    +What is COST ?

    !

    COST can be defined as

    an outlay or expenditure of

    money, time, labouror

    other resources to produce

    a nominated healthservice product

    Hendra - H&A Consultant

    ' BIAYA ' dapat didefinisikan sebagai pengeluaran atau pengeluaran uang,

    waktu, tenaga kerja atau sumber daya lainnya untuk menghasilkan produk

    pelayanan kesehatan dinominasikan

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    3/54

    +

    Costing of healthcare produc

    on the other hand, has been

    described as more of an art

    than a science

    Biaya produk kesehatan di sisi lain , telah digambarkan leb

    sebuah SENIdaripad

    29 Nov 2015 Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    4/54

    +Pengelolaan RS secara EKONOMI

    A.

    RS harus mengetahuibesarnya biaya yang

    dikeluarkan untuk

    memberikan Pelayanan"

    ANALISIS BIAYA & UNIT

    COST

    B. RS harus menetapkan

    tarif yang rasional"

    berdasarkan UNIT COST

    Keseimbangan antara

    EXPENSE & REVENUE

    Pengelolaan COSTpada tingkat EFISIENS

    REVENUE

    = Tarif x Kunjungan

    Indikator Biaya sebagaALAT MANAJERIAL

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    5/54

    +PROPenghitungan

    UNIT COST

    AVERAGE

    REVENUE

    AVERAGE

    COST

    Strategi

    Pentarifan

    Hospital KPIREVENUE

    basedx

    Hospital KPICOST basedx

    TARGETx

    TARGETx

    REVENUE

    COST

    KPI CEO

    KPI Manajer

    KPI Unit

    StrukturGAJI

    Sistem BONUS

    Strategi

    INVESTASI

    BUDGETTING

    STRATEGIC

    MARKETING PLAN

    STRATEGIC

    COST REDUCTION

    DRG

    GRAND

    STRATEGY

    Jml Px Ranap / hariALOSJml resep FarmasiJml Px Operasi dll.

    Jml makan pasienJml kg linen laundryJml maintenance Alat

    29 Nov 2015 Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    6/54

    +Pengertian TARIF

    ! Harga (nilai uang) yang harus dibayar

    oleh konsumen untuk memperoleh

    atau mengkonsumsi suatu komoditi

    (barang atau jasa) yang dibebankan

    kepada masyarakat sebagai imbalan

    atas jasa pelayanan yang diterima

    ! Besarnya biaya yang harus

    dikeluarkan untuk memperoleh jasa

    pelayanan

    ! Tarif pelayanan kesehatan yang

    diberikan di suatu Rumah Sakit yang

    ditetapkan untuk suatu periode waktu

    tertentu, tarif atau harga berlaku

    menurut hukum pasar yang fluktuatif

    dari suatu waktu ke waktu lainnya.

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    7/54

    +Strategi Pentarifan ...

    !

    Pemilihan strategi pentarifanmerupakan prioritasi penting, karenapentarifan adalah komponen terpentingdari seluruh kegiatan pemasaran.

    ! Pentarifan suatu produk layanan

    memerlukan :

    1. Target Biaya & Keuntungan

    2.

    Customer/ Permintaan

    3. Pesaing

    Hendra - H&A Consultant

    Biaya &

    Keuntungan

    Customer or

    Permintaan

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    8/54

    R SION LIS SI T RIF

    ASPEK BIAYA

    BIAYA PRODUKSIJASA KESEHATAN

    (PROVIDER)

    BIAYA MEMPEROLEHPELAYANAN KESEHAT

    (CUSTOMER)

    BIAYA SATUAN ATP & WTP

    KEBIJAKAN INSTITUSIKESEHATAN

    BARIER TO SERVIC(RENTAN & MISK

    KEBIJAKANPEMERINTAH

    T RIF

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    9/54

    +BEBERAPA PERTIMBANGAN PENTARIFAN

    1. Break Even Point (BEP) :1. Total Cost= Total revenue

    2. Fixed Cost + Var. Cost = Tarif x Jumlah Produk

    3. (Unit Cost + Konstanta) x jumlah produk = Tarif x Jumlah Produk

    2. Pertimbangan Total Financial Requirement

    3. Tingkat kemampuan masyarakat ATP & WTP

    1. ATP = ability to pay

    2. WTP = willingness to pay

    4. Pesaing

    5. Subsidi Silang antar Pelayanan

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    10/54

    + KONSEP BIAYA

    DI RUMAH SAKITHendra

    29 Nov 2015 Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    11/54

    +Prinsip Akuntansi di RS

    1. Chart of Account (CoA)

    2. Komponen Pendapatan

    3. Komponen Biaya

    a. Gaji

    b. Obat

    c.

    Material Medisd. Material Non-Medis

    e. Inventaris

    f. Pemeliharaan

    g. Dll.

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    12/54

    +

    KONSEP BIAYA

    Hendra - H&A Consultant

    INPUT PROCESS OUTPUT

    Faktor

    ProduksiProduk

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    13/54

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    14/54

    +

    BIAYA

    !

