 M2 Taksir 120,000.00

10 Cap Kolom 204.76 M2 SNI 03-2837-2002-2-b 33,046.89 Jumlah

II PEKERJAAN LANTAI1 Lantai Kramik 40 x 40 cm 560.00 M2 SNI 03-2838-2002-5-at 1 143,795.18 2 Pasang Bon - Bon Kramik 6.00 M' Taksir 18,000.00

Jumlah III PEK. KOSEN PINTU/JENDELA & VENTILASI

1 Kayu Kosen Pintu, Jendela dan Ventilasi 4.02 M3 SNI 03-3434-2002-b 7,457,592.00 2 Pintu Panel ukuran 90 x 210 cm 6.00 Unit Taksir 650,000.00 3 Jendela Ambang Kaca 5 mm 60 x 85 cm 90.00 Unit Taksir 185,000.00 4 Papan Ventilasi 86.00 Lbr Taksir 38,000.00

Jumlah IV PEKERJAAN ORNAMEN

1 Ornamen Selasar + Besi Stenlisteel (Depan) 13.00 Unit Taksir 1,450,000.00 2 Rellif Ornamen Selasar (Depan) 13.00 Unit Taksir 750,000.00 3 Ornamen Selasar + Besi Stenlisteel (Samping) 2.00 Unit Taksir 850,000.00 4 Rellif Ornamen Selasar (Samping) 2.00 Unit Taksir 600,000.00 5 Ornamen Lening Selasar depan Besi Galvanis steel 13.00 Unit Taksir 1,250,000.00 6 Ornamen Lening Selasar Sp Besi Galvanis steel 2.00 Unit Taksir 820,000.00 7 Rellif Balok Kepala Thoi 32.00 Bh Taksir 230,000.00 8 Rellif Tombak Layar 2.00 Unit Taksir 4,500,000.00 9 Ukiran Tombak Layar Motif Aceh 2.00 Unit Taksir 4,500,000.00

10 Rellif Pot Bunga 14.00 Bh Taksir 650,000.00 Jumlah

V PEKERJAAN ATAP DAN PLAFOND1 Kuda-kuda dan Gording Baja Ringan 890.60 M2 Taksir 145,000.00 2 Atap Genteng Metal 890.60 M2 SNI 03-3436-2002-an 87,904.00 3 Pemasangan Rabung Genteng Supersteel 61.00 M1 SNI 03-3436-2002-ao 69,601.00 4 Lisplank Wood Plank 0,30 m 150.00 M1 Taksir 48,000.00 5 Pekerjaan Rangka Furing Plafond 782.00 M2 SNI 03-3434-2002-an 81,292.50 6 Pekerjaan Pasangan Plafond Gipsum t = 12 mm 782.00 M2 SNI 03-2838-2002-1-j 31,146.30 7 Pekerjaan List Profil Gypsum 465.00 M1 Taksir 21,000.00

Jumlah

VI PEKERJAAN INSTALASI LISTRIK1 Titik Api + Instalasi 45.00 Titik Taksir 125,000.00 2 Lampu Hemat Energi Philips SL'E 23 Watt + Aksesor 14.00 Buah Taksir 85,000.00 3 Lampu TL 40 Watt + Aksresories 24.00 Buah Taksir 110,000.00 4 Saklar Ganda Merk Braco 8.00 Buah Taksir 8,000.00 5 Saklar Triple Merk Braco 6.00 Buah Taksir 20,000.00 6 Stop Kontak 7.00 Buah Taksir 8,000.00

Jumlah

Page 25: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

NO NAMA PEKERJAAN VOLUME SATUAN ANALISA HARGA SATUAN

( RP )

VII PEKERJAAN PENGECATAN1 Cat Kosen Pintu / Jendela 201.00 M2 SNI 03-2838-2002-6-i 28,932.20 2 Cat kilat Pintu Panel / Jendela 59.10 M2 SNI 03-2838-2002-6-i 28,932.20 3 Cat Lisplang 2,5 x 30 cm 60.00 M2 SNI 03-2838-2002-6-i 28,932.20 4 Cat Dinding Tembok 1,500.70 M2 SNI 03-2838-2002-6-n 15,479.92 5 Cat Plafond 828.50 M2 SNI 03-2838-2002-6-n 15,479.92

