Page 1: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

RUPTL 2015-2024

Jakarta, Februari 2015

PT PLN ( Persero )

Page 2: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

2

Hasil Prakiraan Kebutuhan Listrik 2015-2024

Sumatera: 11,6%

31

TWh

83

TWh

TWh

IT : 11,1%

23 57

TWh

JB : 7,8%

165

TWh

324

TWh

Kalimantan: 10,4%

Sulawesi: 12,4%

2015 2024

TWh

TWh

219

Indonesia: 8,7%

Papua: 9,4%

Maluku: 10,3%

Nusa Tenggara: 9,6%

Tahun 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Kebutuhan (TWh) 202 219 239 260 283 307 332 361 392 427 464

Rasio Elektrifikasi 82.4 85.7 89,3 91,6 93,8 95,5 96,5 97,0 97,2 97,4 97,6

Rasio Elektrifikasi (PLN & Non PLN) 84.4 87.7 91.3 93.6 95.8 97.4 98.4 98.9 99.1 99.3 99.4

464

Page 3: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Batubara

65%

Air

5%

Panas Bumi

5%BBM

2%

Gas

23%

Lainnya0%

2019

3

Tambahan Infrastruktur Kelistrikan 2015-2019

3

Pembangunan Infrastruktur Kelistrikan2015-2019: 42,7 GW,Rasio elektrifikasi 97,2%

Oleh PLN:

Pembangkit: 13,7 GW

Transmisi : 42 ribu kms

Gardu Induk: 996 lokasi

Oleh Swasta:

Pembangkit: 29 GW

Transmisi : 360 kms

KebutuhanCapex: Rp 608,5 T

KebutuhanCapex: Rp 579,7 T

Untuk menopang pertumbuhan ekonomi 6,7% (Draft RPJMN Bappenas), dengan pertumbuhan kebutuhan listrik 8,8%.

2014

2019

Page 4: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

4

Penambahan Kapasitas tahun 2015 -2019

4

Pembangkitan

Transmisi dan GI

Page 5: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

5

Tambahan Infrastruktur Kelistrikan 2015-2024

5

Pembangunan Infrastruktur Kelistrikan2015-2024: 70,4 GW,

Oleh PLN:

Pembangkit: 21,4 GW

Transmisi : 63 ribu kms

Gardu Induk: 145 GVA

Oleh Swasta/Unallocated:

Pembangkit: 35,5 GW

Unallocated : 13,5 GW

Transmisi : 1,2 ribu kms

KebutuhanCapex: Rp 832 T

KebutuhanCapex: Rp 754 T

Untuk menopang pertumbuhan ekonomi 6,7% (Draft RPJMN Bappenas), dengan pertumbuhan kebutuhan listrik 8,7% danRasio elektrifikasi 99,4%.

2015

2024

Page 6: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Tambahan Kapasitas Pembangkit

6

• Total tambahan kapasitas 2015-

2024 sekitar 70,4 GW.

• Alokasi proyek pembangkit PLN

dan IPP hanya untuk proyek-

proyek pembangkit yang telah on

going dan committed.

• Proyek yang belum ditetapkan

pengembang maupun sumber

pendanaannya disebut proyek

Unallocated.

MW

Tambahan Kapasitas :

PLTU : 42,0 GW

PLTP : 4,8 GW

PLTGU : 9,2 GW

PLTG/PLTMG : 5,0 GW

PLTA/PLTM : 9,3 GW

Lainnya : 0,1 GW

Per Jenis Pembangkit

MW

Page 7: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Pengembangan TransmisiPer Level Tegangan (kms)

• 500 kVAC: 5.829 kms

• 500 kVDC: 1.543 kms

• 275 kVAC: 8.371 kms

• 150 kV : 40.413 kms

• 70 kV : 3.116 kms

Total 59.272 kms

7

Page 8: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Pengembangan Gardu IndukPer Level Tegangan (MVA)

• 500/275 kV: 5.000 MVA

• 500/150 kV: 34.673 MVA

• 500 kV DC : 3.600 MVA

• 275/150 kV: 20.560 MVA

• 150/70 kV : 690 MVA

• 150/20 kV : 78.426 MVA

• 70/20 kV : 2.450 MVA

Total 145.399 MVA

8

Page 9: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Kebutuhan Investasi RUPTL 2015-2024 IPP & PLN

