I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00...

44
1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA Paket : 1 (SATU) Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN KEL. PELALAWAN KEC. PELALAWAN Kualifikasi : USAHA KECIL Nilai HPS : 261,546,951.01 Rp 80 % X HPS : 209,237,560.81 Rp No. HARGA PENAWARAN TERKOREKSI PERSENTASE TERHADAP HPS (%) BESARNYA NILAI JAMINAN PELAKSANAAN URUTAN BERDASARKAN PERINGKAT KETERANGAN 1 3 4 5 6 7 1 CV. HARAPAN JAYA 202,968,834.83 77.60 13,077,347.55 Rp I (Satu) 2 CV. DELLA BERSAUDARA 203,231,250.22 77.70 13,077,347.55 Rp II (Dua) 3 CV. SATYA MITRA PERKASA 209,222,372.35 79.99 13,077,347.55 Rp III (Tiga) 4 CV. PELALAWAN PERKASA 209,241,803.03 80.00 10,462,090.15 Rp IV (Empat) 5 CV. HARAPAN KERINCI 210,595,482.35 80.52 10,529,774.12 Rp V ( Iima ) 6 CV. SAJADAH PUSAKA 212,212,632.50 81.14 10,610,631.63 Rp VI (Enam) 7 CV. ANUGRAH MANDIRI 215,994,687.15 82.58 10,799,734.36 Rp VII (Tujuh) 8 CV. RADIAN FITRI 220,220,750.10 84.20 11,011,037.51 Rp VIII (Delapan) 9 CV. TUAKAL 222,222,374.00 84.96 11,111,118.70 Rp IX (Sembilan) 10 CV. JAYA PERKASA 248,345,448.43 94.95 12,417,272.42 Rp X (Sepuluh) 11 CV. MUTIARA AZMI PRATAMA 260,294,829.53 99.52 13,014,741.48 Rp XI (Sebelas) 1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA Paket : 2 (DUA) Pekerjaan : SEMENISASI JALAN LINGKUNGAN DESA PULAU MUDA KEC. TELUK MERANTI Kualifikasi : USAHA KECIL Nilai HPS : 724,965,494.88 Rp 80 % X HPS : 579,972,395.90 Rp No. HARGA PENAWARAN TERKOREKSI PERSENTASE TERHADAP HPS (%) BESARNYA NILAI JAMINAN PELAKSANAAN URUTAN BERDASARKAN PERINGKAT KETERANGAN 1 3 4 5 6 7 1 CV. MUSTAQIM 648,630,731.13 89.47 32,431,536.56 Rp I (Satu) Tidak Mendaftar 2 CV. SOVI INDAH LESTARI 687,226,423.89 94.79 34,361,321.19 Rp II (Dua) 3 CV. BONO SAKTI 695,378,427.13 95.92 34,768,921.36 Rp III (Tiga) 4 CV. ARITA MAJU 714,115,255.13 98.50 35,705,762.76 Rp IV (Empat) 5 CV. HAZRA 719,921,561.35 99.30 35,996,078.07 Rp V ( Iima ) PERUSAHAAN 2 I. EVALUASI DOKUMEN PENAWARAN PERUSAHAAN 2 I. EVALUASI DOKUMEN PENAWARAN

Transcript of I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00...

Page 1: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 1 (SATU)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN KEL. PELALAWAN KEC. PELALAWAN

Kualifikasi : USAHA KECIL

Nilai HPS : 261,546,951.01Rp

80 % X HPS : 209,237,560.81Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. HARAPAN JAYA 202,968,834.83 77.60 13,077,347.55Rp I (Satu)

2 CV. DELLA BERSAUDARA 203,231,250.22 77.70 13,077,347.55Rp II (Dua)

3 CV. SATYA MITRA PERKASA 209,222,372.35 79.99 13,077,347.55Rp III (Tiga)

4 CV. PELALAWAN PERKASA 209,241,803.03 80.00 10,462,090.15Rp IV (Empat)

5 CV. HARAPAN KERINCI 210,595,482.35 80.52 10,529,774.12Rp V ( Iima )

6 CV. SAJADAH PUSAKA 212,212,632.50 81.14 10,610,631.63Rp VI (Enam)

7 CV. ANUGRAH MANDIRI 215,994,687.15 82.58 10,799,734.36Rp VII (Tujuh)

8 CV. RADIAN FITRI 220,220,750.10 84.20 11,011,037.51Rp VIII (Delapan)

9 CV. TUAKAL 222,222,374.00 84.96 11,111,118.70Rp IX (Sembilan)

10 CV. JAYA PERKASA 248,345,448.43 94.95 12,417,272.42Rp X (Sepuluh)

11 CV. MUTIARA AZMI PRATAMA 260,294,829.53 99.52 13,014,741.48Rp XI (Sebelas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 2 (DUA)

Pekerjaan : SEMENISASI JALAN LINGKUNGAN DESA PULAU MUDA KEC. TELUK MERANTI

Kualifikasi : USAHA KECIL

Nilai HPS : 724,965,494.88Rp

80 % X HPS : 579,972,395.90Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. MUSTAQIM 648,630,731.13 89.47 32,431,536.56Rp I (Satu) Tidak Mendaftar

2 CV. SOVI INDAH LESTARI 687,226,423.89 94.79 34,361,321.19Rp II (Dua)

3 CV. BONO SAKTI 695,378,427.13 95.92 34,768,921.36Rp III (Tiga)

4 CV. ARITA MAJU 714,115,255.13 98.50 35,705,762.76Rp IV (Empat)

5 CV. HAZRA 719,921,561.35 99.30 35,996,078.07Rp V ( Iima )

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

Page 2: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 3 (TIGA)

Pekerjaan : SEMENISASI JALAN POROS DESA TELUK KEC. KUALA KAMPAR

Kualifikasi : USAHA KECIL

Nilai HPS : 543,364,073.05Rp

80 % X HPS : 434,691,258.44Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARITA MAJU 423,749,133.95 77.99 27,168,203.65Rp I (Satu)

2 CV. RADITYA KARYA 427,897,347.30 78.75 27,168,203.65Rp II (Dua)

3 CV. TEGAR BERMANA 434,147,440.40 79.90 27,168,203.65Rp III (Tiga)

4 CV. PURI RAYA EKATAMA 434,705,282.56 80.00 21,735,264.13Rp IV (Empat)

5 CV. MEGA PRIMA 435,234,746.90 80.10 21,761,737.35Rp V (Lima)

6 CV. FAHRUL SIDIK 435,500,260.47 80.15 21,775,013.02Rp VI (Enam)

7 CV. SUCI KARYA ABADI 435,772,872.76 80.20 21,788,643.64Rp VII (Tujuh)

8 CV. TIRTA EMBUN PAGI 445,558,408.74 82.00 22,277,920.44Rp VIII (Delapan)

9 CV. RINDANG BENUA 445,583,955.07 82.00 22,279,197.75Rp IX (Sembilan)

10 CV. DANNI PUTRA PERKASA 448,213,892.11 82.49 22,410,694.61Rp X (Sepuluh)

11 CV. ENAM BERSAUDARA 450,005,096.42 82.82 22,500,254.82Rp XI (Sebelas)

12 CV. TASIK SERAI RACHMAT 453,095,375.81 83.39 22,654,768.79Rp XII (Dua Belas)

13 CV. ASTAKONA 458,821,047.94 84.44 22,941,052.40Rp XIII (Tiga Belas)

14 CV. ANDI BERSAUDARA 459,700,113.95 84.60 22,985,005.70Rp XIV (Empat Belas)

15 CV. WAHYU MANDIRI SEJAHTERA 460,671,787.34 84.78 23,033,589.37Rp XV (Lima Belas)

16 CV. FIONA 461,030,947.94 84.85 23,051,547.40Rp XVI (Enam Belas)

17 CV. HAZRA 461,787,499.71 84.99 23,089,374.99Rp XVII (Tujuh Belas)

18 CV. TUAH PERKASA 478,073,768.54 87.98 23,903,688.43Rp XVIII (Delapan Belas)

19 CV. NORIKA 483,563,454.44 88.99 24,178,172.72Rp XIX (Sembilan Belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 4 (EMPAT)

Pekerjaan : PEKERJAAN TURAP PENGAMAN JALAN LINGKUNGAN KEL. PELALAWAN KEC. PELALAWAN

Kualifikasi : USAHA KECIL

Nilai HPS : 323,171,483.36Rp

80 % X HPS : 258,537,186.69Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARFAH 234,299,597.42 72.50 16,158,574.17Rp I (Satu)

2 CV. TUAKAL 259,259,259.11 80.22 12,962,962.96Rp II (Dua)

3 CV. ASTAKONA 264,967,332.85 81.99 13,248,366.64Rp III (Tiga)

4 CV. MUTIARA AZMI PRATAMA 268,524,679.45 83.09 13,426,233.97Rp IV (Empat)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 3: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 5 (LIMA)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN DESA SEI. EMAS

Kualifikasi : USAHA KECIL

Nilai HPS : 724,735,249.17Rp

80 % X HPS : 579,788,199.34Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARCH BUILDING CONSTRUCTION 540,615,385.64 74.59 36,236,762.46Rp I (Satu)

2 CV. SUCI KARYA ABADI 545,092,224.59 75.21 36,236,762.46Rp II (Dua)

3 CV. RADITYA KARYA 551,104,609.78 76.04 36,236,762.46Rp III (Tiga)

4 CV. SURYA MAULANA 567,169,701.62 78.26 36,236,762.46Rp IV (Empat)

5 CV. CAHAYA HATI 571,126,797.89 78.80 36,236,762.46Rp V (Lima)

6 CV. WAHYU MANDIRI SEJAHTERA 573,145,354.28 79.08 36,236,762.46Rp VI (Enam)

7 CV. ANIZAR 579,526,925.32 79.96 36,236,762.46Rp VII (Tujuh)

8 CV. MAHKOTA KERINCI 579,791,930.03 80.00 28,989,596.50Rp VIII (Delapan)

9 CV. JAYA BERSAMA PRATAMA 582,276,984.81 80.34 29,113,849.24Rp IX (Sembilan)

10 CV. KEMBAR JAYA UTAMA 610,714,299.16 84.27 30,535,714.96Rp X (Sepuluh)

11 CV. ASTAKONA 611,814,299.16 84.42 30,590,714.96Rp XI (Sebelas)

12 CV. FIONA 614,212,214.33 84.75 30,710,610.72Rp XII (Dua Belas)

13 CV. KASIA JAYA PRATAMA 619,372,684.38 85.46 30,968,634.22Rp XIII (Tiga Belas)

14 CV. TIARA INDAH 625,032,968.65 86.24 31,251,648.43Rp XIV (Empat Belas)

15 CV. NATASHIA 634,025,150.53 87.48 31,701,257.53Rp XV (Lima Belas)

16 CV. NUGRAHA CHANDRA MURNI - 0.00 -Rp XVI (Enam Belas) RAB SALAH

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 4: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 6 (ENAM)

Pekerjaan : PEMBANGUNAN JALAN PELATARAN DESA LABUHAN BILIK

Kualifikasi : USAHA KECIL

Nilai HPS : 1,124,801,037.35Rp

80 % X HPS : 899,840,829.88Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. RIAU ANDALAN SEJAHTERA 861,886,893.07 76.63 56,240,051.87Rp I (Satu)

2 CV. LIA KONTRAKTOR 877,299,879.44 78.00 56,240,051.87Rp II (Dua)

3 CV. HAZRA 888,611,109.91 79.00 56,240,051.87Rp III (Tiga)

4 CV. MAHKOTA KERINCI 899,841,664.85 80.00 44,992,083.24Rp IV (Empat)

5 CV. FIONA 899,947,240.73 80.01 44,997,362.04Rp V (Lima)

6 CV. GITO LESTARI 911,088,331.52 81.00 45,554,416.58Rp VI (Enam)

7 CV. PURI RAYA EKATAMA 922,314,163.79 82.00 46,115,708.19Rp VII (Tujuh)

8 CV. DANNI PUTRA PERKASA 922,334,417.33 82.00 46,116,720.87Rp VIII (Delapan)

9 CV. RINDANG BENUA 927,916,976.50 82.50 46,395,848.83Rp IX (Sembilan)

10 CV. ENAM BERSAUDARA 939,102,205.50 83.49 46,955,110.28Rp X (Sepuluh)

11 CV. TASIK SERAI RACHMAT 945,035,164.36 84.02 47,251,758.22Rp XI (Sebelas)

12 CV. ARITA MAJU 956,075,505.51 85.00 47,803,775.28Rp XII (Dua Belas)

13 CV. ILHAMSYAH 956,079,995.12 85.00 47,803,999.76Rp XIII (Tiga Belas)

14 CV. CHIKA CITRA BUNDA 958,996,869.10 85.26 47,949,843.46Rp XIV (Empat Belas)

15 CV. MELATI PUTIH 961,180,560.38 85.45 48,059,028.02Rp XV (Lima Belas)

16 CV. SERBA GUNA 978,053,162.51 86.95 48,902,658.13Rp XVI (Enam Belas)

17 CV. TIRTA EMBUN PAGI 1,012,314,860.66 90.00 50,615,743.03Rp XVII (Tujuh Belas)

18 CV. BONO SAKTI 1,014,519,230.07 90.20 50,725,961.50Rp XVIII (Delapan Belas)

19 CV. JAYA PERKASA 1,015,597,704.54 90.29 50,779,885.23Rp XIX (Sembilan Belas)

20 CV. GINSAR 1,021,351,384.28 90.80 51,067,569.21Rp XX (Dua Puluh)

21 CV. TUAKAL 1,021,351,384.28 90.80 51,067,569.21Rp XXI (Dua Puluh Satu)

22 CV. MUTIARA AZMI PRATAMA 1,029,341,767.86 91.51 51,467,088.39Rp XXII (Dua Puluh Dua)

23 CV. SURYA MAULANA 1,032,724,314.50 91.81 51,636,215.72Rp XXIII (Dua Puluh Tiga)

24 CV. WAHYU MANDIRI SEJAHTERA 1,097,266,801.40 97.55 54,863,340.07Rp XXIV (Dua Puluh Empat)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 7 (TUJUH)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DESA GAMBUT MUTIARA

Kualifikasi : USAHA KECIL

Nilai HPS : 724,408,100.74Rp

80 % X HPS : 579,526,480.59Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. BONO SAKTI 579,279,595.70 79.97 36,220,405.04Rp I (Satu)

2 CV. HAZRA 579,531,566.21 80.00 28,976,578.31Rp II (Dua)

3 CV. MAHKOTA KERINCI 586,775,446.80 81.00 29,338,772.34Rp III (Tiga)

4 CV. TIRTA EMBUN PAGI 586,775,746.43 81.00 29,338,787.32Rp IV (Empat)

5 CV. ARITA MAJU 594,019,929.08 82.00 29,700,996.45Rp V (Lima)

6 CV. WAHYU MANDIRI SEJAHTERA 594,582,758.68 82.08 29,729,137.93Rp VI (Enam)

7 CV. SOVI INDAH LESTARI 597,262,814.69 82.45 29,863,140.73Rp VII (Tujuh)

8 CV. KASIA JAYA PRATAMA 605,487,299.92 83.58 30,274,365.00Rp VIII (Delapan)

9 CV. LIA KONTRAKTOR 615,752,388.15 85.00 30,787,619.41Rp IX (Sembilan)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 5: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 8 (DELAPAN)

Pekerjaan : RENOVASI DERMAGA / TAMBATAN PERAHU KAWASAN MAKAM DEKAT KEC. PELALAWAN

Kualifikasi : USAHA KECIL

Nilai HPS : 174,871,124.52Rp

80 % X HPS : 139,896,899.62Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. AISYAH KERINCI 139,784,171.85 79.94 8,743,556.23Rp I (Satu)

2 CV. HARAPAN JAYA 139,900,048.15 80.00 6,995,002.41Rp II (Dua)

3 CV. TUAKAL 143,679,648.81 82.16 7,183,982.44Rp III (Tiga)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 6: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 9 (SEMBILAN)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN DESA SUNGAI ARA T = 17.5 CM KEC. PELALAWAN

Kualifikasi : USAHA KECIL

Nilai HPS : 725,753,420.86Rp

80 % X HPS : 580,602,736.69Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. PELALAWAN INDAH LESTARI 544,642,586.22 75.05 36,287,671.04Rp I (Satu)

