MATERI KURSUS

5
ALAMAT : JL SAMBIREJO 11A, GEMPOL, CC, YOGYA PERUM BALEASRI U.13 JL . WATES KM 9, YOGYA [email protected] MATERI KURSUS GEOPROGRAM GEOCOURSE Kursus, konsultasi & bimbingan geosciences HP 081392540410, 0274 9801575 1. COREL DRAW : - SETING HALAMAN, IMPORT PETA RASTER, EDITING SIZE DAN POSISI - FUNGSI DAN PENGUNAAN LAYER - DIGITASI PETA (KONTUR, SUNGAI, JALAN, LITOLOGI) - PENAMPANG DAN REKONSTRUKSI GEOLOGI - PENENTUAN KOMPOSISI WARNA OUTLINE DAN FILL - CROP PETA DAN FOTO, PENGATURAN SKALA DAN LAY OUT PETA - KOLOM STRATIGRAFI, PROFIL BATUAN, TEBAL LITOLOGI - 3 D BLOK , IMPORT DAN EKSPORT JPG, PDF DLL 2. SURFER : - INPUT DATA & GRIDING - PETA KONTUR, PLOTING LOKASI (SINGKAPAN, TITIK BOR, LINTASAN DLL (POS MAP), VEKTOR MAP, - MATH GRID, TERAIN SLOPE, PENAMPANG 3D (SLICE GRID) - MODEL 3 D , 3D SURFACE,3D DIBELAH (TABEL & BLANK GRID) & PEWARNAAN - OVERLAY MAP, STACK MAP,VOLUME TOPOGRAFI, CUT & FILL , - CADANGAN DAN SR BATUBARA - DIGITASI PETA RASTER UNTUK UNTUK PETA KONTUR DAN 3D DLL. - GLOBAL MAPPER : - REGISTRASI PETA, DIGITASI, MEMBUKA FILE BERMACAM PROGRAM - GENERATE KONTUR ,PEMBUATAN 3 D DAN PENAMPANG EXPORT DATA KE XYZ, DXF, MIF, SHP - AREA, VOLUME AREA BOUNDARY, VOLUME PENAMPANG - OVERLAY 3D PETA RUPA BUMI, GEOLOGI dll 3. DIPS : - KONSEP & ANALISA KEKAR (ZONA LEMAH) - KONSEP & ANALISA LIPATAN * - KONSEP & ANALISA SESAR - ANALISA JENIS LONGSORAN BATUAN* (* = PILIHAN BISA DIAMBIL/TIDAK) GEOSLOPE / ROCKSLIDE : - SETING HALAMAN, GRID - SKETSA PENENTUAN SLOPE, TINGGI SLOPE, BENCH DLL - PENGGAMBARAN LERENG - PEMASUKAN DATA PROPERTI SOIL/LAPISAN BATUAN - PERHITUNGAN FAKTOR KEAMANAN DAN STABILITAS LERENG 4. AUTOCAD LAND DEVELOPMENT (ALD) : - SETING FORMAT PROJECT/FILE , PEMBUATAN LAYER DLL - INPUT DATA TITIK PENGUKURAN (X,Y,Z) , PEMBUATAN DESIGN JALAN 2D DAN EDITING - PLOTING LOKASI/ STRIKE-DIP, PEMBUATAN GRID KOORDINAT. - IMPORT DATA TITIK DARI NOTEPAD (EXCEL DLL). - PEMBUATAN KONTUR, LABEL KONTUR, PERSEN LERENG, AREA DAS - PEMBUATAN JALAN 3D DENGAN ELEVASI DAN SLOPE - PERHITUNGAN KETINGGIAN, JARAK, SLOPE, RADIUS, LUAS - DIGITASI PETA, KONTUR , SUNGAI DAN PENAMPANG TOPOGRAFI * - VOLUME DAN PENAMPANG TOPOGRAFI DAN TANAH KUPASAN( METODE GRID, COMPOSITE, AVERAGE AREA DAN PRISMOIDAL) * ( * = BISA DIGANTI STUDI KHUSUS) - 3DGRID, 3D FACE AUTOCAD QUICKSURF : - INPUT DATA X, Y, Z FORMAT QUICKSURF - PEMBUATAN KONTUR , SURFACE, PENAMPANG DAN VOLUME TOPOGRAFI DENGAN QUICKSURF STUDI KHUSUS AUTOCAD LAND DEVELOPMENT : - PERENCANAAN BOR DAN PREDIKSI KEDALAMAN BATUBARA - PEMBUATAN KONTUR STRUKTUR DAN CROPLINE BATUBARA (SURFACE ) - PENAMPANG LAPISAN- LAPISAN BATUBARA BAWAH PERMUKAAN - PERHITUNGAN CADANGAN BATUBARA DAN STRIPPING RATIO (METODE SURFACE)

