PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI BARAT SURABAYA DENGAN BOX CULVERT AHMAD RIFDAN NUR 3111030004 MUHAMMAD ICHWAN A 3111030101 Disusun Oleh : Dr.Ir. Kuntjoro,MT NIP: 19580629 1987031 002 Dosen Pembimbing

Transcript of PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan :...

Page 1: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI BARAT SURABAYA DENGAN

BOX CULVERT

• AHMAD RIFDAN NUR 3111030004

• MUHAMMAD ICHWAN A 3111030101

▪ Disusun Oleh :

Dr.Ir. Kuntjoro,MT NIP: 19580629 1987031 002

Dosen Pembimbing

Page 2: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

LATAR BELAKANG RUMUSAN MASALAH

TUJUAN DAN MANFAAT BATASAN MASALAH

METEDOLOGI ANALISA

KESIMPULAN

Page 3: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV
Page 4: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

LOKASI STUDI

Page 5: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Skema jaringan

Page 6: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

• Apakah kapasitas saluran eksisting dapat menampung debit banjir ?

• Berapa besar dimensi saluran yang diperlukan agar dapat menampung debit banjir yang terjadi ?

• Berapa besar debit yang direncanakan pada daerah studi ?

• Berapa besar dimensi saluran yang diperlukan agar dapt menampung debit banjir yang tinggi

Page 7: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

• Mengatasi masalah genangan di daerah Gayungsari kota Surabaya

• Mengevaluasi kondisi jaringan drainase eksisting daerah Gayungsari secara teknis

• Merencanakan ulang saluran drainase apabila saluran drainase yang ada tidak mampu menampung debit air yang ada

TUJUAN

Page 8: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

• Manfaat dari penulisan Laporan Proyek Akhir ini adalah untuk mengatasi masalah genangan banjir yang terjadi di daerah Gayungsari Kota Surabaya.

• Diharapkan dari proyek akhir ini didapatkan perencanaan dan bisa digunakan pemerintah untuk mengatasi banjir di sistem drainase Gayungsari Barat kota Surabaya.

MANFAAT

Page 9: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

• Perhitungan analisa hidrolgi untuk mencari besar debit banjir yang terjadi dengan menggunakan metode Rasional

• Perhitungan debit yang terjadi hanya dari air hujan berdasarkan hujan yang terjadi di kawasan tersebut

• Perhitungan kapasitas saluran eksisting dengan debit rencana untuk periode ulang 10 tahunan(saluran primer), 5 tahunan (saluran sekunder), 2 tahunan (saluran tersier)

Page 10: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Flow chart

Page 11: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

analisa

HIDROLOGI HIDROLIKA

Page 12: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

HIDROLOGI

DEBIT BANJIR RENCANA

HIDROGRAF METODE

NAKAYASU

Page 13: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

HIDROLIKA

FULLBANK CAPACITY

Redesign DENGAN BOX CULVERT

Page 14: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

1. Curah Hujan Rata-rata Harian 2. Curah Hujan Maksimum 3. Uji Kecocokan 4. Intensitas Hujan 5. Waktu konsentrasi (𝒕𝒄) 6. Debit Rencana

hidrologi

Page 15: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

1. Menghitung kapasitas eksisting saluran (fullbank capacity)

2. Merencanakan redesign saluran dengan Box Culvert

hidrolika

Page 16: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

∗ Metode Aritmatik

CURAH HUJAN RATA-RATA HARIAN

Page 17: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

∗ METODE GUMBEL

CURAH HUJAN MAKSIMUM

METODE DISTRIBUSI NORMAL

METODE LOG PERSON TYPE III

Page 18: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

UJI KECOCOKAN DISTRIBUSI HUJAN

UJI CHI-SQUARE

𝑋2 =∑ 𝑓0 − 𝑓𝑒 ²

𝑓𝑒

UJI SMIRNOV-KOLMOGOROV

Page 19: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

PERHITUNGAN INTENSITAS HUJAN

Page 20: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Tc = t0 +tf Dimana : to : overland flow time ( inlet time ) ,waktu yang diperlukan air hujan mengalir di permukaan untuk sampai di inlet ( jam ) ∗ tf : channel flow time, waktu yang diperlukan air mengalir sepanjang

saluran sampai di outlet ( jam ) Rumus Kirpich

WAKTU KONSENTRASI (Tc)

𝑡0 = 0,0195 𝐿𝐼

0,77

menit

𝒕𝒕 =𝑳𝑽𝒙 𝟑𝟑𝟑𝟑 ( 𝒋𝒋𝒋 )

▪ Dimana :

▪ L : Panjang saluran ( m )

▪ V : Kecepatan air pada saluran ( m/dt )