9

Miliar US$

Pembangkit PLN : 34,3 miliar US$

Pembangkit IPP : 62,8 miliar US$

Transmisi : 20,6 miliar US$

Distribusi : 14,5 miliar US$

Total PLN : 69,4 miliar US$

Total IPP : 62,8 miliar US$

Total PLN+IPP : 132,2 miliar US$

Page 10: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Ke GI 150 kV

Betung

Ke GI 150 kV

Tanjung Api-Api

Ke GI 150 kV

Kayu Agung

Ke GI 150 kV

Simpang Tiga

G

GU

GU

D

Talang

Kelapa

Gandus

Talang

Ratu

Seduduk

Putih

Boom Baru

BungaranSungai

Kedukan

Sungai

Juaro

Borang

Mariana

Kenten

Jakabaring

PLTG

Jakabaring

CNG

GU

G

Keramasan

G

G

ACSR 2x330 mm2

20 kmr-COD 2013

Bukit

Siguntang

ACSR 2x330 mm2

1 kmr-COD 2014

CU 1000 mm2

10 kmr-COD 2014

ACSR1x120 mm2

10 kmr

2013 Uprate to

ACCC 1x160 mm2

ACSR 2x330 mm2

1 kmr-COD 2017

AC

SR

2x

43

0 m

m2

60

km

r-C

OD

20

14

UleeKareeng

Sigli

NaganRaya

Arun

Aceh 1Sumut 4

Binjai

SUMUT 3

SUMUT 2

Pangkalan Susu

SUMUT 1Simangkok

Sarulla

Rantau

Prapat

Batang

ToruNew

Padang

Sidempuan

Payakumbuh

Riau 2

Riau 1

Kiliranjao

Sungai

RumbaiMuaro

Bungo

Bangko

Jambi 2

Jambi 1

Sumsel-5

Pumpstorage-2

Pumpstorage-1

Lubuk

Linggau

Lahat

Lumut Balai

Rantau

Dedap

Muara

Enim

Sumsel-6

Sumsel-1

Sungai

Lilin

Sumsel-7

Gumawang

Palembang

Lampung

Sumsel 1

2

5

9

53

25

21

29

18

28

4036

30

3

4

50

49

27

39

4142

33

34

24

32

16

15

17

43

44

19

1

54

45

46

4847

52

13

12

20

22

8

14

31

26

23

7

35

38

10

37

6

11

51

55

56

57

55

1. PLTP Seulawah Agam (FTP2) 110 MW - 2024

2. PLTU Nagan Raya (FTP1) 2x110 MW - 2014/15

2. PLTU Meulaboh (Nagan Raya) #3,4 200 MW - 2019/20

3. PLTA Peusangan 88 MW – 2018

4. PLTA Peusangan-4 (FTP2) 83 MW - 2022

5. PLTG Arun (Peaker) 200 MW – 2015

5. PLTGU/MGU Sumbagut-2 Peaker 250 MW – 2017

6. PLTA Lawe Alas 151 MW - 2024

7. PLTGU/MGU Sumbagut-1 Peaker 250 MW – 2018

7. PLTA Tampur-1 428 MW - 2024

8. PLTA Wampu (FTP2) 2x15 MW – 2016

9. PLTU Pangkalan Susu (FTP1)220 MW – 2014

9. PLTU Pangkalan Susu (FTP2) 200 MW – 2018

10. PLTGU/MGU Sumbagut-3&4 Peaker 2x250 MW – 2019

11. PLTA Sumatera Pump Storage-1 500 MW – 2023

12. PLTP Simbolon Samosir (FTP2) 110 MW - 2024

13. PLTP Sipoholon Ria-Ria (FTP2) 20 MW - 2024

14. PLTA Hasang (FTP2) 40 MW – 2019

15. PLTA Asahan III (FTP2) 174 MW - 2019

16. PLTP Sarulla I (FTP2) 3x110 MW - 2017/18

16. PLTP Sarulla II (FTP2) 110 MW - 2024

17. PLTA Batang Toru 510 MW – 2022

18. PLTGU Riau 50 MW – 2016

18. PLTGU/MG Riau Peaker 200 MW – 2017

19. PLTP Sorik Marapi (FTP2) 80 MW – 2020

20. PLTP Bonjol (FTP2) 60 MW - 2024

21. PLTGU/MG Riau 250 MW - 2017

21. PLTU Riau/Tenayan 2x110 MW – 2015

22. PLTA Masang-2 (FTP2) 55 MW – 2021

23. PLTA Sumatera Pump Storage-2 500 MW - 2023

24. PLTU Riau Kemitraan 2x600 MW - 2019

25. PLTU Teluk Sirih (FTP1) 2x112 MW - 2014/15

28. PLTMG Payo Selincah (Sewa) 20 MW – 2015

28. PLTP Muara Laboh (FTP2) 70 MW - 2018

29. PLTGU/MG Jambi Peaker – 2017

30. PLTP Sungai Penuh (FTP2) 110 MW - 2024

31. PLTA Merangin-2 2x175 MW - 2021/22

32. PLTU Jambi 2x600 MW - 2019

33. PLTU Sumsel-5 2x150 MW - 2015/16

34. PLTU Sumsel-7 2x150 MW – 2018

35. PLTU Sumsel-1 2x300 MW - 2020/21

36. PLTP Hululais (FTP2) 2x55 MW - 2019/20

37. PLTA Ketahun-1 84 MW - 2022

38. PLTU Bengkulu 2x100 MW - 2019

39. PLTU Banjarsari 2x115 MW – 2014

40. PLTGU Keramasan 80 MW – 2014

41. PLTU Sumbagsel-1 2x150 MW - 2018

42. PLTU Keban Agung 2x113 MW – 2015

43. PLTP Lumut Balai (FTP2) 4x55 MW - 2017/19/24

44. PLTP Rantau Dadap (FTP2) 2x110 MW - 2019/20

45. PLTP Danau Ranau (FTP2) 110 MW – 2024

46. PLTP Suoh Sekincau (FTP2) 62 MW - 2020

47. PLTP Ulubelu (FTP2) 2x55 MW - 2016/17

48. PLTA Semangka (FTP2) 56 MW - 2018

49. PLTGU/MG Lampung Peaker 200 MW – 2017

50. PLTMG Sribawono 100 MW – 2015

51. PLTMG Sutami MPP 100 MW – 2016

52. PLTP Wai Ratai (FTP2) 55 MW – 2024

53. PLTU Sebalang (FTP1) 2x110 MW -2014

54. PLTP Rajabasa (FTP2) 2x110 MW - 2023/24

55. PLTU Sumsel-6 300 MW – 2019

55. PLTMG Bangka Peaker 100 MW - 2018/19

56. PLTU Air Anyir (FTP1) 2x15 MW – 2015

57. PLTU Sewa 2x30 MW – 2019/20

58. PLTU Belitung Baru (FTP1) – 2014/15

58. PLTMG Belitung Peaker (FTP1) 20 MW – 2017/18

59. PLTU Belitung-4 2x15 MW – 2015/16

UU

Dukong

Manggar

U

G

58

59

Rencana Pengembangan Sistem Kelistrikan Sumatera

10Disclaimer: Lokasi Pembangkit maupun GI

hanya indikatif awal

Page 11: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Rencana Pengembangan Sistem Kelistrikan Jawa Bali

