  • Kepada Yth:Ir.Fachrizal NaikemManager Logistik

    SURAT PERMINTAAN BARANG

    NO NAMA BARANG SPESIFIKASI SATUAN JUMLAH NO.ITEM1 MINYAK BEKISTING ROBINAIR LITER 14

    Jakarta: 23 Maret 2015

    Mengetahui : Diajukan Oleh :

    (___________________) ( AFRIZAL ARDIANSYAH )KC/Kapro/SE

  • Form-P-1

    Kepada Yth:Ir.Fachrizal NaikemManager Logistik

    SURAT PERMINTAAN BARANG

    KETERANGAN

    Jakarta: 23 Maret 2015

    Diajukan Oleh :

    ( AFRIZAL ARDIANSYAH )

  • MONITORING KEDATANGAN MATERIAL ( PO )

    No TANGGAL Nomor PO Nama Barang Sat. Volume Harga Tanggal Besi Ulir D-25 mm Besi Ulir D-19 mm Besi Ulir D-13 mm Satuan Realisasi Sisa Realisasi Sisa Realisasi Sisa

    1 28-07-06 1461/ORD/635R BesiI D-25mm btg 15,606.00 4,550.00 Besi D-19mm btg 16,533.00 Besi D-13mm btg 26,800.00

    28-07-2006 1,000.00 14,606.00 - 16,533.00 1,211.00 25,589.00 31-07-2006 14,606.00 1,000.00 15,533.00 289.00 25,300.00 05-08-2006 1,000.00 13,606.00 1,000.00 14,533.00 1,500.00 23,800.00 12-08-2006 1,000.00 12,606.00 1,000.00 13,533.00 1,500.00 22,300.00 29-08-2006 650.00 11,956.00 600.00 12,933.00 1,200.00 21,100.00 30-08-2006 - 11,956.00 700.00 12,233.00 950.00 20,150.00

    11,956.00 12,233.00 20,150.00 03-09-2006 115.00 11,841.00 1,000.00 11,233.00 1,500.00 18,650.00 03-09-2006 885.00 10,956.00 - 11,233.00 - 18,650.00 06-09-2006 1,000.00 9,956.00 540.00 10,693.00 18,650.00 07-09-2006 9,956.00 460.00 10,233.00 1,500.00 17,150.00 09-09-2006 1,000.00 8,956.00 1,000.00 9,233.00 1,500.00 15,650.00 14-09-2006 8,956.00 1,000.00 8,233.00 1,500.00 14,150.00 15-09-2006 660.00 8,296.00 - 8,233.00 14,150.00 17-09-2006 340.00 7,956.00 1,000.00 7,233.00 1,500.00 12,650.00 19-09-2006 650.00 7,306.00 - 7,233.00 - 12,650.00 21-09-2006 92.00 7,214.00 1,000.00 6,233.00 12,650.00 22-09-2006 258.00 6,956.00 - 6,233.00 1,500.00 11,150.00

    6,956.00 6,233.00 11,150.00 Tahap II 6,956.00 6,233.00 11,150.00

    25-09-2006 850.00 6,106.00 500.00 5,733.00 3,000.00 8,150.00 29-09-2006 - 6,106.00 500.00 5,233.00 3,000.00 5,150.00 04-10-2006 1,940.00 4,166.00 - 5,233.00 5,150.00 05-10-2006 610.00 3,556.00 1,000.00 4,233.00 5,150.00 06-10-2006 - 3,556.00 - 4,233.00 5,150.00 07-10-2006 - 3,556.00 - 4,233.00 5,150.00 08-10-2006 850.00 2,706.00 - 4,233.00 5,150.00 10-10-2006 870.00 1,836.00 - 4,233.00 5,150.00 - 10-10-2006 - 1,836.00 - 4,233.00 12-10-2006 850.00 986.00 - 4,233.00 13-10-2006 - 986.00 2,000.00 2,233.00 17-10-2006 - 986.00 100.00 2,133.00 04-11-2006 235.00 751.00 - 2,133.00 07-11-2006 - 751.00 - 2,133.00 18-11-2006 - 751.00 - 2,133.00 20-11-2006 - 751.00 - 2,133.00 - 23-11-2006 - 751.00 - 2,133.00 29-11-2006 650.00 101.00 2,133.00 04-12-2006 101.00 - 2,133.00

