Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat...

23
1 | Page DAFTAR ISI I. Pengantar dari Panitia Pembangunan Gereja ……………………….. 2 II. Surat Keputusan Sinode ………………………………….......... 3 III. Sejarah GPIB Sawangan…………………………………………………. 6 IV. Disain Gereja .............................................................................................. 7 V. Rencana Anggaran Biaya ....................................................................................... 13 VI. Penutup ....................................................................................................... 20 VII. Lampiran a. Susunan Panitia Pembangunan Gereja ............................................... 21 b. Photo-photo Gereja Lama ................................................................... 23 c. Ijin Mendirikan Bangunan (IMB)…………………………………………… 26

Transcript of Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat...

Page 1: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

1 | P a g e

DAFTAR ISI

 I. Pengantar dari Panitia Pembangunan Gereja ……………………….. 2 II. Surat Keputusan Sinode ………………………………….......... 3

III. Sejarah GPIB Sawangan…………………………………………………. 6

IV. Disain Gereja .............................................................................................. 7 V. Rencana Anggaran Biaya ....................................................................................... 13

VI. Penutup ....................................................................................................... 20

VII. Lampiran a. Susunan Panitia Pembangunan Gereja ............................................... 21 b. Photo-photo Gereja Lama ................................................................... 23 c. Ijin Mendirikan Bangunan (IMB)…………………………………………… 26

Page 2: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

2 | P a g e

PENGANTAR “Satu hal telah kuminta kepada TUHAN, itulah yang kuingini: diam di rumah TUHAN seumur hidupku, menyaksikan kemurahan TUHAN dan menikmati bait-Nya” Mazmur 27:4 Dua puluh tujuh tahun sudah jemaat GPIB Sawangan berdiri sebagai jemaat yang mandiri. Sejarah terwujudnya persekutuan orang-orang Kristen di daerah Sawangan dan sekitar telah melewati berbagai pergumulan dan tantangan. Namun oleh kasih Tuhan dan hanya atas kehendakNya berdirilah Persekutuan Jemaat GPIB “Bogor” Wilayah Pelayanan Sawangan sebagai cikal bakal terbentuknya jemaat Tuhan ini. Dia yang sudah memulai, Dia juga akan menjaga dan melanjutkan karya-Nya bagi pembangunan dan pertumbuhan gereja-Nya. Syukur kepada Tuhan karena dalam perkenananNya lah, tepat pada tanggal 13 Maret 1988 GPIB “Jemaat” Sawangan resmi berdiri sebagai lembaga Gereja yang mandiri. Namun demikian Seiring berjalan nya waktu yang membawa pertumbuhan jemaat secara signifikan menuntut kebutuhan akan ruang dan fasilitas ibadah yang lebih memadai sebagai jemaat yang missioner. Gedung Pertemuan Arco dan Gedung pendukung lainnya yang selama ini dipakai untuk kegiatan peribadahan dan kegiatan pelayanan lainnya saat ini, perlu dikembangkankan daya guna dan kapasitasnya untuk menjawab kbutuhan tersebut. Dalam rangka mewujudkan kerinduan ini kami Panitia Pembangunan GPIB Sawangan khususnya Team Asset telah melakukan daya dan upaya yang terus menerus. Kondisi status asset tanah dan bangunan yang masih belum dilegalisasi secara hukum mendorong Panitia khususnya team asset melakukan usaha merampungkan dokumen asset gereja tersebut. Lewat usaha gigih yang dilakukan dan atas pertolongan tangan Tuhan yang Maha Kuasa tentunya Panitia pembangunan berhasil menerbitkan dokumen penting antara lain 4 sertifikat Gereja dan Ijin Mendirikan Bangunan – IMB. Dengan telah terbitnya IMB tersebut makin memicu semangat kami untuk segera merealisasikan proses pembangunan yang menuntut untuk segera dilaksanakan. Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin menyentuh pintu hati bapak/ibu saudara/I untuk turut ambil bagian dalam pembangunan fisik “Rumah Tuhan” ini sebagai sarana menunjang pertumbuhan pelayanan “Tubh Kristus” yang terikat menyatu dalam kasih untuk tetap mendatangkan berkat bagi orang banyak. Kami yakin dan percaya Tuhan telahlah yang berkehendak melibatkan bapak/ibu saudara/I semua untuk menjadi saluran berkat bagi kami. Sawangan, Maret 2015 Panitia Pembangunan Gedung Gereja GPIB Sawangan