CRATA

CBATU

SGLNG

BKASI

CIBNG

CWANG

KMBNG

GNDUL

BRAJA

UJBRG

MDCAN

BDSLN

ADIPALA

RWALO

PEDAN

UNGAR

TASIK

KDIRI

SOLO

GRSIK

SBBRT

DEPOK

PITON

SBSLN

NGBNG

CSKAN PS

PLTU

2x1.000 MW

PMLNG

PLTU 1x1.000 MW

CLCAP IPP

BANGIL

NEW ANTOSARI

SRLYA MTWAR

IDRMYU

BANTEN

XBOGOR

CGRLNG

MKRNGDKSBI

PRIOK

CLGON

JATENG IPP

TJATI B

PLTU 2x1.000 MW

PLTU 2x660 MW

GRATI

TANDES

CBTUBRU

TMBUN

~~~SURALAYA

~

~

~~

~

~

~

~~

Disclaimer: Lokasi Pembangkit

maupun GI hanya indikatif awal

32

4

51

1. PLTU Jawa-7 2x1000 MW (2019)

2. PLTU Jawa-9 600 MW (2018)

3. PLTU Banten 625 MW (2016)

4. PLTU Jawa-5 2x1000 MW (2019)

5. PLTU Lontar Exp #4 315 MW (2018)

6. PLTGU Peaker Muara Karang 500 MW (2017)

7. PLTU Jawa-12 2x1000 MW (2022/23)

8. PLTGU Jawa-2 800 MW (2018)

9. PLTGU Muara Tawar Add-on Blok 2,3,4 650 MW

(2017)

10. PLTGU Jawa-1 2x800 MW (2018)

11. PLTU Jawa-6 2x1000 MW (2023)

6 78

9

12. PLTU Indramayu #4,5 2x1000 MW (2019/24)

13. PLTGU/MG Peaker Jawa-Bali 1 400 MW (2017)

14. Upper Cisokan PS 4x260 MW (2019)

15. PLTA Rajamandala 47 MW (2017)

16. PLTA Jatigede 2x55 MW (2019)

17. Matenggeng PS 4x225 MW (2022/23)

18. PLTU Cilacap 614 MW (2015)

19. PLTU Jawa-8 1x1000 MW (2018)

20. PLTU Jawa-1 1x1.000 MW (2019)

21. PLTU Jawa-3 2x660 MW (2021/22)

22. PLTU Jawa Tengah 2x1000 MW (2019)

23. PLTU Adipala 660 MW (2015)

10

1112

1314

15 16

17

1819

20

24. PLTU Jawa-10 1x600 MW (2019)

25. PLTU Jawa-13 2x1000 MW (2024)

26. PLTU Jawa-4 2x1000 MW (2019)

27. PLTGU Jawa-3 800 MW (2018)

28. PLTGU/MG Peaker Jawa-Bali 2 500 MW (2017)

29. PLTGU Grati 450 MW (2016/17)

30. PLTU Celukan Bawang 380 MW (2015)

31. PLTMG Pesanggaran 200 MW (2015)

32. PLTU Jawa-11 1x600 MW (2021)

33. PLTGU/MG Jawa-Bali 3 500 MW (2017)

34. PLTGU/MG Jawa-Bali 4 450 MW (2016/17)

2122

2324

25

26

27

28

29

30

GITET 500 kV

Keterangan :

SUTET 500 kV

Pembangkit

Rencana GITET 500 kV

Rencana SUTET 500 kV

Rencana Pembangkit~32

31

33 34

Page 12: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Rencana Pengembangan Sistem Kelistrikan Kalimantan

Disclaimer: Lokasi Pembangkit maupun GI hanya

indikatif awal12

SABAH (MALAYSIA)

SULAWESI SELATAN

SULAWESI TENGAH

Longikis

Sangatta

Bontang

Tj . Selor

Tj . Redep

Manggarsari

IndustriPetung

Maloi

Melak

Malinau

Tidang Pale

Kota Bangun

A

Barikin

Tanjung

Rantau

Buntok

Palangkaraya

KualaKurun

Puruk Cahu

MuaraTeweh

Kasongan

Sampit

Seberang Barito

Selat

Trisakti

MantuilCempaka Batulicin

Amuntai

New

Palangkaraya

Kotabaru

Satui

Sukamara

Nangabulik

PangkalanBun

Kuala Pambuang

PangkalanBanteng

Parenggean

Ketapang

Sukadana Sandai

Tayan

Ngabang

Bengkayang

Sambas

Singkawang

Mempawah

Parit Baru Siantan

Sei RayaKota Baru

Sanggau

Sekadau

Sintang

Putussibau

Nanga Pinoh

Kota Baru

SERAWAK (MALAYSIA

)

Talisayan

Muara

Wahau

Kayutangi

Kendawangan

Marabahan

Paringin

Bontang Kuala

Sambera

SambutanHaru Bukuan

New SMD

Sanga-Sanga

SenipahSepaku

Sepaso

TengkawangBukit biru

Ulin

Sei Tabuk

Bandara

Pelaihari

Asam-Asam

New Balikpapan

Embalut

New Industri

KomamKuaro

Grogot

Rantaupulut

16. PLTMG Bangkanai 295 MW-2016/17

17. PLTU Kalsel (FTP2) 200 MW-2017

18. PLTA Kusan 65 MW-2024

19. PLTU Pulang Pisau 120 MW-2015

20. PLTU Kalselteng-2 200 MW-2019/20

21. Kalsel Peaker-1 200 MW-2017

22. Kalsel Peaker-2 100 MW-2021

23. PLTU Sampit 50 MW-2018

24. PLTU Kalselteng-3 200 MW-2020/21

25. PLTU Kalselteng-1 200 MW-2019/20

26. PLTU Ketapang (FTP2) 20 MW-2016

27. PLTU Ketapang IPP 12 MW-2015

28. PLTA Nanga Pinoh 98 MW-2022

29. PLTU Kalbar-3 400 MW – 2023/24

30. PLTU Kalbar-1 200 MW-2018

31. PLTU Kalbar-2 400 MW 2020/21

32. PLTU Pantai Kura-Kura 55 MW-2016

33. PLTU P Baru (FTP1) 100 MW-2016

34. PLTU P Baru (FTP2) 110 MW-2017/18

35. Kalbar Peaker 100 MW- 2019

1. PLTMG Malinau (6 MW) – 2017

2. PLTU Malinau 6 MW- 2016

3. PLTU Tj. Selor 14 MW-2015

4. PLTMG Tj. Selor 15 MW- 2017

5. PLTU Tj. Redep 14 MW-2015

6. PLTA Kelai 55 MW-2024

7. PLTU Kaltim FTP2 200 MW-2018/19

8. PLTU Kaltim (MT) 55 MW-2017

9. Kaltim Peaker-2 100 MW-2017

10. Kaltim Peaker-3 100 MW-2022

11. PLTU Kaltim-4 200 MW-2019/20

12. PLTU Kaltim-3 400 MW-2022/23

13. PLTG Senipah (ST) 35 MW-2017

14. PLTU Teluk BPN 220 MW-2015

15. PLTU Kaltim-5 400 MW-2023/24

Interkoneksi

ke Serawak

Kariangau

1 2

34

5

7

8

9 1011

12

13

1415

16

17

18

19

20

2122

2324

2627

28

29

3031

32

3334

Long Bagun

Samboja

Karjo

6

Tamiang

Layang

Kandangan

25

Page 13: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Rencana Pengembangan Sistem Kelistrikan Sulawesi

Disclaimer: Lokasi

Pembangkit maupun GI

