Luas Lantai Dan OMH

53
Tahun Bul 1 2 3 4 5 1 16000 2223 2345 2244 2567 2 16800 2334.15 2462.25 2356.2 2695.35 3 17640 2450.858 2585.363 2474.01 2830.118 4 18522 2573.4 2714.631 2597.711 2971.623 5 19448.1 2702.07 2850.362 2727.596 3120.205 MS Bul 1 2 3 4 5 60% 26667 1334 1407 1346 1540 10080 1400 1477 1414 1617 10584 1471 1551 1484 1698 11113 1544 1629 1559 1783 11669 1621 1710 1637 1872 MS Bul 1 2 3 4 5 100 8 9 8 10 63 9 9 9 10 66 9 10 9 11 69 10 10 10 11 73 10 11 10 12 104

description

lantai ohm bisi mw ngitung by tedy

Transcript of Luas Lantai Dan OMH

Page 1: Luas Lantai Dan OMH

Tahun Bulan1 2 3 4 5 6

1 16000 2223 2345 2244 2567 27892 16800 2334.15 2462.25 2356.2 2695.35 2928.453 17640 2450.858 2585.363 2474.01 2830.118 3074.8734 18522 2573.4 2714.631 2597.71 2971.623 3228.6165 19448.1 2702.07 2850.362 2727.596 3120.205 3390.047

MS Bulan1 2 3 4 5 6

60%

26667 1334 1407 1346 1540 167310080 1400 1477 1414 1617 175710584 1471 1551 1484 1698 184511113 1544 1629 1559 1783 193711669 1621 1710 1637 1872 2034

MSBulan

1 2 3 4 5 6100 8 9 8 10 10

63 9 9 9 10 1166 9 10 9 11 1269 10 10 10 11 1273 10 11 10 12 13

104

Page 2: Luas Lantai Dan OMH

Bulan7 8 9 10 11 122456 2244 2567 2789 2456 2333

2578.8 2356.2 2695.35 2928.45 2578.8 2449.652707.74 2474.01 2830.118 3074.873 2707.74 2572.133

2843.127 2597.71 2971.623 3228.616 2843.127 2700.7392985.283 2727.596 3120.205 3390.047 2985.283 2835.776

Bulan7 8 9 10 11 121474 1346 1540 1673 1474 14001547 1414 1617 1757 1547 14701625 1484 1698 1845 1625 15431706 1559 1783 1937 1706 16201791 1637 1872 2034 1791 1701

Bulan7 8 9 10 11 12

9 8 10 10 9 910 9 10 11 10 910 9 11 12 10 1011 10 11 12 11 1011 10 12 13 11 11

kpt 100 jam

Page 3: Luas Lantai Dan OMH

Operasi Deskripsi Mesin KuantitiK-01 Stang Atas 1

diukur meterandipotong mesin potongdilubangi mesin boring

dihaluskan gerindaK-02 Stang Bawah 1

diukur meterandipotong mesin potongdilubangi mesin boring

dihaluskan gerindaK-03 Penyangga Tengah 1

diukur meterandipotong mesin potongdilubangi mesin boringdibentuk mesin press

dihaluskan gerindaK-04 Pipa Penyangga Alas 1

diukur meterandipotong mesin potongdibentuk mesin press

dihaluskan gerindaK-05 Pipa Holow 1

diukur meterandipotong mesin potong

dihaluskan gerindaK-06 Plat Alas 1

diukur meterandipotong mesin potongdilubangi mesin boring

dihaluskan gerindaK-07 Penyangga Roda Belakang 2

diukur meterandipotong mesin potongdilubangi mesin boring

dihaluskan gerindaK-08 Rem 1

diukur meterandipotong mesin potongdibentuk mesin bendingdilubangi mesin boring

dihaluskan gerindaK-09 Pipa Penyangga Roda depan 1

diukur meterandipotong mesin potongdilubangi mesin boring

Page 4: Luas Lantai Dan OMH

dihaluskan gerindaK-10 Penyangga Roda depan 1

diukur meterandipotong mesin potongdibentuk mesin bendingdilubangi mesin boring

dihaluskan gerindaASS-1 Assembling 1 1

K-01 dilas dengan K-02 mesin lasASS-2 Assembling 2 1

K-01 K-02 dirakit K-03 meja assemblingASS-3 Assembling 3 1

pengelasan K-04,K-05,K-06,K-07 mesin lasASS-4 Assembling 4 1

K-04,K-05,K-06,K-07 dirakit dengan K-08 meja assemblingASS-5 Assembling 5 1

K-09 dilas dengan K-10 mesin lasASS-6 Assembling 6 1

Ass-2 dirakit dengan Ass-4 dan Ass-05 meja assemblingI-1 Periksa dan Packing 1

diperiksa dan Packing meja packing

Page 5: Luas Lantai Dan OMH

evesiensi 75%Waktu Proses (Detik) Produk Mesin/Jam % Scrap Diminta Disiapkan Efisiensi Mesin

