    D A F T A R S E W A P E R A L A T AN

    S U M B E R D A T A : P A S A R A N B E B A S

    D A E R A H : KOTA SEMARANG & SEKITAR

    EDISI JANUAR

    HARGA

    NO. PERALATAN SATUAN MINIMUM MAKSIMUM

    (Rp) (Rp)

    1 Dump Truck 3 ton jam 140,000 150,000

    2 Dump Truck 5 ton jam 165,000 180,000

    3 Truk Bak Terbuka Jam 110,000 125,000

    4 Truk Tanki Air Jam 110,000 120,000

    5 Bulldoer Jam 180,000 200,000

    6 !otor "rader Jam 225,000 250,000

    # $%eel &oader Jam 200,000 225,000

    8 '(ca)ator Jam 200,000 220,000

    * +rane 30 ton %ari 6,500,000 #,000,000

    10 lat Bed Truck jam 80,000 100,000

    11 Bab- .oller / edetrian Jam 100,000 120,000

    12 Tire .oller 8 10 ton Jam #0,000 100,000

    13 Bab- .oller jam 150,000 1#5,000

    14 ibrator .oller el # ton Jam 50,000 60,000

    15 ibrator .oller ed 1 ton jam 8#,500 *0,000

    16 $ater ump 30m3/%ari Jam 30,000 35,000

    1# Ap%alt pra-er Jam 30,000 40,000

    18 ick 7p %ari 250,000 300,000

    1* A ! Jam 60,000 #0,000

    20 Ap%alt ini%er Jam 85,000 *0,000

    21 +oncrete ibrator Jam 30,000 40,000

    22 +ompreor Jam 30,000 40,000

    23 +oncrete !i(er 0,125m3 Jam 30,000 40,000

    24 +oncrete !i(er 0,5m3 jam 40,000 50,000

    25 tamper Jam 25,000 30,000

    26 "enet Jam 30,000 30,000

    2# Alat enecat !arka Jam 45,000 55,00028 !ein &a jam 45,000 55,000

    2* tone +ru%er jam 60,000 #0,000

  • 7/24/2019 panduan harga

    2/98

    I 2015

    KET.

  • 7/24/2019 panduan harga

    3/98

    2*52551*5(l *8 datar upa% tenaa kerja

    D A F T A R U P A H P E K E R J A

    S U M B E R D A T A : P A S A R A N B E B A S

    D A E R A H : KOTA SEMARANG & SEKITAR

    EDISI JANUARI 2015

    HARGA

    NO. URAIAN PEKERJA SATUAN MINIMUM MAKSIMUM KET.

    (Rp) (Rp)

    1 e k e r j a 9r 55,000 60,000

    2 ! a n d o r 9r #0,000 #5,000

    3 T u k a n l i t r i k 9r #5,000 85,000

    4 T u k a n k a - u 9r #5,000 85,000

    5 : e p t k k a - u 9r 80,000 *0,000

    6 T u k a n b a t u 9r #5,000 85,000

    # : e p t k b a t u 9r 80,000 85,000

    8 T u k a n b e i 9r #5,000 85,000

    * : e p t k b e i 9r 80,000 *0,000

    10 T u k a n c a t 9r #5,000 85,000

    11 : e p t k c a t 9r 80,000 85,000

    12 T u k a n p l i t u r 9r #5,000 85,000

    13 T u k a n j a l a n 9r 55,000 65,000

    14 T u k a n a l i 9r 55,000 65,000

    15 Tukan maak apal 9r 55,000 65,000

    16 T k l e i d e n 9r #5,000 85,000

    1# ! a i n i 9r 150,000 1#5,000

    18 e m b ! a i n i 9r 100,000 110,000

    1* e n j a a a p i 9r 50,000 65,000

    20 e n j a a m a l a m 9r 55,000 65,000

    21 opir 9r 150,000 165,000

    22 embantu opir 9r 100,000 110,000

  • 7/24/2019 panduan harga

    4/98

    D A F T A R H A R G A S A T U A N B A H A N B A N G U N A N

    S U M B E R D A T A : P A S A R A N B E B A S

    D A E R A H : KOTA SEMARANG & SEKITAR

    EDISI JANUARI 2015

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    I B A H A N D A S A R

    1 BATU KALI Bulat 7tu% m3 150,000 1#0,000

    Bulat Bela% m3 1#0,000 1*0,000

    eca% 10/15 m3 1*0,000 220,000

    eca% 5/# m3 210,000 240,000

    eca% 3/5 m3 230,000 260,000

    2 KERIKIL Timbun m3 120,000 130,000

    a

  • 7/24/2019 panduan harga

    5/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    3 GENTENG TANAH LIAT

    laam/lenton b% 2,200 2,300

    :odok b% 2,800 3,200

    :odok "laur b% 4,000 4,250

    ok kerpu :odok b% 6,500 #,200

    ok kerpu :odok "laur b% 8,200 8,500

    lenton uper bear 18 b%/m2 b% 5,100 5,300

    ok kerpu plenton uper b% 8,600 *,200

    4 GENTENG KAA

    laam tebal 2 mm b% 10,500 11,000

    laam tebal 3 mm b% 12,000 13,000

    :odok tebal 2 mm b% 13,500 14,000

    :odok tebal 3 mm b% 15,000 16,500

    5 ASBES GELOMBANG BESAR

    200 cm 102 cm 5 mm b% 80,000 86,000

    225 cm 102 cm 5 mm b% *3,000 105,000

    250 cm 102 cm 5 mm b% *5,000 105,000

    200 cm 102 cm 6 mm b% 82,000 *5,000

    225 cm 102 cm 6 mm b% *0,000 *#,500

    250 cm 102 cm 6 mm b% *#,000 110,000

    Abe "elomban :ecil

    150 cm 105 cm 4 mm b% 40,000 52,500

    180 cm 105 cm 4 mm b% 48,000 5#,000

    210 cm 105 cm 4 mm b% 56,000 65,000

    240 cm 105 cm 4 mm b% 64,000 #5,000

    2#0 cm 105 cm 4 mm b% #2,000 85,000

    300 cm 105 cm 4 mm b% 80,000 *5,000

    CD7&>' ; *5 cm ( 200cm ( 03mm lbr 140,000

    CD7>&&A ; 40cm ( 106 cm ( 0,3mm lbr #5,000

    C: Jabe nok

    :erpu "enten b% 2*,000 35,000

    tel Bear b% 45,000 50,000

    aten Bear b% 43,000 4#,000

    oktel elomban %arle(

    tel Bear b% 44,000 48,000

    atent Bear b% 2#,000 30,500

    lat bear b% 51,000 55,000

    C: 7T CD7&>' CD7>&&A

    7kuran 50cm ( 50 cm ( 0,3mm lbr 100,000

    6 ASBES PLAT

    100cm 100 cm 3 mm b% 16,000 18,000

    100cm 100 cm 4 mm b% 20,000 22,000

    50 cm 200 cm 3 mm b% 14,000 15,000

    40 cm 200 cm 3 mm b% 13,000 14,000

  • 7/24/2019 panduan harga

    6/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    >B'. &AT uk 100cm ( 100cm ( 4mm lbr 25,000