hanya indikatif awal

13

SULAWESI

TENGAH

JNP

Bulukumba

Sinjai

Bone

Kajuara

Soppeng

Sengkang

Siwa

Palopo

Wotu

Malili

Makale

Enrekang

Pare

Pinrang

Barru

Pangkep TonasaMaros

BosowaTello

Sungguminasa

Tallasa

Bakaru

SULAWESI

BARAT

Bantaeng

Punagaya

Likupang

Kema

Lolak

Bintauna

Buroko

Molibagu

Isimu

U

BotupinggeMarisa

SULAWESI

SELATAN

Lasusua

Kolaka UnaahaKendari

Raha

Bau-Bau

GORONTALO

SULAWESI

UTARA

SULAWESI

TENGGARA

KALIMANTAN

TIMUR

Poso

Kolonedale

Palu Baru

SilaeTalise Ampana

Tentena

Toili

Bunta Luwuk

Moutong

LeokTolitoli

Tambu

PolmanMajene

Mamuju

Pasangkayu

Topoyo

Mamuju Baru

Sidrap

Daya Baru

Bangkir

Tilamuta

Bungku

Andolo

Kasipute

Bantaeng Smelter

Donggala

Sigi

Mauro

Masamba

Petobo

Bolontio

Gobar

Pandu

Sario

Belang

Luwu

Pasarwajo

Malaompana

Pure

Andowia

Keera

Rantepao

Limboto Suwawa

Mamasa

Ratahan

Tutuyan

G

U

U

G

A

A

P

P

PanikiRanomut

Sawangan

TelingTasik Ria

TonsealamaKawangkoan

Tomohon

Lopana

U

Otam

TallolamaPanakkukang

Mandai

Daya

UParigi

A

A

A

P

A

AA

Tallo Lama

Bontoala

Pangkep

Daya

MandaiBosowa

Maros

Kima

Daya Baru

TanjungBunga

ke

GI Tallasa

ke

GI Barru

Panakukang

Sungguminasa

Tello

ke

GITET Bantaeng

ke

GI/GITET Sidrap

Tonasa

G

1. PLTG Minahasa Peaker 150 MW - 2017

2. PLTG Sulbagut Peaker 100 MW - 2024

3. PLTA Sawangan 12 MW - 2020

4. PLTU Sulut-3 100 MW – 2019/20

5. PLTU Sulbagut-2 200 MW – 2022/23

6. PLTU Sewa Amurang 50 MW - 2017

7. PLTP Lahendong V 20 MW – 2017

8. PLTP Lahendong VI 20 MW – 2018

9. PLTU Sulut I 50 MW - 2018

10. PLTP Kotamobagu - 80 MW - 2024

11. PLTA Poigar-2 30 MW - 2021

12. PLTU Sulbagut-1 100 MW – 2019/20

13. PLTU Gorontalo (FTP1) 50 MW – 2016/17

14. PLTU Sulbagut-3 100 MW – 2019/20

15. Gorontalo Peaker 100 MW - 2018

16. PLTU Toli-Toli 50 MW – 2020/21

17. PLTU Palu-3 100 MW - 2018

18. PLTU Tawaeli Ekspansi 30 MW - 2016

19. PLTP Masaingi (FTP2) 20 MW - 2022

20. PLTP Borapulu 40 MW – 2022

21. PLTGU Makassar Peaker 450 MW–2017/18

22. PLTGU Sulsel Peaker 450 MW–2018/19

23. PLTA Poso-1 120 MW – 2021/22

24. PLTA Seko-1 480 MW – 2023/24

25. PLTA Salu Uro 95 MW – 2020/21

26. PLTU Kendari (Ekspansi) 10 MW - 2015

27. PLTU Kendari-3 100 MW - 2018

28. PLTA Karama 190 MW – 2024

29. PLTU Mamuju (FTP2) 50 MW - 2017

30. PLTA Kalaena-1 53 MW – 2021/22

31. PLTA Malea 90 MW - 2020

32. PLTA Paleleng 40 MW – 2021/22

33. PLTA Tabulahan 20 MW – 2020/21

34. PLTA Masupu 35 MW – 2020/21

35. PLTA Poko 234 MW – 2021/22

36. PLTA Bakaru II 126 MW - 2020

37. PLTA Bonto Batu 110 MW - 2024

38. PLTA Buttu Batu 200 MW – 2022/23

39. PLTU Sulsel Barru-2 100 MW - 2018

40. PLTMG Wajo 20 MW - 2016

41. PLTU Sulsel-2 400 MW – 2019/20

42. PLTU Punagaya 200 MW – 2017/18

43. PLTU Jeneponto-2 250 MW – 2018/19

44. PLTMG Luwuk 40 MW - 2017

45. PLTA Wotunohu 15 MW - 2023

46. PLTU Bau-Bau IPP 14 MW - 2015

47. PLTU Bau-Bau 50 MW – 2019

48. PLTMG Bau-Bau 30 MW – 2016

49. PLTU Wangi-Wangi 6 MW-201

50. PLTA Konawe 50 MW – 2023

51. PLTA Lasolo 145 MW – 2021/22

21

34

5

78

910

1112

13

1415

Sindue

16

1718

1920

2122

23

24

2627

28

29

30

Bitung

6

25

31

32

33 34

3536

3738

3940

414243

44

45

4647

49

Likupang

Bitung

Kema

Pandu

Sario

Ratahan

Paniki

Ranomut

SawanganTeling

Tomohon

U

U

Tasik Ria

P

Tonsealama

Lopana

ke

GI Otam

ke

GI Belang

21

3

4

5

7

6

Kawangkoan

8

48

A

50

51A

Page 14: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

14

Terima Kasih

Page 15: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

UMuntok

Kelapa

PLTU Air Anyer (FTP1)

2 x 15 MW – 2015

PLTU Sewa

2x30 MW – 2019/20

Sungailiat

ACSR 1x240 mm260 km

(Uprating menjadi HTLS

310 mm2– 2016)

ACSR 2x240 mm270 km

ACSR 1x240 mm260 km

ACSR 2x240 mm260 km

PangkalPinang

Koba

Toboali

TanjungApi-api

Kenten

U

U

Dukong

Manggar

PLTU Belitung Baru

(FTP1)

2 x 16,5 MW – 2014/15

PLTG/MG Belitung

Peaker

20 MW – 2017/18

PLTU Biomass

7 MW

ACSR 1x240 mm270 km

2016

PT PLN (Persero)

PETA JARINGAN

PROPINSI BANGKA BELITUNGPERENCANAAN SISTEM

BIDANG PERENCANAAN

PLTD

PLTGU

PLTU

PLTG PLTAKit Eksisting

Kit Rencana

Existing 70 kV

Existing 150 kV

Rencana 150 kV

Rencana 275 kV PLTP

Edit

Desember 2013

D

A

P

U

G

GU

GI Eksisting

GI Rencana

GI 275/150

kV RencRencana 500 kV

Rencana 275 kV HVDC

Rencana 500 kV HVDC

XLPE 2x300 mm239 km

ACSR 2x240 mm216 km

Landing Point

ACSR 2x330 mm220 km

PLTG/MG Bangka

Peaker

100 MW – 2018

U

PLTU Bangka-1

2 x 100 MW – 2020/21

U

PLTU Belitung-4

2x15 MW – 2015/16

G

Rencana Tambahan Pembangkit Besar Lainnya

:

1. PLTU Bangka-2 200 MW - 2023/24