    - 2,133.00

    15,606.00 - 14,400.00 2,133.00 26,800.00 -

  • REKAP KEBUTUHAN MATERIAL PROYEK

    No No.SPB Nama Barang Sat. Volume ITEM PEKERJAAN

    1 01/P1-BT/VII/06 Besi Ulir D-19 mm U-40 btg 14,400.00 u/Pek.Pembesian Soldier Pile Besi Ulir D-13 mm U-40 btg 6,000.00

    2 02/P1-BT/VII/06 Besi Ulir D-25 mm U-40 btg 15,606.00 u/Pek.Pembesian Pondasi Bored PilBesi Ulir D-13 mm U-40 btg 20,800.00

    3 62/P1-BT/IX/06 Besi Ulir D-19 mm U-40 btg 600.00 u/Pek. Pondasi TC 3 Unit Besi Ulir D-13 mm U-40 btg 566.00 Besi Ulir D-25 mm U-40 btg 150.00

    4 63/P1-BT/IX/06 Besi Ulir D-25 mm U-40 btg 475.00 u/Pek. Capping Beam Besi Ulir D-10 mm U-40 btg 1,996.00

    5 65/P1-BT/IX/06 Besi Ulir D-25 mm U-40 btg 1,726.00 u/Pek.Bored Pile 1500 & 1000 Besi Ulir D-13 mm U-40 btg 15,797.00

    6 136/P1-BT/X/06 Besi Ulir D-13 mm U-40 btg 3,457.00 u/Pek.stek dinding & pla lt.1,2,3 Besi Ulir D-16 mm U-40 btg 618.00

    7 141/P1-BT/X/06 Besi Ulir D-32 mm U-40 btg 6,689.00 u/Raf Foundation

    8 222/P1-BT/XI/06 Besi Ulir D-13 mm U-40 btg 205.00 u/Pek.Kolom CA Besi Ulir D-25 mm U-40 btg 152.00

    Besi Ulir D-10 mm U-40 btg 1,030.00 u/Pek.Peri Meter Beam Besi Ulir D-25 mm U-40 btg 736.00

    Besi Ulir D-13 mm U-40 btg 2,381.00 u/Pek.Tambahan BP.1500 Besi Ulir D-25 mm U-40 btg 1,326.00

    9 230/P1-BT/XI/06 Besi Ulir D-32 mm U-40 btg 9,250.00 u/Raf Foundation

    10 231/P1-BT/XI/06 Besi Ulir D-19 mm U-40 btg 3,900.00 u/Pek.Bore Pile BP.1500 & 1000

  • 11 235/P1-BT/XI/06 Besi Ulir D-32 mm U-50 btg 1,500.00 u/Pek.Kolom dari groun s/d bsm 4 Besi Ulir D-25 mm U-50 btg 2,700.00

    12 238/P1-BT/XI/06 Besi Ulir D-13 mm U-40 btg 3,600.00 u/Pek.Kolom dari lt Bsm 4 s/d Gf Besi Ulir D-16 mm U-40 btg 8,800.00

    Besi Ulir D-10 mm U-40 btg 1,000.00 u/Pek.Dinding Sher Wall Bsm 4 s/dBesi Ulir D-19 mm U-50 btg 4,700.00 Besi Ulir D-32 mm U-50 btg 1,296.00

