langon.pdf

download langon.pdf

of 37

Transcript of langon.pdf

  • 8/11/2019 langon.pdf

    1/37

    2

  • 8/11/2019 langon.pdf

    2/37

    PT. PP (Persero) merupakan perusahaan BUMN yang

    berdiri sejak 26 Agustus 1953.

    Pada tgl 9 Februari 2010, PT. PP (BUMN) resmi

    menjadi Perusahaan Tbk.

    Pada tgl 26 Agustus 2013, PT.PP,Tbk genap berusia

    60th.

    3

  • 8/11/2019 langon.pdf

    3/37

    CONSTRUCTION

    INVESTMENT

    INFRASTRUCTURE SECTOR)

    PROPERTY AND REALTY

    4

  • 8/11/2019 langon.pdf

    4/37

    PT. PP (Persero)Tbk BERHASIL MERAIH RIBUAN PRESTASIBERKAT JAMINAN KERJA TEPAT WAKTU DAN KUALITAS NOMERSATU DALAM MELAKSANAKAN SETIAP PROJECT YANGDITANGGANI

    2013 :

    BUMN INOVATION AWARDS

    PELOPOR GREEN CONTRACTOR AWARD

    PENGEMBANGAN SDM AWARD

    5

  • 8/11/2019 langon.pdf

    5/37

    Proyek PT.PP (Persero) Tbk telah tersebar si seluruhpenjuru kota di Indonesia, meliputi :

    Aceh- Medan

    Padang

    Bengkulu - Lampung- Palembang - Pekanbaru- Jakarta-Bandung-Yogyakarta- Surabaya- Denpasar- Balikpapan-Makasar- Samarinda- Ambon-

    dan kota-kota besar lainnya

    6

  • 8/11/2019 langon.pdf

    6/37

    7

  • 8/11/2019 langon.pdf

    7/37

    KONSEP FASAD GEDUNG

    8

    Architect : DDG

    (USA)

  • 8/11/2019 langon.pdf

    8/379

  • 8/11/2019 langon.pdf

    9/37

    We Bring Everything Closer..

    Where you can conveniently connect with others while

    having a fun daily routinity. To be entertained, eat great

    food, and live a healthy life. To live closer to work and

    play. Where you can have more time with the people

    you love and to do things you love.

    10

  • 8/11/2019 langon.pdf

    10/37

    MASTER PLAN

    11

  • 8/11/2019 langon.pdf

    11/3712

    LOCATION

  • 8/11/2019 langon.pdf

    12/37

    INTERCONNECTION

    BUS WAY TRACK

    ELEVATED

    FREEWAY

    MONORAIL TRACK

    BUSWAY STATION

    MONORAIL

    STATION

    13

  • 8/11/2019 langon.pdf

    13/37

    5 MENIT KE BUNDARAN SATELIT KOTA BEKASI

    5 MENIT DARI EXIT TOL BEKASI BARAT

    5 MENIT KE PINTU TOL Jakarta Cikampek

    1 MENIT DARI PERENCANAAN FLYOVER DAN MONORAIL

    20 MENIT DARI BANDARA

    DEKAT DENGAN SEKOLAH, RUMAHSAKIT, PUSAT BISNIS & PERKANTORAN SERTA GEDUNG PEMERINTAHAN.

    14

  • 8/11/2019 langon.pdf

    14/37

    PERSPECTIVE

    15

  • 8/11/2019 langon.pdf

    15/37

    EXPERIENCES

    16

  • 8/11/2019 langon.pdf

    16/37

    MENAWARKAN HARGA YANG REASONABLE DENGAN STANDART

    SPESIFIKASI MENDEKATI SPESIFIKASI HI-END PRODUCT

    MEMBERIKAN INVESTOR LINGKUP UNTUK KENAIKAN HARGA YANG

    SIGNIFIKAN

    17

  • 8/11/2019 langon.pdf

    17/37

    PT.PP memberikan jaminan tepat waktu dalam pelaksanaan pembangunan dan kualitas

    terbaik dalam setiap proyeknya, yang akan memberikan keuntungan lebih bagi investor

    maupun customer.

