PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

74
1 PAPARAN KEPALA DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN TENGAH GUBERNUR KALIMANTAN TENGAH Kepada

Transcript of PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

Page 1: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

1

PAPARAN

KEPALA DINAS PEKERJAAN UMUM

PROVINSI KALIMANTAN TENGAH

GUBERNUR KALIMANTAN TENGAH

Kepada

Page 2: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

2

1. EXISTING2. TARGET3. STRATEGI4. DANA YANG DIPERLUKAN5. EVALUASI 20066. KINERJA 20077. PROGRAM 20088. STRATEGI PERCEPATAN9. KEBUTUHAN TENAGA

( SISTEM PENYAJIAN )

Page 3: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

3

Page 4: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

4

I.EXISTING PENGAIRANI.EXISTING

PENGAIRANKONDISI PERMASALAHAN PEMECAHAN

A. BID. PENGAIRANRAWA 114.000 HaIRIGASI12.000 Ha

• Lahan Pengairan Tidak Optimal•Teknik Rawa Masih Sederhana Dan Semi Teknis

Koordinasi pemanfaatan Jaringan Pengairan dgn Pertanian, Perikanan, Peternakan, Koperasi, Transmigrasi

B. PENYEDIAAN AIR BAKU

Operasional Tidak Optimal

Pemerintah Kab./Kota memberikan subsidi kpd masyarakat utk mengelola prasarana air baku

C. BANJIR DN ABRASI PANTAI

• DAS “Terganggu”Mengakibatkan Banjir, Tebing Sungai Runtuh Dll.• Terkikisnya Daerah Pantai

• Konservasi DAS, Hutan Lindung, Daerah Resapan Air• Pembangunan Groin, Break Water, Jetty

Page 5: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

5

2.TARGET2.TARGETTARGET PENGAIRAN 1. REVITALISASI/REHABILITASI PLG2. PERLUASAN AREAL PENGAIRAN DENGAN

REHABILITASI DAN PEMBANGUNAN JARINGAN PENGAIRAN 5.800 Ha

3. KONSERVASI DAS.4. PENINGKATAN PENGAIRAN RAWA SELUAS

120.000Ha5. PENGELOLAAN KESATUAN WILAYAH SUNGAI

SESUAI PRINSIP “ONE RIVER, ONE PLAN, ONE INTEGRATED MANAGEMENT”SESUAI KEBARADAAN 11 SUNGAI.

Page 6: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

6

KALIMANTANKALIMANTAN

SELATANSELATAN1. S. Je

lai

2. S. Lamandau 3.

S. Ar

ut

5. S. Seruyan

6. S

. Men

taya

7. S.

Kati

ngan

8.

S. Se

bang

au9.

S. K

ahay

an

10. S

. Kap

uas

11. S

. Bar

ito

Keberadaan 11 Sungai Besar

di Kalteng

Keberadaan Keberadaan 11 Sungai Besar 11 Sungai Besar

di Kaltengdi Kalteng

11 S. Jelai22 S. Lamandau33 S. Arut

55 S. Seruyan66 S. Mentaya77 S. Katingan88 S. Sebangau99 S. Kahayan1010 S. Kapuas1111 S. Barito

4. S.

Kumai

44 S. Kumai

Page 7: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

7

3. STRATEGI PENGAIRAN

1. USULAN ANGGARAN KE PUSAT

2. SHEARING ANGGARAN PUSAT, PROPINSI DANKABUPATEN/KOTA

3. KOORNASI PROGRAM TERPADU DENGAN INSTANSI TERKAIT KABUPATEN, PROPINSI DAN PUSAT

Page 8: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

8

4. DANA YANG DIPERLUKAN PENGEMBANGAN SUMBER DAYA AIR APBN TAHUN ANGGARAN 2007

Kebutuhan Dana :Rp. 486.400.000.000,-

DIPA APBN :Rp. 144.762.909.000,-

Kekurangan:Rp. 342.624.136.000,-

Pemb/Rehab Irigasi 5.800 hadan Rawa : 35.300 ha

Kebutuhan : Rp. 262,5 MDIPA : Rp. 47.947.224.000.

•Konservasi SDA•Penatagunaan SDA•Pengendalian DayaRusak Air

Pengendalian Banjir dan PengamananPantai di WS Kahayan, WS Barito WS

Katingan dan WS SeruyanKebutuhan : Rp. 68 M

DIPA : Rp. 25.000.000.000.

Rehabilitasi Eks PLG 35.000 haKebutuhan : Rp. 120 M

DIPA : Rp. 44.808.640.000.

Penyediaan Air Baku diKalimantan Tengah

Kebutuhan:Rp. 35,9 MDIPA : Rp.

26.020.000.000.

Page 9: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

9

NO URAIAN HARGA

(x 1.000 )

A. SUMBER DANA APBN 144.762.909,00

1. IRIGASI DAN RAWA KALIMANTAN TENGAH 47.947.224.00

2. PENGEMBANGAN DAERAH RAWA LAMUNTI DADAHUP 44.808.640,00

3. PENGENDALIAN BANJIR DAN PENGAMANAN PANTAI KALIMANTAN TENGAH 26.020.000,00

4. PENYEDIAAN AIR BAKU KALIMANTAN TENGAH25.000.000.00

,

PROGRAM T.A. 2007SUB DINAS PENGEMBANGAN PRASARANA PENGAIRAN

Page 10: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

10

NO URAIAN HARGA

(x 1.000 )

A. SUMBER DANA APBN 342.624.136,00

1. IRIGASI DAN RAWA KALIMANTAN TENGAH 214.552.776.00

2. PENGEMBANGAN DAERAH RAWA LAMUNTI DADAHUP 75.191.360,00

3. PENGENDALIAN BANJIR DAN PENGAMANAN PANTAI KALIMANTAN TENGAH 41.980.000,00

4. PENYEDIAAN AIR BAKU KALIMANTAN TENGAH10.900.000.00

,

KEKURANGAN ANGGARAN 2007SUB DINAS PENGEMBANGAN PRASARANA PENGAIRAN

Page 11: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

11

4.DANA YANG DIPERLUKAN PENGEMBANGAN SUMBER DAYA AIR APBD TAHUN ANGGARAN 2007

Kebutuhan Dana :Rp. 133.000.000.000,-

DPA APBD :Rp. 22.702.205.000,-

Kekurangan:Rp. 110.297.795.000,-

PeNGEMBANGAN JARINGAN IRIGASI ,RAWA DAN JARINGAN

LAINNYAKebutuhan : Rp. 98 M

DPA : Rp. 13.448.363.500.

•Konservasi SDA•Penatagunaan SDA•Pengendalian DayaRusak Air

PengendalianBanjir

Kebutuhan:Rp. 35 MDPA : Rp.

9.253.841.500

Page 12: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

12

NO URAIAN

A. SUMBER DANA APBD

1. IRIGASI DAN RAWA KALIMANTAN TENGAH 13.448.363,00

2. PENGENDALIAN BANJIR 9.253.841,00

HARGA(x 1.000 )

22.702.200,00

PROGRAM T.A. 2007SUB DINAS PENGEMBANGAN PRASARANA PENGAIRAN

Page 13: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

13

5. EVALUASI KEGIATAN TAHUN 2006 DINAS PU PROPINSI

Page 14: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

14

REKAPITULASI KEMAJUAN PELAKSANAAN KEGIATAN TAHUN ANGGARAN 2006

DINAS PEKERJAAN UMUM PROVINSI KALTENG

T A R G E T DANA DIP (Rp) BOBOT NILAI KONTRAK PROGRES REALISASI KEUANGAN

No. SUB DINAS G O I ( % ) (Rp) FISIK (%) TERTIMB. (%) (Rp) (%) KET.

EFEKTIF B L N RENC. REAL. DEV. RENC. REAL.

TOTAL

I. SUB DINAS PENGAIRAN 188.437.548.100,00 0,24 196.590.442.399,00 100,00 99,52 -0,48 24,00 23,88 185.234.803.027,00 92,56 * 1)

11.690.990.000,00

200.128.538.100,00

II. SUB DINAS BINA MARGA 486.310.004.362,00 0,66 540.671.554.319,00 100,00 97,83 -2,17 66,32 64,88 527.364.047.819,00 95,36 *2)

66.733.147.000,00

553.043.151.362,00

III. SUB DINAS CIPTA KARYA 80.706.471.000,00 0,10 79.020.370.300,00 100,00 100,00 0,00 9,68 9,68 78.452.588.466,00 97,210,00

80.706.471.000,00

IV. SUB DINAS PERENCANAN DAN PROGRAM 1.517.812.440,00 0,00 1.516.812.440,00 100,00 100,00 0,00 0,18 0,18 1.433.581.690,00 94,450,00

1.517.812.440,00

IV. SUB DINAS BINA JASA KONSTRUKSI 348.177.600,00 0,00 348.177.600,00 100,00 100,00 0,00 0,04 0,04 343.181.200,00 98,560,00

348.177.600,00

755.454.023.462,0078.424.137.000,00 1,00 816.282.367.018,00 100,0 98,45 791.051.439.312,00 94,86

833.878.160.462,00

Catatan :*1) Pengairan : Realisasi tdk 100 % : 1. Pengadaan tanah di Tanjung Harapan Kotim tidak terealisasi karena administrasi kepemilikan tidak lengkap

2.

*2) Bina Marga : Realisasi tdk 100 % : 1.1. Palantaran - Km. 65 Sampit2. Runtu - Kujan - Penopa

31 Desember 2006

FUNGSIONAL

T O T A L D I N A S P U

Fisik untuk Bendungan Karau belum 100 % karena Multi Years Kontrak

Beberapa Kegiatan Masih dalam proses Pra Kontrak antara lain :

Page 15: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

15

7. PROGRAM DAN KEBUTUHAN ANGGARAN BIDANG PENGAIRAN TAHUN 2008

APBN1. IRIGASI Rp 35,685. M2. RAWA DAN SUNGAI Rp 292,020. M3. PENGENDALIAN BANJIR

DAN PENGAMANAN PANTAI Rp 118,550. M4. PENGEMBANGAN AIR BAKU Rp. 21,020. M5. KONSERVASI SDA Rp 5,650. M

TOTAL Rp. 472,925. MAPBD

1. PEMB/PENINGKATAN JARINGANPENGAIRAN Rp. 11,140 M

2. PENGENDALIAN BANJIR Rp. 55,575 M3. O & P PENGAIRAN Rp 9,075 M4. KONSERVASI SDA RP 0,500 M5. PERENCANAAN & PENGAWASAN RP. 5,676 M

TOTAL Rp 81,965 M

Page 16: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

16

6. PENETAPAN KINERJA 2007 DINAS PEKERJAAN UMUM PROV. KALTENG terlampir

Page 17: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

17

EVALUASI PENANGANAN JALAN DAN JEMBATAN TAHUN 2006DAN KEGIATAN TAHUN 2007

Page 18: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

18

KONDISI EXISTING, PERMASALAHAN SERTA UPAYA PEMECAHAN DIBIDANG JALAN DAN JEMBATAN

DI PROVINSI KALIMANTAN TENGAH

KONDISIEXISTING

PERMASALAHAN HARAPAN ALTERNATIF Pemecahan

POROS SELATAN = 820.2 Km

Banjarmasin – PalangkaRaya – Sampit – P.Bun –Batas Kalbar

POROS TENGAH =894,75 Km

- Batas Kaltim - Lampeong- M. Teweh - K. Kurun -Tb, Samba-RabambangBatas Kalbar

- Pasar Panas-M.Teweh–P. Cahu

- Sei Asem – Tb. Talaken- Mantap 35 %- Tidak Mantap 65 %

- Jalan yg tdk Mantap65 %

- Akses dari KaltengKe Kalbar danKaltim blmfungsional

- Muatan Berlebih- LHR Meningkat- Umur Rencana

Jalan sudah > 5-10 Tahun

- Terbatasnya Dana(Minimal 800 Milyarpertahun)

