RENCANA ANGGARAN BIAYAPROYEK PEMBANGUNAN PERENCANAAN RUMAH TINGGAL NO.I 1 2 II 1 2 III 1 2 3 4 5 6 7

URAIAN PEKERJAANPEKERJAAN PERSIAPAN Pek. pengukuran kembali site Pek. Pemasangan bouwplank PEKERJAAN PONDASI Pek. Galian Tanah Pondasi Lajur Batu Kali Pek. Urugan Tanah Bawah Lantai PEKERJAAN BETON K-175 Pek. Pondasi Lajur Batu Kali Pek. Sloof 15/20 Pek. Kolom 15/15 Pek. Balok 15/20 Pek. Ringbalk 15/20 Pek. Plat Dak t = 12 cm Pek. Plat Dak t = 10 cm

SAT VOL HARGA SATUAN JUMLAH HARGAm2 m' 1,700.00 13,300.00 SUB JUMLAH 18,200.00 9,200.00 SUB JUMLAH 378,900.00 2,659,400.00 2,657,600.00 2,659,400.00 2,659,400.00 2,177,100.00 2,107,100.00 SUB JUMLAH 88,800.00 31,100.00 SUB JUMLAH 6,430,700.00 251,400.00 207,300.00 33,000.00 44,000.00 71,500.00 SUB JUMLAH 103,600.00 85,100.00 83,800.00 48,700.00 49,500.00 918,500.00 151,500.00 SUB JUMLAH 50,300.00 50,300.00 50,300.00 50,300.00 23,900.00 25,900.00 25,900.00 SUB JUMLAH 141,500.00 133,500.00 64,000.00 50,000.00 13,000.00 -

m3 m3

m3 m3 m3 m3 m3 m3 m3

IV PEKERJAAN DINDING & PLESTERAN 1 Pas. Dinding Bata 2 Plesteran + Acian V 1 2 3 4 5 6 VI 1 2 3 4 5 6 7 VII 1 2 3 4 5 6 7 VIII 1 2 3 4 5

m2 m2

PEKERJAAN KUSEN PINTU & JENDELA KAYU Pek. Kusen Kayu Manglid m3 Pek. Pasang Daun Pintu Panil m2 Pek. Pasang Daun Jendela Panil m2 Pek. Pasang Roster Diatas Kusen 20x35 cm bh Pasang Glassblock bh Pasang Kaca Gelap 3 mm m2 PEKERJAAN LANTAI, PLAFOND DAN ATAP Pas. Lantai Keramik 60x60 m2 Pas. Lantai Keramik KM/WC 20x20 m2 Pas. Keramik Dinding KM/WC 20/25 m2 Pas. Plafond Gypsum + Rangka Hollow m2 Pas. List Plafond Gypsum Profil 10cm m' Pek. Atap Baja Ringan + Penutup Atap + Bubungan m2 Pek. Paving Blok Warna m2 PEKERJAAN PENGECATAN Pengecatan Plituran Kusen Pintu/Jendela m2 Pengecatan Plituran Daun Pintu Jendela Dan Pintu2 m Pengecatan Plituran Daun Jendela m2 Pengecatan Plituran Rooster m2 Pengecatan Dinding (3x) set. VINILEX m2 Pengecatan Plafond (3x) set. VINILEX m2 Pengecatan List Profil m2 PEKERJAAN INSTALASI LISTRIK & ARMATUR Pas. Instalasi Titik Lampu bh Pas. Stop Kontak bh Pas. Saklar Ganda bh Pas. Saklar Tunggal bh Pas. Lampu 15 Watt bh

NO.6 7 IX 1 2 3 4 5 6 7 8 9 10 11 12

URAIAN PEKERJAANPasang Box MCB Pas. Arde Pertanahan

SAT VOL HARGA SATUAN JUMLAH HARGAbh ls 91,600.00 80,000.00 SUB JUMLAH 1,469,600.00 236,300.00 42,000.00 38,500.00 165,000.00 4,400.00 5,500.00 82,500.00 35,200.00 47,700.00 1,617,990.35 2,571,342.40 SUB JUMLAH -

PEKERJAAN INSTALASI AIR Pasang Closet Duduk Warna Standar bh Pasang Shower KM bh Pasang Floor Drain 2.5" (Plastic) bh Pasang Kran Air Standar bh Pasang Bak Cuci Piring bh Pas. Pipa PVC AW dia. 1/2" + Accesoris m' Pas. Pipa PVC AW dia. 3/4" + Accesoris m' Gate Valve dia. 3/4" bh Pas. Pipa PVC AW dia. 3" + Accesoris m' Pas. Pipa PVC AW dia. 4" + Accesoris m' Pek. Septictank & Resapan + Bak Kontrol (1 bh) ls Pek. Pagar Dan Saluran + L. Torn ls