    unt laond uk 120cm ( 240cm ( 4mm lbr 66,000

    uk 122cm ( 244cm ( 4mm lbr 68,000

    ".+ BCA.D uk122cm ( 244cm ( 5mm lbr 100,000

    uk122cm ( 244cm ( 6mm lbr 125,000

    uk122cm ( 244cm ( 8mm lbr 185,000

    uk122cm ( 244cm ( 10mm lbr 245,000

    # FIBRE GLASS (JABES)

    180 *2 cm b% 48,000 65,000

    200 *2 cm b% 56,000 6#,500

    250 *2 cm b% 6#,000 85,000

    180 105 cm b% #0,000 *0,000

    210 105 cm b% #0,000 100,000

    250 105 cm b% *5,000 110,000

    8 SENG PLAT

    BJ& 0,18 lebar 55 cm mE 22,000 25,000

    BJ& 0,20 lebar 55 cm mE 2#,000 28,000

    BJ& 0,28 lebar 55 cm mE 35,000 36,000

    BJ& 0,30 lebar 55 cm mE 40,000 42,000

    * SENG GELOMBANG

    BJ& 0,18 panjan 180 cm lbr 45,000 55,000

    BJ& 0,20 panjan 180 cm lbr 48,000 5#,000

    BJ& 0,30 panjan 180 cm lbr 54,000 6#,000

    BJ& 0,40 panjan 180 cm lbr #2,000 #5,000

    III . B A H A N K A ! U

    1 JATI apan m3 22,000,000 23,000,000

    Balok/peaen m3 20,000,000 20,500,000

    2 KAMPER apan m3 #,600,000 #,800,000

    Balok/peaen m3 6,*00,000 #,500,000

    3 KRUING apan m3 5,300,000 6,200,000

    Balok/peaen m3 5,000,000 5,800,000

    4 MERANTI apan m3 4,800,000 5,100,000

    Balok/peaen m3 4,500,000 4,600,000

    5 LANAN apan m3 2,050,000 2,100,000

    Balok/peaen m3 1,#50,000 1,*00,000

    6 BENGKIRAI apan m3 10,000,000 13,000,000

    Balok/peaen m3 *,200,000 *,600,000

    # DOLKEN edan 8 ( 10 ( 400 cm bt 34,000 36,000

    :ecil 6 ( # ( 400 cm bt 2*,000 32,000

    Bear 10 ( 12 ( 400 cm bt 38,000 42,000

    :a-u cetakan m3 1,100,000 1,250,000

    :a-u bakar m3 150,000 1#0,000

    Bambu bt 11,000 15,000

  • 7/24/2019 panduan harga

    7/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    I" . BAHAN PENUTUP DINDING # LANTAI

    1 UBIN (TEGEL BIASA)

    + polo 30 30 cm m2 3#,500 40,000

    20 20 cm m2 36,000 38,000

    + B'TC G 10 cm 100 cm b% 30,000 32,000

    G 20 cm 100 cm b% 35,000 38,500

    G 30 cm 100 cm b% 42,500 45,000

    G 50 cm 100 cm b% 80,000 85,000

    G 60 cm 100 cm b% 105,000 110,000

    G #0 cm 100 cm b% 130,000 145,000

  • 7/24/2019 panduan harga

    8/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    7 10 cm 100 cm b% 21,000 22,500

    7 15 cm 100 cm b% 2#,000 30,500

    7 20 cm 100 cm b% 35,000 38,000

    7 30 cm 100 cm b% 40,000 44,000

    7 50 cm 100 cm b%

    2 &7BA" A"> ?.CT'.@ + H A>.

    10 20 cm b% 5,500 #,500

    20 20 cm b% 6,000 8,000

    25 25 cm b% 6,#00 8,500

    30 30 cm b% #,200 *,000

    15 25 cm b% #,500 8,200

    15 30 cm b% #,500 8,500

    "I . B A H A N B E S I

    1 B'> B'TC bei beton polo k *,500 10,#00

    bei beton pretre k 1#,000 1#,200

    bei beton ulir k 12,500 13,000

    2 B'> &AT Bei trip k 13,#00 14,200

    3 B'> .C>& Bei roil k 13,500 14,250

    a BAJA .>"A

    "A&A&7!' lebar ; #,5cm tebal ; 1mm bt 125,000 panj ; 6 m

    t-pe +T #5 lebar ; #,5cm tebal ; 0#5mm bt 85,000 panj ; 6 m

    lebar ; #,5cm tebal ; 0,65mm bt 80,000 panj ; 6 m

    b t-pe .T 12 tini ; 3,5 cm, tebal ; 0,45mm bt 45,000 panj ; 6 m

    t-pe .T 10 tini ; 3,0 cm, tebal ; 0,45mm bt 40,000 panj ; 6 m

    c 9C&&C$ "A&A> &>AT

    tini 2 cmI tebal ; 0,4mm bt 25,000 panj ; 4 m

    tini 4 cmI tebal ; 0,4 mm bt 30,000 panj ; 4 m

    4 JA.>" JA.>" BAJA

    Diameter 4 15 k 15,500 16,000

    Diameter 6 15 k 15,000 15,500

    :a

  • 7/24/2019 panduan harga

    9/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    "II . B A H A N P I P A

    1 Pipa PVC SII SCJ , S - 12,5 (10 bar)

    ipa + D 20 ? K @ A$ J> bt 25,000 26,000 panjan 4 m

    ipa + D 25 ? LK @ A$ J> bt 32,000 33,000 panjan 4 m

    ipa + D 32 ? 1K @ A$ J> bt 41,000 43,000 panjan 4 m

    ipa + D 40 ? 1K @ bt #0,000 #4,000 panjan 6 m

    ipa + D 63 ? 2K @ bt 101,000 110,000 panjan 6 m

    ipa + D *0 ? 3K @ bt 1*5,000 202,000 panjan 6 m

    ipa + D 110 ? 4K @ bt 2*5,000 300,000 panjan 6 m

    ipa + D 160 ? 6K @ bt 615,000 625,000 panjan 6 m

    ipa + D 200 ? 8K @ bt *50,000 *60,000 panjan 6 m

    ipa + D 250 ? 10K @ bt 1,360,000 1,400,000 panjan 6 m

    ipa + D 315 ? 12K @ bt 1,*50,000 2,050,000 panjan 6 m

    2 Pipa Medium !a"#a$i% - SII

    ipa !edium B "al)ani D K bt *0,000 110,000 panjan 6 m

    ipa !edium B "al)ani D 25 ? LK @ bt 105,000 150,000 panjan 6 m

    ipa !edium B "al)ani D 32 ? 1K @ bt 150,000 1*0,000 panjan 6 m

    ipa !edium B "al)ani D 50 ? 1K @ bt 230,000 250,000 panjan 6 m

    ipa !edium B "al)ani D 63 ? 2K @ bt 2#0,000 2*0,000 panjan 6 m

    ipa !edium B "al)ani D 2K bt 310,000 350,000 panjan 6 m

    ipa !edium B "al)ani D *0 ? 3K @ bt 440,000 460,000 panjan 6 m

    ipa !edium B "al)ani D 110 ? 4K @ bt 540,000 560,000 panjan 6 m

    ipa !edium B "al)ani D 160 ? 6K @ bt panjan 6 m

    ipa !edium B "al)ani D 200 ? 8K @ bt panjan 6 m

    ipa !edium B "al)ani D 250 ? 10K@ bt panjan 6 m

    "III . B A H A N L A N G I T % L A N G I T

    1 A:7T>:uk ; 30 30 lbr 5,100 5,500

    30 60 lbr 12,500 13,000

    60 120 lbr 38,000 42,000

    &it :a-u roil mE 4,800 5,000

    2 CT BCA.Duk; 4E 8E

    "-pum tebal * mm lbr 62,000 65,000

    3 9A.D BCA.Duk; 4E 8E lbr 62,000 65,000

    "M.C+ uk120cm(240cm(*mm lbr 5#,500

    4 &M $CCD

    Teak

  • 7/24/2019 panduan harga

    10/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    Triplek

    120 240 3 mm lbr 50,000 55,000

    120 240 4 mm lbr 60,000 65,000

    120 240 6 mm lbr #2,000 #5,000

    !ultiplek

    120 240 * mm lbr 110,000 135,000

    120 240 12 mm lbr 145,000 155,000

    120 240 15 mm lbr 185,000 1*5,000

    120 240 18 mm lbr 210,000 220,000

    ormika ukuran pintu lbr 65,000 #5,000

    I . B A H A N F I N I S H I N G

    1 :AM7

    !enie k 20,000 2#,000

    Dempul plamur k 20,000 2#,500

    Ambril/ampla lbr 3,000 3,500

    Batu Apun k 5,500 6,500

    +at daar k 34,000 36,500

    'mco k 51,000 55,000

    Munior 66 ?nippon paint@ k 52,000 58,000

    :oa b% #,500 *,500

    Deculu( k 55,000 58,000

    irala( on 15,000 18,000

    piritu ltr 11,000 13,500 litur jadi ltr 35,000 42,000

    2 T'!BC:

    :alkarium k 4,000 4,200

    :apur iri% k 4,500 4,#50

    lamur k 24,000 32,000

    +at Tembok k 1*,000 21,000

    inte( 5 k 100,000 105,000

    Danabride 5 k 100,000 110,000

    +at-lac 5 k 105,000 115,000!o

  • 7/24/2019 panduan harga

    11/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    . B A H A N K A A

    1 C&C 3 mm m2 60,000 64,000

    5 mm m2 #0,000 #5,000

    2 ' :AB7. 3 mm m2 #0,000 #5,000

    5 mm m2 80,000 85,000

    3 .AM BAD 3 mm m2 #0,000 #5,000

    5 mm m2 80,000 82,500

    I . BAHAN INSTALASI LISTRIK

    1 :AB'& &>T.>:

    M A ; 1 1 1/2 mm2 mE 3,100 3,300

    & &!: 1 2 1/2 mm2 mE 3,#00 3,*00

    1 4 mm2 mE 5,#00 6,000

    1 6 mm2 mE 8,500 8,*00

    M M ; 2 1 1/2 mm2 mE *,000 *,450

    .>!A 2 2 1/2 mm2 mE 15,000 15,500

    2 4 mm2 mE 2#,000 28,000

    2 6 mm2 mE 35,000 3#,000

    3 1 1/2 mm2 mE 13,200 14,000

    3 2 1/2 mm2 mE 20,000 21,000

    3 4 mm2 mE 34,500 36,500

    3 6 mm2 mE 50,000 53,000

    M ! ; 2 1 1/2 mm2 mE #,000 8,000

    .>!A 2 2 1/2 mm2 mE 10,*00 11,500

    2 4 mm2 mE 21,000 23,000

    3 1 1/2 mm2 mE 12,500 14,000

    3 2 1/2 mm2 mE 1*,000 22,000

    3 4 mm2 mE 30,000 35,000

    3 6 mm2 mE 43,000 48,000

    2 :A:'&A.

    Cut bau< eri b% 15,000 21,000

    'nkel b% 12,000 15,000

    >n bau< eri b% 11,500 16,500

    'nkel b% *,500 12,000

    3 7' BC ?':'.>" :AA@

    1 roup b% 115,000 135,000

    2 roup b% 220,000 245,000

    3 roup b% 325,000 360,000

    4 T':'. Biaa b% 10,000 12,000

    Arde b% 15,000 16,000

    T Biaa b% 12,500 13,000

    T denan Arde b% 1#,000 1#,500

  • 7/24/2019 panduan harga

    12/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    5 >T>" laon b% 8,500 *,000

    "antun b% *,500 84,000

    :ap b% 12,500 16,000

    :ombinai b% 13,500 14,500

    6 TC :CTA: Arde Cutbo< puti% b% 12,500 15,000

    Arde Cutbo< %itam b% 5,000 6,000

    Arde >B b% 10,000 15,000

    Arde utar b% 31,000 42,000

    II . ALAT % ALAT PENGUNI & PENGGANTUNG

    1 :7+> TAA! 7nion ; 1 la b% 55,000 60,000

    2 la b% 65,000 #0,000

    Male ; 1 la b% 85,000 *5,000

    2 la b% 140,000 155,000

    :uda ; 1 la b% 55,000 60,000

    2 la b% #0,000 #5,000

    2 '"'& DA "'.'D'&

    'nel Anin b% 15,000 16,000

    :upukupu biaa b% 4,000 4,500

    -lon kupukupu b% 6,000 *,000

    'panoled dalam neeri b% 30,000 50,000

    "rendel Tanam luar neeri b% #,500 11,000

    "rendel biaa b% 10,000 20,000

    :ait Anin b% 5,000 1#,500

    Door top b% 2#5,000 350,000

    III . BAHAN SANITAIR

    1 :&C'T D7D7: b% 1,100,000 1,500,000

    2 :&C'T JC":C: b% 125,000 150,000

    3 $ATA'& 'D'TA& b% 850,000 1,250,000

    4 $ATA'& !'JA CA& b% #00,000 *50,000

    5 $ATA'& "AT7" B7&AT b% 2#5,000 450,000

    6 $ATA'& "AT7" 7D7T b% 240,000 310,000

    # $ATA'& "AT7" 7D7T :'+>& b% 230,000 2#5,000

    8 $ATA'& BA: +7+> b% 145,000 1#0,000

    * T'!AT AB7 "AT7" b% 30,000 35,000

    10 T'!AT AB7 TAA! b% 20,000 25,000

    11 'T>+ TA: ?'T'.>T ".'>:@

    5 emakai 500 liter unit

    10 emakai 1000 liter unit

  • 7/24/2019 panduan harga

    13/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    12 &A> &A>

    :ran Air b% 15,000 35,000

    eal tape b% 3,#50 4,100

    loor drain b% 65,250 #0,000

    I" . ALAT PENGIKAT KA!U

    1 A:7 ukuran 1K /d 4K k 12,000 1#,000

    2 A:7 pa-un k 13,000 16,000

    3 A:7 ekrup k 8,000 13,500

    4 A:7 beton k 1#,000 18,000

    5 !7. BA7T ?kudakuda@ k 13,000 14,000

    6 A":7. BA7T b% 12,800 13,000

    # &'! :AM7 b% 18,000 20,000

    8 Tali >juk k 18,000 20,000

    " . POMPA AIR.

    1 C!A A>. TA"A

    Draon buatan >ndoneia b% 2#5,000 310,000

    2 C!A A>. &>T.>:

    an-o 100 Abuabu m2 55,000 65,000

    !era%/%itam m2 60,000 #0,000

    5 T.>9' Abuabu m2 55,000 65,000

    !era%/%itam m2 60,000 #0,000

    6 C&M!>A 9'A Abuabu m2 55,000 65,000

    # 9'A"CA& Abuabu m2 60,000 #0,000

    !era%/%itam m2 55,000 65,000

    8 +AT&' Abuabu m2 60,000 #0,000

    * T.A'O Abuabu m2 55,000 65,000

    10 T.A'O ".A B&C+: 60,000 #0,000

    Abuabu m2 55,000 65,000

    11 TADA.D ".A B&C+: AB7AB7 B9 #,500 *,000

    12 BATA+C B9 3,#00 4,000

    13 :AT'' mE 15,500 1#,000

  • 7/24/2019 panduan harga

    14/98

    HARGA

    NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET

    (Rp) (Rp)