- MemerlukanJembatan Yang cukup banyak (Rp.200 Milyar/Tahun)

Adanya AksesbilitasDari :

- Banjarmasin –Palangka Raya

- Palangka Raya –Kalimantan Barat

- Palangka Raya –Kalimantan Timur

- Tertib Muatan Berlebih<=8,2 Ton

- Penanganan TuntasRuas Jalan yang Sudah Melebihi UmurRencana

- Tersedianya Dana Minimal untukperbaikan InfrastrukturRp. 1,2 Triliun untuktahun 2008

- TerbangunnyaJembatan BentangBesar (Jbt.Bahitom, Seruyan,Kalahien,Kapuas dan renc. pemb.Jemb. SeiHanyu)

Adanya KebijakanDalam Penyelesaian :

- PenangananReconstruction UlangPada Beberapa RuasJalan Di Poros Selatan– Recycling

- Penanganan Fungsional(Terbukanya) PorosTengah Operasional 3 fleet alat berat

- Pemeliharaan JalanSecara Kontrak MultyYears (APBN)

- Percepatan membukaketerisolasian kpdsemua Kab.dgn MultyYears kontrak (P.Bun-Kolam, Samuda–U.Pandaran, P. Raya-K.Kurun, Pundu - Tbg. Samba, P.Pisau –Bahaur, P.Raya-Buntok)

Pembiayaan :Sharing

Kab/Prov/Pusat/Loan/Grant Rp. 1,2 Triliun Thn2008

Page 19: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

19

2. TARGET

KINERJA 200635 % MANTAP

65 % TIDAK MANTAP

INPUT DANA 2006RP. 486 MILYAR (APBN/APBD)

SASARAN 2007APBN/LOAN RP. 800 MILYAR

APBD RP. 300 MILYAR

METODA,TEKNOLOGI DAN

OPTIMALISASI MATERIAL LOKAL

KEBIJAKAN DAN

STRATEGI 2008 - 2010

SHARINGOPERASIONAL ALAT,

KINERJA STAF PU

Page 20: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

20

3. STRATEGI PENANGANAN JALAN 2007

1.PEMELIHARAANBACK TO BASIC

4.PERBAIKAN ALIGNEMEN JALANVERTIKAL/HORIZONTAL, SALURAN,PEMANTAPAN SUB GRADE DAN PEMELIHARAAN YANG BERAT :TAHUN 2006 : 2 FLEETTAHUN 2007 : 1 FLEET

2.PENERAPAN METODA RECYCLING :RONSTRUCTION : PENINGKATANSOIL CEMENT : PEMBANGUNAN

3. KONTRAK PENANGANANDENGAN SYSTEM MULTY YEARSUNTUK RUAS STRATEGIS

Page 21: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

21

STRATEGI 1. PENGOPERASIAN ALAT BERAT

FLEET 1 FLEET 2

Page 22: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

22

Sp. Runtu – Bts. KalbarRp. 115,5 M (APBN)

P. Raya – Sampit – P. BunRp. 73 M(APBN)

P. Raya – Kapuas – Bts. KalselRp. 64,3 M (APBN)

Sei Asem –Tb. Talaken –K. Kurun – Sp. M. Laung

Rp. 56 M (APBN)

Psr. Panas – T. Layang –Ampah – M. Teweh –

P. CahuRp. 132 M (APBN)

P. Raya – K. KurunRp. 33 M (APBD)

Samuda – U. PandaranRp. 19 M (APBD)

M. Teweh – Benangin –Bts. Kaltim

Rp. 42 M (APBN)

P. Pisau - BahaurRp. 13 M(APBD)

Pundu – Tb. SambaRp. 5,5 M(APBD)

P. Bun - SukamaraRp. 18 M (APBD)

P. Raya – BuntokRp. 79 M(APBN)Rp. 16 M (APBD)

K. Kapuas - DadahupRp. 50 M(APBN)Rp. 30 (APBD)

Page 23: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

23

DANA YANG DIPERLUKAN UTK PENINGKATAN KINERJA JALAN NASIONAL 2006 - 2010

60,14

75,14

90,14100,00

72,1863,78

-

27,8236,22

24,86

39,86

9,86

-

20

40

60

80

100

120

2005 2006 2007 2008 2009 2010tahun

kine

rja ja

lan

mantap tidak mantap

PANJANG JALAN NASIONAL = 1.714,15 KM P.TENGAH = 893,95 KM; P.SELATAN = 820,2 KM

Page 24: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

24

59,02

74,02

89,02

78,4270,02

55,98

21,5829,98

44,02 40,98

25,98

10,98

-

10

20

30

40

50

60

70

80

90

100

2005 2006 2007 2008 2009 2010

kine

rja ja

lan

mantap tidak mantap

DANA YG DIBUTUHKAN PENINGKATAN JALANPROVINSI 2006 – 2010

PANJANG JALAN PROVINSI = 1.707,95 KM

Page 25: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

25

KONDISI JALAN PER DESEMBER 2007

Lahei

KUALAKAPUAS

PULANG PISAU

KASONGAN

SAMPIT

PANGKALANBUN

NANGA BULIK

PURUK CAHU

BUNTOK

TAMIANG LAYANG

MUARA TEWEH

SUKAMARA

KUALA PEMBUANG

KAB. SUKAMARA

KAB. KTW. BARAT

KAB. SERUYAN

KAB. KTW. TIMUR

KAB. KATINGAN

KAB. LAMANDAU

KAB. GUNUNG MAS

KAB. KAPUAS

KAB. BARSEL

KAB. P. PISAU

KAB. BARUT

KUALA KURUN

KAB. BARTIM

Barumba

Lupakdalam

Mandomai

Bk.Rawi

Tangkiling

Lap.Terbang

Sp.Kerengbengkirai

BerengbengkelKr.Bengkirai

Kotabesi

Samuda

Kumai

Kubu

Pangkut

Tumbangmanjul

Tumbangkunyi

Sei Hanyu

Tbg.Rahuyan

Kandui

Ampah

Dayu

Belawan

Pasarpanas

Patas

Kudangan

Km.35

Bengkuang

Mengkati

Jenamas

BahaurPkl.Pembuang

Sp.RuntuPangkalanlada

Rt.PulutParenggean

Panopa

Kualakuyan

Bangkal

Kerengpangi

Pundu Km.65

Ujung Pandaran

Bukitliti

Bukit Bamba

BawanTbg.Talaken

Tbg.Jutuh

Sei Gula

Tumbang Laung

Tumbang Samba

Tumbang Hiran

Tumbang Senamang

Tumbang Nanga

Tumbang Taburai

Benangin Lampeong

Bts.Kaltim

AsamMadara

Timpah

Tewah

Rabambang

Muara Laung

PROP.KALBAR

PROP.KALTIM

PROP.KALSEL

Ke BANJARMASIN

Ke Nangatayap

Bts.Kalbar

Kujan

(Km.35)

Runtu Simpang Bangkal

Km.65

Palantaran

Sp.Sg.Asem

Ke Nangapinoh

Ktw. Lama

Kuala JelaiS.Pasir

Bapolang

PegatanPangkoh

Bahaur Hilir

Tumbang Sangai

Asam Baru

Saripoi

Montalat

Batu Putih

Papar Punjung

Sei Jalungen

TakarasBandara

Sanggu

Psr.Panjang

Batu Belaman

Bts.Kalsel

Ke Damai-Tenggarong

Ke BARABAI

Bts.Kalbar

Tumbang Gagu

Tongka

KAB. MURUNG RAYA

Telaga Pulang

200 40 km

Skala :

5

Penda Ketap

MentangaiPALANGKARAYA

008

008

007

007

007005

002

003

012

010

006

015

014

014

016

009

009

001

018

019

2

1

3

2

1

1

2

2

2

Km.72

1010

032

032

020

021

022

033

033

023

2

1

011

011011

024

024

011

1

234

2

3

013

1

3

4

0321

017

034

Km.50

2

0203

0241

0244

0245

029Sp. M. Laung

030

032

035

0252

0251

026

028

027

0322

Sp. Panopa

Riam Durian

049

051

050

Palingkau

Dadahup

042

043

041

068

100

Batu KotamAjangSagu

098099

097

0201

1

0342

BagugusBkt. Batu

Lkh. LayangKalahien

Lunci

Sbr. Gajah

PatungHayaping

BentotKambitin

RUSAK

RUSAK

Tumbang Kalang

BaikSedangRusak RinganRusak Berat

Page 26: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

26

APBN : Rp. 690,00 MilyarAPBD : Rp. 261,00 MilyarTotal : Rp. 951,00 Milyar

Page 27: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

27

APBN : Rp. 1.200,00 MilyarAPBD : Rp. 350,00 MilyarTotal : Rp. 1.550,00 Milyar

Page 28: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

28

Lahei

KUALAKAPUAS

PULANG PISAU

KASONGAN

SAMPIT

PANGKALANBUN

NANGA BULIK

PURUK CAHU

BUNTOK

TAMIANG LAYANG

MUARA TEWEH

SUKAMARA

KUALA PEMBUANG

KAB. SUKAMARA

KAB. KTW. BARAT

KAB. SERUYAN

KAB. KTW. TIMUR

KAB. KATINGAN

KAB. LAMANDAU

KAB. GUNUNG MAS

KAB. KAPUAS

KAB. BARSEL

KAB. P. PISAU

KAB. BARUT

KUALA KURUN

KAB. BARTIM

Barumba

Lupakdalam

Mandomai

Bk.Rawi

Tangkiling

Lap.Terbang

Sp.Kerengbengkirai

BerengbengkelKr.Bengkirai

Kotabesi

Samuda

Kumai

Kubu

Pangkut

Tumbangmanjul

Tumbangkunyi

Sei Hanyu

Tbg.Rahuyan

Kandui

Ampah

Dayu

Belawan

Pasarpanas

Patas

Kudangan

Km.35

Bengkuang

Mengkati

Jenamas

BahaurPkl.Pembuang

Sp.RuntuPangkalanlada

Rt.PulutParenggean

Panopa

Kualakuyan

Bangkal

Kerengpangi

Pundu Km.65

Ujung Pandaran

Bukitliti

Bukit Bamba

BawanTbg.Talaken

Tbg.Jutuh

Sei Gula

Tumbang Laung

Tumbang Samba

Tumbang Hiran

Tumbang Senamang

Tumbang Nanga

Tumbang Taburai

Benangin Lampeong

Bts.Kaltim

AsamMadara

Timpah

Tewah

Rabambang

Muara Laung

PROP.KALBAR

PROP.KALTIM

PROP.KALSEL

Ke BANJARMASIN

Ke Nangatayap

Bts.Kalbar

Kujan

(Km.35)