2 CV. TEKAD MANDIRI 552,651,436.15 76.15 36,287,671.04Rp II (Dua)

3 CV. MUDA MANDIRI SAKTI 553,894,013.43 76.32 36,287,671.04Rp III (Tiga)

4 CV. SURYA MAULANA 557,341,637.07 76.79 36,287,671.04Rp IV (Empat)

5 CV. CAHAYA HATI 560,947,036.63 77.29 36,287,671.04Rp V (Lima)

6 CV. KEMUNING RIAU 564,302,279.26 77.75 36,287,671.04Rp VI (Enam)

7 CV. PUTRA LESUNG PERDANA 566,076,912.80 78.00 36,287,671.04Rp VII (Tujuh)

8 CV. JHONI BERSAUDARA 566,536,255.40 78.06 36,287,671.04Rp VIII (Delapan)

9 CV. CAHAYA PRIMA TRUSS 574,947,755.43 79.22 36,287,671.04Rp IX (Sembilan)

10 CV. KARI UTAMA MANDIRI 579,604,862.04 79.86 36,287,671.04Rp X (Sepuluh)

11 CV. ANUGRAH MANDIRI 580,409,058.64 79.97 36,287,671.04Rp XI (Sebelas)

12 CV. TUAKAL 580,625,304.17 80.00 29,031,265.21Rp XII (Dua Belas)

13 CV. HARAPAN KERINCI 580,769,966.31 80.02 29,038,498.32Rp XIII (Tiga Belas)

14 CV. JAYA PERKASA 580,810,351.67 80.03 29,040,517.58Rp XIV (Empat Belas)

15 CV. MUTIARA AZMI PRATAMA 580,811,856.85 80.03 29,040,592.84Rp XV (Lima Belas)

16 CV. TANAGAN PUTIH 582,423,224.41 80.25 29,121,161.22Rp XVI (Enam Belas)

17 CV. KOLY PRIMA ABADI 586,429,511.17 80.80 29,321,475.56Rp XVII (Tujuh Belas)

18 CV. BAHTERA ZAMRUD SEJAHTERA 587,470,048.15 80.95 29,373,502.41Rp XVIII (Delapan Belas)

19 CV. CAHAYA PERDANA 589,408,010.80 81.21 29,470,400.54Rp XIX (Sembilan Belas)

20 CV. RIAU BARU 590,489,461.83 81.36 29,524,473.09Rp XX (Dua Puluh)

21 CV. NUGRAHA CHANDRA MURNI 591,545,459.80 81.51 29,577,272.99Rp XXI (Dua Puluh Satu)

22 CV. FATMA DELA 593,730,011.58 81.81 29,686,500.58Rp XXII (Dua Puluh Dua)

23 CV. RAJAWALI KITA CEMERLANG 595,014,236.38 81.99 29,750,711.82Rp XXIII (Dua Puluh Tiga)

24 CV. TIRTA EMBUN PAGI 595,062,933.12 81.99 29,753,146.66Rp XXIV (Dua Puluh Empat)

25 CV. BERIKAN DAKU RIDHO-MU 596,713,005.89 82.22 29,835,650.29Rp XXV (Dua Puluh Lima)

26 CV. TUAH PERKASA 598,729,109.98 82.50 29,936,455.50Rp XXVI (Dua Puluh Enam)

27 CV. KRIDARIA ANUGRAH 600,551,439.13 82.75 30,027,571.96Rp XXVII (Dua Puluh Tujuh)

28 CV. DAGANG PENYALUR RIAU 605,874,885.32 83.48 30,293,744.27Rp XXVIII (Dua Puluh Delapan)

29 CV. AULIA BROTHERS 617,461,740.60 85.08 30,873,087.03Rp XXIX (Dua Puluh Sembilan)

30 CV. WAHYU MANDIRI SEJAHTERA 631,959,295.59 87.08 31,597,964.78Rp XXX (Tiga Puluh)

31 CV. SHERLY ARLYAN SHELLA 714,668,168.13 98.47 35,733,408.41Rp XXXI (Tiga Puluh Satu)

32 CV. HELSIS RENATA PUTRI 715,595,749.33 98.60 35,779,787.47Rp XXXII (Tiga Puluh Dua)

33 CV. ALFYAN S KONTRAKTOR 715,771,715.69 98.62 35,788,585.78Rp XXXIII (Tiga Puluh Tiga)

34 CV. WAHYUDA KONTRAKTOR 717,362,022.92 98.84 35,868,101.15Rp XXXIV (Tiga Puluh Empat)

35 CV. GIAN PUTRA MANDIRI 718,025,814.67 98.94 35,901,290.73Rp XXXV (Tiga Puluh Lima)

36 CV. JIHAN VIRDI - 0.00 -Rp XXXVI (Tiga Puluh Enam)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 7: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 10 (SEPULUH)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN KAWASAN PESANTREN MANBAUL MA'ARIF

Kualifikasi : USAHA KECIL

Nilai HPS : 826,313,356.67Rp

80 % X HPS : 661,050,685.34Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ADE SALMIAH 626,358,722.05 75.80 41,315,667.83Rp I (Satu)

2 CV. PULAU BARU 652,858,772.01 79.01 41,315,667.83Rp II (Dua)

3 CV. REZKI PERDANA MANDIRI 661,108,743.47 80.01 33,055,437.17Rp III (Tiga)

4 CV. ABDI JAYA 680,470,740.74 82.35 34,023,537.04Rp IV (Empat)

5 CV. RIAU PRIMA INDAH LESTARI 707,777,395.00 85.65 35,388,869.75Rp V (Lima)

6 CV. ADI CIPTA NUGRAHA 749,149,954.01 90.66 37,457,497.70Rp VI (Enam)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 8: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 11 (SEBELAS)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN DESA SERING T = 17,5 CM KEC. PELALAWAN

Kualifikasi : USAHA KECIL

Nilai HPS : 736,893,507.66Rp

80 % X HPS : 589,514,806.13Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. BUMI PELALAWAN MAKMUR 549,194,411.87 74.53 36,844,675.38Rp I (Satu)

2 CV. TRIA DELTA PUTRA TUNGGAL 553,157,364.21 75.07 36,844,675.38Rp II (Dua)

3 CV. PELALAWAN INDAH LESTARI 559,859,575.43 75.98 36,844,675.38Rp III (Tiga)

4 CV. KICIDAN MANDIRI 563,974,418.05 76.53 36,844,675.38Rp IV (Empat)

5 CV. KRIDARIA ANUGRAH 564,262,957.08 76.57 36,844,675.38Rp V (Lima)

6 CV. CAHAYA HATI 566,047,704.18 76.82 36,844,675.38Rp VI (Enam)

7 CV. MUDA MANDIRI SAKTI 566,481,435.42 76.87 36,844,675.38Rp VII (Tujuh)

8 CV. NUSANTARA KERINCI 566,968,024.42 76.94 36,844,675.38Rp VIII (Delapan)

9 CV. SAKURA JAYA 566,990,217.92 76.94 36,844,675.38Rp IX (Sembilan)

10 CV. HARAPAN KERINCI 569,885,817.30 77.34 36,844,675.38Rp X (Sepuluh)

11 CV. RISNAURI 574,627,969.18 77.98 36,844,675.38Rp XI (Sebelas)

12 CV. MITRA SEJATI 575,838,802.46 78.14 36,844,675.38Rp XII (Dua Belas)

13 CV. KERINCI JAYA 581,944,571.98 78.97 36,844,675.38Rp XIII (Tiga Belas)

14 CV. KEMUNING RIAU 582,401,397.73 79.03 36,844,675.38Rp XIV (Empat Belas)

15 CV. ANDRY MULTI KARYA 586,845,438.12 79.64 36,844,675.38Rp XV (Lima Belas)

16 CV. WAHYU MANDIRI SEJAHTERA 588,073,270.57 79.80 36,844,675.38Rp XVI (Enam Belas)

17 CV. PELALAWAN INDAH PRATAMA 589,258,477.96 79.97 36,844,675.38Rp XVII (Tujuh Belas)

18 CV. PULAU SENANG SAKTI 589,379,807.82 79.98 36,844,675.38Rp XVIII (Delapan Belas)

19 CV. TUAKAL 589,516,715.14 80.00 29,475,835.76Rp XIX (Sembilan Belas)

20 CV. JAYA PERKASA 589,517,815.14 80.00 29,475,890.76Rp XX (Dua Puluh)

21 CV. PELALAWAN PERKASA 589,538,123.98 80.00 29,476,906.20Rp XXI (Dua Puluh Satu)

22 CV. MUTIARA AZMI PRATAMA 589,555,556.14 80.01 29,477,777.81Rp XXII (Dua Puluh Dua)

23 CV. KOLY PRIMA ABADI 589,762,741.20 80.03 29,488,137.06Rp XXIII (Dua Puluh Tiga)

24 CV. FAHRUL SIDIK 594,500,704.71 80.68 29,725,035.24Rp XXIV (Dua Puluh Empat)

25 CV. TANAGAN PUTIH 600,570,608.41 81.50 30,028,530.42Rp XXV (Dua Puluh Lima)

26 CV. RIAU ANDALAN SEJAHTERA 616,436,591.21 83.65 30,821,829.56Rp XXVI (Dua Puluh Enam)

27 CV. ANDI BERSAUDARA 618,485,617.64 83.93 30,924,280.88Rp XXVII (Dua Puluh Tujuh)

28 CV. CAHAYA PRIMA TRUSS 625,607,581.58 84.90 31,280,379.08Rp XXVIII (Dua Puluh Delapan)

29 CV. JHONI BERSAUDARA 692,674,340.18 94.00 34,633,717.01Rp XXIX (Dua Puluh Sembilan)

30 CV. DATUK ENGKU RAJO LELO PUTRA 700,082,573.47 95.00 35,004,128.67Rp XXX (Tiga Puluh)

31 CV. ARIS KONTRAKTOR 707,406,592.81 96.00 35,370,329.64Rp XXXI (Tiga Puluh Satu)

32 CV. JURAGAN MUDA 711,146,165.60 96.51 35,557,308.28Rp XXXII (Tiga Puluh Dua)

33 CV. RIZKI TEHNIK 714,769,558.75 97.00 35,738,477.94Rp XXXIII (Tiga Puluh Tiga)

34 CV. ANIZAR 722,157,770.97 98.00 36,107,888.55Rp XXXIV (Tiga Puluh Empat)

35 CV. UTAMA JAYA KONTRAKTOR 729,539,064.97 99.00 36,476,953.25Rp XXXV (Tiga Puluh Lima)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 9: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 12 (DUA BELAS)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN DESA SEGAMAI T = 17.5 CM KEC. TELUK MERANTI

Kualifikasi : USAHA KECIL

Nilai HPS : 152,685,517.89Rp

80 % X HPS : 122,148,414.31Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. RADITYA KARYA 124,720,057.65 81.68 6,236,002.88Rp I (Satu)

2 CV. USAHA MAJU SETIA 126,362,906.19 82.76 6,318,145.31Rp II (Dua)

3 CV. MITRA SEJATI 141,205,871.30 92.48 7,060,293.57Rp III (Tiga)

4 CV. ABDI JAYA 144,001,818.17 94.31 7,200,090.91Rp IV (Empat)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 13 (TIGA BELAS)

Pekerjaan : PEMBANGUNAN SEMENISASI JALANKAMPUNG LALANG DESA TJG. SUM T=17.5 cm , I=1 m , KEC. KUALA KAMPAR

Kualifikasi : KECIL

Nilai HPS : 116,654,798.91Rp

80 % X HPS : 93,323,839.13Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TIARA INDAH 102,924,226.84Rp 88.23 5,146,211.34Rp I

2 CV. KASIA JAYA PRATAMA 104,091,446.08Rp 89.23 5,204,572.30Rp II

3 CV. NATASHIA 106,036,811.48Rp 90.90 5,301,840.57Rp III

4 CV. KICIDAN MANDIRI Beda Paket

5 CV. DEWI CITRA MANDIRI Beda Paket

6 CV. MUDA MANDIRI SAKTI Beda Paket

7 CV. KURNIA BARU Beda Paket

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 10: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 14 (EMPAT BELAS)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN KEL. PKL. BUNUT T = 15 CM KEC. BUNUT

Kualifikasi : USAHA KECIL

Nilai HPS : 311,819,000.00Rp

80 % X HPS : 249,455,200.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. BUMI PELALAWAN MAKMUR 232,537,921.45 74.57 15,590,950.00Rp I (Satu)

2 CV. CAHYA PERDANA 247,479,924.80 79.37 15,590,950.00Rp II (Dua)

3 CV. KARYA PRATAMA SEJAHTERA 249,761,539.60 80.10 12,488,076.98Rp III (Tiga)

4 CV. BAHTERA ZAMRUD SEJAHTERA 262,250,638.30 84.10 13,112,531.91Rp IV (Empat)

5 CV. JIHAN VIRDI 262,923,656.01 84.32 13,146,182.80Rp V (Lima)

6 CV. BULAN PURNAMA 263,821,092.27 84.61 13,191,054.61Rp VI (Enam)

7 CV. PELALAWAN INDAH LESTARI 265,626,036.33 85.19 13,281,301.82Rp VII (Tujuh)

8 CV. HARAPAN KERINCI 271,679,106.50 87.13 13,583,955.32Rp VIII (Delapan)

9 CV. RAJAWALI KITA CEMERLANG 291,318,065.61 93.43 14,565,903.28Rp IX (Sembilan)

10 CV. RIAU BARU - 0.00 -Rp X (Sepuluh)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 15 (LIMA BELAS)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN BATA MAL DESA TELUK DALAM T= 17.5 cm, L=1 m KEC. KUALA KAMPAR

Kualifikasi : KECIL

Nilai HPS : 223,970,299.30Rp

80 % X HPS : 179,176,239.44Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV.TEGAR BERMANA 178,952,355.24Rp 79.90 11,198,514.97Rp I

2 CV.MEGA PRIMA 179,400,067.84Rp 80.10 8,970,003.39Rp II

3 CV.NORIKA 181,445,713.87Rp 81.01 9,072,285.69Rp III

4 CV. DANNI PUTRA PERKASA 190,321,516.29Rp 84.98 9,516,075.81Rp IV

5 CV. RINDANG BENUA 192,565,094.87Rp 85.98 9,628,254.74Rp V

6 CV.ENAM BERSAUDARA 197,011,918.62Rp 87.96 9,850,595.93Rp VI

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 11: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 16 (ENAM BELAS)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN PARIT BULAN DESA TELUK T=17,5 cm L=1 m KEC. KUALA KAMPAR

Kualifikasi : USAHA KECIL

Nilai HPS : 195,728,156.93Rp

80 % X HPS : 156,582,525.54Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. JAYA BERSAMA PRATAMA 156,581,981.76 80.00 9,786,407.85Rp I (Satu)

2 CV. LUTHFI KARYA UTAMA 163,875,514.66 83.73 8,193,775.73Rp II (Dua)

3 CV. USAHA MAJU SETIA 170,778,970.79 87.25 8,538,948.54Rp III (Tiga)

4 CV. FAHRUL SIDIK 171,150,073.93 87.44 8,557,503.70Rp IV (Empat)

5 CV. ANDI BERSAUDARA 175,485,460.04 89.66 8,774,273.00Rp V ( Iima )

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 17 (TUJUH BELAS)

Pekerjaan : SEMENISASI JALAN LINGKUNGAN SP 1 DESA BUKIT LEMBAH SUBUR KEC. KERUMUTAN

Kualifikasi : USAHA KECIL

Nilai HPS : 125,729,868.42Rp

80 % X HPS : 100,583,894.74Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TUAH PERKASA 94,647,690.61 75.28 6,286,493.42Rp I (Satu)

2 CV. PUTERA LESUNG PERDANA 94,803,571.23 75.40 6,286,493.42Rp II (Dua)

3 CV. ROSA MANDIRI PRATAMA 97,098,634.90 77.23 6,286,493.42Rp III (Tiga)

4 CV. ANUGRAH MANDIRI 101,543,582.88 80.76 5,077,179.14Rp IV (Empat)

5 CV. BINTANG TIMUR 101,833,800.05 80.99 5,091,690.00Rp V ( Iima )

6 CV. BULAN PURNAMA 104,620,240.60 83.21 5,231,012.03Rp VI ( Enam )

7 CV. PRIMA JAYA MANDIRI 107,117,150.75 85.20 5,355,857.54Rp VII ( Tujuh )

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 12: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 18 (DELAPAN BELAS)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN SP 2 DESA PEMATANG TINGGI KEC. KERUMUTAN