Transcript of MATERI KURSUS

Page 1: MATERI KURSUS

ALAMAT : JL SAMBIREJO 11A, GEMPOL, CC, YOGYA PERUM BALEASRI U.13 JL . WATES KM 9, YOGYA

[email protected]

MATERI KURSUS GEOPROGRAM GEOCOURSE Kursus, konsultasi & bimbingan geosciences

HP 081392540410, 0274 98015751. COREL DRAW :

- SETING HALAMAN, IMPORT PETA RASTER, EDITING SIZE DAN POSISI- FUNGSI DAN PENGUNAAN LAYER - DIGITASI PETA (KONTUR, SUNGAI, JALAN, LITOLOGI)- PENAMPANG DAN REKONSTRUKSI GEOLOGI- PENENTUAN KOMPOSISI WARNA OUTLINE DAN FILL- CROP PETA DAN FOTO, PENGATURAN SKALA DAN LAY OUT PETA- KOLOM STRATIGRAFI, PROFIL BATUAN, TEBAL LITOLOGI- 3 D BLOK , IMPORT DAN EKSPORT JPG, PDF DLL

2. SURFER : - INPUT DATA & GRIDING- PETA KONTUR, PLOTING LOKASI (SINGKAPAN, TITIK BOR, LINTASAN DLL (POS

MAP), VEKTOR MAP, - MATH GRID, TERAIN SLOPE, PENAMPANG 3D (SLICE GRID)- MODEL 3 D , 3D SURFACE,3D DIBELAH (TABEL & BLANK GRID) & PEWARNAAN - OVERLAY MAP, STACK MAP,VOLUME TOPOGRAFI, CUT & FILL ,- CADANGAN DAN SR BATUBARA - DIGITASI PETA RASTER UNTUK UNTUK PETA KONTUR DAN 3D DLL.

- GLOBAL MAPPER : - REGISTRASI PETA, DIGITASI, MEMBUKA FILE BERMACAM PROGRAM - GENERATE KONTUR ,PEMBUATAN 3 D DAN PENAMPANG EXPORT DATA KE XYZ,

DXF, MIF, SHP - AREA, VOLUME AREA BOUNDARY, VOLUME PENAMPANG - OVERLAY 3D PETA RUPA BUMI, GEOLOGI dll

3. DIPS : - KONSEP & ANALISA KEKAR (ZONA LEMAH) - KONSEP & ANALISA LIPATAN * - KONSEP & ANALISA SESAR - ANALISA JENIS LONGSORAN BATUAN* (* = PILIHAN BISA DIAMBIL/TIDAK) GEOSLOPE / ROCKSLIDE : - SETING HALAMAN, GRID - SKETSA PENENTUAN SLOPE, TINGGI SLOPE, BENCH DLL - PENGGAMBARAN LERENG - PEMASUKAN DATA PROPERTI SOIL/LAPISAN BATUAN - PERHITUNGAN FAKTOR KEAMANAN DAN STABILITAS LERENG

4. AUTOCAD LAND DEVELOPMENT (ALD) : - SETING FORMAT PROJECT/FILE , PEMBUATAN LAYER DLL - INPUT DATA TITIK PENGUKURAN (X,Y,Z) , PEMBUATAN DESIGN JALAN 2D DAN

EDITING - PLOTING LOKASI/ STRIKE-DIP, PEMBUATAN GRID KOORDINAT. - IMPORT DATA TITIK DARI NOTEPAD (EXCEL DLL). - PEMBUATAN KONTUR, LABEL KONTUR, PERSEN LERENG, AREA DAS

- PEMBUATAN JALAN 3D DENGAN ELEVASI DAN SLOPE - PERHITUNGAN KETINGGIAN, JARAK, SLOPE, RADIUS, LUAS

- DIGITASI PETA, KONTUR , SUNGAI DAN PENAMPANG TOPOGRAFI *- VOLUME DAN PENAMPANG TOPOGRAFI DAN TANAH KUPASAN( METODE GRID,

