RAB FILE - Konstruksi Rumah Panggung

120
1 Balok 30/50 A = 0.1500 1/A = 6.6667 Utama dia 19 12 = 178.4000 kg dia 12 2 = 11.8267 kg = 190.2267 kg sengkang dia 10 0.1250 54.0000 1.6 = 53.5680 kg = 53.5680 kg = 243.7947 kg 2 Balok 30/40 A = 0.1200 1/A = 8.3333 Utama dia 19 7 = 130.0833 kg dia 14 2 = 20.1500 kg = 150.2333 kg sengkang dia 10 0.1250 67.0000 1.4 = 58.1560 kg = 58.1560 kg = 208.3893 kg 3 Balok Anak 25/35 A = 0.0875 1/A = 11.4286 Utama dia 19 7 = 178.4000 kg dia 12 2 = 20.2743 kg = 198.6743 kg sengkang dia 10 0.1250 92.0000 1.2 = 68.4480 kg = 68.4480 kg = 267.1223 kg 4 Sloop / Balok Anak 20/30 A = 0.0600 1/A = 16.6667 Utama dia 16 6 = 158.0000 kg dia 12 2 = 29.5667 kg

description

konstruksi rumah panggung RAB

Transcript of RAB FILE - Konstruksi Rumah Panggung

Page 1: RAB FILE - Konstruksi Rumah Panggung

1 Balok 30/50A = 0.1500

1/A = 6.6667Utama

dia 19 12 = 178.4000 kgdia 12 2 = 11.8267 kg

= 190.2267 kgsengkang

dia 100.1250

54.0000 1.6 = 53.5680 kg= 53.5680 kg

= 243.7947 kg

2 Balok 30/40A = 0.1200

1/A = 8.3333Utama

dia 19 7 = 130.0833 kgdia 14 2 = 20.1500 kg

= 150.2333 kgsengkang

dia 100.1250

67.0000 1.4 = 58.1560 kg= 58.1560 kg

= 208.3893 kg

3 Balok Anak 25/35A = 0.0875

1/A = 11.4286Utama

dia 19 7 = 178.4000 kgdia 12 2 = 20.2743 kg

= 198.6743 kgsengkang

dia 100.1250

92.0000 1.2 = 68.4480 kg= 68.4480 kg

= 267.1223 kg

4 Sloop / Balok Anak 20/30A = 0.0600

1/A = 16.6667Utama

dia 16 6 = 158.0000 kgdia 12 2 = 29.5667 kg

= 187.5667 kgsengkang

dia 100.1250

Page 2: RAB FILE - Konstruksi Rumah Panggung

134.0000 1 = 83.0800 kg= 83.0800 kg

= 270.6467 kg

9 kolom 20/20A = 0.0400

1/A = 25.0000Utama

dia 12 8 = 177.4000 kg

= 177.4000 kgsengkang

dia 100.1250

201.0000 0.8 = 99.6960 kg= 99.6960 kg

= 277.0960 kg

Page 3: RAB FILE - Konstruksi Rumah Panggung

5 Balok 15/20A = 0.0300

1/A = 33.3333Utama

dia 12 5 = 147.8333 kgdia 10 0 = 0.0000 kg

= 147.8333 kgsengkang

dia 80.1250

267.0000 0.7 = 73.4517 kg= 73.4517 kg

= 221.2850 kg

6 Balok / Kolom 15/15A = 0.0225

1/A = 44.4444Utama

dia 12 4 = 157.6889 kg

= 157.6889 kgsengkang

dia 80.1500

297.0000 0.6 = 70.0326 kg= 70.0326 kg

= 227.7215 kg

7 Kolom 40/40A = 0.1600

1/A = 6.2500Utama

dia 16 8 = 79.0000 kg

= 79.0000 kgsengkang

dia 100.1200

53.0000 1.6 = 52.5760 kg= 52.5760 kg

= 131.5760 kg

8 Kolom 20/340A = 0.0800

1/A = 12.5000Utama

dia 16 4 = 79.0000 kgdia 12 2 = 22.1750 kg

= 101.1750 kgsengkang

dia 100.1200

Page 4: RAB FILE - Konstruksi Rumah Panggung

105.0000 1.2 = 78.1200 kg= 78.1200 kg

= 179.2950 kg

A = 0.08001/A = 12.5000

Utamadia 16 0 = 0.0000 kgdia 12 0 = 0.0000 kg

= 0.0000 kgsengkang

dia 100.1200

105.0000 0 = 0.0000 kg= 0.0000 kg

= 0.0000 kg

Page 5: RAB FILE - Konstruksi Rumah Panggung

DAFTAR HARGA SATUAN

Proyek :

NO. URAIAN UPAH / BAHAN SATUAN HARGA SATUAN

UPAH

1 Mandor hari Rp. 70,000.00

2 Kepala tukang hari Rp. 70,000.00

3 Tukang (batu, kayu, besi, cat) hari Rp. 65,000.00

4 Pekerja hari Rp. 45,000.00

BAHAN

1 Air ltr Rp. 65.00

2 Ampelas lbr Rp. 3,780.00

3 Balok bekisting (kayu kelas III) m3 Rp. 1,825,200.00

4 Balok lanan (kayu kelas II) m3 Rp. 2,430,100.00

5 Balok ulin (kayu kelas I) m3 Rp. 4,738,900.00

6 Batu bata bj Rp. 400.00

7 Batu cor/kerikil m3 Rp. 79,400.00

8 Batu kali/batu gunung m3 Rp. 106,900.00

9 Bendrat/kawat besi beton kg Rp. 18,000.00

10 Beugel kg Rp. 17,000.00

11 Besi beton polos kg Rp. 14,500.00

12 Besi beton ulir kg Rp. 16,000.00

13 Cat dasar kg Rp. 16,400.00

14 Cat kilap setara "Danalac" kg Rp. 34,700.00

15 Cat tembok setara "Danabrite" (interior) kg Rp. 29,400.00

16 Cat meni kg Rp. 18,900.00

17 Ceiling panel/gypsum bertekstur type byhua 9 mm m2 Rp. 95,000.00

+ exposed grid ceiling systems

18 Closed jongkok warna bh Rp. 227,100.00

19 Closed duduk warna (lengkap) bh Rp. 2,271,900.00

20 Dempul kg Rp. 16,400.00

21 Engsel Nylon 3" kualitas Baik psg Rp. 9,460.00

22 Engsel Nylon 4" kualitas Baik psg Rp. 11,300.00

23 Espagnolet tanam (SES) psg Rp. 50,400.00

24 Formtie bh Rp. 2,800.00

25 Floor drain bh Rp. 15,000.00

26 Handle jendela bh Rp. 6,000.00

27 Galam sedang dia 3,5 - 5 cm bh Rp. 3,750.00

28 Genteng Metal 3.5 mm dua susun lbr Rp. 34,000.00

29 Grendel kualitas baik bj Rp. 7,570.00

30 Kaca polos tebal 5 mm m2 Rp. 63,100.00

31 Kaca polos tebal 8 mm m2 Rp. 105,000.00

32 Kait angin kualitas baik bh Rp. 4,410.00

33 Kalsiborad Lbr Rp. 165,000.00

34 Kran ledeng stainless bh Rp. 9,000.00

35 Keramik uk. 20x20 warna m2 Rp. 57,000.00

36 Keramik uk. 30 x 30 warna m2 Rp. 63,000.00

37 Keramik uk. 40 x 40 warna m2 Rp. 80,000.00

J48
Rekadaya: cek harga
Page 6: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN UPAH / BAHAN SATUAN HARGA SATUAN

38 Kerawang bh Rp. 7,500.00

39 Kuda-kuda baja ringan zincalum m2 Rp. 175,000.00

40 Kunci pintu

- Kunci Tanam 2 Slaag Kualitas Baik set Rp. 113,500.00

- Kunci Tanam 2 Slaag Kualitas Sedang set Rp. 94,600.00

- Kunci Tanam 1 Slaag Kualitas Baik set Rp. 50,400.00

41 Lampu Down Light SL 1 x 20 watt ( RD 150 E27 ) set Rp. 162,500.00

42 Lampu Baret TL + Ring 32 w ( CCB 32 ACR + Ring ) set Rp. 342,100.00

43 Lampu hemat energi 18 watt bh Rp. 32,000.00

44 Lampu RM Acrilic TL 2 x 18 watt ( RM 300 2 x 18 ACR ) set Rp. 594,000.00

45 Lem kayu kg Rp. 20,000.00

46 Lem Vinyl kg Rp. 30,000.00

47 List Kayu Profil m1 Rp. 3,000.00

48 Minyak bekisting ltr Rp. 2,850.00

49 Minyak Cat ltr Rp. 15,700.00

50 Multiplek tebal 9 mm lbr Rp. 138,800.00

51 Nok Atap Genteng Metal bh Rp. 18,500.00

52 Paku biasa kg Rp. 20,100.00

53 Paku plywood kg Rp. 30,000.00

54 Paku ulin kg Rp. 25,200.00

55 Paku sekrup kg Rp. 28,500.00

56 Paku genteng metal kg Rp. 17,500.00

57 Pancangan galam dia 10/12 cm panjang 400 cm btg Rp. 13,200.00

58 Pancangan galam dia 10/12 cm panjang 700 cm btg Rp. 23,400.00

59 Papan bekisting (kayu kelas III) m3 Rp. 1,951,500.00

60 Papan lanan (kayu kelas II) m3 Rp. 2,645,700.00

61 Papan ulin m3 Rp. 5,102,000.00

62 Pasir beton/cor/pasang m3 Rp. 25,700.00

63 Pasir urug m3 Rp. 23,200.00

64 Plamur bh Rp. 12,600.00

65 Plint Vinyl Nipolam Troplan 100 + capping strip m2 Rp. 275,000.00

66 ( Gerflor )

67 Plint Vinyl Nipolam 180 + capping strip ( Gerflor ) m2 Rp. 250,000.00

68 Plywood tebal 4 mm lbr Rp. 46,000.00

69 Portland Cement (PC) zak Rp. 73,800.00

70 Residu ltr Rp. 4,500.00

71 Roster bh Rp. 22,500.00

72 Saklar ganda bh Rp. 15,000.00

73 Saklar tunggal bh Rp. 15,000.00

74 Sambungan ke PLN daya 900 watt bh Rp. 4,100,000.00

Page 7: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN UPAH / BAHAN SATUAN HARGA SATUAN

73 Seal Tape bh Rp. 8,500.00

74 Semen warna kg Rp. 3,000.00

75 Stop kontak 200 watt+Instalasi titik Rp. 180,000.00

76 Tanah urug pilihan m3 Rp. 23,800.00

77 Titik lampu+instalasi titik Rp. 165,000.00

78 Vinyl Mipolam Troplan 100 + welding root ( Gerflor ) m2 Rp. 285,000.00

79 Vinyl Mipolam 180 + welding root ( Gerflor ) m2 Rp. 260,000.00

80 Wastafel+assesories (termasuk cermin) bh Rp. 942,900.00

Page 8: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

I PEKERJAAN PERSIAPAN

1 Pengukuran dan Pemasangan Bouwplank

0.01200 M3 Kayu 5/7 Rp. 2,430,100.00 Rp. 29,161.20

0.02000 Kg Paku biasa Rp. 20,100.00 Rp. 402.00

0.00700 M3 Kayu Papan 2/20 Rp. 2,645,700.00 Rp. 18,519.90

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 12,050.00 Rp. 48,083.10 Rp.

2 Membersihkan Lapangan dan Perataan

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.05000 Oh Mandor Rp. 70,000.00 Rp. 3,500.00

Rp. 8,000.00 Rp. - Rp.

II PEKERJAAN TANAH (SNI 2835 - 2008)

1 Galian Tanah Biasa sedalam 1 M

0.75000 Oh Pekerja Rp. 45,000.00 Rp. 33,750.00

0.02500 Oh Mandor Rp. 70,000.00 Rp. 1,750.00

Rp. 35,500.00 Rp. - Rp.

2 Galian Tanah Biasa sedalam 2 M

0.90000 Oh Pekerja Rp. 45,000.00 Rp. 40,500.00

0.04500 Oh Mandor Rp. 70,000.00 Rp. 3,150.00

Rp. 43,650.00 Rp. - Rp.

3 Urugan Kembali (1/3 galian)

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.00833 Oh Mandor Rp. 70,000.00 Rp. 583.33

Rp. 11,833.33 Rp. - Rp.

4 Pemadatan Tanah ( per 20 cm )

0.50000 Oh Pekerja Rp. 45,000.00 Rp. 22,500.00

0.05000 Oh Mandor Rp. 70,000.00 Rp. 3,500.00

Rp. 26,000.00 Rp. - Rp.

5 Urugan Pasir

1.20000 M3 Pasir Urug Rp. 23,200.00 Rp. 27,840.00

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

Rp. 14,200.00 Rp. 27,840.00 Rp.

1 M1

1 M2

1 M3

1 M3

1 M3

1 M3

1 M3

Page 9: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

6 Urugan Tanah Merah ( BOW )

1.25000 M3 Pasir Urug Rp. 23,800.00 Rp. 29,750.00

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

Rp. 11,950.00 Rp. 29,750.00 Rp.

7 Urugan Sirtu Padat Untuk Peninggian Lantai Bangunan

1.20000 M3 Pasir Batu Rp. 23,200.00 Rp. 27,840.00

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.02500 Oh Mandor Rp. 70,000.00 Rp. 1,750.00

Rp. 13,000.00 Rp. 27,840.00 Rp.

III PEKERJAAN PONDASI (SNI 2836 - 2008)

1 Pasangan Pondasi Batu Kali camp. 1 : 3

1.20000 M3 Bt. Belah 15/20 cm Rp. 106,900.00 Rp. 128,280.00

4.04000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 298,152.00

0.48500 M3 Pasir Pasang Rp. 25,700.00 Rp. 12,464.50

1.50000 Oh Pekerja Rp. 45,000.00 Rp. 67,500.00

0.07500 Oh Mandor Rp. 70,000.00 Rp. 5,250.00

0.75000 Oh Tukang Batu Rp. 65,000.00 Rp. 48,750.00

0.07500 Oh Kepala Tukang Rp. 70,000.00 Rp. 5,250.00

Rp. 126,750.00 Rp. 438,896.50 Rp.

2 Pasangan Pondasi Batu Kali camp. 1 : 4

1.20000 M3 Bt. Belah 15/20 cm Rp. 106,900.00 Rp. 128,280.00

3.26000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 240,588.00

0.52000 M3 Pasir Pasang Rp. 25,700.00 Rp. 13,364.00

1.50000 Oh Pekerja Rp. 45,000.00 Rp. 67,500.00

0.07500 Oh Mandor Rp. 70,000.00 Rp. 5,250.00

0.75000 Oh Tukang Batu Rp. 65,000.00 Rp. 48,750.00

0.07500 Oh Kepala Tukang Rp. 70,000.00 Rp. 5,250.00

Rp. 126,750.00 Rp. 382,232.00 Rp.

3 Pasangan Pondasi Batu Kosong ( aanstamping )

1.20000 M3 Bt. Belah 15/20 cm Rp. 106,900.00 Rp. 128,280.00

0.43200 M3 Pasir Urug Rp. 23,200.00 Rp. 10,022.40

0.78000 Oh Pekerja Rp. 45,000.00 Rp. 35,100.00

0.03900 Oh Mandor Rp. 70,000.00 Rp. 2,730.00

0.39000 Oh Tukang Batu Rp. 65,000.00 Rp. 25,350.00

0.03900 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,730.00

Rp. 65,910.00 Rp. 138,302.40 Rp.

1 M3

1 M3

1 M3

1 M3

1 M3

Page 10: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

JUMLAH

60,133.10

8,000.00

35,500.00

43,650.00

11,833.33

26,000.00

42,040.00

Page 11: RAB FILE - Konstruksi Rumah Panggung

JUMLAH

41,700.00

40,840.00

565,646.50

508,982.00

204,212.40

Page 12: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

IV PEKERJAAN PASANGAN DINDING (SNI 6897 - 2008)

1 Pasangan Dinding Bata tebal 1 Bata, Camp. 1 : 2

140.00000 Bh Batu Bata Rp. 400.00 Rp. 56,000.00

0.87000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 64,206.00

0.08000 M3 Pasir Pasang Rp. 25,700.00 Rp. 2,056.00

0.60000 Oh Pekerja Rp. 45,000.00 Rp. 27,000.00

0.03000 Oh Mandor Rp. 70,000.00 Rp. 2,100.00

0.20000 Oh Tukang Batu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 43,500.00 Rp. 122,262.00 Rp. 165,762.00

2 Pasangan Dinding Bata tebal 1 Bata, Camp. 1 : 4

140.00000 Bh Batu Bata Rp. 400.00 Rp. 56,000.00

0.53100 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 39,187.80

0.09300 M3 Pasir Pasang Rp. 25,700.00 Rp. 2,390.10

0.60000 Oh Pekerja Rp. 45,000.00 Rp. 27,000.00

0.03000 Oh Mandor Rp. 70,000.00 Rp. 2,100.00

0.20000 Oh Tukang Batu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 43,500.00 Rp. 97,577.90 Rp. 141,077.90

3 Pasangan Dinding Bata tebal 1/2 Bata, Camp. 1 : 2

70.00000 Bh Batu Bata Rp. 400.00 Rp. 28,000.00

0.37900 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 27,970.20

0.03800 M3 Pasir Pasang Rp. 25,700.00 Rp. 976.60

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 56,946.80 Rp. 78,696.80

4 Pasangan Dinding Bata tebal 1/2 Bata, Camp. 1 : 4

70.00000 Bh Batu Bata Rp. 400.00 Rp. 28,000.00

0.23000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 16,974.00

0.04300 M3 Pasir Pasang Rp. 25,700.00 Rp. 1,105.10

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 46,079.10 Rp. 67,829.10

1 M2

1 M2

1 M2

1 M2

Page 13: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

V PEKERJAAN PLESTERAN (SNI 2837 - 2008)

1 Plesteran tebal 15 mm camp. 1 : 2

0.20448 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 15,090.62

0.02000 M3 Pasir Pasang Rp. 25,700.00 Rp. 514.00

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 15,604.62 Rp. 40,954.62

2 Plesteran tebal 15 mm camp. 1 : 3

0.15552 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 11,477.38

0.02300 M3 Pasir Pasang Rp. 25,700.00 Rp. 591.10

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 12,068.48 Rp. 37,418.48

3 Plesteran tebal 15 mm camp. 1 : 4

0.12480 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 9,210.24

0.02400 M3 Pasir Pasang Rp. 25,700.00 Rp. 616.80

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 9,827.04 Rp. 35,177.04

4 Finishing Siar Pasangan Dinding Bata ( = 20 m1 )

0.06216 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 4,587.41

0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00

0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00

0.07500 Oh Tukang Batu Rp. 65,000.00 Rp. 4,875.00

0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00

Rp. 12,745.00 Rp. 4,587.41 Rp. 17,332.41

5 Finishing Siar Pasangan Batu Kali Camp. 1 : 2

0.12680 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 9,357.84

0.01200 M3 Pasir Pasang Rp. 25,700.00 Rp. 308.40

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 9,666.24 Rp. 35,016.24

1 M2

1 M2

1 M2

1 M2

1 M2

Page 14: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

6 Pas. Dinding Roster ( 12 x 20 x 20 ) cm,

Camp. 1 : 4

25.00000 Bh Roster Rp. 22,500.00 Rp. 562,500.00

0.22000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 16,236.00

0.03500 M3 Pasir Pasang Rp. 25,700.00 Rp. 899.50

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 579,635.50 Rp. 601,385.50

7 Pas. Dinding Kerawang ( 12 x 20 x 20 ) cm,

Camp. 1 : 4

25.00000 Bh Kerawang Rp. 7,500.00 Rp. 187,500.00

0.22000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 16,236.00

0.03500 M3 Pasir Pasang Rp. 25,700.00 Rp. 899.50

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 204,635.50 Rp. 226,385.50

8 Acian

0.06500 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 4,797.00

0.20000 Oh Pekerja Rp. 45,000.00 Rp. 9,000.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 16,900.00 Rp. 4,797.00 Rp. 21,697.00

1 M2

1 M2

1 M2

Page 15: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

VI PEKERJAAN KAYU (SNI 3434 - 2008)

