18
document.xlsx Iqlal Suriansyah (08/24/2022) REKAP VOLUME BETON No Nama Struktur UNIT K 175 K 225 K 250 1 PLAT LANTAI PRA CETAK 170X100X7 1.00 2 TROTOAR BETON TUMBUK 2.00 11.40 3 TIANG SANDARAN 1.00 5.13 4 BALOK UTAMA 6.00 5 DIAFRAGMA 5.00 6 ABUTMEN 2.00 92.27 7 PLAT INJAK 2.00 8 PILAR 9 WING WALL 4.00 16.92 10 TEMBOK PENGARAH 4.00 12.00 11 SUMURAN 6.00 34.02 12 BORED PILE D50 L=4 10.00 13 STOPPER BLOCK 30 X 30 CM 6.00 1.26 14 PONDASI TPT 15 SLOOF TPT 16 KOLOM TPT 17 BALOK TPT TIANG PANCANG BETON D=50 L17.4 m 14.00 ELESTOMERIK 400X280X46 Bearing 46.02 16.53 110.45 REKAP TULANGAN Nama Struktur SATUAN TOT No JUMLAH POLOS ULIR POLOS 1 PLAT LANTAI dan TROTOAR 1 & 2 377.77 13063.17 377.77 2 TIANG SANDARAN 1 87.86 569.41 87.86 3 BALOK UTAMA 6 497.01 2444.56 2982.06 4 DIAFRAGMA 5 103.07 213.93 515.35 5 ABUTMENT DAN PLAT INJAK 2 50.77 8982.18 101.53 6 PILAR 7 WING WALL 4 159.61 511.43 638.42 8 TEMBOK PENGARAH 4 71.78 166.89 287.11 9 SUMURAN 6 475.87 719.64 10 TIANG PANCANG (ISI) 11 STOPPER BLOCK 30X30X1700 cm 6 61.97 371.79 12 PONDASI TPT 13 SLOOF TPT 14 KOLOM TPT 15 BALOK TPT TOTAL (Kg) 5361.89 TOTAL (m 3 )

description

Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

Transcript of Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

Page 1: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

Iqlal Suriansyah (04/17/2023)

REKAP VOLUME BETONNo Nama Struktur UNIT K 175 K 225 K 250 K 300 K 3501 PLAT LANTAI PRA CETAK 170X100X7 1.00 44.232 TROTOAR BETON TUMBUK 2.00 11.403 TIANG SANDARAN 1.00 5.134 BALOK UTAMA 6.00 81.465 DIAFRAGMA 5.00 10.206 ABUTMEN 2.00 92.277 PLAT INJAK 2.00 3.008 PILAR9 WING WALL 4.00 16.92

10 TEMBOK PENGARAH 4.00 12.0011 SUMURAN 6.00 34.0212 BORED PILE D50 L=4 10.0013 STOPPER BLOCK 30 X 30 CM 6.00 1.2614 PONDASI TPT15 SLOOF TPT16 KOLOM TPT17 BALOK TPT

TIANG PANCANG BETON D=50 L17.4 m 14.00ELESTOMERIK 400X280X46Bearing

46.02 16.53 110.45 0.00 138.89

REKAP TULANGAN

Nama StrukturSATUAN TOTAL

No JUMLAH POLOS ULIR POLOS ULIR1 PLAT LANTAI dan TROTOAR 1 & 2 377.77 13063.17 377.77 13063.172 TIANG SANDARAN 1 87.86 569.41 87.86 569.413 BALOK UTAMA 6 497.01 2444.56 2982.06 14667.374 DIAFRAGMA 5 103.07 213.93 515.35 1069.645 ABUTMENT DAN PLAT INJAK 2 50.77 8982.18 101.53 17964.366 PILAR7 WING WALL 4 159.61 511.43 638.42 2045.738 TEMBOK PENGARAH 4 71.78 166.89 287.11 667.549 SUMURAN 6 475.87 719.64

10 TIANG PANCANG (ISI)11 STOPPER BLOCK 30X30X1700 cm 6 61.97 371.79 0.0012 PONDASI TPT13 SLOOF TPT14 KOLOM TPT15 BALOK TPT

TOTAL (Kg) 5361.89 50047.22

TOTAL (m3)

