REKAPITULASI RENCANA ANGGARAN BIAYA PROYEK : PEMBANGUNAN KAWASAN PERUMAHAN VILLA TAMARA PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL LOKASI : VILLA TAMARA BLOK N NO 3A NO. URAIAN PEKERJAAN I PEKERJAAN PENDAHULUAN 2,165,000.00 2.85 II PEKERJAAN GALIAN / URUGAN 3,908,885.00 5.14 III PEKERJAAN PONDASI 816,280.00 1.07 IV PEKERJAAN BETON BERTULANG 10,303,595.75 13.54 V PEKERJAAN DINDING / PLESTERAN 16,803,652.50 22.09 VI PEKERJAAN PLAFOND 6,150,375.00 8.08 VII PEKERJAAN KOSEN, PINTU , JENDELA , KUNCI & PENGGANTUNG 3,039,000.00 3.99 VIII PEKERJAAAN LANTAI 6,420,570.63 8.44 IX PEKERJAAN PENGECATAN 16,576,792.35 21.79 X PEKERJAAN PLUMBING / SANITAIR 5,230,000.00 6.87 XI PEKERJAAN LISTRIK 2,445,000.00 3.21 XII PEKERJAAN LAIN - LAIN 2,226,812.50 2.93 JUMLAH 76,085,963.73 100.00 s/d 15 Juli 2009 - 15 Juli s/d 29 Juli 2009 26.28 s/d 29 Juli 2009 26.28 JUMLAH HARGA (Rp.) BOBOT PEKERJAAN (%.) Samarinda, 26 Meil 2009 Dibuat Oleh : PT. CIPTA KARYATAMA RAYA ROBENSYAH Samarinda, 29 Juli 2009 Dibuat Oleh, PT. CIPTA KARYATAMA RAYA ASWAYANDI PENGAWAS PELAKSANA Mengetahui, AFRIZAL RAHMAN Plt.MANAGER Disetujui, SELAMET MANDOR

Transcript of n 3a Pek.pengembangan

Page 1: n 3a Pek.pengembangan

REKAPITULASI RENCANA ANGGARAN BIAYA

PROYEK : PEMBANGUNAN KAWASAN PERUMAHAN VILLA TAMARA

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL

LOKASI : VILLA TAMARA BLOK N NO 3A

NO. URAIAN PEKERJAAN

I PEKERJAAN PENDAHULUAN 2,165,000.00 2.85

II PEKERJAAN GALIAN / URUGAN 3,908,885.00 5.14

III PEKERJAAN PONDASI 816,280.00 1.07

IV PEKERJAAN BETON BERTULANG 10,303,595.75 13.54

V PEKERJAAN DINDING / PLESTERAN 16,803,652.50 22.09

VI PEKERJAAN PLAFOND 6,150,375.00 8.08

VII PEKERJAAN KOSEN, PINTU , JENDELA , KUNCI & PENGGANTUNG 3,039,000.00 3.99

VIII PEKERJAAAN LANTAI 6,420,570.63 8.44

IX PEKERJAAN PENGECATAN 16,576,792.35 21.79

X PEKERJAAN PLUMBING / SANITAIR 5,230,000.00 6.87

XI PEKERJAAN LISTRIK 2,445,000.00 3.21

XII PEKERJAAN LAIN - LAIN 2,226,812.50 2.93

JUMLAH 76,085,963.73 100.00

s/d 15 Juli 2009 -

15 Juli s/d 29 Juli 2009 26.28

s/d 29 Juli 2009 26.28

JUMLAH HARGA (Rp.)

BOBOT PEKERJAAN (%.)

Samarinda, 26 Meil 2009 Dibuat Oleh

:PT. CIPTA

KARYATAMA RAYA

ROBENSYAH

Samarinda, 29 Juli 2009Dibuat Oleh,

PT. CIPTA KARYATAMA RAYA

ASWAYANDIPENGAWAS PELAKSANA

Mengetahui,

AFRIZAL RAHMANPlt.MANAGER

Disetujui,

SELAMETMANDOR

Page 2: n 3a Pek.pengembangan

2.85

1.84

0.95

8.48

9.49

0.00

0.00

0.00

0.00

2.48

0.00

0.20

26.28

Realisasi 01 s/d 29 Juli 2009 (%.)

Samarinda, 29 Juli 2009Dibuat Oleh,

PT. CIPTA KARYATAMA RAYA

ASWAYANDIPENGAWAS PELAKSANA

Page 3: n 3a Pek.pengembangan

RAB halaman 3/ 69

RENCANA ANGGARAN BIAYA

PROYEK : PEMBANGUNAN KAWASAN PERUMAHAN VILLA TAMARA

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL

LOKASI : VILLA TAMARA BLOK N NO 3A

No. Uraian Pekerjaan

Bobot MINGGU KE 01Pekerjaan Minggu Lalu Minggu Ini

15 Juli 2009 15 Juli s/d 29 Juli 2009( %. ) (%) Bobot (%) Bobot

I PEKERJAAN PENDAHULUAN1 Pengukuran dan Bowplank 2.85 - - 100 2.845

SUB TOTAL 2.85 - 2.845

II PEKERJAAN GALIAN / URUGAN1 Galian Tanah Pondasi 1.29 - - 100 1.287

2 Urugan Tanah Kembali 0.25 - - 100 0.246

3 Urugan Tanah Tambahan 2.56 - - - -

4 Urugan Pasir Bawah Pondasi & Sloof t = 5 Cm 0.31 - - 100 0.307

5 Urugan Pasir Bawah Lantai, t = 10 Cm 0.74 - - - -

SUB TOTAL 5.14 - 1.840

III PEKERJAAN PONDASI1 Pekerjaan Pancang Ulin 10/10 - 400 0.95 - - 100 0.946

2 Pekerjaan Pondasi Roolag 0.13 - - - -

SUB TOTAL 1.07 - 0.946 IV PEKERJAAN BETON

1 Cor Lantai Kerja 1 : 3 : 5, t = 5 cm 1.85 - - 100 1.855

2 Pondasi poer P1 (70x70) 0.51 - - 100 0.507

3 Sloof ( 20 / 30 ) 1.03 - - 100 1.027

4 Kolom K1 0.76 - - 100 0.759

5 Kolom Kp 0.21 - - 100 0.207

6 Balok (B1) 0.75 - - 60 0.453

7 Balok (B2) 1.06 - - 60 0.636

8 Balok (B3) 0.05 - - 60 0.032

9 Balok Latei (13 / 15) 0.22 - - 50 0.110

10 Ring Balk (15 / 20) 0.46 - - 20 0.091

11 Tangga Beton Bertulang 1.15 - - 60 0.690

12 Plat Lantai Beton Bertulang, t=12cm 2.11 - - 100 2.109

13 Dak Beton Bertulang, t=10cm 2.80 - - - -

14 Kanopi Beton Bertulang 0.58 - - - -

SUB TOTAL 13.54 - 8.477

V PEKERJAAN DINDING / PLESTERAN1 Pasangan Batu bata 1 : 4 5.19 - - 80 4.154

2 Pasangan Batu bata 1 : 2 Trasram 0.53 - - 80 0.426

3 Plesteran dinding bata + Aci 1 : 4 14.84 - - 30 4.451

4 Plesteran dinding bata + Aci 1 : 2 1.52 - - 30 0.457

SUB TOTAL 22.09 - 9.488

VI PEKERJAAN PLAFOND1 Plafond Gypsum polos 9mm + Rangka 5.55 - - - -

2 Plafond Calsiboard 4mm + Rangka 1.46 - - - -

3 List Plafond Gypsum - - - - -

4 List Plafond Kayu (Plafond Luar) 1.07 - - - -

SUB TOTAL 8.08 - -

VII PEKERJAAN KUSEN, PINTU,JENDELA DAN KUNCI

1 Pintu Tipe P1 0.12 - - - -

2 Pintu Tipe P2 0.12 - - - -

3 Pintu Tipe PG 0.59 - - - -

4 Pintu Jendela PJ2 1.05 - - - -

5 Pintu Jendela PJ3 0.53 - - - -

6 Pintu Jendela PJ4 0.53 - - - -

7 Jendela J2 0.92 - - - -

8 BV2 0.14 - - - -

SUB TOTAL 3.99 - -

VIII PEKERJAAN LANTAI1 Pas. Keramik Lt teras (60 x 60) 0.90 - - - -

2 Pas. Keramik Lantai 60 x 60 (Roman Motif KW 1) 3.33 - - - -

3 Pas. Keramik Tangga 30 x 30 (Roman Motif KW 1) 0.43 - - - -

4 Pas. Keramik Lantai km/wc 20 x 20 (Roman Motif KW 1) 0.26 - - - -

5 Pas. Keramik Dinding km/wc 20x25 (Roman Motif KW 1) 1.17 - - - -

6 Pas. Keramik List Dinding km/wc (Roman KW 1) 0.34 - - - -

7 Pas. Keramik Meja Pantry 20 x 20 (Roman Motif KW 1) 0.18 - - - -

8 Pas. Keramik Dinding Pantry 20 x 25 (Roman Motif KW 1) 0.17 - - - -

9 Pek. Plint Lantai Kayu 1.65 - - - -

SUB TOTAL 8.44 - -

L7
user: UPAH MANDOR
F15
dalam pondasi 1 m
F16
Urugan 1/4 Galian
Page 4: n 3a Pek.pengembangan

RAB halaman 4/ 69

No. Uraian PekerjaanPekerjaan Minggu Lalu Minggu Ini

15 Juli 2009 15 Juli s/d 29 Juli 2009( %. ) (%) Bobot (%) Bobot

IX PEKERJAAN PENGECATAN1 Pek. Cat dinding Luar (Mowilex Weather Coat) 5.71 - - - -

2 Pek. Cat dinding Dalam (Mowilex) 5.56 - - - -

3 Pek. Cat Plafond (Catylac) 2.38 - - - -

4 Pek. Polituran Plint Lantai Kayu (Ultran Lazur) 0.14 - - - -

5 Pek. Melamic Kusen, Pintu, dan Jendela, Ventilasi (Ultran Lazur) 7.99 - - - -

SUB TOTAL 21.79 - -

X PEKERJAAN PLUMBING / SANITAIR1 Pasang Pipa Air kotor PVC type AW Ø 4" 1.18 - - 50 0.591

2 Pasang Pipa Air bekas PVC type AW Ø 3" 1.42 - - 50 0.710

3 Pasang Pipa Instalasi Air Bersih type AW Ø 3/4" 2.37 - - 50 1.183

4 Pasang Stop Kran 1/2" + instalasi (Setara Dupont) 0.12 - - - -

5 Pasang Stop kran Leher angsa ut Kitchen Zinc + instalasi (Toto) 0.06 - - - -

6 Closet Duduk (Toto) 0.06 - - - -

7 Closet Jongkok (Toto) 0.26 - - - -

8 Shower u/. Closet duduk (Toto) 0.26 - - - -

9 Bak Mandi (Pas. Bata) 0.79 - - - -

10 Tempat sabun tanam (Toto) 0.06 - - - -

11 Pasang Roof Drain (Toto) 0.20 - - - -

12 Pasang Floor Drain (Toto) 0.10 - - - -

SUB TOTAL 6.87 - 2.484

XI PEKERJAAN LISTRIK1 Pek. Pasang Stop kontak (Broco) + instalasi (Kabel Eterna) 0.58 - - - -