Jumlah VIII PEK. PENGUNCI DAN PENGGANTUNG

1 Kunci Tanam 2 Slaag 6.00 Buah Taksir 113,600.00 2 Pacok Pintu 6.00 Buah Taksir 7,000.00 3 Engsel Pintu Type ARCH 18.00 Buah Taksir 23,112.00 4 Engsel Jendela Type ARCH 180.00 Buah Taksir 16,416.00 5 Hak Angin Jendela 180.00 Buah Taksir 13,716.00 6 Pacok Jendela 90.00 Buah Taksir 7,000.00

Jumlah IX PEKERJAAN ANTI PETIR

1 Pemasangan Anti Petir Ls - Taksir 28,000,000.00 Jumlah

C. LANJUTAN PEMBANGUNAN 4 (EMPAT) RUANG LAB BLOCK BI PEKERJAAN PASANGAN/ BETON

1 Pasangan Batu Bata 1 : 4 557.60 M3 SNI 03-2837-2002-1-k 84,788.21

2 Plesteran 1 : 4 1,115.20 M2 SNI 03-2837-2002-2-d 29,576.40 3 Beton Bertulang Ring Balok 20 / 30 cm 15.24 M3 SNI 03-3435-2002 k 7,060,354.35 4 Beton Bertulang Kolom Induk 30 / 40 cm 16.43 M3 SNI 03-3435-2002 b 6,994,037.74 5 Beton Bertulang Kolom Induk 30 / 30 cm 5.04 M3 SNI 03-3435-2002 c 8,027,531.86 6 Beton Bertulang Balok Thoi 25/40 cm 0.82 M3 SNI 03-3435-2002 i 5,973,852.10 7 Beton Bertulang Balok latai, Top Gevel 13 / 15 cm 2.77 M3 SNI 03-3435-2002 l 9,284,840.26 8 Beton Bertulang Balok Ornamen Teras 15/40 cm 4.20 M3 SNI 03-3435-2002 e 8,240,195.28 9 Pasangan Batu Kerawang 6.00 M2 Taksir 120,000.00

10 Cap Kolom 204.76 M2 SNI 03-2837-2002-2-b 33,046.89 Jumlah

II PEKERJAAN LANTAI1 Lantai Kramik 40 x 40 cm 560.00 M2 SNI 03-2838-2002-5-at 1 143,795.18 4 Pasang Bon - Bon Kramik 6.00 M' Taksir 18,000.00

Jumlah III PEK. KOSEN PINTU/JENDELA & VENTILASI

1 Kayu Kosen Pintu, Jendela dan Ventilasi 4.02 M3 SNI 03-3434-2002-b 7,457,592.00 2 Pintu Panel ukuran 80 x 210 cm 8.00 Unit Taksir 650,000.00 3 Pintu Terali Besi ukuran 90 x 210 cm 8.00 Unit Taksir 950,000.00 4 Jendela Ambang Kaca 5 mm 60 x 85 cm 88.00 Unit Taksir 185,000.00

5 Terali Besi Untuk Jendela 60 x 85 cm 40.00 Unit Taksir 245,000.00 6 Papan Ventilasi 86.00 Lbr Taksir 38,000.00

Jumlah IV PEKERJAAN ORNAMEN

1 Ornamen Selasar + Besi Stenlisteel (Depan) 13.00 Unit Taksir 1,450,000.00 2 Rellif Ornamen Selasar (Depan) 13.00 Unit Taksir 750,000.00 3 Ornamen Selasar + Besi Stenlisteel (Samping) 2.00 Unit Taksir 850,000.00 4 Rellif Ornamen Selasar (Samping) 2.00 Unit Taksir 600,000.00 5 Ornamen Lening Selasar depan Besi Galvanis steel 13.00 Unit Taksir 1,250,000.00 6 Ornamen Lening Selasar Sp Besi Galvanis steel 2.00 Unit Taksir 820,000.00 7 Rellif Balok Kepala Thoi 32.00 Bh Taksir 230,000.00 8 Rellif Tombak Layar 2.00 Unit Taksir 4,500,000.00 9 Ukiran Tombak Layar Motif Aceh 2.00 Unit Taksir 4,500,000.00

