Transcript of Rab 1 Lantai Contoh

LABRENCANA ANGGARAN BIAYA GUDANG KOPIHARGAJUMLAHNOURAIAN / JENIS PEKERJAANANALISAVOLUMESATUANSATUANSATUAN(RP)(RP)1234567 = ( 4 x 6 )I.PEKERJAAN PERSIAPAN1Pekerjaan bongkaranTaksir1.00lsRp750,000.00Rp750,000.00Sub JumlahRp750,000.00III.PEKERJAAN TANAH1Pengukuran dan Pemasangan BauwplankTaksir56.00M1Rp9,000.00Rp504,000.002Pekerjaan Galian Tanah sloof gantung08.40M30.00.03Galian pondasi setempat012.55M30.00.04Urugan Tanah Lantai032.00M30.00.05Pasir Lantai Kerja09.60M30.00.00.0Sub Jumlah0.0IV.PEKERJAAN PASANGAN1Pekerjaan Pasangan Aanstumping Batu Kali011.20M30.00.02Pekerjaan Pasangan Batu Bata trasram046.00M20.00.03Pekerjaan Pasangan Batu Bata 1:40151.00M20.00.04Pekerjaan Plesteran Batu Bata 1 : 40302.00M20.00.05Pekerjaan Plesteran Bata trassram 1 : 2092.00M20.00.06Pekerjaan pasangan bata terasTaksir32.00m1Rp26,000.00Rp832,000.00Sub Jumlah0.0Ke Halaman . 2Halaman ..... 2V.PEKERJAAN BETON / BETON BERTULANG1Lantai Kerja rabat Beton010.80M30.00.02Pembuatan ram terastaksir0.80m30.00.02Acian lantai Rabat betontaksir180.00m2Rp21,000.00Rp3,780,000.002kolom 40 x 40 Cm, Beton Bertulang 1 : 1.5 : 2.5011.20M30.00.03Pondasi telapak 100x100X3004.20M40.00.04Sloof Beton Bertulang 1 : 1.5 : 2.5 Uk 40 x 20 Cm0.04.48M30.00.05balok 20 x 30 Cm, Beton Bertulang 1 : 1.5 : 2.50.03.36M30.00.06RingBalok 15 x 20 Cm, Beton Bertulang 1 : 1.5 : 2.50.01.68M30.00.0Sub Jumlah0.0Ke Halaman . 3Halaman ..... 3VIIIPEKERJAAN ATAP, MEKANIKAL ,ELEKTRIKAL1Penutup Atap seng + Rangka baja ringanTaksir284.00ttkRp195,000.00Rp55,380,000.001Titik Lampu TL 40 watt dan sarangTaksir9.00ttkRp60,000.00Rp540,000.002pipa talang vertikal pvc 2,5"+ elbowTaksir10.00btgRp150,000.00Rp1,500,000.003Talang Horizontal Zink alumTaksir44.00m1Rp21,000.00Rp924,000.004Pemasangan Saklar seriTaksir3.00TitikRp12,000.00Rp36,000.005Pemasangan Saklar tripleTaksir1.00TitikRp18,000.00Rp18,000.006Pemasangan Stop KontakTaksir3.00TitikRp20,000.00Rp60,000.007Pemasangan Instalasi+kabelTaksir13.00TitikRp95,000.00Rp1,235,000.00Sub JumlahRp59,693,000.00Halaman ..... 3VIIIPEKERJAAN FINISHING1Pekerjaan Dempul dinding dalamTaksir151.00m2Rp9,000.00Rp1,359,000.002Pekerjaan Sealeer dinding luarTaksir151.00m2Rp17,000.00Rp2,567,000.003Pengecatan tembok (setara Nippon paint)Taksir302.00m2Rp15,000.00Rp4,530,000.004Pekerjaan Sisipan dan pembersihan akhirTaksir1.00lsRp500,000.00Rp500,000.005Teralis BesiTaksir50.40m2Rp375,000.00Rp18,900,000.006Pintu DorongTaksir2.00setRp15,000,000.00Rp30,000,000.007Sub