Runtu Simpang Bangkal

Km.65

Palantaran

Sp.Sg.Asem

Ke Nangapinoh

Ktw. Lama

Kuala JelaiS.Pasir

Bapolang

PegatanPangkoh

Bahaur Hilir

Tumbang Sangai

Asam Baru

Saripoi

Montalat

Batu Putih

Papar Punjung

Sei Jalungen

TakarasBandara

Sanggu

Psr.Panjang

Batu Belaman

Bts.Kalsel

Ke Damai-Tenggarong

Ke BARABAI

Bts.Kalbar

Tumbang Gagu

Tongka

KAB. MURUNG RAYA

Telaga Pulang

200 40 km

Skala :

5

Penda Ketap

MentangaiPALANGKARAYA

008

008

007

007

007005

002

003

012

010

006

015

014

014

016

009

009

001

018

019

2

1

3

2

1

1

2

2

2

Km.72

1010

032

032

020

021

022

033

033

023

2

1

011

011011

024

024

011

1

234

2

3

013

1

3

4

0321

017

034

Km.50

2

0203

0241

0244

0245

029Sp. M. Laung

030

032

035

0252

0251

026

028

027

0322

Sp. Panopa

Riam Durian

049

051

050

Palingkau

Dadahup

042

043

041

068

100

Batu KotamAjangSagu

098099

097

0201

1

0342

BagugusBkt. Batu

Lkh. LayangKalahien

Lunci

Sbr. Gajah

PatungHayaping

BentotKambitin

RUSAK

RUSAK

Tumbang Kalang

BaikSedangRusak RinganRusak Berat

RENCANA KINERJA JALAN PER DESEMBER 2010

Page 29: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

29

P.Bun – KolamRp. 16,2 M (APBD

P. Raya – K. KurunRp. 109 M (APBD)

Samuda – U. PandaranRp. 62,1M (APBD)

P. Pisau - BahaurRp. 147,2 M(APBD)

Pundu – Tb. SambaRp. 78,4 M(APBD)

P. Raya – BuntokRp.68,6 M(APBD)

K. Kapuas - DadahupRp. 30 (APBD)

Page 30: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

30

Usulan Multy Years untuk menghubungkanantar ProvinsiKalimantan

Kudangan –Bts.Kalbar

M. Teweh-Lampeong-Bts. Kaltim

Page 31: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

31

STRATEGI PERCEPATAN PEMBANGUNAN STRATEGI PERCEPATAN PEMBANGUNAN TRANS KALIMANTAN S/D 2010 TRANS KALIMANTAN S/D 2010

DI PROVINSI KALIMANTAN TENGAHDI PROVINSI KALIMANTAN TENGAH

Page 32: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

32

eksisting

1. JALAN NASIONALLintas Selatan 820,20 kmLintas Tengah 415.20 KmAntar Lintas 479,55 Km

2. KONDISILintas Selatan Fungsional 27 % MantapLintas Tengah Belum terkoneksi dengan

Jaringan lainnyaAntar Lintas 70 % Rusak Perlu

Reconstruksi Ulang3. Belum Tembus Jalan Perbatasan

BAGAIMANA MENGELOLA

SOLUSIRENSTRA 2006–2010

SKENARIO PROGRAM PEMBIAYAAN

LINTAS SELATANProg. Har-Ting-BangMenggunakan Model Kerusakan jalan

2009 = MantapLINTAS TengahPenanganan melaluiAlat Berat TambahanOptimalisasi InterkoneksiDengan Jalan PerkebunanSistem Multy YearsPenghubung POROSProg. Bang dan ReconstructionUlang

MASALAH

LINTAS SELATAN- Program Belum Konsistensi

Terhadap model kerusakan jalan- Ada suatu masa yang tidak

tertangani ->InkonsistenLINTAS TENGAHBelum adanya kesepakatanSebagai prioritas antar PusatDan Daerah

MASIH INKONSISTEN MST- Program Penanganan

Model KerusakanJalan -> Konsisten

- Dana Min Rp. 600 M /Tahun

- Pengadaan Alat Berat- Interkoneksi- Kontrak ->Tahun Jamak- Sharing Dana- Penetapan MST- LOAN KHUSUS UNTUK

PULAU KALIMANTAN

Page 33: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

33

Lahei

KUALAKAPUAS

PULANG PISAU

KASONGAN

SAMPIT

PANGKALANBUN

NANGA BULIK

PURUK CAHU

BUNTOK

TAMIANG LAYANG

MUARA TEWEH

SUKAMARA

KUALA PEMBUANG

KAB. SUKAMARA

KAB. KTW. BARAT

KAB. SERUYAN

KAB. KTW. TIMUR

KAB. KATINGAN

KAB. LAMANDAU

KAB. GUNUNG MAS

KAB. KAPUAS

KAB. BARSEL

KAB. P. PISAU

KAB. BARUT

KUALA KURUN

KAB. BARTIM

Barumba

Lupakdalam

Mandomai

Bk.Rawi

Tangkiling

Lap.Terbang

Sp.Kerengbengkirai

BerengbengkelKr.Bengkirai

Kotabesi

Samuda

Kumai

Kubu

Pangkut

Tumbangmanjul

Tumbangkunyi

Sei Hanyu

Tbg.Rahuyan

Kandui

Ampah

Dayu

Belawan

Pasarpanas

Patas

Kudangan

Km.35

Bengkuang

Mengkati

Jenamas

BahaurPkl.Pembuang

Sp.RuntuPangkalanlada

Rt.PulutParenggean

Panopa

Kualakuyan

Bangkal

Kerengpangi

Pundu Km.65

Ujung Pandaran

Bukitliti

Bukit Bamba

BawanTbg.Talaken

Tbg.Jutuh

Sei Gula

Tumbang Laung

Tumbang Samba

Tumbang Hiran

Tumbang Senamang

Tumbang Nanga

Tumbang Taburai

Benangin Lampeong

Bts.Kaltim

AsamMadara

Timpah

Tewah

Rabambang

Muara Laung

PROP.KALBAR

PROP.KALTIM

PROP.KALSEL

Ke BANJARMASIN

Ke Nangatayap

Bts.Kalbar

Kujan

(Km.35)

Runtu Simpang Bangkal

Km.65

Palantaran

Sp.Sg.Asem

Ke Nangapinoh

Ktw. Lama

Kuala JelaiS.Pasir

Bapolang

PegatanPangkoh

Bahaur Hilir

Tumbang Sangai

Asam Baru

Saripoi

Montalat

Batu Putih

Papar Punjung

Sei Jalungen

TakarasBandara

Sanggu

Psr.Panjang

Batu Belaman

Bts.Kalsel

Ke Damai-Tenggarong

Ke BARABAI

Bts.Kalbar

Tumbang Gagu

Tongka

KAB. MURUNG RAYA

Telaga Pulang

200 40 km

Skala :

5

Penda Ketap

MentangaiPALANGKARAYA

008

008

007

007

007005

002

003

012

010

006

015

014

014

016

009

009

001

018

019

2

1

3

2

1

1

2

2

2

Km.72

1010

032

032

020

021

022

033

033

023

2

1

011

011011

024

024

011

1

234

2

3

013

1

3

4

0321

017

034

Km.50

2

0203

0241

0244

0245

029Sp. M. Laung

030

032

035

0252

0251

026

028

027

0322

Sp. Panopa

Riam Durian

049

051

050

Palingkau

Dadahup

042

043

041

068

100

Batu KotamAjangSagu

098099

097

0201

1

0342

BagugusBkt. Batu

Lkh. LayangKalahien

Lunci

Sbr. Gajah

PatungHayaping

BentotKambitin

RUSAK

RUSAK

Tumbang Kalang

BaikSedangRusak RinganRusak Berat

KONDISI JALAN PER DESEMBER

35 % Mantap65 % Tidak Mantap

Page 34: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

34

North Link

Central LinkSouth LinkJembatan jelai

Kondisi jalan perbatasan Kalbar

JARINGAN JALAN KALIMANTAN TENGAH DILIHAT DARI SISTEM JARINGAN JALAN

DI PULAU KALIMANTAN

Page 35: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

35

DOKUMENTASI KONDISI JALAN

26.87

10.58

27.0035.56

BAIK SEDANG RUSAK RINGAN RUSAK BERAT

KONDISI PERMUKAAN

KONDISI PERMUKAAN JALAN POROS SELATAN

77.22

12.93 9.85

ASPAL KERIKIL TANAH

JENIS PERMUKAAN

JENIS PERMUKAAN JALAN POROS SELATAN

POROS SELATAN

JEMBATAN = 5.168 MTERBANGUN = 4.017 MSISA = 1.151 M

Page 36: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

36

DOKUMENTASI KONDISI JALAN

12.70

6.31

3.53

77.46

BAIK SEDANG RUSAK RINGAN RUSAK BERAT

KONDISI PERMUKAAN

KONDISI PERMUKAAN JALAN POROS TENGAH

POROS TENGAH

40.13

14.21

45.66

ASPAL KERIKIL TANAHJENIS PERMUKAAN

JENIS PERMUKAAN JALAN POROS TENGAH

JEMBATAN = 2.781,4 MTERBANGUN = 231 MSISA = 2.550,4 M

Page 37: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

37

PASAR PANAS – TAMIYANG LAYANG – AMPAH

L = 607 KM

Page 38: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

38

SKENARIO PROGRAM DAN PEMBIAYAAN 2010

Page 39: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

39

Poros tengah :Pembangunan/PeningkatanDengan sistem Kotrak Multy Years

Poros Selatan :Peningkatan Struktur dan KapasitasDengan sistem Kotrak Tahunan dan Multy Years

Page 40: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

40

RENCANA PENINGKATAN KINERJA JALANNASIONAL 2006 – 2010

60,14

75,14

90,14100,00

72,1863,78

-

27,8236,22

24,86

39,86

9,86

-

20

40

60

80

100

120

2005 2006 2007 2008 2009 2010tahun

kine

rja ja

lan

mantap tidak mantap

PANJANG JALAN NASIONAL = 1.714,15 KM P.TENGAH = 893,95 KM; P.SELATAN = 820,2 KM

Page 41: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

41

Lahei

KUALAKAPUAS

PULANG PISAU

KASONGAN

SAMPIT

PANGKALANBUN

NANGA BULIK

PURUK CAHU

BUNTOK

TAMIANG LAYANG

MUARA TEWEH

SUKAMARA

KUALA PEMBUANG

KAB. SUKAMARA

KAB. KTW. BARAT

KAB. SERUYAN

KAB. KTW. TIMUR

KAB. KATINGAN

KAB. LAMANDAU

KAB. GUNUNG MAS

KAB. KAPUAS

KAB. BARSEL

KAB. P. PISAU

KAB. BARUT

KUALA KURUN

KAB. BARTIM

Barumba

Lupakdalam

Mandomai

Bk.Rawi

Tangkiling

Lap.Terbang

Sp.Kerengbengkirai

BerengbengkelKr.Bengkirai

Kotabesi

Samuda

Kumai

Kubu

Pangkut

Tumbangmanjul

Tumbangkunyi

Sei Hanyu

Tbg.Rahuyan

Kandui

Ampah

Dayu

Belawan

Pasarpanas

Patas

Kudangan

Km.35

Bengkuang

Mengkati

Jenamas

BahaurPkl.Pembuang

Sp.RuntuPangkalanlada

Rt.PulutParenggean

Panopa

Kualakuyan

Bangkal

Kerengpangi

Pundu Km.65

Ujung Pandaran

Bukitliti

Bukit Bamba

BawanTbg.Talaken

Tbg.Jutuh

Sei Gula

Tumbang Laung

Tumbang Samba

Tumbang Hiran

Tumbang Senamang

Tumbang Nanga

Tumbang Taburai

Benangin Lampeong

Bts.Kaltim

AsamMadara

Timpah

Tewah

Rabambang

Muara Laung

PROP.KALBAR

PROP.KALTIM

PROP.KALSEL

Ke BANJARMASIN

Ke Nangatayap

Bts.Kalbar

Kujan

(Km.35)