2 Pek. Titik Lampu Biasa + instalasi 0.80 - - - -

3 Pek. Titik Lampu Down Light (Crome)+ Instalasi (Kabel Eterna) 0.94 - - - -

4 Pek. Pasang Saklar Tunggal dan Ganda 0.72 - - - -

5 Pek. Instalasi AC 0.06 - - - -

6 Terminal TV Kabel + instalasi 0.06 - - - -

7 Stop Kontak / Instalasi Telepon 0.06 - - - -

SUB TOTAL 3.21 - -

XII PEKERJAAN LAIN - LAIN1 Pembersihan Lapangan 0.46 - - - -

2 Pembuatan Meja Dapur + Kithcen Zinc 0.66 - - - -

3 Ornamen, Profil Dinding, Benangan 0.79 - - - -

4 Pekerjaan Railling Tangga, Balkon, Void - - - -

5 Pekerjaan Water Proofing Dak 0.63 - - - -

6 Pekerjaan Pembongkaran Dinding Lama 0.39 - - 50 0.197

SUB TOTAL 2.93 - 0.197 JUMLAH 100 - 26.278

Samarinda, 29 Juli 2009Dibuat Oleh,

PT. CIPTA KARYATAMA RAYA

ASWAYANDI

J80
User: vol melamine kisi-kisi bengkirai
Page 5: n 3a Pek.pengembangan

RAB halaman 5/ 69

MINGGU KE 01

s/d Minggu Ini29 Juli 2009

(%) Bobot

100.000 2.845 2.845

100.000 1.287 100.000 0.246 - - 100.000 0.307 - -

1.840

100.000 0.946 - -

0.946

100.000 1.855 100.000 0.507 100.000 1.027 100.000 0.759 100.000 0.207 60.000 0.453 60.000 0.636 60.000 0.032 50.000 0.110 20.000 0.091 60.000 0.690 100.000 2.109 - - - -

8.477

80.000 4.154 80.000 0.426 30.000 4.451 30.000 0.457

9.488

- - - - - - - -

-

- - - - - - - - - - - - - - - -

-

- - - - - - - - - - - - - - - - - -

-

Page 6: n 3a Pek.pengembangan

RAB halaman 6/ 69

s/d Minggu Ini29 Juli 2009

(%) Bobot

- - - - - - - - - -

-

50.000 0.591 50.000 0.710 50.000 1.183 - - - - - - - - - - - - - - - - - -

2.484

- - - - - - - - - - - - - -

-

- - - - - - - - - - 50.000 0.197

0.197 26.278

Samarinda, 29 Juli 2009Dibuat Oleh,

PT. CIPTA KARYATAMA RAYA

ASWAYANDI

Page 7: n 3a Pek.pengembangan

JADWAL PELAKSANAAN PEKERJAAN

PROYEK : PEMBANGUNAN KAWASAN PERUMAHAN VILLA TAMARA

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL

LOKASI : VILLA TAMARA BLOK N NO 3A

JUMLAH BOBOT RENCANA PELAKSANAAN PEKERJAANNO. URAIAN PEKERJAAN HARGA TOTAL BULAN I BULAN 2 BULAN 3 BULAN 4 BULAN 5 BULAN 6 BULAN 7

( Rp ) ( % ) M 1 M2 M3 M4 M 1 M2 M3 M4 M 1 M2 M3 M4 M 1 M2 M3 M4 M 1 M2 M3 M4 M 1 M2 M3 M4 M 1 M2 M3

I. PEKERJAAN PENDAHULUAN 1,180,791.00 #REF! ###

II. PEKERJAAN GALIAN / URUGAN 2,264,251.00 #REF! 0.27 0.31 ###

III. PEKERJAAN PONDASI 7,209,580.33 #REF! 0.78 2.74

IV. PEKERJAAN BETON BERTULANG #VALUE! ### 2.30 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 2.69 ###

V. PEKERJAAN DINDING / PLESTERAN 30,372,411.81 #REF! 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58

VI. PEKERJAAN KAP / ATAP #REF! #REF! 2.08 2.91

VII. PEKERJAAN PLAFOND 7,567,080.30 #REF! 0.93 0.93 0.93

VIII. PEKERJAAN KUSEN, PINTU,JENDELA 23,290,425.00 #REF! 1.56 1.56 1.56 1.56 1.56

IX. PEKERJAAN LANTAI 30,162,730.61 #REF! 0.93 0.93 0.93 0.93 0.93 0.93

X. PEKERJAAN PENGECATAN 30,654,789.85 #REF! 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

XI. PEKERJAAN PLUMBING / SANITAIR 5,944,022.46 #REF! 0.29 0.51 0.51 0.51 0.22 0.51 0.51 0.51

XII. PEKERJAAN LISTRIK 5,775,000.00 #REF! 0.60 0.60 0.26

XIII. PEKERJAAN LAIN - LAIN 26,319,500.00 #REF! 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

JUMLAH #REF! #REF! #REF! 3.47 2.69 4.26 6.14 4.26 4.26 2.69 2.69 4.26 4.56 4.91 7.52 4.13 3.45 2.91 1.76 2.36 2.41 1.81 1.91 1.91 1.91 4.30 4.81 4.81 4.14KUMULATIF 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!REALISASI MINGGUAN ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###REALISASI KUMULATIFDEVIASI

Samarinda, 13 April 2009 Dibuat Oleh :

PT. CIPTA KARYATAMA RAYA

ROBENSYAH

Page 8: n 3a Pek.pengembangan

JADWAL PELAKSANAAN PEKERJAAN

RENCANA PELAKSANAAN PEKERJAANBULAN 7 KET

M4

0.98

0.51

0.60

0.83

2.92#REF!

###

100

90

80

70

60

50

40

30

20

10

0

Page 9: n 3a Pek.pengembangan

Analisa hal 9 / 69

ANALISA HARGA SATUAN PEKERJAAN

PROYEK : PEMBANGUNAN KAWASAN PERUMAHAN VILLA TAMARA

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL

LOKASI : VILLA TAMARA BLOK N NO 3A

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

1 10 M² Pembersihan Lapangan 0.850 OH Pekerja 45,000.00 38,250.00

0.030 OH Mandor 75,000.00 2,250.00 1 m2 = 1/10 x JUMLAH 40,500.00

2 10 M' Pasang Bowplank 0.06 m3 Papan 2,300,000.00 138,000.00

0.025 m3 Tiang 5/7 2,300,000.00 57,500.00

0.100 kg Paku 22,000.00 2,200.00

0.400 OH Tk. Kayu 65,000.00 26,000.00

0.080 OH Kepala Tukang 70,000.00 5,600.00

0.280 OH Pekerja 45,000.00 12,600.00

0.014 OH Mandor 75,000.00 1,050.00 1 m2 = 1/10 x JUMLAH 45,250.00 197,700.00

3 1 M³ Galian Tanah - OH Pekerja 45,000.00 -

- OH Mandor 75,000.00 - JUMLAH -

4 1 M³ Urugan Tanah Kembali - OH Pekerja 45,000.00 -

- OH Mandor 75,000.00 - JUMLAH -

5 1 M3 Urugan Pasir 1.200 m3 Pasir Urug 87,500.00 105,000.00

- OH Pekerja 45,000.00 -

- OH Mandor 75,000.00 - JUMLAH 25,000.00 105,000.00

6 1 M3 Urugan Tanah 1.200 m3 Tanah Urug 45,000.00 54,000.00

- OH Pekerja 45,000.00 -

- OH Mandor 75,000.00 - JUMLAH 30,000.00 54,000.00

7 1 M3 Pasang Aanstamping 1.100 m3 Bt. Gunung 212,500.00 233,750.00

0.500 m3 Pasir 87,500.00 43,750.00

1.530 OH Pekerja 45,000.00 68,850.00

0.075 OH Mandor 75,000.00 5,625.00 JUMLAH 74,475.00 277,500.00

8 1 M³ Pasangan Batu Gunung (1:4) 1.100 m3 Bt. Gunung 212,500.00 233,750.00

3.000 zak Semen Pc @ 50kg 57,000.00 171,000.00

0.600 m3 Pasir pasang 87,500.00 52,500.00

- OH Pekerja 45,000.00 -

- OH Mandor 75,000.00 -

- OH Tk. Batu 65,000.00 -

- OH Kep. tukang 70,000.00 - JUMLAH 100,000.00 457,250.00

HARGA SATUAN (Rp.)

Page 10: n 3a Pek.pengembangan

Analisa hal 10 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

9 1 Titik Tiang Pancang 10/10 - 1m 0.010 m3 Ky. Balok ulin 3,900,000.00 39,000.00

0.105 OH Tk. Kayu 65,000.00 6,825.00

0.011 OH Kep. Tukang 70,000.00 770.00

0.580 OH Pekerja 45,000.00 26,100.00

0.015 OH Mandor 75,000.00 1,125.00

1.000 Alat bantu 10,000.00 10,000.00 JUMLAH 44,820.00 39,000.00

10 1 Titik Tiang Pancang 10/10 - 2m 0.020 m3 Ky. Balok ulin 3,900,000.00 78,000.00

0.145 OH Tk. Kayu 65,000.00 9,425.00

0.020 OH Kep. Tukang 70,000.00 1,400.00

0.400 OH Pekerja 45,000.00 18,000.00

0.025 OH Mandor 75,000.00 1,875.00

1.000 Alat bantu 10,000.00 10,000.00 JUMLAH 40,700.00 78,000.00

11 1 Titik Tiang Pancang Ulin 10/10 - 4m 0.040 m3 Ky. Balok ulin 3,900,000.00 156,000.00

0.100 OH Tk. Kayu 65,000.00 6,500.00

0.029 OH Kep. Tukang 70,000.00 2,030.00

0.500 OH Pekerja 45,000.00 22,500.00

0.039 OH Mandor 75,000.00 2,925.00

1.000 Alat bantu 10,000.00 10,000.00 JUMLAH 20,000.00 156,000.00

12 1 M3 Beton 1 : 3 : 5

4.000 zak Semen Pc @ 50kg 57,000.00 228,000.00

0.950 m3 Kerikil 310,000.00 294,500.00

0.570 m3 Pasir beton 87,500.00 49,875.00

- OH Tk. Batu 65,000.00 -

- OH Kepala tukang 70,000.00 -

- OH Pekerja 45,000.00 -

- OH Mandor 75,000.00 - JUMLAH 300,000.00 572,375.00

13 1 M3 Beton 1 : 2 : 3 6.000 zak Semen Pc @ 50 Kg 57,000.00 342,000.00

0.700 m3 Kerikil 310,000.00 217,000.00

0.540 m3 Pasir beton 87,500.00 47,250.00

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 -

0.000 OH Tukang Batu 65,000.00 -

0.000 OH Kepala Tukang 70,000.00 -

Catatan : 1.000 jam Molen 30,000.00 30,000.00

1.000 jam Vibrator 25,000.00 25,000.00

1.000 Alat Bantu 10,000.00 10,000.00 JUMLAH 300,000.00 671,250.00

14 1 M3 Stuut Werk 0.220 m3 Kayu Stuut 2,300,000.00 506,000.00

2.000 kg Paku 22,000.00 44,000.00

2.000 OH Tukang kayu 65,000.00 130,000.00

0.400 OH Kepala tukang 70,000.00 28,000.00

3.000 OH Pekerja 45,000.00 135,000.00

0.020 OH Mandor 75,000.00 1,500.00 JUMLAH 294,500.00 550,000.00

Page 11: n 3a Pek.pengembangan

Analisa hal 11 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

15 100 kg besi 100.000 kg Besi beton 10,000.00 1,000,000.00

2.000 kg Kawat 20,000.00 40,000.00

0.850 OH Tukang besi 65,000.00 55,250.00

0.150 OH Kepala tukang 70,000.00 10,500.00

0.750 OH Pekerja 45,000.00 33,750.00 99,500.00 1,040,000.00

1 kg besi = 1/100 x JUMLAH 16 10 m2 Begisting (dipakai 2x)

