judul skripsi
-
Author
ginas-septian-nurfakhri -
Category
Documents
-
view
385 -
download
3
Embed Size (px)
Transcript of judul skripsi

TRANSPORTASI :
ANALISA PANJANG ANTRIAN DENGAN TUNDAAN PADA PERSIMPANGAN BERSIGNAL JL.
RADEN SALEH DENGAN JL.BALAI KOTA MEDAN (STUDI KASUS)
ANALISA PANJANG ANTRIAN DENGAN TUNDAAN PADA PERSIMPANGAN BERSIGNAL SEI
SIKAMBING MEDAN (STUDI KASUS : PERSIMPANGAN JL. GATOT SUBROTO DENGAN
JL.SUNGGAL – JL.KAPTEN MUSLIM )
ANALISA PEMILIHAN MODA TRANSPORTASI BUS ANGKUTAN KOTA DAN KERETA API
RUTE MEDAN TANJUNG BALAI TERHADAP KENAIKAN HARGA BBM
ANALISA PEMILIHAN MODA TRANSPORTASI BUS DENGAN METODE STATED
PREFERENCE (STUDI KASUS MEDAN-SIDIKALANG)
ANALISA PEMILIHAN MODA TRANSPORTASI MEDAN-BINJAI DENGAN METODE
ANALYTICAL HIERARCY PROCESS (AHP)
ANALISA PEMILIHAN RUTE JALAN DARI JALAN SEI PADANG SAMPAI PUSAT KOTA
DENGAN ALGORITMA FLOYD – WARSHALL DAN PROGRAM MAP INFO SEBAGAI
TAMPILAN
STUDI PENGEMBANGAN GEOMETRIK AREAL DI LAPANGAN TERBANG ABDUL RACHMAN
SALEH MALANG
STUDI AREA TRAFFIC CONTROL SYSTEM (ATCS) PADA PERSIMPANGAN DI KOTA
MALANG (JALAN A. YANI ? L. A. SUCIPTO ? BOROBUDUR)
STUDI ANALISA PERGERAKAN PENUMPANG DAN KENDARAAN PADA TERMINAL
PENUMPANG BUNGURASIH SURABAYA
ANALISA TINGKAT KECELAKAAN LALU LINTAS PADA RUAS JALAN BY PASS
SURABAYAMOJOKERTO (Km.44+500 ? Km.54+900)
STUDI ANALISIS GEOMETRIK JALAN PADA SIMPANG LIMA SENEN JAKARTA SETELAH
ADANYA FLYOVER (97,)
PERENCANAAN STRUKTUR BAGIAN ATAS PARKIR TIMUR CONVENTION HALL GRAHA
BETHANY-SURABAYA (,00)
PENGARUH PERGERAKAN ANGKUTAN UMUM TERHADAP KELANCARAN ARUS LALU
LINTAS (STUDY KASUS RUSS JALAN LINGKAR (RING ROAD) (,04)
ANALISIS PENGELOLAAN RETRIBUSI TERHADAP KEBUTUHAN PARKIR KENDARAAN
BERMOTOR DIRUMAH SAKIT ISLAM KLATEN (,04)
STUDI TINGKAT AKSESIBILITAS ANTAR DESA DI KABUPATEN ACEH SELATAN, NAD
(STUDI KASUS: KEC. KLUET UTARA, KLUET SELATAN DAN PASIE RAJA)

EVALUASI TINGKAT KERUSAKAN JALAN SEBAGAI DASAR PENENTUAN PERBAIKAN
JALAN.
APLIKASI METODE KEANDALAN WAKTU PERJALANAN DALAM PEMILIHAN RUTE DI
PERUMNAS MANDALA
ANALISA PREFERENSI PEMILIHAN RUTE TERPENDEK JARINGAN JALAN (STUDI KASUS
PERUMNAS SIMALINGKAR – PUSAT KOTA MEDAN)
ANALISA PENENTUAN FASE DAN WAKTU SIKLUS OPTIMUM PADA PERSIMPANGAN
BERSINYAL ( STUDI KASUS : JL. THAMRIN – JL. M.T.HARYONO – JL.AIP II K.S.TUBUN)
PENGGUNAAN ALGORITMA DJIKSTRA DALAM MENENTUKAN RUTE TERPENDEK
JARINGAN JALAN SEBAGAI SALAH SATU ALTERNATIF PENYELESAIAN MASALAH
KEMACETAN LALU LINTAS (STUDY LITERATUR)
ANALISA BIAYA PENGGUNAAN ALAT BERAT PADA PROYEK PENAMBANGAN PASIR DI
WONOKERTO MB PASURUAN (,96)
ANALISA KECELAKAAN LALU LINTAS DAN ALTERNATIF PENANGGULANGANNYA PADA
JALAN GATOT SUBROTO DEN PASAR ( M,00)
ANALISA PEMBANGUNAN JALAN TOL GEMPOL-MALANG DITINJAU DARI SEGI GRAVITY
MODEL DAN DIHUBUNGKAN DENGAN KAPASITAS JALAN YANG ADA
ANALISA PENGEMBANGAN RONWAY BERDASARKAN METODE TREND PROJECTION
DENGAN REGRESI (,97)
ANALISA PERHITUNGAN ALINYEMEN VERTIKAL DALAM PERENCANAAN GEOMETRIK
JALAN RAYA PADA COAL NAUL ROAD PROYEK BONTANG KALIMANTAN TIMUR (KM BIGO
+ OOOS/D KM BTG 2 + 400) DENGAN MENGGUNAKAN BAHASA TURBO PASCAL (,98)
ANALISIS BIAYA PENINGKATAN JALAN KE OBYEK WISATA GIRIMANIK KECAMATAN
SLOGOIMO KAB WONOGIRI (,04)
ANALISIS KAPASITAS DAN TINGKAT PELAYANAN SIMPANG BERDASARKAN MANUAL
KAPASITAS JALAN INDONESIA 1996
ANALISIS KAPASITAS DAN TINGKAT PELAYANAN SIMPANG CANGUK BERDASARKAN
MANUAL KAPASITAS JALAN INDONESIA 1996 (TA/D3)
ANALISIS KAPASITAS PERSIMPANGAN PADA PERSIMPANGAN TANPA LAMPU LALU
LINTAS (STUDI KASUS PADA PERSIMPANGAN JALAN DR WAHIDIN, JALAN ATMO
SUKARTO DAN JALAN UMUM KALIPAN, DAERAH ISTIMEWA YOGYAKARTA) (,99)
ANALISIS KESELAMATAN LALU LINTAS DIKABUPATEN DAERAH TINGKAT II BANYUMAS
(,00)
ANALISA METODE-METODE PERENCANAAN PERKERASAN STRUKTURAL RUNWAY
BANDAR UDARA

