NETWORK PLANNING

I 112 II 35 III 91

`

#REF!

#REF!

#REF!

#REF!

Page 2: LAMPIRAN KONTRAK IPAL

JADWAL WAKTU PELAKSANAAN PEKERJAAN

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADOTAHUN ANGGARAN : 2013

NO URAIAN KEGIATAN BULAN I BULAN II BULAN III BULAN IV I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI

I PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT

II PEKERJAAN RUMAH INCENERATOR

III INCENERATOR ( SLI 1 ) + Acsesories

#REF!#REF!

#REF!#REF!

WAKTU PELAKSANAAN 120 HARI KALENDER

Page 3: LAMPIRAN KONTRAK IPAL

BART CHART

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADOTAHUN ANGGARAN : 2013

NO URAIAN KEGIATAN BULAN I BULAN II BULAN III BULAN IV I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI

I PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT 85.37 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10

II PEKERJAAN RUMAH INCENERATOR 2.67 0.53 0.53 0.53 0.53 0.53

III INCENERATOR ( SLI 1 ) + Acsesories 11.97 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

100.00

#REF! 6.098 6.098 7.018 7.018 7.018 7.018 7.018 7.552 7.552 7.018 7.018 7.018 7.018 7.552 1.454 0.533

#REF! 12.195 13.116 14.036 14.036 14.036 14.036 14.570 15.103 14.570 14.036 14.036 14.036 14.570 9.005 1.987

#REF!#REF!

BOBOT ( % )

WAKTU PELAKSANAAN 120 HARI KALENDER

Page 4: LAMPIRAN KONTRAK IPAL

S CURVE

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADOTAHUN ANGGARAN : 2013

NO URAIAN KEGIATAN BULAN I BULAN II BULAN III BULAN IV I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI

I PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT 85.37 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10

100

II PEKERJAAN RUMAH INCENERATOR2.67 0.53 0.53 0.53 0.53 0.53

III INCENERATOR ( SLI 1 ) + Acsesories11.97 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

100.00 RENCANA KERJA MINGGUAN 6.10 6.10 7.02 7.02 7.02 7.02 7.02 7.55 7.55 7.02 7.02 7.02 7.02 7.55 1.45 0.53 RENCANA KERJA KUMULATIF 6.10 12.20 19.21 26.23 33.25 40.27 47.29 54.84 62.39 69.41 76.42 83.44 90.46 98.01 99.47 100.00

#REF! - #REF!

#REF!

#REF!

BOBOT ( % )

WAKTU PELAKSANAAN 120 hari Kalender

Page 5: LAMPIRAN KONTRAK IPAL

LAMPIRAN : SURAT PERJANJIAN

NOMOR : HK.06.01/II.3/231/2013

TANGGAL : 30 AGUSTUS 2013

NO URAIAN PEKERJAAN ANALISAVOLUME

HARGA JUMLAHSATUAN HARGA

ANGKA SATUAN ( Rp ) ( Rp )

A. PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT

I PEKERJAAN PERSIAPAN1 Direksi Keet, Pondok Kerja dan Gudang Bahan LS 12.00 m2 250,000.00 3,000,000.00 2 Pengadaan air bersih untuk adukan beton LS 1.00 Pekj 350,000.00 350,000.00 3 Papan Nama Proyek LS 1.00 Pekj 750,000.00 750,000.00 4 Pemasangan Bowplank B.3 40.00 m 54,300.00 2,172,000.00

JUMLAH I 6,272,000.00

II PEKERJAAN PIPING1 Pekerjaan galian tanah dalam 50 - 90 cm B.1 281.25 m3 39,375.00 11,074,218.75 2 Pekerjaan pemasangan pipa PVC 6 inchi LS 475.00 m 124,492.50 59,133,937.50 3 Pekerjaan pemasangan pipa PVC 2 inchi LS 150.00 m 33,240.00 4,986,000.00 4 Pekerjaan urugan tanah kembali B.3 281.25 m3 13,100.00 3,684,375.00

JUMLAH II 78,878,531.25

III PEKERJAAN BAK KONTROL 1 Galian Tanah B.1 42.46 m3 39,375.00 1,671,923.08 2 Pas. Batu bata D.2 51.20 m2 99,935.00 5,116,672.00 3 Plesteran E.2 102.40 m2 32,368.00 3,314,483.20 4 Urugan kembali B.3 1.92 m3 13,100.00 25,152.00 5 Lantai bak cor beton G.3 2.56 m3 628,050.00 1,607,808.00 6 Tutup plat besi LS 20.00 set 200,000.00 4,000,000.00

JUMLAH III 15,736,038.28

IV PEKERJAAN HOUSING1 Galian Tanah B.1 4.62 m3 39,375.00 181,912.50 2 Pondasi C.1 3.96 m3 584,825.00 2,315,907.00 3 Sloof G.7 0.33 m3 5,954,214.94 1,964,890.93 4 Kolom praktis G.12 0.27 m3 8,897,922.76 2,402,439.14 5 Dinding Pas bata D.1 30.00 m2 108,025.00 3,240,750.00 6 Plesteran 1 : 2 E.1 60.00 m2 36,468.80 2,188,128.00 7 Tanah Urugan Lantai B.6 1.95 m3 195,750.00 381,712.50 8 Pasir urugan lantai B.5 0.65 m3 225,750.00 146,737.50 9 Lantai cor beton G.2 1.30 m3 629,250.00 818,025.00

10 Rangka atap baja ringan LS 15.00 m2 225,000.00 3,375,000.00 11 Atap asbes gelombang LS 15.00 m2 98,500.00 1,477,500.00 12 Plafond LS 14.50 m2 65,000.00 942,500.00 13 Pasangan keramik lantai 30 x 30 cm G.15 15.00 m2 147,540.00 2,213,100.00 14 Kosen dan pintu kayu ( komplit ) LS 1.00 set 2,500,000.00 2,500,000.00 15 Cat tembok M.1 60.00 m2 21,268.50 1,276,110.00 16 Cat minyak M.4 6.00 m2 19,800.00 118,800.00 17 Lampu TL komplit LS 2.00 set 140,000.00 280,000.00

JUMLAH IV 25,823,512.58

V PEKERJAAN BAK EQUALISASI1 Galian Tanah B.2 87.17 m3 48,375.00 4,216,848.75 2 Lantai kerja t = 5 cm G.2 1.15 m3 629,250.00 723,637.50 3 Pasir urug t = 10 cm B.5 2.31 m3 225,750.00 521,482.50 4 Urugan sirtu t = 20 cm B.7 4.62 m3 380,250.00 1,756,755.00 5 Dinding beton bertulang G.13 12.58 m3 4,788,025.27 60,233,357.92 6 Lantai bak cor beton bertulang G.14 4.62 m3 5,093,619.02 23,532,519.88 7 Balok beton 15/15 G.11 0.26 m3 5,084,573.38 1,321,989.08 8 Tutup plat besi LS 9.00 set 250,000.00 2,250,000.00

JUMLAH V 94,556,590.63

VI PEKERJAAN DUDUKAN BIOREACTOR ( 2 UNIT )1 Galian Tanah B.1 14.78 m3 39,375.00 581,962.50 2 Pondasi C.1 11.70 m3 584,825.00 6,842,452.50 3 Sloof G.7 0.92 m3 5,954,214.94 5,477,877.75 4 Urugan sitru B.7 2.42 m3 380,250.00 920,205.00 5 Lantai beton bertulang ( Port Aerobic Reactor ) G.14 4.84 m3 5,093,619.02 24,653,116.07 6 Plesteran tepi pondasi E.1 30.36 m2 36,468.80 1,107,192.77 7 Tiang HL 4*4 ( t = 16 mm ) LS 45.00 btg 170,000.00 7,650,000.00 8 Atap Polikarbonat LS 45.50 m2 325,000.00 14,787,500.00

