PROYEK HOOVER DAM DI BLACK CANYON, SUNGAI COLORADO Jakarta, 20 Juni 2015 DISUSUN OLEH : Wilie Hade Santoso (41113120109) Agus Susanto (41113120030) Miftah Fauzi (41111120087) Meindra Putri W. (41113120052) Utami Sutjitraningdyah (41113120098) Yosie Malinda (41113120118) DOSEN : Budi Santosa, ST., MT. JURUSAN TEKNIK SIPIL UNIVERSITAS MERCU BUANA

description

Sistem Manajemen Mutu Konstruksi Hoover Dam yang merupakan salah satu bendungan terbesar di dunia.

Transcript of Ppt Tugas Final Sistem Manajemen Mutu

PowerPoint Presentation

PROYEK HOOVER DAM DI BLACK CANYON,SUNGAI COLORADOJakarta, 20 Juni 2015DISUSUN OLEH :

Wilie Hade Santoso (41113120109)Agus Susanto (41113120030)Miftah Fauzi(41111120087)Meindra Putri W.(41113120052)Utami Sutjitraningdyah (41113120098)Yosie Malinda (41113120118)

DOSEN : Budi Santosa, ST., MT.

JURUSAN TEKNIK SIPILUNIVERSITAS MERCU BUANA

PENDAHULUAN HOOVER DAM

HOOVER DAM

TUJUAN PROYEK HOOVER DAM

DIVERSION TUNNELS

Two 50-foot diametyer tunnels drilled into the canyonThe tunnels diverted the water around the damn while it was being constructedThe Tunnels area combined 3 miles in length

Building MaterialsUse of quick-dry concreteThis called for the concrete to be required to be moved quickly from the production plant to the dam siteIf it was not moved quickly enough it would set, and had to be scraped out by hand

PROSES KONSTRUKSI HOOVER DAM PENGEBORAN DINDING BATU

PEMBERSIHAN TEMBOK LEMBAH BLACK CANYONPELAKSANAAN KONSTRUKSI HOOVER DAMBANGUNAN PENGAMBILAN AIR BAKU (INTAKE)FAKTOR YANG MEMPENGARUHI LOKASI INTAKEPERLENGKAPAN INTAKEKRITERIA PERENCANAAN/DESAIN INTAKEJEMBATAN HOOVER DAMGbr . Jembatan Hoover Dam yang sudah selesai dibangun TAHAPAN PEMBANGUNAN HOOVER DAM BRIDGESPEMBUATAN PONDASI UNTUK KOLOM-KOLOM JEMBATANPEMBUATAN KOLOM PENYANGGA JEMBATANPEMBUATAN PILAR MELENGKUNG PADA STRUKTUR JEMBATANGbr . Kedua ujung pelengkung Hoover Dam Bridge dihubungkan.PEMBANGUNAN PLAT LANTAIGbr . Pembangunan plat lantai beton pada Hoover Dam BridgeA