207,100,000 Dua Ratus Tujuh Juta Seratus Ribu Rupiah

(TOTAL ) (Pembulatan )

-

ANALISA PEKERJAANPROYEK PEMBANGUNAN PERENCANAAN RUMAH TINGGAL HARGA CIMAHI 2011

NO. I 1

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN Pekerjaan pengukuran kembali site Tukang Batu Terampil Pekerja Terampil Peralatan Jumlah ( Pembulatan ) Pek. Pemasangan bouwplank Kayu + papan albasiah Paku 5 - 7 Ongkos Pasang Jumlah ( Pembulatan ) PEKERJAAN PONDASI Pek. Galian Tanah Pondasi Lajur Batu Kali Tukang Gali Mandor Alat Bantu Jumlah ( Pembulatan ) Pek. Urugan Tanah Bawah Lantai Tanah dari luar (145,000/truck 4.5 m3) Tukang Gali Mandor Alat Bantu Jumlah ( Pembulatan )

KOEF

SAT

HARGA

BAHAN

0.010 0.020 0.500

m2 org org lot m2 m3 kg lot

40,000.00 37,000.00 1,140.00 1,700.00 1,100,000.00 12,000.00 11,456.00 13,300.00

11,000.00 456.00 11,500.00

2

0.010 0.038 0.155

II 1

0.400 0.040 0.050

m3 org org lot m3 m3 org org lot

39,000.00 44,500.00 17,380.00 18,200.00 39,000.00 44,500.00 8,333.50 9,200.00

-

2

1.000 0.192 0.019 0.100

III PEKERJAAN BETON - Cor Beton Site Mix K 175 Sement PC (50 kg) SpiltePecah mesin 2/3 Pasir Beton Pekerja Tukang Batu 1/2 terampil Kepala Tukang batu Mandor Peralatan Jumlah ( Pembulatan ) - Besi Beton Terpasang U - 24 Besi Beton rata-rata Kawat Beton Tukang Besi Beton 1/2 terampil Tukang Besi Beton Terampil Kepala Tukang besi terampil Mandor Peralatan, Spencer Jumlah ( Pembulatan ) - Pekerjaan Bekisting dengan Papan Kaso-kaso & papan (2xpakai) Albasia Paku Pekerja Tukang kayu terampil Kepala tukang kayu

6.800 0.830 0.540 1.500 0.500 0.050 0.010 0.070

m3 zk m3 m3 org org org org lot Kg Kg Kg org org org org lot m2 m3 kg org org org

54,000.00 150,000.00 130,000.00 35,000.00 39,000.00 42,000.00 44,500.00 74,545.00 641,700.00 11,000.00 17,000.00 39,000.00 40,000.00 42,000.00 44,500.00 2,217.50 14,000.00 2,000,000.00 12,000.00 35,000.00 40,000.00 42,000.00

367,200.00 124,500.00 70,200.00 561,900.00 11,550.00 170.00 11,700.00 41,000.00 4,800.00 -

1.050 0.010 0.025 0.015 0.010 0.005 0.020

0.021 0.400 0.120 0.150 0.150

NO.

URAIAN PEKERJAAN Mandor Tukang kayu 1/2 terampil (bongkar cetakan) Jumlah ( Pembulatan ) Pasangan Stoot werk Kayu Albasia 5/7 cm (2xpakai) Papan terentang (2xpakai) Paku Pekerja Tukang kayu terampil Kepala tukang kayu Mandor Jumlah ( Pembulatan ) Pek. Pondasi Lajur Batu Kali Batu Belah PC (50 kg) Pasir Pasang Pekerja Tukang batu 1/2 terampil Kepala tukang batu Mandor Jumlah ( Pembulatan ) Pek. Sloof 15/20 Cor beton K175 Besi yang dipakai Bekisting dengan papan Stoot Werk Jumlah ( Pembulatan ) Pek. Kolom 15/15 Cor beton K175 Besi yang dipakai Bekisting dengan papan Stoot Werk Jumlah ( Pembulatan ) Pek. Balok 15/20 Cor beton K175 Besi yang dipakai Bekisting dengan papan Stoot Werk Jumlah ( Pembulatan ) Pek. Ringbalk 15/15 Cor beton K175 Besi yang dipakai Bekisting dengan papan Stoot Werk Jumlah ( Pembulatan ) Pek. Plat Dak t = 12 cm, beton K - 175 Cor beton K175 Besi yang dipakai Bekisting dengan papan Stoot Werk Jumlah ( Pembulatan ) Pek. Plat Dak t = 10 cm, beton K - 175 Cor beton K175 Besi yang dipakai Bekisting dengan papan Stoot Werk

