PERANCANGAN SISTEM DRAINASE BERWAWASAN...

21
PERANCANGAN SISTEM DRAINASE BERWAWASAN LINGKUNGAN PADA JALAN DR. SETIABUDHI SEPANJANG 2,9 KM DI KOTA BANDUNG DESIGN OF ECO-DRAINAGE SYSTEM AT DR. SETIABUDHI’S ROAD ALONG 2,9 KM IN BANDUNG TUGAS AKHIR DIPLOMA IV Oleh : ACHMAD FIRDAUS NIM : 091134001 PROGRAM DIPLOMA IV TEKNIK PERANCANGAN JALAN DAN JEMBATAN JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI BANDUNG 2013

Transcript of PERANCANGAN SISTEM DRAINASE BERWAWASAN...

Page 1: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

PERANCANGAN SISTEM DRAINASE BERWAWASAN LINGKUNGAN

PADA JALAN DR. SETIABUDHI

SEPANJANG 2,9 KM DI KOTA BANDUNG

DESIGN OF ECO-DRAINAGE SYSTEM AT DR. SETIABUDHI’S ROAD ALONG 2,9 KM IN BANDUNG

TUGAS AKHIR DIPLOMA IV

Oleh :

ACHMAD FIRDAUS

NIM : 091134001

PROGRAM DIPLOMA IV

TEKNIK PERANCANGAN JALAN DAN JEMBATAN

JURUSAN TEKNIK SIPIL

POLITEKNIK NEGERI BANDUNG

2013

 

 

 

 

 

 

 

 

 

 

 

 

Page 2: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

 

 

 

 

 

 

 

 

 

 

 

 

Page 3: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

 

 

 

 

 

 

 

 

 

 

 

 

Page 4: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

ABSTRAK

Peningkatan populasi penduduk di Kecamatan Sukasari dengan rata-rata peningkatan sebesar 1,6752% menyebabkan meningkatnya produksi air limbah pada daerah tersebut, disamping bencana banjir yang sering terjadi pada daerah tersebut. Hal tersebut menyebabkan terganggunya struktur jalan yang seharusnya dapat mengair ke saluran drainase dengan baik, yang terjadi adalah menggenang dan mengalir di badan jalan.

Metode yang digunakan dalam perencanaan sistem drainase berwawasan lingkungan ini

adalah metode Rasional untuk perhitungan dimensi dan kemiringan saluran drainase. Sedangkan untuk perhitungan kebutuhan sumur resapan memakai metode Sunjoto.

Dari hasil perhitungan tugas akhir, didapatkan dimensi yang ideal untuk meampung

seluruh debit air, baik air hujan dan air limbah, dapat dicontohkan untuk dimensi pada daerah tangkapan nomor 4, dimensi yang ideal untuk menampung debit aliran adalah memiliki tinggi 2,3 meter dan lebar 0,6 meter. Kebutuhan untuk sumur resapan pada perencanaan drainase ini adalah 441 buah sumur resapan, 267 buah untuk sisi kiri (arah Lembang) dan 174 buah untuk sisi kanan (arah Bandung). Perhitungan rancangan anggaran biaya pada perencanaan drainase berwawasan lingkungan ini adalah Rp. 4,376,627,000.00. Biaya tersebut meliputi keseluruhan biaya pekerjaan saluran drainase dan pekerjaan sumur resapan. Sedangkan untuk pekerjaan drainase per meternya menelan biaya sebesar Rp. 720,443.45.

Kata Kunci : Drainase, Sumur Resapan, Metode Sunjoto, Berwawasan Lingkungan

 

 

 

 

 

 

 

 

 

 

 

 

Page 5: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

ABSTRACT

Increase of population in the District of Sukasari with an average of 1.6752% led to increased production of sewage in the area, as well as the floods that frequently happened to the area. It caused disruption of the structure which should be able to flow into the drainage channel, which was pooled and flowing on the road.

Method of calculation of design drainage environmental concept was a Rational Method

to calculate about the dimension and elevation of drainage. Meanwhile, for calculate of necessary about infiltration wells that involved the use of Sunjoto Method.