Page 3: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

3 | P a g e

Page 4: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

4 | P a g e

Page 5: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

5 | P a g e

Page 6: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

6 | P a g e

Sejarah singkat

gpib sawangan Persekutuan Umat Kristen di ARCO Sawangan secara kronologis berawal dari sejumlah guru2 Inpres di Ciseeng tahun 1977 dan beberapa keluarga Kristen di Komplek ARCO Sawangan tahun 1978._ Persekutuan di ARCO ini kemudian disebut PUKAS (Persekutuan Umat Kristen ARCO Sawangan) yang terdiri dari anggota berbagai Denominasi termasuk umat Kristen Katolik. Namun umat Kristen Protestan dari Denominasi GPIB merupakan umat terbanyak yang pada akhir 1978 termasuk kedalam Persekutuan GPIB sebagai Wilayah Pelayanan GPIB Bogor (Zebaoth) di Bogor._ Ibadah Minggu rutinnya bertempat dirumah salah satu anggota Jemaat yang kemudian berpindah ke Gedung Pertemuan / Olahraga ARCO pada 1979._ Gedung Ibadah untuk PUKAS mulai dibangun 1984 dan digunakan akhir 1985. Karena izin resmi sebagai Gedung Ibadah belum diperoleh saat itu, maka Gedung berfungsi sebagai Gedung Serbaguna untuk aktifitas kerohanian Kristen dengan perubahan tampilan sebagaimana yang kita mikili saat ini. Pada 13 Maret 1988, Wilayah Pelayanan GPIB Bogor di Sawangan secara resmi dilembagakan menjadi Jemaat GPIB yang ke-184 dengan nama resmi “GPIB Jemaat Sawangan” dan tetap menggunakan Gedung Serbaguna ini sebagai sarana ibadah yang kemudian berproses menjadi 100% milik GPIB pada 1996._ Gedung ini mengalami sebuah renovasi total pada 1997 berupa penambahan ruang PELKAT dan Sekretariat menggunakan dana hasil usaha Panitia Pembangunan Pastori GPIB Sawangan yang berujung pada tukar guling gedung Pastori dengan lahan dibelakang Gedung Serbaguna/Gereja yang menghasilkan total dana sejumlah hampir Rp 500 juta pada awal semester ke-2 1997._Berkat ini dimanfaatkan juga untuk pembelian Pastori pengganti di jalan Manggis dan pembangunan Gedung Gereja Kartika Sejahtera (ex Sektor 2)._ Kita patut bersyukur kepada Allah didalam Yesus Kristus yang selalu menyertai dan memberkati Jemaat GPIB Sawangan. Oleh Panitia Pembangunan dan Renovasi Gedung Gereja GPIB Sawangan yang dibentuk pada Mei 2014 khusus tim asset nya yang melewati sebuah perjalanan panjang dan berliku telah berhasil memproses 4 (empat) sertifikat lahan dimana Gedung Serbaguna/Gereja berdiri dan juga pastori seluas total sekitar 3,200 M2 yang tadinya atas nama anggota Jemaat menjadi atas nama Gereja Protestan di Indonesia bagian Barat._Dan tepat di HUT GPIB Sawangan yang ke 27 izin Gedung Gereja ini diterbitkan setelah lebih 30 (tiga puluh tahun) digumuli._ Dan mengacu kalender kerja Panitia Pembangunan dan Renovasi Gedung Gereja GPIB Sawangan kegiatan dan upaya serta kerja keras tentu akan terus berlangsung untuk merealisasikan rancangan dan gambar yang sudah dicanangkan dan tentu merupakan bagian tak terpisahkan dari seluruh proses pengurusan izin-izin tersebut diatas._ Oleh karena itu Panitia mengharapkan Doa dan Bantuan seluruh Jemaat agar rencana Panitia yang sudah dicanangkan ini dapat direalisasikan dengan baik. Tuhan Memberkati kita sekalian._