10 Rellif Pot Bunga 14.00 Bh Taksir 650,000.00 Jumlah

V PEKERJAAN ATAP DAN PLAFOND1 Kuda-kuda dan Gording Baja Ringan 890.60 M2 Taksir 145,000.00 2 Atap Genteng Metal 890.60 M2 SNI 03-3436-2002-an 87,904.00 3 Pemasangan Rabung Genteng Supersteel 61.00 M1 SNI 03-3436-2002-ao 69,601.00 4 Lisplank Wood Plank 0,30 m 150.00 M1 Taksir 48,000.00 5 Pekerjaan Rangka Furing Plafond 782.00 M2 SNI 03-3434-2002-an 81,292.50 6 Pekerjaan Pasangan Plafond Gipsum t = 12 mm 782.00 M2 SNI 03-2838-2002-1-j 31,146.30 7 Pekerjaan List Profil Gypsum 465.00 M1 Taksir 21,000.00

Jumlah VI PEKERJAAN INSTALASI LISTRIK

1 Titik Api + Instalasi 78.00 Titik Taksir 125,000.00 2 Lampu Hemat Energi Philips SL'E 23 Watt + Aksesor 14.00 Buah Taksir 85,000.00 3 Lampu TL 40 Watt + Aksresories 24.00 Buah Taksir 110,000.00 4 Saklar Ganda Merk Braco 8.00 Buah Taksir 8,000.00 5 Saklar Triple Merk Braco 6.00 Buah Taksir 20,000.00 6 Stop Kontak 40.00 Buah Taksir 8,000.00

Page 26: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

NO NAMA PEKERJAAN VOLUME SATUAN ANALISA HARGA SATUAN

( RP ) Jumlah

VII PEKERJAAN PENGECATAN1 Cat Kosen Pintu / Jendela 201.00 M2 SNI 03-2838-2002-6-i 28,932.20 2 Cat kilat Pintu Panel / Jendela 59.10 M2 SNI 03-2838-2002-6-i 28,932.20 3 Cat Lisplang 2,5 x 30 cm 60.00 M2 SNI 03-2838-2002-6-i 28,932.20 4 Cat Dinding Tembok 1,500.70 M2 SNI 03-2838-2002-6-n 15,479.92 5 Cat Plafond 828.50 M2 SNI 03-2838-2002-6-n 15,479.92

Jumlah VIII PEK. PENGUNCI DAN PENGGANTUNG

1 Kunci Tanam 2 Slaag 4.00 Buah Taksir 113,600.00 2 Pacok Pintu 8.00 Buah Taksir 7,000.00 3 Engsel Pintu Type ARCH 12.00 Buah Taksir 23,112.00 4 Engsel Jendela Type ARCH 176.00 Buah Taksir 16,416.00 5 Hak Angin Jendela 176.00 Buah Taksir 13,716.00 6 Pacok Jendela 88.00 Buah Taksir 7,000.00

Jumlah IX PEKERJAAN ANTI PETIR

1 Pemasangan Anti Petir Ls - Taksir 28,000,000.00 Jumlah

D. LANJUTAN PEMBANGUNAN 4 (EMPAT) RKB, RUANG PUSTAKA DAN LAB. BAHASA BLOCK CI PEKERJAAN PASANGAN/ BETON

1 Pasangan Batu Bata 1 : 4 849.60 M3 SNI 03-2837-2002-1-k 84,788.21 2 Plesteran 1 : 4 1,699.20 M2 SNI 03-2837-2002-2-d 29,576.40 3 Beton Bertulang Ring Balok 20 / 30 cm 20.04 M3 SNI 03-3435-2002 k 7,060,354.35 4 Beton Bertulang Kolom Induk 30 / 40 cm 24.48 M3 SNI 03-3435-2002 b 6,994,037.74 5 Beton Bertulang Kolom Induk 30 / 30 cm 7.20 M3 SNI 03-3435-2002 c 8,027,531.86 6 Beton Bertulang Balok Thoi 25/40 cm 1.20 M3 SNI 03-3435-2002 i 5,973,852.10 7 Beton Bertulang Balok latai, Top Gevel 13 / 15 cm 3.37 M3 SNI 03-3435-2002 l 9,284,840.26 8 Beton Bertulang Kolom Praktis 13 / 13 cm 0.68 M3 SNI 03-3435-2002 f 9,284,840.26 9 Beton Bertulang Balok Ornamen Teras 15/40 cm 4.86 M3 SNI 03-3435-2002 e 8,240,195.28

