repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri...

16

Transcript of repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri...

Page 1: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry
Page 2: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry
Page 3: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry
Page 4: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry
Page 5: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

TESIS

PENERAPAN REKAYASA NILAI PADA PROYEK

PEMBANGUNAN GEDUNG PERKULIAHAN

POLITEKNIK NEGERI BANYUWANGI

Untuk Memenuhi Sebagian Persyaratan

Guna Mencapai Gelar Magister Teknik Sipil

Diajukan oleh :

SISWO HANDOKO

NIM :147.151.0.0802

PROGRAM STUDI MAGISTER TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS17 AGUSTUS 1945 SURABAYA

2017

Page 6: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

i

TESIS

PENERAPAN REKAYASA NILAI PADA PROYEK

PEMBANGUNAN GEDUNG PERKULIAHAN

POLITEKNIK NEGERI BANYUWANGI

Diajukan oleh :

SISWO HANDOKO

NIM : 147.151.0.0802

Disetujui untuk diuji :

Surabaya, 23 Juli 2017

Pembimbing 1 : Dr. Ir. Hj. RA.RETNO HASTIJANTI, M.T. ………………..

Pembimbing 2 : Ir. HERRY WIDHIARTO, M.Sc. ..………………

PROGRAM STUDI MAGISTER TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS 17 AGUSTUS 1945

SURABAYA

2017

Page 7: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

ii

TESIS

PENERAPAN REKAYASA NILAI PADA PROYEK

PEMBANGUNAN GEDUNG PERKULIAHAN

POLITEKNIK NEGERI BANYUWANGI

Diajukan oleh :

SISWO HANDOKO

NIM : 147.151.0.0802

Telah dipertahankan di depan Tim Penguji dan dinyatakan lulus

pada ujian Tesis Program Studi Magister Teknik Sipil

Fakultas Teknik Universitas 17 Agustus 1945 Surabaya

Pada tanggal : 12 Agustus 2017

Tim Penguji

Dr. Ir. Hj. RA. Retno Hastijanti, M.T. ………………………………

Ketua

Ir. Herry Widhiarto, M.Sc. ………………………………

Anggota

Dr. Ir. Muaffaq Achmad Jani, M.Eng. ………………………………

Anggota

Mengetahui

Fakultas Teknik

Universitas 17 Agustus 1945 Surabaya

Dekan Fakultas Teknik Kaprodi Magister Teknik Sipil

Dr. Ir. Muaffaq Achmad Jani, M.Eng.

Prof. Dr. Dr(TS). Ir. Wateno Oetomo, MM, MT.

Page 8: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

iii

KATA PENGANTAR

Dengan memanjatkan puji syukur penulis panjatkan ke hadirat Allah SWT yang

telah memberikan rahmat dan hidayat-Nya sehingga penulis dapat menyelesaikan

tesis ini dengan judul : PENERAPAN REKAYASA NILAI PADA PROYEK

PEMBANGUNAN GEDUNG PERKULIAHAN POLITEKNIK NEGERI

BANYUWANGI sebagai salah satu syarat untuk derajad sarjana strata 2 (S2)

pada Program Studi Magister Teknik Sipil Program Pascasarjana Universitas 17

Agustus 1945 Surabaya.

Dalam menyusun tesis ini penulis merasakan mendapatkan bantuan dari

berbagai pihak berupa pengarahan, perhatian dan bimbingan. Oleh karena itu pada

kesempatan yang baik ini penulis ingin menyampaikan ucapan terima kasih

kepada :

1. Ibu Prof. Dr. drg. Hj. Ida Aju Brahmasari, Dipl. DHE, MPA., selaku Rektor

Universitas 17 Agustus 1945 Surabaya.

2. Bapak Dr. Ir. H. Muaffaq A. Jani, M. Eng., selaku Dekan Fakultas Teknik

Universitas 17 Agustus 1945 Surabaya.

3. Bapak Prof. Dr. Dr(TS). Ir. Wateno Oetomo, MM, MT., selaku Kaprodi

Magister Teknik Sipil Program Pascasarjana Universitas 17 Agustus 1945

Surabaya.

4. Ibu Dr. Ir. Hj. RA. Retno Hastijanti, M.T., selaku Dosen Pembimbing I atas

bimbingannya selama ini sampai selesai.

Page 9: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

iv

5. Bapak Ir. Herry Widhiarto, M.Sc., selaku Dosen Pembimbing II atas

bimbingannya selama ini sampai selesai.