EVALUASI JARAK PANDANG PADA ALINEMEN VERTIKAL DAN HORIZONTAL PADA
TIKUNGAN JALAN LUAR KOTA (STUDI KASUS SEI RAMPAH-TEBING TINGGI)
EVALUASI JUMLAH ARMADA ANGKUTAN UMUM DIKOTA MEDAN (STUSI KASUS:
ANGKUTAN UMUM KPUM TRAYEK 66)
EVALUASI KAPASITAS DAN PELAYANAN GERBANG TOL TANJUNG MORAWA
EVALUASI POLA PEGERAKAN ORANG DAN BARANG DENGAN MODA TRANSPORTASI AIR
(STUDI KASUS : DARI DAN KE KOTA BALIGE)
EVALUASI KRITERIA PENERIMAAN CAMPURAN BERASPAL LAPIS PERMUKAAN
MENURUT SPESIFIKASI JALAN BINA MARGA VERSI DESEMBER 2006
OPTIMASI SIMPANG JL. NGUMBAN SURBAKTI – TANJUNG SARI DAN ALTERNATIF
APLIKASI TEORI FUZZY DALAM PERHITUNGAN KINERJA PERSIMPANGAN
ANALISIS KAPASITAS DAN TINGKAT PELAYANAN SIMPANG BERDASARKAN MANUAL
KAPASITAS JALAN INDONESIA 1996
ANALISIS KAPASITAS DAN TINGKAT PELAYANAN SIMPANG CANGUK BERDASARKAN
MANUAL KAPASITAS JALAN INDONESIA 1996 (TA/D3)
ANALISIS KAPASITAS PERSIMPANGAN PADA PERSIMPANGAN TANPA LAMPU LALU
LINTAS (STUDI KASUS PADA PERSIMPANGAN JALAN DR WAHIDIN, JALAN ATMO
SUKARTO DAN JALAN UMUM KALIPAN, DAERAH ISTIMEWA YOGYAKARTA) (,99)
ANALISIS KESELAMATAN LALU LINTAS DIKABUPATEN DAERAH TINGKAT II BANYUMAS
(,00)
KAJIAN KAPASITAS TERMINAL SOEKARNO HATTA DI MAGELANG (UKRIM,04) ANALISIS
PENGELOLAAN RETRIBUSI TERHADAP KEBUTUHAN PARKIR KENDARAAN BERMOTOR
DIRUMAH SAKIT ISLAM KLATEN (,04)
METODE PELAKSANAAN PEMBANGUNAN DAN PERAWATAN (JALAN REL KERETA API)
PADA LINTAS YOGYA YOGYAKARTA-SOLO (,00)
OPTIMALISASI OPERASI LALU LINTAS GUNA MENDAPATKAN DELAY MINUMAN PADA
PERSIMPANGAN YANG BERURUTAN (UM MALANG,96)
OPTIMASI OPERASIONAL ALAT BERAT PADA PEMINDAHAN TANAH MEKANIS PROYEK
BENDUNGAN WONOREJO DENGAN PROGRAM DINAMIK (,98)
OPTIMASI PEMILIHAN LOKASI FABRIKASI BAWR PADA PROYEK JALAN TOL SURABAYA
MOJOKERTO GUNA MENEKAN BIAYA ANGKUT BALOK ( MALANG,97)
PADA CAMPURAN PANAS ASPAL BETON (LASTOM DENGAN BATAS GRADASI MENERUS
AGREGA T CAMPURAN NO IV) (UM MALANG,96)
PENDEKATAN ANALISA KATEGORI UNTUK PENGEMBANGAN MODEL PEMBANGKIT
PERJALANAN BERDASARKAN DARI RUMAH KE PERJALANAN PADA PEMUKIMAM
SAWOJAJAR MALANG (U MERDEKA MLG,96)

PENERAPAN MANAJEMEN SISTEM TRANSPORTASI UNTUK MENANGGULANGI
KEMACETAN LALU LINTAS DIKAWASAN KUTA BALI (,00)
PENGARUH NILAI LENDUTAN BALIK JALAN TERHADAP TEBAL LAPIS TAMBAHAN
(YOGYAKARTA-PARANGTRITIS) (,00)
PERENCANAAN PERBAIKAN BADAN JALAN KALIMANTAN POROS SELATAN PULANG-
KUALA KAPUAS PADA STA 29+150 S/D 30+750 KALTENG DENGAN METODE RIGID
PAVEMENT (,01)
STUDI PENELITIAN PENANGGULANGAN KEMACETAN LALU LINTAS PADA RUAS JALAN
MERDEKA UTARA TIMUR KOTAMADYA MALANG (,00)
STUDI PENELITIAN PENGARUH SISTIM PENUMBUKAN CAMPURAN (MIXDESIGN)
TERHADAP STABILITAS KEPADATAN PADA PERKERASAN JALAN (,97)
STUDI PENELITIAN PENGARUH PENGGUNAAN CAMPURAN ARBOSEL PADA
PERKERASAN LENTUR JALAN RAYA METODE RBS PADA RUAS JALAN RAYA GEMPOL
PASURUAN (,99)
STUDI PENELITIAN VARIASI PASIR GUNUNG SEMERU DESA DANDER DAMPIT SEBAGAI
BAHAN CAMPURAN PERKERASAN AC (ASPHALT CONNERETE) UNTUK BAHAN JALAN
TERHADAP KUALITAS PERKERASAN (,00)
STUDI PERBAIKAN TANAH METODE PEMAMPATAN TANAH (SOIL PRECOMPRESSION)
DENGAN SISTEM PRELOUDING SERTA PENGGUNAAN GEOTEXTILE DAN
PREFABRICATED VERTICAL DRAIM PADA PROYEK PEMBANGUNAN JALAN PADA
PROYEK PEMBANGUNAN JALAN MARGOMULYO SURABAYA-GRESIK (,01)
PERENCANAAN PERBAIKAN TANAH DENGAN MENGGUNAKAN METODE PRELOADING
DIKOMBINASIKAN VERTIKAL DRAIN DAN DIPERKUAT GEOSYNTHETICS GEOTEXTILE
PADA RUAS JALAN PASIR MAS-JEMBATAN BARITO (STA 05+000-08+800) DI
BANJARMASIN
STUDI ANALISA TINGKAT EFISIENSI RUTE ANGKUTAN KOTA BOJONEGORO TINJAUAN
PADA PANJANG TRAYEK DAN ARAH RUTE (ROUTE DIRECTNESS)
STUDI EVALUASI TARIF ANGKUTAN PEDESAAN BERDASARKAN BIAYA OPERASIONAL
KENDARAAN
STUDI PERENCANAAN KONSTRUKSI JALAN RAYA (HIGHWAY) BALIKPAPAN- SAMARINDA
PENGARUH PEMBUKAAN JALAN LINGKAR (BY PASS) TERHADAP KINERJA JARINGAN
JALAN PERKOTAAN DAN MANFAATNYA TERHADAP KONSUMSI BAHAN BAKAR (Study
Kasus Di Kota Bumiayu Kabupaten Brebes)
PENGARUH TEMPERATUR PEMADATAN PADA CAMPURAN PERKERASAN AC DENGAN
BAHAN TAMBAH LATEKS TERHADAP SIFAT MARSHALL

EVALUASI TRANSPORTASI ANGKUTAN UMUM PEDESAAN KABUPATEN PAKPAK BHARAT
KAJIAN KINERJA PERSIMPANGAN TIDAK BERSIGNAL PADA SOEKARNO-HATTA-JENDRAL
SUDIRMAN-JALAN CUT NYAK DIEN
KAJIAN METODA PERENCANAAN TEBAL LAPIS TAMBAH PERKERASAN LENTUR
KAJIAN PERBANDINGAN POLA PERGERAKAN PENDUDUK DESA PERTANIAN LAHAN
BASAH DENGAN DESA PERTANIAN LAHAN KERING (PERKEBUNAN) DI KABUPATEN
PADANG LAWAS UTARA (STUDI KASUS : DESA NAGASARIBU,KECAMATAN PADANG
BOLAK DAN DESA SIPAHO,KECAMATAN HALONGONAN)
MANAJEMEN PERLINTASAN SEBIDANG ANTARA JALAN RAYA DENGAN JALAN KERETA
API
MODEL BANGKITAN PERGERAKAN KELUARGA DI KAWASAN PEMUKIMAN DI
PUSAT KOTA LANGSA
PENENTUAN RANGKING OPTIMALISASI FUNGSI DAN KEBERADAAN PERUMNAS DI
WILAYAH KOTA MEDAN DAN SEKITARNYA DENGAN METODE ANALYTIC HERARCHY
PROCESS (AHP)
PENGARUH PENAMBAHAN KAPUR CA(OH)₂ PADA TANAH LEMPUNG (CLAY) TERHADAP
PLASTISITAS DAN NILAI CBR TANAH DASAR (SUBGRADE) PERKERASAN JALAN
PREDIKSI PERKEMBANGAN KETIDAKRATAAN JALAN (KAJIAN LITERATUR)
STUDI PENENTUAN JUMLAH LHR PADA PERENCANAAN PEMBANGUNAN JALAN TOL
TANJUNG MORAWA – TEBING TINGGI
STUDI PENGARUH BEBAN BERLEBIH (OVERLOAD) TERHADAP PENGURANGAN UMUR
RENCANA PERKERASAN JALAN
STUDI PENGARUH KEBERADAAN PUSAT PERBELANJAAN PLAZA MILLENIUM TERHADAP
KONDISI LALU LINTAS DAN USULAN PENANGANAN PERSOALAN LALU LINTAS DI RUAS
JALAN KAPTEN MUSLIM
STUDI PENGARUH PENYEMPITAN JALAN TERHADAP KARAKTERISTIK LALU LINTAS
DENGAN MEMBANDINGKAN MODEL LINEAR GREENSHIELD, LOGARITMIK GREENBERG
DAN EKSPONENSIAL UNDEWOOD.
STUDI PENGARUH PERLINTASAN SEBIDANG JALAN DENGAN REL KERETA API
TERHADAP KARAKTERISTIK LALULINTAS (STUDI KASUS: PERLINTASAN KERETA API
JALAN SEKIP)
STUDI TARIKAN PERJALANAN SERTA ANALISA PERPARKIRAN PADA PUSAT
PERBELANJAAN DIKOTAMEDAN( STUDI KASUS : MEDAN MALL)
MANAJEMEN KONSTRUKSI