Kualifikasi : USAHA KECIL

Nilai HPS : 125,321,000.00Rp

80 % X HPS : 100,256,800.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. WAHYU PERMATA MADANI 96,442,152.42 76.96 6,266,050.00Rp I (Satu)

2 CV. ROSSA MANDIRI PRATAMA 96,499,354.39 77.00 6,266,050.00Rp II ( Dua )

3 CV. MUDA MANDIRI SAKTI 96,721,487.62 77.18 6,266,050.00Rp III (Tiga)

4 CV. KURNIA BARU 98,635,398.58 78.71 6,266,050.00Rp IV (Empat)

5 CV. KICIDAN MANDIRI 99,341,831.41 79.27 6,266,050.00Rp V (Lima)

6 CV. TUAH PERKASA 99,726,777.21 79.58 6,266,050.00Rp VI (Enam)

7 CV. PRIMA JAYA MANDIRI 100,269,613.05 80.01 5,013,480.65Rp VII ( Tujuh )

8 CV. PUTERA LESUNG PERDANA 100,328,185.63 80.06 5,016,409.28Rp VIII ( Delapan ) Tidak Mendaftar

9 CV. ANUGRAH ABADI 100,953,495.53 80.56 5,047,674.78Rp IX (Sembilan)

10 CV. BULAN PURNAMA 101,187,360.76 80.74 5,059,368.04Rp X (Sepuluh)

11 CV. BINTANG TIMUR 107,915,375.35 86.11 5,395,768.77Rp XI (Sebelas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 19 (SEMBILAN BELAS)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN SP 6 DESA SILIKUAN HULU KEC. UKUI

Kualifikasi : USAHA KECIL

Nilai HPS : 125,466,000.00Rp

80 % X HPS : 100,372,800.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. SATYA MITRA PERKASA 100,183,771.39 79.85 6,273,300.00Rp I (Satu)

2 CV. JAYA PERKASA 100,827,933.50 80.36 5,041,396.67Rp II (Dua)

3 CV. WAHYU PERMATA MADANI 101,255,480.68 80.70 5,062,774.03Rp III (Tiga)

4 CV. BULAN PURNAMA 105,510,750.00 84.10 5,275,537.50Rp IV (Empat)

5 CV. PRIMA JAYA MANDIRI 105,632,303.84 84.19 5,281,615.19Rp V ( Iima ) Tidak Mendaftar

6 CV. HARAPAN KERINCI 111,060,957.84 88.52 5,553,047.89Rp VI ( Enam )

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 13: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 20 (DUA PULUH)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN POROS DESA SUNGAI UPIH T=17,5 CM, KEC. KUALA KAMPAR

Kualifikasi : USAHA KECIL

Nilai HPS : 328,000,767.62Rp

80 % X HPS : 262,400,614.10Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. BUMI PERMATA RIAU 222,149,338.16 67.73 16,400,038.38Rp I (Satu)

2 CV. DANNI PUTRA PERKASA 278,812,030.73 85.00 13,940,601.54Rp II (Dua)

3 CV. ARCH BUILDING CONSTRUCTION 281,723,458.76 85.89 14,086,172.94Rp III (Tiga)

4 CV. ENAM BERSAUDARA 282,019,145.41 85.98 14,100,957.27Rp IV (Empat)

5 CV. RINDANG BENUA 288,580,607.19 87.98 14,429,030.36Rp V ( Iima )

6 CV. USAHA MAJU SETIA 296,110,770.56 90.28 14,805,538.53Rp VI ( Enam )

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 21 (DUA PULUH SATU)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN PARIT DESA KE TELUK BERINGIN T=17,5 cm KEC. KUALA KAMPAR

Kualifikasi : USAHA KECIL

Nilai HPS : 328,215,922.51Rp

80 % X HPS : 262,572,738.01Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ROSSA MANDIRI PRATAMA 257,291,585.42 78.39 16,410,796.13Rp I (Satu)

2 CV. JAYA BERSAMA PRATAMA 259,027,451.22 78.92 16,410,796.13Rp II ( Dua )

3 CV. TEGAR BERMANA 262,244,716.47 79.90 16,410,796.13Rp III (Tiga)

4 PT. DUA PUTRI UTAMA 262,652,407.12 80.02 13,132,620.36Rp IV (Empat)

5 CV. RINDANG BENUA 269,170,520.66 82.01 13,458,526.03Rp V (Lima)

6 CV. MEGA PRIMA 270,121,717.78 82.30 13,506,085.89Rp VI (Enam)

7 CV. DANNI PUTRA PERKASA 270,982,660.88 82.56 13,549,133.04Rp VII ( Tujuh )

8 CV. NORIKA 279,003,759.55 85.01 13,950,187.98Rp VIII ( Delapan )

9 CV. RADITYA KARYA 282,877,135.67 86.19 14,143,856.78Rp IX (Sembilan)

10 CV. ARCH BUILDING CONSTRUCTION 290,278,366.43 88.44 14,513,918.32Rp X (Sepuluh)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 14: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 22 (DUA PULUH DUA)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DESA SARI MAKMUR KEC. PKL. LESUNG

Kualifikasi : USAHA KECIL

Nilai HPS : 501,846,000.00Rp

80 % X HPS : 401,476,800.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. BUMI PELALAWAN MAKMUR 375,093,497.83 74.74 25,092,300.00Rp I (Satu)

2 CV. ROSSA MANDIRI PRATAMA 376,394,420.01 75.00 25,092,300.00Rp II ( Dua )

3 CV. CAHAYA HATI 377,929,714.43 75.31 25,092,300.00Rp III (Tiga)

4 CV. JAYA PERKASA 398,002,421.22 79.31 25,092,300.00Rp IV (Empat)

5 CV. SURYA MAULANA 400,366,857.77 79.78 25,092,300.00Rp V (Lima)

6 CV. TEGAR BERMANA 400,975,930.68 79.90 25,092,300.00Rp VI (Enam)

7 CV. DIMAS ANDALAS 402,459,133.33 80.20 20,122,956.67Rp VII ( Tujuh )

8 CV. SATYA MITRA PERKASA 403,707,653.32 80.44 20,185,382.67Rp VIII ( Delapan )

9 CV. PILIANG RIAU 411,680,398.47 82.03 20,584,019.92Rp IX (Sembilan)

10 CV. ANTARA 414,755,894.03 82.65 20,737,794.70Rp X (Sepuluh)

11 CV. RISNAURI 419,131,549.87 83.52 20,956,577.49Rp XI (Sebelas)

12 CV. PRIMA KARYASINDO 419,978,635.66 83.69 20,998,931.78Rp XII (Dua Belas)

13 CV. KURNIA BARU 421,059,434.13 83.90 21,052,971.71Rp XIII (Tiga Belas)

14 CV. MUDA MANDIRI SAKTI 422,535,894.23 84.20 21,126,794.71Rp XIV (Empat Belas)

15 CV. DEWI CITRA MANDIRI 422,622,001.33 84.21 21,131,100.07Rp XV (Lima Belas)

16 CV. KICIDAN MANDIRI 423,460,397.06 84.38 21,173,019.85Rp XVI (Enam Belas)

17 CV. PULAU SENANG SAKTI 424,265,660.08 84.54 21,213,283.00Rp XVII (Tujuh Belas)

18 CV. TUAH PERKASA 424,302,065.11 84.55 21,215,103.26Rp XVIII (Delapan Belas)

19 CV. BAHTERA ZAMRUD SEJAHTERA 431,526,686.76 85.99 21,576,334.34Rp XIX (Sembilan Belas)

20 CV. JALANUSA TABEXINDO 431,704,521.49 86.02 21,585,226.07Rp XX (Dua Puluh)

21 CV. SYARIF BROTHER 441,613,909.35 88.00 22,080,695.47Rp XXI (Dua Puluh Satu)

22 CV. PELALAWAN INDAH LESTARI 442,472,945.38 88.17 22,123,647.27Rp XXII (Dua Puluh Dua)

23 CV. PUTERA LESUNG PERDANA 443,208,236.93 88.32 22,160,411.85Rp XXIII (Dua Puluh Tiga)

24 CV. PINANG SUBUR ABADI 448,485,875.07 89.37 22,424,293.75Rp XXIV (Dua Puluh Empat)

25 CV. SIAK RIAU PERKASA 462,204,842.85 92.10 23,110,242.14Rp XXV (Dua Puluh Lima)

26 CV. MUSTAQIM 464,346,314.16 92.53 23,217,315.71Rp XXVI (Dua Puluh Enam)

27 CV. JAYA BERSAMA PRATAMA 467,191,578.88 93.09 23,359,578.94Rp XXVII (Dua Puluh Tujuh)

28 CV. WAHYU MANDIRI SEJAHTERA 533,338,016.50 106.28 26,666,900.83Rp XXVIII (Dua Puluh Delapan)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 23 (DUA PULUH TIGA)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN PARIT IV DESA Tg. SUM T=17,5 cm, L=1m KEC. KUALA KAMPAR

Kualifikasi : USAHA KECIL

Nilai HPS : 178,182,267.35Rp

80 % X HPS : 142,545,813.88Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. NATASHIA 157,807,639.45 88.57 7,890,381.97Rp I (Satu)

2 CV. KEMBAR JAYA UTAMA 159,202,895.23 89.35 7,960,144.76Rp II ( Dua )

3 CV. KASIA JAYA PRATAMA 160,403,270.23 90.02 8,020,163.51Rp III (Tiga)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 15: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 24 (DUA PULUH EMPAT)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN DESA SOKOI T = 17.5 CM L= 1 M

KEC. KUALA KAMPAR

Kualifikasi : USAHA KECIL

Nilai HPS : 277,205,776.23Rp

80 % X HPS : 221,764,620.98Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. NORIKA 239,882,551.95Rp 86.54 11,994,127.60Rp I (Satu)

2 CV. KASIA JAYA PRATAMA 243,988,079.01Rp 88.02 12,199,403.95Rp II (Dua)

3 CV. NATASHIA 247,563,771.79Rp 89.31 12,378,188.59Rp III (Tiga)

4 CV. TIARA INDAH 251,805,991.20Rp 90.84 12,590,299.56Rp IV (Empat)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 25 ( DUA PULUH LIMA )

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN DESA SERAPUNG T= 17.5cm L= 1 m KEC. KUALA KAMPAR

KEC. KUALA KAMPAR

Kualifikasi : USAHA KECIL

Nilai HPS : 276,454,242.85Rp

80 % X HPS : 221,163,394.28Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ENAM BERSAUDARA 196,669,192.65Rp 71.14 13,822,712.14Rp I (Satu)

Penawaran tidak

lengkap

2 CV. FIONA 227,454,354.37Rp 82.28 11,372,717.72Rp II (Dua)

3 CV. TEGAR BERMANA 227,907,182.74Rp 82.44 11,395,359.14Rp III (Tiga)

4 CV. RINDANG BENUA 243,205,082.11Rp 87.97 12,160,254.11Rp IV (Empat)

5 CV. DANNI PUTRA PERKASA 248,839,531.84Rp 90.01 12,441,976.59Rp V ( Lima)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 26 ( DUA PULUH ENAM )

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN DESA BALAM MERAH T=15 CM DESA BALAM MERAH

KEC. BUNUT

Kualifikasi : USAHA KECIL

Nilai HPS : 185,988,000.00Rp

80 % X HPS : 148,790,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. WAHYU PERMATA MADANI 140,912,301.13Rp 75.76 9,299,400.00Rp I (Satu)

2 CV. DIMENSI ALAM PERKASA 150,328,381.57Rp 80.83 7,516,419.08Rp II (Dua)

3 CV. RAHMAN PUTRA PERDANA 156,089,146.76Rp 83.92 7,804,457.34Rp III (Tiga)

4 CV. WAHYUDA KONTRAKTOR 156,351,341.38Rp 84.07 7,817,567.07Rp IV (Empat)

5 CV. PANGKALAN LESUNG PERKASA 159,293,073.71Rp 85.65 7,964,653.69Rp V ( Lima)

6 CV. PUTRA JAYA ABADI 179,154,008.06Rp 96.33 8,957,700.40Rp VI ( Enam )

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 16: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Peningkatan Pembangunan Sarana dan Prasarana Olahraga

Paket : 1 (Satu)

Pekerjaan : Pembangunan Sarana dan Prasarana Penunjang GOR Pangkalan Kerinci

Kualifikasi : USAHA NON KECIL

Nilai HPS : 8,720,971,426.44Rp

80 % X HPS : 6,976,777,141.15Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 PT. GHIFARI BANGUN NEGERI 7,074,223,625.91Rp 81.12 353,711,181.30Rp I (Satu)

2 PT. APRILIAN DWIPA INTERNUSA 7,305,186,868.70Rp 83.77 365,259,343.43Rp II (Dua)

3 PT. DHORFA SARANA MANDIRI 7,530,783,090.79Rp 86.35 376,539,154.54Rp III (Tiga)

4 PT. RIAU MAKMUR 7,848,733,440.17Rp 90.00 392,436,672.01Rp IV (Empat)

5 PT. NINDYA KARYA (Persero) 7,927,380,394.80Rp 90.90 396,369,019.74Rp V (Lima)

6 PT. SINAR INTAN PAPUA PERMAI 8,040,249,039.38Rp 92.19 402,012,451.97Rp VI (Enam)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Peningkatan Pembangunan Sarana Dan Prasarana Olah Raga

Paket : 2 (Dua)

Pekerjaan : Pembangunan Stadiona Mini Kec.Langgam

Kualifikasi : Usaha Kecil

Nilai HPS : 1,199,960,000.00Rp

80 % X HPS : 959,968,000.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. DASTI 946,551,224.08 78.88 59,998,000.00Rp I (Satu)

2 CV. DEBBY MANDIRI KARYA TEKNIK 972,537,731.47 81.05 48,626,886.57Rp II (Dua)

3 CV. HANE KAMPAR 972,666,465.54 81.06 48,633,323.28Rp III (Tiga)

4 CV. RENGAT CAHAYA PERMATA 975,710,482.89 81.31 48,785,524.14Rp IV (Empat)

5 CV. AYU INDAH GEMILANG 1,020,015,806.26 85.00 51,000,790.31Rp V ( Iima )

6 CV. TASIK SERAI ANDITA 1,020,073,116.26 85.01 51,003,655.81Rp VI (Enam)

I. EVALUASI DOKUMEN PENAWARAN

`

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 17: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Peningkatan Pembangunan Sarana DanPrasarana Olahraga

Paket : 3 (Tiga)

Pekerjaan : Pembangunan Stadion Mini Kec.Kerumutan

Kualifikasi : Usaha Kecil

Nilai HPS : 1,199,430,655.27Rp

80 % X HPS : 959,544,524.22Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. AYU INDAH GEMILANG 917,588,488.69 76.50 59,971,532.76Rp I (Satu)

2 CV. HARIMAU MUDA BERTUAH 921,377,652.12 76.82 59,971,532.76Rp II (Dua)

3 CV. RENGAT CAHAYA PERMATA 925,223,196.20 77.14 59,971,532.76Rp III (Tiga)

4 CV. TANAGAN PUTIH 933,751,674.44 77.85 59,971,532.76Rp IV (Empat)

5 CV. FEREN 935,592,807.73 78.00 59,971,532.76Rp V ( Iima )

6 CV. ALFI PUTRA KAMPAR 945,509,115.67 78.83 59,971,532.76Rp VI (Enam)

7 CV. DEBBY MANDIRI KARYA TEKNIK 950,426,159.53 79.24 59,971,532.76Rp VII (Tujuh) Tidak Mendaftar

8 CV. CITRA GEMILANG 957,495,356.89 79.83 59,971,532.76Rp VIII (Delapan) Tidak Mendaftar

9 CV. SIAK RIAU PERKASA 959,654,645.27 80.01 47,982,732.26Rp IX (Sembilan) Tidak Mendaftar

10 CV. RIZKI TEHNIK 960,017,854.44 80.04 48,000,892.72Rp X (Sepuluh)

11 CV. SABAR JAYA 993,379,992.66 82.82 49,668,999.63Rp XI (Sebelas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Peningkatan Pembangunan Sarana Dan Prasarana Olahraga

