Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

21
NO. PEKERJAAN SESUAI BOQ (Pekerjaan Kurang) 1 I PEKERJAAN DINDING, PARTISI 1 Dinding Sandwich Panel Command Center Room Security Room Toilet Pria Toilet Wanita Ruang Istirahat Locker Room Main Lobby Lobby dan koridor Ruang Panel Data Center On Duty Staging and Testing Room N O C Room Tape Media Storage room Ruang Tabung Ruang Power Outdoor PAC Room 2 PEKERJAAN INTERIOR Security Room Façade area Lobby Lift (Bahan ACP) Fasade area Main Lobby Meja command center PEKERJAAN PLAFOND AKUSTIK PANEL (Perubahan logo ASKES menjadi BPJS) (Perubahan logo ASKES menjadi BPJS)

description

ff

Transcript of Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

Page 1: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

NO.PEKERJAAN SESUAI BOQ

(Pekerjaan Kurang)1

CIVIL & ARSITEK I PEKERJAAN DINDING, PARTISI

1 Dinding Sandwich PanelCommand Center Room 63,046,974 Security Room 24,741,399 Toilet Pria 61,351,810 Toilet Wanita 49,459,930 Ruang Istirahat 30,129,907 Locker Room 14,470,360 Main Lobby 40,020,750 Lobby dan koridor 195,529,950 Ruang Panel 34,532,190 Data Center On Duty 39,334,680 Staging and Testing Room 42,765,030 N O C Room 45,509,310 Tape Media Storage room 40,706,820 Ruang Tabung 23,326,380 Ruang Power 32,473,980 Outdoor PAC Room 59,688,090

2 PEKERJAAN INTERIOR Security RoomFaçade area Lobby Lift (Bahan ACP) 9,678,000

Fasade area Main Lobby 9,678,000 Meja command center 17,340,000

PEKERJAAN PLAFOND AKUSTIK PANEL 72,372,663

(Perubahan logo ASKES menjadi BPJS)(Perubahan logo ASKES menjadi BPJS)

Page 2: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

Bongkar Lantai existing 160.00

Pasang Homogeneous tile 60 x 60 160.00

Screeding Lantai 160.00Nat Keramik 160.00Pembersihan 1.00

Berdasarkan hasil meeting lapanganBerdasarkan hasil meeting lapangan

Pasang Dinding hebel 71.20

Plester 142.400

Aci 142.400

Pengecatan 142.400Pembesian 1.000Pengecoran 1.000

Berdasarkan hasil meeting lapangan

Pasang Dinding hebel 40.80

Plester 81.20

Aci 81.20

Pengecatan 81.20Pembesian 1.000Pengecoran 1.000

Berdasarkan hasil meeting lapangan

Pasang Dinding Hebel 56.80

Plester 113.60

Aci 113.60

Pengecatan 113.60Pembesian 1.000Pengecoran 1.000

Adhi karya hanya menyiapkan wooden doorAdhi karya hanya menyiapkan wooden doorAdhi karya hanya menyiapkan wooden door

Adhi karya hanya menyiapkan wooden doorAdhi karya hanya menyiapkan wooden doorAdhi karya hanya menyiapkan wooden door

(Permintaan Askes mengenai penggantian tiles 30 x 30 menjadi 60 x 60, MOM kordinasi AK+MK+KDC+SEIT

Page 3: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

Tidak terlampir di gambar kerja awal

Permintaan di hasil meeting lapanganPermintaan di hasil meeting lapanganPermintaan di hasil meeting lapangan

Permintaan di hasil meeting lapangan

ELECTRICAL SYSTEM1

2

Page 4: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

3

906,156,865

TOTAL PEKERJAAN TAMBAH

Page 5: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

PEKERJAAN PENAMBAHAN DR BOQ(Pekerjaan Tambah)

2

CIVIL & ARSITEK

Pekerjaan dinding GypsumCommand Center RoomSecurity Room

Ruang IstirahatLocker RoomMain LobbyLobby dan koridor

Data Center On DutyStaging and Testing Room N O C RoomKolom coverPengecatan Dinding Gypsum

Pek. Pemasangan Plafond :R. Main lobbyR. NOC

R. Staging n TestingR. Data Center on dutyR. Buid up media storageR. TabungR. Power DCR. Selasar ServiceR.PanelPengecatan Plafon Gipsum

PEKERJAAN INTERIORacrylic & Stiker Askes wall Paper backGround

PEKERJAAN HOMOGENEOUS TILE

Page 6: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

Pemasangan Homogeneous Tile

lsls

PEKERJAAN PARTISI HEBELTape Media Storage room

Lotlot

Ruang Tabung

Lotlot

Ruang Power

Lotlot

PEKERJAAN PINTU BESIRuang B-up Media Storage Single door Uk. 90cm

Lantai 8Double door uk. 180cmRuang masuk ServerRuang Panel

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

D45
Faisal Yusman: Breakdown detail dari unsur pekerjaan
D53
Faisal Yusman: breakdown detail dari setiap unsur pekerjaan
Page 7: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