ANALISA PENERAPAN MANAJEMEN WAKTU PADA PROYEK KONSTRUKSI JALAN (STUDI
KASUS : PT. SABARITHA PERKASA ABADI, PT. SINAR KASIH REINHARD, PT. DIAN
PERKASA)
ANALISA PERBANDINGAN PRODUKTIVITAS PEKERJA KONSTRUKSI JALAN RAYA PADA
PAGI & SIANG HARI BERDASARKAN STANDAR BINA MARGA
PENGUKURAN PRODUKTIVITAS PEKERJA SEBAGAI DASAR PERHITUNGAN UPAH KERJA
PADA ANGGARAN BIAYA (STUDI KASUS)
STRATEGI HARGA PENAWARAN TENDER PADA PROYEK PEMBANGUNAN PT. PP.
LONSUM DI MUARASA RUPIT SUMATERA SELATAN
STUDY PENERAPAN SISTEM MANAJEMEN MUTU ISO 9001:2000 PADA PROYEK BANDARA
KUALA NAMU KABUPATEN DELI SERDANG
ANALISA OPTIMASI TEKNIS PELAKSANAAN DAN BIAYA ANTARA METODE PENGECORAN
BETON SITE MIX READY MDS DI HOTEL BATU TRAVEL ODER (,97)
ANALISA RENCANA DAN PENGENDALIAN JUMLAH PENGGUNAAN ANGGARAN BIAYA
PELAKSANAAN PROYEK BERSKALA KECIL (ROKO MONDOKAN-TUBAN) (,97)
ANALISIS FAKTOR PENUNJANG KEBERHASILAN PROYEK KONSTRUKSI BANGUNAN
GEDUNG DIKABUPATEN SLEMAN (,05)
ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PEKERJAAN
PROYEK KONSTRUKSI DI DIY (,00)
ANALISIS WAKTU PENJADWALAN PROYEK PEMBANGUNAN GEDUNG FAKULTAS
PETERNAKAN UNIVERSITAS GAJAH MADA YOGYA (PACKAGE) DENGAN METODE
PRIMAVERA VERSI 3,1 (,03)
ANALISIS TENGGANG WAKTU KEBUTUHAN MATERIAL DENGAN KURVA S PADA PROYEK
LABORATERIUM AS YOGYAKARTA (,04)
APLIKASI METODE LINE OF BALANCE PADA PENJADWALAN PROYEK KONTRUKSI
(PROYEK PERUMAHAN GAYA TAMAN AIR DI YOGYAKARTA) (,00)
FAKTOR-FAKTOR YANG MEMPENGARUHI INVESTASI PERHOTELAN PERSEPTIF
INVESTOR HOK (,98)
KAJIAN STUDI ANALISA BIAYA MENGGUNAKAN PROGRAM MIKROSOFT PROYEK 200 DAN
SURETRAK MANAJER PADA PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT PANTI
NIRMALA MALANG (,00)

OPERASIONAL AUDITS “DALAM USAHA MENINGKATKAN KUALITAS DENGAN
MENGESTIMASI BIAYA DAN WAKTU PROYEK PEMBANGUNAN GEDUNG LAB BERSAMA
FPINIPA IKIP MALANG (,98)
PEMBAHASAN PERHITUNGAN STRUKTUR PORSAL PADA PROYEK PEMBANGUNAN
SEBAGIAN GEDUNG FAKULTAS BIOLOGI (A)3 LANTAI UNIVERSITAS GAJAH MADA
YOGYAKARTA (,97)
ANALISIS FAKTOR MOTIVASI KERJA PENGARUHNYA TERHADAP KINERJA MANDOR
PADA PROYEK KONSTRUKSI (,02)
PENERAPAN KESELAMATAN DAN KESEHATAN KERJA PADA OPERASIONAL SPOOR
DILINTAS DAOP – VI YOGYAKARTA (,03)
ANALISA NETWORK PLANING DAN CRASH PROGRAM PADA PROYEK PEMBANGUNAN
GEDUNG PDAM SAWOJAJAR MALANG (,97)
PENERAPAN SISTIM MANAJEMEN MUTU ISO 9002 DAN PENYELESAIAN MASALAH
DENGAN PENDEKATAN PENGENDALIAN MUTU TERPADU PADA PROYEK KONSTRUKSI
(,03)
PENGENDALIAN WAKTU DAN BIAYA (STUDI KASUS PROYEK PEMBANGUNAN GEDUNG
PERKULIAHAN KAMPUS MUH MALANG) (03, M)
PENILAIAN TERHADAP KEMAMPUAN KERJA PARA TEKNISI SETELAH PELATIHAN DAN
HUBUNGAN DENGAN TINGKAT PENDIDIKAN DAN MASA KERJANYA (01,)
PENJADWALAN PROYEK DITINJAU DARI SEGI WAKTU DAN BIAYA DIPERUMAHAN
PERMAT PERMATA GRIYA MANDIRI DENGAN MENGGUNAKAN METODE CPM (,04)
PERHITUNGAN WAKTU DAN BIAYA PEKERJAAN GALIAN DAN TIMBANGAN TANAH (STUDI
KASUS PADA PROYEK MONALISA DI SUNGAI WAWAR) (,04)
PERHITUNGAN WAKTU DAN BIAYA PEKERJAAN GALIAN DAN TIMBUNAN TANAH (STUDI
KASUS PADA PROYEK NORMALISASI SUNGAI WAWAR (,03)
PERSEPSI PESERTA PROGRAM PELATIHAN TENAGA KERJA PEMAGANGAN TENTANG
KEBUTUHAN PASAR KERJA DIKAITKAN DENGAN PELAKSANAAN PROGRAM DI PUSAT
PELATIHAN DAN PRODUKTIFITAS TENAGA KERJA INDUSTRI MANUFAKTUR BANDUNG (
,01)
STRATEGI HARGA PENAWARAN PADA TENDER PROYEK KONTRUKSI DENGAN
MEMPERHITUNGKAN FAKTOR RECIKO (,97)
STUDI KASUS ANALISA ANGGARAN BIAYA DENGAN METODE BOW DAN NON BOW
PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN SUNAN KALIJAGA (,03)
STUDI KOMPERASI TENAGA KERJA TERHADAP PRODUKTIVITAS TUKANG PADA PROYEK
KONSTRUKSI (,03)

