langon.pdf
-
Upload
vikar-cihuyy -
Category
Documents
-
view
216 -
download
0
Transcript of langon.pdf
-
8/11/2019 langon.pdf
1/37
2
-
8/11/2019 langon.pdf
2/37
PT. PP (Persero) merupakan perusahaan BUMN yang
berdiri sejak 26 Agustus 1953.
Pada tgl 9 Februari 2010, PT. PP (BUMN) resmi
menjadi Perusahaan Tbk.
Pada tgl 26 Agustus 2013, PT.PP,Tbk genap berusia
60th.
3
-
8/11/2019 langon.pdf
3/37
CONSTRUCTION
INVESTMENT
INFRASTRUCTURE SECTOR)
PROPERTY AND REALTY
4
-
8/11/2019 langon.pdf
4/37
PT. PP (Persero)Tbk BERHASIL MERAIH RIBUAN PRESTASIBERKAT JAMINAN KERJA TEPAT WAKTU DAN KUALITAS NOMERSATU DALAM MELAKSANAKAN SETIAP PROJECT YANGDITANGGANI
2013 :
BUMN INOVATION AWARDS
PELOPOR GREEN CONTRACTOR AWARD
PENGEMBANGAN SDM AWARD
5
-
8/11/2019 langon.pdf
5/37
Proyek PT.PP (Persero) Tbk telah tersebar si seluruhpenjuru kota di Indonesia, meliputi :
Aceh- Medan
Padang
Bengkulu - Lampung- Palembang - Pekanbaru- Jakarta-Bandung-Yogyakarta- Surabaya- Denpasar- Balikpapan-Makasar- Samarinda- Ambon-
dan kota-kota besar lainnya
6
-
8/11/2019 langon.pdf
6/37
7
-
8/11/2019 langon.pdf
7/37
KONSEP FASAD GEDUNG
8
Architect : DDG
(USA)
-
8/11/2019 langon.pdf
8/379
-
8/11/2019 langon.pdf
9/37
We Bring Everything Closer..
Where you can conveniently connect with others while
having a fun daily routinity. To be entertained, eat great
food, and live a healthy life. To live closer to work and
play. Where you can have more time with the people
you love and to do things you love.
10
-
8/11/2019 langon.pdf
10/37
MASTER PLAN
11
-
8/11/2019 langon.pdf
11/3712
LOCATION
-
8/11/2019 langon.pdf
12/37
INTERCONNECTION
BUS WAY TRACK
ELEVATED
FREEWAY
MONORAIL TRACK
BUSWAY STATION
MONORAIL
STATION
13
-
8/11/2019 langon.pdf
13/37
5 MENIT KE BUNDARAN SATELIT KOTA BEKASI
5 MENIT DARI EXIT TOL BEKASI BARAT
5 MENIT KE PINTU TOL Jakarta Cikampek
1 MENIT DARI PERENCANAAN FLYOVER DAN MONORAIL
20 MENIT DARI BANDARA
DEKAT DENGAN SEKOLAH, RUMAHSAKIT, PUSAT BISNIS & PERKANTORAN SERTA GEDUNG PEMERINTAHAN.
14
-
8/11/2019 langon.pdf
14/37
PERSPECTIVE
15
-
8/11/2019 langon.pdf
15/37
EXPERIENCES
16
-
8/11/2019 langon.pdf
16/37
MENAWARKAN HARGA YANG REASONABLE DENGAN STANDART
SPESIFIKASI MENDEKATI SPESIFIKASI HI-END PRODUCT
MEMBERIKAN INVESTOR LINGKUP UNTUK KENAIKAN HARGA YANG
SIGNIFIKAN
17
-
8/11/2019 langon.pdf
17/37
PT.PP memberikan jaminan tepat waktu dalam pelaksanaan pembangunan dan kualitas
terbaik dalam setiap proyeknya, yang akan memberikan keuntungan lebih bagi investor
maupun customer.
