DAFTAR HARGA SATUAN UPAH KABUPATEN PASER BIDANG KE CIPTA KARYAAN TAHUN ANGARAN 2012

NO

Uraian

11 2 3 4 5 6 7 8 9 10 11 12

2Buruh Terampil/Pekerja Tukang Kayu Tukang Batu Tukang Besi Tukang Cat Kepala Tukang MandorPembantu Supir Mekanik Pembantu Mekanik Operator Pembantu Operator

Upah (Rp) 12

Ket 13 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja 1 hari = 7 jam kerja

55,000.00 75,000.00 75,000.00 75,000.00 75,000.00 80,000.00 90,000.00 50,000.00 75,000.00 50,000.00 80,000.00 50,000.00

DAFTAR HARGA SATUAN MATERIAL KONSTRUKSI KABUPATEN PASER BIDANG KE CIPTA KARYAAN TAHUN ANGARAN 2012

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

1 Semen 1 2 3 4 5 5 6 1 2 3 4 5 6 7 8 Semen Tonasa Semen Tonasa Semen Gresik Semen Gresik Semen PC Semen Warna Semen Putih Kawat Kawat Wiremesh Kawat Las Kawat Las Kawat Las Kawat Bendrat Kawat Nyamuk Kawat Kasa Kawat Duri Besi Beton

2 1 zak 1 zak 1 zak 1 zak = = = = 50 40 50 40 kg kg kg kg

3

4 Zak Zak Zak Zak kg kg kg

5 66,000 58,300 67,100 59,400 1,342 11,000 2,860 3,300,000 143,000 154,000 220,000 23,100 25,300 17,325 89,100

6 60,000 53,000 61,000 54,000 10,000 2,600 3,000,000 130,000 140,000 200,000 21,000 23,000 15,750 81,000

7

8 6,000 5,300 6,100 5,400 1,000 260 300,000 13,000 14,000 20,000 2,100 2,300 1,575 8,100 -

9

Ukuran Ukuran Ukuran Ukuran

8 2.6 3.2 4

mm mm mm mm

x RB RB RB

2.25

m

x

50 m

Roll Dos Dos Dos Kg m' m' Roll

26 @ 26 @ 26 @

Lebar Lebar

90 cm 90 cm

Besi Beton Polos ( Full ) 1 2 3 4 5 6 7 Besi beton polos U-22 Besi Beton Besi Beton Besi Beton Besi Beton Besi Beton Besi Beton Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran 6 8 10 12 14 16 mm mm mm mm mm mm kg Batang Batang Batang Batang Batang Batang 12,534 28,600 41,800 63,800 90,200 182,600 248,600 26,000 38,000 58,000 82,000 166,000 226,000

2,600 3,800 5,800 8,200 16,600 22,600

8

Besi Beton

Ukuran

18

mm

Batang

306,900

279,000

27,900

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

Besi Beton Ulir 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Besi beton Ulir U-32 Besi Beton Ulir Besi Beton Ulir Besi Beton Ulir Besi Beton Ulir Baut Mur Klam U Klam Plat Baut Dan Mur Baut dan Mur Baut dan Mur Paku Paku Triplek Paku Payung Paku Ulir Paku Sumbat Paku Sekrup Paku Sekrup Paku Sekrup Paku Sekrup Paku Seng Paku Seng Paku Ulin Paku Ulin Paku Ulin Paku Ulin Paku Ulin Paku Ulin Paku Biasa Paku Biasa Paku Biasa 1 1/4 1 1/2 2 2 1/2 2 1 3/4 1 1 1/2 2 3 4 1 2 3 3 1/2 " " " " " " " " " " " " " " " besar kecil Kg Kg Kg Kg Kotak Kotak Kotak Kotak Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg 27,500 27,500 27,500 27,500 7,700 11,000 22,000 16,500 27,500 27,500 22,000 22,000 22,000 22,000 22,000 22,000 16,500 16,500 16,500 25,000 25,000 25,000 25,000 7,000 10,000 20,000 15,000 25,000 25,000 20,000 20,000 20,000 20,000 20,000 20,000 15,000 15,000 15,000 2,500 2,500 2,500 2,500 700 1,000 2,000 1,500 2,500 2,500 2,000 2,000 2,000 2,000 2,000 2,000 1,500 1,500 1,500 10 mm 12 mm 16 mm 5 5 cm cm P P P x x 3 mm 3 mm 20 cm 25 cm 25 cm x x 40 cm 40 cm Buah Buah Pasang Pasang Pasang 10,450 11,000 3,300 4,400 4,950 9,500 10,000 3,000 4,000 4,500 Ukuran Ukuran Ukuran Ukuran 10 16 19 22 mm mm mm mm kg Batang Batang Batang Batang 16,688 102,795 113,190 173,250 259,875 93,450 102,900 157,500 236,250 9,345 10,290 15,750 23,625 950 1,000 300 400 450

20

Paku Biasa

4

"

Kg

16,500

15,000

1,500

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

Peralatan cat 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 1 2 3 4 5 Ampelas Kuas Roll Kuas Kuas Kuas Kuas Kuas Kuas Kuas Kuas Cat dasar Cat Meni Kayu Cat dasar tembok Cat Meni Besi Wall Filler Decor DWF - 200 Minyak cat Water proofing Plamir Residu Minyak Begisting Dempul Cat Tembok Cat Tembok biasa Cat tembok mutu A ( setara jotun ) Cat Kilap Pelitur Kayu Multipleks Triplek Triplek Triplek Triplek Triplek 3 3.6 4 6 9 mm mm mm mm mm Lembar Lembar Lembar Lembar Lembar 51,700 55,000 60,500 100,100 167,200 47,000 50,000 55,000 91,000 152,000 4,700 5,000 5,500 9,100 15,200 5 2.5 1 1 2 2,5 3 3,5 4 4,5 5 6 1 5 1 4 1 1 1 1 1 1 Kg kg Kg Liter " " " " " " " " Kg Kg Kg Kg kg Kg Lembar Buah Buah Buah Buah Buah Buah Buah Buah Buah Kaleng Kaleng Kaleng Kaleng Kaleng Kaleng Kg Kg ltr Kg Kaleng Kaleng Kaleng Kaleng 3,850 27,500 6,050 8,800 10,450 13,750 17,050 17,050 25,300 24,750 25,850 16,500 138,600 104,500 16,500 27,500 25,300 127,050 9,900 23,100 77,000 135,000 49,500 51,700 3,500 25,000 5,500 8,000 9,500 12,500 15,500 15,500 23,000 22,500 23,500 15,000 126,000 95,000 15,000 25,000 23,000 115,500 9,000 21,000 70,000 165,000 45,000 47,000 350 2,500 550 800 950 1,250 1,550 1,550 2,300 2,250 2,350 1,500 12,600 9,500 1,500 2,500 2,300 11,550 900 2,100 7,000 16,500 4,500 4,700

6

Triplek

12

mm

Lembar

202,400

184,000

18,400

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

7 8 9 1 2

Triplek Melamine Teakwood Kalsi Board Kalsi Board Kalsi Board Keramik 1 Plint Keramik 10 x 20 2 Plint Keramik 10 x 30 3 Keramik 4 Keramik 7 Keramik 8 Keramik 9 Keramik Warna Warna Warna Warna Warna Polos Polos Warna Warna Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran

18 3 1200 1200 10 10 10 20 20 25 30 20 30 40 60

mm mm x x x x x x x x x x x x x 2400 2400 20 20 20 20 25 40 30 20 30 40 60 x x Cm Cm Cm Cm Cm Cm Cm Cm Cm Cm Cm 3.5 mm 4.5 mm

Lembar Lembar Lembar Lembar Lembar bh bh Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak

316,800 77,000 69,300 57,750 59,950 7,700 8,250 69,300 61,600 61,600 64,900 60,500 44,000 49,500 80,300 93,500 -

288,000 70,000 63,000 52,500 54,500 7,000 7,500 63,000 56,000 56,000 59,000 55,000 40,000 45,000 73,000 85,000 -

28,800 7,000 6,300 5,250 5,450 700 750 6,300 5,600 5,600 5,900 5,500 4,000 4,500 7,300 8,500 -

10 Keramik 11 Keramik 12 Keramik 14 Keramik

Bahan Penutup Atap Genteng Metal 1 2 3 4 5 1 2 3 4 1 Atap Metal Atap Metal Atap Metal Atap Metal Atap Metal Talang Talang PVC Corong Talang Belokan Talang Tutup Talang Asbes Gelombang Asbes Gelombang Plat Lembar 31,900 29,000 2,900 92,400 18,700 18,700 7,700 84,000 17,000 17,000 7,000 8,400 1,700 1,700 700 Multi Roof / Multi Colour Mega Colour/ spyro roof Nok U Nok Pinggir L Nok C Ukuran Ukuran Ukuran Ukuran Ukuran 0.4 mm 0.3 mm Lembar Lembar m' m' m' 79,750 46,200 28,600 25,300 30,800 72,500 42,000 26,000 23,000 28,000 7,250 4,200 2,600 2,300 2,800

2

Bubungan Asbes gelombang

Buah

30,800

28,000

2,800

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

Atap Seng 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Seng Gelombang Besar BJLS 30 Seng Gelombang Kecil BJLS 30 Seng Gelombang Besar BJLS 20 Seng Gelombang Kecil BJLS 20 Seng Plat BJLS 20 Seng Plat BJLS 20 Seng Plat BJLS 20 Seng Plat BJLS 30 Seng Plat BJLS 30 Seng Plat BJLS 30 Penggantung & Pengunci Engsel Standart Mutu A Engsel Standart Mutu A Engsel Kupu-kupu Grendel Grendel Tanam Hak Angin Kuningan Handle Kunci Pintu Besar Standart 2 x Slag Kunci Pintu Kecil Standart 2 x Slag Kunci Alpha 8000 Perlengkapan Sanitasi Bak Mandi 1 1 2 3 Bak Mandi Viber Closet Closet Jongkok Keramik Closet Jongkok Porselin Urinoir Closet Duduk Standart Mutu A Buah Buah Set Set Ukuran 80 x 60 x 60 cm Buah 258,500 132,000 192,500 880,000 2,200,000 235,000 120,000 175,000 800,000 2,000,000 23,500 12,000 17,500 80,000 200,000 20 cm 4 " 4 " 3 " 4 " Pasang Pasang Pasang Buah Buah Buah Buah Set Set Set 30,800 22,000 6,600 9,900 108,900 14,300 17,600 143,000 110,000 77,000 28,000 20,000 6,000 9,000 99,000 13,000 16,000 130,000 100,000 70,000 2,800 2,000 600 900 9,900 1,300 1,600 13,000 10,000 7,000 Lebar Lebar Lebar Lebar Lebar Lebar 50 40 30 50 40 30 Lembar Lembar Lembar Lembar m' m' m' m' m' m' 46,200 46,200 42,900 42,900 22,000 15,950 13,750 19,250 17,050 11,550 42,000 42,000 39,000 39,000 20,000 14,500 12,500 17,500 15,500 10,500 4,200 4,200 3,900 3,900 2,000 1,450 1,250 1,750 1,550 1,050

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

Kran Air 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 1 2 3 4 1 2 3 4 5 Kran Washtafel Steinliss Kran Bebek Steinliss Kran Shower Stainliss Bak Cuci Piring Almun. lobang 1 Bak Cuci Piring Almun. lobang 2 Kran Air Stainliss Kran Air Stainliss Kran Air galvaniss Kran Air galvaniss Floor Drain Plastik Floor Drain galvanis Floor Drain Stainliss Tandon Air Tandon Air Tandon Air Tandon Air Tandon Air Tandon Air Tandon Air Air PDAM Wastafel Wastafel Wastafel Wastafel Wastafel Pipa PVC Type AW Pipa PVC Pipa PVC Pipa PVC Pipa PVC Pipa PVC 1/2'' 3/4" 1" 1 1/4" 1 1/2" Panjang Panjang Panjang Panjang Panjang 4 4 4 4 4 m m m m m Batang Batang Batang Batang Batang 20,900 25,300 31,900 51,700 57,750 19,000 23,000 29,000 47,000 52,500 1,900 2,300 2,900 4,700 5,250 Type LW 650 J/LW 650 FJ Type LW 501 J Type L 34 Type L 529 V1 Buah Buah Buah Buah 286,000 286,000 192,500 192,500 260,000 260,000 175,000 175,000 26,000 26,000 17,500 17,500 5,000 Ltr 3,000 Ltr 2,000 Ltr 1,200 Ltr 1,000 Ltr 450 Ltr Buah Buah Buah Buah Buah Buah Liter 6,490,000 4,180,000 3,080,000 1,430,000 924,000 1,023,000 39.60 5,900,000 3,800,000 2,800,000 1,300,000 840,000 930,000 36 590,000 380,000 280,000 130,000 84,000 93,000 4 Ukuran Ukuran Ukuran Ukuran 3/4 " 1/2 " 3/4 " 1/2 " Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah 97,900 176,000 97,900 286,000 484,000 39,600 38,500 26,400 22,000 8,800 23,100 34,100 89,000 160,000 89,000 260,000 440,000 36,000 35,000 24,000 20,000 8,000 21,000 31,000 8,900 16,000 8,900 26,000 44,000 3,600 3,500 2,400 2,000 800 2,100 3,100

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

6 7 8 9 10 11 1 2 3 4 5 6 7 1 2 3 1 2 3 4 5 6 7 8 9 10

Pipa PVC Pipa PVC Pipa PVC Pipa PVC Pipa PVC Pipa PVC Pipa Galvanis Pipa Galvanis Pipa Galvanis Pipa Galvanis Pipa Galvanis Pipa Galvanis Pipa Galvanis Pipa Galvanis Lem Lem PVC Lem PVC Isolatif TBA Alat Pertukangan Benang Nylon Bethel Cangkul Cangkul (lengkap) Ember Cor Gergaji Kayu Hammer Konde Hammer Cabut Kain Majun Kereta Dorong

2" 2 1/2" 3" 4" 5" 6" 1/2" 3/4"

Panjang Panjang Panjang Panjang Panjang Panjang Panjang Panjang Panjang Panjang Panjang Panjang Panjang

4 4 4 4 4 4 6 6 6 6 6 6 6

m m m m m m m' m' m' m' m' m' m'

Batang Batang Batang Batang Batang Batang Batang Batang Batang Batang Batang Batang Batang Tube Buah Buah Rol Buah Buah Buah Buah Buah Buah Buah Kg Buah