KOEF 0.050 0.120

SAT org org m2 m3 m3 kg org org org org m3 m3 zak m3 org org org org

HARGA 44,500.00 39,000.00 69,200.00 1,100,000.00 900,000.00 12,000.00 35,000.00 40,000.00 42,000.00 44,500.00 47,200.00 130,000.00 54,000.00 110,000.00 35,000.00 39,000.00 42,000.00 44,500.00 378,900.00 641,700.00 14,000.00 69,200.00 47,200.00 2,659,400.00 641,700.00 14,000.00 69,200.00 47,200.00 2,657,600.00 641,700.00 14,000.00 69,200.00 47,200.00 2,659,400.00 641,700.00 14,000.00 69,200.00 47,200.00 2,659,400.00 641,700.00 14,000.00 69,200.00 47,200.00 2,177,100.00 641,700.00 14,000.00 69,200.00 47,200.00

BAHAN 45,800.00 11,550.00 7,200.00 6,000.00 24,800.00 156,000.00 108,000.00 46,200.00 310,200.00 -

-

0.011 0.008 0.500 0.150 0.200 0.200 0.017

1

1.200 2.000 0.420 1.250 0.500 0.113 0.017

2

m3 1.000 m3 100.000 kg 6.675 m2 3.300 m2 m3 1.000 m3 100.000 kg 6.650 m2 3.300 m2 m3 1.000 m3 100.000 kg 6.675 m2 3.300 m2 m3 1.000 m3 100.000 kg 6.675 m2 3.300 m2 m3 m3 kg m2 m2 m3 m3 kg m2 m2

3

4

5

6

1.000 75.000 4.170 4.170

7

1.000 70.000 4.170 4.170

NO.

URAIAN PEKERJAAN Jumlah ( Pembulatan )

KOEF

SAT

HARGA 2,107,100.00

BAHAN -

IV PEKERJAAN DINDING & PLESTERAN 1 Pas. Dinding Bata ad. 1Pc : 3Psr (trasram) Bata Merah PC (50 kg) Pasir Pasang Pekerja 1/2 Tranpil Tukang batu 1/2 terampil Kepala tukang batu Mandor Jumlah ( Pembulatan ) 2 Plesteran + Acian ad. 1Pc : 3Psr PC (50 kg) Pasir Pasang Pekerja 1/2 Tranpil Tukang batu 1/2 terampil Kepala tukang batu Mandor Jumlah ( Pembulatan ) V 1 PEKERJAAN KUSEN PINTU & JENDELA KAYU Pek. Kusen Kayu 5/15, Kamper Banjar Kayu Kamper Manglid Paku Lem Putih (FOX) Pekerja Tranpil Tukang Kayu terampil Kepala tukang kayu Mandor Jumlah ( Pembulatan ) Pek. Pasang Daun Pintu Rangka Kayu Panil Lem Putih (FOX) List Kayu 2 cm Pekerja 1/2 Terampil Tukang Kayu terampil Kepala tukang kayu Mandor Jumlah ( Pembulatan ) Pek. Pasang Daun Jendela Rangka Kayu Panil Lem Putih (FOX) List Kayu 2 cm Pekerja 1/2 Terampil Tukang Kayu terampil Kepala tukang kayu Mandor Jumlah ( Pembulatan ) Pek. Pasang Roster Diatas Kusen Roster kayu kamper diatas 15 x 25 cm Upah pemasangan Jumlah ( Pembulatan ) Pasang Glassblock Glassblock Upah pemasangan

70.000 0.420 0.054 0.429 0.214 0.021 0.011

m2 bh zak m3 org org org org m2 zak m3 org org org org

500.00 54,000.00 110,000.00 36,000.00 39,000.00 42,000.00 44,500.00 88,800.00 54,000.00 110,000.00 36,000.00 39,000.00 42,000.00 44,500.00 31,100.00

35,000.00 22,680.00 5,940.00 63,600.00 8,640.00 2,090.00 10,700.00

0.160 0.019 0.286 0.214 0.021 0.020

1.100 1.250 1.000 4.000 15.500 2.700 0.500

m3 m3 kg kg org org org org m2 m3 kg m' org org org org m2 m3 kg m' org org org org bh bh lot bh bh lot