STUDI MENGENAI KETERLAMBATAN PEMBAYARAN DARI PEMILIK PROYEK KONSTRUKSI
KEPADA KONTRAKTOR (4,)
STUDY EVALUASI PENGENDALIAN BIAYA (COST CONTROL)DAN JADWAL PELAKSANAAN
(SCHEDULING) PADA PROYEK RUMAH SAKIT UMUM DAERAH MARDI WALUYO BLITAR
JATIM
PENGUKURAN KINERJA KONSULTAN PENGAWAS PROYEK KONSTRUKSI (Studi Kasus
Hasil Pengawasan Konsultan)
STUDI PENJADWALAN WAKTU DAN ANGGARAN BIAYA (RAB) PADA PROYEK
PENGEMBANGAN KAMPUS UNIVERSITAS ISLAM NEGERI (UIN) MALANG
STUDI PENJADWALAN WAKTU DAN ANGGARAN BIAYA (RAB) PADA PROYEK
PENGEMBANGAN KAMPUS UNIVERSITAS ISLAM NEGERI (UIN) MALANG
PERENCANAAN ULANG BANGUNAN ATAS GEDUNG CIBOGO TOWN SQUARE MALANG
ANALISA PENJADWALAN PROYEK PEMBANGUNAN SMP UNGGULAN TERPADU
KABUPATEN LUMAJANG
STRATEGI HARGA PENAWARAN PADA TENDER PROYEK KONTRUKSI DENGAN
MEMPERHITUNGKAN FAKTOR RESIKO
ANALISIS FAKTOR-FAKTOR MOTIVASI KERJA PENGARUHNYA TERHADAP KINERJA
MANDOR PADA PROYEK KONSTRUKSI
APLIKASI TATA CARA PENGADAAN JASA KONTRUKSI DENGAN MENGGUNAKAN SISTEM
KONTRAK UNIT PRICE DENGAN KONTRAK LUMPSUM
PENGARUH PELAKSANAAN KESELAMATAN DAN KESEHATAN KERJA (K3) PADA
KEBERHASILAN POYEK KONTRUKSI
ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PEKERJAAN
PROYEK KONSTRUKSI DI DIY
STUDI MENGENAI KETERLAMBATAN PEMBAYARAN DARI PEMILIK PROYEK KONSTRUKSI
KEPADA KONTRAKTOR
APLIKASI TATA CARA PENGADAAN JASA KONTRUKSI DENGAN MENGGUNAKAN SISTIM
KONTRAK UNIT PRICE DENGAN KONTRAK LUMPSUM (,96)
HIDRO (AIR) :
ANALISA KAPASITAS TAMPUNGAN PENYIMPANAN AIR DI CATCHMENT AREA DANAU
TOBA

ANALISA KELAYAKAN UKURAN PANJANG DERMAGA, GUDANG BONGKAR MUAT BARANG
DAN SANDAR KAPAL STUDY KASUS (DERMAGA UJUNG BARU – PELABUHAN BELAWAN)
EVALUASI DAN ANALISA DESAIN KAPASITAS SALURAN DRAINASE DI PASAR TAVIP
PEMERINTAHAN KOTA BINJAI
EVALUASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT (STUDI KASUS RUMAH SAKIT UMUM
DR.DJASAMEN SARAGIH PEMATANG SIANTAR)
KONSEP PENGELOLAAN DRAINASE KOTA MEDAN SECARA TERPADU
STUDI KARAKTERISTIK MUARA SUNGAI BELAWAN SUMATERA UTARA
STUDI KARAKTERISTIK FISIK ESTUARI SUNGAI DELI
STUDI KARAKTERISTIK SEDIMEN DI PERAIRAN PELABUHAN BELAWAN
STUDI KARAKTERISTIK SEDIMEN DI PERAIRAN PELABUHAN BELAWAN
STUDI PENYALURAN DAN PENGOLAHAN AIR LIMBAH DI KOMPLEK PEMUKIMAN (STUDI
KASUS: KOMPLEK PESANTREN)
ANALISIS BAKTERIOLOGIS PADA JARINGAN AIR BERSIH DIDESA SANGANGALANGA,
KECAMATAN GEROBAK, KABUPATEN BULELANG TAHUN 03 (,03)
ANALISIS DUGAAN JUMLAH SEDIMEN DAN ALTERNATIF PENGENDALIANNYA PADA
WADUK WLINGI RAYA (,98)
APLIKASI BOFFLES PIER SEBAGAI ALTERNATIF PEMECAH ENERGI TYPE SAF PADA
EFEKTIFITAS PEREDAMAN ENERGI (,00)
EFEKTIFITAS FILTER CADAS AON DALAM MENINGKATKAN KUALITAS AIR MINUM
SECARA BAKTERIALOGIS BAGI MASYARAKAT PEDESAAN (,02)
EFEKTIFITAS PENGOLAHAN AIR LIMBAH SEBAGAI UPAYA PENURUNAN BODS DIRUMAH
SAKIT UMUM DAERAH NGANJUK (,03)
EVALUASI DIMENSI SISTIM DRAINISASI DIKAWASAN SIMPANG LIMA KOTAMADYA
SEMARANG (00,)
HUBUNGAN ANTARA CURAH HUJAN SAAT DENGAN KARAKTERISTIK AIR LARIAN PADA
SUNGAI PELANG STUDI KASUS DIKAWASAN KAMPUS TERPADU UNIVERSITAS ISLAM
INDONESIA (,04)
PERBEDAAN KUALITAS SECARA BAKTEIOLOGIS AIR SUMUR GALI YANG MEMAKAI
CINCIN/BUIS DENGAN YANG TIDAK MEMAKAI CINCIN/BUIS DIDESA MEDAHAN
KECAMATAN BILAH BATUH KABUPATEN GIANYAR (,03)
PERENCANAAN ULANG JEMBATAN RANGKA AIR LAYANG BANGKA INDUK KEPULAUAN
BANGKA BELITUNG (,05)
PREDIKSI LAJU SEDIMENTASI PADA WADUK SUTAMI (STUDI PENGAMATAN PADA K
BRANTAS DAN K LESTI) (,00)

PROYEK PEMBANGUNAN JEMBATAN AIR SERANGAI HULU DAERAH TK II BENGKULU
PROPINSI BENGKULU PROPINSI BENGKULU (,03)
RENCANA PENGEMBANGAN SISTEM PENYEDIAAN AIR BERSIH KABUPATEN DATI II
GIANJAR PROPINSI BALI SAMPAI DENGAN TAHUN 2015 (,00)
STUDI ALTERNATIF PENOLAHAN LIMBAH PABRIK KERTAS PT SURYA JAYA PAMENAG
DENGAN METODE FILTRASI (,98)
STUDI PERENCANAAN INSTALASI AIR PADA RUMAH SAKIT MARDI WALUYO KOTA
BLITAR JAWA TIMUR
STUDI PEMANFAATAN AIR PADA BENDUNGAN BULIA KABUPATEN GORONTALO
STUDI PERENCANAAN TUBUH BENDUNGAN PADA BENDUNGAN BULIA DI KABUPATEN
GORONTALO
OPTIMASI DIMENSI PIPA PENSTOCK PADA PEMBANGKIT LISTRIK TENAGA AIR
AMPELGADING MALANG
STUDI PERENCANAAN JARINGAN DISTRIBUSI AIR BERSIH PDAM UNTUK MEMENUHI
KEBUTUHAN AIR BERSIH DI KECAMATAN NGASEM KABUPATEN BOJONEGORO
HUBUNGAN ANTARA CURAH HUJAN SESAAT DENGAN KARAKTERISTIK AIR LARIAN
PADA SUNGAI PELANG (STUDI KASUS DI KAWASAN KAMPUS TERPADU UNVERSITAS
ISLAM INDONESIA), 04
HUBUNGAN ANTARA CURAH HUJAN SESAAT DENGAN KARAKTERISTIK AIR LARIAN
PADA SUNGAI PELANG (STUDI KASUS DI KAWASAN KAMPUS TERPADU UNIVERSITAS
ISLAM INDONESIA
ANALISA PENGARUH BENDUNG TERHADAP TANGGUL BANJIR SUNGAI ULAR
SIMULASI NUMERIK ALIRAN FLUIDA DAN BENTUK SUDU TINGKAT PERTAMA TURBIN
GAS PENGGERAK GENERATOR DENGAN DAYA 141,9 MW MENGGUNAKAN CFD FLUENT
6.3.26
STUDI ALIRAN PIPA PRIMER DAN SEKUNDER UNTUK IRIGASI HORTIKULTURA DI DESA
GURU BENUA, KABUPATEN KARO
TEKNOLOGI LUBANG RESAPAN BIOPORI (LRB) TERKAIT DENGAN PERESAPAN AIR
TANAH DAN PENGOLAHAN SAMPAH ORGANIK (EKSPERIMEN)
STUDI IDENTIFIKASI DAN ANALISA SISTEM DRAINASE UNTUK PENANGGULANGAN
BANJIR PADA KECAMATAN MEDAN JOHOR DAN KECAMATAN MEDAN POLONIA (STUDI
KASUS : JLN. BRIGJEND KATAMSO DAN JLN. DIPONEGORO)
ANALISA OPTIMASI PENGOPERASIAN WADUK WONOREJO DENGAN METODE UNIER
SEBAGAI KAJIAN (,97)
KAJIAN PENGARUH TINGGI BUKAAN PINTU AIR TEGAK (SUICE GATE) TERHADAP
BILANGAN FROUDE (CF) DI BAGIAN HILIR SALURAN AIR (,00)