74,800 97,900 132,000 213,400 275,000 561,000 121,000 129,800 154,000 269,500 214,500 616,000 836,000 11,000 7,700 4,950 4,950 20,900 63,800 88,000 11,550 57,750 88,000 55,000 27,500 418,000

68,000 89,000 120,000 194,000 250,000 510,000 110,000 118,000 140,000 245,000 195,000 560,000 760,000 10,000 7,000 4,500 4,500 19,000 58,000 80,000 10,500 52,500 80,000 50,000 25,000 380,000

6,800 8,900 12,000 19,400 25,000 51,000 11,000 11,800 14,000 24,500 19,500 56,000 76,000 1,000 700 450 450 1,900 5,800 8,000 1,050 5,250 8,000 5,000 2,500 38,000

1" 1 1/2" 2" 3" 4"

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

Bola Lampu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Lampu pijar 5 watt Phillip Lampu pijar 10 watt Phillip Lampu pijar 15 watt Phillip Lampu pijar 25 watt Phillip Lampu pijar 40 watt Phillip Lampu pijar 60 watt Phillip Lampu pijar 100 watt Phillip Lampu EL 8 watt Mutu Klas - A Phillip Lampu EL 18 watt Mutu Klas - A Phillip Lampu EL 20 watt Mutu Klas - A Phillip Lampu TL ( trafo ) 20 watt Phillip Lampu TL ( trafo ) 40 watt Phillip Lampu TL ( trafo ) 2x20 watt Phillip Lampu TL ( trafo ) 2x40 watt Phillip Box MCB 2 Group Box MCB 4 Group Box MCB 8 Group Saklar Tunggal Standart mutu A Saklar Ganda Standart mutu A Stop Kontak Standart Mutu A Piting lampu tanam ( besar ) Mutu A Piting lampu tanam ( kecil ) Mutu A Breaker / MCB 2 Amp Breaker / MCB 4 Amp Breaker / MCB 6 Amp Breaker / MCB 12 Amp Kabel NGA 2,5 Amp Eterna Kabel NGA 2,5 Amp Surya Stop Kontak AC Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Rol Rol Buah 4,950 6,050 6,050 7,150 7,150 8,250 8,250 34,650 38,500 40,700 115,500 150,150 207,900 288,750 17,600 34,650 75,075 14,300 17,600 14,300 85,800 57,750 23,100 23,100 28,875 34,650 288,750 173,250 23,100 4,500 5,500 5,500 6,500 6,500 7,500 7,500 31,500 35,000 37,000 105,000 136,500 189,000 262,500 16,000 31,500 68,250 13,000 16,000 13,000 78,000 52,500 21,000 21,000 26,250 31,500 262,500 157,500 21,000 450 550 550 650 650 750 750 3,150 3,500 3,700 10,500 13,650 18,900 26,250 1,600 3,150 6,825 1,300 1,600 1,300 7,800 5,250 2,100 2,100 2,625 3,150 26,250 15,750 2,100

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

Stop Kontak Stop Kontak Stop kontak Saklar Saklar Beugel Beugel Elbou PVC Elbou PVC Isolasi isolasi Isolasi Kelam Kabel Handel OHM Saklar Germany Pole Braker Braker Braker Braker Braker Braker Braker Kabel Kabel Kabel Kabel Kabel Kabel Kabel Kabel Kabel

Cabang empat Tembok Brocco Ganda Tunggal 1 1/2 x 18 x 18 cm 10" 1 1/2" 5/8" S chot 23 Unibel Unibel Besar Nomer. 10,12,14 01 63A 25A 3" MCB 2 AMP MCB 4 AMP MCB 6 AMP MCB 12 AMP MCB 20 A MCB 25 A NYA 4 mm NYFGBY 4 x 16 mm NYFGBY 4 x 10 mm NYFGBY 4 x 25 mm NYFGBY 4 x 6 mm NYM 2 x 2,5 mm NYM 3 x 2,5 mm NYM 3 x 4 mm NYM 4 x 4 mm

Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Rol Rol Rol Rol Rol Rol Rol Rol Rol

17,325 28,875 14,300 17,600 13,750 12,650 11,550 4,950 2,750 80,300 8,250 12,100 7,700 632,500 374,000 11,550 23,100 23,100 28,875 34,650 57,750 69,300 462,000 115,500 86,625 167,475 75,075 866,250 1,155,000 1,732,500 2,310,000

15,750 26,250 13,000 16,000 12,500 11,500 10,500 4,500 2,500 73,000 7,500 11,000 7,000 575,000 340,000 10,500 21,000 21,000 26,250 31,500 52,500 63,000 420,000 105,000 78,750 152,250 68,250 787,500 1,050,000 1,575,000 2,100,000

1,575 2,625 1,300 1,600 1,250 1,150 1,050 450 250 7,300 750 1,100 700 57,500 34,000 1,050 2,100 2,100 2,625 3,150 5,250 6,300 42,000 10,500 7,875 15,225 6,825 78,750 105,000 157,500 210,000

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

61 62 63 64 65 66 67 68 69 70 71 72 73 74 75

Kabel Kabel Kabel Kabel Kabel Kabel Bola Lampu Bola Lampu Bola Lampu Bola Lampu Bola Lampu Bola Lampu Bola Lampu Sekring Otomatis Sekring Otomatis Bahan Pelapis Dinding Kaca Kaca Bening Kaca Bening Kaca Rayband BAHAN CETAKAN/CAMPURAN BETON Batu gunung Belah Batu Pecah Batu Pecah Batu Pecah Batu Pecah Batu Pecah Batu Pecah Batu Abu Filler/Kapur Kerikil Sirtu Pasir Untuk Beton Pasir Urug Pasir Pasangan Ijuk

NYMHY 2 x 0,75 mm NYMHY 3 x 2,5 mm NYY 3 x 4 mm NYY 4 x 10 mm NYY 4x 16 mm NYY 4 x 6 mm Hologen 1000 Watt Hologen 500 Watt HPIT 400Watt HPL 125 Watt mercury 250 watt ML 160 Watt ML 250 Watt 16 a 20 a

Rol Rol Rol Rol Rol Rol Buah Buah Buah Buah Buah Buah Buah Buah Buah

462,000 1,443,750 2,136,750 5,428,500 80,850 3,349,500 286,000 148,500 44,000 56,100 69,300 51,700 66,000 23,100 23,100

420,000 1,312,500 1,942,500 4,935,000 73,500 3,045,000 260,000 135,000 40,000 51,000 63,000 47,000 60,000 21,000 21,000

42,000 131,250 194,250 493,500 7,350 304,500 26,000 13,500 4,000 5,100 6,300 4,700 6,000 2,100 2,100

1 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14

3 5 5

mm mm mm

m2 m2 m2 m3 m3 m3 m3 m3 m m3 m3 m3 m3 m3 m3 m3 kg3

75,900 86,900 97,900 204,800 285,000 340,000 367,500 395,000 422,500 505,000 395,000 186,000 151,000 105,000 94,000 100,600 16,500

69,000 79,000 89,000 180,000 250,000 300,000 325,000 350,000 375,000 450,000 350,000 160,000 130,000 90,000 80,000 86,000 15,000 6,800 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 8,000 6,000 6,000 6,000

6,900 7,900 8,900 18,000 25,000 30,000 32,500 35,000 37,500 45,000 35,000 16,000 13,000 9,000 8,000 8,600 1,500

10 - 15 cm 5 - 7 cm 3 - 5 cm 2 - 3 cm 1 - 2 cm 0.5 - 1.0 cm (Chipping)

15

Tanah Urug

m3

38,550

32,500

2,800

3,250

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

CETAKAN BETON 1 Batu Bata 2 Glass block 3 Loster 4 Bataco 5 Paving Block Abu-abu Kecil 6 Paving Block Abu-abu Besar 7 Buis Beton Bulat Bertulang 8 Buis Beton Bulat Bertulang 9 Buis Beton Bulat Bertulang 10 Buis Beton Bulat Bertulang 11 Buis Beton Bulat Tidak Bertulang 12 Buis Beton Bulat Tidak Bertulang 13 Buis Beton Bulat Tidak Bertulang 14 Buis Beton Bulat Tidak Bertulang Kayu Ulin 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 Kayu Ulin Kayu Ulin Kayu Ulin Kayu Ulin Kayu Ulin Kayu Ulin Kayu Ulin Papan Ulin Papan Ulin Kayu Ulin Kayu Ulin Kayu Meranti Kayu Meranti Kayu Meranti Kayu Meranti Kayu Meranti Kayu Meranti Kayu Meranti Kayu Meranti Papan Meranti Papan Meranti

Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran

10 20 10 10 Tbl Tbl 20 15 12 10 5 5 5 2.5 2 5 7 2 5 5 5 5 6 10 2.5 2

x 10 x 20 x 20 x 20 6 cm 6 cm 80 x 60 x 40 x 30 x 80 x 60 x 40 x 30 x cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm x x x x x x x x x x x x x x x x x x x x

x x x

20 cm cm 20 cm 40 cm

P P P P P P P P

50 50 100 100 50 50 100 100 20 15 12 10 10 7 5 20 10 20 14 3 3 5 7 10 12 10 20 4

cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm cm

x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Tbl Tbl Tbl Tbl Tbl Tbl Tbl Tbl 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

10 10 10 10 10 10 10 10 m m m m m m m m m m m m m m m m m m m m

Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

1,000 26,400 6,050 7,700 9,350 3,300 412,500 313,500 198,000 187,000 165,000 126,500 159,500 137,500 4,950,000 4,950,000 4,950,000 4,950,000 5,500,000 5,500,000 5,720,000 6,600,000 5,500,000 5,500,000 5,500,000 2,695,000 2,695,000 2,640,000 2,640,000 2,640,000 2,640,000 2,640,000 2,750,000 2,695,000

900 24,000 5,500 7,000 8,500 3,000 375,000 285,000 180,000 170,000 150,000 115,000 145,000 125,000 4,500,000 4,500,000 4,500,000 4,500,000 5,000,000 5,000,000 5,200,000 6,000,000 5,000,000 5,000,000 5,000,000 2,450,000 2,450,000 2,400,000 2,400,000 2,400,000 2,400,000 2,400,000 2,500,000 2,450,000

10

90 2,400 550 700 850 300 37,500 28,500 18,000 17,000 15,000 11,500 14,500 12,500 450,000 450,000 450,000 450,000 500,000 500,000 520,000 600,000 500,000 500,000 500,000 245,000 245,000 240,000 240,000 240,000 240,000 240,000 250,000 245,000

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

Kayu Bengkirai 1 2 3 4 5 6 7 8 Kayu Bengkirai Kayu Bengkirai Kayu Bengkirai Kayu Bengkirai Kayu Bengkirai Kayu Bengkirai Papan bengkirai Papan bengkirai Kayu Kawi Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran 3 5 5 5 7 10 2.5 2 5 5 5 10 2.5 2 cm cm cm cm cm cm cm cm cm cm cm cm cm cm x x x x x x x x x x x x x x 5 5 7 10 14 10 20 20 5 7 10 10 20 20 cm cm cm cm cm cm cm cm cm cm cm cm cm cm x x x x x x x x x x x x x x 4 4 4 4 4 4 4 4 4 4 4 4 4 4 m m m m m m m m m m m m m m m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 bh Batang m3 bh m' m' m' Buah Batang m3 Buah Buah Pasang Buah Buah Pasang Buah Buah Buah Buah 3,520,000 3,520,000 3,520,000 3,520,000 3,520,000 3,520,000 3,850,000 3,850,000 3,465,000 3,465,000 3,465,000 3,025,000 3,465,000 3,465,000 2,200,000 27,500 27,500 2,750,000 44,000 63,800 74,800 11,550 396,000 16,500 3,025,000 770,000 825,000 1,595,000 660,000 693,000 1,375,000 302,500 302,500 346,500 346,500 3,200,000 3,200,000 3,200,000 3,200,000 3,200,000 3,200,000 3,500,000 3,500,000 3,150,000 3,150,000 3,150,000 2,750,000 3,150,000 3,150,000 2,000,000 25,000 25,000 2,500,000 40,000 58,000 68,000 10,500 360,000 15,000 2,750,000 700,000 750,000 1,450,000 600,000 630,000 1,250,000 275,000 275,000 315,000 315,000 320,000 320,000 320,000 320,000 320,000 320,000 350,000 350,000 315,000 315,000 315,000 275,000 315,000 315,000 200,000 2,500 2,500 250,000 4,000 5,800 6,800 1,050 36,000 1,500 275,000 70,000 75,000 145,000 60,000 63,000 125,000 27,500 27,500 31,500 31,500

1 Kayu Kawi 2 Kayu Kawi 3 Kayu Kawi 4 Kayu Kawi 5 Papan Kawi 6 Papan Kawi 7 Kayu Campuran ( Bekisting) 8 Formite/penjaga jarak bekisting/spacer 9 Kayu .Galam BAHAN MEBEL/MOULDING 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Papan Moulding (Meranti) Papan Ruiter (Meranti) Kusen Kayu Bengkirai Kusen Kayu Ulin Jalusi Kayu Jalusi Dinding Layar 5 Segi List Profille Sudut 3/5 kayu Lumber zering moulding Daun Pintu Panil kayu ulin Daun Pintu Panil kayu ulin Daun Pintu Panil kayu ulin 2 Daun Daun Pintu Panil kayu bengkirai Daun Pintu Panil kayu bengkirai Daun Pintu Panil kayu Bangkirai 2 Daun Daun jendela bengkirai Daun jendela bengkirai Daun jendela ulin Daun jendela ulin

10 - 12 panjang 4 m Ukuran Ukuran 15 15 x x 18 18 x x 400 cm 400 cm

Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran Ukuran

1 4 4 4 4 4 4 110 110 110 110

x x x x x x x x x x x

8 75 90 60 75 90 60 77 55 77 55

x x x x x x x cm cm cm cm

400 210 210 210 210 210 210 + + + +

cm cm cm cm cm cm cm Kaca Kaca Kaca Kaca

No

Nama Barang

Ukuran / Tipe

Satuan

Harga

Harga Dasar

Galian C

Benefit 10 %

Ket.