5,000,000.00 12,000.00 12,000.00 37,000.00 40,000.00 42,000.00 44,500.00 6,430,700.00 7,000,000.00 12,000.00 5,000.00 36,000.00 40,000.00 42,000.00 44,500.00 251,400.00 7,000,000.00 12,000.00 5,000.00 36,000.00 40,000.00 42,000.00 44,500.00 207,300.00 30,000.00 30,000.00 33,000.00 40,000.00 40,000.00

5,500,000.00 15,000.00 12,000.00 5,527,000.00 119,000.00 3,600.00 20,000.00 142,600.00 119,000.00 3,600.00 20,000.00 142,600.00 30,000.00 30,000.00 40,000.00 -

2

0.017 0.300 4.000 0.700 1.800 0.260 0.015

3

0.017 0.300 4.000 0.300 1.200 0.120 0.020

4

1.000 0.100

5

1.000 0.100

NO.

URAIAN PEKERJAAN Jumlah ( Pembulatan ) Pasang Kaca Polos 5 mm Kaca polos 5 mm Upah pemasangan Jumlah ( Pembulatan )

KOEF

SAT

HARGA 44,000.00

BAHAN 40,000.00 65,000.00 65,000.00

6

1.000 0.100

m m2 lot

2

65,000.00 65,000.00 71,500.00

VI PEKERJAAN LANTAI, PLAFOND DAN ATAP 1 Lantai Keramik 60x60 m2 Keramik KW 1 DN corak/ warna 1.010 m2 PC (50 kg) 0.160 zak Pasir Pasang 0.030 m3 Semen Warna 0.013 kg Pekerja Tranpil 0.188 org Tukang batu terampil 0.375 org Kepala tukang batu 0.075 org Mandor 0.019 org Jumlah ( Pembulatan ) 2 Lantai Keramik KM/WC 20x20 m2 Keramik KW 1 DN Corak 1.010 m2 PC (50 kg) 0.240 zak Pasir Pasang 0.030 m3 Semen Warna 0.013 kg Pekerja Tranpil 0.188 org Tukang batu terampil 0.375 org Kepala tukang batu 0.113 org Mandor 0.028 org Jumlah ( Pembulatan ) 3 Pas. Keramik Dinding KM/WC 20/25 m2 Keramik KW 1 DN Corak berwarna 1.010 m2 PC (50 kg) 0.160 zak Pasir Pasang 0.030 m3 Semen Warna 0.013 kg Pekerja Tranpil 0.188 org Tukang batu terampil 0.375 org Kepala tukang batu 0.075 org Mandor 0.019 org Jumlah ( Pembulatan ) 4 Pas. Plafond Gypsum 9mm + Rangka m2 Gypsum Jayaboard 0.347 lbr Hollow L.40.40.4 0.014 m3 Mur 0.220 kg Pekerja 1/2 Tranpil 0.280 org Tukang Kayu terampil 0.400 org Kepala tukang cat/Plitur 0.080 org Mandor 0.014 org Jumlah ( Pembulatan ) 5 Pas. List Plafond Gypsum Profil 10cm m' Profil Gypsum ukuran 20 cm 1.000 m' Upah pasang 0.100 lot Jumlah ( Pembulatan ) 6 Pek. Atap Kuda-kuda kayu + Penutup Atap + Bubungan ls Rangka Atap Baja Ringan 1.000 m2 Genteng Bubung 25.000 m' Genteng 50.000 bh Upah 0.100 lot Jumlah ( Pembulatan )

65,000.00 54,000.00 110,000.00 9,000.00 37,000.00 40,000.00 42,000.00 44,500.00 103,600.00 40,000.00 54,000.00 110,000.00 9,000.00 39,000.00 40,000.00 42,000.00 44,500.00 85,100.00 45,000.00 54,000.00 110,000.00 9,000.00 39,000.00 40,000.00 42,000.00 44,500.00 83,800.00 45,000.00 25,000.00 12,000.00 36,000.00 40,000.00 42,000.00 44,500.00 48,700.00 45,000.00 45,000.00 49,500.00 150,000.00 25,000.00 1,200.00 835,000.00 918,500.00

65,650.00 8,640.00 3,300.00 117.00 77,700.00 40,400.00 12,960.00 3,300.00 117.00 56,800.00 45,450.00 8,640.00 3,300.00 117.00 57,500.00 15,615.00 350.00 2,640.00 18,600.00 45,000.00 45,000.00 150,000.00 625,000.00 60,000.00 835,000.00