0.400 m3 Kayu 2,300,000.00 920,000.00

4.000 kg Paku 22,000.00 88,000.00

4.000 OH Tukang kayu 65,000.00 260,000.00

0.500 OH Kepala tukang 70,000.00 35,000.00

2.000 OH Pekerja 45,000.00 90,000.00

0.100 OH Mandor 75,000.00 7,500.00 Bongkar Siram

3.000 OH Pekerja 45,000.00 135,000.00 527,500.00 1,008,000.00

1 m2 = 1/20 x JUMLAH 26,375.00 50,400.00 17 1 M³ Pasangan batu bata 1:4

550.000 bh Batu bata 600.00 330,000.00

2.090 zak PC semen @ 50 kg 57,000.00 119,130.00

0.406 m3 Pasir pasang 87,500.00 35,525.00

1.250 OH Tukang batu 65,000.00 81,250.00

1.750 OH Pekerja 45,000.00 78,750.00

0.100 OH Mandor 75,000.00 7,500.00

0.080 OH Kepala tukang 70,000.00 5,600.00 JUMLAH 173,100.00 484,655.00

18 1 M³ Pasangan batu bata 1:2550.000 bh Batu bata 600.00 330,000.00

3.397 zak PC semen @ 50 kg 57,000.00 193,629.00

0.333 m3 Pasir pasang 87,500.00 29,137.50

1.250 OH Tukang batu 65,000.00 81,250.00

1.750 OH Pekerja 45,000.00 78,750.00

0.100 OH Mandor 75,000.00 7,500.00

0.080 OH Kepala tukang 70,000.00 5,600.00 JUMLAH 173,100.00 552,766.50

19 1 M' Parit Pasangan batu bata 1:430.000 bh Batu bata 600.00 18,000.00

0.120 zak PC semen @ 50 kg 57,000.00 6,840.00

0.120 m3 Pasir pasang 87,500.00 10,500.00

0.150 OH Tukang batu 65,000.00 9,750.00

0.400 OH Pekerja 45,000.00 18,000.00

0.020 OH Mandor 75,000.00 1,500.00

0.015 OH Kepala tukang 70,000.00 1,050.00 JUMLAH 30,300.00 35,340.00

20 1 M2 Plasteran t. = 25 mm 1:40.130 zak PC semen @ 50 kg 57,000.00 7,410.00

0.020 m3 Pasir pasang 125,000.00 2,500.00

0.100 OH Tukang batu 65,000.00 6,500.00

0.010 OH Kepala tukang 70,000.00 700.00

0.200 OH Pekerja 45,000.00 9,000.00

0.020 OH Mandor 75,000.00 1,500.00 JUMLAH 17,700.00 9,910.00

Page 12: n 3a Pek.pengembangan

Analisa hal 12 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

21 1 M2 Plasteran t = 25mm 1:20.172 zak PC semen @ 50 kg 57,000.00 9,804.00

0.017 m3 Pasir pasang 125,000.00 2,125.00

0.100 OH Tukang batu 65,000.00 6,500.00

0.010 OH Kepala tukang 70,000.00 700.00

0.200 OH Pekerja 45,000.00 9,000.00

0.020 OH Mandor 75,000.00 1,500.00 JUMLAH 17,700.00 11,929.00

22 1 M2 Pasangan Glass Block0.168 zak PC semen @ 50 kg 57,000.00 9,576.00

0.140 m3 Pasir pasang 87,500.00 12,250.00

25.000 bh Glass Block 20,000.00 500,000.00

0.200 OH Tukang batu 65,000.00 13,000.00

0.100 OH Kepala tukang 70,000.00 7,000.00

0.400 OH Pekerja 45,000.00 18,000.00

0.025 OH Mandor 75,000.00 1,875.00 JUMLAH 39,875.00 521,826.00

23 1 M2 Afwerking beton0.192 zak PC semen @ 50 kg 57,000.00 10,944.00

0.009 m3 Pasir pasang 87,500.00 787.50

0.200 OH Tukang batu 65,000.00 13,000.00

0.020 OH Kepala tukang 70,000.00 1,400.00

0.400 OH Pekerja 45,000.00 18,000.00

0.020 OH Mandor 75,000.00 1,500.00 JUMLAH 33,900.00 11,731.50

24 1 M3 Kuda-kuda Kayu (diketam)1.100 m3 Kayu Bengkirai 3,900,000.00 4,290,000.00

21.000 OH Tukang kayu 65,000.00 1,365,000.00

2.100 OH Kepala tukang 70,000.00 147,000.00

7.000 OH Pekerja 45,000.00 315,000.00

0.300 OH Mandor 75,000.00 22,500.00 1,849,500.00

upah x0.5 JUMLAH 647,325.00 4,290,000.00 25 1 M2 Rangka Atap Genteng

0.040 m3 Kayu Bengkirai 3,900,000.00 156,000.00

0.250 kg Paku 22,000.00 5,500.00

0.300 OH Tukang kayu 65,000.00 19,500.00

0.010 OH Kepala tukang 70,000.00 700.00

0.100 OH Pekerja 45,000.00 4,500.00

0.005 OH Mandor 75,000.00 375.00 JUMLAH 50,000.80 161,500.00

26 1 M2 Atap genteng9.000 bh Genteng 12,500.00 112,500.00

1.050 m2 Alumunium Foil 7,000.00 7,350.00

0.200 OH Tukang kayu 65,000.00 13,000.00

0.022 OH Kepala tukang 70,000.00 1,540.00

0.150 OH Pekerja 45,000.00 6,750.00

0.005 OH Mandor 75,000.00 375.00 JUMLAH 30,001.69 119,850.00

27 1 M' Vee Starter & Vee Ridge End4.000 bh 12,500.00 50,000.00

0.167 bag Mortar Compound 22,500.00 3,750.00

0.067 bag Pigment 32,500.00 2,166.67

0.002 m3 Pasir Pasang 87,500.00 194.44

Vee Starter & Vee Ridge End

Page 13: n 3a Pek.pengembangan

Analisa hal 13 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

0.011 zak Semen 57,000.00 608.00

0.100 OH Tukang kayu 65,000.00 6,500.00

0.010 OH Kepala tukang 70,000.00 700.00

0.050 OH Tukang batu 65,000.00 3,250.00

0.200 OH Pekerja 45,000.00 9,000.00

0.005 OH Mandor 75,000.00 375.00 19,825.00 56,719.11

1 bh Vee Starter = 1/4 x JUMLAH 28 1 M' Vee Ridge

4.000 bh Vee Ridge 12,500.00 50,000.00

0.167 bag Mortar Compound 22,500.00 3,750.00

0.067 bag Pigment 32,500.00 2,166.67

0.002 m3 Pasir Pasang 87,500.00 194.44

0.011 zak Semen 57,000.00 608.00

0.100 OH Tukang kayu 65,000.00 6,500.00

0.010 OH Kepala tukang 70,000.00 700.00

0.050 OH Tukang batu 65,000.00 3,250.00

0.200 OH Pekerja 45,000.00 9,000.00

0.005 OH Mandor 75,000.00 375.00 19,825.00 56,719.11

1 bh Vee Ridge = 1/4 x JUMLAH 29 1 M' Verge

4.000 bh Verge 12,500.00 50,000.00

0.002 kg Paku 22,000.00 44.00

0.100 OH Tukang kayu 65,000.00 6,500.00

0.010 OH Kepala tukang 70,000.00 700.00

0.050 OH Tukang batu 65,000.00 3,250.00

0.200 OH Pekerja 45,000.00 9,000.00

0.005 OH Mandor 75,000.00 375.00 19,825.00 50,044.00

1 bh Verge end = 1/4 x JUMLAH 30 1 M' Verge End

4.000 bh Vee Ridge 12,500.00 50,000.00

0.002 kg Paku 22,000.00 44.00

0.100 OH Tukang kayu 65,000.00 6,500.00

0.010 OH Kepala tukang 70,000.00 700.00

0.050 OH Tukang batu 65,000.00 3,250.00

0.200 OH Pekerja 45,000.00 9,000.00

0.005 OH Mandor 75,000.00 375.00 19,825.00 50,044.00

1 bh Verge end = 1/4 x JUMLAH 31 1 Unit Pintu P1

5.100 m' Kusen Bengkirai 65,000.00 331,500.00

1.000 unit Daun pintu Bengkirai 750,000.00 750,000.00

1.500 set Engsel pintu 50,000.00 75,000.00

0.000 m2 Kaca Rayben 5 mm 125,000.00 -

1.000 set Kunci setara SES 325,000.00 325,000.00

0.400 OH Tukang kayu 65,000.00 26,000.00

0.100 OH Kepala tukang 70,000.00 7,000.00

0.200 OH Pekerja 45,000.00 9,000.00

0.050 OH Mandor 75,000.00 3,750.00 JUMLAH 75,487.50 1,481,500.00

32 1 Unit Pintu P25.000 m' Kusen Ulin 65,000.00 325,000.00

Page 14: n 3a Pek.pengembangan

Analisa hal 14 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

1.000 unit Daun pintu ulin 750,000.00 750,000.00

1.000 set Kunci Bulat setara SES 70,000.00 70,000.00

1.500 set Engsel pintu 50,000.00 75,000.00

0.400 OH Tukang kayu 65,000.00 26,000.00

0.100 OH Kepala tukang 70,000.00 7,000.00

0.200 OH Pekerja 45,000.00 9,000.00

0.050 OH Mandor 75,000.00 3,750.00 JUMLAH 75,487.50 1,220,000.00

32 1 Unit Pintu PG5.100 m' Kusen Bengkirai 65,000.00 331,500.00

1.000 unit Daun pintu Bengkirai 750,000.00 750,000.00

1.000 set Kunci setara SES 325,000.00 325,000.00

1.000 set Rel Pintu Geser 500,000.00 500,000.00

- OH Tukang kayu 65,000.00 -

- OH Kepala tukang 70,000.00 -

- OH Pekerja 45,000.00 -

- OH Mandor 75,000.00 - JUMLAH 80,000.00 1,906,500.00

33 1 Unit PJ216.100 m' Kusen Ulin 65,000.00 1,046,500.00

2.000 unit Daun pintu kaca 450,000.00 900,000.00

3.000 set Engsel pintu 50,000.00 150,000.00

1.000 set Kunci setara SES 325,000.00 325,000.00

3.040 m2 Kaca Rayben 5 mm 125,000.00 380,000.00

0.000 OH Tukang kayu 65,000.00 -

0.000 OH Kepala tukang 70,000.00 -

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 - JUMLAH 150,000.00 2,801,500.00

34 1 Unit PJ39.950 m' Kusen Bengkirai 65,000.00 646,750.00

1.000 unit Daun pintu 750,000.00 750,000.00

1.000 unit Slimar Daun jendela 225,000.00 225,000.00

1.500 set Engsel pintu 50,000.00 75,000.00

1.000 set Engsel jendela 30,000.00 30,000.00

2.000 bh Hak angin 55,000.00 110,000.00

1.000 bh Hand Vatten 25,000.00 25,000.00

2.000 bh Grendel Jendela 40,000.00 80,000.00

0.400 m2 Kaca Rayben 5 mm 125,000.00 50,000.00

1.000 set Kunci setara SES 325,000.00 325,000.00

0.000 OH Tukang kayu 65,000.00 -

0.000 OH Kepala tukang 70,000.00 -

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 - JUMLAH 175,000.00 2,316,750.00