JumlahRp57,856,000.00TOTAL0.0I.PEKERJAAN PERSIAPANRp750,000.00II.PEKERJAAN TANAH0.0IV.PEKERJAAN PASANGAN0.01,824.00Luas LantaiV.PEKERJAAN BETON / BETON BERTULANG0.0VI.PEKERJAAN ATAP, MEKANIKAL ,ELEKTRIKALRp59,693,000.00VIII.PEKERJAAN FINISHINGRp57,856,000.00JUMLAH0.0JUMLAH TOTAL0.00.0110.000.00.04.668.79120879122.330.06.010.03.005JumlbekistingLUAS LANTAI0.0FISIK1,824.51490,000.000Rp21.2845,000.001.500.0278,000.001.550,000.001.500.097,000.001.500.000.0131.2130. Kg145. Kg120. Kg175. Kg175. Kg175. Kg135. Kg165. Kg120. Kg165. Kg175. Kg175. Kg175. Kg135. Kg165. Kg120. Kg165. Kg160. Kg210. Kg110. Kg125. Kg250. Kg105. Kg105. Kg145. Kg3639332424227268649363,600,000,000.000.00.0

Terbilang :Dibulatkan

RABRENCANA ANGGARAN BIAYA (RAB)Rp2,491,941.58per M2349200000PROYEK:PEMB. RUMAH TINGGAL KELUARGA dr.ISMAIL SALIMRp2,491,944.65per M2Rp26.21LUAS BANGUNAN:116.4M2DISIAPKAN OLEH:PT. BRAHMAWAHANA CIPTA CONSULTANTNOURAIAN / JENIS PEKERJAANANALISAVOLSATHARGAJUMLAHSATUANSATUAN(RP)(RP)1234567 = ( 4 x 6 )IPEKERJAAN PERSIAPAN1Pekerjaan Pembersihan Tapaktaksir132.00ls7,800.00Rp1,029,600.002Listrik kerjataksir4.00bln75,000.00Rp300,000.003Air kerjataksir4.00bln75,000.00Rp300,000.004Pengamanan Proyektaksir4.00bln50,000.00Rp200,000.005Alat bantu kerja habistaksir1.00ls500,000.00Rp500,000.006Pembuatan barak pekerjataksir15.00M2175,000.00Rp2,625,000.00Sub JumlahRp4,954,600.00IIPEKERJAAN TANAH1Pengukuran dan Pemasangan BauwplankAnl56.00M165,900.00Rp3,690,400.002Pekerjaan Galian Tanah Pondasi SetempatAnl13.82M345,700.00Rp631,756.803Pekerjaan Urugan kembali tanah pondasiAnl8.29M314,000.00Rp116,121.604Pekerjaan Urugan tanah bawah lantaiAnl49.33M386,300.00Rp4,256,876.955Pekerjaan Pemadatan tanah dengan stemperAnl116.40M213,300.00Rp1,548,120.00Sub JumlahRp10,243,275.35IIIPEKERJAAN PONDASI DAN BETON1Pek. Pas. Pondasi rolag bataAnl1.62M2187,900.00Rp304,398.002Pek. lantai kerja beton rabat untuk pondasi setempatAnl0.52M3583,500.00Rp302,486.403Pek. lantai kerja pasir urug untuk beton rabat lantaiAnl3.49M3102,800.00Rp358,977.604Pek. beton rabat untuk lantai setara K.175Anl8.15M3689,100.00Rp5,614,786.805Pek. Pond. telapak 80x80x15, beton bertulang 1:1,5:2,5Anl2.59M32,698,900.00Rp6,995,548.806Pek. sloof 15x25cm, beton bertulang 1:1,5:2,6Anl3.31M33,942,000.00Rp13,052,947.50Rp16,511,333.487Pek. kolom 15x25cm, beton bertulang 1:1,5:2,5Anl2.62M34,762,000.00Rp12,458,582.508Pek. kolom 15x15cm , beton bertulang 1:1,5:2,5Anl0.53M34,762,000.00Rp2,535,050.709Pek. Kolom praktis sofi 13x13 beton bertulang 