6. Bapak dan ibu dosen yang tidak dapat saya sebutkan satu persatu atas

bimbingannya selama penulis mengikuti perkuliahan.

7. Para staf tata usaha baik umum dan akademik atas bantuannya yang telah

memberikan informasi kepada penulis selama ini.

8. Rekan-rekan mahasiswa Magister Teknik Sipil pada umumnya khususnya

angkatan MT 25 tahun 2015/2016 yang selalu mendorong untuk

menyelesaikan kuliah dan tesis ini.

9. Rekan-rekan kerja, pimpinan dan staf yang telah banyak memberikan

bimbingan, dukungan dan saran dan data yang diperlukan dalam penyelesaian

tesis ini.

10. Lebih khusus saya terima kasih penulis tujukan kepada Bapak, Ibu dan Istriku

tercinta yang senantiasa memberikan dorongan dan do’a.

Akhirnya semoga tesis ini ada manfaatnya.

Surabaya, 2017

Penulis

Page 10: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

v

ABSTRAKSI

Siswo Handoko, 2017

Penerapan Rekayasa Nilai pada Proyek Pembangunan Gedung Perkuliahan

Politeknik Negeri Banyuwangi

Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T.

Pembimbing 2 : Ir. Herry Widhiarto, M.Sc.

Pada kondisi optimal, faktor-faktor biaya dan waktu, dan kualitas

membentuk tata guna yang saling bergantung. Dalam kegiatan suatu proyek akan

banyak didapati masalah seperti penggunaan material yang boros, tenaga kerja

yang kurang terampil dan waktu penyelesaian proyek yang tidak tepat waktu yang

menyebabkan pemborosan biaya. Agar pelaksanaan suatu proyek konstruksi dapat

berhasil melalui system koordinasi serta pengendalian yang terarah, perlu

diperhatikan bahwa tujuan, sasaran dan teknik-teknik pelaksanaan setiap

pekerjaan hendaknya dinyatakan jelas dan terinci, untuk itu diperlukan suatu

metoda untuk merencanakan dan mengendalikan suatu proyek

Salah satu teknik yang digunakan untuk mengefisienkan biaya adalah

dengan menggunakan aplikasi Rekayasa Nilai (Value Engineering). Rekayasa

nilai (Value Engineering) adalah suatu pendekatan terorganisasi dan kreatif yang

bertujuan untuk mengadakan pengidentifikasian biaya yang tidak perlu. Biaya

yang tidak perlu ini adalah biaya yang tidak memberikan kualitas atau kegunaan

Dengan menggunakan aplikasi rekayasa nilai yang diterapkan pada

pekerjaan dinding dengan mengganti material alternative awal bata merah dengan

bata ringan dan pekerjaan plesteran dari material alternative semen dan pasir

diganti dengan semen instan mortar render pada proyek pembangunan Gedung

Perkuliahan Politeknik Negeri Banyuwangi. Besar penghematan keseluruhan pada

pekerjaan dinding yang didapat Rp. 65.175.999,90,- dari biaya awal sebesar Rp.

616.495.393,90,- setelah dilakukan analisis Rekayasa Nilai menjadi Rp.

551.319.394,00,- dengan nilai penghematan sebesar 10,57 %.

Kata kunci : biaya, penghematan, proyek konstruksi, rekayasa nilai, waktu

Page 11: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

vi

ABSTRACT

Under optimal conditions, cost and time, and quality factors form

interdependent uses. In the activities of a project there will be many problems

such as the use of wasteful materials, less skilled labor and insufficient project

timing that lead to waste of costs. In order for the implementation of a

construction project to succeed through a coordinated and well-directed control

system, it should be noted that the objectives, targets and techniques for the

implementation of each work should be clearly stated and detailed, a method for

planning and controlling a project.

One technique used to streamline costs is to use Value Engineering

applications. Value engineering is an organized and creative approach aimed at

identifying unnecessary costs. These unnecessary costs are costs that do not

provide quality or usability.

By applying value engineering applied to wall work by replacing

alternative material of early red brick with light brick and plaster work from

alternative material of cement and sand replaced with instant mortar rendering

cement on project of Building of State Polytechnic Lecture of Banyuwangi. Large

overall savings on wall work earned Rp. 65.175.999,90, - from the initial cost of

Rp. 616.495.393,90, - after the analysis of Value Engineering to be Rp.

551.319.394,00, - with a savings value of 10.57%.

