Rab Komplet Revi

27
HARGA SATUAN DASAR (HSD) I UPAH NO NAMA BAHAN SATUAN HARGA (Rp.) 1 Pekerja/Buruh tak terlatih Hari 28,000.00 2 Buruh semi terlatih Hari 30,000.00 3 Buruh terlatih Hari 33,000.00 4 Mandor Hari 50,000.00 5 Kepala tukang kayu Hari 47,500.00 6 Kepala tukang batu Hari 45,000.00 7 Kepala tukang besi Hari 45,000.00 8 Kepala tukang cat Hari 42,500.00 9 Kepala tukang gali Hari 42,500.00 10 Tukang kayu Hari 42,500.00 11 Tukang batu Hari 40,000.00 12 tukang besi Hari 37,500.00 13 Tukang cat Hari 35,000.00 14 Tukang gali Hari 35,000.00 15 Tukang listrik Hari 40,000.00 16 Tukang pipa Hari 40,000.00 17 Sopir Hari 37,100.00 18 Mekanik terlatih Hari 45,000.00 19 Operator semi terlatih/stoker Hari 43,300.00 20 Operator terlatih Hari 45,100.00 21 Penjaga malam Hari 30,900.00 II BAHAN NO NAMA BAHAN SATUAN HARGA (Rp.) 1 Pasir Urug 71,500.00 2 Pasir Pasang 101,000.00 3 Pasir beton 110,000.00 4 Tanah urug 35,000.00 5 Kerikil 184,000.00 6 Batu belah 132,250.00 7 Batu Pecah 2/3 cm (split)/Mesin 166,750.00 8 Batu Merah bj 280.00 9 Batu Candi 70,000.00 10 Roaster bj 2,800.00 11 Kawur 230,000.00 12 Potland Cement (PC) 40 Kg zak 42,000.00 13 PC Putih (40 Kg) zak 61,200.00 14 PC Warna (40 Kg) zak 126,500.00 15 Kalsit zak 4,025.00 16 Keramik 40x40 warna motif Asia 36,500.00 17 Keramik 20x20 Asia KM/WC 36,800.00 18 Keramik 20x25 Polos/Warna Asia 37,375.00 19 Keramik milan 40x40 Warna/Motif 39,500.00 20 Cat Tembok Merk property inerior 5 kg 68,500.00 21 Cat Tembok Merk property eksterior 5 kg 78,000.00 22 Cat Besi semprot kg 55,000.00 23 Plamur Tembok Decopil 5 kg 37,375.00 24 Cat Afiner B lt 10,062.50 25 Thinner A Afdiner lt 14,950.00 26 Meni Besi Merk Padang kg 16,100.00 27 Plamur Tembok Decopil 5 kg 37,375.00 28 Amplas Besi lbr 2,875.00 29 Amplas Kayu lbr 2,875.00 30 Minyak Begisting/residu lt 6,000.00 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 2 m 3 m 2 m 2 m 2 m 2

Transcript of Rab Komplet Revi

Page 1: Rab Komplet Revi

HARGA SATUAN DASAR (HSD)

I UPAH

NO NAMA BAHAN SATUANHARGA

(Rp.)

1 Pekerja/Buruh tak terlatih Hari 28,000.00

2 Buruh semi terlatih Hari 30,000.00

3 Buruh terlatih Hari 33,000.00

4 Mandor Hari 50,000.00

5 Kepala tukang kayu Hari 47,500.00

6 Kepala tukang batu Hari 45,000.00

7 Kepala tukang besi Hari 45,000.00

8 Kepala tukang cat Hari 42,500.00

9 Kepala tukang gali Hari 42,500.00

10 Tukang kayu Hari 42,500.00

11 Tukang batu Hari 40,000.00

12 tukang besi Hari 37,500.00

13 Tukang cat Hari 35,000.00

14 Tukang gali Hari 35,000.00

15 Tukang listrik Hari 40,000.00

16 Tukang pipa Hari 40,000.00

17 Sopir Hari 37,100.00

18 Mekanik terlatih Hari 45,000.00

19 Operator semi terlatih/stoker Hari 43,300.00

20 Operator terlatih Hari 45,100.00

21 Penjaga malam Hari 30,900.00

II BAHAN

NO NAMA BAHAN SATUANHARGA

(Rp.)

1 Pasir Urug 71,500.00

2 Pasir Pasang 101,000.00

3 Pasir beton 110,000.00

4 Tanah urug 35,000.00

5 Kerikil 184,000.00

6 Batu belah 132,250.00

7 Batu Pecah 2/3 cm (split)/Mesin 166,750.00

8 Batu Merah bj 280.00

9 Batu Candi 70,000.00

10 Roaster bj 2,800.00

11 Kawur 230,000.00

12 Potland Cement (PC) 40 Kg zak 42,000.00

13 PC Putih (40 Kg) zak 61,200.00

14 PC Warna (40 Kg) zak 126,500.00

15 Kalsit zak 4,025.00

16 Keramik 40x40 warna motif Asia 36,500.00

17 Keramik 20x20 Asia KM/WC 36,800.00

18 Keramik 20x25 Polos/Warna Asia 37,375.00

19 Keramik milan 40x40 Warna/Motif 39,500.00

20 Cat Tembok Merk property inerior 5 kg 68,500.0021 Cat Tembok Merk property eksterior 5 kg 78,000.0022 Cat Besi semprot kg 55,000.00

23 Plamur Tembok Decopil 5 kg 37,375.00

24 Cat Afiner B lt 10,062.50

25 Thinner A Afdiner lt 14,950.00

26 Meni Besi Merk Padang kg 16,100.00

27 Plamur Tembok Decopil 5 kg 37,375.00

28 Amplas Besi lbr 2,875.00

29 Amplas Kayu lbr 2,875.00

30 Minyak Begisting/residu lt 6,000.00

m3

m3

m3

m3

m3

m3

m3

m2

m3

m2

m2

m2

m2

Page 2: Rab Komplet Revi

31 Grendel bh 11,500.00

32 Pengait Angin/Hak Angin bh 12,500.00

33 Pengait Angin/Hak Angin biasa bh 7,000.00

34 Kunci Tanam Merk UNION bh 75,000.00

35 Engsel H Sedang Putih/Hitam stel 7,500.00

36 Spring Knip bh 14,375.00

37 Floor Drain Stainless/Biasa bh 51,750.00

38 Closet jongkok INA bh 110,000.00

39 bh 201,000.00

40 bh 21,000.00

41 bh 45,000.00

42 Pintu Alluminium 80x210 (putih) unit 155,000.00

43 Pintu Alluminium 80x210 (putih) unit 207,000.00

44 Pompa Air Sanyo Otomatis bh 560,000.00

45 Paku triplek 2 cm kg 17,500.00

46 Paku reng kg 12,500.00

47 Paku Usuk kg 12,500.00

48 Paku Beton 5 cm/10 cm bj 460.00

49 Paku Besar/Paku Gording/Dudur = 12 cm kg 14,950.00

50 Paku Sekrup 3,50" kg/bj 14,950.00

51 Freezer 8 mm/12 mm bh 750.00

52 Multipkex 12 mm lbr 230,000.00

53 Triplex 3 mm lbr 46,575.00

54 Lys Gypsum m' 11,500.00

55 Gypsum Rangka Alluminium 132,250.00

56 Gypsum 9 mm lbr 55,200.00

57 hollo galvanis btg 27,000.00

58 Langit-langit gypsum board t= 9 mm (120x240) lbr 55,200.00

59 m' 80,500.00

60 btg 12,650.00

61 btg 17,500.00

62 btg 22,000.00

63 btg 25,000.00

64 btg 47,500.00

65 btg 55,000.00

66 seltip bh 2,000.00

67 bambu btg 9,500.00

68 Kayu meranti 6/12 4,715,000.00

69 Kayu meranti 5/10 4,715,000.00

70 Kayu meranti 5/7 4,715,000.00

71 Kayu meranti reng 3/4 3,450,000.00

72 Kayu meranti reng 2/3 3,220,000.00

73 Kayu meranti ram pintu 4,945,000.00

74 Kayu meranti ram jendela 4,945,000.00

75 Kayu meranti papan 20 cm pj = 4 m' 4,945,000.00

76 Kayu meranti papan 30 cm 5,520,000.00

77 Kayu sangon 5/7 990,000.00

78 Kayu sangon papan 1,782,500.0079 Kayu lis 2/3 m' 5,000.00

80 Kayu lis profil m' 9,500.00

81 Bambu 4m btg 4,000.00

82 kusen almunium Uk 5.10. m' 55,000.00

83 Kaca bening 8 mm 85,000.00

84 Bendrat kg 12,500.00

85 Besi Beton kg 10,750.00

86 Minyak Begisting/residu lt 6,000.00

87 Nok genteng metal decrabon m' 55,000.00

88 Genteng metal 130,000.00

89 Rangka baja ringan untuk genteng metal 145,000.00

90 Fitting perselin bh 5,750.00

91 Travo 250 watt bh 138,000.00

92 Bolam Pijar bh 7,500.00

Bak Mandi Fiberglass Volume = 0,30 m3 Kecil/Besar

Kran Ø 1/2"