34 1 Unit PJ421.200 m' Kusen Bengkirai 65,000.00 1,378,000.00

1.000 unit Daun pintu bengkirai 750,000.00 750,000.00

0.000 unit Slimar Daun jendela 225,000.00 -

1.500 set Engsel pintu 50,000.00 75,000.00

0.000 set Engsel jendela 30,000.00 -

0.000 bh Hak angin 55,000.00 -

0.000 bh Hand Vatten 25,000.00 -

0.000 bh Grendel Jendela 40,000.00 -

Page 15: n 3a Pek.pengembangan

Analisa hal 15 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

1.850 m2 Kaca Rayben 5 mm 125,000.00 231,250.00

1.000 set Kunci setara SES 325,000.00 325,000.00

0.000 OH Tukang kayu 65,000.00 -

0.000 OH Kepala tukang 70,000.00 -

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 - JUMLAH 155,000.00 2,759,250.00

35 1 Unit J10.000 m' Kusen Bengkirai 65,000.00 -

2.000 unit Slimar Daun jendela Bkr 225,000.00 450,000.00

2.000 set Engsel jendela 30,000.00 60,000.00

4.000 bh Hak angin 40,000.00 160,000.00

2.000 bh Hand Vatten 25,000.00 50,000.00

4.000 bh Grendel Jendela 40,000.00 160,000.00

2.350 m2 Kaca Rayben 5 mm 125,000.00 293,750.00

0.700 OH Tukang kayu 65,000.00 45,500.00

0.150 OH Kepala tukang 70,000.00 10,500.00

0.400 OH Pekerja 45,000.00 18,000.00

0.075 OH Mandor 75,000.00 5,625.00 JUMLAH 125,000.00 1,173,750.00

36 1 Unit J25.900 m' Kusen Bengkirai 65,000.00 383,500.00

1.000 unit Slimar Daun jendela Bkr 225,000.00 225,000.00

1.000 set Engsel jendela 30,000.00 30,000.00

2.000 bh Hak angin 40,000.00 80,000.00

2.000 bh Grendel Jendela 40,000.00 80,000.00

1.000 bh Hand Vatten 25,000.00 25,000.00

0.420 m2 Kaca Rayben 5 mm 125,000.00 52,500.00

0.000 OH Tukang kayu 65,000.00 -

0.000 OH Kepala tukang 70,000.00 -

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 - JUMLAH 80,000.00 876,000.00

37 1 Unit J30.000 m' Kusen Bengkirai 65,000.00 -

4.440 m2 Kaca Rayben 5 mm 125,000.00 555,000.00

0.000 OH Tukang kayu 65,000.00 -

0.000 OH Kepala tukang 70,000.00 -

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 - JUMLAH 150,000.00 555,000.00

38 1 Unit Jendela J40.000 m' Kusen Bengkirai 65,000.00 -

3.680 m2 Kaca Rayben 5 mm 125,000.00 460,000.00

0.000 OH Tukang kayu 65,000.00 -

0.000 OH Kepala tukang 70,000.00 -

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 - JUMLAH 100,000.00 460,000.00

39 1 Unit Jendela J50.000 m' Kusen Bengkirai 65,000.00 -

2.000 unit Slimar Daun jendela Bkr 225,000.00 450,000.00

2.000 set Engsel jendela 30,000.00 60,000.00

4.000 bh Hak angin 40,000.00 160,000.00

Page 16: n 3a Pek.pengembangan

Analisa hal 16 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

2.000 bh Hand Vatten 25,000.00 50,000.00

4.000 bh Grendel Jendela 40,000.00 160,000.00

1.660 m2 Kaca Rayben 5 mm 125,000.00 207,500.00

0.000 OH Tukang kayu 65,000.00 -

0.000 OH Kepala tukang 70,000.00 -

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 - JUMLAH 100,000.00 1,087,500.00

40 1 Unit Jendela J60.000 m' Kusen Bengkirai 65,000.00 -

1.000 unit Slimar Daun jendela Bkr 225,000.00 225,000.00

1.000 set Engsel jendela 30,000.00 30,000.00

2.000 bh Hak angin 40,000.00 80,000.00

1.000 bh Hand Vatten 25,000.00 25,000.00

2.000 bh Grendel Jendela 40,000.00 80,000.00

0.340 m2 Kaca Rayben 5 mm 125,000.00 42,500.00

0.000 OH Tukang kayu 65,000.00 -

0.000 OH Kepala tukang 70,000.00 -

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 - JUMLAH 50,000.00 482,500.00

40 1 Unit BV10.000 m' Kusen Bengkirai 65,000.00 -

0.600 m2 Kaca Es 5 mm 125,000.00 75,000.00

0.500 OH Tukang kayu 65,000.00 32,500.00

0.150 OH Kepala tukang 70,000.00 10,500.00

0.400 OH Pekerja 45,000.00 18,000.00

0.075 OH Mandor 75,000.00 5,625.00 JUMLAH 50,000.00 75,000.00

40 1 Unit BV22.100 m' Kusen Bengkirai 70,000.00 147,000.00

0.220 m2 Kaca Es 5 mm 125,000.00 27,500.00

0.500 OH Tukang kayu 65,000.00 32,500.00

0.150 OH Kepala tukang 70,000.00 10,500.00

0.400 OH Pekerja 45,000.00 18,000.00

0.075 OH Mandor 75,000.00 5,625.00 JUMLAH 40,000.00 174,500.00

40 1 Unit BV30.000 m' Kusen Bengkirai 70,000.00 -

0.500 m2 Kaca Es 5 mm 125,000.00 62,500.00

0.500 OH Tukang kayu 65,000.00 32,500.00

0.150 OH Kepala tukang 70,000.00 10,500.00

0.400 OH Pekerja 45,000.00 18,000.00

0.075 OH Mandor 75,000.00 5,625.00 JUMLAH 60,000.00 62,500.00

45 1 M' lisplank, ky.bengkirai 2x3/20cm0.014 m3 Kayu Bengkirai 3,900,000.00 56,160.00

0.100 kg Paku 22,000.00 2,200.00

0.000 OH Tukang kayu 65,000.00 -

0.000 OH Kepala Tukang 70,000.00 -

0.000 OH Pekerja 45,000.00 -

0.000 OH Mandor 75,000.00 - JUMLAH 25,000.00 58,360.00

46 10 M2 Pek. Menie kayu 2x jalan

Page 17: n 3a Pek.pengembangan

Analisa hal 17 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

2.400 kg Menie kayu 6,500.00 15,600.00

1.500 OH Tukang cat 65,000.00 97,500.00

0.050 OH Kepala Tukang 70,000.00 3,500.00

0.500 OH Pekerja 45,000.00 22,500.00

0.005 OH Mandor 75,000.00 375.00 123,875.00 123,875.00 15,600.00

1 m2 = 1/10 x JUMLAH 47 1 M2 Pek. Cat dinding dalam/plafond

dengan cat tembok Mowilex Upah cat / menggosok

0.260 kg Cat tembok 36,000.00 9,360.00

0.260 kg Plamir 22,500.00 5,850.00

0.500 lbr Amplas 3,000.00 1,500.00

0.280 OH Tukang cat 65,000.00 18,200.00

0.030 OH kepala tukang 70,000.00 2,100.00

0.160 OH Pekerja 45,000.00 7,200.00

0.010 OH Mandor 75,000.00 750.00 upahx0,75 JUMLAH 15,000.75 16,710.00

48 1 M2 Pek. cat dinding Luar dengan cat tembok Mowilex Watercoat Upah cat / menggosok

0.260 kg Cat tembok 68,000.00 17,680.00

0.260 kg Plamir 22,500.00 5,850.00

0.500 lbr Amplas 3,000.00 1,500.00

0.280 OH Tukang cat 65,000.00 18,200.00

0.030 OH kepala tukang 70,000.00 2,100.00

0.160 OH Pekerja 45,000.00 7,200.00

0.010 OH Mandor 75,000.00 750.00 upahx0,75 JUMLAH 15,000.75 25,030.00

49 1 M2 Melamik Kusen, Daun Pintu dan Lumbersering dengan melamik kayu setara Ultran Lazur Upah cat / menggosok

0.577 kg Wood Filler 25,000.00 14,425.00

0.050 kg Wood Stain (Pewarna) 49,000.00 2,450.00

0.043 kg Sanding Sailer 40,000.00 1,720.00

0.400 kg Dempul 15,000.00 6,000.00

0.030 ltr Thinner A Spesial 9,400.00 282.00

0.150 lbr Amplas 3,000.00 450.00

0.510 OH Tukang cat 65,000.00 33,150.00

0.045 OH kepala tukang 70,000.00 3,150.00

0.300 OH Pekerja 45,000.00 13,500.00

0.150 OH Mandor 75,000.00 11,250.00 JUMLAH 61,050.00 25,327.00

50 1 M2 Pek. cat minyak dengan cat minyak Altec

0.287 kg Cat Minyak 32,000.00 9,174.40

0.080 kg Dempul 15,000.00 1,200.00

0.060 ltr Thinner 9,400.00 564.00

0.150 lbr Amplas 3,000.00 450.00

0.340 OH Tukang cat 65,000.00 22,100.00

0.030 OH Kepala tukang 70,000.00 2,100.00

0.200 OH Pekerja 45,000.00 9,000.00

0.010 OH Mandor 75,000.00 750.00

Page 18: n 3a Pek.pengembangan

Analisa hal 18 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

JUMLAH 30,001.62 11,388.40 51 1 M2 memasang keramik

setara Roman Grez 60 x 600.025 m3 Spesi 1 : 4 514,750.00 12,868.75

0.020 zak Semen putih 85,000.00 1,700.00

1.000 m2 Keramik 60x60 160,000.00 160,000.00

0.450 OH Tukang Keramik 65,000.00 29,250.00

0.050 OH Kepala tukang 70,000.00 3,500.00

0.950 OH Pekerja 45,000.00 42,750.00

0.025 OH Mandor 75,000.00 1,875.00 upahx0,35 JUMLAH 25,765.88 174,568.75

52 1 M2 memasang keramik setara Roman 30x30 (Motif)

0.025 m3 Spesi 1 : 4 514,750.00 12,868.75

0.020 zak Semen putih 85,000.00 1,700.00

1.000 m2 Keramik 40x40 55,500.00 55,500.00

0.450 OH Tukang Keramik 65,000.00 29,250.00

0.050 OH Kepala tukang 70,000.00 3,500.00

0.950 OH Pekerja 45,000.00 42,750.00

0.025 OH Mandor 75,000.00 1,875.00 upahx0,35 JUMLAH 25,765.88 70,068.75

53 1 M2 memasang keramik setara Roman 40x40 (Polos)