    13 273/P1-BT/XII/06 Besi Ulir D-32 mm U-40 btg 17,478.00 u/Raf Foundation

    14 364/P1-BT/II/07 Besi Ulir D-10 mm U-40 btg 312.00 u/Peb.Slab Podium Besi Ulir D-13 mm U-40 btg 150.00 Besi Ulir D-19 mm U-40 btg 4,378.00 Besi Ulir D-22 mm U-40 btg 4,258.00 Besi Ulir D-25 mm U-40 btg 2,247.00 Besi Ulir D-32 mm U-50 btg 33,152.00 u/Raft Foundation

    15 366/P1-BT/II/07 Besi Ulir D-19 mm U-50 btg 250.00 u/Pek Pemb.Area Podium Besi Ulir D-25 mm U-50 btg 447.00 Besi Ulir D-32 mm U-50 btg 375.00

    16 401/P1-BT/II/07 Besi Ulir D-32 mm U-50 btg 265.00 U/Pek Tie Beam

    17 403/P1-BT/III/07 Besi Ulir D-10 mm U-40 btg 293.00 u/Pemb.Pondasi Pit Lift Besi Ulir D-13 mm U-40 btg 68.00 Besi Ulir D-19 mm U-40 btg 62.00 Besi Ulir D-25 mm U-40 btg 26.00 Besi Ulir D-32 mm U-50 btg 262.00

    18 408/P1-BT/III/07 Besi Ulir D-10 mm U-40 btg 312.00 u/Pek Slab Podium & Rettining Wall Besi Ulir D-16 mm U-40 btg 300.00 BSM 4 Besi Ulir D-19 mm U-40 btg 200.00 Besi Ulir D-22 mm U-40 btg 200.00 Besi Ulir D-25 mm U-40 btg 1,340.00

    19 417/P1-BT/III/07 Besi Ulir D-19 mm U-40 btg 450.00 u/Pemb.Slab Podium Besi Ulir D-25 mm U-40 btg 500.00

    20 547/P1-BT/V/07 Besi Ulir D-25 mm U-40 btg 2,280.00 u/Balok , Plat B3 Besi Ulir D-22 mm U-40 btg 4,201.00 Besi Ulir D-19 mm U-40 btg 857.00 Besi Ulir D-16 mm U-40 btg 2,900.00

  • Besi Ulir D-13 mm U-40 btg 27,415.00 Besi Ulir D-10 mm U-40 btg 1,542.00 Besi Ulir D-32 mm U-40 btg 6.00

    21 559/P1-BT/VI/07 Besi Ulir D-25 mm U-40 btg 2,070.00 u/Balok , Plat B2 Besi Ulir D-22 mm U-40 btg 4,260.00 Besi Ulir D-19 mm U-40 btg 790.00 Besi Ulir D-16 mm U-40 btg 3,080.00 Besi Ulir D-13 mm U-40 btg 25,770.00 Besi Ulir D-10 mm U-40 btg 2,010.00

    22 602/P1-BT/VI/07 Besi Ulir D-19 mm U-40 btg 2,400.00 u/Serwall Besi Ulir D-19 mm U-40 btg 200.00 u/Gadangan

    23 620/P1-BT/VI/07 Besi Ulir D-10 mm U-40 btg 2,850.00 u/Parameter Beam B3 s/d B1 Besi Ulir D-13 mm U-40 btg 4,640.00 u/Facing Wall B4 - GF Besi Ulir D-25 mm U-40 btg 1,050.00

    24 621/P1-BT/VI/07 Besi Ulir P- 8 mm U-40 btg 1,200.00 Pek.STP B4 - Gf Besi Ulir D-10 mm U-40 btg 2,100.00 Pek Tangga B4 - Gf Besi Ulir D-13 mm U-40 btg 2,500.00 Besi Ulir D-16 mm U-40 btg 310.00

