PENGARUH POSISI PENGELASAN 3G VERTICAL UP DAN...

15
PENGARUH POSISI PENGELASAN 3G VERTICAL UP DAN VERTICAL DOWN PADA MATERIAL SA-36 TERHADAP KEKUATAN TARIK TUGAS AKHIR Diajukan Kepada : UNIVERSITAS MUHAMMADIYAH MALANG SEBAGAI SYARAT UNTUK MEMPEROLEH GELAR SARJANA TEKNIK MESIN STRATA SATU (S1) Disusun Oleh : ARIF DWI CAHYOKO 201210120311200 JURUSAN TEKNIK MESIN FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH MALANG 2017

Transcript of PENGARUH POSISI PENGELASAN 3G VERTICAL UP DAN...

  • PENGARUH POSISI PENGELASAN 3G

    VERTICAL UP DAN VERTICAL DOWN PADA MATERIAL SA-36

    TERHADAP KEKUATAN TARIK

    TUGAS AKHIR

    Diajukan Kepada :

    UNIVERSITAS MUHAMMADIYAH MALANG

    SEBAGAI SYARAT UNTUK MEMPEROLEH GELAR

    SARJANA TEKNIK MESIN STRATA SATU (S1)

    Disusun Oleh :

    ARIF DWI CAHYOKO

    201210120311200

    JURUSAN TEKNIK MESIN

    FAKULTAS TEKNIK

    UNIVERSITAS MUHAMMADIYAH MALANG

    2017

  •  

    ix    

    KATA PENGANTAR

    Puji syukur saya panjatkan kehadirat Tuhan Yang Maha Esa yang telah

    memberikan segala barokah dan hidayah serta rahmat-Nya sehingga saya dapat

    menyelesaikan Tugas Akhir dengan judul “Pengaruh Posisi Pengelasan 3G

    Vertikal Up dan Vertikal Down Pada Material SA-36 Terhadap Kekuatan

    Tarik” Saya menyadari bahwa tanpa bantuan dari berbagai pihak tidak mungkin

    dapat menyelesaikan pembuatan Tugas Akhir ini.Untuk itu saya mengucapkan

    terima kasih atas bimbingan dan bantuannya kepada :

    1. Kedua Orang Tua dan Saudara-saudari saya yang selalu memberikan do’a dan

    dukungannya.

    2. Bapak Ir. Eko Hariyadi, MT selaku dosen pembimbing I yang selalu

    membimbing dalam menyelesaikan tugas akhir ini.

    3. Bapak Ir. Herry Supriyanto, MT selaku dosen pembimbing II yang selalu

    membimbing dalam menyelesaikan tugas akhir ini.

    4. Seluruh Dosen dan staf pengajar di jurusan teknik mesin universitas

    muhammadiyah malang.

    5. Teman-teman teknik mesin angkatan 2012 khususnya kelas D selalu

    memberikan motivasi dalam penyelesaian tugas akhir ini.

    6. Semua pihak lain yang turut membantu pembuatan tugas akhir ini.

    Semoga Tuhan Yang Maha Esa memberikan balasan yang sebesar-besarnya

    atas segala kemurahan hati dan kebaikan kepada pihak yang telah membantu.

  •  

    x      

    Saya menyadari bahwa dalam pembuatan laporan ini masih banyak

    kekurangan dan keterbatasan dalam pembuatan Tugas akhir ini, untuk itu saya

    sangat berterima kasih atas saran dan kritik yang bersifat membangun sehingga

    dapat meningkatkan kemampuan saya dimasa yang akan datang.