40 90 0% 13.67 13.67 18.2360 60 1.0% 13.53 13.67 18.2360 60 2% 13.26 13.53 18.0560 60 1% 13.13 13.26 17.69

40 90 0% 13.67 13.67 18.2360 60 1.0% 13.53 13.67 18.2360 60 2% 13.26 13.53 18.0560 60 1% 13.13 13.26 17.69

40 90 0% 13.67 13.67 18.2360 60 1.0% 13.53 13.67 18.2360 60 2% 13.26 13.53 18.0560 60 1% 13.13 13.26 17.6960 60 1% 13.00 13.13 17.51

40 90 0% 13.40 13.40 17.8660 60 1.0% 13.26 13.40 17.8660 60 0% 13.26 13.26 17.6960 60 1% 13.13 13.26 17.69

40 90 0% 13.40 13.40 17.8660 60 1% 13.26 13.40 17.8660 60 1% 13.13 13.26 17.69

40 90 0% 13.67 13.67 18.2360 60 1% 13.53 13.67 18.2360 60 2% 13.26 13.53 18.0560 60 1% 13.13 13.26 17.69

40 90 0% 27.34 27.34 36.4660 60 1% 27.07 27.34 36.4660 60 2% 26.53 27.07 36.0960 60 1% 26.26 26.53 35.37

40 90 0% 13.53 13.53 18.0560 60 1% 13.40 13.53 18.0560 60 0% 13.40 13.40 17.8760 60 2% 13.13 13.40 17.8760 60 1% 13.00 13.13 17.51

40 90 0% 13.67 13.67 18.2360 60 1% 13.53 13.67 18.2360 60 2% 13.26 13.53 18.05

Page 6: Luas Lantai Dan OMH

60 60 1% 13.13 13.26 17.69

40 90 0% 13.67 13.67 18.2360 60 1% 13.53 13.67 18.2360 60 0% 13.53 13.53 18.0560 60 2% 13.26 13.53 18.0560 60 1% 13.13 13.26 17.69

300 12 1% 13.00 13.13 17.51

180 20 0% 13.00 13.00 17.33

1200 3 1% 13.00 13.13 17.51

180 20 0% 13.00 13.00 17.33

300 12 1% 13.00 13.13 17.51

540 6.67 0% 13.00 13.00 17.33

300 12 0% 13.00 13.00 17.33KPT 13

Page 7: Luas Lantai Dan OMH

Mesin Teoritis Mesin Aktual

0.20 10.30 10.30 10.29 1

0.20 10.30 10.30 10.29 1

0.20 10.30 10.30 10.29 10.29 1

0.20 10.30 10.29 10.29 1

0.20 10.30 10.29 1

0.20 10.30 10.30 10.29 1

0.41 10.61 10.60 10.59 1

0.20 10.30 10.30 10.30 10.29 1

0.20 10.30 10.30 1

Page 8: Luas Lantai Dan OMH

0.29 1

0.20 10.30 10.30 10.30 10.29 1

1.46 2

0.87 1

5.84 6

0.87 1

1.46 2

2.60 3

1.44 2Total 59

Page 9: Luas Lantai Dan OMH

nama komponen kode tipe bahanukuran terima (cm)

P L TK-01 stang atas K1 pipa besi 150K-02 stang bawah K2 pipa besi 150K-03 penyangga tengah K3 pipa besi 150K-04 pipa penyangga alas K4 pipa besi 150K-05 pipa holow K5 besi holow 150 6 5K-06 plat alas K6 plat besi 150 150 1K-07 penyangga roda belakang K7 plat besi 150 150 1K-08 rem K8 plat besi 150 150 1K-09 pipa penyangga roda depan K9 pipa besi 150K-10 penyangga roda depan K10 plat besi 150 150 1

kode kompenen

Page 10: Luas Lantai Dan OMH

nli trtinggi disiapkn

ukuran terima (cm) ukuran pakai (cm)

Ø P L T Ø K1 13.7 4.411764706 1093.70872 34.0 2 K2 13.7 4.411764706 1093.70872 34.0 2 K3 13.7 4.573170732 1093.70873 32.8 3 K4 13.4 9.868421053 1071.83463 15.2 3 K5 13.4 6.048387097 1071.8346

24.8 6 5 K6 13.7 28.125 1093.708750 16 1 K7 27.34 285.3881279 2187.4175

14.6 5.4 1 K8 13.53 124.8404816 1082.771626.9 6.7 1 K9 13.67 4.87012987 1093.7087

1 30.8 1 K10 13.67 230.7219032 1093.708721.2 4.6 1 6518.50

0 25 0.0001389 00 0

barang disiapkan

jumlah potongan

material 2 minggu

Page 11: Luas Lantai Dan OMH

Kapasitas rakluas lantai

213.52 233528.68864 1592.3566879 1 1.50 4.50 6213.52 233528.68864 1592.3566879 1 2 4.50 6