0.025 m3 Spesi 1 : 4 514,750.00 12,868.75

0.020 zak Semen putih 85,000.00 1,700.00

1.000 m2 Keramik 40x40 64,000.00 64,000.00

0.450 OH Tukang Keramik 65,000.00 29,250.00

0.050 OH Kepala tukang 70,000.00 3,500.00

0.950 OH Pekerja 45,000.00 42,750.00

0.025 OH Mandor 75,000.00 1,875.00 upahx0,35 JUMLAH 25,765.88 78,568.75

54 1 M' memasang keramik Listsetara Roman

0.025 m3 Spesi 1 : 4 514,750.00 12,868.75

0.020 zak Semen putih 85,000.00 1,700.00

5.000 Bh Keramik 13,000.00 65,000.00

0.450 OH Tukang Keramik 65,000.00 29,250.00

0.050 OH Kepala tukang 70,000.00 3,500.00

0.950 OH Pekerja 45,000.00 42,750.00

0.025 OH Mandor 75,000.00 1,875.00 JUMLAH 7,737.50 79,568.75

55 1 M2 memasang keramiksetara Asia Tile/Roman 20x20

0.025 m3 Spesi 1 : 4 514,750.00 12,868.75

0.020 zak Semen putih 85,000.00 1,700.00

1.000 m2 Keramik 20x20 62,000.00 62,000.00

0.450 OH Tukang Keramik 65,000.00 29,250.00

0.050 OH Kepala tukang 70,000.00 3,500.00

0.950 OH Pekerja 45,000.00 42,750.00

0.025 OH Mandor 75,000.00 1,875.00 upahx0,35 JUMLAH 25,765.88 76,568.75

56 1 M2 memasang keramiksetara Asia Tile/Roman 20x25 (Motif)

0.025 m3 Spesi 1 : 4 514,750.00 12,868.75

Page 19: n 3a Pek.pengembangan

Analisa hal 19 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

0.020 zak Semen putih 85,000.00 1,700.00

1.000 m2 Keramik 20x25 65,000.00 65,000.00

0.450 OH Tukang Keramik 65,000.00 29,250.00

0.050 OH Kepala tukang 70,000.00 3,500.00

0.950 OH Pekerja 45,000.00 42,750.00

0.025 OH Mandor 75,000.00 1,875.00 upahx0,35 JUMLAH 30,006.02 79,568.75

57 1 M' Pasang Plint Lantai Kayu1.000 m' Kayu Plint Lantai 10,500.00 10,500.00

0.010 kg Paku 22,000.00 220.00

0.500 OH Pekerja 45,000.00 22,500.00

0.100 OH Tukang kayu 65,000.00 6,500.00

0.015 OH Kepala Tukang 70,000.00 1,050.00

0.005 OH Mandor 75,000.00 375.00 JUMLAH 15,002.57 10,720.00

58 1 M2 Pasang Paving Block1.000 m2 Paving block 78,000.00 78,000.00

0.035 m3 Pasir pasang 87,500.00 3,062.50

0.600 OH Pekerja 45,000.00 27,000.00

0.100 OH Tukang Batu 65,000.00 6,500.00 JUMLAH 33,500.00 81,062.50

59 1 M2 Pasang Batu Alam0.025 m3 Spesi 1 : 4 514,750.00 12,868.75

0.020 zak PC semen @ 50 kg 57,000.00 1,140.00

1.000 m2 Batu Alam 200,000.00 200,000.00

0.250 OH Tukang Keramik 65,000.00 16,250.00

0.025 OH Kepala tukang 70,000.00 1,750.00

0.500 OH Pekerja 45,000.00 22,500.00

0.025 OH Mandor 75,000.00 1,875.00 JUMLAH 50,002.50 214,008.75

60 1 M3 Spesi 1 : 47.250 zak PC semen @ 50 kg 57,000.00 413,250.00

1.160 m3 Pasir pasang 87,500.00 101,500.00 JUMLAH - 514,750.00

61 1 M2 Plafond Gypsum Polos 9 mm + rangka0.011 m3 Kayu rangka 2,300,000.00 25,300.00

0.347 lbr Gypsum Polos 53,000.00 18,402.78

0.020 kg Paku 20,000.00 400.00

0.200 OH Tukang kayu 65,000.00 13,000.00

0.050 OH Kepala Tukang 70,000.00 3,500.00

0.100 OH Pekerja 45,000.00 4,500.00

0.010 OH Mandor 75,000.00 750.00 JUMLAH 25,001.63 44,102.78

62 1 M2 Plafond Calsiboard 4mm+ rangka0.011 m3 Kayu rangka 2,300,000.00 25,300.00

0.347 m2 Calsiboard 43,000.00 14,921.00

0.020 kg Paku 20,000.00 400.00

0.200 OH Tukang kayu 65,000.00 13,000.00

0.050 OH Kepala Tukang 70,000.00 3,500.00

0.100 OH Pekerja 45,000.00 4,500.00

0.010 OH Mandor 75,000.00 750.00 JUMLAH 25,001.63 40,621.00

63 1 M2 Plafond Lumbersering + Rangka0.013 m3 Kayu rangka 2,300,000.00 29,933.12

Page 20: n 3a Pek.pengembangan

Analisa hal 20 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

3.150 btg Lumbersering 20,000.00 63,000.00

0.020 kg Paku 20,000.00 400.00

0.200 OH Tukang kayu 65,000.00 13,000.00

0.050 OH Kepala Tukang 70,000.00 3,500.00

0.100 OH Pekerja 45,000.00 4,500.00

0.010 OH Mandor 75,000.00 750.00 JUMLAH 36,975.00 93,333.12

64 1 M3 Sloof (20 / 30), 146kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

10.000 m2 Begisting 76,775.00 767,750.00

113 kg Besi 11,395.00 1,282,554.30 JUMLAH - 3,021,554.30

65 1 M3 Kolom K2 (13 / 47), 141kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

19.640 m2 Begisting 76,775.00 1,507,855.97

148 kg Besi 11,395.00 1,683,501.09 JUMLAH - 4,162,607.07

65 1 M3 Kolom K3 (13 / 47), 152kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

19.640 m2 Begisting 76,775.00 1,507,855.97

159 kg Besi 11,395.00 1,809,871.83 JUMLAH - 4,288,977.81

66 1 M3 Kolom K1 (13 / 30), 212kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

22.051 m2 Begisting 76,775.00 1,692,987.18

0.200 m3 Kayu Perancah 844,500.00 168,900.00

168 kg Besi 11,395.00 1,911,249.07 JUMLAH - 4,744,386.25

67

1.000 m3 Beton 1:2:3 971,250.00 971,250.00

13.333 m2 Begisting 76,775.00 1,023,666.67

0.200 m3 Kayu Perancah 844,500.00 168,900.00

150 kg Besi 11,395.00 1,709,250.00 JUMLAH - 3,873,066.67

68 1 M3 Kolom K5 (30 x 30), 150kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

13.333 m2 Begisting 76,775.00 1,023,666.67

0.200 m3 Kayu Perancah 844,500.00 168,900.00

150 kg Besi 11,395.00 1,709,250.00 JUMLAH - 3,873,066.67

69 1 M3 Kolom K6 (13 / 13), 150kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

18.750 m2 Begisting 76,775.00 1,439,531.25

0.200 m3 Kayu Perancah 844,500.00 168,900.00

150 kg Besi 11,395.00 1,709,250.00 JUMLAH - 4,288,931.25

70 1 M3 Kolom Kp (8/20), 146 kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

35.000 m2 Begisting 76,775.00 2,687,125.00

0.200 m3 Kayu Perancah 844,500.00 168,900.00

153 kg Besi 11,395.00 1,739,508.83 JUMLAH - 5,566,783.83

71 1 M3 Ring Balok (15 / 20), 130kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

1 M3 Kolom K4 Ø30, 150kg besi

Page 21: n 3a Pek.pengembangan

Analisa hal 21 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

15.385 m2 Begisting 76,775.00 1,181,153.85

0.350 m3 Kayu Skor 844,500.00 295,575.00

136 kg Besi 11,395.00 1,548,817.28 JUMLAH - 3,996,796.12

72 1 M3 Balok Latei (13 / 15), 118kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

15.385 m2 Begisting 76,775.00 1,181,153.85

0.350 m3 Kayu Skor 844,500.00 295,575.00

124 kg Besi 11,395.00 1,410,411.52 JUMLAH - 3,858,390.37

73 1 M3 Balok B1 (13 / 35), 191 kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

15.385 m2 Begisting 76,775.00 1,181,153.85

0.350 m3 Kayu Skor 844,500.00 295,575.00

200 kg Besi 11,395.00 2,281,611.94 JUMLAH - 4,729,590.79

74 1 M3 Balok B2 (13 / 40), 191kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

15.385 m2 Begisting 76,775.00 1,181,153.85

0.350 m3 Kayu Skor 844,500.00 295,575.00

200 kg Besi 11,395.00 2,281,611.94 JUMLAH - 4,729,590.79

75 1 M3 Balok B3 (13 / 45) 134kg besi1.000 m3 Beton 1:2:3 971,250.00 971,250.00

15.385 m2 Begisting 76,775.00 1,181,153.85

0.350 m3 Kayu Skor 844,500.00 295,575.00

200 kg Besi 11,395.00 2,281,611.94 JUMLAH - 4,729,590.79

76 1 M' List Plank & Talang Beton1.000 m3 Beton 1:2:3 971,250.00 971,250.00

3.371 m2 Begisting 76,775.00 258,823.88

0.010 m3 Stuut werk 844,500.00 #VALUE!

10 kg Besi 11,395.00 113,950.00 JUMLAH - #VALUE!

77 1 M3 Plat Beton Bertulang, t= 12cm1.000 m3 Beton 1:2:3 971,250.00 971,250.00

10.500 m2 Begisting 76,775.00 806,137.50 Upah Anal. F.8 26,375.00 26,375.00

0.450 m3 Kayu Mal 1,500,000.00 675,000.00 m3 Kayu Perancah 30,000.00 #VALUE!

5.000 kg Paku 36,000.00 180,000.00

123 kg Besi 11,395.00 1,405,267.86 JUMLAH 26,375.00 #VALUE!

78 1 M3 Plat Beton Bertulang, t= 10cm1.000 m3 Beton 1:2:3 971,250.00 971,250.00

10.000 m2 Begisting 76,775.00 767,750.00 Upah Anal. F.8 173,100.00 173,100.00

0.450 m3 Kayu Mal 1,500,000.00 675,000.00 m3 Kayu Perancah 1,500,000.00 #VALUE!

5.000 kg Paku 36,000.00 180,000.00

51.4 kg Besi 11,395.00 585,333.30 JUMLAH 173,100.00 #VALUE!

79 1 M3 Pondasi Foot Plate Tangga1.000 m3 Beton 1:2:3 971,250.00 971,250.00

Page 22: n 3a Pek.pengembangan

Analisa hal 22 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

2.500 m2 Begisting 76,775.00 191,937.50

145 kg Besi 11,395.00 1,652,275.00 JUMLAH - 2,815,462.50

80 1 M3 Pondasi Poer P11.000 m3 Beton 1:2:3 971,250.00 971,250.00

5.714 m2 Begisting 76,775.00 438,714.29

29.795 kg Besi 11,395.00 339,514.48 JUMLAH - 1,749,478.77

81 1 M3 Pondasi Poer P21.000 m3 Beton 1:2:3 971,250.00 971,250.00

4.857 m2 Begisting 76,775.00 372,907.14

34.500 kg Besi 11,395.00 393,122.03 JUMLAH - 1,737,279.17

82 1 Unit Septic tank 3.760 m3 Galian Tanah 50,000.00 188,000.00

0.072 m3 Pas. Bt gunung,t=20cm 557,250.00 40,122.00

0.113 m3 Cor lantai, t=10cm 872,375.00 98,578.38

- m3 Urugan bt kali, t=55cm 212,500.00 -

1.350 m3 Pas. Bata trasraam 1:2 725,866.50 979,919.78

15.000 m2 Plesteran + acian 1:2 29,629.00 444,435.00

0.050 m3 Ring balk 15/20 3,996,796.12 199,839.81

0.188 m3 Plat Dak beton, t=10cm #VALUE! #VALUE!