Page 21: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

∗ Menggunakan metode rasional Q = 0.278 x β x C x It x A Dimana : Q = debit rencana pada periode ulang tertentu

(m3/det) β = koefisien penyebaran hujan C = koefisien pengaliran It = intesitas hujan (mm/jam) pada periode ulang

tertentu A = luas daerah pelayanan / pengaliran (km²)

PERHITUNGAN DEBIT RENCANA

Page 22: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

∗ Menggunakan Rumus Manning

KECEPATAN (V)

𝑉 =1𝑛𝑅2

3⁄ . 𝐼1 2⁄ ……………..………...………..…..(2.39)

Dimana :

V = Kecepatan aliran (m/det)

n = Koefisien kekasaran dinding dan dasar saluran

R = Jari- jari hidrolis saluran = 𝐴𝑃

(m)

I = Kemiringan dasar saluran

Page 23: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

DEBIT BANJIR RENCANA Penentuan Sta.

Hujan C.H. Harian Maksimal

Parameter Statistik

Curah Hujan Rencana

Uji Distribusi

Intensitas Hujan

Koefisien Pengaliran Debit Banjir Rencana

Page 24: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

∗ Data Curah Hujan Harian Maksimum Sta. Kebonagung

Curah hujan harian maksimum

Page 25: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

∗ Perhitungan Parameter Statistik

Parameter statistik

No Tahun R 1 2001 117

103.3

13.68 187.14 2560.11 35022.28 2 1995 115 11.68 136.42 1593.41 18611.07 3 2012 114 10.68 114.06 1218.19 13010.23 4 1992 112 8.68 75.34 653.97 5676.48 5 1984 110 6.68 44.62 298.08 1991.16 6 1988 110 6.68 44.62 298.08 1991.16 7 1989 110 6.68 44.62 298.08 1991.16 8 1999 110 6.68 44.62 298.08 1991.16 9 2000 110 6.68 44.62 298.08 1991.16 10 2010 109 5.68 32.26 183.25 1040.86 11 1990 105 1.68 2.82 4.74 7.97 12 1991 105 1.68 2.82 4.74 7.97 13 2002 105 1.68 2.82 4.74 7.97 14 2005 105 1.68 2.82 4.74 7.97 15 1985 101 -2.32 5.38 -12.49 28.97 16 2007 100 -3.32 11.02 -36.59 121.49 17 2006 98 -5.32 28.30 -150.57 801.03 18 1987 97 -6.32 39.94 -252.44 1595.40 19 1993 97 -6.32 39.94 -252.44 1595.40 20 1994 97 -6.32 39.94 -252.44 1595.40 21 2011 97 -6.32 39.94 -252.44 1595.40 22 2013 95 -8.32 69.22 -575.93 4791.74 23 2004 92 -11.32 128.14 -1450.57 16420.47 24 1997 87 -16.32 266.34 -4346.71 70938.27 25 1986 85 -18.32 335.62 -6148.60 112642.40 26 2008 85 -18.32 335.62 -6148.60 112642.40 27 1998 80 -23.32 543.82 -12681.94 295742.80 28 2009 76 -27.32 746.38 -20391.17 557086.69 29 2003 75 -28.32 802.02 -22713.27 643239.93 30 1996 72 -31.32 980.94 -30723.12 962247.99

Jumlah 2971 -128.6 5192.232 -98671.01984 2866434.339

R ̅ (R−R ̅) (R−R ̅)² 〖(R−R ̅)〗^3 〖(R−R ̅)〗^4

Page 26: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Parameter statistik Data Hasil

Parameter Statistik Distribusi

Normal Log Normal Gumbel Log Person Type III

103.320 Cv & Ck

Sd 13.381 Selain

Cv 0.130 Nilai

Cs -1.522 0 0.391 1.139 Distribusi

Ck 3.671 3 3.273 5.402 Lain

Keterangan Tidak Diterima Tidak Diterima Tidak Diterima Diterima

R ̅

Didapat hasil perhitungan : 𝑅� = 103,320mm Sd = 13,381 Cv = 0,130 Cs = -1,522 Ck = 3,671 Cs Log Normal = 0,391 Ck Log Normal = 3,273