Result of calculation found the ideal dimensions to accommodate the entire flow of water,

either rain water and sewage, can be exemplified for dimensions on catchment area number 4, the dimension which ideal for accommodate debit of the flow is has a height 2.3 meters and width 0. 6 meters. The need for infiltration wells on the planning of the drainage this is the 441 infiltration wells, 267 for the left side (the way to Lembang) and 174 for the right side (the way to Bandung). Calculation of the project cost of Eco-Drainage is Rp. 4,376,627,000.00. Cost includes the total cost of the work of drainage and work of infiltration wells. Where as job of drainage for every meter needed cost to Rp. 720,443.45.

Keywords: Drainage, Infiltration wells, Sunjoto Method, Environmental

 

 

 

 

 

 

 

 

 

 

 

 

Page 6: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

KATA PENGANTAR

Dengan memanjatkan puji syukur kehadirat Allah SWT, atas segala limpahan rahmat dan

karunia-Nya sehingga penyusun dapat menyelesaikan Laporan Tugas Akhir ini. Laporan Tugas

Akhir ini merupakan syarat akhir yang harus ditempuh oleh mahasiswa D-IV semester VIII pada

jurusan Teknik Sipil Politeknik Negeri Bandung untuk menyelesaikan jenjang pendidikan

Diploma IV.

Dalam kesempatan ini penulis tidak lupa mengucapkan terima kasih yang sebesar-

besarnya kepada semua pihak yang telah membantu penulis dalam menyusun laporan tugas akhir

selama ini, antara lain:

1. Bapak Ir. Taufik Hamzah, MSA., MBA, selaku Ketua Jurusan Teknik Sipil, Politeknik

Negeri Bandung.

2. Bapak R. Desutama,ST,MT, selaku Ketua Prodi Teknik Perancangan Jalan dan Jembatan,

Jurusan Teknik Sipil, Politeknik Negeri Bandung.

3. Ibu Ruth Ester Ambat, Dra., MT dan Bapak Angga Marditama Sultan Sufanir, ST, MT.,

selaku dosen Pembimbing pada penyusunan Laporan Tugas Akhir.

4. Bapak R. Andjar Prasetyo, ST, MT. dan Ibu Iin Karnisah, ST, MT. selaku dosen Penguji

Laporan Tugas Akhir.

5. Teman-teman TPJJ 2009 yang saling bahu-membahu membantu dalam dan saling

menyemangati dalam mengerjakan penyusunan laporan tugas akhir ini.

6. Serta semua pihak yang telah membantu penulis selama penyusunan Laporan Tugas Akhir

ini.

 

 

 

 

 

 

 

 

 

 

 

 

Page 7: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

Dalam penyusunan Laporan Tugas Akhir ini tidak dipungkiri terdapat kekurangan-

kekurangan yang dibuat oleh penyusun, maka dari itu kritik dan saran dari berbagai pihak akan

sangat membantu penyususn dalam menyempurkan proposal laporan Tugas Akhir ini.

Bandung, Juli 2013

Penulis

 

 

 

 

 

 

 

 

 

 

 

 

Page 8: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

DAFTAR ISI

KATA PENGANTAR ............................................................................... iv

DAFTAR ISI ............................................................................................... v

DAFTAR TABEL ...................................................................................... ix

DAFTAR GAMBAR ............................................................................... xiii

BAB I PENDAHULUAN

1.1 Latar Belakang ................................................................................. I-1

1.2 Lokasi Kajian .................................................................................... I-3

1.3 Identifikasi Masalah .......................................................................... I-5

1.4 Tujuan Penulisan Tugas Akhir.......................................................... I-5

1.5 Ruang Lingkup ................................................................................. I-5

1.6 Sistematika Penyusunan.................................................................... I-6

BAB II DASAR TEORI

2.1 Penelitian Tentang Drainase ........................................................... II-1

2.2 Teori Tata Ruang dan Klasifikasi Fungsi Jalan .............................. II-4

2.3 Dasar Teori Perhitungan ................................................................. II-6

2.3.1 Analisa Hidrologi ...................................................................... II-6

2.3.2 Analisa Hidrolika ................................................................... II-21

2.4 Air Limbah Rumah Tangga .......................................................... II-24

2.5 Sumur Resapan ............................................................................. II-28

2.6 Analisis SWOT (Strength, Weakness, Opportunity,

Threats) ........................................................................................ II-29