    Malang, 10 Mei 2017

    Penyusun

  • UNIVERSITAS MUHAMMADIYAH MALANG FAKULTAS TEKNIK – JURUSAN TEKNIK MESIN

    Jl. Raya Togomas No. 246 Telp (0341) 464318 pes. 128. Fax (0341) 460782 Malang 65144  

    iv    

    BERITA ACARA

    BIMBINGAN TUGAS AKHIR (TA)

    Nama : Arif Dwi Cahyoko NIM : 201210120311200 Program Studi : Strata Satu (S1) No. ST. Pem. TA : E.3.d/388/FT/UMM/X/16 Tgl.ST.TAKeluar : 3 Oktober 2016 Judul : Pengaruh Posisi Pengelasan Vertikal Up dan Vertikal Down

    Pada Material SA-36 Terhadap Kekuatan Tarik Pembimbing I : Ir. Eko Hariyadi, MT

    NO TANGGAL URAIAN ASISTENSI TTD

    1 18/10/2016 ACC judul

    2 19/10/2016 Konsultasi BAB I

    3 20/10/2016 ACC BAB I

    4 28/11/2016 Konsultasi BAB II

    5 06/12/2016 ACC BAB II

    6 27/03/2017 Konsultasi BAB III

    7 01/03/2017 ACC BAB III

    8 10/03/2017 Konsultasi BAB IV

    9 14/03/2017 ACC BAB IV

    10 14/03/2017 Konsultasi BAB V

    11 16/03/2017 ACC BAB V dan Seminar Hasil Mengetahiu : Ketua Jurusan Teknik Mesin Ir. Daryono, MT NIP.10889090124

    Malang, 10 Mei 2017 Dosen Pembimbing I Ir. Eko Hariyadi, MT NIP.108.9303.0292

  • UNIVERSITAS MUHAMMADIYAH MALANG FAKULTAS TEKNIK – JURUSAN TEKNIK MESIN

    Jl. Raya Togomas No. 246 Telp (0341) 464318 pes. 128. Fax (0341) 460782 Malang 65144  

    v      

    BERITA ACARA

    BIMBINGAN TUGAS AKHIR (TA)

    Nama : Arif Dwi Cahyoko NIM : 201210120311200 Program Studi : Strata Satu (S1) No. ST. Pem. TA : E.3.d/388/FT/UMM/X/16 Tgl.ST.TAKeluar : 3 Oktober 2016 Judul : Pengaruh Posisi Pengelasan Vertikal Up dan Vertikal Down

    Pada Material SA-36 Terhadap Kekuatan Tarik Pembimbing II : Ir. Herry Supriyanto, MT

    NO TANGGAL URAIAN ASISTENSI TTD

    1 11/10/2016 ACC judul

    2 14/10/2016 Konsultasi BAB I

    3 25/10/2016 ACC BAB I

    4 04/11/2016 Konsultasi BAB II

    5 08/12/2016 ACC BAB II

    6 26/02/2017 Konsultasi BAB III

    7 01/03/2017 ACC BAB III

    8 10/03/2017 Konsultasi BAB IV

    9 15/03/2017 ACC BAB IV

    10 16/03/2017 Konsultasi BAB V

    11 16/03/2017 ACC BAB V dan Seminar Hasil Mengetahiu : Ketua Jurusan Teknik Mesin Ir. Daryono, MT NIP.10889090124

    Malang, 10 Mei 2017 Dosen Pembimbing II Ir. Herry Supriyanto, MT NIP. 10887090049

  •  

    iii    

    LEMBAR PENGESAHAN SKRIPSI

    PENGARUH POSISI PENGELASAN VERTIKAL UP DAN VERTIKAL DOWN PADA MATERIAL SA-36 TERHADAP KEKUATAN TARIK

    Diajukan kepada :

    Universitas Muhammadiyah Malang Sebagai Salah Satu

    Persyaratan Untuk Memperoleh Gelar Sarjana Teknik

    Program Strata Satu (S1) Jurusan Teknik Mesin

    Disusun Oleh :

    ARIF DWI CAHYOKO

    201210120311200

    Diterima dan Disetujui

    Pada tanggal 10 Mei 2017

    Dosen Pembimbing I Dosen Pembimbing II

    Ir. Eko Hariyadi, MT NIP.108.9303.0292

    Ir. Herry Supriyanto, MT NIP. 10887090049

    Mengetahui, Ketua Jurusan Teknik Mesin

    Ir. Daryono, MT NIP. 10887090049

  •  

    vi    

    LEMBAR SURAT PERNYATAAN

    Yang bertanda tangan dibawah :