1 Pasangan Kusen Pintu dan Jendela Kayu Ulin

1.10000 M3 Kayu Balok Ulin Rp. 4,738,900.00 Rp. 5,212,790.00

1.25000 Kg Paku Ulin Rp. 25,200.00 Rp. 31,500.00

1.00000 Kg Lem Kayu Rp. 20,000.00 Rp. 20,000.00

7.00000 Oh Pekerja Rp. 45,000.00 Rp. 315,000.00

0.35000 Oh Mandor Rp. 70,000.00 Rp. 24,500.00

21.00000 Oh Tukang Kayu Rp. 65,000.00 Rp. 1,365,000.00

2.10000 Oh Kepala Tukang Rp. 70,000.00 Rp. 147,000.00

Rp. 1,851,500.00 Rp. 5,264,290.00 Rp. 7,115,790.00

2 Pasangan Kusen Pintu dan Jendela Kayu Lanan

1.20000 M3 Kayu Balok Lanan Rp. 2,430,100.00 Rp. 2,916,120.00

1.25000 Kg Paku Rp. 20,100.00 Rp. 25,125.00

1.00000 Kg Lem Kayu Rp. 20,000.00 Rp. 20,000.00

6.00000 Oh Pekerja Rp. 45,000.00 Rp. 270,000.00

0.30000 Oh Mandor Rp. 70,000.00 Rp. 21,000.00

18.00000 Oh Tukang Kayu Rp. 65,000.00 Rp. 1,170,000.00

1.80000 Oh Kepala Tukang Rp. 70,000.00 Rp. 126,000.00

Rp. 1,587,000.00 Rp. 2,961,245.00 Rp. 4,548,245.00

3 Pasangan Listplank 2/30 cm Kayu Kelas I atau II

0.01100 M3 Kayu Ulin Rp. 5,102,000.00 Rp. 56,122.00

0.05000 Kg Paku Rp. 25,200.00 Rp. 1,260.00

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.20000 Oh Tukang Kayu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 19,250.00 Rp. 57,382.00 Rp. 76,632.00

4 Pasangan Rangka Dinding Pemisah (60 x 120) cm

Kayu Lanan

0.02800 M3 Kayu, Balok Lanan Rp. 2,430,100.00 Rp. 68,042.80

0.15000 Kg Paku Rp. 20,100.00 Rp. 3,015.00

0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00

0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00

0.45000 Oh Tukang Kayu Rp. 65,000.00 Rp. 29,250.00

0.04500 Oh Kepala Tukang Rp. 70,000.00 Rp. 3,150.00

Rp. 39,710.00 Rp. 71,057.80 Rp. 110,767.80

5 Pasangan Dinding Pemisah Plywood Rangkap +

Rangka Kayu Lanan

0.02800 M3 Kayu, Balok Lanan Rp. 2,430,100.00 Rp. 68,042.80

0.15000 Kg Paku Rp. 20,100.00 Rp. 3,015.00

0.56000 Kg Lem Kayu Rp. 20,000.00 Rp. 11,200.00

0.86000 Lbr Plywood Rp. 46,000.00 Rp. 39,560.00

0.15000 Oh Pekerja Rp. 45,000.00 Rp. `

0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00

0.45000 Oh Tukang Kayu Rp. 65,000.00 Rp. 29,250.00

0.04500 Oh Kepala Tukang Rp. 70,000.00 Rp. 3,150.00

1 M3

1 M3

1 M1

1 M2

1 M2

Page 16: RAB FILE - Konstruksi Rumah Panggung

Rp. 32,960.00 Rp. 121,817.80 Rp. 154,777.80

Page 17: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

VII PEKERJAAN BETON (SNI 7394 - 2008)

1 Membuat Beton Mutu f'c = 7,4 MPa (K 100), slump

(12±2) cm, w/c = 0,87

4.94000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 364,572.00

0.62071 M3 Pasir Beton Rp. 25,700.00 Rp. 15,952.25

0.74000 M3 Koral Beton Rp. 79,400.00 Rp. 58,756.00

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 453,255.25 Rp. 553,150.25

2 Membuat Beton Mutu f'c = 9,8 MPa (K 125), slump

(12±2) cm, w/c = 0,78

5.52000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 407,376.00

0.59143 M3 Pasir Beton Rp. 25,700.00 Rp. 15,199.75

0.74963 M3 Koral Beton Rp. 79,400.00 Rp. 59,520.62

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 496,071.37 Rp. 595,966.37

3 Membuat Beton Mutu f'c = 12,2 MPa (K 150), slump

(12±2) cm, w/c = 0,72

5.98000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 441,324.00

0.57071 M3 Pasir Beton Rp. 25,700.00 Rp. 14,667.25

0.75333 M3 Koral Beton Rp. 79,400.00 Rp. 59,814.40

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 529,780.65 Rp. 629,675.65

4 Membuat Lantai Kerja Beton Mutu f'c = 7,4 MPa (K 100)

slump (3-6) cm, w/c = 0,87

4.60000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 339,480.00

0.63786 M3 Pasir Beton Rp. 25,700.00 Rp. 16,393.00

0.76074 M3 Koral Beton Rp. 79,400.00 Rp. 60,402.76

200.00000 Lt Air Rp. 65.00 Rp. 13,000.00

1.20000 Oh Pekerja Rp. 45,000.00 Rp. 54,000.00

0.06000 Oh Mandor Rp. 70,000.00 Rp. 4,200.00

0.20000 Oh Tukang Batu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 72,600.00 Rp. 429,275.76 Rp. 501,875.76

1 M3

1 M3

1 M3

1 M3

Page 18: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

5 Membuat Beton Mutu f'c = 14,5 MPa (K 175), slump

(12±2) cm, w/c = 0,66

6.52000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.54286 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.76222 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 569,622.77 Rp. 669,517.77

6 Membuat Beton Mutu f'c = 16,9 MPa (K 200), slump

(12±2) cm, w/c = 0,61

7.04000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 519,552.00

0.52214 M3 Pasir Beton Rp. 25,700.00 Rp. 13,419.00

0.76370 M3 Koral Beton Rp. 79,400.00 Rp. 60,637.78

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 607,583.78 Rp. 707,478.78

7 Membuat Beton Mutu f'c = 19,3 MPa (K 225), slump

(12±2) cm, w/c = 0,58

7.42000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 547,596.00

0.49857 M3 Pasir Beton Rp. 25,700.00 Rp. 12,813.25

0.77556 M3 Koral Beton Rp. 79,400.00 Rp. 61,579.46

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 635,963.71 Rp. 735,858.71

8 Membuat Beton Mutu f'c = 21,7 MPa (K 250), slump

(12±2) cm, w/c = 0,56

7.68000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 566,784.00

0.49429 M3 Pasir Beton Rp. 25,700.00 Rp. 12,703.25

0.76963 M3 Koral Beton Rp. 79,400.00 Rp. 61,108.62

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 654,570.88 Rp. 754,465.88

1 M3

1 M3

1 M3

1 M3

Page 19: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

9 Membuat Beton Mutu f'c = 24,0 MPa (K 275), slump

(12±2) cm, w/c = 0,53

8.12000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 599,256.00

0.48857 M3 Pasir Beton Rp. 25,700.00 Rp. 12,556.25

0.76000 M3 Koral Beton Rp. 79,400.00 Rp. 60,344.00

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 686,131.25 Rp. 786,026.25

10 Membuat Beton Mutu f'c = 26,4 MPa (K 300), slump

(12±2) cm, w/c = 0,52

8.26000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 609,588.00

0.48643 M3 Pasir Beton Rp. 25,700.00 Rp. 12,501.25

0.75630 M3 Koral Beton (mak. 30 mm) Rp. 79,400.00 Rp. 60,050.22

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 696,114.47 Rp. 796,009.47

11 Membuat Beton Mutu f'c = 28,8 MPa (K 325), slump

(12±2) cm, w/c = 0,49

8.78000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 647,964.00

0.47857 M3 Pasir Beton Rp. 25,700.00 Rp. 12,299.25

0.74519 M3 Koral Beton (mak. 30 mm) Rp. 79,400.00 Rp. 59,168.09

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

2.10000 Oh Pekerja Rp. 45,000.00 Rp. 94,500.00

0.10500 Oh Mandor Rp. 70,000.00 Rp. 7,350.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 127,050.00 Rp. 733,406.34 Rp. 860,456.34

12 Membuat Beton Mutu f'c = 31,2 MPa (K 350), slump

(12±2) cm, w/c = 0,48

8.96000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 661,248.00

0.47643 M3 Pasir Beton Rp. 25,700.00 Rp. 12,244.25

0.74074 M3 Koral Beton (mak. 30 mm) Rp. 79,400.00 Rp. 58,814.76

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

2.10000 Oh Pekerja Rp. 45,000.00 Rp. 94,500.00

0.10500 Oh Mandor Rp. 70,000.00 Rp. 7,350.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 127,050.00 Rp. 746,282.01 Rp. 873,332.01

13 Pembesian dengan Besi Polos atau Ulir 10 Kg

10.50000 Kg Besi Beton Rp. 14,500.00 Rp. 152,250.00

0.15000 Kg Kawat Beton Rp. 18,000.00 Rp. 2,700.00

0.07000 Oh Pekerja Rp. 45,000.00 Rp. 3,150.00

1 M3

1 M3

1 M3

1 M3

Page 20: RAB FILE - Konstruksi Rumah Panggung

0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00

0.07000 Oh Tukang Besi Rp. 65,000.00 Rp. 4,550.00

0.00700 Oh Kepala Tukang Rp. 70,000.00 Rp. 490.00

Rp. 8,470.00 Rp. 154,950.00 Rp. 163,420.00

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

14 Pasang Bekisting untuk Pondasi

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.30000 Kg Paku Rp. 20,100.00 Rp. 6,030.00

0.10000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 285.00

0.52000 Oh Pekerja Rp. 45,000.00 Rp. 23,400.00

0.02600 Oh Mandor Rp. 70,000.00 Rp. 1,820.00

0.26000 Oh Tukang Kayu Rp. 65,000.00 Rp. 16,900.00

0.02600 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,820.00

Rp. 43,940.00 Rp. 84,375.00 Rp. 128,315.00

15 Pasang Bekisting untuk Sloof

0.04500 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 87,817.50

0.30000 Kg Paku Rp. 20,100.00 Rp. 6,030.00

0.10000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 285.00

0.52000 Oh Pekerja Rp. 45,000.00 Rp. 23,400.00

0.02600 Oh Mandor Rp. 70,000.00 Rp. 1,820.00

0.26000 Oh Tukang Kayu Rp. 65,000.00 Rp. 16,900.00

0.02600 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,820.00

Rp. 43,940.00 Rp. 94,132.50 Rp. 138,072.50

16 Pasang Bekisting untuk Kolom

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.01500 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 36,451.50

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

2.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 7,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 179,201.50 Rp. 234,971.50

17 Pasang Bekisting untuk Balok

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.01800 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 43,741.80

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

2.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 7,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 186,491.80 Rp. 242,261.80

1 M2

1 M2

1 M2

1 M2

Page 21: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

18 Pasang Bekisting untuk Lantai

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.01500 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 36,451.50

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

6.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 22,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 194,201.50 Rp. 249,971.50

19 Pasang Bekisting untuk Dinding

0.03000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 58,545.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.02000 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 48,602.00

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

3.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 11,250.00

4.00000 Bh Formtie/Penjaga Jarak Bekisting Rp. 2,800.00 Rp. 11,200.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 186,787.00 Rp. 242,557.00

20 Pasang Bekisting untuk Tangga

0.03000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 58,545.00

0.40000 Kg Paku Biasa Rp. 20,100.00 Rp. 8,040.00

0.15000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 427.50

0.01500 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 36,451.50

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

2.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 7,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 159,544.00 Rp. 215,314.00

1 M2

1 M2

1 M2

Page 22: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

21 Membuat Pondasi Beton Bertulang Mutu f'c = 14,5 MPa

(K 175), slump (12±2) cm, w/c = 0,66

( 150 Kg + Bekisting )

0.20000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 390,300.00

1.50000 Kg Paku Rp. 20,100.00 Rp. 30,150.00

0.40000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 1,140.00

157.50000 Kg Besi Beton Rp. 14,500.00 Rp. 2,283,750.00

2.25000 Kg Kawat Beton Rp. 18,000.00 Rp. 40,500.00

6.52000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.54286 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.76222 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

5.30000 Oh Pekerja Rp. 45,000.00 Rp. 238,500.00

0.27300 Oh Mandor Rp. 70,000.00 Rp. 19,110.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

1.30000 Oh Tukang Kayu Rp. 65,000.00 Rp. 84,500.00

1.05000 Oh Tukang Besi Rp. 65,000.00 Rp. 68,250.00

0.26300 Oh Kepala Tukang Rp. 70,000.00 Rp. 18,410.00

Rp. 446,645.00 Rp. 3,315,462.77 Rp. 3,762,107.77

22 Membuat Sloof Beton Bertulang Mutu f'c = 14,5 MPa

(K 175), slump (12±2) cm, w/c = 0,66

( 225 Kg + Bekisting )

0.27000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 526,905.00

1.80000 Kg Paku Rp. 20,100.00 Rp. 36,180.00

0.60000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 1,710.00

236.25000 Kg Besi Beton Rp. 14,500.00 Rp. 3,425,625.00

3.37500 Kg Kawat Beton Rp. 18,000.00 Rp. 60,750.00

6.52000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.54286 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.76222 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

6.34500 Oh Pekerja Rp. 45,000.00 Rp. 285,525.00

0.32900 Oh Mandor Rp. 70,000.00 Rp. 23,030.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

1.56000 Oh Tukang Kayu Rp. 65,000.00 Rp. 101,400.00

1.57500 Oh Tukang Besi Rp. 65,000.00 Rp. 102,375.00

0.34150 Oh Kepala Tukang Rp. 70,000.00 Rp. 23,905.00

Rp. 554,110.00 Rp. 4,620,792.77 Rp. 5,174,902.77

1 M3

1 M3

Page 23: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

23 Membuat Kolom Beton Bertulang Mutu f'c = 16,9 MPa

(K 200), slump (12±2) cm, w/c = 0,61

( 230 Kg + Bekisting )

0.32000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 624,480.00

3.20000 Kg Paku Rp. 20,100.00 Rp. 64,320.00

1.60000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 4,560.00

0.12000 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 291,612.00

2.80000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 388,640.00

16.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 60,000.00

241.50000 Kg Besi Beton Rp. 14,500.00 Rp. 3,501,750.00

3.45000 Kg Kawat Beton Rp. 18,000.00 Rp. 62,100.00

7.04000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 519,552.00

0.52214 M3 Pasir Beton Rp. 25,700.00 Rp. 13,419.00

0.76370 M3 Koral Beton Rp. 79,400.00 Rp. 60,637.78

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

8.54000 Oh Pekerja Rp. 45,000.00 Rp. 384,300.00

0.43900 Oh Mandor Rp. 70,000.00 Rp. 30,730.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

2.64000 Oh Tukang Kayu Rp. 65,000.00 Rp. 171,600.00

1.61000 Oh Tukang Besi Rp. 65,000.00 Rp. 104,650.00

0.45300 Oh Kepala Tukang Rp. 70,000.00 Rp. 31,710.00

Rp. 740,865.00 Rp. 5,605,045.78 Rp. 6,345,910.78

24 Membuat Balok Beton Bertulang Mutu f'c = 14,5 MPa

(K 175), slump (12±2) cm, w/c = 0,66

( 225 Kg + Bekisting )

0.32000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 624,480.00

3.20000 Kg Paku Rp. 20,100.00 Rp. 64,320.00

1.60000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 4,560.00

0.14400 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 349,934.40

2.80000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 388,640.00

16.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 60,000.00

236.25000 Kg Besi Beton Rp. 14,500.00 Rp. 3,425,625.00

3.37500 Kg Kawat Beton Rp. 18,000.00 Rp. 60,750.00

6.52000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.54286 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.76222 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

8.50500 Oh Pekerja Rp. 45,000.00 Rp. 382,725.00

0.43700 Oh Mandor Rp. 70,000.00 Rp. 30,590.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

2.64000 Oh Tukang Kayu Rp. 65,000.00 Rp. 171,600.00

1.57500 Oh Tukang Besi Rp. 65,000.00 Rp. 102,375.00

0.44950 Oh Kepala Tukang Rp. 70,000.00 Rp. 31,465.00

Rp. 736,630.00 Rp. 5,547,932.17 Rp. 6,284,562.17

1 M3

1 M3

Page 24: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

25 Membuat Lantai Beton Bertulang Mutu f'c = 19,3 MPa

(K 225), slump (12±2) cm, w/c = 0,58

( 125 Kg + Bekisting )

0.50000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 975,750.00

5.00000 Kg Paku Rp. 20,100.00 Rp. 100,500.00

2.50000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 7,125.00

0.18750 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 455,643.75

4.37500 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 607,250.00

75.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 281,250.00

131.25000 Kg Besi Beton Rp. 14,500.00 Rp. 1,903,125.00

1.87500 Kg Kawat Beton Rp. 18,000.00 Rp. 33,750.00

7.42000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 547,596.00

0.49857 M3 Pasir Beton Rp. 25,700.00 Rp. 12,813.25

0.77556 M3 Koral Beton Rp. 79,400.00 Rp. 61,579.46

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

10.77500 Oh Pekerja Rp. 45,000.00 Rp. 484,875.00

0.54550 Oh Mandor Rp. 70,000.00 Rp. 38,185.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

4.12500 Oh Tukang Kayu Rp. 65,000.00 Rp. 268,125.00

0.87500 Oh Tukang Besi Rp. 65,000.00 Rp. 56,875.00

0.52800 Oh Kepala Tukang Rp. 70,000.00 Rp. 36,960.00

Rp. 902,895.00 Rp. 5,000,357.46 Rp. 5,903,252.46

26 Membuat Dinding Beton Bertulang Mutu f'c = 14,5 MPa

(K 175), slump (12±2) cm, w/c = 0,66

( 95 Kg + Bekisting )

0.24000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 468,360.00

3.20000 Kg Paku Rp. 20,100.00 Rp. 64,320.00

1.60000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 4,560.00

0.16000 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 388,816.00

2.80000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 388,640.00

24.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 90,000.00

32.00000 Bh Formtie/Penjaga Jarak Bekisting Rp. 2,800.00 Rp. 89,600.00

99.75000 Kg Besi Beton Rp. 14,500.00 Rp. 1,446,375.00

1.42500 Kg Kawat Beton Rp. 18,000.00 Rp. 25,650.00

6.52000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.54286 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.76222 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

7.59500 Oh Pekerja Rp. 45,000.00 Rp. 341,775.00

0.38500 Oh Mandor Rp. 70,000.00 Rp. 26,950.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

2.64000 Oh Tukang Kayu Rp. 65,000.00 Rp. 171,600.00

0.66500 Oh Tukang Besi Rp. 65,000.00 Rp. 43,225.00

0.35850 Oh Kepala Tukang Rp. 70,000.00 Rp. 25,095.00

1 M3

1 M3

Page 25: RAB FILE - Konstruksi Rumah Panggung

Rp. 626,520.00 Rp. 3,535,943.77 Rp. 4,162,463.77

Page 26: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

VIII PEKERJAAN PENUTUP ATAP

1 Pasang Atap Genteng Metal

1.62000 Lbr Genteng Metal Rp. 34,000.00 Rp. 55,080.00

0.20000 Kg Paku Rp. 17,500.00 Rp. 3,500.00

0.20000 Oh Pekerja Rp. 45,000.00 Rp. 9,000.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 16,900.00 Rp. 58,580.00 Rp. 75,480.00

2 Pasang Atap Nok Genteng Metal

2.50000 Bh Nok Genteng Metal Rp. 18,500.00 Rp. 46,250.00

0.05000 Kg Paku Rp. 17,500.00 Rp. 875.00

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.01300 Oh Mandor Rp. 70,000.00 Rp. 910.00

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 22,960.00 Rp. 47,125.00 Rp. 70,085.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839 - 2008)

1 Pasang Langit - langit Plywood Tebal 3 mm, 4 mm

dan 6 mm

0.37500 Lbr Plywood 4 mm Rp. 46,000.00 Rp. 17,250.00

0.03000 Kg Paku Triplek Rp. 30,000.00 Rp. 900.00

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 12,050.00 Rp. 18,150.00 Rp. 30,200.00