0.475 m3 Urugan pasir 87,500.00 41,562.50

1.000 - Ijuk 50,000.00 50,000.00 JUMLAH - #VALUE!

83 1 Unit Sumur Resapan 2.860 m3 Galian Tanah 50,000.00 143,000.00

0.316 m3 Pas. Bt gunung,t=20cm 557,250.00 176,091.00

0.396 m3 Urugan kerikil 310,000.00 122,760.00

0.132 m3 Urugan pasir 87,500.00 11,550.00

0.343 m3 Pas. Bata trasraam 1:4 65,640.00 22,514.52

0.457 m2 Plesteran + acian 1:4 27,610.00 12,617.77

64.000 bh Bata 600.00 38,400.00

0.132 m3 Plat Dak beton, t=10cm #VALUE! #VALUE!

1.000 - Ijuk 50,000.00 50,000.00 JUMLAH - #VALUE!

84 1 Buah Bak Mandi Pas. Bata (vol. 0,45 m3) 0.136 m3 Pas. Bata 1:2 725,866.50 98,717.84

2.720 m2 Pas. Keramik 20/25 109,574.78 298,043.39

3.000 oh Tukang 65,000.00 195,000.00

0.300 oh Kepala Tukang 70,000.00 21,000.00

0.300 oh Mandor 75,000.00 22,500.00

6.000 oh Pekerja 45,000.00 270,000.00 JUMLAH 254,250.00 396,761.23

85 1 Buah Bak Kontrol (45x45) 125.000 bh Bata 600.00 75,000.00

0.130 m3 Pasir Pasang 125,000.00 16,250.00

1.540 zak Semen Pc 57,000.00 87,780.00

0.020 m3 Batu Kerikil 310,000.00 6,200.00

2.600 kg Besi Beton 11,395.00 29,627.00

0.090 m3 Pasir Beton 87,500.00 7,875.00

1.420 oh Pekerja 45,000.00 63,900.00

0.473 oh Tukang 65,000.00 30,745.00

0.047 oh Kepala Tukang 70,000.00 3,290.00

Page 23: n 3a Pek.pengembangan

Analisa hal 23 / 69

NO URAIAN PEKERJAANHARGA

UPAH (Rp.) BAHAN (Rp.)

HARGA SATUAN (Rp.)

0.071 oh Mandor 75,000.00 5,325.00 JUMLAH 140,762.00 185,230.00

82 1 Unit Resevoir, vol 2,5m3 5.022 m3 Galian Tanah 50,000.00 251,100.00

0.324 m3 Cor lantai, t=10cm 872,375.00 282,649.50

0.960 m3 Pas. Bata trasraam 1:2 725,866.50 696,831.84

10.153 m2 Pas Keramik 20/20 102,334.63 1,038,952.28

0.324 m3 Plat Dak beton, t=10cm #VALUE! #VALUE!

1.200 m2 Plesteran Acian 27,610.00 33,132.00

1.000 Bh Pelampung 150,000.00 150,000.00 JUMLAH - #VALUE!

Page 24: n 3a Pek.pengembangan

Analisa hal 24 / 69

ANALISA HARGA SATUAN PEKERJAAN

4,050.00

27,270.00

50,000.00

20,000.00

130,000.00

84,000.00

351,975.00

557,250.00

JUMLAH HARGA (Rp.)

Page 25: n 3a Pek.pengembangan

Analisa hal 25 / 69

JUMLAH HARGA (Rp.)

83,820.00

118,700.00

176,000.00

872,375.00

971,250.00

844,500.00

Page 26: n 3a Pek.pengembangan

Analisa hal 26 / 69

JUMLAH HARGA (Rp.)

1,139,500.00 11,395.00

1,535,500.00 76,775.00

657,755.00

725,866.50

65,640.00

27,610.00

Page 27: n 3a Pek.pengembangan

Analisa hal 27 / 69

JUMLAH HARGA (Rp.)

29,629.00

561,701.00

45,631.50

4,937,325.00

211,500.80

149,851.69

Page 28: n 3a Pek.pengembangan

Analisa hal 28 / 69

JUMLAH HARGA (Rp.)

76,544.11 19,136.03

76,544.11 19,136.03

69,869.00 17,467.25

69,869.00 17,467.25

1,556,987.50

Page 29: n 3a Pek.pengembangan

Analisa hal 29 / 69

JUMLAH HARGA (Rp.)

1,295,487.50

1,986,500.00

2,951,500.00

2,491,750.00

Page 30: n 3a Pek.pengembangan

Analisa hal 30 / 69

JUMLAH HARGA (Rp.)

2,914,250.00

1,298,750.00

956,000.00

705,000.00

560,000.00

Page 31: n 3a Pek.pengembangan

Analisa hal 31 / 69

JUMLAH HARGA (Rp.)

1,187,500.00

532,500.00

125,000.00

214,500.00

122,500.00

83,360.00

Page 32: n 3a Pek.pengembangan

Analisa hal 32 / 69

JUMLAH HARGA (Rp.)

139,475.00 13,947.50

31,710.75

40,030.75

86,377.00

Page 33: n 3a Pek.pengembangan

Analisa hal 33 / 69

JUMLAH HARGA (Rp.)

41,390.02

200,334.63

95,834.63

104,334.63

87,306.25

102,334.63

Page 34: n 3a Pek.pengembangan

Analisa hal 34 / 69

JUMLAH HARGA (Rp.)

109,574.78

25,722.57

114,562.50

264,011.25

514,750.00

69,104.40

65,622.63

Page 35: n 3a Pek.pengembangan

Analisa hal 35 / 69

JUMLAH HARGA (Rp.)

130,308.12

3,021,554.30

4,162,607.07

4,288,977.81

4,744,386.25

3,873,066.67

3,873,066.67

4,288,931.25

5,566,783.83

Page 36: n 3a Pek.pengembangan

Analisa hal 36 / 69

JUMLAH HARGA (Rp.)

3,996,796.12

3,858,390.37

4,729,590.79

4,729,590.79

4,729,590.79

#VALUE!

#VALUE!

#VALUE!

Page 37: n 3a Pek.pengembangan

Analisa hal 37 / 69

JUMLAH HARGA (Rp.)

2,815,462.50

1,749,478.77

1,737,279.17

#VALUE!

#VALUE!

651,011.23

Page 38: n 3a Pek.pengembangan

Analisa hal 38 / 69

JUMLAH HARGA (Rp.)

325,992.00

#VALUE!

Page 39: n 3a Pek.pengembangan

Harga Satuan hal 39/ 69

DAFTAR HARGA SATUAN UPAH DAN BAHAN TH. 2009

PROYEK : PEMBANGUNAN KAWASAN PERUMAHAN VILLA TAMARA

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL

LOKASI : VILLA TAMARA BLOK N NO 3A

NO. U R A I A N SATUAN

I. SPESIFIKASI UPAH :

1 M a n d o r Hari 75,000

2 Kepala tukang Hari 70,000

3 Tukang kayu Hari 65,000

4 Tukang batu Hari 65,000

5 Tukang besi Hari 65,000

6 Tukang cat Hari 65,000

7 Tukang keramik Hari 65,000

8 Tukang lisrik Hari 65,000

9 P e k e r j a Hari 45,000

II. SPESIFIKASI BAHAN

1 Aluminium Foil 1 Sisi M² 7,000

2 Amplas Lbr 3,000

3 Bak Mandi 60 X 60 cm (Pasangan Bata) Bh 550,000

4 Bath tub Setara Toto Bh 3,000,000

5 Batu alam adesit M² 200,000

6 Batu Alam sisir M² 175,000

7 Batu Bata Bh 600

8 Batu Gunung ( Rp. 425.000 / Rit / 2 M3 ) M³ 212,500

9 Batu Padas ( Rp. 150.000 / Rit / 2 M3 ) M³ 75,000

10 Besi Beton Polos Ex KS Kg 10,000

11 Calsiboard Lbr 46,000

12 Cat Dasar Kg 22,500

13 Cat Minyak Setara Altex Kg 32,000

14 Cat Tembok Merek EMCO Interior Kg 26,300

15 Cat Tembok Mowilex Interior Kg 36,000

16 Cat Tembok Mowilex Weathercoat Kg 68,000

17 Cat Tembok Setara EMCO Weatherguard Kg 42,800

18 Clear Dof Kg 30,000

19 Closed Duduk Setara Toto Set 1,500,000

20 Closed Jongkok Setara Toto Bh 140,000

21 Compound Gypsum Zak 60,000

22 Daun Jendela ( Tipe JLT 1 ) Unit 225,000

23 Daun jendela 35x100 Bh 175,000

24 Daun jendela Boven Bh 150,000

25 Daun jendela kecil Bh 135,000

26 Daun Pintu Bengkirai 70 x 210 Unit 750,000

27 Daun Pintu Bengkirai 80 x 210 Panel Unit 750,000

28 Daun Pintu Bengkirai 80 x 210 Slimar Unit 450,000

29 Daun pintu multiplek Bh 600,000

30 Daun pintu plywood 12 mm lapis sungkai 3 mm Bh 650,000

31 Daun pintu sungkai Bh 60,000

32 Daun Pintu Ulin KM / WC Unit 750,000

33 Dempul Kayu Kg 15,000

H. SATUAN BARU (Rp.)

F24
User: up date okt 08, tradding (monier)
F33
User: up date okt 08, UD. sumber jaya (741434; 752069)
F34
User: up date Sept 08, merk Nusa board
F36
User: up date Okt 08, tk pandan wangi
F37
User: Tanggo 131,500/5kg, EMCO Dekor 214,000/5kg, Decolyn 164,500/ 25kg
F38
up date okt 08, tk samudra jaya
F39
up date okt 08, tk samudra jaya
F40
User: Tanggo 131,500/5kg, EMCO Dekor 214,000/5kg, Decolyn 164,500/ 25kg
F42
User: up date Sept 08 "TOTO"
F43
User: up date Sept 08 "TOTO"
F44
okt 08, tk mitra jaya metalindo (7168865; 08115809265)
F45
User: UP DATE JULI 07
F48
User: UP DATE JULI 07
F49
User: UP DATE JULI 07
F50
User: UP DATE JULI 07
F51
User: UP DATE JULI 07
F52
User: UP DATE JULI 07
F54
User: UP DATE JULI 07
F55
User: UP DATE JULI 07
Page 40: n 3a Pek.pengembangan

Harga Satuan hal 40/ 69

NO. U R A I A N SATUANH. SATUAN BARU

(Rp.)