308.976 337929.74945 1061.5711253 2 3 9.00 12143.184 153469.55938 1061.5711253 2 3 9.00 12

744 797444.91131 333.33333333 4 6 18.00 24800 874966.9863 66.666666667 17 26 76.50 102

78.84 172455.993 66.666666667 33 50 148.50 198180.23 195147.93368 66.666666667 17 26 76.50 10296.712 105774.75897 3184.7133758 1 2 4.50 697.52 106658.47563 66.666666667 17 26 76.50 102

2630868.5837 162

KOMPONEN UTAMA VOLUME LUASP L T

150 100 100 1,500,000 15,000 cm1.5 1 1 2 2 m

volume unit

volume kebutuhan

kebutuhan rak

allowance luas (m)

total luas (m)

Page 12: Luas Lantai Dan OMH

nama komponen kode tipe bahanukuran terima (cm)

P L T1 hand grip HG busa 10 7 32 mur+baud MR baja 20 10 53 ass roda AR baja 20 10 54 Bering BE besi 20 10 105 Roda RO plastik 40 30 156 Stiker ST kertas 20 11 97 plastik bungkus DS Kertas 78 52 24

kode kompene

n

Page 13: Luas Lantai Dan OMH

ukuran terima (cm)berat bentuk(KG) kom/unit unit sedia prod/jam BB pakai (kg) unit/jam

Ø2 2 26 134 100 52 0.522 35 26 0.7428572 70 26 0.3714292 20 26 1.31 100 13 0.131 70 13 0.185714

KPT 13 jam

Page 14: Luas Lantai Dan OMH

unit 2 minggu voulume unit volume kebutuhan kapasitas rak (unit) kebutuhan rak (unit)

1040 210 218400 214.285714285714 541.6 1000 41600 75 1

59.4285714286 1000 59428.5714285714 75 129.7142857143 2000 59428.5714285714 75 1

104 18000 1872000 12.5 910.4 1980 20592 68.1818181818182 1

14.8571428571 97344 1446253.71428571 3.69822485207101 5

6.8556546004KOMPONEN UTAMA

P L T150 100 100

1.5 1 1

Page 15: Luas Lantai Dan OMH

luas lantai luas allowance total luas

7.50 11.25 18.75 1.50 2.25 3.75 1.50 2.25 3.75 1.50 2.25 3.75 13.50 20.25 33.75 1.50 2.25 3.75 7.50 11.25 18.75

86

VOLUME LUAS

1,500,000 15,000 cm 2 2 m

Page 16: Luas Lantai Dan OMH

Departemen Meja ukur

Deskripsi Nama Mesin Ukuran

diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0diukur Mj. Ukur 1 2 x 2

Storage Storage 2 1.0 x 1.0

Departemen Mesin Potong

Deskripsi Nama Mesin Ukuran

dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0

No. Kode

Jumlah

Mesin

No. Kode

Jumlah

Mesin

Page 17: Luas Lantai Dan OMH

dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0dipotong Ms.Potong 1 2 x 2

Storage Storage 2 1.0 x 1.0

Departemen Mesin Boring

Deskripsi Nama Mesin Ukuran

dilubangi Ms.Boring 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.Boring 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.Boring 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.Boring 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.Boring 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.Boring 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.Boring 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.Boring 1 2 x 2

Storage Storage 2 1.0 x 1.0

Departemen Penghalusan

Deskripsi Nama Mesin Ukuran

dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0

No. Kode

Jumlah

Mesin

No. Kode

Jumlah

Mesin

Page 18: Luas Lantai Dan OMH

dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0dihaluskan ms.gerinda 1 2 x 2

Storage Storage 2 1.0 x 1.0

Departemen Pembentukan

Deskripsi Nama Mesin Ukuran

dibentuk Ms.press 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.press 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.Bending 1 2 x 2

