Rekap AwalREKAPITULASI ANGGARAN BIAYAREKAPITULASI ANGGARAN BIAYAREKAPITULASI ANGGARAN BIAYAREKAPITULASI ANGGARAN BIAYAPEMBANGUNAN RUMAH PRIBADIPEMBANGUNAN RUMAH PRIBADIDr. dr. H. Rachmat Latif, SpPD - KTPI, M.Kes, FINASIMDr. dr. H. Rachmat Latif, SpPD - KTPI, M.Kes, FINASIM

NOURAIAN PEKERJAANHARGA TOTALNOURAIAN PEKERJAAN HARGA TOTALNOURAIAN PEKERJAAN HARGA TOTALNOURAIAN PEKERJAAN HARGA TOTALIBIAYA KONSTRUKSI LANTAI 1IBIAYA KONTRUKSI LANTAI 11PEKERJAAN PERSIAPANRp57,171,523.081PEKERJAAN PERSIAPANRp57,171,523.08APEKERJAAN PERSIAPANRp.24,608,214.001.634913356619,703,473.933,940,694.7915,762,779.14APEKERJAAN PERSIAPANRp15,762,779.142PEKERJAAN STRUKTURRp298,311,517.562PEKERJAAN STRUKTURRp298,311,517.56BPEKERJAAN TANAH DAN PASIRRp.64,645,658.164.2951,760,929.9210,352,185.9841,408,743.94BPEKERJAAN TANAH & PASIRRp41,408,743.943PEKERJAAN ARSITEKTURRp415,528,966.623PEKERJAAN ARSITEKTURRp415,528,966.62CPEKERJAAN PONDASIRp.16,817,185.391.1213,465,299.592,693,059.9210,772,239.67CPEKERJAAN PONDASIRp20,772,239.674PEKERJAAN ELECTRICALRp26,340,288.644PEKERJAAN ELECTRICALRp56,340,288.64DPEKERJAAN BETON DAN BEKISTINGRp.236,502,525.9715.71189,364,468.0937,872,893.62151,491,574.48DPEKERJAAN BETON & BEKISTINGRp131,491,574.485PEKERJAAN MEPRp36,659,259.875PEKERJAAN MEPRp66,659,259.87EPEKERJAAN PASANGAN & LANTAIRp.351,656,850.5923.36281,567,024.2456,313,404.85225,253,619.40EPEKERJAAN PASANGAN & LANTAIRp145,253,619.40FPEKERJAAN KUSEN, PINTU & JENDELARp.43,771,111.702.9135,046,954.587,009,390.9228,037,563.66FPEKERJAAN KUSEN, PINTU & JENDELARp38,037,563.66TOTAL HARGA KONSTRUKSIRp834,011,555.77TOTAL HARGA KONSTRUKSIRp894,011,555.77GPEKERJAAN PLAFONDRp.15,929,662.291.0612,754,671.502,550,934.3010,203,737.20GPEKERJAAN PLAFONDRp10,203,737.20LUAS BANGUNANM 160.00LUAS BANGUNANM 160.00HPEKERJAAN PENGECATANRp.44,912,899.912.9835,961,169.417,192,233.8828,768,935.53HPEKERJAAN PENGECATANRp28,768,935.53HARGA PERMETERRp5,212,572.22HARGA PERMETERRp5,587,572.22IPEKERJAAN SANITAIR / PLUMBINGRp.39,352,531.332.6131,509,055.276,301,811.0525,207,244.22IPEKERJAAN SANITAI & PLUMBINGRp25,207,244.22JPEKERJAAN LISTRIKRp.23,718,560.001.5818,991,139.653,798,227.9315,192,911.72JPEKERJAAN LISTRIKRp15,192,911.72KPEKERJAAN ATAPRp.9,471,000.000.637,583,305.381,516,661.086,066,644.30KPEKERJAAN LANSCAPERp11,653,200.34LPEKERJAAN LANSCAPERp.37,912,490.872.5230,356,033.786,071,206.7624,284,827.03LSECONDARY SKINRp8,671,013.11MSECONDARY SKINRp.13,536,835.360.9010,838,766.382,167,753.288,671,013.11MPEKERJAAN INTERIORRp81,600,524.00Makassar, 28 Mei 2014Makassar, 28 Mei 2014NPEKERJAAN PEMBERSIHANRp.6,584,202.000.445,271,884.111,054,376.824,217,507.29NPEKERJAAN PEMBERSIHANRp4,217,507.290.00.0Menyetujui,CV. SURYA CIPTA MANDIRICV. SURYA CIPTA MANDIRIIIBIAYA KONSTRUKSI LANTAI 20.00.0IIBIAYA KONTRUKSI LANTAI II0.00.0APEKERJAAN BETON DAN BEKISTINGRp.64,821,7724.3151,901,941.9110,380,388.3841,521,553.52APEKERJAAN BETON & BEKISTINGRp41,521,553.52BPEKERJAAN PASANGAN & LANTAIRp.295,851,659.8719.66236,884,540.5647,376,908.11189,507,632.45BPEKERJAAN PASANGAN & LANTAIRp92,507,632.45Dr. dr. H. Rachmat Latif, SpPd - KTPI, M.Kes FINASIMIr. Khaidir TarjonoDr. dr. H. Rachmat Latif, SpPd - KTPI, M.Kes FINASIMIr. Khaidir TarjonoCPEKERJAAN KUSEN, PINTU & JENDELARp.26,052,776.141.7320,860,115.874,172,023.1716,688,092.70CPEKERJAAN KUSEN, PINTU & JENDELARp16,688,092.70OWNERDIREKTUR TEKNIKOWNERDIREKTUR TEKNIKDPEKERJAAN PLAFONDRp.15,061,018.931.0012,059,160.162,411,832.039,647,328.13DPEKERJAAN PLAFONDRp9,688,092.70EPEKERJAAN ATAPRp.95,472,300.006.3476,443,417.3915,288,683.4861,154,733.91EPEKERJAAN PENGECATANRp20,583,737.00FPEKERJAAN PENGECATANRp.32,134,500.002.1325,729,672.335,145,934.4720,583,737.87FPEKERJAAN SANITAI & PLUMBINGRp11,452,015.65GPEKERJAAN SANITAIR / PLUMBINGRp.17,878,424.501.1914,315,019.822,863,003.9611,452,015.85GPEKERJAAN LISTRIKRp8,621,066.03HPEKERJAAN LISTRIKRp.13,458,860.000.8910,776,332.532,155,266.518,621,066.03HSECONDARY SKINRp8,093,648.48ISECONDARY SKINRp.10,108,381.630.678,093,648.481,618,729.706,474,918.79IPEKERJAAN INTERIORRp37,557,224.81JPEKERJAAN PEMBERSIHANRp.4,909,884.000.333,931,279.67786,255.933,145,023.74JPEKERJAAN PEMBERSIHANRp3,145,023.740.0IIIBIAYA KONSTRUKSI LANTAI 3IIIBIAYA KONSTRUKSI LANTAI 3