E13
Iqlal: LIAT GAMBAR
E14
Iqlal: LIAT GAMBAR
Page 2: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

Iqlal Syah (04/17/2023)

PENULANGAN PLAT LANTAIDetail Gambar Panjang Besi Berat

(m) (m) Spasi (mm) ф n kg/m kgjlh

0.04 2 0.530 200 12 115 0.88781616 108.2250.04

0.45

1.4 jlh

20.55 1.95 400 16 58 1.578 357.020

0.22 jlh

2

0.55 0.55 1.32 200 12 115 0.888 269.541

jlh

21.48 200 16 115 1.578 537.267

1.48

1.55 jlh

10 3.5 400 16 58 1.578 3204.030

0.351.6

9.92 jlh

19.92 200 16 115 1.578 1800.570

9.74 9.74 200 16 115 1.578 1767.898

jlh

1 23.54 100 13 98 1.042 2403.697

23.04 23.54 jlh

1 23.04 100 13 98 1.042 2352.642

Total Tulangan Slab 12800.891Total Tulangan Slab + Faktor Kehilangan 5% 13440.935

Polos = 377.77 kg

Ulir = 13063.17 kg

Perhitungan Volume Beton Plat Lantai K-350l (m) b (m) h (m) jlh (unit) Vol (m³) Vol Total (m³)

22.80 9.70 0.20 1.00 44.23 44.23

Perhitungan Volume Beton Trotoar K-225l (m) b (m) h (m) jlh (unit) Vol (m³) Vol Total (m³)

22.80 1.00 0.25 2.00 5.70 11.40

F5
Iqlal Suriansyah: D14-20 (A3)
F11
Iqlal Suriansyah: D16-300 (B1)
F17
Iqlal Suriansyah: D14-200 (D1)
F22
Iqlal Suriansyah: D16-300 (A2)
F26
Iqlal Suriansyah: D13-100(H1-H10) CEK GAMBAR dari pak rudi pake 16-200
F31
Iqlal Suriansyah: D16-300(A1)
F33
Iqlal Suriansyah: D16-300 (C1)
F36
Iqlal Suriansyah: D13-100(C2)
F39
Iqlal Suriansyah: D13-100(A4)
Page 3: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

Iqlal Syah (04/17/2023)

PENULANGANTIANG SANDARANDetail Gambar Panjang Besi Berat

(m) (m) Spasi (mm) ф n kg/m kg0.22

jlh2.310 200 13 115 1.04 276.79

0.36 0.3 1

0.660.65

0.12jlh

22.80 122.8 200 13 11 1.04 261.32

jlh1

0.250.25 100 10 570 0.62 87.86

TOTAL TULANGAN 625.972TOTAL TULANGAN PELAT + Faktor Kehilangan 5% 657.271

Perhitungan Volume Beton Tiang Sandaran K-225l (m) b (m) h (m) jlh (unit) Vol (m³) Vol Total (m³)

22.80 0.25 0.90 1.00 5.13 5.13

Polos = 87.86 kg

Ulir = 569.41 kg

Page 4: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

Iqlal Suriansyah (2012)