10 Pasangan Batu Kerawang 6.00 M2 Taksir 120,000.00 11 Cap Kolom 308.32 M2 SNI 03-2837-2002-2-b 33,046.89

Jumlah II PEKERJAAN LANTAI

1 Lantai Kramik 40 x 40 cm 729.00 M2 SNI 03-2838-2002-5-at 1 143,795.18 2 Lantai Kramik KM/WC 20 x 20 cm 27.00 M2 SNI 03-2838-2002-5-au 1 141,795.18 3 Dinding Kramik KM/WC 20 x 25 cm , T = 1,5 M 63.00 M2 SNI 03-2838-2002-5-bn 144,607.26 4 Pasang Bon - Bon Kramik 56.00 M' Taksir 18,000.00

Jumlah III PEK. KOSEN PINTU/JENDELA & VENTILASI

1 Kayu Kosen Pintu, Jendela dan Ventilasi 5.26 M3 SNI 03-3434-2002-b 7,457,592.00 2 Pintu Panel ukuran 90 x 210 cm 4.00 Unit Taksir 650,000.00 3 Pintu Panel ukuran 60 x 210 cm 5.00 Unit Taksir 500,000.00 4 Pintu Panel ukuran 80 x 210 cm 4.00 Unit Taksir 600,000.00 5 Pintu Panel ukuran 70 x 200 cm 6.00 Unit Taksir 500,000.00 6 Jendela Ambang Kaca 5 mm 60 x 85 cm 118.00 Unit Taksir 185,000.00 7 Terali Besi Untuk Jendela 60 x 85 cm 86.00 Unit Taksir 245,000.00 8 Papan Ventilasi 112.00 Lbr Taksir 38,000.00

Jumlah IV PEKERJAAN ORNAMEN

1 Ornamen Selasar + Besi Stenlisteel (Depan) 18.00 Unit Taksir 1,450,000.00 2 Rellif Ornamen Selasar (Depan) 18.00 Unit Taksir 750,000.00 3 Ornamen Selasar + Besi Stenlisteel (Samping) 2.00 Unit Taksir 850,000.00 4 Rellif Ornamen Selasar (Samping) 2.00 Unit Taksir 150,000.00 5 Ornamen Lening Selasar depan Besi Galvanis steel 18.00 Unit Taksir 600,000.00 6 Ornamen Lening Selasar Sp Besi Galvanis steel 2.00 Unit Taksir 820,000.00 7 Rellif Balok Kepala Thoi 48.00 Bh Taksir 230,000.00 8 Rellif Tombak Layar 2.00 Unit Taksir 4,500,000.00 9 Ukiran Tombak Layar Motif Aceh 2.00 Unit Taksir 4,500,000.00

10 Rellif Pot Bunga 19.00 Bh Taksir 650,000.00 Jumlah

V PEKERJAAN ATAP DAN PLAFOND1 Kuda-kuda dan Gording Baja Ringan 1,182.60 M2 Taksir 145,000.00 2 Atap Genteng Metal 1,182.60 M2 SNI 03-3436-2002-an 87,904.00 3 Pemasangan Rabung Genteng Supersteel 81.00 M1 SNI 03-3436-2002-ao 69,601.00 4 Lisplank Wood Plank 0,30 m 184.00 M1 Taksir 48,000.00 5 Pekerjaan Rangka Furing Plafond 1,015.50 M2 SNI 03-3434-2002-an 81,292.50 6 Pekerjaan Pasangan Plafond Gypsum t = 12 mm 1,015.50 M2 SNI 03-2838-2002-1-j 31,146.30 7 Pekerjaan List Profil Gypsum 558.00 M1 Taksir 21,000.00

Jumlah

Page 27: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

NO NAMA PEKERJAAN VOLUME SATUAN ANALISA HARGA SATUAN

( RP )

VI PEKERJAAN INSTALASI LISTRIK1 Titik Api + Instalasi 76.00 Titik Taksir 125,000.00 2 Lampu Hemat Energi Philips SL'E 23 Watt + Aksesor 18.00 Buah Taksir 85,000.00 3 Lampu TL 40 Watt + Aksresories 34.00 Buah Taksir 110,000.00 4 Saklar Ganda Merk Braco 10.00 Buah Taksir 8,000.00 5 Saklar Triple Merk Braco 18.00 Buah Taksir 20,000.00 6 Stop Kontak 24.00 Buah Taksir 8,000.00