Runtu Simpang Bangkal

Km.65

Palantaran

Sp.Sg.Asem

Ke Nangapinoh

Ktw. Lama

Kuala JelaiS.Pasir

Bapolang

PegatanPangkoh

Bahaur Hilir

Tumbang Sangai

Asam Baru

Saripoi

Montalat

Batu Putih

Papar Punjung

Sei Jalungen

TakarasBandara

Sanggu

Psr.Panjang

Batu Belaman

Bts.Kalsel

Ke Damai-Tenggarong

Ke BARABAI

Bts.Kalbar

Tumbang Gagu

Tongka

KAB. MURUNG RAYA

Telaga Pulang

200 40 km

Skala :

5

Penda Ketap

MentangaiPALANGKARAYA

008

008

007

007

007005

002

003

012

010

006

015

014

014

016

009

009

001

018

019

2

1

3

2

1

1

2

2

2

Km.72

1010

032

032

020

021

022

033

033

023

2

1

011

011011

024

024

011

1

234

2

3

013

1

3

4

0321

017

034

Km.50

2

0203

0241

0244

0245

029Sp. M. Laung

030

032

035

0252

0251

026

028

027

0322

Sp. Panopa

Riam Durian

049

051

050

Palingkau

Dadahup

042

043

041

068

100

Batu KotamAjangSagu

098099

097

0201

1

0342

BagugusBkt. Batu

Lkh. LayangKalahien

Lunci

Sbr. Gajah

PatungHayaping

BentotKambitin

RUSAK

RUSAK

Tumbang Kalang

BaikSedangRusak RinganRusak Berat

60,14 % Mantap39,86 % Tidak Mantap

Rencana Kinerja KONDISI JALAN PER Desember 2007

Page 42: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

42

PROGRAM CIPTA KARYA TAHUN 2007

Page 43: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

43

1. Existing Ke Cipta Karyaan TAHUN 2006

1. Pengembangan Permukiman Bertahap danberkelanjutan (bersifat Stimulan); 30 %

2. Penataan Bangunan Dan Lingkungan (Bersifat Bantuan); 25 %

3. Pengembangan Kinerja Pengelo-laan Air Minum dan Air Limbah ;40 %

4. Pengembangan Sistem DrainaseDan Pengelolaan Persampahan ;28 %

Page 44: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

44

5. Pembangunan Prasarana Dan Sarana Perdesaan ; 15 %

6. Perencanaan Dan PengendalianPengembangan Prasarana & SaranaDesa Agropolitan ; 40 %

7. Penataan Revitalisasi Kawasan ;20 %

8. Pembinaan Tata Ruang Kawasan Sedang Berkembang ; 5 %

9. Program Pengembangan Perkotaan15 %

Page 45: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

45

KONDISI UMUM BIDANG CIPTA KARYA KALIMANTAN TENGAH

• INFRASTRUKTUR YANG ADAPembangunan fisik prasarana dan sarana perkotaan dan perdesaan di kalimantan tengah relatif masih minim, hal ini di akibatkan oleh terbatasnya sarana dan prasarana yang di miliki kota & desa di Kalimantan tengah, hal ini juga berdampak terlambatnya akan perkembangan dan pertumbuhan kota/desa, kabupaten dan kota di kalimantan tengah serta secara umum terlambat juga perkembangan dan pertumbuhan propinsi Kalimantan tengah.

Page 46: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

46

a. Kondisi sarana dan prasarana keciptakaryaan di 8 kabupaten pemekaran relatif masih minim

b. Tingkat pelayanan air bersih masih rendah yaitu :perkotaan 39,80%, perdesaan 12%

c. Terdapat 35 IKK belum mendapat pelayanan air bersihd. 35% unit instalasi penjernihan Air (IPA) Ibukota Kecamatan

Kinerjanya menurun dengan umur instalasi rata-rata di atas 10 tahun dan belum pernah direhab

e. Saluran drainase 14 kab/kota sebagian belum permanen, musim hujan sering tergenang air

f. 906 desa (69,30%) masyarakat menggunakan air sungai untuk masak dan minum, sementara sebagian air sungai sudah tercemar oleh mercury (air raksa)

g. 49,60% masyarakat tinggal di bantaran sungai, membuang sampah dan buang air besar di sungai.

KONDISI AIR BERSIH

Page 47: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

47

KAWASAN KUMUH PERKOTAAN

Ibukota Kabupaten di Kalimantan Tengah pada umumnya terletak di pinggir sungai, dimana luas daerah kumuh + 154 Ha, dengan jumlah penduduk + 210.600 jiwa (56 ribu KK) tinggal di bantaran sungai.Yang bermukim minimnya sarana & prasarana (infastruktur) daerah permukiman yang memadai, kualitas lingkungan yang kumuh dan tidak layak huni.

Page 48: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

48

2. Target Ke Cipta Karyaan TAHUN 2009

1. Pengembangan Permukiman Bertahap danberkelanjutan (bersifat Stimulan); 60 %

2. Penataan Bangunan Dan Lingkungan (Bersifat Bantuan); 50 %

3. Pengembangan Kinerja Pengelo-laan Air Minum dan Air Limbah ;70 %

4. Pengembangan Sistem DrainaseDan Pengelolaan Persampahan ;60 %

Page 49: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

49

5. Pembangunan Prasarana Dan Sarana Perdesaan ; 50 %

6. Perencanaan Dan PengendalianPengembangan Prasarana & SaranaDesa Agropolitan ; 80 %

7. Penataan Revitalisasi Kawasan ;60 %

8. Pembinaan Tata Ruang Kawasan Sedang Berkembang ; 40 %

9. Program Pengembangan Perkotaan50 %

Page 50: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

50

Strategi dan Terobosan Tahun 2007 Bidang Cipta Karya

• BEBAS BANJIR KOTA PALANGKA RAYAKegiatan : a. Merealisasikan Review Master Plan Drainase Kota Palangka

Raya secara bertahapb. Pemeliharaan Drainase Primer, Sekunder dan Tersierc. Membuka Saluran Primer Baru : Drainase Yos Sudarso sampai

Sungai Sebangau

• MEMPERINDAH KOTA Kegiatan : a. Operasi dan Pemeliharaan Kebersihan Kota Palangka Raya

pada kawasan strategis.b. Penataan Ruang terbuka Jalan Adonis Samadc. Pembuatan Trotoar Jalan Imam Bonjol dan Diponegorod. Penataan Lingkungan Terbuka Hijau Bawah Jembatan Kahayan dan Sekitarnya.e. Penyusunan Rencana Perhotelan Terusan Limau/Danau Seha

seberang, Pusat Pemerintah Provinsi dan Tugu Provinsi.f. Penataan Kembali Bundaran-bundaran.

Page 51: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

51

PROGRAM CIPTA KARYA TAHUN 2007SUMBER DANA APBN

1. Penataan dan Revitalisasi Kawasan Rp. 2.000.000.000

2. Pengembangan Kawasan Permukiman Rp. 16.263.233.000

3. Pengembangan Kinerja Pengelolaan Penyehatan Rp. 15.706.000.000Lingkungan Permukiman Kalteng

4. Pembangunan Infrastruktur Pedesaan Kalteng Rp. 1.520.166.000

5. Penataan Bangunan dan Lingkungan Kalteng Rp. 22.577.751.000

6. Pengembangan Kinerja Pengelolaan Air Minum Rp. 37.196.000.0007. Penyediaan Prasarana dan Sarana Agropolitan Rp. 5.600.000.000

Total Rp. 100.863.150.000*

* Dari Total Rp. 100.863.150.000 Milyar, Rp. 40.000.000.000 masih belum dapatdilaksanakan.

Page 52: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

52

DANA YANG DIBUTUHKAN DAN PROGRAM CIPTA KARYA TAHUN 2008SUMBER DANA APBN

1. Pengembangan Sistem Drainase, Air Limbah dan Rp. 27.000.000.000Persampahan

2. Pengembangan Kinerja Pengelolaan Air Minum Rp. 40.000.000.000

3. Penataan Bangunan dan Lingkungan Rp. 40.000.000.000

4. Pengembangan Permukiman Rp. 68.000.000.000

5. Perencanaan dan Pengendalian Prasarana dan Rp. 11.246.100.000Sarana Desa Agropolitan

6. Pembinaan Tata Ruang Kawasan sedang Berkembang Rp. 500.000.000

Total Rp. 187.446.100.000

Page 53: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

53

DANA YANG DIBUTUHKAN DAN PROGRAM CIPTA KARYA TAHUN 2008SUMBER DANA APBD

1. Pengembangan Sistem Drainase, Air Limbah dan Rp. 14.000.000.000Persampahan

2. Pengembangan Kinerja Pengelolaan Air Minum Rp. 16.000.000.000

3. Penataan Bangunan dan Lingkungan Rp. 22.000.000.000

4. Pengembangan Permukiman Rp. 32.000.000.000

5. Perencanaan dan Pengendalian Prasarana dan Rp. 9.500.000.000Sarana Desa Agropolitan

6. Pembinaan Tata Ruang Kawasan sedang Berkembang Rp. 500.000.000

Total Rp. 84.000.000.000

Page 54: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

54

STRATEGI PERCEPATAN PROGRAM KE CIPTA KARYAAN

• Mengusulkan Anggaran Ke Pusat• Sharing Penangan Antara Pusat, Propinsi

Dan Kabupaten• Sinkranisasi Program Lintas Instansi.

Page 55: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

55

KEBUTUHAN TENAGA

• Dengan Bertambahnya Beban Kegiatan 2 Kali LipatDinas PU Propinsi Kalimantan TengahMembutuhkan Tenaga Tambahan :1. Sarjana Teknis ( S1 Dan S2) Sebanyak 4 Orang2. Sarjana Muda Teknik 8 Orang3. STM 16 Orang

Page 56: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

56

LAMPIRAN

Page 57: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

57

REKAPITULASI KEMAJUAN PELAKSANAAN KEGIATAN - KEGIATAN APBD TAHUN ANGGARAN 2006

DINAS PEKERJAAN UMUM PROPINSI KALTENG

T A R G E T DANA DASK(Rp) BOBOT NILAI KONTRAK PROGRES REALISASI KEUANGAN

No. SUB DINAS G O I ( % ) (Rp) FISIK (%) TERTIMB. (%) (Rp) (%) KET.

EFEKTIF B L N RENC. REAL. DEV. RENC. REAL.