Paket : 4 (Empat)

Pekerjaan : Pembangunan Tribune Dan Pagar BRC Lapangan Bola Desa Lubuk Terap

Kualifikasi : Usaha Kecil

Nilai HPS : 933,160,846.38Rp

80 % X HPS : 746,528,677.10Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. NUANSA BANGUN PERSADA 699,730,669.78 74.99 46,658,042.32Rp I (Satu)

2 CV. SABAR JAYA 720,980,395.41 77.26 46,658,042.32Rp II (Dua)

3 CV. TANAGAN PUTIH 745,080,190.96 79.84 46,658,042.32Rp III (Tiga)

4 CV. HARIMAU MUDA BERTUAH 746,093,095.46 79.95 46,658,042.32Rp IV (Empat)

5 CV. RIZKI TEHNIK 746,892,475.05 80.04 37,344,623.75Rp V ( Iima )

6 CV. ALFI PUTRA KAMPAR 760,946,555.82 81.55 38,047,327.79Rp VI (Enam)

7 CV. CITRA GEMILANG 765,350,624.00 82.02 38,267,531.20Rp VII (Tujuh)

8 CV. AYU INDAH GEMILANG 775,479,945.92 83.10 38,773,997.30Rp VIII (Delapan)

9 CV. RENGAT CAHAYA PERMATA 796,617,919.83 85.37 39,830,895.99Rp IX (Sembilan)

10 CV. RIAU PRIMA 811,077,264.45 86.92 40,553,863.22Rp X (Sepuluh)

11 CV. DEBBY MANDIRI KARYA TEKNIK 861,120,876.03 92.28 43,056,043.80Rp XI (Sebelas) Tidak Mendaftar

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 18: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH / AIR MINUM

Paket : 1 (SATU)

Pekerjaan : PEMBANGUNAN SARANA DAN PRASARANA AIR BERSIH UPT-BPAB KEC. TELUK MERANTI (EX. KEBAKARAN THN 2010)

Kualifikasi : USAHA KECIL

Nilai HPS : 1,881,834,000.00Rp

80 % X HPS : 1,505,467,200.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. FAJAR BAKTI 1,409,746,000.00 74.91 94,091,700.00Rp I (Satu)

2 CV. SATRIA SAKTI 1,504,130,000.00 79.93 94,091,700.00Rp II ( Dua )

3 CV. DINASTY JAYA 1,506,739,000.00 80.07 75,336,950.00Rp III (Tiga)

4 PT. VINDHARA DINAMIKA RIAU 1,595,749,000.00 84.80 79,787,450.00Rp IV (Empat)

5 CV. JAYA BINTANG RAYHAND 1,598,448,000.00 84.94 79,922,400.00Rp V (Lima)

6 CV. HASBAPELA 1,646,605,000.00 87.50 82,330,250.00Rp VI (Enam)

7 CV. IKRARKU 1,665,176,000.00 88.49 83,258,800.00Rp VII (Tujuh)

8 CV. ANANDA PUTRA MANDIRI 1,690,056,000.00 89.81 84,502,800.00Rp VIII (Delapan)

9 CV. SIKOEMBER 1,728,545,000.00 91.85 86,427,250.00Rp IX (Sembilan)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH / AIR MINUM

Paket : 2 (DUA)

Pekerjaan : PEMBANGUNAN PRASARANA DAN SARANA AIR BERSIH/AIR MINUM SEDERHANA DESA SIALANG BUNGKUK KEC. BANDAR PETALANGAN

Kualifikasi : USAHA KECIL

Nilai HPS : 799,986,000.00Rp

80 % X HPS : 639,988,800.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. KERINCI BERSAUDARA 678,765,000.00 84.85 33,938,250.00Rp I (Satu)

2 CV. KOLY PRIMA ABADI 700,492,800.00 87.56 35,024,640.00Rp II ( Dua )

3 CV. CAHYA PERDANA 710,993,000.00 88.88 35,549,650.00Rp III (Tiga)

4 PT. BUDI PERKASA PANCA BERSAUDARA 767,000,000.00 95.88 38,350,000.00Rp IV (Empat)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH / AIR MINUM

Paket : 3 (TIGA)

Pekerjaan : REVITALISASI JARINGAN AIR BERSIH PEDESAAN KEL. LANGGAM

Kualifikasi : USAHA KECIL

Nilai HPS : 796,907,000.00Rp

80 % X HPS : 637,525,600.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. BOBO 733,166,000.00 92.00 36,658,300.00Rp I (Satu)

2 CV. FORTUNA 772,234,000.00 96.90 38,611,700.00Rp II ( Dua )

3 CV. DIMAS ANDALAS 780,113,000.00 97.89 39,005,650.00Rp III (Tiga)

4 CV. WANAS SENTOSA 787,991,000.00 98.88 39,399,550.00Rp IV (Empat)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 19: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH / AIR MINUM

Paket : 4 (EMPAT)

Pekerjaan : PEMBANGUNAN AIR BERSIH DESA TAMBAK KEC. LANGGAM

Kualifikasi : USAHA KECIL

Nilai HPS : 799,799,000.00Rp

80 % X HPS : 639,839,200.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. KOLY PRIMA ABADI 675,940,300.00 84.51 33,797,015.00Rp I (Satu)

2 CV. WANAS SENTOSA 791,456,000.00 98.96 39,572,800.00Rp II (Dua)

3 CV. BARAKA CITRA SEJATI 792,655,000.00 99.11 39,632,750.00Rp III (Tiga)

4 CV. DIMAS ANDALAS 793,112,000.00 99.16 39,655,600.00Rp IV (Empat)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH / AIR MINUM

Paket : 5 (Lima)

Pekerjaan : PEMBANGUNAN AIR BERSIH DESA PADANG LUAS KEC. LANGGAM

Kualifikasi : USAHA KECIL

Nilai HPS : 798,478,000.00Rp

80 % X HPS : 638,782,400.00Rp

No. HARGA PENAWARAN

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. KOLY PRIMA ABADI 700,123,500.00 87.68 35,006,175.00Rp I (Satu)

2 CV. BARAKA CITRA SEJATI 790,400,000.00 98.99 39,520,000.00Rp II ( Dua )

3 CV. DIMAS ANDALAS 793,655,000.00 99.40 39,682,750.00Rp III (Tiga)

4 CV. WANAS SENTOSA 796,493,000.00 99.75 39,824,650.00Rp IV (Empat)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 20: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH / AIR MINUM

Paket : 6 (ENAM)

Pekerjaan : PEMBANGUNAN AIR BERSIH DESA BERINGIN MAKMUR KEC. KERUMUTAN

Kualifikasi : USAHA KECIL

Nilai HPS : 798,598,000.00Rp

80 % X HPS : 638,878,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. JAYA BINTANG RAYHAND 598,528,000.00 74.95 39,929,900.00Rp I (Satu)

2 CV. ANANDA PUTRA MANDIRI 638,638,000.00 79.97 39,929,900.00Rp II ( Dua )

3 CV. SHERLY ARLYAN SHELLA 655,518,330.00 82.08 32,775,916.50Rp III (Tiga)

4 CV. KESUMA ANDALAN 676,275,270.00 84.68 33,813,763.50Rp IV (Empat)

5 CV. CAHYA PERDANA 676,765,000.00 84.74 33,838,250.00Rp V (Lima)

6 CV. SATRIA SAKTI 678,032,000.00 84.90 33,901,600.00Rp VI (Enam)

7 CV. HARAPAN KERINCI 678,462,350.00 84.96 33,923,117.50Rp VII (Tujuh)

8 CV. KERINCI BERSAUDARA 678,468,000.00 84.96 33,923,400.00Rp VIII (Delapan)

9 CV. AZATY MANDIRI 688,000,000.00 86.15 34,400,000.00Rp IX (Sembilan)

10 CV. DELLA BERSAUDARA 691,455,000.00 86.58 34,572,750.00Rp X (Sepuluh)

11 CV. IKRARKU 699,575,400.00 87.60 34,978,770.00Rp XI (Sebelas)

12 CV. CAHAYA RIAU SEJAHTERA 700,000,000.00 87.65 35,000,000.00Rp XII (Dua Belas)

13 CV. HASBAPELA 708,975,000.00 88.78 35,448,750.00Rp XIII (Tiga Belas)

14 CV. BOBO 712,000,000.00 89.16 35,600,000.00Rp XIV (Empat Belas)

15 CV. FAJAR BHAKTI 717,717,000.00 89.87 35,885,850.00Rp XV (Lima Belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH / AIR MINUM

Paket : 7 (tujuh)

Pekerjaan : PEMBANGUNAN AIR BERSIH DESA PEMATANG TINGGI KEC. KERUMUTAN

Kualifikasi : USAHA KECIL

Nilai HPS : 799,984,000.00Rp

80 % X HPS : 639,987,200.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. SATRIA SAKTI 599,446,000.00 74.93 39,999,200.00Rp I (satu)

2 CV. FAJAR BAKTI 639,700,000.00 79.96 39,999,200.00Rp II (dua)

3 CV. HARAPAN KERINCI 675,188,080.00 84.40 33,759,404.00Rp III (tiga)

4 CV. ANANDA PUTRA MANDIRI 679,307,000.00 84.92 33,965,350.00Rp IV (empat)

5 CV. KERINCI BERSAUDARA 680,214,000.00 85.03 34,010,700.00Rp V (lima)

6 CV.CAHYA PERDANA 696,584,000.00 87.07 34,829,200.00Rp VI (enam)

7 CV. KOLY PRIMA ABADI 697,256,300.00 87.16 34,862,815.00Rp VII (tujuh)

8 CV. SHERLY ARLYAN SHELLA 701,556,350.00 87.70 35,077,817.50Rp VIII (delapan)

9 CV. HASBAPELA 703,188,400.00 87.90 35,159,420.00Rp IX (sembilan)

10 CV. IKRARKU 705,583,100.00 88.20 35,279,155.00Rp X (sepuluh)

11 CV. JAYA BINTANG RAYHAND 719,000,000.00 89.88 35,950,000.00Rp XI (sebelas)

12 PT. BUDI PERKASA PANCA BERSAUDARA 774,881,000.00 96.86 38,744,050.00Rp XII (dua belas)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 21: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan Jaringan Air Bersih / Air Minum

Paket : 8 (Delapan)

Pekerjaan : Pembangunan Air Bersih Perdesaan di Desa Sari Makmur Kec. Pkl. Lesung

Kualifikasi : Usaha Kecil

Nilai HPS : 740,528,000.00Rp

80 % X HPS : 592,422,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ANANDA PUTRA MANDIRI 554,860,000.00 74.93 37,026,400.00Rp I (Satu)

2 CV. JAYA BINTANG RAYHAND 591,130,000.00 79.83 37,026,400.00Rp II (Dua)

3 CV. BOBO 612,613,000.00 82.73 30,630,650.00Rp III (Tiga)

4 CV. CAHAYA RIAU SEJAHTERA 625,000,000.00 84.40 31,250,000.00Rp IV (Empat)

5 CV. KERINCI BERSAUDARA 627,605,000.00 84.75 31,380,250.00Rp V ( Iima )

6 CV. FAJAR BHAKTI 628,085,000.00 84.82 31,404,250.00Rp VI (Enam)

7 CV. IKRARKU 646,481,000.00 87.30 32,324,050.00Rp VII (Tujuh)

8 CV. AZATY MANDIRI 650,000,000.00 87.78 32,500,000.00Rp VIII (Delapan)

9 CV. CAHYA PERDANA 650,647,000.00 87.86 32,532,350.00Rp IX (Sembilan)

10 CV. HASBAPELA 657,609,000.00 88.80 32,880,450.00Rp X (Sepuluh)

11 CV. SATRIA SAKTI 666,244,000.00 89.97 33,312,200.00Rp XI (Sebelas)

12 CV. DELLA BERSAUDARA 692,992,000.00 93.58 34,649,600.00Rp XII (Dua belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan Jaringan Air Bersih / Air Minum

Paket : 9 (Sembilan)

Pekerjaan : Pembangunan Kantor UPT-BPAB IKK Kerumutan 48 M2

Kualifikasi : Usaha Kecil

Nilai HPS : 119,999,000.00Rp

80 % X HPS : 95,999,200.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. MUTIARA MELAYU 84,859,494.01 70.72 5,999,950.00Rp I (Satu)

2 CV. WAHYU PERMATA MADANI 92,389,790.52 76.99 5,999,950.00Rp II (Dua)

3 CV. RAJU MANDIRI 95,997,156.95 80.00 5,999,950.00Rp III (Tiga)

4 CV. HARAPAN KERINCI 96,086,153.46 80.07 4,804,307.67Rp IV (Empat)

5 CV. NISAB 98,750,628.47 82.29 4,937,531.42Rp V ( Iima )

6 CV. WAHANA JAYA CIPTA 101,252,083.03 84.38 5,062,604.15Rp VI (Enam)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 22: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH/ AIR MINUM

Paket : 10 (SEPULUH)

Pekerjaan : PENGADAAN BAHAN KIMIA DI UPT- BPAB KEC. PANGKALAN KERINCI

Kualifikasi : KECIL

Nilai HPS : 158,164,000.00Rp

80 % X HPS : 126,531,200.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. JAYA PERKASA 125,094,750.00Rp 79.09 7,908,200.00Rp I

2 CV. SATYA MITRA PERKASA 132,808,500.00Rp 83.97 6,640,425.00Rp II

3 CV. RADITYA KARYA 138,506,500.00Rp 87.57 6,925,325.00Rp III

4 CV. KERINCI BERSAUDARA 150,395,300.00Rp 95.09 7,519,765.00Rp IV

5 CV. PETRONAS PRATAMA 152,411,336.00Rp 96.36 7,620,566.80Rp V

6 CV. BOBO 153,609,896.00Rp 97.12 7,680,494.80Rp VI

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH/ AIR MINUM

Paket : 11 (SEBELAS)

Pekerjaan : PENGADAAN BAHAN KIMIA DI UPT- BPAB KEC. KERUMUTAN

Kualifikasi : KECIL

Nilai HPS : 126,283,000.00Rp

80 % X HPS : 101,026,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. SATYA MITRA PERKASA 107,838,500.00Rp 85.39 5,391,925.00Rp I

2 CV. JAYA PERKASA 109,263,000.00Rp 86.52 5,463,150.00Rp II

3 CV. KERINCI BERSAUDARA 122,834,800.00Rp 97.27 6,141,740.00Rp III

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN JARINGAN AIR BERSIH/ AIR MINUM

Paket : 12 (DUA BELAS)

Pekerjaan : PENGADAAN BAHAN KIMIA DI UPT- BPAB KEC. PELALAWAN

Kualifikasi : KECIL

Nilai HPS : 160,477,000.00Rp

80 % X HPS : 128,381,600.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. JAYA PERKASA 130,350,000.00Rp 81.23 6,517,500.00Rp I

2 CV. SATYA MITRA PERKASA 130,515,000.00Rp 81.33 6,525,750.00Rp II

3 CV. RADITYA KARYA 142,670,000.00Rp 88.90 7,133,500.00Rp III

4 CV. KERINCI BERSAUDARA 152,314,800.00Rp 94.91 7,615,740.00Rp IV

5 CV. BOBO 154,080,080.00Rp 96.01 7,704,004.00Rp V

6 CV. PETRONAS PRATAMA 155,443,200.00Rp 96.86 7,772,160.00Rp VI

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 23: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN GEDUNG KANTOR

Paket : 1 ( SATU )

Pekerjaan : PEMBANGUNAN KANTOR CAMAT BUNUT

Kualifikasi : KECIL

Nilai HPS : 2,399,725,481.67Rp

80 % X HPS : 1,919,780,385.34Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ADI CIPTA NUGRAHA 1,498,537,343.17Rp 62.45 119,986,274.08Rp I (Satu)