Jumlah VII PEKERJAAN PENGECATAN

1 Cat Kosen Pintu / Jendela 265.00 M2 SNI 03-2838-2002-6-i 28,932.20 2 Cat kilat Pintu Panel /Jendela 64.00 M2 SNI 03-2838-2002-6-i 28,932.20 3 Cat Lisplank Wood Plank 0,30 m 73.60 M2 SNI 03-2838-2002-6-i 28,932.20 4 Cat Dinding Tembok 1,977.50 M2 SNI 03-2838-2002-6-n 15,479.92 5 Cat Plafond 1,015.50 M2 SNI 03-2838-2002-6-n 15,479.92

Jumlah VIII PEK. PENGUNCI DAN PENGGANTUNG

1 Kunci Tanam 2 Slaag 16.00 Buah Taksir 113,600.00 2 Engsel Pintu Type ARCH 48.00 Buah Taksir 23,112.00 3 Engsel Jendela Type ARCH 236.00 Buah Taksir 16,416.00 4 Hak Angin Jendela 236.00 Buah Taksir 13,716.00 5 Pacok Jendela 118.00 Buah Taksir 7,000.00

Jumlah

IX PEKERJAAN SANITASIa. Pekerjaan Instalasi Air

1 Instalasi Air 6.00 Ttk Taksir 85,000.00 2 Kran Air Merk Sun Ei 6.00 Bh Taksir 85,000.00 3 Memasang Pengering Air Bak Mandi 6.00 Bh Taksir 28,820.00 4 Memasang Floor Drain 6.00 Bh Taksir 41,150.00 5 Memasang Tempat Sabun Keramik 6.00 Bh Taksir 56,210.00 6 Memasang Closed Jongkok 6.00 Bh Taksir 125,000.00 7 Memasang Pipa Air Bersih type AW Dia. 1/2" + 26.00 M1 Taksir 28,000.00

Accessories8 Memasang Pipa Buangan Air Kotor Type AW 32.00 M1 Taksir 48,000.00

Dia 3" + Accessories9 Memasang Pipa Buangan Air Kotor Type AW 28.00 M1 Taksir 56,000.00

Dia 4" + Accessories Jumlah

b. Pekerjaan Septick Tank1 Pekerjaan Galian Tanah 16.20 M3 SNI 03-2835-2002-2-b 26,588.20 2 Cor Beton 1 : 2 : 3 1.20 M3 SNI 03 - 3435 - 2002 - ai 983,195.00 3 Pekerjaan Pasir Urug 1.13 M3 SNI 03-2835-2002-2-k 141,318.80 4 Pasangan Batu Bata 1 : 2 1.60 M3 SNI 03-2837-2002-1-i 92,776.04 5 Pekerjaan Timbunan Kembali Lobang Galian 0.55 M3 SNI 03-2835-2002-2-i 9,706.40 6 Cor Plat Sekat beton Bertulang 1 : 2 : 3 0.10 M3 SNI 03-3435-2002 m 5,709,518.92 7 Cor plat lantai beton bertulang 1 : 2 : 3 0.62 M3 SNI 03-3435-2002 m 5,709,518.92 8 Ijuk 5.00 Kg Taksir 24,500.00 9 Memasang Pipa Buangan Air Kotor PVC Type AW 6.00 M1 Taksir 58,000.00

Dia 4" + Accessories10 Kerikil 0.50 M3 Taksir 188,600.00 11 Pipa Hawa 1.00 Bh Taksir 56,000.00 12 Plesteran 1 : 2 13.00 M2 SNI 03-2837-2002-2-b 33,046.89

Jumlah b Jumlah a + b

X PEKERJAAN ANTI PETIR1 Pemasangan Anti Petir Ls - Taksir 36,000,000.00

Jumlah

Page 28: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

BILL OF QUANTITY ( BQ )

JUMLAH HARGA( RP )

1,500,000.00 6,500,000.00 3,700,000.00 1,350,000.00 1,500,000.00 850,000.00 850,000.00 16,250,000.00

