PRA RENCANA PABRIK PEMBUATAN PRECIPITATED CALCIUM CARBONATE (PCC) DENGAN BAHAN BAKU CALCIUM OXIDE (CAO) KAPASITAS 100.OOO TON/TAHUN SKRIPSI: WIRDAWATI DEBORA CHRISTINA 03101403041 03101403056 DOSEN PEMBIMBING: IR. H. ABDULLAH SALEH, MS., M.ENG

description

FInal Project

Transcript of Ppt Ta Pcc Tgl 9 Mei 2015 Wirda-Debora

PRA RENCANA PABRIK PEMBUATAN PRECIPITATED

CALCIUM CARBONATE (PCC)DENGAN BAHAN BAKU CALCIUM OXIDE

(CAO) KAPASITAS 100.OOO TON/TAHUN

SKRIPSI:

WIRDAWATI DEBORA CHRISTINA

03101403041 03101403056

DOSEN PEMBIMBING: IR. H. ABDULLAH SALEH, MS., M.ENG

KERANGKA PRESENTASI

Precipitated Calcium Carbonate (PCC) merupakan produk kimia yang dihasilkan dari pemanfaatan komponen kalsium dan direaksikan dengan CO2, sehingga menghasilkan CaCO3 dengan persen kemurnian yang tinggi.

APA ITU PCC?

ALASAN PENDIRIAN PABRIKALASAN PENDIRIAN PABRIK

Peningkatan kebutuhan PCC

Ketersediaan bahan baku yang melimpah

Pengurangan impor PCC

Pra Rencana Pendirian Pabrik CaCO3

Pengembangan pabrik PCC

TahunKebutuhan ( Ton /

Tahun )

2009 52.372,796

2010 67.558,651

2011 69.602,7622012 113.100,144

2013 103.455,515

PENENTUAN KAPASITAS PABRIK

PENENTUAN KAPASITAS PABRIK

Sumber : Biro Pusat Statistik

Dari data di samping, maka diperkirakan

kebutuhan Precipitated Calcium Carbonate di Indonesia pada tahun 2020, yaitu sebesar

110.767,6952 Ton/Tahun. Dengan memproduksi 60% dari total kebutuhan PCC di Indonesia maka kapasitas pabrik sebesar 100.000

Ton/Tahun.

KETERSEDIAAN BAHAN BAKU

KETERSEDIAAN BAHAN BAKU

KALSIUM OKSIDA

AIR

KARBON DIOKSIDA

Diperoleh dari CV. Banten Prima Mineral yang terdapat di Pulo Merak, Cilegon, Jawa Barat dengan kapasitas produksinya mencapai 200 ton/hari.

Dipenuhi dengan mengolah air dari waduk Krakatausteel yang berada di dekat pabrik.

Didapat dari PT. RMI Krakatau Karbonindo yang bertempat di Cilegon, Jawa Barat. Saat ini, kapasitas produksi PT. RMI 18 ton / jam

LOKASI PABRIKLOKASI PABRIKPabrik PCC didirikan di Cilegon,

Provinsi Banten, Jawa Barat

LOKASI PABRIK

Lokasi berdekatan dengan pabrik pemasok bahan baku

Ketersediaan sumber air sebagai utilitas

Letak pabrik dekat dengan jalan darat dan laut, serta tersedianya

sarana transportasi yang memadai sehingga mempermudah pengadaan bahan baku dan pemasaran produk

Mudah diperoleh tenaga kerja

Keadaan iklim yang baik dan aman dari bencana alam

DASAR PERTIMBANGAN

LOKASI

MACAM PROSES PEMBUATAN

MACAM PROSES PEMBUATAN

Direct Process

Proses Foster Wheeler

Proses Lime Soda

Proses ini lebih cepat, menghasilkan size particle yang lebih halus, dan memiliki konversi yang tinggi.

PROSES TERPILIH

PROSES TERPILIH

Direct Process

Bahan baku : CaO, air, dan

CO2.

Reaksi:Reaksi Hidrasi & Reaksi Karbonasi

Reaksi yang terjadi pada pembuatan Precipitated Calcium Carbonate (CaCO3):

Reaksi yang terjadi pada pembuatan Precipitated Calcium Carbonate (CaCO3):

Reaksi Hidrasi (Terjadi pada Slaker-01):

CaO(s) + H2O(l) Ca(OH)2(aq

Kalsium Oksida Air Kalsium Hidroksida

Reaksi Karbonasi (Terjadi pada Reaktor-01 dan Reaktor-02):

Ca(OH)2(aq) + CO2(g) CaCO3(s) +

H2O(l)

Kalsium Hidroksida Karbon Dioksida Kalsium Karbonat

Air

Bahan Baku : CaO, air, CO2

Katalis : sorbitolProduk : Precipitated Calsium

Carbonate (PCC)

Uraian Proses

BLOK DIAGRAM

PCCPCC

PreparasiCaOH2O + sorbitol Slaker

Produksi

Purifikasi

Reaktor

CO2

Filter

Ca(OH)2

(S-01)

Water from utility

(01)

(02)(31)

(MT-01)

T = 28°CP = 1 atm

(SL-01)

(05)

(S-01)

(04)

T = 85°CP = 1 atm

H-01

(06)

(07,08)(TF-01)

(S-03)

(PS-01)

(10)

(C-01) (TP-01)

(09)

(12)

(14)

(116)

(17)

R-01

(11)

(15)

(18)

(19)

R-02

(MT-02)

(20)(C-02)

(22)

(TH-01) (21)

(RVDF-01)