COMPOSITE, AVERAGE AREA DAN PRISMOIDAL) * ( * = BISA DIGANTI STUDI KHUSUS)

- 3DGRID, 3D FACE AUTOCAD QUICKSURF : - INPUT DATA X, Y, Z FORMAT QUICKSURF - PEMBUATAN KONTUR , SURFACE, PENAMPANG DAN VOLUME TOPOGRAFI

DENGAN QUICKSURF

STUDI KHUSUS AUTOCAD LAND DEVELOPMENT : - PERENCANAAN BOR DAN PREDIKSI KEDALAMAN BATUBARA

- PEMBUATAN KONTUR STRUKTUR DAN CROPLINE BATUBARA (SURFACE )- PENAMPANG LAPISAN- LAPISAN BATUBARA BAWAH PERMUKAAN

- PERHITUNGAN CADANGAN BATUBARA DAN STRIPPING RATIO (METODE SURFACE) VOLUME METODE SOLID (TAMBAHAN BISA DIAMBIL/TIDAK):

- SOLID TOPOGRAFI DAN SOLID BATUBARA- VOLUME SOLID OB , VOLUME SOLID BATUBARA DAN STRIPPING RATIO

DESIGN TAMBANG OPEN PIT ( TAMBAHAN BISA DIAMBIL/TIDAK)- PEMBUATAN PIT BOTOM , PENENTUAN BENCH DAN BERM- PENENTUAN RAMP, PEMBUATAN SPIRAL- VOLUME OB DAN BATUBARA TERAMBIL

( BONUS PROGRAM SESUAI PROGRAM YANG DIAMBIL )

Page 2: MATERI KURSUS

ALAMAT : JL SAMBIREJO 11A, GEMPOL, CC, YOGYA PERUM BALEASRI U.13 JL . WATES KM 9, YOGYA

[email protected]

GEOCOURSE Kursus, konsultasi & bimbingan geosciences

HP 081392540410, 0274 9801575

PROGRAM-PROGRAM SIG :

5. MAP INFO ( SIG) : - PENGENALAN MENU-MENU - REGISTRASI PETA RASTER , VEKTOR DAN KONVERSI KOORDINAT - DIGITASI DAN TOPOLOGI : KONTUR , LITOLOGI DLL - PLOTING LOKASI KOORDINAT : SINGKAPAN, LOKASI PENGAMATAN DLL. - PEMBUATAN HOTLINK FOTO, GRAFIK, GRID KOORDINAT UTM DAN GEOGRAFIS - EDITING PETA DAN TABEL(UPDATE COLUM : JARAK, TINGGI, LUAS DLL, QUERY

DATA) DAN PENGGABUNGAN TABEL - PEMBUATAN BUFFER DAERAH PENGARUH - GEOCODING , PETA TEMATIK DAN PETA 3D , 3D DIBELAH - PEMBUATAN KONTUR ISO KIMIA MINERAL , PENAMPANG TOPOGRAFI, OVERLAY

SURFACE.* - KLASIFIKASI LERENG (PETA GEOMORFOLOGI) DAN VOLUME TOPOGRAFI * - LAYOUT PETA- STUDI KHUSUS MAP INFO (* BISA DIGANTI STUDI KHUSUS)

a. PEMBUATAN STRUKTUR DATA PEMBORAN, SETING DATA, PLOT LOG BOR, SECTION BOR

b. PERHITUNGAN CADANGAN METODE PENAMPANG DAN STRIPING RATIO BATUBARA*

c. PERHITUNGAN CADANGAN EMAS DENGAN BUFFER DAN RATA2 KADAR * (* =PILIH SALAH SATU )

6. ARCGIS(SIG) : - PENGENALAN MENU-MENU - REGISTRASI , TOPOLOGI, KONVERSI KOORDINAT - LABEL,PEMBUATAN HOTLINK FOTO, TEKS. - MENAMPILKAN FILE AUTOCAD DLL