2.7 Software SPSS .............................................................................. II-33

2.8 Biaya ............................................................................................. II-33

 

 

 

 

 

 

 

 

 

 

 

 

Page 9: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

BAB III METODOLOGI

3.1 Metodologi Penulisan Laporan Tugas Akhir ................................ III-1

3.2 Metodologi Pengumpulan dan Analisis Data ................................ III-2

3.3 Metodologi Perancangan ............................................................... III-3

3.4 Metodologi Pemilihan Alternatif Solusi........................................ III-6

3.5 Metodologi Perhitungan Estimasi Biaya dan Rencana

Anggaran Biaya. ............................................................................ III-7

BAB IV PERHITUNGAN

4.1 Alternatif Perencanaan Strategis ...................................................IV-1

4.2 Perhitungan Perencanaan Saluran Drainase ..................................IV-8

4.2.1 Debit Aliran Air Hujan .............................................................IV-8

4.2.2 Debit Aliran Air Limbah Tata Guna Lahan .......................... IV-27

4.2.3 Sumur Resapan .......................................................................IV-28

4.2.4 Saluran Banjir dan Kemarau .................................................IV-30

4.2.5 Pengalihan Aliran Saluran dengan Sumur Resapan ...............IV-34

4.3 Perhitungan Rancangan Anggaran Biaya (RAB) ........................IV-37

4.3.1 Perhitungan Volume ..............................................................IV-37

4.3.2 Analisis Harga Satuan Pekerjaan ..........................................IV-47

4.3.3 Rekapitulasi Hasil Perhitungan Analisis Harga

Satuan dan Volume Pekerjaan ...............................................IV-52

 

 

 

 

 

 

 

 

 

 

 

 

Page 10: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

BAB V PENUTUP

5.1. Kesimpulan ................................................................................... V-1

5.2 . Saran ............................................................................................ V-2

DAFTAR PUSTAKA

LAMPIRAN 1 : ADMINISTRATIF

LAMPIRAN 2 : DATA

LAMPIRAN 3 : GAMBAR

 

 

 

 

 

 

 

 

 

 

 

 

Page 11: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

DAFTAR TABEL

Tabel 1.1 Laju Pertumbuhan Penduduk Kota Bandung

Tahun 1990-2008 .................................................................. I-1

Tabel 2.1 Matriks Persamaan dan Perbedaan Tinjauan Pustaka .......... II-2

Tabel 2.2 Reduce Mean ........................................................................ II-7

Tabel 2.3 Reduce Standart Deviation (Sn)........................................... II-7

Tabel 2.4 Reduce Variate (Yt) .............................................................. II-8

Tabel 2.5 Faktor Penyimpangan K, yang digunakan untuk

Distribusi Log Pearson Type III ........................................ II-10

Tabel 2.6 PUH Untuk Perancangan Drainase Kota dan

Bangunan-bangunan yang dianjurkan................................ II-11

Tabel 2.7 Durasi Hujan Jakarta .......................................................... II-13

Tabel 2.8 Harga Koefisien Pengaliran (C) dan Harga Faktor

Limpasan (Fk) .................................................................... II-16

Tabel 2.9 Koefisien hambatan (nd) berdasarkan kondisi permukaan II-18

Tabel 2.10 Koefisien kekasaran ........................................................... II-20

Tabel 2.11 Jenis Penampang Drainase dan Cara Perhitungannya ....... II-21

Tabel 2.12 Angka Kekasaran Manning................................................ II-22

Tabel 2.13 Kriteria dan Parameter ....................................................... II-25

