Rab Mesjid Al MUHAJERIN

download Rab Mesjid Al MUHAJERIN

of 31

description

Rab Masjid

Transcript of Rab Mesjid Al MUHAJERIN

  • PERHITUNGAN QUANTITY

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGLOKASI :

    No. Uraian Pekerjaan Stn Volume

    A BANGUNAN MESJID

    I PEKERJAAN PERSIAPAN

    1 Mobilisasi dan Demobilisasi ls 1.00

    2 Papan Nama Proyek bh 1.00

    3 Direksi Keet ls 1.00

    4 Pembersihan HASIL m2 288.63 UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 270 m2

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.125 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    288.625 m25 Pengukuran Lapangan HASIL m2 288.63

    UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 270 m2P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.125 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    288.625 m26 Foto Dokumentasi ls 1.00

    II PEKERJAAN TANAH

    1 Pembersihan Site HASIL m2 288.63 UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 270 m2

    P2 = 2.5 m L2 = 2.625 m JLH = 2 Unit = 13.125 m2P3 = 2 m L3 = 2.750 m JLH = 1 Unit = 5.5 m2

    288.625 m22 Pembuatan Bouplank HASIL m' 72.00

    UKURAN BANGUNAN : P1 = 18 m L1 = 15.000 m JLH = 1 Unit = 66 m'P2 = 2.5 m L2 = 2.625 m JLH = 2 Unit = 6 m'P3 = 2 m L3 = 2.750 m JLH = 1 Unit = 0.000 m'

    72 m'3 Galian Tanah Pondasi dan Selasar/Teras HASIL 192.52

    a Pondasi Menerus P1 = 17 m L1 = 13.000 m JLH = 1 Unit = 60 m'Uk. Pondasi lebar = 1 m H = 1.050 m = 0.8 m = 113.4 m3

    P2 = 2.5 m L2 = 2.625 m JLH = 2 Unit = 15.25 m'

    m3

    +lebar

  • P3 = 2 m L3 = 2.750 m JLH = 1 Unit = 2.750 m'18 m'

    Uk. Pondasi lebar = 0.8 m H = 1.050 m = 0.8 m = 30.24 m3

    a Pondasi Pas.Batu kali La = 0.25 m Lb = 0.700 m Ltot = 52.00 MH = 0.750 = 0.4 m = 42.9 m3

    d Pas. Batu Bata Teras L1 = 0.925 m L2 = 2.480 m jlh = 2.00 unitH = 0.400 = 0.2 m = 2.412 m3

    L1 = 0.900 m L2 = 5.800 m jlh = 1.00 unitH = 0.400 = 0.2 m = 2.64 m3

    L1 = 0.900 m L2 = 0.850 m jlh = 2.00 unitH = 0.400 = 0.2 m = 0.924 m3

    TOTAL = 192.516 m3

    4 Timbunan Kembali Tanah Pondasi = 0.25x Vol.galian 48.13

    5 Timbunan Tanah dalam Bangunan P1 = 17 m L1 = 13.000 m JLH = 1 Unit = 221 m2 m3 143.78 P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.125 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    239.625 m2Tinggi Timbunan = 0.600 m HASIL = 143.78 m3

    6 Timbunan Tanah Teras P1 = 19 m L1 = 1.000 m JLH = 2 Unit = 38 m2 m3 46.24 P1 = 13 m L1 = 1.000 m JLH = 2 Unit = 26 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    69.5 m2Tinggi Timbunan = 0.600 m HASIL = 41.70 m3

    L1 = 0.925 m L2 = 2.480 m jlh = 2 unit = 4.588 m2L1 = 0.900 m L2 = 5.800 m jlh = 1 unit = 5.22 m2L1 = 0.900 m L2 = 0.850 m jlh = 2 unit = 1.53 m2

    11.338 m2Tinggi Timbunan = 0.200 m s/d 0.6 m HASIL = 4.54 m3

    TOTAL = 46.24 m3

    7 Timbunan Pasir Urug dalam Banguna T = 0.07 m hasil = 16.774 m3 m3 16.77 8 Timbunan Pasir Urug Teras T = 0.07 m hasil = 5.659 m3 m3 5.66 9 Timbunan Pasir Urug Pondasi Pas.batuT = 0.05 m hasil = 2.080 m3 m3 2.08

    Sub Total II

    III PEKERJAAN PONDASI

    +lebar

    +lebar

    +lebar

    +lebar

    +lebar

    m3

  • 1 Lantai Kerja Pondasi Menerus Beton Cor 1 : 3 : 5 4.14 a Pondasi Menerus P1 = 17 m L1 = 13.000 m Ltot = 60 m'

    Ukuran Pondasi p = 1 m t = 0.050 m + p = 0.1 m' HASIL = 3.30 m3b Pondasi Menerus P1 = 17 m L1 = 13.000 m Ltot = 60 m'

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.125 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    tot 18.625 m2Ukuran Pondasi p = 0.8 m t = 0.050 m + p = 0.1 m' HASIL = 0.84 m3

    TOTAL = 4.14 m3

    2 Pondasi Menerus Beton Bertulang 1 : 2 : 3 18.73 a Pondasi Menerus P1 P1 = 17 m L1 = 13.000 m Ltot = 60 m'

    Ukuran Pondasi p = 1 m t = 0.250 m + p = 0 m' HASIL = 15.00 m3b Pondasi Menerus P2

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.125 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    tot 18.625 m2Ukuran Pondasi p = 1 m t = 0.200 m + p = 0 m' HASIL = 3.73 m3

    TOTAL = 18.73 m3

    c Pembesian Lbesi = 1.2 m jarak = 0.150 m Jlh = 9 bh = 540 M'Lbesi = 60 m jarak = 0.150 m Jlh = 401 bh = 481.2 M'

    Lbesi = 1 m jarak = 0.150 m Jlh = 7 bh = 130.375 M'Lbesi = 18.625 m jarak = 0.150 m Jlh = 125 bh = 125 M'

    1276.575 M'Tot. Berat = 1133.29222 Kg

    HASIL = 70.00 Kg3 Pondasi Pasangan Batu kali 1 : 4 17.29

    a Pondasi Batu Kali La = 0.25 m Lb = 0.700 m H = 0.7 m'Panjang Total = 52.00 m' HASIL = 17.29 m3

    4 Cerucuk Kayu Laut dia 4" m' 1,768.00 a Pondasi Menerus Ltot = 78.625 m Jarak = 0.600 m JLH = 133 bh

    Baris = 2 bh Panjang Kayu Cerocok = 4 M HASIL = 1,064.00 m'

    a Pondasi Pas.batu kali Ltot = 52.00 m Jarak = 0.600 m JLH = 88 bhBaris = 2 bh Panjang Kayu Cerocok = 4 M HASIL = 704.00 m'

    TOTAL = 1,768.00 m'

    5 Sloof Beton Bertulang 1 : 2 : 3 7.84 a Sloof b = 0.2 M l = 0.300 M Ltot = 130.63 M HASIL = 7.84 m3

    b Pembesian 4 12 522.5 M Berat = 463.8546 KgBeuge= 6 - 0.15 Ls = 0.9 m

    Jumlah sengkang = 871 Bh Berat = 173.978766 Kg

    m3

    m3

    m3

    m3

  • Tot. Berat = 637.83 KgHASIL = 97.00 Kg

    IV. PEKERJAAN LANTAI KERAMIK

    1 Lantai Kerja Beton Cor 1 : 3 : 5 22.43 UKURAN BANGUNAN : P1 = 17 m L1 = 13.000 m JLH = 1 Unit = 221 m2

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.125 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    239.625 m2Tebal lt.kerja = 0.070 m HASIL = 16.77 m3

    P1 = 19 m L1 = 1.000 m JLH = 2 Unit = 38 m2P1 = 13 m L1 = 1.000 m JLH = 2 Unit = 26 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    69.5 m2Tebal lt.kerja = 0.070 m HASIL = 4.87 m3

    L1 = 0.925 m L2 = 2.480 m jlh = 2 unit = 4.588 m2L1 = 0.900 m L2 = 5.800 m jlh = 1 unit = 5.22 m2L1 = 0.900 m L2 = 0.850 m jlh = 2 unit = 1.53 m2

    11.338 m2Tebal lt.kerja = 0.070 m HASIL = 0.79 m3

    TOTAL = 22.43 m3

    2 Keramik Lantai Dalam Bangunan 30 x 30 cm 239.63 UKURAN BANGUNAN : P1 = 17 m L1 = 13.000 m JLH = 1 Unit = 221 m2

    P1 = 2.5 m L1 = 2.625 m JLH = 2 Unit = 13.125 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    239.625 m2

    3 Keramik Lantai Teras 30 x 30 cm 88.34 UKURAN TERAS P1 = 19 m L1 = 1.000 m JLH = 2 Unit = 38 m2

    P1 = 13 m L1 = 1.000 m JLH = 2 Unit = 26 m2P1 = 2 m L1 = 2.750 m JLH = 1 Unit = 5.5 m2

    69.5 m2 69.50 m2

    UKURAN LT. TANGGA L1 = 0.925 m L2 = 2.480 m jlh = 2 unit = 4.588 m2L1 = 0.900 m L2 = 5.800 m jlh = 1 unit = 5.22 m2L1 = 0.900 m L2 = 0.850 m jlh = 2 unit = 1.53 m2

    11.338 m2 11.34 m2

    UKURAN KAKI TANGG L1 = 0.925 m L2 = 2.480 m jlh = 2 unit = 4.33 M'L1 = 0.900 m L2 = 5.800 m jlh = 1 unit = 7.6 M'L1 = 0.900 m L2 = 0.850 m jlh = 2 unit = 2.65 M'