2 1 m2 Pasang rangka langit-langit (0,60 x 1,20) m, kayu lanan

0.0120 M3 Balok kayu lanan Rp. 2,430,100.00 29,161.2000

0.1000 Kg Paku kayu 2" - 5" Rp. 20,100.00 2,010.0000

0.1500 Oh Pekerja Rp. 45,000.00 6,750.00

0.0750 Oh Mandor Rp. 70,000.00 5,250.00

0.2500 Oh Tukang kayu Rp. 65,000.00 16,250.00

0.0250 Oh Kepala tukang kayu Rp. 70,000.00 1,750.00

Rp. 30,000.00 Rp. 31,171.20 Rp. 61,171.20

1 m2 Langit-langit kalsiboard, tebal 4 mm

0.3640 Lbr kalsiboard (120x240x4) mm Rp. 125,000.00 45,500.0000

0.1100 Kg Paku skrup Rp. 28,500.00 3,135.0000

0.1000 Oh Pembantu tukang kayu Rp. 45,000.00 4,500.00

0.0050 Oh Mandor Rp. 70,000.00 350.00

0.0500 Oh Tukang kayu Rp. 65,000.00 3,250.00

0.0050 Oh Kepala tukang kayu Rp. 70,000.00 350.00

Rp. 8,450.00 Rp. 48,635.00 Rp. 57,085.00

1 M2

1 M1

1 M2

H54
Rekadaya: cek harga
Page 27: RAB FILE - Konstruksi Rumah Panggung

2 Pasang Langit - langit Lambrizing Kayu Tebal 9 mm

0.01500 M3 Kayu Lanan ( Papan ) Rp. 2,645,700.00 Rp. 39,685.50

0.01000 Kg Paku Triplek Rp. 30,000.00 Rp. 300.00

0.80000 Oh Pekerja Rp. 45,000.00 Rp. 36,000.00

0.04000 Oh Mandor Rp. 70,000.00 Rp. 2,800.00

0.80000 Oh Tukang Kayu Rp. 65,000.00 Rp. 52,000.00

0.08000 Oh Kepala Tukang Rp. 70,000.00 Rp. 5,600.00

Rp. 96,400.00 Rp. 39,985.50 Rp. 136,385.50

3 Pasang List Langit - langit Kayu Profil

1.05000 M1 List Kayu Profil Rp. 3,000.00 Rp. 3,150.00

0.01000 Kg Paku Rp. 20,100.00 Rp. 201.00

0.05000 Oh Pekerja Rp. 45,000.00 Rp. 2,250.00

0.00300 Oh Mandor Rp. 70,000.00 Rp. 210.00

0.05000 Oh Tukang Kayu Rp. 65,000.00 Rp. 3,250.00

0.00500 Oh Kepala Tukang Rp. 70,000.00 Rp. 350.00

Rp. 6,060.00 Rp. 3,351.00 Rp. 9,411.00

1 M2

1 M1

Page 28: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

X PEKERJAAN PIPA DAN SANITASI

1 Memasang 1 Buah Kloset Duduk/Monoblok 1 Bh

1.00000 Bh Kloset Duduk/Monoblok Rp. 2,271,900.00 Rp. 2,271,900.00

0.06000 Perlengkapan 6% Harga Kloset Rp. 2,271,900.00 Rp. 136,314.00

3.30000 Oh Pekerja Rp. 45,000.00 Rp. 148,500.00

0.16000 Oh Mandor Rp. 70,000.00 Rp. 11,200.00

1.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 71,500.00

0.00100 Oh Kepala Tukang Rp. 70,000.00 Rp. 70.00

Rp. 231,270.00 Rp. 2,408,214.00 Rp. 2,639,484.00

2 Memasang 1 Buah Kloset Jongkok Porselin 1 Bh

1.00000 Bh Kloset Jongkok Rp. 227,100.00 Rp. 227,100.00

0.12000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 8,856.00

0.01000 M3 Pasir Beton Rp. 25,700.00 Rp. 257.00

1.00000 Oh Pekerja Rp. 45,000.00 Rp. 45,000.00

0.16000 Oh Mandor Rp. 70,000.00 Rp. 11,200.00

1.50000 Oh Tukang Batu Rp. 65,000.00 Rp. 97,500.00

0.15000 Oh Kepala Tukang Rp. 70,000.00 Rp. 10,500.00

Rp. 164,200.00 Rp. 236,213.00 Rp. 400,413.00

3 Memasang 1 Bh Bak Mandi Batu Bata Vol 0,3 m3 1 Bh

300.00000 Bh Batu Bata Rp. 400.00 Rp. 120,000.00

2.40000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 177,120.00

0.30000 M3 Pasir Beton Rp. 25,700.00 Rp. 7,710.00

4.35600 M2 Keramik 20 x 20 cm Rp. 57,000.00 Rp. 248,292.00

6.00000 Kg Semen Nat Rp. 3,000.00 Rp. 18,000.00

6.00000 Oh Pekerja Rp. 45,000.00 Rp. 270,000.00

0.30000 Oh Mandor Rp. 70,000.00 Rp. 21,000.00

3.00000 Oh Tukang Batu Rp. 65,000.00 Rp. 195,000.00

0.30000 Oh Kepala Tukang Rp. 70,000.00 Rp. 21,000.00

Rp. 507,000.00 Rp. 571,122.00 Rp. 1,078,122.00

4 Memasang 1 Buah Wastafel 1 Bh

1.00000 Bh Wastafel Rp. 942,900.00 Rp. 942,900.00

0.12000 Perlengkapan 12% Harga Wastafel Rp. 942,900.00 Rp. 113,148.00

0.12000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 8,856.00

0.01000 M3 Pasir Beton Rp. 25,700.00 Rp. 257.00

1.20000 Oh Pekerja Rp. 45,000.00 Rp. 54,000.00

0.10000 Oh Mandor Rp. 70,000.00 Rp. 7,000.00

1.45000 Oh Tukang Batu Rp. 65,000.00 Rp. 94,250.00

0.15000 Oh Kepala Tukang Rp. 70,000.00 Rp. 10,500.00

Rp. 165,750.00 Rp. 1,065,161.00 Rp. 1,230,911.00

Page 29: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

5 Pasang 1 Buah Bak Kontrol Pas. Bt Bata Bh

Uk 30 x 30 tinggi 35 cm

145.00000 Bh Batu Bata Rp. 400.00 Rp. 58,000.00

0.88000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 64,944.00

0.07000 M3 Pasir Pasang Rp. 25,700.00 Rp. 1,799.00

0.07000 M3 Kerikil Rp. 79,400.00 Rp. 5,558.00

0.06000 M3 Pasir Beton Rp. 25,700.00 Rp. 1,542.00

1.60000 Kg Besi Beton Rp. 14,500.00 Rp. 23,200.00

3.20000 Oh Pekerja Rp. 45,000.00 Rp. 144,000.00

0.01600 Oh Mandor Rp. 70,000.00 Rp. 1,120.00

1.01500 Oh Tukang Batu Rp. 65,000.00 Rp. 65,975.00

0.01600 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,120.00

Rp. 212,215.00 Rp. 155,043.00 Rp. 367,258.00

6 Pasang 1 Buah Bak Kontrol Pas. Bt Bata Bh

Uk 45 x 45 tinggi 50 cm

250.00000 Bh Batu Bata Rp. 400.00 Rp. 100,000.00

1.54000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 113,652.00

0.13000 M3 Pasir Pasang Rp. 25,700.00 Rp. 3,341.00

0.02000 M3 Kerikil Rp. 79,400.00 Rp. 1,588.00

0.09000 M3 Pasir Beton Rp. 25,700.00 Rp. 2,313.00

2.60000 Kg Besi Beton Rp. 14,500.00 Rp. 37,700.00

1.42000 Oh Pekerja Rp. 45,000.00 Rp. 63,900.00

0.07100 Oh Mandor Rp. 70,000.00 Rp. 4,970.00

0.47300 Oh Tukang Batu Rp. 65,000.00 Rp. 30,745.00

0.04700 Oh Kepala Tukang Rp. 70,000.00 Rp. 3,290.00

Rp. 102,905.00 Rp. 258,594.00 Rp. 361,499.00

7 Memasang 1 Buah Kran dia. 3/4" atau 1/2" 1 Bh

1.00000 Bh Kran Air Rp. 9,000.00 Rp. 9,000.00

0.02500 Bh Seal Tape Rp. 8,500.00 Rp. 212.50

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 8,000.00 Rp. 9,212.50 Rp. 17,212.50

8 Memasang 1 Buah Floor Drain 1 Bh

1.00000 Bh Floor Drain Rp. 15,000.00 Rp. 15,000.00

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 8,000.00 Rp. 15,000.00 Rp. 23,000.00

Page 30: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

XII PEKERJAAN KUNCI DAN KACA

1 Pasang Kunci Tanam Biasa Kualitas Sedang 1 Bh

1.00000 Bh Kunci Tanam 2 Slaag Rp. 94,600.00 Rp. 94,600.00

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.50000 Oh Tukang Kayu Rp. 65,000.00 Rp. 32,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 34,000.00 Rp. 94,600.00 Rp. 128,600.00

2 Pasang Kunci Tanam Kamar Mandi 1 Bh

1.00000 Bh Kunci Tanam 1 Slaag Rp. 50,400.00 Rp. 50,400.00

0.00500 Oh Pekerja Rp. 45,000.00 Rp. 225.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.50000 Oh Tukang Kayu Rp. 65,000.00 Rp. 32,500.00

0.00500 Oh Kepala Tukang Rp. 70,000.00 Rp. 350.00

Rp. 33,250.00 Rp. 50,400.00 Rp. 83,650.00

3 Pasang Engsel Pintu 1 Bh

1.00000 Bh Engsel Pintu (kuningan 4") Rp. 11,300.00 Rp. 11,300.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 11,300.00 Rp. 22,827.50

4 Pasang Engsel Jendela 1 Bh

1.00000 Bh Engsel Jendela Rp. 9,460.00 Rp. 9,460.00

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00050 Oh Mandor Rp. 70,000.00 Rp. 35.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 7,685.00 Rp. 9,460.00 Rp. 17,145.00

5 Pasang Engsel Angin 1 Bh

1.00000 Bh Engsel angin Rp. 9,460.00 Rp. 9,460.00

0.02000 Oh Pekerja Rp. 45,000.00 Rp. 900.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

0.20000 Oh Tukang Kayu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 16,000.00 Rp. 9,460.00 Rp. 25,460.00

6 Pasang Kait Angin 1 Bh

1.00000 Bh Kait Angin Rp. 4,410.00 Rp. 4,410.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 4,410.00 Rp. 15,937.50

Page 31: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

7 Pasang Gerendel 1 Bh

1.00000 Bh Grendel Rp. 7,570.00 Rp. 7,570.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 7,570.00 Rp. 19,097.50

8 Pasang Kaca tebal 5 mm

1.10000 M2 Kaca Rp. 63,100.00 Rp. 69,410.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 69,410.00 Rp. 80,937.50

1 M2

Page 32: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

(SNI 7395 -2008)

1 Pasang Lantai Keramik Uk. 30 x 30 cm

1.06830 M2 Keramik Uk. 30 x 30 cm Rp. 63,000.00 Rp. 67,302.90

0.20000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 14,760.00

0.04500 M3 Pasir Beton Rp. 25,700.00 Rp. 1,156.50

1.50000 Kg Semen Warna Rp. 3,000.00 Rp. 4,500.00

0.70000 Oh Pekerja Rp. 45,000.00 Rp. 31,500.00

0.03500 Oh Mandor Rp. 70,000.00 Rp. 2,450.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 59,150.00 Rp. 87,719.40 Rp. 146,869.40

2 Pasang Lantai Keramik Uk. 40 x 40 cm

1.06830 M2 Keramik Uk. 40 x 40 cm Rp. 80,000.00 Rp. 85,464.00

0.20000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 14,760.00

0.04500 M3 Pasir Beton Rp. 25,700.00 Rp. 1,156.50

1.50000 Kg Semen Warna Rp. 3,000.00 Rp. 4,500.00

0.70000 Oh Pekerja Rp. 45,000.00 Rp. 31,500.00

0.03500 Oh Mandor Rp. 70,000.00 Rp. 2,450.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 59,150.00 Rp. 105,880.50 Rp. 165,030.50

3 Pasang Lantai Keramik Uk. 20 x 20 cm

1.06000 M2 Keramik Uk. 20 x 20 cm Rp. 57,000.00 Rp. 60,420.00

0.20800 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 15,350.40

0.04500 M3 Pasir Beton Rp. 25,700.00 Rp. 1,156.50

1.62000 Kg Semen Warna Rp. 3,000.00 Rp. 4,860.00

0.70000 Oh Pekerja Rp. 45,000.00 Rp. 31,500.00

0.03500 Oh Mandor Rp. 70,000.00 Rp. 2,450.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 59,150.00 Rp. 81,786.90 Rp. 140,936.90

4 Pasang Dinding Keramik 20 x 20 cm

1.06000 M2 Keramik 20 x 20 cm Rp. 57,000.00 Rp. 60,420.00

0.18600 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 13,726.80

0.01800 M3 Pasir Beton Rp. 25,700.00 Rp. 462.60

1.94000 Kg Semen Warna Rp. 3,000.00 Rp. 5,820.00

0.90000 Oh Pekerja Rp. 45,000.00 Rp. 40,500.00

0.04500 Oh Mandor Rp. 70,000.00 Rp. 3,150.00

0.45000 Oh Tukang Batu Rp. 65,000.00 Rp. 29,250.00

0.04500 Oh Kepala Tukang Rp. 70,000.00 Rp. 3,150.00

Rp. 76,050.00 Rp. 80,429.40 Rp. 156,479.40

1 M2

1 M2

1 M2

1 M2

Page 33: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

5 Pasang Lantai Vinyl Flexible Homogeneous

1.05000 M2 Vinyl type Mipolam Troplan 100 + Rp. 285,000.00 Rp. 299,250.00

welding rod ( Gerflor )

0.35000 Kg Lem Vinyl Rp. 30,000.00 Rp. 10,500.00

0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00

0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00

0.15000 Oh Tukang Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 18,110.00 Rp. 309,750.00 Rp. 327,860.00

6 Pasang Lantai Vinyl Flexible Homogeneous

1.05000 M2 Vinyl type Mipolam 180 + welding rod Rp. 260,000.00 Rp. 273,000.00

( Gerflor )

0.35000 Kg Lem Vinyl Rp. 30,000.00 Rp. 10,500.00

0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00

0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00

0.15000 Oh Tukang Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 18,110.00 Rp. 283,500.00 Rp. 301,610.00

7 Pasang Plint Vinyl Flexible Homogeneous

0.11000 M2 Vinyl type Mipolam Troplan 100 + Rp. 275,000.00 Rp. 30,250.00

capping strip ( Gerflor )

0.08000 Kg Lem Vinyl Rp. 30,000.00 Rp. 2,400.00

0.08000 Oh Pekerja Rp. 45,000.00 Rp. 3,600.00

0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00

0.08000 Oh Tukang Rp. 65,000.00 Rp. 5,200.00

0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00

Rp. 9,640.00 Rp. 32,650.00 Rp. 42,290.00

8 Pasang Plint Vinyl Flexible Homogeneous

0.11000 M2 Vinyl type Mipolam 180 + capping Rp. 250,000.00 Rp. 27,500.00

strip ( Gerflor )

0.08000 Kg Lem Vinyl Rp. 30,000.00 Rp. 2,400.00

0.08000 Oh Pekerja Rp. 45,000.00 Rp. 3,600.00

0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00

0.08000 Oh Tukang Rp. 65,000.00 Rp. 5,200.00

0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00

Rp. 9,640.00 Rp. 29,900.00 Rp. 39,540.00

1 M2

1 M2

1 M1

1 M1

Page 34: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

XIV PEKERJAAN CAT - CATAN

1 Mendempul dan Menggosok Kayu

0.08000 Kg Dempul Jadi Rp. 16,400.00 Rp. 1,312.00

0.02000 Kg Minyak Cat Rp. 15,700.00 Rp. 314.00

0.20000 Lbr Ampelas Rp. 3,780.00 Rp. 756.00

0.04000 Oh Pekerja Rp. 45,000.00 Rp. 1,800.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.04000 Oh Tukang Cat Rp. 65,000.00 Rp. 2,600.00

0.00400 Oh Kepala Tukang Rp. 70,000.00 Rp. 280.00

Rp. 4,855.00 Rp. 2,382.00 Rp. 7,237.00

2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir

1 Lapis Cat Dasar dan 2 Lapis Cat Penutup )

0.20000 Kg Cat Meni Rp. 18,900.00 Rp. 3,780.00

0.15000 Kg Plamir Rp. 12,600.00 Rp. 1,890.00

0.17000 Kg Cat Dasar Rp. 16,400.00 Rp. 2,788.00

0.26000 Kg Cat Penutup 2 Kali Rp. 34,700.00 Rp. 9,022.00

0.07000 Oh Pekerja Rp. 45,000.00 Rp. 3,150.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.09000 Oh Tukang Cat Rp. 65,000.00 Rp. 5,850.00

0.00600 Oh Kepala Tukang Rp. 70,000.00 Rp. 420.00

Rp. 9,595.00 Rp. 17,480.00 Rp. 27,075.00

3 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir

1 Lapis Cat Dasar dan 3 Lapis Cat Penutup )

0.20000 Kg Cat Meni Rp. 18,900.00 Rp. 3,780.00

0.15000 Kg Plamir Rp. 12,600.00 Rp. 1,890.00

0.17000 Kg Cat Dasar Rp. 16,400.00 Rp. 2,788.00

0.35000 Kg Cat Penutup 3 Kali Rp. 34,700.00 Rp. 12,145.00

0.07000 Oh Pekerja Rp. 45,000.00 Rp. 3,150.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.10500 Oh Tukang Cat Rp. 65,000.00 Rp. 6,825.00

0.00400 Oh Kepala Tukang Rp. 70,000.00 Rp. 280.00

Rp. 10,430.00 Rp. 20,603.00 Rp. 31,033.00

4 Pelaburan Bidang Kayu dengan Cat Residu dan Ter

0.35000 Ltr Residu atau Ter Rp. 2,850.00 Rp. 997.50

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00600 Oh Mandor Rp. 70,000.00 Rp. 420.00

Rp. 4,920.00 Rp. 997.50 Rp. 5,917.50

5 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 Lapis

Cat Dasar dan 2 Lapis Cat Penutup )

0.10000 Kg Plamir Rp. 12,600.00 Rp. 1,260.00

0.10000 Kg Cat Dasar Rp. 16,400.00 Rp. 1,640.00

0.26000 Kg Cat Penutup 2 Kali Rp. 29,400.00 Rp. 7,644.00

0.02000 Oh Pekerja Rp. 45,000.00 Rp. 900.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.06300 Oh Tukang Cat Rp. 65,000.00 Rp. 4,095.00

0.00630 Oh Kepala Tukang Rp. 70,000.00 Rp. 441.00

1 M2

1 M2

1 M2

1 M2

1 M2

Page 35: RAB FILE - Konstruksi Rumah Panggung

Rp. 5,611.00 Rp. 10,544.00 Rp. 16,155.00

Page 36: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

I PEKERJAAN PERSIAPAN

1 Pengukuran dan Pemasangan Bouwplank

0.01200 M3 Kayu 5/7 Rp. 2,430,100.00 Rp. 29,161.20

0.02000 Kg Paku biasa Rp. 20,100.00 Rp. 402.00

0.00700 M3 Kayu Papan 2/20 Rp. 2,645,700.00 Rp. 18,519.90

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 12,050.00 Rp. 48,083.10 Rp.

2 Membersihkan Lapangan dan Perataan

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.05000 Oh Mandor Rp. 70,000.00 Rp. 3,500.00

Rp. 8,000.00 Rp. - Rp.

II PEKERJAAN TANAH (SNI 2835 - 2008)

1 Galian Tanah Biasa sedalam 1 M

0.75000 Oh Pekerja Rp. 45,000.00 Rp. 33,750.00

0.02500 Oh Mandor Rp. 70,000.00 Rp. 1,750.00

Rp. 35,500.00 Rp. - Rp.

2 Galian Tanah Biasa sedalam 2 M

0.90000 Oh Pekerja Rp. 45,000.00 Rp. 40,500.00

0.04500 Oh Mandor Rp. 70,000.00 Rp. 3,150.00

Rp. 43,650.00 Rp. - Rp.