Page 7: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

7 | P a g e

disain bangunan

SITE PLAN – EXISTING

Page 8: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

8 | P a g e

SITE PLAN – RENCANA

Page 9: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

9 | P a g e

DENAH LANTAI DASAR & LANTAI 2

Page 10: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

10 | P a g e

TAMPAK DEPAN &SAMPING

Page 11: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

11 | P a g e

Page 12: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

12 | P a g e

Page 13: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

13 | P a g e

Rencana anggaran

Biaya (RAB)

Total biaya Rp 5.990.394.000 Lima Miliar Sembilan ratus Sembilan puluh juta tiga ratus Sembilan puluh empat ribu rupiah

NO.  AMOUNT 

I IDR                        66,500,000 

II STRUCTURE IDR                  3,095,434,989 

III ARCHITECTURE IDR                  1,061,525,500 

IV INTERIOR IDR                      876,198,704 

V MECHANICAL & ELECTRICAL IDR                      890,735,000 

SUB TOTAL   IDR                  5,990,394,193 

ITEM

PRELIMINARY

ROUGHLY COST ESTIMATION

GRAND SUMMARY

Total area 1220 m² Biaya per m² : Rp 4.910.000,-

Page 14: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

14 | P a g e

BIAYA PENDAHULUAN

UNIT PRICE TOTAL

A PRELIMINARIES

A.1 Preliminaries

1 Preparing works 1 ls 7,500,000IDR              7,500,000IDR                

2 Safety equipment 1 ls 3,000,000IDR              3,000,000IDR                

3 1 ls 12,000,000IDR           12,000,000IDR              

4 1 ls  IDR            3,000,000  3,000,000IDR                

5 Temporary site office & other facil ities 1 ls 1,500,000IDR              1,500,000IDR                

6 1 ls 1,000,000IDR              1,000,000IDR                

7 Water for use of the contractors 1 ls 7,500,000IDR              7,500,000IDR                

8 Lighting and power for use of the contractors  24 hours 1 ls 10,000,000IDR           10,000,000IDR              

9 Equipment & transportation 1 ls ‐IDR                                 

10 Protection of the works 1 ls 7,500,000IDR              7,500,000IDR                

12 Final  cleaning 1 ls 10,000,000IDR           10,000,000IDR              

13 1 ls 3,500,000IDR              3,500,000IDR                

a

TOTAL  66,500,000IDR              

PRELIMINARIES

ROUGHLY COST ESTIMATION

contractor is  fully responsibble of care and obtain the permits  of relevant agencies  

in connection with the implementation of activities  in the project work and 

implemantation activities  into and out of transportation project,including debrish 

removal  permit. 

AMOUNT

contractor must provide temporary power generation or article l ighting for  night 

work or day l ighting used

Preparing, submitting and revising shop drawings  & 4 sets  of closed out documents  

(list material, warranty and as  built drawings)

Contractor do site survey,Measurement with bowplank (using theodolite) Equipment 

of P3K,and coordination with related parties,contarctor also must provide the 

necessary equipment such as: optical  measuring instrument,waterpass  etc,and 

experience surveyor who sometimes  can be assigned to the measurement of as  as  

buildings  (vertical  and horizontal).