    14.58 M'Tebal Kaki tangga = 0.150 m HASIL = 2.19 m2

    m3

    m2

    m2

  • L1 = 0.625 m L2 = 2.480 m jlh = 2 unit = 3.73 M'L1 = 0.600 m L2 = 5.200 m jlh = 1 unit = 6.4 M'L1 = 0.600 m L2 = 0.850 m jlh = 2 unit = 2.05 M'

    12.18 M'Tebal Kaki tangga = 0.200 m HASIL = 2.44 m2

    L1 = 0.325 m L2 = 2.480 m jlh = 2 unit = 3.13 M'L1 = 0.300 m L2 = 4.600 m jlh = 1 unit = 5.2 M'L1 = 0.300 m L2 = 0.850 m jlh = 2 unit = 1.45 M'L1 = m L2 = 4.600 m jlh = 2 unit = 4.6 M'

    14.38 M'Tebal Kaki tangga = 0.200 m HASIL = 2.88 m2

    TOTAL = 88.34 m2

    4 Plin dinding keramik10 x 30 cm Dinding dalam = 63.7 m' m' 108.40 Dinding luar = 49.1 m'Pengurangan = -4.4 m'

    hasil = 108.4 m'

    Sub Total IV

    V. PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 2 26.97 Panjang ### m' H = 1.37 M' Luas = 175.189 M2Panjang ### m' H = 0.65 M' Luas = 33.800 M2Panjang 7.6 m' H = 0.25 M' Luas = 1.900 M2Panjang 6.4 m' H = 0.45 M' Luas = 2.880 M2Panjang 5.2 m' H = 0.65 M' Luas = 3.380 M2Panjang ### m' H = 0.25 M' Luas = 2.165 M2Panjang 7.46 m' H = 0.2 M' Luas = 1.492 M2Panjang 6.26 m' H = 0.2 M' Luas = 1.252 M2Panjang 5.3 m' H = 0.25 M' Luas = 1.325 M2Panjang 4.1 m' H = 0.2 M' Luas = 0.820 M2Panjang 2.9 m' H = 0.2 M' Luas = 0.580 M2

    ### Hasil = 224.783 M2

    2 Pasangan Bata 1: 4 62.89 Panjang ### m' H = 4.25 M' 1 unit Luas = 543.469 M2Panjang 7.9 m' H = 2.58 M' 1 unit Luas = 20.382 M2Panjang 8.1 m' H = 3.082 M' 1 unit Luas = 24.964 M2

    Pengurangan Pintu 2.83 m' H = 2 M' -3 unit Luas = -16.980 M2Pengurangan Pintu 0.9 m' H = 2.1 M' -2 unit Luas = -3.780 M2Pengurangan Jendela 2.08 m' H = 1.9 M' -4 unit Luas = -15.770 M2Pengurangan Jendela 2.08 m' H = 0.7 M' -12 unit Luas = -17.430 M2Pengurangan Jendela 0.3 m' H = 0.3 M' -40 unit Luas = -3.600 M2

    m3

    m3

  • Pengurangan Jendela 1.38 m' H = 0.6 M' -2 unit Luas = -1.656 M2Pengurangan Jendela 0.3 m' H = 0.15 M' -15 unit Luas = -0.675 M2Pengurangan Jendela 1.6 m' H = 0.15 M' -20 unit Luas = -4.800 M2Pengurangan Jendela 0.22 m' H = 0.22 M' -96 unit Luas = -4.646 M2

    Hasil = 524.124 M2

    3 Plesteran Trasram 1 : 2 =2 x Luasan Pasangan Batu Bata Luas = 449.566 M2 449.57 4 Plesteran 1 : 4 =2 x Luasan Pasangan Batu Bata Luas = 1,082.123 M2 1,082.12 1 Pasangan Ventilasi block 1: 4 0.68 5 Sponengan/tali air lebar = 10 cm,tebal 1.5 cm Panjang = 123.360 M2 12.34 6 Plesteran/Acian Kolom 1 : 4 Luas = 61.700 M2 61.70 7 Plesteran/Acian Balok Luas = 76.050 M2 76.05 8 Plesteran/Acian Dak 1 : 4 Luas = 27.450 M2 27.45

    Sub Total V

    VI. PEKERJAAN KOLOM, BALOK, PELAT DAN LEUVEL

    1 Kolom 20 x 40 cm Beton Bertulang 1 : 2 : 3 l 0.2 m' b = 0.400 m 9.04 Tinggi H= 5.65 m' 20 ttk Vol = 9.04 m3

    2 Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3 l 0.2 m' b = 0.150 m 2.16 Tinggi H= 3.6 m' 20 ttk Vol = 2.16 m3

    3 Kolom Praktis 15 x 15 cm Beton Bertulang 1 l 0.15 m' b = 0.150 m 1.47 Dinding H= 3.97 m' 6 ttk Vol = 0.53595 m3Pintu H= 3.8 m' 8 ttk Vol = 0.684 m3Pintu H= 5.62 m' 2 ttk Vol = 0.2529 m3

    TOTAL = 1.47285 m3

    4 Balok 15 x 60 cm Beton Bertulang 1 : 2 : 3 l 0.15 m' b = 0.600 m 4.56 Panjang L= 50.7 m' Vol = 4.563 m3

    5 Balok Praktis 15 x 20 cm Beton Bertulang 1 l 0.15 m' b = 0.200 m 6.40 Panjang L= 213.24 m' Vol = 6.3972 m3

    6 Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3 l 0.15 m' b = 0.300 m 0.54 Panjang L= 18 m' Vol = 0.54 m3

    7 Pelat Dak Lantai Beton Bertulang 1 : 2 : 3 T = 0.12 m 3.29 Luasan L= 27.45 m2 Vol = 3.294 m3

    Sub Total VIVII. PEKERJAAN KUDA - KUDA DAN ATAP

    1 Kuda-kuda Kuda- 0.08 x 0.1 L= 122.6 Vol = 0.9195 7.91

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m3

    m3

    m3

    m3

    m3

    m3

    m3

    m3

  • Kuda- 0.05 x 0.075 L= 38.7 Vol = 0.145125Gapit 0.2 x 0.0375 L= 245.88 Vol = 1.8441Gapit 0.15 x 0.0375 L= 186 Vol = 1.04625Gapit 0.1 x 0.05 L= 69 Vol = 0.345sekur 0.08 x 0.125 L= 152.4 Vol = 1.42875Gordi 0.08 x 0.05 L= 580.875 Vol = 2.17828125

    total 7.90700625

    2 Rangka Atap Genteng Metal 0.87 A = 350.26 m2 323 420.90 0.91 A = 70.64 m2 6.483 1.1033

    total = 420.9 m2 0.906371793 Atap Genteng Metal 420.9 420.90 4 Rabung Genteng 63.271 m' 63.27 5 Lisplank Kayu Dowble 159.47 m' 159.47

    Sub Total VIIVIII. PEKERJAAN PINTU DAN JENDELA

    1 Kusen Pintu Uk. 215 x 80 cm Uk 2.15 x 0.8 0.08 Dimensi Kayu 0.05 m x 0.15 mPanjang Kayu 5.3 m 2 unit Vol = 0.080

    2 Pintu Sliding Bingkai kaca rangka Aluminium uk.200 x 260 cm Komplit Kunci dan alat penggantung ( 2 daun Ventilasi lengkung ) unit 3.00 3 Pintu Panel P1 Uk. 210 x 80 cm (1 daun) 3.44 4 Jendela Kaca Rangka Aluminium uk.196 x 2230 cm Komplit Kunci dan alat penggantung ( 3 daun dengan Ventilasi lengkung ) Unit 6.00 5 Jendela Kaca Rangka Aluminium uk.70 x 2230 cm Komplit Kunci dan alat penggantung ( 1 daun dengan Ventilasi lengkung ) Unit 12.00 6 Jendela Kaca Rangka Aluminium uk.60 x 138 cm Komplit Kunci dan alat penggantung ( 1 Daun ) Unit 2.00 7 Ventilasi Kaca mati Rangka Aluminium uk 30 x 30 cm Unit 40.00 8 Ventilasi V2 Kayu Uk. 22 x 22 cm (1 daun) Unit 96.00

    Sub Total VIIIIX PEKERJAAN KUNCI DAN ALAT PENGGANTUNG

    1 Kunci & Hendel Pintu bh 2.00 2 Engsel Pintu 4" bh 6.00 3 Engsel Jendela & Ventilasi 3" bh4 Hak Angin Lipat Besar bh5 Grendel Pintu 10 " bh 4.00 6 Grendel Kodok Jendela bh -

    Sub Total IX

    IX PEKERJAAN PLAFOND

    1 Plafond Gypsum 9 mm + rangka m2 416.64 Sub Total IX

    X PEKERJAAN LISTRIK

    1 Instalasi Listrik Ttk 36.00 2 Lampu Down Light Bh 30.00

    m2

    m2

    m3

    m2

  • 3 Saklar Ganda Tanam Bh 15.00 4 Stop Kontak Tanam Bh 6.00 5 Sekering Box Dua Group Set 1.00

    Sub Total XIIXIII PEKERJAAN CAT

    1 Cat Tembok 1,082.12 2 Cat Plafond 416.64 3 Cat Ventilasi Block 3.38 4 Cat Dak Lantai 27.45 5 Cat Lisplank 71.76 6 Pengecatan Kolom 137.75 7 Pengecatan Ventilasi Kayu 181.63 8 Pengecatan Pintu Kayu 6.88

    Sub Total XIII

    TOTAL

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

  • REKAPITULASI RENCANA ANGGARAN BIAYA

    SATUAN KERJA :KEGIATAN :PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGLOKASI :

    JumlahNo. Uraian Pekerjaan Harga

    (Rp.)

