21
TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 SOAL 1 No Massa Tanah % Tanah Ayakan Diameter Tertahan Tertahan % Tanah Lolos Pada Tiap USA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan (mm) (gr) (gr) (gr) .(1) .(2) .(3) .(4) .(5) 4 4.75 0 0 100 10 2 21.6 4.8 95.2 20 0.85 49.5 11 84.2 40 0.425 102.6 22.8 61.4 60 0.25 89.1 19.8 41.6 100 0.15 95.6 21.24 20.36 200 0.075 60.4 13.42 6.93 pan 31.2 6.93 0 Tota l 450 DISTRIBUSI BUTIRAN % Lolos CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 1

Transcript of Mektan I Tugas IV

Page 1: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

SOAL 1

No Massa Tanah % TanahAyakan Diameter Tertahan Tertahan % Tanah Lolos

Pada TiapUSA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan

(mm) (gr) (gr) (gr).(1) .(2) .(3) .(4) .(5)4 4.75 0 0 10010 2 21.6 4.8 95.220 0.85 49.5 11 84.240 0.425 102.6 22.8 61.460 0.25 89.1 19.8 41.6

100 0.15 95.6 21.24 20.36200 0.075 60.4 13.42 6.93pan 31.2 6.93 0

Total 450

DISTRIBUSI BUTIRAN

% L

olos

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 1

Page 2: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

100

90

80

70D

60 6050

40D

30 3020

D10 10

0

0.01 0.09 0.1 0.19 0.4 1 10

Diameter Butiran (mm)

Dia(mm) Cu Cc

D10 0.09 4.4 1.00D30 0.19D60 0.4

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 2

Page 3: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

SOAL 2

Diketahui : D10 = 0.1 mmD30 = 0.41 mmD60 = 0.62 mm

Ditanya : Koefisien Keseragaman (CU) dan Koefisien Gradasi (CC)Jawab:

DC = 60 = 0.62 = 6.2

U D10 0.1(D )

2C (0.41) 2

30

C

= D xD

== 2.711

60 10 0.62x0.1

SOAL 3

Diketahui : D10 = 0.082 mm

D30 = 0.29 mmD60 = 0.51 mm

Ditanya : Koefisien Keseragaman (CU) dan Koefisien Gradasi (CC)

Jawab:

CU=D

60=0.51

=6.222D100.082

CC=(D )

2(0.29) 2

= 2.01130 =

D xD60 10 0.51x0.82

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 3

Page 4: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

SOAL 4

No Massa Tanah % TanahAyakan Diameter Tertahan Tertahan % Tanah Lolos

Pada TiapUSA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan

(mm) (gr) (gr) (gr).(1) .(2) .(3) .(4) .(5)4 4.75 0 0 1006 3.35 30 6 9410 2 48.7 9.74 84.2620 0.85 127.3 25.46 58.840 0.425 96.8 19.36 39.4460 0.25 76.6 15.32 24.12

100 0.15 55.2 11.04 13.08

200 0.075 43.4 8.68 4.40pan 22 4.40 0.00

Total 500

DISTRIBUSI BUTIRAN

% L

olos

D60

D30

D10

0.01

100

90

80

70

6050

40

3020

10

0.31 0 0.95

0.1 0.125

1 10Diameter Butiran (mm)

Dia(mm) Cu Cc

D10 0.125 7.6 0.81D30 0.31D60 0.95

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 4

Page 5: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

3

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 5

Page 6: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

SOAL 5

No Massa Tanah % TanahAyakan Diameter Tertahan Tertahan % Tanah Lolos

Pada TiapUSA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan

(mm) (gr) (gr) (gr).(1) .(2) .(3) .(4) .(5)4 4.75 0 0 1006 3.35 0 0 10010 2 0 0 100

20 0.85 9.1 1.82 98.1840 0.425 249.4 49.88 48.360 0.25 179.8 35.96 12.34

100 0.15 22.7 4.54 7.80200 0.075 15.5 3.10 4.70pan 23.5 4.70 0.00

Total 500

DISTRIBUSI BUTIRAN

100

90

80

70D

% L

olos

60

D

6050

40

30 3020

D10 10

0.185 0.325 0.5 00.01 0.1 1 10

Diameter Butiran (mm)

Dia(mm) Cu Cc

D10 0.185 2.7 1.14D30 0.325D60 0.5

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 6

Page 7: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

4

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 7

Page 8: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I

ZUL ANWAR 1310015211092

SOAL 6

NoAyakan Diameter % Tanah Lolos

USA ayakan Pada Tiap Ayakan(mm) (gr)

.(1) .(2) .(3)20 0.85 10040 0.425 92.160 0.25 85.8

0.15 77.3200 0.075 62

0.04 50.800.02 41.000.01 34.30

0.006 29.000.002 23.00

DISTRIBUSI UKURAN BUTIRAN SISTEMMIT

% L

olos

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 8

Page 9: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I

ZUL ANWAR 1310015211092

100 0.002 0.06 2

90

80

70

60

50 58%

40

30

20 23%10

0 Ukuran Butiran (mm)

0.001 0.01 0.1 1 10

Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel )

Persentase ButiranMenurut Sistem MIT

Jenis Tanah %Gravel 0Sand 42Silt 35Clay 23

Total 100

5

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 9

Page 10: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

SOAL 7

NoAyakan Diameter % Tanah Lolos

USA ayakan Pada Tiap Ayakan(mm) (gr)

.(1) .(2) .(3)20 0.85 10040 0.425 92.160 0.25 85.8

0.15 77.3200 0.075 62

0.04 50.800.02 41.000.01 34.30

0.006 29.000.002 23.00

DISTRIBUSI UKURAN BUTIRAN SISTEM USDA

100 0.00 0.05 2

90

80

70

Lol

os 60

50 55

%

40

30

20

10 23

0

0.001 0.01 0.1 1 Ukuran Butiran (mm) 10Clay Lanau (Silt ) Pasir Kerikil(Gravel )

Persentase ButiranMenurut Sistem USDA

Jenis Tanah %Gravel 0Sand 45Silt 32Clay 23

Total 100

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 10

Page 11: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

6

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 11

Page 12: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

SOAL 8

NoAyakan Diameter % Tanah Lolos

USA ayakan Pada Tiap Ayakan(mm) (gr)

.(1) .(2) .(3)20 0.85 100

40 92.10.425

60 85.80.25

77.30.15

200 620.075

50.800.04

41.000.02

34.300.01

29.000.006

23.000.002

DISTRIBUSI UKURAN BUTIRAN SISTEM AASTHO

100 0.00 0.07 2

90

80

70

L o l o

60 62%50

40

3020

23%

10

0 Ukuran Butiran (mm)

0.001 0.01 0.1 1 10

Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel )

Persentase ButiranMenurut SistemAASTHO

Jenis Tanah %Gravel 0Sand 38Silt 39Clay 23

Total 100

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 12

Page 13: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

7

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 13

Page 14: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH

I

ZUL ANWAR

1310015211092

SOAL 9

NoAyakan Diameter % Tanah Lolos

USA ayakan Pada Tiap Ayakan(mm) (gr)

.(1) .(2) .(3)20 0.85 10040 0.425 10060 0.25 94.1

0.15 79.3200 0.075 34.1

0.04 28.000.02 25.200.01 21.80

0.006 18.900.002 14.00

% L

olos

DISTRIBUSI UKURAN BUTIRAN SISTEM

MIT

100 0.002 0.06 2

90

80

70

60

50

40

30 32%20

10 14%0 Ukuran Butiran (mm)

0.001 0.01 0.1 1 10

Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel )

Persentase ButiranMenurut Sistem MIT

Jenis Tanah %Gravel 0Sand 68Silt 18Clay 14

Total 100

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 14

Page 15: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH

I

ZUL ANWAR

1310015211092

8

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 15

Page 16: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

SOAL 10

NoAyakan Diameter % Tanah Lolos

USA ayakan Pada Tiap Ayakan(mm) (gr)

.(1) .(2) .(3)20 0.85 10040 0.425 10060 0.25 94.1

0.15 79.3200 0.075 34.1

0.04 28.000.02 25.200.01 21.80

0.006 18.900.002 14.00

DISTRIBUSI UKURAN BUTIRAN SISTEM USDA

% L

olos

0.002 0.05 2100

90

80

70

60

50

40

30

20 29

10 14%0

0.001 0.01 0.1 1 Ukuran Butiran (mm) 10Clay Lanau (Silt ) Pasir Kerikil(Gravel )

Persentase Butiran Menurut Sistem USDAJenis Tanah %

Gravel 0Sand 71Silt 15Clay 14

Total 100

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 16

Page 17: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

9

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 17

Page 18: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH

I

ZUL ANWAR

1310015211092

SOAL 11

NoAyakan Diameter % Tanah Lolos

USA ayakan Pada Tiap Ayakan(mm) (gr)

.(1) .(2) .(3)20 0.85 10040 0.425 10060 0.25 94.1

0.15 79.3200 0.075 34.1

0.04 28.000.02 25.200.01 21.80

0.006 18.900.002 14.00

% L

olos

DISTRIBUSI UKURAN BUTIRAN SISTEM AASTHO

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 18

Page 19: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH

I

ZUL ANWAR

1310015211092

1000.002 0.07 2

90

80

70

60

50

40

30 34.120

10 14%0 Ukuran Butiran (mm)

0.001 0.01 0.1 1 10

Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel )

Persentase Butiran Menurut Sistem AASTHO

Jenis Tanah %Gravel 0Sand 65.9Silt 20.1Clay 14

Total 100

10

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 19

Page 20: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

SOAL 12

Diket: Uji hydrometer GS = 2.70

T = 22° C L = 11.9 cmt. = 30 menit

Ditanya : Diameter ukuran butir terkecil

Jawab: Berdasarkan Tabel 1.7 (hal 20) didapat nilai K = 0.01199

D = K L = 0.01199 11.9= 0.001887 mm

t 30

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 20

Page 21: Mektan I Tugas IV

TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092

11

CIVIL ENGINEERINGBUNG HATTA UNIVERSITY Page 21