3 Urugan Kembali (1/3 galian)

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.00833 Oh Mandor Rp. 70,000.00 Rp. 583.33

Rp. 11,833.33 Rp. - Rp.

4 Pemadatan Tanah ( per 20 cm )

0.50000 Oh Pekerja Rp. 45,000.00 Rp. 22,500.00

0.05000 Oh Mandor Rp. 70,000.00 Rp. 3,500.00

Rp. 26,000.00 Rp. - Rp.

5 Urugan Pasir

1.20000 M3 Pasir Urug Rp. 23,200.00 Rp. 27,840.00

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

Rp. 14,200.00 Rp. 27,840.00 Rp.

1 M1

1 M2

1 M3

1 M3

1 M3

1 M3

1 M3

Page 37: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

6 Urugan Tanah Merah ( BOW )

1.25000 M3 Pasir Urug Rp. 23,800.00 Rp. 29,750.00

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

Rp. 11,950.00 Rp. 29,750.00 Rp.

7 Urugan Sirtu Padat Untuk Peninggian Lantai Bangunan

1.20000 M3 Pasir Batu Rp. 23,200.00 Rp. 27,840.00

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.02500 Oh Mandor Rp. 70,000.00 Rp. 1,750.00

Rp. 13,000.00 Rp. 27,840.00 Rp.

III PEKERJAAN PONDASI (SNI 2836 - 2008)

1 Pasangan Pondasi Batu Kali camp. 1 : 3

1.20000 M3 Bt. Belah 15/20 cm Rp. 106,900.00 Rp. 128,280.00

4.04000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 298,152.00

0.48500 M3 Pasir Pasang Rp. 25,700.00 Rp. 12,464.50

1.50000 Oh Pekerja Rp. 45,000.00 Rp. 67,500.00

0.07500 Oh Mandor Rp. 70,000.00 Rp. 5,250.00

0.75000 Oh Tukang Batu Rp. 65,000.00 Rp. 48,750.00

0.07500 Oh Kepala Tukang Rp. 70,000.00 Rp. 5,250.00

Rp. 126,750.00 Rp. 438,896.50 Rp.

2 Pasangan Pondasi Batu Kali camp. 1 : 4

1.20000 M3 Bt. Belah 15/20 cm Rp. 106,900.00 Rp. 128,280.00

3.26000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 240,588.00

0.52000 M3 Pasir Pasang Rp. 25,700.00 Rp. 13,364.00

1.50000 Oh Pekerja Rp. 45,000.00 Rp. 67,500.00

0.07500 Oh Mandor Rp. 70,000.00 Rp. 5,250.00

0.75000 Oh Tukang Batu Rp. 65,000.00 Rp. 48,750.00

0.07500 Oh Kepala Tukang Rp. 70,000.00 Rp. 5,250.00

Rp. 126,750.00 Rp. 382,232.00 Rp.

3 Pasangan Pondasi Batu Kosong ( aanstamping )

1.20000 M3 Bt. Belah 15/20 cm Rp. 106,900.00 Rp. 128,280.00

0.43200 M3 Pasir Urug Rp. 23,200.00 Rp. 10,022.40

0.78000 Oh Pekerja Rp. 45,000.00 Rp. 35,100.00

0.03900 Oh Mandor Rp. 70,000.00 Rp. 2,730.00

0.39000 Oh Tukang Batu Rp. 65,000.00 Rp. 25,350.00

0.03900 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,730.00

Rp. 65,910.00 Rp. 138,302.40 Rp.

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

IV PEKERJAAN PASANGAN DINDING (SNI 6897 - 2008)

1 Pasangan Dinding Bata tebal 1 Bata, Camp. 1 : 2

140.00000 Bh Batu Bata Rp. 400.00 Rp. 56,000.00

1 M3

1 M3

1 M3

1 M3

1 M3

1 M2

Page 38: RAB FILE - Konstruksi Rumah Panggung

0.87000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 64,206.00

0.08000 M3 Pasir Pasang Rp. 25,700.00 Rp. 2,056.00

0.60000 Oh Pekerja Rp. 45,000.00 Rp. 27,000.00

0.03000 Oh Mandor Rp. 70,000.00 Rp. 2,100.00

0.20000 Oh Tukang Batu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 43,500.00 Rp. 122,262.00 Rp.

2 Pasangan Dinding Bata tebal 1 Bata, Camp. 1 : 4

140.00000 Bh Batu Bata Rp. 400.00 Rp. 56,000.00

0.53100 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 39,187.80

0.09300 M3 Pasir Pasang Rp. 25,700.00 Rp. 2,390.10

0.60000 Oh Pekerja Rp. 45,000.00 Rp. 27,000.00

0.03000 Oh Mandor Rp. 70,000.00 Rp. 2,100.00

0.20000 Oh Tukang Batu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 43,500.00 Rp. 97,577.90 Rp.

3 Pasangan Dinding Bata tebal 1/2 Bata, Camp. 1 : 2

70.00000 Bh Batu Bata Rp. 400.00 Rp. 28,000.00

0.37900 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 27,970.20

0.03800 M3 Pasir Pasang Rp. 25,700.00 Rp. 976.60

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 56,946.80 Rp.

4 Pasangan Dinding Bata tebal 1/2 Bata, Camp. 1 : 4

70.00000 Bh Batu Bata Rp. 400.00 Rp. 28,000.00

0.23000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 16,974.00

0.04300 M3 Pasir Pasang Rp. 25,700.00 Rp. 1,105.10

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 46,079.10 Rp.

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

V PEKERJAAN PLESTERAN (SNI 2837 - 2008)

1 Plesteran tebal 15 mm camp. 1 : 2

0.20448 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 15,090.62

0.02000 M3 Pasir Pasang Rp. 25,700.00 Rp. 514.00

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

1 M2

1 M2

1 M2

1 M2

Page 39: RAB FILE - Konstruksi Rumah Panggung

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 15,604.62 Rp.

2 Plesteran tebal 15 mm camp. 1 : 3

0.15552 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 11,477.38

0.02300 M3 Pasir Pasang Rp. 25,700.00 Rp. 591.10

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 12,068.48 Rp.

3 Plesteran tebal 15 mm camp. 1 : 4

0.12480 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 9,210.24

0.02400 M3 Pasir Pasang Rp. 25,700.00 Rp. 616.80

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 9,827.04 Rp.

4 Finishing Siar Pasangan Dinding Bata ( = 20 m1 )

0.06216 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 4,587.41

0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00

0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00

0.07500 Oh Tukang Batu Rp. 65,000.00 Rp. 4,875.00

0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00

Rp. 12,745.00 Rp. 4,587.41 Rp.

5 Finishing Siar Pasangan Batu Kali Camp. 1 : 2

0.12680 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 9,357.84

0.01200 M3 Pasir Pasang Rp. 25,700.00 Rp. 308.40

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 9,666.24 Rp.

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

6 Pas. Dinding Roster ( 12 x 20 x 20 ) cm,

Camp. 1 : 4

25.00000 Bh Roster Rp. 22,500.00 Rp. 562,500.00

0.22000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 16,236.00

0.03500 M3 Pasir Pasang Rp. 25,700.00 Rp. 899.50

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

1 M2

1 M2

1 M2

1 M2

1 M2

Page 40: RAB FILE - Konstruksi Rumah Panggung

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 579,635.50 Rp.

7 Pas. Dinding Kerawang ( 12 x 20 x 20 ) cm,

Camp. 1 : 4

25.00000 Bh Kerawang Rp. 7,500.00 Rp. 187,500.00

0.22000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 16,236.00

0.03500 M3 Pasir Pasang Rp. 25,700.00 Rp. 899.50

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 204,635.50 Rp.

8 Acian

0.06500 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 4,797.00

0.20000 Oh Pekerja Rp. 45,000.00 Rp. 9,000.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 16,900.00 Rp. 4,797.00 Rp.

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

VI PEKERJAAN KAYU (SNI 3434 - 2008)

1 Pasangan Kusen Pintu dan Jendela Kayu Ulin 1 M3

1.10000 M3 Kayu Balok Ulin Rp. 4,738,900.00 Rp. 5,212,790.00

1.25000 Kg Paku Ulin Rp. 25,200.00 Rp. 31,500.00

1.00000 Kg Lem Kayu Rp. 20,000.00 Rp. 20,000.00

7.00000 Oh Pekerja Rp. 45,000.00 Rp. 315,000.00

0.35000 Oh Mandor Rp. 70,000.00 Rp. 24,500.00

21.00000 Oh Tukang Kayu Rp. 65,000.00 Rp. 1,365,000.00

2.10000 Oh Kepala Tukang Rp. 70,000.00 Rp. 147,000.00

Rp. 1,851,500.00 Rp. 5,264,290.00 Rp.

2 Pasangan Kusen Pintu dan Jendela Kayu Lanan 1 M3

1.20000 M3 Kayu Balok Lanan Rp. 2,430,100.00 Rp. 2,916,120.00

1.25000 Kg Paku Rp. 20,100.00 Rp. 25,125.00

1.00000 Kg Lem Kayu Rp. 20,000.00 Rp. 20,000.00

6.00000 Oh Pekerja Rp. 45,000.00 Rp. 270,000.00

0.30000 Oh Mandor Rp. 70,000.00 Rp. 21,000.00

18.00000 Oh Tukang Kayu Rp. 65,000.00 Rp. 1,170,000.00

1.80000 Oh Kepala Tukang Rp. 70,000.00 Rp. 126,000.00

Rp. 1,587,000.00 Rp. 2,961,245.00 Rp.

3 Pasangan Listplank 2/30 cm Kayu Kelas I atau II 1 M1

0.01100 M3 Kayu Ulin Rp. 5,102,000.00 Rp. 56,122.00

0.05000 Kg Paku Rp. 25,200.00 Rp. 1,260.00

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.20000 Oh Tukang Kayu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

1 M2

1 M2

Page 41: RAB FILE - Konstruksi Rumah Panggung

Rp. 19,250.00 Rp. 57,382.00 Rp.

4 Pasangan Rangka Dinding Pemisah (60 x 120) cm 1 M2

Kayu Lanan

0.02800 M3 Kayu, Balok Lanan Rp. 2,430,100.00 Rp. 68,042.80

0.15000 Kg Paku Rp. 20,100.00 Rp. 3,015.00

0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00

0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00

0.45000 Oh Tukang Kayu Rp. 65,000.00 Rp. 29,250.00

0.04500 Oh Kepala Tukang Rp. 70,000.00 Rp. 3,150.00

Rp. 39,710.00 Rp. 71,057.80 Rp.

5 Pasangan Dinding Pemisah Plywood Rangkap + 1 M2

Rangka Kayu Lanan

0.00833 M3 Kayu, Balok Lanan Rp. 2,430,100.00 Rp. 68,042.80

0.00000 Kg Paku Rp. 20,100.00 Rp. 3,015.00

0.56000 Kg Lem Kayu Rp. 20,000.00 Rp. 11,200.00

0.86000 Lbr Plywood Rp. 46,000.00 Rp. 39,560.00

0.00000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00

Pemadatan TOh Mandor Rp. 70,000.00 Rp. 560.00

0.00000 Oh Tukang Kayu Rp. 65,000.00 Rp. 29,250.00

0.50000 Oh Kepala Tukang Rp. 70,000.00 Rp. 3,150.00

Rp. 39,710.00 Rp. 121,817.80 Rp.

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

VII PEKERJAAN BETON (SNI 7394 - 2008)

1 Membuat Beton Mutu f'c = 7,4 MPa (K 100), slump 1 M3

(12±2) cm, w/c = 0,87

4.94000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 364,572.00

0.62071 M3 Pasir Beton Rp. 25,700.00 Rp. 15,952.25

0.74000 M3 Koral Beton Rp. 79,400.00 Rp. 58,756.00

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 453,255.25 Rp.

2 Membuat Beton Mutu f'c = 9,8 MPa (K 125), slump 1 M3

(12±2) cm, w/c = 0,78

5.52000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 407,376.00

0.59143 M3 Pasir Beton Rp. 25,700.00 Rp. 15,199.75

0.74963 M3 Koral Beton Rp. 79,400.00 Rp. 59,520.62

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 496,071.37 Rp.

3 Membuat Beton Mutu f'c = 12,2 MPa (K 150), slump 1 M3

(12±2) cm, w/c = 0,72

5.98000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 441,324.00

0.57071 M3 Pasir Beton Rp. 25,700.00 Rp. 14,667.25

Page 42: RAB FILE - Konstruksi Rumah Panggung

0.75333 M3 Koral Beton Rp. 79,400.00 Rp. 59,814.40

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 529,780.65 Rp.

4 Membuat Lantai Kerja Beton Mutu f'c = 7,4 MPa (K 100) 1 M3

slump (3-6) cm, w/c = 0,87

4.60000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 339,480.00

0.63786 M3 Pasir Beton Rp. 25,700.00 Rp. 16,393.00

0.76074 M3 Koral Beton Rp. 79,400.00 Rp. 60,402.76

200.00000 Lt Air Rp. 65.00 Rp. 13,000.00

1.20000 Oh Pekerja Rp. 45,000.00 Rp. 54,000.00

0.06000 Oh Mandor Rp. 70,000.00 Rp. 4,200.00

0.20000 Oh Tukang Batu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 72,600.00 Rp. 429,275.76 Rp.

NO. URAIAN

5 Membuat Beton Mutu f'c = 14,5 MPa (K 175), slump 1 M3

(12±2) cm, w/c = 0,66

6.52000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.54286 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.76222 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 569,622.77 Rp.

6 Membuat Beton Mutu f'c = 16,9 MPa (K 200), slump 1 M3

(12±2) cm, w/c = 0,61

7.04000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 519,552.00

0.52214 M3 Pasir Beton Rp. 25,700.00 Rp. 13,419.00

0.76370 M3 Koral Beton Rp. 79,400.00 Rp. 60,637.78

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 607,583.78 Rp.

7 Membuat Beton Mutu f'c = 19,3 MPa (K 225), slump 1 M3

(12±2) cm, w/c = 0,58

7.42000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 547,596.00

0.49857 M3 Pasir Beton Rp. 25,700.00 Rp. 12,813.25

0.77556 M3 Koral Beton Rp. 79,400.00 Rp. 61,579.46

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

Page 43: RAB FILE - Konstruksi Rumah Panggung

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 635,963.71 Rp.

8 Membuat Beton Mutu f'c = 21,7 MPa (K 250), slump 1 M3

(12±2) cm, w/c = 0,56

7.68000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 566,784.00

0.49429 M3 Pasir Beton Rp. 25,700.00 Rp. 12,703.25

0.76963 M3 Koral Beton Rp. 79,400.00 Rp. 61,108.62

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 654,570.88 Rp.

NO. URAIAN

9 Membuat Beton Mutu f'c = 24,0 MPa (K 275), slump 1 M3

(12±2) cm, w/c = 0,53

8.12000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 599,256.00

0.48857 M3 Pasir Beton Rp. 25,700.00 Rp. 12,556.25

0.76000 M3 Koral Beton Rp. 79,400.00 Rp. 60,344.00

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 686,131.25 Rp.

10 Membuat Beton Mutu f'c = 26,4 MPa (K 300), slump 1 M3

(12±2) cm, w/c = 0,52

8.26000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 609,588.00

0.48643 M3 Pasir Beton Rp. 25,700.00 Rp. 12,501.25

0.75630 M3 Koral Beton (mak. 30 mm) Rp. 79,400.00 Rp. 60,050.22

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 696,114.47 Rp.

11 Membuat Beton Mutu f'c = 28,8 MPa (K 325), slump 1 M3

(12±2) cm, w/c = 0,49

8.78000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 647,964.00

0.47857 M3 Pasir Beton Rp. 25,700.00 Rp. 12,299.25

0.74519 M3 Koral Beton (mak. 30 mm) Rp. 79,400.00 Rp. 59,168.09

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

Page 44: RAB FILE - Konstruksi Rumah Panggung

2.10000 Oh Pekerja Rp. 45,000.00 Rp. 94,500.00

0.10500 Oh Mandor Rp. 70,000.00 Rp. 7,350.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 127,050.00 Rp. 733,406.34 Rp.

12 Membuat Beton Mutu f'c = 31,2 MPa (K 350), slump 1 M3

(12±2) cm, w/c = 0,48

8.96000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 661,248.00

0.47643 M3 Pasir Beton Rp. 25,700.00 Rp. 12,244.25

0.74074 M3 Koral Beton (mak. 30 mm) Rp. 79,400.00 Rp. 58,814.76

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

2.10000 Oh Pekerja Rp. 45,000.00 Rp. 94,500.00

0.10500 Oh Mandor Rp. 70,000.00 Rp. 7,350.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 127,050.00 Rp. 746,282.01 Rp.

13 Pembesian dengan Besi Polos atau Ulir 10 Kg

10.50000 Kg Besi Beton Rp. 14,500.00 Rp. 152,250.00

0.15000 Kg Kawat Beton Rp. 18,000.00 Rp. 2,700.00

0.07000 Oh Pekerja Rp. 45,000.00 Rp. 3,150.00

0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00

0.07000 Oh Tukang Besi Rp. 65,000.00 Rp. 4,550.00

0.00700 Oh Kepala Tukang Rp. 70,000.00 Rp. 490.00

Rp. 8,470.00 Rp. 154,950.00 Rp.

NO. URAIAN

14 Pasang Bekisting untuk Pondasi 1 M2

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.30000 Kg Paku Rp. 20,100.00 Rp. 6,030.00

0.10000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 285.00

0.52000 Oh Pekerja Rp. 45,000.00 Rp. 23,400.00

0.02600 Oh Mandor Rp. 70,000.00 Rp. 1,820.00

0.26000 Oh Tukang Kayu Rp. 65,000.00 Rp. 16,900.00

0.02600 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,820.00

Rp. 43,940.00 Rp. 84,375.00 Rp.

15 Pasang Bekisting untuk Sloof 1 M2

0.04500 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 87,817.50

0.30000 Kg Paku Rp. 20,100.00 Rp. 6,030.00

0.10000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 285.00

0.52000 Oh Pekerja Rp. 45,000.00 Rp. 23,400.00

0.02600 Oh Mandor Rp. 70,000.00 Rp. 1,820.00

0.26000 Oh Tukang Kayu Rp. 65,000.00 Rp. 16,900.00

0.02600 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,820.00

Rp. 43,940.00 Rp. 94,132.50 Rp.

16 Pasang Bekisting untuk Kolom 1 M2

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.01500 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 36,451.50

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

2.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 7,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

Page 45: RAB FILE - Konstruksi Rumah Panggung

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 179,201.50 Rp.

17 Pasang Bekisting untuk Balok 1 M2

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.01800 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 43,741.80

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

2.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 7,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 186,491.80 Rp.

NO. URAIAN

18 Pasang Bekisting untuk Lantai 1 M2

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.01500 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 36,451.50

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

6.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 22,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 194,201.50 Rp.

19 Pasang Bekisting untuk Dinding 1 M2

0.03000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 58,545.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.02000 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 48,602.00

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

3.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 11,250.00

4.00000 Bh Formtie/Penjaga Jarak Bekisting Rp. 2,800.00 Rp. 11,200.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 186,787.00 Rp.

Page 46: RAB FILE - Konstruksi Rumah Panggung

20 Pasang Bekisting untuk Tangga 1 M2

0.03000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 58,545.00

0.40000 Kg Paku Biasa Rp. 20,100.00 Rp. 8,040.00

0.15000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 427.50

0.01500 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 36,451.50

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

2.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 7,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 159,544.00 Rp.

NO. URAIAN

21 Membuat Pondasi Beton Bertulang Mutu f'c = 14,5 MPa 1 M3

(K 175), slump (12±2) cm, w/c = 0,66

( 150 Kg + Bekisting )

0.00000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 390,300.00

#VALUE! Kg Paku Rp. 20,100.00 Rp. 30,150.00

0.00000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 1,140.00

0.22500 Kg Besi Beton Rp. 14,500.00 Rp. 2,283,750.00

2.25000 Kg Kawat Beton Rp. 18,000.00 Rp. 40,500.00

0.01000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.00000 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.00000 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

Urugan Sirt Lt Air Rp. 65.00 Rp. 13,975.00

0.84900 Oh Pekerja Rp. 45,000.00 Rp. 238,500.00

1.32000 Oh Mandor Rp. 70,000.00 Rp. 19,110.00

0.25000 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

1.50000 Oh Tukang Kayu Rp. 65,000.00 Rp. 84,500.00

0.00000 Oh Tukang Besi Rp. 65,000.00 Rp. 68,250.00

#VALUE! Oh Kepala Tukang Rp. 70,000.00 Rp. 18,410.00

Rp. 446,645.00 Rp. 3,315,462.77 Rp.

