HPS PU KOTA PKU.xls

30
HARGA S TAH NO. JENIS BAHAN SATUAN 1 2 3 I TENAGA KERJA 1 MANDOR HARI 2 KEPALA TUKANG HARI 3 TUKANG HARI 4 PEKERJA HARI II BAHAN A. BAHAN STRUKTURAL 1 PASIR URUG M3 2 PASIR PASANG M3 3 PASIR BETON / COR M3 4 TANAH URUG / TIMBUN M3 5 BATU PECAH M3 6 KERIKIL / KORAL BETON M3 7 SIRTU M3 8 SIRTU GALIAN/GRAVEL M3 9 AGGREGATE KASAR (KERIKIL PECAH) M3 10 AGGREGATE HALUS (KERIKIL PECAH) M3 11 FILER/ ABU BATU Kg 12 FINE/PASIR HALUS M3 13 BATU KALI UK. 5 x 10 CM M3 14 BATU BATA UK. 5 x 10 x 20 CM Bh 15 BATU BATA RINGAN/HEUBEL UK. 10 x 20 x 60 CM Bh 16 PORTLAND CEMENT / SEMEN PADANG TYPE I Kg 17 PORTLAND CEMENT PUTIH Kg 18 PAVING BLOK TEBAL 6 CM Bh 19 CONEBLOCK TEBAL 10X10x20 CM Bh 20 KASTEEN CONEBLOCK UK. 30 X 60 CM Bh 21 GRASS BLOK TEBAL 6 CM Bh 22 BATU KERAWANG BETON Bh 23 BATU KERAWANG TANAH LIAT Bh 24 BATU SIKAT M2 25 BATU TEPLEK M2 26 BUIS BETO 20 CM Bh

description

Harga satuan Kota Pekanbaru

Transcript of HPS PU KOTA PKU.xls

Page 1: HPS PU KOTA PKU.xls

HARGA SATUAN UPAH DAN BAHANTAHUN ANGGARAN 2012

NO. JENIS BAHAN SATUAN

1 2 3 5

I TENAGA KERJA1 MANDOR HARI 80,000.00 2 KEPALA TUKANG HARI 79,000.00 3 TUKANG HARI 70,000.00 4 PEKERJA HARI 56,000.00

II BAHAN

A. BAHAN STRUKTURAL

1 PASIR URUG M3 120,000.00 2 PASIR PASANG M3 133,100.00 3 PASIR BETON / COR M3 167,200.00 4 TANAH URUG / TIMBUN M3 86,702.00 5 BATU PECAH M3 385,000.00 6 KERIKIL / KORAL BETON M3 258,000.00 7 SIRTU M3 177,870.00 8 SIRTU GALIAN/GRAVEL M3 270,000.00 9 AGGREGATE KASAR (KERIKIL PECAH) M3 462,753.00

10 AGGREGATE HALUS (KERIKIL PECAH) M3 462,733.00 11 FILER/ ABU BATU Kg 360.00 12 FINE/PASIR HALUS M3 270,561.00 13 BATU KALI UK. 5 x 10 CM M3 265,000.00 14 BATU BATA UK. 5 x 10 x 20 CM Bh 625.00 15 BATU BATA RINGAN/HEUBEL UK. 10 x 20 x 60 CM Bh16 PORTLAND CEMENT / SEMEN PADANG TYPE I Kg 1,276.00 17 PORTLAND CEMENT PUTIH Kg 2,250.00 18 PAVING BLOK TEBAL 6 CM Bh 2,600.00 19 CONEBLOCK TEBAL 10X10x20 CM Bh 3,000.00 20 KASTEEN CONEBLOCK UK. 30 X 60 CM Bh 35,000.00 21 GRASS BLOK TEBAL 6 CM Bh 3,000.00 22 BATU KERAWANG BETON Bh 5,000.00 23 BATU KERAWANG TANAH LIAT Bh 25,000.00 24 BATU SIKAT M2 220,000.00 25 BATU TEPLEK M2 65,000.00 26 BUIS BET 20 CM Bh 87,000.00 27 BUIS BET 40 CM Bh 178,000.00 28 BUIS BET 60 CM Bh 325,000.00 29 BUIS BET 80 CM Bh 640,000.00

HARGA SATUAN

(PERLENGKAPAN)