NO. ITEM QTY

Permits  and removal  of rubbish at regular intervals

Meeting & report

Conttractor responsible for the procurement of safety equipment such as: Helmet 

works,field boots,raincoat,safety belt,safety net& other as  needed for purpose of 

workers  & staff of contractor.

contractor must provide labors  of the needs  of water obtained from existing sources  

or purchase of water works  etc, contractor must make the connection as  necessary

Crane or transport eguipment to the top

Contractor must provide the necessary facil ites  include consumption for the 

implementation of routine meeting with client,consultant & contarctor other 

package

Page 15: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

15 | P a g e

PEKERJAAN STRUKTUR

UNIT PRICE AMOUNT

I DEMOLITION WORK

‐IDR                        

II SOIL WORK

1 Cut, Fill  & Compaction As  4'~0 / B'~K, As  J~K / 2 197.362 M3 200,000IDR                      39,472,400IDR                     

III FOUNDATION WORK

1  Bore  Pile Ø300, Length=20m,84 Unit 1180 M1 330,000IDR                      389,400,000IDR                  

2  PDA Test, 3 Unit 2 Unit 9,750,000IDR                   19,500,000IDR                     

3  Pilecap K‐250, U‐39 43 M3 5,125,000IDR                   220,375,000IDR                  

4  Tie Beam K‐250, U‐39 62 M3 5,150,000IDR                   319,300,000IDR                  

5  Pedestal  K‐250, U‐39 3.5 M3 5,150,000IDR                   18,025,000IDR                     

6  Ground Floor Slab On Grade, t=150mm, K‐250, U‐39 46 M3 4,850,000IDR                   223,100,000IDR                  

7  Slab Concrete, t=200mm, K‐250, U‐39 46 M3 4,850,000IDR                   223,100,000IDR                  

1,412,800,000IDR       

IV UPPER STRUCTURE WORK

1  Steel  Column K1 HB.200x200x8x12 (incl  plate and bolt)  650 kg 18,500IDR                         12,025,000IDR                     

2  Steel  Column K1‐K HB.200x200x8x12 (incl  plate and bolt)  560 kg 18,500IDR                         10,360,000IDR                     

3  Concrete For Column K1‐K(Composite), K‐250, U‐39 1.18163 M3 5,125,000IDR                   6,055,844IDR                       

4  Steel  Pipe Column K2 Ø250, t=9.3mm (incl  plate and bolt) 6250 kg 22,300IDR                         139,375,000IDR                  

5  Concrete For Column K2, K‐250, U‐39 6.235 M3 5,125,000IDR                   31,954,375IDR                     

6  Steel  Column K4 HB.30X300X10X15 (incl  plate and bolt)  6200 kg 18,500IDR                         114,700,000IDR                  

7  Steel  Beam WF.150x75x5x7 (incl  plate and bolt)  934.5 kg 18,500IDR                         17,288,250IDR                     

8  Steel  Beam WF.200x100x5.5x8 (incl  plate and bolt)  6023 kg 18,500IDR                         111,425,500IDR                  

9  Steel  Beam WF.300x150x6.5x9 (incl  plate and bolt)   15326 kg 18,500IDR                         283,531,000IDR                  

10  Steel  Beam WF.350x175x7x11 (incl  plate and bolt)  7768 kg 18,500IDR                         143,708,000IDR                  

11  Steel  Beam WF.400x200x8x13 (incl  plate and bolt)   4123 kg 18,500IDR                         76,275,500IDR                     

12  Steel  Ring Beam HB.200x200x8x12 (incl  plate and bolt)  4629 kg 18,500IDR                         85,636,500IDR                     

13  Steel  Ring Beam WF.250X125X6X9 (incl  plate and bolt)  663 kg 18,500IDR                         12,265,500IDR                     

14  Purlin CNP.150x65x20x2.3 (incl  plate and bolt)  2978 kg 17,540IDR                         52,234,120IDR                     

15  Slab Concrete, t=100mm, K‐250, U‐39 78.4 M3 5,125,000IDR                   401,800,000IDR                  

16  Bondek Plate, t=0.75mm ex‐BHP 256 M2 213,000IDR                      54,528,000IDR                     

1,553,162,589IDR       

V STAIRCASE WORK (2 units)1  Staircase Beam,  Staircase Steps &  Chequer Plate t=3mm 2 ls 45,000,000IDR                 90,000,000IDR                     