22 Membuat Sloof Beton Bertulang Mutu f'c = 14,5 MPa 1 M3

(K 175), slump (12±2) cm, w/c = 0,66

( 225 Kg + Bekisting )

#VALUE! M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 526,905.00

0.00000 Kg Paku Rp. 20,100.00 Rp. 36,180.00

Page 47: RAB FILE - Konstruksi Rumah Panggung

0.37296 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 1,710.00

0.33750 Kg Besi Beton Rp. 14,500.00 Rp. 3,425,625.00

3.37500 Kg Kawat Beton Rp. 18,000.00 Rp. 60,750.00

0.01000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.00000 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.00000 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

Urugan Sirt Lt Air Rp. 65.00 Rp. 13,975.00

1.23750 Oh Pekerja Rp. 45,000.00 Rp. 285,525.00

1.24800 Oh Mandor Rp. 70,000.00 Rp. 23,030.00

0.25000 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.45000 Oh Tukang Kayu Rp. 65,000.00 Rp. 101,400.00

0.00000 Oh Tukang Besi Rp. 65,000.00 Rp. 102,375.00

#VALUE! Oh Kepala Tukang Rp. 70,000.00 Rp. 23,905.00

Rp. 554,110.00 Rp. 4,620,792.77 Rp.

NO. URAIAN

23 Membuat Kolom Beton Bertulang Mutu f'c = 16,9 MPa 1 M3

(K 200), slump (12±2) cm, w/c = 0,61

( 230 Kg + Bekisting )

1.01440 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 624,480.00

0.09600 Kg Paku Rp. 20,100.00 Rp. 64,320.00

2.40000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 4,560.00

0.12000 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 291,612.00

1.20000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 388,640.00

0.12000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 60,000.00

0.34500 Kg Besi Beton Rp. 14,500.00 Rp. 3,501,750.00

3.45000 Kg Kawat Beton Rp. 18,000.00 Rp. 62,100.00

0.00000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 519,552.00

1.20000 M3 Pasir Beton Rp. 25,700.00 Rp. 13,419.00

4.04000 M3 Koral Beton Rp. 79,400.00 Rp. 60,637.78

0.48500 Lt Air Rp. 65.00 Rp. 13,975.00

1.84500 Oh Pekerja Rp. 45,000.00 Rp. 384,300.00

0.07500 Oh Mandor Rp. 70,000.00 Rp. 30,730.00

0.75000 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.00000 Oh Tukang Kayu Rp. 65,000.00 Rp. 171,600.00

0.00000 Oh Tukang Besi Rp. 65,000.00 Rp. 104,650.00

#VALUE! Oh Kepala Tukang Rp. 70,000.00 Rp. 31,710.00

Rp. 740,865.00 Rp. 5,605,045.78 Rp.

24 Membuat Balok Beton Bertulang Mutu f'c = 14,5 MPa 1 M3

Page 48: RAB FILE - Konstruksi Rumah Panggung

(K 175), slump (12±2) cm, w/c = 0,66

( 225 Kg + Bekisting )

0.00000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 624,480.00

0.00000 Kg Paku Rp. 20,100.00 Rp. 64,320.00

0.00000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 4,560.00

0.00000 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 349,934.40

0.00000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 388,640.00

#VALUE! Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 60,000.00

0.33750 Kg Besi Beton Rp. 14,500.00 Rp. 3,425,625.00

3.37500 Kg Kawat Beton Rp. 18,000.00 Rp. 60,750.00

0.01000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.00000 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.00000 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

Urugan Sirt Lt Air Rp. 65.00 Rp. 13,975.00

0.33750 Oh Pekerja Rp. 45,000.00 Rp. 382,725.00

1.20000 Oh Mandor Rp. 70,000.00 Rp. 30,590.00

0.25000 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

#VALUE! Oh Tukang Kayu Rp. 65,000.00 Rp. 171,600.00

0.00000 Oh Tukang Besi Rp. 65,000.00 Rp. 102,375.00

#VALUE! Oh Kepala Tukang Rp. 70,000.00 Rp. 31,465.00

Rp. 736,630.00 Rp. 5,547,932.17 Rp.

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

25 Membuat Lantai Beton Bertulang Mutu f'c = 19,3 MPa 1 M3

(K 225), slump (12±2) cm, w/c = 0,58

( 125 Kg + Bekisting )

0.00000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 975,750.00

0.00000 Kg Paku Rp. 20,100.00 Rp. 100,500.00

#VALUE! Ltr Minyak Bekisting Rp. 2,850.00 Rp. 7,125.00

0.00000 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 455,643.75

0.81250 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 607,250.00

2.50000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 281,250.00

0.18750 Kg Besi Beton Rp. 14,500.00 Rp. 1,903,125.00

1.87500 Kg Kawat Beton Rp. 18,000.00 Rp. 33,750.00

3.26000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 547,596.00

0.52000 M3 Pasir Beton Rp. 25,700.00 Rp. 12,813.25

1.50000 M3 Koral Beton Rp. 79,400.00 Rp. 61,579.46

0.07500 Lt Air Rp. 65.00 Rp. 13,975.00

1.06250 Oh Pekerja Rp. 45,000.00 Rp. 484,875.00

1.32500 Oh Mandor Rp. 70,000.00 Rp. 38,185.00

0.00000 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.12500 Oh Tukang Kayu Rp. 65,000.00 Rp. 268,125.00

0.00000 Oh Tukang Besi Rp. 65,000.00 Rp. 56,875.00

#VALUE! Oh Kepala Tukang Rp. 70,000.00 Rp. 36,960.00

Rp. 902,895.00 Rp. 5,000,357.46 Rp.

Page 49: RAB FILE - Konstruksi Rumah Panggung

26 Membuat Dinding Beton Bertulang Mutu f'c = 14,5 MPa 1 M3

(K 175), slump (12±2) cm, w/c = 0,66

( 95 Kg + Bekisting )

#VALUE! M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 468,360.00

0.00000 Kg Paku Rp. 20,100.00 Rp. 64,320.00

0.00000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 4,560.00

#VALUE! M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 388,816.00

0.00000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 388,640.00

#VALUE! Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 90,000.00

0.00000 Bh Formtie/Penjaga Jarak Bekisting Rp. 2,800.00 Rp. 89,600.00

0.14250 Kg Besi Beton Rp. 14,500.00 Rp. 1,446,375.00

1.42500 Kg Kawat Beton Rp. 18,000.00 Rp. 25,650.00

0.01000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.00000 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.00000 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

Urugan Sirt Lt Air Rp. 65.00 Rp. 13,975.00

8.94250 Oh Pekerja Rp. 45,000.00 Rp. 341,775.00

11.20000 Oh Mandor Rp. 70,000.00 Rp. 26,950.00

0.25000 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

8.00000 Oh Tukang Kayu Rp. 65,000.00 Rp. 171,600.00

0.00000 Oh Tukang Besi Rp. 65,000.00 Rp. 43,225.00

#VALUE! Oh Kepala Tukang Rp. 70,000.00 Rp. 25,095.00

Rp. 626,520.00 Rp. 3,535,943.77 Rp.

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

VIII PEKERJAAN PENUTUP ATAP

1 Pasang Atap Genteng Metal 1 M2

1.62000 Lbr Genteng Metal Rp. 34,000.00 Rp. 55,080.00

0.20000 Kg Paku Rp. 17,500.00 Rp. 3,500.00

0.20000 Oh Pekerja Rp. 45,000.00 Rp. 9,000.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 16,900.00 Rp. 58,580.00 Rp.

2 Pasang Atap Nok Genteng Metal 1 M1

2.50000 Bh Nok Genteng Metal Rp. 18,500.00 Rp. 46,250.00

0.05000 Kg Paku Rp. 17,500.00 Rp. 875.00

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.01300 Oh Mandor Rp. 70,000.00 Rp. 910.00

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 22,960.00 Rp. 47,125.00 Rp.

IX PEKERJAAN LANGIT - LANGIT (SNI 2839 - 2008)

1 Pasang Langit - langit Plywood Tebal 3 mm, 4 mm 1 M2

dan 6 mm

0.37500 Lbr Plywood 4 mm Rp. 46,000.00 Rp. 17,250.00

0.03000 Kg Paku Triplek Rp. 30,000.00 Rp. 900.00

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

Page 50: RAB FILE - Konstruksi Rumah Panggung

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 12,050.00 Rp. 18,150.00 Rp.

2 1 m2 Pasang rangka langit-langit (0,60 x 1,20) m, kayu lanan

0.0120 M3 Balok kayu lanan Rp. 2,430,100.00 29,161.2000

0.1000 Kg Paku kayu 2" - 5" Rp. 20,100.00 2,010.0000

0.1500 Oh Pekerja Rp. 45,000.00 6,750.00

0.0750 Oh Mandor Rp. 70,000.00 5,250.00

0.2500 Oh Tukang kayu Rp. 65,000.00 16,250.00

0.0250 Oh Kepala tukang kayu Rp. 70,000.00 1,750.00

Rp. 30,000.00 Rp. 31,171.20 Rp.

1 m2 Langit-langit kalsiboard, tebal 4 mm

0.3640 Lbr kalsiboard (120x240x4) mm Rp. 125,000.00 45,500.0000

0.1100 Kg Paku skrup Rp. 28,500.00 3,135.0000

0.1000 Oh Pembantu tukang kayu Rp. 45,000.00 4,500.00

0.0050 Oh Mandor Rp. 70,000.00 350.00

0.0500 Oh Tukang kayu Rp. 65,000.00 3,250.00

0.0050 Oh Kepala tukang kayu Rp. 70,000.00 350.00

Rp. 8,450.00 Rp. 48,635.00 Rp.

2 Pasang Langit - langit Lambrizing Kayu Tebal 9 mm 1 M2

0.01500 M3 Kayu Lanan ( Papan ) Rp. 2,645,700.00 Rp. 39,685.50

0.01000 Kg Paku Triplek Rp. 30,000.00 Rp. 300.00

0.80000 Oh Pekerja Rp. 45,000.00 Rp. 36,000.00

0.04000 Oh Mandor Rp. 70,000.00 Rp. 2,800.00

0.80000 Oh Tukang Kayu Rp. 65,000.00 Rp. 52,000.00

0.08000 Oh Kepala Tukang Rp. 70,000.00 Rp. 5,600.00

Rp. 96,400.00 Rp. 39,985.50 Rp.

3 Pasang List Langit - langit Kayu Profil 1 M1

1.05000 M1 List Kayu Profil Rp. 3,000.00 Rp. 3,150.00

0.01000 Kg Paku Rp. 20,100.00 Rp. 201.00

0.05000 Oh Pekerja Rp. 45,000.00 Rp. 2,250.00

0.00300 Oh Mandor Rp. 70,000.00 Rp. 210.00

0.05000 Oh Tukang Kayu Rp. 65,000.00 Rp. 3,250.00

0.00500 Oh Kepala Tukang Rp. 70,000.00 Rp. 350.00

Rp. 6,060.00 Rp. 3,351.00 Rp.

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

X PEKERJAAN PIPA DAN SANITASI

1 Memasang 1 Buah Kloset Duduk/Monoblok 1 Bh

1.00000 Bh Kloset Duduk/Monoblok Rp. 2,271,900.00 Rp. 2,271,900.00

0.06000 Perlengkapan 6% Harga Kloset Rp. 2,271,900.00 Rp. 136,314.00

3.30000 Oh Pekerja Rp. 45,000.00 Rp. 148,500.00

0.16000 Oh Mandor Rp. 70,000.00 Rp. 11,200.00

H909
Rekadaya: cek harga
Page 51: RAB FILE - Konstruksi Rumah Panggung

1.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 71,500.00

0.00100 Oh Kepala Tukang Rp. 70,000.00 Rp. 70.00

Rp. 231,270.00 Rp. 2,408,214.00 Rp.

2 Memasang 1 Buah Kloset Jongkok Porselin 1 Bh

1.00000 Bh Kloset Jongkok Rp. 227,100.00 Rp. 227,100.00

0.12000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 8,856.00

0.01000 M3 Pasir Beton Rp. 25,700.00 Rp. 257.00

1.00000 Oh Pekerja Rp. 45,000.00 Rp. 45,000.00

0.16000 Oh Mandor Rp. 70,000.00 Rp. 11,200.00

1.50000 Oh Tukang Batu Rp. 65,000.00 Rp. 97,500.00

0.15000 Oh Kepala Tukang Rp. 70,000.00 Rp. 10,500.00

Rp. 164,200.00 Rp. 236,213.00 Rp.

3 Memasang 1 Bh Bak Mandi Batu Bata Vol 0,3 m3 1 Bh

300.00000 Bh Batu Bata Rp. 400.00 Rp. 120,000.00

2.40000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 177,120.00

0.30000 M3 Pasir Beton Rp. 25,700.00 Rp. 7,710.00

4.35600 M2 Keramik 20 x 20 cm Rp. 57,000.00 Rp. 248,292.00

6.00000 Kg Semen Nat Rp. 3,000.00 Rp. 18,000.00

6.00000 Oh Pekerja Rp. 45,000.00 Rp. 270,000.00

0.30000 Oh Mandor Rp. 70,000.00 Rp. 21,000.00

3.00000 Oh Tukang Batu Rp. 65,000.00 Rp. 195,000.00

0.30000 Oh Kepala Tukang Rp. 70,000.00 Rp. 21,000.00

Rp. 507,000.00 Rp. 571,122.00 Rp.

4 Memasang 1 Buah Wastafel 1 Bh

1.00000 Bh Wastafel Rp. 942,900.00 Rp. 942,900.00

0.12000 Perlengkapan 12% Harga Wastafel Rp. 942,900.00 Rp. 113,148.00

0.12000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 8,856.00

0.01000 M3 Pasir Beton Rp. 25,700.00 Rp. 257.00

1.20000 Oh Pekerja Rp. 45,000.00 Rp. 54,000.00

0.10000 Oh Mandor Rp. 70,000.00 Rp. 7,000.00

1.45000 Oh Tukang Batu Rp. 65,000.00 Rp. 94,250.00

0.15000 Oh Kepala Tukang Rp. 70,000.00 Rp. 10,500.00

Rp. 165,750.00 Rp. 1,065,161.00 Rp.

NO. URAIAN

5 Pasang 1 Buah Bak Kontrol Pas. Bt Bata Bh

Uk 30 x 30 tinggi 35 cm

145.00000 Bh Batu Bata Rp. 400.00 Rp. 58,000.00

0.88000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 64,944.00

0.07000 M3 Pasir Pasang Rp. 25,700.00 Rp. 1,799.00

0.07000 M3 Kerikil Rp. 79,400.00 Rp. 5,558.00

0.06000 M3 Pasir Beton Rp. 25,700.00 Rp. 1,542.00

1.60000 Kg Besi Beton Rp. 14,500.00 Rp. 23,200.00

3.20000 Oh Pekerja Rp. 45,000.00 Rp. 144,000.00

0.01600 Oh Mandor Rp. 70,000.00 Rp. 1,120.00

Page 52: RAB FILE - Konstruksi Rumah Panggung

1.01500 Oh Tukang Batu Rp. 65,000.00 Rp. 65,975.00

0.01600 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,120.00

Rp. 212,215.00 Rp. 155,043.00 Rp.

6 Pasang 1 Buah Bak Kontrol Pas. Bt Bata Bh

Uk 45 x 45 tinggi 50 cm

250.00000 Bh Batu Bata Rp. 400.00 Rp. 100,000.00

1.54000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 113,652.00

0.13000 M3 Pasir Pasang Rp. 25,700.00 Rp. 3,341.00

0.02000 M3 Kerikil Rp. 79,400.00 Rp. 1,588.00

0.09000 M3 Pasir Beton Rp. 25,700.00 Rp. 2,313.00

2.60000 Kg Besi Beton Rp. 14,500.00 Rp. 37,700.00

1.42000 Oh Pekerja Rp. 45,000.00 Rp. 63,900.00

0.07100 Oh Mandor Rp. 70,000.00 Rp. 4,970.00

0.47300 Oh Tukang Batu Rp. 65,000.00 Rp. 30,745.00

0.04700 Oh Kepala Tukang Rp. 70,000.00 Rp. 3,290.00

Rp. 102,905.00 Rp. 258,594.00 Rp.

7 Memasang 1 Buah Kran dia. 3/4" atau 1/2" 1 Bh

1.00000 Bh Kran Air Rp. 9,000.00 Rp. 9,000.00

0.02500 Bh Seal Tape Rp. 8,500.00 Rp. 212.50

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 8,000.00 Rp. 9,212.50 Rp.

8 Memasang 1 Buah Floor Drain 1 Bh

1.00000 Bh Floor Drain Rp. 15,000.00 Rp. 15,000.00

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 8,000.00 Rp. 15,000.00 Rp.

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

XII PEKERJAAN KUNCI DAN KACA

1 Pasang Kunci Tanam Biasa Kualitas Sedang 1 Bh

1.00000 Bh Kunci Tanam 2 Slaag Rp. 94,600.00 Rp. 94,600.00

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.50000 Oh Tukang Kayu Rp. 65,000.00 Rp. 32,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 34,000.00 Rp. 94,600.00 Rp.

2 Pasang Kunci Tanam Kamar Mandi 1 Bh

1.00000 Bh Kunci Tanam 1 Slaag Rp. 50,400.00 Rp. 50,400.00

0.00500 Oh Pekerja Rp. 45,000.00 Rp. 225.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.50000 Oh Tukang Kayu Rp. 65,000.00 Rp. 32,500.00

0.00500 Oh Kepala Tukang Rp. 70,000.00 Rp. 350.00

Rp. 33,250.00 Rp. 50,400.00 Rp.

Page 53: RAB FILE - Konstruksi Rumah Panggung

3 Pasang Engsel Pintu 1 Bh

1.00000 Bh Engsel Pintu (kuningan 4") Rp. 11,300.00 Rp. 11,300.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 11,300.00 Rp.

4 Pasang Engsel Jendela 1 Bh

1.00000 Bh Engsel Jendela Rp. 9,460.00 Rp. 9,460.00

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00050 Oh Mandor Rp. 70,000.00 Rp. 35.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 7,685.00 Rp. 9,460.00 Rp.

5 Pasang Engsel Angin 1 Bh

1.00000 Bh Engsel angin Rp. 9,460.00 Rp. 9,460.00

0.02000 Oh Pekerja Rp. 45,000.00 Rp. 900.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

0.20000 Oh Tukang Kayu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 16,000.00 Rp. 9,460.00 Rp.

6 Pasang Kait Angin 1 Bh

1.00000 Bh Kait Angin Rp. 4,410.00 Rp. 4,410.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 4,410.00 Rp.

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

7 Pasang Gerendel 1 Bh

1.00000 Bh Grendel Rp. 7,570.00 Rp. 7,570.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 7,570.00 Rp.

8 Pasang Kaca tebal 5 mm 1 M2

1.10000 M2 Kaca Rp. 63,100.00 Rp. 69,410.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 69,410.00 Rp.

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

Page 54: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

(SNI 7395 -2008)

1 Pasang Lantai Keramik Uk. 30 x 30 cm 1 M2

1.06830 M2 Keramik Uk. 30 x 30 cm Rp. 63,000.00 Rp. 67,302.90

0.20000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 14,760.00

0.04500 M3 Pasir Beton Rp. 25,700.00 Rp. 1,156.50

1.50000 Kg Semen Warna Rp. 3,000.00 Rp. 4,500.00

0.70000 Oh Pekerja Rp. 45,000.00 Rp. 31,500.00

0.03500 Oh Mandor Rp. 70,000.00 Rp. 2,450.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 59,150.00 Rp. 87,719.40 Rp.

2 Pasang Lantai Keramik Uk. 40 x 40 cm 1 M2

1.06830 M2 Keramik Uk. 40 x 40 cm Rp. 80,000.00 Rp. 85,464.00

0.20000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 14,760.00

0.04500 M3 Pasir Beton Rp. 25,700.00 Rp. 1,156.50

1.50000 Kg Semen Warna Rp. 3,000.00 Rp. 4,500.00

0.70000 Oh Pekerja Rp. 45,000.00 Rp. 31,500.00

0.03500 Oh Mandor Rp. 70,000.00 Rp. 2,450.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 59,150.00 Rp. 105,880.50 Rp.