Page 27: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Parameter statistik

No Tahun R LogR

1 2001 117 2.07 0.08 0.0058 0.0004 2 1995 115 2.06 0.07 0.0047 0.0003 3 2012 114 2.06 0.06 0.0042 0.0003 4 1992 112 2.05 0.06 0.0033 0.0002 5 1984 110 2.04 0.05 0.0024 0.0001 6 1988 110 2.04 0.05 0.0024 0.0001 7 1989 110 2.04 0.05 0.0024 0.0001 8 1999 110 2.04 0.05 0.0024 0.0001 9 2000 110 2.04 0.05 0.0024 0.0001 10 2010 109 2.04 0.05 0.0021 0.0001 11 1990 105 2.02 0.03 0.0008 0.0000 12 1991 105 2.02 0.03 0.0008 0.0000 13 2002 105 2.02 0.03 0.0008 0.0000 14 2005 105 2.02 0.03 0.0008 0.0000 15 1985 101 2.00 0.01 0.0001 0.0000 16 2007 100 2.00 0.01 0.0001 0.0000 17 2006 98 1.99 0.00 0.0000 0.0000 18 1987 97 1.99 -0.01 0.0000 0.0000 19 1993 97 1.99 -0.01 0.0000 0.0000 20 1994 97 1.99 -0.01 0.0000 0.0000 21 2011 97 1.99 -0.01 0.0000 0.0000 22 2013 95 1.98 -0.01 0.0002 0.0000 23 2004 92 1.96 -0.03 0.0008 0.0000 24 1997 87 1.94 -0.05 0.0028 -0.0001 25 1986 85 1.93 -0.06 0.0039 -0.0002 26 2008 85 1.93 -0.06 0.0039 -0.0002 27 1998 80 1.90 -0.09 0.0079 -0.0007 28 2009 76 1.88 -0.11 0.0124 -0.0014 29 2003 75 1.88 -0.12 0.0137 -0.0016 30 1996 72 1.86 -0.13 0.0182 -0.0024

Jumlah 2971 59.76 0.00 0.0997 -0.0048

Perhitungan parameter statistik data Metode Log Person Type III

Page 28: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Parameter statistik

Dari perhitungan parameter menggunakan Metode Log Person Type III mendapatkan hasil:

𝐿𝐿𝐿𝑅 = 1,99 𝑆𝑆𝐿𝐿𝐿𝑅 = 0,06

Cs = -0,88 Cv = 0,0294

Page 29: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Uji distribusi

UJI CHI-KHADRAT

UJI SMIRNOV-KOLMOGOROV

Page 30: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

UJI CHI-KUADRAT

Diperoleh Hasil Hitungan : Cs = -0,88 n = 30 Jumlah Kelas (G) = 5,91 Peluang Interval (P) = 0,2 𝑅� = 103,3 S = 13,38 Kelas (K) = 5,907≈ 6 Derajat Kebebasan (DK) = 3 α = 0,05 X² = 7,815

Perhitungan Faktor Distribusi

Probabilitas Periode Ulang Xrata-rata Sd K Log R R

0.2 1.25 1.99 0.06 -2.15815 1.863 73.03 0.4 1.666667 1.99 0.06 -0.87567 1.939 86.83 0.6 2.5 1.99 0.06 0.252667 2.005 101.11 0.8 5 1.99 0.06 0.132 1.998 99.52

No Interval Jumlah data Oi - Ei

sub kelompok Oi Ei 1 R ≤ 73.026 8 6 2 0.667 2 73.026 - 86.829 1 6 -5 4.167 3 86.829 - 101.114 6 6 0 0.000 4 101.114 - 99.522 6 6 0 0.000 5 R ≥ 99.522 9 6 3 1.500

Jumlah 30 30 6.333

Dari perhitungan diperoleh : Xh²= 6,333 X² = 7,815 Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima

Page 31: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

UJI SMIRNOV-KOLMOGOROV Diperoleh Hasil Hitungan : 𝐿𝐿𝐿𝑅 = 1,99 𝑆𝑆𝐿𝐿𝐿𝑅 = 0,06 D0 = 0,248 D max = 0,175