    25 622/P1-BT/VI/07 Besi Ulir D-10 mm U-40 btg 1,470.00 u/Plat & Balok B1 Besi Ulir D-13 mm U-40 btg 11,300.00 Besi Ulir D-16 mm U-40 btg 2,280.00 Besi Ulir D-19 mm U-40 btg 970.00 Besi Ulir D-22 mm U-40 btg 1,050.00 Besi Ulir D-25 mm U-40 btg 1,100.00 Besi Ulir D-32 mm U-40 btg 47.00

    26 642/P1-BT/VI/07 Besi Ulir P- 8 mm U-40 btg 785.00 u/B2 s/d Lt.5 Besi Ulir D-10 mm U-40 btg 28,283.00 Periode 30 Juni 31 Juli 07 Besi Ulir D-13 mm U-40 btg 3,599.00 Besi Ulir D-16 mm U-40 btg 34,784.00 Besi Ulir D-19 mm U-40 btg 10,360.00 Besi Ulir D-22 mm U-40 btg 528.00 Besi Ulir D-25 mm U-40 btg 1,925.00 Besi Ulir D-32 mm U-40 btg 6,159.00

    27 747/P1-BT/8/07 Besi Ulir P- 8 mm U-40 btg 70.00 u/Pekerjaan Lt.6 & 7 tanpa besi Slab Besi Ulir D-10 mm U-40 btg 8,855.00 Besi Ulir D-13 mm U-40 btg 1,271.00 Besi Ulir D-16 mm U-40 btg 1,147.00 Besi Ulir D-19 mm U-40 btg 2,630.00

  • Besi Ulir D-22 mm U-40 btg 208.00 Besi Ulir D-25 mm U-40 btg 1,009.00 Besi Ulir D-32 mm U-40 btg 1,043.00

    28 773/P1-BT/7/07 Besi Ulir P- 8 mm U-40 btg 228.00 u/Pemb.Lt 8 s/d 15 Besi Ulir D-10 mm U-40 btg 16,535.00 tidak termasuk pembesian slab Besi Ulir D-13 mm U-40 btg 6,526.00 Besi Ulir D-16 mm U-40 btg 4,643.00 Besi Ulir D-19 mm U-40 btg 9,706.00 Besi Ulir D-22 mm U-40 btg 525.00 Besi Ulir D-25 mm U-40 btg 8,241.00 Besi Ulir D-32 mm U-40 btg 1,943.00

    29 774/P1-BT/7/07 Besi Ulir P- 8 mm U-40 btg 353.00 u/Pemb.Lt 16 s/d 25 Besi Ulir D-10 mm U-40 btg 20,337.00 tidak termasuk pembesian slab Besi Ulir D-13 mm U-40 btg 11,004.00 Besi Ulir D-16 mm U-40 btg 5,073.00 Besi Ulir D-19 mm U-40 btg 5,506.00 Besi Ulir D-22 mm U-40 btg 281.00 Besi Ulir D-25 mm U-40 btg 10,140.00 Besi Ulir D-32 mm U-40 btg 2,801.00

    30 996/P1-BT/1/08 Besi Ulir P- 6 mm U-40 btg 2,766.00 u/Struktur s/d lt.45 Besi Ulir P- 8 mm U-40 btg 5,510.00 Besi Ulir D-10 mm U-40 btg 79,431.00 Besi Ulir D-13 mm U-40 btg 26,791.00 Besi Ulir D-16 mm U-40 btg 6,051.00 Besi Ulir D-19 mm U-40 btg 3,041.00 Besi Ulir D-22 mm U-40 btg 8,322.00 Besi Ulir D-25 mm U-40 btg 32,170.00 Besi Ulir D-32 mm U-40 btg 4,024.00

    SPB REALISASI Besi Ulir P- 6 mm U-40 btg 2,766.00 - Besi Ulir P- 8 mm U-40 btg 8,146.00 2,636.00