    Biaya adalah NILAI dari sejumlah fakproduksi ( input) yang dipakai untuk

    menghasilkan suatu produk (output)

    !Dalam hal sarana pelayanan kesehatan, maka untuk

    menghasilkan suatu pelayanan kesehatan yang sadar

    dan sadar biaya dibutuhkan sejumlah input yang dinil

    dikonversi dalam bentuk uang/nilai.Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    15/54

    +JENIS BIAYA

    1. Biaya Tetap (fixed cost)! biaya yang secara relatif tidak dipengaruhi oleh jumlah produk yang dihasilk

    (output)

    2. Biaya Tidak Tetap (variable cost)! biaya yang dipengaruhi oleh jumlah produk yang dihasilkan (output)

    3. Biaya Investasi!

    biaya yang kegunaannya dapat berlangsung dalam waktu yang relatif lama, blebih dari satu tahun

    4. Biaya Operasional! biaya yang diperlukan untuk melaksanakan kegiatan -kegiatan dalam suatu p

    produksi dan memiliki sifat habis pakai dalam kurun waktu relatif singkat

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    16/54

    +BIAYA = NILAI dari SEJUMLAH INPUT

    Biaya LANGSUNG

    1. Tenaga Medis

    2. Alat Kesehatan

    3.

    Obat-obatan

    4. dsb.

    Biaya TAK LANGSUNG

    1. Gedung

    2. Alat Tulis Kantor

    3. Mebeler

    4. Listrik

    5. Air

    6. dsb.

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    17/54

    +MATRIKS BIAYA

    Hendra - H&A Consultant

    BIAYA LANGSUNG BIAYA TAK LANGSUNG

    Biaya Tetap#

    Gedung

    # Diklat

    #

    Mebeler

    Biaya Tidak Tetap# Obat-obatan

    # Reagen Lab

    #

    Material habis pakai

    # Insentif karyawan

    Biaya Investasi

    # Gedung

    # Mebeler

    # Perijinan RS

    # Gaji karyawan

    #

    SIM / IT

    Biaya Operasional#Obat-obatan

    # Material habis pakai

    #Alat Tulis Kantor

    #

    Telepon

    # Listrik

    #Air

    # Pemasaran

    # Pemeliharaan

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    18/54

    +BIAYA RS

    !

    Biaya Total (Total Cost)!Jumlahfixed cost dan variable cost

    !Biaya Satuan (Unit Cost)

    !

    Biaya yang dihitung untuk satu satuan produkpelayanan yang diperoleh dengan cara memb

    biaya total dengan jumlah produk

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    19/54

    +ANALISIS BIAYA

    !

    Kegiatan menghitung biaya untuk berbagai jenispelayanan yang ditawarkan, baik secara total maupun

    pelayanan per pasien dengan cara menghitung seluru

    biaya pada seluruh unit yang ada.

    !

    Biaya pada Unit kerja yang TIDAK menghasilkan prod(cost center) didistribusikan pada Unit Kerja yang

    menghasilkan produk/pendapatan (revenue center)

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    20/54

    +ALAT BANTU

    1.

    Struktur Organisasi Unit Kerja (cost center &revenue center2. Data Kepegawaian

    3. Data Gedung

    4. Data Inventaris Peralatan Medis

    5. Data Inventaris Peralatan Non Medis

    6. Data Inventaris Kendaraan

    7. Data Biaya Obat & Bahan Medis Habis Pakai

    8. Data Bahan Habis Pakai Non Medis

    9. Data Pemeliharaan gedung & peralatan

    10. Data Biaya Umum listrik, air, telepon

    11. dll.

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    21/54

    +Faktor Penentu Penetapan Tarif Pelayana

    Kesehatan

    !

    Faktor internal institusiyaitu biaya riil atau biaya

    satuan (unit cost)

    pelayanan yang

    diperlukan dan

    kebijakan pembiayaanbagi pelayanan tersebut

    Faktor eksternal institusiyang ssatunya adalah faktor kemampu

    (ATP) dan kemauan membayar

    pengguna jasa (pasien).

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    22/54

    +

    +TARIF = Unit Cost Konsta

    FORMULA TARIF

    29 Nov 2015 Hendra - H&A Consultant

    1. SUBSIDI

    2. ATP WTP3. KEBIJAKAN

    4. PESAING

    BISA +BISA -

    UNIT COST = BIAYA SATUAN

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    23/54

    + METODE PENENTUA

    UNIT COSTHendra

    29 Nov 2015 Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    24/54

    +DISTRIBUSI BIAYA

    1. Simple Distribution!

    Cara langsung membagi habis biaya Cost Center keRevenue Center berdasarbobot tertentu

    2. Step Down Method

    !