Kesimpulan : Karena hasilnya D0 > D max ,maka metode LP Type III dapat diterima

No Tahun R Log R P(X) P(X<) F(t) P'(X) P'(X<) D

1 2001 117 2.068186 0.032258 0.967742 1.297867 0.1038 0.8962 -0.071542

2 1995 115 2.060698 0.064516 0.935484 1.17014 0.1271 0.8729 -0.062584

3 2012 114 2.056905 0.096774 0.903226 1.10544 0.1401 0.8599 -0.043326

4 1992 112 2.049218 0.129032 0.870968 0.974322 0.1711 0.8289 -0.042068

5 1984 110 2.041393 0.16129 0.83871 0.84084 0.1711 0.8289 -0.00981

6 1988 110 2.041393 0.193548 0.806452 0.84084 0.1711 0.8289 0.022448

7 1989 110 2.041393 0.225806 0.774194 0.84084 0.2033 0.7967 0.022506

8 1999 110 2.041393 0.258065 0.741935 0.84084 0.2033 0.7967 0.054765

9 2000 110 2.041393 0.290323 0.709677 0.84084 0.2033 0.7967 0.087023

10 2010 109 2.037426 0.322581 0.677419 0.773187 0.2236 0.7764 0.098981

11 1990 105 2.021189 0.354839 0.645161 0.496219 0.3085 0.6915 0.046339

12 1991 105 2.021189 0.387097 0.612903 0.496219 0.3085 0.6915 0.078597

13 2002 105 2.021189 0.419355 0.580645 0.496219 0.3085 0.6915 0.110855

14 2005 105 2.021189 0.451613 0.548387 0.496219 0.3085 0.6915 0.143113

15 1985 101 2.004321 0.483871 0.516129 0.208493 0.3085 0.6915 0.175371

16 2007 100 2 0.516129 0.483871 0.134781 0.4404 0.5596 0.075729

17 2006 98 1.991226 0.548387 0.451613 -0.01488 0.496 0.504 0.052387

18 1987 97 1.986772 0.580645 0.419355 -0.09086 0.496 0.504 0.084645

19 1993 97 1.986772 0.612903 0.387097 -0.09086 0.5199 0.4801 0.093003

20 1994 97 1.986772 0.645161 0.354839 -0.09086 0.5199 0.4801 0.125261

21 2011 97 1.986772 0.677419 0.322581 -0.09086 0.5199 0.4801 0.157519

22 2013 95 1.977724 0.709677 0.290323 -0.2452 0.5793 0.4207 0.130377

23 2004 92 1.963788 0.741935 0.258065 -0.48291 0.6628 0.3372 0.079135

24 1997 87 1.939519 0.774194 0.225806 -0.89687 0.7939 0.2061 -0.019706

25 1986 85 1.929419 0.806452 0.193548 -1.06916 0.7939 0.2061 0.012552

26 2008 85 1.929419 0.83871 0.16129 -1.06916 0.8389 0.1611 -0.00019

27 1998 80 1.90309 0.870968 0.129032 -1.51827 0.9222 0.0778 -0.051232

28 2009 76 1.880814 0.903226 0.096774 -1.89825 0.9625 0.0375 -0.059274

29 2003 75 1.875061 0.935484 0.064516 -1.99637 0.9693 0.0307 -0.033816

30 1996 72 1.857332 0.967742 0.032258 -2.29878 0.9846 0.0154 -0.016858

max 0.17537

Page 32: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Curah hujan rencana Diperoleh Hasil Hitungan : 𝐿𝐿𝐿𝑅 = 1,99 𝑆𝑆𝐿𝐿𝐿𝑅 = 0,06 Cs = -0,88 Perhitungan Curah Hujan Rencana Metode Log Person Type III

Periode Curah Standart Faktor Hujan harian Hujan harian

Ulang rata-rata

deviasi distribusi

maksimum maksimum

( T ) ( Log R ) ( K ) ( Rt )

2 1.99 0.06 0.128 1.998 99.43

5 1.99 0.06 0.856 2.040 109.69

10 1.99 0.06 1.169 2.059 114.43

Page 33: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Intensitas Hujan Perhitungan Intensitas Hujan Metode Mononobe

Nama Saluran Jenis Saluran L A L0

I0 R2 R5 R10 t0 V tf tc I (mm/jam)

(m) (m²) (m) (mm) (mm) (mm) (jam) (m/det) (jam) (jam) 2 Tahun 5 Tahun 10 Tahun

99.43 109.69 114.43

Sal. GayungSari Barat 8 Tersier 203.505 74737.521 235.876 0.0058967 0.157 3.309 0.017 0.175 112.192 123.777 129.119

Sal. GayungSari Barat 8A Tersier 192.175 170661.951 376.839 0.0062443 0.221 3.425 0.016 0.237 91.525 100.977 105.334

Sal. GayungSari Barat 7 Tersier 201.318 66318.309 211.477 0.0059607 0.144 3.331 0.017 0.161 118.454 130.686 136.326

Sal. Gayungan II Tersier 154.159 78164.591 157.775 0.0077842 0.104 3.909 0.011 0.115 148.577 163.920 170.994

Sal. YKP Tersier 154.159 132459.459 205.352 0.0077842 0.127 3.909 0.011 0.138 131.235 144.786 151.035

Sal. Gayungan Sekunder 1031.733 522341.831 124.956 0.0011631 0.180 1.249 0.229 0.410 63.337 69.877 72.893

Sal. Gayungan - A.Yani Tersier 520.9 239792.795 426.705 0.0023037 0.357 1.883 0.077 0.434 60.965 67.260 70.163

Sal. Gayungan Peternakan 2 Sekunder 243.667 239792.795 205.971 0.0049248 0.152 2.970 0.023 0.175 112.070 123.643 128.979