    Nama : Arif Dwi Cahyoko

    NIM : 201210120311200

    Tempat /Tanggal lahir : Blitar,12 Agustus 1992

    Jurusan : Teknik Mesin

    Fakultas : Teknik

    Instansi : Universitas Muhammadiyah Malang

    Dengan ini menyatakan dengan sebenar-benarnya bahwa :

    Sesungguhnya bahwa tugas akhir dengan judul “Pengaruh Posisi Pengelasan

    3G Vertikal Up dan Vertikal Down Pada Material SA-36 Terhadap Kekuatan

    Tarik” yang diajukan untuk memperoleh gelar sarjana S1 pada Jurusan Teknik

    Mesin, Fakultas Teknik, Universitas Muhammadiyah Malang. Sejauh yang saya

    ketahui bukan merupakan duplikasi (PLAGIASI) dari skripsi yang sudah

    dipublikasikan dan atau pernah dipakai untuk mendapatkan gelar kesarjanaan

    dilingkungan Universitas Muhammadiyah Malang atau instansi manapun, kecuali

    bagian yang sumber informasinya saya kutip dan daftar pustaka sebagaimana

    mestinya.

    Demikian surat pernyataan ini dibuat dengan sebenarnya untuk digunakan

    sebagaimana mestinya.

    Malang, 10 Mei 2017 Penulis, (Arif Dwi Cahyoko)

  • xi    

    DAFTAR ISI

    HALAMAN JUDUL ............................................................................................. i

    POSTER ................................................................................................................ ii

    LEMBAR PENGESAHAN .................................................................................. iii

    LEMBAR ASISTENSI ......................................................................................... iv

    LEMBAR PERNYATAAN .................................................................................. vi

    ABSTRAK ............................................................................................................ vii

    ABSTRACT.........................................................................................................viii

    KATA PENGANTAR .......................................................................................... ix

    DAFTAR ISI ......................................................................................................... xi

    DAFTAR GAMBAR ......................................................................................... .xiv

    DAFTAR TABEL .............................................................................................. xvii

