Kapasitas Produksi
Produksi Mi 3 shift 23 jam; 24 hari
2 line
1 jam 3 batch x @ 250 kg = 750 kg
250 kg 288 kg
1% x 288 = 5,76 § 6
282 kg
@ 65 gram = 4.338 pcs/batch
4.338 pcs x 3 batch x 2 line x 23 jam = 598.644 pcs/hari
= 14.367.456 pcs/bulan
= 172.409.472 pcs/tahun
= 11.2056,62 ton/tahun
Produksi Bumbu 1 line (23 jam; 24 hari)
Jumlah bumbu/batch = 398 kg
1 hari = 30 batch
Jumlah bumbu / pcs = 19,5 gram
Jumlah bumbu/hari = 11.940 kg
2 % x 11.940 kg = 238,8 kg
11.701,2 kg/hari = 600.061 pcs/hari
Kapasitas Steaming.
Jumlah untaian mi/batch/line sebsar 322,1 kg
Dalam satu jam terdapat 3 batch dan mesin berjalan selama 23 jam sehari.
Mesin steaming berjumlah dua buah dengan panas yang dihasilkan oleh sebuah
boiler.
Jumlah untaian mi per hari = 332,1 kg x 2 x 3 x 23
= 44.449,8 kg
5/13/2018 Perhitungan kapasitas - slidepdf.com
http://slidepdf.com/reader/full/perhitungan-kapasitas 2/4
89
Q steaming = m . c . t
= 44.449,8 kg x 1949,79 J/KgºC x (37-30) ºC
= 606.658,8714 kJ
Efisiensi alat 80%
Jadi kebutuhan panas untuk steam :
Perubahan kalor dari suhu 30-110 ºC
Suhu awal boiler = 30ºC
Suhu akhir steam = 110ºC
Kapasitas kalor spesifik (tabel)
Hfg 110 = 2230 kJ/kg
Hf 30 = 125,7 kJ/kg
Kebutuhan kalor untuk mengubah suhu dari 30ºC menjadi 110ºC:
2230 kJ/kg ± 125,7 kJ/kg = 2.104,03 kJ/kg
Kebutuhan steam/hari =
= 360,368 kg
Jumlah panas boiler:
Q = m . Hfg + m . Cp . t
= 360,368 kg x 2230kJ/Kg + 360,368kg x 4148 J/kg ºC x (110-30) ºC
= 803.620,64 kJ + 119.584,5171 kJ
= 923.205,1571 kJ
Kapasitas kalor batu bara 4000 kkal/kg atau 16.744 kJ/kg
Kebutuhan batubara =
= 55,136 kg batubara
Kebutuhan batubara tiap bulan = 55,136 x 25
5/13/2018 Perhitungan kapasitas - slidepdf.com
http://slidepdf.com/reader/full/perhitungan-kapasitas 3/4
90
= 1.378,4 kg § 1.380 kg
Kebutuhan listrik 1 bulan
Kebutuhan (KWh) = daya (KW) x jumlah line(2) x jam (23) x hari (24)
Conveyor = 0,8 x 2 x 23 x 24 = 883,2 KWh
Fryer = 40 x 2 x 23 x 24 = 44.298 KWh
Kipas = 0,2 x 2 x 23 x 24 = 220,8 KWh
Mixer = 7,5 x 2 x 23 x 24 = 8.280 KWh
Packer = 1,5 x 8 x 23 x 24 = 6.624 KWh
Cutting = 7,5 x 2 x 23 x 24 = 8.280 KWh
Screw = 1 x 2 x 23 x 24 = 1.104 KWh
Hopper = 0,5 x 2 x 23 x 24 = 552 KWh
Feeder = 2,2 x 2 x 23 x 24 = 2.428,8 KWh
DCM = 1,5 x 2 x 23 x 24 = 1.656 KWh
Roll = 2 x 2 x 23 x 24 = 2.208 KWh
Folder = 2,2 x 2 x 23 x 24 = 2.428,8 KWh
Total = 78.963,6 KWh
Produksi Bumbu :
Cooling = 8 x 23 x 24 = 4.416 KWh
Filling = 4 x 23 x 24 = 2.208 KWh
Conveyor = 0,8 x 23 x 24 = 441,6 KWh
Total = 7.065,6 KWh
Kebutuhan listri total :
Kantor = 25.000 KWh
Gudang = 5.000 KWh
Mushola = 500 KWh
Kantin = 500 KWh
Fasilitas lain = 1.000 KWh
Proses Bumbu = 7.065 KWh
Proses Mi = 78.963,6 KWh
Pompa = 1.800 KWh
Total = 118.868,8 KWh
5/13/2018 Perhitungan kapasitas - slidepdf.com
http://slidepdf.com/reader/full/perhitungan-kapasitas 4/4
91
Harga listrik selama sebulan per KWh Rp.900
Maka jumlah pengeluaran untuk listrik selama sebulan:
118.868,8 KWh x Rp. 900 = Rp. 106.981.920
Komposisi Bumbu Pasta
No. BumbuJumlah per Batch Jumlah per
Bulan
HargaHarga
(%) (kg) per kg
1 Bubuk bawang putih 0,91 3.621 2607.12 15000 3910680
2 Bubuk bawang merah 1,52 6.049 4355.28 12000 5226336
3 Bubuk ketumbar 0,76 3.024 2177.28 9000 1959552
4 Bubuk kunyit 0,91 3.621 2607.12 7500 1955340
5 Bubuk jahe 0,91 3.261 2347.92 10000 23479206 Bubuk kemiri 0,30 1.194 859.68 5000 429840
7 Bubuk merica 0,38 1.512 1088.64 8000 870912
8 Garam 0,76 3.024 2177.28 1950 424569
9 Kecap asin 30,45 121.191 87257.52 15000 130886280
10 Kecap manis 5,18 20.616 14843.52 25000 37108800
11 Kecap inggris 3,04 12.099 8711.28 27000 23520456
12 Penguat rasa 3,81 15.163 10917.36 5000 5458680
13 Pengawet 0,06 0.238 171.36 54000 925344
14 Minyak ayam 31,0 123.380 88833.6 7500 66625200
15 Kaldu ayam 20 79.600 57312 3200 18339840299989749