Sal. Cipta Menanggal Blok B Tersier 333.208 260230.268 406.934 0.0036014 0.290 2.462 0.038 0.327 73.621 81.223 84.729

Sal. GayungSari Barat Tersier 309.623 192532.673 337.91 0.0038757 0.244 2.572 0.033 0.278 82.229 90.720 94.635

Sal. Menanggal 4 Tersier 257.961 118523.788 134.38 0.0046519 0.112 2.870 0.025 0.137 132.071 145.709 151.997

Sal. Gayungan 8 Tersier 244.233 162919.061 181.377 0.0049133 0.138 2.966 0.023 0.161 118.502 130.739 136.382

Sal. Gayungsari 14 Tersier 370.889 98841.165 289.401 0.0032355 0.232 2.308 0.045 0.277 82.361 90.866 94.787

Sal. Gayungan Peternakan 1 Sekunder 1632.402 1595181.581 167.3 0.0007351 0.269 0.949 0.478 0.747 42.342 46.714 48.730

Sal. Gayungsari Barat 1 Tersier 125.608 57936.14 163.989 0.0095535 0.099 4.420 0.008 0.107 155.982 172.089 179.516

Sal. Gayungsari Barat 3 Tersier 410.123 168796.313 172.268 0.0029260 0.162 2.173 0.052 0.214 97.773 107.869 112.524

Sal. Gayungsari Barat 2 Tersier 114.521 69094.941 152.258 0.0104784 0.090 4.672 0.007 0.097 166.423 183.608 191.532

Sal. Gayung Kebonsari Dalam Tersier 114.521 120691.218 166.048 0.0104784 0.096 4.672 0.007 0.103 159.629 176.113 183.713

Sal. Gayungsari 7 Tersier 114.521 126793.145 169.927 0.0104784 0.098 4.672 0.007 0.105 157.862 174.163 181.679

Sal. Gayungsari 12 Tersier 472.568 151555.917 72.685 0.0025393 0.088 1.996 0.066 0.154 122.146 134.759 140.574

Sal. Gayungsari 13 Tersier 92.634 51267.608 349.098 0.0129542 0.157 5.306 0.005 0.162 117.876 130.048 135.661

Sal. GayungSari Sekunder 2272.531 2341316.863 195.329 0.0005280 0.345 0.778 0.811 1.156 31.607 34.871 36.376

Sal. Kebonsari Baru 1 Tersier 210.093 70984.666 77.802 0.0057118 0.068 3.246 0.018 0.086 180.503 199.143 207.737

Sal. Kebonsari ELVEKA 4 Tersier 650.941 130325.63 106.373 0.0018435 0.133 1.647 0.110 0.243 89.830 99.106 103.383

Sal. Kebonsari ELVEKA 1 Tersier 109.837 3169.517 93.597 0.0109253 0.061 4.791 0.006 0.067 212.419 234.353 244.467

Sal. Kebonsari Sekunder 1599.189 204479.813 137.736 0.0007504 13.808 0.961 1664.939 1678.747 0.241 0.265 0.277

Page 34: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Koefisien Pengaliran Perhitungan koefisien pengaliran

Nama Saluran Jenis Saluran L A Jalan Pemukiman RTH Jasa & Perdagangan C

(m) (m²) A (m²) 0.8 A (m²) 0.7 A (m²) 0.3 A (m²) 0.75

Sal. GayungSari Barat 8 Tersier 203.505 74737.521 9209.54 7367.632 65527.981 45869.59 0 0 0 0 0.712

Sal. GayungSari Barat 8A Tersier 192.175 170661.951 22581.511 18065.21 148080.440 103656.3 0 0 0 0 0.713

Sal. GayungSari Barat 7 Tersier 201.318 66318.309 10228.652 8182.922 56089.657 39262.76 0 0 0 0 0.715

Sal. Gayungan II Tersier 154.159 78164.591 18093.941 14475.15 60070.65 42049.46 0 0 0 0 0.723

Sal. YKP Tersier 154.159 132459.459 0 0 132459.46 92721.62 0 0 0 0 0.700

Sal. Gayungan Sekunder 1031.733 522341.831 60113.644 48090.92 462228.19 323559.7 0 0 0 0 0.712

Sal. Gayungan - A.Yani Tersier 520.9 239792.795 40019.286 32015.43 162480.02 113736 0 0 37293.49 27970.12 0.724

Sal. Gayungan Peternakan 2 Sekunder 243.667 239792.795 40019.286 32015.43 162480.02 113736 0 0 37293.49 27970.12 0.724

Sal. Cipta Menanggal Blok B Tersier 333.208 260230.268 36290.793 29032.63 160540.67 112378.5 0 0 63398.81 47549.11 0.726