Total  3,095,434,989IDR       

AMOUNTNO. ITEM QTY

ROUGHLY COST ESTIMATION

STRUCTURE 

Page 16: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

16 | P a g e

PEKERJAAN ARSITEKTUR

UNIT PRICE AMOUNT

I DEMOLITION

1 Demolish existing Brick Wall  Celcon (include window opening) 175 m² 25,000IDR               4,375,000IDR                

2 Dismantle existing Exterior Glass  window 23 unit 250,000IDR             5,750,000IDR                

3 Demolish existing stair 1 lot 1,500,000IDR          1,500,000IDR                

4 Dismantle existing terrace ceramic 63 m² 15,000IDR               945,000IDR                    

12,570,000IDR              

II PARTITION & FAÇADE

1 Brick Wall  Celcon , w/ cement plaster ‐ ready to receive wall  finishes  material  on the inside 902 m² 265,000IDR             239,030,000IDR            

2 Column concrete base 18 m¹ 680,000IDR             12,240,000IDR             

‐  to cover all  exposed column ‐ w/ stone coating finish  400mm x 400mm

251,270,000IDR            

III  DOOR & WINDOW

GROUND FLOOR

1 D1 Single aluminium door with glass  panel   (900x2800mm) 2 unit 5,100,000IDR          10,200,000IDR              

‐ 50/100 mm  aluminium door jamb anodize finish color ‐ black

‐ 40mm thk aluminium door with anodize finish, color ‐ black

‐ 8mm thk clear glass  panel  

‐ door ironmongery specification as describe in technical  specification

‐ Selected door handle 

‐ Selected door stopper 

‐ Hinges, ex Simon werk K05/f13‐Zp

‐ Concealed door closer, ex Dorma TS 90/2‐4/Silver 2 unit 1,250,000IDR          2,500,000IDR                

2 D2 Double aluminium door with glass panel   (900x2800mm) 4 unit 9,200,000IDR          36,800,000IDR              

‐ 50/100 mm  aluminium door jamb anodize finish color ‐ black

‐ 40mm thk aluminium door with anodize finish, color ‐ black

‐ 8mm thk clear glass  panel  

‐ door ironmongery specification as describe in technical  specification

‐ Selected door handle 

‐ Selected door stopper 

‐ Hinges, ex Simon werk K05/f13‐Zp

‐ Concealed door closer, ex Dorma TS 90/2‐4/Silver 8 unit 1,250,000IDR          10,000,000IDR              

3 AW‐06 Aluminium  window louver  2100x500mm 4 unit 1,540,000IDR          6,160,000IDR                

‐ 50/100 mm  aluminium door jamb anodize finish color ‐ black

‐ 40mm thk aluminium window with anodize finish, color ‐ black 

‐ 8mm thk clear glass  panel  

4 AW‐10 Aluminium  window  800x2800mm 10 unit 1,350,000IDR          13,500,000IDR              

‐ 50/100 mm  aluminium door jamb anodize finish color ‐ black

‐ 40mm thk aluminium window with anodize finish, color ‐ black , at the center module

‐ 8mm thk clear glass  panel  

5 AW‐11 Aluminium  window 800x2000mm 20 unit 2,500,000IDR          50,000,000IDR              

‐ 50/100 mm  aluminium door jamb anodize finish color ‐ black

‐ 40mm thk aluminium window with anodize finish, color ‐ black , at the center module

‐ 8mm thk clear glass  panel  

1st FLOOR

6 AW‐10 Aluminium  window  800x2800mm 10 unit 1,350,000IDR          13,500,000IDR              

‐ 50/100 mm  aluminium door jamb anodize finish color ‐ black

‐ 40mm thk aluminium window with anodize finish, color ‐ black , at the center module

‐ 8mm thk clear glass  panel  

7 AW‐11 Aluminium  window 800x2000mm 35 unit 2,500,000IDR          87,500,000IDR              

‐ 50/100 mm  aluminium door jamb anodize finish color ‐ black

‐ 40mm thk aluminium window with anodize finish, color ‐ black , at the center module

