Page 1: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

PEKERJAAN ARSITEKTURPEKERJAAN ARSITEKTUR

Page 2: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

PEKERJAAN PASANGAN BATU BATA

1. RENCANA POSISI PASANGAN BATA SESUAI SHOP DRAWINGS

AS BANGUNAN

BATU BATA

2. BUAT TIANG KAYU / PROFILAN PADA KOLOM-KOLOM STRUKTUR DENGAN POSISI SEPERTI GAMBAR DI BAWAH INI

BATU BATA

AS

• PROFIL KAYU HARUS LURUS DAN DISERUT PADA KEEMPAT SISI

• CHECK POSISI KETEGANGAN KAYU DENGAN WATER PASS

• BUAT SKALA PADA PROFIL YANG TERPASANG TERSEBUT

• KETINGGIAN / SKALA ANTARA PROFIL HARUS SAMA BAIK ELEVASI MAUPUN JARAK ANTARA SKALA

• PROPIL KAYU HARUS KUAT / TIDAK BOLEH BERGERAK / BERGESER SELAMA PEK. PAS. BATA BERLANGSUNG

Page 3: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

3. HUBUNGAN SKALA PADA PROFIL TERSEBUT YANG SAMA ELEVASINYA DIUSAHAKAN JARAK ANTARA SKALA SETIAP KELIPATAN 3 LAPIS BATA

BENANG NILON

PROFIL KAYU

A

A

As

Benang nylonTiang kayu

DENAH

TAMPAK

KOLOM

.POSISI BENANG

POTONGAN A - A

As bangunan

PROFIL KAYUKOLOM

Page 4: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

4. BILA BENTANG ANTAR KOLOM > 4 M DIUSAHAKAN DITENGAH – TENGAH BENTANG TERSEBUT DI PASANG KOLOM PRAKTIS 5. PENGECORAN KOLOM PRAKTIS DILAKSANAKAN SETIAP KETINGGIAN 1 – 1.5 M 6. PASANGAN BATA HANYA BISA DILAKSANAKAN SETELAH KOLOM PRAKTIS SELESAI DI COR

Lo > 4 m

1 m

BESI

DI COR

BEKISTING

HAL – HAL YANG HARUS DIPERHATIKAN :

1. SEBELUM DI PASANG BATA HARUS DIRENDAM SAMPAI JENUH AIR 2. PASIR YANG DIGUNAKAN DI AYAK DAHULU UNTUK MENDAPATKAN GRADASI MATERIAL YANG SERAGAM 3. AIR YANG DIGUNAKAN HARUS BEBAS DARI PENGARUH ASAM 4. POSISI PASANGAN BATA ANTAR LAPISAN HARUS ZIG – ZAG

ALAT YANG DIGUNAKAN :

1. SARINGAN PASIR 2. SENDOK ADUKAN 3. CANGKUL 4. BENANG NYLON 5. PROFIL KAYU 6. EMBER

KAPASITAS PRODUKSI :

1. 2 TUKANG 2. 1 KENEK

17.5 M2/HARI

Page 5: Pekerjaan Arsitektur

AADDHHII KKAARRYYAAF

LO

W C

HA

RT P

AS

AN

GA

N B

ATU

BA

TA

CATATAN.

SEB

ELU

M D

IPA

SA

NG

BA

TA

H

AR

US

D

ICELU

P A

TA

U D

IREN

DA

M D

ALA

M

AIR

PEK

ER

JAA

N P

EN

GU

KU

RA

N

DA

N

PEM

AS

AN

GA

N P

RO

FIL

HU

BU

NG

ELE

VA

SI YA

NG

SA

MA

PA

DA

PR

OFIL

DEN

GA

N B

EN

AN

G

PA

SA

NG

BA

TA

PA

SA

NG

AN

GK

UR

SETIA

P 3

LA

PIS

B

ATU

BEN

TA

NG

ILO

STA

RT

FIN

ISH

PA

SA

NG

KO

LOM

PR

AK

TIS

LO >

4

LO <

4

Page 6: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

PEKERJAAN KUSEN

1. Installing ready frame 2. Checking frame with wall 3. Drilled at concrete frame

4. Fill Fischer into drill hole 5. Install window 6. Fill sealant & mortar

Page 7: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

PEKERJAAN PLESTERAN DAN ACI

1

GAMBAR 2

A

C

B

D

1 M

JIDAR PENGGESEK

BIDANG PLESTERAN

GAMBAR 4

ARAH GERAKAN JIDAR

GAMBAR 3

1 M

KEPALAN

BENANG LOT

PAKU BESAR

LOTAN

1

GAMBAR 1

TITIK KEPALAN

C

A B

D

1

PAKU BESAR

METERAN

DIN

DIN

G T

EM

BO

K

BIDANG PLESTERAN

METERAN

BENANG LOT

LOTAN

POTONGAN 1-1

A = C

A

C

Page 8: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

KETERANGAN

1. Buat titik kepalan plesteran minimal pada dua titik

( misal titik A dan B )

2. Buat titiki bantu kepalan antara A-B dengan jarak 1 m

3. Proyeksikan ketebalan titik kepalaan A dan B ke C

dan D.