    Cara membagi biaya Cost Center keRevenue Center melalui 2 tahap, barudialokasikan keRevenue Center dengan dasar pembobotan

    3. Double Distribution!

    Cara membagi biaya Cost Center keRevenue Center melalui alokasi antar CosdanRevenue Center, setelah itu dialokasikan dari Cost Center keRevenue Cen

    4. Activity-Based Costing

    ! Cara analisis biaya berdasarkan aktivitas

    Hendra - H&A Consultant

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    25/54

    +

    DISTRIBUSI TAHAP

    KE-1TUJUAN:

    Menentukan Total Biaya yang

    dikeluarkan oleh UNIT KERJA KAMAR

    OPERASI

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    26/54

    +TAHAP UNIT COST Double Distribution (1

    1.

    Tentukan Asumsi untuk pendistribusian :a.

    Biaya Gedung : luas lantai

    b. Gaji karyawan : jumlah karyawan

    c. Biaya air : jumlah wastafel

    d. Biaya listrik : jumlah titik lampu

    e. Biaya kebersihan : luas lantai

    f. Biaya peralatan medis : proporsi Rp per unit

    2. Identifikasi Jenis Pelayanan di Unit Kerja

    3. Tentukan Unit Kerja sebagai Cost Center &Revenue Center

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    27/54

    +Penentuan Pusat Biaya

    REVENUE CENTER COST CENTER

    IGD Direksi, Wadir, Kabid, Kanit, SPI

    Klinik Umum LogistikKlinik Penyakit Dalam Akuntansi

    Klinik Bedah Bendahara

    Laboratorium CSSD

    Radiologi Rekam Medik

    CT Scan IT

    Farmasi BogaKamar Operasi Pencucian Linen

    Ruang 1 Pemeliharaan Sipil

    Ruang 2 Pemeliharaan Listrik

    ICU Umum

    Dll. Dll.

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    28/54

    +TAHAP UNIT COST

    4.

    Inventaris gedung, peralatan medis & non medis"biayapenyusutan per tahun

    5. Hitung biaya operasional dan pemeliharaan 1 tahun per mas

    masing Unit Kerja (bila tidak memungkinkan : hitung total,

    kemudian didistribusikan dengan pembobotan)

    6. Distribusikan masing-masing biaya investasi & operasional

    (double distribution)7. Hitung Total Cost untukRevenue Center (investasi, operasion

    termasuk pemeliharaan)

    8. Hitung Unit Cost dengan membagi Total Cost setahun dengan

    jumlah pelayanan/unit setahun

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    29/54

    +KOMPONEN GAJI (Rp)

    UNIT KERJA Gaji Lembur Insentif Diklat T

    IGD 1000

    Klinik Anak 1000Klinik Bedah 1000

    Ruang 1 5000

    Ruang 2 5000

    Laboratorium 2000

    Farmasi 2000

    Radiologi 2000

    Kamar Operasi 2000

    Adm & Manajemen 9000

    Pemeliharaan 3000

    JUMLAH 33000 3

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    30/54

    +KOMPONEN PEMELIHARAAN (item)

    UNIT KERJA Level 1 Level 2 Level 3 Level 4 DA TOTAL

    Bobot !"!# !"%# !"& !"# 2000

    IGD 10 5 3 1 2,7 0,160606

    Klinik Anak 10 0,5 0,030303

    Klinik Bedah 10 0,5 0,030303

    Ruang 1 50 2,5 0,151515

    Ruang 2 50 2,5 0,151515

    Laboratorium 20 1,0 0,060606

    Farmasi 20 1,0 0,060606

    Radiologi 20 1,0 0,060606

    Kamar Operasi 20 1,0 0,060606

    Adm & Manajemen 90 4,5 0,272727

    Pemeliharaan 30 1,5 0,090909

    JUMLAH 330 %'"# %Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    31/54

    +KOMPONEN BOGA (1) (item)

    UNIT KERJA VIP Kelas 1 Kelas 2 Kelas 3 DA TOTAL (

    Bobot 4 2,5 2 1 1

    Ruang 1 10 20 50 60250 0,248756

    Ruang 2 20 10 20 60 205 0,20398

    Ruang 3 10 10 40 50 195 0,19403

    Ruang 4 10 20 30 40 190 0,189055

    Ruang 5 10 10 10 80 165 0,164179

    Laboratorium

    FarmasiRadiologi

    Kamar Operasi

    Adm & Manajemen

    Pemeliharaan

    JUMLAH 60 70 150 290 1005 1 1

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    32/54

    +KOMPONEN BOGA (2) (Rp)

    UNIT KERJA VIP Kelas 1 Kelas 2 Kelas 3 TOTAL

    Biaya per porsi 40 35 25 20

    Ruang 1 10 20 50 60

    Ruang 2 20 10 20 60

    Ruang 3 10 10 40 50

    Ruang 4 10 20 30 40

    Ruang 5 10 10 10 80

    Laboratorium

    FarmasiRadiologi

    Kamar Operasi

    Adm & Manajemen

    Pemeliharaan

    JUMLAH 60 70 150 290

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    33/54

    +KOMPONEN PENCUCIAN (kg/item)