Page 2: HPS PU KOTA PKU.xls

30 BUIS BET 100 CM Bh 680,000.00 31 TANAH HITAM M3 130,000.00 32 RUMPUT GAJAH M2 15,000.00 33 RUMPUT GAJAH MINI M2 25,000.00 34 ASPAL DRUM Kg 14,000.00 35 ASPAL CURAH Kg 10,000.00 36 BIAYA PERKERASAN ASPAL HOT MIX M2 415,000.00 37 BETON READY MIX : MUTU DENGAN MATERIAL KORAL

- K 125 M3 450,000.00 - K 150 M3 500,000.00 - K 175 M3 560,000.00 - K 200 M3 585,000.00 - K 225 M3 625,000.00

38 BETON READY MIX : MUTU DENGAN MATERIAL BATU PECAH- K 175 M3 690,000.00 - K 200 M3 710,000.00 - K 225 M3 740,000.00 - K 250 M3 770,000.00 - K 300 M3 820,000.00 - K 350 M3 840,000.00 - K 400 M3- K 450 M3- K 500 M3

39 TIANG PANCANG BAJA DIA 60 cm M'40 TIANG PANCANG MINIPILE BETON 20X20 M'41 TIANG PANCANG MINIPILE BETON 25X25 M'

B. BAHAN KAYU1 KAYU KULIM M3 6,500,000.00 2 KAYU JATI M3 9,000,000.00 3 KAYU KLAS II M34 KAYU KLAS III M35 KAYU LAMBERZIRING (JELUTUNG) M3 4,900,000.00 6 KAYU PIRI-PIRI BIASA M3 2,100,000.00 7 PAPAN MERANTI M3 2,200,000.00 8 TRIPLEK 3 MM LBR 42,000.00 9 TRIPLEK 3.6 MM LBR 51,000.00

10 TRIPLEK 4 MM LBR 58,000.00 11 TRIPLEK 6 MM LBR 75,000.00 12 TRIPLEK 9 MM LBR 110,000.00 13 TRIPLEK 12 MM LBR 150,000.00 14 KAYU CEROCOK / KAYU UBAR BTG 25,000.00 15 KAYU DOLKEN DIA 5-10 CM BTG16 KAYU PERANCAH / BEKISTING M3 2,000,000.00 17 KAYU PROFIL M' 3,600.00 18 PAPAN LISPLANK UKIRAN (LEBAH BERGAYUT) M' 80,000.00 19 LISPLANK UKIR (GRC) M' 250,000.00

Page 3: HPS PU KOTA PKU.xls

20 SINGAP UKIR (PAPAN) M2 350,000.00 21 SINGAP UKIR (GRC) M2 600,000.00 22 GRC POLOS (TANPA MOTIF) M' 550,000.00 23 SELEMBAYUNG UKIR (KAYU) Bh 300,000.00 24 SELEMBAYUNG UKIR (FIBERGLASS) Bh 690,000.00 25 SELEMBAYUNG UKIR (GRC) Bh 600,000.00 26 KAYU RAMIN BTG 23,575.00 27 KAYU BAKAR IKAT 83,375.00

C. BAHAN BESI1 BESI BETON BIASA Kg 12,200.00 2 BESI BETON ULIR Kg 13,000.00 2 KAWAT IKAT BETON (BANDRAT) Kg 20,000.00 3 KAWAT HARMONIKA M2 20,700.00 4 KAWAT NYAMUK M2 17,250.00 5 TEMPAT MASAK ASPAL Bh 57,500.00 6 KAWAT DURI M' 3,000.00 7 BESI PROFIL WF Kg 10,000.00 8 BAJA STRUKTURAL/PROFIL (WF, C, H, L...) Kg9 VERTICAL BLIND M2 145,000.00

10 TERALI BESI PINTU/JENDELA (BESI BULAT) M2 350,000.00 11 TERALI BESI PINTU/JENDELA (BESI NAKO) M2 400,000.00 12 BESI PAGAR BRC, P=2.4 M Bh 550,000.00 13 BESI PAGAR TERALI (BESI BULAT), T=1.2 M M' 350,000.00 14 BESI PAGAR TERALI (BESI NAKO), T =1.2 M M' 400,000.00 15 BESI HOLLOW UK. 40 X 40 MM M' 65,000.00 16 FOLDING GATE M2 850,000.00 17 RANGKA ALUMUNIUM M' 50,000.00 18 ROLLING DOOR M2 600,000.00

