LAYOUT PERENCANA AN TAMBANG BAWAH TANAH CV. TAHITI COAL
73
-
Front C1 L = 15 meter
Front maju L = 35 meter
Q= 0,8007 m3/s
Q= 0,7850 m3/s Q= 0,7693 m3/s
Q= 0,77536 m3/s
Q= 0,7693 m3/s
Q= 0,7536 m3/s
Q= 0,7379 m3/s
Front C3 L = 30 meter
Front C5 L = 27 meter
Front C6 L = 20 meter
Front C2 L = 18 meter
Front C4 L = 25 meter
50 meter 45 meter 45 meter
LAMPIRAN 2
LAYOUT KONDISI LAPANGAN SAAT INI
74
-
LAMPIRAN 3 DIMENSI PENAMPANG FRONT PENAMBANGAN
No. Lokasi Model Penampang Rumus Keterangan Luas (m2)
1. Lubang Maju
a = 2,5 m b = 2 m t = 2 m
A = , x 2,2
= 4,95 m2
2. C1
a = 2 m b = 1,6 m t = 2 m
A = , x 2
= 3,6 m2
3. C2
a = 2,5 m b = 2 m t = 2 m
A = , x 2
= 3,6 m2
a
b
t
a
b
t
a
b
t
75
-
4. C3
a = 2,2 m b = 1,6 m t = 2 m
A =
, x 2 = 3,6 m2
5. C4
a = 2,2 m b = 1,6 m t = 2 m
A =
, x 2 = 3,6 m2
6. C5
a = 2 m b = 1,6 m t = 2 m
A = , x 2
= 3,6 m2
7. C6
a = 2 m b = 1,5 m t = 2 m
A = , x 2
= 3,6 m2
a
b
t
a
b
t
a
b
t
a
b
t
76
-
8
Lubang Maju (10m)
A1 = p x l K1 = 2p + 2l
a = 3,5 m b = 2m c = 2,5 m
A1 = 3,5 x 2 = 7m
A2 = , x 0,5
= 1,375 m Atot = 8,375 m
a
c
b
77
-
78
LAMPIRAN 4
JAM KERJA EFEKTIF
Kegiatan waktu Sampai di lokasi kerja 7.00 Rapat Koordinasi 7.00 - 7.30 Persiapan/pengecekan kondisi gas 7.30 - 8.00 Shift I 8.00 12.00 Istirahat 12.00 13.00 Shift II 13.00 17.00 Pengecekan kondisi gas 17.00 - 17.30 Pulang 17.30
-
79
LAMPIRAN 5
PRODUKTIVITAS BATUBARA
No Tanggal Produktivitas (ton)
1 5 januari 2014 55
2 7 januari 2014 45
3 10 januari 2014 47
4 12 januari 2014 50
5 14 januari 2014 45
6 17 januari 2014 50
7 19 januari 2014 52
Total 344
Rata-rata 49