    UNIT KERJA uk 1 uk 2 uk 3 uk 4DA

    TOTAL

    Bobot 0,5 1,5 3 5 Rp xxx

    IGDKlinik Anak

    Klinik Bedah

    Ruang 1

    Ruang 2

    Laboratorium

    Farmasi

    Radiologi

    Kamar Operasi

    Adm & Manajemen

    Pemeliharaan

    JUMLAH

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    34/54

    +KOMPONEN REKAM MEDIS (item)

    UNIT KERJAPENDAFTARAN

    SAJARAWAT JALAN RAWAT INAP

    DATOT

    Bobot 0,05 0,1 0,85 Rp y

    IGD

    Klinik Anak

    Klinik Bedah

    Ruang 1

    Ruang 2

    LaboratoriumFarmasi

    Radiologi

    Kamar Operasi

    JUMLAH

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    35/54

    +KOMPONEN STERILISASI

    UNIT KERJA linen uk 1 linen uk 2paket op

    kecilpaket opsedang

    DATOTA

    Bobot 0,15 0,4 0,8 3,5 Rp zz

    IGD

    Klinik Anak

    Klinik Bedah

    Ruang 1

    Ruang 2

    LaboratoriumFarmasi

    Radiologi

    Kamar Operasi

    JUMLAH

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    36/54

    +KOMPONEN BARANG MEDIS

    UNIT KERJA BHP MedisAlat Medis

    inventaris

    BARU

    Barang Medis

    non inventaris

    BARU

    Penyusutan

    Alat Medis

    inventaris

    LAMA

    TO

    IGD

    Klinik Anak

    Klinik Bedah

    Ruang 1

    Ruang 2

    Laboratorium

    Farmasi

    Radiologi

    Kamar Operasi

    Adm & Manajemen

    JUMLAH

    Hendra - H&A Consultant

    ??

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    37/54

    +KOMPONEN BARANG NON-MEDIS

    UNIT KERJAAlat Non Medis

    inventaris

    Barang Non

    Medis non

    inventaris

    BHP Non Medis

    Penyusutan Alat

    Non Medis

    inventaris

    LAMA

    TO

    IGD

    Klinik Anak

    Klinik Bedah

    Ruang 1

    Ruang 2

    Laboratorium

    Farmasi

    Radiologi

    Kamar Operasi

    Adm & Manajemen

    JUMLAH

    Hendra - H&A Consultant

    ?

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    38/54

    +KOMPONEN LISTRIK

    UNIT KERJALuas Area

    (m2)Watt alat besar DA TO

    (R

    Bobot 0,5 0,5 18

    IGD 5 200 102,5 0,303704

    Klinik Anak 5 0 2,5 0,007407

    Klinik Bedah 5 0 2,5 0,007407

    Ruang 1 10 100 55 0,162963

    Ruang 2 10 0 5 0,014815

    Laboratorium 5200 102,5 0,303704

    Farmasi 5 0 2,5 0,007407

    Radiologi 5 0 2,5 0,007407

    Kamar Operasi 10 100 55 0,162963

    Adm & Manajemen 10 0 5 0,014815

    JUMLAH 337,5 1 18

    Hendra - H&A Consultant

    ?

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    39/54

    +KOMPONEN AIR

    UNIT KERJAJumlah

    KaryawanFungsi DA TO

    (R

    Bobot 0,4 0,6 60

    Pencucian 4 14 10 0,236967

    Klinik Anak 6 1 3 0,07109

    Klinik Bedah 4 1 2,2 0,052133

    Ruang 1 6 2 3,6 0,085308

    Ruang 2 4 1 2,2 0,052133

    Laboratorium 4 1 2,2 0,052133

    Farmasi 16 1 7 0,165877

    Radiologi 4 1 2,2 0,052133

    Kamar Operasi 8 1 3,8 0,090047

    Adm & Manajemen 10 0 4 0,094787

    JUMLAH 42,2 1

    Hendra - H&A Consultant

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    40/54

    KOMPONEN TELEPON

    UNIT KERJAJumlah

    KaryawanFungsi DA TO

    (R

    Bobot 0,4 0,6 10

    Klinik Anak

    Klinik Bedah

    Ruang 1

    Ruang 2

    Laboratorium

    Farmasi

    Radiologi

    Kamar Operasi

    Adm & Manajemen

    JUMLAH

    Hendra - H&A Consultant

    ?

    +KOMPONEN GEDUNG

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    41/54

    KOMPONEN GEDUNG

    UNIT KERJALuas Area

    (m2)DA

    Penyusutan

    GedungPBB

    Cleani

    Servic

    150000 7000 6

    IGD 5 0,071429 10714 500

    Klinik Anak 5 0,071429 10714 500

    Klinik Bedah 5 0,071429 10714 500

    Ruang 1 10 0,142857 21429 1000

    Ruang 2 10 0,142857 21429 1000

    Laboratorium 50,071429 10714 500

    Farmasi 5 0,071429 10714 500

    Radiologi 5 0,071429 10714 500

    Kamar Operasi 5 0,071429 10714 500

    Adm & Manajemen 5 0,071429 10714 500

    JUMLAH 70 1

    Hendra - H&A Consultant

    ?