  • Besi Ulir D-10 mm U-40 btg 168,356.00 139,851.00 Besi Ulir D-13 mm U-40 btg 173,840.00 169,813.00 Besi Ulir D-16 mm U-40 btg 69,986.00 72,126.00 Besi Ulir D-19 mm U-40 btg 60,450.00 78,386.00 Besi Ulir D-19 mm U-50 btg 4,950.00 2,549.00 Besi Ulir D-22 mm U-40 btg 23,833.00 19,237.00 Besi Ulir D-25 mm U-40 btg 84,269.00 95,250.00 Besi Ulir D-25 mm U-50 btg 3,147.00 1,779.00 Besi Ulir D-32 mm U-40 btg 49,440.00 18,623.00 Besi Ulir D-32 mm U-50 btg 36,850.00 31,777.00

  • REKAP KEBUTUHAN MATERIAL PROYEK

    ITEM PEKERJAAN TERKIRIM SISA KG

    u/Pek.Pembesian Soldier Pile 14,400.00 - 6,000.00 -

    - u/Pek.Pembesian Pondasi Bored Pil 15,606.00 -

    20,800.00 - - - - -

    u/Pek. Pondasi TC 3 Unit 600.00 - 566.00 - 150.00 -

    - -

    u/Pek. Capping Beam 475.00 - 1,996.00 -

    - u/Pek.Bored Pile 1500 & 1000 1,726.00 - -

    15,797.00 - - - - -

    u/Pek.stek dinding & pla lt.1,2,3 3,457.00 - - 618.00 -

    - u/Raf Foundation 6,689.00 - -

    - u/Pek.Kolom CA 205.00 - -

    152.00 - - -

    u/Pek.Peri Meter Beam 1,030.00 - - 736.00 - -

    - u/Pek.Tambahan BP.1500 2,381.00 - -

    1,326.00 - - -

    u/Raf Foundation 9,250.00 - - -

    u/Pek.Bore Pile BP.1500 & 1000 3,900.00 - -

  • - u/Pek.Kolom dari groun s/d bsm 4 993.00 507.00 38,390.04

    1,332.00 1,368.00 63,201.60 -

    u/Pek.Kolom dari lt Bsm 4 s/d Gf 3,600.00 - - 8,800.00 - -

    - u/Pek.Dinding Sher Wall Bsm 4 s/d 1,000.00 - -

    2,299.00 2,401.00 64,250.76 - 1,296.00 98,133.12

    - u/Raf Foundation - 17,478.00 1,323,434.16

    - u/Peb.Slab Podium 312.00 - -

    150.00 - - 4,378.00 - - 4,258.00 - - 2,247.00 - -

    u/Raft Foundation 30,875.00 2,277.00 172,414.44 -

    u/Pek Pemb.Area Podium 250.00 - 447.00 - 375.00 -

    - 265.00 -

    - u/Pemb.Pondasi Pit Lift 293.00 - -

    68.00 - - 62.00 - - 26.00 - - 262.00 -

    - u/Pek Slab Podium & Rettining Wall 312.00 - -

    300.00 - - 200.00 - - 200.00 - - 1,340.00 - -

    - - u/Pemb.Slab Podium 450.00 - -

    500.00 - - - -

    2,280.00 - - 4,201.00 - - 857.00 - - 2,900.00 - -

  • 27,415.00 - - 1,542.00 - - 6.00 - -

    - - 2,070.00 - - 4,260.00 - - 790.00 - - 3,080.00 - - 25,770.00 - - 2,010.00 - -

    - - 2,400.00 - - 200.00 - - - -

    u/Parameter Beam B3 s/d B1 2,850.00 - u/Facing Wall B4 - GF 4,640.00 - -

    1,050.00 - -

    1,200.00 - Pek Tangga B4 - Gf 2,100.00 - -

    2,500.00 - - 310.00 -

    - 1,470.00 - 11,300.00 - - 2,280.00 - - 970.00 - 1,050.00 - -

    903.00 1,100.00 - - 47.00 - -

    - 785.00 - -

    Periode 30 Juni 31 Juli 07 28,283.00 - - 3,599.00 - - 34,784.00 - - 10,360.00 - - 528.00 - - 1,925.00 - - 1,622.00 4,537.00 343,541.64