SEWA ALAT 1 CONCRETE MIXER 0.3-0.6 M3 ( Molen ) 2 DUMP TRUCK 3 GENERATOR SET 4 CONCRETE VIBRATOR 5 WATER PUMP 70-100 mm 6 WATER TANKER 3000-4500 L. 7 PILE DRIVER + HAMMER 8 Alat Pancang Manual

Jam Jam Jam Jam Jam Jam Jam Jam

25,000.00 340,000.00 530,000.00 25,000.00 33,000.00 310,000.00 495,000.00 25,000.00

Keterangan :# Harga diatas merupakan harga rata - rata tertinggi pada ibukota kabupaten / pusat kecamatan # Harga sudah termasuk : a. keuntungan(benefit) 10% b. Restribusi tambang Galian C

ANALISA HARGA SATUAN BIDANG KECIPTA KARYAANNO. A. A.1 NAMA PEKERJAAN Pekerjaan Persiapan 1 m2 Pembersihan lapangan dan peralatan 0.1000 or Pekerja 0.0050 or Mandor 1 m' Pengukuran dan pemasangan bouwplank 0.0120 m3 Kayu meranti 5/7 cm 0.0200 kg Paku biasa 2 s/d 5 inchi 0.0070 m3 Papan kayu meranti 2.5/20 cm 0.1000 or Tukang kayu 0.1000 or Pekerja 0.0100 or Kepala tukang 0.0050 or Mandor Pekerjaan Bongkaran 1 m3 Membongkar pasangan batu kali 0.4000 or Pekerja 4.0000 or Tukang batu 1 m3 Pembongkaran pasangan dinding bata 6.6670 or Pekerja 0.3330 or Mandor 1 m3 Pembongkaran beton bertulang 6.6670 or Pekerja 0.3330 or Mandor 10 m2 Mengupas plesteran lama 1.2500 or Pekerja 0.1250 or Mandor HARGA SATUAN ( Rp ) UPAH ( Rp ) BAHAN ( Rp ) JUMLAH HARGA ( Rp )

55,000.00 90,000.00 Jumlah 2,640,000.00 16,500.00 2,750,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

5,500.00 450.00 5,950.00 31,680.00 330.00 19,250.00 7,500.00 5,500.00 800.00 450.00 14,250.00

5,500.00 450.00 5,950.00 31,680.00 330.00 19,250.00 7,500.00 5,500.00 800.00 450.00 65,510.00

A.2

51,260.00

B. B.1

55,000.00 75,000.00 Jumlah 55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah

22,000.00 300,000.00 322,000.00 366,685.00 29,970.00 396,655.00 366,685.00 29,970.00 396,655.00

22,000.00 300,000.00 322,000.00 366,685.00 29,970.00 396,655.00 366,685.00 29,970.00 396,655.00 68,750.00 11,250.00 80,000.00 8,000.00 110,000.00 9,000.00 119,000.00 11,900.00

B.2

B.3

B.4

55,000.00 68,750.00 90,000.00 11,250.00 Jumlah 80,000.00 Untuk 1 m2 pekerjaan bongkaran 55,000.00 110,000.00 90,000.00 9,000.00 Jumlah 119,000.00 Untuk 1 m2 pekerjaan bongkaran

B.5

10 m2 Membongkar lantai tegel/keramik untuk dipakai kembali 2.0000 or Pekerja 0.1000 or Mandor

B.6

1 m2 Menurunkan atap sirap/genteng yang tidak dipakai kembali 0.0542 or Pekerja 0.0027 or Mandor 10 m2 Menurunkan atap sirap/genteng yang dipakai kembali 2.0000 or Pekerja 0.1000 or Mandor

55,000.00 90,000.00 Jumlah

2,981.00 243.00 3,224.00

2,981.00 243.00 3,224.00

B.7

55,000.00 110,000.00 90,000.00 9,000.00 Jumlah 119,000.00 Untuk 1 m2 pekerjaan bongkaran

110,000.00 9,000.00 119,000.00 11,900.00

B.8

1 m3 Membongkar kayu balok loteng, kuda-kuda,gelagar jembatan,rangka rumah dll (kayu bongkaran dipakai lagi) 6.0000 or Tukang kayu 4.0000 or Pekerja 0.6000 or Kepala tukang 0.2000 or Mandor 1 m3 Membongkar kayu balok loteng, kuda-kuda,gelagar jembatan,rangka rumah dll (kayu bongkaran tidak dipakai lagi) 1.0000 or Pekerja 0.2000 or Mandor 10 m2 Membongkar atap seng 0.5000 or Pekerja 1.0000 or Mandor

75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

450,000.00 220,000.00 48,000.00 18,000.00 736,000.00

450,000.00 220,000.00 48,000.00 18,000.00 736,000.00

B.9

55,000.00 90,000.00 Jumlah

55,000.00 18,000.00 73,000.00

55,000.00 18,000.00 73,000.00 27,500.00 90,000.00 117,500.00 11,750.00

B.10

55,000.00 27,500.00 90,000.00 90,000.00 Jumlah 117,500.00 Untuk 1 m2 pekerjaan bongkaran

B.11

10 m2 Menurunkan rangka atap dari kayu (kayu bongkaran dipakai lagi) 0.6000 or Tukang kayu 2.0000 or Pekerja 0.0600 or Kepala tukang 0.1000 or Mandor

75,000.00 45,000.00 55,000.00 110,000.00 80,000.00 4,800.00 90,000.00 9,000.00 Jumlah 168,800.00 Untuk 1 m2 pekerjaan bongkaran

45,000.00 110,000.00 4,800.00 9,000.00 168,800.00 16,880.00

NO. B.12

NAMA PEKERJAAN 1 m2 Menurunkan rangka atap dari kayu (kayu bongkaran tidak dipakai lagi) 2.0000 or Pekerja 0.1000 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

55,000.00 110,000.00 90,000.00 9,000.00 Jumlah 119,000.00 Untuk 1 m2 pekerjaan bongkaran

110,000.00 9,000.00 119,000.00 11,900.00

C. C.1

Pekerjaan Tanah 1 m3 Galian tanah biasa sedalam 1 m' 0.7500 or Pekerja 0.0250 or Mandor 1 m3 Galian tanah biasa sedalam 2 m' 0.9000 or Pekerja 0.0450 or Mandor 1 m3 Galian tanah biasa sedalam 3 m' 1.0500 or Pekerja 0.0670 or Mandor 1 m3 Menggali tanah keras sedalam 1 m' 1.0000 or Pekerja 0.0320 or Mandor 1 m3 Menggali tanah yang banyak batu bundar 0.8571 or Pekerja 0.0429 or Mandor 1 m3 Menggali tanah lumpur 0.7895 or Pekerja 0.0395 or Mandor 1 m3 Menggali tanah lumpur sedalam 1 m' 1.2000 or Pekerja 0.0450 or Mandor 1 m3 Menggali tanah cadas sedalam 1 m' 1.5000 or Pekerja 0.0600 or Mandor 1 m3 Membuang tanah sejauh 15 m' 0.3300 or Pekerja 0.0100 or Mandor 1 m3 Urugan tanah kembali 1/3 m3 Pekerjaan Galian Tanah (C.1) 1 m3 Urugan tanah pilihan 1.2000 m3 Tanah urug 0.3000 or Pekerja 0.0150 or Mandor 1 m3 Urugan pasir 1.2000 m3 Pasir urug 0.3000 or Pekerja 0.0100 or Mandor 1 m3 Memadatkan tanah per-20 cm 0.5000 or Pekerja 0.0500 or Mandor 1 m2 Memasang lapisan ijuk tebal 10 cm untuk bidang resapan 6.0000 kg Ijuk 0.1500 or Pekerja 0.0150 or Mandor 1 m2 Memasang sirtu padat untuk peninggian lantai bangunan 1.2000 m3 Sirtu 0.2500 or Pekerja 0.0250 or Mandor

55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah 43,500.00 Jumlah 38,550.00 55,000.00 90,000.00 Jumlah 94,000.00 55,000.00 90,000.00 Jumlah 55,000.00 90,000.00 Jumlah 16,500.00 55,000.00 90,000.00 Jumlah 151,000.00 55,000.00 90,000.00 Jumlah

41,250.00 2,250.00 43,500.00 49,500.00 4,050.00 53,550.00 57,750.00 6,030.00 63,780.00 55,000.00 2,880.00 57,880.00 47,140.50 3,861.00 51,001.50 43,422.50 3,555.00 46,977.50 66,000.00 4,050.00 70,050.00 82,500.00 5,400.00 87,900.00 18,150.00 900.00 19,050.00 14,500.00 14,500.00 46,260.00 16,500.00 1,350.00 17,850.00

41,250.00 2,250.00 43,500.00 49,500.00 4,050.00 53,550.00 57,750.00 6,030.00 63,780.00 55,000.00 2,880.00 57,880.00 47,140.50 3,861.00 51,001.50 43,422.50 3,555.00 46,977.50 66,000.00 4,050.00 70,050.00 82,500.00 5,400.00 87,900.00 18,150.00 900.00 19,050.00 14,500.00 14,500.00 46,260.00 16,500.00 1,350.00 64,110.00 112,800.00 16,500.00 900.00 130,200.00 27,500.00 4,500.00 32,000.00 99,000.00 99,000.00 8,250.00 1,350.00 108,600.00 181,200.00 13,750.00 2,250.00 197,200.00

C.2

C.3

C.4

C.5

C.6

C.7

C.8

C.9

C.10

C.11

46,260.00 112,800.00

C.12

16,500.00 900.00 17,400.00 27,500.00 4,500.00 32,000.00

112,800.00

C.13

C.14

8,250.00 1,350.00 9,600.00

99,000.00 181,200.00

C.15

13,750.00 2,250.00 16,000.00

181,200.00

NO. D D.1

NAMA PEKERJAAN Pekerjaan Tiang Pancang Memancang tiang per m` - 20/20, tanah lunak (dihitung bagian yang masuk tanah) 0.1250 or Tukang kayu 0.2917 or Pekerja 0.0125 or Kepala tukang kayu 0.0007 or Mandor 1.0000 ls Sewa alat Pancang 1 m1 Tanah biasa - 20/20 1.2500 Upah (D.1) 1 m1 Tanah keras - 20/20 1.5000 Upah (D.1) 1 m1 Tanah keras - 10/10 1.0000 Upah (D.1) 1 m1 Tanah pasir - 20/20 2.0000 Upah (D.1) 1 m1 Tanah pasir - 10/10 2.6667 Upah (D.1) 1 bh membuat cincin kepala tiang pancang & dilancipkan balok kayu ulin ukuran 20/20 cm 0.2250 or Tukang kayu 0.0750 or Pekerja 0.0225 or Kepala tukang kayu 0.0038 or Mandor 1 bh Membuat cincin kepala tiang pancang & dilancipkan balok kayu ulin 10/10 cm 0.5000 Upah (D.7) Membuat cincin kepala tiang pancang & dilancipkan kayu galam dia 12 - 20 cm 0.5000 Upah (D.7) 1 bh Membuat sunduk pada pancang kayu 5/7-50 cm 0.0019 m3 Kayu ulin 0.0600 or Tukang kayu 0.0600 or Pekerja 0.0060 or Kepala tukang kayu 0.0030 or Mandor 1 psg Membuat pen dan lobang pada tiap kepala kayu (tiap-tiap pasang) 0.2000 Tukang kayu 0.0200 Kepala tukang kayu Pekerjaan Pondasi 1 m3 Memasang batu kosong / Aanstamping 1.2000 m3 Batu belah ( 15 s/d 20) cm 0.4320 m3 Pasir urug 0.3900 or Tukang batu 0.7800 or Pekerja 0.0390 or Kepala tukang 0.0390 or Mandor 1 m3 Memasang pondasi batu belah campuran 1 : 3 1.2000 m3 Batu belah ( 15 s/d 20) cm 0.4850 m3 Pasir pasang 202.0000 kg Semen Pc 50 kg 0.7500 or Tukang batu 1.5000 or Pekerja 0.0750 or Kepala tukang 0.0750 or Mandor 1 m3 Memasang pondasi batu belah campuran 1 : 4 1.2000 m3 Batu belah ( 15 s/d 20) cm 0.5200 m3 Pasir pasang 163.0000 kg Semen Pc 50 kg 0.7500 or Tukang batu 1.5000 or Pekerja 0.0750 or Kepala tukang 0.0750 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

75,000.00 55,000.00 80,000.00 90,000.00 25,000.00 Jumlah 51,481.50 Jumlah 51,481.50 Jumlah 51,481.50 Jumlah 51,481.50 Jumlah 51,481.50 Jumlah

9,375.00 16,043.50 1,000.00 63.00 26,481.50 64,351.88 64,351.88 77,222.25 77,222.25 51,481.50 51,481.50 102,963.00 102,963.00 137,285.72 137,285.72 25,000.00 25,000.00

9,375.00 16,043.50 1,000.00 63.00 25,000.00 51,481.50 64,351.88 64,351.88 77,222.25 77,222.25 51,481.50 51,481.50 102,963.00 102,963.00 137,285.72 137,285.72

D.2

D.3

D.4

D.5

D.6

D.7

75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

16,875.00 4,125.00 1,800.00 342.00 23,142.00

16,875.00 4,125.00 1,800.00 342.00 23,142.00

D.8

23,142.00 Jumlah

11,571.00 11,571.00

11,571.00 11,571.00

D.9

11,571.00 Jumlah 5,500,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

5,785.50 5,785.50 10,450.00 4,500.00 3,300.00 480.00 270.00 8,550.00

5,785.50 5,785.50 10,450.00 4,500.00 3,300.00 480.00 270.00 19,000.00

D.10

10,450.00

D.11

75,000.00 80,000.00 Jumlah

15,000.00 1,600.00 16,600.00

15,000.00 1,600.00 16,600.00

E E.1

204,800.00 94,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 204,800.00 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 204,800.00 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

245,760.00 40,608.00 29,250.00 42,900.00 3,120.00 3,510.00 78,780.00

286,368.00 245,760.00 48,791.00 271,084.00

245,760.00 40,608.00 29,250.00 42,900.00 3,120.00 3,510.00 365,148.00 245,760.00 48,791.00 271,084.00 56,250.00 82,500.00 6,000.00 6,750.00 717,135.00 245,760.00 52,312.00 218,746.00 56,250.00 82,500.00 6,000.00 6,750.00 668,318.00