    +KOMPONEN IT

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    42/54

    KOMPONEN IT

    UNIT KERJA Jumlah Komputer DA TOTAL (R

    UGD 3 0,103448

    Klinik Anak 2 0,068966

    Klinik Bedah 2 0,068966

    Ruang 1 2 0,068966

    Ruang 2 2 0,068966

    Laboratorium 2 0,068966

    Farmasi 2 0,068966

    Radiologi 2 0,068966

    Kamar Operasi 2 0,068966

    Adm & Manajemen 2 0,068966

    JUMLAH 29 1

    Hendra - H&A Consultant

    + OVERHEAD COST

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    43/54

    UNIT KERJA SDM LISTRIK PEMEL dst TOTAL BOBOT DAOVER

    CO

    IGD 1000 5467 3212 9679 0,5 0,020243

    Klinik Anak 1000 133 606 1739 0,5 0,020243

    Klinik Bedah 1000 133 606 1739 0,5 0,020243

    Ruang 1 5000 2933 3030 10963 0,5 0,020243

    Laboratorium 2000 5467 1212 8679 2 0,080972

    Farmasi 2000 133 12123345

    20

    0,809717Radiologi 2000 133 1212 3345 0,1 0,004049

    Kamar Operasi 2000 2933 1212 6145 0,1 0,004049

    Adm & Manajemen 9000 267 5455 14722

    Pemeliharaan 3000 133 1818 4951

    JUMLAH 33000 18000 20000 71000 24,7 1

    Hendra - H&A Consultant

    + TOTAL BIAYA (termasuk overhead)

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    44/54

    cost)UNIT KERJA TOTAL OVERHEAD COST GRAND TOTAL B

    UGD 9679 398

    Klinik Anak 1739 398

    Klinik Bedah 1739 398

    Ruang 1 10963 398

    Ruang 2 8297 398

    Laboratorium 8679 1593

    Farmasi

    3345 15930Radiologi 3345 80

    Kamar Operasi 6145 80

    Adm & Manajemen 14722

    Pemeliharaan 4951

    JUMLAH 71000

    Hendra - H&A Consultant

    ?

    +

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    45/54

    +

    DISTRIBUSI TAHAP

    KE-2TUJUAN:

    Membagi habis Total Biaya Unit Kerja

    Kamar Operasi ke komponen TARIFUnit Kerja Kamar Operasi

    Hendra - H&A Consultant

    +1 Me e t ka Ko o e Ta if

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    46/54

    1. Menentukan Komponen Tarif

    a. Tindakan

    1) Pasang Kateter;

    2) Injeksi i.v. ; dll.

    b.

    Sewa Alat

    1) Sewa Mesin anestesi;

    2) Pemakaian Bor; dll.

    c.

    Sewa Kamar Operasi

    1) Sewa OK Kecil

    2) Sewa OK Sedang

    3) Sewa OK Besar

    4) Sewa OK Khusus

    Hendra - H&A Consultant

    +2 Menentukan Pembagian Total Biaya OK

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    47/54

    2. Menentukan Pembagian Total Biaya OK

    PENDAPATAN BIAYA

    TINDAKAN 500.000.000 19%118,280

    SEWA ALAT 600.000.000 23%143,181

    SEWA OK 1.514.692.000 58%361,066

    TOTAL 2.614.692.000 100% 622.528.

    Hendra - H&A Consultant

    +3 Menentukan Bobot masing-masing Komponen Tarif

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    48/54

    3. Menentukan Bobot masing-masing Komponen Tarif

    (per Komponen Biaya)