Kran leher angsa Ø 3/4"

m2

Buis Beton Ø 60 cm

Pipa PVC Ø 1/2 /4 m

Pipa PVC Ø 3/4 /4 m

Pipa PVC Ø 1" / 4 m

Pipa PVC Ø 2" /4 m

Pipa PVC Ø 3" /4 m

Pipa PVC Ø 4" /4 m

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

m2

Page 3: Rab Komplet Revi

93 Lampu SL 18 watt bh 27,750.00

94 Lampu SL 20 watt bh 27,750.00

95 Fotto cell 10 A bh 86,250.00

96 Kabel listrik 1,50 mm m' 4,600.00

97 Kabel listrik 2,50 mm m' 6,612.50

98 Alqua klem jaringan bh 4,150.00

99 Ignator bh 6,900.00

100 Kapasitor bh 4,600.00

101 Isolasi PVC bh 6,200.00

102 Trafo 50 KVA bh 9,800.00

103 KWH meter bh 1,955,000.00

104 Kontraktor SK 70 bh 977,500.00

105 MCB 80 A bh 6,200.00

106 NT. Fuse 80 A bh 46,000.00

107 Box meter bh 14,800.00

108 Box philips H.NOX bh 575,000.00

109 Box MCB bh 4,600.00

110 Tiang tarikan bh 966,000.00

111 T. Dos bh 1,725.00

112 MCB 10A bh 51,750.00

Page 4: Rab Komplet Revi

ANALISA HARGA SATUAN

A. PEKERJAAN PERSIAPAN :

1 Pengukuran dan pemasangan bouwplankUpah

0.1000 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 4,250.000.1000 Oh Pekerja @ Rp. 28,000.00 = Rp. 2,800.000.0100 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 475.000.0050 Oh Mandor @ Rp. 50,000.00 = Rp. 250.00

Rp 7,775.00 Bahan

0.0060 Kayu sengon 5/7 @ Rp. 990,000.00 = Rp. 5,940.000.0200 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 250.00

0.0060 Kayu sengon papan 3/20 @ Rp. 1,782,500.00 = Rp. 10,695.00 Rp 16,885.00 Rp 24,660.00

B. PEKERJAAN TANAH :

1 Galian tanah biasa Upah

0.7350 Oh Pekerja @ Rp. 28,000.00 = Rp. 20,580.000.0730 Oh Mandor @ Rp. 50,000.00 = Rp. 3,650.00

Rp 24,230.00 Bahan

Rp - Rp 24,230.00

2 Mengurug tanah kembaliUpah

0.1920 Oh Pekerja @ Rp. 28,000.00 = Rp. 5,376.000.0190 Oh Mandor @ Rp. 50,000.00 = Rp. 950.00

Rp 6,326.00 Bahan

Rp - Rp 6,326.00

3 Urugan TanahUpah

0.2500 Oh Pekerja @ Rp. 28,000.00 = Rp. 7,000.000.0600 Oh Mandor @ Rp. 50,000.00 = Rp. 3,000.00

Rp 10,000.00 Bahan

1.0500 Tanah urug @ Rp. 35,000.00 = Rp. 36,750.00 Rp 36,750.00 Rp 46,750.00

4 Urugan pasirUpah

0.3000 Oh Pekerja @ Rp. 28,000.00 = Rp. 8,400.000.0100 Oh Mandor @ Rp. 50,000.00 = Rp. 500.00

Rp 8,900.00 Bahan

1.1000 Pasir urug @ Rp. 71,500.00 = Rp. 78,650.00 Rp 78,650.00 Rp 87,550.00

C. PEKERJAAN PASANGAN :

1 Pasangan pondasi batu kali dgn 1PC : 8PsUpah

1.5000 Oh Pekerja @ Rp. 28,000.00 = Rp. 42,000.000.6000 Oh Tukang batu @ Rp. 40,000.00 = Rp. 24,000.000.0600 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 2,700.000.0750 Oh Mandor @ Rp. 50,000.00 = Rp. 3,750.00

Rp 72,450.00 Bahan

1.0500 Batu belah @ Rp. 132,250.00 = Rp. 138,862.5091.0000 kg PC @ Rp. 1,100.00 = Rp. 100,100.00

0.5610 Pasir pasang @ Rp. 101,000.00 = Rp. 56,661.00 Rp 295,623.50 Rp 368,073.50

2 Pasangan pondasi batu kosongUpah

0.7800 Oh Pekerja @ Rp. 28,000.00 = Rp. 21,840.000.3900 Oh Tukang batu @ Rp. 40,000.00 = Rp. 15,600.000.0390 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 1,755.00

1 m1

m3

m3

1 m3

1 m3

1 m3

m3

1 m3

m3

1 m3

m3

m3

1 m3

Page 5: Rab Komplet Revi

0.0390 Oh Mandor @ Rp. 50,000.00 = Rp. 1,950.00 Rp 41,145.00

Bahan

1.0500 Batu belah @ Rp. 132,250.00 = Rp. 138,862.50

0.3000 Pasir urug @ Rp. 71,500.00 = Rp. 21,450.00 Rp 160,312.50 Rp 201,457.50

3 Pasangan rolak bata merah tebal 1 bata, 1PC : 8PsUpah

0.6500 Oh Pekerja @ Rp. 28,000.00 = Rp. 18,200.000.2000 Oh Tukang batu @ Rp. 40,000.00 = Rp. 8,000.000.0200 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 900.000.0200 Oh Mandor @ Rp. 50,000.00 = Rp. 1,000.00

Rp 28,100.00 Bahan

140.0000 bh Bata merah @ Rp. 280.00 = Rp. 39,200.0016.6500 kg PC @ Rp. 1,100.00 = Rp. 18,315.00

Rp 57,515.00 Rp 85,615.00

4 Pasangan bata merah tebal 1/2 bata, 1PC : 8PsUpah

0.3200 Oh Pekerja @ Rp. 28,000.00 = Rp. 8,960.000.1000 Oh Tukang batu @ Rp. 40,000.00 = Rp. 4,000.000.0100 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 450.000.0150 Oh Mandor @ Rp. 50,000.00 = Rp. 750.00

Rp 14,160.00 Bahan

70.0000 bh Bata merah @ Rp. 280.00 = Rp. 19,600.005.7000 kg PC @ Rp. 1,100.00 = Rp. 6,270.00

0.0500 Pasir pasang @ Rp. 101,000.00 = Rp. 5,050.00 Rp 30,920.00 Rp 45,080.00

5 1 bh Pasangan roster semenUpah

0.0050 Oh Pekerja @ Rp. 28,000.00 = Rp. 140.000.0250 Oh Tukang batu @ Rp. 40,000.00 = Rp. 1,000.000.0001 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 4.500.0001 Oh Mandor @ Rp. 50,000.00 = Rp. 5.00

Rp 1,149.50 Bahan

1.0000 bh roster @ Rp. 2,800.00 = Rp. 2,800.000.2500 kg PC @ Rp. 1,100.00 = Rp. 275.00

0.0030 Pasir pasang @ Rp. 101,000.00 = Rp. 303.00 Rp 3,378.00 Rp 4,527.50

6 1 bh Pasang glasblokUpah

0.0040 Oh Pekerja @ Rp. 28,000.00 = Rp. 112.000.0500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 2,000.000.0050 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 225.000.0050 Oh Mandor @ Rp. 50,000.00 = Rp. 250.00

Rp 2,587.00 Bahan

0.7500 kg PC @ Rp. 1,100.00 = Rp. 825.001.0000 bh Glasblok @ Rp. 16,000.00 = Rp. 16,000.00

Rp 16,825.00 Rp 19,412.00

D PEKERJAAN PLESTERAN :

1 Plesteran dan acian 1PC : 8Ps tebal 15 mmUpah

0.2500 Oh Pekerja @ Rp. 28,000.00 = Rp. 7,000.000.2500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 10,000.000.0200 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 900.000.0125 Oh Mandor @ Rp. 50,000.00 = Rp. 625.00

Rp 18,525.00 Bahan

3.8800 kg PC @ Rp. 1,100.00 = Rp. 4,268.00

0.0420 Pasir pasang @ Rp. 101,000.00 = Rp. 4,242.00 Rp 8,510.00 Rp 27,035.00

m3

m3

1 m2

1 m2

m3

m3

1 m2

m3

Page 6: Rab Komplet Revi

2 Plesteran Skoning 1PC : 2PsUpah

0.0290 Oh Pekerja @ Rp. 28,000.00 = Rp. 812.000.0290 Oh Tukang batu @ Rp. 40,000.00 = Rp. 1,160.000.0290 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 1,305.000.0020 Oh Mandor @ Rp. 50,000.00 = Rp. 100.00