Tidak diragukan lagi mengapa para developer besar menggandeng PT.PP dalam
merealisasikan proyek- proyek besar di seluruh Nusantara.
18
-
8/11/2019 langon.pdf
18/37
1. STRATEGIC LOCATION WITH MANY ACCESS FOR ANY LOCATION
2. AFFORDABLE PRICE WITH HIGH SPECIFICATION
3. COMPANY WITH HIGH COMMITMENT
4. MIXUSED DEVELOPMENT WITH HARMONY ENVIRONMENT CONCEPT ( Green
Building, Green Concept, Green Environment, Green Development )
19
-
8/11/2019 langon.pdf
19/37
TIMELINE
PRE-SALE NUP PILIH UNIT
20
PROJECT COMPLETION :
24 Bulan + 3 Bulan
( sejak Ground Breaking Gedung- Des 2014 )
-
8/11/2019 langon.pdf
20/3721
-
8/11/2019 langon.pdf
21/37
LAY OUT PLAN TYPE UNIT
22
-
8/11/2019 langon.pdf
22/37
VIEW UNIT
23
-
8/11/2019 langon.pdf
23/37
MASTERPLAN PHASE 1
24
-
8/11/2019 langon.pdf
24/37
ELEVASI EMERALD NORTH
25
-
8/11/2019 langon.pdf
25/37
TYPE UNIT- EMERALD NORTH - STUDIO, 1 BR
26
Studio (26,38 m2) 1 BR. A (35,38 m2) 1 BR. B (35,38 m2)
-
8/11/2019 langon.pdf
26/37
27
2 BR. A Suite (64,72 m2)
2 BR. B (58,18 m2)
2 BR. C (52,76 m2)
TYPE UNIT- EMERALD NORTH - STUDIO, 2 BR
-
8/11/2019 langon.pdf
27/37
28
TYPE UNIT- EMERALD NORTH - STUDIO, 3 BR
3 BR (91,10 m2)
-
8/11/2019 langon.pdf
28/37
29
TECHNICAL SPECIFICATION : EMERALD NORTH
1 FLOOR : Homogeneous tile 40X40 cm
Ceramic tile for bath room
2 WALL : Interiror : brickwall ,plastered, smooth painted
Exterior : panel finish Watershield, Glass Curtain Wall, Allumunium Cladding
3 CEILING : Height ( floor to concrete ceiling) : 2.40 to 2.80 M
Finishing : gypsum ,smooth painted4 DOOR : Timber engineering solid door apply to main door
Timber engineering door apply to internal door
5 WINDOWS : Glass with powder coating aluminium frame
6 BATHROOM AND SANITARY
FITTING
: TOTO brand or equal
7 HOT WATER : The installation for Electric Water Heater in bathroom
8 AC : The installation for Wall mounted AC in each room
9 ELECTRICITY : One bedroom : 1,300 VA
Provided by PLN Two bedrooms : 2,200 VA
Three bedrooms : 3,500 VAGenerating Set : Full Power backup
Metering : Prepaid Individual KWH meter for each unit
10 WATER SUPPLY : Treated water from PDAM
11 GAS : Treated from PGN
12 KITCHEN : Inlet and Outlet are installed
13 FEATURES :
Enterta inment : Cable TV insta llat ion , Telephone insta llat ion and internet out le t, audio video intercomm, public sound system
Fire fi gh ti ng sys tem : Water spr inkl ers , Fire al arm, smoke de tector and hydran t sys tem
Evacuation sound system
14 LIFT : 6 Units Passenger Lift
1 unit Service Lift ,serving at all floor ( from loading dock)
15 SECURITY SYSTEM : CCTV 24 hours i ns tal led at main pub li c en trance al l f loors, and every access point
16 PARKING : 1 lot per unit for 2BR and 3 BR (unreserved)
1 lot for 3 units for 1BR .