    Hendra - H&A Consultant

    UNIT KERJA : KAMAR OPERASI JUMLAHTRANSAKSI

    GAJI SDM TOTAL Rdata dari pembagian Unit Cost RS BOBOT DASAR ALOKASI TINDAKAN R

    DA waktu prof kesulitan waktu prof kesulitan Jumlah DA SEWA ALAT R

    BOBOT 0.15 0.55 0.30 SEWA OK R

    TINDAKAN

    Injeksi IV 6282 10.00 9.00 10.00 1.50 4.95 3.00 9.45 0.26

    Lepas kateter 200 3.00 5.00 3.00 0.45 2.75 0.90 4.10 0.11

    Pasang maag slang 200 30.00 8.00 10.00 4.50 4.40 3.00 11.90 0.33

    Pasang ransel verband 200 30.00 7.00 7.00 4.50 3.85 2.10 10.45 0.29

    35.90 1.00

    SEWA ALAT JUMLAH SEWA

    Alat Anastesi 264 120.00 20.00 8.00 18.00 11.00 2.40 31.40 0.16

    Diatermi 420 120.00 6.00 6.00 18.00 3.30 1.80 23.10 0.12

    Monitor 419 15.00 8.00 8.00 2.25 4.40 2.40 9.05 0.05

    Torniquet 59 4.00 8.00 8.00 0.60 4.40 2.40 7.40 0.04

    Tur 33 120.00 10.00 10.00 18.00 5.50 3.00 26.50 0.14

    Pisau Tur 30 120.00 10.00 10.00 18.00 5.50 3.00 26.50 0.14

    Meja Ortho 5 120.00 10.00 10.00 18.00 5.50 3.00 26.50 0.14

    Steril alat Sedang 243 120.00 4.00 4.00 18.00 2.20 1.20 21.40 0.11

    Steril alat Besar 146 120.00 6.00 6.00 18.00 3.30 1.80 23.10 0.12

    194.95 1.00

    SEWA AKOMODASI

    JUMLAH HARIPASIEN

    Sewa Kamar Operasi Besar 357 240.00 10.00 10.00 36.00 5.50 3.00 44.50 0.50

    Sewa Kamar Operasi Sedang 370 120.00 8.00 8.00 18.00 4.40 2.40 24.80 0.28

    Sewa Kamar Operasi Kecil 259 60.00 4.00 6.00 9.00 2.20 1.80 13.00 0.15

    Sewa Kamar Gips 300 30.00 2.00 4.00 4.50 1.10 1.20 6.80 0.08

    89.10 1.00

    +Membagi Komponen Biaya CSSD

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    49/54

    Membagi Komponen Biaya CSSD

    Hendra - H&A Consultant

    UNIT KERJA CSSDdata dari pembagian Unit Cost RS TOTAL Rp6

    DA jasa CSSD TINDAKAN

    BOBOT 1.00 SEWA ALAT

    SEWA OK

    TINDAKAN JUMLAH TINDAKAN

    Injeksi IV 6282 0 0 0

    Lepas kateter 200 1 200 1

    Pasang maag slang 200 0 0 0

    Pasang ransel verband 200 0 0 0

    200 1

    SEWA ALAT JUMLAH SEWA

    Alat Anastesi 264 0 0 0.00000

    Diatermi 420 0 0 0.00000

    Monitor 419 0 0 0.00000

    Torniquet 59 0 0 0.00000

    Tur 33 0 0 0.00000

    Pisau Tur 30 5 150 0.08099

    Meja Ortho 5 0 0 0.00000

    Steril alat Sedang 243 4 972 0.52484

    Steril alat Besar 146 5 730 0.39417

    1852 1 1,8

    SEWA AKOMODASI JUMLAH HARI PASIEN

    Sewa Kamar Operasi Besar 357 357 127449 0.374376524

    Sewa Kamar Operasi Sedang 370 370 136900 0.402138472

    Sewa Kamar Operasi Kecil 259 259 67081 0.197047851

    Sewa Kamar Gips 300 30 9000 0.026437153

    1031 340430 1 4,2

    +Membagi Komponen Biaya OPERASIONAL

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    50/54

    Membagi Komponen Biaya OPERASIONAL

    Hendra - H&A Consultant

    UNIT KERJAJUMLAHTRANS.

    DA OPR. Listrik Air Telpon Gedung Pemeliharaan IT Keuang

    TOTAL Rp51,955,951 Rp11,147,924 Rp2,364,798 Rp8,467,657 Rp8,924,318 Rp249,771 Rp1

    DA TINDAKAN waktu Rp30,098,101 Rp6,457,996 Rp1,369,929 Rp4,905,317 Rp5,169,860 Rp144,693 Rp

    BOBOTSEWAALAT 1.00 Rp9,935,386 Rp2,131,785 Rp452,214 Rp1,619,246 Rp1,706,571 Rp47,763 Rp

    TINDAKAN SEWA OK Rp11,922,464 Rp2,558,142 Rp542,656 Rp1,943,095 Rp2,047,886 Rp57,316 Rp

    Injeksi IV 6282 10.00 62820.0 Rp25,069,778 Rp5,379,095 Rp1,141,062 Rp4,085,813 Rp4,306,161 Rp120,520 Rp

    Lepas kateter 200 3.00 600.0 Rp239,444 Rp51,376 Rp10,898 Rp39,024 Rp41,129 Rp1,151

    Pasang maag slang 200 30.00 6000.0 Rp2,394,439 Rp513,763 Rp108,984 Rp390,240 Rp411,286 Rp11,511 R

    Pasang ransel verband 200 30.00 6000.0 Rp2,394,439 Rp513,763 Rp108,984 Rp390,240 Rp411,286 Rp11,511 R

    75420.0 30,098,101 6,457,996 1,369,929 4,905,317 5,169,860 144,693

    SEWA ALAT JUMLAH SEWA

    Alat Anastesi 264 120.00 31680.0 Rp2,194,303 Rp470,820 Rp99,875 Rp357,622 Rp376,909 Rp10,549 R