Rp 3,377.00 Bahan

0.5000 kg PC @ Rp. 1,100.00 = Rp. 550.00

0.0020 Pasir pasang @ Rp. 101,000.00 = Rp. 202.00 Rp 752.00 Rp 4,129.00

3 Plesteran siar 1PC : 2PsUpah

0.1500 Oh Pekerja @ Rp. 28,000.00 = Rp. 4,200.000.0700 Oh Tukang batu @ Rp. 40,000.00 = Rp. 2,800.000.0070 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 315.000.0080 Oh Mandor @ Rp. 50,000.00 = Rp. 400.00

Rp 7,715.00 Bahan

2.1600 kg PC @ Rp. 1,100.00 = Rp. 2,376.00

0.0160 Pasir pasang @ Rp. 101,000.00 = Rp. 1,616.00 Rp 3,992.00 Rp 11,707.00

4 Pasang batu candiUpah

0.1900 Oh Pekerja @ Rp. 28,000.00 = Rp. 5,320.000.0750 Oh Tukang batu @ Rp. 40,000.00 = Rp. 3,000.000.0450 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 2,025.000.0300 Oh Mandor @ Rp. 50,000.00 = Rp. 1,500.00

Rp 11,845.00 Bahan

1.0500 batu candi @ Rp. 70,000.00 = Rp. 73,500.008.5000 kg Semen Portland @ Rp. 1,100.00 = Rp. 9,350.00

0.0160 Pasir pasang @ Rp. 101,000.00 = Rp. 1,616.00 Rp 84,466.00 Rp 96,311.00

E PEKERJAAN PINTU DAN JENDELA :

1 Pasang pintu alluminium (80x20)Upah

0.1200 Oh Pekerja @ Rp. 28,000.00 = Rp. 3,360.000.1900 Oh Tukang besi @ Rp. 37,500.00 = Rp. 7,125.000.0250 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 1,125.000.0035 Oh Mandor @ Rp. 50,000.00 = Rp. 175.00

Rp 11,785.00 Bahan

1.1000 Kusen almunium 5.10.0,1 @ Rp. 55,000.00 = Rp. 60,500.00 Rp 60,500.00 Rp 72,285.00

2 Pasang pintu alluminium (80x20)Upah

0.6500 Oh Pekerja @ Rp. 28,000.00 = Rp. 18,200.000.6500 Oh Tukang besi @ Rp. 37,500.00 = Rp. 24,375.000.0650 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 2,925.000.0042 Oh Mandor @ Rp. 50,000.00 = Rp. 210.00

Rp 45,710.00 Bahan

1.0000 Pintu alluminium @ Rp. 207,000.00 = Rp. 207,000.00 Rp 207,000.00 Rp 252,710.00

3 1 Buah pasang engsel jendelaUpah

0.0100 Oh Pekerja @ Rp. 28,000.00 = Rp. 280.000.1100 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 4,675.000.0011 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 52.250.0005 Oh Mandor @ Rp. 50,000.00 = Rp. 25.00

Rp 5,032.25 Bahan

1.0000 bh Engsel jendela @ Rp. 7,500.00 = Rp. 7,500.00

1 m1

m3

1 m2

m3

1 m2

m2

m3

1 m1

m1

1 m2

m2

Page 7: Rab Komplet Revi

Rp 7,500.00 Rp 12,532.25

4 1 Buah pasang kait anginUpah

0.0100 Oh Pekerja @ Rp. 28,000.00 = Rp. 280.000.1100 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 4,675.000.0011 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 52.25

0.00075 Oh Mandor @ Rp. 50,000.00 = Rp. 37.50 Rp 5,044.75

Bahan1.0000 bh Kait angin @ Rp. 12,500.00 = Rp. 12,500.00

Rp 12,500.00 Rp 17,544.75

5 Pasang kaca bening, tebal 8 mmUpah

0.0150 Oh Pekerja @ Rp. 28,000.00 = Rp. 420.000.1500 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 6,375.000.0150 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 712.50

0.00075 Oh Mandor @ Rp. 50,000.00 = Rp. 37.50 Rp 7,545.00

Bahan

1.1000 Kaca @ Rp. 85,000.00 = Rp. 93,500.00 Rp 93,500.00 Rp 101,045.00

F PEKERJAAN BETON :

1 Membuat beton , 1Pc : 3Ps : 5KrUpah

1.6500 Oh Pekerja @ Rp. 30,000.00 = Rp. 49,500.000.2500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 10,000.000.0250 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 1,125.000.0800 Oh Mandor @ Rp. 50,000.00 = Rp. 4,000.00

Rp 64,625.00 Bahan

218.0000 kg Semen Portland @ Rp. 1,100.00 = Rp. 239,800.00

0.5200 Pasir beton @ Rp. 110,000.00 = Rp. 57,200.00

0.8700 Koral beton @ Rp. 166,750.00 = Rp. 145,072.50 Rp 442,072.50 Rp 506,697.50

2 Pondasi FootplatUpah

3.9000 Oh Pekerja @ Rp. 30,000.00 = Rp. 117,000.000.3500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 14,000.001.0400 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 44,200.001.0500 Oh Tukang besi @ Rp. 37,500.00 = Rp. 39,375.000.2450 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 11,637.500.1650 Oh Mandor @ Rp. 50,000.00 = Rp. 8,250.00

Rp 234,462.50 Bahan

0.2000 Kayu sengon @ Rp. 1,782,500.00 = Rp. 356,500.001.5000 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 18,750.000.4000 Lt Minyak bekisting @ Rp. 6,000.00 = Rp. 2,400.00

160.4923 kg besi Ulir dan polos @ Rp. 10,750.00 = Rp. 1,725,291.872.0000 btg kawat beton @ Rp. 12,500.00 = Rp. 25,000.00

323.0000 kg Semen Portland @ Rp. 1,100.00 = Rp. 355,300.00

0.5200 Pasir beton @ Rp. 110,000.00 = Rp. 57,200.00

0.7800 Koral beton @ Rp. 166,750.00 = Rp. 130,065.00 Rp 2,670,506.87 Rp 2,904,969.37

3 SloofUpah

4.8500 Oh Pekerja @ Rp. 30,000.00 = Rp. 145,500.000.3500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 14,000.001.5600 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 66,300.001.4000 Oh Tukang besi @ Rp. 37,500.00 = Rp. 52,500.000.3310 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 15,722.500.1700 Oh Mandor @ Rp. 50,000.00 = Rp. 8,500.00

Rp 302,522.50 Bahan

0.2700 Kayu sengon @ Rp. 1,782,500.00 = Rp. 481,275.002.0000 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 25,000.000.6000 Lt Minyak bekisting @ Rp. 6,000.00 = Rp. 3,600.00

1 m2

m2

1 m3

m3

m3

1 m3

m3

m3

m3

1 m3

m3

Page 8: Rab Komplet Revi

195.1363 kg besi Ulir dan polos @ Rp. 10,750.00 = Rp. 2,097,715.583.0000 btg kawat beton @ Rp. 12,500.00 = Rp. 37,500.00

323.0000 kg Semen Portland @ Rp. 1,100.00 = Rp. 355,300.00

0.5200 Pasir beton @ Rp. 110,000.00 = Rp. 57,200.00

0.7800 Koral beton @ Rp. 166,750.00 = Rp. 130,065.00 Rp 3,187,655.58 Rp 3,490,178.08

4 Kolom Upah

7.3000 Oh Pekerja @ Rp. 30,000.00 = Rp. 219,000.000.3500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 14,000.003.3000 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 140,250.002.1000 Oh Tukang besi @ Rp. 37,500.00 = Rp. 78,750.000.5700 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 27,075.000.2500 Oh Mandor @ Rp. 50,000.00 = Rp. 12,500.00

Rp 491,575.00 Bahan

0.4000 Kayu sengon @ Rp. 1,782,500.00 = Rp. 713,000.004.0000 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 50,000.002.0000 Lt Minyak bekisting @ Rp. 6,000.00 = Rp. 12,000.00

0.1500 Balok kayu @ Rp. 990,000.00 = Rp. 148,500.0020.0000 btg bambu @ Rp. 4,000.00 = Rp. 80,000.00

164.2475 kg besi Ulir dan polos @ Rp. 10,750.00 = Rp. 1,765,660.631.5000 btg kawat beton @ Rp. 12,500.00 = Rp. 18,750.00

323.0000 kg Semen Portland @ Rp. 1,100.00 = Rp. 355,300.00

0.5200 Pasir beton @ Rp. 110,000.00 = Rp. 57,200.00

0.7800 Koral beton @ Rp. 166,750.00 = Rp. 130,065.00 Rp 3,330,475.63 Rp 3,822,050.63

5 Sloof/Kolom PraktisUpah

3.9000 Oh Pekerja @ Rp. 30,000.00 = Rp. 117,000.001.2600 Oh Tukang batu @ Rp. 40,000.00 = Rp. 50,400.001.2600 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 53,550.001.2600 Oh Tukang besi @ Rp. 37,500.00 = Rp. 47,250.000.3780 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 17,955.000.1890 Oh Mandor @ Rp. 50,000.00 = Rp. 9,450.00