JUMLAH VI 62,020,306.58

VII PEKERJAAN BAK PRETREATMENT KITCHEN & LOUNDRY1 Galian Tanah B.1 1.50 m3 39,375.00 59,062.50 2 Pas. Batu bata D.2 5.60 m2 99,935.00 559,636.00 3 Plesteran E.1 11.20 m2 36,468.80 408,450.56 4 Urugan sirtu B.7 0.22 m3 380,250.00 83,655.00 5 Lantai bak cor beton G.3 0.30 m3 628,050.00 188,415.00 6 Tutup plat besi LS 2.00 set 200,000.00 400,000.00

JUMLAH VII 1,699,219.06

VIII PEKERJAAN FISH POND1 Galian Tanah B.1 4.92 m3 39,375.00 193,725.00 2 Pas. Batu bata D.2 5.00 m2 99,935.00 499,675.00 3 Plesteran E.1 10.00 m2 36,468.80 364,688.00 4 Urugan sirtu B.7 0.60 m3 380,250.00 228,150.00 5 Lantai bak cor beton G.3 1.20 m3 628,050.00 753,660.00

JUMLAH VIII 2,039,898.00

IX PEKERJAAN BAK CHLORINE1 Galian Tanah B.1 1.96 m3 39,375.00 77,175.00 2 Pas. Batu bata D.2 2.40 m2 99,935.00 239,844.00 3 Plesteran E.1 4.80 m2 36,468.80 175,050.24 4 Urugan sirtu B.7 0.10 m3 380,250.00 38,025.00 5 Lantai bak cor beton G.3 0.20 m3 628,050.00 125,610.00 6 Tutup pelat besi LS 1.00 set 200,000.00 200,000.00

JUMLAH IX 855,704.24

PEKERJAAN : PEMBANGUNAN GEDUNG RUMAH SAKIT LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER :

PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT (INCINERATOR

Page 6: LAMPIRAN KONTRAK IPAL

NO URAIAN PEKERJAAN ANALISAVOLUME

HARGA JUMLAHSATUAN HARGA

ANGKA SATUAN ( Rp ) ( Rp )

X PEKERJAAN PEMBUATAN TAMAN1 Pekerjaan pembuatan taman disekitar lokasi IPAL LS 1.00 set 13,500,000.00 13,500,000.00

JUMLAH X 13,500,000.00

XI PEKERJAAN PEMBUATAN SEPTITANK

1 Galian Tanah B.2 60.75 m3 48,375.00 2,938,781.25

2 Pondasi batu kali C.1 3.76 m3 584,825.00 2,198,942.00

3 Sloof 15/20 G.7 0.56 m3 5,954,214.94 3,334,360.37

4 Lantai kerja t = 5 cm G.2 0.73 m3 629,250.00 459,352.50

5 Pasir urug t = 10 cm B.5 1.46 m3 225,750.00 329,595.00

6 Lantai cor beton G.1 2.93 m3 629,250.00 1,843,702.50

7 Dinding pasangan bata D.1 46.99 m2 108,025.00 5,076,094.75

8 Plesteran dan acian ( E.2 + E.4 ) 55.24 M2 51,068.00 2,820,996.32

9 Kolom 15/15 G.9 0.30 m3 8,714,468.46 2,614,340.54

10 Pelat penutup beton bertulang G.14 2.14 m3 5,093,619.02 10,900,344.71

11 Ring balok 15/15 G.11 0.25 m3 5,084,573.38 1,271,143.35

12 Tutup Manhole dari beton LS 2.00 set 350,000.00 700,000.00

JUMLAH XI 34,487,653.28

TOTAL 2 UNIT 68,975,306.56

JUMLAH ( I - XI ) 370,357,107.18

XII BIO+STRAIN REACTORa. Main Frame

b. Biomed Filtration Tecnolog

c. Aero Reactor ( Diffuser )

d. Generatif Starter

e. Nutrie Bac

f. BRU System

g. Trickling Filter

h. Package ( Vacuum Flat Membrane )

2.00 set 930,798,000.00 1,861,596,000.00

XIII INLET PUMP 2.00 set 15,000,000.00 30,000,000.00

XIV SCREENINGa. Bar Screen 1.00 set 3,000,000.00 3,000,000.00

b. Fine Screen 1.00 set 3,000,000.00 3,000,000.00

XV ROOT BLOWER 2.00 set 20,000,000.00 40,000,000.00

XVI PRA PENGOLAHAN LIMBAH CAIR DAPUR 1.00 set 10,000,000.00 10,000,000.00

XVII PRA PENGOLAHAN LIMBAH CAIR CUCIAN ( LOUNDRY ) 1.00 set 10,000,000.00 10,000,000.00

XVIII PRA PENGOLAHAN LIMBAH CAIR LABORATORIUM 1.00 set 80,000,000.00 80,000,000.00

XIX ALCHIMIA COMPOUND ANNIHILATION APPARATUS 1.00 set 60,000,000.00 60,000,000.00

XX CHLORINATOR a. Dosing pump 1.00 set 10,000,000.00 10,000,000.00

b. Tangki Chlorine 1.00 set 1,000,000.00 1,000,000.00

XXI TRANSFER PUMP 2.00 set 15,000,000.00 30,000,000.00

XXII ORGANIC REDUCING APPARATUS 1.00 set 8,000,000.00 8,000,000.00

XXIII PANEL CONTROLE 1.00 set 15,000,000.00 15,000,000.00

XXIV LABORATORY TEST sesuai dengan Kep 58/MENLH/12/1995 1.00 set 5,000,000.00 5,000,000.00

JUMLAH A (I - XXIV ) 2,536,953,107.18

Page 7: LAMPIRAN KONTRAK IPAL

NO URAIAN PEKERJAAN ANALISAVOLUME

HARGA JUMLAHSATUAN HARGA

ANGKA SATUAN ( Rp ) ( Rp )

B. PEKERJAAN RUMAH INCENERATOR

I PEKERJAAN PONDASI1 Galian tanah untuk pondasi B.1 8.64 M3 39,375.00 340,200.00 2 Urugan pasir bawah pondasi t = 10 cm B.5 1.08 M3 225,750.00 243,810.00 3 Pondasi batu kali C.1 6.84 M3 584,825.00 4,000,203.00 4 Sloof 15/20 G.7 0.54 M3 5,954,214.94 3,215,276.07 5 Urugan tanah kembali B.6 1.62 M3 195,750.00 317,115.00

Jumlah 8,116,604.07

II PEKERJAAN LANTAI1 Urugan sirtu peninggian lantai B.7 3.00 M3 380,250.00 1,140,750.00 2 Urugan pasir bawah lantai t = 10 cm B.5 2.00 M3 225,750.00 451,500.00 3 Lantai plat beton bertulang t = 15 cm G.14 3.00 M3 5,093,619.02 15,280,857.07

Jumlah 16,873,107.07

III PEKERJAAN DINDING1 Pasangan batu bata 1 : 4 D.2 17.72 M2 99,935.00 1,770,848.20 2 Plesteran dinding 1 : 5 E.2 35.44 M2 32,368.00 1,147,121.92 3 Acian E.4 35.44 M2 18,700.00 662,728.00