    Tidak diragukan lagi mengapa para developer besar menggandeng PT.PP dalam

    merealisasikan proyek- proyek besar di seluruh Nusantara.

    18

  • 8/11/2019 langon.pdf

    18/37

    1. STRATEGIC LOCATION WITH MANY ACCESS FOR ANY LOCATION

    2. AFFORDABLE PRICE WITH HIGH SPECIFICATION

    3. COMPANY WITH HIGH COMMITMENT

    4. MIXUSED DEVELOPMENT WITH HARMONY ENVIRONMENT CONCEPT ( Green

    Building, Green Concept, Green Environment, Green Development )

    19

  • 8/11/2019 langon.pdf

    19/37

    TIMELINE

    PRE-SALE NUP PILIH UNIT

    20

    PROJECT COMPLETION :

    24 Bulan + 3 Bulan

    ( sejak Ground Breaking Gedung- Des 2014 )

  • 8/11/2019 langon.pdf

    20/3721

  • 8/11/2019 langon.pdf

    21/37

    LAY OUT PLAN TYPE UNIT

    22

  • 8/11/2019 langon.pdf

    22/37

    VIEW UNIT

    23

  • 8/11/2019 langon.pdf

    23/37

    MASTERPLAN PHASE 1

    24

  • 8/11/2019 langon.pdf

    24/37

    ELEVASI EMERALD NORTH

    25

  • 8/11/2019 langon.pdf

    25/37

    TYPE UNIT- EMERALD NORTH - STUDIO, 1 BR

    26

    Studio (26,38 m2) 1 BR. A (35,38 m2) 1 BR. B (35,38 m2)

  • 8/11/2019 langon.pdf

    26/37

    27

    2 BR. A Suite (64,72 m2)

    2 BR. B (58,18 m2)

    2 BR. C (52,76 m2)

    TYPE UNIT- EMERALD NORTH - STUDIO, 2 BR

  • 8/11/2019 langon.pdf

    27/37

    28

    TYPE UNIT- EMERALD NORTH - STUDIO, 3 BR

    3 BR (91,10 m2)

  • 8/11/2019 langon.pdf

    28/37

    29

    TECHNICAL SPECIFICATION : EMERALD NORTH

    1 FLOOR : Homogeneous tile 40X40 cm

    Ceramic tile for bath room

    2 WALL : Interiror : brickwall ,plastered, smooth painted

    Exterior : panel finish Watershield, Glass Curtain Wall, Allumunium Cladding

    3 CEILING : Height ( floor to concrete ceiling) : 2.40 to 2.80 M

    Finishing : gypsum ,smooth painted4 DOOR : Timber engineering solid door apply to main door

    Timber engineering door apply to internal door

    5 WINDOWS : Glass with powder coating aluminium frame

    6 BATHROOM AND SANITARY

    FITTING

    : TOTO brand or equal

    7 HOT WATER : The installation for Electric Water Heater in bathroom

    8 AC : The installation for Wall mounted AC in each room

    9 ELECTRICITY : One bedroom : 1,300 VA

    Provided by PLN Two bedrooms : 2,200 VA

    Three bedrooms : 3,500 VAGenerating Set : Full Power backup

    Metering : Prepaid Individual KWH meter for each unit

    10 WATER SUPPLY : Treated water from PDAM

    11 GAS : Treated from PGN

    12 KITCHEN : Inlet and Outlet are installed

    13 FEATURES :

    Enterta inment : Cable TV insta llat ion , Telephone insta llat ion and internet out le t, audio video intercomm, public sound system

    Fire fi gh ti ng sys tem : Water spr inkl ers , Fire al arm, smoke de tector and hydran t sys tem

    Evacuation sound system

    14 LIFT : 6 Units Passenger Lift

    1 unit Service Lift ,serving at all floor ( from loading dock)

    15 SECURITY SYSTEM : CCTV 24 hours i ns tal led at main pub li c en trance al l f loors, and every access point

    16 PARKING : 1 lot per unit for 2BR and 3 BR (unreserved)

    1 lot for 3 units for 1BR .