Rp 295,605.00 Bahan

0.1260 Kayu sengon @ Rp. 1,782,500.00 = Rp. 224,595.000.6300 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 7,875.00

103.6567 kg besi Ulir dan polos @ Rp. 10,750.00 = Rp. 1,114,309.1728.3500 btg kawat beton @ Rp. 12,500.00 = Rp. 354,375.00

323.0000 kg Semen Portland @ Rp. 1,100.00 = Rp. 355,300.00

0.5200 Pasir beton @ Rp. 110,000.00 = Rp. 57,200.00

0.7800 Koral beton @ Rp. 166,750.00 = Rp. 130,065.00 Rp 2,243,719.17 Rp 2,539,324.17

6 BalokUpah

5.9600 Oh Pekerja @ Rp. 30,000.00 = Rp. 178,800.000.3500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 14,000.002.8000 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 119,000.001.4000 Oh Tukang besi @ Rp. 37,500.00 = Rp. 52,500.000.4550 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 21,612.500.2080 Oh Mandor @ Rp. 50,000.00 = Rp. 10,400.00

Rp 396,312.50 Bahan

0.3200 Kayu sengon @ Rp. 1,782,500.00 = Rp. 570,400.003.2000 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 40,000.001.6000 Lt Minyak bekisting @ Rp. 6,000.00 = Rp. 9,600.00

0.1400 Balok kayu @ Rp. 990,000.00 = Rp. 138,600.0016.0000 btg bambu @ Rp. 4,000.00 = Rp. 64,000.00

177.3713 kg besi Ulir dan polos @ Rp. 10,750.00 = Rp. 1,906,741.833.0000 btg kawat beton @ Rp. 12,500.00 = Rp. 37,500.00

323.0000 kg Semen Portland @ Rp. 1,100.00 = Rp. 355,300.00

0.5200 Pasir beton @ Rp. 110,000.00 = Rp. 57,200.00

0.7800 Koral beton @ Rp. 166,750.00 = Rp. 130,065.00 Rp 3,309,406.83 Rp 3,705,719.33

7 Plat LantaiUpah

5.8000 Oh Pekerja @ Rp. 30,000.00 = Rp. 174,000.000.3500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 14,000.00

m3

m3

1 m3

m3

m3

m3

m3

1 m3

m3

m3

m3

1 m3

m3

m3

m3

m3

1 m3

Page 9: Rab Komplet Revi

2.8000 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 119,000.001.0500 Oh Tukang besi @ Rp. 37,500.00 = Rp. 39,375.000.4200 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 19,950.000.1850 Oh Mandor @ Rp. 50,000.00 = Rp. 9,250.00

Rp 375,575.00 Bahan

0.3200 Kayu sengon @ Rp. 1,782,500.00 = Rp. 570,400.003.2000 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 40,000.001.6000 Lt Minyak bekisting @ Rp. 6,000.00 = Rp. 9,600.00

0.1200 Balok kayu @ Rp. 990,000.00 = Rp. 118,800.0032.0000 btg bambu @ Rp. 4,000.00 = Rp. 128,000.00

110.7975 kg besi Ulir dan polos @ Rp. 10,750.00 = Rp. 1,191,073.132.2500 btg kawat beton @ Rp. 12,500.00 = Rp. 28,125.00

323.0000 kg Semen Portland @ Rp. 1,100.00 = Rp. 355,300.00

0.5200 Pasir beton @ Rp. 110,000.00 = Rp. 57,200.00

0.7800 Koral beton @ Rp. 166,750.00 = Rp. 130,065.00 Rp 2,628,563.13 Rp 3,004,138.13

8 Plat TanggaUpah

5.6000 Oh Pekerja @ Rp. 30,000.00 = Rp. 168,000.000.3500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 14,000.002.3000 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 97,750.001.4000 Oh Tukang besi @ Rp. 37,500.00 = Rp. 52,500.000.4050 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 19,237.500.2020 Oh Mandor @ Rp. 50,000.00 = Rp. 10,100.00

Rp 361,587.50 Bahan

0.2500 Kayu sengon @ Rp. 1,782,500.00 = Rp. 445,625.003.0000 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 37,500.001.2000 Lt Minyak bekisting @ Rp. 6,000.00 = Rp. 7,200.00

0.1050 Balok kayu @ Rp. 990,000.00 = Rp. 103,950.0014.0000 btg bambu @ Rp. 4,000.00 = Rp. 56,000.00

172.9750 kg besi Ulir dan polos @ Rp. 10,750.00 = Rp. 1,859,481.252.2500 kg kawat beton @ Rp. 12,500.00 = Rp. 28,125.00

323.0000 kg Semen Portland @ Rp. 1,100.00 = Rp. 355,300.00

0.5200 Pasir beton @ Rp. 110,000.00 = Rp. 57,200.00

0.7800 Koral beton @ Rp. 166,750.00 = Rp. 130,065.00 Rp 3,080,446.25 Rp 3,442,033.75

9 RingbalkUpah

4.8500 Oh Pekerja @ Rp. 30,000.00 = Rp. 145,500.000.3500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 14,000.001.5600 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 66,300.001.4000 Oh Tukang besi @ Rp. 37,500.00 = Rp. 52,500.000.3310 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 15,722.500.1700 Oh Mandor @ Rp. 50,000.00 = Rp. 8,500.00

Rp 302,522.50 Bahan

0.2700 Kayu sengon @ Rp. 1,782,500.00 = Rp. 481,275.002.0000 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 25,000.000.6000 Lt Minyak bekisting @ Rp. 6,000.00 = Rp. 3,600.00

164.5757 kg besi Ulir dan polos @ Rp. 10,750.00 = Rp. 1,769,188.423.0000 kg kawat beton @ Rp. 12,500.00 = Rp. 37,500.00

323.0000 kg Semen Portland @ Rp. 1,100.00 = Rp. 355,300.00

0.5200 Pasir beton @ Rp. 110,000.00 = Rp. 57,200.00

0.7800 Koral beton @ Rp. 166,750.00 = Rp. 130,065.00 Rp 2,859,128.42 Rp 3,161,650.92

G PEKERJAAN PENUTUP ATAP :

1 Pasang Rangka atap genteng metalUpah

0.5000 Oh Pekerja @ Rp. 28,000.00 = Rp. 14,000.000.5500 Oh Tukang @ Rp. 42,500.00 = Rp. 23,375.000.0550 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 2,612.500.0200 Oh Mandor @ Rp. 50,000.00 = Rp. 1,000.00

Rp 40,987.50 Bahan

1.0200 Rangka baja ringan untu genteng metal @ Rp. 145,000.00 = Rp. 147,900.00 Rp 147,900.00 Rp 188,887.50

2 Pasang atap genteng metal

m3

m3

m3

m3

1 m3

m3

m3

m3

m3

1 m3

m3

m3

m3

1 m2

m2

1 m2

Page 10: Rab Komplet Revi

Upah0.2000 Oh Pekerja @ Rp. 28,000.00 = Rp. 5,600.000.1000 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 4,250.000.0100 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 475.000.0010 Oh Mandor @ Rp. 50,000.00 = Rp. 50.00

Rp 10,375.00 Bahan

1.0200 Genteng metal @ Rp. 130,000.00 = Rp. 132,600.003.2000 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 40,000.00

Rp 132,600.00 Rp 142,975.00

3 Pasang Nok genteng metalUpah

0.2500 Oh Pekerja @ Rp. 28,000.00 = Rp. 7,000.000.1500 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 6,375.000.0150 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 712.500.0130 Oh Mandor @ Rp. 50,000.00 = Rp. 650.00

Rp 14,737.50 Bahan

1.1000 Genteng Decrabon @ Rp. 55,000.00 = Rp. 60,500.000.0500 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 625.00

Rp 60,500.00 Rp 75,237.50

H PEKERJAAN LANGIT_LANGIT :

1 Langit-langit gypsum board, tebal 9 mm + rangka HolloUpah

0.2500 Oh Pekerja @ Rp. 28,000.00 = Rp. 7,000.000.3500 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 14,875.000.0350 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 1,662.500.0350 Oh Mandor @ Rp. 50,000.00 = Rp. 1,750.00

Rp 25,287.50 Bahan

0.3640 lbr Gypsum board 120x240 @ Rp. 55,200.00 = Rp. 20,092.800.2200 kg Paku sekrup @ Rp. 14,950.00 = Rp. 3,289.001.3500 btg hollo galvanis @ Rp. 27,000.00 = Rp. 36,450.000.0200 kg Paku biasa 2"-5" @ Rp. 12,500.00 = Rp. 250.00