E.2

56,250.00 82,500.00 6,000.00 6,750.00 151,500.00

565,635.00 245,760.00 52,312.00 218,746.00

E.3

56,250.00 82,500.00 6,000.00 6,750.00 151,500.00

516,818.00

NO. E.4

NAMA PEKERJAAN 1 m3 Rangka bawah dari kayu ulin (tongkat, sunduk) 1.1000 m3 Kayu ulin 9.0000 or Tukang kayu 9.0000 or Pekerja 0.9000 or Kepala tukang 0.4500 or Mandor 1.0000 ls Alat bantu (Bor listrik, dll) Pekerjaan Rangka Kayu 1 m3 Mengerjakan sloof dan lenger 1.1000 m3 Kayu ulin 5.2238 kg Paku ulin 10.0000 or Tukang kayu 6.0000 or Pekerja 1.0000 or Kepala tukang 0.3000 or Mandor 1.0000 ls Alat bantu (Bor listrik, dll) 1 m3 Mengerjakan kolom praktis (meranti) 1.1000 m3 Kayu meranti 2.6493 kg Paku kayu 12.0000 or Tukang kayu 5.7143 or Pekerja 2.5000 or Kepala tukang 0.4688 or Mandor 1.0000 ls Alat bantu (mesin ketam, dll) 1 m3 Mengerjakan rangka rumah kayu ulin 1.1000 m3 Kayu ulin 2.6493 kg Paku ulin 25.0000 or Tukang kayu 9.3750 or Pekerja 2.5000 or Kepala tukang 0.4688 or Mandor 1.0000 ls Mesin ketam Pekerjaan Struktur 1 m2 Memasang bekisting untuk pondasi 0.0400 m3 Papan kayu klas III 0.3000 kg Paku 5 s/d 10 cm 0.1000 ltr Minyak bekisting 0.2600 or Tukang kayu 0.5200 or Pekerja 0.0260 or Kepala tukang 0.0260 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

4,950,000.00 75,000.00 55,000.00 80,000.00 90,000.00 20,000.00 Jumlah

5,445,000.00 675,000.00 495,000.00 72,000.00 40,500.00 1,282,500.00 20,000.00 5,465,000.00

5,445,000.00 675,000.00 495,000.00 72,000.00 40,500.00 20,000.00 6,747,500.00

F F.1

4,950,000.00 22,000.00 75,000.00 55,000.00 80,000.00 90,000.00 25,000.00 Jumlah 2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 30,000.00 Jumlah 4,950,000.00 22,000.00 75,000.00 55,000.00 80,000.00 90,000.00 30,000.00 Jumlah

5,445,000.00 114,923.60 750,000.00 330,000.00 80,000.00 27,000.00 1,187,000.00 25,000.00 5,584,923.60 2,904,000.00 43,713.45 900,000.00 314,286.50 200,000.00 42,192.00 1,456,478.50 30,000.00 2,977,713.45 5,445,000.00 58,284.60 1,875,000.00 515,625.00 200,000.00 42,192.00 2,632,817.00 30,000.00 5,533,284.60

5,445,000.00 114,923.60 750,000.00 330,000.00 80,000.00 27,000.00 25,000.00 6,771,923.60 2,904,000.00 43,713.45 900,000.00 314,286.50 200,000.00 42,192.00 30,000.00 4,434,191.95 5,445,000.00 58,284.60 1,875,000.00 515,625.00 200,000.00 42,192.00 30,000.00 8,166,101.60

F.2

F.3

G. G.1

2,200,000.00 16,500.00 9,900.00 75,000.00 19,500.00 55,000.00 28,600.00 80,000.00 2,080.00 90,000.00 2,340.00 Jumlah 50,180.00 Untuk bekisting 2 x pakai

88,000.00 4,950.00 990.00

93,940.00

88,000.00 4,950.00 990.00 19,500.00 28,600.00 2,080.00 2,340.00 146,460.00 73,230.00

G.2

1 m2 Memasang bekisting untuk sloof 0.0450 m3 Papan kayu klas III 0.3000 kg Paku 5 s/d 10 cm 0.1000 ltr Minyak bekisting 0.2600 or Tukang kayu 0.5200 or Pekerja 0.0260 or Kepala tukang 0.0260 or Mandor

2,200,000.00 16,500.00 9,900.00 75,000.00 19,500.00 55,000.00 28,600.00 80,000.00 2,080.00 90,000.00 2,340.00 Jumlah 50,180.00 Untuk bekisting 2 x pakai 2,200,000.00 16,500.00 9,900.00 2,640,000.00 167,200.00 27,500.00 75,000.00 24,750.00 55,000.00 36,300.00 80,000.00 2,640.00 90,000.00 2,970.00 Jumlah 63,690.00 Untuk bekisting 2 x pakai

99,000.00 4,950.00 990.00

104,940.00

99,000.00 4,950.00 990.00 19,500.00 28,600.00 2,080.00 2,340.00 157,460.00 78,730.00 88,000.00 6,600.00 1,980.00 39,600.00 58,520.00 55,000.00 24,750.00 36,300.00 2,640.00 2,970.00 316,360.00 158,180.00

G.3

1 m2 Memasang bekisting untuk kolom 0.0400 m3 Papan kayu klas III 0.4000 kg Paku 5 cm s/d 12 cm 0.2000 ltr Minyak bekisting 0.0150 m3 Balok kayu klas II 0.3500 lbr Plywood tebal 9 mm 2.0000 btg Dolken kayu galam, (8 - 10) cm, panjang 4m' 0.3300 or Tukang kayu 0.6600 or Pekerja 0.0330 or Kepala tukang 0.0330 or Mandor

88,000.00 6,600.00 1,980.00 39,600.00 58,520.00 55,000.00

249,700.00

NO. G.4

NAMA PEKERJAAN 1 m2 Memasang bekisting untuk balok 0.0400 m3 Papan kayu klas III 0.4000 kg Paku 5 cm s/d 12 cm 0.2000 ltr Minyak bekisting 0.0180 m3 Balok kayu klas II 0.3500 lbr Plywood tebal 9 mm 2.0000 btg Dolken kayu galam, (8 - 10) cm, panjang 4m' 0.3300 or Tukang kayu 0.6600 or Pekerja 0.0330 or Kepala tukang 0.0330 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

2,200,000.00 16,500.00 9,900.00 2,640,000.00 167,200.00 27,500.00 75,000.00 24,750.00 55,000.00 36,300.00 80,000.00 2,640.00 90,000.00 2,970.00 Jumlah 63,690.00 Untuk bekisting 2 x pakai 2,200,000.00 16,500.00 9,900.00 2,640,000.00 167,200.00 27,500.00 75,000.00 24,750.00 55,000.00 36,300.00 80,000.00 2,640.00 90,000.00 2,970.00 Jumlah 63,690.00 Untuk bekisting 2 x pakai 2,200,000.00 16,500.00 9,900.00 2,640,000.00 167,200.00 27,500.00 27,500.00 75,000.00 24,750.00 55,000.00 36,300.00 80,000.00 2,640.00 90,000.00 2,970.00 Jumlah 63,690.00 Untuk bekisting 2 x pakai 2,200,000.00 16,500.00 9,900.00 2,640,000.00 167,200.00 27,500.00 75,000.00 24,750.00 55,000.00 36,300.00 80,000.00 2,640.00 90,000.00 2,970.00 Jumlah 63,690.00 Untuk bekisting 2 x pakai 2,200,000.00 16,500.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 3,750.00 8,250.00 400.00 720.00 13,120.00

88,000.00 6,600.00 1,980.00 47,520.00 58,520.00 55,000.00

88,000.00 6,600.00 1,980.00 47,520.00 58,520.00 55,000.00 24,750.00 36,300.00 2,640.00 2,970.00 324,280.00 162,140.00 88,000.00 6,600.00 1,980.00 39,600.00 58,520.00 165,000.00 24,750.00 36,300.00 2,640.00 2,970.00 426,360.00 213,180.00 66,000.00 6,600.00 1,980.00 52,800.00 58,520.00 82,500.00 110,000.00 24,750.00 36,300.00 2,640.00 2,970.00 445,060.00 222,530.00 66,000.00 6,600.00 1,485.00 39,600.00 58,520.00 55,000.00 24,750.00 36,300.00 2,640.00 2,970.00 293,865.00 146,932.50 58,080.00 9,900.00 13,750.00 3,750.00 8,250.00 400.00 720.00 94,850.00

257,620.00

G.5

1 m2 Memasang bekisting untuk plat lantai 0.0400 m3 Papan kayu klas III 0.4000 kg Paku 5 cm s/d 12 cm 0.2000 ltr Minyak bekisting 0.0150 m3 Balok kayu klas II 0.3500 lbr Plywood tebal 9 mm 6.0000 btg Dolken kayu galam, (8 - 10) cm, panjang 4m' 0.3300 or Tukang kayu 0.6600 or Pekerja 0.0330 or Kepala tukang 0.0330 or Mandor

88,000.00 6,600.00 1,980.00 39,600.00 58,520.00 165,000.00

359,700.00

G.6

1 m2 Memasang bekisting untuk dinding 0.0300 m3 Papan kayu klas III 0.4000 kg Paku 5 cm s/d 12 cm 0.2000 ltr Minyak bekisting 0.0200 m3 Balok kayu klas II 0.3500 lbr Plywood tebal 9 mm 3.0000 btg Dolken kayu galam, (8 - 10) cm, panjang 4m' 4.0000 bh Formite/penjaga jarak bekisting/ spacer 0.3300 or Tukang kayu 0.6600 or Pekerja 0.0330 or Kepala tukang 0.0330 or Mandor

66,000.00 6,600.00 1,980.00 52,800.00 58,520.00 82,500.00 110,000.00

378,400.00

G.7

1 m2 Memasang bekisting untuk tangga 0.0300 m3 Papan kayu klas III 0.4000 kg Paku 5 cm s/d 12 cm 0.1500 ltr Minyak bekisting 0.0150 m3 Balok kayu klas II 0.3500 lbr Plywood tebal 9 mm 2.0000 btg Dolken kayu galam, (8 - 10) cm, panjang 4m' 0.3300 or Tukang kayu 0.6600 or Pekerja 0.0330 or Kepala tukang 0.0330 or Mandor

66,000.00 6,600.00 1,485.00 39,600.00 58,520.00 55,000.00

227,205.00

G.8

1 m2 Memasang jembatan untuk pengecoran beton 0.0264 m3 Papan kayu klas III 0.6000 kg Paku 5 cm s/d 12 cm 0.5000 btg Dolken kayu galam (kasau), (8 - 10) cm, panjang 4m' 0.0500 or Tukang kayu 0.1500 or Pekerja 0.0050 or Kepala tukang 0.0080 or Mandor

58,080.00 9,900.00 13,750.00

81,730.00

NO. G.9

NAMA PEKERJAAN 1 m3 Pek. Beton campuran 1 : 2 : 3 0.8100 m3 Koral 0.5400 m3 Pasir beton 336.0000 kg Semen Pc 50 kg 350.0000 ltr Air bersih 0.3500 or Tukang batu 2.0000 or Pekerja 0.0350 or Kepala tukang 0.1000 or Mandor 1.0000 ls alat bantu pengecoran 1 m3 Pek. Beton campuran 1 : 3 : 5 0.8700 m3 Koral 0.5200 m3 Pasir beton 218.0000 kg Semen Pc 50 kg 350.0000 ltr Air bersih 0.2500 or Tukang batu 1.6500 or Pekerja 0.0250 or Kepala tukang 0.0800 or Mandor 1.0000 ls alat bantu pengecoran 1 m3 Pekerjaan beton mutu K-225, f'c = 19.3 Mpa, slump 12 (2) cm, w/c = 0.58 0.7756 m3 Batu pecah 2-3 cm 0.5983 m3 Pasir beton 371.0000 kg Semen Pc 50 kg 215.0000 ltr Air bersih 0.2750 or Tukang batu 1.6500 or Pekerja 0.0280 or Kepala tukang 0.0830 or Mandor 1.0000 ls alat bantu pengecoran 10 kg Pekerjaan pembesian dengan besi polos 10.5000 kg Besi beton polos 0.1500 kg kawat beton 0.0700 or Tukang besi 0.0700 or Pekerja 0.0070 or Kepala tukang 0.0040 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

186,000.00 105,000.00 1,342.00 39.60 75,000.00 55,000.00 80,000.00 90,000.00 100,600.00 Jumlah 186,000.00 105,000.00 1,342.00 39.60 75,000.00 55,000.00 80,000.00 90,000.00 100,600.00 Jumlah

150,660.00 56,700.00 450,912.00 13,860.00 26,250.00 110,000.00 2,800.00 9,000.00 148,050.00 100,600.00 772,732.00 161,820.00 54,600.00 292,556.00 13,860.00 18,750.00 90,750.00 2,000.00 7,200.00 118,700.00 100,600.00 522,836.00

150,660.00 56,700.00 450,912.00 13,860.00 26,250.00 110,000.00 2,800.00 9,000.00 100,600.00 920,782.00 161,820.00 54,600.00 292,556.00 13,860.00 18,750.00 90,750.00 2,000.00 7,200.00 100,600.00 742,136.00

G.10

G.11

395,000.00 105,000.00 1,342.00 39.60 75,000.00 55,000.00 80,000.00 90,000.00 100,600.00 Jumlah

306,344.44 62,820.00 497,882.00 8,514.00 20,625.00 90,750.00 2,240.00 7,470.00 121,085.00 100,600.00 875,560.44 131,603.77 3,465.00

306,344.44 62,820.00 497,882.00 8,514.00 20,625.00 90,750.00 2,240.00 7,470.00 100,600.00 1,097,245.44 131,603.77 3,465.00 5,250.00 3,850.00 560.00 360.00 145,088.77 14,508.88 175,218.75 3,465.00 5,250.00 3,850.00 560.00 360.00 188,703.75 18,870.38

G.12

12,533.69 23,100.00 75,000.00 5,250.00 55,000.00 3,850.00 80,000.00 560.00 90,000.00 360.00 Jumlah 10,020.00 Untuk 1 kg pembesian besi polos 16,687.50 23,100.00 75,000.00 5,250.00 55,000.00 3,850.00 80,000.00 560.00 90,000.00 360.00 Jumlah 10,020.00 Untuk 1 kg pembesian besi ulir

135,068.77

G.13

10 kg Pekerjaan pembesian dengan besi ulir 10.5000 kg Besi beton ulir 0.1500 kg kawat beton 0.0700 or Tukang besi 0.0700 or Pekerja 0.0070 or Kepala tukang 0.0040 or Mandor