1:1,5:2,5Anl0.30M35,131,700.00Rp1,517,700.2810Pek. balok 15x35cm, beton bertulang 1:1,5:2,5Anl2.48M35,479,200.00Rp13,587,046.2011Pek. balok 15x50cm, beton bertulang 1:1,5:2,5Anl0.72M35,479,200.00Rp3,917,628.0012Pek. ringbalok/sofi 15x20cm, beton bertulang 1:1,5:2,5Anl1.48M35,040,700.00Rp7,469,006.8213Pek. plat lantai t.12cm, beton bertulang setara K.225Anl3.96M35,162,400.00Rp20,443,104.000.014Pek. kanopi & dak betonAnl0.57M34,575,000.00Rp2,618,730.000.015Pek. plat meja dapur t.7cmAnl0.13M32,776,600.00Rp349,851.60Sub JumlahRp91,525,845.19Rp106,723,720.54Rp(64,633,835.53)Rp(60.56)IVPEKERJAAN ATAP DAN PLAFON1Pek. Rangka atap baja ringantaksir79.34M2110,000.00Rp8,727,400.002Pek. Pas.Spandek lapis peredam suara/panasAnl79.34M281,200.00Rp6,442,408.003Pek. Pas.Atap tambahan R.jemurtaksir1.00ls1,500,000.00Rp1,500,000.004Pek. Pemasangan Listplank GRCAnl17.80M138,000.00Rp676,400.005Pek. Pemasangan plasing pinggiran ataptaksir32.00M112,000.00Rp384,000.006Pek. Pas. Plafon gypsum 9mm rangka hollo 4x4/4x8Anl86.77M2100,500.00Rp8,720,385.007Pek. list drop gypsumtaksir117.03M14,000.00Rp468,120.008Pek. Pas. Plafon multiplek 6mm rangka kayuAnl3.75M289,300.00Rp334,875.009Pek. perapihan bawah plat lantai / kanopitaksir15.50M239,500.00Rp612,250.0010Pek. champer campuran 1:3:5 di pinggiran dak betonAnl18.20M18,000.00Rp145,600.00Sub JumlahRp28,011,438.00Rp171,357,556.07Rp127.18VPEKERJAAN DINDING DAN LANTAIRp134,735,158.541Pek. pasangan batu bata 1/2 bata 1:4Anl211.05M2136,000.00Rp28,702,800.002Pek. plesteran dinding 1:4Anl358.79M232,500.00Rp11,660,512.503.565Rp(27.18)3Pek. acianAnl304.97M220,400.00Rp6,221,331.904Pek. Kamprot halustaksir53.82M212,500.00Rp672,721.885Pek. Pas. lantai Granit 60x60 by SandimasAnl75.30M2260,900.00Rp19,645,770.00NOURAIAN / JENIS PEKERJAANANALISAVOLSATHARGAJUMLAHSATUANSATUAN(RP)(RP)1234567 = ( 4 x 6 )6Pek. Pas. Plin lantai Granit 8x60Anl91.73M146,300.00Rp4,247,099.007Pek.Pas.Keramik lantai teras 30x30 roman Gol.CAnl8.56M2269,200.00Rp2,304,352.008Pek. Pas. Keramik lantai KM 30x30 roman Gol.CAnl5.16M3194,100.00Rp1,001,556.009Pek. Pas. Plin lantai teras 8x30Anl8.50M143,100.00Rp366,350.0010Pek. Pas. Keramik dinding 20x25 KM roman Gol.CAnl30.72M2165,200.00Rp5,074,944.0011Pek. Pas. Keramik 20x60 dinding dapur roman Gol.CAnl4.50M3178,300.00Rp802,350.0012Pek. Pas. Batu alamAnl8.50M2193,400.00Rp1,643,900.00Sub JumlahRp82,343,687.28VIPEKERJAAN KUSEN, PINTU & JENDELARp217,078,845.8215425400071.05897371931Pek. Pasangan kusen P1 kayu fin. Melamiktaksir13.20M175,000.00Rp990,000.002Pek. Pasangan