    A BANGUNAN MESJIDI PEKERJAAN PERSIAPAN 6,264,346.88

    II PEKERJAAN TANAH 29,944,508.26 III PEKERJAAN PONDASI 151,105,676.39 IV PEKERJAAN LANTAI KERAMIK 61,055,974.68 V PEKERJAAN PASANGAN DAN PLESTERAN 137,551,899.08

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI 124,464,836.63 VII PEKERJAAN KUDA - KUDA DAN ATAP 152,949,009.46

    VIII PEKERJAAN PINTU DAN JENDELA 70,633,775.20 IX PEKERJAAN KUNCI DAN ALAT PENGGANTUNG 358,100.00 X PEKERJAAN PLAFOND 30,944,287.74

    XI PEKERJAAN LISTRIK 5,840,950.00 XII PEKERJAAN CAT 46,031,267.52

    TOTAL - A 817,144,631.84

    B BANGUNAN TEMPAT WUDHU PRIAI PEKERJAAN PERSIAPAN 18,562.50

    II PEKERJAAN TANAH 576,253.38 III PEKERJAAN PONDASI 7,044,190.47 IV PEKERJAAN LANTAI KERAMIK 4,899,844.89 V PEKERJAAN PASANGAN DAN PLESTERAN 8,899,907.12

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI 10,078,138.21 VII PEKERJAAN VENTILASI 300,000.00

    VIII PEKERJAAN LISTRIK 312,150.00 IX PEKERJAAN INSTALASI AIR 1,574,850.00 X PEKERJAAN CAT 2,420,397.90

    TOTAL - B 36,124,294.47

    C BANGUNAN TEMPAT WUDHU WANITAI PEKERJAAN PERSIAPAN 18,562.50

    II PEKERJAAN TANAH 576,253.38 III PEKERJAAN PONDASI 7,044,190.47 IV PEKERJAAN LANTAI KERAMIK 4,899,844.89 V PEKERJAAN PASANGAN DAN PLESTERAN 8,899,907.12

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI 10,078,138.21 VII PEKERJAAN VENTILASI 300,000.00

    VIII PEKERJAAN LISTRIK 312,150.00 IX PEKERJAAN INSTALASI AIR 1,574,850.00 X PEKERJAAN CAT 2,420,397.90

    TOTAL - C 36,124,294.47

  • D BANGUNAN PAGAR DEPANI PEKERJAAN PERSIAPAN 142,500.00

    II PEKERJAAN TANAH 741,712.50 III PEKERJAAN PONDASI 10,655,145.57 IV PEKERJAAN PASANGAN DAN PLESTERAN 3,218,461.54 V PEKERJAAN KOLOM 41,472.00

    VI PEKERJAAN PAGAR PIPA BESI DAN PINTU GERBANG 19,920,000.00 VII PEKERJAAN CAT 918,331.93

    TOTAL - D 35,637,623.54

    E BANGUNAN PAGAR KIRI DAN KANANI PEKERJAAN PERSIAPAN 330,000.00

    II PEKERJAAN TANAH 1,717,650.00 III PEKERJAAN PONDASI 24,581,389.73 IV PEKERJAAN PASANGAN DAN PLESTERAN 4,175,879.56 V PEKERJAAN KOLOM 4,736,016.00

    VI PEKERJAAN PAGAR PIPA BESI 39,600,000.00 VII PEKERJAAN CAT 2,625,461.48

    TOTAL - E 77,766,396.76

    F BANGUNAN PAGAR KIRI DAN KANANI PEKERJAAN PERSIAPAN 88,875.00

    II PEKERJAAN TANAH 462,594.38 III PEKERJAAN PONDASI 6,672,239.74 IV PEKERJAAN PASANGAN DAN PLESTERAN 4,042,153.28 V PEKERJAAN KOLOM 1,184,004.00

    VI PEKERJAAN CAT 1,235,720.53 TOTAL - F 13,685,586.92

    G HALAMAN I PEKERJAAN PERSIAPAN 256,558.50

    II PEKERJAAN PAVING BLOCK 16,642,613.00 TOTAL - G 16,899,171.50

    G SALURAN TERBUKA PASANGAN BATU BATAI PEKERJAAN PERSIAPAN 196,600.00

    II PEKERJAAN TANAH 591,297.54 III PEKERJAAN SALURAN 7,116,344.80

    TOTAL - G 7,904,242.34

    JUMLAH 1,041,286,241.82 PPN 10 % 104,128,624.18 TOTAL 1,145,414,866.01 DIBULATKAN 1,145,414,000.00

    Terbilang : Tiga ratus empat puluh juta enam ratus tiga puluh enam ribu rupiah

    Medan , Agustus 2006

  • RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGSUB PEKERJAAN : SALURAN

    Harga JumlahNo. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    G SALURAN TERBUKA PASANGAN BATU BATA

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m' 49.15 2,500.00 122,875.00 2 Pengukuran Lapangan - m' 49.15 1,500.00 73,725.00

    Total I 196,600.00

    II PEKERJAAN TANAH

    1 Pembersihan Site - m' 49.15 2,500.00 122,875.00 2 Pembuatan Bouplank - m' 49.15 2,000.00 98,300.00 3 Galian tanah A.1. m3 10.32 33,750.00 348,350.63 4 Timbunan kembali tanah bekas galian 1/4A.1. m3 2.58 8,437.50 21,771.91

    Sub Total II 591,297.54

    III PEKERJAAN SALURAN

    1 Pasangan Batu Bata 1 : 2 G.32.M. m3 1.77 948,055.00 1,677,488.52 2 Plesteran 1 : 2 G.50.H.a m3 20.74 37,712.50 782,206.28 3 Cor Lantai Bawah 1 : 2 : 3 Supl. V. m3 4.36 1,069,100.00 4,656,650.00

    Sub Total III 7,116,344.80 TOTAL BIAYA -SALURAN TERBUKA PASANGAN BATU BATA 7,904,242.34

  • RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGSUB PEKERJAAN : HALAMAN

    Harga JumlahNo. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    G HALAMAN

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m2 103.66 1,425.00 147,715.50 2 Pengukuran Lapangan - m2 103.66 1,050.00 108,843.00

    Total I 256,558.50

    II PEKERJAAN PAVING BLOCK

    1 Pembersihan Site - m2 103.66 1,500.00 155,490.00 2 Pembuatan Bouplank - m2 103.66 1,000.00 103,660.00 3 Timbunan sirtu t = 18 cm A.18 m3 18.66 165,000.00 3,078,702.00 4 Timbunan Pasir urug t = 5cm A.17. m3 5.18 195,000.00 1,010,685.00 5 Paving Block Tamb .1 m3 103.66 118,600.00 12,294,076.00

    Sub Total II 16,642,613.00 TOTAL BIAYA - HALAMAN 16,899,171.50

  • RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGSUB PEKERJAAN : PAGAR BELAKANG

    Harga JumlahNo. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    F BANGUNAN PAGAR KIRI DAN KANAN

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m' 11.85 2,500.00 29,625.00 2 Pengukuran Lapangan - m' 11.85 5,000.00 59,250.00

    Total I 88,875.00

    II PEKERJAAN TANAH

    1 Pembersihan Site - m' 11.85 5,000.00 59,250.00 2 Pembuatan Bouplank - m' 11.85 10,000.00 118,500.00 3 Galian Tanah Pondasi A.1. m3 5.69 33,750.00 191,970.00 4 Timbunan Kembali Tanah Pondasi A.1. m3 1.42 8,437.50 11,998.13 5 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 0.41 195,000.00 80,876.25

    Sub Total II 462,594.38

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 3.20 654,730.00 2,094,808.64 2 Cerucuk Kayu Laut dia 4" E.13 m' 83.00 17,800.00 1,477,400.00 3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.71 4,360,100.00 3,100,031.10

    Sub Total III 6,672,239.74

    IV PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 4 G.32.H. m3 2.70 819,309.50 2,212,135.65 2 Plesteran 1 : 4 G.50.H. m2 48.38 34,415.00 1,664,825.63 3 Plesteran Kolom G.50.H. m2 4.80 34,415.00 165,192.00

    Sub Total IV 4,042,153.28

    V PEKERJAAN KOLOM

    1 Kolom 20 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.24 4,933,350.00 1,184,004.00 Sub Total V 1,184,004.00

    VI PEKERJAAN CAT

    1 Cat Tembok K23 m2 48.38 23,238.75 1,124,174.53 2 Cat Kolom K23 m2 4.80 23,238.75 111,546.00

    Sub Total VI 1,235,720.53 TOTAL BIAYA PAGAR DEPAN 13,685,586.92

  • RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGSUB PEKERJAAN : PAGAR KIRI DAN KANAN

    Harga JumlahNo. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    E BANGUNAN PAGAR KIRI DAN KANAN

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m' 44.00 2,500.00 110,000.00 2 Pengukuran Lapangan - m' 44.00 5,000.00 220,000.00

    Total I 330,000.00

    II PEKERJAAN TANAH

    1 Pembersihan Site - m' 44.00 5,000.00 220,000.00 2 Pembuatan Bouplank - m' 44.00 10,000.00 440,000.00 3 Galian Tanah Pondasi A.1. m3 21.12 33,750.00 712,800.00 4 Timbunan Kembali Tanah Pondasi A.1. m3 5.28 8,437.50 44,550.00 5 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 1.54 195,000.00 300,300.00

    Sub Total II 1,717,650.00

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 11.88 654,730.00 7,778,192.40 2 Cerucuk Kayu Laut dia 4" E.13 m' 297.33 17,800.00 5,292,533.33 3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 2.64 4,360,100.00 11,510,664.00

    Sub Total III 24,581,389.73

    IV PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 4 G.32.H. m3 2.45 819,309.50 2,005,669.66 2 Plesteran 1 : 4 G.50.H. m2 43.86 34,415.00 1,509,441.90 3 Plesteran Kolom G.50.H. m2 19.20 34,415.00 660,768.00