TOTAL

I SUB DINAS PENGAIRAN 14.999.638.100,00 0,06 14.947.807.500,00 100,00 99,36 -0,64 5,63 5,59 14.693.558.735,00 97,96

0,00

14.999.638.100,00

II SUB DINAS BINA MARGA 226.267.733.660,00 0,85 225.484.196.229,00 100,00 99,96 -0,04 84,87 84,84 224.806.543.514,00 99,35

0,00

226.267.733.660,00

III SUB DINAS CIPTA KARYA 23.461.220.000,00 0,09 22.932.792.800,00 100,00 99,87 -0,13 8,80 8,79 22.948.160.110,00 97,81

0,00

23.461.220.000,00

IV SUB DINAS BINA PERENCANAAN & PROGRAM 1.517.812.440,00 0,01 1.516.812.440,00 100,00 100,00 0,00 0,57 0,57 1.433.581.690,00 94,45

0,00

1.517.812.440,00

V SUB DINAS BINA JASA KONSTRUKSI 348.177.600,00 0,00 348.177.600,00 100,00 100,00 0,00 0,13 0,13 343.181.200,00 98,560,00

348.177.600,00

266.594.581.800,000,00 1,00 265.229.786.569,00 100,00 99,92 264.225.025.249,00 99,11

266.594.581.800,00

31 Desember 2006

FUNGSIONAL

T O T A L D I N A S P U

Page 58: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

58

REKAPITULASI KEMAJUAN PELAKSANAAN KEGIATAN - KEGIATAN APBN TAHUN ANGGARAN 2006

DINAS PEKERJAAN UMUM PROPINSI KALTENG

T A R G E T DANA DIPA (Rp) BOBOT NILAI KONTRAK PROGRES REALISASI KEUANGAN

No. SUB DINAS G O I ( % ) (Rp) FISIK (%) TERTIMB. (%) (Rp) (%) KET.

EFEKTIF B L N RENC. REAL. DEV. RENC. REAL.

TOTAL

I SUB DINAS PENGAIRAN 173.437.910.000,00 0,33 181.642.634.899,00 99,72 99,53 -0,19 32,44 32,38 170.541.244.292,00 92,12

11.690.990.000,00

185.128.900.000,00

II. SUB DINAS BINA MARGA 260.042.270.702,00 0,57 315.187.358.090,00 96,51 96,36 -0,16 55,41 55,32 302.557.504.305,00 92,59

66.733.147.000,00

326.775.417.702,00

III SUB DINAS CIPTA KARYA 57.245.251.000,00 0,10 56.087.577.500,00 98,86 98,50 -0,36 9,94 9,91 55.504.428.356,00 96,960,00

57.245.251.000,00

490.725.431.702,0078.424.137.000,00 1,00 552.917.570.489,00 97,79 97,60 528.603.176.953,00 92,88

569.149.568.702,00

31 Desember 2006

FUNGSIONAL

T O T A L D I N A S P U

Page 59: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

59

DANA DIPA (Rp) BOBOT NILAI KONTRAK

No. G O I ( % ) (Rp) KET.

B L N (Rp) (%)

TOTAL

I D A N A A P B N 173.437.910.000,0 0,93 181.642.634.899,00 99,72 99,53 -0,19 92,25 92,07 170.541.244.292,0 92,12

11.690.990.000,00

185.128.900.000,0

II. D A N A A P B D 14.999.638.100,00 0,07 14.947.807.500,00 100,00 99,36 -0,64 7,50 7,45 14.693.558.735,00 97,96

0,00

14.999.638.100,00

188.437.548.100,0

11.690.990.000,00 1,00 196.590.442.399,0 99,74 99,52 185.234.803.027,0 92,56

200.128.538.100,0

RENC. REAL.

31 Desember 2006

TOTAL PENGAIRAN

T A R G E T

EFEKTIFRENC. REAL. DEV.

FISIK (%) TERTIMB. (%)

PROGRES

FUNGSIONAL

REKAPITULASI KEMAJUAN PELAKSANAAN KEGIATAN TAHUN ANGGARAN 2006

SUB DINAS PENGAIRAN

SUMBER DANA

REALISASI KEUANGAN

Page 60: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

60

DANA DIPA (Rp) BOBOT NILAI KONTRAKNo. G O I ( % ) (Rp) TERTIMB. (%) (Rp) (%) KET.

B L N RENC. REAL. DEV. RENC. REAL.TOTAL

I IRIGASI RAWA KALIMANTAN TENGAH 65.166.057.000,00 0,42 75.355.481.800,00 99,35 99,03 -0,31 41,25 41,11 63.630.126.350,0 82,79 11.690.990.000,00

76.857.047.000,00

II. PENGENDALIAN BANJIR DAN PENGAMAN PANTAI 34.377.277.000,00 0,19 34.362.492.000,00 100,00 99,98 -0,02 18,57 18,57 34.343.687.000,0 99,90KALIMANTAN TENGAH 0,00

34.377.277.000,00

III. PENGEMBANGAN DAERAH RAWA LAMUNTI - DADAHUP 47.016.836.000,00 0,25 45.412.863.099,00 99,96 99,82 -0,14 25,39 25,35 46.326.013.621,0 98,53KALIMANTAN TENGAH 0,00

47.016.836.000,00

IV. PENYEDIAAN AIR BAKU KALIMANTAN TENGAH 26.877.740.000,00 0,15 26.511.798.000,00 100,00 99,89 -0,11 14,52 14,50 26.241.417.321,00 97,630,00

26.877.740.000,00

173.437.910.000,011.690.990.000,00 1,00 181.642.634.899,0 99,72 99,53 170.541.244.292,0 92,12185.128.900.000,0

TOTAL APBN

FUNGSIONALNAMA SATKER SEMENTARA / KEGIATAN FISIK (%)

EFEKTIF

SUB DINAS PENGAIRANSUMBER DANA APBN

PROGRES REALISASI KEUANGANT A R G E T

31 Desember 2006

KEGIATAN TAHUN ANGGARAN 2006REKAPITULASI KEMAJUAN PELAKSANAAN

Page 61: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

61

DANA DASK (Rp) BOBOT NILAI KONTRAKNo. G O I ( % ) (Rp) KET.

B L N (Rp) (%)TOTAL

I. PEMBANGUNAN/PENINGKATAN JARINGAN PENGAIRAN 6.338.200.000,00 0,42 6.333.643.400,00 100,00 99,73 -0,27 42,26 42,14 6.312.918.850,00 99,60 0,00

6.338.200.000,00

II. PENUNJANGAN OPERASI DAN PEMELIHARAAN PENGAIRAN 2.835.628.100,00 0,19 2.832.561.100,00 100,00 97,44 -2,56 18,90 18,42 2.727.732.070,00 96,190,00

2.835.628.100,00

III. PERENCANAAN PENGEMBANGAN SUMBER DAYA AIR 1.025.000.000,00 0,07 1.013.851.000,00 100,00 99,33 -0,67 6,83 6,79 933.329.665,00 91,060,00

1.025.000.000,00

IV. PENGENDALIAN BANJIR DAN PENGAMANAN PANTAI 1.192.500.000,00 0,08 1.177.500.000,00 100,00 100,00 0,00 7,95 7,95 1.152.494.350,00 96,650,00

1.192.500.000,00

V. PENINGKATAN KUALITAS PELAYANAN INFORMASI PUBLIK 83.310.000,00 0,01 83.310.000,00 100,00 100,00 0,00 0,56 0,56 60.141.800,00 72,190,00

83.310.000,00

VI. APBD - P 3.525.000.000,00 0,24 3.506.942.000,00 100,00 100,00 0,00 23,50 23,50 3.506.942.000,00 99,490,00

3.525.000.000,00

14.999.638.100,000,00 0,76 14.947.807.500,00 100,00 99,36 14.693.558.735,00 97,96

14.999.638.100,00

TOTAL APBD

KEGIATAN TAHUN ANGGARAN 2006SUB DINAS PENGAIRAN

SUMBER DANA APBD

RENC. REAL.

PROGRES

EFEKTIFRENC. REAL. DEV.

REALISASI KEUANGANT A R G E T

PROGRAM / PAKET FISIK (%) TERTIMB. (%)

REKAPITULASI KEMAJUAN PELAKSANAAN

31 Desember 2006

FUNGSIONAL

Page 62: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

62

BOBOT NILAI KONTRAK

No. G O I ( % ) (Rp) TERTIMB. (%) KET.

B L N (Rp) (%)

TOTAL

I D A N A A P B N 260.042.270.702,00 0,59 315.187.358.090,00 96,51 96,36 -0,16 57,03 56,93 302.557.504.305,0 92,59

66.733.147.000,00

326.775.417.702,00

III D A N A A P B D 226.267.733.660,00 0,41 225.484.196.229,00 100,0 99,96 -0,04 40,91 40,90 224.806.543.514,00 99,35

0,00

226.267.733.660,00

486.310.004.362,00

66.733.147.000,00 1,00 540.671.554.319,00 97,94 97,83 527.364.047.819,00 95,36

553.043.151.362,00

SUMBER DANA

REKAPITULASI KEMAJUAN PELAKSANAAN KEGIATAN TAHUN ANGGARAN 2006

SUB DINAS BINA MARGA

REALISASI KEUANGAN

FISIK (%)

EFEKTIFRENC. REAL. DEV. RENC. REAL.

T A R G E T DANA DIP (Rp) PROGRES

TOTAL SUBDIN BINA MARGA

FUNGSIONAL

31 Desember 2006

Page 63: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

63

BOBOT NILAI KONTRAKNo. G O I ( % ) (Rp) TERTIMB. (%) KET.

B L N (Rp) (%)TOTAL

I REHABILITASI / PEMELIHARAAN JALAN DAN JEMBATAN 83,15 Km 676,29 Km 56.596.430.859,00 0,26 79.088.772.859,00 93,95 93,78 -0,17 24,10 24,06 69.754.702.630,00 83,22

PROPINSI KALIMANTAN TENGAH 3.537,00 M' 0,00 M' 27.222.212.000,00

83.818.642.859,00

II PEMBANGUNAN JALAN DAN JEMBATAN PROPINSI 121,11 M' 80,00 M' 180.327.092.843,00 0,66 208.975.674.321,00 97,07 96,9 -0,12 64,2 64,1 207.290.759.308,00 95,90

KALIMANTAN TENGAH 158,27 Km 995,13 Km 35.828.333.000,00

216.155.425.843,00

III PERENCANAAN DAN PENGAWASAN TEKNIS JALAN 0,00 0,00 9.618.747.000,00 0,04 13.806.410.910,00 100,0 99,22 -0,78 4,07 4,04 12.195.542.367,00 91,69

DAN JEMBATAN KALIMANTAN TENGAH (P3JJ) 3.682.602.000,00

13.301.349.000,00

IV APBN - P 13.500.000.000,00 0,04 13.316.500.000,00 100,0 100,00 0,00 4,13 4,13 13.316.500.000,00 98,64

0,00

13.500.000.000,00

204,26 Km 756,29 Km 260.042.270.702,00

3.695,27 M' 995,13 M' 66.733.147.000,00 1,00 315.187.358.090,00 96,51 96,36 302.557.504.305,00 92,59

326.775.417.702,00

RENC. REAL.

T O T A L APBN

EFEKTIFRENC. REAL. DEV.

KEGIATAN TAHUN ANGGARAN 2006SUB DINAS BINA MARGA

SUMBER DANA APBN

PROYEK / BAGPRO / PAKET

T A R G E T DANA DIPA (Rp) PROGRES REALISASI KEUANGAN

FISIK (%)

31 Desember 2006

REKAPITULASI KEMAJUAN PELAKSANAAN

FUNGSIONAL

Page 64: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

64

BOBOT NILAI KONTRAKNo. G O I ( % ) (Rp) TERTIMB. (%) KET.