Tabel 2.14 Matriks SWOT Kearns ...................................................... II-29

Tabel 2.15 Tabel SWOT ...................................................................... II-31

Tabel 4.1 Nilai Kuisioner Untuk Alternatif 1 .....................................IV-3

 

 

 

 

 

 

 

 

 

 

 

 

Page 12: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

Tabel 4.2 Nilai Kuisioner Untuk Alternatif 2 .....................................IV-4

Tabel 4.3 Nilai Kuisioner Untuk Alternatif 3 .....................................IV-5

Tabel 4.4 Perbandingan Nilai Ketiga Alternatif .................................IV-5

Tabel 4.5 Nilai Kuadran Alternatif 1 ..................................................IV-6

Tabel 4.6 Nilai Kuadran Alternatif 2 ..................................................IV-7

Tabel 4.7 Nilai Kuadran Alternatif 3 ..................................................IV-7

Tabel 4.8 Curah Hujan Maksimum 24 Jam ........................................IV-9

Tabel 4.9 Parameter Statistik ..............................................................IV-9

Tabel 4.10 Perhitungan Selisih Periode Ulang (Perhitungan

pada Gumbel) ....................................................................IV-11

Tabel 4.11 Intensitas Hujan Metode Van Breen (Perhitungan

pada Gumbel) ...................................................................IV-12

Tabel 4.12 Perhitungan Selisih Periode Ulang Hujan Metode

Log Normal .......................................................................IV-13

Tabel 4.13 Intensitas Hujan Metode Van Breen (Perhitungan

pada Log Normal) ............................................................IV-13

Tabel 4.14 Penyusunan Data Curah Hujan (R) dari yang Terbesar

Sampai yang Terkecil .......................................................IV-14

Tabel 4.15 Konversi Data Curah Hujan dari Ri ke Log Ri .................IV-14

Tabel 4.16 Faktor Penyimpangan K, yang digunakan untuk

Distribusi Log Pearson Type III .......................................IV-16

Tabel 4.17 Perhitungan Selisih Periode Ulang Hujan.........................IV-18

Tabel 4.18 Intensitas Hujan Metode Van Breen (Perhitungan

pada Log Pearson Type III) ..............................................IV-18

 

 

 

 

 

 

 

 

 

 

 

 

Page 13: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

Tabel 4.19 Rekapitulasi Nilai Intensitas Hujan Van Breen dari

Ketiga Metode ................................................................... IV-19

Tabel 4.20 Parameter Pemilihan Distribusi Data Intensitas ...............IV-19

Tabel 4.21 Nilai Intensitas ..................................................................IV-22

Tabel 4.22 Hasil Pengukuran Daerah Tangkapan Air Hujan

Menggunakan Planimeter ................................................IV-23

Tabel 4.23 Koefisien Hambatan..........................................................IV-24

Tabel 4.24 Hasil Perhitungan Nilai Intensitas Hujan Untuk

Setiap Daerah Tangkapan Hujan .....................................IV-26

Tabel 4.25 Hasil Perhitungan Debit Aliran Air Hujan Untuk Setiap

Daerah Tangkapan Hujan .................................................IV-27

Tabel 4.26 Nilai Aliran Sumur Resapan .............................................IV-29

Tabel 4.27 Kebutuhan Sumur Resapan ...............................................IV-30

Tabel 4.28 Kebutuhan Volume Galian ...............................................IV-39

Tabel 4.29 Kebutuhan Volume Pembongkaran Pasangan Batu .........IV-40

Tabel 4.30 Volume Pasangan Batu .....................................................IV-41

Tabel 4.31 Volume Galian Sumur Resapan ........................................IV-42

Tabel 4.32 Kebutuhan Sumur Resapan ...............................................IV-42

Tabel 4.33 Volume Galian Saluran Penghubung Drainase ke

Sumur Resapan .................................................................IV-44

Tabel 4.34 Kebutuhan Galian Saluran Inlet ........................................IV-45