APEKERJAAN BETON & BEKISTINGAPEKERJAAN BETON & BEKISTINGRp26,788,921.80BPEKERJAAN PASANGAN & LANTAIBPEKERJAAN PASANGAN & LANTAIRp9,622,340.00CPEKERJAAN KUSEN, PINTU & JENDELARp.0.0CPEKERJAAN KUSEN, PINTU & JENDELARp6,326,734.6052.32DPEKERJAAN ATAP1,205,169,304.58DPEKERJAAN ATAPRp66,443,417.3957.76EPEKERJAAN PENGECATANEPEKERJAAN PENGECATANRp9,430,619.4521.667FPEKERJAAN LISTRIKFPEKERJAAN LISTRIKRp2,526,310.89131.747GPEKERJAAN PEMBERSIHANGPEKERJAAN PEMBERSIHANRp3,931,279.67TOTAL HARGA KONSTRUKSIRp953,169,304.58PPN 10%Rp95,316,930.46TOTAL HARGA KONSTRUKSIRp.1,505,169,304.581,205,169,304.58LUAS BANGUNANM 80.750PPN 10%Rp.150,516,930.46HARGA PERMETERRp11,803,954.24JASA KONTRUKSI 7%Rp.105,361,851.32TOTAL BIAYA Rp.1,761,048,086.36Makassar, 28 Mei 2014LUAS BANGUNANM509.60HARGA PERMETERRp.3,455,745.85SURYA CIPTA MANDIRI