STUDI ANALISA USIA GUNA WADUK SELOREJO (TINJAUAN SEDIMENTASI PADA WADUK)
(,00)
STUDI EVALUASI PROSES PENJERNIHAN AIR DIDESA MOJOSARI KECAMATAN
KEPANJEN KABUPATEN MALANG (,97)
STUDI PENELITIAN TINGKAT PENCEMARAN AIR SUNGAI BRONKAS AKIBAT LIMBAH
DOMESTIK DIKOTAMADYA MALANG (,97)
STUDI OPTIMASI POLA TANAM PADA DAERAH IRIGASI (D.I) BONDOYUDO Kab LUMAJANG
DENGAN MODEL LINIER PROGRAMMING PERUBAHAN KOEFISIEN LIMPASAN (RUNOFF COEFFICIENT) DI DAERAH ALIRAN SUNGAI
ULAR
STRUKTUR :
ANALISA BALOK SILANG DENGAN GRID ELEMEN PADA STRUKTUR JEMBATAN BAJA
ANALISA DAN PERENCANAAN PELAT BETON PRACETAK SISTEM HOLLOW CORE SLAB
(HCS) UNTUK PELAT SATU ARAH
ANALISA DAN PERENCANAAN PILE CAP DENGAN METODE STRUT AND TIE MODEL
BERDASARKAN ACIBUILDING CODE 318-2002
ANALISA DAYA DUKUNG PONDASI BORED PILE TUNGGAL PADA PROYEK
PEMBANGUNAN GEDUNG CRYSTAL SQUARE JL. IMAM BONJOL NO. 6MEDAN
ANALISA DAYA DUKUNG PONDASI TIANG PANCANG (MINI PILE) PADA PROYEK
PEMBANGUNAN RSIA STELLA MARISS JALAN SAMANHUDI – MEDAN
ANALISA EFISIENSI KONSTRUKSI BETON BERTULANG BERDASARKAN SK SNI T-15-1991-
03 DAN SK SNI 03-2002
ANALISA GAYA DALAM PADA RIGID ZONE PERTEMUAN BALOK DAN KOLOM PORTAL
BETON BERTULANG DENGAN MENGGUNAKAN MODEL STRUT AND TIE
ANALISA GAYA TARIK KABEL PRATEGANG PADA BALOK STATIS TAK TENTU
ANALISA JEMBATAN COMPOSITE GELAGAR KAYU LANTAI BETON
ANALISA KOLOM BETON BERTULANG YANG DIPERKUAT DENGAN CARBON FIBER
REINFORCED POLYMER (CFRP)
ANALISA KUAT GESER BALOK TINGGI BETON BERTULANG BERDASARKAN MODEL
STRUT-AND-TIE
ANALISA LENDUTAN BALOK KAYU KELAPA NON PRISMATIC PERLETAKAN SENDI – ROL
DENGAN METODE PLASTIS (EKSPERIMEN)
ANALISA LENDUTAN PROFIL BAJA NON PRISMATIS PERLETAKAN SENDI-ROL DENGAN
METODE PLASTIS.

ANALISA PELAT BETON BERTULANG YANG DIPERKUAT DENGAN FIBER REINFORCED
POLYMER (FRP) (STUDY LITERATUR)
ANALISA PELAT PERSEGI PANJANG DENGAN METODE HIRZFELD DAN METODE M.LEVY
ANALISA PELAT SATU ARAH (ONE WAY SLAB) DARI TEORI M. LEVY
ANALISA PENURUNAN ELASTIS PONDASI TIANG PANCANG PROYEK PEMBANGUNAN
RUSUNAWA MEDAN AREA
ANALISA PERBANDINGAN BEBAN KRITIS PADA PAPAN KAYU PERLETAKAN SENDI-ROLL
(EKSPERIMENTAL DAN TEORITIS).
ANALISA PERBANDINGAN JUMLAH MEDAN EKONOMIS UNTUK JEMBATAN GELAGAR
RANGKA BAJA TYPE CURVED BENTUK TERTUTUP DENGAN BENTANG 48 METER
ANALISA PERBANDINGAN BEBAN BATAS DAN BEBAN LAYAN (LOAD FACTOR) DALAM
TAHAPAN PEMBENTUKAN SENDI – SENDI PLASTIS PADA STRUKTUR GELAGAR
MENERUS
ANALISA PERBANDINGAN BERAT JENIS DAN KUAT TEKAN ANTARA BETON RINGAN DAN
BETON NORMAL DENGAN MUTU BETON K-200
ANALISA PERBANDINGAN TEKUK KOLOM DENGAN MENGGUNAKAN PROFIL BAJA
TERSUSUN DAN KOMPOSIT
ANALISA PERBANDINGAN WAKTU DAN PERBEDAAN FAKTOR AIR SEMEN SERTA
PENGARUHNYA TERHADAP KUAT TEKAN BENDA UJI (KAJIAN EKSPERIMENTAL)
ANALISA PERHITUNGAN KONSTRUKSI BETON BERTULANG BERDASARKAN METODE
KEKUATAN BATAS (ULTIMATE DESIGN) DAN METODE ELASTIS DESIGN
ANALISA PRESTRESS (POST-TENSION) PADA PRECAST CONCRETE U GIRDER (STUDI
KASUS PADA JEMBATAN FLYOVER AMPLAS)
ANALISA STRUKTUR PADA PLANE FRAME DENGAN MENGGUNAKAN METODE CROSS
DAN FINITE ELEMENT METHOD
ANALISA STRUKTUR PELAT DUA ARAH TANPA BALOK (FLAT SLAB)
ANALISA TANGKI BAJA CPO DAN DIBANDINGKAN DENGAN ANALITIS
ANALISA TEKUK KOLOM BAJA RINGAN (ZINCALUME) DAN BAJA KONVENSIONAL
ANALISA TEKUK KOLOM KONSTRUKSI KAYU DENGAN MENGGUNAKAN PELAT KOPPEL
ANALISA WARPING AKIBAT TORSI PADA PROFIL C DENGAN METODE ANALITIS &
PROGRAM
ANALISIS CELLULAR BEAM DENGAN METODE PENDEKATAN DIBANDINGKAN DENGAN
PROGRAM ANSYS
ANALISIS DAN PERENCANAAN FLAT SLAB BERDASARKAN PERATURAN ACI 318M 2005
ANALISA TORSI, LENTUR, LENDUTAN DAN LINTANG PADA TAMPANG I
ANALISA TORSI PADA BALOK DENGAN LUBANG PADA BADANNYA