Partisi Bawah Raised Floor

Pekerjaan Kaca & Grill AcPekerjaan Kaca Mati Command Center Kaca Film 2 Muka

Pekerjaan Hanging partitionPekerjaan Hanging partition

Pekerjaan Grill Partition

ELECTRICAL SYSTEMPEKERJAAN MODIFIKASI PANEL (MSB B 9th Floor )

Panel Modification - additional of 1 cubicle (panel MSB B extention)MCCB 4P 160-400A - 50 KAMCCB 3P 100A - 25KABusbar & accessoriesAssembly

Panel UPS (for UPS Existing)MCCB 4P 160-400A - 50KAMCB 3P 63A - 10KAMCB 3P 32A - 10KADigital power meter (PM810)Surge arresterBusbar & accessoriesAssembly

Jasa Modifikasi Panel

- Jasa bongkar Pasang UPS Existing

- Dokumentasi, Startup, testing & Commissioning Panel (12 panel)- Delivery & positioning all electrical panel to Site

From MSB B Extension to Input 1 UPS Existing (4x1cx240mm2)+NYA 1x1cx240mm2From MSB B Extension to Input 2 UPS Existing(3x1cx240mm2)+NYA 1x1cx240mm2

(4x1cx240mm2)+NYA 1x1cx240mm2

- Jasa modifikasi panel MSB B, pasang panel MSB B extension, pasang panel UPS

PENAMBAHAN PANEL PEKERJAAN KABEL ELEKTRIKAL - UNTUK PANEL UPS Existing

From MSB B Extension to Panel UPS Existing (Manual Bypass cabling)

Page 8: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

(4x1cx240mm2)+NYA 1x1cx240mm2

Jasa Instalasi Kabel

PENAMBAHAN PEKERJAAN MATERIAL UNTUK PAC EXISTINGMaterial installation:Copper klas L + insulationGas line dia. 3/4"Liquid line dia. 7/8"Pipe fittingsPipe tray + coverDrain pipe + insulationIndoor & outdoor base frameRefrigerant R407C/R410A

TOTAL PEKERJAAN TAMBAH

From Output UPS existing to Panel UPS Existing (Output UPS cabling)

Page 9: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

PEKERJAAN PENAMBAHAN DR BOQ(Pekerjaan Tambah)

2

CIVIL & ARSITEK

Jumlah 22,770,000 22,770,000 27,133,333 27,133,333 Kenapa ada pekerjaan tambah?

- -

6,600,000 6,600,000 12,100,000 12,100,000 56,466,667 56,466,667

129,066,667 129,066,667 -

33,000,000 33,000,000 28,600,000 28,600,000 28,233,333 28,233,333 85,800,000 85,800,000 82,736,471 82,736,471

- - -

145,896,667 145,896,667

17,858,824 17,858,824 - -

10,000,000 10,000,000 9,533,333 9,533,333

- -

Page 10: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

-

51,750 8,280,000

474,375 75,900,000

77,625 12,420,000 51,750 8,280,000 3,400,000 3,400,000

- - -

420,000 29,904,000

175,000 24,920,000

190,000 27,056,000

75,162 10,703,069 9,500,000 9,500,000 9,500,000 9,500,000

-

420,000 17,136,000

175,000 14,210,000

190,000 15,428,000

75,162 6,103,154 9,500,000 9,500,000 9,500,000 9,500,000

-

420,000 23,856,000

175,000 19,880,000

190,000 21,584,000

75,162 8,538,403 9,500,000 9,500,000 9,500,000 9,500,000

- - -

16,266,667 16,266,667 - -

22,173,333 22,173,333 19,564,706 19,564,706 19,564,706 19,564,706

-

Page 11: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

18,000,000 18,000,000 Harga disesuaikan dengan BoQ (jgn terlalu mahal) - -

25,000,000 25,000,000 7,175,000 7,175,000

- 62,000,000 62,000,000 Dihilangkan32,750,000 32,750,000

1,302,888,332

ELECTRICAL SYSTEM

-

-

-

-

-

-

Page 12: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

-

-

-

1,302,888,332

TOTAL PEKERJAAN TAMBAH 396,731,468

Page 13: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

Kenapa ada pekerjaan tambah?

Pastikan Harga sesuai dgn BoQ untuk material Gypsum

Pastikan Harga tidak terlalu "mahal"

Pekerjaan ini tidak dilaksanakan, jadi sub pekerjaan ini otomatis menjadi biaya pengurangan atas pekerjaan tambah

Page 14: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

Pastikan Harga sesuai dgn BoQ untuk material Homogeneous

Satuan utk pekerjaan ini nilai angka nya ketinggian ada baiknya angka ini di adjustment

Page 15: Pekerjaan_Kurang_Tambah_Analisa_r281113NS(1) 03-12-2013-1

Harga disesuaikan dengan BoQ (jgn terlalu mahal)

Dihilangkan