D. BAHAN LANTAI1 KERAMIK KW 1 (Roman)

- KERAMIK 60x60 CM BH 229,000.00 - KERAMIK 40x40 CM BH 122,000.00 - KERAMIK 30x30 CM BH 118,000.00 - KERAMIK 25x25 CM BH 98,000.00 - KERAMIK 20x25 CM BH 52,900.00 - KERAMIK 20x20 CM M2 52,325.00 - PLIN KER 10X20 CM Bh 710.00 - PLIN KER 10X30 CM Bh 1,800.00 - PLIN KER 10X40 CM Bh 2,500.00 - PLIN KER 10X60 CM Bh 5,025.00 - PLIN KERAMIK TANGGA / SKEP FASING (SETARA) Bh- PLIN KERAMIK KM/WC / WBIS WARNA Uk. 20 CM Bh- BON-BON KERAMIK M' 7,000.00

2 GRANIT MOTIF KW I- GRANIT 80X80 CM Bh 162,500.00 - GRANIT 60X60 CM Bh 72,000.00

Page 4: HPS PU KOTA PKU.xls

- GRANIT 40X40 CM Bh 26,000.00 3 PORSELIN Bh 1,725.00 4 MARMER M2 1,250,000.00 5 KARPET M2 17,000.00 6 PARQUET M2 238,000.00 7 BATU TEMPEL HITAM M2 230,000.00 8 BATU TEMPEL PALIMANAN M2 175,000.00 9 WALL PAPER M2 85,000.00

10 VINIL M2 34,500.00 11 Paving Block Segi Enam T=6cm BH12 Paving Block esgi Empat BH

E. BAHAN ATAP1 SENG GELOMBANG BJLS 20 K LBR 77,000.00 2 SENG GELOMBANG WARNA BJLS 20 K LBR 90,000.00 3 PERABUNG SENG PLAT BJLS 30 K LBR 27,500.00 4 ATAP GENTENG METAL 0,35 MM M2 52,000.00 5 ATAP ONDULEN BITUMEN M2 180,000.00 6 PERABUNG GENTENG METAL BULAT LBR 26,000.00 7 PERABUNG GENTENG METAL PERSEGI LBR 25,000.00 8 SENG PLAT BJLS 20 K LBR 45,000.00 9 SENG PLAT ALUMUNIUM 0.3 MM LBR 85,000.00

10 PLASTIK GOT M' 9,000.00 11 ASBES LBR 25,000.00 12 ALUMUNIUM FOIL M2 8,500.00 13 FORMIKA M2 35,000.00 14 ATAP GENTENG BH 7,500.00 15 NOK ATAP GENTENG M' 1,800.00

F. BAHAN LANGIT - LANGIT DAN LAP. DINDING1 PLYWOO 4 MM LBR 54,000.00 2 PLYWOO 6 MM LBR 66,000.00 3 PLYWOO 9 MM LBR 110,000.00 4 PLYWOOD 4 MM LBR 95,000.00 5 GYPSUM 6 MM LBR 65,000.00 6 GYPSUM 9 MM LBR 96,000.00 7 LIST PROFIL KAYU M' 4,125.00 8 LIST PROFIL GYPSUM M' 14,300.00 9 METAL CLADING M2 300,000.00

G. BAHAN PIPA1 STOPKRAN 3/4 " Bh 27,500.00 2 KRAN AIR 1/2 " Bh 27,500.00 3 KRAN AIR 3/4 " Bh 27,500.00 4 PIPA PVC 1/2 " M' 5,000.00 5 PIPA PVC 3/4 " M' 6,450.00 6 PIPA PVC 1 " M' 7,600.00 7 PIPA PVC 1,5 " M' 12,000.00

Page 5: HPS PU KOTA PKU.xls

8 PIPA PVC 2 " M' 18,500.00 9 PIPA PVC 3 " M' 52,500.00

10 PIPA PVC 4 " M' 58,500.00 11 ELBOW P 4 " Bh 22,000.00 12 SOCKET 4 " Bh 15,400.00 13 PIPA BESI HIGH P 1" M' 49,000.00 14 PIPA BESI HIGH P 3/4 " M' 33,000.00 15 PIPA BESI HIGH P 1/2 " M' 21,500.00 16 PIPA BESI HIGH PRESSURE HITAM 2 " M' 30,000.00 17 PIPA BESI HIGH PRESSURE HITAM 2,5 " M' 30,000.00 17 PIPA BESI HIGH PRESSURE HITAM 3 " M' 40,000.00 18 PIPA BESI HIGH PRESSURE HITAM 4 " M'19 PIPA BESI HIGH PRESSURE HITAM 6 " M'20 PIPA GALVANIS DIA 1.6" BTG