Tabel 4.35 Rekapitulasi Kebutuhan Pekerjaan ...................................IV-46

Tabel 4.36 Harga Upah dan Bahan .....................................................IV-46

 

 

 

 

 

 

 

 

 

 

 

 

Page 14: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

Tabel 4.37 Analisa Harga Satuan Pekerjaan Pemasangan

Papan Nama ......................................................................IV-47

Tabel 4.38 Analisa Harga Satuan Pekerjaan Pengukuran dan

Pemasangan Bouwplank ..................................................IV-48

Tabel 4.39 Analisa Harga Satuan Pekerjaan Pembuatan

Kantor Sementara dengan Lantai Plesteran ......................IV-48

Tabel 4.40 Analisa Harga Satuan Pekerjaan Pembersihan

dengan Peralatan ...............................................................IV-49

Tabel 4.41 Analisa Harga Satuan Pekerjaan Membongkar Dinding

Batu (Bongkar Tidak Dipakai Lagi) .................................IV-49

Tabel 4.42 Analisa Harga Satuan Pekerjaan Galian Tanah

Biasa Sedalam 1 (satu) Meter ..........................................IV-49

Tabel 4.43 Analisa Harga Satuan Pekerjaan Tanah Galian Biasa

Max. Kedalaman 3 (tiga) Meter dengan Tenaga Manusia IV-50

Tabel 4.44 Analisa Harga Satuan Pekerjaan Pemasangan Pondasi

Batu Kali (1 Pc : 5 Ps).......................................................IV-50

Tabel 4.45 Analisa Harga Satuan Pekerjaan Pasangan Batu Bata

Merah Tebal ½ Bata (1 Pc : 3 Ps) .....................................IV-51

Tabel 4.46 Analisa Harga Satuan Pelat Beton K225 ..........................IV-51

Tabel 4.47 Analisa Harga Satuan Pekerjaan Pemasangan

Buis Beton Ukuran Ø 100 cm............................................IV-52

Tabel 4.48 Rekapitulasi Anggaran Biaya ...........................................IV-52

Tabel 4.49 Perhitungan Pekerjaan Saluran Drainase Per Meter .........IV-54

 

 

 

 

 

 

 

 

 

 

 

 

Page 15: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

DAFTAR GAMBAR

Gambar 1.1 Peta Topografi Lokasi Tinjauan ....................................... I-3

Gambar 1.2 Peta Lokasi Tinjauan ....................................................... I-4

Gambar 2.1 Bagian-bagian Jalan ........................................................ II-5

Gambar 2.2 Penampang Tipikal Jalan Kolektor Primer

(Kondisi Minimum) ......................................................... II-4

Gambar 2.3 Penampang Tipikal Jalan Kolektor Primer

Kondisi Minimum Ideal) ................................................. II-5

Gambar 2.4 Daerah Pengaliran Saluran Samping Jalan .................... II-15

Gambar 2.5 Panjang Daerah Pengaliran yang Diperhitungkan......... II-15

Gambar 2.6 Saluran Inlet Untuk Daerah Tanjakan/Turunan ............ II-23

Gambar 2.7 Contoh bak kontrol ........................................................ II-24

Gambar 2.8 Kuadran Analisis SWOT ............................................... II-32

Gambar 3.1 Diagram Alir Metodologi Penulisan Laporan

Tugas Akhir ................................................................... III-1

Gambar 3.2 Diagram Alir Metodologi Penentuan Pengumpulan

dan Anailisis Data .......................................................... III-3

Gambar 3.3 Diagram Alir Metodologi Perancangan ......................... III-5

Gambar 3.4 Diagram Alir Metodologi Pemilihan Alternatif Solusi .. III-7

Gambar 3.5 Diagram Alir Metodologi Estimasi Biaya dan

Rencana Anggaran Biaya .............................................. III-8

Gambar 4.1 Contoh Kuisioner yang Diserahkan Kepada

Para Ahli .........................................................................IV-2

Gambar 4.2 Data Masukan SPSS .....................................................IV-20

 

 

 