175,218.75 3,465.00

178,683.75

G.14

Peralatan tambahan untuk 1 m3 Beton mutu K-225, K-275, K-350 1.9640 jam Cone mixer (molen) jam Water tanker 1.9600 jam Cone vibrator 1.0000 ls Alat bantu tukang batu Pekerjaan Dinding 1 m2 Pasangan batu bata 1 : 2, tebal 1 bata 100.0000 bh Batu bata 0.0800 m3 Pasir pasang 43.5000 kg Semen Pc 50 kg 0.2000 or Tukang batu 0.6000 or Pekerja 0.0200 or Kepala tukang 0.0300 or Mandor 1 m2 Pasangan batu bata 1 : 2, tebal 1/2 bata 50.0000 bh Batu bata 0.0380 m3 Pasir pasang 18.9500 kg Semen Pc 50 kg 0.1000 or Tukang batu 0.3000 or Pekerja 0.0100 or Kepala tukang 0.0150 or Mandor

25,000.00 25,000.00 2,500.00 Jumlah

49,100.00 49,000.00 2,500.00 100,600.00

49,100.00 49,000.00 2,500.00 100,600.00

H. H.1

1,000.00 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 1,000.00 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

100,000.00 8,048.00 58,377.00 15,000.00 33,000.00 1,600.00 2,700.00 52,300.00

166,425.00 50,000.00 3,822.80 25,430.90

100,000.00 8,048.00 58,377.00 15,000.00 33,000.00 1,600.00 2,700.00 218,725.00 50,000.00 3,822.80 25,430.90 7,500.00 16,500.00 800.00 1,350.00 105,403.70

H.2

7,500.00 16,500.00 800.00 1,350.00 26,150.00

79,253.70

NO. H.3

NAMA PEKERJAAN 1 m2 Pasangan batu bata 1 : 4, tebal 1 bata 100.0000 bh Batu bata 0.0930 m3 Pasir pasang 26.5500 kg Semen Pc 50 kg 0.2000 or Tukang batu 0.6000 or Pekerja 0.0200 or Kepala tukang 0.0300 or Mandor 1 m2 Pasangan batu bata 1 : 4, tebal 1/2 bata 50.0000 bh Batu bata 0.0430 m3 Pasir pasang 11.5000 kg Semen Pc 50 kg 0.1000 or Tukang batu 0.3000 or Pekerja 0.0100 or Kepala tukang 0.0150 or Mandor 1 m2 Memasang plesteran 1 : 2, tebal 15 mm 0.0200 m3 Pasir pasang 10.2240 kg Semen Pc 50 kg 0.1500 or Tukang batu 0.3000 or Pekerja 0.0150 or Kepala tukang 0.0150 or Mandor 1 m2 Memasang plesteran 1 : 4, tebal 15 mm 0.0240 m3 Pasir pasang 6.2400 kg Semen Pc 50 kg 0.1500 or Tukang batu 0.3000 or Pekerja 0.0150 or Kepala tukang 0.0150 or Mandor 1 m2 Memasang plesteran 1 : 2, tebal 20 mm 0.0270 m3 Pasir pasang 13.6320 kg Semen Pc 50 kg 0.2000 or Tukang batu 0.4000 or Pekerja 0.0200 or Kepala tukang 0.0220 or Mandor 1 m2 Memasang plesteran 1 : 4, tebal 20 mm 0.0320 m3 Pasir pasang 8.3200 kg Semen Pc 50 kg 0.2000 or Tukang batu 0.4000 or Pekerja 0.0200 or Kepala tukang 0.0220 or Mandor 1 m2 Memasang acian dinding 3.2500 kg Semen Pc 50 kg 0.1000 or Tukang batu 0.2000 or Pekerja 0.0100 or Kepala tukang 0.0100 or Mandor 1 m' Pekerjaan nat tali air 1 : 3 0.0086 m3 Pasir pasang 0.0770 zak Semen Pc 50 kg 0.0600 or Tukang batu 0.1600 or Pekerja 0.0060 or Kepala tukang 0.0250 or Mandor 1 m2 Dinding keramik 20 x 20 26.5000 bh Keramik 20 x 20 0.0180 m3 Pasir pasang 9.3000 kg Semen Pc 50 kg 1.9400 kg Semen warna 0.4500 or Tukang batu 0.9000 or Pekerja 0.0450 or Kepala tukang 0.0450 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

1,000.00 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 1,000.00 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 100,600.00 67,100.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 2,464.00 100,600.00 1,342.00 2,860.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

100,000.00 9,355.80 35,630.10 15,000.00 33,000.00 1,600.00 2,700.00 52,300.00

144,985.90 50,000.00 4,325.80 15,433.00

100,000.00 9,355.80 35,630.10 15,000.00 33,000.00 1,600.00 2,700.00 197,285.90 50,000.00 4,325.80 15,433.00 7,500.00 16,500.00 800.00 1,350.00 95,908.80 2,012.00 13,720.61 11,250.00 16,500.00 1,200.00 1,350.00 46,032.61 2,414.40 8,374.08 11,250.00 16,500.00 1,200.00 1,350.00 41,088.48 2,716.20 18,294.14 15,000.00 22,000.00 1,600.00 1,980.00 61,590.34 3,219.20 11,165.44 15,000.00 22,000.00 1,600.00 1,980.00 54,964.64 4,361.50 7,500.00 11,000.00 800.00 900.00 24,561.50 865.16 5,166.70 4,500.00 8,800.00 480.00 2,250.00 21,196.70 65,296.00 1,810.80 12,480.60 5,548.40 33,750.00 49,500.00 3,600.00 4,050.00 176,035.80

H.4

7,500.00 16,500.00 800.00 1,350.00 26,150.00

69,758.80 2,012.00 13,720.61

H.5

11,250.00 16,500.00 1,200.00 1,350.00 30,300.00

15,732.61 2,414.40 8,374.08

H.6

11,250.00 16,500.00 1,200.00 1,350.00 30,300.00

10,788.48 2,716.20 18,294.14

H.7

15,000.00 22,000.00 1,600.00 1,980.00 40,580.00

21,010.34 3,219.20 11,165.44

H.8

15,000.00 22,000.00 1,600.00 1,980.00 40,580.00

14,384.64 4,361.50

H.9

7,500.00 11,000.00 800.00 900.00 20,200.00

4,361.50 865.16 5,166.70

H.10

4,500.00 8,800.00 480.00 2,250.00 16,030.00

5,166.70 65,296.00 1,810.80 12,480.60 5,548.40

H.11

33,750.00 49,500.00 3,600.00 4,050.00 90,900.00

85,135.80

NO. H.12

NAMA PEKERJAAN 1 m2 Dinding keramik 30 x 30 1.0000 dos Keramik 30 x 30 0.0171 m3 Pasir pasang 0.1416 zak Semen Pc 50 kg 0.0140 kg Semen warna 0.6000 or Tukang batu 0.9000 or Pekerja 0.0600 or Kepala tukang 0.0450 or Mandor 1 m2 Dinding keramik 20 x 25 1.0000 dos Keramik 20 x 25 0.0171 m3 Pasir pasang 0.1416 zak Semen Pc 50 kg 0.0140 kg Semen warna 0.6000 or Tukang batu 0.9000 or Pekerja 0.0600 or Kepala tukang 0.0450 or Mandor 1 m' Plint keramik 10 x 20 5.0000 bh Plint keramik 10 x 20 0.0017 m3 Pasir pasang 0.0200 zak Semen Pc 50 kg 0.0058 kg Semen warna 0.1000 or Tukang batu 0.0500 or Pekerja 0.0100 or Kepala tukang 0.0025 or Mandor . 1 m' Plint keramik 10 x 30 3.5000 bh Plint keramik 10 x 30 0.0016 m3 Pasir pasang 0.0200 zak Semen Pc 50 kg 0.0058 kg Semen warna 0.1000 or Tukang batu 0.0500 or Pekerja 0.0100 or Kepala tukang 0.0025 or Mandor 1 m2 Dinding skat Double Plywood 3.6 mm + rangka 0.7639 lbr Plywood 3,6 mm 0.0161 m3 Kayu meranti 0.0494 kg Paku kayu 0.1765 or Tukang kayu 0.0880 or Pekerja 0.0177 or Kepala tukang 0.0044 or Mandor . 1 m2 Dinding sekat/partisi (tdk termasuk finishing) Double gypsum 12 mm + rangka kayu 0.7639 lbr Board gypsum 12 mm 0.0161 m3 Kayu meranti 0.0494 kg Paku 0.4286 or Tukang kayu 0.2143 or Pekerja 0.0429 or Kepala tukang 0.0107 or Mandor 1 m2 Dinding sekat/partisi (tdk termasuk finishing) Double Calsiboard 4 mm + rangka kayu 0.7639 lbr Calsiboard 4 mm 0.0161 m3 Kayu meranti 0.0494 kg Paku 0.4286 or Tukang kayu 0.2143 or Pekerja 0.0429 or Kepala tukang 0.0107 or Mandor 1 m2 Dinding susun sirih papan meranti 0.0281 m3 Papan kayu meranti 0.0676 kg Paku 0.4000 or Tukang kayu 0.2000 or Pekerja 0.0400 or Kepala tukang 0.0100 or mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

60,500.00 100,600.00 67,100.00 2,860.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 61,600.00 100,600.00 67,100.00 2,860.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 7,700.00 100,600.00 67,100.00 11,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 8,250.00 100,600.00 67,100.00 11,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

60,500.00 1,720.26 9,501.36 40.04 45,000.00 49,500.00 4,800.00 4,050.00 103,350.00

71,761.66 61,600.00 1,720.26 9,501.36 40.04

60,500.00 1,720.26 9,501.36 40.04 45,000.00 49,500.00 4,800.00 4,050.00 175,111.66 61,600.00 1,720.26 9,501.36 40.04 45,000.00 49,500.00 4,800.00 4,050.00 176,211.66 38,500.00 171.02 1,342.00 63.80 7,500.00 2,750.00 800.00 225.00 51,351.82 28,875.00 160.96 1,342.00 63.80 7,500.00 2,750.00 800.00 225.00 41,716.76

H.13

45,000.00 49,500.00 4,800.00 4,050.00 103,350.00

72,861.66 38,500.00 171.02 1,342.00 63.80

H.14

7,500.00 2,750.00 800.00 225.00 11,275.00

40,076.82 28,875.00 160.96 1,342.00 63.80

H.15

7,500.00 2,750.00 800.00 225.00 11,275.00

30,441.76

H.16

55,000.00 2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

42,014.50 42,504.00 815.10 13,237.50 4,840.00 1,416.00 396.00 19,889.50

85,333.60

42,014.50 42,504.00 815.10 13,237.50 4,840.00 1,416.00 396.00 105,223.10

H.17

202,400.00 2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

154,613.36 42,504.00 815.10 32,145.00 11,786.50 3,432.00 963.00 48,326.50

197,932.46

154,613.36 42,504.00 815.10 32,145.00 11,786.50 3,432.00 963.00 246,258.96

H.18

59,950.00 2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 2,695,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

45,795.81 42,504.00 815.10 32,145.00 11,786.50 3,432.00 963.00 48,326.50

89,114.91 75,729.50 1,115.40

45,795.81 42,504.00 815.10 32,145.00 11,786.50 3,432.00 963.00 137,441.41 75,729.50 1,115.40 30,000.00 11,000.00 3,200.00 900.00 121,944.90

H.19

30,000.00 11,000.00 3,200.00 900.00 45,100.00

76,844.90

NO. H.20

NAMA PEKERJAAN 1 m2 Dinding susun sirih papan meranti dilapisi calsiboard 4 mm + rangka 0.0281 m3 Papan kayu meranti 0.3820 lbr Calsiboard 4 mm 0.0161 m3 Kayu meranti 0.2372 kg Paku 0.4206 or Tukang kayu 0.2143 or Pekeja 0.0428 or kepala tukang 0.0107 or Mandor 1 m2 Dinding Plywood 3.6 mm + rangka 0.3820 bh Plywood 3.6 mm 0.0161 m3 Kayu meranti 0.0494 kg Paku kayu 0.1500 or Tukang kayu 0.0750 or Pekerja 0.0150 or Kepala tukang 0.0038 or Mandor 1 m2 Dinding skat double multiplek 9 mm dan rangka 0.7639 bh Multiplek 9 mm 0.0161 m3 Kayu meranti 0.0494 kg Paku kayu 0.1765 or Tukang kayu 0.0880 or Pekerja 0.0177 or Kepala tukang 0.0044 or Mandor 1 m2 Glass block 20 x 20 25.0000 bh Glass block 20 x 20 0.0230 m3 Pasir pasang 0.1390 kg Semen Pc 50 kg 2.0000 or Tukang batu 1.0000 or Pekerja 0.2000 or Kepala tukang 0.0500 or Mandor 1 m2 Dinding roster 20 x 20 25.0000 bh Roster beton 20 x 20 0.0230 m3 Pasir pasang 0.1390 kg Semen Pc 50 kg 1.2000 or Tukang batu 0.7200 or Pekerja 0.1200 or Kepala tukang 0.0360 or Mandor 1 m2 Dinding papan ulin diketam dgn alur lidah 0.0234 m3 Papan kayu ulin 0.1126 kg Paku ulin 0.6000 or Tukang kayu 0.3000 or Pekerja 0.0600 or Kepala tukang 0.0150 or Mandor 1.0000 ls Alat bantu (ketam listrik) 1 m2 Dinding papan meranti diketam dgn alur lidah 0.0234 m3 Papan kayu meranti 0.0100 m3 kayu meranti 0.1126 kg Paku kayu 0.6000 or Tukang kayu 0.3000 or Pekerja 0.0600 or Kepala tukang 0.0150 or Mandor 1.0000 ls Alat bantu (ketam listrik) Pekerjaan Lantai 1 m2 Lantai keramik 20 x 20 26.5000 bh Keramik 20 x 20 0.0450 m3 Pasir pasang 10.4000 kg Semen Pc 50 kg 1.6200 kg Semen warna 0.3500 or Tukang batu 0.7000 or Pekerja 0.0350 or Kepala tukang 0.0350 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

2,695,000.00 59,950.00 2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

75,729.50 22,900.90 42,504.00 3,913.80 31,545.00 11,786.50 3,424.00 963.00 47,718.50

145,048.20

75,729.50 22,900.90 42,504.00 3,913.80 31,545.00 11,786.50 3,424.00 963.00 192,766.70