‐ 8mm thk clear glass  panel  

230,160,000IDR            

Total II

ROUGHLY COST ESTIMATION

ARCHITECTURE

QTYNo

Total III

AMOUNTItem

Total I

Page 17: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

17 | P a g e

PEKERJAAN ARSITEKTUR

IV

1 Wall  paint finish 1,010 m² 75,000IDR               75,750,000IDR              

‐ ICI Dulux wether shield

75,750,000IDR              

V

1 Water proof gypsum board ceil ing 9 mm ex jaya board/eq 210 m² 175,000IDR             36,750,000IDR              

‐ CH 2800 w/paint finish ICI briliant white

2 Roof  Metal  roof  blue scope ex Lysaght

‐ Metal  roof sheet  Trimdek 040TCT Zincalume 450 m² 495,000IDR             222,750,000IDR            

‐ framming 450 m² 95,000IDR               42,750,000IDR              

‐ Insulation 450 m² 115,000IDR             51,750,000IDR              

3 Concrete roof

‐ Floor screed 20 m² 45,000IDR               900,000IDR                    

‐ Waterproofing 20 m² 125,000IDR             2,500,000IDR                

357,400,000IDR            

VI FLOOR FINISHES

1 CT‐03 Ceramic ti le for External  Corridor 84.7 m² 165,000IDR             13,975,500IDR              

2 CT‐03 Ceramic ti le for stair + Nosing 280 m² 190,000IDR             53,200,000IDR              

67,175,500IDR              

VII

2 Lanscape & hardscape 1 ls 12,000,000IDR       12,000,000IDR              

3 Railing Stair & parimeter fence on the 1st floor

‐ Steel  w/ duco pain finish 106 m' 450,000IDR             47,700,000IDR              

‐ Slink

4 2 unit 1,500,000IDR          3,000,000IDR                

‐ brick wall  + screed

‐ paint finish

‐ including top w/plate 5 mm

5 Cat Ladder 1 unit 4,500,000IDR          4,500,000IDR                

‐ Ø 2" st.steel  w/Paint finish

67,200,000IDR              

TOTAL 1,061,525,500IDR  

Total VII

Garbage box 1500 height

CEILING & ROOF

WALL FINISHES

MISCELLANEOUS

Total VI

Total IV

Total V

Page 18: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

18 | P a g e

PEKERJAAN INTERIOR

NO.  AMOUNT 

A

I PRELIMINARIES IDR                      8,500,000 

II DEMOLITION WORKS IDR                                        ‐ 

III PARTITION WORKS IDR                  148,603,700 

IV DOORS IDR                    91,250,000 

V WALL FINISHES IDR                    33,453,000 

VI CEILING WORKS IDR                    65,879,000 

VII FLOOR FINISHES IDR                    74,760,000 

VIII FURNITURE WORKS IDR                  121,250,000 

XI TOILET & SANITARY IDR                    61,256,000 

XII MISCELLANEOUS IDR                    24,600,000 

Total A  IDR                  629,551,700 

B

I PRELIMINARIES IDR                      8,500,000 

II DEMOLITION WORKS IDR                                        ‐ 

III PARTITION WORKS IDR                      3,861,000 

IV DOORS IDR                      5,000,004 

V WALL FINISHES IDR                    10,500,000 

VI CEILING WORKS IDR                    71,210,000 

VII FLOOR FINISHES IDR                  114,576,000 

XII MISCELLANEOUS IDR                    33,000,000 

Total B  IDR                  246,647,004 

GRAND TOTAL  IDR                  876,198,704 

GROUND FLOOR

ITEM

LOWER GROUND

ROUGHLY COST ESTIMATION

INTERIOR

SUNMMARY

Page 19: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

19 | P a g e

PEKERJAAN MEKANIKAL - ELEKTRIKAL

NO.  AMOUNT 

A.I MECHANICAL & ELECTRICAL, FIRE ALARM , SOUND SYSTEM  438,932,600IDR                   

AND PLUMBING WORKS LEVEL ‐ 1ST FLOOR

B.I MECHANICAL & ELECTRICAL, FIRE ALARM , SOUND SYSTEM  246,390,400IDR                   