    BAB I PENDAHULUAN .................................................................................... 1

    1.1 Latar Belakang ........................................................................................ 1

    1.2 Rumusan Masalah ................................................................................... 4

    1.3 Tujuan ..................................................................................................... 4

    1.4 Batasan Masalah ..................................................................................... 4

    1.5 Manfaat ................................................................................................... 4

    1.6 Posisi Pengelasan .................................................................................... 5

    BAB II TINJAUAN PUSTAKA ......................................................................... 7

    2.1 Hasil Penelitian Terdahulu ....................................................................... 7

    2.2 Pengertian Las ......................................................................................... 8

    2.2.1 Definisi Las ..................................................................................... 8

    2.2.2 Klasifikasi Cara-cara Pengelasan ..................................................... 8

  • xii    

    2.3 Las Busur Listrik ...................................................................................... 9

    2.3.1 Las Busur Listrik dengan Elektroda Terbungkus ............................. 10

    2.3.2 Elektroda .......................................................................................... 12

    2.4 Posisi Pengelasan ................................................................................... 14

    2.5 Kampuh V ............................................................................................... 20

    2.6 Kekuatan Sambungan .............................................................................. 21

    2.6.1 Kekuatan Statik ................................................................................ 21

    2.6.2 Efisiensi Sambungan ........................................................................ 24

    2.7 Patahnya Konstruksi Las .......................................................................... 25

    2.7.1 Patah Ulet ......................................................................................... 25

    2.7.2 Patah Getas ....................................................................................... 26

    2.7.3 Patah Fatik ........................................................................................ 27

    2.7.4 Patah Mulur ...................................................................................... 29

    2.8 Baja Karbon ............................................................................................. 30

    2.9 Parameter Pengelasan .............................................................................. 31

    2.10 Pengujian Tarik ...................................................................................... 33

    2.11 Standart ASME ...................................................................................... 36

    BAB III METODOLOGI PENELITIAN ......................................................... 38

    3.1 Diagram Alir Penelitian ........................................................................... 38

    3.2 Rancangan Penelitian ............................................................................... 39

    3.3 Variabel Penelitian ................................................................................... 39

    3.4 Waktu dan Tempat Penelitian .................................................................. 41

    3.5 Teknik Pengumpulan Data ....................................................................... 41

    3.6 Alat dan Bahan Penelitian ........................................................................ 42

    3.6.1 Alat ................................................................................................... 42

    3.6.2 Bahan ................................................................................................ 45

  • xiii    

    3.7 Pelaksanaan Penelitian ............................................................................. 47

    3.7.1 Persiapan Penentuan Arus Listrik Pada Mesin Las SMAW ............ 47

    3.7.2 Persiapan Bahan ............................................................................... 47

    3.7.3 Langkah-langkah Pengelasan ........................................................... 48

    3.8 Pengujian Yang Dilakukan ...................................................................... 50

    3.8.1 Pembuatan Spesimen Uji Tarik ........................................................ 51

    3.8.2 Pengujian Tarik ................................................................................ 51

    BAB IV ANALISA DATA DAN PEMBAHASAN ........................................... 54

    4.1 Bahan Eksperimen Sebelum Diuji ........................................................... 54

    4.2 Hasil Eksperimen ..................................................................................... 54

    4.2.1 Data Penelitian yang Diketahui ........................................................ 54

    4.2.2 Hasil Pengelasan ............................................................................... 55

    4.3 Hasil Pengujian Tarik ............................................................................... 57

    4.3.1 Hasil Pengujian Tarik Pada Tiap Spesimen ..................................... 58

    4.4 Analisa Hasil Pengujian Tarik ................................................................. 92

    BAB V KESIMPULAN ....................................................................................... 95

    5.1 Kesimpulan ..................................................................................................... 95

    5.2 Saran ................................................................................................................ 95

    DAFTAR PUSTAKA

    LAMPIRAN

  • xiv    

    DAFTAR GAMBAR

    Gambar 1.1 Posisi Pengelasan 3G Vertikal Up dan Vertikal Down ...................... 6

    Gambar 2.1 Macam-macam Cara Pengelasan ....................................................... 9

    Gambar 2.2 Las SMAW ........................................................................................ 10

    Gambar 2.3 Posisi Pengelasan 1G ......................................................................... 15

    Gambar 2.4 Posisi Pengelasan 2G .......................................................................... 15

    Gambar 2.5 Posisi Pengelasan 3G ......................................................................... 16

    Gambar 2.6 Posisi Pengelasan 3G Vertikal Ke Atas ............................................. 17

    Gambar 2.7 Posisi Pengelasan 3G Vetikal ke Bawah ........................................... 17

    Gambar 2.8 Posisi Pengelasan 4G ........................................................................ 18

    Gambar 2.9 Posisi Pengelasan Sambungan Sudut ................................................ 18

    Gambar 2.10 Posisi Pengelasan Sambungan Tumpul Pada Pipa .......................... 19

    Gambar 2.11 Posisi Pengelasan Sambungan Sudut Pada Pipa ............................ 20

    Gambar 2.12 Kampuh V ....................................................................................... 21

    Gambar 2.13 Batas Elastis dan Tegangan Luluh 0,2% ......................................... 22

    Gambar 2.14 Konsentrasi Tegangan Pada Las Sudut ........................................... 23

    Gambar 2.15 Terjadinya Patahan Ulet .................................................................. 26

    Gambar 2.16 Ciri Patahan Getas ........................................................................... 27

    Gambar 2.17 Permukaan Patahan Getas ............................................................... 27

    Gambar 2.18 Permukaan Patah Fatik .................................................................... 28

    Gambar 2.19 Skema Permukaan Patahan Fatik .................................................... 28