2. PLTG/MG Belitung-3 Peaker 30 MW – 2020

3. PLTU Belitung-5 2x15 MW 2023/24

dggg

2016

2014

2016

2015

2016

2014

G

Rencana Pengembangan Sistem Kelistrikan Babel

15Disclaimer: Lokasi Pembangkit

maupun GI hanya indikatif awal

Page 16: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

GI Elelim

(Kab. Yalimo)

GI Wamena

GI Ilaga

(Kab. Puncak)

GI Karubaga

(Kab. Tolikara)

GI Sumohai

GI Mulia

(Kab. Puncak Jaya)

Kenyam

(Kab. Nduga)

(Kab. Lanny Jaya)

A

PLTA Baliem

50 MW (2023/24)

ACSR 1x240 mm2

40 km (2023)

ACSR 1x240 mm2

65 km (2023) ACSR 1x240 mm2

75 km (2023)

ACSR 1x240 mm2

61 km (2023)

ACSR 2x240 mm2

25 km (2023)

ACSR 1x240 mm2

25 km (2023)

D

PLTD Wamena

7 MW U

PLTU Jayapura (FTP 1)

2x10 MW (2015)

A

PLTA Orya/Genyem

20 MW (2015)

PLTU Holtekamp 2

2x15 MW (2018)

A

PLTA Orya 2

10 MW (2021)

PLTU Jayapura 3

2x25 MW (2021/22)

PLTU IPP Jayapura

2x15 MW (2018)

Jayapura

(Skyland)

Sentani

D

PLTD Sentani

D

PLTD Genyem

ACSR 1x240 mm2

80 km (2015)ACSR 1x240 mm

2

20 km (2015)

ACSR 1x240 mm2

18 km (2015)

PLTU Jayapura Peaker 2

20 MW (2022)

G

PLTMG Jayapura Peaker

50 MW (2018)

D

PLTD Jayapura

Abepura

U

A

PLTU Klalin/Sorong

2X15 MW (2018)

PLTA Warsamson

3x15.5 MW (2021/22)

ACSR 1x240 mm2

20 km (2020)ACSR 1x240 mm

2

30 km (2017)

D

PLTD Sorong

34 MW

GI Sorong

Rencana Pengembangan Sistem Kelistrikan Papua

16

1

32

1

2

3

Page 17: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Rencana Pengembangan Sistem Kelistrikan Lombok

17y

U

U

UP

A

A

A

D

G 0

PLTU Lombok APBN

1x25 MW

PLTGU Lombok Peaker 150 MW (2017)

PLTG/MG/GU Lombok Peaker-2 60 MW (2022)

PLTMH Santong

0,85 MW (2014)

PLTM Kokok Putih

3,8 MW (2013)

PLTP Sembalun (FTP2)

20 MW (2021)

PLTU Lombok Timur

2x25 MW (2017)

GI Pringgabaya

GI Selong

GI Sengkol

GI Kuta

GI Jeranjang

GI Ampenan

PLTM Segara

5,8 MW (2014)

PLTU Lombok (FTP2)

2x50 MW (2018/19)

ACSR 1x240 mm2

15 km 2017

ACSR 1x240 mm2

12 km - 2015

ACSR 1x240 mm2

10,5 km - 2014

GI Tanjung

PT PLN (Persero)PETA JARINGAN SISTEM LOMBOK

PROPINSI NTB

T/L 70 kV Existing / Rencana

T/L 150 kV Existing / Rencana

T/L 275 kV Existing / Rencana

T/L 500 kV Existing / Rencana

/

/

/

/

PLTU Existing / Rencana

PLTG Existing / Rencana

PLTP Existing / Rencana

PLTA Existing / Rencana

G

A

U

P

/

/

/

/

PLTGU Existing / Rencana

PLTMG Existing / Rencana

PLTM Existing / Rencana

PLTD Existing / Rencana

MG

D

GU

M

GI 500 kV Existing / Rencana

GI 275 kV Existing / Rencana

GI 150 kV Existing / Rencana

GI 70 kV Existing / Rencana

GI 500/275 kV Existing / Rencana

GI 500/275/150 kV Existing / Rencana

GI 275/150 kV Existing / Rencana

GI 150/70 kV Existing / Rencana

/

/

/

/

/

/

/

/

MG

D

GU

M

G

A

U

P

/

/

/

/

Kit Existing

Kit Rencana

Edit Oktober 2014

PERENCANAAN SISTEM

GI Bayan

ACSR 2x240 mm2

35 km - 2018

ACSR 2x240 mm2

41 km (2018)

GI Mantang

ACSR 1x240 mm2

15 km - 2014

PLTU Lombok 2

2x50 MW (2019/20)

ACSR 2x240 mm2

15 km 2018

Kabel Tanah

5.6 km - 2015

GI Mataram

GI Sekotong

U

PLTU Lombok (FTP 1)

2x25 MW (2015)

PLTD Ampenan

55 MW

DPLTD Taman

9,6 MW

U

PLTU Lombok 3

100 MW (2023/24)

Disclaimer: Lokasi Pembangkit

maupun GI hanya indikatif awal

Page 18: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Rencana Pengembangan Sistem Kelistrikan Sumbawa

18

U A

U UPLTU Sumbawa Barat

2x7 MW (2015/16)

PLTU Sumbawa 2

2x25 MW (2023/24)

PLTA Brang Beh

3x6 MW (2020/21)

PLTU Bima 2

2x10 MW (2018)

PLTU Bima (FTP 1)

2x10 MW (2015)

ACSR 1x240 mm2

142 km (2017)

GI DompuGI Labuhan

GI Bima

GI Taliwang

2cct 1xOstrich

15 km - 2015

ACSR 1x240 mm2

7 km (2016)

GI Woha

GI Sape

ACSR 1x240 mm2

142 km (2017)

GI Empang

U

PT PLN (Persero)PETA JARINGAN SISTEM SUMBAWA

PROPINSI NTB

T/L 70 kV Existing / Rencana

T/L 150 kV Existing / Rencana

T/L 275 kV Existing / Rencana

T/L 500 kV Existing / Rencana

/

/

/

/

PLTU Existing / Rencana

PLTG Existing / Rencana

PLTP Existing / Rencana

PLTA Existing / Rencana

G

A

U

P

/

/

/

/

PLTGU Existing / Rencana

PLTMG Existing / Rencana

PLTM Existing / Rencana

PLTD Existing / Rencana

MG

D

GU

M

GI 500 kV Existing / Rencana

GI 275 kV Existing / Rencana

GI 150 kV Existing / Rencana

GI 70 kV Existing / Rencana

GI 500/275 kV Existing / Rencana

GI 500/275/150 kV Existing / Rencana

GI 275/150 kV Existing / Rencana

GI 150/70 kV Existing / Rencana

/

/

/

/

/

/

/

/

MG

D

GU

M

G

A

U

P

/

/

/

/

Kit Existing

Kit Rencana

Edit Oktober 2014

PERENCANAAN SISTEM

GI Alas/Tano 2cct 1xOstrich

60 km - 2015

ACSR 1x240 mm2

30 km - 2020

2cct 1xHAWK

35 km - 2017

PLTU Sumbawa