3 Pasang Lantai Keramik Uk. 20 x 20 cm 1 M2

1.06000 M2 Keramik Uk. 20 x 20 cm Rp. 57,000.00 Rp. 60,420.00

0.20800 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 15,350.40

0.04500 M3 Pasir Beton Rp. 25,700.00 Rp. 1,156.50

1.62000 Kg Semen Warna Rp. 3,000.00 Rp. 4,860.00

0.70000 Oh Pekerja Rp. 45,000.00 Rp. 31,500.00

0.03500 Oh Mandor Rp. 70,000.00 Rp. 2,450.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 59,150.00 Rp. 81,786.90 Rp.

4 Pasang Dinding Keramik 20 x 20 cm 1 M2

1.06000 M2 Keramik 20 x 20 cm Rp. 57,000.00 Rp. 60,420.00

0.18600 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 13,726.80

0.01800 M3 Pasir Beton Rp. 25,700.00 Rp. 462.60

1.94000 Kg Semen Warna Rp. 3,000.00 Rp. 5,820.00

0.90000 Oh Pekerja Rp. 45,000.00 Rp. 40,500.00

0.04500 Oh Mandor Rp. 70,000.00 Rp. 3,150.00

0.45000 Oh Tukang Batu Rp. 65,000.00 Rp. 29,250.00

0.04500 Oh Kepala Tukang Rp. 70,000.00 Rp. 3,150.00

Rp. 76,050.00 Rp. 80,429.40 Rp.

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

5 Pasang Lantai Vinyl Flexible Homogeneous 1 M2

1.05000 M2 Vinyl type Mipolam Troplan 100 + Rp. 285,000.00 Rp. 299,250.00

welding rod ( Gerflor )

Page 55: RAB FILE - Konstruksi Rumah Panggung

0.35000 Kg Lem Vinyl Rp. 30,000.00 Rp. 10,500.00

0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00

0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00

0.15000 Oh Tukang Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 18,110.00 Rp. 309,750.00 Rp.

6 Pasang Lantai Vinyl Flexible Homogeneous 1 M2

1.05000 M2 Vinyl type Mipolam 180 + welding rod Rp. 260,000.00 Rp. 273,000.00

( Gerflor )

0.35000 Kg Lem Vinyl Rp. 30,000.00 Rp. 10,500.00

0.15000 Oh Pekerja Rp. 45,000.00 Rp. 6,750.00

0.00800 Oh Mandor Rp. 70,000.00 Rp. 560.00

0.15000 Oh Tukang Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 18,110.00 Rp. 283,500.00 Rp.

7 Pasang Plint Vinyl Flexible Homogeneous 1 M1

0.11000 M2 Vinyl type Mipolam Troplan 100 + Rp. 275,000.00 Rp. 30,250.00

capping strip ( Gerflor )

0.08000 Kg Lem Vinyl Rp. 30,000.00 Rp. 2,400.00

0.08000 Oh Pekerja Rp. 45,000.00 Rp. 3,600.00

0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00

0.08000 Oh Tukang Rp. 65,000.00 Rp. 5,200.00

0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00

Rp. 9,640.00 Rp. 32,650.00 Rp.

8 Pasang Plint Vinyl Flexible Homogeneous 1 M1

0.11000 M2 Vinyl type Mipolam 180 + capping Rp. 250,000.00 Rp. 27,500.00

strip ( Gerflor )

0.08000 Kg Lem Vinyl Rp. 30,000.00 Rp. 2,400.00

0.08000 Oh Pekerja Rp. 45,000.00 Rp. 3,600.00

0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00

0.08000 Oh Tukang Rp. 65,000.00 Rp. 5,200.00

0.00800 Oh Kepala Tukang Rp. 70,000.00 Rp. 560.00

Rp. 9,640.00 Rp. 29,900.00 Rp.

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

XIV PEKERJAAN CAT - CATAN

1 Mendempul dan Menggosok Kayu 1 M2

0.08000 Kg Dempul Jadi Rp. 16,400.00 Rp. 1,312.00

0.02000 Kg Minyak Cat Rp. 15,700.00 Rp. 314.00

0.20000 Lbr Ampelas Rp. 3,780.00 Rp. 756.00

0.04000 Oh Pekerja Rp. 45,000.00 Rp. 1,800.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.04000 Oh Tukang Cat Rp. 65,000.00 Rp. 2,600.00

0.00400 Oh Kepala Tukang Rp. 70,000.00 Rp. 280.00

Rp. 4,855.00 Rp. 2,382.00 Rp.

2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir 1 M2

1 Lapis Cat Dasar dan 2 Lapis Cat Penutup )

0.20000 Kg Cat Meni Rp. 18,900.00 Rp. 3,780.00

0.15000 Kg Plamir Rp. 12,600.00 Rp. 1,890.00

0.17000 Kg Cat Dasar Rp. 16,400.00 Rp. 2,788.00

Page 56: RAB FILE - Konstruksi Rumah Panggung

0.26000 Kg Cat Penutup 2 Kali Rp. 34,700.00 Rp. 9,022.00

0.07000 Oh Pekerja Rp. 45,000.00 Rp. 3,150.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.09000 Oh Tukang Cat Rp. 65,000.00 Rp. 5,850.00

0.00600 Oh Kepala Tukang Rp. 70,000.00 Rp. 420.00

Rp. 9,595.00 Rp. 17,480.00 Rp.

3 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir 1 M2

1 Lapis Cat Dasar dan 3 Lapis Cat Penutup )

0.20000 Kg Cat Meni Rp. 18,900.00 Rp. 3,780.00

0.15000 Kg Plamir Rp. 12,600.00 Rp. 1,890.00

0.17000 Kg Cat Dasar Rp. 16,400.00 Rp. 2,788.00

0.35000 Kg Cat Penutup 3 Kali Rp. 34,700.00 Rp. 12,145.00

0.07000 Oh Pekerja Rp. 45,000.00 Rp. 3,150.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.10500 Oh Tukang Cat Rp. 65,000.00 Rp. 6,825.00

0.00400 Oh Kepala Tukang Rp. 70,000.00 Rp. 280.00

Rp. 10,430.00 Rp. 20,603.00 Rp.

4 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 1 M2

0.35000 Ltr Residu atau Ter Rp. 2,850.00 Rp. 997.50

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00600 Oh Mandor Rp. 70,000.00 Rp. 420.00

Rp. 4,920.00 Rp. 997.50 Rp.

5 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 Lapis 1 M2

Cat Dasar dan 2 Lapis Cat Penutup )

0.10000 Kg Plamir Rp. 12,600.00 Rp. 1,260.00

0.10000 Kg Cat Dasar Rp. 16,400.00 Rp. 1,640.00

0.26000 Kg Cat Penutup 2 Kali Rp. 29,400.00 Rp. 7,644.00

0.02000 Oh Pekerja Rp. 45,000.00 Rp. 900.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.06300 Oh Tukang Cat Rp. 65,000.00 Rp. 4,095.00

0.00630 Oh Kepala Tukang Rp. 70,000.00 Rp. 441.00

Rp. 5,611.00 Rp. 10,544.00 Rp.

Page 57: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

JUMLAH

60,133.10

8,000.00

35,500.00

43,650.00

11,833.33

26,000.00

42,040.00

Page 58: RAB FILE - Konstruksi Rumah Panggung

JUMLAH

41,700.00

40,840.00

565,646.50

508,982.00

204,212.40

JUMLAH

Page 59: RAB FILE - Konstruksi Rumah Panggung

165,762.00

141,077.90

78,696.80

67,829.10

JUMLAH

Page 60: RAB FILE - Konstruksi Rumah Panggung

40,954.62

37,418.48

35,177.04

17,332.41

35,016.24

JUMLAH

Page 61: RAB FILE - Konstruksi Rumah Panggung

601,385.50

226,385.50

21,697.00

JUMLAH

7,115,790.00

4,548,245.00

Page 62: RAB FILE - Konstruksi Rumah Panggung

76,632.00

110,767.80

161,527.80

JUMLAH

553,150.25

595,966.37

Page 63: RAB FILE - Konstruksi Rumah Panggung

629,675.65

501,875.76

669,517.77

707,478.78

Page 64: RAB FILE - Konstruksi Rumah Panggung

735,858.71

754,465.88

786,026.25

796,009.47

Page 65: RAB FILE - Konstruksi Rumah Panggung

860,456.34

873,332.01

163,420.00

128,315.00

138,072.50

Page 66: RAB FILE - Konstruksi Rumah Panggung

234,971.50

242,261.80

249,971.50

242,557.00

Page 67: RAB FILE - Konstruksi Rumah Panggung

215,314.00

3,762,107.77

Page 68: RAB FILE - Konstruksi Rumah Panggung

5,174,902.77

6,345,910.78

Page 69: RAB FILE - Konstruksi Rumah Panggung

6,284,562.17

JUMLAH

5,903,252.46

Page 70: RAB FILE - Konstruksi Rumah Panggung

4,162,463.77

JUMLAH

75,480.00

70,085.00

Page 71: RAB FILE - Konstruksi Rumah Panggung

30,200.00

61,171.20

57,085.00

136,385.50

9,411.00

JUMLAH

Page 72: RAB FILE - Konstruksi Rumah Panggung

2,639,484.00

400,413.00

1,078,122.00

1,230,911.00

Page 73: RAB FILE - Konstruksi Rumah Panggung

367,258.00

361,499.00

17,212.50

23,000.00

JUMLAH

128,600.00

83,650.00

Page 74: RAB FILE - Konstruksi Rumah Panggung

22,827.50

17,145.00

25,460.00

15,937.50

JUMLAH

19,097.50

80,937.50

JUMLAH

Page 75: RAB FILE - Konstruksi Rumah Panggung

JUMLAHJUMLAH

146,869.40

165,030.50

140,936.90

156,479.40

JUMLAH

Page 76: RAB FILE - Konstruksi Rumah Panggung

327,860.00

301,610.00

42,290.00

39,540.00

JUMLAH

7,237.00

Page 77: RAB FILE - Konstruksi Rumah Panggung

27,075.00

31,033.00

5,917.50

16,155.00

Page 78: RAB FILE - Konstruksi Rumah Panggung

DAFTAR HARGA SATUAN

NO. URAIAN UPAH / BAHAN SATUAN HARGA SATUAN

UPAH

1 Mandor hari Rp. 70,000.00

2 Kepala tukang hari Rp. 70,000.00

3 Tukang (batu, kayu, besi, cat) hari Rp. 65,000.00

4 Pekerja hari Rp. 45,000.00

BAHAN

1 Air ltr Rp. 150.00

2 Ampelas lbr Rp. 5,000.00

3 Balok bekisting (kayu kelas III) m3 Rp. -

4 Balok lanan (kayu kelas II) m3 Rp. 2,430,100.00

5 Balok ulin (kayu kelas I) m3 Rp. 4,738,900.00

6 Batu bata bj Rp. 1,000.00

7 Batu cor/kerikil m3 Rp. 79,400.00

8 Batu kali/batu gunung m3 Rp. 106,900.00

9 Bendrat/kawat besi beton kg Rp. 18,000.00

10 Beugel kg Rp. 17,000.00

11 Besi beton polos kg Rp. 14,500.00

12 Besi beton ulir kg Rp. 16,000.00

13 Cat dasar kg Rp. 16,400.00

14 Cat kilap setara "Danalac" kg Rp. 34,700.00

15 Cat tembok setara "Danabrite" (interior) kg Rp. 29,400.00

16 Cat meni kg Rp. 18,900.00

17 Ceiling panel/gypsum bertekstur type byhua 9 mm m2 Rp. 95,000.00

+ exposed grid ceiling systems

18 Closed jongkok warna bh Rp. 227,100.00

19 Closed duduk warna (lengkap) bh Rp. 2,271,900.00

20 Dempul kg Rp. 16,400.00

21 Engsel Nylon 3" kualitas Baik psg Rp. 9,460.00

22 Engsel Nylon 4" kualitas Baik psg Rp. 11,300.00

23 Espagnolet tanam (SES) psg Rp. 50,400.00

24 Formtie bh Rp. 2,800.00

25 Floor drain bh Rp. 15,000.00

26 Handle jendela bh Rp. 6,000.00

27 Galam sedang dia 3,5 - 5 cm bh Rp. 3,750.00

28 Genteng Metal 3.5 mm dua susun lbr Rp. 34,000.00

29 Grendel kualitas baik bj Rp. 7,570.00

30 Kaca polos tebal 5 mm m2 Rp. 63,100.00

31 Kaca polos tebal 8 mm m2 Rp. 105,000.00

32 Kait angin kualitas baik bh Rp. 4,410.00

33 Kalsiborad Lbr Rp. 165,000.00

34 Kran ledeng stainless bh Rp. 9,000.00

35 Keramik uk. 20x20 warna m2 Rp. 57,000.00

36 Keramik uk. 30 x 30 warna m2 Rp. 63,000.00

37 Keramik uk. 40 x 40 warna m2 Rp. 80,000.00

J47
Rekadaya: cek harga
Page 79: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN UPAH / BAHAN SATUAN HARGA SATUAN

38 Kerawang bh Rp. 7,500.00

39 Kuda-kuda baja ringan zincalum m2 Rp. 175,000.00

40 Kunci pintu

- Kunci Tanam 2 Slaag Kualitas Baik set Rp. 113,500.00

- Kunci Tanam 2 Slaag Kualitas Sedang set Rp. 94,600.00

- Kunci Tanam 1 Slaag Kualitas Baik set Rp. 50,400.00

41 Lampu Down Light SL 1 x 20 watt ( RD 150 E27 ) set Rp. 162,500.00

42 Lampu Baret TL + Ring 32 w ( CCB 32 ACR + Ring ) set Rp. 342,100.00

43 Lampu hemat energi 18 watt bh Rp. 32,000.00

44 Lampu RM Acrilic TL 2 x 18 watt ( RM 300 2 x 18 ACR ) set Rp. 594,000.00

45 Lem kayu kg Rp. 20,000.00

46 Lem Vinyl kg Rp. 30,000.00

47 List Kayu Profil m1 Rp. 3,000.00

48 Minyak bekisting ltr Rp. 2,850.00

49 Minyak Cat ltr Rp. 15,700.00

50 Multiplek tebal 9 mm lbr Rp. 138,800.00

51 Nok Atap Genteng Metal bh Rp. 18,500.00

52 Paku biasa kg Rp. 20,100.00

53 Paku plywood kg Rp. 30,000.00

54 Paku ulin kg Rp. 25,200.00

55 Paku sekrup kg Rp. 28,500.00

56 Paku genteng metal kg Rp. 17,500.00

57 Pancangan galam dia 10/12 cm panjang 400 cm btg Rp. 13,200.00

58 Pancangan galam dia 10/12 cm panjang 700 cm btg Rp. 23,400.00

59 Papan bekisting (kayu kelas III) m3 Rp. 1,951,500.00

60 Papan lanan (kayu kelas II) m3 Rp. 2,645,700.00

61 Papan ulin m3 Rp. 5,102,000.00

62 Pasir beton/cor/pasang m3 Rp. 25,700.00

63 Pasir urug m3 Rp. 23,200.00

64 Plamur bh Rp. 12,600.00

65 Plint Vinyl Nipolam Troplan 100 + capping strip m2 Rp. 275,000.00

66 ( Gerflor )

67 Plint Vinyl Nipolam 180 + capping strip ( Gerflor ) m2 Rp. 250,000.00

68 Plywood tebal 4 mm lbr Rp. 46,000.00

69 Portland Cement (PC) zak Rp. 73,800.00

70 Residu ltr Rp. 4,500.00

71 Roster bh Rp. 22,500.00

72 Saklar ganda bh Rp. 15,000.00

73 Saklar tunggal bh Rp. 15,000.00

74 Sambungan ke PLN daya 900 watt bh Rp. 4,100,000.00

73 Seal Tape bh Rp. 8,500.00

74 Semen warna kg Rp. 3,000.00

75 Stop kontak 200 watt+Instalasi titik Rp. 180,000.00

76 Tanah urug pilihan m3 Rp. 23,800.00

77 Titik lampu+instalasi titik Rp. 165,000.00

78 Vinyl Mipolam Troplan 100 + welding root ( Gerflor ) m2 Rp. 285,000.00

79 Vinyl Mipolam 180 + welding root ( Gerflor ) m2 Rp. 260,000.00

80 Wastafel+assesories (termasuk cermin) bh Rp. 942,900.00

Page 80: RAB FILE - Konstruksi Rumah Panggung

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

DAFTAR : HARGA SATUAN PEKERJAAN ( UNIT PRICE )

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

I PEKERJAAN PERSIAPAN

1 Pengukuran dan Pemasangan Bouwplank

0.01200 M3 Kayu 5/7 Rp. 2,430,100.00 Rp. 29,161.20

0.02000 Kg Paku biasa Rp. 20,100.00 Rp. 402.00

0.00700 M3 Kayu Papan 2/20 Rp. 2,645,700.00 Rp. 18,519.90

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 12,050.00 Rp. 48,083.10 Rp. 60,133.10

2 Membersihkan Lapangan dan Perataan

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.05000 Oh Mandor Rp. 70,000.00 Rp. 3,500.00

Rp. 8,000.00 Rp. - Rp. 8,000.00

II PEKERJAAN TANAH (SNI 2835 - 2008)

1 Galian Tanah Biasa sedalam 1 M

0.75000 Oh Pekerja Rp. 45,000.00 Rp. 33,750.00

0.02500 Oh Mandor Rp. 70,000.00 Rp. 1,750.00

Rp. 35,500.00 Rp. - Rp. 35,500.00

2 Galian Tanah Biasa sedalam 2 M

0.90000 Oh Pekerja Rp. 45,000.00 Rp. 40,500.00

0.04500 Oh Mandor Rp. 70,000.00 Rp. 3,150.00

Rp. 43,650.00 Rp. - Rp. 43,650.00

3 Urugan Kembali (1/3 galian)

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.00833 Oh Mandor Rp. 70,000.00 Rp. 583.33

Rp. 11,833.33 Rp. - Rp. 11,833.33

4 Pemadatan Tanah ( per 20 cm )

0.50000 Oh Pekerja Rp. 45,000.00 Rp. 22,500.00

0.05000 Oh Mandor Rp. 70,000.00 Rp. 3,500.00

Rp. 26,000.00 Rp. - Rp. 26,000.00

5 Urugan Pasir

1.20000 M3 Pasir Urug Rp. 23,200.00 Rp. 27,840.00

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

Rp. 14,200.00 Rp. 27,840.00 Rp. 42,040.00

1 M1

1 M2

1 M3

1 M3

1 M3

1 M3

1 M3

Page 81: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

6 Urugan Tanah Merah ( BOW )

1.25000 M3 Pasir Urug Rp. 23,800.00 Rp. 29,750.00

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

Rp. 11,950.00 Rp. 29,750.00 Rp. 41,700.00

7 Urugan Sirtu Padat Untuk Peninggian Lantai Bangunan

1.20000 M3 Pasir Batu Rp. 23,200.00 Rp. 27,840.00

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.02500 Oh Mandor Rp. 70,000.00 Rp. 1,750.00

Rp. 13,000.00 Rp. 27,840.00 Rp. 40,840.00

III PEKERJAAN PONDASI (SNI 2836 - 2008)