    "II. L A I N % L A I N

    1 :.'> 25 !! m2 45,000 50,000

    2 lidin intu J4 b% 210,000 225,000

    3 aco per Daun b% 10,500 12,500

    4 .ollin door Bei m2 230,000 2#5,000

    .ollin door Almunium m2 300,000 325,000

    5 AD' &A"' B'A!

    150 #5 5 # 12 bt 1,500,000 1,550,000

    8 AA&

    Apal '( ertamina ii et 160 k drum 1,#50,000 1,800,000

    9otmi( Tebal P 4 +m m2 65,000 #0,000

    9otmi( Tebal P 5 +m m2 80,000 85,000

    9otmi( Tebal P 6 +m m2 *5,000 100,000

    9otmi( Tebal P # +m m2 110,000 120,000

    Binder +oure ton 1,300,000 1,350,000

    $earin +oure ton 1,300,000 1,450,000

    9ot .oller %eet ton 1,150,000 1,300,000

    and %eet ton 1,100,000 1,250,000

    and %eet 'muli ton 1,450,000 1,600,000

    +old !i( ton 1,#50,000 1,850,000

    rime / Tack +oard .+ liter 8,200 8,#00

    rime +oat !+ liter 8,200 8,#00

    rime / Tack +oat 'muli liter 8,200 8,#00

    10 : A + A

    +ermin tebal 5 mm m2 225,000 2#5,000

    11 A"A. B.+ aar B.+ *0 A2 /lb 500,000 550,000

    aar B.+ 120 A2 /lb 600,000 650,000

    12 &A>&A>

    !in-ak Beton bekitin ltr *,000 10,000

    intu &ipat Bei m2 380,000 425,000

    uncreen Allumunim m2 310,000 350,000

    Allumunium oil m2 #,500 8,000

    oda api k 12,000 13,000

    abun k 11,000 13,000

    Air m3 15,000 1#,000

    :oa Alanalan ikat 1,250 2,000

    olar ?>ndutri@ ltr 11,250 11,300

    remium ?>ndutri@ ltr 10,000 11,000

    eluma ltr 38,000 41,000

    -nil 30(30 cm b% 6,000 6,300

  • 7/24/2019 panduan harga

    15/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    16/98

    ile;///)ar/ m3 26,604,05000 2#,512,65000

    2 A4612 embuatan emaanan :oen intu Jendela :a-u kla >> atau >>> m3 11,1#3,80000 12,22#,32500

    3 A4613 embuatan emaanan intu :lamptandard :a-u :la >> ?:a-u :amer@ m2 453,48600 4##,2*000

    4 A4614 embuatan emaanan Daun intu :lamp eder%ana :a-u :la >>> m2 453,48600 4##,2*000

    5 A4615 embuatan emaanan Daun intu anel, :a-u :la > atau >> m2 6#3,64000 #24,62500

    6 A4616 embuatan emaanan intu Jendela :aca :a-u :la > atau >> m2 4##,18000 516,#8000

    # A461# embuatan emaanan intu Jendela Jalui :a-u :la > atau >> ?jati@ m2 1,8*6,*5000 2,010,52500

  • 7/24/2019 panduan harga

    17/98

    ile;///)ar/ m2 560,*1200 606,*6*00

    10 A46110 embuatan emaanan Jalui mati :oen :a-u :la > atau >> m2 1,#02,*1000 1,#**,46250

    11 A46111 embuatan emaanan intu Teak m3 28,*66,24500 2*,*4#,1*#50

    15 A46115 emaanan kontruki "ordin, :a-u :la >> m3 *,426,45000 10,2#8,18000

    16 A46116 emaanan .anka Atap "enten :eramik, :a-u :la >> m2 152,44*00 16#,22#50

    1# A4611# emaanan .anka Atap "enten Beton, :a-u :la >> m2 1#*,##300 1*6,*2#50

    18 A46118 emaanan .anka Atap irap, :a-u :la >> m2 12#,5#800 140,06300

    1* A4611* emaanan .anka &anitlanit ?50(1,00@ m, ka-u :la >> atau >>> m2 161,#6600 1##,8*#50

    20 A46120 emaanan .anka &anitlanit ?60(60@ cm, ka-u :la >> atau >>> m2 16#,2##00 184,1*500

    21 A46121 emaanan &itplank 7k ?3(20@cm :a-u kla > atau >> mE 28#,3#500 302,80250

    22 A46122 emaanan &itplank 7k ?3(30@cm :a-u kla > atau kla >> mE 11#,31500 123,00#50

    23 A46123 emaanan .anka Dindin emia% ?60(120@ cm :a-u kla >> atau >>> m2 265,2#600 2*0,8*500

    24 A46124 emaanan Dindin emia% Teak> m2 333,12400 364,#0500

    25 A46125 emaanan Dindin emia% l-> m2 33*,10800 3#1,80000

    26 A46126 emaanan Dindin &ambriirin dari apan kla > m2 3#4,**000 40*,3*250

    2# A4612# emaanan Dindin &ambriirin dari l->> atau > m2 118,0*424 128,08840

    "II A..1.1 HARGA SATUAN PEKERJAAN B E T O N

    1 A4111 !embuat Beton mutu EcP#,4 !pa ?:100@, lum ?12S2@cm,

  • 7/24/2019 panduan harga

    18/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    19/98

    ile;///)ar/$ k 26,41650 28,43##5

    3 A4213 enerjaan ekerjaan erakitan ?:udakuda Baja@ k #5,32800 81,80150

    4 A4214 embuatan intu Bei lat Baja tebal 2 mm rankap, ranka baja iku m2 883,30000 *32,64600

    5 A4215 enerjaan enelaan denan &a &itrik cm 16,5#645 18,13130

    6 A421# emaanan intu .ollin Door Bei m2 435,62200 506,2#500

    # A4218 emaanan intu &ipat ?oldin Door@ m2 486,48600 543,85100

    8 A421* emaanan uncreen Allumunium m2 41*,18800 4#3,33000

    * A42110 emaanan .ollin Door Allumunium m2 485,65000 531,02500

    10 A42111 emaanan :uen intu Allumunium mE 108,43*10 116,02#45

    11 A42112 emaanan intu Allumunium trip &ebar 8 cm m2 4#2,6*640 506,44550

    12 A42113 emaanan intu :aca .anka Allumunium m2 440,13200 4#3,#8100

    13 A42114 emaanan enetion Blind ertical Blind m2 15*,01600 1#0,##500

    14 A42115 emaanan Terali Bei trip ?2(3@ cm m2 318,5836# 353,4034*

    15 A42116 emaanan :a

  • 7/24/2019 panduan harga

    20/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    21/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    22/98

    D A F T A R A N A L I S A P E K E R J A A N

    S U M B E R D A T A : P A S A R A N B E B A S

    D A E R A H : KOTA SEMARANG & SEKITAR

    EDISI JANUARI 2015

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

    1 A.2.2.1.2 1 / P++ S3/3,4++ *+ S3, G36/7+, T, 2800 / 5-28902.00 082-5.00

    A TENAGA 8000.00 98'00.00

    &01 02 C9 ekerja 55,00000 60,00000 11,00000 12,00000

    &02 04 C9 Tukan :a-u #5,00000 85,00000 30,00000 34,00000

    &03 002 C9 :epala Tukan 80,00000 *0,00000 1,60000 1,80000

    &04 002 C9 !andor #0,00000 #5,00000 1,40000 1,50000

    B BAHAN -820.00 5508950.00

    125 Bt :a-u Dolken diameter 8 10 / 400 cm 34,00000 36,00000 42,50000 45,00000

    25 : ortalnd emen 1,40000 1,45000 3,50000 3,62500

    12 &br en "elomban 3K 5K 48,00000 5#,00000 5#,60000 68,40000

    0005 m3 air Beton 250,00000 280,00000 1,25000 1,40000

    000* m3 :oral Beton 250,00000 2*5,00000 2,25000 2,6550000#2 m3 :a-u 5/#4m :a-u :ruin 5,000,00000 5,800,00000 360,00000 41#,60000

    006 : aku Biaa 2K 5K 12,00000 1#,00000 #2000 1,02000

    045 : !eni Bei 20,00000 25,00000 *,00000 11,25000

    PERALATAN

    D J;/6+< A = B = 520820.00 008250.00

    E O>3333

  • 7/24/2019 panduan harga

    23/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    A.2.2.1.- 1 /2 P3/7;+4+, G;*+, S3/3, *+, P3+6+4+, 18580.00 1825891-.50

    A T3,++ 228500.00 2518-50.00

    &01 1 C9 ekerja 55,00000 60,00000 55,00000 60,00000

    &02 2 C9 Tukan :a-u #5,00000 85,00000 150,00000 1#0,00000

    &03 02 C9 :epala Tukan 80,00000 *0,00000 16,00000 18,00000

    &04 005 C9 !andor #0,00000 #5,00000 3,50000 3,#5000

    B B+

  • 7/24/2019 panduan harga

    24/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    9 A.2.2.1.1 1 /' B,++, D,*, T3/7 B+4+ M3+< 0589.50 28-.50