    Gambar 2.20 Kurva Mulur .................................................................................... 30

    Gambar 2.21 WPS Pada Pengelasan GTAW ........................................................ 32

  • xv    

    Gambar 2.22 PQR Pada Pengelasan GTAW ........................................................ 33

    Gambar 2.23 Kurva Tegangan Regangan ............................................................. 34

    Gambar 2.24 Spesimen Uji Tarik Standart ASME ............................................... 36

    Bagan 3.1 Diagram Alir Penelitian Pengelasan Posisi 3G .................................... 25

    Gambar 3.1 Mesin Las SMAW ............................................................................. 42

    Gambar 3.2 Gerinda .............................................................................................. 43

    Gambar 3.3 Penggaris ........................................................................................... 43

    Gambar 3.4 Alat Uji Tarik Shimadzu Corporation ............................................... 44

    Gambar 3.5 Mesin Frais ........................................................................................ 45

    Gambar 3.6 Elektroda ........................................................................................... 46

    Gambar 3.7 Penentuan Arus di Mesin Las SMAW .............................................. 47

    Gambar 3.8 Spesimen SA-36 ................................................................................ 47

    Gambar 3.9 Pembentukan Kampuh V dan Akar Las ............................................ 48

    Gambar 3.10 Pengelasan Vertikal ......................................................................... 49

    Gambar 3.11 Hasil Pengelasan Vertikal Up dan Vertikal Down .......................... 50

    Gambar 3.12 Spesimen Uji Tarik ASME-IX ........................................................ 51

    Gambar 4.1 Bentuk Sambungan Vertikal Up Arus 100A .................................... 55

    Gambar 4.2 Bentuk Sambungan Vertikal Up Arus 120A ..................................... 55

    Gambar 4.3 Bentuk Sambungan Vertikal Down Arus 100A ................................ 56

    Gambar 4.4 Bentuk Sambungan Vertikal Down Arus 120A ................................ 56

    Gambar 4.5 Spesimen No 1 3G Up Arus 100A .................................................... 60

    Gambar 4.6 Grafik Kekuatan Tarik Sambungan No 1 3G Up Arus 100A ........... 60

    Gambar 4.7 Spesimen No 2 3G Up Arus 100A .................................................... 62

    Gambar 4.8 Grafik Kekuatan Tarik Sambungan No 2 3G Up Arus 100A ........... 63

  • xvi    

    Gambar 4.9 Spesimen No 3 3G Up Arus 100A .................................................... 65

    Gambar 4.10 Grafik Kekuatan Tarik Sambungan No 3 3G Up Arus 100A ......... 65

    Gambar 4.11 Spesimen No 1 3G Up Arus 120A .................................................. 68

    Gambar 4.12 Grafik Kekuatan Tarik Sambungan No 1 3G Up Arus 120A ......... 68

    Gambar 4.13 Spesimen No 2 3G Up Arus 120A .................................................. 71

    Gambar 4.14 Grafik Kekuatan Tarik Sambungan No 2 3G Up Arus 120A ......... 71

    Gambar 4.15 Spesimen No 3 3G Up Arus 120A .................................................. 73

    Gambar 4.16 Grafik Kekuatan Tarik Sambungan No 3 3G Up Arus 120A ......... 74

    Gambar 4.17 Spesimen No 1 3G Down Arus 100A ............................................. 76

    Gambar 4.18 Grafik Kekuatan Tarik Sambungan No 1 3G Down Arus 100A .... 77

    Gambar 4.19 Spesimen No 2 3G Down Arus 100A ............................................. 79

    Gambar 4.20 Grafik Kekuatan Tarik Sambungan No 2 3G Down Arus 100A .... 79

    Gambar 4.21 Spesimen No 3 3G Down Arus 100A ............................................. 82

    Gambar 4.22 Grafik Kekuatan Tarik Sambungan No 3 3G Down Arus 100A .... 82

    Gambar 4.23 Spesimen No 1 3G Down Arus 120A ............................................. 85