H. BAHAN SANITAIR1 KLOSET JONGKOK Bh 355,000.00 2 KLOSET DUDUK Bh 1,350,000.00 3 FLOOR DRAIN Bh 327,000.00 4 CLEAN OUT 0.2" (SARINGAN AIR KOTOR) Bh 19,800.00 5 BAK FIBERGLASS 1 M3 Bh 250,000.00 6 WASTAFEL Bh 650,000.00 7 BAK AIR KAMAR MANDI 220 lTR+C176 Bh 250,000.00 8 TEMPAT SABUN Bh 30,000.00 9 GANTUNGAN HANDUK Bh 75,000.00

10 KACA KAMAR MANDI Bh 165,000.00 11 MESIN POMPA AIR UNIT 1,500,000.00 12 URINOIR Bh 1,380,000.00 13 BAK CUCI STAINLESS STEEL / KITCHEN SINK Bh 385,000.00 14 SEAL TAPE Bh 4,500.00 15 BATHTUB KOMPLIT UNIT 6,000,000.00 16 TANKI AI 0.50 M3 Bh 650,000.00 17 TANKI AI 1.00 M3 Bh 1,350,000.00 18 KRAN AIR DIA. 3/4" , 1/2" Bh

I. BAHAN PAKU1 PAKU ATAP GENTENG METAL Kg 26,000.00 2 PAKU KAYU Kg 15,000.00 3 PAKU SENG Kg 25,000.00 4 PAKU ASBES Kg 22,000.00 5 PAKU SERI Kg 18,000.00 6 PAKU 2" - 5" Kg 13,000.00 7 PAKU SKRUP + BAUT + KARET DIA. 8" Bh 20,000.00 8 ANGKER BESI Bh 6,500.00 9 BESI STRIP 2" Kg 12,000.00

10 PAKU GYPSUM Kg 25,000.00 11 PAKU TRIPLEKS / TEAKWOOD Kg 19,000.00

Page 6: HPS PU KOTA PKU.xls

J. BAHAN PENGGANTUNG / KUNCI1 KUNCI 2 SLAAG Bh 93,150.00 2 KUNCI 1 SLAAG Bh 92,000.00 3 KUNCI BIASA Bh 62,100.00 4 GRENDEL 4 " Bh 15,000.00 5 ENGSEL 4 " Bh 14,000.00 6 ENGSEL 3 " Bh 15,000.00 7 ENGSEL TANAM PINTU Bh 25,000.00 8 GRENDEL 2 " Bh 10,000.00 9 HAK ANGIN JENDELA Bh 16,500.00

10 HANDLE JENDELA Bh 27,500.00 11 HANDLE PINTU Bh 125,000.00 12 KUNCI G 3 " Bh 80,000.00 13 KUNCI TANAM ANTIK Bh 495,000.00 14 DOOR CLOSER Bh 85,000.00 15 DOOR STOP Bh 125,000.00

K. BAHAN KACA1 KACA BE 3 MM M2 65,000.00 2 KACA BE 5 MM M2 95,000.00 3 KACA NAKO (RANGKA 9 DAUN + BESI) UNIT 180,000.00 4 KACA BU 3 MM M2 114,000.00 5 KACA BU 5 MM M2 115,000.00 6 KACA BLOK / GLASSBLOCK Bh 21,850.00 7 KACA PATRY TEBAL 8 MM BINGKAI TEMBAGA (3 LAPIS M2 1,900,000.00 8 KACA PATRY TEBAL 16 MM BINGKAI TEMBAGA (3 LAPI M2 2,400,000.00 9 KACA PATRY TEBAL 17 MM BINGKAI KUNINGAN (3 LAP M2 2,600,000.00

10 KACA GR 5 MM M2 1,200,000.00 11 KACA RE 5 MM M2 125,000.00

L. BAHAN LISTRIK1 TITIK LAMPU (KABEL INSTALASI STANDAR PLN) TITIK 172,000.00 2 LAMPU P 25 WATT Bh 30,000.00 3 LAMPU P 40 WATT Bh 45,000.00 4 LAMPU NEON (JANTUNG) 35 WATT Bh 75,000.00 5 LAMPU T 1X20 WATT TKI 2 X 18 Bh 70,000.00 6 LAMPU T 2X20 WATT TK0 2 X 18 Bh 75,000.00 7 LAMPU T 1X40 WATT TK0 2 X 30 Bh 445,000.00 8 LAMPU T 1X40 WATT TKI 2 X 30 Bh 260,000.00 9 STOP KONTAK (STANDAR PLN) Bh 13,800.00