Makassar, 28 Mei 2014M. YANTOSURYA CIPTA MANDIRIDIREKTUR

M. YANTODIREKTUR

RABRENCANA ANGGARAN BIAYA (RAB)PEKERJAAN PEMBANGUNAN RUMAH TINGGAL PERMANEN Dr. dr. H. Rachmat Latif, SpPD - KTPI, M.Kes, FINASIMJALAN PONTIKU, MAKASSAR

NO.URAIAN PEKERJAANVOLUMESAT.HARGA JUMLAHSATUANBIAYA(Rp.)(Rp.)LANTAI 1IPEKERJAAN PERSIAPAN1Pengukuran dan Pas. Bouwplank1.00Ls0.0Jumlah (I)0.0IIPEKERJAAN TANAH DAN PASIR1Galian Tanah Pondasi Batu Gunung/KaliM0.02Urugan Kembali Bekas Galian0.0M0.03Timb. TanahM30.04Urugan Pasir Bawah Pas. Pondasi Batu GunungM0.05Urugan Pasir Bawah LantaiM0.0Jumlah (II)0.0IIIPEKERJAAN BETON1Beton SloofM0.02Beton KolomM0.03Beton Plat Teras t = 10 cmM0.04Beton Balok plat terasM0.05Beton kolom terasM0.06Beton RingbalkM0.07Meja Beton dapurM0.08Sopi-sopiM30.09Beton tumbuk CarportM30.010Pas. Bekisting SloofM0.011Pas. Bekisting KolomM0.012Pas. Bekisting plat terasM0.013Pas. Bekisting Balok plat terasM0.014Pas. Bekisting RingbalkM0.015Pekerjaan Besi BetonKg0.0Jumlah (III)0.0IVPEKERJAAN PASANGAN & LANTAI1Pas. Batu KosongM0.02Pas. Pondasi Batu Gunung camp 1 : 5M0.03Pas. Batu Bata trasram camp 1 : 3M0.04Pas. Dinding batu bata camp 1 : 5M0.05Plesteran Dinding trasram camp 1 : 30.0M0.06Plesteran dinding & beton camp 1 : 5 0.0M0.07Acian Dinding0.0M20.08Pek. Batu bata bawah lantai (dalam ruangan)M0.09Pek. Batu bat bawah lantai (Luar ruangan)M0.010Pek. Lantai Granit ukr 60 x 60 cmM0.011Pek. Lantai KM/WC 20 x 20 cm warnaM0.012Pas. Tegel keramik dinding KM/WC 20 x 40 cmM0.013Pas. Tegel keramik meja dapur+dinding 20 x 25 cmM0.014Pas. Plint LantaiM'0.0Jumlah (IV)0.0