    B T3,++ '8995.00 02895.00

    &02 666# C9 ekerja 55,00000 60,00000 366,68500 400,02000

    &04 0033 C9 !andor #0,00000 #5,00000 2,31000 2,4#500

    B B+

  • 7/24/2019 panduan harga

    25/98

    ile;///)ar/333333

  • 7/24/2019 panduan harga

    26/98

    ile;///)ar/3333

  • 7/24/2019 panduan harga

    27/98

    ile;///)ar/333

  • 7/24/2019 panduan harga

    28/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    29/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    30/98

    ile;///)ar/3

  • 7/24/2019 panduan harga

    31/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    32/98

    ile;///)ar/33

  • 7/24/2019 panduan harga

    33/98

    ile;///)ar/33

  • 7/24/2019 panduan harga

    34/98

    ile;///)ar/3

  • 7/24/2019 panduan harga

    35/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    36/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    37/98

    ile;///)ar/33

  • 7/24/2019 panduan harga

    38/98

    ile;///)ar/33

  • 7/24/2019 panduan harga

    39/98

    ile;///)ar/33

  • 7/24/2019 panduan harga

    40/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    41/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    "I A...1 HARGA SATUAN PEKERJAAN K A ! U

    1 A...1.1 1 /' P3/7;+4+, & P3/++,+, K3, P,4; & J3,*36+ K+; 6+ I 2808050.00 2-8512850.00

    A T3,++ 281528500.00 28208250.00

    &01 # C9 ekerja 55,00000 60,00000 385,00000 420,00000

    &02 21 C9 Tukan :a-u #5,00000 85,00000 1,5#5,00000 1,#85,00000

    &03 210 C9 :epala Tukan 80,00000 *0,00000 168,00000 18*,00000&04 035 C9 !andor #0,00000 #5,00000 24,50000 26,25000

    B B+ ?Jati@ , Balok 20,000,00000 20,500,00000 22,000,00000 22,550,00000

    125 k aku Biaa 2K 5 K 12,00000 1#,00000 15,00000 21,25000

    1 k &em :a-u 18,00000 20,00000 18,00000 20,00000

    PERALATAN

    D J;/6+< A = B = 28158500.00 2580118500.00

    E O>3> ?:amer@, papan #,600,00000 #,800,00000 304,00000 312,00000

    0050 k &em :a-u 18,00000 20,00000 *0000 1,00000

    PERALATAN

    D J;/6+< A = B = 12800.00 58-50.00

    E O>3

  • 7/24/2019 panduan harga

    42/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    6 A...1. 1 /2 P3/7;+4+, & P3/++,+, P,4; & J3,*36+ K+@+ K+; K6+ I +4+; II --810.00 518-0.00

    A T3,++ 28000.00 2-800.00

    &01 0800 C9 ekerja 55,00000 60,00000 44,00000 48,00000

    &02 2400 C9 Tukan :a-u #5,00000 85,00000 180,00000 204,00000

    &03 0240 C9 :epala Tukan 80,00000 *0,00000 1*,20000 21,60000

    &04 0040 C9 !andor #0,00000 #5,00000 2,80000 3,00000B B+3

  • 7/24/2019 panduan harga

    43/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    11 A...1.11 1 /2 P3/7;+4+, & P3/++,+, P,4; T3+* R+,+p8 R+,+ Ep3 K+; K6+ I 9-89'.00 18015821.00

    A T3,++ 28000.00 2-800.00

    &01 080 C9 ekerja 55,00000 60,00000 44,00000 48,00000

    &02 240 C9 Tukan :a-u #5,00000 85,00000 180,00000 204,00000

    &03 024 C9 :epala Tukan 80,00000 *0,00000 1*,20000 21,60000

    &04 004 C9 !andor #0,00000 #5,00000 2,80000 3,00000B B+ ?Jati@, papan 22,000,00000 23,000,00000 550,00000 5#5,00000

    003 : aku Biaa 1/2K 1K 12,00000 1#,00000 36000 51000

    03 k &em :a-u 18,00000 20,00000 5,40000 6,00000

    1 &br Teak3

  • 7/24/2019 panduan harga

    44/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    F H++ S+4;+, P33C++, (D=E) 982850.00 1082-810.00

  • 7/24/2019 panduan harga

    45/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    16 A...1.1 1 /2 P3/++,+, R+,+ A4+p G3,43, K3+/8 K+; K6+ II 15289.00 1-822-.50

    A T3,++ 18150.00 158--5.00

    &01 01 C9 ekerja 55,00000 60,00000 5,50000 6,00000

    &02 01 C9 Tukan :a-u #5,00000 85,00000 #,50000 8,50000

    &03 001 C9 :epala Tukan 80,00000 *0,00000 80000 *0000

    &04 0005 C9 !andor #0,00000 #5,00000 35000 3#500B B+3 ?:amer@, balok 6,*00,00000 #,500,00000 *6,60000 105,00000

    02 : aku Biaa 2K 5K 12,00000 1#,00000 2,40000 3,40000

    PERALATAN

    D J;/6+< A = B = 115890.00 12-8''0.00

    E O>3 ?:amer@, balok 6,*00,00000 #,500,00000 106,26000 115,50000

    02 : aku Biaa 2K 5K 12,00000 1#,00000 2,40000 3,40000

    PERALATAN

    D J;/6+< A = B = 1-800.00 118-25.00

    E O>3

  • 7/24/2019 panduan harga

    46/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    21 A...1.21 1 / P3/++,+, L4p6+, U. ('20)@/ K+; 6+ I +4+; II 2-8'-5.00 '02802.50

    A T3,++ 22850.00 2581-5.00

    &01 01 C9 ekerja 55,00000 60,00000 5,50000 6,00000

    &02 02 C9 Tukan :a-u #5,00000 85,00000 15,00000 1#,00000

    &03 0020 C9 :epala Tukan 80,00000 *0,00000 1,60000 1,80000

    &04 0005 C9 !andor #0,00000 #5,00000 35000 3#500B B+ ?:amer@, balok 6,*00,00000 #,500,00000 1*3,20000 210,00000

    015 : aku Biaa 2K 5K 12,00000 1#,00000 1,80000 2,55000

    PERALATAN

    D J;/6+< A = B = 21810.00 2850.00

    E O>3 ?:amer@, balok 6,*00,00000 #,500,00000 1*3,20000 210,00000

    015 : aku Biaa 2K 5K 12,00000 1#,00000 1,80000 2,55000

    086 &br Teak ?:amer@, balok 6,*00,00000 #,500,00000 1*3,20000 210,00000

    015 : aku Biaa 2K 5K 12,00000 1#,00000 1,80000 2,55000

    086 &br l-

  • 7/24/2019 panduan harga

    47/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    26 A...1.2 1 /2 P3/++,+, D,*, L+/7, *+ P+p+, 6+ I '-8990.00 098'92.50

    A T3,++ 18500.00 20-850.00

    &01 06 C9 ekerja 55,00000 60,00000 33,00000 36,00000

    &02 18 C9 Tukan :a-u #5,00000 85,00000 135,00000 153,00000

    &03 018 C9 :epala Tukan 80,00000 *0,00000 14,40000 16,20000

    &04 003 C9 !andor #0,00000 #5,00000 2,10000 2,25000B B+ ?Jati@, papan 22,000,00000 23,000,00000 154,00000 161,00000

    01 : aku Biaa 2K 5K 12,00000 1#,00000 1,20000 1,#0000

    015 : aku ekrup 3,5K 8000.00 13500.00 1,20000 2,02500

    PERALATAN

    D J;/6+< A = B = '08900.00 '-281-5.00

    E O>3

  • 7/24/2019 panduan harga

    48/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    "II A..1.1 HARGA SATUAN PEKERJAAN B E T O N

    1 A..1.1.1 1 /' M3/7;+4 B34, /;4; ?@-8 Mp+ (K100)8 6;/ (122)@/8 #@ 08- 9891.' 9-'8'-'.50

    A T3,++ 119825.00 1'0890.00

    &01 165 C9 ekerja 55,00000 60,00000 *0,#5000 **,00000

    &02 02#5 C9 Tukan Batu #5,00000 85,00000 20,62500 23,3#500

    &03 0028 C9 :epala Tukan 80,00000 85,00000 2,24000 2,38000&04 0083 C9 !andor #0,00000 #5,00000 5,81000 6,22500