1 Pasangan Pondasi Batu Kali camp. 1 : 3

1.20000 M3 Bt. Belah 15/20 cm Rp. 106,900.00 Rp. 128,280.00

4.04000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 298,152.00

0.48500 M3 Pasir Pasang Rp. 25,700.00 Rp. 12,464.50

1.50000 Oh Pekerja Rp. 45,000.00 Rp. 67,500.00

0.07500 Oh Mandor Rp. 70,000.00 Rp. 5,250.00

0.75000 Oh Tukang Batu Rp. 65,000.00 Rp. 48,750.00

0.07500 Oh Kepala Tukang Rp. 70,000.00 Rp. 5,250.00

Rp. 126,750.00 Rp. 438,896.50 Rp. 565,646.50

2 Pasangan Pondasi Batu Kali camp. 1 : 4

1.20000 M3 Bt. Belah 15/20 cm Rp. 106,900.00 Rp. 128,280.00

3.26000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 240,588.00

0.52000 M3 Pasir Pasang Rp. 25,700.00 Rp. 13,364.00

1.50000 Oh Pekerja Rp. 45,000.00 Rp. 67,500.00

0.07500 Oh Mandor Rp. 70,000.00 Rp. 5,250.00

0.75000 Oh Tukang Batu Rp. 65,000.00 Rp. 48,750.00

0.07500 Oh Kepala Tukang Rp. 70,000.00 Rp. 5,250.00

Rp. 126,750.00 Rp. 382,232.00 Rp. 508,982.00

3 Pasangan Pondasi Batu Kosong ( aanstamping )

1.20000 M3 Bt. Belah 15/20 cm Rp. 106,900.00 Rp. 128,280.00

0.43200 M3 Pasir Urug Rp. 23,200.00 Rp. 10,022.40

0.78000 Oh Pekerja Rp. 45,000.00 Rp. 35,100.00

0.03900 Oh Mandor Rp. 70,000.00 Rp. 2,730.00

0.39000 Oh Tukang Batu Rp. 65,000.00 Rp. 25,350.00

0.03900 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,730.00

Rp. 65,910.00 Rp. 138,302.40 Rp. 204,212.40

IV PEKERJAAN PASANGAN DINDING (SNI 6897 - 2008)

1 Pasangan Dinding Bata tebal 1 Bata, Camp. 1 : 2

140.00000 Bh Batu Bata Rp. 400.00 Rp. 56,000.00

0.87000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 64,206.00

0.08000 M3 Pasir Pasang Rp. 25,700.00 Rp. 2,056.00

0.60000 Oh Pekerja Rp. 45,000.00 Rp. 27,000.00

0.03000 Oh Mandor Rp. 70,000.00 Rp. 2,100.00

0.20000 Oh Tukang Batu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 43,500.00 Rp. 122,262.00 Rp. 165,762.00

1 M3

1 M3

1 M3

1 M3

1 M3

1 M2

Page 82: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN HARGA SATUAN BIAYA UPAH BIAYA BAHAN JUMLAH

2 Pasangan Dinding Bata tebal 1 Bata, Camp. 1 : 4

140.00000 Bh Batu Bata Rp. 400.00 Rp. 56,000.00

0.53100 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 39,187.80

0.09300 M3 Pasir Pasang Rp. 25,700.00 Rp. 2,390.10

0.60000 Oh Pekerja Rp. 45,000.00 Rp. 27,000.00

0.03000 Oh Mandor Rp. 70,000.00 Rp. 2,100.00

0.20000 Oh Tukang Batu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 43,500.00 Rp. 97,577.90 Rp. 141,077.90

3 Pasangan Dinding Bata tebal 1/2 Bata, Camp. 1 : 2

70.00000 Bh Batu Bata Rp. 400.00 Rp. 28,000.00

0.37900 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 27,970.20

0.03800 M3 Pasir Pasang Rp. 25,700.00 Rp. 976.60

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 56,946.80 Rp. 78,696.80

4 Pasangan Dinding Bata tebal 1/2 Bata, Camp. 1 : 4

70.00000 Bh Batu Bata Rp. 400.00 Rp. 28,000.00

0.23000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 16,974.00

0.04300 M3 Pasir Pasang Rp. 25,700.00 Rp. 1,105.10

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 46,079.10 Rp. 67,829.10

V PEKERJAAN PLESTERAN (SNI 2837 - 2008)

1 Plesteran tebal 15 mm camp. 1 : 2

0.20448 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 15,090.62

0.02000 M3 Pasir Pasang Rp. 25,700.00 Rp. 514.00

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 15,604.62 Rp. 40,954.62

2 Plesteran tebal 15 mm camp. 1 : 3

0.15552 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 11,477.38

0.02300 M3 Pasir Pasang Rp. 25,700.00 Rp. 591.10

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 12,068.48 Rp. 37,418.48

3 Plesteran tebal 15 mm camp. 1 : 4

0.12480 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 9,210.24

0.02400 M3 Pasir Pasang Rp. 25,700.00 Rp. 616.80

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.15000 Oh Tukang Batu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 25,350.00 Rp. 9,827.04 Rp. 35,177.04

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

Page 83: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

6 Pas. Dinding Roster ( 12 x 20 x 20 ) cm,

Camp. 1 : 4

25.00000 Bh Roster Rp. 22,500.00 Rp. 562,500.00

0.22000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 16,236.00

0.03500 M3 Pasir Pasang Rp. 25,700.00 Rp. 899.50

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 579,635.50 Rp. 601,385.50

7 Pas. Dinding Kerawang ( 12 x 20 x 20 ) cm,

Camp. 1 : 4

25.00000 Bh Kerawang Rp. 7,500.00 Rp. 187,500.00

0.22000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 16,236.00

0.03500 M3 Pasir Pasang Rp. 25,700.00 Rp. 899.50

0.30000 Oh Pekerja Rp. 45,000.00 Rp. 13,500.00

0.01500 Oh Mandor Rp. 70,000.00 Rp. 1,050.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 21,750.00 Rp. 204,635.50 Rp. 226,385.50

VI PEKERJAAN KAYU (SNI 3434 - 2008)

1 Pasangan Kusen Pintu dan Jendela Kayu Ulin 1 M3

1.10000 M3 Kayu Balok Ulin Rp. 4,738,900.00 Rp. 5,212,790.00

1.25000 Kg Paku Ulin Rp. 25,200.00 Rp. 31,500.00

1.00000 Kg Lem Kayu Rp. 20,000.00 Rp. 20,000.00

7.00000 Oh Pekerja Rp. 45,000.00 Rp. 315,000.00

0.35000 Oh Mandor Rp. 70,000.00 Rp. 24,500.00

21.00000 Oh Tukang Kayu Rp. 65,000.00 Rp. 1,365,000.00

2.10000 Oh Kepala Tukang Rp. 70,000.00 Rp. 147,000.00

Rp. 1,851,500.00 Rp. 5,264,290.00 Rp. 7,115,790.00

2 Pasangan Kusen Pintu dan Jendela Kayu Lanan 1 M3

1.20000 M3 Kayu Balok Lanan Rp. 2,430,100.00 Rp. 2,916,120.00

1.25000 Kg Paku Rp. 20,100.00 Rp. 25,125.00

1.00000 Kg Lem Kayu Rp. 20,000.00 Rp. 20,000.00

6.00000 Oh Pekerja Rp. 45,000.00 Rp. 270,000.00

0.30000 Oh Mandor Rp. 70,000.00 Rp. 21,000.00

18.00000 Oh Tukang Kayu Rp. 65,000.00 Rp. 1,170,000.00

1.80000 Oh Kepala Tukang Rp. 70,000.00 Rp. 126,000.00

Rp. 1,587,000.00 Rp. 2,961,245.00 Rp. 4,548,245.00

3 Pasangan Listplank 2/30 cm Kayu Kelas I atau II 1 M1

0.01100 M3 Kayu Ulin Rp. 5,102,000.00 Rp. 56,122.00

0.05000 Kg Paku Rp. 25,200.00 Rp. 1,260.00

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.20000 Oh Tukang Kayu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 19,250.00 Rp. 57,382.00 Rp. 76,632.00

VII PEKERJAAN BETON (SNI 7394 - 2008)

4 Membuat Lantai Kerja Beton Mutu f'c = 7,4 MPa (K 100) 1 M3

slump (3-6) cm, w/c = 0,87

4.60000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 339,480.00

0.63786 M3 Pasir Beton Rp. 25,700.00 Rp. 16,393.00

0.76074 M3 Koral Beton Rp. 79,400.00 Rp. 60,402.76

200.00000 Lt Air Rp. 65.00 Rp. 13,000.00

1.20000 Oh Pekerja Rp. 45,000.00 Rp. 54,000.00

0.06000 Oh Mandor Rp. 70,000.00 Rp. 4,200.00

0.20000 Oh Tukang Batu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 72,600.00 Rp. 429,275.76 Rp. 501,875.76

1 M2

1 M2

Page 84: RAB FILE - Konstruksi Rumah Panggung

5 Membuat Beton Mutu f'c = 14,5 MPa (K 175), slump 1 M3

(12±2) cm, w/c = 0,66

6.52000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 481,176.00

0.54286 M3 Pasir Beton Rp. 25,700.00 Rp. 13,951.50

0.76222 M3 Koral Beton Rp. 79,400.00 Rp. 60,520.27

215.00000 Lt Air Rp. 65.00 Rp. 13,975.00

1.65000 Oh Pekerja Rp. 45,000.00 Rp. 74,250.00

0.08300 Oh Mandor Rp. 70,000.00 Rp. 5,810.00

0.27500 Oh Tukang Batu Rp. 65,000.00 Rp. 17,875.00

0.02800 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,960.00

Rp. 99,895.00 Rp. 569,622.77 Rp. 669,517.77

13 Pembesian dengan Besi Polos atau Ulir 10 Kg

10.50000 Kg Besi Beton Rp. 14,500.00 Rp. 152,250.00

0.15000 Kg Kawat Beton Rp. 18,000.00 Rp. 2,700.00

0.07000 Oh Pekerja Rp. 45,000.00 Rp. 3,150.00

0.00400 Oh Mandor Rp. 70,000.00 Rp. 280.00

0.07000 Oh Tukang Besi Rp. 65,000.00 Rp. 4,550.00

0.00700 Oh Kepala Tukang Rp. 70,000.00 Rp. 490.00

Rp. 8,470.00 Rp. 154,950.00 Rp. 163,420.00

14 Pasang Bekisting untuk Pondasi 1 M2

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.30000 Kg Paku Rp. 20,100.00 Rp. 6,030.00

0.10000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 285.00

0.52000 Oh Pekerja Rp. 45,000.00 Rp. 23,400.00

0.02600 Oh Mandor Rp. 70,000.00 Rp. 1,820.00

0.26000 Oh Tukang Kayu Rp. 65,000.00 Rp. 16,900.00

0.02600 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,820.00

Rp. 43,940.00 Rp. 84,375.00 Rp. 128,315.00

15 Pasang Bekisting untuk Sloof 1 M2

0.04500 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 87,817.50

0.30000 Kg Paku Rp. 20,100.00 Rp. 6,030.00

0.10000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 285.00

0.52000 Oh Pekerja Rp. 45,000.00 Rp. 23,400.00

0.02600 Oh Mandor Rp. 70,000.00 Rp. 1,820.00

0.26000 Oh Tukang Kayu Rp. 65,000.00 Rp. 16,900.00

0.02600 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,820.00

Rp. 43,940.00 Rp. 94,132.50 Rp. 138,072.50

16 Pasang Bekisting untuk Kolom 1 M2

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.01500 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 36,451.50

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

2.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 7,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 179,201.50 Rp. 234,971.50

17 Pasang Bekisting untuk Balok 1 M2

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.01800 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 43,741.80

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

2.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 7,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 186,491.80 Rp. 242,261.80

Page 85: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

18 Pasang Bekisting untuk Lantai 1 M2

0.04000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 78,060.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.01500 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 36,451.50

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

6.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 22,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 194,201.50 Rp. 249,971.50

19 Pasang Bekisting untuk Dinding 1 M2

0.03000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 58,545.00

0.40000 Kg Paku Rp. 20,100.00 Rp. 8,040.00

0.20000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 570.00

0.02000 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 48,602.00

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

3.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 11,250.00

4.00000 Bh Formtie/Penjaga Jarak Bekisting Rp. 2,800.00 Rp. 11,200.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 186,787.00 Rp. 242,557.00

20 Pasang Bekisting untuk Tangga 1 M2

0.03000 M3 Kayu Kelas III (papan) Rp. 1,951,500.00 Rp. 58,545.00

0.40000 Kg Paku Biasa Rp. 20,100.00 Rp. 8,040.00

0.15000 Ltr Minyak Bekisting Rp. 2,850.00 Rp. 427.50

0.01500 M3 Balok Kayu Kelas II Rp. 2,430,100.00 Rp. 36,451.50

0.35000 Lbr Multiplek tebal 9 mm Rp. 138,800.00 Rp. 48,580.00

2.00000 Btg Dolken Ky. Galam dia. 8-10 / 4 m Rp. 3,750.00 Rp. 7,500.00

0.66000 Oh Pekerja Rp. 45,000.00 Rp. 29,700.00

0.03300 Oh Mandor Rp. 70,000.00 Rp. 2,310.00

0.33000 Oh Tukang Kayu Rp. 65,000.00 Rp. 21,450.00

0.03300 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,310.00

Rp. 55,770.00 Rp. 159,544.00 Rp. 215,314.00

VIII PEKERJAAN PENUTUP ATAP

1 Pasang Atap Genteng Metal 1 M2

1.62000 Lbr Genteng Metal Rp. 34,000.00 Rp. 55,080.00

0.20000 Kg Paku Rp. 17,500.00 Rp. 3,500.00

0.20000 Oh Pekerja Rp. 45,000.00 Rp. 9,000.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 16,900.00 Rp. 58,580.00 Rp. 75,480.00

2 Pasang Atap Nok Genteng Metal 1 M1

2.50000 Bh Nok Genteng Metal Rp. 18,500.00 Rp. 46,250.00

0.05000 Kg Paku Rp. 17,500.00 Rp. 875.00

0.25000 Oh Pekerja Rp. 45,000.00 Rp. 11,250.00

0.01300 Oh Mandor Rp. 70,000.00 Rp. 910.00

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 22,960.00 Rp. 47,125.00 Rp. 70,085.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839 - 2008)

1 Pasang Langit - langit Plywood Tebal 3 mm, 4 mm 1 M2

dan 6 mm

0.37500 Lbr Plywood 4 mm Rp. 46,000.00 Rp. 17,250.00

0.03000 Kg Paku Triplek Rp. 30,000.00 Rp. 900.00

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Page 86: RAB FILE - Konstruksi Rumah Panggung

Rp. 12,050.00 Rp. 18,150.00 Rp. 30,200.00

Page 87: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

2 1 m2 Pasang rangka langit-langit (0,60 x 1,20) m, kayu lanan

0.0120 M3 Balok kayu lanan Rp. 2,430,100.00 29,161.2000

0.1000 Kg Paku kayu 2" - 5" Rp. 20,100.00 2,010.0000

0.1500 Oh Pekerja Rp. 45,000.00 6,750.00

0.0750 Oh Mandor Rp. 70,000.00 5,250.00

0.2500 Oh Tukang kayu Rp. 65,000.00 16,250.00

0.0250 Oh Kepala tukang kayu Rp. 70,000.00 1,750.00

Rp. 30,000.00 Rp. 31,171.20 Rp. 61,171.20

2.a 1 m2 Langit-langit kalsiboard, tebal 4 mm

0.3640 Lbr kalsiboard (120x240x4) mm Rp. 125,000.00 45,500.0000

0.1100 Kg Paku skrup Rp. 28,500.00 3,135.0000

0.1000 Oh Pembantu tukang kayu Rp. 45,000.00 4,500.00

0.0050 Oh Mandor Rp. 70,000.00 350.00

0.0500 Oh Tukang kayu Rp. 65,000.00 3,250.00

0.0050 Oh Kepala tukang kayu Rp. 70,000.00 350.00

Rp. 8,450.00 Rp. 48,635.00 Rp. 57,085.00

3 Pasang List Langit - langit Kayu Profil 1 M1

1.05000 M1 List Kayu Profil Rp. 3,000.00 Rp. 3,150.00

0.01000 Kg Paku Rp. 20,100.00 Rp. 201.00

0.05000 Oh Pekerja Rp. 45,000.00 Rp. 2,250.00

0.00300 Oh Mandor Rp. 70,000.00 Rp. 210.00

0.05000 Oh Tukang Kayu Rp. 65,000.00 Rp. 3,250.00

0.00500 Oh Kepala Tukang Rp. 70,000.00 Rp. 350.00

Rp. 6,060.00 Rp. 3,351.00 Rp. 9,411.00

X PEKERJAAN PIPA DAN SANITASI

1 Memasang 1 Buah Kloset Duduk/Monoblok 1 Bh

1.00000 Bh Kloset Duduk/Monoblok Rp. 2,271,900.00 Rp. 2,271,900.00

0.06000 Perlengkapan 6% Harga Kloset Rp. 2,271,900.00 Rp. 136,314.00

3.30000 Oh Pekerja Rp. 45,000.00 Rp. 148,500.00

0.16000 Oh Mandor Rp. 70,000.00 Rp. 11,200.00

1.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 71,500.00

0.00100 Oh Kepala Tukang Rp. 70,000.00 Rp. 70.00

Rp. 231,270.00 Rp. 2,408,214.00 Rp. 2,639,484.00

2 Memasang 1 Buah Kloset Jongkok Porselin 1 Bh

1.00000 Bh Kloset Jongkok Rp. 227,100.00 Rp. 227,100.00

0.12000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 8,856.00

0.01000 M3 Pasir Beton Rp. 25,700.00 Rp. 257.00

1.00000 Oh Pekerja Rp. 45,000.00 Rp. 45,000.00

0.16000 Oh Mandor Rp. 70,000.00 Rp. 11,200.00

1.50000 Oh Tukang Batu Rp. 65,000.00 Rp. 97,500.00

0.15000 Oh Kepala Tukang Rp. 70,000.00 Rp. 10,500.00

Rp. 164,200.00 Rp. 236,213.00 Rp. 400,413.00

3 Memasang 1 Bh Bak Mandi Batu Bata Vol 0,3 m3 1 Bh

300.00000 Bh Batu Bata Rp. 400.00 Rp. 120,000.00

2.40000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 177,120.00

0.30000 M3 Pasir Beton Rp. 25,700.00 Rp. 7,710.00

4.35600 M2 Keramik 20 x 20 cm Rp. 57,000.00 Rp. 248,292.00

6.00000 Kg Semen Nat Rp. 3,000.00 Rp. 18,000.00

6.00000 Oh Pekerja Rp. 45,000.00 Rp. 270,000.00

0.30000 Oh Mandor Rp. 70,000.00 Rp. 21,000.00

3.00000 Oh Tukang Batu Rp. 65,000.00 Rp. 195,000.00

0.30000 Oh Kepala Tukang Rp. 70,000.00 Rp. 21,000.00

Rp. 507,000.00 Rp. 571,122.00 Rp. 1,078,122.00

4 Memasang 1 Buah Wastafel 1 Bh

1.00000 Bh Wastafel Rp. 942,900.00 Rp. 942,900.00

0.12000 Perlengkapan 12% Harga Wastafel Rp. 942,900.00 Rp. 113,148.00

0.12000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 8,856.00

0.01000 M3 Pasir Beton Rp. 25,700.00 Rp. 257.00

1.20000 Oh Pekerja Rp. 45,000.00 Rp. 54,000.00

0.10000 Oh Mandor Rp. 70,000.00 Rp. 7,000.00

1.45000 Oh Tukang Batu Rp. 65,000.00 Rp. 94,250.00

0.15000 Oh Kepala Tukang Rp. 70,000.00 Rp. 10,500.00

Rp. 165,750.00 Rp. 1,065,161.00 Rp. 1,230,911.00

H446
Rekadaya: cek harga
Page 88: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

5 Pasang 1 Buah Bak Kontrol Pas. Bt Bata Bh

Uk 30 x 30 tinggi 35 cm

145.00000 Bh Batu Bata Rp. 400.00 Rp. 58,000.00

0.88000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 64,944.00

0.07000 M3 Pasir Pasang Rp. 25,700.00 Rp. 1,799.00

0.07000 M3 Kerikil Rp. 79,400.00 Rp. 5,558.00

0.06000 M3 Pasir Beton Rp. 25,700.00 Rp. 1,542.00

1.60000 Kg Besi Beton Rp. 14,500.00 Rp. 23,200.00

3.20000 Oh Pekerja Rp. 45,000.00 Rp. 144,000.00

0.01600 Oh Mandor Rp. 70,000.00 Rp. 1,120.00

1.01500 Oh Tukang Batu Rp. 65,000.00 Rp. 65,975.00

0.01600 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,120.00

Rp. 212,215.00 Rp. 155,043.00 Rp. 367,258.00

7 Memasang 1 Buah Kran dia. 3/4" atau 1/2" 1 Bh

1.00000 Bh Kran Air Rp. 9,000.00 Rp. 9,000.00

0.02500 Bh Seal Tape Rp. 8,500.00 Rp. 212.50

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 8,000.00 Rp. 9,212.50 Rp. 17,212.50