Storage Storage 2 1.0 x 1.0dilubangi Ms.Bending 1 2 x 2

Storage Storage 2 1.0 x 1.0

Departemen Packing Inspeksi

Deskripsi Nama Mesin Ukuran

a1diperiksa dan Packing Mj.Packing 1 2 x 2

Storage Storage 2 1.0 x 1.0

a2

No. Kode

Jumlah

Mesin

No. Kode

Jumlah

Mesin

Page 19: Luas Lantai Dan OMH

Departemen Meja ukur Departemen Assembling 1

Allowance

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

472

Departemen Mesin Potong Departemen Assembling 2

Allowance

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

Luas Mesi

n

Luas Mesin

keseluruhan

LUAS allowance

TOTAL LUAS

No. Kode

Luas Mesi

n

Luas Mesin

keseluruhan

LUAS allowance

TOTAL LUAS

No. Kode

Page 20: Luas Lantai Dan OMH

4 4687% 41 47

1 2

4 4687% 41 47

1 2

472

Departemen Mesin Boring Departemen Assembling 3

Allowance

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

378

Departemen Penghalusan Departemen Assembling 4

Allowance

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

Luas Mesi

n

Luas Mesin

keseluruhan

LUAS allowance

TOTAL LUAS

No. Kode

Luas Mesi

n

Luas Mesin

keseluruhan

LUAS allowance

TOTAL LUAS

No. Kode

Page 21: Luas Lantai Dan OMH

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

472

Departemen Pembentukan Departemen Assembling 5

Allowance

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

4 4687% 41 47

1 2

189

Departemen Assembling 6

Departemen Packing Inspeksi

Allowance

4 4687% 41 47

1 2

Luas Mesi

n

Luas Mesin

keseluruhan

LUAS allowance

TOTAL LUAS

No. Kode

No. Kode

Luas Mesi

n

Luas Mesin

keseluruhan

LUAS allowance

TOTAL LUAS

Page 22: Luas Lantai Dan OMH

Departemen Assembling 1

Deskripsi Nama Mesin Ukuran

K-01 dilas dengan K-02 Ms.las 1 2 x 2

Storage Storage 2 1.0 x 1.0

Departemen Assembling 2

Deskripsi Nama Mesin Ukuran

K-01 K-02 dirakit K-03 Mj.assembling 1 3 x 2

Storage Storage 2 1.0 x 1.0

Jumlah

Mesin

Jumlah

Mesin

Page 23: Luas Lantai Dan OMH

Departemen Assembling 3

Deskripsi Nama Mesin Ukuran

pengelasan K-04,K-05,K-06,K-07 Ms.las 1 2 x 2

Storage Storage 2 1.0 x 1.0

Departemen Assembling 4

Deskripsi Nama Mesin Ukuran

K-04,K-05,K-06,K-07 dirakit dengan K-08 Mj.Assembling 1 3 x 2

Storage Storage 2 1.0 x 1.0

Jumlah

Mesin

Jumlah

Mesin

Page 24: Luas Lantai Dan OMH

Departemen Assembling 5

Deskripsi Nama Mesin Ukuran

K-09 dilas dengan K-10 Ms.las 1 2 x 2

Storage Storage 2 1.0 x 1.0

Departemen Assembling 6

Deskripsi Nama Mesin Ukuran

Ass-2 dirakit dengan Ass-4 dan Ass-05 Mj.Assembling 1 3 x 2

Storage Storage 2 1.0 x 1.0

Jumlah

Mesin

Jumlah

Mesin

Page 25: Luas Lantai Dan OMH

Departemen Assembling 1

4 4687% 41 47

1 2

Departemen Assembling 2

6 6687% 55 63

1 2

Luas Mesin

Luas Mesin

keseluruhan

Allowance

LUAS allowan

ce

TOTAL LUAS

Luas Mesin

Luas Mesin

keseluruhan

Allowance

LUAS allowan

ce

TOTAL LUAS

Page 26: Luas Lantai Dan OMH

Departemen Assembling 3

4 4687% 41 47

1 2

Departemen Assembling 4

6 6687% 55 63

1 2

Luas Mesin

Luas Mesin

keseluruhan

Allowance

LUAS allowan

ce

TOTAL LUAS

Luas Mesin

Luas Mesin

keseluruhan

Allowance

LUAS allowan

ce

TOTAL LUAS

Page 27: Luas Lantai Dan OMH

Departemen Assembling 5

4 4687% 41 47

1 2

Departemen Assembling 6

6 6687% 55 63

1 2

Luas Mesin

Luas Mesin

keseluruhan

Allowance

LUAS allowan

ce

TOTAL LUAS

Luas Mesin

Luas Mesin

keseluruhan

Allowance

LUAS allowan

ce

TOTAL LUAS

Page 28: Luas Lantai Dan OMH

Nama KomponenUkuran Produk (cm) Produk

p l t ø 4 minggu

Packaging 0.9 1.20 0.04 0.0432 1040

KPT 13

Volume Kemasan (m3)

Page 29: Luas Lantai Dan OMH

Kapasitas

Rak

1 1040 44.928 47 23.00

Rak

Ukuran

P L T

2 1 1

Jml produk Kemasan

Jml Kemasan 2 minggu

Volume 4 minggu

Kebutuhan Rak

Page 30: Luas Lantai Dan OMH

46 69 115

Rak

Volume (m3) Luas (m2)

2 2

Luas Lantai (m2)

Luas Allowance (m2)

Total Luas (m2)

Page 31: Luas Lantai Dan OMH

fasilitas Non Perkantoran (Dalam Pabrik)

No Nama RuanganUkuran

P L1 Toilet Karyawan Pria 7 6 4

2 Toilet Karyawan Wanita 6 6 4

3 Ruang Ganti Karyawan Pria 6 7 4

4 Ruang Ganti Karyawan Wanita 6 7 4

5 Tempat Alarm 3 3 2

6 Tempat Hydrant 3 3 2

Total

fasilitas Non Perkantoran (Luar Pabrik)