  • 8/11/2019 langon.pdf

    29/37

    ELEVASI SOUTH

    30

  • 8/11/2019 langon.pdf

    30/37

    31

    TYPE UNIT- EMERALD SOUTH - STUDIO, 1 BR

    1 BR. A (36,35 m2) 1 BR. B (36,13 m2) 1 BR. C (39,56 m2)

  • 8/11/2019 langon.pdf

    31/37

    32

    TYPE UNIT- EMERALD SOUTH - STUDIO, 2 BR

    2 BR. A (53,74 m2) 2 BR. A (65,68 m2)

  • 8/11/2019 langon.pdf

    32/37

    33

    TYPE UNIT- EMERALD SOUTH - STUDIO, 3 BR

    3 BR (81,75 m2)

  • 8/11/2019 langon.pdf

    33/37

    34

    TECHNICAL SPECIFICATION : EMERALD SOUTH

    1 FLOOR : Homogeneous tile 60x60 cm

    High Quality Ceramic tile for bath room

    2 WALL : Interiror : brickwall ,plastered, smooth painted

    Exterior : panel finish Watershield, Glass Curtain Wall, Allumunium Cladding

    3 CEILING : Height ( floor to concrete ceiling) : 2.40 to 2.80 M

    Finishing : gypsum ,smooth painted

    4 DOOR : Timber engineering solid door apply to main door

    Timber engineering door apply to internal door

    5 WINDOWS : Glass with powder coating aluminium frame

    6 BATHROOM AND SANITARY

    FITTING

    : TOTO brand or equal

    7 HOT WATER : The installation for Electric Water Heater in bathroom

    8 AC : The installation for Wall mounted AC in each room

    9 ELECTRICITY : One bedroom : 1,300 VA

    Provided by PLN Two bedrooms : 2,200 VA

    Three bedrooms : 3,500 VA

    Generating Set : Full Power backup

    Metering : Prepaid Individual KWH meter for each unit

    10 WATER SUPPLY : Treated water from PDAM

    11 GAS : Treated from PGN

    12 KITCHEN : Inlet and Outlet are installed

    13 FEATURES :

    Enterta inment : Cable TV insta llat ion , Telephone insta llat ion and internet out le t, audio video intercomm, public sound system

    Fire fi gh ti ng sys tem : Water spr inkl ers , Fire al arm, smoke de tector and hydran t sys tem

    Evacuation sound system

    14 LIFT : 6 Units Passenger Lift

    1 unit Service Lift ,serving at all floor ( from loading dock)

    15 SECURITY SYSTEM : CCTV 24 hours i ns tal led at main pub li c en trance al l f loors, and every access point

    16 PARKING : 1 lot per unit for 2BR and 3 BR (unreserved)

    1 lot for 3 units for 1BR .

  • 8/11/2019 langon.pdf

    34/37

    ALUR NUP

    35

    START

    Sudah Bayar

    NUP

    Setor Tunai

    Credit

    Card/Debit

    Card di Kasir

    Berkas Lengkap :

    1.FC. KTP

    2.Form Minat Beli

    3.FC. Bukti Transfer

    Sudah Lengkap &

    Sudah Bayar

    Agar Dilengkapi

    Pengambilan

    No Antrian

    Verifikasi Berkas

    pendaftaran

    NUP

    Berkas dibawa

    ke Kasir

    Pemberiaan

    NUP oleh KasirSELESAI

  • 8/11/2019 langon.pdf

    35/37

    Syarat kelengkapan berkas :

    1.Formulir Minat Beli (fotocopy) diisi lengkap dan ditandatangan

    2.Foto copy Bukti Transfer

    3.Foto copy KTP Pemesan

    36

  • 8/11/2019 langon.pdf

    36/37

    37

    HARD CASH:Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )

    DP 30% cicil 3xSisa 70 %

    Installment ( In House ) 24xBooking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )

    - Cicil 24x Tanpa DP

  • 8/11/2019 langon.pdf

    37/37

    KPA

    Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )DP 20% cicil 4x

    30% cicil 20x

    Sisa 50 % KPA

    Installment ( In House ) 36X

    Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )DP 30% cicil 3x, Pelunasan 70% cicil 36x

    38