    Sub Total IV 4,175,879.56

    V PEKERJAAN KOLOM

    1 Kolom 20 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.96 4,933,350.00 4,736,016.00 Sub Total V 4,736,016.00

    VI PEKERJAAN PAGAR PIPA BESI

    1 Pipa Besi Hitam dia. 4", tebal = 2.4 mm Upah+bahan M' 132.00 300,000.00 39,600,000.00 Sub Total VI 39,600,000.00

    VII PEKERJAAN CAT

    1 Cat Tembok K23 m2 43.86 23,238.75 1,019,251.58 2 Cat Kolom K23 m2 19.20 23,238.75 446,184.00 3 Pengecatan Pagar Pipa K23 m2 41.45 27,987.50 1,160,025.90

    Sub Total VII 2,625,461.48 TOTAL BIAYA PAGAR DEPAN 77,766,396.76

  • RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGSUB PEKERJAAN : PAGAR DEPAN

    Harga JumlahNo. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    D BANGUNAN PAGAR DEPAN

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m' 19.00 2,500.00 47,500.00 2 Pengukuran Lapangan - m' 19.00 5,000.00 95,000.00

    Total I 142,500.00

    II PEKERJAAN TANAH

    1 Pembersihan Site - m' 19.00 5,000.00 95,000.00 2 Pembuatan Bouplank - m' 19.00 10,000.00 190,000.00 3 Galian Tanah Pondasi A.1. m3 9.12 33,750.00 307,800.00 4 Timbunan Kembali Tanah Pondasi A.1. m3 2.28 8,437.50 19,237.50 5 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 0.67 195,000.00 129,675.00

    Sub Total II 741,712.50

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 5.13 654,730.00 3,358,764.90 2 Cerucuk Kayu Laut dia 4" E.13 m' 130.67 17,800.00 2,325,866.67 3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 1.14 4,360,100.00 4,970,514.00

    Sub Total III 10,655,145.57

    IV PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 4 G.32.H. m3 0.73 819,309.50 597,276.63 2 Plesteran 1 : 4 G.50.H. m2 13.06 34,415.00 449,502.92 3 Plesteran Kolom G.50.H. m2 10.80 34,415.00 371,682.00 4 Pembuatan Kepala Kolom ( Bola ) Upah+bahan bh 6.00 300,000.00 1,800,000.00

    Sub Total IV 3,218,461.54

    V PEKERJAAN KOLOM

    1 Kolom 30 x 30 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.81 51,200.00 41,472.00 Sub Total V 41,472.00

    VI PEKERJAAN PAGAR PIPA BESI DAN PINTU GERBANG

    1 Pipa Besi Hitam dia. 4", tebal = 2.4 mm Upah+bahan M' 41.40 300,000.00 12,420,000.00 2 Pintu Gerbang Lebar = 5.2 M Upah+bahan unit 1.00 7,500,000.00 7,500,000.00

    Sub Total VI 19,920,000.00

    VII PEKERJAAN CAT

    1 Cat Tembok K23 m2 13.06 23,238.75 303,527.12 2 Cat Kolom K23 m2 10.80 23,238.75 250,978.50 3 Pengecatan Pagar Pipa K23 m2 13.00 27,987.50 363,826.31

    Sub Total XII 918,331.93 TOTAL BIAYA PAGAR DEPAN 35,637,623.54

  • RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGSUB PEKERJAAN : TEMPAT WUDHU WANITA

    Harga JumlahNo. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    C BANGUNAN TEMPAT WUDHU WANITA

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m2 7.50 1,425.00 10,687.50 2 Pengukuran Lapangan - m2 7.50 1,050.00 7,875.00

    Total I 18,562.50

    II PEKERJAAN TANAH

    1 Pembersihan Site - m2 7.50 1,500.00 11,250.00 2 Pembuatan Bouplank - m' 11.09 2,500.00 27,720.00 3 Galian Tanah Pondasi A.1. m3 6.58 33,750.00 222,235.65 4 Timbunan Kembali Tanah Pondasi A.1. m3 1.65 8,437.50 13,889.73 5 Timbunan Tanah dalam Bangunan t = 0.13 m A.20. m3 1.11 92,880.00 102,632.40 6 Timbunan Pasir Urug dalam Bangunan T = 0.07 m A.17. m3 0.60 195,000.00 116,025.00 7 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 0.42 195,000.00 82,500.60

    Sub Total II 576,253.38

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 3.08 654,730.00 2,018,165.94 2 Cerucuk Kayu Laut dia 4" E.13 m' 104.70 17,800.00 1,863,731.20 3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.73 4,360,100.00 3,162,293.33

    Sub Total III 7,044,190.47

    IV PEKERJAAN LANTAI KERAMIK

    1 Lantai Kerja Beton Cor 1 : 3 : 5 G.43. m3 0.58 781,500.00 453,299.31 2 Keramik Lantai 20 x 20 cm G.72.D m2 8.93 137,849.40 1,231,512.08 3 Keramik Dinding 20 x 25 cm ( H = 1.75 m ) Supl. IV m2 20.70 155,349.40 3,215,033.51

    Sub Total IV 4,899,844.89

    V PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 2 G.32.M. m3 2.48 948,055.00 2,354,786.59 2 Pasangan Bata 1: 4 G.32.H. m3 3.61 819,309.50 2,953,756.58 3 Plesteran Trasram 1 : 2 G.50.H.a m2 20.70 37,712.50 780,697.78 4 Plesteran 1 : 4 G.50.H. m2 59.82 34,415.00 2,058,784.45 5 Plesteran/Acian Balok G.50.H. m2 7.91 34,415.00 272,179.63 6 Plesteran/Acian Dak 1 : 4 G.50.H. m2 8.99 34,415.00 309,261.79 7 Plesteran/Acian Dak 1 : 4 G.50.H. m2 4.95 34,415.00 170,440.29

    Sub Total V 8,899,907.12

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI

    1 Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.31 4,933,350.00 1,539,205.20 2 Kolom Praktis 15 x 15 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.18 5,506,600.00 966,408.30 3 Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.53 4,360,100.00 2,298,862.73 4 Pelat Dak Lantai Beton Bertulang 1 : 2 : 3 Supl. V. m3 1.18 3,786,850.00 4,469,903.07 5 Listplank (10/30) Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.21 3,786,850.00 803,758.91

    Sub Total VI 10,078,138.21

    VII PEKERJAAN VENTILASI

    1 Ventilasi V2 Kayu Uk. 22 x 110 cm Upah+bahan Unit 1.00 300,000.00 300,000.00 Sub Total VII 300,000.00

    VIII PEKERJAAN LISTRIK

    1 Instalasi Listrik Upah+bahan Ttk 3.00 75,000.00 225,000.00

  • 2 Lampu Pijar 20 Watt Upah+bahan Bh 2.00 20,000.00 40,000.00 3 Saklar Ganda Tanam Upah+bahan Bh 1.00 21,950.00 21,950.00 4 Stop Kontak Tanam Upah+bahan Bh 1.00 25,200.00 25,200.00

    Sub Total XIII 312,150.00

    IX PEKERJAAN INSTALASI AIR

    1 Instalasi Air Buangan Pipa PVC 4" Upah+bahan Bh 6.00 74,316.67 445,900.00 2 Upah+bahan Bh 30.00 31,641.67 949,250.00 3 Kran Air Upah+bahan Bh 4.00 29,550.00 118,200.00 4 Floor drain Upah+bahan Bh 2.00 30,750.00 61,500.00

    Sub Total IX 1,574,850.00 X PEKERJAAN CAT

    1 Cat Tembok K23 m2 80.52 23,238.75 1,871,267.81 2 Cat Dak Lantai ,Balok dan Balok K23 m2 21.85 23,238.75 507,708.59 3 Pengecatan Ventilasi Kayu K23 m2 1.48 27,987.50 41,421.50

    Sub Total X 2,420,397.90

    TOTAL BIAYA TEMPAT WUDHU WANITA 36,124,294.47

    Instalasi Air Bersih Pipa PVC 1" ( sampai ke meteran air)

  • RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGSUB PEKERJAAN : TEMPAT WUDHU PRIA

    Harga JumlahNo. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    B BANGUNAN TEMPAT WUDHU PRIA

    I PEKERJAAN PERSIAPAN

    1 Pembersihan - m2 7.50 1,425.00 10,687.50 2 Pengukuran Lapangan - m2 7.50 1,050.00 7,875.00

    Total I 18,562.50

    II PEKERJAAN TANAH

    1 Pembersihan Site - m2 7.50 1,500.00 11,250.00 2 Pembuatan Bouplank - m' 11.09 2,500.00 27,720.00 3 Galian Tanah Pondasi A.1. m3 6.58 33,750.00 222,235.65 4 Timbunan Kembali Tanah Pondasi A.1. m3 1.65 8,437.50 13,889.73 5 Timbunan Tanah dalam Bangunan t = 0.13 m A.20. m3 1.11 92,880.00 102,632.40 6 Timbunan Pasir Urug dalam Bangunan T = 0.07 m A.17. m3 0.60 195,000.00 116,025.00 7 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 0.42 195,000.00 82,500.60

    Sub Total II 576,253.38

    III PEKERJAAN PONDASI

    1 Pondasi Pasangan Batu kali 1 : 4 G.32. m3 3.08 654,730.00 2,018,165.94 2 Cerucuk Kayu Laut dia 4" E.13 m' 104.70 17,800.00 1,863,731.20 3 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.73 4,360,100.00 3,162,293.33

    Sub Total III 7,044,190.47

    IV PEKERJAAN LANTAI KERAMIK

    1 Lantai Kerja Beton Cor 1 : 3 : 5 G.43. m3 0.58 781,500.00 453,299.31 2 Keramik Lantai 20 x 20 cm G.72.D m2 8.93 137,849.40 1,231,512.08 3 Keramik Dinding 20 x 25 cm ( H = 1.75 m ) Supl. IV m2 20.70 155,349.40 3,215,033.51