8 Memasang 1 Buah Floor Drain 1 Bh

1.00000 Bh Floor Drain Rp. 15,000.00 Rp. 15,000.00

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.10000 Oh Tukang Batu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 8,000.00 Rp. 15,000.00 Rp. 23,000.00

XII PEKERJAAN KUNCI DAN KACA

1 Pasang Kunci Tanam Biasa Kualitas Sedang 1 Bh

1.00000 Bh Kunci Tanam 2 Slaag Rp. 94,600.00 Rp. 94,600.00

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00500 Oh Mandor Rp. 70,000.00 Rp. 350.00

0.50000 Oh Tukang Kayu Rp. 65,000.00 Rp. 32,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 34,000.00 Rp. 94,600.00 Rp. 128,600.00

2 Pasang Kunci Tanam Kamar Mandi 1 Bh

1.00000 Bh Kunci Tanam 1 Slaag Rp. 50,400.00 Rp. 50,400.00

0.00500 Oh Pekerja Rp. 45,000.00 Rp. 225.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.50000 Oh Tukang Kayu Rp. 65,000.00 Rp. 32,500.00

0.00500 Oh Kepala Tukang Rp. 70,000.00 Rp. 350.00

Rp. 33,250.00 Rp. 50,400.00 Rp. 83,650.00

3 Pasang Engsel Pintu 1 Bh

1.00000 Bh Engsel Pintu (kuningan 4") Rp. 11,300.00 Rp. 11,300.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 11,300.00 Rp. 22,827.50

4 Pasang Engsel Jendela 1 Bh

1.00000 Bh Engsel Jendela Rp. 9,460.00 Rp. 9,460.00

0.01000 Oh Pekerja Rp. 45,000.00 Rp. 450.00

0.00050 Oh Mandor Rp. 70,000.00 Rp. 35.00

0.10000 Oh Tukang Kayu Rp. 65,000.00 Rp. 6,500.00

0.01000 Oh Kepala Tukang Rp. 70,000.00 Rp. 700.00

Rp. 7,685.00 Rp. 9,460.00 Rp. 17,145.00

Page 89: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

5 Pasang Engsel Angin 1 Bh

1.00000 Bh Engsel angin Rp. 9,460.00 Rp. 9,460.00

0.02000 Oh Pekerja Rp. 45,000.00 Rp. 900.00

0.01000 Oh Mandor Rp. 70,000.00 Rp. 700.00

0.20000 Oh Tukang Kayu Rp. 65,000.00 Rp. 13,000.00

0.02000 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,400.00

Rp. 16,000.00 Rp. 9,460.00 Rp. 25,460.00

6 Pasang Hak Angin 1 Bh

1.00000 Bh Kait Angin Rp. 4,410.00 Rp. 4,410.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 4,410.00 Rp. 15,937.50

7 Pasang Gerendel 1 Bh

1.00000 Bh Grendel Rp. 7,570.00 Rp. 7,570.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 7,570.00 Rp. 19,097.50

8 Pasang Kaca tebal 5 mm 1 M2

1.10000 M2 Kaca Rp. 63,100.00 Rp. 69,410.00

0.01500 Oh Pekerja Rp. 45,000.00 Rp. 675.00

0.00075 Oh Mandor Rp. 70,000.00 Rp. 52.50

0.15000 Oh Tukang Kayu Rp. 65,000.00 Rp. 9,750.00

0.01500 Oh Kepala Tukang Rp. 70,000.00 Rp. 1,050.00

Rp. 11,527.50 Rp. 69,410.00 Rp. 80,937.50

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

(SNI 7395 -2008)

2 Pasang Lantai Keramik Uk. 40 x 40 cm 1 M2

1.06830 M2 Keramik Uk. 40 x 40 cm Rp. 80,000.00 Rp. 85,464.00

0.20000 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 14,760.00

0.04500 M3 Pasir Beton Rp. 25,700.00 Rp. 1,156.50

1.50000 Kg Semen Warna Rp. 3,000.00 Rp. 4,500.00

0.70000 Oh Pekerja Rp. 45,000.00 Rp. 31,500.00

0.03500 Oh Mandor Rp. 70,000.00 Rp. 2,450.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 59,150.00 Rp. 105,880.50 Rp. 165,030.50

3 Pasang Lantai Keramik Uk. 20 x 20 cm 1 M2

1.06000 M2 Keramik Uk. 20 x 20 cm Rp. 57,000.00 Rp. 60,420.00

0.20800 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 15,350.40

0.04500 M3 Pasir Beton Rp. 25,700.00 Rp. 1,156.50

1.62000 Kg Semen Warna Rp. 3,000.00 Rp. 4,860.00

0.70000 Oh Pekerja Rp. 45,000.00 Rp. 31,500.00

0.03500 Oh Mandor Rp. 70,000.00 Rp. 2,450.00

0.35000 Oh Tukang Batu Rp. 65,000.00 Rp. 22,750.00

0.03500 Oh Kepala Tukang Rp. 70,000.00 Rp. 2,450.00

Rp. 59,150.00 Rp. 81,786.90 Rp. 140,936.90

4 Pasang Dinding Keramik 20 x 25 cm 1 M2

1.06000 M2 Keramik 20 x 20 cm Rp. 57,000.00 Rp. 60,420.00

0.18600 Zak Semen Portland 50 kg Rp. 73,800.00 Rp. 13,726.80

0.01800 M3 Pasir Beton Rp. 25,700.00 Rp. 462.60

1.94000 Kg Semen Warna Rp. 3,000.00 Rp. 5,820.00

0.90000 Oh Pekerja Rp. 45,000.00 Rp. 40,500.00

0.04500 Oh Mandor Rp. 70,000.00 Rp. 3,150.00

0.45000 Oh Tukang Batu Rp. 65,000.00 Rp. 29,250.00

0.04500 Oh Kepala Tukang Rp. 70,000.00 Rp. 3,150.00

Rp. 76,050.00 Rp. 80,429.40 Rp. 156,479.40

Page 90: RAB FILE - Konstruksi Rumah Panggung

NO. URAIAN SATUAN UPAH BAHAN JUMLAH

XIV PEKERJAAN CAT - CATAN

1 Mendempul dan Menggosok Kayu 1 M2

0.08000 Kg Dempul Jadi Rp. 16,400.00 Rp. 1,312.00

0.02000 Kg Minyak Cat Rp. 15,700.00 Rp. 314.00

0.20000 Lbr Ampelas Rp. 3,780.00 Rp. 756.00

0.04000 Oh Pekerja Rp. 45,000.00 Rp. 1,800.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.04000 Oh Tukang Cat Rp. 65,000.00 Rp. 2,600.00

0.00400 Oh Kepala Tukang Rp. 70,000.00 Rp. 280.00

Rp. 4,855.00 Rp. 2,382.00 Rp. 7,237.00

2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir 1 M2

1 Lapis Cat Dasar dan 2 Lapis Cat Penutup )

0.20000 Kg Cat Meni Rp. 18,900.00 Rp. 3,780.00

0.15000 Kg Plamir Rp. 12,600.00 Rp. 1,890.00

0.17000 Kg Cat Dasar Rp. 16,400.00 Rp. 2,788.00

0.26000 Kg Cat Penutup 2 Kali Rp. 34,700.00 Rp. 9,022.00

0.07000 Oh Pekerja Rp. 45,000.00 Rp. 3,150.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.09000 Oh Tukang Cat Rp. 65,000.00 Rp. 5,850.00

0.00600 Oh Kepala Tukang Rp. 70,000.00 Rp. 420.00

Rp. 9,595.00 Rp. 17,480.00 Rp. 27,075.00

3 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir 1 M2

1 Lapis Cat Dasar dan 3 Lapis Cat Penutup )

0.20000 Kg Cat Meni Rp. 18,900.00 Rp. 3,780.00

0.15000 Kg Plamir Rp. 12,600.00 Rp. 1,890.00

0.17000 Kg Cat Dasar Rp. 16,400.00 Rp. 2,788.00

0.35000 Kg Cat Penutup 3 Kali Rp. 34,700.00 Rp. 12,145.00

0.07000 Oh Pekerja Rp. 45,000.00 Rp. 3,150.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.10500 Oh Tukang Cat Rp. 65,000.00 Rp. 6,825.00

0.00400 Oh Kepala Tukang Rp. 70,000.00 Rp. 280.00

Rp. 10,430.00 Rp. 20,603.00 Rp. 31,033.00

4 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 1 M2

0.35000 Ltr Residu atau Ter Rp. 2,850.00 Rp. 997.50

0.10000 Oh Pekerja Rp. 45,000.00 Rp. 4,500.00

0.00600 Oh Mandor Rp. 70,000.00 Rp. 420.00

Rp. 4,920.00 Rp. 997.50 Rp. 5,917.50

5 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 Lapis 1 M2

Cat Dasar dan 2 Lapis Cat Penutup )

0.10000 Kg Plamir Rp. 12,600.00 Rp. 1,260.00

0.10000 Kg Cat Dasar Rp. 16,400.00 Rp. 1,640.00

0.26000 Kg Cat Penutup 2 Kali Rp. 29,400.00 Rp. 7,644.00

0.02000 Oh Pekerja Rp. 45,000.00 Rp. 900.00

0.00250 Oh Mandor Rp. 70,000.00 Rp. 175.00

0.06300 Oh Tukang Cat Rp. 65,000.00 Rp. 4,095.00

0.00630 Oh Kepala Tukang Rp. 70,000.00 Rp. 441.00

Rp. 5,611.00 Rp. 10,544.00 Rp. 16,155.00

Page 91: RAB FILE - Konstruksi Rumah Panggung

RENCANA ANGGARAN BIAYA

Pekerjaan : Pembangunan ……..

HARGA SATUAN JUMLAH HARGA

NO. URAIAN PEKERJAAN ANALISA VOLUME (Rp) (Rp)

( a ) ( b ) ( c ) ( d ) ( e ) ( d x e )

I PEKERJAAN PERSIAPAN

1 Pengukuran dan bowplank I 1 M' 60,133.10

2 IMB Ls M2 5,500.00

3 Papan nama pekerjaan Ls Unit 500,000.00

Sub Jumlah

II PEKERJAAN TANAH

1 Galian tanah pondasi II 1 M3 35,500.00

2 Urugan tanah merah bawah lantai II 6 M3 41,700.00

3 Urugan pasir tebal 10 cm bawah pondasi II 5 M3 42,040.00

4 Pemadatan tanah II 4 M3 26,000.00

5 Urugan pasir tebal 10 cm bawah lantai II 5 M3 42,040.00

6 Urugan pasir tebal 10 cm bawah rabat pada carport II 5 M3 42,040.00

7 Mengurug tanah kembali II 3 M3 11,833.33

Sub Jumlah

III PEKERJAAN PONDASI DAN PASANGAN

1 Pancangan galam dia 10/12 cm panjang 300 cm Ls - btg 13,200.00

2 Pasangan batu kali camp. 1 : 4 III 2 M3 508,982.00

3 Aanstamping batu kosong III 3 M3 204,212.40

4 Pasangan roolag 1 bata camp.1:4 IV 2 M2 141,077.90

5 Pasangan dinding 1/2 bata camp.1:4 IV 4 M2 67,829.10

6 Plesteran dinding camp.1:4 tebal 15 mm V 3 M2 35,177.04

7 Pasangan dinding 1/2 bata camp 1:2 untuk KM/WC IV 3 M2 78,696.80

8 Plesteran KM/WC camp.1:2 tebal 15 mm V 1 M2 40,954.62

9 Benangan profil,tali air dan sponengan sudut Ls - Unit 3,500,000.00

10 Pasang glasblok Ls M2 165,000.00

11 Pasangan batu alor Ls M2 195,000.00

12 Pasangan batu candi Ls M2 195,000.00

13 Pembuatan meja dapur beton lapis keramik Ls - Unit 3,500,000.00

Sub Jumlah

IV PEKERJAAN BETON

1 Pek. Cor beton tumbuk u/ lantai dalam bangunan tebal 7 cm VII 1 M3 553,150.25

2 Pek. Cor beton tumbuk lantai tebal 7 cm pada luar bangunan VII 1 M3 553,150.25

3 Sloof beton bertulang 15/20 VII 22 M3 5,174,902.77

4 Kolom beton bertulang 15/15, 20/20 VII 23 M3 6,345,910.78

5 Ringbalk atas beton bertulang 15/20 VII 24 M3 6,284,562.17

6 Ringbalk bawah + konsol beton bertulang 15/20 VII 24 M3 6,284,562.17

7 Balok latai/balok gantung dan balok teras beton bertulang VII 24 M3 6,284,562.17

8 Balok beton bertulang 15/30 VII 24 M3 6,284,562.17

9 Pek. Plat beton bertulang tebal 10 cm VII 25 M3 5,903,252.46

10 Listplank,kanopi beton bertulang tebal 5 cm VII 26 M3 4,162,463.77

Sub Jumlah

Page 92: RAB FILE - Konstruksi Rumah Panggung

HARGA SATUAN JUMLAH HARGA

NO. URAIAN PEKERJAAN ANALISA VOLUME (Rp) (Rp)

( a ) ( b ) ( c ) ( d ) ( e ) ( d x e )

V PEKERJAAN ATAP

1 Pek. Kuda-kuda kayu kelas II 6/12 -

2 Pek. Gording kayu kelas II 6/12

3 Pek. Nok dan Jurai

4 Pek.Kasau 5/7 reng 3/5 M2

5 Pek. Atap metal VIII 1 M2 75,480.00

6 Bubungan VIII 2 M' 70,085.00

7 List plank ulin 2/30 VI 3 M' 76,632.00

Sub Jumlah

VI PEKERJAAN PLAFOND

1 Pek. Rangka plafond M2 61,171.20

2 Plafond kalsiboard - M2 57,085.00

3 Pekerjaan Lis Gypsum M' 13,200.00

Sub Jumlah

VII PEKERJAAN LANTAI

1 Pasangan keramik uk 40/40 XIII 2 M2 165,030.50

2 Pasangan keramik uk 20/20 KM/WC XIII 3 M2 140,936.90

3 Pasangan keramik uk 20/25 untuk dinding KM/WC XIII 4 M2 156,479.40

4 Pasangan Lis keramik uk 10/20 dinding KM/WC M' 100,000.00

Sub Jumlah

VIII PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI

1 Pek. Kusen ulin 6/12 VI 1 M3 7,115,790.00

2 Pasang Kaca mati 5 mm XII 8 M2 80,937.50

3 Pintu kayu kelas 2 uk. 80 x 210 cm bh 750,000.00

4 Daun Jendela ventilasi kaca bening 5 mm bingkai ulin bh 250,000.00

uk. 40 x 55 cm

5 Daun Jendela ventilasi kaca bening 5 mm bingkai ulin bh 300,000.00

uk. 40 x 70 cm

6 Daun Jendela ventilasi kaca bening 5 mm bingkai ulin bh 350,000.00

uk. 50 x 90 cm

7 Pintu Panil Ulin uk. 70 x 215 cm bh 750,000.00

8 Pintu Panil lanan uk. 55 x 215 cm bh 650,000.00

9 Pintu Panil lanan uk. 80 x 215 cm bh 700,000.00

Sub Jumlah

IX PEKERJAAN KUNCI / ALAT PENGGANTUNG

1 Kunci 1 slaag XII 2 bh 83,650.00

2 Kunci 2 slaag XII 1 bh 128,600.00

3 Engsel 4" XII 3 bh 22,827.50

4 Engsel 3" XII 4 bh 17,145.00

5 Kait angin XII 6 bh 15,937.50

6 Pegangan jendela Ls - bh 6,000.00

7 Pegangan pintu ganda Ls bh 750,000.00

8 Grendel XII 7 bh 19,097.50

9 Espagnolet tanam - psg 50,400.00

Sub Jumlah

Page 93: RAB FILE - Konstruksi Rumah Panggung

HARGA SATUAN JUMLAH HARGA

NO. URAIAN PEKERJAAN ANALISA VOLUME (Rp) (Rp)

( a ) ( b ) ( c ) ( d ) ( e ) ( d x e )

X PEKERJAAN SANITASI

1 Saluran air hujan / Riol keliling bangunan Ls - M' 107,000.00

2 Bak kontrol X 5 unit 367,258.00

3 Septictank Ls - unit 2,000,000.00

4 Resapan Ls - unit 1,250,000.00

5 Closet duduk putih (polos) unit 2,639,484.00

6 Closet jongkok putih (polos) X 2 bh 400,413.00

7 Bak mandi lapis keramik X 3 bh 1,078,122.00

8 Bathup Ls unit 5,000,000.00

9 Dop bak mandi Ls - bh 10,000.00

10 Floor drain X 8 bh 23,000.00

11 Kran air stainless steel X 7 bh 17,212.50

12 Shower Ls bh 250,000.00

13 Washtafel+cermin (standart) X 4 bh 1,230,911.00

14 Bak cuci piring stainlessteel 1 lubang Ls bh 1,500,000.00

15 Instalasi air bersih dan kotor Ls - unit 720,000.00

16 Instalasi air hujan Ls - unit 448,000.00

Sub Jumlah

XI PEKERJAAN PENGECATAN

1 Menggosok dan mendempul kayu XIV 1 M2 7,237.00

2 Cat tembok+plamir pada :

* Dinding XIV 5 M2 16,155.00

* Plafond M2 16,155.00

3 Cat minyak pada :

* Kusen+pintu+jendela XIV 3 M2 31,033.00

* Listplank ulin XIV 3 M2 31,033.00

7 Water proofing coating Ls - M2 43,000.00

Sub Jumlah

XII PEKERJAAN INSTALASI LISTRIK

1 Titik lampu+instalasi Ls ttk 165,000.00

2 Lampu hemat energi 18 watt Ls bh 32,000.00

3 Saklar tunggal Ls bh 15,000.00

4 Saklar ganda Ls bh 15,000.00

5 Stop kontak 200 watt+Instalasi Ls bh 180,000.00

6 Panil Kontrol 4 group Ls set 3,500,000.00

7 Grounding Ls unit 1,350,000.00

Sub Jumlah

Page 94: RAB FILE - Konstruksi Rumah Panggung

REKAPITULASI BIAYA

Pekerjaan :

NOURAIAN JUMLAH

I PEKERJAAN PERSIAPAN Rp.II PEKERJAAN TANAH Rp.III PEKERJAAN PONDASI DAN PASANGAN Rp.IV PEKERJAAN BETON Rp.V PEKERJAAN ATAP Rp.VI PEKERJAAN PLAFOND Rp.VII PEKERJAAN LANTAI Rp.VIII PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI Rp.IX PEKERJAAN KUNCI / ALAT PENGGANTUNG Rp.X PEKERJAAN SANITAIR Rp.XI PEKERJAAN PENGECATAN Rp.XII PEKERJAAN INSTALASI LISTRIK Rp.

JUMLAH Rp.DIBULATKAN Rp.

Terbilang : …………………………………………………..

Banjarmasin,……………………PT / CV……………….

Nama TerangJabatan

Page 95: RAB FILE - Konstruksi Rumah Panggung

NO URAIAN UPAH / BAHAN1 KONSUMSI

biaya makanair minum

2 TRASPORTpenyebrangan feri untuk mobil bak terbukapenyebrangan feri untuk kendaraan

3 BENSINKendaraanmobil bak terbuka

4 SEWA ALATtendamobil bak terbuka

5 KESEKRETARIATANpenyediaan kertastinta printermaintance printerjilidpembuatan tokID CardPlakat / cinderamataAmplop

6 SURVEYuang lelah

7 YANG LAIN

Page 96: RAB FILE - Konstruksi Rumah Panggung

SATUAN UPAH VOLUME JUMLAH

perhari untuk 3x makan, 1x makan = 15000 45000 70 3150000dus 16000 40 640000

01x perbuah = 5000, untuk pulang pergi 10000 20 2000001x perbuah = 15000,untuk pulang pergi 30000 3 90000

04 ltr, 1ltr = 6000 28000 20 56000050 ltr, 1ltr = 6000 300000 3 900000

0buah 200000 4 800000buah 200000 3 600000

0rim 40000 5 200000pack 75000 4 300000

30000 1 30000buah 3000 50 150000buah 40000 1 40000buah 5000 70 350000buah 40000 5 200000kotak 15000 5 75000

Team 100000 7 700000500000

000

biaya total 9485000