AND PLUMBING WORKS LEVEL ‐ 2ND FLOOR

C.I ROOF TANK 27,000,000IDR                     

D.I HALOTRON WORKS ‐IDR                                         

E.I RAIN WATER PIPE WORKS  110,562,000IDR                   

F.I UPS POWER SUPPLY ‐ SERVER ‐IDR                                         

G.I LIGHTING PROTECTION  62,850,000IDR                     

H.I UPS POWER SUPPLY ‐ WORKING AREA ‐IDR                                         

I.I TEST AND COMMISIONING WORKS ALL SYSTEM  2,500,000IDR                        

J.I AS ‐ BUILT DRAWING  AND DOCUMENTATION HAND OVER 2,500,000IDR                        

TOTAL ALL ITEMS 890,735,000IDR                   

DESCRIPTION

MECHNICAL & ELECTRICAL

ROUGHLY COST ESTIMATION

SUMMARY

RENCANA PENGGALANGAN DANA Proyek Tahap 1 : Pekerjaan Struktur Rp 3.095.434.989,- Aksi Dana :

1. Aksi Janji Iman Jemaat – Kontribusi per m² proyek : a. Target 200 Kepala Keluarga x Rp 5.000.000,- = Rp 1.000.000.000,-

2. Proposal Keluar – 100 proposal x Rp 10.000.000,- = Rp 1.000.000,000,- 3. Dinner Charity = Rp 500.000.000,- 4. Aksi Dana Lainnya = Rp 595,434,989,-

__________________________________________________________________ Total Rp 3.095.434.989,-

Page 20: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

20 | P a g e

PENUTUP

Kita patut mengucap syukur atas pemeliharaan Tuhan terhadap gerak pelayanan GPIB Sawangan yang terus terpelihara secara baik. Oleh karena itu melalui surat ini sekali lagi kami ingin mengajak bapak/ibu. Saudara/I untuk menyatakan syukur itu dengan membagikan berkat yang Tuhan beri dengan tulus dan ikhlas, guna menopang usaha dana ini sebagai aksi “ Janji Iman” kita kepada Tuhan. Namun demikian kami mengimani bahwa usaha dana yang gigih tanpa disertai oleh doa akan berakhir sia-sia. Oleh karena itu kami juga mohon dukungan doa seluruh jemaat atas segala usaha, dan daya upaya yang kami lakukan. Biarlah apa yang kita lakukan bersama ini berkenan bagi Tuhan, dan menjadi berkat bagi kita masing-masing dan bagi pertumbuhan jemaat GPIB Sawangan secara umum. Tuhan Yesus memberkati saudara dan pemberian saudara.

                            

Page 21: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

21 | P a g e

  

SURAT KESEDIAAN DONATUR 

 

Yang bertanda tangan di bawah ini : 

 

Nama      : ______________________________________________ 

Alamat      : ______________________________________________ 

         ______________________________________________ 

Bersedia menjadi donator  Biaya PembangunanGPIB Sawangan 

Jumlah donasi    : Rp _______________ 

Terbilang     : ____________________________________________ 

           ____________________________________________ 

         

        ____,_____________ 2015 

 

            [_____________________] 

TANDA TERIMA 

Telah terima dari    : ________________________________________ 

Uang sebesar      : ________________________________________ 

Terbilang        : Rp _______________ 

Untuk pembayaran    : ________________________________________ 

      

                Panitia  Pembangunan GPIB Sawangan 

             

        ____,_____________ 2015 

                       

                              

                                                                          [_____________________] 

 

Page 22: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

22 | P a g e

LAMPIRAN 1 - IMB

Page 23: Proposal Pembangunan GPIB Sawangan 2015 Pembangunan GPIB Sawangan 2015… · Oleh karena itu lewat Proposal permohonan dana Pembangunan Gedung gereja GPIB Sawangan ini kami ingin

23 | P a g e