NO. 7

URAIAN PEKERJAAN Pek. Paving Blok Warna Kanstine Paving Block Warna 6 cm Pasir Beton Pekerja 1/2 Terampil Tukang Batu 1/2 Terampil Kepala Tukang Batu Mandor Peralatan Jumlah ( Pembulatan )

KOEF

SAT m2 m' m2 m3 org org org org lot

HARGA

BAHAN

1.200 1.010 0.100 0.250 0.500 0.025 0.003 0.100

12,000.00 90,000.00 130,000.00 36,000.00 40,000.00 42,000.00 44,500.00 30,183.50 151,500.00

14,400.00 90,900.00 13,000.00 118,300.00

VII PEKERJAAN PENGECATAN 1 Pengecatan Plituran Kayu Dempul Plitur (dempul kasar) Wood Filer (Infra) Oker Putih Oker Warna Batu Apung (gosok) Sirlak Ex india Kwas 3" Spirtus Apelas Kayu Pekerja Tranpil Tukang cat / Plitur 1/2 terampil Kepala tukang cat/Plitur Mandor Jumlah ( Pembulatan ) 2 Pengecatan Dinding (3x) set. VINILEX Cat Tembok Vinilek Plamir tembok Rol Cat Ampelas Pekerja 1/2 Tranpil Tukang cat 1/2 terampil Kepala tukang cat Mandor Steger Werk Jumlah ( Pembulatan ) 3 Pengecatan Plafond (3x) set. VINILEX Cat Tembok Vinilek Plamir tembok Rol Cat Ampelas Pekerja 1/2 Tranpil Tukang cat 1/2 terampil Kepala tukang cat Mandor Steger Werk Jumlah ( Pembulatan ) 4 Pengecatan List Profil Cat Tembok Vinilek Plamir tembok Rol Cat Ampelas Pekerja 1/2 Tranpil Tukang cat 1/2 terampil

0.030 0.200 0.200 0.010 0.100 0.200 0.010 0.200 0.100 0.250 0.285 0.040 0.020

m2 kg kg kg ltr kg kg bh ltr lbr org org org org m2 kg kg bh lbr org org org org lot m2 kg kg bh lbr org org org org lot m2 kg kg bh lbr org org

15,000.00 22,500.00 18,000.00 25,000.00 25,000.00 70,000.00 6,000.00 9,000.00 2,000.00 37,000.00 39,000.00 42,000.00 44,500.00 50,300.00 13,000.00 8,000.00 10,000.00 2,000.00 36,000.00 39,000.00 42,000.00 44,500.00 18,385.00 23,900.00 13,000.00 8,000.00 10,000.00 2,000.00 36,000.00 40,000.00 42,000.00 44,500.00 20,105.00 25,900.00 13,000.00 8,000.00 10,000.00 2,000.00 36,000.00 40,000.00

450.00 4,500.00 3,600.00 250.00 2,500.00 14,000.00 60.00 1,800.00 200.00 27,400.00 2,275.00 1,280.00 100.00 1,000.00 827.33 5,500.00 2,600.00 1,280.00 100.00 1,000.00 854.46 5,800.00 2,600.00 1,280.00 100.00 1,000.00 -

0.175 0.160 0.010 0.500 0.160 0.280 0.030 0.010 0.045

0.200 0.160 0.010 0.500 0.200 0.280 0.030 0.010 0.043

0.200 0.160 0.010 0.500 0.200 0.280

NO.

URAIAN PEKERJAAN Kepala tukang cat Mandor Steger Werk Jumlah ( Pembulatan )

KOEF 0.030 0.010 0.043

SAT org org lot

HARGA 42,000.00 44,500.00 20,105.00 25,900.00

BAHAN 854.46 5,800.00

VIII PEKERJAAN INSTALASI LISTRIK & ARMATUR 1 Pas. Instalasi Titik Lampu Titik Lampu Plafond Fitting Saklar merk Broco Kabel type NYM 2 x 1.5 Isolasi hitam Klem kabel 1.5 mm Upah pemasangan Jumlah ( Pembulatan ) 2 Stop Kontak (Broco) + Instalasi Perkabelan Stop kontak merk Broco Mangkok Kabel type NYM 3 x 1.5 Isolasi hitam Klem kabel 1.5 mm Upah pemasangan Jumlah ( Pembulatan ) 3 saklar ganda saklar ganda Upah pemasangan Jumlah ( Pembulatan ) 3 saklar tunggal saklar tunggal Upah pemasangan Jumlah ( Pembulatan ) 3 lampu lampu 15 watt Upah pemasangan Jumlah ( Pembulatan ) 3 Pasang Box MCB Bok MCB Upah pemasangan Jumlah ( Pembulatan ) IX PEKERJAAN INSTALASI AIR 1 Pasang Closet Duduk Warna Standar Closet duduk warna standar Upah pemasangan Jumlah ( Pembulatan ) 2 Pasang Shower KM Shower Komplit Upah pemasangan Jumlah ( Pembulatan ) 3 Pasang Floor Drain 2.5" (Plastic) Floor Drain 2.5" ( plastik ) Upah pemasangan Jumlah ( Pembulatan ) 4 Pasang Kran Air Standar Kran air standar Upah pemasangan Jumlah ( Pembulatan )