No Nama RuanganUkuran

P L1 Pos Keamanan Luar Pabrik 3 10 8

2 Ruang Absen Kerja Langsung 3 6 4

3 2 12 12

4 Lapangan Parkir Mobil 2 50 40

5 Lapangan Parkir Motor 2 20 15

6 Lapangan Parkir Kendaraan Karyawan 2 28 18

7 Masjid 1 80 60

8 Tempat Wudu + Toilet Wanita 2 4 3

9 Tempat Wudu + Toilet Pria 2 4 3

10 Kantin 2 10 8

11 Poliklinik 1 13 10

12 Ruang Generator Set 2 4 3

13 Ruang Maintenance Kendaran Pabrik 2 25 15

14 Ruang Gardu Listrik 2 4 3

15 Tower Air dan Pompa 2 7 4

16 Taman 2 35 20

17 Tempat Pembuangan Sampah 2 12 6

18 Smoking Area 2 6 4

19 Ruang Serikat Pekerja 2 10 8

20 pembuangan limbah 1 100 40

21 Ruang Serba Guna dan Olah Raga 1 50 40

Fasilitas Perkantoran

No Nama RuanganUkuran

P L1 Ruang Rapat Perusahaan 1 20 15

2 Ruang Resepsionis dan Lobby 1 12 10

3 Ruang Absen Perkantoran dan Gaji 1 6 4

4 Ruang Auditorium 1 30 20

5 Ruang Cleaning Servis 1 10 8

6 Toilet Dewan Komisaris dan Derektur 1 8 6

Jumlah Ruangan

Jumlah Ruangan

Ruang Control Pabrik

Jumlah Ruangan

Page 32: Luas Lantai Dan OMH

7 Toilet Manager dan Staff 3 5 4

8 Toilet Tamu 3 5 4

9 Mushola Kantor 1 20 16

10 Ruang Istirahat 1 10 10

11 Ruang Tamu 1 6 4

12 Tempat Alarm 1 2 1

13 Tempat Hydrant 1 2 1

Total

Ruang Perkantoran

No Nama RuanganUkuran

P L

1 Dewan Komisaris 1 9 8

2 Direktur Utama 1 5 4

3 Sekretaris 1 4 3

4 Manajer Keuangan 1 4 4

5 Kepala bagian adminitrasi & keuangan 1 4 3

6 Staf adminitrasi & keuangan 1 3 3

7 Manajer Pemasaran 1 4 3

8 Kepala bagian distribusi 1 3 3

9 Kepala Bagian Pemasaran 1 4 3

10 Staf Bagian distribusi 1 3 3

11 Staf Bagian pemasaran 1 4 4

12 Manajer Sumber Daya Manusia 1 4 3

13 Kepala bagian personalia 1 3 3

14 Kepala bagian Pendidikan Dan Pelatihan 1 4 3

15 Staf Bagian Personalia 1 3 3

16 Staf Pendidikan Dan Pelatihan 1 4 4

17 Manajer Produksi 1 4 3

18 Kepala Perencanaan pengendalian produk 1 3 3

19 Kepala Bagian quality control 1 4 3

20 Kepala bagian pengendalian kualitas 1 3 3

21 Staf Perencanaan pengendalian produksi 1 4 3

22 Staf Bagian quality control 1 3 3

23 Staf bagian pengendalian kualitas 1 4 4

24 Manajer HRD 1 4 3

25 Kepala bagian pelatihan 1 3 3

26 Kepala Bagian Perawatan 1 4 3

27 Staf Bagian Pelatihan 1 3 3

28 Staf bagian Perawatan 1 3 3

TOTAL

Jumlah Ruangan

Page 33: Luas Lantai Dan OMH

AllowanceLuas

(m2) (m2)

50% 168 84 252

50% 144 72 216

50% 168 84 252

50% 168 84 252

50% 18 9 27

50% 18 9 27

Total 1026 32.03123

AllowanceLuas

(m2) (m2)

50% 240 120 360 bangunan t 406150% 72 36 108

50% 288 144 432

50% 4000 2000 6000

50% 600 300 900

50% 1008 504 1512

50% 4800 2400 7200

50% 24 12 36

50% 24 12 36

50% 160 80 240

50% 130 65 195

50% 24 12 36

50% 750 375 1125

50% 24 12 36

50% 56 28 84

50% 1400 700 2100

50% 144 72 216

50% 48 24 72

50% 160 80 240

50% 4000 2000 6000

50% 2000 1000 3000

29928

AllowanceLuas

(m2) (m2)