B L N (Rp) (%)TOTAL

I PROGRAM REHABILITASI/PEMELIHARAAN JALAN DAN 22,63 Km 445,11 Km 21.160.885.500,00 0,09 21.135.298.559,00 100,0 99,92 -0,08 9,35 9,34 21.030.763.559,00 99,39

JEMBATAN PROPINSI DI KALIMANTAN TENGAH 0,00

21.160.885.500,00

II PROGRAM PENINGKATAN/PEMBANGUNAN JALAN DAN 2.502,00 Km 828,19 Km 110.595.548.150,00 0,49 110.585.008.820,00 100,0 99,97 -0,03 48,88 48,86 110.549.244.685,00 99,96

JEMBATAN PROPINSI DI KALIMANTAN TENGAH 0,00

110.595.548.150,00

III PROGRAM PENGGANTIAN JEMBATAN PROPINSI DI 234,00 M' 209,00 M' 30.384.000.000,00 0,13 30.379.428.200,00 100,0 99,89 -0,11 13,43 13,41 30.346.376.500,00 99,88

KALIMANTAN TENGAH 0,00

30.384.000.000,00

IV PROGRAM PERENCANAAN DAN PENGAWASAN TEKNIS 10.026.700.000,00 0,04 9.954.047.000,00 100,0 99,94 -0,06 4,43 4,43 9.702.620.590,00 96,77

PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN 0,00

PROPINSI 10.026.700.000,00

V APBD - P 54.100.600.010,00 0,24 53.430.413.650,00 100,0 100,00 0,00 23,91 23,91 53.177.538.180,00 98,29

0,00

54.100.600.010,00

226.267.733.660,00

0,00 1,00 225.484.196.229,00 100,00 99,96 224.806.543.514,00 99,35

226.267.733.660,00

RENC. REAL.

T O T A L APBD

EFEKTIFRENC. REAL. DEV.

DANA DASK (Rp) PROGRES REALISASI KEUANGAN

PROGRAM / PAKET KEGIATAN FISIK (%)FUNGSIONAL

REKAPITULASI KEMAJUAN PELAKSANAAN KEGIATAN TAHUN ANGGARAN 2006

SUB DINAS BINA MARGASUMBER DANA APBD

T A R G E T

31 Desember 2006

Page 65: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

65

LAMPIRAN PENETAPAN KINERJA

Page 66: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

66

Anggaran

Uraian Uraian (Rp)1 2 4 6 81 Pengembangan dan Pengelolaan Jaringan 1 O & P Pengairan Bartim Pemeliharaan Rutin 2.000 Ha Terpeliharanya Jaringan 2.000 Ha 398.225.000,00

Irigasi, Rawa dan Jaringan Pengairan Pemeliharaan Rutin DI Natampin Tampa 1.200 Ha dan berkala Irigasi DI Talohen danLainnya. Pemeliharaan Berkala DI Talohen di Natampin, DI Natampin

Tampa 1.500 HaDemplot 2 Ha

2 O & P Pengairan Barito Utara Pemeliharaan Rutin 2000 Ha Terpeliharanya Jaringan 2000 Ha 347.225.000,00 Pemeliharaan Rutin DI Tandrahean 1200 Ha dan berkala Irigasi DI Tandrahean Pemeliharaan Rutin DI Tandrahean 1500 Ha

3 O & P Pengairan Kalimantan Tengah Pemeliharaan Rutin 7000 Ha Terpeliharanya Jaringan 7000 Ha 900.000.000,00 Pemeliharaan Rutin DR Barimba Dahirang dan berkala Irigasi Pemeliharaan Berkala DR Barimba DahirangDemplot 2 Ha

4 O & P Pengairan Gumas Pemeliharaan Rutin 2000 Ha Terpeliharanya Jaringan 2000 Ha 398.225.000,00 Pemeliharaan OP Gunung Mas dan berkala Irigasi di Gunung MasDemplot 2 Ha

5 O & P Pengairan Pulang Pisau Pemeliharaan Rutin 2000 Ha Terpeliharanya Jaringan 2000 Ha 398.225.000,00 Pemeliharaan OP Pulang Pisau dan berkala Irigasi di Pulang PisauDemplot 2 Ha

6 O & P Pengairan Seruyan dan Kotim Pemeliharaan Rutin 2000 Ha Terpeliharanya Jaringan 2000 Ha 398.225.000,00 Pemeliharaan Rutin DR Handil 120 Ha dan berkala Irigasi di Seruyan & KotimPemeliharaan Berkala DR Handil 1500 HaDemplot 2 Ha

7 O & P Pengairan Sukamara & Lamandau Pemeliharaan Rutin 2000 Ha Terpeliharanya Jaringan 2000 Ha 398.225.000,00 Pemeliharaan Rutin 1000 Ha dan berkala Irigasi di Sukamara dan Pemeliharaan Berkala 1000 Ha Lamandau

73 5

SasaranIndikator Kinerja outcome

TargetNo. Program Utama

Indikator Kinerja output

Target

PENETAPAN KINERJA APBD 2007

DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN TENGAH

Page 67: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

67

Anggaran

Uraian Uraian (Rp)1 2 4 6 8

8 Pembangunan Jaringan Pengairan di Jabiren Tersedianya Layanan 250 Ha Terbangunnya Jaringan 250 Ha 498.600.000,00 Kabupaten Pulang Pisau Pengairan Pengairan di Jabiren

9 Pembangunan Jaringan Irigasi dan Rawa Ds. Lahei Terbangunnya Jaringan 300 Ha Terbangunnya Jaringan 300 Ha 748.600.000,00 10 Pembangunan Jaringan Irigasi di Sei Damar Terbangunnya Jaringan 200 Ha Terbangunnya Jaringan 200 Ha 298.600.000,00 11 Pembangunan Jaringan Pengairan Irigasi dan Rawa Terbangunnya Jaringan 300 Ha Terbangunnya Jaringan 300 Ha 498.600.000,00

di Mangkatip Kabupaten Barsel12 Pengemb/Peningk. Jaringan Irigasi di Bagok Meningkatnya Jaringan 100 Ha Terbangunnya Jaringan 100 Ha 248.600.000,00

Kabupaten Barito Timur Pengairan13 Pengemb/Peningk. Jaringan Irigasi di Desa Bereng Meningkatnya Jaringan 500 Ha Terbangunnya Jaringan 500 Ha 748.600.000,00

Bengkel Palangka Raya Pengairan 14 Pengemb/Peningk. Jaringan Irigasi di Desa Kandan Meningkatnya Jaringan 250 Ha Terbangunnya Jaringan 250 Ha 598.600.000,00

Kabupaten Kotawaringin Timur Pengairan 15 Pengemb/Peningk. Jaringan Irigasi di Karta Mulia Meningkatnya Jaringan 100 Ha Terbangunnya Jaringan 100 Ha 248.600.000,00

Kabupaten Sukamara Pengairan 16 Pengemb/Peningk. Jaringan Irigasi di Talingko Meningkatnya Jaringan 100 Ha Terbangunnya Jaringan 100 Ha 248.600.000,00

Kabupaten Katingan Pengairan 17 Pengemb/Peningk. Jaringan Irigasi DR Keladan Meningkatnya Jaringan 100 Ha Terbangunnya Jaringan 100 Ha 748.600.000,00 18 Pembangunan Jaringan Irigasi DR Bereng Rambang Pengairan 19 Pembangunan Bendung Hurung Bunut Tersedianya Layanan 200 M Terbangunnya Sudetan 200 M 1.020.254.000,00

Pengairan Bendung20 Pemeliharaan Berkala Bendung Sekata Juri dan Meningkatnya Kualitas 2 Bh Terpeliharanya Jaringan 2 Bh 198.600.000,00

Sekata Tewah Jaringan Irigasi Irigasi21 Pemeliharaan Berkala DR Belatin Kab. P. Pisau Meningkatnya Kualitas 2000 Ha Terpeliharanya Jaringan 2000 Ha 298.600.000,00

Jaringan Irigasi Irigasi22 Pemeliharaan di Sekata Juri Kab. Gumas Meningkatnya Kualitas 400 Ha Terpeliharanya Jaringan 400 Ha 73.600.000,00

Jaringan Irigasi Irigasi23 Pengembangan Jaringan Irigasi DI Karang Anyar Meningkatnya Kualitas 250 Ha Terpeliharanya Jaringan 250 Ha 298.600.000,00

Jaringan Irigasi Irigasi24 Pengumpulan Data Asep Okmar dan Jaringan Data Asep Okmar dan Data Base Terdokumentasinya data Data Base 498.600.000,00

Jaringan yang akurat25 Perencanaan Pengembangan Sumber Daya Air Dokumen Perencanaan Data Base Tersusunnya Dokumen Data Base 1.022.554.000,00

Teknis SDA Perenc. Teknis SDA26 Rapat Teknis O & P Tingkat Prov. Regional dan Laporan Rapat Teknis 75 Bk Terdokumentasinya 75 Bk 442.405.500,00

Rapat Sinkronisasi Program SDA Penanganan O & P27 Rehabilitasi Jaringan Pengairan DI Baruh Rintis Meningkatnya Kualitas 250 Ha Terpeliharanya Jaringan 250 Ha 623.600.000,00

di Desa Matabu Kabupaten Bartim Jaringan Irigasi Irigasi28 Rehabilitasi Jaringan Pengairan Di Terusan Raya Meningkatnya Kualitas 250 Ha Terpeliharanya Jaringan 250 Ha 648.600.000,00

Jaringan Irigasi Irigasi29 Rehabilitasi Jaringan Pengairan DR Katingan I Meningkatnya Kualitas 80 Ha Terpeliharanya Jaringan 80 Ha 198.600.000,00

Jaringan Irigasi Irigasi

3 5 7

No. Program Utama SasaranIndikator Kinerja output Indikator Kinerja outcome

Target Target

Page 68: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

68

Anggaran

Uraian Uraian (Rp)1 2 4 6 8

2 Pengendalian Banjir 1 Pengamanan Abrasi Pantai Kubu Mengurangi Abrasi 250 M Terlindunginya dari Abrasi 250 M 986.387.500,00 2 Perbaikan Tebing Sungai Barito Mengurangi longsor 50 M Terlindunginya tebing 50 M 1.248.600.000,00 3 Pengamanan Abrasi Pantai Kuala Jelai Mengurangi Abrasi 50 M Terlindunginya dari Abrasi 50 M 520.254.000,00 4 Pengendalian Aliran Terusan Tuan P. Raya Mengurangi longsor 1 Bh Terlindunginya Tebing, Jalan 1 Bh 6.498.600.000,00

dan Jembatan

3 Pembangunan Jalan dan Jembatan 1 Bagugus - Bukit Batu (Multi Years TahapII) Meningkatnya Struktur 8 Km Terbukanya akses jalan 8 Km 3.016.846.500,00 Jalan menuju Kabupaten

2 B. Rawi - B. Liti - B. Lahei (AWP2), EIRTP 2 1.416.700.000,00 3 Bawan - K. Kurun (Multi Years Tahap II) 15 Km 15 Km 8.883.520.500,00 4 Biaya Operasional dan Pemasangan Pondasi Tersebar Tersebar 996.732.500,00 5 Bukit Liti - Bawan I & II 20,00 Km 20,00 Km 7.643.520.500,00 6 Jalan Adonis Samad 1,5 Km 1,5 Km 1.256.024.000,00 7 Jalan G. Obos (Palangka Raya) 1,5 Km 1,5 Km 706.024.000,00 8 Jalan Lingkar Kota Palangka Raya 2 Km 2 Km 956.024.000,00 9 Jalan Manduhara 1,5 Km 1,5 Km 454.912.000,00 10 Jalan Telawang Raya 1,5 Km 1,5 Km 454.912.000,00 11 Jalan Yos Sudarso II (Palangka Raya) 1,25 Km 1,25 Km 704.912.000,00 12 Jembatan Barito Hulu (Sharing) Meningkatnya Struktur 43 M Terbukanya akses jalan 43 M 6.990.000.000,00