ANALISIS PEMAKAIAN DIAPHRAGM WALLS PADA GALIAN BASEMENT DENGAN
PROGRAM PLAXIS (STUDI KASUS : PROYEK HOTEL SANTIKAMEDAN)
ANALISIS RESPON BEBAN ANGIN PADA BANGUNAN BETON TINGKAT TINGGI YANG
MENGGUNAKAN SISTEM OUTRIGGER TRUSS
ANALISIS SAMBUNGAN PORTAL BAJA ANTARA BALOK DAN KOLOM DENGAN
MENGGUNAKAN SAMBUNGAN BAUT MUTU TINGGI (HTB)
ANALISIS SAMBUNGAN PORTAL BAJA ANTARA BALOK DAN KOLOM DENGAN
MENGGUNAKAN SAMBUNGAN LAS DAN BAUT (STUDI LITERATUR)
ANALISIS TEKUK FLENS DAN WEB PROFIL IWF PADA STRUKTUR GABLE FRAME
DENGAN METODE PLASTIS
APLIKASI ANALISA PELAT KONTINIU PADA BANGUNAN
ANALISIS TEKUK PADA KOLOM BAJA TAMPANG IWF AKIBAT GAYA TEKAN AKSIAL
ANALISI TORSI PADA TAMBANG PERSEGI PANJANG DAN APLIKASI PADA KOMPONEN
STRUKTUR BETON BERTULANG DENGAN MENGGUNAKAN ELEMEN GRID
APLIKASI REKAYASA KONSTRUKSI (DIAGRAM INTERAKSI KOLOM) DENGAN VISUAL
BASIC 6.0
EFISIENSI DAN OPTIMALISASI PEMAKAIAN BAJA SEBAGAI BAHAN KONSTRUKSI
EKSPERIMEN PERSEN KEKUATAN SAMBUNGAN MEMAKAI PLAT BAJA DAN KAYU
DENGAN MEMIKUL MOMEN PADA BALOK BERDASARKAN PKKI NI-5-2002
EKSPERIMEN TORSI PADA DINDING TIPIS PERSEGI PANJANG BERLUBANG
EKSPERIMEN TORSI PADA DINDING TIPIS TAMPANG TERTUTUP BUJUR SANGKAR TIDAK
BERLUBANG
EKSPERIMEN TORSI PADA DINDING TIPIS TAMPANG TERTUTUP PERSEGI PANJANG
TIDAK BERLUBANG
FUNGSI PELAT KOPEL BAJA PADA BATANG TEKAN
KAJIAN ANGKA REDUKSI MOMEN INERSIA TERHADAP DISTRIBUSI GAYA-GAYA DALAM
PADA STRUKTUR BETON BERTULANG
KAJIAN EFEK PARAMETER BASE ISOLATOR TERHADAP RESPON BANGUNAN AKIBAT
GAYA GEMPA DENGAN METODE ANALISIS RIWAYAT WAKTU
KAJIAN EFEKTIFITAS SISTEM STRUKTUR TUBE DENGAN SISTEM STRUKTUR TUBE IN
TUBE DI BAWAH BEBAN GEMPA
KAJIAN FAKTOR REDUKSI U (SHEAR LAG FACTOR) PADA KOMPONEN STRUKTUR YANG
MEMIKUL GAYA AKSIAL ” (STUDI LITERATUR)
KAJIAN KERUSAKAN STRUKTUR PLAZA ANDALAS PASCA GEMPA PADANG TANGGAL 30
SEPTEMBER 2009 (STUDY KASUS)

KAJIAN PERBANDINGAN SAMBUNGAN ANTAR KAYU DENGAN KAYU DAN ANTAR KAYU
DENGAN PELAT BAJA BERDASARKAN PKKI NI-5-2002 (TEORITIS DAN EKSPERIMENTAL)
KOMBINASI ALAT PENYAMBUNG PAKU DAN BAUT PADA KOLOM PENDEK KAYU MERANTI
DENGAN PEMBEBANAN AKSIAL TEKAN BERDASARKAN PKKI NI-5 2002 (EKSPERIMEN)
KOMBINASI ALAT PENYAMBUNG PAKU DAN BAUT PADA SAMBUNGAN KAYU MERANTI
DENGAN PEMBEBANAN NORMAL BERDASARKAN PKKI – NI 5 2002 ( EKSPERIMEN )
NALISA PERBANDINGAN DAN PROFIL TUNGGAL DAN PROFIL MAJEMUK PADA
KONSTRUKSI RANGKA BAJA (STUDI LITERATUR)
PEMAKAIAN ELEMEN GRID (BALOK SILANG) UNTUK MENENTUKAN LENDUTAN PADA
BALOK (STUDI LITERATUR)
PEMOGRAMAN FINITE ELEMENT METHOD PADA ELEMENT TRUSS DENGAN
MENGGUNAKAN MATLAB
PENELITIAN BALOK BETON BERTULANG SELF COMPACTING CONCRETE DENGAN
MENGGUNAKAN 100%, 85%, DAN 70% SCC”
PENELITIAN TERHADAP KEGAGALAN STRUKTUR RANGKA ATAP KAYU BENTANG 12
METER DAN METODE PERBAIKAN STRUKTURNYA (STUDI KASUS)
PENENTUAN BESAR BEBAN KRITIS (PCR) PADA STRUKTUR PORTAL BAJA BERATAP
PELANA (GABLE FRAME) (DENGAN KEMIRINGAN SUDUT ATAP BERVARIASI)
PENGARUH PENAMBAHAN POZZOLITH®100RI TERHADAP KUAT TEKAN DAN KUAT TARIK
BELAH BETON DENGAN PENGURANGAN FAKTOR AIR SEMEN
PERANCANGAN PROFIL RANGKA BATANG JEMBATAN BAJA DAN ANALISA MOMEN
SEKUNDER PADA SAMBUNGANNYA (ALAT SAMBUNG BAUT)
PERBANDINGAN ANALISIS STATIK DAN ANALISIS DINAMIK PADA PORTAL BERTINGKAT
BANYAK SESUAI SNI 03-1726-2002
PERBANDINGAN CRITICAL LOAD PADA BALOK KANTILEVER SECARA TEORITIS
DIBANDINGKAN DENGAN PROGRAM ANSYS
PERBANDINGAN DESAIN STRUKTUR PORTAL BAJA SEDERHANA DENGAN
MENGGUNAKAN TAPPERED BEAM DAN HONEYCOMB BEAM
PERBANDINGAN PERHITUNGAN KAPASITAS TIANG DENGAN RUMUS DINAMIS
PERENCANAAN BEAM COLUMN BERDASARKAN METODE PLASTIS.
PERENCANAAN BEBERAPA TIPE JEMBATAN RANGKA BAJA DIBANDINGKAN DENGAN
RANGKA BAJA AUSTRALIA PADA JEMBATAN TANJUNG SELAMAT MEDAN
PERBANDINGAN KAPASITAS BALOK BETON BERTULANG ANTARA YANG
MENGGUNAKAN SEMEN PORTLAND POZZOLAN DENGAN SEMEN PORTLAND TIPE I
(KAJIAN EKSPERIMENTAL)

PERBANDINGAN KAPASITAS PELAT DUA ARAH BETON PRATEGANG DAN PELAT DUA
ARAH BETON BERTULANG
PERENCANAAN RANGKA ATAP BAJA RINGAN BERDASARKAN
AUSTRALIAN/NEWZEALAND STANDARD (AS/NZS 4600:1996)
PERENCANAAN PORTAL BAJA 4 LANTAI DENGAN METODE PLASTISITAS DAN
DIBANDINGKAN DENGAN METODE LRFD
PERENCANAAN STRUKTUR GEDUNG BETON BERTULANG DENGAN PERBANDINGAN SK
SNI T-15-1991 DAN SK SNI 03-2002 (STUDY KASUS : ASRAMA RUMAH SAKIT UMUM
SEMBIRING DELI TUA)
PERENCANAAN STRUKTUR GEDUNG BETON BERTULANG SISTEM RANGKA PEMIKUL
MOMEN KHUSUS (SRPMK) DAN SISTEM RANGKA PEMIKUL MOMEN MENENGAH (SRPMM)
PERHITUNGAN BEBAN DAN TEGANGAN KRITIS PADA KOLOM KOMPOSIT BAJA – BETON
PRA RANCANGAN PABRIK PEMBUATAN LEMAK COKELAT MENTAH DARI BIJI COKELAT
KERING HASIL FERMENTASI DENGAN KAPASITAS PRODUKSI 10000 TON/TAHUN
PERHITUNGAN KERUSAKAN STRUKTUR PERKERASAN LENTUR AKIBAT PENGARUH
TEMPERATUR (STUDY LITERATUR)
PERILAKU BALOK BERTULANG YANG DIBERI PERKUATAN GESER MENGGUNAKAN
LEMBARAN WOVEN CARBON FIBER
STUDI PERBANDINGAN STRUKTUR RANGKA ATAP BAJA UNTUK BERBAGAI TYPE
STUDI PERENCANAAN TEBAL LAPISAN PERKERASAN TAMBAHAN (OVERLAY) PADA
PROYEK PENINGKATAN JALAN PROPINSI JURUSAN BINJAI – TIMBANG LAWANG (STA
61+000 – 62+800)
ANALISA BAHAN TAMABAH HIGH EARLY STRENGHT PLASTICITERPADA CAMPURAN
BETON UNTUK KUAT TEKAN BETON (,00)
ANALISA KOLOM NON PRISMATIS PADA PORTAL DENGAN MENGGUNAKAN METODE
ELEMEN HINGGA (,97)
ANALISA PENGGUNAAN ROADCELL 50 SEBAGAI BAHAN ADDITING UNTUK
MENINGKATKAN KUALITAS CAMPURAN ASPAL PANAS (HOTMIX) (,37)
ANALISA PENGGUNAAN TERAK BAJA SEBAGAI BAHAN-BAHAN PENGISI (FILTER)
ALTERNATIF PADA CAMPURAN LASTON TERHADAP UJI MARSHALL DAN SKID RESIS
TANCE (97,)
ANALISA PERBANDINGAN GAYA GESER BALOK GUDER I PRATEGANG PARSIAL STUDI
KASUS FLY OVER GUBENG SURABAYA (,00)
ANALISA PERENCANAAN DAN OPTIMASI BIAYA SAMBUNGAN ANTARA BALOK RAJA DAN
KOLOM BETON BERTUNAG, STRUKTUR KOMPOSIT DENGAN TULANGAN BAJA PROFIL
(,96)