Sal. GayungSari Barat Tersier 309.623 192532.673 38858.73 31086.98 153673.94 107571.8 0 0 0 0 0.720

Sal. Menanggal 4 Tersier 257.961 118523.788 4511.759 3609.407 114012.03 79808.42 0 0 0 0 0.704

Sal. Gayungan 8 Tersier 244.233 162919.061 20270.927 16216.74 142648.13 99853.69 0 0 0 0 0.712

Sal. Gayungsari 14 Tersier 370.889 98841.165 0 0 0 0 98841.16 29652.347 0 0 0.300

Sal. Gayungan Peternakan 1 Sekunder 1632.402 1595181.58 200065.139 160052.1 1195583 836908.1 98841.16 29652.347 100692.3 75519.23 0.691

Sal. Gayungsari Barat 1 Tersier 125.608 57936.14 0 0 57936.14 40555.3 0 0 0 0 0.700

Sal. Gayungsari Barat 3 Tersier 410.123 168796.313 10985.372 8788.298 157810.94 110467.7 0 0 0 0 0.707

Sal. Gayungsari Barat 2 Tersier 114.521 69094.941 16229.314 12983.45 52865.627 37005.94 0 0 0 0 0.723

Sal. Gayung Kebonsari Dalam Tersier 114.521 120691.218 16447.825 13158.26 40463.08 28324.16 0 0 63780.31 47835.23 0.740

Sal. Gayungsari 7 Tersier 114.521 126793.145 24428.394 19542.72 0 0 102364.8 30709.425 0 0 0.396

Sal. Gayungsari 12 Tersier 472.568 151555.917 11633.296 9306.637 0 0 139922.6 41976.786 0 0 0.338

Sal. Gayungsari 13 Tersier 92.634 51267.608 0 0 0 0 51267.61 15380.282 0 0 0.300

Sal. GayungSari Sekunder 2272.531 2341316.86 279789.34 223831.5 1504658.8 1053261 392396.1 117718.84 164472.6 123354.5 0.648

Sal. Kebonsari Baru 1 Tersier 210.093 70984.666 5565.616 4452.493 65419.05 45793.34 0 0 0 0 0.708

Sal. Kebonsari ELVEKA 4 Tersier 650.941 130325.63 6371.234 5096.987 123954.4 86768.08 0 0 0 0 0.705

Sal. Kebonsari ELVEKA 1 Tersier 109.837 25780.274 0 0 25780.274 18046.19 0 0 0 0 0.700

Sal. Kebonsari Sekunder 1599.189 227090.57 11936.85 9549.48 215153.72 150607.6 0 0 0 0 0.705

Page 35: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Debit Banjir Rencana Perhitungan Debit Banjir Rencana Metode Rasional

Nama Saluran Jenis Saluran I (mm/jam)

C A Qr (m³/det) Qr (m³/det)

2 Tahun 5 Tahun 10 Tahun (km²) 2 Tahun 5 Tahun 10 Tahun

Sal. GayungSari Barat 8 Tersier 112.192 123.777 129.119 0.712 0.07474 1.66043 2.57172 1.91095 1.66043

Sal. GayungSari Barat 8A Tersier 91.525 100.977 105.334 0.713 0.17066 3.09709 4.79073 3.56437 3.09709

Sal. GayungSari Barat 7 Tersier 118.454 130.686 136.326 0.715 0.06632 1.56239 2.40939 1.79812 1.56239

Sal. Gayungan II Tersier 148.577 163.920 170.994 0.723 0.07816 2.33472 3.56193 2.68697 2.33472

Sal. YKP Tersier 131.235 144.786 151.035 0.700 0.13246 3.38278 5.33157 3.89316 3.38278

Sal. Gayungan Sekunder 63.337 69.877 72.893 0.712 0.52234 6.54387 10.14690 7.53118 10.14690

Sal. Gayungan - A.Yani Tersier 60.965 67.260 70.163 0.724 0.23979 2.94428 4.48375 3.38851 2.94428

Sal. Gayungan Peternakan 2 Sekunder 112.070 123.643 128.979 0.724 0.23979 5.41238 8.24232 6.22898 8.24232

Sal. Cipta Menanggal Blok B Tersier 73.621 81.223 84.729 0.726 0.26023 3.86739 5.87603 4.45088 3.86739

Sal. GayungSari Barat Tersier 82.229 90.720 94.635 0.720 0.19253 3.16969 4.85572 3.64792 3.16969

Sal. Menanggal 4 Tersier 132.071 145.709 151.997 0.704 0.11852 3.06275 4.80106 3.52484 3.06275