H.21

55,000.00 2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

21,010.00 42,504.00 815.10 11,250.00 4,125.00 1,200.00 342.00 16,917.00

64,329.10

21,010.00 42,504.00 815.10 11,250.00 4,125.00 1,200.00 342.00 81,246.10

H.22

167,200.00 2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 26,400.00 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 6,050.00 100,600.00 1,342.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 5,500,000.00 22,000.00 75,000.00 55,000.00 80,000.00 90,000.00 3,000.00 Jumlah 2,695,000.00 2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 3,000.00 Jumlah

127,724.08 42,504.00 815.10 13,237.50 4,840.00 1,416.00 396.00 19,889.50

171,043.18 660,000.00 2,313.80 186.54

127,724.08 42,504.00 815.10 13,237.50 4,840.00 1,416.00 396.00 190,932.68 660,000.00 2,313.80 186.54 150,000.00 55,000.00 16,000.00 4,500.00 888,000.34 151,250.00 2,313.80 186.54 90,000.00 39,600.00 9,600.00 3,240.00 296,190.34 128,700.00 2,477.20 45,000.00 16,500.00 4,800.00 1,350.00 3,000.00 201,827.20 63,063.00 26,400.00 1,857.90 45,000.00 16,500.00 4,800.00 1,350.00 3,000.00 161,970.90

H.23

150,000.00 55,000.00 16,000.00 4,500.00 225,500.00

662,500.34 151,250.00 2,313.80 186.54

H.24

90,000.00 39,600.00 9,600.00 3,240.00 142,440.00

153,750.34 128,700.00 2,477.20

H.25

45,000.00 16,500.00 4,800.00 1,350.00 67,650.00 3,000.00 134,177.20 63,063.00 26,400.00 1,857.90 45,000.00 16,500.00 4,800.00 1,350.00 67,650.00 3,000.00 94,320.90

H.26

I. I.1

2,464.00 100,600.00 1,342.00 11,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

65,296.00 4,527.00 13,956.80 17,820.00 26,250.00 38,500.00 2,800.00 3,150.00 70,700.00

101,599.80

65,296.00 4,527.00 13,956.80 17,820.00 26,250.00 38,500.00 2,800.00 3,150.00 172,299.80

NO. I.2

NAMA PEKERJAAN 1 m2 Lantai keramik 30 x 30 11.8700 bh Keramik 30 x 30 0.0450 m3 Pasir pasang 10.0000 kg Semen Pc 50 kg 1.5000 kg Semen warna 0.3500 or Tukang batu 0.7000 or Pekerja 0.0350 or Kepala tukang 0.0350 or Mandor 1 m2 Lantai keramik 40 x 40 6.2500 bh Keramik 40 x 40 0.0450 m3 Pasir pasang 10.0000 kg Semen Pc 50 kg 1.5000 kg Semen warna 0.3500 or Tukang batu 0.7000 or Pekerja 0.0350 or Kepala tukang 0.0350 or Mandor 1 m2 Lantai keramik 60 x 60 2.7780 bh Keramik 60 x 60 0.0450 m3 Pasir pasang 10.0000 kg Semen Pc 50 kg 1.5000 kg Semen warna 0.3500 or Tukang batu 0.7000 or Pekerja 0.0350 or Kepala tukang 0.0350 or Mandor 1 m2 Lantai keramik anti slip 20 x 20 26.5000 bh Keramik anti slip 20 x 20 0.0450 m3 Pasir pasang 10.4000 kg Semen Pc 50 kg 1.6200 kg Semen warna 0.3500 or Tukang batu 0.7000 or Pekerja 0.0350 or Kepala tukang 0.0350 or Mandor 1 m2 Lantai keramik anti slip 30 x 30 11.8700 bh Keramik 30 x 30 0.0450 m3 Pasir pasang 10.0000 kg Semen Pc 50 kg 1.5000 kg Semen warna 0.3500 or Tukang batu 0.7000 or Pekerja 0.0350 or Kepala tukang 0.0350 or Mandor 1 m2 Lantai keramik anti slip 40 x 40 1.0000 dos Keramik 40 x 40 0.0190 m3 Pasir pasang 0.1920 zak Semen Pc 50 kg 0.0140 kg Semen warna 0.2500 or Tukang batu 0.5000 or Pekerja 0.0250 or Kepala tukang 0.0250 or Mandor 1 m2 Lantai Papan Ulin diketam tanpa celah 0.0234 m3 Papan kayu ulin 0.1609 kg Paku ulin 0.6000 or Tukang kayu 0.3000 or Pekerja 0.0600 or Kepala tukang 0.0150 or Mandor 1.0000 ls Alat bantu (ketam listrik) 1 m2 Lantai jembatan titian ulin dengan celah 0.0234 m3 Papan ulin 0.1609 kg Paku ulin 0.3750 or Tukang kayu 0.0375 or Kepala tukang 0.0125 or Mandor 0.1250 or Pekerja 1.0000 ls Alat bantu (ketam listrik)

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

5,500.00 100,600.00 1,342.00 11,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 13,383.33 100,600.00 1,342.00 11,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 23,375.00 100,600.00 1,342.00 11,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 2,464.00 100,600.00 1,342.00 11,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 5,500.00 100,600.00 1,342.00 11,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 80,300.00 100,600.00 67,100.00 11,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 5,500,000.00 22,000.00 75,000.00 55,000.00 80,000.00 90,000.00 3,000.00 Jumlah 5,500,000.00 22,000.00 75,000.00 80,000.00 90,000.00 55,000.00 3,000.00 Jumlah

65,285.00 4,527.00 13,420.00 16,500.00 26,250.00 38,500.00 2,800.00 3,150.00 70,700.00

99,732.00 83,645.83 4,527.00 13,420.00 16,500.00

65,285.00 4,527.00 13,420.00 16,500.00 26,250.00 38,500.00 2,800.00 3,150.00 170,432.00 83,645.83 4,527.00 13,420.00 16,500.00 26,250.00 38,500.00 2,800.00 3,150.00 188,792.83 64,935.75 4,527.00 13,420.00 16,500.00 26,250.00 38,500.00 2,800.00 3,150.00 170,082.75 65,296.00 4,527.00 13,956.80 17,820.00 26,250.00 38,500.00 2,800.00 3,150.00 172,299.80 65,285.00 4,527.00 13,420.00 16,500.00 26,250.00 38,500.00 2,800.00 3,150.00 170,432.00 80,300.00 1,911.40 12,883.20 154.00 18,750.00 27,500.00 2,000.00 2,250.00 145,748.60 128,700.00 3,539.80 45,000.00 16,500.00 4,800.00 1,350.00 3,000.00 202,889.80 128,700.00 3,539.80 28,125.00 3,000.00 1,125.00 6,875.00 3,000.00 174,364.80

I.3

26,250.00 38,500.00 2,800.00 3,150.00 70,700.00

118,092.83 64,935.75 4,527.00 13,420.00 16,500.00

I.4

26,250.00 38,500.00 2,800.00 3,150.00 70,700.00

99,382.75 65,296.00 4,527.00 13,956.80 17,820.00

I.5

26,250.00 38,500.00 2,800.00 3,150.00 70,700.00

101,599.80 65,285.00 4,527.00 13,420.00 16,500.00

I.6

26,250.00 38,500.00 2,800.00 3,150.00 70,700.00

99,732.00 80,300.00 1,911.40 12,883.20 154.00

I.7

18,750.00 27,500.00 2,000.00 2,250.00 50,500.00

95,248.60 128,700.00 3,539.80

L.8

45,000.00 16,500.00 4,800.00 1,350.00 67,650.00 3,000.00 135,239.80 128,700.00 3,539.80 28,125.00 3,000.00 1,125.00 6,875.00 39,125.00 3,000.00 135,239.80

L.9

NO. J. J.1

NAMA PEKERJAAN Pekerjaan Plapond 1 m2 Memasang langit-langit tripleks (120 x 240) cm, tebal 3.6 mm 0.3750 lbr Plywood 3.6 mm 0.0300 kg Paku plywood 0.1000 or Tukang kayu 0.1000 or Pekerja 0.0100 or Kepala tukang 0.0050 or Mandor 1 m2 Memasang langit-langit tripleks (120 x 240) cm, tebal 4 mm 0.3750 lbr Plywood 4 mm 0.0300 kg Paku plywood 0.1000 or Tukang kayu 0.1000 or Pekerja 0.0100 or Kepala tukang 0.0050 or Mandor 1 m2 Memasang langit-langit tripleks (120 x 240) cm, tebal 6 mm 0.3750 lbr Plywood 6 mm 0.0300 kg Paku plywood 0.1000 or Tukang kayu 0.1000 or Pekerja 0.0100 or Kepala tukang 0.0050 or Mandor 1 m2 Memasang langit-langit calsiboard (120 x 240) cm, tebal 4.5 mm 0.3750 lbr Calsiboard 4.5 mm 0.0300 kg Paku plywood 0.1000 or Tukang kayu 0.1000 or Pekerja 0.0100 or Kepala tukang 0.0050 or Mandor 1 m2 Memasang langit-langit lambreziring kayu tebal 9 mm 0.0150 m3 Papan kayu lumbriziring tebal 9 mm 0.0100 kg Paku kayu 0.8000 or Tukang kayu 0.8000 or Pekerja 0.0800 or Kepala tukang 0.0400 or Mandor 1 m' Memasang list langit-langit kayu profil 1.0500 m' List kayu profil 0.0100 kg Paku kayu 0.0500 or Tukang kayu 0.0500 or Pekerja 0.0050 or Kepala tukang 0.0030 or Mandor 1 m2 Plapond calsiboard 3,5 mm + rangka 0.3819 lbr Calsiboard 3,6 mm 0.0201 m3 Kayu meranti 0.1000 kg Paku 0.5000 or Tukang kayu 0.2500 or Pekerja 0.0500 or Kepala tukang 0.0125 or Mandor 1 m1 Kusen pintu, jendela, ventilasi kayu ulin (pekerjaan memasang kusen jadi) 1.0000 m1 Kusen kayu ulin 0.0750 or Tukang kayu 0.1500 or Pekerja 0.0075 or Kepala tukang 0.0075 or Mandor 1 m2 Memasang rangka langit-langit (60 x 60) cm, kayu klas II atau III 0.0163 m3 Kayu balok 5/7 cm 0.2500 kg Paku kayu 7 s/d 10 cm 0.3000 or Tukang kayu 0.2000 or Pekerja 0.0300 or Kepala tukang 0.0100 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

55,000.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

20,625.00 825.00 7,500.00 5,500.00 800.00 450.00 14,250.00

21,450.00

20,625.00 825.00 7,500.00 5,500.00 800.00 450.00 35,700.00

J.2

60,500.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

22,687.50 825.00 7,500.00 5,500.00 800.00 450.00 14,250.00

23,512.50

22,687.50 825.00 7,500.00 5,500.00 800.00 450.00 37,762.50

J.3

100,100.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

37,537.50 825.00 7,500.00 5,500.00 800.00 450.00 14,250.00

38,362.50

37,537.50 825.00 7,500.00 5,500.00 800.00 450.00 52,612.50

J.4

59,950.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 3,025,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 4,125.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 57,750.00 2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

22,481.25 825.00 7,500.00 5,500.00 800.00 450.00 14,250.00

23,306.25 45,375.00 165.00

22,481.25 825.00 7,500.00 5,500.00 800.00 450.00 37,556.25 45,375.00 165.00 60,000.00 44,000.00 6,400.00 3,600.00 159,540.00 4,331.25 165.00 3,750.00 2,750.00 400.00 270.00 11,666.25 22,054.73 53,064.00 1,650.00 37,500.00 13,750.00 4,000.00 1,125.00 133,143.73

J.5

60,000.00 44,000.00 6,400.00 3,600.00 114,000.00

45,540.00 4,331.25 165.00

j.6

3,750.00 2,750.00 400.00 270.00 7,170.00

4,496.25 22,054.73 53,064.00 1,650.00

J.7

37,500.00 13,750.00 4,000.00 1,125.00 56,375.00

76,768.73

J.8

74,800.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

74,800.00 5,625.00 8,250.00 600.00 675.00 15,150.00

74,800.00

74,800.00 5,625.00 8,250.00 600.00 675.00 89,950.00

J.9

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

43,032.00 4,125.00 22,500.00 11,000.00 2,400.00 900.00 36,800.00

47,157.00

43,032.00 4,125.00 22,500.00 11,000.00 2,400.00 900.00 83,957.00

NO. J.10

NAMA PEKERJAAN 1 m2 Memasang rangka langit-langit (50 x 100) cm, kayu klas II atau III 0.0154 m3 Kayu balok 5/7 cm 0.2000 kg Paku kayu 7 s/d 10 cm 0.3000 or Tukang kayu 0.1500 or Pekerja 0.0300 or Kepala tukang 0.0750 or Mandor Pekerjaan Kusen 1 m3 Membuat dan memasang kusen pintu dan jendela, kayu klas I 1.1000 m3 Balok kayu klas I 1.2500 kg Paku 10 cm 1.0000 kg Lem kayu 21.0000 or Tukang kayu 7.0000 or Pekerja 2.1000 or Kepala tukang 0.3500 or Mandor 1 m3 Membuat dan memasang kusen pintu dan jendela, kayu klas II atau III 1.2000 m3 Balok kayu klas II atau III 1.2500 kg Paku 10 cm 1.0000 kg Lem kayu 18.0000 or Tukang kayu 6.0000 or Pekerja 1.8000 or Kepala tukang 0.3000 or Mandor 1 m2 Membuat dan memasang daun pintu panel, kayu klas I 0.0400 m3 Papan kayu klas I 0.5000 kg Lem kayu 3.0000 or Tukang kayu 1.0000 or Pekerja 0.3000 or Kepala tukang 0.0500 or Mandor 1 m2 Membuat dan memasang daun pintu panel, kayu klas II 0.0400 m3 Papan kayu klas II 0.5000 kg Lem kayu 3.0000 or Tukang kayu 1.0000 or Pekerja 0.3000 or Kepala tukang 0.0500 or Mandor 1 m2 Membuat dan memasang pintu dan jendela kaca, kayu klas I 0.0240 m3 Papan kayu klas I 0.3000 kg Lem kayu 2.4000 or Tukang kayu 0.8000 or Pekerja 0.2400 or Kepala tukang 0.0400 or Mandor 1 m2 Membuat dan memasang pintu dan jendela kaca, kayu klas II 0.0240 m3 Papan kayu klas II 0.3000 kg Lem kayu 2.4000 or Tukang kayu 0.8000 or Pekerja 0.2400 or Kepala tukang 0.0400 or Mandor 1 m2 Membuat dan memasang pintu dan jendela jalusi, kayu klas I 0.0640 m3 Papan kayu klas I 0.5000 kg Lem kayu 3.0000 or Tukang kayu 1.0000 or Pekerja 0.3000 or Kepala tukang 0.0500 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