Jumlah 3,580,698.12

IV PEKERJAAN RANGKA BAJA1 Kolom CNP 150x50x20x2,3 ( Double ) N.8 360.48 Kg 17,795.00 6,414,741.60 2 Kolom CNP 150x50x20x2,3 ( Single ) N.8 90.12 Kg 17,795.00 1,603,685.40 3 Balok CNP 75x45x15x2,3 ( Double ) N.8 468.00 Kg 17,795.00 8,328,060.00 4 Besi siku 40x40x4 N.9 261.34 Kg 18,370.00 4,800,815.80 5 Teralis besi 6mm LS 79.04 M2 225,000.00 17,784,000.00

Jumlah 38,931,302.80

V PEKERJAAN PINTU1 Besi siku 40x40x4 N.9 30.60 Kg 18,370.00 562,122.00 2 Teralis besi 8mm LS 4.09 M2 225,000.00 920,250.00

Jumlah 1,482,372.00

VI PEKERJAAN ATAP1 Kuda kuda CNP 125x50x20x2,3 ( Double ) N.8 126.28 Kg 17,795.00 2,247,152.60 2 Gording CNP 75x45x15x2.3 N.8 171.60 Kg 17,795.00 3,053,622.00 3 Asbes gelombang kecil H.1 46.20 M2 62,150.00 2,871,330.00 4 Bubungan / nok asbes H.2 6.60 M' 31,004.00 204,626.40

Jumlah 8,376,731.00

VII PEKERJAAN PENGECATAN1 Pengecatan dinding M.1 35.44 M2 21,268.50 753,755.64 2 Pengecatan besi M.5 83.13 M2 10,140.00 842,938.20

Jumlah 1,596,693.84

VIII PEKERJAAN INSTALASI LISTRIK1 Lampu TL 40 watt LS 2.00 Bh 100,000.00 200,000.00 2 Saklar ganda LS 1.00 Bh 35,000.00 35,000.00 3 Stop kontak LS 3.00 Bh 25,000.00 75,000.00

Jumlah 310,000.00

JUMLAH ( B ) 79,267,508.90

C INCENERATOR ( SLI 1 ) + Acsesories

INCENERATOR ( SLI 1 ) LS 1.00 SET 295,600,000.00 295,600,000.00

MESIN PENGHANCUR JARUM SUNTIK BEKAS PAKAI LS 1.00 SET 60,000,000.00 60,000,000.00

(USED NEEDLE AND SYRINGE MILLING UNIT )

JUMLAH (C) 355,600,000.00

JUMLAH (A,B, C) 2,971,820,616.07

PPN 10% 297,182,061.61

TOTAL 3,269,002,677.68

TOTALDIBULATKAN 3,269,000,000.00

Untuk dan atas nama, Untuk dan atas nama,BLU RSUP Prof.Dr.R.D.Kandou MANADO PT ROGABE PASTRI

MARLYN LONGKUTOY, S.Pd,M.Kes TUMUNGGU SILITONGANIP. 196208111981112001 DIREKTUR

MENGETAHUI,DIREKTUR UTAMA

SELAKUKUASA PENGGUNA ANGGARAN

Dr. DJOLLY M. RUMOPA,SpOG

Page 8: LAMPIRAN KONTRAK IPAL

NO URAIAN PEKERJAAN ANALISAVOLUME

HARGA JUMLAHSATUAN HARGA

ANGKA SATUAN ( Rp ) ( Rp )NIP. 195507181983011001

Page 9: LAMPIRAN KONTRAK IPAL

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADOTAHUN ANGGARAN : 2013

REKAPITULASI

No URAIAN JUMLAH

A. PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT Rp 2,536,953,107.18

B. PEKERJAAN RUMAH INCENERATOR Rp 79,267,508.90

C. INCENERATOR ( SLI 1 ) + Acsesories Rp 355,600,000.00

Jumlah Rp 2,971,820,616.07

PPN 10% Rp 297,182,061.61

Total Jumlah Rp 3,269,002,677.68

Jumlah Dibulatkan Rp 3,269,000,000.00

#REF!#REF!

#REF!#REF!

Terbilang: Tiga Milliar Dua Ratus Enam Puluh Sembilan Juta Rupiah

Page 10: LAMPIRAN KONTRAK IPAL

ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADOTAHUN ANGGARAN : 2013

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

PEKERJAAN PERSIAPAN

1 1 M' Pengukuran dan pemasangan bowplank0.012 m3 Kayu 5x7 cm kelas IV 2,150,000.00 25,800.000.020 kg Besi paku biasa 18,000.00 360.000.007 m3 Kayu papan kelas IV 2,295,000.00 16,065.000.100 Oh Tukang kayu 60,000.00 6,000.000.100 Oh Pekerja 50,000.00 5,000.000.010 Oh Kepala Tukang 70,000.00 700.000.005 Oh Mandor 75,000.00 375.00

Jumlah 42,225.00 12,075.00 54,300.002 1 M2 Menbersihkan Lapangan dan Perataan

0.100 Oh Pekerja 50,000.00 5,000.000.050 Oh Mandor 75,000.00 3,750.00

Jumlah 8,750.00 8,750.00

PEKERJAAN TANAH, SNI DT-91-0006-2007

3 1 M3 Galian Tanah Biasa0.750 Oh Pekerja 50,000.00 37,500.000.025 Oh Mandor 75,000.00 1,875.00

Jumlah 39,375.00 39,375.004 1 M3 Galian Tanah Biasa 2 m

0.900 Oh Pekerja 50,000.00 45,000.000.045 Oh Mandor 75,000.00 3,375.00

Jumlah 48,375.00 48,375.005 1 M3 Urugan Kembali

0.250 Oh Pekerja 50,000.00 12,500.000.008 Oh Mandor 75,000.00 600.00

Jumlah 13,100.00 13,100.006 1 M3 Timbunan Pasir Urug

1.200 M3 Pasir Urug 175,000.00 210,000.000.300 Oh Pekerja 50,000.00 15,000.000.010 Oh Mandor 75,000.00 750.00

Jumlah 210,000.00 15,750.00 225,750.007 1 M3 Urugan Tanah

1.200 M3 Tanah Urug 150,000.00 180,000.000.300 Oh Pekerja 50,000.00 15,000.000.010 Oh Mandor 75,000.00 750.00

Jumlah 180,000.00 15,750.00 195,750.007.a. 1 M3 Urugan Sirtu

2.250 M3 Sirtu 162,000.00 364,500.000.300 Oh Pekerja 50,000.00 15,000.000.010 Oh Mandor 75,000.00 750.00

Jumlah 364,500.00 15,750.00 380,250.00

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

PEKERJAAN PONDASI, SNI DT - 91 - 0007 - 2007

8 1 M3 Pasang pondasi batu kali 1 Pc : 4 Ps1.200 m3 Batu Kali 150,000.00 180,000.00

163.000 kg Semen Portland ( 50 Kg ) 1,200.00 195,600.000.520 m3 Pasir Pasang 170,000.00 88,400.001.500 Oh Pekerja 50,000.00 75,000.000.600 Oh Tukang Batu 60,000.00 36,000.000.060 Oh Kepala Tukang 70,000.00 4,200.000.075 Oh Mandor 75,000.00 5,625.00

Jumlah 464,000.00 120,825.00 584,825.009 1 M3 Pasang pondasi batu kosong ( aanstamping batu kali )

1.200 m3 Batu Kali 150,000.00 180,000.000.432 m3 Pasir Urug 175,000.00 75,600.000.780 Oh Pekerja 50,000.00 39,000.000.390 Oh Tukang Batu 60,000.00 23,400.000.039 Oh Kepala Tukang 70,000.00 2,730.000.039 Oh Mandor 75,000.00 2,925.00