- 3 D ANALIS : PENAMPANG, KONTUR, RUNOF AIR,3 D LAPISAN BAWAH PERMUKAAN

- VOLUME CUT AND FILL, OVERLAY 3D AND PETA 2D, CADANGAN BATUBARA - SPATIAL ANALYSIS : RASTER GRID , KONTUR, SLOPE, HILLSHADE, MAP QUERY - GEOPROCESSING ,SCORING DAN QUERY - PERHITUNGAN PROSEN LERENG (SLOPE) DAN KLASIFIKASI LERENG (Van

Zuidam) - PEMBUATAN PETA POTENSI PEMUKIMAN/RAWAN LONGSOR/PENCEMARAN * - LAYOUT PETA , EXSPORT KE PROGRAM LAIN (* SALAH SATU) - ARCVIEW : (MATERI = ARCGIS)

- REGISTRASI, KONVERSI KOORDINAT DLL - 3D ANALIS AND SPASIAL ANALIS DLL- LAYOUT PETA DLL

- R TO V : - REGISTRASI DAN DIGITASI OTOMATIS

- EDITING ELEVASI - EKSPOR DATA KE MAP INFO , AUTOCAD, SURFER 3D (X,Y,Z).

7. KURSUS & BIMBINGAN PEMBUATAN TUGAS AKHIR PETA2 DAN DRAFT

( GEOLOGI, GEOMORFOLOGI, PETA2 SIG, PETA2 AUTOCAD, PETA2 STUDI KHUSUS) , PERENCANAAN TAMBANG, DRAFT LAPORAN PENELITI AN,SKRIPSI, THESIS, SEMINAR DLL.

(KURSUS BIMBINGAN AKTIF)

( BONUS PROGRAM SESUAI PROGRAM YANG DIAMBIL )

Page 3: MATERI KURSUS

ALAMAT : JL SAMBIREJO 11A, GEMPOL, CC, YOGYA PERUM BALEASRI U.13 JL . WATES KM 9, YOGYA

[email protected]

PROGRAM GEOMODEL : 8. ROCK WORK :

- FORMAT DATA & INPUT DATA PROJECT- PETA KONTUR, 3D GRID, PENAMPANG TOPOGRAFI- PLOTING STRIKE DIP DAN PLOTING KE PETA DASAR- EKSPORT FORMAT 2 D KE 3D , DXF- ANALISA SLOPE DAN GRADIEN SLOPE, ARAH ALIRAN AIR- METODE TIGA TITIK DAN PREDIKSI BOR- PENAMPANG VERTIKAL LOG BOR 2D DAN 3D- KORELASI ANTAR LOG BOR, MODEL STRUKTUR LAPISAN BATUAN- PROFIL/ PENAMPANG ANTAR TITIK BOR, DIAGRAM PAGAR ANTAR TITIK BOR- CADANGAN METODE PENAMPANG DAN SR- ISOPACH & MODEL SOLID 3 D ANTAR LUBANG BOR- ROSET DIAGRAM DAN STEREONET ANALISA KEKAR DAN MINERALISASI- BLOK DAN SOLID MODELING 3D EMAS / BATUBARA PERMUKAAN DAN BAWAH

PERMUKAAN- BLOK DAN SOLID MODELING 3D EMAS/BATUBARA DIBELAH- PENGGABUNGAN MODELING TOPOGRAFI DAN EMAS/ BATUBARA BAWAH

PERMUKAAN - PERHITUNGAN CADANGAN MINERAL (EMAS DLL) DAN BATUBARA METODE SOLID- UTILITY

- LOG PLOT : - PENGENALAN MENU-MENU

- INPUT DATA DAN EDITING LOG DESIGN - PROCESSING DATA DAN TAMPILAN LAY OUT LOG DESIGN

9. MINESCAPE(MINCOM) / STRATMODEL :

- PEMBUATAN FORMAT DATA KONTUR, SURVEY DAN PEMBORAN - PEMBUATAN KONTUR - PEMBUATAN SURFACE TOPOGRAFI - PEMASUKAN DATA PEMBORAN - PEMBUATAN PENAMPANG (SECTION) BATUBARA - PEMBUATAN CROPLINE - PEMBUATAN KONTUR STRUKTUR BATUBARA - PEMBUATAN KONTUR STRIPPING RATIO BATUBARA - PERHITUNGAN CADANGAN MEASURED, INDICATED DAN INFERRED