    Diatermi 420 120.00 50400.0 Rp3,490,937 Rp749,033 Rp158,892 Rp568,945 Rp599,628 Rp16,782 Rp

    Monitor 419 15.00 6285.0 Rp435,328 Rp93,406 Rp19,814 Rp70,949 Rp74,775 Rp2,093

    Torniquet 59 4.00 236.0 Rp16,346 Rp3,507 Rp744 Rp2,664 Rp2,808 Rp79

    Tur 33 120.00 3960.0 Rp274,288 Rp58,853 Rp12,484 Rp44,703 Rp47,114 Rp1,319

    Pisau Tur 30 120.00 3600.0 Rp249,353 Rp53,502 Rp11,349 Rp40,639 Rp42,831 Rp1,199

    Meja Ortho 5 120.00 600.0 Rp41,559 Rp8,917 Rp1,892 Rp6,773 Rp7,138 Rp200 Steril alat Sedang 243 120.00 29160.0 Rp2,019,756 Rp433,369 Rp91,930 Rp329,175 Rp346,927 Rp9,710 R

    Steril alat Besar 146 120.00 17520.0 Rp1,213,516 Rp260,378 Rp55,234 Rp197,776 Rp208,442 Rp5,834 R

    143441.0 9,935,386 2,131,785 452,214 1,619,246 1,706,571 47,763

    SEWA AKOMODASI JUMLAH HARI PASIEN

    Sewa Kamar Operasi Besar 357 240.00 85680.0 Rp6,606,627 Rp1,417,550 Rp300,704 Rp1,076,732 Rp1,134,801 Rp31,760 Rp

    Sewa Kamar Operasi Sedang 370 120.00 44400.0 Rp3,423,602 Rp734,585 Rp155,827 Rp557,971 Rp588,062 Rp16,459 R

    Sewa Kamar Operasi Kecil 259 60.00 15540.0 Rp1,198,261 Rp257,105 Rp54,539 Rp195,290 Rp205,822 Rp5,760 R

    Sewa Kamar Gips 300 30.00 9000.0 Rp693,973 Rp148,902 Rp31,587 Rp113,102 Rp119,202 Rp3,336 R

    154620.0 11,922,464 2,558,142 542,656 1,943,095 2,047,886 57,316

    +Membagi Komponen Biaya OVERHEAD

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    51/54

    Membagi Komponen Biaya OVERHEAD

    Hendra - H&A Consultant

    UNIT KERJA JUMLAH TRANSAKSI OHC BEBAN OH

    data dari pembagian Unit Cost RS Rp26,073,647 TOTAL Rp19

    ambil data RIIL TINDAKAN Rp11

    DA waktu SEWA ALAT Rp3BOBOT 1.00 SEWA OK Rp4

    TINDAKAN JUMLAH TINDAKAN

    Injeksi IV 6282 10 62820 0.83294 Rp

    Lepas kateter 200 3 600 0.00796

    Pasang maag slang 200 30 6000 0.07955 Rp

    Pasang ransel verband 200 30 6000 0.07955 Rp

    75420 1 Rp11

    SEWA ALAT JUMLAH SEWA

    Alat Anastesi 264 120 31680 0.22086 Rp

    Diatermi 420 120 50400 0.35136 Rp

    Monitor 419 15 6285 0.04382 Rp

    Torniquet 59 4 236 0.00165

    Tur 33 120 3960 0.02761 RpPisau Tur 30 120 3600 0.02510

    Meja Ortho 5 120 600 0.00418

    Steril alat Sedang 243 120 29160 0.20329 Rp

    Steril alat Besar 146 120 17520 0.12214 Rp

    143441 1 37,966,16

    SEWA AKOMODASI JUMLAH HARI PASIEN

    Sewa Kamar Operasi Besar 357 240 85680 0.554133 Rp

    Sewa Kamar Operasi Sedang 370 120 44400 0.287156 Rp

    Sewa Kamar Operasi Kecil 259 60 15540 0.100504 Rp

    Sewa Kamar Gips 300 30 9000 0.05821 Rp

    154620 1 45,559,39

    +4 REKAPITULASI PEMBAGIAN BIAYA OK

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    52/54

    4. REKAPITULASI PEMBAGIAN BIAYA OK

    Hendra - H&A Consultant

    UNIT KERJA : KAMAR

    OPERASIJUMLAH

    TRANSAKSI SDM BHP Medis CSSDRumah Tangga

    BIAYA OPR. OHC TO(a) Boga Pencucian

    data dari pembagian Unit Cost RS Rp335,436,194 Rp6,917,400 Rp6,100,984 Rp16,559,557 Rp89,386,741 Rp26,073,647