Keywords: cost, savings, construction projects, value engineering, time

Page 12: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

vii

DAFTAR ISI

Halaman

LEMBAR PERSETUJUAN ........................................................................... i

LEMBAR TIM PENGUJI ............................................................................. ii

KATA PENGANTAR ................................................................................... iii

ABSTRAKSI ................................................................................................... v

ABSTRACT ................................................................................................... vi

DAFTAR ISI ................................................................................................. vii

DAFTAR TABEL ......................................................................................... ix

DAFTAR GAMBAR ...................................................................................... x

DAFTAR LAMPIRAN ................................................................................. xi

BAB I : PENDAHULUAN . ................................................................. 1

1.1 Latar Belakang .......................................................... 1

1.2 Perumusan Masalah ................................................. 3

1.3 Batasan Masalah ........................................................ 3

1.4 Tujuan Penelitian ....................................................... 4

1.5 Manfaat Penelitian ..................................................... 4

BAB II : TINJAUAN PUSTAKA ........................................................ 5

2.1 Penelitian Terdahulu ................................................ 5

2.2 Pengertian Rekayasa Nilai ....................................... 8

2.3 Unsur-unsur Utama Rekayasa Nilai ...................... 13

2.4 Sebab-sebab Timbulnya Biaya-biaya yang tidak

diperlukan ................................................................ 15

2.5 Waktu mengaplikasikan Rekayasa Nilai ............... 18

2.6 Rekayasa Nilai pada Tahap Perencanaan ............. 22

2.7 Rekayasa Nilai pada Tahap Pelaksanaan .............. 24

2.8 Dinding ..................................................................... 24

2.8.1 Fungsi Dinding ............................................ 26

2.8.2 Material Dinding ......................................... 28

BAB III : METODE PENELITIAN .................................................... 37

3.1 Konsep Penelitian .................................................... 37

Page 13: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

viii

3.2 Proses Penelitian ...................................................... 37

3.3 Analisis Data ............................................................ 40

3.4 Sistematika Pembahasan ........................................ 45

BAB IV : PEMBAHASAN REKAYASA NILAI ................................ 46

4.1 Bata Ringan (Hebel/ Celcon) .................................. 46

4.1.1 Alasan dilakukannya Rekayasa Nilai pada

Dinding dengan menggunakan Bata

Ringan / Hebel .............................................. 47

4.2 Analisa Rekayasa Nilai pada Dinding ..................... 48

4.2.1 Tahap Informasi .......................................... 49

4.2.2 Tahap Kreatif ............................................... 50

4.2.3 Tahap Analisa ............................................... 51

4.2.4 Tahap Rekomendasi .................................... 54

4.2.5 Tahap Penyajian .......................................... 56

BAB V : KESIMPULAN DAN SARAN

5.1 Kesimpulan .................................................................. 58

5.2 Saran ............................................................................ 58

DAFTAR PUSTAKA

LAMPIRAN

Page 14: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

ix

DAFTAR TABEL

Halaman

Tabel 2.1 Karakteristik Dinding Panel . .................................................... 36

Tabel 4.1 Informasi umum dan Kriteria Desain Dinding Existing .......... 49

Tabel 4.2 Informasi umum dan Kriteria Desain Plesteran Existing ......... 49

Tabel 4.3 Kelebihan dan kekurangan dari Bata Ringan/Hebel ................. 51

Tabel 4.4 Analisa Harga Satuan pekerjaan pasangan bata ringan ............. 53

Tabel 4.5 Analisa Harga Satuan pekerjaan plesteran dinding ................... 54

Tabel 4.6 Perbandingan pekerjaan awal dengan pekerjaan kreatif dinding 56

Tabel 4.7 Perhitungan Rekayasa Nilai ...................................................... 57

Page 15: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

x

DAFTAR GAMBAR

Halaman

Gambar 3.1 Kerangka Berpikir / Alur Pikir Penelitian..................................45

Gambar 4.1 Metode pasangan bata ringan di lantai tipikal............................50

Gambar 4.2 Metode pasangan bata ringan pada opening...............................50

Page 16: repository.untag-sby.ac.idrepository.untag-sby.ac.id/1072/2/ABSTRAK.pdf · Politeknik Negeri Banyuwangi Pembimbing 1 : Dr. Ir. Hj. RA. Retno Hastijanti, M.T . Pembimbing 2 : Ir. Herry

xi

DAFTAR LAMPIRAN

Halaman

Lampiran 1 : Rencana Anggaran Biaya............................................................61

Lampiran 2 : Analisa Harga Satuan..................................................................84

Lampiran 3 : Gambar Perencanaan Gedung.....................................................87