kusen PJ1 kayu fi,. Melamiktaksir39.20M175,000.00Rp2,940,000.003Pek. Pasangan kusen J2 kayu fin.melamiktaksir5.30M175,000.00Rp397,500.004Pek. Pas. daun pintu P1 panel kayu fin.melamiktaksir2.00bh1,350,000.00Rp2,700,000.005Pek. Pas. daun pintu PJ1 panel kayu fin.melamiktaksir2.00bh1,350,000.00Rp2,700,000.006Pek. Pasangan Pintu KM PVCtaksir2.00set425,000.00Rp850,000.007Pek. Pas.daun jendela PJ1 kayu fin.melamiktaksir2.00bh700,000.00Rp1,400,000.008Pek. Pas.daun jendela PJ2 kayu fin melamiktaksir2.00bh550,000.00Rp1,100,000.009Pek. Pas.daun jendela J1 kayu fin.melamiktaksir1.00bh550,000.00Rp550,000.0010Pek. Pasangan Kaca 5mm polostaksir4.92M2135,000.00Rp664,200.0011Pek. Pasangan Kaca 8mm polos,pencahayaan ataptaksir3.48M2165,000.00Rp574,200.0012Pek. Pasangan Kunci pintu & handle lengkap ex Ondataksir4.00unit175,000.00Rp700,000.0013Pek. Pasangan Grendel pintu imperial 4"taksir4.00bh35,000.00Rp140,000.0014Pek. Pasangan Grendel jendela miller 3"taksir5.00bh24,000.00Rp120,000.0015Pek. Pasangan hak angin sakura silvertaksir5.00bh18,000.00Rp90,000.0016Pek. Magnet pintu ex falcotaksir4.00bh32,000.00Rp128,000.0017Pek. Pasangan bata terawangtaksir48.00bh15,000.00Rp720,000.00Sub JumlahRp16,763,900.00VIIPEKERJAAN MEKANIKAL DAN ELEKTRIKAL1Pek. Pas. Pipa air bersih 1/2" ex wavinAnl55.00M115,500.00Rp852,500.002Pek. Pas. Pipa air bersih 3/4" ex wavinAnl16.50M217,000.00Rp280,500.003Pek. Pas. Pipa air kotor cair PVC 4" ex wavinAnl29.70M156,100.00Rp1,666,170.004Pek. Pas. Pipa air padat cair PVC 4" ex wavinAnl16.50M156,100.00Rp925,650.005Pek. Pas. Pipa vertikal dari talang PVC 2,5" ex wafinAnl14.00M131,200.00Rp436,800.006Pek. Pas. Monoblock ex toto typeCW660JAnl2.00bh2,469,000.00Rp4,938,000.007Pek. Pas. Jet shower by toto, type THX20NBPIVtaksir2.00bh226,800.00Rp453,600.008Pek. Pas. Zink ex royal type SB9Taksir1.00bh624,750.00Rp624,750.009Pek. Pas. Wastafel ex toto type LW240CJAnl2.00bh635,900.00Rp1,271,800.0010Pek. Pas.Shower dan kran lengkap ex toto type TX432SDtaksir2.00bh1,243,000.00Rp2,486,000.0011Pek. Pas. Floordraintaksir3.00bh52,500.00Rp157,500.0012Pek. Pas. Kran airtaksir4.00bh93,000.00Rp372,000.0013Pek. Pas. Kran wastafel ex toto type T205taksir2.00bh378,000.00Rp756,000.0014Pek. Pas. Kran zing by toto type T30AR13V7ntaksir1.00bh361,100.00Rp361,100.0015Pek. Pas. Kaca cermintaksir2.00unit850,000.00Rp1,700,000.0016Pek. Pas. Instalasi + kabel golden key setarataksir23.00ttk125,000.00Rp2,875,000.0017Pek. Pas. Lampu TLD 1x18Wtaksir4.00ttk150,000.00R