10 PANEL BOX (STANDAR PLN) Bh 1,650,000.00 11 SAKLAR TRIPLE (STANDAR PLN) Bh 25,000.00 12 SAKLAR GANDA (STANDAR PLN) Bh 3,000.00 13 SAKLAR TUNGGAL (STANDAR PLN) Bh 18,400.00 14 LAMPU PHILIPs XL SAVE ENERGY 25 WATT Bh 65,000.00 15 LAMPU DOWN LIGHT KOMPLIT 20 WATT Bh 60,500.00 16 LAMPU BARET KOM20 WATT Bh 195,000.00 17 LAMPU HIAS TANAM KOMPLIT Bh 2,850,000.00

Page 7: HPS PU KOTA PKU.xls

18 PANEL MCB KOMPLIT (STANDAR PLN) Bh 55,000.00 19 EXHAUSST VAN BESAR UNIT 550,000.00 20 EXHAUSST VAN KECIL UNIT 450,000.00

M. BAHAN PINTU1 PINTU PANIL TEMBUSU Bh 3,500,000.00 2 PINTU PANIL MERANTI Bh 600,000.00 3 PINTU TERALI BESI dia 12 mm Bh 1,300,000.00 4 PINTU KACA 10 mm Bh 2,100,000.00 5 PINTU TEAKWOOD LBR 684,000.00 6 PINTU PLYWOOD LBR 225,000.00 7 PINTU FIBER WARNA LBR 281,325.00 8 PINTU PANIL KACA LBR 1,140,000.00 9 PINTU ALUMUNIUM KACA (setara YKK) KOMPLIT LBR 2,000,000.00

10 PINTU FIBERGLASS MOTIF LBR 500,000.00 11 PINTU BESI ROLLING DOOR M2 700,000.00

N. BAHAN FINISHING1 CAT MINYAK SETARA CATYLAC Kg 75,000.00 2 KAPUR TEMBOK Kg 7,500.00 3 CAT TEMBOK SETARA DANABRITE Kg 25,300.00 4 CAT TEMBOK SETARA CATYLAC Kg 27,000.00 5 CAT VERNISH Kg 55,000.00 6 CAT KAYU DASAR / MENI Kg 24,000.00 7 MINYAK CAT / THINNER LTR 27,600.00 8 RESIDU Kg 10,000.00 9 DEMPUL Kg 26,000.00

10 PLAMIR Kg 40,000.00 11 CAT ATAP SENG / GENTENG Kg 55,000.00 12 KERTAS PASIR / AMPLAS LBR 5,000.00 13 PLITUR LTR 40,000.00 14 TEMPAT ADUKAN CAT Bh 10,000.00 15 TEPUNG PENGISI NAT KERAMIK Kg 12,000.00 16 TEPUNG PENGISI NAT GYPSUM / CORNICE Kg 4,500.00 17 KUAS 3" Bh 10,000.00 18 KUAS GULUNG / ROL Bh 27,500.00 19 MINYAK BEKISTING LTR 8,000.00 20 SODA API Kg 10,000.00 21 SABUN Bh 10,000.00 22 LEM Kg 5,000.00 23 LEM KAYU FOX LTR 26,000.00 24 BATACOTE Kg 40,000.00 25 WALLPAPER M2 95,000.00 26 CAT IMPRA Kg 46,000.00 27 CAT EKSTERIOR (WEATHER SHIELD) Kg 100,100.00

O. BAJA RINGAN1 SUPERTRUSS C75. 100 INT / SETARA Kg 30,000.00

Page 8: HPS PU KOTA PKU.xls

2 SUPERTRUSS C75. 75 INT / SETARA Kg 25,000.00 3 TOPSPAN 40,055 INT Kg 25,000.00 4 WTEKS 12-14 x 20 HWFS CLASS II PC 800.00 5 CSP 10-16 x 16 HWFS CLASS II PC 600.00

6 SG 10 MULTIPLATE PC 6,250.00

III BAHAN & UPAH BINA MARGATENAGA KERJA

1 Pekerja Jam2 Tukang Jam3 M a n d o r Jam4 Operator Jam5 Pembantu Operator Jam6 Sopir / Driver Jam7 Pembantu Sopir / Driver Jam8 Mekanik Jam9 Pembantu Mekanik Jam