PENULANGAN GELAGAR INDUKDetail Gambar Panjang Besi Berat

(m) (m) n ф kg/m kg

7.00 7.00

1.49 1.49 16.96 4 29.00 5.1851 351.834

10.5410.54 2 29.00 5.1851 109.272

10.54 2 29.00 5.1851 109.27210.54

3.37 1 29.00 5.1851 17.4903.37

2.72 1 29.00 5.1851 14.1122.72

2.72 1 29.00 5.1851 14.1122.72

8.41 2 29.00 5.1851 87.1818.41

10.42 4 29.00 5.1851 216.18310.42

10.42 6 29.00 5.1851 324.27510.42

3.37 2 29.00 5.1851 34.9803.37

12.12 2 29.00 5.1851 125.64512.12

10.54 7 29.00 5.1851 382.45310.54

7.13 14 29.00 5.1851 517.6757.13

1.04A 4.75 6 10.00 0.6165 17.559

0.65 B1.35 2.00

A B 3.78 12 10.00 0.6165 27.9880.75

0.32 0.32Tumpuan

5.18 52 10.00 0.6165 165.040

1.35 1.35Lapangan

0.31 0.31 5.18 90 10.00 0.6165 286.423

0.31 0.31

0.62

TOTAL TULANGAN 2801.495TOTAL TULANGAN + 5% Faktor Kehilangan 2941.570

F5
Iqlal Suriansyah: 2D25 B3
F8
Iqlal: 4D25 (B2)
F10
Iqlal Suriansyah: 1D25(B2)
F12
Iqlal Suriansyah: 1D25(B2)
F14
Iqlal Suriansyah: 1D25(B2)
F16
Iqlal Suriansyah: 1D25(B2)
F18
Iqlal Suriansyah: 1D25(B2)
F20
Iqlal Suriansyah: 1D25(B2)
F22
Iqlal Suriansyah: 1D25(B2)
F24
Iqlal Suriansyah: 1D25(B2)
F26
Iqlal Suriansyah: 1D25(B2)
F28
Iqlal Suriansyah: 1D25(B2)
F30
Iqlal Suriansyah: 1D25(B2)
F34
Iqlal Suriansyah: 2D25 B3
F37
Iqlal Suriansyah: 2D25 B3
Page 5: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

Iqlal Suriansyah (2012)

Perhitungan Volume Beton Balok Lantai K-350

l (m) b (m) h (m) jlh (unit) Vol (m³) Vol Total (m³)

22.80 0.70 1.45 6.00 13.58 81.46

Polos = 497.01 kgUlir = 2444.56 kg

Perhitungan Volume Balok Diafragma K-350l (m) b (m) h (m) jlh (unit) Vol (m³) Vol Total (m³)

8.50 0.30 0.80 5.00 2.04 10.20

Daftar Pembesian Diafragma Jembatan

Str Non ø L

(mm) (m) 10 12 25

1 3 25 8.60 25.82 4 12 8.60 34.43 3 25 8.60 25.8

4 58 10 2.04 117.64

Total Panjang (m) 117.64 34.40 51.60

Berat Perunit (kg/m) 0.617 0.888 3.853

Jumlah Berat (kg) 72.53 30.54 198.83

Total Berat (kg) 301.904

Total Berat (kg) + Faktor Kehilangan 5% 316.999

Polos 103.07 kgUlir 213.93 kg

Perhitungan Volume Beton Plat Lantai Pra Cetakl (m) b (m) h (m) jlh (unit) Vol (m³) Vol Total (m³)

13.60 0.07 1.00 6.00 0.95 5.71

Bentuk Tulangan

Page 6: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

Iqlal Suriansyah (04/17/2023)

Daftar Pembesian Abutment

Str No ø s LJLH BTG

Total Panjang (m)Bentuk Tulangan

(mm) (mm) (m) 10 13 16 19 22 251 16 - 150 5.05 71 358.322 19 - 150 4.16 71 295.033 16 - 200 0.65 53 34.524 19 - 150 4.67 71 ` 331.295 22 - 150 2.99 71 212.026 22 - 150 4.16 71 295.617 16 10.53 6 63.198 16 - 150 10.53 6 63.199 16 - 150 10.53 11 115.85

10 16 10.53 2 21.0611 16 - 150 10.53 22 231.7012 22 - 150 10.53 21 221.1713 16 - 150 10.53 21 221.1714 16 - 150 10.53 6 63.1915 16 - 450 2.98 24 71.6216 10 - 200 0.12 108 13.0517 10 - 200 0.32 216 69.2918 13 - 300 1.02 144 147.0019 13 - 450 0.92 168 154.5620 13 - 300 3.20 108 345.6021 16 - 150 3.76 71 267.06

Daftar Pembesian Plat Injak22 19 - 150 6.05 47 284.5123 19 - 150 5.25 47 246.7524 13 - 100 7.12 100 712.0025 13 - 400 0.22 156 34.32

Total Panjang (m) 82.34 1359.16 1510.88 1157.58 728.80 0.00

Berat Perunit (kg/m) 0.62 1.04 1.58 2.23 2.98 3.85Jumlah Berat (kg) 50.77 1416.17 2384.67 2576.42 2174.78 0.00Total Berat (kg) 8602.80