    - u/Pekerjaan Lt.6 & 7 tanpa besi Slab 70.00 - -

    8,855.00 - - 1,271.00 - - 1,147.00 - - 2,630.00 - -

  • 208.00 - - 1,009.00 - -

    1,043.00 78,975.96 - -

    u/Pemb.Lt 8 s/d 15 228.00 - - tidak termasuk pembesian slab 16,535.00 - -

    6,202.00 324.00 24,533.28 4,643.00 - - 9,706.00 - - 525.00 - - 8,241.00 - -

    1,943.00 147,123.96 - -

    u/Pemb.Lt 16 s/d 25 353.00 - - tidak termasuk pembesian slab 20,337.00 - -

    11,004.00 - - 5,073.00 - - 5,506.00 - - 281.00 - - 10,140.00 - - 853.00 1,948.00 147,502.56

    - 2,766.00 6,251.16 5,510.00 12,452.60 79,431.00 179,514.06 26,791.00 60,547.66 6,051.00 13,675.26 3,041.00 6,872.66 8,322.00 297,594.72 32,170.00 1,486,254.00 4,024.00 304,697.28

    SELISIH KG (terhadap Rea.) LP.10 MUTASI 2,766.00 2,160.00 5,745.60 5,510.00 12,494.64 9,718.00 46,063.32 1,508.00

  • 28,505.00 1,034,897.40 138,329.00 1,023,634.60 11,285.00 4,027.00 2,119,266.24 177,351.00 2,213,340.48 16,551.00 (2,140.00) 1,367,508.96 75,486.00 1,431,214.56 9,538.00 (17,936.00) 2,097,609.36 88,473.00 2,367,537.48 13,950.00 2,401.00 68,211.24 2,549.00 68,211.24 4,596.00 687,915.12 21,581.00 771,736.56 4,862.00 (10,981.00) 4,400,550.00 100,064.00 4,622,956.80 9,090.00 1,368.00 82,189.80 1,779.00 82,189.80 30,817.00 1,410,133.56 19,125.00 1,448,145.00 808.00 5,073.00 2,406,154.44 31,777.00 2,406,154.44

    15,686,930.76 16,486,929.88

  • 10 13 16.00 19.00 25 32 150,351.00 184,288.00 75,486.00 88,473.00 ### ###

    4,338.00 52,806.00 9,418.00 23,600.00 22,871.00 ###

    (146,013.00) ### (66,068.00) (64,873.00) ### ###

    324.00 477.00

    The Grove.324 The Grove.477

    1,441.00

    cukup

    0./

    15,000.00

  • 33,417.00

    6,226.00

    32,770.00

    22 500.00 17,880.00 19 450.00 12,042.00

    29,922.00

    5,090.00 Besi Ulir D-25 btg 2,280.00 2280 - 5,790.00 Besi Ulir D-22 btg 4,201.00 3061 1,140.00

    Besi Ulir D-19 btg 857.00 857 - Besi Ulir D-16 btg 2,887.00 1580 1,307.00

  • Besi Ulir D-13 btg 27,415.00 16366 ### 42.00 Besi Ulir D-10 btg 1,542.00 1542 - 2,010.00 Besi Ulir D-32 btg 6.00 6.00

    13,766.00 (13,649.00)

    3,050.00

    8/12 1,131.00 5/7 600.00

    2,002.00 53,573.52 1,858.00 66,442.08 1,145.00 52,899.00

    172,914.60 13 45,659.00 22 3,900.00

  • 650.00 650.00 209.00 650.00 600.00 650.00 650.00

    800.00

    650.00 291.00

    MUTASI

    7,147.92 2,636.00 -

  • 83,509.00 88,925.00 50,926.00 206,556.48 145,454.00 24,359.00 180,840.48 63,935.00 8,191.00 373,302.00 57,409.00 20,977.00