Jumlah 255,600.00 68,055.00 323,655.00

PEKERJAAN DINDING, SNI DT-91-0009-2007

10 1 M2 Pasangan bata merah tebal 1/2 bata, 1Pc:2Ps70.000 Bh Bata Merah 5x11x22 cm 800.00 56,000.0018.950 kg Semen Portland ( 50 Kg ) 1,200.00 22,740.000.038 m3 Pasir Pasangan 170,000.00 6,460.000.300 Oh Pekerja 50,000.00 15,000.000.100 Oh Tukang Batu 60,000.00 6,000.000.010 Oh Kepala Tukang 70,000.00 700.000.015 Oh Mandor 75,000.00 1,125.00

Jumlah 85,200.00 22,825.00 108,025.0011 1 M2 Pasangan bata merah tebal 1/2 bata, 1Pc:4Ps

70.000 Bh Bata Merah 5x11x22 cm 800.00 56,000.0011.500 kg Semen Portland ( 50 Kg ) 1,200.00 13,800.000.043 m3 Pasir Pasangan 170,000.00 7,310.000.300 Oh Pekerja 50,000.00 15,000.000.100 Oh Tukang Batu 60,000.00 6,000.000.010 Oh Kepala Tukang 70,000.00 700.000.015 Oh Mandor 75,000.00 1,125.00

Jumlah 77,110.00 22,825.00 99,935.00

Page 11: LAMPIRAN KONTRAK IPAL

PEKERJAAN PLESTERAN, SNI DT-91-000-2007

12 1 M2 Plesteran 1 Pc:2Ps, tebal 15 mm10.224 kg Semen Portland ( 50 Kg ) 1,200.00 12,268.800.020 m3 Pasir Pasangan 170,000.00 3,400.000.200 Oh Pekerja 50,000.00 10,000.000.150 Oh Tukang Batu 60,000.00 9,000.000.015 Oh Kepala Tukang 70,000.00 1,050.000.010 Oh Mandor 75,000.00 750.00

Jumlah 15,668.80 20,800.00 36,468.80

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

13 1 M2 Plesteran 1 Pc:4Ps, tebal 15 mm6.240 kg Semen Portland ( 50 Kg ) 1,200.00 7,488.000.024 m3 Pasir Pasang 170,000.00 4,080.000.200 Oh Pekerja 50,000.00 10,000.000.150 Oh Tukang Batu 60,000.00 9,000.000.015 Oh Kepala Tukang 70,000.00 1,050.000.010 Oh Mandor 75,000.00 750.00

Jumlah 11,568.00 20,800.00 32,368.0014 1 M2 Plesteran Beton 1Pc:2Ps, tebal 15 mm

9.300 kg Semen Portland ( 50 Kg ) 1,200.00 11,160.000.018 m3 Pasir Pasang 170,000.00 3,060.000.260 Oh Pekerja 50,000.00 13,000.000.200 Oh Tukang Batu 60,000.00 12,000.000.020 Oh Kepala Tukang 70,000.00 1,400.000.013 Oh Mandor 75,000.00 975.00

Jumlah 14,220.00 27,375.00 41,595.0015 1 M2 Pasang acian

3.250 kg Semen Portland ( 50 Kg ) 1,200.00 3,900.000.150 Oh Pekerja 50,000.00 7,500.000.100 Oh Tukang Batu 60,000.00 6,000.000.010 Oh Kepala Tukang 70,000.00 700.000.008 Oh Mandor 75,000.00 600.00

Jumlah 3,900.00 14,800.00 18,700.00

PEKERJAAN KAYU, SNI DT-91-0011-2007

16 1 M3 Pasang kosen pintu dan jendela kayu Banio1.100 m3 Kayu Balok Banio 5,000,000.00 5,500,000.001.250 kg Paku 10 cm 18,000.00 22,500.001.000 kg Lem Kayu 17,000.00 17,000.006.000 Oh Pekerja 50,000.00 300,000.00

20.000 Oh Tukang Kayu 60,000.00 1,200,000.002.000 Oh Kepala Tukang 70,000.00 140,000.000.300 Oh Mandor 75,000.00 22,500.00

Jumlah 5,539,500.00 1,662,500.00 7,202,000.0017 1 M2 Pasang pintu panel kayu kelas I

0.040 m3 Kayu Balok Banio 5,000,000.00 200,000.000.500 kg Lem Kayu 18,000.00 9,000.001.000 Oh Pekerja 50,000.00 50,000.002.500 Oh Tukang Kayu 60,000.00 150,000.000.250 Oh Kepala Tukang 70,000.00 17,500.000.050 Oh Mandor 75,000.00 3,750.00

Jumlah 209,000.00 221,250.00 430,250.00

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

18 1 M2 Pasang pintu dan jendela kaca kayu kelas I0.024 m3 Kayu Papan kelas I 5,000,000.00 120,000.000.300 kg Lem Kayu 17,000.00 5,100.000.800 Oh Pekerja 50,000.00 40,000.002.000 Oh Tukang Kayu 60,000.00 120,000.000.200 Oh Kepala Tukang 70,000.00 14,000.000.040 Oh Mandor 75,000.00 3,000.00

Jumlah 125,100.00 177,000.00 302,100.0019 1 M2 Pasang jalusi kosen kayu kelas I

0.060 m3 Kayu Papan kelas I 5,000,000.00 300,000.000.150 kg Paku biasa 1/2" - 1" 18,000.00 2,700.000.500 Oh Pekerja 50,000.00 25,000.001.000 Oh Tukang Kayu 60,000.00 60,000.000.100 Oh Kepala Tukang 70,000.00 7,000.000.030 Oh Mandor 75,000.00 2,250.00

Jumlah 302,700.00 94,250.00 396,950.0020 1 M3 Pasang konstruksi kuda kuda kayu Kelas I

1.100 m3 Kayu kelas I balok 5,000,000.00 5,500,000.0015.000 kg Besi strip 5,700.00 85,500.005.600 kg Paku biasa 2" - 5" 18,000.00 100,800.004.000 Oh Pekerja 50,000.00 200,000.00

12.000 Oh Tukang Kayu 60,000.00 720,000.001.200 Oh Kepala Tukang 70,000.00 84,000.000.200 Oh Mandor 75,000.00 15,000.00

Jumlah 5,686,300.00 1,019,000.00 6,705,300.0021 1 M2 Pasang rangka langit-langit ( 60x60 ) cm kayu

0.0163 m3 Kayu kelas II balok 5,000,000.00 81,500.000.250 kg Paku biasa 18,000.00 4,500.000.200 Oh Pekerja 50,000.00 10,000.000.300 Oh Tukang Kayu 60,000.00 18,000.000.030 Oh Kepala Tukang 70,000.00 2,100.000.010 Oh Mandor 75,000.00 750.00

Jumlah 86,000.00 30,850.00 116,850.00

Page 12: LAMPIRAN KONTRAK IPAL

22 1 M2 Pasang listplank ukuran 2x(2x20) cm kayu kelas II SNI - '020.009 m3 Kayu kelas II balok 5,000,000.00 45,000.000.060 kg Paku biasa 2" - 5" 18,000.00 1,080.000.100 Oh Pekerja 50,000.00 5,000.000.100 Oh Tukang Kayu 60,000.00 6,000.000.010 Oh Kepala Tukang 70,000.00 700.000.050 Oh Mandor 75,000.00 3,750.00