2 CV. MAHKOTA TERUSAN 1,850,306,799.63Rp 77.10 119,986,274.08Rp II (Dua)

3 CV. BANGUN PELALAWAN JAYA 1,861,936,647.61Rp 77.59 119,986,274.08Rp III (Tiga)

4 CV. REZKI PERDANA MANDIRI 1,873,285,075.63Rp 78.06 119,986,274.08Rp IV (Empat)

5 CV. ADE SALMIAH 1,919,699,919.96Rp 80.00 119,986,274.08Rp V ( Iima )

6 CV. TANAGAN PUTIH 1,951,670,264.43Rp 81.33 97,583,513.22Rp VI ( Enam )

7 CV. KRIDARIA ANUGRAH 1,961,629,575.41Rp 81.74 98,081,478.77Rp VII ( Tujuh )

8 CV. ABDI JAYA 1,975,398,833.55Rp 82.32 98,769,941.68Rp VIII ( Delapan )

9 CV. ABDI JAYA 1,975,398,833.55Rp 82.32 98,769,941.68Rp IX ( Sembilan )

10 CV. EMBUN SURI 2,014,136,910.43Rp 83.93 100,706,845.52Rp X ( Sepuluh )

11 CV. HARFA DUA PUTRA 2,015,300,427.08Rp 83.98 100,765,021.35Rp XI ( Sebelas )

12 CV. JIHAN VIRDI 2,048,213,313.89Rp 85.35 102,410,665.69Rp XII ( Dua Belas )

13 CV. JALANUSA TABEXINDO 2,059,759,499.15Rp 85.83 102,987,974.96Rp XIII ( Tiga Belas )

14 CV. RENGAT CAHAYA PERMATA 2,061,522,035.28Rp 85.91 103,076,101.76Rp XIV ( Empat Belas )

15 CV. RIAU BARU 2,066,469,274.90Rp 86.11 103,323,463.74Rp XV ( Lima Belas )

16 CV. PILIANG RIAU 2,079,613,512.14Rp 86.66 103,980,675.61Rp XVI ( Enam Belas )

17 CV. RAJAWALI KITA CEMERLANG 2,089,630,474.83Rp 87.08 104,481,523.74Rp XVII ( Tujuh Belas )

18 CV. RIAU NIAGA GROUP 2,149,463,068.69Rp 89.57 107,473,153.43Rp XVIII ( Delapan Belas )

19 CV. LUMBA-LUMBA AMANAH 2,152,699,072.92Rp 89.71 107,634,953.65Rp XIX ( Sembilan Belas )

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 24: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan Gedung Kantor

Paket : 2 (Dua)

Pekerjaan : Rehab Mess Pemda

Kualifikasi : Usaha Kecil

Nilai HPS : 599,672,609.75Rp

80 % X HPS : 479,738,087.80Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. JURAGAN MUDA 449,809,211.06 75.01 29,983,630.49Rp I (Satu)

2 CV. PENTA MULYA PERKASA 461,821,995.03 77.01 29,983,630.49Rp II (Dua)

3 CV. HARAPAN JAYA 462,861,648.04 77.19 29,983,630.49Rp III (Tiga)

4 CV. PONGKAI SARANA 471,559,825.25 78.64 29,983,630.49Rp IV (Empat)

5 CV. PURI RAYA EKATAMA 473,020,392.35 78.88 29,983,630.49Rp V ( Iima )

6 CV. FYAT MOTOR 477,163,441.52 79.57 29,983,630.49Rp VI (Enam)

7 CV. TUAKAL 479,243,601.76 79.92 29,983,630.49Rp VII (Tujuh)

8 CV. HADE SATRIA 479,723,172.59 80.00 29,983,630.49Rp VIII (Delapan)

9 CV. JAYA PERKASA 479,774,703.65 80.01 23,988,735.18Rp IX (Sembilan)

10 CV. MUTIARA AZMI PRATAMA 479,778,422.53 80.01 23,988,921.13Rp X (Sepuluh)

11 CV. TIARA ANDALAN 479,874,125.94 80.02 23,993,706.30Rp XI (Sebelas)

12 CV. CAHAYA HATI 491,625,006.84 81.98 24,581,250.34Rp XII (Dua belas)

13 CV. SURYA MAULANA 492,221,261.10 82.08 24,611,063.06Rp XIII (Tiga belas)

14 CV. HARAPAN KERINCI 498,732,141.27 83.17 24,936,607.06Rp XIV (Empat belas)

15 CV. LUMBA-LUMBA AMANAH 507,479,860.88 84.63 25,373,993.04Rp XV (Lima belas )

16 CV. MAHKOTA TERUSAN 508,073,000.82 84.73 25,403,650.04Rp XVI (Enam belas)

17 CV. BANGUN PELALAWAN JAYA 510,422,960.70 85.12 25,521,148.04Rp XVII (Tujuh belas)

18 CV. RIAU PRIMA 521,209,398.16 86.92 26,060,469.91Rp XVIII (Delapan belas)

19 CV. ARITA MAJU 524,736,134.01 87.50 26,236,806.70Rp XIX (Sembilan belas)

20 CV. KESUMA ANDALAN 533,279,399.94 88.93 26,663,970.00Rp XX (Dua puluh)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN GEDUNG KANTOR

Paket : 3 ( TIGA )

Pekerjaan : REHAB EX KANTOR BAPPEDA PERTAMA

Kualifikasi : KECIL

Nilai HPS : 249,118,000.00Rp

80 % X HPS : 199,294,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. AISYAH KERINCI 220,432,064.98Rp 88.49 11,021,603.25Rp I (Satu)

2 CV. TARUNA BISNIS ANDALAN 221,684,029.98Rp 88.99 11,084,201.50Rp II (Dua)

3 CV. LAGO ZONE 235,210,433.75Rp 94.42 11,760,521.69Rp III (Tiga)

4 CV. WAHYU MANDIRI SEJAHTERA 236,153,753.20Rp 94.80 11,807,687.66Rp IV (Empat)

5 CV. PULAU SENANG SAKTI -Rp - -Rp RAB TIDAK TERLAMPIR

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 25: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan Gedung Kantor

Paket : 4 (Empat)

Pekerjaan : Pembangunan Pagar Kantor Dan Rumah Dinas Camat Bandar Petalangan

Kualifikasi : Usaha Kecil

Nilai HPS : 212,098,753.42Rp

80 % X HPS : 169,679,002.74Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ROSSA MANDIRI PRATAMA 158,109,020.79 74.55 10,604,937.67Rp I (Satu)

2 CV. MELLINDO JAYA CONTRACTOR 168,674,818.01 79.53 10,604,937.67Rp II (Dua)

3 CV. MUTIARA MELAYU 169,070,304.27 79.71 10,604,937.67Rp III (Tiga)

4 CV. KAMPAR JAYA 169,620,170.91 79.97 10,604,937.67Rp IV (Empat)

5 CV. RAJU MANDIRI 169,671,510.44 80.00 10,604,937.67Rp V ( Iima )

6 CV. KURNIA BARU 169,685,049.89 80.00 8,484,252.49Rp VI (Enam)

7 CV. ANUGRAH MANDIRI 169,890,573.95 80.10 8,494,528.70Rp VII (Tujuh)

8 CV. CITRA GEMILANG 169,930,335.82 80.12 8,496,516.79Rp VIII (Delapan)

9 CV. BRILLIANT 170,049,818.01 80.17 8,502,490.90Rp IX (Sembilan)

10 CV. KICIDAN MANDIRI 170,584,718.10 80.43 8,529,235.90Rp X (Sepuluh)

11 CV. DEWI CITRA MANDIRI 171,647,011.29 80.93 8,582,350.56Rp XI (Sebelas)

12 CV. SEI KIJANG PERKASA 172,520,437.90 81.34 8,626,021.90Rp XII (Dua belas)

13 CV. LANSANI KERINCI 509,319,987.10 240.13 25,465,999.36Rp XIII (Tiga belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan Gedung Kantor

Paket : 5 (Lima)

Pekerjaan : Rehab Aula Mess Pemda

Kualifikasi : Usaha Kecil

Nilai HPS : 199,952,499.00Rp

80 % X HPS : 159,961,999.20Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. MUTIARA MELAYU 143,230,307.65 71.63 9,997,624.95Rp I (Satu)

2 CV. ROSSA MANDIRI PRATAMA 151,963,414.58 76.00 9,997,624.95Rp II (Dua)

3 CV. GIAN PUTRA MANDIRI 159,128,956.73 79.58 9,997,624.95Rp III (Tiga)

4 CV. AISYAH KERINCI 159,952,258.21 80.00 9,997,624.95Rp IV (Empat)

5 CV. PENTA MULIA PERKASA 159,963,135.25 80.00 7,998,156.76Rp V ( Iima )

6 CV. ANAK TERUSAN 159,969,649.02 80.00 7,998,482.45Rp VI (Enam)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 26: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 1 ( SATU )

Pekerjaan : PEMBANGUNAN DRAINASE SEKUNDER JALAN MENUJU ISTANA SAYAP KEC. PELALAWAN

Kualifikasi : KECIL

Nilai HPS : 1,874,901,927.90Rp

80 % X HPS : 1,499,921,542.32Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARFAH 1,359,302,923.29Rp 72.50 93,745,096.40Rp I

2 CV.ALFIKA PELALAWAN 1,361,177,162.03Rp 72.60 93,745,096.40Rp II

3 CV.PELALAWAN PERKASA 1,363,053,527.73Rp 72.70 93,745,096.40Rp III

4 CV. SIAK RIAU PERKASA 1,414,465,677.87Rp 75.44 93,745,096.40Rp IV

5 CV. ASTAKONA 1,435,317,539.03Rp 76.55 93,745,096.40Rp V

6 CV. PULAU SENANG SAKTI 1,444,756,077.05Rp 77.06 93,745,096.40Rp VI

7 CV.MEKAR JAYA 1,453,627,172.29Rp 77.53 93,745,096.40Rp VII

8 CV. PINANG SUBUR ABADI 1,492,702,899.47Rp 79.61 93,745,096.40Rp VIII

9 CV.GITO LESTARI 1,513,798,507.87Rp 80.74 75,689,925.39Rp IX

10 CV.PILIANG RIAU 1,522,081,143.79Rp 81.18 76,104,057.19Rp X

11 CV. RUZIQNAA PRATAMA 1,533,672,774.28Rp 81.80 76,683,638.71Rp XI

12 CV. MUTIARA AZMI PRATAMA 1,555,555,598.98Rp 82.97 77,777,779.95Rp XII

13 CV.TUAKAL 1,555,983,526.48Rp 82.99 77,799,176.32Rp XIII

14 CV. SERBA GUNA 1,561,795,172.00Rp 83.30 78,089,758.60Rp XIV

15 CV.JALANUSA TABEXINDO 1,566,261,553.25Rp 83.54 78,313,077.66Rp XV

16 CV.FAHRUL SIDIK 1,575,716,433.50Rp 84.04 78,785,821.68Rp XVI

17 CV. MELATI PUTIH 1,575,793,602.34Rp 84.05 78,789,680.12Rp XVII

18 CV. WAHYU MANDIRI SEJAHTERA 1,580,628,980.88Rp 84.30 79,031,449.04Rp XVIII

19 CV. BERIKAN DAKU RIDHOMU 1,585,545,955.60Rp 84.57 79,277,297.78Rp XIX

20 CV. PUTRA MELAYU 1,592,443,679.90Rp 84.93 79,622,184.00Rp XX

21 CV.RIAU NIAGA GROUP 1,610,765,256.83Rp 85.91 80,538,262.84Rp XXI

22 CV. PUTRA SUNGAI NILO 1,630,301,349.48Rp 86.95 81,515,067.47Rp XXII

23 CV. EMBUN SARI 1,640,310,040.78Rp 87.49 82,015,502.04Rp XXIII Tidak Mendaftar

24 CV.ANDI BERSAUDARA 1,647,767,615.12Rp 87.89 82,388,380.76Rp XXIV

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 27: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 2 ( DUA )

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE TERSIER DI BLOCK C BUMI LAGO PERMAI KEC. PKL. KERINCI (L=0.7, D=0.7 , Tb=0.15)

Kualifikasi : KECIL

Nilai HPS : 584,201,184.17Rp

80 % X HPS : 467,360,947.34Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV.TRI TUNGGAL JAYA LESTARI 407,777,776.39Rp 69.80 29,210,059.21Rp I

2 CV. BUMI PELALAWAN MAKMUR 423,038,821.11Rp 72.41 29,210,059.21Rp II

3 CV. DWI KARYA 423,266,956.08Rp 72.45 29,210,059.21Rp III

4 CV. PELALAWAN INDAH PRATAMA 434,445,838.07Rp 74.37 29,210,059.21Rp IV

5 CV. EKA KARYA 434,989,437.73Rp 74.46 29,210,059.21Rp V

6 CV. PULAU SENANG SAKTI 445,375,620.74Rp 76.24 29,210,059.21Rp VI

7 CV. TUAH PERKASA 447,689,234.91Rp 76.63 29,210,059.21Rp VII

8 CV. NUSANTARA KERINCI 451,265,200.45Rp 77.24 29,210,059.21Rp VIII

9 CV. JAYA PERKASA 453,427,619.11Rp 77.61 29,210,059.21Rp IX

10 CV. MUTIARA AZMI PRATAMA 453,444,999.11Rp 77.62 29,210,059.21Rp X

11 CV.RAJA JAYA UTAMA 453,499,726.12Rp 77.63 29,210,059.21Rp XI Tidak Mendaftar

12 CV. RIAU PRIMA 454,859,317.46Rp 77.86 29,210,059.21Rp XII

13 CV.PONGKAI SARANA 454,916,594.90Rp 77.87 29,210,059.21Rp XIII

14 CV.FYAT MOTOR 458,101,754.90Rp 78.42 29,210,059.21Rp XIV

15 CV.WAHYU MANDIRI SEJAHTERA 461,347,417.01Rp 78.97 29,210,059.21Rp XV

16 CV. BANGUN RIAU GEMILANG 462,144,355.69Rp 79.11 29,210,059.21Rp XVI

17 CV.ASTAKONA 463,414,569.29Rp 79.32 29,210,059.21Rp XVII

18 CV. RIZKI TEHNIK 466,668,012.56Rp 79.88 29,210,059.21Rp XVIII

19 CV. GUMANTAN ALAM 467,131,123.93Rp 79.96 29,210,059.21Rp XIX

20 CV.UKEM 467,360,241.52Rp 80.00 29,210,059.21Rp XX

21 CV. PUTRA TUNGGAL 467,462,862.70Rp 80.02 23,373,143.13Rp XXI

22 CV.LAUTAN GADING 467,477,393.40Rp 80.02 23,373,869.67Rp XXII

23 CV.KARYA FAJRI MANDIRI 468,051,083.22Rp 80.12 23,402,554.16Rp XXIII

24 CV. SHINTA MANDIRI 469,170,668.09Rp 80.31 23,458,533.40Rp XXIV

25 CV. KARYA MANDIRI UTAMA 471,904,271.44Rp 80.78 23,595,213.57Rp XXV

26 CV. JASA KONTRAKTOR 475,605,960.75Rp 81.41 23,780,298.04Rp XXVI

27 CV.HARIMAU MUDA BERTUAH 476,911,139.78Rp 81.63 23,845,556.99Rp XXVII

28 CV. TARUNA BISNIS ANDALAN 486,668,737.80Rp 83.30 24,333,436.89Rp XXVIII

29 CV.PUTRA SUNGAI NILO 496,148,787.48Rp 84.93 24,807,439.37Rp XXIX

30 CV. RIAU PRIMA INDAH LESTARI 499,000,103.33Rp 85.42 24,950,005.17Rp XXX

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

Page 28: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 3 (TIGA)

Pekerjaan : PEMBANGUNAN DRAINASE SEKUNDER L= 0.70 M, D= 0.70 M, T= 0.15 M JALAN SEPAKAT PKL. KERINCI

Kualifikasi : KECIL

Nilai HPS : 564,707,304.48Rp

80 % X HPS : 451,765,843.58Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV.TRI TUNGGAL JAYA LESTARI 419,999,981.74Rp 74.37 28,235,365.22Rp I

