Joko Sampurno – Merbau Plant Senior SupervisorPrabumulih, 23 Agustus 2013
1
OPTIMALISASI PRODUKSI OPTIMALISASI PRODUKSI SUMUR-SUMUR MERBAU SUMUR-SUMUR MERBAU DENGAN PENAMBAHAN REFRIGERANT DENGAN PENAMBAHAN REFRIGERANT PACKAGEPACKAGE
GAMBARAN UMUM
• Plant merbau di buat / dibangun untuk mengolah Raw Gas dari sumur Merbau dengan kapasitas operasional plant sebesar 85 mmscfd dan produk lean gas sebesar 70 mmscfd.
• Terdapat beberapa proses operasi pada plant ini yaitu:1.Pemisahan antara gas dan cairan2.Menurunkan Kandungan CO2 ± 20% ± 5%3.Menurunkan kandungan H2O ± 20lb ± 7lb/mmscfd
PERALATAN UTAMA
• SeparationSeparation System System• CO2 RemovalCO2 Removal UnitUnit• DehydrationDehydration UnitUnit• Refrigerant PackageRefrigerant Package
1. SEPARATION SYSTEM
Test Separator (V-33-201)HP Separator (V-33-202)HP Scrubber (V-33-205)MP Separator (V-33-203)LP Separator (V-33-204)
2. CO2 REMOVAL UNIT
CO2 ABSORBER (V-33-301)CO2 ABSORBER (V-33-301) HP FLASH DRUM (V-33-302)HP FLASH DRUM (V-33-302) AMINE REGENERATOR (V-33-303)AMINE REGENERATOR (V-33-303) AMINE REGENERATOR REBOILER (HE-33-322 A/B)AMINE REGENERATOR REBOILER (HE-33-322 A/B) AMINE REFLUX PUMP (P-33-333 A/B)AMINE REFLUX PUMP (P-33-333 A/B) AMINE REGENERATOR OVERHEAD SEPARATOR (V-33-304)AMINE REGENERATOR OVERHEAD SEPARATOR (V-33-304) AMINE/AMINE HEAT EXCHANGER (HE-33-321 A/B)AMINE/AMINE HEAT EXCHANGER (HE-33-321 A/B) AMINE FILTER (F-33-351/352/353)AMINE FILTER (F-33-351/352/353) LEAN AMINE PUMP (P-33-331 A/B)LEAN AMINE PUMP (P-33-331 A/B) AMINE BOOSTER PUMP (P-33-332 A/B)AMINE BOOSTER PUMP (P-33-332 A/B)
DEHYDRATION UNIT
GLYCOL CONTACTORGLYCOL CONTACTOR (V-33- (V-33-4401)01)GLYCOL FLASH DRUM GLYCOL FLASH DRUM (V-33- (V-33-4402)02)GLYCOL ACCUMULATORGLYCOL ACCUMULATOR (V-33- (V-33-440055))GLYCOL REBOILER GLYCOL REBOILER (HE-33-(HE-33-423423))GLYCOL SUMP DRUM SUMP DRUM (P-33- (P-33-432432))GLYCOL RECIRCULATION PUMPSGLYCOL RECIRCULATION PUMPS ( (P P -33--33-431 A/B431 A/B))GLYCOL REFLUX CONDENSERGLYCOL REFLUX CONDENSER ( (HE – 33- 422HE – 33- 422))GLYCOL STILL COLOUMN ( V-33-404 )GLYCOL STILL COLOUMN ( V-33-404 )STRIPPING COLOUMN ( V-33-407 )STRIPPING COLOUMN ( V-33-407 )COLD /HOT LEAN RICH GLYCOL HEAT EXCHANGER ( HE-33-424 A/ B )COLD /HOT LEAN RICH GLYCOL HEAT EXCHANGER ( HE-33-424 A/ B )GAS/GLYCOL HEAT EXCHANGER ( HE -33-421 )GAS/GLYCOL HEAT EXCHANGER ( HE -33-421 )GLYCOL CHARCOAL FILTER ( F-33-452 )GLYCOL CHARCOAL FILTER ( F-33-452 )GLYCOL GLYCOL SOLIDSOLID FILTERFILTER( F-33-451 A/B )( F-33-451 A/B )
Flow Diagram Dehydration Units
TO OILY WATER SEWER
REMOVAL UNITWET GAS FROM CO2
V-33-401
LC
LC
HE-33-421
V-33-402
LC
V-33-405
F-33-452
F-33-451A/B
P-33-431 A/B
FT
HE-33-422
V-33-404
TC
HE-33-423
TO ATM
HE-33-424 A/B
V-33-403
SDV
SDV
FUEL GASFI
EDPVFLARE
ESDV
PC
FLASH GAS TO FLARE
STRIPPING GASTO SAFE LOCATION
TO PAGARDEWATRANSMISSION LINE
ESDV
TO FUEL GAS
TO SAFE
DRAIN HEADER
GLYCOL
V-33-407
TO CLOSED DRAIN
CWS
V-33-406
P-33-434
M
M P-33-432
DRAIN
GLYCOL
LOCATION
4. REFRIGERANT PACKAGE
• Penambahan refrigerant package diperlukan karena adanya kenaikan temparature operasi dari sumur-sumur yang ada di Merbau
• Refrigerant package dibangun dengan tujuan untuk memaksimalkan operasional dari plant Merbau
• Refrigerant package dapat dioperasikan maksimum pada temperature 146 ºF dengan flow 85 mmscfd
• Temperature gas dari sumur bisa diturunkan dengan refrigerant package sampai dengan 60 ºF
PERALATAN UTAMA REFRIGERANT PACKAGE
• Gas-gas Recuperative (HE-33-201R)• Evaporator (HE-33-202R)• Compressor (K-33-208R A/B/C)• Condenser (AFC-33-208R A/B/C/D)• Liquid Receiver (V-33-210R)
PERBANDINGAN DATA OPERASI
Agustus 2012(Avg.)
Agustus 2013(Avg.)
Flow Gas In (mmscfd)
37.82 35.86
Temp. In (ºF) 127 137
Temp. Out Evaporator (ºF)
- 61
Flow Gas Produksi (mmscfd)
30.59 29.36
Produksi Kondensat (bbls)
575 651