QUALITY : - MENDIFINISIKAN KUALITAS

- MEMBUAT KUALITAS MODEL- MEMBUAT KOMPOSIT KUALITAS- MEMBUAT KONTUR KUALITAS-

OPENCUT DESIGN :-SIMULATION PIT SHELL -CREATE SOLID-MINING RESERVE-RESERVE BLOCK-STRIP AND LEVEL BY LEVEL-CREST- TOE AND RAMP

10. SURPAC : - PEMBUATAN FORMAT DATA KONTUR, DAN PEMBORAN - PEMBUATAN KONTUR DAN SOLID TOPOGRAFI - MEMASUKAN DATA BASE PEMBORAN - SECTION, CROPLINE - PERHITUNGAN CADANGAN BATUBARA DTM - PERHITUNGAN CADANGAN BATUBARA DENGAN BLOK MODEL - DESIGN TAMBANG OPEN PIT - CONTOH PERHITUNGAN CADANGAN EMAS DENGAN BLOK MODEL

11. PENGENALAN PETREL: - ANALISA DATA SUMUR : (WELL HEADS, WELL PARTS/DEVIATION/TRACE,WELL LOGS,

WELL TOP, WELL PICK AND PETA SURFACE - ANALISA DATA SEISMIK ( INTERPRETASI SESAR, INTERPRETASI HORISON DAN PETA

INTERPRETASI SEISMIK, SEISMIK PICK, PETA SURFACE - GEOLOGI MODELING ( MODEL SESAR, MODEL HORISON, PEMBUATAN ZONA,

KONTAK HIDROKARBON) - PROPERTI MODELING DAN CADANGAN HIDRO KARBON

( BONUS PROGRAM SESUAI PROGRAM YANG DIAMBIL )

Page 4: MATERI KURSUS

ALAMAT : JL SAMBIREJO 11A, GEMPOL, CC, YOGYA PERUM BALEASRI U.13 JL . WATES KM 9, YOGYA

[email protected]

KETENTUAN KURSUS

1. MATERI KURSUS YANG DIAJARKAN SESUAI DENGAN BROSUR KURSUS JIKA ADA KELEBIHAN BERARTI BONUS

2. SELURUH MATERI YANG ADA DI BROSUR KURSUS AKAN DISAMPAIKAN SEMUA KE PESERTA KURSUS

3. UNTUK PROGRAM KURSUS KLAS PESERTA KURSUS HARUS SABAR MENUNGGU GILIRAN DIBERI PANDUAN DAN PENGARAHAN DARI TUTOR/PEMBIMBING

4. PESERTA KURSUS MAKSIMAL 3 X PERTEMUAN TIDAK MASUK HARUS MEMBERI KA BAR (IZIN)/ SMS/TELP JIKA TIDAK JADWAL BISA BERUBAH ATAU DIISI ORANG LAIN.

5. PESERTA KURSUS YANG IZIN LEBIH DARI 1 BULAN (KERJA DLL.) HARUS MEMBUAT SURAT IZIN YANG DITANDA TANGANI.

6. PESERTA KURSUS DALAM WAKTU MAKSIMAL 1 BULAN TIDAK ADA KABAR/SMS /TELP DIANGGAP GUGUR.

7. UNTUK JADWAL KURSUS PESERTA KURSUS BISA MEMILIH DARI DUA KELAS YAITU :

KELAS A = SENIN - RABU - JUMAT KELAS B = SELASA – KAMIS – SABTU JAM KURSUS :

-9.00 SD 11.00 WIB- 11.00 SD 13.00 WIB- 13. 30 SD 15.30 WIB

TANGGAL MERAH LIBUR ADMINISTRASI :1. CALON PESERTA KURSUS DIANGGAP SERIUS AKAN MENGAMBIL JADWAL

KURSUS JIKA SUDAH MEMBERIKAN UANG TANDA JADI MINIMAL 15 % DARI BEAYA KURSUS , PESERTA AKAN DIBERIKAN JADWAL YANG SESUAI

2. UNTUK PEMBAYARAN BEAYA KURSUS HARUS LANGSUNG LUNAS DIDEPAN SEBELUM PESERTA MULAI MENGIKUTI KURSUS.

3. BEAYA KURSUS YANG SUDAH DI BAYAR TIDAK BISA DITARIK KEMBALI.

Condong Catur, …………………

Menyetujui Peserta :

(……………………. ……………) No Hp : …………………