34 Engsel Jendela Belluci 3" Set 30,000

35 Engsel Jendela SES 3" Set 30,000

36 Engsel Jendela SSS 3" kuningan 3mm Set 35,000

37 Engsel Pintu SES 5" Set 50,000

38 Engsel Pintu SSS 5" kuningan 4mm Set 65,000

39 Fleksi board (plafond luar/ calsy) Lbr 43,000

40 Floor Drain Bh 50,000

41 Genteng Beton Monier /Setara Genteng Keramik bh 12,500

42 Glass Block Bh 20,000

43 Grendel Set 32,500

44 Grendel Pintu Set 50,000

45 Grendel Jendela Set 40,000

46 Grendel Tanam Set 52,000

47 Gypsum Polos 9 mm Lbr 53,000

48 Hak Angin Set 55,000

49 Hand Vatten Bh 25,000

50 Handle Pintu Bh 175,000

51 Handle Stainless steel Bh 250,000

52 Jet Washer Bh 150,000

53 Kaca Bening biru 5mm M2 135,000

54 Kaca Bening 5mm M2 95,000

55 Kaca Es 5 mm M² 125,000

56 Kaca Ray ben 5 mm M² 115,000

57 Kawat Beton Kg 20,000

58 Kayu Balok Bengkirai (diketam) M³ 3,900,000

59 Kayu Balok Meranti M³ 2,300,000

60 Kayu Balok Ulin M³ 3,900,000

61 Kayu Papan Bengkirai M³ 3,900,000

62 Kayu Papan Meranti M³ 2,300,000

63 Kayu Papan Ulin M³ 3,900,000

64 Kayu plint lantai M' 10,500

65 Keramik Cina 60 x 60 cm M² 92,857

66 Keramik Cina 60 x 60 cm (monalisa) 325,000

67 Keramik setara Roman 20 x 25 cm ( Motif ) M² 65,000

68 Keramik setara Roman 20 x 20 cm (Motif) M² 62,000

69 Keramik setara Roman 20 x 20 cm (Polos) M² 50,000

70 Keramik setara Roman 25 x 45 cm ( Dinding ) M² 76,000

71 Keramik setara Roman 30 x 30 cm ( Motif ) M² 55,500

72 Keramik List setara Roman M² 13,000

73 Keramik setara Roman 40 x 40 cm ( Polos ) M² 64,000

74 Keramik setara Roman 50 x 50 cm ( Motif ) M² 99,000

75 Keramik setara Roman Grez 33 x 33 M² 58,000

76 Kerikil Beton M³ 310,000

77 Kitchen Sink Bh 150,000

78 Kunci Bundar (km/wc) Set 70,000

79 Kunci Geser Setara SES Set 100,000

80 Kunci Tanam 2 slag setara SES Set 325,000

81 Kusen Bengkirai M' 65,000

82 Kusen Ulin M' 65,000

83 List plafon gipsum 3 Cm M' 15,000

84 Lumbersering Lbr 20,000

85 Menie Kayu Kg 6,500

86 Mortar Compound bh 22,500

F57
User: up date okt 08, tk pandan wangi
F58
User: up date Agts 08
F59
User: up date Agts 08
F60
User: up date Agts 08
F61
User: up date sept 08, tk Ganesa Jaya (7283229; 7078975)
F62
okt 08, tk mitra jaya metalindo (7168865; 08115809265)
F70
okt 08, tk mitra jaya metalindo (7168865; 08115809265)
F80
User: 300,000/ rol update okt 08
F81
User: UP DATE MARET 09, UD.Alamsyah
F82
User: UP DATE MARET 09, UD.Alamsyah
F83
User: UP DATE MARET 09, UD.Alamsyah
F84
User: UP DATE MARET 09, UD.Alamsyah
F85
User: UP DATE MARET 09, UD.Alamsyah
F86
User: UP DATE MARET 09, UD.Alamsyah
F88
User: up date juli 07
F89
User: up date juli 07
F90
keramik jaya 15 okt 08
F91
keramik jaya 15 okt 08
F92
User: up date 9 jan 08
F93
keramik jaya 15 okt 08
F94
User: up date 9 jan 08
F95
User: up date 9 jan 08
F96
keramik jaya 15 okt 08
F97
User: up date 9 jan 08
F98
keramik jaya 15 okt 08
F101
User: keramik jaya, 15 okt 08 (766851)
F102
User: keramik jaya, 15 okt 08
F103
User: keramik jaya, 15 okt 08
F104
User: UP DATE Agts 08
F105
User: UP DATE Agts 08
Page 41: n 3a Pek.pengembangan

Harga Satuan hal 41/ 69

NO. U R A I A N SATUANH. SATUAN BARU

(Rp.)

87 Paku 2 - 6 Kg 22,000

88 Paku Genteng Kg 11,000

89 Paku Gipsum Kg 20,000

90 Paku Seng Kg 20,000

91 Pasang Rel pintu geser + Instalasi Bh 450,000

92 Pasang Stop Kran 1/2" + instalasi Bh 150,000

93 Pasang Stop kran Leher angsa untuk Kitchen Zinc + instalasi Bh 250,000

94 Pasir Beton ( Palu ) M³ 275,000

95 Pasir Pasang / Tenggarong ( Rp. 250.000 / Rit / 2 M3 ) M³ 125,000

96 Pasir Urug Mahakam ( Rp. 175.000 / Rit / 2 M3 ) M³ 87,500

97 Paving Block m2 78,000

98 Pigment bh 32,500

99 Pipa PVC Dia 1/2" M1 3,750

100 Pipa PVC Dia 2 " M1 8,500

101 Pipa PVC Dia 3 " M1 17,000

102 Pipa PVC Dia 3 /4" M1 5,500

103 Pipa PVC Dia 4 " M1 19,750

104 Pipa Sambungan Pancang Bh 20,000

105 Pompa Sanyo Bh 340,000

106 Pompa Sanyo Bh 975,000

107 Pompa Simitsu Bh 450,000

108 Rel Pintu Garasi setara Grand Set 6,000,000

109 Residu Kg 7,500

110 Roof Drain Bh 20,000

111 Sainding Sailler Kg 40,000

112 Semen PC ( @ 50 Kg ) Zak 57,000

113 Semen Putih Zak 85,000

114 Shower + Kran + Aksesoris Bh 225,000

115 Shower Screen+ Kran + Aksesoris Bh 250,000

116 Stop Kran 1/2" Bh 50,000

117 Tangki Air Fiber glass 1200 Liter Bh 1,300,000

118 Tempat Sabun tanam (Toto) Bh 75,000

119 Thinner A spesial Ltr 9,400

120 Triplek 18 mm Lbr 105,000

121 Triplek 4 mm Lbr 45,000

122 Triplek 6 mm Lbr 60,000

123 Vee Ridge End Monier/ Setara Genteng Keramik bh 12,500

124 Vee Ridge Monier/ Setara Genteng Keramik bh 12,500

125 Vee Starter Monier/ Setara Genteng Keramik bh 12,500

126 Verge bh 12,500

127 Verge End bh 12,500

128 Washtafel Bh 245,000

129 Wood Filler ( Cat Dasar/ Dempul ) Kg 25,000

130 Wood Stain ( Pewarna ), dark brown Kg 49,000

131 Thinner A Ltr 10,000

di buat oleh,

0

F110
User: up date okt 08, tk pandan wangi
F112
okt 08, tk mitra jaya metalindo (7168865; 08115809265)
F113
User: up date okt 08, tk pandan wangi
F118
User: UP DATE Sept 08
F119
User: UP DATE Sept 08
F122
tk.pandan wangi 7 okt 08
F123
User: up date okt 08, tk pandan wangi
F124
tk.pandan wangi 7 okt 08
F125
User: up date okt 08, tk pandan wangi
F128
User: tk. Purnama jaya 16 okt 08
F129
User: tk. Purnama jaya 16 okt 08
F130
User: tk. Keramik jaya okt 08
F135
User: Gresik 50kg up date 14 okt 08
F136
User: UP DATE Sept 08
F139
User: up date okt 08
F153
User: up date okt 08, tk pandan wangi
F154
User: up date Okt 08, tk pandan wangi
Page 42: n 3a Pek.pengembangan

Harga Satuan hal 42/ 69

DAFTAR HARGA SATUAN UPAH DAN BAHAN TH. 2009

KETERANGAN

Rp 700,000/ rol

2kg

Rp 90,000/2,5 Kg

Rp 170,000/2,5 Kg

elephand

Page 43: n 3a Pek.pengembangan

Harga Satuan hal 43/ 69

KETERANGAN

jaya board

jaya board

Biasa

per dos = 1,4m2

KW1

KW1

KW1

KW1

KW1

Page 44: n 3a Pek.pengembangan

Harga Satuan hal 44/ 69

KETERANGAN

15,000/ btg

Rp 34,000/ btg

68,000/btg D

Rp 22,000/ btg

Rp 79,000/ btg

125W

150W

125W

Page 45: n 3a Pek.pengembangan

PondasiPoer Ukuran (m) tebal Jml ttk PancangP1 0.70 0.70 0.25 9 4 36 P2 0.70 1.00 0.25 0 6 0 P3 0.90 1.25 0.30 3 0 P4 0.90 1.80 0.30 6 0

36

Roolag Bata tbl h pj. vol.

0.10 0.50 24.1 1.20

Sloof Ukuran (m) Vol. Sx 23.77 S1 0.13 0.35 2.23 Sy 25.32

49.09

Kolom Lantai 1 Lantai 2 Ukuran Luas Jumlah Tinggi Jumlah

K3 (T) 0.13 0.17 0.30 0.06 - 4.70 K2 (L) 0.13 0.17 0.30 0.06 - 4.70 K1 (T) 0.13 0.30 0.04 9.00 4.70 - K4 0.15 0.07 - 4.70 K5 0.15 0.07 4.70 KP2 0.08 0.33 0.03 4.70 KP1 0.08 0.20 0.02 - 4.70 8.00

Balok Panjang Ukuran Luas Bx By Total

B1 0.13 0.35 0.05 22.17 13.89 36.06 B2 0.13 0.40 0.05 21.67 22.67 44.34 B3 0.13 0.45 0.06 1.00 1.00 2.00 Rbalk 0.15 0.20 0.03 19.30 13.85 33.15

luas Volume Plat Lt 2 tebal 0.12 m 38.20 4.58 Dak tebal 0.10 m 60.95 6.10

Luas Masing-masing Lantai Luas 113.83

Lantai 1 74.89 Teras Depan 2.150 Teras Belakang 10.310 R. Cuci - Garasi - Ruang Santai 16.640 Ruang Keluarga 13.500 Ruang Makan + Dapur 10.750 R Tidur Utama 14.360 Wardrobe 7.180 Kamar Mandi utama - Kamar Mandi umum - WIC - Kelilin luar -

Page 46: n 3a Pek.pengembangan

Gudang -

Lantai 2 38.94 Balkon Depan 3.20 Balkon Belakang' 7.14 Ruang Duduk 6.00 Ruang Tidur 1 16.00 Ruang Tidur 2 Selasar R. Pembantu Gudang KM / WC umum 2.63 KM / WC umum 3.98 KM / WC pembantu Void R. Jemur

LANTAI 1DINDING Pas Bata 1 : 4

Luar Dalam Keliling 39.71 6.00 Tinggi 3.80 3.80 Sub Luas 150.90 22.80 Kamar Mandi Tinggi Kamar Mandi Sub Luas - - Luas 150.90 22.80

Luas Dinding 129.23 20.87 Luas Total 225.77 Tebal 0.10 Volume Dinding 22.58

l t jml luas Luar DalamMultiplek P1 0.90 2.15 1.00 1.94 - Ulin P2 0.80 2.15 1.00 1.72 - Multiplek PG 0.90 2.15 1.00 1.94 - 1.94 Ulin PJ2 - - 2.00 5.76 11.52 Bengkirai PJ4 1.00 4.38 - Bengkirai PJ3 2.00 2.90 5.80 Bengkirai J1 - - - Bengkirai J2 7.00 0.87 4.35

J3 - - - J4 - - - J5 - - - - J6 - - - - BV1 - - - BV2 1.00 0.32 - BV3 - -

21.67 1.94

Page 47: n 3a Pek.pengembangan

Urug Galian Psr Bwh Pnds Psr Bwh Sloof Lantai Kerja Beton

5.76 0.58 0.98 0.29 1.10 - - - - - - - - - - - - 5.76 0.58 0.98 0.29

Lantai 2Tinggi Total

4.00 - 4.00 - 3.51 1.65 4.00 - 4.00 - 4.00 - 3.51 0.45

Volume

1.64 2.31 0.12 0.99

Urug Plafon Tnh Hlmn Tanah Psr Bwh Lti Lantai Kerja Gypsum

102.43 54.42 14.98 3.74 3.74 84.43 68.66 14.98 3.74 3.74 62.43 1.08 0.43 0.11 0.11 - 5.16 2.06 0.52 0.52 - - - - - -