2x10 MW (2018)

PLTMG Bima Peaker

40 MW–2017

G

PLTMG Sumbawa Peaker

40 MW–2017

G

GI Maluk

2 cct 1x240 mm2

20 km - 2018

D

PLTD Labuhan

13,4 MW

D

PLTD Taliwang

5,3 MW

D

PLTD Bima

7,8 MW

U

PLTU Bima 3

2x25 MW (2021/22)

Disclaimer: Lokasi Pembangkit

maupun GI hanya indikatif awal

Page 19: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Rencana Pengembangan Sistem Kelistrikan Timor

19

UPLTU Timor 2

2x25 MW (2022/23)

PLTU Timor 1

2x15 MW (2018/19)

U

PLTU Kupang IPP

2x15 MW (2015/16)

PLTMG Kupang Peaker

40 MW (2017)

G

PLTMG Kupang Peaker 2

20 MW (2019)

UPLTU Atambua

24 MW (2017/18)

Atambua

Kefamenanu

Soe/Nonohonis

Naibonat

Maulafa

Atapupu

Ostrich 1x152 mm2

75 km - 2015

Ostrich 1x152 mm2

18 km - 2015

Ostrich 1x152 mm2

51 km - 2015

Ostrich 1x152 mm2

51 km - 2015

Ostrich 1x152 mm2

31 km - 2015

Bolok

PT PLN (Persero)PETA JARINGAN SISTEM PULAU TIMOR

PROPINSI NTT

T/L 70 kV Existing / Rencana

T/L 150 kV Existing / Rencana

T/L 275 kV Existing / Rencana

T/L 500 kV Existing / Rencana

/

/

/

/

PLTU Existing / Rencana

PLTG Existing / Rencana

PLTP Existing / Rencana

PLTA Existing / Rencana

G

A

U

P

/

/

/

/

PLTGU Existing / Rencana

PLTMG Existing / Rencana

PLTM Existing / Rencana

PLTD Existing / Rencana

MG

D

GU

M

GI 500 kV Existing / Rencana

GI 275 kV Existing / Rencana

GI 150 kV Existing / Rencana

GI 70 kV Existing / Rencana

GI 500/275 kV Existing / Rencana

GI 500/275/150 kV Existing / Rencana

GI 275/150 kV Existing / Rencana

GI 150/70 kV Existing / Rencana

/

/

/

/

/

/

/

/

MG

D

GU

M

G

A

U

P

/

/

/

/

Kit Existing

Kit Rencana

Edit Oktober 2014

PERENCANAAN SISTEM

TIMOR LESTE

TIMOR LESTE

PLTU Kupang (FTP1)

2x16,5 MW (2014/15)

U

2xZebra

45 km - 2016

D

PLTD Soe

DPLTD

Kefamenanu

Oekabiti

Kupang

Tenau

2xZebra

10 km - 2016

Disclaimer: Lokasi Pembangkit

maupun GI hanya indikatif awal

Page 20: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Rencana Pengembangan Sistem Kelistrikan Flores

20Disclaimer: Lokasi Pembangkit

maupun GI hanya indikatif awal

Waingapu

Ruteng

Ende

Bajawa

Maumere

Ropa

PT PLN (Persero)PETA JARINGAN SISTEM PULAU FLORES

PROPINSI NTT

T/L 70 kV Existing / Rencana

T/L 150 kV Existing / Rencana

T/L 275 kV Existing / Rencana

T/L 500 kV Existing / Rencana

/

/

/

/

PLTU Existing / Rencana

PLTG Existing / Rencana

PLTP Existing / Rencana

PLTA Existing / Rencana

G

A

U

P

/

/

/

/

PLTGU Existing / Rencana

PLTMG Existing / Rencana

PLTM Existing / Rencana

PLTD Existing / Rencana

MG

D

GU

M

GI 500 kV Existing / Rencana

GI 275 kV Existing / Rencana

GI 150 kV Existing / Rencana

GI 70 kV Existing / Rencana

GI 500/275 kV Existing / Rencana

GI 500/275/150 kV Existing / Rencana

GI 275/150 kV Existing / Rencana

GI 150/70 kV Existing / Rencana

/

/

/

/

/

/

/

/

MG

D

GU

M

G

A

U

P

/

/

/

/

Kit Existing

Kit Rencana

Edit Oktober 2014

PERENCANAAN SISTEM

PLTP Sokoria (FTP 2)

3 x 5 MW (2020/21/22/23)

PLTU Ende (FTP1)

2 x 7 MW (2014/15)

PLTP Mataloko (FTP 2)

20 MW (2019)

PLTP Ulumbu (ADB)

2 x 2,5 MW (2014)

P

A

PLTA Wae Rancang

10 MW (2020)

6,5 MW (2021)

P

P

PLTP Oka Ile Ange

10 MW (2021)

P

PLTP Ulumbu 5

5 MW (2019)

P

U

PLTP Ulumbu 6

5 MW (2021)

Labuan Bajo ACSR 1x240 mm2

85 km - 2015

ACSR 1x240 mm2

60 km - 2015

ACSR 1x240 mm2

95 km - 2015ACSR 1x240 mm

2

44 km - 2014ACSR 1x240 mm

2

10 km - 2017

ACSR 1x240 mm2

60 km - 2015

ACSR 1x240 mm2

15 km - 2017

ACSR 1x240 mm2

33 km - 2016

PLTMG Maumere Peaker

40 MW (2017)

G

Larantuka

ACSR 1x240 mm2

100 km – 2020

P

D

PLTD Ruteng

D

PLTD

Labuhan Bajo

D

PLTD Bajawa

Page 21: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Rencana Pengembangan Sistem Kelistrikan Ambon & Seram

21Disclaimer: Lokasi Pembangkit

maupun GI hanya indikatif awal

P

U

A

A

A

A

A

Bula

PLTM Isal 3

4 MW (2019/20)

Masohi

Haruku

Waai

Tulehu

Piru

PLTM Makariki

4 MW (2019/20)

PLTM Nua

8,8 MW (2018/19)

PLTM Wae Mala

2 MW (2019/20)

ACSR 1xZebra mm2

105 km (2020)

ACSR 1xZebra mm2

55 km (2018)

PT PLN (Persero)PETA JARINGAN SISTEM AMBON

PROPINSI MALUKU

T/L 70 kV Existing / Rencana

T/L 150 kV Existing / Rencana

T/L 275 kV Existing / Rencana

T/L 500 kV Existing / Rencana

/

/

/

/

PLTU Existing / Rencana

PLTG Existing / Rencana

PLTP Existing / Rencana

PLTA Existing / Rencana

G

A

U

P

/

/

/

/

PLTGU Existing / Rencana

PLTMG Existing / Rencana

PLTM Existing / Rencana

PLTD Existing / Rencana

MG

D

GU

M

GI 500 kV Existing / Rencana

GI 275 kV Existing / Rencana

GI 150 kV Existing / Rencana

GI 70 kV Existing / Rencana

GI 500/275 kV Existing / Rencana