    Sub Total IV 4,899,844.89

    V PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 2 G.32.M. m3 2.48 948,055.00 2,354,786.59 2 Pasangan Bata 1: 4 G.32.H. m3 3.61 819,309.50 2,953,756.58 3 Plesteran Trasram 1 : 2 G.50.H.a m2 20.70 37,712.50 780,697.78 4 Plesteran 1 : 4 G.50.H. m2 59.82 34,415.00 2,058,784.45 5 Plesteran/Acian Balok G.50.H. m2 7.91 34,415.00 272,179.63 6 Plesteran/Acian Dak 1 : 4 G.50.H. m2 8.99 34,415.00 309,261.79 7 Plesteran/Acian Dak 1 : 4 G.50.H. m2 4.95 34,415.00 170,440.29

    Sub Total V 8,899,907.12

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI

    1 Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.31 4,933,350.00 1,539,205.20 2 Kolom Praktis 15 x 15 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.18 5,506,600.00 966,408.30 3 Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.53 4,360,100.00 2,298,862.73 4 Pelat Dak Lantai Beton Bertulang 1 : 2 : 3 Supl. V. m3 1.18 3,786,850.00 4,469,903.07 5 Listplank (10/30) Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.21 3,786,850.00 803,758.91

    Sub Total VI 10,078,138.21

    VII PEKERJAAN VENTILASI

    1 Ventilasi V2 Kayu Uk. 22 x 110 cm Upah+bahan Unit 1.00 300,000.00 300,000.00 Sub Total VII 300,000.00

    VIII PEKERJAAN LISTRIK

    1 Instalasi Listrik Upah+bahan Ttk 3.00 75,000.00 225,000.00

  • 2 Lampu Pijar 20 Watt Upah+bahan Bh 2.00 20,000.00 40,000.00 3 Saklar Ganda Tanam Upah+bahan Bh 1.00 21,950.00 21,950.00 4 Stop Kontak Tanam Upah+bahan Bh 1.00 25,200.00 25,200.00

    Sub Total XIII 312,150.00

    IX PEKERJAAN INSTALASI AIR

    1 Instalasi Air Buangan Pipa PVC 4" klas D setara Vinilex Upah+bahan Bh 6.00 74,316.67 445,900.00 2 Upah+bahan Bh 30.00 31,641.67 949,250.00 3 Kran Air Upah+bahan Bh 4.00 29,550.00 118,200.00 4 Floor drain Upah+bahan Bh 2.00 30,750.00 61,500.00

    Sub Total IX 1,574,850.00 X PEKERJAAN CAT

    1 Cat Tembok K23 m2 80.52 23,238.75 1,871,267.81 2 Cat Dak Lantai ,Balok dan Balok K23 m2 21.85 23,238.75 507,708.59 3 Pengecatan Ventilasi Kayu K23 m2 1.48 27,987.50 41,421.50

    Sub Total X 2,420,397.90

    TOTAL BIAYA TEMPAT PRIA 36,124,294.47

    Instalasi Air Bersih Pipa PVC 1" ( sampai ke meteran air)

  • RENCANA ANGGARAN BIAYA

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGLOKASI :

    Harga JumlahNo. Uraian Pekerjaan ANL Stn Volume Satuan Harga

    (Rp.) (Rp).

    A BANGUNAN MESJID

    I PEKERJAAN PERSIAPAN

    1 Mobilisasi dan Demobilisasi - ls 1.00 1,500,000.00 1,500,000.00 2 Papan Nama Proyek - bh 1.00 200,000.00 200,000.00 3 Direksi Keet - ls 1.00 3,500,000.00 3,500,000.00 4 Pembersihan - m2 288.63 1,425.00 411,290.63 5 Pengukuran Lapangan - m2 288.63 1,050.00 303,056.25 6 Foto Dokumentasi - ls 1.00 350,000.00 350,000.00

    Total I 6,264,346.88

    II PEKERJAAN TANAH

    1 Pembersihan Site - m2 288.63 1,500.00 432,937.50 2 Pembuatan Bouplank - m' 72.00 2,500.00 180,000.00 3 Galian Tanah Pondasi dan Selasar/Teras A.1. m3 192.52 33,750.00 6,497,415.00 4 Timbunan Kembali Tanah Pondasi 1/4A.1. m3 48.13 8,437.50 406,088.44 5 Timbunan Tanah dalam Bangunan A.20. m3 143.78 92,880.00 13,353,822.00 6 Timbunan Tanah Teras A.20. m3 46.24 92,880.00 4,294,325.38 7 Timbunan Pasir Urug dalam Bangunan A.17. m3 16.77 195,000.00 3,270,881.25 8 Timbunan Pasir Urug Teras A.17. m3 5.66 195,000.00 1,103,438.70 9 Timbunan Pasir Urug Pondasi Pas.batu kali A.17. m3 2.08 195,000.00 405,600.00

    Sub Total II 29,944,508.26

    III PEKERJAAN PONDASI

    1 Lantai Kerja Pondasi Menerus Beton Cor 1 : 3 : 5 G.43. m3 4.14 781,500.00 3,233,944.69 2 Pondasi Menerus Beton Bertulang 1 : 2 : 3 G.32. m3 18.73 3,786,850.00 70,908,766.25 3 Pondasi Pasangan Batu kali 1 : 4 Supl. V. m3 17.29 654,730.00 11,320,281.70 4 Cerucuk Kayu Laut dia 4" E.13 m' 1,768.00 17,800.00 31,470,400.00 5 Sloof Beton Bertulang 1 : 2 : 3 Supl. V. m3 7.84 4,360,100.00 34,172,283.75

    Sub Total III 151,105,676.39

    IV PEKERJAAN LANTAI KERAMIK

    1 Lantai Kerja Beton Cor 1 : 3 : 5 G.43. m3 22.43 781,500.00 17,530,928.42 2 Keramik Lantai Dalam Bangunan 30 x 30 cm G.72.C m2 239.63 120,422.00 28,856,121.75 3 Keramik Lantai Teras 30 x 30 cm G.72.C m2 88.34 120,422.00 10,637,718.21 4 Plin dinding keramik10 x 30 cm G.72.D m' 108.40 37,188.25 4,031,206.30

    Sub Total IV 61,055,974.68

    V PEKERJAAN PASANGAN DAN PLESTERAN

    1 Pasangan Bata 1: 2 G.32.M. m3 26.97 948,055.00 25,572,769.21 2 Pasangan Bata 1: 4 G.32.H. m3 62.89 819,309.50 51,530,367.77 3 Plesteran Trasram 1 : 2 G.50.H.a m2 449.57 37,712.50 16,954,238.92 4 Plesteran 1 : 4 G.50.H. m2 1,082.12 34,415.00 37,241,276.81 5 Pasangan Ventilasi block 1: 4 G.50.H. m2 0.68 212,362.87 143,344.93 5 Sponengan/tali air lebar = 10 cm,tebal 1.5 cm G.50.H. m2 12.34 34,415.00 424,543.44 6 Plesteran/Acian Kolom 1 : 4 G.50.H. m2 61.70 34,415.00 2,123,405.50 7 Plesteran/Acian Balok G.50.H. m2 76.05 34,415.00 2,617,260.75 8 Plesteran/Acian Dak 1 : 4 G.50.H. m2 27.45 34,415.00 944,691.75

    Sub Total V 137,551,899.08

    VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI

    1 Kolom 20 x 40 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 9.04 4,360,100.00 39,415,304.00 2 Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 2.16 4,933,350.00 10,656,036.00 3 Kolom Praktis 15 x 15 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 1.47 5,506,600.00 8,110,395.81 4 Balok 15 x 60 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 4.56 4,360,100.00 19,895,136.30

  • 5 Balok Praktis 15 x 20 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 6.40 4,933,350.00 31,559,626.62 6 Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3 Supl. V. m3 0.54 4,360,100.00 2,354,454.00 7 Pelat Dak Lantai Beton Bertulang 1 : 2 : 3 Supl. V. m3 3.29 3,786,850.00 12,473,883.90

    Sub Total VI 124,464,836.63

    VII PEKERJAAN KUDA - KUDA DAN ATAP

    1 Kuda-kuda F.22 m3 7.91 7,015,884.89 55,474,645.67 2 Rangka Atap Genteng Metal F.19 m2 420.90 41,000.00 17,257,000.41 3 Atap Genteng Metal H.8b m2 420.90 159,350.00 67,070,805.27 4 Rabung Genteng H.10.A m2 63.27 93,579.55 5,920,879.64 5 Lisplank Kayu Dowble F 21 m' 159.47 45,311.15 7,225,678.47

    Sub Total VII 152,949,009.46 VIII PEKERJAAN PINTU DAN JENDELA

    1 Kusen Pintu Uk. 215 x 80 cm F.27 m3 0.08 8,263,884.89 656,978.85

    2 Upah+bahan unit 3.00 6,240,000.00 18,720,000.00

    3 Pintu Panel P1 Uk. 210 x 80 cm (1 daun) F.33 m2 3.44 450,940.80 1,551,236.35 4 Upah+bahan Unit 6.00 4,152,260.00 24,913,560.00

    5 Upah+bahan Unit 2.00 1,561,000.00 3,122,000.00

    6 Upah+bahan Unit 2.00 1,035,000.00 2,070,000.00

    7 Ventilasi Kaca mati Rangka Aluminium uk 30 x 30 cm Upah+bahan Unit 40.00 250,000.00 10,000,000.00 8 Ventilasi V2 Kayu Uk. 22 x 22 cm (1 daun) Upah+bahan Unit 96.00 100,000.00 9,600,000.00

    Sub Total VIII 70,633,775.20 IX PEKERJAAN KUNCI DAN ALAT PENGGANTUNG

    1 Kunci & Hendel Pintu Upah+bahan bh 2.00 113,650.00 227,300.00 2 Engsel Pintu 4" Upah+bahan bh 6.00 15,500.00 93,000.00 3 Grendel Pintu 10 " Upah+bahan bh 4.00 9,450.00 37,800.00