4. Buat titik – titik bantu kepalan antara A-C dan B- D

( secara vertikal )

5. Hubungkan titik – titik kepalan secara vertikal

6. Diamkan kepalan terdebut minimal 1 hari supaya mengering

7. Kamprotkan adukan spesi antara dua kepalan

8. Ratakan dengan jidar dan finish dengan roskam

HAL-HAL YANG PERLU DIPERHATIKAN

1. Sebelum plesteran di mulai dinding pasangan bata disiram dahulu menggunakan air agar dinding bata menjadi jenuh

2. Pengamprotan spesi plesteran berjalan dari bawah ke atas

3. Jarak antara kepalan maksimal 1 m

4. Jidar yang dipakai harus rata, lurus dan tidak boleh melengkung dan lebih panjang dari jarak antar kepalaan

5. Pasir yang digunakan harus diayak agar memperoleh gradasi material yang seragam

6. Air tidak boleh mengandung zat kimia atau asam / garam

ALAT YANG DIPERGUNAKAN

1. Saringan 5. Ember 9. Selang Air

2. Cangkul 6. Jidar

3. Benang Lot + Lotan 7. Sendok Adukan

4. Meteran 8. Roskam

KAPASITAS PRODUKSI

1. 2 Tukang

2. 1 Kenek 20 m² / hari

Page 9: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

FL

OW

CH

AR

T P

LE

ST

ER

AN

DA

N A

CIA

N

FINISH

ST

AR

T

BU

AT

T

ITIK

B

AN

TU

K

EP

ALA

AN

M

INIM

AL

2 T

ITIK

BE

RB

ED

A

HU

BU

NG

KA

N

2 T

ITIK

K

EP

ALA

AN

T

ER

SE

BU

T

DE

NG

AN

BE

NA

NG

LO

T

AN

TA

RA

2

TT

K

KE

PA

LAN

T

SB

B

UA

T

TT

K

–TT

K

KE

PA

LAN

LA

IN D

NG

JA

RA

K

1M

DE

NG

AN

C

AR

A

YA

NG

S

AM

A

BU

AT

T

TK

–T

TK

B

AN

TU

KE

PA

LAN

DR

TT

K

KE

PA

LAA

N

TS

B

SE

CA

RA

V

ER

TIK

AL

HU

BU

NG

KA

N

TT

K

– T

TK

K

EP

ALA

N

SE

CA

RA

V

ER

TIK

AL

TS

B

DE

NG

AN

S

PE

SI

PLE

ST

ER

AN

S

EH

ING

GA

M

UN

CU

L G

RS

-G

RS

VE

RT

IKA

L S

PE

SI

PA

DA

D

IND

ING

BA

TA

BIA

RK

AN

JA

UR

K

EP

ALA

AN

T

SB

ME

NG

ER

AS

KA

MP

RO

TK

AN

A

DU

KA

N

SP

ES

I P

AD

A

DIN

DIN

G

AN

TA

RA

DU

A K

EP

ALA

AN

RA

TA

KA

N

DE

NG

AN

JI

DA

R

DA

N R

OS

KA

M

FIN

ISH

A

A

Page 10: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

PEKERJAAN LANTAIPEKERJAAN LANTAI TILE ( LANTAI KERAMIK, LANTAI GRANITO, VINIL DAN LAIN-LAIN)

1. CHECK KONDISI REAL DILAPANGAN DAN BUAT SHOP DRAWING

2. TENTUKAN POSISI START POINT DALAM SHOPDRAWING DAN MINTALAH PERSETUJUAN DARIPENGAWAS / MK

3. TERAPKAN POSISI START POINT YANG SUDAHDISETUJUI DI LAPANGAN SEBAGAI CONTOH LIHATGAMBAR DIBAWAH INI.

4. PASANG KERAMIK MENURUT SALAH SATU ARAH SUMBU KEPALAAN

5. PEMASANGAN BERIKUTNYA DILAKSANAKAN DENGANCARA MENGGESER BENANG NYLON SEJAJAR DENGANSALAH SATU SUMBU KEPALAAN

.