2 CV. SURYA MAULANA 429,485,157.90Rp 76.05 28,235,365.22Rp II

3 CV. PELALAWAN INDAH PRATAMA 434,796,917.27Rp 77.00 28,235,365.22Rp III

4 CV. HARAPAN JAYA 438,787,296.07Rp 77.70 28,235,365.22Rp IV

5 CV.PONGKAI SARANA 442,984,503.35Rp 78.44 28,235,365.22Rp V

6 CV.FYAT MOTOR 445,351,361.49Rp 78.86 28,235,365.22Rp VI

7 CV. RARA JAYA UTAMA 447,441,768.62Rp 79.23 28,235,365.22Rp VII

8 CV. ASTAKONA 449,414,189.49Rp 79.58 28,235,365.22Rp VIII

9 CV. MUTIARA AZMI PRATAMA 450,176,177.77Rp 79.72 28,235,365.22Rp IX

10 CV. JAYA PERKASA 450,182,973.44Rp 79.72 28,235,365.22Rp X

11 CV.GUMANTAN ALAM 451,676,899.74Rp 79.98 28,235,365.22Rp XI

12 CV. UKEM 451,765,720.97Rp 80.00 28,235,365.22Rp XII

13 CV. LAUTAN GADING 451,854,132.41Rp 80.02 22,592,706.62Rp XIII

14 CV. DIMAS ANDALAS 452,885,007.59Rp 80.20 22,644,250.38Rp XIV

15 CV. CAHAYA HATI 458,257,427.52Rp 81.15 22,912,871.38Rp XV

16 CV. MAULANA CREASINDOTAMA 463,104,407.13Rp 82.01 23,155,220.36Rp XVI

17 CV. ANTARA 468,753,415.61Rp 83.01 23,437,670.78Rp XVII Tidak Mendaftar

18 CV. JASA KONTRAKTOR 471,749,248.68Rp 83.54 23,587,462.43Rp XVIII

19 CV. PULAU SENANG SAKTI 474,470,641.21Rp 84.02 23,723,532.06Rp XIX

20 CV. WAHYU MANDIRI SEJAHTERA 474,704,649.66Rp 84.06 23,735,232.48Rp XX

21 CV. KAMPAR JAYA 477,121,244.31Rp 84.49 23,856,062.22Rp XXI

22 CV. RIAU PRIMA INDAH LESTARI 496,752,681.67Rp 87.97 24,837,634.08Rp XXII

23 CV. LANSANI KERINCI 3,691,345,290.17Rp 653.67 184,567,264.51Rp XXIII

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 29: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 4 (EMPAT)

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE TERSIER DI JALAN SUKA DAMAI KEC. PKL. KERINCI (L= 0,7 m, D= 0,7 m, Tb= 0,15)

Kualifikasi : KECIL

Nilai HPS : 486,916,306.22Rp

80 % X HPS : 389,533,044.98Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARCH BUILDING CONSTRUCTION 369,804,809.68Rp 75.95 24,345,815.31Rp I

2 CV.ADE SALMIAH 370,058,154.73Rp 76.00 24,345,815.31Rp II

3 CV. FATMA DELA 370,066,240.01Rp 76.00 24,345,815.31Rp III

4 CV. MUTIARA AZMI PRATAMA 375,888,888.72Rp 77.20 24,345,815.31Rp IV

5 CV.WINARA DHEA MANDIRI 377,404,441.90Rp 77.51 24,345,815.31Rp V

6 CV. RARA JAYA UTAMA 381,004,235.90Rp 78.25 24,345,815.31Rp VI

7 CV. WAHYU MANDIRI SEJAHTERA 382,223,329.63Rp 78.50 24,345,815.31Rp VII

8 CV. ASTAKONA 384,448,011.69Rp 78.96 24,345,815.31Rp VIII

9 CV. GUMANTAN ALAM 389,223,821.44Rp 79.94 24,345,815.31Rp IX

10 CV. ABDI JAYA 389,530,283.50Rp 80.00 24,345,815.31Rp X

11 CV. MEGA PRIMA 390,019,775.12Rp 80.10 19,500,988.76Rp XI

12 CV. JASA KONTRAKTOR 397,012,862.09Rp 81.54 19,850,643.10Rp XII

13 CV. MAULANA CREASINDOTAMA 397,889,729.41Rp 81.72 19,894,486.47Rp XIII

14 CV. ANTARA 402,740,436.45Rp 82.71 20,137,021.82Rp XIV

15 CV. PULAU SENANG SAKTI 407,699,604.90Rp 83.73 20,384,980.25Rp XV

16 CV. PUTRA SUNGAI NILO 409,249,271.69Rp 84.05 20,462,463.58Rp XVI

17 CV. RIAU PRIMA INDAH LESTARI 409,999,119.09Rp 84.20 20,499,955.95Rp XVII

18 CV. LANSANI KERINCI 2,272,198,250.64Rp 466.65 113,609,912.53Rp XVIII

19 CV. CAHAYA PERDANA -Rp 0.00 -Rp XIX RAB TIDAK TERLAMPIR

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 5 (LIMA)

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE TERSIER DI GG. WAJIB SENYUM KEC. PKL. KERINCI (L= 0.7 m, D= 0.7 m, Tb= 0.15)

Kualifikasi : KECIL

Nilai HPS : 389,507,340.38Rp

80 % X HPS : 311,605,872.30Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TRI TUNGGAL JAYA LESTARI 278,888,941.46Rp 71.60 19,475,367.02Rp I

2 CV. SATYA MITRA PERKASA 299,658,418.27Rp 76.93 19,475,367.02Rp II

3 CV. TARUNA BISNIS ANDALAN 300,698,901.92Rp 77.20 19,475,367.02Rp III

4 CV. MEGA PRIMA 301,318,580.76Rp 77.36 19,475,367.02Rp IV

5 CV. DHENNI UTAMA 309,936,228.71Rp 79.57 19,475,367.02Rp V

6 CV. GAMANA PRATAMA 311,877,854.24Rp 80.07 15,593,892.71Rp VI

7 CV. WAHYU PERMATA MADANI 312,324,832.78Rp 80.18 15,616,241.64Rp VII

8 CV. SHINTA MANDIRI 312,833,831.70Rp 80.32 15,641,691.58Rp VIII

9 CV. KAMPAR JAYA 313,535,497.67Rp 80.50 15,676,774.88Rp IX

10 CV. WAHYU MANDIRI SEJAHTERA 318,830,874.87Rp 81.85 15,941,543.74Rp X

11 CV. PRIMA KARYASINDO 322,707,539.12Rp 82.85 16,135,376.96Rp XI

12 CV. ENAM BERSAUDARA 327,187,406.00Rp 84.00 16,359,370.30Rp XII

13 CV. PUTRA SUNGAI NILO 333,974,314.64Rp 85.74 16,698,715.73Rp XIII

14 CV. RIAU PRIMA INDAH LESTARI 339,999,239.64Rp 87.29 16,999,961.98Rp XIV

15 CV. LANSANI KERINCI 1,831,260,595.88Rp 470.15 91,563,029.79Rp XV

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 30: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 6 (ENAM)

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE SEKUNDER DESA TRI MULYA JAYA KEC. UKUI (L= 0.70, D= 0.70 Tb= 0.15)

Kualifikasi : KECIL

Nilai HPS : 389,367,109.93Rp

80 % X HPS : 311,493,687.94Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. BUMI PELALAWAN MAKMUR 291,962,390.82Rp 74.98 19,468,355.50Rp I

2 CV. KICIDAN MANDIRI 292,422,933.12Rp 75.10 19,468,355.50Rp II

3 CV. MUDA MANDIRI SAKTI 303,176,827.05Rp 77.86 19,468,355.50Rp III

4 CV. FAJAR KUALU RIAU 311,492,114.77Rp 80.00 19,468,355.50Rp IV

5 CV. BRILLIANT 315,076,430.46Rp 80.92 15,753,821.52Rp V

6 CV. WAHYU MANDIRI SEJAHTERA 317,664,446.63Rp 81.58 15,883,222.33Rp VI

7 CV. TUAH PERKASA 318,245,238.87Rp 81.73 15,912,261.94Rp VII

8 CV.BAHTERA ZAMRUD SEJAHTERA 319,207,773.37Rp 81.98 15,960,388.67Rp VIII

9 CV. RIAU NIAGA GROUP 319,309,641.95Rp 82.01 15,965,482.10Rp IX

10 CV. KARYA MANDIRI UTAMA 322,120,853.75Rp 82.73 16,106,042.69Rp X

11 CV. SYARIF BROTHER 326,028,543.76Rp 83.73 16,301,427.19Rp XI

12 CV. PILIANG RIAU 327,112,214.48Rp 84.01 16,355,610.72Rp XII

13 CV. CITRA GEMILANG 327,396,060.61Rp 84.08 16,369,803.03Rp XIII

14 CV. PRIMA KARYASINDO 334,043,677.37Rp 85.79 16,702,183.87Rp XIV

15 CV. JALAN NUSA TABEXINDO 334,917,846.14Rp 86.02 16,745,892.31Rp XV

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 7 (TUJUH)

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE JALAN MASUK MUSHOLA DARUL IKHSAN KEC. PKL. KERINCI

Kualifikasi : KECIL

Nilai HPS : 319,920,690.27Rp

80 % X HPS : 255,936,552.22Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. SEI KIJANG PERKASA 238,916,201.12Rp 74.68 15,996,034.51Rp I

2 CV. FATMA DELA 251,304,987.05Rp 78.55 15,996,034.51Rp II

3 CV. DHENNI UTAMA 255,616,986.78Rp 79.90 15,996,034.51Rp III

4 CV. SHINTA MANDIRI 257,031,720.39Rp 80.34 12,851,586.02Rp IV

5 CV. GAMANA PRATAMA 260,468,294.91Rp 81.42 13,023,414.75Rp V

6 CV. PULAU BARU 262,157,470.83Rp 81.94 13,107,873.54Rp VI

7 CV. KAMPAR JAYA 262,333,429.97Rp 82.00 13,116,671.50Rp VII

8 CV. PRIMA KARYASINDO 264,893,788.08Rp 82.80 13,244,689.40Rp VIII

9 CV. WAHYU MANDIRI SEJAHTERA 265,990,615.62Rp 83.14 13,299,530.78Rp IX

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

Page 31: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE/GORONG-GORONG

Paket : 8 (DELAPAN)

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE KANTOR LURAH KERINCI KOTA ( 0.7 x 0.7 x 0.15 )

Kualifikasi : USAHA KECIL

Nilai HPS : 194,506,586.55Rp

80 % X HPS : 155,605,269.24Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. WAHYU PERMATA MADANI 149,873,321.40Rp 77.05 9,725,329.33Rp I (Satu)

2 CV. SATYA MITRA PERKASA 152,374,032.03Rp 78.34 9,725,329.33Rp II (Dua)

3 CV. DHENNI UTAMA 155,151,721.45Rp 79.77 9,725,329.33Rp III (Tiga)

4 CV. YUDE CONTRACTOR 155,428,250.43Rp 79.91 9,725,329.33Rp IV (Empat)

5 CV. KARYA MANDIRI UTAMA 158,669,653.18Rp 81.58 7,933,482.66Rp V ( Iima )

6 CV. TARUNA BISNIS ANDALAN 159,469,698.11Rp 81.99 7,973,484.91Rp VI ( Enam )

7 CV. PULAU BARU 159,501,213.30Rp 82.00 7,975,060.67Rp VII ( Tujuh )

8 CV. FAJAR KUALU RIAU 161,199,710.16Rp 82.88 8,059,985.51Rp VIII ( Delapan )

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE/GORONG-GORONG

Paket : 9 (SEMBILAN)

Pekerjaan : PEMBANGUNAN DRAINASE SEKUNDER L= 0,70 m D=0,70m T=0,15m

JALAN PEPAYA MESJID AL-MUHAJIRIN PKL. KERINCI

Kualifikasi : USAHA KECIL

Nilai HPS : 184,922,149.97Rp

80 % X HPS : 147,937,719.98Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. SATYA MITRA PERKASA 139,855,390.85Rp 75.63 9,246,107.50Rp I (Satu)

2 CV. DHENNI UTAMA 148,394,868.47Rp 80.25 7,419,743.42Rp II (Dua)

3 CV. TARUNA BISNIS ANDALAN 148,422,764.65Rp 80.26 7,421,138.23Rp III (Tiga)

4 CV. ANTARA 150,342,783.23Rp 81.30 7,517,139.16Rp IV (Empat)

5 CV. PULAU SENANG SAKTI 156,164,035.88Rp 84.45 7,808,201.79Rp V ( Iima )

PERUSAHAAN

I. EVALUASI DOKUMEN PENAWARAN

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

2

Page 32: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG-GORONG

Paket : 10 ( SEPULUH )

Pekerjaan : PEMBANGUNAN DRAINASE SEKUNDER L=0.60 M, D=0.60 M, T=0.15 M DESA MULYA SUBUR KEC. PANGKALAN LESUNG

Kualifikasi : KECIL

Nilai HPS : 166,425,423.64Rp

80 % X HPS : 133,140,338.91Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. KURNIA BARU 126,477,700.58Rp 76.00 8,321,271.18Rp I (Satu)

2 CV. PULAU SENANG SAKTI 129,564,607.33Rp 77.85 8,321,271.18Rp II (Dua)

3 CV. ROSSA MANDIRI PRATAMA 130,648,232.37Rp 78.50 8,321,271.18Rp III (Tiga)

4 CV. WAHYU MANDIRI SEJAHTERA 134,084,648.41Rp 80.57 6,704,232.42Rp IV (Empat)

5 CV. BINTANG TIMUR 134,789,221.22Rp 80.99 6,739,461.06Rp V ( Iima )

6 CV. PANGKALAN LESUNG PERKASA 136,132,757.26Rp 81.80 6,806,637.86Rp VI ( Enam )

7 CV. PELALAWAN INDAH LESTARI 136,472,070.37Rp 82.00 6,823,603.52Rp VII ( Tujuh )

8 CV. KAMPAR JAYA 137,095,459.00Rp 82.38 6,854,772.95Rp VIII ( Delapan )

9 CV. USAHA MAJU SETIA 137,806,913.64Rp 82.80 6,890,345.68Rp IX ( Sembilan )

10 CV. RIAU BARU 141,433,575.80Rp 84.98 7,071,678.79Rp X ( Sepuluh )

11 CV. LANSANI KERINCI 149,236,000.61Rp 89.67 7,461,800.03Rp XI ( Sebelas )

12 CV. LAUTAN GADING 153,186,124.81Rp 92.04 7,659,306.24Rp XII ( Dua Belas )

13 CV. DEWI CITRA MANDIRI 156,709,916.65Rp 94.16 7,835,495.83Rp XIII ( Tiga Belas )

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE/GORONG-GORONG

Paket : 11 ( SEBELAS )

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE SEKUNDER JALAN SAKURA

KEC. PANGKALAN KERINCI (L=1,2m - D=1,1m TB=0,15)

Kualifikasi : USAHA KECIL

Nilai HPS : 141,003,811.26Rp

80 % X HPS : 112,803,049.01Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. FATMA DELA 108,767,298.20Rp 77.14 7,050,190.56Rp I (Satu)

2 CV. PUTRA TUNGGAL 110,687,774.27Rp 78.50 7,050,190.56Rp II (Dua)

3 CV. PUTRI NISA 112,836,944.84Rp 80.02 5,641,847.24Rp III (Tiga)

4 CV. JASA KONTRAKTOR 115,646,004.57Rp 82.02 5,782,300.23Rp IV (Empat)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 33: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE/GORONG-GORONG

Paket : 12 ( DUA BELAS )

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE TERSIER JL.PEMDA GG.MURAI

KEC. PANGKALAN KERINCI (L: 0.4m, D: 0.4m)

Kualifikasi : USAHA KECIL

Nilai HPS : 123,689,296.36Rp

80 % X HPS : 98,951,437.09Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. DHENNI UTAMA 98,055,453.10Rp 79.28 6,184,464.82Rp I (Satu)

2 CV. ANAK TERUSAN 98,951,028.77Rp 80.00 6,184,464.82Rp II (Dua)

3 CV. RIYAN KONTRAKTOR 98,951,246.90Rp 80.00 6,184,464.82Rp III (Tiga)

4 CV. WAHYU MANDIRI SEJAHTERA 110,336,873.08Rp 89.20 5,516,843.65Rp IV (Empat)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG-GORONG

Paket : 13 ( TIGA BELAS )

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE SEKUNDER L=60 M, D=60 M, T=0,15