Rp 60,081.80 Rp 85,369.30

2 Pasang list GipsumUpah

0.0210 Oh Pekerja @ Rp. 28,000.00 = Rp. 588.000.0210 Oh Tukang kayu @ Rp. 42,500.00 = Rp. 892.500.0020 Oh Kepala tukang @ Rp. 47,500.00 = Rp. 95.000.0010 Oh Mandor @ Rp. 50,000.00 = Rp. 50.00

Rp 1,625.50 Bahan

1.0500 m' lis gipsum @ Rp. 11,500.00 = Rp. 12,075.00 Rp 12,075.00 Rp 13,700.50

I PEKERJAAN SANITASI :1 Memasang 1 buah kloset jongkok Porselin

Upah0.7500 Oh Pekerja @ Rp. 28,000.00 = Rp. 21,000.000.9500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 38,000.000.0950 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 4,275.000.0095 Oh Mandor @ Rp. 50,000.00 = Rp. 475.00

Rp 63,750.00 Bahan

1.0000 bh Kloset jongkok porselin @ Rp. 90,000.00 = Rp. 90,000.006.0000 kg Semen portland @ Rp. 1,100.00 = Rp. 6,600.00

0.0100 Pasir pasang @ Rp. 101,000.00 = Rp. 1,010.00 Rp 97,610.00 Rp 161,360.00

2 Memasang 1 m' pipa PVC tipe AW diameter 3/4"Upah

0.0360 Oh Pekerja @ Rp. 28,000.00 = Rp. 1,008.000.0600 Oh Tukang batu @ Rp. 40,000.00 = Rp. 2,400.000.0060 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 270.000.0018 Oh Mandor @ Rp. 50,000.00 = Rp. 90.00

Rp 3,768.00 Bahan

1.2000 m' Pipa PVC @ Rp. 4,375.00 = Rp. 5,250.00

m2

1 m1

m2

1 m2

1 m1

m3

Page 11: Rab Komplet Revi

35% Perlengkapan @ Rp. 5,250.00 = Rp. 1,837.50 Rp 7,087.50 Rp 10,855.50

3 Memasang 1 m' pipa PVC diameter 3"Upah

0.0540 Oh Pekerja @ Rp. 28,000.00 = Rp. 1,512.000.0900 Oh Tukang batu @ Rp. 40,000.00 = Rp. 3,600.000.0090 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 405.000.0270 Oh Mandor @ Rp. 50,000.00 = Rp. 1,350.00

Rp 6,867.00 Bahan

1.2000 m' Pipa PVC @ Rp. 11,875.00 = Rp. 14,250.0035% Perlengkapan @ Rp. 14,250.00 = Rp. 4,987.50

Rp 19,237.50 Rp 26,104.50

4 Memasang 1 m' pipa PVC diameter 4"Upah

0.0540 Oh Pekerja @ Rp. 28,000.00 = Rp. 1,512.000.0900 Oh Tukang batu @ Rp. 40,000.00 = Rp. 3,600.000.0090 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 405.000.0270 Oh Mandor @ Rp. 50,000.00 = Rp. 1,350.00

Rp 6,867.00 Bahan

1.2000 m' Pipa PVC @ Rp. 13,750.00 = Rp. 16,500.0035% Perlengkapan @ Rp. 16,500.00 = Rp. 5,775.00

Rp 22,275.00 Rp 29,142.00

5 Memasang 1 buah kran SAN EI diameter 3/4" atau 1/2"Upah

0.0100 Oh Pekerja @ Rp. 28,000.00 = Rp. 280.000.1000 Oh Tukang batu @ Rp. 40,000.00 = Rp. 4,000.000.0100 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 450.000.0050 Oh Mandor @ Rp. 50,000.00 = Rp. 250.00

Rp 4,980.00 Bahan

1.0000 bh Kran air @ Rp. 21,000.00 = Rp. 21,000.000.0250 bh Seal tape @ Rp. 2,000.00 = Rp. 50.00

Rp 21,050.00 Rp 26,030.00

6Upah

0.0700 Oh Pekerja @ Rp. 28,000.00 = Rp. 1,960.001.3000 Oh Tukang batu @ Rp. 40,000.00 = Rp. 52,000.000.1500 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 6,750.000.0150 Oh Mandor @ Rp. 50,000.00 = Rp. 750.00

Rp 61,460.00

Bahan1.0000 bh Bak fiberglass @ Rp. 201,000.00 = Rp. 201,000.00

10% Perlengkapan @ Rp. 201,000.00 = Rp. 20,100.00 Rp 221,100.00 Rp 282,560.00

7 Memasang 1 buah kran leher angsa 1/2"Upah

0.0100 Oh Pekerja @ Rp. 28,000.00 = Rp. 280.000.1000 Oh Tukang batu @ Rp. 40,000.00 = Rp. 4,000.000.0100 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 450.000.0050 Oh Mandor @ Rp. 50,000.00 = Rp. 250.00

Rp 4,980.00 Bahan

1.0000 bh Kran air @ Rp. 45,000.00 = Rp. 45,000.000.0250 bh Seal tape @ Rp. 2,000.00 = Rp. 50.00

Rp 45,050.00 Rp 50,030.00

8 Memasang 1 buah floor drainUpah

0.0100 Oh Pekerja @ Rp. 28,000.00 = Rp. 280.000.1000 Oh Tukang batu @ Rp. 40,000.00 = Rp. 4,000.000.0100 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 450.000.0050 Oh Mandor @ Rp. 50,000.00 = Rp. 250.00

Rp 4,980.00

Memasang 1 buah bak mandi fiberglass volume 0,30 m3

Page 12: Rab Komplet Revi

Bahan1.0000 bh Floor drain @ Rp. 12,000.00 = Rp. 12,000.00

Rp 12,000.00 Rp 16,980.00

9 1 unit Pekerjaa septictank

5.16 galian tanah biasa @ Rp. 24,230.00 = Rp. 125,026.80

12.96 Pasangan 1/2 bata @ Rp. 45,080.00 = Rp. 584,236.80

16.7520 Plester aci @ Rp. 27,035.00 = Rp. 452,890.32

0.2100 Tutup beton @ Rp. 506,697.50 = Rp. 106,406.482.0000 bh @ Rp. 80,500.00 = Rp. 161,000.00

Rp 1,429,560.40 10 1 unit Sumur bor

Upah16.5142 Oh tukabg sumur @ Rp. 50,000.00 = Rp. 825,710.00

Rp 825,710.00 Bahan

30.0000 m' pipa 3/4' @ Rp. 4,375.00 = Rp. 131,250.001.0000 bh tusen @ Rp. 19,000.00 = Rp. 19,000.000.1600 % perlengkapan @ Rp. 150,250.00 = Rp. 24,040.00

Rp 174,290.00 Rp 1,000,000.00

11 Memasang 1 buah bak kontrol pasangan batu bata ukuran (30x30) cm, tinggi 35 cmUpah

3.2000 Oh Pekerja @ Rp. 28,000.00 = Rp. 89,600.001.0150 Oh Tukang batu @ Rp. 40,000.00 = Rp. 40,600.000.0015 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 67.500.0160 Oh Mandor @ Rp. 50,000.00 = Rp. 800.00

Rp 131,067.50 Bahan

80.0000 bh Batu bata @ Rp. 280.00 = Rp. 22,400.0044.0000 kg Semen portland @ Rp. 1,100.00 = Rp. 48,400.00

0.0700 Pasir pasang @ Rp. 101,000.00 = Rp. 7,070.00

0.0700 Koral beton @ Rp. 166,750.00 = Rp. 11,672.501.6000 kg Besi beton @ Rp. 10,750.00 = Rp. 17,200.00

0.0600 Pasir beton @ Rp. 110,000.00 = Rp. 6,600.00 Rp 113,342.50 Rp 244,410.00

J PEKERJAAN PENUTUP LANTAI DAN DINDING :

1 Pasang lantai keramik milan motif ukuran 40x40 cmUpah

0.2300 Oh Pekerja @ Rp. 28,000.00 = Rp. 6,440.000.2500 Oh Tukang batu @ Rp. 40,000.00 = Rp. 10,000.000.0160 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 720.000.0160 Oh Mandor @ Rp. 50,000.00 = Rp. 800.00

Rp 17,960.00 Bahan

1.0750 keramik milan 40x40 cm @ Rp. 39,500.00 = Rp. 42,462.5012.2000 kg Semen Portland @ Rp. 1,100.00 = Rp. 13,420.00

0.0750 Pasir pasang @ Rp. 101,000.00 = Rp. 7,575.001.3000 kg Semen warna @ Rp. 3,162.50 = Rp. 4,111.25

Rp 67,568.75 Rp 85,528.75

2 Pasang lantai keramik asia motif ukuran 20x20 cmUpah

0.1700 Oh Pekerja @ Rp. 33,000.00 = Rp. 5,610.000.1300 Oh Tukang batu @ Rp. 40,000.00 = Rp. 5,200.000.0120 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 540.000.0125 Oh Mandor @ Rp. 50,000.00 = Rp. 625.00