Jembatan menuju Kabupaten13 Jembatan Barito Kalahien 620 M 100 M 100 M 5.883.900.000,00 14 Jem batan Palinget 14 M 14 M 1.259.903.000,00 15 Jembatan Murui Tahap 2 (AWP 2),EIRTP 2 25 M 25 M 864.012.000,00 16 Jembatan Hambie Tahap 1 10 M 10 M 979.903.000,00 17 Jembatan S. Langanen Tahap 1 10 M 10 M 979.903.000,00 18 Jembatan S. Mangkutup (AWP2), EIRTP 2 559.902.500,00 19 Jembatan S, Mangkutup Tahap II (Multi Years) 10 M 10 M 759.903.000,00 20 Jembatan Sei Buluh (Sharing) 10 M 10 M 998.362.000,00 21 Jembatan Sei Jelai (Sharing) 200 M 14 M 14 M 1.018.632.500,00 22 Jembatan Sei Jutuh (Sharing) 10 M 10 M 999.862.000,00 23 Jembatan Sei Kurun Tahap 1 10 M 10 M 999.862.000,00 24 Jembatan Sei Miri (Sharing) 10 M 10 M 1.009.862.000,00 25 Jembatan Sei Pangi Tahap 1 10 M 10 M 999.862.000,00 26 Jembatan Sei Rungan (Sharing) 10 M 10 M 1.009.862.000,00 27 Jembatan Sei Tampelas Tahap 1 10 M 10 M 999.862.000,00 28 Jembatan Seruyan (Sharing) 34 M 34 M 2.932.512.000,00 29 Jembatan S. Petak Bahandang Tahap 1 14 M 14 M 1.470.932.500,00 30 Jembatan Tumbang Terusan Tahap 2 40 M 40 M 2.520.932.500,00 31 Jembatan Tumbang Empas 10 M 10 M 999.862.000,00 32 Kotawaringin Lama - Riam Durian - Tempayung Meningkatnya Struktur 8 Km Terbukanya akses jalan 8 Km 3.541.035.000,00

Jalan menuju Kabupaten

3 5 7

No. Program Utama SasaranIndikator Kinerja output Indikator Kinerja outcome

Target Target

Page 69: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

69

Anggaran

Uraian Uraian (Rp)1 2 4 6 8

33 Kuala Kapuas - Palingkau - Dadahup 1 Meningkatnya Struktur 10 Km Terbukanya akses jalan 10 Km 10.750.000.000,00 Jalan menuju Kabupaten

34 Laman Baru - Ajang - Lupu 1,5 Km 1,5 Km 1.074.103.000,00 35 Lingkar Kota Muara Teweh 1,25 Km 1,25 Km 981.612.000,00 36 Bukit Batu - L. Layang (Penanganan Daerah 10 Km 10 Km 31.891.899.000,00

Kabunter)37 Lupu - Riam Durian 1,5 Km 1,5 Km 1.077.912.000,00 38 Nanga Bulik - Laman Baru 1,5 Km 1,5 Km 1.093.212.000,00 39 Jembatan Terusan Tuan Meningkatnya Struktur 40,00 M 40,00 M 5.659.724.000,00

Jembatan40 Pangkalan Bun - Kotawaringin Lama (Multi Years) Meningkatnya Struktur 20 Km 20 Km 13.041.035.000,00 41 Palangka Raya - Bagugus (Multi Years) Jalan 5 Km 5 Km 4.296.846.500,00 42 Pasar Panas - Bentot - Kambitin 5 Km 5,00 Km 3.041.035.000,00 43 Pengadaan Bangunan Atas Jembatan Semi 4.031.273.500,00

Permanen (Bailey)44 Pengawasan Teknis Jalan dan Jembatan Provinsi Buku laporan Pengawasan Dokumen Pengawasan 6.359.967.500,00

dan Studi45 Perencanaan Teknis Jalan dan Jembatan Provinsi Buku laporan Perencanaan Dokumen Perencanaan 4.043.746.350,00

dan Studi46 Pulang Pisau - Maliku I (Multi Years) Meningkatnya Struktur 6 Km Terbukanya akses jalan 6 Km 5.331.526.500,00

Jalan menuju Kabupaten47 Pulang Pisau - Maliku II (Multi Years) 6,00 Km 6,00 Km 5.015.388.000,00 48 Maliku - Pangkoh (Multi Years) 2 Km 2 Km 4.123.623.500,00 49 Lingkar Kota Kuala Pembuang 1,5 Km 1,5 Km 2.521.250.000,00 50 Lingkar Selatan Kota Sampit 6 Km 6 Km 1.058.925.000,00 51 Samuda - Ujung Pandaran (AWP3), EIRTP 2 1.700.000.000,00 52 Samuda - Ujung Pandaran 1 (Multi Years) 8 Km 8 Km 3.169.785.000,00 53 Samuda - Ujung Pandaran 12(Multi Years) 12 Km 12 Km 5.580.758.500,00 54 Lingkar Utara Kota Sampit 1,5 Km 1,5 Km 655.525.000,00 55 Sei Rangit - Pel. CPO Bumi Hardjo 2 Km 2 Km 1.769.773.500,00 56 Simpang Bangkal - Bangkal 1,5 Km 1,5 Km 704.906.000,00 57 Sp. Pundu - Tb. Samba I (Multi Years) 6 Km 6 Km 4.912.638.000,00 58 Sp. Pundu - Tb. Samba II (Multi Years) 6 Km 6 Km 4.115.773.500,00 59 Kereng Pangi - Daun Bango 4 Km 4 Km 1.261.135.000,00 60 Tb. Samba - Tb. Hiran - Tb. Sanamang 5 Km 5 Km 2.420.808.500,00 61 Tempayung - Sukamara 6 Km 6 Km 2.524.073.500,00 62 Tumbang Sangai - Tumbang Kalang 1,5 Km 1,5 Km 1.198.635.000,00 63 Ujung Pandaran - Kuala Pembuang 1 3 Km 3 Km 4.541.326.500,00 64 Muara Teweh - Trinsing 3 Km 3 Km 1.031.612.000,00 65 Kuala Kapuas - Palingkau - Dadahup 2 10 Km 10 Km 5.000.000.000,00

3 5 7

No. Program Utama SasaranIndikator Kinerja output Indikator Kinerja outcome

Target Target

Page 70: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

70

Anggaran

Uraian Uraian (Rp)1 2 4 6 8

66 Jembatan S. Kampuri Meningkatnya Struktur Terbukanya akses jalan 2.020.932.500,00 67 Jembatan S. Sepang Tahap 1 Jembatan menuju Kabupaten 1.320.932.500,00 68 Jembatan S. Rangan Tate 2.520.932.500,00 69 Jembatan S. Tuyun Tahap 1 1.320.932.500,00 70 Jembatan S. Kapuas Tahap 1 3.054.903.000,00 71 Peningkatan Jalan Desa di 4 Kabupaten Meningkatnya Struktur Terbukanya akses jalan 1.439.612.000,00

Jalan menuju Kabupaten72 Bukit Batu - Lungkuh Layang (Multi Years) 3.696.846.500,00 73 Lungkuh Layang - Buntok (Multi Years) 2.776.846.500,00 74 Samuda - Ujung Pandaran (Penanganan Khusus 4 Km 4 Km 10.847.358.000,00

Daerah Lempuyang)

4 Rehabilitasi/Pemeliharaan Jalan dan 1 Ampah - Buntok Meningkatnya Struktur 3 Km Terbukanya akses jalan 3 Km 1.171.453.000,00 Jembatan 2 Bereng Bengkel - Dermaga Kalampangan Jalan 5,01 Km menuju Kabupaten 5,01 Km 516.526.500,00

3 Hayaping - Bentot 1,5 Km 1,5 Km4 Jalan Wisata Nyaru Menteng 1,5 Km 1,5 Km 755.908.500,00 5 Jalan Seth Adji 3,2 Km 3,2 Km 145.908.500,00 6 Jalan Yos Sudarso I Palangka Raya 7 Km 7 Km 205.925.500,00 7 Patung - Hayaping 1,5 Km 1,5 Km 1.440.920.000,00 8 Palantaran - Parenggean 2,5 Km 2,5 Km 2.018.176.500,00 9 Pangkalan Lima - Kumai 2 Km 2 Km 499.903.000,00 10 Parenggean - Tumbang Sanggai 2 Km 2 Km 499.903.000,00 11 Pemel. Rutin Jalan Provinsi Wilayah Barsel & Bartim 75.000.000,00 12 Pemel. Rutin Jalan Provinsi Wilayah Gumas 75.000.000,00 13 Pemel. Rutin Jalan Provinsi Wilayah Kapuas 75.000.000,00 14 Pemel. Rutin Jalan Provinsi Wilayah Kobar 75.000.000,00 15 Pemel. Rutin Jalan Provinsi Wilayah Kotim 75.000.000,00 16 Sampit - Samuda (Transisi) 3 Km 3 Km 517.653.000,00 17 Sampit - Samuda (AWP2) 500.000.000,00 18 Sp. Kereng Bangkirai - Kereng Bangkirai 9,15 Km 9,15 Km 124.708.500,00 19 Pemeliharaan Jembatan Tersebar di Ruas Jalan 261.096.500,00

Provinsi20 Biaya Operasional Alat Berat 1.250.004.000,00 21 Pengadaan 1 Fleet Alat Berat UPR UPTD dll 6.980.000.000,00 22 Biaya Transportasi As Buton 1.750.000.000,00 23 Pemel. Jalan Dayu - Siung - Telang 0,5 Km 0,5 Km 255.908.500,00 24 Pemel. Jalan Lungkang 0,5 Km 0,5 Km 305.908.500,00 25 Pemel. Jl. T. Tandang. Baban, Damang Leman, 2,5 Km 2,5 Km 2.279.388.500,00

Bukit Raya dan Jalan Bima

3 5 7

No. Program Utama SasaranIndikator Kinerja output Indikator Kinerja outcome

Target Target

Page 71: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

71

AnggaranUraian Uraian (Rp)

1 2 4 6 8

IX Penggantian Jembatan Wilayah Palangka Raya - Pembangunan Jembatan 40,00 M Tersedianya Prasarana 40,00 MBarsel - Barut - Mura di Provinsi Kalimantan Tengah baru dan Jembatan dgn Jembatan dgn Konstruksi

1 Pkt. Oprit Jembatan Sei Tulan 40 M kondisi bertahap bertahap 5 tahun dan baru 1.200.000.000,00 2 Pkt. Jembatan Barito Hulu (Sharing) 450 M 5.000.000.000,00 3 Pkt. Jembatan Barito Kalahien 620 M 3.000.000.000,00 4 Pkt. Jembatan Sei Bengaris (lantai jembatan) 400.000.000,00 5 Harga Perolehan 100.000.000,00

X Penggantian Jembatan Tersebar di Prov. Kalteng Pembangunan Jembatan 44,00 M Tersedianya Prasarana 44,00 M1 Pkt. Jembatan Murui Tahap 1 baru dan Jembatan dgn Jembatan dgn Konstruksi 1.400.000.000,00 2 Pkt. Jembatan Tumbang Terusan Tahap 1 kondisi bertahap bertahap 5 tahun dan baru 1.500.000.000,00 3 Pkt. Jembatan S. Mangkutup 1.370.000.000,00 4 Pkt. Jembatan S. Mangkutup (AWP2) 600.000.000,00 5 Harga Perolehan 75.000.000,00