    B B+33 3+ @,

    2 A..1.1.2 1 /' M3/7;+4 B34, /;4; ?@98 Mp+ (K125)8 6;/ (122)@/8 #@ 08- 928-.01 1801'8-''.'1

    A T3,++ 119825.00 1'0890.00

    &01 165 C9 ekerja 55,00000 60,00000 *0,#5000 **,00000

    &02 028 C9 Tukan Batu #5,00000 85,00000 20,62500 23,3#500

    &03 003 C9 :epala Tukan 80,00000 85,00000 2,24000 2,38000

    &04 008 C9 !andor #0,00000 #5,00000 5,81000 6,22500

    B B+

  • 7/24/2019 panduan harga

    49/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    F H++ S+4;+, P33C++, (D=E) 995851.' 1802809.1

  • 7/24/2019 panduan harga

    50/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    6 A..1.1. 1 /' M3/7;+4 B34, /;4; ?@189 MP+ (K200)8 6;/ (122)@/8 #@ 081 180'0802.0 1811810.'5

    A T3,++ 119825.00 1'0890.00

    &01 1650 C9 ekerja 55,00000 60,00000 *0,#5000 **,00000

    &02 02#5 C9 Tukan Batu #5,00000 85,00000 20,62500 23,3#500

    &03 0028 C9 :epala Tukan 80,00000 85,00000 2,24000 2,38000

    &04 0083 C9 !andor #0,00000 #5,00000 5,81000 6,22500

    B B+333

  • 7/24/2019 panduan harga

    51/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    F H++ S+4;+, P33C++, (D=E) 181128.' 1820280-1.5

  • 7/24/2019 panduan harga

    52/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    11 A..1.1.11 1 /' M3/7;+4 B34, /;4; ?@28 MP+ (K'25)8 6;/ (122)@/8 #@ 089 181'82'0.5- 182-89.09

    A T3,++ 1518900.00 1800.00

    &01 21 C9 ekerja 55,00000 60,00000 115,50000 126,00000

    &02 035 C9 Tukan Batu #5,00000 85,00000 26,25000 2*,#5000

    &03 0035 C9 :epala Tukan 80,00000 85,00000 2,80000 2,*#500

    &04 0105 C9 !andor #0,00000 #5,00000 #,35000 #,8#500

    B B+33

  • 7/24/2019 panduan harga

    53/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    16 A..1.1.20 1 /2 M3/++, B34, ;,4; P,*+ 1'98150.00 15'851.00

    A T3,++ 528000.00 5-80.00

    &01 052 C9 ekerja 55,00000 60,00000 28,60000 31,20000

    &02 026 C9 Tukan :a-u #5,00000 85,00000 1*,50000 22,10000

    &03 0026 C9 :epala Tukan 80,00000 85,00000 2,08000 2,21000

    &04 0026 C9 !andor #0,00000 #5,00000 1,82000 1,*5000

    B B+>> ?Terentan@ 1,#50,00000 1,*00,00000 #0,00000 #6,00000

    03 : aku Biaa 2K 5K 12,00000 1#,00000 3,60000 5,10000

    01 &tr !in-ak Bekitin *,00000 10,00000 *0000 1,00000

    PERALATAN

    D J;/6+< A = B = 128500.00 1'9850.00

    E O>333

  • 7/24/2019 panduan harga

    54/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+>> ?Terentan@ 1,#50,00000 1,*00,00000 #0,00000 #6,00000

    04 : aku Biaa 2K 5K 12,00000 1#,00000 4,80000 6,80000

    02 &tr !in-ak Bekitin *,00000 10,00000 1,80000 2,00000

    0015 m3 Balok :a-u :la >> ?Borneo@ 5,000,00000 5,800,00000 #5,00000 8#,00000

    035 &br l-3> ?Terentan@ 1,#50,00000 1,*00,00000 52,50000 5#,00000

    04 : aku Biaa 2K 5K 12,00000 1#,00000 4,80000 6,80000

    015 &tr !in-ak Bekitin *,00000 10,00000 1,35000 1,500000015 m3 Balok :a-u :la >> 5,000,00000 5,800,00000 #5,00000 8#,00000

    035 &br l-

  • 7/24/2019 panduan harga

    55/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B a3a$ 2,0,500&00 ,00,100&00

    0.2 m3 &au &las (erentang) 1#50000.00 1"00000.00 350000.00 380000.00

    1.5 &g Paku Biasa 2 5 12000.00 1#000.00 18000.00 25500.00

    0.4 -tr Minak Bekisting "000.00 10000.00 3!00.00 4000.00

    15#.5 &g Besi Beton Polos "500.00 10#00.00 14"!250.00 1!85250.00

    2.25 &g &a6at Beton 15000.00 1!000.00 33#50.00 3!000.00

    33! &g Portland $emen 1400.00 1450.00 4#0400.00 48#200.00

    0.54 m3 Pasir Beton 250000.00 280000.00 135000.00 151200.00

    0.81 m3 &erikil Beton 250000.00 2"5000.00 202500.00 238"50.00

    C PERA4AAN

    D Jum"a3 A . . C ,2,5&00 ,51,0&00

    E #er3ead 6 Pr+7i* (8+$*+3 109) 107 2,&50 5,1&00

    : ;ara Sa*ua$ Peer

  • 7/24/2019 panduan harga

    56/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B a3a$ 5,012,00&00 5,/1/,50&00

    0.32 m3 &au &las (erentang) 1#50000.00 1"00000.00 5!0000.00 !08000.00

    3.2 &g Paku Biasa 2 5 12000.00 1#000.00 38400.00 54400.00

    1.! -tr Minak Bekisting "000.00 10000.00 14400.00 1!000.00

    210 &g Besi Beton Polos "500.00 10#00.00 1""5000.00 224#000.00

    3 &g &a6at Beton 15000.00 1!000.00 45000.00 48000.00

    33! &g Portland $emen 1400.00 1450.00 4#0400.00 48#200.00

    0.54 m3 Pasir Beton 250000.00 280000.00 135000.00 151200.00

    0.81 m3 &erikil Beton 250000.00 2"5000.00 202500.00 238"50.00

    0.14 m3 &au &las Balok 5000000.00 5800000.00 #00000.00 812000.00

    2.8 -br Pl6ood " mm 110000.00 135000.00 308000.00 3#8000.00

    1! Btg 'olken diameter 8 4rm 34000.00 3!000.00 544000.00 5#!000.00

    C PERA4AAN

    D Jum"a3 A . . C 5,//0,225&00 /,2,50&00

    E #er3ead 6 Pr+7i* (8+$*+3 109) 107 5//,022&50 /,25&00

    : ;ara Sa*ua$ Peer

  • 7/24/2019 panduan harga

    57/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B a3a$ ',/0,200&00 5,1/0,50&00

    0.25 m3 &au &las (erentang) 1#50000.00 1"00000.00 43#500.00 4#5000.00

    3 &g Paku Biasa 2 5 12000.00 1#000.00 3!000.00 51000.00

    1.2 -tr Minak Bekisting "000.00 10000.00 10800.00 12000.00

    210 &g Besi Beton Polos "500.00 10#00.00 1""5000.00 224#000.00

    3 &g &a6at Beton 15000.00 1!000.00 45000.00 48000.00

    33! &g Portland $emen 1400.00 1450.00 4#0400.00 48#200.00

    0.54 m3 Pasir Beton 250000.00 280000.00 135000.00 151200.00

    0.81 m3 &erikil Beton 250000.00 2"5000.00 202500.00 238"50.00

    0.105 m3 &au &las Balok 5000000.00 5800000.00 525000.00 !0"000.00

    2.5 -br Pl6ood " mm 110000.00 135000.00 2#5000.00 33#500.00

    14 Btg 'olken diameter 8 4rm 34000.00 3!000.00 4#!000.00 504000.00

    C PERA4AAN

    D Jum"a3 A . . C 5,20,225&00 5,2,505&00

    E #er3ead 6 Pr+7i* (8+$*+3 109) 107 520,22&50 52,50&50

    : ;ara Sa*ua$ Peer

  • 7/24/2019 panduan harga

    58/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    "III A..5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