    Gambar 4.24 Grafik Kekuatan Tarik Sambungan No 1 3G Down Arus 120A .... 85

    Gambar 4.25 Spesimen No 2 3G Down Arus 120A ............................................. 87

    Gambar 4.26 Grafik Kekuatan Tarik Sambungan No 2 3G Down Arus 120A .... 88

    Gambar 4.27 Spesimen No 3 3G Down Arus 120A ............................................. 90

    Gambar 4.28 Grafik Kekuatan Tarik Sambungan No 3 3G Down Arus 120A .... 90

    Gambar 4.29 Grafik Uji Tarik Rata-rata Batas Lulus, Kekuatan Tarik dan Beban Patah ...................................................................................................................... 92

    Gambar 4.30 Grafik Data Hasil Perhitungan Rata-rata Tegangan Tarik, Regangan dan Modulus Elastisitas ......................................................................................... 92

  • xvii    

    DAFTAR TABEL

    Table 2.1 Macam dan Fungsi Bahan Flusks ......................................................... 11

    Table 2.2 Spesifikasi Elektroda ............................................................................. 13

    Table 2.3 Spesifikasi Arus Menurut Tipe Elektroda dan Diameter ...................... 14

    Table 2.4 Efisiensi Sambungan ............................................................................. 25

    Table 2.5 Kekuatan Fatik Untuk Sambungan Tumpul .......................................... 29

    Table 2.6 Klasifikasi Baja Karbon ........................................................................ 33

    Table 3.1 Model Penelitian ................................................................................... 39

    Tabel 3.2 Jadwal Kegiatan .................................................................................... 41

    Tabel 4.1 Bentuk Patahan Hasil Pengujian Tarik ................................................. 57

    Tabel 4.2 Hasil Pengujian Tarik Pada Pengelasan 3G Up Arus 100A ................. 66

    Tabel 4.3 Hasil Pengujian Tarik Pada Pengelasan 3G Up Arus 120A ................. 75

    Tabel 4.4 Hasil Pengujian Tarik Pada Pengelasan 3G Down Arus 100A ............ 83

    Tabel 4.5 Hasil Pengujian Tarik Pada Pengelasan 3G Down Arus 120A ............ 91

    Tabel 4.6 Data Hasil Pengujian Tarik .................................................................. 92

  • DAFTAR PUSTAKA Arikunto, S. (2010). Prosedur Penelitian, Rineka Cipta, Jakarta. ASME Boiler and Pressure Veseel Code Section IX. Hamidi, 2007, Metode Penelitian dan Teori Komunikasi, UMM Press, Malang. Hery Soenawan, 2003, Teknik Las Listrik. Http://www.hima-tl-ppns.ac.id, Diakses pada tanggal 10 Februari 2017

    Http://www.pengelasan.com, Diakses pada tanggal 15 Februari 2017. Http://www.jetzukaj.blogspot.co.id/2014/02/posisi-pengelasan.html, Diakses pada tanggal

    20 Februari 2017. Saiful Huda, dkk., Analisa Pengaruh Variasi Arus dan Bentuk Kampuh Pada Pengelasan

    SMAW Distorsi Sudut dan Kekuatan Tarik Sambungan Butt-Join Baja AISI 4140, 2013.

    Soetardjo, 1977. Teknik Pengelasan. Wiryosumarto, H., 1979, Teknik pengelasan Logam, PT. Pradnya Paramita, Jakarta. Wiryosumarto, H., 2000, Teknik pengelasan Logam, Erlangga, Jakarta. Yanuardi Pribadi, dkk., Pengaruh Posisi Pengelassan dan Jenis Elektroda Temper Head

    Welding Terhadap Ketangguhan Hasil Las SMAW Pada Baja SS 41, Teknik Mesin, Universitas Brawijaya Malang, 2011.

    CoverKata PengantarLembar konsultasi asistensiLembar pengesahanLembar surat pernyataan plagiasiDaftar IsiDaftar Pustaka