VPEKERJAAN KUSEN, PINTU & JENDELA1Kusen Pintu Jendela Type PJ.1Unit0.02Kusen Pintu Jendela Type PJ.2Unit0.03Kusen Pintu Type P.1Unit0.04Kusen Jendela Type J.1Unit0.05Kusen Jendela Type J.2Unit0.06Kusen Jendela Type J.3Unit0.07Kusen Ventilasi Type V.1Bh0.08Kusen + Pintu KM/WCUnit0.09Pek. Pintu PanilM0.010Pek. Daun JendelaM0.011Pek. Kaca Mati 5mmM0.012Kunci PintuUnit0.013Engsel PintuPsg0.014Engsel JendelaPsg0.015Grendel Kodok JendelaBh0.016Hak AnginPsg0.0Jumlah (V)0.0VIPEKERJAAN PLAFOND1Pek. Plafond gypsum 4 mmM0.02Pek Rangka PlafondM0.03List plafond (profil)0.0M'0.0Jumlah (VI)0.0VIIPEKERJAAN ATAP DAN LISPLANK1Pek. Pas. Rangka Atap Baja RinganM0.02Pek. Pas. Atap Genteng Beton0.0M0.03Pek. Pas. Nok Genteng BetonM'0.04Pek. Lisplank woodplank (2 x 1/20)M'0.0Jumlah (VII)0.0VIIIPEKERJAAN PENGECATAN1Cat dinding Tembok0.0M0.02Cat Plafond0.0M0.03Kompound 0.0M0.04Cat KayuM0.0Jumlah (VIII)0.0IXPEKERJAAN SANITAIR / PLUMBING1Pas. Kran AirBh0.02Pas. Kran Leher angsa (pada Kitchen sink)Bh0.03Pas. Kloset Duduk + accesoriesBh0.04Pas. Wastafel TempelBh0.05Pasang Kitchen sinkBh0.06Inst. Pipa Air bersih 1/2" (AW)M'0.07Inst. Pipa Air bersih 3/4" (AW)M'0.08Inst. Pipa buangan Air mandi/cuci 2" (AW)M'0.09Inst. Pipa Air kotor 3" (D)M'0.010Sambugan Pipa L 1/2" Bh0.011Sambugan Pipa T 1/2" Bh0.012Sambungan Pipa L 2" Bh0.013Sambungan pipa T 2" Bh0.014Sambungan Pipa L 3" Bh0.015Sambungan Pipa T 3" Bh0.016Pas. Floor DrainBh0.017SeptictankUnit0.018Pek. Peresapan dari septictankUnit0.0Jumlah (IX)0.0

XPEKERJAAN LISTRIK1Instalasi LampuTtk0.02Instalasi titik stop kontakTtk0.03Fitting tempelBh0.04Stop KontakBh0.05Saklar tunggalBh0.06Saklar GandaBh0.07Kabel NYM 3 x 2,5 mmM'0.08Kabel NYM 2 x 2,5 mmrol0.09Kabel NYM 2 x 1,5 mmrol0.010T- dosBh0.011Inbow box segi empatBh0.012ArdeSet0.013MCB + Kontakset0.0Jumlah (X)0.0

XIPEKERJAAN PEMBERSIHAN1Pembersihan Sisa Bahan Bangunanls350,000.000.02Pek. Alur PlesteranM'6,000.000.0Jumlah (XI)0.0

AnalisaDAFTAR ANALISA HARGA SATUANPA6.4Pengukuran dan Pemasangan bouplank

6.4.1.Bahan-Kayu 5/70.012M3xRp2,934,000=Rp35,208.00-Paku biasa 2" - 5"0.020KgxRp15,300=Rp306.00-Kayu papan 3/200.007M3xRp2,934,000=Rp20,538.00Jumlah (1)=Rp56,052.00

6.4.2.Tenaga-Tukang kayu0.100OhxRp50,000=Rp5,000.00-Pekerja0.100OhxRp55,000=Rp5,500.00-Kepala tukang0.010OhxRp80,000=Rp800.00-Mandor0.005OhxRp90,000=Rp450.00Jumlah (2)=Rp11,750.00Jumlah (1) + (2)=Rp67,802.00

Daftar HargaDAFTAR HARGA BAHAN & MATERIALKOTA MAKASSAR2014NOURAIANKETERANGANSATUANHARGA SATUAN

I.BATA, BATU DAN PASIR 1Bata Merahbh610.002Batako Pres uk. 39x19x9 cmbh2,300.003Bata Beton ringan ex Hebelm35,100.004Batu Belah Pondasim3152,100.005Batu Split Pecah Mesin 1/2m3159,900.006Batu Split Pecah Mesin 2/3m3159,900.007Batu Split Pecah Mesin 3/5m3167,700.008Batu Split Pecah Mesin 5/7m3148,200.009Batu Bronjolkrng46,800.0010Batu Bataco 6x12x24 cmbh4,180.0011Batu kali/gunungm3132,000.0012Abu batu 5mmm3148,200.0013Sirtum3124,800.0014Pasir Betonm3163,800.0015Pasir Pasangm3159,900.0016Pasir Urugm3117,000.0017Pasir putihm3202,800.0018Tanah Urugm339,000.0019Tanah Timbun/Merahm395,000.002