Total Berat (kg) + Faktor Kehilangan 5% 9032.94

Polos = 50.77 kg

Ulir = 8982.18 kg

Perhitungan Volume Beton Abutmen K250l (m) Luas (m²) Vol (m³) Jumlah Vol Total (m³)14.60 3.16 46.14 2 92.27

PerhitunganVolume Beton Plat Injak K350t (m) P L Luas (m²) Vol (m³) Jumlah Vol Total (m³)0.30 5.00 12.00 60.00 1.50 2 3.00

G10
Iqlal Suriansyah: lihat gambar jumlah bes
G12
Iqlal Suriansyah: u10/2 adalah sisi kanan
G13
Iqlal Suriansyah: lihat gambar jumlah bes
G14
Iqlal Suriansyah: x 2 karena sisi kiri dan kanan nilai formula X21 tu; bawah kolom
Page 7: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

Iqlal Suriansyah (2012)

Daftar Pembesian Wing wall

Str No ø s LJLH BTG

Total Panjang

(mm) (mm) (m) 19 12 16 b = 3 m1 16 - 200 3.08 3 9.24 l1 = 3 m2 16 - 200 5.94 3 17.83 l2 = 1.05 m3 16 - 300 3.61 2 7.22

3a 12 - 200 3.61 2 7.224 16 - 300 3.41 7 23.87

4a 12 - 200 3.41 10 34.105 16 - 200 6.13 11 67.40

5a 12 - 200 4.21 11 46.266 16 - 300 5.04 10 50.43

6a 12 - 200 3.52 14 49.317 16 - 300 3.15 10 31.53

7a 12 - 200 2.83 10 28.338 10 - 200 0.46 135 62.109 16 2.90 3 8.70

10 12 - 400 0.97 15 14.55Total Panjang (m) 62.100 179.773 216.216

Berat Perunit (kg/m) 2.226 0.888 1.578

Jumlah Berat (kg) 138.216 159.605 341.262Total Berat (kg) 639.083

Total Berat (kg) + 5% 671.037

Perhitungan Volume beton Wing wallt (m) JLH Vol Total (m³)0.40 10.58 4.00 16.92

polos 159.61 kgulir 511.43 kg

Luas (m²)

Page 8: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

Iqlal Suriansyah (2012)

T.PENGARAH 1.000 2.500 1.200 4.000 2.500 12.000

VOL. TOTAL (M3) 12.000

STA (M2) VOL (M1) BJ BERAT/M JUMLAH PANJANG JUMLAH BESI BERAT

(Kg) (UNIT) (M) ( Batang ) (Kg)

a b=a*a c d e=(b/c)*d f g h i=e*g

Dia 16 mm

0.016 0.0002 0.0002 8,750 1.758 1.700 3.0 8.968

Dia 13 mm

0.013 0.0001 0.0001 8,750 1.161 5.750 15.0 100.121

0.013 0.0001 0.0001 8,750 1.161 3.200 12.5 46.433

Dia 10 mm

0.010 0.0001 0.0001 8,750 0.687 3.200 28.8 63.193

0.010 0.0001 0.0001 8,750 0.687 2.500 5.0 8.586

Total Berat (Kg) 227.300

Total Berat (Kg) + 5% 238.665

polos 71.78 kgulir 166.89 kg

Page 9: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

Iqlal Suriansyah

Daftar Pembesian Sumuran

Str No ø s LJLH BTG

(mm) (mm) (m) 12 16 25 L = 4.0001 16 - 250 4.950 32 158.400 D1 = 2.5002 16 - 250 5.150 32 164.800 D2 = 1.9003 12 - 150 7.854 28 219.911 S = 0.34 12 - 150 5.969 28 167.133 7.8545 12 - 250 0.38 392 148.960 5.9696 25 - 250 2.2 18 39.600

Total Panjang (m) 536.004 323.200 39.600Berat Perunit (kg/m) 0.888 1.578 3.853Jumlah Berat (kg) 475.872 510.118 152.593Total Berat (kg) 1138.583Total Berat (kg) + Faktor Kehilangan 5% 1195.513

polos 475.87 kgulir 719.64 kg

Perhitungan Volume Beton Dinding Sumuran K250l (m) Luas (m2) JLH Vol (m³) Vol Total (m³)4.00 2.07 6.00 8.29 49.763