54,942,756.84 38,331,014.40 107,599,800.23 120,856,972.11 40,458,760.57 4,898,558.72 25,719,007.51 34,608,820.17 720,000.00 6,766,681.20 434,902,371.76

80,525,298.00 108,000.00 80,633,298.00

29,979,519.84 3,900,000.00 16,650,000.00 3,268,000.00 53,797,519.84

18,850,000.00 9,750,000.00 1,700,000.00 1,200,000.00 16,250,000.00 1,640,000.00 7,360,000.00 9,000,000.00 9,000,000.00 9,100,000.00 83,850,000.00

129,137,000.00 78,287,302.40 4,245,661.00 7,200,000.00 63,570,735.00 24,356,406.60 9,765,000.00 316,562,105.00

5,625,000.00 1,190,000.00 2,640,000.00 64,000.00 120,000.00 56,000.00 9,695,000.00

Page 29: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

JUMLAH HARGA( RP )

5,815,372.20 1,709,893.02 1,735,932.00 23,230,715.94 12,825,113.72 45,317,026.88

681,600.00 42,000.00 416,016.00 2,954,880.00 2,468,880.00 630,000.00 7,193,376.00

28,000,000.00 28,000,000.00

47,277,903.11

32,983,601.28 107,599,800.23 114,912,040.04 40,458,760.57 4,898,558.72 25,719,007.51 34,608,820.17 720,000.00 6,766,681.20 415,945,172.83

80,525,298.00 108,000.00 80,633,298.00

29,979,519.84 5,200,000.00 7,600,000.00 16,280,000.00

9,800,000.00 3,268,000.00 72,127,519.84

18,850,000.00 9,750,000.00 1,700,000.00 1,200,000.00 16,250,000.00 1,640,000.00 7,360,000.00 9,000,000.00 9,000,000.00 9,100,000.00 83,850,000.00

129,137,000.00 78,287,302.40 4,245,661.00 7,200,000.00 63,570,735.00 24,356,406.60 9,765,000.00 316,562,105.00

9,750,000.00 1,190,000.00 2,640,000.00 64,000.00 120,000.00 320,000.00

Page 30: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

JUMLAH HARGA( RP )

14,084,000.00

5,815,372.20 1,709,893.02 1,735,932.00 23,230,715.94 12,825,113.72 45,317,026.88

454,400.00 56,000.00 277,344.00 2,889,216.00 2,414,016.00 616,000.00 6,706,976.00

28,000,000.00 28,000,000.00

72,036,058.97 50,256,218.88 141,489,501.09 171,214,043.83 57,798,229.39 7,168,622.52 31,289,911.67 6,276,552.01 40,047,349.06 720,000.00 10,189,017.12 588,485,504.54

104,826,682.57 3,828,469.72 9,110,257.07 1,008,000.00 118,773,409.36

39,226,933.92 2,600,000.00 2,500,000.00 2,400,000.00 3,000,000.00 21,830,000.00 21,070,000.00 4,256,000.00 96,882,933.92

26,100,000.00 13,500,000.00 1,700,000.00 300,000.00 10,800,000.00 1,640,000.00 11,040,000.00 9,000,000.00 9,000,000.00 12,350,000.00 95,430,000.00

171,477,000.00 103,955,270.40 5,637,681.00 8,832,000.00 82,552,533.75 31,629,067.65 11,718,000.00 415,801,552.80

Page 31: Rab. Pembangunan Lanjutan Sman 1 Kota Lhokseumawe

JUMLAH HARGA( RP )

9,500,000.00 1,530,000.00 3,740,000.00 80,000.00 360,000.00 192,000.00 15,402,000.00

7,667,033.00 1,851,660.80 2,129,409.92 30,611,541.80 15,719,858.76 57,979,504.28

1,817,600.00 1,109,376.00 3,874,176.00 3,236,976.00 826,000.00 10,864,128.00

510,000.00 510,000.00 172,920.00 246,900.00 337,260.00 750,000.00 728,000.00

1,536,000.00

1,568,000.00

6,359,080.00

430,728.84 1,179,834.00 159,690.24 148,441.67 5,338.52 570,951.89 3,539,901.73 122,500.00 348,000.00

94,300.00 56,000.00 429,609.57 7,085,296.46 13,444,376.46

36,000,000.00 36,000,000.00