    173,865.12 15,511.00 3,726.00 419,958.00 52,099.00 43,151.00

    61,181.76 18,467.00 (156.00) 2,275.00

    1,506,360.76

  • Kepada Yth :PT. FAJAR RAYAJl.Danau Sunter BaratDi Jakarta

    PESANAN PEMBELIAN BARANGNo.13/SK/P3/PBI/PTK6/09

    Berdasarkan Surat Penawaran Sdr .Via Telepontgl, 24 Maret 2015 Kami Mengharap Agar Saudara dapatMengirimkan Barang-barang Seperti Tersebut Dibawah Ini:

    No Nama Barang Satuan/No.SC Sat. JumlahHarga Satuan Jumlah Harga

    ( Rp ) ( Rp )

    1 MINYAK BEKISTING LITER 14.00 7,000.00 98,000.00

    Sub Total : 98,000.00 Terbilang : Sembilan Juta Delapan ratus Sembilan Puluh Delapan Ribu Rupiah PPN 10% :Dua Ratus Empat Puluh Rupiah Total : 98,000.00 Tanggal Penyerahan : Tempat Penyerahan :tgl, 27 Maret 2015 PROYEK BAKRIE TOWER

    JL.RASUNA SAID KUNINGAN JAKARTA

    SPB:No:

    Dengan Syarat - Syarat Sebagai Berikut : 1. Mutu Barang : Sesuai Dengan Contah Atau Standar Yang Telah Ditentukan Dan Memperhatikan

    2. Penyerahan Barang : Penjual Menjamin Bahwa barang Diserahkan Dalam Keadaan Baik Dan Lengkap3. Sanksi : a. Apabila Penjual Terlambat Menyerahkan Barang Tersebut Diatas,Maka Penjual

    Dikenakan Denda 0,1%(Satu Permil) dari Nilai barang Terlambat Dikirim Per- hari,Maksimum 5%(Lima Persen)dari Nilai Pesanan,Kecuali Terjadi Force Majeure.: b. Apa Bila Barang Yang Dikirim Tidak Sesuai Pasal 1 Tersebut Diatas Atau Ter- dapat Kerusakan / Cacat,Maka Penjual Akan Mengganti Dengan Barang Yang Sama Dalam WaktuSatu Hari Sejak Tanggal Pesanan Ini.

    4. Pembayaran : a. Pembayaran Dilaksanakan Berdasarkan Tagihan Penjualan Yang Dilampiri Dengan Pesanan Pembelian Barang (P3)Dan Berita Acara Penerimaan/ Penyerahan.: b. Pembayaran Dilakukan, 60 Hari Setelah invoice diterima dan barang dikirim

    5. Lain -Lain : . . .

    Jakarta, 24 Maret 2015Setuju Mengirim Barang-Barang Hormat KamiDegan Syarat-Syarat Tersebut PT.HUTAMA KARYA (Persero)

    PT. FAJAR RAYA

    HARTONO Ir.Fachrizal NaikemManager Logistik

    Persyaratan Mutu K3 Dan Lingkungan.

  • BUKU REGISTER PENERIMAAN BAHAN

    NO TANGGAL NO.P4 NO.SPB NAMA BARANG SAT. VOL. H.SAT.

    1 27-03-2015 875/P4-BT/3/15 001/P1-BT/3/15 MINYAK BEKISTING LITER 14.00 7000.000

    2 01-06-2015 876/P4-BT/6/15 002/P1-BT/6/15 MINYAK BEKISTING LITER 14.00 7000.000

  • BUKU REGISTER PENERIMAAN BAHAN

    STOCK

    HARI INI S/D HR INI SUPPLIER

    0 14 PT. FAJAR RAYA

    2 16 PT. FAJAR RAYA

  • Form P-4

    BERITA ACARA PENERRIMAAN / PENYERAHAN BARANGNomor :.