    TINDAKAN JUMLAH TINDAKAN

    Injeksi IV 6282 Rp51,150,640 Rp- Rp- Rp- Rp- Rp43,130,878 Rp95,799,315 R

    Lepas kateter 200 Rp22,192,341 Rp- Rp- Rp- Rp- Rp411,947 Rp914,989

    Pasang maag slang 200 Rp64,411,918 Rp- Rp- Rp- Rp- Rp4,119,473 Rp9,149,887

    Pasang ransel verband 200 Rp56,563,407 Rp- Rp- Rp- Rp- Rp4,119,473 Rp9,149,887

    SEWA ALAT JUMLAH SEWA

    Alat Anastesi 264 Rp10,331,557 Rp514,221 Rp- Rp- Rp- Rp3,775,152 Rp8,385,106

    Diatermi 420 Rp7,600,604 Rp- Rp- Rp- Rp- Rp6,005,924 Rp13,339,941

    Monitor 419 Rp2,977,726 Rp- Rp- Rp- Rp- Rp748,953 Rp1,663,522

    Torniquet 59 Rp2,434,826 Rp- Rp- Rp- Rp- Rp28,123 Rp62,465

    Tur 33 Rp8,719,308 Rp- Rp- Rp- Rp- Rp471,894 Rp1,048,138

    Pisau Tur 30 Rp8,719,308 Rp- Rp148,242 Rp- Rp- Rp428,995 Rp952,853 Meja Ortho 5 Rp8,719,308 Rp- Rp- Rp- Rp- Rp71,499 Rp158,809

    Steril alat Sedang 243 Rp7,041,253 Rp- Rp960,609 Rp- Rp3,121,771 Rp3,474,856 Rp7,718,109

    Steril alat Besar 146 Rp7,600,604 Rp- Rp721,445 Rp- Rp2,344,540 Rp2,087,773 Rp4,637,218

    SEWA AKOMODASI JUMLAH HARI PASIEN

    Sewa Kamar Operasi Besar 357 Rp38,443,502 Rp2,528,563 Rp1,598,846 Rp- Rp2,696,647 Rp11,366,260 Rp25,245,950

    Sewa Kamar Operasi Sedang 370 Rp21,424,693 Rp2,163,700 Rp1,717,408 Rp- Rp2,235,875 Rp5,890,079 Rp13,082,635

    Sewa Kamar Operasi Kecil 259 Rp11,230,686 Rp1,194,733 Rp841,530 Rp- Rp1,173,834 Rp2,061,528 Rp4,578,922

    Sewa Kamar Gips 300 Rp5,874,513 Rp516,183 Rp112,905 Rp- Rp453,218 Rp1,193,935 Rp2,651,885

    335,436,194 6,917,400 6,100,984 - 12,025,886 89,386,741 198,539,630

    +5 PENENTUAN TARIF

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    53/54

    5. PENENTUAN TARIF

    Hendra - H&A Consultant

    UNIT KERJA : KAMAR OPERASI JML. TRANSAKSITOTAL BIAYA DASAR TARIF TARIF 2015 PROFIT

    data dari pembagian Unit Cost RS

    TINDAKAN JML. TINDAKAN

    Injeksi IV 6282 Rp190,080,834 Rp30,258 20%

    Lepas kateter 200 Rp23,519,277 Rp117,596 20%

    Pasang maag slang 200 Rp77,681,277 Rp388,406 20%

    Pasang ransel verband 200 Rp69,832,766 Rp349,164 20%

    SEWA ALAT JUMLAH SEWA

    Alat Anastesi 264 Rp23,006,036 Rp87,144 Rp100,000 20%

    Diatermi 420 Rp26,946,469 Rp64,158 Rp50,000 20%

    Monitor 419 Rp5,390,201 Rp12,864 Rp200,000 20%

    Torniquet 59 Rp2,525,413 Rp42,804 Rp50,000 20%

    Tur 33 Rp10,239,340 Rp310,283 Rp300,000 20%

    Pisau Tur 30 Rp10,249,398 Rp341,647 Rp350,000 20%

    Meja Ortho 5 Rp8,949,616 Rp1,789,923 Rp200,000 20%

    Steril alat Sedang 243 Rp22,316,597 Rp91,838 Rp175,000 20%Steril alat Besar 146 Rp17,391,580 Rp119,120 Rp225,000 20%

    SEWA AKOMODASI

    JML. HARI

    PASIEN

    Sewa Kamar Operasi Besar 357 Rp81,879,767 Rp229,355 Rp1,000,000 50%

    Sewa Kamar Operasi Sedang 370 Rp46,514,391 Rp125,715 Rp800,000 40%

    Sewa Kamar Operasi Kecil 259 Rp21,081,233 Rp81,395 Rp500,000 30%

    Sewa Kamar Gips 300 Rp10,802,639 Rp36,009 Rp120,000 20%

    648,406,835

  • 7/25/2019 Peran Unit Cost Dalam Strategi Rs - 29 Nov 2015

    54/54

    +Terima kasih

    Selamat Bekerja

    29 Nov 2015 Hendra - H&A Consultant