(23)

(24)

(26)(FP-01)

(S-04)

(MF-01)

(28)

(29)

(31)

(EV-01)

(32)

(TC-01)

water backto utility

(SC-01)

(BM-01)

(SC-02)

(30)

T = 70°CP = 8 atm

T = 70°CP = 8 atmBE-01

(03)CaOT = 28°CP = 1 atm

C6H14O6T = 28°CP = 1 atm

(C3H5NO)nT = 28°CP = 1 atm

(13)

(27)

(CaCO3)

(MP-01)

CO2 gasT = 28°CP = 7 atm

BE-02

(BE-03)

P-01

P-02

P-03

P-04

P-05

P-06P-07

K-01

(H-02)

(H-03)

P-08 P-09

P-10

(33)

(retentat)blowdown

(25)

(BC-01)

(TP-02)

Flowsheet

BAHAN BAKU DAN UTILITASBAHAN BAKU DAN UTILITAS

Kebutuhan Steam = 192.932,28 Kg/JamKebutuhan Air = 5.830.324,32 Kg/JamKebutuhan Listrik = 998,41 Hp/JamKebutuhan Bahan Bakar = 10.823.61 Kg/Jam

Kalsium Oksida (CaO) = 9.631,71 Kg/JamAir (H2O) = 133.541,71 Kg/JamKarbon dioksida (CO2) = 7.404,69 Kg/Jam

Bahan Baku

Utilitas

BENTUK = PERSEROAN TERBATAS

ORGANISASI = LINE AND STAFF

KARYAWAN = 172 ORANG

ORGANISASI PERUSAHAAN

DIREKTURUTAMA

DIREKTURPEMASARAN DAN

KEUANGAN

DIREKTURUMUM DAN

KEPEGAWAIAN

DIREKTURTEKNIK DAN

PRODUKSI

DEWANKOMISARIS

BAGIANTEKNIK DAN

PEMELIHARAAN

BAGIAN PENELITIAN DAN PENGEMBANGAN

BAGIANPENGOLAHAN

DAN PRODUKSI

BAGIANKEUANGAN

BAGIANPEMBELANJAAN DAN PEMASARAN

BAGIANPERSONALIA

BAGIANPELAYANAN

UMUM

• INVESTASI = US $ 105,589,615.80

• HASIL PENJUALAN PER TAHUN = US $ 250,000,000.00

• BIAYA PRODUKSI PER TAHUN = US $ 160,580,194.87

• LABA BERSIH PER TAHUN = US $ 58,122,873.32

• PAY OUT TIME = 2 TAHUN

• RATE OF RETURN ON INVESTMENT = 55,04 %

• DISCOUNTED CASH FLOW –ROR = 62,07 %

• BREAK EVEN POINT = 35,34 %

• SERVICE LIFE = 11 TAHUN

ANALISA EKONOMI

GRAFIK BREAK EVEN POINTGRAFIK BREAK EVEN POINT

No Parameter Hasil perhitungan Syarat kelayakan Kesimpulan

1 Annual Cash Flow (ACF)US$

65,809,797.36

Lebih besar dari bunga bank

(>24%)Layak didirikan

2 Pay Out Time (POT) 2 tahunKurang dari setengah umur pabrik

(umur pabrik 11 tahun)Layak didirikan

3

Net Profit Over Total

Life time of The Project

(NPOTLP)

US $

641,091,250.72

Lebih besar dari Total Capital

Investment ditambah Total Bunga

Pinjaman

(US $ 154,645,645.87)

Layak didirikan

4 Total Capital Sink (TCS)US $

600,939,009.82

Lebih besar dari Total Capital

Investment

(US $ 105,589,615.80)

Layak didirikan

5 Rate Of Return (ROR) 55,04 %Lebih besar dari bunga bank (24

%)Layak didirikan

6

Discounted Cash

Flowrate of Return

(DCF-ROR)

62,07 %Lebih besar dari bunga bank (24

%)Layak didirikan

7Break Event Point

(BEP)35,34 % 20 % < BEP < 40 % Layak didirikan

BERDASARKAN URAIAN DAN HASIL PERHITUNGAN PRA RANCANGAN PABRIK PEMBUATAN PRECIPITATED CALCIUM CARBONATE, DAPAT DISIMPULKAN BAHWA:

•PRA RANCANGAN PABRIK PEMBUATAN PRECIPITATED CALCIUM CARBONATE KAPASITAS 100.000 TON/TAHUN DIRENCANAKAN UNTUK MEMBANTU MEMENUHI KEBUTUHAN DALAM NEGERI.

•BERDASARKAN KETERSEDIAAN BAHAN BAKU, TRANSPORTASI, SUMBER DAYA MANUSIA, LINGKUNGAN, DAN PEMASARAN, MAKA PRA RANCANGAN PABRIK PEMBUATAN PRECIPITATED CALCIUM CARBONATE INI DIDIRIKAN DI KOTA CILEGON, PROVINSI BANTEN, JAWA BARAT.

•PERUSAHAAN YANG AKAN DIDIRIKAN BERBENTUK BADAN USAHA PERSEROAN TERBATAS DENGAN STRUKTUR ORGANISASI LINE AND STAFF, YANG DIPIMPIN OLEH SEORANG DIREKTUR UTAMA DENGAN JUMLAH KARYAWAN SEBANYAK 171 ORANG.

KESIMPULANKESIMPULAN

Berdasarkan hasil keseluruhan unsur analisa ekonomi, maka Pabrik Pembuatan Precipitated Calcium Carbonate ini layak

untuk didirikan.