 

 

 

 

 

 

 

 

 

Page 16: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

Gambar 4.3 Hasil dari proses data menggunakan software SPSS ...IV-20

Gambar 4.4 Pembagian Daerah Tangkapan Hujan ..........................IV-22

Gambar 4.5 Spesifikasi dan Dimensi Kerb Terpilih ........................IV-37

 

 

 

 

 

 

 

 

 

 

 

 

Page 17: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

DAFTAR PUSTAKA

___________. Pedoman Teknis No. 18 Tahun 2004 tentang Klasifikasi Fungsi Jalan di

Wilayah Perkotaan.

___________. Perencanaan Sistem Drainase Jalan (Pd. T-02-2006-B). Departemen Pekerjaan Umum. 2006. Jakarta

___________. Peraturan pemerintah Republik Indonesia N0. 34 Tahun 2006 Tentang Jalan.

___________. Petunjuk Desain Drainase Permukaan Jalan (NO. 008/T/BNKT/1990). Direktorat Jendral Bina Marga. Direktorat Pembinaan Jalan Kota. 1990. Jakarta

___________. Tata Cara Penyususnan Program Pemeliharaan Jalan Kota

(NO.018/T/BNKT/1990. Direktorat Jendral Bina Marga. Direktorat Pembinaan Jalan Kota. 1990.). Jakarta

Chow, Ven Te (E.V Nensi Rosalina). Hidrolika Saluran Terbuka. 1989. Bandung

Ester Ambat, Ruth. Dan Bambang S.Budianto. 2009. Sanitasi Pemukiman ; Politeknik Negeri Bandung

Fauzy Rizsky .2012. Evaluasi Sistem Drainase Pada Jalan Prof. DR. Surya Sumantri Kota

Bandung Sepanjang 1,1 Km. Bandung : PoliteknikNegeri Bandung

Fahmie Andri, Denden dan Desca Ardhi. 2006. Perancangan Drainase Horizontal dan

Vertikal pada jalan Gegerkalong Hilir Bandung : Politeknik Negeri Bandung.

Hardjosuprapto, Masduki. 1998. Drainase Perkotaan.

Harijanto, Didik. 2009. Perencanaan Sistem Drainase Saluran Rungkut Medokan. Institut

Teknologi Sepuluh Nopember. Surabaya

Hendarsin, Shirley L. 2000. Perencanaan Teknik Jalan Raya. Bandung : Politeknik Negeri

Bandung.

Indriatmoko, Robertus Haryoto, Drs. Dan Heru Dwi Wahjono, B.Eng. 1999. Teknologi

Konservasi Air Tanah Dengan Sumur Resapan. Kelompok Teknologi Pengelolaan Air

Bersih dan Limbah Cair. Direktorat Teknologi Lingkungan. Deputi Bidang Teknologi

 

 

 

 

 

 

 

 

 

 

 

 

Page 18: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

Informasi, Energi, Material dan Lingkungan Badan Pengkajian dan Penerapan Teknologi.

Jakarta.

Wahyuningtyas, Ayu., Hariani, Septiana. dan Fauzul Rizal Sutikno. 2011. Strategi

Penerapan Sumur Resapan Sebagai Teknologi Ekodrainase di Kota Malang ; Malang

.Universitas Brawijaya.

Kamaruzzaman, Rizal. 2006. Desain Saluran Drainase Bandara Udara Juwata Kota Tarakan, Kalimantan Timur. Yogyakarta. Universitas Gajah Mada.

M, Sunpin. 2007. Sistem Drainase Perkotaan yang Berkelanjutan. Yogyakarta : Penerbit

Andi.

MSS, Angga, 2010. Bahan Kuliah Perencanaan Drainase Jalan (Drainase Permukaan) :

Politeknik Negeri Bandung.

Sunjoto, Dip.HE, DEA., Prof. Dr. Ir. 2011. Teknik Drainase Pro-Air. Yogyakarta:

Universitas Gadjah Mada

Suryapraja, Dipo. 2011. Perencanaan Sistem Drainase Pada Proyek Pembangunan Jalan Tol Surabaya-Mojokerto Seksi IA. Surabaya: Institut Teknologi Sepuluh Nopember.