Sal. Gayungan 8 Tersier 118.502 130.739 136.382 0.712 0.16292 3.82379 5.92138 4.40071 3.82379

Sal. Gayungsari 14 Tersier 82.361 90.866 94.787 0.300 0.09884 0.67893 2.49679 0.78136 0.67893

Sal. Gayungan Peternakan 1 Sekunder 42.342 46.714 48.730 0.691 1.59518 12.97314 20.71575 14.93048 20.71575

Sal. Gayungsari Barat 1 Tersier 155.982 172.089 179.516 0.700 0.05794 1.75860 2.77172 2.02393 1.75860

Sal. Gayungsari Barat 3 Tersier 97.773 107.869 112.524 0.707 0.16880 3.24148 5.06180 3.73054 3.24148

Sal. Gayungsari Barat 2 Tersier 166.423 183.608 191.532 0.723 0.06909 2.31279 3.52682 2.66174 2.31279

Sal. Gayung Kebonsari Dalam Tersier 159.629 176.113 183.713 0.740 0.12069 3.96364 5.90896 4.56165 3.96364

Sal. Gayungsari 7 Tersier 157.862 174.163 181.679 0.396 0.12679 2.20534 6.13898 2.53808 2.20534

Sal. Gayungsari 12 Tersier 122.146 134.759 140.574 0.338 0.15156 1.74140 5.67773 2.00414 1.74140

Sal. Gayungsari 13 Tersier 117.876 130.048 135.661 0.300 0.05127 0.50401 1.85350 0.58005 0.50401

Sal. GayungSari Sekunder 31.607 34.871 36.376 0.648 2.34132 13.33992 22.69725 15.35260 22.69725

Sal. Kebonsari Baru 1 Tersier 180.503 199.143 207.737 0.708 0.07098 2.52133 3.92983 2.90174 2.52133

Sal. Kebonsari ELVEKA 4 Tersier 89.830 99.106 103.383 0.705 0.13033 2.29411 3.59065 2.64024 2.29411

Sal. Kebonsari ELVEKA 1 Tersier 212.419 234.353 244.467 0.700 0.02578 1.06567 1.67959 1.22645 1.06567

Sal. Kebonsari Sekunder 0.241 0.265 0.277 0.705 0.22709 0.01071 0.01676 0.01233 0.01676

Page 36: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Hidrograf Satuan Sintetik Hidorgraf Satuan Sintetik Nakayasu Data Saluran Primer : Panjang sungai (L) = 2,273 km Luas DAS = 2,341 km2 C = 0,650 Hujan Satuan (R0) = 1 mm α = 2

Diperoleh Hasil : Tg = 0,373 Tr = 0,280 Tp = 0,60 T0,3 = 0,75 Qp = 0,456 m3/dt

Debit Puncak : Q2 = 29,290 m3/det Q5 = 32,415 m3/det Q10 = 33,834 m3/det Debit puncak terjadi pada menit ke 36

0.000

5.000

10.000

15.000

20.000

25.000

30.000

35.000

40.000

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5

Deb

it (m

3 /det

)

Waktu Konsentrasi (jam)

Hidrograf Banjir Metode Nakayasu Saluran Sekunder Gayungsari

Q2

Q5

Q10

Page 37: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Full Bank Capacity Perhitungan Full Bank Capacity menggunakan rumus Manning

Karena Q existing lebih besar dari Q rencana maka saluran aman atau tidak meluber

Saluran L

I n Jenis b h m A P R R2/3 V Q tampungan Q rencana

Kondisi (m) Saluran (m) (m) (m) (m²) (m) (m) (m) (m/det) (m³/det) (m³/det)

Sal. Gayungsari Barat 1 125.608 0.009553532 0.015 persegi 0.8 0.9 - 0.720 3.4 0.212 0.355 2.315 1.666834 1.758602 meluber

Sal. Gayungsari Barat 3 410.123 0.002925951 0.015 persegi 0.65 0.5 - 0.325 2.3 0.141 0.271 0.978 0.317953 3.241477 meluber

Sal. Gayungsari Barat 2 114.521 0.010478428 0.015 persegi 0.65 1.1 - 0.715 3.5 0.204 0.347 2.367 1.692472 2.312791 meluber

Sal. Gayung Kebonsari Dalam 114.521 0.010478428 0.015 persegi 0.6 0.6 0.36 2.4 0.150 0.282 1.927 0.693564 3.963636 meluber

Sal. Gayungsari 7 114.521 0.010478428 0.015 persegi 0.75 0.5 - 0.375 2.5 0.150 0.282 1.927 0.722463 2.205342 meluber