GI 500/275/150 kV Existing / Rencana

GI 275/150 kV Existing / Rencana

GI 150/70 kV Existing / Rencana

/

/

/

/

/

/

/

/

MG

D

GU

M

G

A

U

P

/

/

/

/

Kit Existing

Kit Rencana

Edit Oktober 2014

PERENCANAAN SISTEM

PLTU Ambon (FTP1)

2x15 MW (2017)

PLTU Tulehu (FTP2)

2x10 MW (2018/19)

U

PLTU Ambon 2

2x15 MW (2019)Kairatu

PLTA Wai Tala

54 MW (2023/24)

ACSR 1xZebra mm2

15 km (2023)

Sirimau

PassoWayame

PLTMG Ambon Peaker

50 MW–2018

20 MW–2021

G

U

PLTU Ambon 3

2x25 MW (2023/24)

PLTMG Seram Peaker

20 MW–2021

MG

TaniwelA

PLTM Sapalewa

8 MW (2018)

ACSR 1x240 mm2

30 km (2018)

D

PLTD Hative Kecil

44.7 MW

D

PLTD Masohi

8.1 MW

D

PLTD Poka

34.9 MW

Page 22: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Rencana Pengembangan Sistem Kelistrikan Halmahera

22

P

P

PLTP Jailolo (FTP2)

20 MW (2021)

PLTP Jailolo 2

20 MW (2022/23)

PLTU Tidore FTP1

2x7 MW (2015)

UPLTU Tidore 2

2x10 MW (2018)Maba

Jailolo

Tobelo

ACSR 1x240 mm2

110 km (2019)

ACSR 1x240 mm2

42 km (2020)

ACSR 1x240 mm2

72 km (2020)

ACSR 1x240 mm2

23 km (2020)

U

PLTU Sofifi

6 MW (2017)

PT PLN (Persero)PETA JARINGAN SISTEM HALMAHERA

PROPINSI MALUKU UTARA

T/L 70 kV Existing / Rencana

T/L 150 kV Existing / Rencana

T/L 275 kV Existing / Rencana

T/L 500 kV Existing / Rencana

/

/

/

/

PLTU Existing / Rencana

PLTG Existing / Rencana

PLTP Existing / Rencana

PLTA Existing / Rencana

G

A

U

P

/

/

/

/

PLTGU Existing / Rencana

PLTMG Existing / Rencana

PLTM Existing / Rencana

PLTD Existing / Rencana

MG

D

GU

M

GI 500 kV Existing / Rencana

GI 275 kV Existing / Rencana

GI 150 kV Existing / Rencana

GI 70 kV Existing / Rencana

GI 500/275 kV Existing / Rencana

GI 500/275/150 kV Existing / Rencana

GI 275/150 kV Existing / Rencana

GI 150/70 kV Existing / Rencana

/

/

/

/

/

/

/

/

MG

D

GU

M

G

A

U

P

/

/

/

/

Kit Existing

Kit Rencana

Edit Oktober 2014

PERENCANAAN SISTEMPLTU Tidore 3

2x15 MW (2021/22)

PLTMG Ternate Peaker

40 MW (2018)

GD

PLTD Kayu Merah

41 MW

D

PLTD Soa Siu

4,9

Malifut

Tidore

Ternate

MG

PLTMG Tobelo Peaker

10 MW (2020)

Disclaimer: Lokasi Pembangkit

maupun GI hanya indikatif awal

Page 23: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Sumatera

Page 24: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Neraca Daya Sistem Sumatera

24

PLTU PLN

Kapasitas Terpasang

PLTU IPP

PLTP

PLTA

PLTG/MG

Kit. IPP

Page 25: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Neraca Daya Sistem Sumatera Bagian Utara

25

PLTU PLN

Kapasitas Terpasang

PLTU IPP

PLTP

PLTA

PLTG/MG

Kit. IPPIPP Existing

Geothermal

PLN Existing Capacity

PLTG/MG

PLTU PLN

Hydro

PLTU IPP

Page 26: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Neraca Daya Sistem Sumatera Bagian Selatan

26

PLTU PLN

Kapasitas Terpasang

PLTU IPP

PLTP

PLTA

PLTG/MG

Kit. IPPIPP Existing

Geothermal

PLN Existing Capacity

PLTG/MG

PLTU PLN

Hydro

PLTU IPP

Page 27: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Jawa-Bali

Page 28: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

PLTU IPP

PLTP

Kapasitas Terpasang

PLTA

PLTU PLN

PLTU Baru

PLTGU

MW

Neraca Daya Sistem Jawa Bali 2015-2024

28

PLTGU/MG

Page 29: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Kalimantan

Page 30: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

68%

58%31%

44%

47%

50%

60% 56%

61%

63%

-

200

400

600

800

1.000

1.200

1.400

1.600

1.800

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

MW

Tahun

Pembangkit Eksisting PLN Pembangkit Sewa

PLTU PLN PLTU IPP

PLTA Power Purchase (Sesco)

PLTG/MG Reserve Margin

Beban Puncak

Neraca Daya Kalbar

30

Power Purchase

Tambahan PLTG/MG

PLTU PLN

Pembangkit Eksisting PLN

Pembangkit Sewa

PLTU IPP

Page 31: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

31

31

35%28%

45%

54%

51%

52%

54%

54%

-

500

1.000

1.500

2.000

2.500

3.000

3.500

4.000

4.500

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Reserve Margin Tambahan PLTA

Tambahan PLTG/MG/GU PLTG PLN

PLTGU IPP PLTG/MG PLN

PLTU PLN PLTM (PLN+IPP)

Tambahan PLTU Pembangkit Sewa

Pembangkit IPP dan Excess Power Pembangkit PLN

Tambahan PLTG/MG/GU

PLTU PLN

Tambahan PLTU

Kapasitas Terpasang PLN

Kapasitas SewaKapasitas IPP

PLTG/MG PLN

PLTGU IPP

PLTA

PLTG PLN

PLTU IPP

Neraca Daya Sistem Kalseltengtimra

Page 32: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Sulawesi

Page 33: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

45%37%

44%45%

53%

69%66%

64%

61%

66%

-

200

400

600

800

1.000

1.200

1.400

1.600

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Reserve Margin Tambahan PLTA/M