Rp 11,975.00 Bahan

1.0000 keramik asia 20x20 cm @ Rp. 36,800.00 = Rp. 36,800.009.8000 kg Semen Portland @ Rp. 1,100.00 = Rp. 10,780.00

0.0215 Pasir pasang @ Rp. 101,000.00 = Rp. 2,171.501.3000 kg Semen warna @ Rp. 3,162.50 = Rp. 4,111.25

Rp 53,862.75 Rp 65,837.75

3 Pasang dinding keramik asia 20x25 cmUpah

m3

m2

m2

m3

buis beton Ø60cm peresapan

m3

m3

m3

1 m2

m2

m3

1 m2

m2

m3

1 m2

Page 13: Rab Komplet Revi

0.4000 Oh Pekerja @ Rp. 28,000.00 = Rp. 11,200.000.1000 Oh Tukang batu @ Rp. 40,000.00 = Rp. 4,000.000.0450 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 2,025.000.0300 Oh Mandor @ Rp. 50,000.00 = Rp. 1,500.00

Rp 18,725.00 Bahan

1.0000 Keramik 20x25 cm @ Rp. 37,375.00 = Rp. 37,375.009.3000 kg Semen Portland @ Rp. 1,100.00 = Rp. 10,230.00

0.0180 Pasir pasang @ Rp. 101,000.00 = Rp. 1,818.001.5000 kg Semen warna @ Rp. 3,162.50 = Rp. 4,743.75

Rp 54,166.75 Rp 72,891.75

K PEKERJAAN CAT/PLITUR :

1 Pengecatan tembok merk property eksterior baru ( 1 lapis cat dasar, 3 lapis cat penutup)Upah

0.0400 Oh Pekerja @ Rp. 28,000.00 = Rp. 1,120.000.0670 Oh Tukang cat @ Rp. 35,000.00 = Rp. 2,345.000.0063 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 283.500.0025 Oh Mandor @ Rp. 50,000.00 = Rp. 125.00

. Rp 3,873.50 Bahan

0.2000 kg Cat dasar @ Rp. 15,600.00 = Rp. 3,120.000.3600 kg Cat penutup @ Rp. 15,600.00 = Rp. 5,616.00

Rp 8,736.00 Rp 12,609.50

2 Pengecatan tembok merk property interior baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)Upah

0.0400 Oh Pekerja @ Rp. 28,000.00 = Rp. 1,120.000.0670 Oh Tukang cat @ Rp. 35,000.00 = Rp. 2,345.000.0063 Oh Kepala tukang @ Rp. 42,500.00 = Rp. 267.750.0025 Oh Mandor @ Rp. 50,000.00 = Rp. 125.00

. Rp 3,857.75 Bahan

0.0750 kg Plamir @ Rp. 7,475.00 = Rp. 560.630.1300 kg Cat dasar @ Rp. 13,700.00 = Rp. 1,781.000.3600 kg Cat penutup @ Rp. 13,700.00 = Rp. 4,932.00

Rp 7,273.63 Rp 11,131.38

3 Pengecatan plafon baru (1 lapis cat dasar, 2 lapis cat penutup)Upah

0.0300 Oh Pekerja @ Rp. 28,000.00 = Rp. 840.000.0730 Oh Tukang cat @ Rp. 35,000.00 = Rp. 2,555.000.0073 Oh Kepala tukang @ Rp. 45,000.00 = Rp. 328.500.0025 Oh Mandor @ Rp. 50,000.00 = Rp. 125.00

. Rp 3,848.50 Bahan

0.2000 kg Cat dasar @ Rp. 13,700.00 = Rp. 2,740.000.2600 kg Cat penutup @ Rp. 13,700.00 = Rp. 3,562.00

Rp 6,302.00

12 Pengecatan permukaan baja dengan semprotUpah

0.2500 Oh Pekerja @ Rp. 28,000.00 = Rp. 7,000.000.2250 Oh Tukang cat @ Rp. 35,000.00 = Rp. 7,875.000.0250 Oh Kepala tukang @ Rp. 42,500.00 = Rp. 1,062.500.0075 Oh Mandor @ Rp. 50,000.00 = Rp. 375.00

. Rp 16,312.50 Bahan

0.1000 kg meni @ Rp. 16,100.00 = Rp. 1,610.000.3600 kg cat besi @ Rp. 55,000.00 = Rp. 19,800.00

Rp 21,410.00 Rp 37,722.50

L PEKRJAAN INSTALASI LISTRIK1 1 Titik lampu/stopkontak

Upah0.1850 Oh Pekerja @ Rp. 28,000.00 = Rp. 5,180.000.3950 Oh Tukang listrik @ Rp. 40,000.00 = Rp. 15,800.000.0010 Oh Mandor @ Rp. 50,000.00 = Rp. 50.00

. Rp 21,030.00 Bahan

7.0000 m kabel @ Rp. 6,612.50 = Rp. 46,287.501.0000 fiting/stopkontak @ Rp. 5,750.00 = Rp. 5,750.00

m2

m3

1 m2

1 m2

1 m2

1 m2

Page 14: Rab Komplet Revi

0.3400 % perlengkapan @ Rp. 6,612.50 = Rp. 2,248.25 Rp 54,285.75 Rp 75,315.75

2 1 bh Saklar dobelUpah

0.0150 Oh Tukang listrik @ Rp. 40,000.00 = Rp. 600.00. Rp 600.00

Bahan1.0000 m saklar tunggal @ Rp. 9,400.00 = Rp. 9,400.00

Rp 9,400.00 Rp 10,000.00

3 1 bh Saklar tunggalUpah

0.0150 Oh Tukang listrik @ Rp. 40,000.00 = Rp. 600.00. Rp 600.00

Bahan1.0000 m saklar tunggal @ Rp. 6,900.00 = Rp. 6,900.00

Rp 6,900.00 Rp 7,500.00

4 1 bh lampu SL 20 wattUpah

0.0563 Oh Tukang listrik @ Rp. 40,000.00 = Rp. 2,250.00. Rp 2,250.00

Bahan1.0000 bh lampu SL 20watt @ Rp. 27,750.00 = Rp. 27,750.00

Rp 27,750.00 Rp 30,000.00

5 1 bh lampu pijar 10 wattUpah

0.0625 Oh Tukang listrik @ Rp. 40,000.00 = Rp. 2,500.00. Rp 2,500.00

Bahan1.0000 bh lampu SL 20watt @ Rp. 7,500.00 = Rp. 7,500.00

Rp 7,500.00 Rp 10,000.00

6 1 bh lampu tamanUpah

0.0563 Oh Tukang listrik @ Rp. 40,000.00 = Rp. 2,250.00. Rp 2,250.00

Bahan1.0000 bh lampu SL 20watt @ Rp. 27,750.00 = Rp. 27,750.00

Rp 27,750.00 Rp 30,000.00

7 1 unit pompa air sedangUpah

0.7500 Oh Tukang listrik @ Rp. 40,000.00 = Rp. 30,000.00. Rp 30,000.00

Bahan1.0000 set mesin air @ Rp. 625,000.00 = Rp. 625,000.000.2000 % perlengkapan @ Rp. 625,000.00 = Rp. 125,000.00

Rp 750,000.00 Rp 780,000.00

8 1 unit pompa air kecilUpah

0.7500 Oh Tukang listrik @ Rp. 40,000.00 = Rp. 30,000.00. Rp 30,000.00

Bahan1.0000 set mesin air @ Rp. 300,000.00 = Rp. 300,000.000.2000 % perlengkapan @ Rp. 300,000.00 = Rp. 60,000.00

Rp 360,000.00 Rp 390,000.00

Page 15: Rab Komplet Revi
Page 16: Rab Komplet Revi

HARGA SATUAN POKOK KEGIATAN (HSPK)

No UraianHarga Satuan (Rp.)