Jumlah 46,080.00 15,450.00 61,530.0023 1 M2 Pasang list kayu profil

1.050 m1 Kayu profil 16,800.00 17,640.000.021 Oh Pekerja 50,000.00 1,050.000.021 Oh Tukang Kayu 60,000.00 1,260.000.002 Oh Kepala Tukang 70,000.00 140.000.001 Oh Mandor 75,000.00 75.00

Jumlah 17,640.00 2,525.00 20,165.00

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

PEKERJAAN SANITASI

24 1 bh Pasang bak kontrol batu bata 60x60x650.371 m3 Batu bata 702,479.00 260,619.712.280 zak Semen Portland 60,000.00 136,800.000.184 m3 Pasir pasang 170,000.00 31,280.000.033 m3 Batu kerikil 200,000.00 6,600.004.850 kg Besi beton 12,500.00 60,625.000.120 m3 Pasir beton 170,000.00 20,400.002.160 Oh Pekerja 50,000.00 108,000.000.720 Oh Tukang Batu 60,000.00 43,200.000.072 Oh Kepala Tukang 70,000.00 5,040.000.100 Oh Tukang Gali 60,000.00 6,000.000.108 Oh Mandor 75,000.00 8,100.00

Jumlah 516,324.71 170,340.00 686,664.7125 1M' Pasang pipa PVC dia 2"

1.200 m' Pipa PVC 4" 15,000.00 18,000.000.350 hrg pipa Perlengkapan = 35% harga pipa 5,250.00 1,837.500.081 Oh Pekerja 50,000.00 4,050.000.135 Oh Tukang Batu 60,000.00 8,100.00

0.0135 Oh Kepala Tukang 70,000.00 945.000.0041 Oh Mandor 75,000.00 307.50

Jumlah 19,837.50 13,402.50 33,240.0026 1M' Pasang pipa PVC dia 6"

1.200 m' Pipa PVC 6" 84,000.00 100,800.000.350 hrg pipa Perlengkapan = 35% harga pipa 29,400.00 10,290.000.081 Oh Pekerja 50,000.00 4,050.000.135 Oh Tukang Batu 60,000.00 8,100.00

0.0135 Oh Kepala Tukang 70,000.00 945.000.0041 Oh Mandor 75,000.00 307.50

Jumlah 111,090.00 13,402.50 124,492.50

PEKERJAAN PENUTUP ATAP

27 Analisa Pasangan Perabung atap seng /10M2.000 lbr Seng plat 91,000.00 182,000.000.040 kg Paku atap 22,000.00 880.002.500 Oh Pekerja 50,000.00 125,000.000.025 Oh Tukang Kayu 60,000.00 1,500.000.003 Oh Kepala Tukang 70,000.00 210.000.006 Oh Mandor 75,000.00 450.00

Jumlah 182,880.00 127,160.00 310,040.00Untuk 1 M 31,004.00

28 1M2 Pasang atap seng warna0.700 lbr Seng Gelombang 73,200.00 51,240.000.020 kg Paku seng 22,000.00 440.000.120 Oh Pekerja 50,000.00 6,000.000.060 Oh Tukang Kayu 60,000.00 3,600.00

0.0060 Oh Kepala Tukang 70,000.00 420.000.0060 Oh Mandor 75,000.00 450.00

Jumlah 51,680.00 10,470.00 62,150.00

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

29 1M' Pekerjaan Papan Ruiter0.300 Oh Tukang Kayu 60,000.00 18,000.000.030 Oh Kepala Tukang 70,000.00 2,100.001.000 m' Kayu Papan 4,000,000.00 4,000,000.000.025 kg Paku besi 35,000.00 875.00

Jumlah 20,100.00 4,000,875.00 4,020,975.00

PEKERJAAN LANGIT-LANGIT, SNI DT - 91 - 0013 - 2007

30 1M2 Langit-langit triplek 4 mm + rangka kayu Kls I0.023 m3 Kayu kelas I balok 5,000,000.00 115,000.000.060 Kg Paku biasa 18,000.00 1,080.000.390 Lbr Triplek t 4 mm 60,000.00 23,400.000.270 Oh Pekerja 50,000.00 13,500.000.400 Oh Tukang Kayu 60,000.00 24,000.000.040 Oh Kepala Tukang 70,000.00 2,800.000.014 Oh Mandor 75,000.00 1,050.00

Jumlah 139,480.00 41,350.00 180,830.00

Page 13: LAMPIRAN KONTRAK IPAL

PEKERJAAN KUNCI DAN KACA

31 1 BH Pasang kunci tanam biasa1.000 Bh Kunci tanam setara Ciga Brown 5404 111,500.00 111,500.000.010 Oh Pekerja 50,000.00 500.000.500 Oh Tukang Kayu 60,000.00 30,000.000.010 Oh Kepala Tukang 70,000.00 700.000.005 Oh Mandor 75,000.00 375.00

Jumlah 111,500.00 31,575.00 143,075.0032 1 M2 Pasang kaca reyben t 5 mm

1.100 M2 Kaca reyben tebal 5 mm 132,500.00 145,750.000.015 Oh Pekerja 50,000.00 750.000.150 Oh Tukang Kayu 60,000.00 9,000.000.015 Oh Kepala Tukang 70,000.00 1,050.000.001 Oh Mandor 75,000.00 75.00

Jumlah 145,750.00 10,875.00 156,625.0033 1 M2 Pasang kaca bening t 5 mm

1.100 M2 Kaca tebal 5 mm 132,500.00 145,750.000.015 Oh Pekerja 50,000.00 750.000.150 Oh Tukang Kayu 60,000.00 9,000.000.015 Oh Kepala Tukang 70,000.00 1,050.000.007 Oh Mandor 75,000.00 525.00

Jumlah 145,750.00 11,325.00 157,075.00

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

PEKERJAAN PENGECATAN, SK - SNI 2001

34 1M2 Pengecatan Bidang kayu baru ( 1 plamir, 1 cat dasar, 2 cat penutup )0.200 kg Cat menie 41,000.00 8,200.000.150 kg Plamir 19,500.00 2,925.000.170 kg Cat Dasar 19,500.00 3,315.000.260 kg Cat penutup setara platoon 40,300.00 10,478.000.070 Oh Pekerja 50,000.00 3,500.000.009 Oh Tukang Cat 60,000.00 540.000.006 Oh Kepala Tukang 70,000.00 420.00

0.0025 Oh Mandor 75,000.00 187.50Jumlah 24,918.00 4,647.50 29,565.50

35 1M2 Pelaburan bidang kayu dengan cat residu/ter0.350 Ltr Residu/ter 13,400.00 4,690.000.100 Oh Pekerja 50,000.00 5,000.000.006 Oh Mandor 75,000.00 450.00

Jumlah 4,690.00 5,450.00 10,140.0036 1M2 Pelaburan bidang kayu dengan cat menie

0.350 Ltr Menie 41,000.00 14,350.000.100 Oh Pekerja 50,000.00 5,000.000.006 Oh Mandor 75,000.00 450.00

Jumlah 14,350.00 5,450.00 19,800.0037 1M2 Pengecatan tembok baru ( 1 plamir, 1 cat dasar, 2 cat penutup )

0.1000 kg Plamir 19,500.00 1,950.000.1000 kg Cat Dasar 19,500.00 1,950.000.2600 kg Cat penutup matex 46,000.00 11,960.000.0200 Oh Pekerja 50,000.00 1,000.000.0630 Oh Tukang Cat 60,000.00 3,780.000.0063 Oh Kepala Tukang 70,000.00 441.000.0025 Oh Mandor 75,000.00 187.50