100% 300 300 600

100% 120 120 240

100% 24 24 48

100% 600 600 1200

100% 80 80 160

100% 48 48 96.0

Luas Allowance

Total Luas

Luas Allowance

Total Luas

Luas Allowance

Total Luas

Page 34: Luas Lantai Dan OMH

100% 60 60 120

100% 60 60 120

100% 320 320 640

100% 100 100 200

100% 24 24 48

100% 2 2 4

100% 2 2 4

Total 3480

AllowanceLuas

50% 72 36 108

50% 20 10 30

50% 12 6 18

50% 16 8 24

50% 12 6 18

50% 9 4.5 13.5

50% 12 6 18

50% 9 4.5 13.5

50% 12 6 18

50% 9 4.5 13.5

50% 16 8 24

50% 12 6 18

50% 9 4.5 13.5

50% 12 6 18

50% 9 4.5 13.5

50% 16 8 24

50% 12 6 18

50% 9 4.5 13.5

50% 12 6 18

50% 9 4.5 13.5

50% 12 6 18

50% 9 4.5 13.5

50% 16 8 24

50% 12 6 18

50% 9 4.5 13.5

50% 12 6 18

50% 9 4.5 13.5

50% 9 4.5 13.5

TOTAL 580.5

Luas Allowance

Total Luas

Page 35: Luas Lantai Dan OMH

ONGKOS MATERIAL HANDLINGdari ke nama komponen prod/jam

recieving

mj.ukur

stang atas 13.67stang bawah 13.67penyangga tengah 13.67pipa penyangga alas 13.40pipa holow 13.40plat alas 13.67penyangga roda belakang 27.34rem 13.53pipa penyangga roda depan 13.67penyangga roda depan 13.67

total

assembling 2mur & baud 52.00

total

assembling 4mur & baud 52.00

total

assembling 5mur & baud 52.00roda 26.00

total

assembling 6bering 70.00

total

mj.periksaplastik 13.00

total

mj.ukur msin potog

stang atas 13.67stang bawah 13.67penyangga tengah 13.67pipa penyangga alas 13.40pipa holow 13.40plat alas 13.67penyangga roda belakang 27.34rem 13.53pipa penyangga roda depan 13.67penyangga roda depan 13.67total

mesin potong

mesin boring

stang atas 13.67stang bawah 13.67penyangga tengah 13.67plat alas 13.67penyangga roda belakang 27.34pipa penyangga roda depan 13.67

total

mesin presspipa penyangga alas 13.40

total

mesin gerindapipa holow 13.40

total

mesin bendingrem 13.53penyangga roda depan 13.67

Page 36: Luas Lantai Dan OMH

mesin potong

mesin bendingtotal

mesin boringmesin gerinda

stang atas 13.67stang bawah 13.67plat alas 13.67penyangga roda belakang 27.34pipa penyangga roda depan 13.67penyangga roda depan 13.67

total

mesin presspenyangga tengah 13.67

total

mesin press gerindapenyangga tengah 13.67pipa penyangga alas 13.40

total

mesin bending mesin boringrem 13.53penyangga roda depan 13.67

total

mesin gerinda

assembling 1stang atas 13.67stang bawah 13.67

total

assembling 2penyangga tengah 13.67

total

assembling 3

pipa penyangga alas 13.40pipa holow 13.40plat alas 13.67penyangga roda belakang 27.34

total

assembling 4rem 13.53

total

assembling 5pipa penyangga roda depan 13.67penyangga roda depan 13.67

total

assembling 1 assembling 2k1,k2 13.00penyangga tengah 13.67

total

assembling 2 assembling 6k1-k2-K3 13.00

total

assembling 3 assembling 4k4-k5-k6-k7 13.00rem 13.53

total

assembling 4 assembling 6k4-k5-k6-k7-k8 13.00

total

assembling 5 assembling 6k9-k10 13.00

total

assembling 6 meja periksaotopad 13.00

total

meja periksa shippingotopad 13.00

totalTotal

Page 37: Luas Lantai Dan OMH

ONGKOS MATERIAL HANDLINGberat bentuk(kg) berat total alat angkut OMH jarak total onkos

2 27.3427183

lift truck 250 18.74 Rp 4,686

2 27.3427183 A2 27.3427183 B2 26.795864 C2 26.795864 D2 27.3427183 E2 54.6854366 F

1.2 16.2415747 G2 27.3427183 H2 27.3427183 I

total 288.575049 J0.2 10.4

manusia 100 11.85 Rp 1,185 Ktotal 10.4 L

0.2 10.4manusia 100 11.85 Rp 1,185 M

total 10.4 N0.2 10.4

manusia 100 11.31 Rp 1,131 O

0.1 2.6total 13

0.3 21walky fallet 200 11.85 Rp 2,369

total 210.002 0.026

manusia 100 11.31 Rp 1,131 total 0.026

2 27.3427183

lift truck 250 21.73 Rp 5,433

2 27.34271832 27.34271832 26.7958642 26.795864 A2 27.3427183 B2 54.6854366 C

1.2 16.2415747 D2 27.3427183 E2 27.3427183 F

19.2 288.575049 G2 27.3427183

lift truck 250 20.58 Rp 5,146

H2 27.3427183 I2 27.3427183 J2 27.3427183 K2 54.6854366 L2 27.3427183 M

total 191.399028 N2 26.795864

walky fallet 200 17.74 Rp 3,547 Ototal 26.795864

2 26.795864walky fallet 200 21.73 Rp 4,346

total 26.7958641.2 16.2415747

walky fallet200 17.74 Rp 3,547

2 27.3427183

Beberapa alat angkut yang umum digunakan :