1.000 1.000 1.000 10.000 0.200 10.000 1.000

bh bh bh bh m' bh bh ttk bh bh bh m' bh bh ttk bh unit lot bh unit lot bh unit lot bh unit lot

22,500.00 8,500.00 17,500.00 5,000.00 5,000.00 100.00 41,000.00 141,500.00 30,000.00 500.00 6,000.00 5,000.00 100.00 41,000.00 133,500.00 32,000.00 32,000.00 64,000.00 25,000.00 25,000.00 50,000.00 6,500.00 6,500.00 13,000.00 45,800.00 45,800.00 91,600.00

22,500.00 8,500.00 17,500.00 50,000.00 1,000.00 1,000.00 100,500.00 30,000.00 500.00 60,000.00 1,000.00 1,000.00 92,500.00 32,000.00 32,000.00 25,000.00 25,000.00 6,500.00 6,500.00 45,800.00 45,800.00

1.000 1.000 10.000 0.200 10.000 1.000

1.000 1.000

1.000 1.000

1.000 1.000

1.000 1.000

1.000 0.100

bh unit lot bh bh lot bh bh lot bh bh lot

1,336,000.00 1,336,000.00 1,469,600.00 225,000.00 225,000.00 236,300.00 40,000.00 40,000.00 42,000.00 35,000.00 35,000.00 38,500.00

1,336,000.00 1,336,000.00 225,000.00 225,000.00 40,000.00 40,000.00 35,000.00 35,000.00

1.000 0.050

1.000 0.050

1.000 0.100

NO. 4

URAIAN PEKERJAAN

KOEF

SAT bh bh lot m' m' lot m' m' lot bh bh lot m' m' lot m' m' lot

HARGA

BAHAN

Pasang Bak cuci piring Bak Cuci piring Upah pemasangan Jumlah ( Pembulatan ) 5 Pas. Pipa PVC AW dia. 1/2" + Accesoris Masvion dia 1/2" AW Upah pemasangan Jumlah ( Pembulatan ) 6 Pas. Pipa PVC AW dia. 3/4" + Accesoris Pipa PVC dia 3/4" Upah pemasangan Jumlah ( Pembulatan ) 7 Gate Valve dia. 3/4" Gate Valve dia 3/4" Upah pemasangan Jumlah ( Pembulatan ) 8 Pas. Pipa PVC AW dia. 3" + Accesoris Masvion dia 3" AW Upah pemasangan Jumlah ( Pembulatan ) 9 Pas. Pipa PVC AW dia. 4" + Accesoris Masvion dia 4" AW Upah pemasangan Jumlah ( Pembulatan ) 10 Pek. Septictank & Resapan Galian tanah Pasir urug Pas. Bata Plesteran camp: 1pc : 3psr Plat beton bertulang Pipa PVC dia 4 " + sambunngan Pipa Gip 1 1/2 " Galian tanah untuk rembesan Pasangan injuk Urugan kerikil 3.5 Pipa PVC dia 4" berlibang Tambahan upah Jumlah ( Pembulatan ) 11 Pek. Pagar dan Saluran Gravel Bata 50 cm Pagar 2m Kolom Rollag Pagar L. Tapak Torn Tambahan upah Jumlah ( Pembulatan )

1.000 0.100

150,000.00 150,000.00 165,000.00 4,000.00 4,000.00 4,400.00 5,000.00 5,000.00 5,500.00 75,000.00 75,000.00 82,500.00 32,000.00 32,000.00 35,200.00 43,400.00 43,400.00 47,700.00 18,200.00 110,000.00 500.00 20,400.00 2,107,100.00 43,400.00 42,000.00 18,200.00 25,000.00 150,000.00 43,400.00 1,507,070.00 1,617,990.35 10,000.00 44,800.00 119,592.00 44,800.00 300,000.00 2,337,584.00 2,571,342.40