Upah Bahan Pekerjaan

1 2 3 4 5

A EKERJAAN PERSIAPAN :

1 1Ls Barak dan pagar

2 1Ls Air kerja

3 1 m1 Pengukuran dan pemasangan bouwplank 7,775.00 16,885.00 24,660.00

-

B PEKERJAAN TANAH : -

1 1 m3 Galian tanah biasa 24,230.00 24,230.00

2 1 m3 Mengurug tanah kembali 6,326.00 6,326.00

3 1 m3 Urugan Tanah 10,000.00 36,750.00 46,750.00

4 1 m3 Urugan pasir 8,900.00 78,650.00 87,550.00

-

C PEKERJAAN PASANGAN -

Lantai 1

1 1 m3 Pasangan pondasi batu kali dgn 1PC : 8Ps 72,450.00 295,623.50 368,073.50

2 1 m3 Pasangan pondasi batu kosong 41,145.00 160,312.50 201,457.50

3 1 m2 Pasangan rolak bata merah tebal 1 bata, 1PC : 8Ps 28,100.00 57,515.00 85,615.00

4 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 8Ps 14,160.00 30,920.00 45,080.00

5 1 bh Pasangan roster semen 1,149.50 3,378.00 4,527.50

6 1 bh Pasang glasblok 2,587.00 16,825.00 19,412.00

Lantai 2

7 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 8Ps 15,576.00 30,920.00 46,496.00

-

D PEKERJAAN PLESTERAN : -

Lantai 1

1 1 m2 Plesteran dan acian 1PC : 8Ps tebal 15 mm 18,525.00 8,510.00 27,035.00

2 1 m1 Plesteran Skoning 1PC : 2Ps 3,377.00 752.00 4,129.00

3 1 m2 Pasang batu candi 11,845.00 96,311.00 108,156.00

4 1 m2 Plesteran siar 1PC : 2Ps 7,715.00 3,992.00 11,707.00

Lantai 2

5 1 m2 Plesteran dan acian 1PC : 8Ps tebal 15 mm 24,082.50 8,510.00 32,592.50

F PEKERJAAN BETON : -

1 1 m3 Membuat beton , 1Pc : 3Ps : 5Kr 64,625.00 442,072.50 506,697.50

2 1 m3 Pondasi Footplat 234,462.50 2,670,506.87 2,904,969.37

4 1 m3 Sloof 302,522.50 3,187,655.58 3,490,178.08

5 1 m3 Kolom 491,575.00 3,330,475.63 3,822,050.63

6 1 m3 Sloof/Kolom Praktis 295,605.00 2,243,719.17 2,539,324.17

7 1 m3 Balok 396,312.50 3,309,406.83 3,705,719.33

8 1 m3 Plat Lantai 375,575.00 2,628,563.13 3,004,138.13

9 1 m3 Plat Tangga 361,587.50 3,080,446.25 3,442,033.75

10 1 m3 Ringbalk 302,522.50 2,859,128.42 3,161,650.92

E PEKERJAAN PINTU DAN JENDELA -

1 Pasang Pintu Folding Besi 950,000.00

2 1 m' Kusen almunium 11,785.00 60,500.00 72,285.00

3 Pasang pintu alluminium (80x20) 45,710.00 207,000.00 252,710.00

4 1 Buah pasang engsel jendela 5,032.25 7,500.00 12,532.25

5 1 Buah pasang kait angin 5,044.75 12,500.00 17,544.75

6 1 m2 Pasang kaca bening, tebal 8 mm 7,545.00 93,500.00 101,045.00

J PEKERJAAN PENUTUP LANTAI DAN DINDING : -

1 1 m2 Pasang lantai keramik milan motif ukuran 40x40 cm 17,960.00 67,568.75 85,528.75

2 1 m2 Pasang lantai keramik asia motif ukuran 20x20 cm 11,975.00 53,862.75 65,837.75

3 1 m2 Pasang dinding keramik asia 20x25 cm 18,725.00 54,166.75 72,891.75

-

H PEKERJAAN LANGIT-LANGIT : -

1 1 m2 Langit-langit gypsum board, tebal 9 mm + rangka Hollo 25,287.50 60,081.80 85,369.30

2 1 m1 Pasang list Gipsum 1,625.50 12,075.00 13,700.50

1 m2

1 m2

Page 17: Rab Komplet Revi

-

G PEKERJAAN PENUTUP ATAP : -

1 1 m2 Pasang Rangka atap genteng metal 40,987.50 147,900.00 188,887.50

2 1 m2 Pasang atap genteng metal 10,375.00 132,600.00 142,975.00

1 m1 Pasang Nok genteng metal 14,737.50 60,500.00 75,237.50

-

I PEKERJAAN SANITASI : -

1 Memasang 1 buah kloset jongkok Porselin 63,750.00 97,610.00 161,360.00

3 Memasang 1 m' pipa PVC tipe AW diameter 3/4" 3,768.00 7,087.50 10,855.50

4 Memasang 1 m' pipa PVC diameter 3" 6,867.00 19,237.50 26,104.50

5 Memasang 1 m' pipa PVC diameter 4" 6,867.00 22,275.00 29,142.00

6 Memasang 1 buah kran SAN EI diameter 3/4" atau 1/2" 4,980.00 21,050.00 26,030.00

7 Memasang 1 buah bak mandi fiberglass volume 0,30 m3 61,460.00 221,100.00 282,560.00

8 Memasang 1 buah kran leher angsa 1/2" 4,980.00 45,050.00 50,030.00

9 Memasang 1 buah floor drain 4,980.00 12,000.00 16,980.00

Memasang 1 buah wastafel 175,000.00

10 1 unit Pekerjaa septictank 1,429,560.40

11 1 unit Sumur bor 825,710.00 174,290.00 1,000,000.00

12 Memasang 1 buah bak kontrol pasangan batu bata ukuran (30x30) cm, tinggi 35 cm 131,067.50 113,342.50 244,410.00

-

-

K PEKERJAAN CAT DAN PELITUR : -

1 1 m2 Pengecatan tembok merk property eksterior baru ( 1 lapis cat dasar, 3 lapis cat penutup) 3,873.50 8,736.00 12,609.50

2 1 m2 Pengecatan tembok merk property interior baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 3,857.75 7,273.63 11,131.38

3 1 m2 Pengecatan plafon baru (1 lapis cat dasar, 2 lapis cat penutup) 3,848.50 6,302.00 10,150.50

4 1 m2 Pengecatan permukaan baja dengan semprot 16,312.50 21,410.00 37,722.50

-

L PEKRJAAN INSTALASI LISTRIK

1 1 Titik lampu/stopkontak 21,030.00 54,285.75 75,315.75

2 1 bh Saklar dobel 600.00 9,400.00 10,000.00

3 1 bh Saklar tunggal 600.00 6,900.00 7,500.00

4 1 bh lampu SL 20 watt 2,250.00 27,750.00 30,000.00

5 1 bh lampu pijar 10 watt 2,500.00 7,500.00 10,000.00

6 1 bh lampu taman 2,250.00 27,750.00 30,000.00

7 1 unit pompa air sedang 30,000.00 750,000.00 780,000.00

8 1 unit pompa air kecil 30,000.00 360,000.00 390,000.00

-

Page 18: Rab Komplet Revi

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUKO

LOKASI : TAMANAN BANGUNTAPAN BANTUL

Harga Jumlah Total

No Uraian Pekerjaan Volume Satuan Satuan Harga Harga BOBOT

(Rp) (Rp) (Rp)

1 2 3 4 5 6 7 81) PEKERJAAN PERSIAPAN

1 pagar dan barak kerja 1.00 Ls 1,500,000.00 1,500,000.00 0.442 Air Kerja 1.00 Ls 1,000,000.00 1,000,000.00 0.29