5 Pengembangan Perkotaan I Perencanaan Perkotaan Tersediannya dokumen 36 Dok Lancarnya pelaksanaan 36 Dok1 Pkt. Redesain Bundaran Burung dan Perencanaan perencanaan Review kegiatan fisik 80.000.000,00

Penataan Ruang Terbuka Jl. Adonis Samad P. Raya Master Plan Drainase Kota2 Pkt. Pembangunan Trotoar Jl. Imam Bonjol, Jl. P. Raya, Redesain bun- 1.800.000.000,00

Diponegoro dan Jl. Dr. Murjani daran Burung & penataan3 Perencanaan dan Supervisi Ruang Terbuka Jl. Adonis 700.000.000,00 4 Harga Perolehan 38.700.000,00

1 Pkt. Review Master Plan Drainase Kota P. Raya Samad P. Raya 900.000.000,00 2 Harga Perolehan 11.500.000,00

II Pembangunan / Peningkatan Drainase dan Jalan Meningkatnya kwalitas 544 M Lancarnya lalu lintas dan 544 MLingkungan Kota Palangka Raya drainase dan jalan 133 M aliran drainase air hujan 133 M

1 Pkt. Pembuatan Jl. Lingkungan di Gang Batur dan lingkungan 550.000.000,00 Jl. Untung Suropati

2 Pkt. Lanjutan Jl. Lingkungan di Komplek APPT 150.000.000,00 Temanggung Tilung 200 M

3 Harga Perolehan 20.000.000,00

1 Pkt. Peningkatan Drainase Jl. Gajah Mada, Sudirman 350.000.000,00 dan Sutanegara Palangka Raya

2 Pkt. Lanjutan Peningkatan Drainase Primer di Jl. 450.000.000,00 Krakatau dan Komplek POLDA Kalteng

3 Pkt. Lanjutan Drainase di Komplek Amaco dan 350.000.000,00 Jl. Temanggung Tilung

4 Pkt. Drainase Jl. Seth Adji, Jl. Yos Sudarso dan 2.530.000.000,00 Jl. RTA. Milono

5 Harga Perolehan 75.000.000,00

Indikator Kinerja outcomeTarget

3 5 7

No. Program Utama SasaranIndikator Kinerja output

Target

Page 72: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

72

AnggaranUraian Uraian (Rp)

1 2 4 6 8

III Rehabilitasi Gedung dan Penataan Kota Tersedianya ruang terbu- 110.000 M2 Terpenuhinya fasilitas 110.000 M21 Pkt. Penataan Ruang Terbuka Jl. Adonis Samad 7 Km ka hijau dan fasilitas kan- 650,00 M2 tempat rekreasi dan ter- 650,00 M2 5.550.000.000,00 2 Pkt. Penataan Ruang Terbuka Bawah Jembatan tor sesuai rencana 260,00 M2 penuhinya kebutuhan 260,00 M2 500.000.000,00

Kahayan & sekitarnya 10.000 M2 fasilitas kantor yang nyaman3 Harga Perolehan 50.000.000,00 4 Instalasi Listrik Kantor DPU Prov. Kalteng 250.000.000,00 5 Pkt. Rehab Kantor DPU Prov. Kalteng 950.000.000,00 6 Pkt. Lanj. Pemb. Kantor Eks Kanwil PU Km. 3 P. Raya 200.000.000,00 7 Identifikasi Keselamatan Gedung Negara 500.000.000,00 8 Harga Perolehan 50.000.000,00

6 Peningkatan Sarana dan Prasarana I Peningkatan Prasarana dan Sarana Perdesaan Terbangunnya/meningkat 1.428,00 M Lancarnya lalu lintas sara- 1.428,00 MPedesaan Wilayah Barat nya prasarana jalan pada 800,00 M na pertanian dari areal 800,00 M

1 Pkt. Peningkatan Jl. Usaha Tani Kwsn. Agropolitan kawasan Agropolitan dan 1.600,00 M pertanian ke tempat 1.600,00 M 500.000.000,00 Pangkalan Lada Kabupaten Kotawaringin Barat Pusat Desa pengolahan hasil, gudang

2 Pkt. Peningkatan Jl. Desa Pinang Merah Pangkalan dan pasar 300.000.000,00 Bun Kabupaten Kotawaringin Barat

3 Pkt. Penink. Jl. Poros Desa Kab. Seruyan 300.000.000,00 4 Pkt. Penink. Jl. Poros Desa Kab. Sukamara 300.000.000,00 5 Harga Perolehan 80.000.000,00

II Peningkatan Prasarana dan Sarana Perdesaan Terbangunnya/meningkat 1.428,00 M Lancarnya lalu lintas sara- 1.428,00 MWilayah Timur nya prasarana jalan pada 1.428,00 M na pertanian dari areal 1.428,00 M

1 Penk. Jl. Usaha Tani Kwsn. Agropolitan Basarang kawasan Agropolitan dan 1.066,00 M pertanian ke tempat 1.066,00 M 500.000.000,00 Kabupaten Kapuas 1.428 M Pusat Desa pengolahan hasil, gudang

2 Pnk. Jl. Usaha Tani Kwsn. Agropolitan Ds. Tengah dan pasar 500.000.000,00 Kabupaten Barito Timur 1.428 M

3 Pnk.Jl. Poros Desa Kab. P. Pisau 1.066 M 400.000.000,00 4 Harga Perolehan 60.000.000,00

7 Pengembangan Permukiman Lingkungan I Operasi & Pemeliharaan (OP) Drainase Kota P. Raya Pemeliharaan Drainase 70,00 Km Mengurangi genangan air/ 70,00 Km1 Operasi & Pemeliharaan Drainase Primer, Sekunder Primer banjir pd kwsn permukiman 1.000.000.000,00

dan Tersier kota Palangka Raya

II Operasi & Pemeliharaan (OP) Kebersihan Kota Terpeliharanya kebersih- Mengurangi volume timbun- 600.000.000,00 Palangka Raya an kota Palangka Raya an sampah kota

Indikator Kinerja outcomeNo. Program Utama Sasaran

Indikator Kinerja outputTarget Target

3 5 7

Page 73: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

73

AnggaranUraian Uraian (Rp)

1 2 4 6 8

III Pembangunan Jaringan Penyediaan Air Bersih Tersedianya jaringan air 6.863,00 M Tersedianya Air bersih bagi 6.863,00 MPerdesaan di Kecamatan Kahayan Tengah dan bersih perdesaan masyarakatBanama Tingang 500.000.000,00

1 Pengadaan & Pemasangan Pipa Air Minum 6.863 M2 Harga Perolehan 38.510.000,00

IV Pembangunan Jaringan Penyediaan Air Bersih di Terbangunnya jaringan air 6.863,00 Unit Tersedianya jaringan air 6.863,00 UnitKota Palangka Raya bersih bersih

1 Pengadaan Sambungan Rumah di Kecamatan Tersambungnya SR ke 1.346,00 Unit Tersedianya Sambungan 1.346,00 Unit 750.000.000,00 Pahandut dan Jekan Raya perumahan Rumah

V Pengadaan 1 buah Dump Truck Sampah Tersedianya 1 buah 1,00 Unit Mobilisasi angkutan sampah 1,00 Unit 250.000.000,00 Dump Truck Sampah di lebih cepatKota Palangka Raya

Harga Perolehan 19.010.000,00 8 Peningkatan Kualitas Pelayanan Informasi I Rapat Koordinasi SDA Provinsi dan Regional Terdokumentasinya 15,00 Buku Tertanganinya masalah OP 15,00 Buku 83.310.000,00

Publik penanganan OP Pengair- Pengairan Prov & Kab.an

II Pembinaan, Penilaian dan Pengendalian Kinerja Terdokumentasinya 40,00 orangMeningkatnya Kinerja 40,00 orang 91.797.100,00 Kontraktor di Lingkungan PU Kinerja Kontraktor Kontraktor

III Pembinaan Tenaga Pengawas Bidang Jalan dan Meningkatkan pemahaman 40,00 orangMeningkatnya pemahaman 40,00 orang 103.011.100,00 Jembatan Tenaga Pengawas Bid Jl Tenaga Pengawas Bid Jl

IV Pembinaan Tenaga Pengawas Bidang Pengairan Meningkatkan pemahaman 40,00 orangMeningkatnya pemahaman 40,00 orang 78.486.100,00 Tenaga Pengawas Bid Air Tenaga Pengawas Bid Air

V Pembinaan Pengendalian Mutu Bidang Jalan Meningkatnya Mutu 40,00 orangMeningkatnya Mutu 40,00 orang 78.486.100,00

VI Monitoring dan Evaluasi Program Terdokumentasinya 12,00 Buku Meningkatnya kemampuan 12,00 Buku 449.482.250,00 Kinerja Pelaksanaan Penyusunan KegiatanKegiatan

VII Rapat Teknis / Mid Term Review Terdokumentasinya 12,00 Buku Meningkatnya Kinerja 12,00 Buku 95.945.000,00 Kinerja Pelaksanaan Keg. Implementasi pelaksanaanserta dipahaminya masalah tahun mendatangyang dihadapi

No. Program Utama SasaranIndikator Kinerja output Indikator Kinerja outcome

Target Target3 5 7

Page 74: PAPARAN Kadis PU Prov. Ke Gub Tgl. 05 Maret 07

74

AnggaranUraian Uraian (Rp)

1 2 4 6 8

VIII Perencanaan Umum PSD PU Tersedianya Dokumen 3,00 Buku Meningkatnya Kinerja 3,00 Buku 216.378.000,00 Perencanaan sebagai data Implementasi awal dokumen pelaksanaan

IX Koordinasi dan Laporan Bidang Infrastruktur Laporan Bidang Infrastruk- 12,00 Buku Terdokumentasinya 12,00 Buku 80.047.750,00 Transportasi, SDA dan Permukiman tur Bidang Transportasi, kinerja pelaksanaan keg.

SDA dan Permukiman serta dipahaminya masalahkendala yang dihadapi

X Penyusunan LAKIP Dinas PU Prov. Kalteng Laporan Akuntabilitas 10,00 Buku Terdokumentasinya Lap. 10,00 Buku 42.435.000,00 Kinerja Akuntabilitas Kinerja Dinas

Pekerjaan Umum

XI Harga Standar Pokok Kegiatan (HSPK) Buku Dokumen HSPK 15,00 Buku Terhimpunnya Standarisasi 15,00 Buku 104.948.500,00 Harga Satuan Pek. PU

XII Draf Final Program RASK dan DASK DPUP Buku Dokumen RASK dan 30,00 Buku Tersusunnya RASK dan DASK 30,00 Buku 82.363.500,00 DASK Dinas Pekerjaan Umum

XIII Pembelian Penunjangan Kegiatan Operasional Peralatan Kantor dan 1,00 Pkt Termobilisasinya kegiatan 1,00 Pkt 272.750.000,00 Dinas PU Komputer operasional Dinas PU

XIV Penyusunan SKPD Infrastruktur Dokumen kesepakatan 15,00 Dok Terdokumentasinya usulan 15,00 Dok 157.079.750,00 dalam bidang PSD PU yang akan dituangkan dlm

RASK

No. Program Utama SasaranIndikator Kinerja output

Target3 5

Indikator Kinerja outcomeTarget

7