-
8/11/2019 langon.pdf
29/37
ELEVASI SOUTH
30
-
8/11/2019 langon.pdf
30/37
31
TYPE UNIT- EMERALD SOUTH - STUDIO, 1 BR
1 BR. A (36,35 m2) 1 BR. B (36,13 m2) 1 BR. C (39,56 m2)
-
8/11/2019 langon.pdf
31/37
32
TYPE UNIT- EMERALD SOUTH - STUDIO, 2 BR
2 BR. A (53,74 m2) 2 BR. A (65,68 m2)
-
8/11/2019 langon.pdf
32/37
33
TYPE UNIT- EMERALD SOUTH - STUDIO, 3 BR
3 BR (81,75 m2)
-
8/11/2019 langon.pdf
33/37
34
TECHNICAL SPECIFICATION : EMERALD SOUTH
1 FLOOR : Homogeneous tile 60x60 cm
High Quality Ceramic tile for bath room
2 WALL : Interiror : brickwall ,plastered, smooth painted
Exterior : panel finish Watershield, Glass Curtain Wall, Allumunium Cladding
3 CEILING : Height ( floor to concrete ceiling) : 2.40 to 2.80 M
Finishing : gypsum ,smooth painted
4 DOOR : Timber engineering solid door apply to main door
Timber engineering door apply to internal door
5 WINDOWS : Glass with powder coating aluminium frame
6 BATHROOM AND SANITARY
FITTING
: TOTO brand or equal
7 HOT WATER : The installation for Electric Water Heater in bathroom
8 AC : The installation for Wall mounted AC in each room
9 ELECTRICITY : One bedroom : 1,300 VA
Provided by PLN Two bedrooms : 2,200 VA
Three bedrooms : 3,500 VA
Generating Set : Full Power backup
Metering : Prepaid Individual KWH meter for each unit
10 WATER SUPPLY : Treated water from PDAM
11 GAS : Treated from PGN
12 KITCHEN : Inlet and Outlet are installed
13 FEATURES :
Enterta inment : Cable TV insta llat ion , Telephone insta llat ion and internet out le t, audio video intercomm, public sound system
Fire fi gh ti ng sys tem : Water spr inkl ers , Fire al arm, smoke de tector and hydran t sys tem
Evacuation sound system
14 LIFT : 6 Units Passenger Lift
1 unit Service Lift ,serving at all floor ( from loading dock)
15 SECURITY SYSTEM : CCTV 24 hours i ns tal led at main pub li c en trance al l f loors, and every access point
16 PARKING : 1 lot per unit for 2BR and 3 BR (unreserved)
1 lot for 3 units for 1BR .
-
8/11/2019 langon.pdf
34/37
ALUR NUP
35
START
Sudah Bayar
NUP
Setor Tunai
Credit
Card/Debit
Card di Kasir
Berkas Lengkap :
1.FC. KTP
2.Form Minat Beli
3.FC. Bukti Transfer
Sudah Lengkap &
Sudah Bayar
Agar Dilengkapi
Pengambilan
No Antrian
Verifikasi Berkas
pendaftaran
NUP
Berkas dibawa
ke Kasir
Pemberiaan
NUP oleh KasirSELESAI
-
8/11/2019 langon.pdf
35/37
Syarat kelengkapan berkas :
1.Formulir Minat Beli (fotocopy) diisi lengkap dan ditandatangan
2.Foto copy Bukti Transfer
3.Foto copy KTP Pemesan
36
-
8/11/2019 langon.pdf
36/37
37
HARD CASH:Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )
DP 30% cicil 3xSisa 70 %
Installment ( In House ) 24xBooking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )
- Cicil 24x Tanpa DP
-
8/11/2019 langon.pdf
37/37
KPA
Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )DP 20% cicil 4x
30% cicil 20x
Sisa 50 % KPA
Installment ( In House ) 36X
Booking Fee Rp 10 juta ( North ), Rp. 15 Juta ( South )DP 30% cicil 3x, Pelunasan 70% cicil 36x
38