Alat angkut dengan menggunakan Tenaga Manusia (0 – 15 kg)

Ongkos untuk tenaga manusia = Rp. 100 / meter gerakan

Alat angkut dengan menggunakan Walky Fallet (15 – 49 kg)

Ongkos untuk Walky Fallet = Rp. 200 / meter gerakan

Alat angkut dengan menggunakan Lift Truck (diatas 50 kg)

Ongkos untuk Lift Truck = Rp. 250 / meter gerakan

Page 38: Luas Lantai Dan OMH

total 43.584293walky fallet

200 20.58 Rp 3,547

2 27.3427183

walky fallet

2 27.34271832 27.34271832 54.68543662 27.34271832 27.3427183

total 191.3990282 27.3427183

walky fallet 200 16.59 Rp 3,318 total 27.3427183

2 27.3427183lift truck 250 17.74 Rp 4,434 2 26.795864

total 54.13858231.2 16.2415747

walky fallet 200 16.59 Rp 3,318 2 27.3427183total 43.584293

2 27.3427183lift truck 250 14.3 Rp 3,575 2 27.3427183

total 54.68543662 27.3427183

walky fallet 200 14.83 Rp 2,966 total 27.3427183

2 26.795864

lift truck 250 14.3 Rp 3,575 2 26.7958642 27.34271832 54.6854366

total 135.6198831.2 16.2415747

walky fallet 200 14.83 Rp 2,966 total 16.2415747

2 27.3427183lift truck 250 14.3 Rp 3,575 2 27.3427183

total 54.68543664 52

lift truck 250 7.403 Rp 1,851 2 27.3427183total 79.3427183

6 78lift truck 250 7.935 Rp 1,984

total 786 78

lift truck 250 7.403 Rp 1,851 1.2 16.2415747total 94.2415747

8 104lift truck 250 7.935 Rp 1,984

total 1044 52

lift truck 250 7.403 Rp 1,851 total 52

19.2 249.6lift truck 250 7.403 Rp 1,851

total 249.619.2 249.6

lift truck 250 8.798 Rp 2,199 total 249.6

Total Rp 78,552

Page 39: Luas Lantai Dan OMH

lUas lantaiRECIEVING 248 2,913 MJ.UKUR 472MS.POTONG 472.2MS.BORING 378 (0.5*SQRT(P4))+(0.5*SQRT(P5))MS.GERINDA 472MS.BENDING 189MS.PRESS 189LAS.ASSEMBLING 1 47MJ.ASSEMBLING 2 63LAS.ASSEMBLING 3 47MJ.ASSEMBLING 4 63LAS.ASSEMBLING 5 47MJ.ASSEMBLING 6 63MJ.PERIKSA PACKING 47SHIPPING 115

P LRECIEVING 248.25 15.75595 11.42421 54.88454MJ.UKUR 472.2 21.73016MS.POTONG 472.2 21.73016MS.BORING 377.76 19.43605 27.49345 13.74MS.GERINDA 472.2 21.73016 25.483MS.BENDING 188.88 13.74336 13.74MS.PRESS 188.88 13.74336LAS.ASSEMBLING 1 47.22 6.871681MJ.ASSEMBLING 2 62.96 7.934734 9.164483LAS.ASSEMBLING 3 47.22 6.871681MJ.ASSEMBLING 4 62.96 7.934734LAS.ASSEMBLING 5 47.22 6.871681MJ.ASSEMBLING 6 62.96 7.934734 4.582242MJ.PERIKSA PACKING 47.22 6.871681SHIPPING 115 10.72381 2.436441

2,913 53.97342115 47.2 2.436441

Beberapa alat angkut yang umum digunakan :

Alat angkut dengan menggunakan Tenaga Manusia (0 – 15 kg)

Ongkos untuk tenaga manusia = Rp. 100 / meter gerakan

Alat angkut dengan menggunakan Walky Fallet (15 – 49 kg)

Ongkos untuk Walky Fallet = Rp. 200 / meter gerakan

Alat angkut dengan menggunakan Lift Truck (diatas 50 kg)

Ongkos untuk Lift Truck = Rp. 250 / meter gerakan

Page 40: Luas Lantai Dan OMH

FTCReceiving M. Ukur MS.POTONG MS.BORING MS.GERINDA MS.BENDING

RECIEVING 4685.7643MJ.UKUR 5432.5408MS.POTONG 5145.7765 4346.0327 3547.3525MS.BORING 3547.3525MS.GERINDAMS.BENDING 3317.9411MS.PRESS 4434.1907LAS.ASSEMBLING 1MJ.ASSEMBLING 2LAS.ASSEMBLING 3MJ.ASSEMBLING 4LAS.ASSEMBLING 5MJ.ASSEMBLING 6MJ.PERIKSA PACKINGSHIPPING