    1 A..5.2.1 1 /2 P3/++,+, A4+p G3,43, P63,4, K3@6 --80'.50 1855.00

    A T3,++ 1580'5.00 1850.00

    &01 015 C9 ekerja 55,00000 60,00000 8,25000 *,00000

    &02 00#5 C9 Tukan :a-u #5,00000 85,00000 5,62500 6,3#500

    &03 000#5 C9 :epala Tukan 80,00000 *0,00000 60000 6#500

    &04 0008 C9 !andor #0,00000 #5,00000 56000 60000

    B B+3

  • 7/24/2019 panduan harga

    59/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    5 A..5.2.5 1 / P3/++,+, G3,43, B;7;, K* # G6+; 9-8020.00 10899-.00

    A T3,++ '8-0.00 28950.00

    &01 04 C9 ekerja 55,00000 60,00000 22,00000 24,00000

    &02 02 C9 Tukan :a-u #5,00000 85,00000 15,00000 1#,00000

    &03 002 C9 :epala Tukan 80,00000 *0,00000 1,60000 1,80000

    &04 0002 C9 !andor #0,00000 #5,00000 14000 15000

    B B+

  • 7/24/2019 panduan harga

    60/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    9 A..5.2.12 1 /2 P3/++,+, A4+p A73 G36/7+, ('8001805 /) // 82.00 5580.50

    A T3,++ 18000.00 158505.00

    &01 014 C9 ekerja 55,00000 60,00000 #,#0000 8,40000

    &02 00# C9 Tukan :a-u #5,00000 85,00000 5,25000 5,*5000

    &03 000# C9 :epala Tukan 80,00000 *0,00000 56000 63000

    &04 000# C9 !andor #0,00000 #5,00000 4*000 52500

    B B+

  • 7/24/2019 panduan harga

    61/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    02 : aku Biaa 1/2K 1K 12,00000 1#,00000 2,40000 3,40000

  • 7/24/2019 panduan harga

    62/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    PERALATAN

    D J;/6+< A = B = 8'0.00 980.00

    E O>3

  • 7/24/2019 panduan harga

    63/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

  • 7/24/2019 panduan harga

    64/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    1 A..5.2.'9 1 / P3/++,+, A4+p N S3, 2800.00 '0821.00

    A T3,++ 180.00 180'0.00

    &01 015 C9 ekerja 55,00000 60,00000 8,25000 *,00000

    &02 00# C9 Tukan :a-u #5,00000 85,00000 5,25000 5,*5000

    &03 000# C9 :epala Tukan 80,00000 *0,00000 56000 63000

    &04 0006 C9 !andor #0,00000 #5,00000 42000 45000

    B B+3

  • 7/24/2019 panduan harga

    65/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    I A..5.1 HARGA SATUAN PEKERJAAN LANGIT%LANGIT

    1 A..5.1.1 1 /2 P3/++,+, L+,4%6+,4 A73 (18001800) /8 437+6 //8 5 // & // 2800.00 '18515.00

    A T3,++ -8-0.00 80.00

    &01 003 C9 ekerja 55,00000 60,00000 1,65000 1,80000

    &02 00# C9 Tukan :a-u #5,00000 85,00000 5,25000 5,*5000

    &03 000# C9 :epala Tukan 80,00000 *0,00000 56000 63000

    &04 0004 C9 !andor #0,00000 #5,00000 28000 30000

    B B+33

  • 7/24/2019 panduan harga

    66/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    &04 0005 C9 !andor #0,00000 #5,00000 35000 3#500

  • 7/24/2019 panduan harga

    67/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+

  • 7/24/2019 panduan harga

    68/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    F H++ S+4;+, P33C++, (D=E) 1'89-.00 18-9.50

  • 7/24/2019 panduan harga

    69/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

    1 A.5.1.1.1 1 U,4 M3/++, 634 D;*; # M, B6 185580.00 2802899.00

    A T3,++ 2-5820.00 '0'8590.00

    &01 33 C9 ekerja 55,00000 60,00000 181,50000 1*8,00000

    &02 11 C9 Tukan Batu #5,00000 85,00000 82,50000 *3,50000

    &03 0001 C9 :epala Tukan 80,00000 *0,00000 8000 *000

    &04 016 C9 !andor #0,00000 #5,00000 11,20000 12,00000

    Bua% B+33

  • 7/24/2019 panduan harga

    70/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+3

  • 7/24/2019 panduan harga

    71/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    10 A.5.1.1.15 1 7< P3/++,+, B+ K,46 P+.B+4; B+4+ '0'0 4, '5 @/ '80.00 '--85-.50

    A T3,++ 1-98''0.00 198105.00

    &01 2160 C9 ekerja 55,00000 60,00000 118,80000 12*,60000

    &02 0#20 C9 Tukan Batu #5,00000 85,00000 54,00000 61,20000

    &03 00#2 C9 :epala Tukan 80,00000 *0,00000 5,#6000 6,48000

    &04 0011 C9 !andor #0,00000 #5,00000 ##000 82500

    B B++,

    Pp+ G+6>+,

  • 7/24/2019 panduan harga

    72/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    1 A.5.1.1.19 1 7< 58020.'1 089'.-

    A T3,++ '8100.00 '85-5.00

    &01 0010 C9 ekerja 55,00000 60,00000 55000 60000

    &02 0400 C9 Tukan Batu #5,00000 85,00000 30,00000 34,00000

    &03 0040 C9 :epala Tukan 80,00000 *0,00000 3,20000 3,60000

    &04 0005 C9 !andor #0,00000 #5,00000 35000 3#500

    B B+3333+,

    Pp+ G+6>+,

    P3/++,+, Pp+ G+6>+, 1

    Pp+ G+6>+, 1

    P3/++,+, Pp+ G+6>+, 1

    Pp+ G+6>+, 1

    P3/++,+, Pp+ G+6>+, '

    Pp+ G+6>+, '

  • 7/24/2019 panduan harga

    73/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    F H++ S+4;+, P33C++, (D=E) 158'2.'' 1'851.-

  • 7/24/2019 panduan harga

    74/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    19 A.5.1.1.2 1 / 2598.00 2-18502.00

    A T3,++ 28'0.00 29820.00

    &01 0135 C9 ekerja 55,00000 60,00000 #,42500 8,10000

    &02 0225 C9 Tukan Batu #5,00000 85,00000 16,8#500 1*,12500

    &03 0023 C9 :epala Tukan 80,00000 *0,00000 1,84000 2,0#000

    &04 000# C9 !andor #0,00000 #5,00000 4*000 52500

    B B+3+,

    Pp+ G+6>+,

    P3/++,+, Pp+ P" 4p3 AW

    Pp+ P"

    P3/++,+, Pp+ P" 4p3 AW

    Pp+ P"

    P3/++,+, Pp+ P" 4p3 AW 1

    Pp+ P" 1

    P3/++,+, Pp+ P" 4p3 AW 1

    Pp+ P" 1

  • 7/24/2019 panduan harga

    75/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    F H++ S+4;+, P33C++, (D=E) '180.- '815.'

  • 7/24/2019 panduan harga

    76/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    2 A.5.1.1.29 1 / 0815.' 8'-5.'