    Sub Total IX 358,100.00

    X PEKERJAAN PLAFOND

    1 Plafond Gypsum 9 mm + rangka F.37 A m2 416.64 74,270.83 30,944,287.74 Sub Total X 30,944,287.74

    XI PEKERJAAN LISTRIK

    1 Instalasi Listrik Upah+bahan Ttk 36.00 75,000.00 2,700,000.00 2 Lampu Down Light Upah+bahan Bh 30.00 85,000.00 2,550,000.00 3 Saklar Ganda Tanam Upah+bahan Bh 15.00 21,950.00 329,250.00 4 Stop Kontak Tanam Upah+bahan Bh 6.00 25,200.00 151,200.00 5 Sekering Box Dua Group Upah+bahan Set 1.00 110,500.00 110,500.00

    Sub Total XI 5,840,950.00 XII PEKERJAAN CAT

    (Cat setara Vinilex )1 Cat Tembok K23 m2 1,082.12 23,238.75 25,147,195.16 2 Cat Plafond K23 m2 416.64 23,238.75 9,682,220.69 3 Cat Ventilasi Block K23 m2 3.38 23,238.75 78,430.78 4 Cat Dak Lantai K23 m2 27.45 23,238.75 637,903.69 5 Cat Lisplank K23 m2 71.76 27,987.50 2,008,399.79 6 Pengecatan Kolom K23 m2 137.75 23,238.75 3,201,137.81 7 Pengecatan Ventilasi Kayu K23 m2 181.63 27,987.50 5,083,425.60 8 Pengecatan Pintu Kayu K23 m2 6.88 27,987.50 192,554.00

    Sub Total XII 46,031,267.52

    TOTAL BIAYA BANGUNAN MESJID 817,144,631.84

    Pintu Sliding Bingkai kaca rangka Aluminium uk.200 x 260 cm Komplit Kunci dan alat penggantung ( 2 daun Ventilasi lengkung )

    Jendela Kaca Rangka Aluminium uk.196 x 2230 cm Komplit Kunci dan alat penggantung ( 3 daun dengan Ventilasi lengkung )

    Jendela Kaca Rangka Aluminium uk.70 x 2230 cm Komplit Kunci dan alat penggantung ( 1 daun dengan Ventilasi lengkung )

    Jendela Kaca Rangka Aluminium uk.60 x 138 cm Komplit Kunci dan alat penggantung ( 1 Daun )

  • upahbahan - 22

    DAFTAR SATUAN UPAH DAN BAHAN

    PEKERJAAN : 0SATKER : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG#REF! : 0

    No. Jenis Tenaga Kerja dan Bahan Satuan Harga Satuan(Rp.)

    I. DAFTAR SATUAN UPAH

    1 Pekerja Hari 50,000.00 2 Mandor Hari3 Tukang Hari 70,000.00 4 Kepala Tukang Hari

    II. DAFTAR SATUAN BAHAN

    1 Tanah Timbun 64,900.00 2 Pasir Timbun/Urug 150,000.00 3 Pasir Pasang 150,000.00 4 Sirtu 125,000.00 5 Ventilasi Block bh 6,000.00 5 Batu Bata Mesin bh 550.00 6 Batu Kerikil (A) Cor 80,000.00 7 Batu Koral 15 - 20 cm 80,000.00 8 Batu Koral 10 - 12.5 cm 80,000.00 9 Paving Block K 175 Holand Disk Warna Merah t = 6 cm bh 1,600.00

    10 Kanstin K 175 Uk. 15 x 30 x 40 cm bh 19,950.00 11 Semen PC @ 50 kg Zak 65,000.00 12 Semen Putih @ 40 kg Zak 84,700.00 13 Broti/Papan Kayu Sembarang 1,500,000.00 14 Broti Kayu Meranti 4,676,258.99 15 Broti Kayu Damar Laut 4,485,800.00 16 Papan Kayu Meranti 3,203,200.00 17 Papan Kayu Meranti Batu 4,676,258.99 18 Papan Kayu Damar Laut 4,869,700.00 19 Kayu Laut 4" Btg 44,000.00 20 Kayu Lat Asbest Btg 6,650.00 21 Gypsum Board tebal 9 mm Lbr 85,800.00 22 Asbes Lokal 1 x 1 m Lbr 11,000.00 23 Magnesium Board 4mm Uk. 120x240 cm Lbr 75,000.00 23 Triplex Jati # 3 mm Uk. 120 x 240 cm Lbr 121,000.00 24 Triplex # 6 mm Uk. 120 x 240 cm Lbr 85,250.00 25 Triplex # 9 mm Uk. 120 x 240 cm Lbr 200,000.00 26 Triplex # 12 mm Uk. 120 x 240 cm Lbr 250,000.00 27 Paku Biasa Kg 12,000.00 28 Paku Seng Bh 350.00 29 Besi Beton Kg 17,000.00 30 Besi Propil Kg 15,000.00 31 Paku/Sekrup Bh 400.00 32 Baut dia 12 mm Bh 1,250.00

    m3

    m3

    m3

    m3

    m3

    m3

    m3

    m3

    m3

    m3

    m3

    m3

    m3

  • upahbahan - 23

    No. Jenis Tenaga Kerja dan Bahan Satuan Harga Satuan(Rp.)

    33 Kawat Beton Kg 9,000.00 34 Atap Galvalum 53,289.47 35 Rabung Asbes Gelombang m' 19,950.00 37 Seng Plat BJLS 35 Lbr 40,000.00 38 Atap Genteng Metal m2 90,000.00 36 Rabung Genteng Bh 25,000.00 39 Cat Minyak/Perak (Setara Kuda Terbang) Kg 38,500.00 40 Minyak Cat Kg 11,850.00 41 Cat Tembok Setara Vinilex Kg 13,650.00 42 Cat Vernis Jadi Kg 33,600.00 43 Cat Meni Kg 33,000.00 44 Residu (Colter) Kg 3,300.00 45 Kaca Bening # 5 mm 119,800.00 46 Kaca Rybent # 5 mm 146,450.00 47 Kaca Blok # 5 mm 19,950.00 48 Kaca Nako Bening # 5 mm Lbr 8,800.00 49 Kaca Nako Rybent # 5 mm Lbr 9,950.00 50 Plint Keamik 15 x 30 cm Bh 2,750.00 51 Keramik 10 x 20 cm Roman Bh 1,500.00 52 Keramik 20 x 20 cm Roman Bh 3,300.00 53 Keramik 20 x 25 cm Roman Bh 4,125.00 54 Keramik 30 x 30 cm Roman Bh 5,909.09 55 Keramik 40 x 40 cm Roman Bh 10,450.00 56 Granito 40 x 40 cm Bh 35,400.00 57 Pipa PVC (Paralon) Kwalited D dia 1/2" Btg 34,950.00 58 Pipa PVC (Paralon) Kwalited AW dia 3/4" Btg 36,850.00 59 Pipa PVC (Paralon) Kwalited AW dia 1" Btg 40,920.00 60 Pipa PVC (Paralon) Kwalited AW dia 3" Btg 148,500.00 61 Pipa PVC (Paralon) Kwalited AW dia 4" Btg 355,900.00 62 Pipa Besi GIP dia 3/4" Btg 99,850.00 63 Pipa Besi GIP dia 1/2" Btg 73,250.00 64 Pipa Besi GIP dia 1" Btg 146,400.00 65 Keran Air dia 1/2 " Bh 14,550.00 66 Floor Drain 3" Bh 15,750.00 67 Closed Duduk Bh 1,270,500.00 68 Closed Jongkok Bh 159,750.00 69 Bak Cuci Stainless Steel 1 Lobang Bh 408,375.00 70 Bak Air Fibre Bh 300,000.00 70 Shoapholder Bh 60,000.00 70 Riol Beton dia 15 cm Bh 20,600.00 71 Riol Beton dia 20 cm Bh 27,500.00 72 Riol Beton dia 30 cm Bh 33,000.00 73 Kunci Tanam Besar Union (Sejenis) Bh 78,650.00 74 Kunci Tanam Kecil Union (Sejenis) Bh 48,400.00 75 Engsel Pintu Cabut Uk 5" Set 10,300.00 76 Engsel Pintu Nilon Uk 4" Set 11,500.00 77 Engsel Jendela Cabut Uk 3" Set 7,900.00 78 Engsel Jendela Nilon Uk 3" Set 10,300.00 79 Ensel Millano 18 " Set 75,050.00 80 Ensel Millano 16 " Set 66,550.00

    m2

    m2

    m2

    m2

  • upahbahan - 24

    No. Jenis Tenaga Kerja dan Bahan Satuan Harga Satuan(Rp.)

    81 Engsel Pintu Lipat (Gudang) Set 38,750.00 82 Grendel Pintu Bh 5,450.00 83 Grendel Jendela Bh 4,850.00 84 Hak Angin Set 4,250.00 85 Hak Angin lipat besar Set 7,250.00 77 Lampu TL 2 x 20 Watt (Komplit) Tanam Double Set 205,000.00 78 Lampu TL 1 x 20 Watt (Komplit) set 75,000.00 79 Lampu Down Light Bh 45,000.00 80 Lampu Neon Tabung Bh 40,000.00 81 Stop Kontak Timbul Bh 7,250.00 82 Stop Kontak Tanam Bh 15,200.00 83 Saklar Tunggal Tanam Bh 9,000.00 84 Saklar Seri Tanam Bh 16,950.00 85 Saklar Triple Tanam Bh 21,200.00 86 Saklar Triple Timbul Bh 13,050.00 87 Saklar Seri Timbul Bh 10,300.00 88 Saklar Enkle Timbul Bh 7,250.00 89 Box Sekering 1 Group Set 48,500.00 90 Box Sekering 2 Group Set 60,500.00

  • DAFTAR ANALISA HARGA SATUAN

    PEKERJAAN : PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNGLOKASI :

    Harga JumlahAnalisa Uraian Satuan Volume Satuan Harga

    (Rp.) (Rp.)