40,656.00 3,300.00 22,500.00 8,250.00 2,400.00 6,750.00 39,900.00

43,956.00

40,656.00 3,300.00 22,500.00 8,250.00 2,400.00 6,750.00 83,856.00

K. K.1

5,500,000.00 22,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

6,050,000.00 27,500.00 20,250.00 1,575,000.00 385,000.00 168,000.00 31,500.00 2,159,500.00

6,097,750.00

6,050,000.00 27,500.00 20,250.00 1,575,000.00 385,000.00 168,000.00 31,500.00 8,257,250.00

K.2

3,520,000.00 22,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

4,224,000.00 27,500.00 20,250.00 1,350,000.00 330,000.00 144,000.00 27,000.00 1,851,000.00

4,271,750.00

4,224,000.00 27,500.00 20,250.00 1,350,000.00 330,000.00 144,000.00 27,000.00 6,122,750.00

K.3

6,600,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

264,000.00 10,125.00 225,000.00 55,000.00 24,000.00 4,500.00 308,500.00

274,125.00

264,000.00 10,125.00 225,000.00 55,000.00 24,000.00 4,500.00 582,625.00

K.4

3,850,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

154,000.00 10,125.00 225,000.00 55,000.00 24,000.00 4,500.00 308,500.00

164,125.00

154,000.00 10,125.00 225,000.00 55,000.00 24,000.00 4,500.00 472,625.00

K.5

6,600,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

158,400.00 6,075.00 180,000.00 44,000.00 19,200.00 3,600.00 246,800.00

164,475.00

158,400.00 6,075.00 180,000.00 44,000.00 19,200.00 3,600.00 411,275.00

K.6

3,850,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

92,400.00 6,075.00 180,000.00 44,000.00 19,200.00 3,600.00 246,800.00

98,475.00

92,400.00 6,075.00 180,000.00 44,000.00 19,200.00 3,600.00 345,275.00

K.7

6,600,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

422,400.00 10,125.00 225,000.00 55,000.00 24,000.00 4,500.00 308,500.00

432,525.00

422,400.00 10,125.00 225,000.00 55,000.00 24,000.00 4,500.00 741,025.00

NO. K.8

NAMA PEKERJAAN 1 m2 Membuat dan memasang pintu dan jendela jalusi, kayu klas II 0.0640 m3 Papan kayu klas II 0.5000 kg Lem kayu 3.0000 or Tukang kayu 1.0000 or Pekerja 0.3000 or Kepala tukang 0.0500 or Mandor 1 m2 Memasang jalusi kusen, kayu klas I 0.0600 m3 Papan kayu klas I 0.1500 kg Paku 1 s/d 2.5 cm 2.0000 or Tukang kayu 0.6700 or Pekerja 0.2000 or Kepala tukang 0.3350 or Mandor 1 m2 Memasang jalusi kusen, kayu klas II 0.0600 m3 Papan kayu klas II 0.1500 kg Paku 1 s/d 2.5 cm 2.0000 or Tukang kayu 0.6700 or Pekerja 0.2000 or Kepala tukang 0.3350 or Mandor Pekerjaan Atap 1 m3 Kuda-kuda bentang lebih dari 7 meter (atap pelana tdk byk jurai/atap sekolah dasar) 1.1000 m3 Kayu meranti 3.0000 kg Paku kayu 17.3611 or Tukang kayu 11.0480 or Pekerja 1.7361 or Kepala tukang 0.5524 or Mandor 1.0000 ls Alat bantu (bor listrik, dll) 1 m3 Kuda-kuda bentang lebih dari 7 meter (atap perisai/byk jurai/atap rumah agak rumit) 1.2000 m3 Kayu meranti 3.6000 kg Paku kayu 20.8330 or Tukang kayu 13.2576 or Pekerja 2.0833 or Kepala tukang 0.6629 or Mandor 1.0000 ls Alat bantu (bor listrik, dll) 1 m3 Kuda-kuda bentang lebih dari 7 meter (atap bentuk sulit dgn bentuk arsitektur rumit) 1.3000 m3 Kayu meranti 3.9000 kg Paku kayu 22.5694 or Tukang kayu 14.3624 or Pekerja 2.2569 or Kepala tukang 0.7181 or Mandor 1.0000 ls Alat bantu (bor listrik, dll) 1 m3 Kuda-kuda bentang kurang dari 7 meter (atap pelana tdk byk jurai/atap sekolah dasar) 1.1000 m3 Kayu meranti 3.0000 kg Paku kayu 6.9444 or Tukang kayu 13.8889 or Pekerja 0.6944 or Kepala tukang 0.6944 or Mandor 1.0000 ls Alat bantu (bor listrik, dll) 1 m3 Kuda-kuda bentang kurang dari 7 meter (atap perisai/byk jurai/atap rumah agak rumit) 1.2000 m3 Kayu meranti 3.6000 kg Paku kayu 16.6667 or Tukang kayu 8.3330 or Pekerja 1.6667 or Kepala tukang 0.4167 or Mandor 1.0000 ls Alat bantu (bor listrik, dll)

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

3,850,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 6,600,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 3,850,000.00 20,250.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

246,400.00 10,125.00 225,000.00 55,000.00 24,000.00 4,500.00 308,500.00

256,525.00 396,000.00 3,037.50

246,400.00 10,125.00 225,000.00 55,000.00 24,000.00 4,500.00 565,025.00 396,000.00 3,037.50 150,000.00 36,850.00 16,000.00 30,150.00 632,037.50 231,000.00 3,037.50 150,000.00 36,850.00 16,000.00 30,150.00 467,037.50

K.9

150,000.00 36,850.00 16,000.00 30,150.00 233,000.00

399,037.50 231,000.00 3,037.50

K.10

150,000.00 36,850.00 16,000.00 30,150.00 233,000.00

234,037.50

L. L.1

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 20,000.00 Jumlah

2,904,000.00 49,500.00 1,302,082.50 607,640.00 138,888.00 49,716.00 2,098,326.50 20,000.00 2,973,500.00

2,904,000.00 49,500.00 1,302,082.50 607,640.00 138,888.00 49,716.00 20,000.00 5,071,826.50

L.2

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 20,000.00 Jumlah

3,168,000.00 59,400.00 1,562,475.00 729,168.00 166,664.00 59,661.00 2,517,968.00 20,000.00 3,247,400.00

3,168,000.00 59,400.00 1,562,475.00 729,168.00 166,664.00 59,661.00 20,000.00 5,765,368.00

L.3

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 20,000.00 Jumlah

3,432,000.00 64,350.00 1,692,705.00 789,932.00 180,552.00 64,629.00 2,727,818.00 20,000.00 3,516,350.00

3,432,000.00 64,350.00 1,692,705.00 789,932.00 180,552.00 64,629.00 20,000.00 6,244,168.00

L.4

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 20,000.00 Jumlah

2,904,000.00 49,500.00 520,830.00 763,889.50 55,552.00 62,496.00 1,402,767.50 20,000.00 2,973,500.00

2,904,000.00 49,500.00 520,830.00 763,889.50 55,552.00 62,496.00 20,000.00 4,376,267.50

L.5

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 20,000.00 Jumlah

3,168,000.00 59,400.00 1,250,002.50 458,315.00 133,336.00 37,503.00 1,879,156.50 20,000.00 3,247,400.00

3,168,000.00 59,400.00 1,250,002.50 458,315.00 133,336.00 37,503.00 20,000.00 5,126,556.50

NO. L.6

NAMA PEKERJAAN 1 m3 Kuda-kuda bentang kurang dari 7 meter (atap bentuk sulit dgn bentuk arsitektur rumit) 1.3000 m3 Kayu meranti 3.9000 kg Paku kayu 18.0556 or Tukang kayu 9.0277 or Pekerja 1.8056 or Kepala tukang 0.4514 or Mandor 1.0000 ls Alat bantu (bor listrik, dll) 1 m1 Kuda-kuda diketam halus, konsul kayu bengkirai 1.0000 m1 Kayu bengkirai 3.0000 kg Paku 0.0511 or Tukang kayu 0.0682 or Pekerja 0.0051 or Kepala tukang 0.0034 or Mandor 1.1000 m3 Pek. Gergajian 1 m3 Gording, kayu klas II 1.1000 m3 Balok kayu klas II 15.0000 kg Besi strip tebal 5 mm 3.0000 kg Paku 12 cm 7.2000 or Tukang kayu 2.4000 or Pekerja 0.7200 or Kepala tukang 0.1200 or Mandor 1 m2 Kasau + reng (untuk atap sirap, genteng) (atap pelana tdk byk jurai/atap sekolah dasar) 0.0123 m3 Kayu meranti 0.0523 kg Paku kayu 0.0900 or Tukang kayu 0.0600 or Pekerja 0.0090 or Kepala tukang 0.0030 or Mandor 0.4000 m2 Upah menggergaji 1 m2 Kasau + reng (untuk atap sirap, genteng) (atap perisai/byk jurai/atap rumah agak rumit) 0.0146 m3 Kayu meranti 0.0567 kg Paku kayu 0.1170 or Tukang kayu 0.0780 or Pekerja 0.0117 or Kepala tukang 0.0039 or Mandor 1 m2 Kasau + reng (untuk atap sirap, genteng) (atap bentuk sulit dgn bentuk arsitektur rumit) 0.0157 m3 Kayu meranti 0.0610 kg Paku kayu 0.1260 or Tukang kayu 0.0840 or Pekerja 0.0126 or Kepala tukang 0.0042 or Mandor Atap seng gelombang BJLS 20 (atap pelana/perisai sederhana/atap sekolahan) 0.8929 lbr Seng BJLS 20 0.0482 kg Paku seng 0.0750 or Tukang kayu 0.0375 or Pekerja 0.0075 or Kepala tukang 0.0018 or Mandor Atap seng gelombang BJLS 20 (atap perisai yang banyak jurai) 1.1688 lbr Seng BJLS 20 0.0540 kg Paku seng 0.0975 or Tukang kayu 0.0488 or Pekerja 0.0098 or Kepala tukang 0.0023 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 20,000.00 Jumlah 3,520,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 5,000.00 Jumlah 2,640,000.00 12,533.69 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

3,432,000.00 64,350.00 1,354,170.00 496,523.50 144,448.00 40,626.00 2,035,767.50 20,000.00 3,516,350.00 3,520,000.00 49,500.00 3,832.50 3,751.00 408.00 306.00 8,297.50 5,500.00 3,575,000.00 2,904,000.00 188,005.39 49,500.00 540,000.00 132,000.00 57,600.00 10,800.00 740,400.00

3,432,000.00 64,350.00 1,354,170.00 496,523.50 144,448.00 40,626.00 20,000.00 5,552,117.50 3,520,000.00 49,500.00 3,832.50 3,751.00 408.00 306.00 5,500.00 3,583,297.50 2,904,000.00 188,005.39 49,500.00 540,000.00 132,000.00 57,600.00 10,800.00 3,881,905.39

L.7

L.8

3,141,505.39

L.9

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 2,000.00 Jumlah

32,472.00 862.95 6,750.00 3,300.00 720.00 270.00 800.00 11,840.00

33,334.95

32,472.00 862.95 6,750.00 3,300.00 720.00 270.00 800.00 45,174.95

L.10

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

38,544.00 935.55 8,775.00 4,290.00 936.00 351.00 14,352.00

39,479.55

38,544.00 935.55 8,775.00 4,290.00 936.00 351.00 53,831.55

L.11

2,640,000.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

41,448.00 1,006.50 9,450.00 4,620.00 1,008.00 378.00 15,456.00

42,454.50

41,448.00 1,006.50 9,450.00 4,620.00 1,008.00 378.00 57,910.50

L.12

42,900.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

38,305.41 1,325.50 5,625.00 2,062.50 600.00 162.00 8,449.50

39,630.91

38,305.41 1,325.50 5,625.00 2,062.50 600.00 162.00 48,080.41

L.13

42,900.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

50,141.52 1,485.00 7,312.50 2,684.00 784.00 207.00 10,987.50

51,626.52

50,141.52 1,485.00 7,312.50 2,684.00 784.00 207.00 62,614.02

NO. L.15

NAMA PEKERJAAN 1 m' Bubungan seng datar/ Jurai dalam 1.0000 m' Seng plat BJLS 20 0.0500 kg Paku seng 0.0088 m3 Papan kayu meranti 0.0750 or Tukang besi 0.0750 or Pekerja 0.0075 or Kepala tukang 0.0038 or Mandor 1 m2 Atap genteng metal mutu klas I (atap pelana/perisai sederhana/atap sekolahan) 1.3000 lbr Genteng metal 0.4mm 0.0300 kg Paku genteng 0.0536 or Tukang kayu 0.0321 or Pekerja 0.0054 or Kepala tukang 0.0016 or Mandor 1 m2 Atap genteng metal mutu klas I (atap perisai yang banyak jurai) 1.3000 lbr Genteng metal 0.4mm 0.0300 kg Paku genteng 0.0577 or Tukang kayu 0.0346 or Pekerja 0.0058 or Kepala tukang 0.0017 or Mandor 1 m2 Atap genteng metal mutu klas II (atap pelana/perisai sederhana/atap sekolahan) 1.3000 lbr Genteng metal 0.3 mm 0.0300 kg Paku genteng 0.0536 or Tukang kayu 0.0321 or Pekerja 0.0054 or Kepala tukang 0.0016 or Mandor 1 m2 Atap genteng metal mutu klas II (atap perisai yang banyak jurai) 1.3000 lbr Genteng metal 0.0300 kg Paku genteng 0.0577 or Tukang kayu 0.0346 or Pekerja 0.0058 or Kepala tukang 0.1700 or Mandor 1 m' Nok genteng metal model U panjang 110 cm 1.0000 bh Nok model U 0.0750 kg Paku genteng 0.0375 or Tukang kayu 0.0375 or Pekerja 0.0038 or Kepala tukang 0.0019 or Mandor 1 M1 Nok genteng metal model C panjang 40 cm 3.0000 bh Nok model C 0.0750 kg Paku genteng 0.0375 or Tukang kayu 0.0375 or Pekerja 0.0038 or Kepala tukang 0.0019 or Mandor 1 m' Nok samping genteng metal 110 cm 1.0000 bh Nok samping genteng metal 0.0750 kg Paku genteng 0.0375 or Tukang kayu 0.0375 or Pekerja 0.0038 or Kepala tukang 0.0019 or Mandor 1 m' List plank 3/20 cm, kayu klas I 0.0108 m3 Papan kayu klas I 0.1000 kg Paku 5 s/d 7 cm 0.2000 or Tukang kayu 0.1000 or Pekerja 0.0200 or Kepala tukang 0.0050 or Mandor