Tambahan PLTG/MG/GU PLTP PLN

Tambahan PLTP PLTU SEWA

Tambahan PLTU PLTU IPP

PLTU PLN Kapasitas Sewa

Kapasitas IPP Kapasitas Terpasang PLN

PEAK DEMAND FORECAST

33

Tambahan PLTP

Tambahan PLTG/MG/GU

PLTU PLN

Tambahan PLTU

PLTA/M

Kapasitas Terpasang PLN

Kapasitas Sewa

Kapasitas IPP

33

PLTU Sewa

Neraca Daya Sistem Sulbagut

Page 34: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

28%32%

28%

30%33%

42%41%

43%

45%

53%

-

1.000

2.000

3.000

4.000

5.000

6.000

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Reserve Margin Tambahan PLTA

PLTA IPP Tambahan PLTG/MG/GU

Tambahan PLTMG PLTGU IPP

PLTU PLN PLTU IPP

Tambahan PLTU Pembangkit Sewa

Pembangkit IPP Pembangkit Terpasang PLN

34 Tambahan PLTG/MG/GU

Kapasitas Terpasang PLN

Kapasitas Sewa

Kapasitas IPP

PLTU IPP

Tambahan PLTU

Tambahan PLTA

Tambahan PLTP

34

Neraca Daya Sistem Sulbagsel

Page 35: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Nusa Tenggara

Page 36: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

36%32%

41%61%

65%

66%57%

60%59%

58%

0

100

200

300

400

500

600

700

800

900

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Reserve Margin Tambahan PLTG/MG/GU

PLTBio PLTGU PLN

PLTU IPP PLTU PLN

Tambahan PLTU PLTP IPP

PLTM (PLN+IPP) Pembangkit Sewa

Pembangkit IPP Pembangkit PLN

Beban Puncak

36

Tambahan PLTG/MG/GU

Tambahan PLTU

Kapasitas Terpasang PLN

Kapasitas Sewa

Kapasitas IPP

PLTU IPP

PLTU PLN

Tambahan PLTP

PLTGU PLN

36

Tambahan PLTA/M

Neraca Daya Sistem Lombok

Page 37: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Komposisi Fuel Mix Indonesia (TWh)

37

Panas BumiAir

Batubara

Gas

LNG

BBM

Page 38: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Komposisi Fuel Mix Indonesia (%)

38

Tahun 2015

Prod. Energi 253 TWhTahun 2024

Prod. Energi 550 TWh

Page 39: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Komposisi Fuel Mix Sumatera (TWh)

39

Panas Bumi

Air

Batubara

GasLNG

BBM

Page 40: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Komposisi Fuel Mix Sumatera (%)

40

Tahun 2015

Prod. Energi 38 TWhTahun 2024

Prod. Energi 106 TWh

Page 41: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Komposisi Fuel Mix Jawa-Bali (TWh)

41

Panas BumiAir

Batubara

Gas

LNG

BBM

Page 42: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Komposisi Fuel Mix Jawa-Bali (%)

42

Tahun 2015

Prod. Energi 188 TWh

Tahun 2024

Prod. Energi 377 TWh

Page 43: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Komposisi Fuel Mix Indonesia Timur (Wh)

43

Panas Bumi

Air

Batubara

Gas

LNG

BBM

Impor

Page 44: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Komposisi Fuel Mix Indonesia Timur (%)

44

Tahun 2015

Prod. Energi 26 TWh

Tahun 2024

Prod. Energi 66 TWh

Page 45: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Kebutuhan Bahan Bakar Indonesia 2015 - 2024

45

No. FUEL TYPE 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

1 HSD ( x 10^3 kl ) 6,722 5,509 3,559 2,403 1,734 1,771 1,794 1,796 1,888 1,981

2 MFO ( x 10^3 kl ) 1,339 1,644 925 191 188 170 185 204 228 282

3 Gas (bcf) 503 525 571 531 467 389 372 367 372 382

4 LNG (bcf) 85 103 143 192 290 283 284 299 313 345

5 Batubara (10^6 ton) 74 86 103 106 119 133 148 157 168 171

6 Biomass (10^3 ton) 34 46 45 45 43 43 43 43 43 43

Page 46: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Kebutuhan Bahan Bakar Indonesia 2015 - 2024

46

Ribu kL

Juta Ton

TBTU

Page 47: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Kebutuhan Investasi RUPTL 2015-2024 PLN

47

Miliar US$

Pembangkit : 34,3 miliar US$

Transmisi : 20,6 miliar US$

Distribusi : 14,5 miliar US$

Total PLN : 69,4 miliar US$

Page 48: PT PLN ( Persero ) RUPTL 2015-2024...PT PLN ( Persero ) 2 Hasil Prakiraan Kebutuhan Listrik 2015-2024 Sumatera: 11,6% 31 TWh 83 TWh TWh IT : 11,1% 23 57 TWh JB : 7,8% 165 TWh 324 TWh

Prakiraan Jumlah Pelanggan Rumah Tangga 2015-2024

Proyeksi Jumlah Pelanggan Rumah Tangga 2014-2024Juta Plg

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Gab SMT 10.4 10.9 11.4 11.9 12.4 12.9 13.4 13.6 13.8 14.0 14.2

Gab IT 8.3 8.8 9.3 9.9 10.4 11.0 11.5 11.9 12.2 12.5 12.8

Gab JB 34.3 36.1 38.2 39.4 40.5 41.4 41.9 42.3 42.6 43.0 43.3

Holding 53.0 55.8 58.9 61.2 63.3 65.3 66.7 67.8 68.7 69.5 70.3

Penambahan Pelanggan Rumah Tangga 2014-2024Juta Plg

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Gab SMT 0.66 0.48 0.52 0.56 0.50 0.47 0.47 0.26 0.19 0.17 0.16

Gab IT 0.61 0.57 0.51 0.52 0.49 0.61 0.50 0.44 0.33 0.29 0.28

Gab JB 1.80 1.83 2.04 1.21 1.15 0.85 0.48 0.40 0.37 0.34 0.33

Holding 3.07 2.88 3.06 2.29 2.13 1.94 1.45 1.10 0.89 0.80 0.77