10 Kepala Tukang Jam

BAHAN12 Bahan Pilihan M3 33,000.00 14 Kerosen / Minyak Tanah LITER 7,769.67 15 Semen / PC (50kg) Zak 63,800.00 22 Cat Marka (Non Thermoplas) Kg23 Cat Marka (Thermoplastic) Kg26 B e n s i n LITER 6,882.34 27 S o l a r LITER 7,617.05 28 Minyak Pelumas / Olie LITER 30,250.00 29 Plastik Filter M2 20,350.00 31 Pipa Porus M' 126,500.00 32 Bahan Agr.Base Kelas A M3 432,202.00 33 Bahan Agr.Base Kelas B M3 411,625.15 34 Bahan Agr.Base Kelas C M3 310,993.02 35 Bahan Agr.Base Kelas C2 M3 137,887.71 36 Geotextile M237 Aspal Emulsi Kg 8,224.18 38 Gebalan Rumput M240 Glass Bead Kg41 Pelat Rambu (Eng. Grade) BH42 Pelat Rambu (High I. Grade) BH43 Rel Pengaman M'45 Baja Tulangan (Polos) U24 Kg 11,000.00 46 Baja Tulangan (Ulir) D32 Kg 12,100.00 47 Kapur M3 66,387.71 48 Chipping M349 Chipping (kg) Kg50 Cat Kg51 Pemantul Cahaya (Reflector) Bh.

Page 9: HPS PU KOTA PKU.xls

52 Pasir Alam M353 Arbocell Kg.54 Baja Bergelombang Kg59 Kawat Las Dos 13,581.63 60 Pipa Baja Kg61 Minyak Fluks Liter62 Bunker Oil Liter63 Asbuton Halus Ton64 Baja Prategang Kg65 Baja Tulangan (Polos) U32 Kg 11,000.00 66 Baja Tulangan (Ulir) D39 Kg 12,100.00 67 Baja Tulangan (Ulir) D48 Kg 12,100.00 68 PCI Girder L=17m Buah69 PCI Girder L=21m Buah70 PCI Girder L=26m Buah71 PCI Girder L=32m Buah72 PCI Girder L=36m Buah73 PCI Girder L=41m Buah77 Elastomer buah78 Bahan pengawet: kreosot liter79 Mata Kucing buah80 Anchorage buah81 Anti strpping agent liter82 Bahan Modifikasi Kg85 Ducting (Kabel prestress) M'86 Ducting (Strand prestress) M'89 Elastomer jenis 1 buah 1,500,000.00 90 Elastomer jenis 2 buah91 Elastomer jenis 3 buah92 Expansion Tipe Joint Asphaltic Plug M93 Expansion Join Tipe Rubber M94 Expansion Join Baja Siku M95 Marmer Buah96 Kerb Type A Buah

Pekanbaru, Januari 2012

KEPALA DINAS PEKERJAAN UMUMKOTA PEKANBARU

Ir. H. DEDI GUSRIADI, MTNip. 196408121990071001

Page 10: HPS PU KOTA PKU.xls

HARGA SATUAN UPAH DAN BAHANTAHUN ANGGARAN 2012

5 4

80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 79,000.00 70,000.00 70,000.00 70,000.00 60,000.00 60,000.00 56,000.00

120,000.00 95,000.00 120,000.00 120,000.00 121,000.00 100,000.00 121,000.00 130,000.00 170,000.00 105,000.00 152,000.00 165,000.00 8,000.00 40,000.00 68,200.00 70,000.00

385,000.00 385,000.00 166,000.00 135,000.00 258,000.00 258,000.00 230,000.00 177,870.00 177,870.00 456,900.00 270,000.00 270,000.00 372,276.35 462,753.00 462,753.00 372,276.35 462,733.00 462,733.00 300.00 360.00 360.00 372,276.35 270,561.00 270,561.00 272,500.00 265,000.00 265,000.00

550.00 500.00 625.00 1000

500.00 8,500.00 83.333333

1,160.00 1,180.00 1,160.00 1,200.00 2,250.00 2,250.00 3,000.00 2,600.00 2,600.00 2,800.00 35,000.00 35,000.00 3,000.00 3,000.00 5,000.00 5,000.00 25,000.00 25,000.00 220,000.00 220,000.00

65,000.00 65,000.00 65,000.00 87,000.00 87,000.00 178,000.00 178,000.00 325,000.00 325,000.00 640,000.00 640,000.00