Triatmodjo, Bambang. 2008. Hidrologi Terapan. Yogyakarta. Penerbit Beta Office

Undang – Undang Republik Indonesia No. 38 Tahun 2004 Tentang Jalan.

 

 

 

 

 

 

 

 

 

 

 

 

Page 19: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

Curriculum Vitae

Name : Achmad Firdaus

Place/Date of Birth : Bandung, October 15th

1991

Gender : Male

Religion : Islam

Height, Weight : 183 Cm, 83 Kg

Status : Single

Address : 1. Jl. Aria Adiarsa No.17

RT 02 RW 05, East Karawang.

2. Jl. Sukahaji No. 53,

Gegerkalong, Bandung

HP : +62 887-6800-545

Last GPA : 3,12

E-mail : [email protected]

[email protected]

Education

1997-2000 : SD Purwawinangun 2 Kab. Kuningan

2000-2003 : SD Karangpawitan 1 Kab. Karawang

2003-2006 : SMP Negeri 1 Kab.Karawang

2006-2009 : SMA Negeri 1 Kab.Karawang

2009- Until Now : Department of Civil Engineering, Concentrations in Road And

Bridge Design Engineering, Politeknik Negeri Bandung

 

 

 

 

 

 

 

 

 

 

 

 

Page 20: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

Seminar/Training/ Certificates

2009 : Pekan Olahraga Pelajar Daerah (POPDA) VIII Jawa Barat

By Dinas Pendidikan Provinsi Jawa Barat

2009 : Pelatihan Komputer By SMA Negeri 1 Karawang

2009 : Latihan Dasar Kedisiplinan By Politeknik Negeri Bandung

2010 : The Fixing System Technology For Building

By Mr.Safety Group

2011 : Kolokium 2011 Jalan dan Jembatan By Puslitbang

Kementrian PU

2011 : Bandung Intra Urban Toll Road By Himpunan Pengembang

Jalan Indonesia

2012 : Pelatihan Aplikasi Software untuk Rekayasa Stuktur

By Politeknik Negeri Bandung

2012 : Kompetisi Rancang Bangun 2012 By Himpunan

Mahasiswa Sipil Fakultas Teknik Universitas Udayana,

Bali

Extracurricular Activities/Organization Experiences

2009- Until Now : Member of Himpunan Mahasiswa Jurusan Teknik Sipil

Politeknik Negeri Bandung

2009- Until Now : Member of Basketball Club of Politeknik Negeri Bandung

2011-2012 : Member of Twittland Bandung Social Media

2011- 2012 : Secretary at Basketball Club of Politeknik Negeri Bandung

Other Skills

1. Sport : Basketball, Football, Futsal, Volly.

2. Computer: Able to operate Windows, Ms Office, SAP, ACAD, Corel Draw,

Mindjet MindManager, Photoshop, Sketch Up, and Internet.

3. Language: Intermediate command of English both oral and written.

 

 

 

 

 

 

 

 

 

 

 

 

Page 21: PERANCANGAN SISTEM DRAINASE BERWAWASAN …digilib.polban.ac.id/files/disk1/100/jbptppolban-gdl-achmadfird... · Tabel 4.36 Harga Upah dan Bahan ... Tabel 4.38 Analisa Harga Satuan

Research Experiences

2012 : Site Trainee Report of Widening Project of Surotokunto’s Street

along

2,1 Km in Karawang City.

2012 : Study Of Dr. Setiabudhi’s open channel system problem along 1,4

Km in Bandung.

2013 : Design Of Eco-Drainage System At DR. Setiabudhi’s Road Along

2,9

Km in Bandung

Work Experience

2012 : Junior Engineer Trainee in Widening Project Of Surotokunto’s Street,

Kabupaten Karawang

Bandung, June 27th

2013

Yours Sincerely,

Achmad Firdaus