    Pengirim :.. Order Pembelian :..Alamat :. Tanggal :..

    :. Faktur No :..No.Kendaraan :. Tanggal :..

    NO NAMA BARANG/BAHAN SAT. JUMLAH JUMLAHKETERANGAN

    BAIK RUSAK HILANG

    Jakarta,

    Mengetahui : Yang Menyerahkan : Penerima Barang :

    (---------------------------- ) '(-----------------------------) (---------------------)

  • KARTU GUDANGNAMA BARANG : MINYAK BEKISTINGSATUAN : LITERHARGA SATUAN :Rp.7000,00

    HALAMAN :

    TANGGALPENERIMAAN PENGELUARAN SALDO

    KETERANGANHARI INI S/D HR INI HARI INI S/D HR INI HAI INI

    27-03-2015 14 14 2 2 12

    03-04-2015 0 14 2 4 8

    20-04-2015 0 14 2 6 6

    03-05-2015 0 14 2 8 4

    17-05-2015 0 14 2 10 2

    01-06-2015 14 28 0 10 16

  • SCHEDULE PENGIRIMAN MATERIAL DRYMIXPROYEK BAKRIE TOWER

    NO URAIAN SAT. VOLUME STATUSSCHEDULE PENGIRIMAN

    TOTAL SALDOPERIODE TGL, 31 Mei s/d 7 Juni 200831 2 3 4 5 6 7

    1Skimcoat zak 100.00

    Renc. 100.00 100.00 - Real. 100.00 100.00 -

    @ 30 kg Kg 3,000.00 - - - - - 3,000.00 - 3,000.00

    2Thinbed 101 zak 137.00

    Renc. 37.00 50.00 ### 137.00 - Real. 37.00 50.00 ### 137.00 -

    @ 40 kg Kg 5,480.00 - 1,480.00 - 2,000.00 - 2,000.00 - 5,480.00

    3Concrete Fill zak 100.00

    Renc. 50.00 ### 100.00 - Real. 50.00 ### 100.00 -

    @ 40 kg Kg 4,000.00 - - - 2,000.00 - 2,000.00 - 4,000.00

    4Plesteran zak 2,920.00

    Renc. 480.00 360.00 480.00 320.00 480.00 320.00 480.00 2,920.00 Real. 320.00 390.00 480.00 320.00 480.00 320.00 480.00 2,790.00 130.00

    @ 50 kg Kg 146,000.00 24,000.00 18,000.00 24,000.00 16,000.00 24,000.00 16,000.00 24,000.00 146,000.00

    5Acian zak 217.00

    Renc. 100.00 100.00 17.00 217.00 Real. 100.00 100.00 17.00 217.00 -

    @ 30 kg Kg 6,510.00 - 3,000.00 - 3,000.00 - 510.00 - 6,510.00

    164,990.00 24,000.00 22,480.00 24,000.00 23,000.00 24,000.00 23,510.00 24,000.00 164,990.00

    Jakarta, 30 Mei 2008Dibuat oleh :

    Ir.Zaim SusiloManager Logistik

  • PT.HUTAMA KARYAPROYEK BAKRIE TOWER

    NO URAIAN SAT. VOLUMESTATUS

    SCHEDULE PENGIRIMANTOTAL SALDOPERIODE TGL, 15 MEI 2008 s/d 30 MEI 2008

    TANGGAL 15 16 17 19 21 22 23 24 26 27 28 29 30

    1 AEROBLOK M3 499.20

    Renc. 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 499.20 - Real. -

    - TOTAL #REF! 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 499.20

    Jakarta, 14 Mei 2008Dibuat oleh :

    Ir.Zaim SusiloManager Logistik

    SPBporekap spborderbk reg.penP-4KARTU GUDANGSCH DRYMIXSCH EARPBLOK