Perhitungan Volume Beton Isi Sumuran K250

l (m) Luas (m2) JLH Vol (m³) Vol Total (m³)2.00 2.84 6.00 5.67 34.023

Total K250 = 83.786 m3

Perhitungan Volume beton Sumuran K175l (m) Luas (m2) JLH Vol (m³) Vol Total (m³)2.00 2.84 6.00 5.67 34.023

Πd1 =Πd2 =

L3
Iqlal Suriansyah: liat detail sumuran
L5
Iqlal Suriansyah: 0.3 TEBAL PLAT ISIAN
Page 10: Jembatan Alue Bitak b. Konvensional b=10 m Plebaran

document.xlsx

ANALISA TEKNIS BETON BERTULANG ( BESI + BEKISTING )

No. Uraian Beton

Beton Bertulang Besi Beton Begisting

DimensiAxis

Potonganx Pakai

Perancah

Panjang Lebar Tinggi Panjang Jumlah

1.2 Pondasi Foot Plat 0.750 0.750 0.500 0.2813 X atas 12 0.888 0.790 4 2.8053 3.000 0.500 1.5000 76.3009 1.7778 3 - - X bwh 12 0.888 1.630 4 5.7882 - - - - Y atas 12 0.888 0.790 2 1.4027 - - - - Y bwh 12 0.888 1.630 2 2.8941 - - - - Sabuk 10 0.617 2.780 5 8.5694 - - - 0.2813 21.4596 1.5000

a Sloof 1.000 0.200 0.300 0.0600 Pokok 12 0.888 1.000 4 3.5510 1.000 0.600 0.6000 59.1840 3.3333 3 - Extra - 1.000 - Sabuk - 1.000 -

Beugel 10 0.617 0.900 6.67 3.6990 0.0600 7.2500 0.6000 61.6500

b Kolom 1.000 0.250 0.300 0.0750 Pokok 12 0.888 1.000 4 3.5510 1.000 1.100 1.1000 47.3472 4.8889 3 - Extra 0 - 1.000 0 - Sabuk - 0.380 -

Beugel 10 0.617 0.960 6.666667 3.9456 0.0750 7.4966 1.1000 52.6080

c Balok 1.000 0.200 0.250 0.0500 Pokok 12 0.888 1.000 4 3.5510 1.000 0.700 0.7000 71.0208 4.6667 3 - Extra 0 - 1.000 0 - Sabuk - 1.000 -

Beugel 10 0.617 0.760 6.666667 3.1236 0.0500 6.6746 0.7000 62.4720

c Balok 1.000 0.300 0.300 0.0900 Pokok 12 0.888 1.000 5 4.4388 1.000 0.900 0.9000 49.3200 3.3333 3 - Extra 0 - 1.000 0 - Sabuk - 1.000 -

Beugel 10 0.617 1.060 6.666667 4.3566 0.0900 8.7954 0.9000 48.4067

Pondasi TPT pada oprit

Ukuran Tinggi Jumlah Sisi Volume beton besi 1/m3 total besi

0.75 0.75 0.50 15.20 2.00 8.55 76.30 652.37

Sloof TPT pada opritUkuran Tinggi Panjang Sisi Volume beton besi 1/m3 total besi

0.20 0.30 71.00 2.00 8.52 120.83 1029.51

Kolom TPT pada oprit

Ukuran Tinggi Jumlah Sisi Volume beton besi 1/m3 total besi

0.25 0.30 1.63 15.20 2.00 3.71 99.96 370.33

Balok TPT pada oprit

Ukuran Tinggi Panjang Sisi Volume beton besi 1/m3 total besi

0.20 0.25 71.00 2.00 7.10 133.49 947.80

Stop Block

Ukuran Tinggi Panjang Sisi Volume beton besi 1/m3 total besi

0.30 0.30 6.98 2.00 1.26 49.32 61.97 panjan 1 stopblock 1.10.30 0.60 6.60 2.00 2.380.30 0.30 1.20 2.00 0.22

Note : sepanjang balok gelagar di dua tumpuan

Volume / 1 m3 Beton

Volume m3 Ø Besi mm Berat Kg/m1 Jml. Berat

KgPanjang

m1Lebar

m1Luas

m2Pembesian

KgBegisting

M2M2