HARGA SATUAN ( Rp ) 15,950.00 27,500.00 2,695,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

UPAH ( Rp )

BAHAN ( Rp ) 15,950.00 1,375.00 23,716.00

JUMLAH HARGA ( Rp ) 15,950.00 1,375.00 23,716.00 5,625.00 4,125.00 600.00 342.00 51,733.00

5,625.00 4,125.00 600.00 342.00 10,692.00

41,041.00

L.16

79,750.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

103,675.00 825.00 4,020.00 1,765.50 432.00 144.00 6,361.50

104,500.00

103,675.00 825.00 4,020.00 1,765.50 432.00 144.00 110,861.50

L.17

79,750.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

103,675.00 825.00 4,327.50 1,903.00 464.00 153.00 6,847.50

104,500.00

103,675.00 825.00 4,327.50 1,903.00 464.00 153.00 111,347.50

L.18

46,200.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

60,060.00 825.00 4,020.00 1,765.50 432.00 144.00 6,361.50

60,885.00

60,060.00 825.00 4,020.00 1,765.50 432.00 144.00 67,246.50

L.19

46,200.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 28,600.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 30,800.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 25,300.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 5,500,000.00 22,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

60,060.00 825.00 4,327.50 1,903.00 464.00 15,300.00 21,994.50

60,885.00 28,600.00 2,062.50

60,060.00 825.00 4,327.50 1,903.00 464.00 15,300.00 82,879.50 28,600.00 2,062.50 2,812.50 2,062.50 304.00 171.00 36,012.50 92,400.00 2,062.50 2,812.50 2,062.50 304.00 171.00 99,812.50 25,300.00 2,062.50 2,812.50 2,062.50 304.00 171.00 32,712.50 59,400.00 2,200.00 15,000.00 5,500.00 1,600.00 450.00 84,150.00

L.20

2,812.50 2,062.50 304.00 171.00 5,350.00

30,662.50 92,400.00 2,062.50

L.21

2,812.50 2,062.50 304.00 171.00 5,350.00

94,462.50 25,300.00 2,062.50

L.23

2,812.50 2,062.50 304.00 171.00 5,350.00

27,362.50 59,400.00 2,200.00

L.24

15,000.00 5,500.00 1,600.00 450.00 22,550.00

61,600.00

NO. L.25

NAMA PEKERJAAN 1 m' List plank 3/20 cm, kayu klas I I 0.0108 m3 Papan kayu klas II 0.1000 kg Paku 5 s/d 7 cm 0.2000 or Tukang kayu 0.1000 or Pekerja 0.0200 or Kepala tukang 0.0050 or Mandor 1 m1 Les penutup teras papan ulin 2/20 0.0044 m3 Papan kayu ulin 0.0250 kg Paku 0.0750 or Tukang kayu 0.0750 or Pekerja 0.0075 or Kepala tukang 0.0038 or Mandor 1.0000 ls Pemakaian ketam, bor, dll 1 m1 Les penutup papan ulin 3/20 0.0060 m3 Papan kayu ulin 0.0250 kg Paku 0.0750 or Tukang kayu 0.0750 or Pekerja 0.0075 or Kepala tukang 0.0038 or Mandor 1.0000 ls Pemakaian ketam, bor, dll Pekerjaan Cat-catan 1 m2 Mengikis/mengerok cat tembok cara manual 0.0500 bh Kapek 0.1500 or Pekerja 0.0080 or Mandor 1 m2 Mencuci bidang permukaan tembok lama dengan sabun 0.0500 kg Sabun 0.0800 or Pekerja 0.0040 or Mandor 1 m2 Lapis plamir pada tembok 0.1000 kg Plamir tembok 0.0500 bh Kapek 0.5000 lbr Ampelas 0.0300 or Tukang cat 0.0200 or Pekerja 0.0030 or Kepala tukang 0.0010 or Mandor 1 m2 Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 0.1000 kg Plamir 0.1000 kg Cat dasar 0.2600 kg Cat tembok biasa (penutup 2x ) 0.0630 or Tukang cat 0.0200 or Pekerja 0.0063 or Kepala tukang 0.0025 or Mandor 1 m2 Mengecat dinding / plapond (anti jamur/klas A) 0.4250 kg Cat tembok (klas A) 0.0750 kg Tukang cat 0.1500 lbr Pekerja 0.0075 or Kepala tukang 0.0075 or Mandor 1 m2 Mengecat bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 0.2000 kg Cat meni 0.1500 kg Plamir 0.1700 kg Cat dasar 0.2600 kg Cat kilap penutup 2x 0.0900 or Tukang cat 0.0700 or Pekerja 0.0060 or Kepala tukang 0.0025 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

3,465,000.00 22,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 5,500,000.00 22,000.00 75,000.00 55,000.00 80,000.00 90,000.00 500.00 Jumlah 5,500,000.00 22,000.00 75,000.00 55,000.00 80,000.00 90,000.00 500.00 Jumlah

37,422.00 2,200.00 15,000.00 5,500.00 1,600.00 450.00 22,550.00

39,622.00 24,200.00 550.00

37,422.00 2,200.00 15,000.00 5,500.00 1,600.00 450.00 62,172.00 24,200.00 550.00 5,625.00 4,125.00 600.00 342.00 500.00 35,942.00 33,000.00 550.00 5,625.00 4,125.00 600.00 342.00 500.00 44,742.00

L.26

5,625.00 4,125.00 600.00 342.00 10,692.00 500.00 25,250.00 33,000.00 550.00 5,625.00 4,125.00 600.00 342.00 10,692.00 500.00 34,050.00

L.27

M. M.1

20,000.00 55,000.00 90,000.00 Jumlah 15,000.00 55,000.00 90,000.00 Jumlah 25,300.00 20,000.00 3,850.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

1,000.00 8,250.00 720.00 8,970.00

1,000.00 750.00

1,000.00 8,250.00 720.00 9,970.00 750.00 4,400.00 360.00 5,510.00 2,530.00 1,000.00 1,925.00 2,250.00 1,100.00 240.00 90.00 9,135.00

M.2

4,400.00 360.00 4,760.00

750.00 2,530.00 1,000.00 1,925.00

M.3

2,250.00 1,100.00 240.00 90.00 3,680.00

5,455.00

M.4

25,300.00 16,500.00 15,400.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 54,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

2,530.00 1,650.00 4,004.00 4,725.00 1,100.00 504.00 225.00 6,554.00

8,184.00 22,950.00 5,625.00 8,250.00

2,530.00 1,650.00 4,004.00 4,725.00 1,100.00 504.00 225.00 14,738.00 22,950.00 5,625.00 8,250.00 600.00 675.00 38,100.00

M.5

600.00 675.00 1,275.00

36,825.00

M.6

25,850.00 25,300.00 16,500.00 49,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

5,170.00 3,795.00 2,805.00 12,870.00 6,750.00 3,850.00 480.00 225.00 11,305.00

24,640.00

5,170.00 3,795.00 2,805.00 12,870.00 6,750.00 3,850.00 480.00 225.00 35,945.00

NO. M.7

NAMA PEKERJAAN 1 m2 Pengecatan bidang tembok lama 2 lapis dengan kuas 0.2400 kg Cat tembok (klas A) 0.0150 bh Kuas 0.0500 or Tukang cat 0.0600 or Pekerja 0.0050 or Kepala tukang 0.0030 or Mandor 1 m2 Pengecatan bidang tembok lama 2 lapis dengan roll 0.4700 kg Cat tembok (klas A) 0.0100 bh Roll 0.0300 or Tukang cat 0.0400 or Pekerja 0.0030 or Kepala tukang 0.0020 or Mandor 1 m2 Pengecatan langit-langit 2 lapis dengan cat tembok, menggunakan kuas termasuk plamur 0.1000 kg Plamir 0.2400 kg Cat tembok biasa 0.5000 lbr Ampelas 0.0150 bh Kuas 0.0500 bh Kapek 0.0600 or Tukang cat 0.0800 or Pekerja 0.0060 or Kepala tukang 0.0040 or Mandor 1 M2 Mengecat dasar / meni 0.0840 kg Cat meni 0.0440 ltr Minyak cat 0.0600 or Tukang cat 0.0300 or Pekerja 0.0060 or Kepala tukang 0.0015 or Mandor 1 m2 Pengecatan langit-langit 2 lapis dengan cat tembok, menggunakan roll termasuk plamur 0.1000 kg Plamir 0.4700 kg Cat tembok biasa 0.5000 lbr Ampelas 0.0100 bh Roll 0.0500 bh Kapek 0.0400 or Tukang cat 0.0600 or Pekerja 0.0040 or Kepala tukang 0.0030 or Mandor 1 m2 Pasang waterproofing 0.4250 kg Waterproofing 0.0750 or Tukang cat 0.1500 or Pekerja 0.0075 or Kepala tukang 0.0075 or Mandor Pekerjaan Pipa dan Saniter 1 m1 Memasang pipa PVC AW 1/2 inchi 1.2000 m Pipa PVC AW 1/2 inchi 35% Harga pipa ls Perlengkapan 0.0600 or Tukang pipa 0.0360 or Pekerja 0.0060 or Kepala tukang 0.0018 or Mandor 1 m1 Memasang pipa PVC AW 3/4 inchi 1.2000 m Pipa PVC AW 3/4 inchi 35% Harga pipa ls Perlengkapan 0.0600 or Tukang pipa 0.0360 or Pekerja 0.0060 or Kepala tukang 0.0018 or Mandor

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HARGA ( Rp )

54,000.00 17,050.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 54,000.00 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

12,960.00 255.75 3,750.00 3,300.00 400.00 270.00 7,720.00

13,215.75 25,380.00 275.00

12,960.00 255.75 3,750.00 3,300.00 400.00 270.00 20,935.75 25,380.00 275.00 2,250.00 2,200.00 240.00 180.00 30,525.00

M.8

2,250.00 2,200.00 240.00 180.00 4,870.00

25,655.00

M.9

25,300.00 15,400.00 3,850.00 17,050.00 20,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 25,850.00 16,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

2,530.00 3,696.00 1,925.00 255.75 1,000.00 4,500.00 4,400.00 480.00 360.00 9,740.00

9,406.75 2,171.40 726.00

2,530.00 3,696.00 1,925.00 255.75 1,000.00 4,500.00 4,400.00 480.00 360.00 19,146.75 2,171.40 726.00 4,500.00 1,650.00 480.00 135.00 9,662.40

M.10

4,500.00 1,650.00 480.00 135.00 6,765.00

2,897.40

M.11

25,300.00 15,400.00 3,850.00 27,500.00 20,000.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 27,500.00 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

2,530.00 7,238.00 1,925.00 275.00 1,000.00 3,000.00 3,300.00 320.00 270.00 6,890.00

12,968.00 11,687.50

2,530.00 7,238.00 1,925.00 275.00 1,000.00 3,000.00 3,300.00 320.00 270.00 19,858.00 11,687.50 5,625.00 8,250.00 600.00 675.00 26,837.50

M.12

5,625.00 8,250.00 600.00 675.00 15,150.00

11,687.50

N. N.1

5,225.00 1,828.75 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah 6,325.00 2,213.75 75,000.00 55,000.00 80,000.00 90,000.00 Jumlah

6,270.00 1,828.75 4,500.00 1,980.00 480.00 162.00 7,122.00

8,098.75 7,590.00 2,213.75

6,270.00 1,828.75 4,500.00 1,980.00 480.00 162.00 15,220.75 7,590.00 2,213.75 4,500.00 1,980.00 480.00 162.00 16,925.75

N.2

4,500.00 1,980.00 480.00 162.00 7,122.00

9,803.75

NO. N.3

NAMA PEKERJAAN 1 m1 Memasang pipa PVC AW 1 inchi 1.2000 m Pipa PVC AW 1 inchi 35% Harga pipa ls Perlengkapan 0.0600 or Tukang pipa 0.0360 or Pekerja 0.0600 or Kepala tukang 0.0018 or Mandor 1 m1 Memasang pipa PVC AW 2 inchi 1.2000 m Pipa PVC AW 2 inchi 35% Harga pipa ls Perlengkapan 0.0900 or Tukang pipa 0.0540 or Pekerja 0.0090 or Kepala tukang 0.0027 or Mandor 1 m1 Memasang pipa PVC AW 4 inchi 1.2000 m Pipa PVC AW 4inchi 35% Harga pipa ls Perlengkapan 0.1350 or Tukang pipa 0.0810 or Pekerja 0.0135 or Kepala tukang 0.0041 or Mandor 1 bh Memasang closed jongkok porselin 1.0000 bh Closed jongkok porselin 6.0000 kg Semen Pc 50 kg 0.0100 m3 Pasir pasang 1.5000 or Tukang batu 1.0000 or Pekerja 0.1500 or Kepala tukang 0.1600 or Mandor 1 bh Memasang closed jongkok teraso 1.0000 bh Closed jongkok teraso 0.0100 m3 Batu bata 6.0000 kg Semen Pc 50 kg 0.0100 m3 Pasir pasang 1.5000 or Tukang batu 1.0000 or Pekerja 0.3000 or Kepala tukang 0.1100 or Mandor 1 bh Memasang closed duduk/monoblock 1.0000 bh Closed duduk/monoblock 6% Harga Closed ls Perlengkapan 1.1000 or Tukang batu 3.3000 or Pekerja 0.0010 or Kepala tukang 0.1600 or Mandor 1 bh Memasang urinoir 1.0000 bh 30% Harga Urinoir ls 6.0000 kg 0.0100 m3 1.0000 or 1.0000 or 0.1000 or 0.1000 or

HARGA SATUAN ( Rp )

UPAH ( Rp )

BAHAN ( Rp )

JUMLAH HAR