HARGA SATUAN (BINA MARGA)

HARGA SATUAN (PENGAIRAN)

HARGA SATUAN (CIPTA KARYA)

HARGA SATUAN DINAS

PEKERJAAN UMUM

Page 11: HPS PU KOTA PKU.xls

680,000.00 680,000.00 114,200.00 125,000.00 15,000.00 15,000.00 24,000.00 25,000.00

11,500.00 11,000.00 14,000.00 10,000.00 10,000.00 415,000.00 415,000.00

1,055,086.89 420,000.00 572,000.00 450,000.00 612,000.00 520,000.00 627,000.00 550,000.00 671,000.00 570,000.00 715,000.00

1,102,491.28 870,000.00 894,848.00 910,000.00 836,000.00 937,000.00 899,673.00

1,498,426.94 952,000.00 940,338.00 1,683,251.72 977,000.00 991,997.00 1,981,496.48 968,000.00 2,031,905.50 1,045,000.00

1,100,000.00 2,311,597.43 1,210,000.00 25,247.37 750,000.00

140,000.00 155,000.00 185,000.00 216,000.00

6,500,000.00 6,500,000.00 9,000,000.00 9,000,000.00 3,500,000.00 3,500,000.00

1,800,000.00 2,200,000.00 2,200,000.00 4,900,000.00 4,900,000.00 2,100,000.00 2,100,000.00

2,200,000.00 42,000.00 46,000.00 51,000.00 51,000.00 58,000.00 58,000.00 75,000.00 75,000.00

110,000.00 110,000.00 110,000.00 181,500.00 150,000.00 150,000.00 25,000.00 24,000.00 25,000.00 25,000.00

16,000.00 20,000.00 20,000.00 2,000,000.00 1,760,000.00 2,000,000.00 2,000,000.00

3,600.00 3,600.00 80,000.00 80,000.00 250,000.00 250,000.00

Page 12: HPS PU KOTA PKU.xls

350,000.00 350,000.00 600,000.00 600,000.00 550,000.00 550,000.00 300,000.00 300,000.00 690,000.00 690,000.00 600,000.00 600,000.00 23,575.00 23,575.00 83,375.00 83,375.00

10,000.00 10,000.00 12,200.00 12,200.00 12,000.00 13,000.00 13,000.00 20,000.00 18,000.00 20,000.00 20,000.00

20,700.00 20,700.00 17,250.00 17,250.00 57,500.00 57,500.00 3,000.00 3,000.00

10,000.00 18,000.00 17,500.00 18,000.00

145,000.00 145,000.00 350,000.00 350,000.00 400,000.00 400,000.00 550,000.00 550,000.00 350,000.00 350,000.00 400,000.00 400,000.00 65,000.00 65,000.00 850,000.00 850,000.00 50,000.00 50,000.00 600,000.00 600,000.00

229,000.00 76,333.33 122,000.00 20,333.33 118,000.00 10,727.27 98,000.00 6,125.00 52,900.00 2,645.00 132.25

52,325.00 2,093.00 6,800.00 1,500.00 15,000.00 1,800.00 17,000.00 2,500.00 23,000.00 5,025.00 15,000.00 15,000.00 7,500.00 7,500.00 7,000.00 7,000.00

162,500.00 162,500.00 72,000.00 72,000.00

Page 13: HPS PU KOTA PKU.xls

26,000.00 26,000.00 1,725.00 1,725.00 1,250,000.00 1,250,000.00 17,000.00 17,000.00 238,000.00 238,000.00 230,000.00 230,000.00 175,000.00 175,000.00 85,000.00 85,000.00 34,500.00 34,500.00

2,200.00 1,660.00 1300

77,000.00 77,000.00 90,000.00 90,000.00 27,500.00 27,500.00 52,000.00 52,000.00 180,000.00 180,000.00 26,000.00 26,000.00 25,000.00 25,000.00 45,000.00 45,000.00 85,000.00 85,000.00 9,000.00 9,000.00 25,000.00 25,000.00 8,500.00 8,500.00 35,000.00 35,000.00 7,500.00 7,500.00 1,800.00 1,800.00

54,000.00 54,000.00 66,000.00 66,000.00 110,000.00 110,000.00 95,000.00 95,000.00 65,000.00 65,000.00 96,000.00 96,000.00 4,125.00 4,125.00 14,300.00 14,300.00 275,000.00 300,000.00 3.36 700000