    A.1. 1 m3 Galian Tanah Biasa

    Pekerja Orang 0.7500 50,000.00 37,500.00 Mandor Orang 0.0250 0.00 0.00

    Jumlah 37,500.00 Upah diambil Galian 90 % 33,750.00

    A3/A4. 1 m3 Galian Tanah Berbatu / LumpurPekerja Orang 1.5000 50,000.00 75,000.00 Mandor Orang 0.0500 0.00 0.00

    Jumlah 75,000.00

    A.17. 1 m3 Pasir UrugPasir urug m3 1.2000 150,000.00 180,000.00 Pekerja Orang 0.3000 50,000.00 15,000.00 Mandor Orang 0.0100 0.00 0.00

    Jumlah 195,000.00

    A.20. 1 m3 Urugan TanahTanah m3 1.2000 64,900.00 77,880.00 Pekerja Orang 0.3000 50,000.00 15,000.00 Mandor Orang 0.0100 0.00 0.00

    Jumlah 92,880.00

    A.18 1 m3 Timbunan SirtuSirtu m3 1.2000 125,000.00 150,000.00 Pekerja Orang 0.3000 50,000.00 15,000.00 Mandor Orang 0.0100 0.00 0.00

    Jumlah 165,000.00

    G.32. 1 m3 Pas. Batu Kali 1 : 4Batu Kali m3 1.2000 80,000.00 96,000.00 Pasir Pasang m3 0.5522 150,000.00 82,830.00 Semen Zak 3.2600 65,000.00 211,900.00 Pekerja Orang 3.6000 50,000.00 180,000.00 Mandor Orang 0.1800 0.00 0.00 Tukang Batu Orang 1.2000 70,000.00 84,000.00 Kepala Tukang Orang 0.1200 0.00 0.00

    Jumlah 654,730.00

    G.32.H. a 1 m2 Pas. Ventilasi Block 1 : 4Ventilasi Block bh ### 6,000.00 1,110,000.00 Pasir Pasang m3 2.1160 150,000.00 317,398.33 Semen Zak 0.1891 65,000.00 12,292.22 Pekerja Orang 4.5000 50,000.00 225,000.00 Mandor Orang 0.2550 0.00 0.00 Tukang Batu Orang 1.5000 70,000.00 105,000.00 Kepala Tukang Orang 0.1500 0.00 0.00

    Jumlah 1,769,690.55 Harga / m2 212,362.87

  • G.32.M. 1 m3 Pas. Batu Bata 1 : 2Batu Bata bh ### 550.00 247,500.00 Semen zak 5.1470 65,000.00 334,555.00 Pasir Pasang m3 0.4600 150,000.00 69,000.00

    Jumlah Bahan 651,055.00 Pekerja Orang 4.5000 50,000.00 225,000.00 Mandor Orang 0.2550 0.00 0.00 Tukang Batu Orang 1.5000 70,000.00 105,000.00 Kepala Tukang Orang 0.1500 0.00 0.00

    Jumlah Upah 330,000.00 Upah diambil 90 % 297,000.00

    Jumlah 948,055.00

    G.32.H. 1 m3 Pas. Batu Bata 1 : 4Batu Bata bh ### 550.00 247,500.00 Semen zak 3.1663 65,000.00 205,809.50 Pasir Pasang m3 0.4600 150,000.00 69,000.00

    Jumlah Bahan 522,309.50 Pekerja Orang 4.5000 50,000.00 225,000.00 Mandor Orang 0.2550 0.00 0.00 Tukang Batu Orang 1.5000 70,000.00 105,000.00 Kepala Tukang Orang 0.1500 0.00 0.00

    Jumlah Upah 330,000.00 Upah diambil 90 % 297,000.00

    Jumlah 819,309.50

    G.43. 1 m3 Beton Campuran 1 : 3 : 5Kerikil m3 1.0000 80,000.00 80,000.00 Semen zak 5.0000 65,000.00 325,000.00 Pasir Pasang m3 0.5000 150,000.00 75,000.00

    Jumlah Bahan 480,000.00 Pekerja Orang 6.0000 50,000.00 300,000.00 Mandor Orang 0.3000 0.00 0.00 Tukang Batu Orang 0.5000 70,000.00 35,000.00 Kepala Tukang Orang 0.0500 0.00 0.00

    Jumlah Upah 335,000.00 Upah diambil 90 % 301,500.00

    Jumlah 781,500.00

    Supl. V. 1 M3 Beton Campuran 1 : 2 : 3Pasir Pasang m3 0.5400 150,000.00 81,000.00 Batu. Kerikil m3 0.8200 80,000.00 65,600.00 Semen zak 8.5000 65,000.00 552,500.00 Pekerja Orang 6.0000 50,000.00 300,000.00 Mandor Orang 0.3000 0.00 0.00 Tukang Batu Orang 1.0000 70,000.00 70,000.00 Kepala Tukang Orang 0.1000 0.00 0.00

    Jumlah = A 1,069,100.00 Bahan Besi BetonUntuk 100 kg besi diperlukan 110 kg besiBesi kg ### 17,000.00 1,870,000.00 Kawat ikat kg 2.0000 9,000.00 18,000.00

    Jumlah Bahan 1,888,000.00

    Pekerja Orang 6.7500 50,000.00 337,500.00 Tukang Besi Orang 6.7500 70,000.00 472,500.00 Kepala Tukang Orang 2.2500 0.00 0.00

    Jumlah Upah 810,000.00 Upah diambil 50 % 405,000.00

    Jumlah = B 2,293,000.00 Untuk besi 75 kg = 0.75 x B 1,719,750.00

  • Untuk besi 75 kg =1.0 x B 2,293,000.00 Untuk besi 125 kg = 1.25 x B 2,866,250.00 Untuk besi 150 kg = 1.50 x B 3,439,500.00 Untuk besi 175 kg = 1.75 x B 4,012,750.00 Untuk besi 200 kg = 2.00 x B 4,586,000.00

    Bahan Begesting (Cetakan)Kayu Bekesting (dipakai 2 kali) m3 0.4000 750,000.00 300,000.00 Paku kg 4.0000 12,000.00 48,000.00

    Jumlah Bahan 348,000.00 Pekerja Orang 2.0000 50,000.00 100,000.00 Mandor Orang 0.1000 0.00 0.00 Tukang Kayu Orang 5.0000 70,000.00 350,000.00 Kepala Tukang Orang 0.5000 0.00 0.00 Pekerja (bongkar bekesting) Orang 4.0000 50,000.00 200,000.00

    Jumlah Upah 650,000.00 Upah 650,000.00 Bekesting dipakai 2 kali Jumlah = C 998,000.00

    Untuk 1 m3 beton bertulang besi 75 kg 3,786,850.00 Untuk 1 m3 beton bertulang besi 100 kg 4,360,100.00 Untuk 1 m3 beton bertulang besi 125 kg 4,933,350.00 Untuk 1 m3 beton bertulang besi 150 kg 5,506,600.00 Untuk 1 m3 beton bertulang besi 175 kg 6,079,850.00 Untuk 1 m3 beton bertulang besi 200 kg 6,653,100.00

    G.50.H. 1 M2 Plesteran 1 : 4 tebal 10Semen zak 0.1220 65,000.00 7,930.00 Pasir Pasang m3 0.0139 150,000.00 2,085.00

    Jumlah Bahan 10,015.00 Pekerja Orang 0.4000 50,000.00 20,000.00 Mandor Orang 0.0200 0.00 0.00 Tukang Batu Orang 0.1500 70,000.00 10,500.00 Kepala Tukang Orang 0.0150 0.00 0.00

    Jumlah Upah 30,500.00 Upah diambil 80 % 24,400.00

    Jumlah 34,415.00

    G.50.H.a 1 M2 Plesteran 1 : 2 tebal 10Semen zak 0.1785 65,000.00 11,602.50 Pasir Pasang m3 0.0114 150,000.00 1,710.00

    Jumlah Bahan 13,312.50 Pekerja Orang 0.4000 50,000.00 20,000.00 Mandor Orang 0.0200 0.00 0.00 Tukang Batu Orang 0.1500 70,000.00 10,500.00 Kepala Tukang Orang 0.0150 0.00 0.00

    Jumlah Upah 30,500.00 Upah diambil 80 % 24,400.00

    Jumlah 37,712.50

    E.13 1 M' Cerucuk dia 4 " cm UpahPekerja Orang 0.2000 50,000.00 10,000.00 Mandor Orang 0.0215 0.00 0.00 Tukang Kayu Orang 0.0200 70,000.00 1,400.00 Kepala Tukang Orang 0.0020 0.00 0.00

    Jumlah Upah 11,400.00 Upah diambil 50 % 5,700.00

    BahanKayu dia 4" m 1.1000 11,000.00 12,100.00

    Jumlah Bahan 12,100.00

  • Jumlah 17,800.00

    G.68.A 1 m' Plint Keramik 10 x 30 cmPlint Keramik 15 x 30 cm bh 3.3330 2,750.00 9,165.75 Semen zak 0.0765 65,000.00 4,972.50 Pasir m3 0.0070 150,000.00 1,050.00 Pekerja Orang 0.3000 50,000.00 15,000.00 Mandor Orang 0.0150 0.00 0.00 Tukang Orang 0.1000 70,000.00 7,000.00 Kepala Tukang Orang 0.0100 0.00 0.00

    Jumlah 37,188.25

    G.72.B 1 m2 Lantai Keramik 40 x 40 cmKeramik (Roman) bh 6.2500 10,450.00 65,312.50 Semen zak 0.1420 65,000.00 9,230.00 Semen Putih zak 0.0020 84,700.00 169.40 Pasir Pasang m3 0.0230 150,000.00 3,450.00 Pekerja Orang 0.5000 50,000.00 25,000.00 Mandor Orang 0.0250 0.00 0.00 Tukang Orang 0.2500 70,000.00 17,500.00 Kepala Tukang Orang 0.0250 0.00 0.00