150,000.00 150,000.00 4,000.00 4,000.00 5,000.00 5,000.00 75,000.00 75,000.00 32,000.00 32,000.00 43,400.00 43,400.00 36,400.00 23,540.00 140,000.00 204,000.00 632,130.00 86,800.00 21,000.00 27,300.00 135,000.00 157,500.00 43,400.00 1,507,070.00 320,000.00 492,800.00 239,184.00 985,600.00 300,000.00 2,337,584.00

1.000 0.100

1.000 0.100

1.000 0.100

1.000 0.100

1.000 0.100

bh 2.000 m3 0.214 m3 280.000 bh 10.000 m2 0.300 m3 2.000 m' 0.500 btg 1.500 m3 5.400 kg 1.050 m3 1.000 m' 0.074 lot ls m' m' bh m2 ls lot

32.000 11.000 2.000 22.000 1.000 0.100

LISA PEKERJAAN

AN PERENCANAAN RUMAH TINGGAL

RGA CIMAHI 2011

UPAH

400.00 740.00 570.00 1,700.00 1,775.68 1,800.00

15,600.00 1,780.00 869.00 18,200.00 7,488.00 845.50 833.35 9,200.00

52,500.00 19,500.00 2,100.00 445.00 5,218.15 79,800.00 975.00 600.00 420.00 222.50 44.35 2,300.00 4,200.00 6,000.00 6,300.00

UPAH 2,225.00 4,680.00 23,400.00 5,250.00 8,000.00 8,400.00 756.50 22,400.00 43,750.00 19,500.00 4,725.00 752.05 68,700.00 641,700.00 1,400,000.00 461,910.00 155,760.00 2,659,400.00 641,700.00 1,400,000.00 460,180.00 155,760.00 2,657,600.00 641,700.00 1,400,000.00 461,910.00 155,760.00 2,659,400.00 641,700.00 1,400,000.00 461,910.00 155,760.00 2,659,400.00 641,700.00 1,050,000.00 288,564.00 196,824.00 2,177,100.00 641,700.00 980,000.00 288,564.00 196,824.00

UPAH 2,107,100.00

15,444.00 8,346.00 882.00 489.50 25,200.00 10,296.00 8,346.00 882.00 890.00 20,400.00

148,000.00 620,000.00 113,400.00 22,250.00 903,700.00 25,200.00 72,000.00 10,920.00 667.50 108,800.00 10,800.00 48,000.00 5,040.00 890.00 64,700.00 3,000.00 3,000.00 4,000.00

UPAH 4,000.00 6,500.00 6,500.00

6,937.50 15,000.00 3,150.00 836.60 25,900.00 7,312.50 15,000.00 4,725.00 1,254.90 28,300.00 7,312.50 15,000.00 3,150.00 836.60 26,300.00 10,080.00 16,000.00 3,360.00 623.00 30,100.00 4,500.00 4,500.00 83,500.00 83,500.00

UPAH

9,000.00 20,000.00 1,050.00 133.50 3,018.35 33,200.00

9,250.00 11,115.00 1,680.00 890.00 22,900.00 5,760.00 10,920.00 1,260.00 445.00 18,400.00 7,200.00 11,200.00 1,260.00 445.00 20,100.00 7,200.00 11,200.00

UPAH 1,260.00 445.00 20,100.00

41,000.00 41,000.00 41,000.00 41,000.00 32,000.00 32,000.00 25,000.00 25,000.00 6,500.00 6,500.00 45,800.00 45,800.00

133,600.00 133,600.00

11,250.00 11,300.00

2,000.00 2,000.00

3,500.00 3,500.00

UPAH

15,000.00 15,000.00

400.00 400.00

500.00 500.00

7,500.00 7,500.00

3,200.00 3,200.00

4,340.00 4,300.00 110,920.35 110,920.35 233,758.40 233,758.40

DAFTAR HARGA BAHAN BANGUNAN PROYEK PEMBANGUNAN PERENCANAAN RUMAH TINGGAL HARGA CIMAHI 2011NO. URAIAN SATUA HARGA SATUAN N Rp. 110,000.00 110,000.00 130,000.00 150,000.00 130,000.00 500.00 54,000.00 9,000.00 12,000.00 90,000.00 8,000.00 13,000.00 10,000.00 6,000.00 2,000.00 15,000.00 22,500.00 18,000.00 25,000.00 25,000.00 70,000.00 9,000.00 1,100,000.00 900,000.00 25,000.00 5,000,000.00 7,000,000.00 5,000.00 30,000.00 45,000.00 17,500.00 40,000.00 45,000.00 65,000.00 11,000.00 2,500.00 17,000.00 12,000.00 65,000.00 40,000.00 12,000.00 1,336,000.00 225,000.00 40,000.00 35,000.00 150,000.00 4,000.00 5,000.00 32,000.00 43,400.00