ANALISA PERILAKU DAN KEKUATAN TERHADAP BEBAN GEMPA PADA STRUKTUR
BETON PRATEKAN DENGAN SISTIM DENGAN SISTIM POST-TENSION PARTIALLY
DEBONDED (,99)
ANALISA TOLERANSI TITIK BELOK DENGAN PEDOMAN DAERAH BATAS TENDON PADA
BALOK PRATEKAN MENERUS SISTEM PRATEKAN LUAR (,97)
ANALISA TULANGAN JOINT BALOK KOLAM PADA STRUKTUR TAHAN GEMPA GEDUNG
HOLIDAY INN GROWNE PLAZA JAKARTA (,00)
ANALISIS TINGKAT DAKTILITAS 3 STRUKTUR PILAR TIPE COLUMN FRAME DI TITIK 12
PADA JEMBATAN S KAHAYAN PALANGKARAYA (,00)
PENGARUH BERKEKUATAN MODE DENGAN PROFIL TRAPESIUM TULANGAN BAMBU
BETUNG TERHADAP KEKUATAN BALOK BETON (,99)
PENGARUH GEOMETRI WIRE MESH TERHADAP KUAT GESER BETON (,02)
PENGARUH PENGGUNAAN CAMPURAN KAPUR DAN SELAM GUNA MENINGKATKAN
STABILITAS TANAH EKSPANSIF (,02)
PENGARUH WAKTU PEMADATAN TERHADAP KUAT TEKAN BETON PADA FAKTOR AIR
SEMEN TERTENTU (97,)
PERENCANAAN PONDASI DENGAN MENGGUNAKAN PONDASI SUMURAN PADA PROYEK
PEMBANGUNAN GEDUNG BPD SAMARINDA (,01)
STUDI PENELITIAN PENGARUH SISTIM PENUMPUKAN CAMPURAN (MIXDESIGN)
TERHADAP STABILITAS KEPADATAN PADA...............
STUDI PENELITIAN PENGARUH PENGGUNAAN TERAK BAJA SEBAGAI AGREGAT HALUS
PADA BETON TERHADAP PERILAKU MEKANIS BETON DENGAN MUTU BETON 25 MPA
DENGAN METODE DOE (,04)
STUDI PENELITIAN PENGARUH PENAMBANGAN BENTONITE PADA CAMPURAN BETON
TERHADAP KUAT TEKAN KUAT TARIK LENTUR KADAR UDARA DAN FAKTOR KEPADATAN
(,00)
PERBANDINGAN PONDASI TIANG VERTIKAL DAN PONDASI TIANG MIRING UNTUK
MELAWAN GAYA HORISONTAL YANG TERJADI PADA KONSTRUKSI ABUTMENT
JEMBATAN MRAHU KABUPATEN MAGETAN/2004
GEOTEKNIK (Tanah) :
ANALISA DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK PEMBANGUNAN
GEDUNG KANWIL DJP DAN KPP SUMBAGUT I JALAN SUKA MULIA MEDAN

ANALISA GRAVITY WALL DAN CANTILIVER WALL DITINJAU DARI SEGI EKONOMIS
TERHADAP TINGGI YANG VARIATIF
ANALISA PERBANDINGAN PERHITUNGAN DAYA DUKUNG TANAH PADA PONDASI V –
PILE (STUDI KASUS DI RUMAH SAKIT HAJI MEDAN)
ANALISA POTENSI LIKUIFAKSI PADA AREA APRON BANDAR UDARA MEDAN BARU
ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG KELOMPOK PADA PROYEK
PEMBANGUNAN GEDUNG DPRD SUMATERA UTARA
ANALISIS DAYA DUKUNG PONDASI KELOMPOK MINI PILE PADA PROYEK PEMBANGUNAN
PUSAT BISNIS RING ROAD
ANALISIS DAYA DUKUNG PONDASI TIANG BOR KELOMPOK PADA PROYEK
PEMBANGUNAN GEDUNG GRHA 165 JALAN TB SIMATUPANG JAKARTA
ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK PEMBANGUNAN
JEMBATAN SEI BABALAN-LANGKAT
ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG SERTA PERHITUNGAN
PENURUNAN PONDASI TIANG TUNGGAL PADA PROYEK PEMBANGUNAN CARGO –
BANDARA KUALA NAMU MEDAN
ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG TUNGGAL PADA PROYEK
PEMBAGUNAN RUSUNAWA UNIVERSITAS MEDAN AREA PANCING – MEDAN
ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG TUNGGAL PADA PROYEK
PEMBANGUNAN PLTU 2 SUMATERA UTARA 2 X 200 MW PANGKALAN SUSU – SUMATERA
UTARA
ANALISIS DAYA DUKUNG SISTEM PONDASI MINI PILE SERTA PERHITUNGAN
PENURUNAN MINI PILE TUNGGAL (STUDI KASUS PADA PROYEK PEMBANGUNAN HOTEL
TORGANDA SIANTAR)
ANALISIS DAYA DUKUNG SISTEM PONDASI TIANG DENGAN PENEKANAN HIDROLIK
PADA PROYEK PEMBANGUNAN ASRAMA RSU SEMBIRING JALAN MEDAN-DELITUA
KAJIAN PERANCANGAN GELAGAR JEMBATAN SEI BELUMAI BERDASARKAN
PEMBEBANAN RSNI T – 02 – 2005
ALTERNATIF PERENCANAAN PONDASI TELAPAK DAN PONDASI TIANG BOR (STRUSS)
PADA PROYEK PEMBANGUNAN GEDUNG LABORATORIUM ELEKTRO KAMPUS II
(MALANG,05)
ANALISA DINAMIS BIAYA DURUNG PONDASI TIANG PANCANG PADA DERMAGA (,97)
ANALISA KEGAGALAN TIANG PANCANG AKIBAT LIQUIFAKSI (,98)
ANALISA PENURUNAN PADA PONDASI TIANG PANCANG AKIBAT BEBEN ARSIAL SENTRIS
(,98)