Jumlah 15,860.00 5,408.50 21,268.5038 1M2 Pengecatan plafond ( 1 plamir, 1 cat dasar, 2 cat penutup )

0.100 kg Plamir 19,500.00 1,950.000.100 kg Cat Dasar 19,500.00 1,950.000.260 kg Cat penutup matex 46,000.00 11,960.000.028 Oh Pekerja 50,000.00 1,400.000.042 Oh Tukang Cat 60,000.00 2,520.000.004 Oh Kepala Tukang 70,000.00 280.000.003 Oh Mandor 75,000.00 225.00

Jumlah 15,860.00 4,425.00 20,285.00

PEKERJAAN BESI DAN ALUMUNIUM

39 1M2 Pasang terali besi strip 2x3 mm6.177 kg Besi strip 5,700.00 35,208.90

27.080 cm Pengelasan 35,000.00 947,800.001.670 Oh Pekerja 50,000.00 83,500.001.670 Oh Tukang Besi 60,000.00 100,200.000.167 Oh Kepala Tukang 70,000.00 11,690.000.083 Oh Mandor 75,000.00 6,225.00

Jumlah 983,008.90 201,615.00 1,184,623.90

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

PEKERJAAN BETON SNI - DT - 91 - 0008 - 2007

40 1M3 Pekerjaan Beton Tumbuk 1 : 3 : 5 SNI - '02218.000 kg Semen portland 1,200.00 261,600.00

0.520 m3 Pasir beton 170,000.00 88,400.000.870 m3 Kerikil beton 200,000.00 174,000.001.650 Oh Pekerja 50,000.00 82,500.000.250 Oh Tukang Batu 60,000.00 15,000.000.025 Oh Kepala Tukang 70,000.00 1,750.00

0.0800 Oh Mandor 75,000.00 6,000.00Jumlah 524,000.00 105,250.00 629,250.00

Page 14: LAMPIRAN KONTRAK IPAL

41 1M3 Pekerjaan Beton Tumbuk 1 : 2 : 3 SNI - '02232.000 kg Semen portland ( 50 kg ) 1,200.00 278,400.00

0.520 m3 Pasir beton 170,000.00 88,400.000.780 m3 Kerikil beton 200,000.00 156,000.001.650 Oh Pekerja 50,000.00 82,500.000.250 Oh Tukang Batu 60,000.00 15,000.000.025 Oh Kepala Tukang 70,000.00 1,750.00

0.0800 Oh Mandor 75,000.00 6,000.00Jumlah 522,800.00 105,250.00 628,050.00

42 1M3 Pekerjaan Beton fc' = 19.3 Mpa w/c = 0.58 K-225 slump 12+2 cm371.000 kg Semen portland ( 50 kg ) 1,200.00 445,200.00698.000 kg Pasir beton 1,000.00 698,000.00

1,047.000 kg Kerikil beton 180.00 188,460.00215.000 ltr Air 2,500.00 537,500.00

1.650 Oh Pekerja 50,000.00 82,500.000.275 Oh Tukang Batu 60,000.00 16,500.000.028 Oh Kepala Tukang 70,000.00 1,960.000.083 Oh Mandor 75,000.00

Jumlah 1,331,660.00 638,460.00 1,970,120.0043 1 kg Pembesian dengan besi polos atau ulir

10.500 kg Besi beton polos 12,500.00 131,250.000.150 kg Kawat beton 14,000.00 2,100.000.070 Oh Pekerja 50,000.00 3,500.000.070 Oh Tukang Besi 60,000.00 4,200.000.007 Oh Kepala Tukang 70,000.00 490.000.004 Oh Mandor 75,000.00 300.00

Jumlah 10 kg 133,350.00 8,490.00 141,840.00Jumlah 1 kg 14,184.00

44 1 M2 Pasang Bekisting untuk pondasi0.045 m3 Kayu terentang/perancah 1,000,000.00 45,000.000.300 kg Paku biasa 18,000.00 5,400.000.100 ltr Minyak bekisting 18,000.00 1,800.000.300 Oh Pekerja 50,000.00 15,000.000.260 Oh Tukang Kayu 60,000.00 15,600.000.026 Oh Kepala Tukang 70,000.00 1,820.000.005 Oh Mandor 75,000.00 375.00

Jumlah 52,200.00 32,795.00 84,995.0045 1 M2 Pasang Bekisting untuk kolom

0.040 m3 Kayu terentang/perancah 1,000,000.00 40,000.000.400 kg Paku biasa 18,000.00 7,200.000.200 ltr Minyak bekisting 18,000.00 3,600.000.015 m3 Balok kayu kelas III 4,000,000.00 60,000.000.350 lbr Plywood 9 mm 135,000.00 47,250.002.000 btg Dolken kayu dia. 8 - 10 100,000.00 200,000.000.660 Oh Pekerja 50,000.00 33,000.000.330 Oh Tukang Kayu 60,000.00 19,800.000.033 Oh Kepala Tukang 70,000.00 2,310.000.033 Oh Mandor 75,000.00 2,475.00

Jumlah 358,050.00 57,585.00 415,635.00

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

46 1 M2 Pasang Bekisting untuk balok0.040 m3 Kayu terentang/perancah 1,000,000.00 40,000.000.400 kg Paku biasa 18,000.00 7,200.000.200 ltr Minyak bekisting 18,000.00 3,600.000.018 m3 Balok kayu kelas III 4,000,000.00 72,000.000.350 lbr Plywood 9 mm 135,000.00 47,250.002.000 btg Dolken kayu dia. 8 - 10 100,000.00 200,000.000.660 Oh Pekerja 50,000.00 33,000.000.330 Oh Tukang Kayu 60,000.00 19,800.000.033 Oh Kepala Tukang 70,000.00 2,310.000.033 Oh Mandor 75,000.00 2,475.00

Jumlah 370,050.00 57,585.00 427,635.0047 1 M2 Pasang Bekisting untuk lantai

0.040 m3 Kayu terentang/perancah 1,000,000.00 40,000.000.400 kg Paku biasa 18,000.00 7,200.000.200 ltr Minyak bekisting 18,000.00 3,600.000.015 m3 Balok kayu kelas III 4,000,000.00 60,000.000.350 lbr Plywood 9 mm 135,000.00 47,250.006.000 btg Dolken kayu dia. 8 - 10 100,000.00 600,000.000.660 Oh Pekerja 50,000.00 33,000.000.330 Oh Tukang Kayu 60,000.00 19,800.000.033 Oh Kepala Tukang 70,000.00 2,310.000.033 Oh Mandor 75,000.00 2,475.00

Jumlah 758,050.00 57,585.00 815,635.0048 1 M2 Pasang Bekisting untuk dinding beton

0.030 m3 Kayu terentang/perancah 1,000,000.00 30,000.000.400 kg Paku biasa 18,000.00 7,200.000.200 ltr Minyak bekisting 18,000.00 3,600.000.020 m3 Balok kayu 4,000,000.00 80,000.000.350 lbr Plywood 9 mm 135,000.00 47,250.003.000 btg Dolken kayu dia. 8 - 10 100,000.00 300,000.004.000 bh Formtie/penjaga jarak bekisting/spacer 12,000.00 48,000.000.660 Oh Pekerja 50,000.00 33,000.000.330 Oh Tukang Kayu 60,000.00 19,800.000.033 Oh Kepala Tukang 70,000.00 2,310.000.033 Oh Mandor 75,000.00