- - - - 3.33 0.83 0.83 16.64 2.70 0.68 0.68 13.50 2.15 0.54 0.54 10.75 2.87 0.72 0.72 14.36 1.44 0.36 0.36 7.18 - - - - - - - - - - - - - - -

Page 48: n 3a Pek.pengembangan

- - - -

33.77 22.00 1.60 3.57

6.00 16.00 - - - -

- - -

LANTAI 1 LANTAI 2Pas Bata 1:2 Pas Bata 1 : 4 Pas Bata 1:2

Luar Dalam Luar Dalam Luar Dalam 14.30 1.00 4.10 4.10

- - 58.63 4.10 - - - - 6.15 - 3.80 3.80 4.10 4.10 - - 21.00 - 25.22 - - - 79.63 4.10 25.22 -

- - 73.51 2.16 23.18 - 23.18 0.10 2.32

Luar Dalam Luar Dalam Luar Dalam - 1.94

- - - 1.72 - - -

- 4.38

- 1.74 - - - -

- - - - 0.32

- -

- - 6.12 1.94 2.04 -

L80
User: GEWEL ATAS GARASI
Page 49: n 3a Pek.pengembangan
Page 50: n 3a Pek.pengembangan

Plafon List Keramik Lantai Keramik Dinding Calsiboard Lumbersiring Gypsum Kayu 60*60 60*60 20*20 20*25 M 22.26 - 88.53 27.20 22.79 84.43 6.60 29.70 12.46 - 60.66 6.30 12.46 62.43 - - 2.15 - 6.30 2.15 10.31 - 10.31 - - -

- - - 12.16 - 16.64 12.00 13.50 14.30 10.75 11.20 14.36 11.00 7.18

- - - - - - -

- - - - - - -

Page 51: n 3a Pek.pengembangan

- - - -

9.80 - 27.87 20.90 10.33 22.00 6.60 29.70 3.20 - 6.40 3.20 - - 7.14 -

10.00 6.00 17.87 16.00 - - - - - - - -

2.63 - 6.50 2.63 13.20 3.98 - 8.00 3.98 16.50 - - - -

-

pjg kusen luas daun luas peitur 5.10 3.36 4.53 4.53 5.00 2.94 4.09 4.09 5.10 11.58 12.75 12.75 16.10 2.14 5.84 11.69 21.20 3.54 8.42 8.42 9.95 4.44 6.73 13.46 - 1.60 1.60 - 5.90 2.94 4.30 30.08 - - - - - - - - - 1.96 1.96 - - 0.56 0.56 - - - - - 2.10 - 0.48 0.48 - - - -

70.45 35.06 51.26 85.50

Page 52: n 3a Pek.pengembangan

Keramik Dinding Plint Lantai Listrik 20*25 B list DL Biasa Saklar Stop kontak - 12.90 62.77 13 11 10 8 - - 40.92 10 6 6 6

- 1 - 3 - -

- - - - - 12.32 3 2 2 10.00 2 1 1 1 - 2 - 1 1 9.60 2 1 1 1 9.00 1 1 1

- - - - - - - - -

- - - - - - - - -

Page 53: n 3a Pek.pengembangan

- -

- 12.90 21.85 3 5 4 2 1

- - 1 - - 6.00 1 - 1 1 15.85 2 1 1 1 - - - - - - - - - - - - - - - - - - - -

7.20 1 1 5.70 1 1 - - -

- -

Page 54: n 3a Pek.pengembangan

Stop kontak

Page 55: n 3a Pek.pengembangan

No. Uraian Pekerjaan

PEKERJAAN KAP / ATAPpapan roiter

NOKgording

1 Pekerjaan kuda-kuda K1 Pekerjaan kuda-kuda 1/2K1 Pekerjaan kuda-kuda K2 Pekerjaan kuda-kuda 1/2K2 Pekerjaan kuda-kuda K2 Pekerjaan kuda-kuda 1/2K2

JURAIJUMLAH kuda-kuda

2 Pekerjaan Rangka Atap Kayu Bengkirai3 Pekerjaan Bout Angker Kuda - Kuda4 Pasangan Atap Genteng + Alumunium Foil5 Bubungan/Vee Ridge6 2 way Cap ridge7 vee starter8 4 way cap apex9 3 way Vee apex

10 Talang jurai, seng BJLS 3011 Pekerjaan Lisplank papan 2X20 diloter

Page 56: n 3a Pek.pengembangan

Sat Volume Panjang lebar tinggi tebal diameter jumlah

m³ 0.003 0.80 0.20 0.02 m³ 0.006 0.80 0.06 0.12 m³ 0.432 60.00 0.06 0.12 m³ 0.405 28.10 0.06 0.12 2.00 m³ 0.202 2.00 m³ - - 0.06 0.12 2.00 m³ - 1.00 m³ - - 0.06 0.12 1.00 m³ - 1.00

0.177 24.60 0.06 0.12 m3 1.225

m² 72.980 ls 1.00 m² 72.980 bh 102 25.40 bhbh 4 bhbh 2.00 m' - m' 31.62

Page 57: n 3a Pek.pengembangan

Pengurangan luas

Page 58: n 3a Pek.pengembangan

NO SKET GAMBAR

1

1.900 16.000 0.891

1

2.500 8.000 0.891

2

1.900 8.000 0.891

NO SKET GAMBAR

1

16.667 8.000 0.616

2

0.900 84.330 0.266

PEKERJAAN PEMBESIAN Polosø12 (FOOT PLAT) 70X70CM

PANJANG (M')

BANYAKNYA (BT/BH)

BERAT PER M'

TOTAL BESI ø12 TOTAL BESI ø12 + 10%

PEKERJAAN PEMBESIAN Polosø12 (FOOT PLAT) 70X100CM

TOTAL BESI ø12 TOTAL BESI ø12 + 10%

PEKERJAAN PEMBESIAN SLOOF 20X30CM, BESI Ø10 & 6PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

0,2m'0,2m'

0,95m'

0,2m'0,2m'

0,65m'

0,2m'0,2m'

0,65m'

0,3

0,2

0,3

0,2

Page 59: n 3a Pek.pengembangan

NO SKET GAMBAR

1

25.641 8.000 0.616

2

0.760 129.205 0.266

NO SKET GAMBAR

1

16.367 10.000 0.616

2

1.520 82.833 0.266

NO SKET GAMBAR

1

16.367 11.000 0.616

TOTAL BESI ø10 +Ø6TOTAL BESI + 10%

PEKERJAAN PEMBESIAN KOLOM K1 13X30CM, BESI Ø10 & 6PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

TOTAL BESI ø10 +Ø6TOTAL BESI + 10%

PEKERJAAN PEMBESIAN KOLOM K2 13X47CM, BESI Ø 10 & 6PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

TOTAL BESI ø10 +Ø6TOTAL BESI + 10%

PEKERJAAN PEMBESIAN KOLOM K3 13X47CM, BESI Ø 10 & 6PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

0,3

0,13

0,3

0,13

0,3

0,13

0,3

0,13

0,13

0,13

Page 60: n 3a Pek.pengembangan

16.367 11.000 0.616

2

1.520 82.833 0.266

NO SKET GAMBAR

1

62.500 4.000 0.395

2

0.480 313.500 0.266

NO SKET GAMBAR

1

38.462 4.000 0.616

2

0.560 193.308 0.266

TOTAL BESI ø10 +Ø6TOTAL BESI + 10%

PEKERJAAN PEMBESIAN KOLOM KP 8X20CM, BESI Ø 8 & 6PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

TOTAL BESI ø8 +Ø6TOTAL BESI + 10%

PEKERJAAN PEMBESIAN RINGBALK 13X20CM, BESI Ø 10 & 6PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

0,3

0,13

0,30

0,13

0,08

0,2

0,08

0,2

0,13

0,2

0,13

0,2

Page 61: n 3a Pek.pengembangan

0.560 193.308 0.266

NO SKET GAMBAR

1

51.282 4.000 0.395

2

0.460 257.410 0.266

NO SKET GAMBAR

1

21.978 8.000 0.891

2

0.860 110.890 0.266

NO SKET GAMBAR

1

19.231 8.000 0.891

TOTAL BESI ø10 +Ø6TOTAL BESI + 10%

PEKERJAAN PEMBESIAN BLK LATEI 13X15CM, BESI Ø 8 & 6PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

TOTAL BESI ø8 +Ø6TOTAL BESI + 10%

PEKERJAAN PEMBESIAN BLK B1 13X35CM, BESI Ø 12 & 6PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

TOTAL BESI ø12 +Ø6TOTAL BESI + 10%

PEKERJAAN PEMBESIAN BLK B2 13X40CM, BESI Ø 12 & 6PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

0,13

0,15

0,13

0,15

0,13

0,35

0,13

0,35

0,13

Page 62: n 3a Pek.pengembangan

19.231 8.000 0.891

2

0.960 97.154 0.266

NO SKET GAMBAR

1

8.333 12.000 0.616

2

1.000 82.000 0.616

NO SKET GAMBAR

1

8.333 7.667 0.395

2

1.000 54.333 0.395

TOTAL BESI ø12 +Ø6TOTAL BESI + 10%

PEKERJAAN PEMBESIAN PLAT LT.2 T=12CM, BESI Ø 10PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

TOTAL BESI ø10 TOTAL BESI + 10%

PEKERJAAN PEMBESIAN PLAT DAK T=10CM, BESI Ø 8PANJANG

(M')BANYAKNYA

(BT/BH)BERAT PER

M'

0,13

0,40

0,13

0,40

0,12

0,1

0,1

Page 63: n 3a Pek.pengembangan

1.000 54.333 0.395

TOTAL BESI ø10 +Ø6TOTAL BESI + 10%

0,1

Page 64: n 3a Pek.pengembangan

27.086

27.086

29.795

17.820

13.543

31.363

34.500

82.133

20.189

12 (FOOT PLAT) 70X70CM

VOLUME (KG)

12 (FOOT PLAT) 70X100CM

10 & 6VOLUME

(KG)

Page 65: n 3a Pek.pengembangan

102.322

112.554

126.359

26.120

152.479

167.727

100.818

33.491

134.309

147.740

110.900

Ø10 & 6VOLUME

(KG)

10 & 6VOLUME

(KG)

10 & 6VOLUME

(KG)

Page 66: n 3a Pek.pengembangan

110.900

33.491

144.391

158.830

98.750

40.028

138.778

152.655

94.769

28.795

Ø 8 & 6VOLUME

(KG)

10 & 6VOLUME

(KG)

Page 67: n 3a Pek.pengembangan

28.795

123.564

135.921

81.026

31.497

112.522

123.775

156.659

25.367

182.027

200.229

137.077

Ø 8 & 6VOLUME

(KG)

12 & 6VOLUME

(KG)

12 & 6VOLUME

(KG)

Page 68: n 3a Pek.pengembangan

137.077

24.809

161.886

178.075

61.600

50.512

112.112

123.323

25.236

21.462

Ø 10VOLUME

(KG)

PEKERJAAN PEMBESIAN PLAT DAK T=10CM, BESI Ø 8VOLUME

(KG)

Page 69: n 3a Pek.pengembangan

21.462

46.698

51.368