DESA LUBUK TERAP KECAMATAN BANDAR PETALANGAN

Kualifikasi : USAHA KECIL

Nilai HPS : 103,445,962.68Rp

80 % X HPS : 82,756,770.14Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. CITRA GEMILANG 81,471,236.59Rp 78.76 5,172,298.13Rp I (Satu)

2 CV. KARYA MANDIRI UTAMA 82,800,132.19Rp 80.04 4,140,006.61Rp II (Dua) Tidak Mendaftar

3 CV. ANUGRAH MANDIRI 83,579,018.97Rp 80.79 4,178,950.95Rp III (Tiga)

4 CV. BRILLIANT 83,716,983.30Rp 80.93 4,185,849.16Rp IV (Empat)

5 CV. FAJAR KUALU RIAU 84,541,491.02Rp 81.73 4,227,074.55Rp V ( Iima )

6 CV. JAYA PERKASA 85,013,182.32Rp 82.18 4,250,659.12Rp VI ( Enam )

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 34: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 1 (SATU)

Pekerjaan : REHABILITASI DAN PEMELIHARAAN RUMAH ADAT BATIN LALANG

Kualifikasi : USAHA KECIL

Nilai HPS : 219,769,000.00Rp

80 % X HPS : 175,815,200.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. MUTIARA MELAYU 154,545,061.72Rp 70.32 10,988,450.00Rp I (Satu)

2 CV. WAHYU PERMATA MADANI 169,032,167.23Rp 76.91 10,988,450.00Rp II (Dua)

3 CV. AISYAH KERINCI 175,822,439.06Rp 80.00 8,791,121.95Rp III (Tiga)

4 CV. MUTIARA BUMI RIAU 177,959,903.76Rp 80.98 8,897,995.19Rp IV (Empat)

5 CV. SUKSES MANDIRI 184,601,166.76Rp 84.00 9,230,058.34Rp V ( Iima )

6 CV. SINAR RUPAT JAYA 191,012,828.20Rp 86.92 9,550,641.41Rp VI ( Enam )

7 CV. WAHYU MANDIRI SEJAHTERA 212,330,564.30Rp 96.62 10,616,528.21Rp VII ( Tujuh )

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 2 (DUA)

Pekerjaan : PEMBANGUNAN RUMAH DINAS TYPE 70

Kualifikasi : USAHA KECIL

Nilai HPS : 431,756,463.64Rp

80 % X HPS : 345,405,170.91Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TRIA DELTA PUTRA TUNGGAL 341,042,946.31Rp 78.99 21,587,823.18Rp I (Satu)

2 CV. NUSANTARA KERINCI 345,413,608.60Rp 80.00 17,270,680.43Rp II (Dua)

3 CV. DUTA CIPTA PERSADA 345,458,661.02Rp 80.01 17,272,933.05Rp III (Tiga)

4 CV. TIARA ANDALAN 345,603,154.60Rp 80.05 17,280,157.73Rp IV (Empat)

5 CV. MUTIARA MELAYU 348,221,419.65Rp 80.65 17,411,070.98Rp V (Lima)

6 CV. KARYA FAJRI MANDIRI 359,189,934.40Rp 83.19 17,959,496.72Rp VI (Enam)

7 CV. ANAK TERUSAN 359,336,037.88Rp 83.23 17,966,801.89Rp VII (Tujuh)

8 CV. HARAPAN JAYA 367,013,973.70Rp 85.00 18,350,698.69Rp VIII (Delapan)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 35: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 3 (TIGA))

Pekerjaan : PEMBANGUNAN ASRAMA PESANTREN HIDAYATUL MAARIFIAH

Kualifikasi : USAHA KECIL

Nilai HPS : 901,260,993.12Rp

80 % X HPS : 721,008,794.50Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARITA MAJU 747,717,041.02Rp 82.96 37,385,852.05Rp I (Satu)

2 CV. PUTRA PERKASA 757,086,966.16Rp 84.00 37,854,348.31Rp II (Dua)

3 CV. GINSAR 896,308,153.20Rp 99.45 44,815,407.66Rp III (Tiga)

4 CV. PULAU BARU 897,024,444.15Rp 99.53 44,851,222.21Rp IV (Empat)

5 CV. MUTIARA AZMI PRATAMA 897,939,444.15Rp 99.63 44,896,972.21Rp V (Lima)

6 CV. TUAKAL 899,464,444.15Rp 99.80 44,973,222.21Rp VI (Enam)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 4 (EMPAT)

Pekerjaan : PERBAIKAN GEDUNG ARSIP KABUPATEN PELALAWAN

Kualifikasi : USAHA KECIL

Nilai HPS : 299,000,000.00Rp

80 % X HPS : 239,200,000.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TIARA ANDALAN 239,215,349.45Rp 80.01 11,960,767.47Rp I (Satu)

2 CV. RAJU MANDIRI 241,063,070.60Rp 80.62 12,053,153.53Rp II (Dua)

3 CV. HARAPAN JAYA 241,063,070.60Rp 80.62 12,053,153.53Rp III (Tiga)

4 CV. WAHYU MANDIRI SEJAHTERA 279,692,076.80Rp 93.54 13,984,603.84Rp IV (Empat)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 5 (LIMA)

Pekerjaan : PEMBANGUNAN WC UMUM 6 x 8 M KAWASAN MESJID HIBAH KEL. PELALAWAN

Kualifikasi : USAHA KECIL

Nilai HPS : 124,729,289.74Rp

80 % X HPS : 99,783,431.79Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. RADIAN FITRI 87,869,270.61Rp 70.45 6,236,464.49Rp I (Satu)

2 CV. PUTRA TUNGGAL 89,666,090.27Rp 71.89 6,236,464.49Rp II (Dua)

3 CV. PUTRA BUNGSU MANDIRI 90,363,757.38Rp 72.45 6,236,464.49Rp III (Tiga)

4 CV. SAJADAH PUSAKA 90,709,925.27Rp 72.73 6,236,464.49Rp IV (Empat)

5 CV. EKIE SEJAHTERA MANDIRI 91,011,670.92Rp 72.97 6,236,464.49Rp V (Iima)

6 CV. PELALAWAN PERKASA 104,456,447.90Rp 83.75 5,222,822.40Rp VI (Enam)

7 CV. PELALAWAN JAYA SATU 136,334,112.53Rp 109.30 6,816,705.63Rp VII (Tujuh)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 36: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 1 (Satu)

Pekerjaan : Pembangunan Semenisasi Jalan Lingkungan BTN Lama T=15 cm Kec. Pkl.Kerinci

Kualifikasi : Usaha Kecil

Nilai HPS : 469,987,285.09Rp

80 % X HPS : 375,989,828.07Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ADI CIPTA NUGRAHA 352,353,939.76 74.97 23,499,364.25Rp I (Satu)

2 CV. JURAGAN MUDA 352,492,042.20 75.00 23,499,364.25Rp II (Dua)

3 CV. BUMI PELALAWAN MAKMUR 352,647,488.51 75.03 23,499,364.25Rp III (Tiga)

4 CV. MAHKOTA TERUSAN 360,064,620.88 76.61 23,499,364.25Rp IV (Empat)

5 CV. BANGUN PELALAWAN JAYA 365,400,308.14 77.75 23,499,364.25Rp V ( Iima )

6 CV. SAKURA JAYA 366,525,432.58 77.99 23,499,364.25Rp VI (Enam)

7 CV. UKEM 366,827,050.21 78.05 23,499,364.25Rp VII (Tujuh)

8 CV. PONGKAI SARANA 367,745,322.11 78.25 23,499,364.25Rp VIII (Delapan)

9 CV. JASA KONTRAKTOR 368,692,663.14 78.45 23,499,364.25Rp IX (Sembilan)

10 CV. EKA KARYA 369,556,433.18 78.63 23,499,364.25Rp X (Sepuluh)

11 CV. FYAT MOTOR 369,617,658.49 78.64 23,499,364.25Rp XI (Sebelas)

12 CV. REZKI PERDANA MANDIRI 370,666,877.07 78.87 23,499,364.25Rp XII (Dua belas)

13 CV. KERINCI JAYA 371,258,924.31 78.99 23,499,364.25Rp XIII (Tiga belas)

14 CV. WAHYU MANDIRI SEJAHTERA 371,528,322.43 79.05 23,499,364.25Rp XIV (Empat belas)

15 CV. RISNAURI 375,738,513.54 79.95 23,499,364.25Rp XV (Lima belas )

16 CV. ABDI JAYA 375,989,911.41 80.00 18,799,495.57Rp XVI (Enam belas)

17 CV. PANDUK JAYA MANDIRI 376,023,818.03 80.01 18,801,190.90Rp XVII (Tujuh belas)

18 CV. KARYA MULIA ABADI 376,051,443.23 80.01 18,802,572.16Rp XVIII (Delapan belas)

19 CV. DWI KARYA 376,370,870.81 80.08 18,818,543.54Rp IX (Sembilan belas)

20 CV. NUSANTARA KERINCI 376,474,667.55 80.10 18,823,733.38Rp XX (Dua puluh)

21 CV. KAMPAR JAYA 380,692,819.23 81.00 19,034,640.96Rp XXI (Dua puluh satu)

22 CV. TRI TUNGGAL JAYA LESTARI 385,460,221.47 82.02 19,273,011.07Rp XXII (Dua puluh dua)

23 CV. ADE SALMIAH 389,284,583.85 82.83 19,464,229.19Rp XXIII (Dua puluh tiga)

24 CV. ARYA BUMI RIAU TEKNIK 391,857,340.99 83.38 19,592,867.05Rp XXIV (Dua puluh empat)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 37: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 2 (Dua)

Pekerjaan : Pembangunan Semenisasi Jalan Lingkungan Blok E Rt.05/07 Jalan Mess Pemda T=17.5 cm Kec. Pkl.Kerinci

Kualifikasi : Usaha Kecil

Nilai HPS : 336,141,557.62Rp

80 % X HPS : 268,913,246.10Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. YUDE CONTRACTOR 258,869,066.17 77.01 16,807,077.88Rp I (Satu)

2 CV. DHENNI UTAMA 268,229,213.91 79.80 16,807,077.88Rp II (Dua)

3 CV. WAHYUDA KONTRAKTOR 268,711,014.19 79.94 16,807,077.88Rp III (Tiga)

4 CV. PANDUK JAYA MANDIRI 268,942,322.45 80.01 13,447,116.12Rp IV (Empat)

5 CV. SHERLY ARLYAN SHELLA 270,581,199.52 80.50 13,529,059.98Rp V ( Iima )

6 CV. SUMA RIFA 272,565,986.39 81.09 13,628,299.32Rp VI (Enam)

7 CV. PULAU SENANG SAKTI 277,140,540.29 82.45 13,857,027.01Rp VII (Tujuh)

8 CV. KERINCI MUDA MANDIRI 277,540,268.28 82.57 13,877,013.41Rp VIII (Delapan)

9 CV. NUSANTARA KERINCI 281,422,888.60 83.72 14,071,144.43Rp IX (Sembilan)

10 CV. MEGA PRIMA 282,204,011.41 83.95 14,110,200.57Rp X (Sepuluh)

11 CV. WAHYU MANDIRI SEJAHTERA 284,320,650.90 84.58 14,216,032.55Rp XI (Sebelas)

12 CV. ANTARA 285,931,148.83 85.06 14,296,557.44Rp XII (Dua belas)

13 CV. ABDI JAYA 286,041,359.67 85.10 14,302,067.98Rp XIII (Tiga belas)

14 CV. LIA KONTRAKTOR 286,823,080.84 85.33 14,341,154.04Rp XIV (Empat belas)

15 CV. MITRA SEJATI 287,847,001.11 85.63 14,392,350.06Rp XV (Lima belas )

16 CV. JASA KONTRAKTOR 319,949,945.57 95.18 15,997,497.28Rp XVI (Enam belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 3( TIGA )

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN GEREJA PENTA KOSTA T=20 CM KEC.PKL KERINCI

Kualifikasi : Usaha Kecil

Nilai HPS : 323,948,746.18Rp

80 % X HPS : 259,158,996.94Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. BUMI PELALAWAN MAKMUR 242,929,378.30Rp 74.99 16,197,437.31Rp I (Satu)

2 PT. DUA PUTRI UTAMA 248,799,596.89Rp 76.80 16,197,437.31Rp II (Dua)

3 CV. RAHMAN PUTRA PERDANA 259,159,491.08Rp 80.00 12,957,974.55Rp III (Tiga)

4 CV. TUAH PERKASA 259,199,030.90Rp 80.01 12,959,951.55Rp IV (Empat)

5 CV. GAMANA PRATAMA 262,364,971.18Rp 80.99 13,118,248.56Rp V ( Iima )

6 CV. MEGA PRIMA 262,906,361.20Rp 81.16 13,145,318.06Rp VI ( Enam )

7 CV. SUMMA RIFA 264,675,778.23Rp 81.70 13,233,788.91Rp VII ( Tujuh )

8 CV. JASA KONTRAKTOR 268,104,128.25Rp 82.76 13,405,206.41Rp VIII ( Delapan )

9 CV. HARIMAU MUDA BERTUAH 269,389,453.44Rp 83.16 13,469,472.67Rp IX ( Sembilan )

10 CV. PUTRA TUNGGAL 281,581,602.75Rp 86.92 14,079,080.14Rp X (Sepuluh )

11 CV. WAHYU MANDIRI SEJAHTERA 294,784,692.50Rp 91.00 14,739,234.62Rp XI ( Sebelas )

12 CV. ANUGRAH MANDIRI 304,595,186.13Rp 94.03 15,229,759.31Rp XII ( Dua belas )

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 38: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 4 (Empat)

Pekerjaan : Pembangunan Semenisasi Jalan Keluarga T= 15 cmKec. Pkl. Kerinci

Kualifikasi : Usaha Kecil

Nilai HPS : 163,518,872.13Rp

80 % X HPS : 130,815,097.70Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TRIA DELTA PUTRA TUNGGAL 126,418,921.74 77.31 8,175,943.61Rp I (Satu)

2 CV. SUMA RIFA 128,146,821.13 78.37 8,175,943.61Rp II (Dua)

3 CV. NAURI PRIMA UTAMA 128,201,821.13 78.40 8,175,943.61Rp III (Tiga)

4 CV. PUTRA TUNGGAL 129,988,832.99 79.49 8,175,943.61Rp IV (Empat)

5 CV. MEGA PRIMA 130,831,460.79 80.01 6,541,573.04Rp V ( Iima )

6 CV. BINA KARYA 130,978,396.05 80.10 6,548,919.80Rp VI (Enam)

7 CV. SABILLA 133,749,854.96 81.79 6,687,492.75Rp VII (Tujuh)

8 CV. JASA KONTRAKTOR 136,137,029.11 83.25 6,806,851.46Rp VIII (Delapan)

9 CV. WAHYU PERMATA MADANI 139,712,432.32 85.44 6,985,621.62Rp IX (Sembilan)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN / PENINGKATAN INFRASTRUKTUR

Paket : 5 ( LIMA )

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN MANGGIS 1 T=15 CM KEC.PKL KERINCI

Kualifikasi : USAHA KECIL

Nilai HPS : 163,647,640.91Rp

80 % X HPS : 130,918,112.73Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TRIA DELTA PUTRA TUNGGAL 126,606,571.95Rp 77.37 8,182,382.05Rp I (Satu)

2 CV. HARAPAN JAYA 126,820,071.20Rp 77.50 8,182,382.05Rp II (Dua)

3 CV. PUTRA TUNGGAL 127,143,798.32Rp 77.69 8,182,382.05Rp III (Tiga)

4 CV. CITRA KAMPAR 127,728,051.41Rp 78.05 8,182,382.05Rp IV (Empat)

5 CV. EKIE SEJAHTERA MANDIRI 128,088,971.12Rp 78.27 8,182,382.05Rp V ( Iima )

6 CV. SABILLA 128,344,348.24Rp 78.43 8,182,382.05Rp VI ( Enam )

7 CV. UKEM 128,418,228.71Rp 78.47 8,182,382.05Rp VII ( Tujuh )

8 CV. SUMMA RIFA 129,191,489.06Rp 78.94 8,182,382.05Rp VIII ( Delapan )

9 CV. JASA KONTRAKTOR 130,724,542.67Rp 79.88 8,182,382.05Rp IX ( Sembilan )

10 CV. PUTRA BUNGSU MANDIRI 130,760,351.48Rp 79.90 8,182,382.05Rp X (Sepuluh )

11 CV. GEMURUH INDAH PERKASA 132,375,429.36Rp 80.89 6,618,771.47Rp XI ( sebelas )

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 39: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 6 (Enam)