CONTOH DENAH

BENANG NYLON

BENANG NYLON

ARAH KEPALAAN

BENANG NYLONDI GESER

BENANG NYLON

CONTOH DENAH

.STRAT POINT

BENANG NYLONDI GESER

Page 11: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

BENANG NYLON DI GESER

BENANG NYLON

HAL – HAL YANG PERLU DIPERHATIKAN :

1. CHECK TERHADAP ELEVASI LANTAI PADA SAAT MEMBUAT KEPALAAN AWAL

2. PASIR YANG DIGUNAKAN HARUS DIAYAK AGAR MENDAPATKAN GRADASI MATERIAL YANG SERAGAM

3. AIR YANG DIGUNAKAN MEMENUHI SYARAT SEBAGAI AIR MINUM

4. SEBELUM DIPASANG KERAMIK HARUS DIRENDAM DALAM AIR DAHULU SAMPAI JENUH

5. PADA SAAT PEMASANGAN KERAMIK HARUS DIPASTIKAN BAHWA SPESI YANG TERLETAK DIBAWAH KERAMIK BENAR-BENAR PADAT TIDAK BERONGGA DENGAN CARA DIPUKUL – PUKUL DENGAN PALU KARET

6. PEMASANGAN KERAMIK DAPAT JUGA DENGAN CARA MENGGUNAKAN LEM (TERGANTUNG PERMINTAAN SPEK)

7. CHECK KERATAAN PASANGAN KERAMIK DENGAN JIDAR ATAU PUN DENGAN WATER PASS

CONTOH DENAH

ALAT YANG DIPERLUKAN :

1. PALU KARET2. ZIDAR / WATER PASS3. BESI SIKU4. BENANG NYLON5. EMBER DAN GAYUNG6. SKRAP7. SAPU8. SPON BASAH / KAIN BASAH

ZIDAR /WATER PASS

Page 12: Pekerjaan Arsitektur

AADDHHII KKAARRYYAAF

LO

W C

HA

RT

L

AN

TA

I K

ER

AM

IK S

TA

RT

CH

EC

K /

UK

UR

KO

ND

ISI

RE

AL

LAP

AN

GA

N

BU

AT

SH

OP

DR

AW

ING

K

EN

AIK

AN

ST

AR

T P

OIN

T

TE

RA

PK

AN

SH

OP

DR

AW

ING

D

ILA

PA

NG

AN

DE

NG

AN

S

TS

RT

PO

INT

SE

BA

GA

I K

EP

ALA

N A

WA

L

PA

SA

NG

KE

RA

MIK

B

ER

IKU

TN

YA

DIL

AK

UK

AN

D

EN

GA

N C

AR

A

ME

NG

GE

SE

R B

EN

AN

G

SE

JAJA

R D

EN

GA

N A

RA

H

KE

PA

LAA

N L

AP

IS D

EM

I LA

PIS

ISI

HE

AD

-HE

AD

DE

NG

AN

B

AH

AN

YA

NG

D

ITE

NT

UK

AN

DA

LAM

S

PE

K

FIN

ISH

Page 13: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

PEKERJAAN PLAFOND

1. Marking ceiling elevation 2. Determine pattern of frame after fixing wall angle 3. Fix hanger at the frame pattern that have determined

4. Fix frame and hanger 5. Adjust the frames to flat the elevation 6. Fix ceiling panel

Page 14: Pekerjaan Arsitektur

AADDHHII KKAARRYYAA

PEKERJAAN CLADDING / CURTAIN WALL

LUBANG TITIK PINJAMAN

LANTAI DASAR 3.1. Start point

Start point

Start point Start point

• CHECK DAN UKUR KONDISI TIAP LANTAI DI LAPANGAN

• TENTUKAN POSISI START POINT TIAP LANTAI

• BUAT SHOP DRAWING DAN MINTAKAN PERSETUJUANNYA PADA PENGAWAS ATAU MK

• PASANG PROFIL MULLION YANG MENGHUBUNGKAN TITIK TERSEBUT DARI LANTAI KE LANTAI

• CHECK KETEGAKANNYA SELAMA PROSES BERLANGSUNG

•PASANG PROFIL TRANNSOM SECARA TEGAK LURUS/MENYILANG TERHADAP PROFIL MULLION SESUAI SHOP DRAWING

• PASANG PANEL DIDING EXTERIORBILA : -TERBUAT DARI KACA ( CURTAIN WALL ) -TERBUAT DARI ALUMUNIUM ( CLADDING )

• PASANG SEALENT PADA NAAT PANEL DIDING EXTERIOR• BUKA LAPISAN PENUTUP CLADDING BILA DIDING TERBUAT DARI

ALUMUNIUM

CATATAN : 1. PANEL-PANEL PENUTUP EXTERIOR

SUDAH DISIAPKAN DI WORKSHOP2. SISTEM SAMBUNGAN TERGANTUNG

PERSETUJUAN DARI PENGAWAS3. PELAKSANAAN PEMASANGN DIDING

PENUTUP SEBAIKNYA DENGAN BANTUAN ALAT GONDOLA

4.

POSISI HARUS

TEGAK LURUS

2.

5.

• TERAPKAN DAN PLOTKAN POSISI DARI TITIK-TITIK UNTUK PEGANGAN PROFIL MULLION PADA BAGIAN TEPI BANGUNAN

• TIAP LANTAI CHECK KELURUSANNYA POSISI TITIK-TITIK MULLION

• YANG SAMA DARI LANTAI ATAS s/d BAWAH DAN SEBALIKNYA