Sal. Gayungsari 12 472.568 0.002539317 0.015 persegi 0.8 0.65 - 0.52 2.9 0.179 0.318 1.068 0.555487 1.741405 meluber

Sal. Gayungsari 13 92.634 0.012954207 0.015 persegi 0.7 0.6 - 0.42 2.6 0.162 0.297 2.251 0.945252 0.504005 aman

Sal. Gayungsari 2272.531 0.00052804

6 0.25 trapesium 1.72 1 0.5 2.22 4.84 0.459 0.595 0.055 0.121396 22.69725 meluber

Sal. Kebonsari Baru 1 210.093 0.005711756 0.015 persegi 0.8 1 - 0.8 3.6 0.222 0.367 1.848 1.478797 2.521333 meluber

Sal. Kebonsari ELVEKA 4 650.941 0.001843485 0.015 persegi 0.6 0.9 - 0.54 3 0.180 0.319 0.913 0.492762 2.294115 meluber

Sal. Kebonsari ELVEKA 1 109.837 0.01092528 0.015 persegi 0.75 0.6 - 0.45 2.7 0.167 0.303 2.110 0.949664 1.06567 meluber

Sal. Gayung Kebonsari 1599.189 0.00075038 0.25 trapesium 3.8 1 0.5 4.3 6.92 0.622 0.728 0.080 0.343157 0.016758 aman

Page 38: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

Redesign dengan box culvert

No. NAMA Q rencana

Data Saluran eksisting Redesign

SALURAN I b h m n A

P R V Q ex I b h n A

P R V Q

1 Sal. Gayungsari Barat 1 1.758602 0.009554 0.8 0.9 -

0.015 0.72 3.400 0.212 2.315 1.7586 2.315047 1.3 1.5 0.015 1.95 5.6 0.3482 3.225 6.289

2 Sal. Gayungsari Barat 3 3.241477 0.002926 0.65 0.5 -

0.015 0.325 2.300 0.141 0.978 3.2415 0.978316 1.3 1.5 0.015 1.95 5.6 0.3482 1.785 3.480

3 Sal. Gayungsari Barat 2 2.312791 0.010478 0.65 1.1 -

0.015 0.715 3.500 0.204 2.367 2.3128 2.367094 1.3 1.5 0.015 1.95 5.6 0.3482 3.378 6.587

4 Sal. Gayung Kebonsari Dalam 3.963636 0.010478 0.6 0.6

- 0.015 0.36 2.400 0.150 1.927 3.9636 1.926568 1.3 1.5 0.015 1.95 5.6 0.3482 3.378 6.587

5 Sal. Gayungsari 7 2.205342 0.010478 0.75 0.5 -

0.015 0.375 2.500 0.150 1.927 2.2053 1.926568 1.3 1.5 0.015 1.95 5.6 0.3482 3.378 6.587

6 Sal. Gayungsari 12 1.741405 0.002539 0.8 0.65 -

0.015 0.52 2.900 0.179 1.068 1.7414 1.068245 1.3 1.5 0.015 1.95 5.6 0.3482 1.663 3.242

7 Sal. Kebonsari Baru 1 2.521333 0.005712 0.8 1 -

0.015 0.8 3.600 0.222 1.479 1.4788 1.848496 1.3 1.5 0.015 1.95 5.6 0.3482 2.494 4.863

8 Sal. Kebonsari ELVEKA 4 2.294115 0.001843 0.6 0.9 -

0.015 0.54 3.000 0.180 0.493 0.4928 0.912522 1.3 1.5 0.015 1.95 5.6 0.3482 1.417 2.763

9 Sal. Kebonsari ELVEKA 1 1.06567 0.010925 0.75 0.6 -

0.015 0.45 2.700 0.167 0.950 0.9497 2.110365 1.3 1.5 0.015 1.95 5.6 0.3482 3.449 6.725

Page 39: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

∗ Dari 13 saluran yang ditinjau terdapat 10 saluran yang tidak bisa menampung debit rencana (meluber)

∗ 10 Saluran di Redesign dengan Box culvert, dan terdapat 1 saluran yang tidak bisa di Redesign karena ketersediaan lahan yaitu Saluran Sekunder Gayungsari, maka dari itu diperlukan penambahan pompa.

∗ Direncanakan pompa air : Kapasitas pompa air = 1700 liter/dt Head = 100 m Jumlah pompa air = 1 buah Waktu pengosongan = 0,82 jam

Kesimpulan

Page 40: PERENCANAAN SALURAN DRAINASE DI GAYUNGSARI … · BOX CULVERT • AHMAD RIFDAN NUR ... Kesimpulan : Karena hasilnya Xh² < X² ,maka metode LP Type III dapat diterima. UJI SMIRNOV-KOLMOGOROV

TERIMA KASIH