Jumlah 468,050.00 103,110.00 571,160.00

Page 15: LAMPIRAN KONTRAK IPAL

49 1 M' Ring balok Late Beton Bertulang ( 10x15 )0.003 m3 Kayu kelas III 1,000,000.00 3,000.000.020 kg Paku biasa 18,000.00 360.003.600 kg Besi beton 18,000.00 64,800.000.050 kg Kawat beton 14,000.00 700.000.110 Zak Semen portland ( 50 kg ) 60,000.00 6,600.000.009 m3 Pasir beton 170,000.00 1,530.000.015 m3 Kerikil beton 200,000.00 3,000.000.297 Oh Pekerja 50,000.00 14,850.000.033 Oh Tukang Batu 60,000.00 1,980.000.033 Oh Tukang Kayu 60,000.00 1,980.000.033 Oh Tukang Besi 60,000.00 1,980.000.010 Oh Kepala Tukang 70,000.00 700.000.015 Oh Mandor 75,000.00 1,125.00

Jumlah 79,990.00 22,615.00 102,605.00

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIANHARGA SATUAN BAHAN UPAH JUMLAH

KETERANGANRp Rp Rp Rp

1 2 3 4 5 6 7

DAFTAR ANALISA BETON BERTULANG ( SLOOF, KOLOM, BALOK, PLAT )

50 1 M3 Pekerjaan Sloof beton 15/20 ( Tul.4 12 Skg 8 - 150 )1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.005.000 m2 Analisa cetakan sloof 427,635.00 2,138,175.00

130.141 kg Analisa besi beton 14,184.00 1,845,919.94Jumlah 5,954,214.94

51 1 M3 Pekerjaan Sloof beton 20/40 ( Tul.8 12 Skg 8 - 200 )1.000 m3 Analisa Beton K225 1,970,120.00 1.000 1,970,120.006.667 m2 Analisa cetakan sloof 427,635.00 5.000 2,851,042.55

164.943 kg Analisa besi beton 14,184.00 130.141 2,339,551.51Jumlah 7,160,714.06

52 1 M3 Pekerjaan kolom beton 20/20 ( Tul.6 12 Skg 8 - 150 )1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.00

10.000 m2 Analisa cetakan kolom 415,635.00 4,156,350.00182.459 kg Analisa besi beton 14,184.00 2,587,998.46

Jumlah 8,714,468.4653 1 M3 Pekerjaan kolom praktis beton 13x13 cm ( Tul.4 12 Skg 8 - 150 )

1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.007.050 m2 Analisa cetakan kolom 415,635.00 2,930,226.75

281.837 kg Analisa besi beton 14,184.00 3,997,576.01Jumlah 8,897,922.76

54 1 M3 Pekerjaan ring balok beton 15x20 cm ( Tul.4 12 Skg 8 - 150 )1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.006.667 m2 Analisa cetakan balok 102,605.00 684,067.54

171.347 kg Analisa besi beton 14,184.00 2,430,385.85Jumlah 5,084,573.38

55 1 M3 Pekerjaan plat beton tebal 12 cm ( Tul. 12 )1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.001.250 m2 Analisa cetakan plat beton 815,635.00 1,019,543.75

147.740 kg Analisa besi beton 14,184.00 2,095,544.16Jumlah 5,085,207.91

56 1 M3 Pekerjaan lantai beton tebal 12 cm ( Tul. 12 )1.000 m3 Analisa Beton 1:2:3 1,970,120.00 1,970,120.001.250 m2 Analisa cetakan plat beton 815,635.00 1,019,543.75

148.333 kg Analisa besi beton 14,184.00 2,103,955.27Jumlah 5,093,619.02

57 1 M3 Pekerjaan dinding beton bak air tebal 12 cm ( Tul. 12 )1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.001.250 m2 Analisa cetakan dinding beton 571,160.00 713,950.00

148.333 kg Analisa besi beton 14,184.00 2,103,955.27Jumlah 4,788,025.27

58 1 M3 Pekerjaan pondasi incenerator plat beton ( Tul. 10 )1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.003.264 m2 Analisa cetakan dinding beton 571,160.00 1,864,266.24

56.238 kg Analisa besi beton 14,184.00 797,679.79Jumlah 4,632,066.03

59 1M2 Memasang lantai keramik ukuran ( 30x30 ) cm11.870 Bh Keramik ( 30x30 ) 5,500.00 65,285.0010.000 kg Semen 1,200.00 12,000.000.045 m3 Pasir pasang 170,000.00 7,650.001.500 kg Semen warna 2,770.00 4,155.000.700 Oh Pekerja 50,000.00 35,000.000.350 Oh Tukang Batu 60,000.00 21,000.000.035 Oh Kepala Tukang 70,000.00 2,450.000.035 Oh Mandor 75,000.00

Jumlah 84,935.00 62,605.00 147,540.00

60 1 KG Pekerjaan pembesian ( besi profil )1.150 kg Besi Profil 8,500.00 9,775.000.200 kg Elektroda ( 20 % ) 5,000.00 1,000.000.060 Oh Pekerja 50,000.00 3,000.000.060 Oh Tukang Besi 60,000.00 3,600.000.006 Oh Kepala Tukang Besi 70,000.00 420.000.003 Oh Mandor 75,000.00

Jumlah 10,775.00 7,020.00 17,795.00

61 1 KG Pekerjaan pembesian ( besi siku )1.150 kg Besi Siku 9,000.00 10,350.000.200 kg Elektroda ( 20 % ) 5,000.00 1,000.000.060 Oh Pekerja 50,000.00 3,000.000.060 Oh Tukang Besi 60,000.00 3,600.000.006 Oh Kepala Tukang Besi 70,000.00 420.000.003 Oh Mandor 75,000.00 225

Jumlah 11,350.00 7,020.00 18,370.00

#REF!#REF!

#REF!#REF!

Page 16: LAMPIRAN KONTRAK IPAL

DAFTAR HARGA SATUAN PEKERJAAN

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN

AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUD PROF Dr R. D. KANDOU ( SULUT )

TAHUN ANGGARAN : 2013

NO URAIAN PEKERJAAN SATUANHARGA SATUAN

KET(Rp)

1 2 3 4 5

PEKERJAAN PERSIAPAN1 Pekerjaan Pembersihan Lapangan Ls 8,750.00 A.12 Pasangan bowplank tiap-tiap 1 m M' 54,300.00 A.2

PEKERJAAN TANAH1 Pekerjaan galian tanah biasa M3 39,375.00 B.12 Pekerjaan galian tanah dalam 2 m M3 48,375.00 B.23 Upah urugan kembali M3 13,100.00 B.34 Pekerjaan pemadatan tanah M3 13,100.00 B.45 Pekerjaan timbunan pasir urug M3 225,750.00 B.56 Pekerjaan urugan tanah M3 195,750.00 B.67 Pekerjaan urugan sirtu M3 380,250.00 B.7

PEKERJAAN PONDASI1 Pasangan pondasi batu kalin1pc:4ps M3 584,825.00 C.12 Analisa pasangan pondasi astamping batu kali/M3 M3 323,655.00 C.23 Pek pondasi plat beton bertulang besi 150 kg/m3 M3 4,632,066.03 C.3

PEKERJAAN DINDING1 Pasangan bata merah tebal 1/2 bata 1pc:2ps M2 108,025.00 D.12 Pasangan bata merah tebal 1/2 bata 1pc:4ps M2 99,935.00 D.2

PEKERJAAN PLESTER1 Plester 1pc:2ps,tebal 15 mm M2 36,468.80 E.12 Plester 1pc:4ps,tebal 15 mm M2 32,368.00 E.23 Plesteran beton 1pc:2ps,tebal 15 mm M2 41,595.00 E.34 Pek acian M2 18,700.00 E.4