Total 4685.7643 5432.5408 8463.7176 12327.5759 3547.3525

InflowReceiving M. Ukur MS.POTONG MS.BORING MS.GERINDA MS.BENDING

RECIEVING 1.0000MJ.UKUR 1.0000MS.POTONG 0.6080 0.3525 1.0000MS.BORING 0.2878MS.GERINDAMS.BENDING 0.3920MS.PRESS 0.3597LAS.ASSEMBLING 1MJ.ASSEMBLING 2LAS.ASSEMBLING 3MJ.ASSEMBLING 4LAS.ASSEMBLING 5MJ.ASSEMBLING 6MJ.PERIKSA PACKINGSHIPPING

0 1.0000 1.0000 1.0000 1.0000 1.0000

outflowReceiving M. Ukur MS.POTONG MS.BORING MS.GERINDA MS.BENDING

RECIEVING 0.8625MJ.UKUR 0.3275MS.POTONG 0.7495 0.2609 1.0691MS.BORING 0.2129MS.GERINDA

Page 41: Luas Lantai Dan OMH

MS.BENDING 0.4833MS.PRESS 0.2662LAS.ASSEMBLING 1MJ.ASSEMBLING 2LAS.ASSEMBLING 3MJ.ASSEMBLING 4LAS.ASSEMBLING 5MJ.ASSEMBLING 6MJ.PERIKSA PACKINGSHIPPING

Page 42: Luas Lantai Dan OMH

MS.PRESS LAS.ASSEMBLING 1 MJ.ASSEMBLING 2 LAS.ASSEMBLING 3 MJ.ASSEMBLING 41184.5343 1184.5343

3547.35253317.9411

3575.2305 2966.4897 3575.2305 2966.4897

1850.8018

1850.8018

6865.2936 3575.2305 6001.8258 3575.2305 6001.8258

MS.PRESS LAS.ASSEMBLING 1 MJ.ASSEMBLING 2 LAS.ASSEMBLING 3 MJ.ASSEMBLING 40.1974 0.1974

0.51670.4833

1.0000 0.4943 1.0000 0.4943

0.3084

0.3084

1.0000 1.0000 1.0000 1.0000 1.0000

MS.PRESS LAS.ASSEMBLING 1 MJ.ASSEMBLING 2 LAS.ASSEMBLING 3 MJ.ASSEMBLING 40.5971 0.5971

0.80000.7483

1.9317 1.4954 1.9317 1.4954

Page 43: Luas Lantai Dan OMH

0.9330

0.9330

Page 44: Luas Lantai Dan OMH

LAS.ASSEMBLING 5 MJ.ASSEMBLING 6 MJ.PERIKSA PACKING SHIPPING Total1131.3816 2369.0685 1131.3816 11686.6646

5432.540816586.51436865.2936

3575.2305 16658.67113317.94114434.19071850.8018

1983.6834 1983.68341850.8018

1983.6834 1983.68341850.8018 1850.8018

1850.8018 1850.80182199.4358 2199.4358

1.00004706.6122 8187.2372 2982.1835 2199.4358 78552.8263

LAS.ASSEMBLING 5 MJ.ASSEMBLING 6 MJ.PERIKSA PACKING SHIPPING0.2404 0.2894 0.3794

0.7596

0.2423

0.24230.2261

0.62061.0000

1.0000 1.0000 1.0000 1.0000

LAS.ASSEMBLING 5 MJ.ASSEMBLING 6 MJ.PERIKSA PACKING SHIPPING0.6113 1.2800 0.5144

1.9317

Page 45: Luas Lantai Dan OMH

1.0718

1.07181.0000

0.84152199.4358

Page 46: Luas Lantai Dan OMH

RECIEVINGMJ.UKURMS.POTONG

MS.BORINGMS.GERINDAMS.BENDINGLAS.ASSEMBLING 1MJ.ASSEMBLING 2LAS.ASSEMBLING 3MJ.ASSEMBLING 4LAS.ASSEMBLING 5MJ.ASSEMBLING 6MJ.PERIKSA PACKINGSHIPPING

KODE 1 2 3 4 5 6RECIEVING A B N M L I KMJ.UKUR B CMS.POTONG C F D G EMS.BORING D G EMS.GERINDA E H J L I KMS.BENDING F DMS.PRESS G ELAS.ASSEMBLING 1 H IMJ.ASSEMBLING 2 I MLAS.ASSEMBLING 3 J KMJ.ASSEMBLING 4 K MLAS.ASSEMBLING 5 L MMJ.ASSEMBLING 6 M NMJ.PERIKSA PACKING N OSHIPPING O O

Page 47: Luas Lantai Dan OMH

A B C D FJ I H GL M K EO N

F D C B AE G H I JO N L M K