Pekerjaan : Peningkatan Semenisasi Jalan Pendidikan 2 x 0,2 x 120 m Kec. Pkl. Kerinci

Kualifikasi : Usaha Kecil

Nilai HPS : 149,732,559.94Rp

80 % X HPS : 119,786,047.95Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. PUTRA TUNGGAL 116,170,088.31 77.59 7,486,628.00Rp I (Satu)

2 CV. TRIA DELTA PUTRA TUNGGAL 117,037,516.56 78.16 7,486,628.00Rp II (Dua)

3 CV. PUTRA BUNGSU MANDIRI 118,659,088.33 79.25 7,486,628.00Rp III (Tiga)

4 CV. EKIE SEJAHTERA MANDIRI 119,464,777.92 79.79 7,486,628.00Rp IV (Empat)

5 CV. MEGA PRIMA 119,801,338.47 80.01 5,990,066.92Rp V ( Iima )

6 CV. SUMA RIFA 122,070,728.38 81.53 6,103,536.42Rp VI (Enam)

7 CV. JASA KONTRAKTOR 126,351,546.98 84.38 6,317,577.35Rp VII (Tujuh)

8 CV. WAHYU PERMATA MADANI 131,877,580.08 88.08 6,593,879.00Rp VIII (Delapan)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : REHABILITASI/PEMELIHARAAN DRAINASE/GORONG-GORONG

Paket : 1 ( SATU )

Pekerjaan : PEMELIHARAAN DRAINASE PKL. KERINCI KOTA

Kualifikasi : KECIL

Nilai HPS : 119,633,000.00Rp

80 % X HPS : 95,706,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TARUNA BISNIS ANDALAN 82,550,522.31Rp 69.00 5,981,650.00Rp I (Satu)

2 CV. AISYAH KERINCI 83,508,398.05Rp 69.80 5,981,650.00Rp II (Dua)

3 CV. PULAU SENANG SAKTI 86,547,158.50Rp 72.34 5,981,650.00Rp III (Tiga)

4 CV. ANAK TERUSAN 89,394,015.81Rp 74.72 5,981,650.00Rp IV (Empat)

5 CV. RIAU BARU 89,691,993.94Rp 74.97 5,981,650.00Rp V ( Iima )

6 CV. USAHA MAJU SETIA 89,828,794.69Rp 75.09 5,981,650.00Rp VI ( Enam )

7 CV. ROSSA MANDIRI PRATAMA 93,910,335.75Rp 78.50 5,981,650.00Rp VII ( Tujuh )

8 CV. LANSANI KERINCI 100,000,000.65Rp 83.59 5,000,000.03Rp VIII ( Delapan )

9 CV. LAUTAN GADING 112,022,033.48Rp 93.64 5,601,101.67Rp IX ( Sembilan )

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 40: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : REHABILITASI / PEMELIHARAAN DRAINASE / GORONG - GORONG

Paket : 2 ( DUA )

Pekerjaan : NORMALISASI DRAINASE PRIMER BTN LAMA MENUJU PIPA GAS KEC. PKL. KERINCI

Kualifikasi : KECIL

Nilai HPS : 149,331,000.00Rp

80 % X HPS : 119,464,800.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARCH BUILDING CONSTRUCTION 99,566,460.13Rp 66.68 7,466,550.00Rp I (Satu)

2 CV. DASTI 99,708,730.00Rp 66.77 7,466,550.00Rp II (Dua)

3 CV. SUMA RIFA 111,929,510.00Rp 74.95 7,466,550.00Rp III (Tiga)

4 CV. CAKRAWALA PERSADA 112,002,935.00Rp 75.00 7,466,550.00Rp IV (Empat)

5 CV. WAHYU PERMATA MADANI 114,847,150.00Rp 76.91 7,466,550.00Rp V ( Iima )

6 CV. FATMA DELA 115,967,733.75Rp 77.66 7,466,550.00Rp VI ( enam )

7 CV. LUMBA - LUMBA AMANAH 115,989,396.05Rp 77.67 7,466,550.00Rp VII ( tujuh )

8 CV. SABILLA 117,333,547.65Rp 78.57 7,466,550.00Rp VIII ( delapan )

9 CV. WAHYUDA KONTRAKTOR 120,719,412.00Rp 80.84 6,035,970.60Rp IX ( sembilan )

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PENATAAN TATA LETAK BANGUNAN

Paket : 1 (SATU)

Pekerjaan : PEMBANGUNAN TANGERAN (LAND MARKS) DI KEC. BANDAR SEIKIJANG

Kualifikasi : USAHA KECIL

Nilai HPS : 199,682,000.00Rp

80 % X HPS : 159,745,600.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARFAH 157,658,406.62Rp 78.95 9,984,100.00Rp I (Satu)

2 CV. RAJU MANDIRI 159,745,157.74Rp 80.00 9,984,100.00Rp II (Dua)

3 CV. ASSALAM 159,745,523.63Rp 80.00 9,984,100.00Rp III (Tiga)

4 CV. SEIKIJANG PERKASA 162,317,276.30Rp 81.29 8,115,863.82Rp IV (Empat)

5 CV. WAHANA JAYA CIPTA 165,094,736.51Rp 82.68 8,254,736.83Rp V ( Iima )

6 CV. NISAB 169,309,664.70Rp 84.79 8,465,483.24Rp VI ( Enam )

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 41: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PENATAAN TATA LETAK BANGUNAN

Paket : 2 (DUA)

Pekerjaan : - PEKERJAAN TIMBUNAN HALAMAN DEPAN ISTANA SAYAP KEC. PELALAWAN

- TIMBUNAN PARIT SAMPING PINTU GERBANG ISTANA SAYAP KEC. PELALAWAN

Kualifikasi : USAHA KECIL

Nilai HPS : 580,048,000.00Rp

80 % X HPS : 464,038,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARCH BUILDING CONSTRUCTION 417,560,000.00Rp 71.99 29,002,400.00Rp I (Satu)

2 CV. PELALAWAN PERKASA 472,082,187.50Rp 81.39 23,604,109.38Rp II (Dua)

3 CV. CIPTA USAHA 472,110,449.32Rp 81.39 23,605,522.47Rp III (Tiga)

4 CV. DASTI 478,071,000.00Rp 82.42 23,903,550.00Rp IV (Empat)

5 CV. CAHAYA PERDANA 480,909,000.00Rp 82.91 24,045,450.00Rp V ( Iima )

6 CV. SABILLA 484,440,000.00Rp 83.52 24,222,000.00Rp VI (Enam)

7 CV. HADE SATRIA 587,018,954.50Rp 101.20 29,350,947.73Rp VII (Tujuh)

8 CV. JURAGAN MUDA 587,524,946.25Rp 101.29 29,376,247.31Rp VIII (Delapan)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PENATAAN KOTA

Paket : 1 (SATU)

Pekerjaan : REHABILITASI GAPURA KM 55

Kualifikasi : USAHA KECIL

Nilai HPS : 249,847,593.66Rp

80 % X HPS : 199,878,074.93Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ASTAKONA 190,987,894.16Rp 76.44 12,492,379.68Rp I (Satu) Tidak Mendaftar

2 CV. ROSSA MANDIRI PRATAMA 192,360,955.29Rp 76.99 12,492,379.68Rp II (Dua)

3 CV. LUMBA-LUMBA AMANAH 193,808,274.09Rp 77.57 12,492,379.68Rp III (Tiga)

4 CV. BANGUN PELALAWAN JAYA 194,797,640.98Rp 77.97 12,492,379.68Rp IV (Empat)

5 CV. MAHKOTA TERUSAN 197,151,337.33Rp 78.91 12,492,379.68Rp V ( Iima )

6 CV. RAJU MANDIRI 199,855,066.58Rp 79.99 12,492,379.68Rp VI (Enam)

7 CV. HANE KAMPAR 199,866,900.49Rp 80.00 12,492,379.68Rp VII (Tujuh)

8 CV. KARYA PRATAMA SEJAHTERA 204,148,761.30Rp 81.71 10,207,438.06Rp VIII (Delapan) Tidak Mendaftar

9 CV. PANGLIMO 206,115,251.00Rp 82.50 10,305,762.55Rp IX (Sembilan)

10 CV. ANDRY MULTI KARYA 211,998,144.44Rp 84.85 10,599,907.22Rp X (Sepuluh)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 42: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PENGEMBANGAN RUANG TERBUKA HIJAU PERTAMANAN

Paket : 1 ( SATU )

Pekerjaan : PEMBUATAN TAMAN KOTA KEC. PELALAWAN

Kualifikasi : KECIL

Nilai HPS : 249,483,000.00Rp

80 % X HPS : 199,586,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TUAKAL 199,052,334.95Rp 79.79 12,474,150.00Rp I (Satu)

2 CV. PUTRA TUNGGAL 202,016,834.95Rp 80.97 10,100,841.75Rp II (Dua)

3 CV. PELALAWAN JAYA SATU 203,254,348.89Rp 81.47 10,162,717.44Rp III (Tiga)

4 CV. HARAPAN JAYA 204,209,079.95Rp 81.85 10,210,454.00Rp IV (empat)

5 CV. EKIE SEJAHTERA MANDIRI 205,449,109.95Rp 82.35 10,272,455.50Rp V (lima)

6 CV. PELALAWAN PERKASA 207,040,396.70Rp 82.99 10,352,019.83Rp VI (enam)

7 CV. ARFAH 207,192,153.39Rp 83.05 10,359,607.67Rp VII (tujuh)

8 CV. ALFIKA PELALAWAN 207,312,547.07Rp 83.10 10,365,627.35Rp VIII (delapan)

9 CV. BANGUN PELALAWAN JAYA 207,470,883.01Rp 83.16 10,373,544.15Rp IX (sembilan)

10 CV. SAJADAH PUSAKA 208,202,026.85Rp 83.45 10,410,101.34Rp X (sepuluh)

11 CV. SABILLA 208,677,697.40Rp 83.64 10,433,884.87Rp XI (sebelas)

12 CV. ANGGIAT 209,440,834.60Rp 83.95 10,472,041.73Rp XII (dua belas)

13 CV. MAHKOTA TERUSAN 211,091,623.46Rp 84.61 10,554,581.17Rp XIII (tigabelas)

14 CV. RENGAT CAHAYA PERMATA 211,783,502.32Rp 84.89 10,589,175.12Rp XIV (empat belas)

15 CV. AYU INDAH GEMILANG 213,500,899.58Rp 85.58 10,675,044.98Rp XV (lima belas)

16 CV. RADIAN FITRI 213,976,033.47Rp 85.77 10,698,801.67Rp XVI (enam belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PENGEMBANGAN RUANG TERBUKA HIJAU PERTAMANAN

Paket : 2 ( Dua)

Pekerjaan : PEMBANGUNAN JEMBATAN GANTUNG HUTAN KOTA PANGKALAN KERINCI

Kualifikasi : USAHA KECIL

Nilai HPS : 249,886,000.00Rp

80 % X HPS : 199,908,800.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. RIZKI TEHNIK 199,965,933.40 80.02 9,998,296.67Rp I (Satu)

2 CV. CANAL PRAN PRATAMA 217,004,165.10 86.84 10,850,208.25Rp II (Dua)

3 CV. MITRA MADANI 222,972,568.91 89.23 11,148,628.45Rp III (Tiga)

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

Page 43: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PENGEMBANGAN RUANG TERBUKA HIJAU PERTAMANAN

Paket : 3 ( TIGA )

Pekerjaan : PENGADAAN DAN PENANAMAN POHON PELINDUNG KM 55 - Sp. KUALO

Kualifikasi : KECIL

Nilai HPS : 161,072,535.58Rp

80 % X HPS : 128,858,028.46Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. PELALAWAN JAYA SATU 128,851,828.05Rp 80.00 6,442,591.40Rp I (Satu)

2 CV. HELSIS RENATA PUTRI 128,852,255.80Rp 80.00 6,442,612.79Rp II (Dua)

3 CV. PUTRA TUNGGAL 129,019,463.44Rp 80.10 6,450,973.17Rp III (Tiga)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PENGEMBANGAN RUANG TERBUKA HIJAU PERTAMANAN

Paket : 4 ( empat )

Pekerjaan : PENATAAN LANDSCAPE MASJID RAYA KEC. LANGGAM

Kualifikasi : USAHA KECIL

Nilai HPS : 617,851,000.00Rp

80 % X HPS : 494,280,800.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TEKAD MANDIRI 481,456,531.34 77.92 30,892,550.00Rp I (Satu)

2 CV. UTAMA JAYA KONTRAKTOR 572,975,028.71 92.74 28,648,751.44Rp II (Dua)

3 CV. NUSANTARA KERINCI 613,815,438.48 99.35 30,690,771.92Rp III (Tiga)

4 CV. BEST LANGKER 614,703,875.65 99.49 30,735,193.78Rp IV (empat)

5 CV. DIMAS ANDALAS 614,938,458.64 99.53 30,746,922.93Rp V (lima)

6 CV. KOLY PRIMA ABADI 615,329,592.41 99.59 30,766,479.62Rp VI (enam)

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

Page 44: I. EVALUASI DOKUMEN PENAWARAN - pelalawankab.go.id KARYA.pdf · 16 cv. nugraha chandra murni - 0.00 rp - xvi (enam belas) rab salah i. evaluasi dokumen penawaran perusahaan 2. 1.2.

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PENINGKATAN KINERJA OPERASIONAL PENGELOLAAN TPA

Paket : 1 ( satu )

Pekerjaan : PEMBANGUNAN JALAN PENGHUBUNG TPA KEMANG

Kualifikasi : USAHA KECIL

Nilai HPS : 274,890,000.00Rp

80 % X HPS : 219,912,000.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. RIYAN KONTRAKTOR 211,174,846.37 76.82 13,744,500.00Rp I (Satu)

2 CV. MITRA MADANI 213,743,680.24 77.76 13,744,500.00Rp II (Dua)

3 CV. MEDIA NUSANTARA INDONESIA 219,933,953.76 80.01 10,996,697.69Rp III (Tiga)

4 CV. ILHAMSYAH 225,410,159.85 82.00 11,270,507.99Rp IV (Empat)

5 CV. MUTIARA ABADI 229,080,195.53 83.34 11,454,009.78Rp V ( Iima )

6 CV. CANAL PRAN MANDIRI 231,350,881.66 84.16 11,567,544.08Rp IV (Empat)

7 CV. CAHAYA HATI 241,738,618.72 87.94 12,086,930.94Rp V ( Iima )

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN GEDUNG KANTOR

Paket : 1 (SATU)

Pekerjaan : PEMBANGUNAN GEDUNG AULA / GEDUNG SERBA GUNA

Kualifikasi : USAHA KECIL

Nilai HPS : 586,185,000.00Rp

80 % X HPS : 468,948,000.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ZALISTI MANDIRI 496,576,938.14Rp 84.71 24,828,846.91Rp I (Satu)

2 CV. GINSAR 582,330,933.66Rp 99.34 29,116,546.68Rp II (Dua)

3 CV. JASA KONTRAKTOR 583,896,497.90Rp 99.61 29,194,824.89Rp III (Tiga)

4 CV PUTRA PERKASA 584,116,497.90Rp 99.65 29,205,824.89Rp IV (Empat)

5 CV. PULAU BARU 584,776,497.90Rp 99.76 29,238,824.89Rp V (Lima)

Pangkalan Kerinci, Juli 2011

Panitia Pengadaan Barang / Jasa

1. AZWARDI, ST 1. . 3. RIZAL DAIRI ALI, Amd 3.

Ketua Anggota

2. ERWINSYAH 2. 4. SIGIT YASIEN, ST 4.

Sekretaris Anggota

5. SYAHRIAL 5

Anggota

PERUSAHAAN

2

PERUSAHAAN

2

I. EVALUASI DOKUMEN PENAWARAN

I. EVALUASI DOKUMEN PENAWARAN