ANALISA PERBAIKAN TANAH DENGAN METODE PEMBEBANAN AWAL MAKSIMUM DAN
DRAINASE VENTICAL PADA PROYEK REKLAMASI PANTAI DILAGUNA INDAH SURABAYA
(,00)
ANALISIS PENGARUH VARIASI CAMPURAN DAN PREKUENSI TUMBUKAN TERHADAP
KUAT TEKAM PADA BETON UNTUK LANTAI (01,)
ANALISIS STABILITAS LERENG DENGAN MENGGUNAKAN SOIL NAIL PADA PROYEK
PEMBANGUNAN JEMBATAN BESUK KOBO’AN CANDIPURA-LUMAJANG (,01)
APLIKASI METODE STATISTIK DAN PROBALITAS DALAM PERHITUNGAN DAYA DUKUNG
TANAH DALAM WILAYAH PEMBANGUNAN KAMPUS II TH TAHAP I MALANG TASIK MADU
(,03)
KAJIAN PENURUNAN PONDASI TIANG DENGAN TEORI ELASTID DAN KONSOLIDASI PADA
PEMBANGUNAN GEDUNG PABRIK MIE ABC DI MEDAN (,01)
METODE PERBAIKAN TANAH DENGAN MEMPERCEPAT KONSOLIDASI MELALUI SISTEM
PREFABRICATED VERTICAL DRAIM PADA AREA PARKIR PENUMPUKAN PETKEMAS DI
PELABUHAN TANJUNG PERAK SURABAYA (,01)
OPTIMALISASI LAHAN PERUMAHAN TYPE 36/80 BERDASARKAN KEBUTUHAN RUANG
(,01)
PELAKSANAAN PEMANCINGAN PONDASI TANKI 214 DI PERTAMINA UP-II DUMAI (,99) PKL
PENELITIAN TENTANG PENGARUH PENGGUNAAN TANAH KUNING KALIKETEK SEBAGAI
BAHAN CAMPURAN PADA TANAH GERAK TERHADAP KEPADATAN NILAI CBR VNTTEBAL
PERKERASAN JALAN (,97)
PERBANDINGAN PONDASI TIANG VERTIKAL DAN PONDASI TIANG MIRING U/ MELAWAN
GAYA HORISONTAL YANG TERJADI PADA KONSTRUKSI ABUTMENT JEMBATAN MRAHU
KABUPATEN MAGETAN (,04)
PERENCANAAN TIANG PANCANG DENGAN BEBAN EKSENTRIS PADA PONDASI
JEMBATAN SUNGAI KAHAYAM KALIMANTAN TENGAH (,00) ANALISIS STABILITAS LERENG
DENGAN MENGGUNAKAN SOIL NAIL PADA PROYEK PEMBANGUNAN JEMBATAN BESUK
KOBO’AN CANDIPURA-LUMAJANG (,01)
STUDI ANALISIS DAYA DUKUNG PONDASI-PONDASI RAKIT GRID BAJA DENGAN SEL-SEL
SEGI EMPAT PADA TANAH KONESIF HOMOGEN (,96)
STUDI ANALISIS SISTEM PRATEKAN STRUKTUR DINDING GESER PADA BANGUNAN
BERTINGKAT DENGAN METODE ELEMEN HINGGA (,00)
STUDI PENELITIAN MENGKAJI KEJADIAN GERUSAN PADA PILAR JEMBATAN DENGAN
MODEL FISIK TINJAUAN TERHADAP VARIASI BERAT JENIS SEDIMEN PADA POSISI
TENGAH (,98)

STUDI PENELITIAN PERBANDINGAN NILAI CBR HASIL STABILISASI TANAH LEMBEK
DICAMPUR TANAH AMPO LAMPAK DAN TANAH LEMBEK DICAMPUR TANAH KAPUR
DIKABUPATEN TUBAN (,97)
STUDI PENELITIAN PENGARUH WAKTU PEMERAMAN DENGAN PENAMBAHAN KAPUR
SEBAGAI BAHAN ADDITIVE PADA TANAH LEMPUNG EKSPANSIF TERHADAP NILAI CBR
TANAH (,02)
ANALISA PERHITUNGAN PENURUNAN DAN WAKTU KONSOLIDASI PADA TANAH DI
APRON BANDARA KUALANAMU SECARA ANALITIK DAN PROGRAM PLAXIS
STUDI PENELITIAN PENGARUH VARIASI PENAMBAHAN PROSENTASE DOSIS ASPAL
PERTAMINA (6070) TERHADAP STABILITAS LENTUR KONTROKSI PERKERASAN LENTUR
(,98)
STUDI PENELITIAN PENGARUH WAKTU PEMERAMAN CAMPURAN TANAH LEMPUNG
EKSPANSIF DENGAN PENAMBAHAN SERBUK BATU KARANG TERHADAP NILAI CBR
TANAH (,02)
STUDI PENINGKATAN DAYA DUKUNG TANAH LIAT DENGAN BERMACAM-MACAM KADAR
PASIR TERHADAP PENGARUH PEMADATAN (,97)
STUDI PERBANDINGAN ATTERBERG LIMIT HASIL STABILISASI TANAH LEMBEK
DICAMPUR TANAH PEDEL TERHADAP PERKERASAN JALAN (,97)
STUDI PERBANDINGAN DENGAN STRUKTUR TAHAN GEMPA BERDASARKAN BNI 1991
DAN ONIKORM BOILDING CODE 1994 (UM,97)
METODE PERBAIKAN TANAH DENGAN MEMPERCEPAT KONSOLIDASI MELALUI SISTEM
PREFABRICATED VERTICAL DRAIN PADA AREA PARKIR PENUMPUKAN PETI KEMAS DI
PELABUHAN TANJUNGA PERAK SURABAYA/2001
STUDI PENANGGULANGAN MASALAH KONSOLIDASI TANAH LEMPUNG PADA RUAS
JALAN KM. 65 - ASAM BARU DENGAN METODE PRELOADING KOMBINASI VERTIKAL
DRAIN
KONTROL PENURUNAN TANAH AKIBAT TIMBUNAN PADA TITIK DENGAN BORE LOG TEST
NO.BH II (AREA II) PROYEK BANDAR UDARA KUALA NAMU
ANALISIS RESPON SPEKTRUM PADA BANGUNAN YANG MENGGUNAKAN YIELDING
DAMPER AKIBATGAYAGEMPA
KUALITAS DAN KARAKTERISTIK GENTENG KERAMIK DENGAN CAMPURAN BAHAN
TANAH LIAT DARI DAERAH GODEAN YOGYAKARTA DENGAN TANAH LIAT DARI DAERAH
KEBUMEN JAWA TENGAH (,02)
PENGARUH GARAM DAPUR TERHADAP TANAM SEBAGAI BAHAN STABILISASI
BLIBERADE KONSTRUKSI JALAN RAYA (,98)
STABILITAS TANAH LEMPUNG MENGEMBANG DENGAN MEMAKON BETONITE (,98)

STUDI ALTERNATIF PERBANDINGAN PENGGUNAAN PONDASI TELAPAK KOMBINASI DAN
PONDASI SUMURAN PADA JEMBATAN LENGKUNG BESUK KOBO/AN CANDIPURA
LUMAJANG (,01)
STUDI ANALISA PENGARUH TANAH GAMBUT TERHADAP KONSOLIDASI TRIAL,
SUREHARGE EMBANKMENT PADA RUAS JALAN BARENG BENGKEL KM 3,5
PALANGKARAYA-PULAU PISAU (,01)
STUDI KASUS KELONGSORAN TEBING PADA BADAN JALAN JURUSAN KAWASAN WISATA
AIR PANAS CANGAR BATU (,00)
STUDI KASUS PENANGGULANGAN RUNTUHNYA DINDING PENAHAN TANAH PADA RUAS
JALAN RAYA BATU KANDANGAN (,00)
STUDI PENANGGULANGAN MASALAH KONSOLIDASI TANAH LEMPUNG PADA RUAS
JALAN KM 65 ASAM BARU DENGAN METODE PRELOUDING KOMBINASI VERTIKAL DRAIM
(,05)
STUDI PERBANDINGAN KAPASITAS TAHANAN KULIT TIANG PANCANG KELOMPOK
DENGAN METODE A, METODE B DAN METODE Z PADA JEMBATAN DIDAERAH NGAMBAR
KABUPATEN PONOROGO (,00)
PENGARUH VARIASI PEMADATAN TERHADAP NILAI STABILITAS MARSHALL PADA
LASBUTAG CAMPURAN PANAS
GEOGRID SEBAGAI TULANGAN PADA DINDING PENAHAN TANAH (STUDI LITERATUR)