3 Pengukuran&Pemasangan Bowplank 40.60 m¹ 24,660.00 1,001,196.00 0.29

3,501,196.00

LANTAI 12) PEKERJAAN TANAH

1 Galian tanah 108.13 24,230.00 2,620,052.90 0.77

2 Urugan Tanah kembali 32.44 6,326.00 205,214.05 0.06

3 Urugan Tanah 79.14 46,750.00 3,699,935.25 1.08

4 Urugan Pasir 25.57 87,550.00 2,238,312.06 0.65

8,763,514.253) PEKERJAAN PASANGAN

1 Pond.Batu kali 1pc : 8ps 29.09 368,073.50 10,707,478.96 3.13

2 Pas. Batu kosong 12.36 201,457.50 2,489,168.58 0.73

3 Pond rolak 1 bata 1pc : 8ps 4.65 85,615.00 398,109.75 0.12

4 Pas.Bata merah t 1/2 bata 1Pc:8Ps 203.32 45,080.00 9,165,665.60 2.68

5 Roster semen uk. 15x25 14.00 bh 4,527.50 63,385.00 0.02

6 pasang Gas blok 12.00 bh 19,412.00 232,944.00 0.07

23,056,751.894) PEKERJAAN PLESTERAN

1 Plesteran & acian 1Pc:8Ps, t=15mm 451.56 27,035.00 12,207,924.60 3.57

2 Sponengan 58.50 m¹ 4,129.00 241,546.50 0.07

12,449,471.105) PEKERJAAN BETON

1 Lantai kerja 1:3:5 0.45 506,697.50 225,733.74 0.07

2 Rabat lantai 1:3:5 5.67 506,697.50 2,874,494.92 0.84

3 Rabat Parkir 1:3:5 7.07 506,697.50 3,581,337.93 1.05

4 Footplat 4.07 2,904,969.37 11,827,582.78 3.46

5 Sloof 15/30 2.74 3,490,178.08 9,564,833.04 2.79

6 Sloof 10/15 0.48 2,539,324.17 1,220,399.19 0.36

7 Kolom 15/45 2.43 3,822,050.63 9,287,583.02 2.71

8 Kolom 25/25 0.50 3,822,050.63 1,911,025.31 0.56

9 Kolom Praktis 1.26 2,539,324.17 3,199,548.45 0.93

10 Balok 20/45 0.54 3,705,719.33 2,001,088.44 0.58

11 Balok 20/35 0.45 3,705,719.33 1,667,573.70 0.49

12 Balok 15/35 3.00 3,705,719.33 11,128,275.16 3.25

13 Balok 15/30 0.69 3,705,719.33 2,551,387.76 0.75

14 Balok 15/25 0.48 3,705,719.33 1,764,848.83 0.52

15 Plat Lantai 11.08 3,004,138.13 33,273,833.87 9.72

16 Plat Beton topi 1.12 2,539,324.17 2,833,885.77 0.83

17 Tangga 2.01 3,442,033.75 6,906,096.52 2.02

105,819,528.426) PEKERJAAN PINTU DAN JENDELA

1 Pasang pintu folding besi 27.30 m2 950,000.00 25,935,000.00 7.58

2 Pasang pintu alumunium km/wc 2.00 unit 252,710.00 505,420.00 0.15

26,440,420.007) PEKERJAAN PENUTUP LANTAI

1 Keramik lantai utama & teras 40/40 112.58 85,528.75 9,628,826.68 2.81

2 Keramik Tangga 20.72 85,528.75 1,772,155.70

3 Keramik lantai km/wc 20/20 6.16 65,837.75 405,560.54 0.12

4 Dinding Keramik km/wc 20/25 22.50 72,891.75 1,640,064.37 0.48

13,446,607.298) PEKERJAAN LANGIT-LANGIT

1 Pasang Plafon Gypsum board 96.95 85,369.30 8,276,553.64 2.42

2 List profil gypsum 69.30 m¹ 13,700.50 949,444.65 0.28

m3

m3

m3

m3

m3

m3

m2

m2

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

Page 19: Rab Komplet Revi

9,225,998.299) PEKERJAAN CAT

1 Cat dinding exterior merk property 82.80 12,609.50 1,044,066.60 0.30

2 Cat dinding interior merk Property 272.23 11,131.38 3,030,316.48 0.89

3 Cat plafond 96.95 10,150.50 984,090.98 0.29

4 Cat Pintu Folding 54.60 37,722.50 2,059,648.50 0.60

7,118,122.5510) PEKERJAAN SANITASI

1 Klosed jongkok 2.00 bh 161,360.00 322,720.00 0.09

2 Pipa PVC 3/4" 25.00 m¹ 10,855.50 271,387.50 0.08

3 Pipa PVC 3" 45.00 m¹ 26,104.50 1,174,702.50 0.34

4 Pipa PVC 4" 33.00 m¹ 29,142.00 961,686.00 0.28

5 Kran 1/2" 2.00 bh 26,030.00 52,060.00 0.02

6 Bak air fiber 2.00 bh 282,560.00 565,120.00 0.17

7 Kran leher angsa1/2" 1.00 bh 50,030.00 50,030.00 0.01

8 Floor drain stainless 2.00 unit 16,980.00 33,960.00 0.01

10 wastafel 1.00 unit 175,000.00 175,000.00 0.05

12 Septictank 1.00 unit 1,429,560.40 1,429,560.40 0.42

13 Sumur bor 1.00 Ls 1,000,000.00 1,000,000.00 0.29

6,036,226.4011) PEKERJAAN INSTALASI LISTRIK

1 Titik lampu 17.00 ttk 75,315.75 1,280,367.75 0.37

2 Stop kontak 8.00 ttk 75,315.75 602,526.00 0.18

3 Saklar Ganda 7.00 bh 10,000.00 70,000.00 0.02

4 Saklar Tunggal 3.00 bh 7,500.00 22,500.00 0.01

5 Lampu SL 20 Watt 10.00 bh 30,000.00 300,000.00 0.09

6 Lampu pijar 10 watt (teras) 7.00 bh 10,000.00 70,000.00 0.02

7 Pompa Air 1.00 bh 780,000.00 780,000.00 0.23

3,125,393.75

LANTAI 212) PEKERJAAN PASANGAN

1 Pas.Bata merah t 1/2 bata 1Pc:8Ps 170.52 46,496.00 7,928,497.92 2.32

2 pasang Gas blok 6.00 bh 19,412.00 116,472.00 0.03

8,044,969.9213) PEKERJAAN PLESTERAN

1 Plesteran & acian 1Pc:8Ps, t=15mm 385.96 32,592.50 12,579,401.30 3.67

2 Pasang Batu candi 9.36 108,156.00 1,012,340.16

3 Sponengan 92.00 m¹ 4,129.00 379,868.00 0.11

13,971,609.4614) PEKERJAAN BETON

1 Kolom 15/45 2.43 3,822,050.63 9,287,583.02 2.71

2 Kolom 25/25 0.25 3,822,050.63 955,512.66 0.28

3 Kolom Praktis 0.63 2,539,324.17 1,599,774.23 0.47

4 Ringbalk 15/25 2.85 3,161,650.92 8,998,848.92 2.63

5 Talang beton 3.13 3,004,138.13 9,402,952.33 2.75

6 Plat Beton topi/dak 1.61 3,004,138.13 4,836,662.38 1.41

35,081,333.5315) PEKERJAAN PINTU DAN JENDELA

1 Pasang kusen jendela almunium 43.20 72,285.00 3,122,712.00 0.91

2 Kaca Bening, t=8mm 17.28 101,045.00 1,746,057.60 0.51

4,868,769.6016) PEKERJAAN PENUTUP ATAP

1 Rangka atap baja ringan 102.30 188,887.50 19,323,191.25 5.64

2 Genteng metalroof 118.75 142,975.00 16,978,281.25 4.96

3 nok genteng metal roof 25.00 m¹ 75,237.50 1,880,937.50 0.55

38,182,410.0017) PEKERJAAN LANGIT-LANGIT

1 Pasang Plafon Gypsum board 102.30 85,369.30 8,733,279.39 2.55

2 List profil gypsum 40.60 m¹ 13,700.50 556,240.30 0.16

9,289,519.6918) PEKERJAAN SANITASI

1 Pipa PVC 3" 32.00 m¹ 26,104.50 835,344.00 0.24

835,344.0019) PEKERJAAN PENUTUP LANTAI

m2

m2

m2

m2

m2

m2

m2

m3

m3

m3

m3

m3

m3

m1

m2

m2

m2

m2

Page 20: Rab Komplet Revi

1 Keramik lantai utama 40/40 92.70 85,528.75 7,928,515.13 2.32

7,928,515.1320) PEKERJAAN CAT

1 Cat dinding exterior merk property 82.40 12,609.50 1,039,022.80 0.30

2 Cat dinding interior merk Property 170.52 11,131.38 1,898,122.07 0.55

3 Cat plafond 102.30 10,150.50 1,038,396.15 0.30

3,975,541.0221) PEKERJAAN INSTALASI LISTRIK

1 Titik lampu 7.00 ttk 75,315.75 527,210.25 0.15

2 Stop kontak 5.00 ttk 75,315.75 376,578.75 0.11

3 Saklar Ganda 2.00 bh 10,000.00 20,000.00 0.01

4 Saklar Tunggal 3.00 bh 7,500.00 22,500.00 0.01

5 Lampu SL 20 Watt 7.00 bh 30,000.00 210,000.00 0.06

1,156,289.00

REAL COST 342,317,531.28 99.19

m2

m2

m2

m2

Page 21: Rab Komplet Revi

REKAPITULASI

PEKERJAAN : PEMBANGUNAN RUKO

LOKASI : TAMANAN BANGUNTAPAN BANTUL

NO MACAM PEKERJAAN

1 PEKERJAAN PERSIAPAN

2 PEKERJAAN TANAH

3 PEKERJAAN PASANGAN

4 PEKERJAAN PLESTERAN

5 PEKERJAAN BETON

7 PEKERJAAN PENUTUP LANTAI

8 PEKERJAAN PENUTUP ATAP

9 PEKERJAAN LANGIT-LANGIT

10 PEKERJAAN CAT

11 PEKERJAAN SANITASI

12 PEKERJAAN INSTALASI LISTRIK

JUMLAH NOMINAL

JASA PEMBORONG 7%

JUMLAH NOMINAL

PPN 10%

TOTAL

DIBULATKAN

Page 22: Rab Komplet Revi

REKAPITULASI

PEKERJAAN : PEMBANGUNAN RUKO

JUMLAH HARGA

Rp. 3.501.196,00

Rp. 8.763.514,25

Rp. 31.101.721,81

Rp. 26.421.080,56

Rp. 140.900.861,9

Rp. 13.446.607,29

Rp. 38.182.421,00

Rp. 18.515.517,98

Rp. 11.093.663,57

Rp. 6.871.570,4

Rp. 4.281.682,75

Rp. 342.317.531,280

Rp. 23.962.227,18

Rp. 366.279.758,4

Rp. 36.627.975,84

Rp. 402.907.734,2

Rp. 402.907.750,00