    A T3,++ 10850.00 118925.00

    &01 0054 C9 ekerja 55,00000 60,00000 2,*#000 3,24000

    &02 00*0 C9 Tukan Batu #5,00000 85,00000 6,#5000 #,65000

    &03 000* C9 :epala Tukan 80,00000 *0,00000 #2000 81000

    &04 0003 C9 !andor #0,00000 #5,00000 21000 22500

    B B+33

  • 7/24/2019 panduan harga

    77/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+3

  • 7/24/2019 panduan harga

    78/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    I A..2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM

    1 A..2.1.1 1 K P3/++,+, B3 P?6 2-8-'.50 '080-.-5

    A T3,++ 890.00 985.00

    &01 006 C9 ekerja 55,00000 60,00000 3,30000 3,60000

    &02 006 C9 Tukan Bei #5,00000 85,00000 4,50000 5,10000

    &03 0006 C9 :epala Tukan 80,00000 *0,00000 48000 54000

    &04 0003 C9 !andor #0,00000 #5,00000 21000 22500

    B B+3$ 13,50000 14,25000 15,52500 16,38#50

    PERALATAN

    D J;/6+< A = B = 28015.00 25852.50

    E O>333

  • 7/24/2019 panduan harga

    79/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    5 A..2.1.5 10 @/ P3,3C++, P3,36++, *3,+, L+ L4 185-.5 181'1.'0

    A T3,++ 8000.00 8'0.00

    &01 004 C9 ekerja 55,00000 60,00000 2,20000 2,40000

    &02 002 C9 Tukan Bei #5,00000 85,00000 1,50000 1,#0000

    &03 0002 C9 :epala Tukan 80,00000 *0,00000 16000 18000

    &04 0002 C9 !andor #0,00000 #5,00000 14000 15000

    B B+3333

  • 7/24/2019 panduan harga

    80/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+33

  • 7/24/2019 panduan harga

    81/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+

  • 7/24/2019 panduan harga

    82/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+

  • 7/24/2019 panduan harga

    83/98

    il /// / / / i /t / t % 3/2*52551*5 l *8/83 bk 12 14

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    II A...2 HARGA SATUAN PEKERJAAN KUNI *+, KAA

    1 A...2.2 1 B;+< P3/++,+, K;,@ T+,+/ B++ 19-8120.00 2198'12.50

    A T3,++ '98200.00 8'-5.00

    &01 001 C9 ekerja 55,00000 60,00000 55000 60000

    &02 05 C9 Tukan :a-u #5,00000 85,00000 3#,50000 42,50000&03 001 C9 :epala Tukan 80,00000 *0,00000 80000 *0000

    &04 0005 C9 !andor #0,00000 #5,00000 35000 3#500

    B Ba%an 108000.00 1558000.00

    1 Bua% :unci Tanam Biaa 140,00000 155,00000 140,00000 155,00000

    PERALATAN

    D J;/6+< A = B = 1-98200.00 1998'-5.00

    E O>333

  • 7/24/2019 panduan harga

    84/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

  • 7/24/2019 panduan harga

    85/98

    il /// / / / i /t / t % 3/2*52551*5 l *8/85 bk 12 14

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    A...2.- 1 B;+< P3/++,+, E,36 A,, 08.50 8921.25

    A T3,++ 2281'5.00 28'-.50

    &01 010 C9 ekerja 55,00000 60,00000 5,50000 6,00000

    &02 020 C9 Tukan :a-u #5,00000 85,00000 15,00000 1#,00000

    &03 002 C9 :epala Tukan 80,00000 *0,00000 1,60000 1,80000

    &04 00005 C9 !andor #0,00000 #5,00000 3500 3#50

    B B+3

  • 7/24/2019 panduan harga

    86/98

    il /// / / / i /t / t % 3/2*52551*5 l *8/86 bk 12 14

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    11 A...2.1 1 B;+< P3/++,+, R36 P,4; D, 2981.00 '1'8--.50

    A T3,++ 5'8'10.00 08225.00

    &01 006 C9 ekerja 55,00000 60,00000 3,30000 3,60000

    &02 06 C9 Tukan :a-u #5,00000 85,00000 45,00000 51,00000

    &03 006 C9 :epala Tukan 80,00000 *0,00000 4,80000 5,40000

    &04 0003 C9 !andor #0,00000 #5,00000 21000 22500

    B B+333

  • 7/24/2019 panduan harga

    87/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    III A...' HARGA SATUAN PEKERJAAN PENUTUP LANTAI *+, DINDING

    1 A...'.2 1 /2 P3/++,+, 6+,4+ U7, P A7;%+7; U. '0 '0 @/ 9805.00 108'-2.00

    A T3,++ 2580-5.00 2-8--0.00

    &01 025 C9 ekerja 55,00000 60,00000 13,#5000 15,00000

    &02 0125 C9 Tukan Batu #5,00000 85,00000 *,3#500 10,62500

    &03 0013 C9 :epala Tukan 80,00000 *0,00000 1,04000 1,1#000

    &04 0013 C9 !andor #0,00000 #5,00000 *1000 *#500

    B B+3

  • 7/24/2019 panduan harga

    88/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    5 A...'.9 1 /2 P3/++,+, 6+,4+ U7, G+,4 U. 0 0 @/ '''829.50 5-'851.00

    A T3,++ 2580-5.00 2-8--0.00

    &01 0250 C9 ekerja 55,00000 60,00000 13,#5000 15,00000

    &02 0125 C9 Tukan Batu #5,00000 85,00000 *,3#500 10,62500

    &03 0013 C9 :epala Tukan 80,00000 *0,00000 1,04000 1,1#000

    &04 0013 C9 !andor #0,00000 #5,00000 *1000 *#500

    B B+3

  • 7/24/2019 panduan harga

    89/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    9 A...'.'' 1 /2 P3/++,+, 6+,4+ K3+/ U. 10 10 @/ # 5 20 @/ 19890.0 215812-.55

    A T3,++ -08000.00 --8525.00

    &01 0#0 C9 ekerja 55,00000 60,00000 38,50000 42,00000

    &02 0350 C9 Tukan Batu #5,00000 85,00000 26,25000 2*,#5000

    &03 0035 C9 :epala Tukan 80,00000 *0,00000 2,80000 3,15000

    &04 0035 C9 !andor #0,00000 #5,00000 2,45000 2,62500

    B B+3

  • 7/24/2019 panduan harga

    90/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    1' A...'.'- 1 /2 P3/++,+, L+,4+ K3+/ ;.10 '' @/8 ;,4; >++ # 7*3 '-8-.50 0'8-99.00

    A T3,++ 10'815.00 1158020.00

    &01 105 C9 ekerja 55,00000 60,00000 5#,#5000 63,00000

    &02 0525 C9 Tukan Batu #5,00000 85,00000 3*,3#500 44,62500

    &03 0053 C9 :epala Tukan 80,00000 *0,00000 4,24000 4,##000

    &04 0035 C9 !andor #0,00000 #5,00000 2,45000 2,62500

    B B+33

  • 7/24/2019 panduan harga

    91/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    1- A...'.' 1 /2 P3/++,+, L+,4+ M+/3 U;+, 1.001.00 @/ 598522.0 --8-10.55

    A T3,++ -08000.00 --8525.00

    &01 0# C9 ekerja 55,00000 60,00000 38,50000 42,00000

    &02 035 C9 Tukan Batu #5,00000 85,00000 26,25000 2*,#5000

    &03 0035 C9 :epala Tukan 80,00000 *0,00000 2,80000 3,15000

    &04 0035 C9 !andor #0,00000 #5,00000 2,45000 2,62500

    B B+3

  • 7/24/2019 panduan harga

    92/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+33

  • 7/24/2019 panduan harga

    93/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+3

  • 7/24/2019 panduan harga

    94/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    I" A..-.1 HARGA SATUAN PEKERJAAN PENGEATAN

    1 A..-.1.1 1 /2 P3,+, # p3,3+, P3/;++, +4 T3/7 L+/+ 989.00 1082.50

    A T3,++ 80.00 98225.00

    &01 015 C9 ekerja 55,00000 60,00000 8,25000 *,00000

    &04 00030 C9 !andor #0,00000 #5,00000 21000 22500

    B B+33

  • 7/24/2019 panduan harga

    95/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+33

  • 7/24/2019 panduan harga

    96/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

  • 7/24/2019 panduan harga

    97/98

    ile;///)ar/

  • 7/24/2019 panduan harga

    98/98

    HARGA BAHAN#UPAH JUMLAH

    N. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM

    Rp Rp Rp Rp

    B B+33