PEKERJAAN KAYU1 Pasang konstruksi kuda-kuda kayu kls I + gording M3 6,705,300.00 F.12 Pas kozen kayu pintu dan jendela kayu kls I M3 7,202,000.00 F.23 Pasang rangka langit langit (60x60) kayu kelas II M2 116,850.00 F.34 Pasang listplank kayu 20x20 kayu kls I M2 61,530.00 F.4

PEKERJAAN BETON1 Membuat beton tumbuk 1pc:3ps:5kr M3 629,250.00 G.12 Membuat lantai kerja beton tumbuk 1pc:3ps:5kr M3 629,250.00 G.23 Pek beton 1pc:2ps:3Kr M3 628,050.00 G.34 Pek beton K225 M3 1,970,120.00 G.45 Pembesian dgn besi polos atau ulir kg 14,184.00 G.56 Pekerjaan pondasi reaktor IPAL M3 4,788,025.27 G.67 Pekerjaan sloof 15/20 beton bertulang M3 5,954,214.94 G.78 Pekerjaan sloof 20/40 beton bertulang M3 7,160,714.06 G.89 Pekerjaan kolom 20x20 beton bertulang M3 8,714,468.46 G.9

10 Pekerjaan plat lantai beton bertulang M3 5,085,207.91 G.1011 Membuat balok pinggang ( Late ) beton bertulang ( 15x15 ) cm M' 5,084,573.38 G.1112 Pek kolom praktis 13x13 M' 8,897,922.76 G.1213 Pek dinding beton tebal 12 cm M3 4,788,025.27 G.1314 Pek lantai beton bertulang tebal 12 cm M3 5,093,619.02 G.1415 Pekerjaan pemasangan keramik ( 30x30 ) cm M2 147,540.00 G.15

PEKERJAAN PENUTUP ATAP1 Pasangan atap seng warna M2 62,150.00 H.12 Pasangan perabung seng M' 31,004.00 H.23 Pas bola bola atap metal ( terpasang ) M' 65,000.00 H.3

PEKERJAAN LANGIT LANGIT1 Pas loteng triplek 4 mm ( uk 60x120 cm) + rangka kayu kls II M2 180,830.00 J.12 List plafond dari kayu / M' M' 20,165.00 J.2

Page 17: LAMPIRAN KONTRAK IPAL

PEKERJAAN KUNCI DAN KACA1 Pasang kunci tanam antik/Bh Bh 250,000.00 L.12 Pasang engsel pintu/Bh Bh 11,500.00 L.33 Pasang engsel jendela/Bh Bh 6,500.00 L.44 Pasang grendel jendela Bh 8,900.00 L.55 Pasang kait angin Bh 8,900.00 L.66 Pasang tangan tangan jendela Bh 50,000.00 L.7

PEKERJAAN PENGECATAN1 Pengecatan bidang dinding baru cat tembok 3 kali cat/M2 M2 21,268.50 M.12 Pengecatan plafon dengan cat matex M2 20,285.00 M.23 Pengecatan kayu baru dengan cat setara platoon M2 29,565.50 M.34 Pekerjaan meni kayu 19,800.00 M.45 Pekerjaan residu 10,140.00 M.5

PEKERJAAN MEKANIKAL1 Pas jaringan instalasi listrik ttk 150,000.00 N.12 Pas instalasi stop kontak Bh 50,000.00 N.23 Pas lampu down 18 watt Bh 25,000.00 N.34 Pas saklar tunggal setara clipsal Bh 30,000.00 N.45 Pas stop kontak setara clipsal Bh 35,000.00 N.56 Pas pipa PVC 6" M' 124,492.50 N.67 Pas pipa PVC 2" M' 33,240.00 N.78 Pekerjaan Besi Profil kg 17,795.00 N.89 Pekerjaan Besi Siku kg 18,370.00 N.9

#REF!#REF!

#REF!#REF!

Page 18: LAMPIRAN KONTRAK IPAL

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH

( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADO

TAHUN ANGGARAN : 2013

NO KETERANGAN SATUAN HARGA

I UPAH

1 Mandor hari Rp 75,000.00

2 Kepala Tukang hari Rp 70,000.00

3 Tukang Kayu hari Rp 60,000.00

4 Tukang Batu hari Rp 60,000.00

5 Tukang Besi hari Rp 60,000.00

6 Tukang Cat hari Rp 60,000.00

7 Pekerja hari Rp 50,000.00

II BAHAN

Pasir/Batu

1 Pasir pasangan m3 Rp 170,000.00

2 Pasir Beton m3 Rp 170,000.00

3 Pasir Urug m3 Rp 175,000.00

4 Tanah urug m3 Rp 150,000.00

5 Kerikil m3 Rp 200,000.00

6 Batu kali m3 Rp 150,000.00

7 Sirtu m3 Rp 162,000.00

8 Semen ( 50 kg ) Zak Rp 60,000.00

9 Semen Putih kg Rp 2,770.00

10 Batu bata bh Rp 800.00

11 Keramik ukuran ( 30x30 ) cm bh Rp 5,500.00

Kayu

1 Kayu Papan Kls I m3 Rp 5,000,000.00

2 Kayu Balok Kls I m3 Rp 5,000,000.00

3 Kayu Papan Kls II m3 Rp 4,750,000.00

4 Kayu Balok Kls II m3 Rp 4,750,000.00

5 Kayu Kelas III ( papan ) m3 Rp 4,000,000.00

6 Kayu Kelas III ( balok ) m3 Rp 4,000,000.00

7 Kayu bekisting papan m3 Rp 2,200,000.00

8 Kayu Stutwerk ( Perancah ) m3 Rp 1,000,000.00

9 Kayu kelas IV ( Bekisting ) Balok/Kaso m3 Rp 2,150,000.00

10 Kayu kelas IV ( Bekisting ) Papan m3 Rp 2,295,000.00

11 Dolken btg Rp 100,000.00

12 Triplek 4 mm lbr Rp 60,000.00

13 Triplek 9 mm lbr Rp 135,000.00

18 Minyak Bekisting ltr Rp 18,000.00

Page 19: LAMPIRAN KONTRAK IPAL

Besi

1 Besi Beton kg Rp 12,500.00

2 Besi Profil kg Rp 8,500.00

3 Besi Strip kg Rp 5,700.00

4 Besi Siku L kg Rp 9,000.00

5 Paku biasa kg Rp 18,000.00

6 Paku sekrup kg Rp 16,500.00

7 Paku atap seng kg Rp 22,000.00

8 Paku triplek kg Rp 18,500.00

9 Baut bh Rp 10,000.00

10 Kawat beton kg Rp 14,000.00

Kap/Atap

1 Seng BJLS lbr Rp 73,200.00

2 Seng Plat lbr Rp 91,000.00

Cat/Kaca

1 Cat Tembok kg Rp 46,000.00

2 Cat Minyak kg Rp 40,300.00

3 Cat Menie kg Rp 41,000.00

4 Cat Dasar kg Rp 19,500.00

5 Minyak Cat Ltr Rp 22,000.00

6 Amplas Kayu Lbr Rp 4,000.00

7 Amplas Besi Lbr Rp 4,000.00

8 Plamur kg Rp 19,500.00

9 Residu kg Rp 13,400.00

10 Dempul kayu kg Rp 19,500.00

11 Lem Kayu kg Rp 17,000.00

Sanitary

1 Pipa PVC 2" m' Rp 15,000.00

2 Pipa PVC 6" m' Rp 84,000.00

#REF!

#REF!