BAHAN AGREGAT, PEREKAT DAN BAHAN JADINYA 1 Pasir urug m3 2 Pasir pasang m3 3 Pasir Beton m3 4 Batu pecah mesin 2/ 3 m3 5 Batu belah pondasi m3 6 Bata merah bh 7 Semen PC Tiga Roda / 50 kg zak 8 Semen Warna kg 9 Kanstine m1 10 Paving Block Warna 6 cm m2 BAHAN FINISHING : Laburan, Pengisi dan Alatnya 1 Plamir tembok kg 2 Cat tembok Vinilek kg 3 Rool cat tembok bh 4 Kwas 3" bh 5 Ampelas lbr 6 Dempul Plitur (dempul kasar) kg 7 Wood Filer (Infra) kg 8 Oker Putih kg 9 Oker Warna ltr 10 Batu Apung (gosok) kg 11 Sirlak Ex india kg 12 Spirtus ltr BAHAN KAYU BERIKUT BAHAN JADINYA 1 Kayu Albasiah m3 2 Papan terentang m3 3 Hollow L.40.40.4 m3 4 Kayu Manglid m3 5 Kayu Panil m3 6 List kayu 2 cm m' 7 Kayu Roster 25x35 cm bh BAHAN PENUTUP RANGKA PLAPOND 1 Gypsum 120 x 240 t = 9 mm ex DN lbr 2 Profil gypsum m' BAHAN LANTAI DAN PELAPIS DINDING 1 Keramik 20 x 20 (KM) KW I DN anti slip m2 2 Keramik 20 x 25 dinding KM KW I DN m2 3 Keramik 60 x 60 KW I DN m2 BAHAN LOGAM DAN BAHAN JADINYA 1 Besi beton U-24 kg 2 Genteng bh 3 Kawat beton kg 5 Lem Fox kg 6 Kaca Gelap 5 mm ( Asahi ) m2 7 Glassblock bh 8 Paku berbagai ukuran m' BAHAN SANITAIR 1 Closet duduk warna standar bh 2 Shower + Lengkap bh 3 Floor Drain 2.5" ( plastik ) unit 4 Kran air standar unit 5 Bak Cuci piring 1 lubang unit 6 Pipa PVC dia 1/2" AW m1 7 Pipa PVC dia 3/4" AW m1 8 Pipa PVC dia 3" AW m1 9 Pipa PVC dia 4" AW m1

NO.

URAIAN

SATUA HARGA SATUAN N Rp. bh bh bh bh bh bh bh m' m' bh bh bh bh 75,000.00 8,500.00 6,000.00 25,000.00 20,000.00 17,500.00 30,000.00 5,000.00 6,000.00 5,000.00 100.00 500.00 45,800.00

10 Gate Valve dia 3/4" BAHAN ELEKTRIKAL 1 Plafond Fitting 2 Lampu SL 5 watt merk Philip komplit 3 Plafond Fitting + Down Light 4 Saklar double 5 Saklar tunggal 6 Stop Kontak 7 Kabel type NYM 2 x 1.5 8 Kabel type NYM 3 x 1.5 9 Isolasi hitam 10 Klem kabel 1.5 mm 11 Mangkok 12 Box MCB

DAFTAR HARGA UPAH PROYEK PEMBANGUNAN PERENCANAAN RUMAH TINGGAL HARGA CIMAHI 2011NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Pekerja Pekerja setengah terampil Pekerja terampil Tukang Gali Tukang Batu Setengah Terampil Tukang Batu Terampil Kepala Tukang Batu Tukang Kayu Setengah Terampil Tukang Kayu Terampil Kepala Tukang Kayu Tukang Cat Setengah Terampil Tukang Cat Terampil Kepala Tukang Cat Tukang Besi Beton Setengah Terampil Tukang Besi Beton Terampil Kepala Tukang Besi Beton Tukang Besi Profil Setengah Terampil Tukang Besi Profil Terampil Kepala Tukang Besi Profil Mandor URAIAN SATUAN (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) (org/hari ) HARGA SATUAN Rp. 35,000.00 36,000.00 37,000.00 39,000.00 39,000.00 40,000.00 42,000.00 39,000.00 40,000.00 42,000.00 39,000.00 40,000.00 42,000.00 39,000.00 40,000.00 42,000.00 39,000.00 40,000.00 42,000.00 44,500.00