    Jumlah 120,661.90

    G.72.C 1 m2 Lantai Keramik 30 x 30 cmKeramik (Roman) bh 11.0000 5,909.09 65,000.00 Semen zak 0.1420 65,000.00 9,230.00 Semen Putih zak 0.0020 121,000.00 242.00 Pasir Pasang m3 0.0230 150,000.00 3,450.00 Pekerja Orang 0.5000 50,000.00 25,000.00 Mandor Orang 0.0250 0.00 0.00 Tukang Orang 0.2500 70,000.00 17,500.00 Kepala Tukang Orang 0.0250 0.00 0.00

    Jumlah 120,422.00

    G.72.D 1 m2 Lantai Keramik 20 x 20 cmKeramik (Roman) bh 25.0000 3,300.00 82,500.00 Semen zak 0.1420 65,000.00 9,230.00 Semen Putih m3 0.0020 84,700.00 169.40 Pasir m3 0.0230 150,000.00 3,450.00 Pekerja Orang 0.5000 50,000.00 25,000.00 Mandor Orang 0.0250 0.00 0.00 Tukang Orang 0.2500 70,000.00 17,500.00 Kepala Tukang Orang 0.0250 0.00 0.00

    Jumlah 137,849.40

    Supl. IV 1 m2 Dinding Keramik 20 x 25 cmKeramik (Roman) bh 20.0000 4,125.00 82,500.00 Semen zak 0.1420 65,000.00 9,230.00 Semen Putih m3 0.0020 84,700.00 169.40 Pasir m3 0.0230 150,000.00 3,450.00 Pekerja Orang 0.5000 50,000.00 25,000.00 Mandor Orang 0.0500 0.00 0.00 Tukang Orang 0.5000 70,000.00 35,000.00 Kepala Tukang Orang 0.0500 0.00 0.00

    Jumlah 155,349.40

    F.22 1 M3 Kuda-Kuda KayuKayu Meranti m3 1.1000 ### 5,143,884.89

    Jumlah Bahan 5,143,884.89 Pekerja Orang 8.0000 50,000.00 400,000.00 Mandor Orang 0.4000 0.00 0.00 Tukang Orang 24.0000 70,000.00 1,680,000.00

  • Kepala Tukang Orang 2.4000 0.00 0.00 Jumlah Upah 2,080,000.00 Upah diambil 90 % 1,872,000.00

    Jumlah 7,015,884.89

    F.19 1 m2 Pasang Rangka Atap Genteng MetalRangka :Kayu Meranti m3 0.0110 ### 51,438.84 Paku Biasa Kg 0.1000 12,000.00 1,200.00 Pekerja Orang 0.0150 50,000.00 750.00 Mandor Orang 0.0075 0.00 0.00 Tukang Orang 0.1000 70,000.00 7,000.00 Kepala Tukang Orang 0.0100 0.00 0.00

    Jumlah bahan /Upah 60,388.84 Dibulatkan 41,000.00

    H.8b 1 m2 Atap Genteng MetalAtap Genteng metal m2 1.1000 90,000.00 99,000.00 Paku Seng bh 4.0000 12,000.00 48,000.00

    Jumalah Bahan 147,000.00 Pekerja Orang 0.1000 50,000.00 5,000.00 Mandor Orang 0.0050 0.00 0.00 Tukang Orang 0.2000 70,000.00 14,000.00 Kepala Tukang Orang 0.0200 0.00 0.00

    Jumlah Upah 19,000.00 Upah diambil 65 % 12,350.00

    Jumlah 159,350.00 H.10.A 1 m' Rabung Genteng

    Rabung Genteng Bh 3.5000 25,000.00 87,500.00 Semen Zak 0.03375 65,000.00 2,193.55 Pasir Pasang m3 0.00324 150,000.00 486.00 Pekerja Orang 0.0400 50,000.00 2,000.00 Mandor Orang 0.0020 0.00 0.00 Tukang Orang 0.0200 70,000.00 1,400.00 Kepala Tukang Orang 0.0020 0.00 0.00

    Jumlah 93,579.55

    F.27 1 M3 Kosen KayuKayu Meranti m3 1.1000 ### 5,143,884.89 Pekerja Orang 12.0000 50,000.00 600,000.00 Mandor Orang 0.6000 0.00 0.00 Tukang Orang 36.0000 70,000.00 2,520,000.00 Kepala Tukang Orang 3.6000 0.00 0.00

    Jumlah 8,263,884.89

    F.33 1 M2 Pintu PanelPapan Meranti m' 0.0440 ### 140,940.80 Pekerja Orang 2.0000 50,000.00 100,000.00 Mandor Orang 0.0200 0.00 0.00 Tukang Orang 3.0000 70,000.00 210,000.00 Kepala Tukang Orang 0.0300 0.00 0.00

    Jumlah 450,940.80

    F.36. A 1 M2 Pintu KacaKaca tebal 5 mm m' 1.0000 119,800.00 119,800.00 Pekerja Orang 0.2000 50,000.00 10,000.00 Mandor Orang 0.1000 0.00 0.00 Tukang Orang 0.6000 70,000.00 42,000.00 Kepala Tukang Orang 0.0600 0.00 0.00

    Jumlah 171,800.00

    F.36. B 1 M2 Jendela Kaca

  • Kaca tebal 5 mm m2 1.0000 119,800.00 119,800.00 Jumlah Bahan 119,800.00

    Pekerja Orang 0.2000 50,000.00 10,000.00 Mandor Orang 0.0100 0.00 0.00 Tukang Orang 0.6000 70,000.00 42,000.00 Kepala Tukang Orang 0.0600 0.00 0.00

    Jumlah Upah 52,000.00 Upah diambil 60 % 31,200.00

    Jumlah 151,000.00

    F.36. C 1 M2 Jendela KacaKaca tebal 5 mm m2 1.0000 119,800.00 119,800.00 Kayu Meranti m3 0.0350 ### 163,669.06

    Jumlah Bahan 283,469.06 Pekerja Orang 0.2000 50,000.00 10,000.00 Mandor Orang 0.0100 0.00 0.00 Tukang Orang 0.6000 70,000.00 42,000.00 Kepala Tukang Orang 0.0600 0.00 0.00

    Jumlah Upah 52,000.00 Upah diambil 60 % 31,200.00

    Jumlah 314,669.06

    F.19 1 m2 Pasang Rangka Atap Genteng MetalRangka :Kayu Meranti m3 0.0110 ### 51,438.84 Paku Biasa Kg 0.1000 12,000.00 1,200.00 Pekerja Orang 0.0150 50,000.00 750.00 Mandor Orang 0.0075 0.00 0.00 Tukang Orang 0.1000 70,000.00 7,000.00 Kepala Tukang Orang 0.0100 0.00 0.00

    Jumlah bahan /Upah 60,388.84 Dibulatkan 41,000.00

    K23 100 m2 MengecatPekerja Orang 5.0000 50,000.00 250,000.00 Mandor Orang 0.2500 0.00 0.00 Tukang Orang 7.5000 70,000.00 525,000.00 Kepala Tukang Orang 0.7500 0.00 0.00

    Jumlah 775,000.00 Untuk 1 m2 7,750.00 Upah diambil 75 % 5,812.50

    Cat TembokUpah kali 3.0000 5,812.50 17,437.50 Cat Tembok Setara Vinilex kg 0.4250 13,650.00 5,801.25

    Jumlah 23,238.75

    Cat MinyakUpah kali 2.0000 5,812.50 11,625.00 Cat kg 0.4250 38,500.00 16,362.50

    Jumlah 27,987.50

    Cat MenieUpah kali 1.0000 5,812.50 5,812.50 Cat kg 0.2833 33,000.00 9,348.90

    Jumlah 15,161.40

    Cat Residu (Colter)Upah kali 1.0000 5,812.50 5,812.50 Cat kg 0.2833 3,300.00 934.89

  • Jumlah 6,747.39

    F.37 A 1 m2 Rangka dan Plafon GymsumGypsum boar m2 1.1000 29,791.67 32,770.83 Rangka alunium, Besi Siku, dan lain -lain Ls 1.0000 22,500.00 22,500.00

    Jumlah bahan 55,270.83 Pekerja Orang 0.1000 50,000.00 5,000.00 Mandor Orang 0.0100 0.00 0.00 Tukang Orang 0.2000 70,000.00 14,000.00 Kepala Tukang Orang 0.0800 0.00 0.00

    Jumlah Upah 19,000.00 Jumlah 74,270.83

    F 21 1 m' Lisplank

    Papan Damat Laut m3 0.0045 ### 21,913.65 Paku kg 0.0500 19,950.00 997.50

    Jumlah Bahan 22,911.15 Pekerja Orang 0.1120 50,000.00 5,600.00 Mandor Orang 0.0560 0.00 0.00 Tukang Orang 0.3200 70,000.00 22,400.00 Kepala Tukang Orang 0.0320 0.00 0.00

    Jumlah Upah 28,000.00 Upah diambil 80 % 22,400.00

    Jumlah 45,311.15

    Tamb .1 1 M2 Pemasangan Paving BlockPaving Block K 175 bh 46.0000 1,600.00 73,600.00 Pasir Urug m3 0.1200 150,000.00 18,000.00

    Jumlah Bahan 91,600.00 Pekerja Orang 0.4000 50,000.00 20,000.00 Mandor Orang 0.0200 0.00 0.00 Tukang Batu Orang 0.1000 70,000.00 7,000.00 Kepala Tukang Orang 0.0100 0.00 0.00

    Jumlah Upah 27,000.00 Jumlah 118,600.00

    PERHITUNGANRekapRAB SALURANRAB HALAMANRAB PAGAR BELAKANGRAB PAGAR KIRI&KANANRAB PAGAR DEPANRAB WUDHU WANITARAB WUDHU PRIARAB MESJIDupahbahanAnalisa