27,500.00 27,500.00 27,500.00 27,500.00 27,500.00 27,500.00 5,000.00 5,000.00 6,450.00 6,450.00 7,600.00 7,600.00 12,000.00 12,000.00

Page 14: HPS PU KOTA PKU.xls

18,500.00 18,500.00 52,500.00 52,500.00 58,500.00 58,500.00 22,000.00 22,000.00 15,400.00 15,400.00 49,000.00 49,000.00 33,000.00 33,000.00 21,500.00 21,500.00 50,000.00 60,000.00 58,333.33

50,000.00 70,000.00 70,833.33 80,000.00 79,166.67

129,166.67 137,500.00 ###

175,000.00 192,000.00 ###

850,000.00 850,000.00

355,000.00 355,000.00 1,350,000.00 1,350,000.00 327,000.00 165,000.00 19,800.00 19,800.00 250,000.00 250,000.00 650,000.00 650,000.00 250,000.00 250,000.00 30,000.00 30,000.00 75,000.00 75,000.00 165,000.00 165,000.00 1,500,000.00 1,500,000.00 1,380,000.00 1,380,000.00 385,000.00 385,000.00 4,500.00 4,500.00 6,000,000.00 6,000,000.00 650,000.00 650,000.00 1,350,000.00 1,350,000.00

30,000.00

26,000.00 26,000.00 16,000.00 15,000.00 15,000.00

25,000.00 25,000.00 22,000.00 22,000.00 18,000.00 18,000.00

16,000.00 17,000.00 13,000.00 13,000.00 20,000.00 20,000.00 6,500.00 6,500.00 12,000.00 12,000.00 25,000.00 25,000.00 19,000.00 19,000.00

Page 15: HPS PU KOTA PKU.xls

93,150.00 93,150.00 92,000.00 92,000.00 62,100.00 62,100.00 15,000.00 15,000.00 14,000.00 14,000.00 15,000.00 15,000.00 25,000.00 25,000.00 10,000.00 10,000.00 16,500.00 16,500.00 27,500.00 27,500.00 125,000.00 125,000.00 80,000.00 80,000.00 495,000.00 495,000.00 85,000.00 85,000.00 125,000.00 125,000.00

65,000.00 65,000.00 95,000.00 95,000.00 180,000.00 180,000.00 114,000.00 114,000.00 115,000.00 115,000.00 21,850.00 21,850.00 1,900,000.00 1,900,000.00 2,400,000.00 2,400,000.00 2,600,000.00 2,600,000.00 1,200,000.00 1,200,000.00 125,000.00 125,000.00

172,000.00 172,000.00 30,000.00 30,000.00 45,000.00 45,000.00 75,000.00 75,000.00 70,000.00 70,000.00 75,000.00 75,000.00 445,000.00 445,000.00 260,000.00 260,000.00 13,800.00 13,800.00 1,650,000.00 1,650,000.00 25,000.00 25,000.00 3,000.00 3,000.00 18,400.00 18,400.00 65,000.00 65,000.00 60,500.00 60,500.00 195,000.00 195,000.00 2,850,000.00 2,850,000.00

Page 16: HPS PU KOTA PKU.xls

55,000.00 55,000.00 550,000.00 550,000.00 450,000.00 450,000.00

3,500,000.00 3,500,000.00 600,000.00 600,000.00 1,300,000.00 1,300,000.00 2,100,000.00 2,100,000.00 684,000.00 684,000.00 225,000.00 225,000.00 281,325.00 281,325.00 1,140,000.00 1,140,000.00 2,000,000.00 2,000,000.00 500,000.00 500,000.00 700,000.00 700,000.00

40,000.00 75,000.00 75,000.00 7,500.00 7,500.00 25,300.00 25,300.00 27,000.00 27,000.00 55,000.00 55,000.00

30,000.00 24,000.00 24,000.00 28,000.00 22,000.00 27,600.00 27,600.00

10,000.00 10,000.00 26,000.00 26,000.00 40,000.00 40,000.00 55,000.00 55,000.00

8,000.00 5,000.00 5,000.00 40,000.00 40,000.00 10,000.00 10,000.00 12,000.00 12,000.00 4,500.00 4,500.00

9,000.00 10,000.00 10,000.00 27,500.00 27,500.00

12,500.00 8,000.00 8,000.00 10,000.00 10,000.00 10,000.00 10,000.00 5,000.00 5,000.00 26,000.00 26,000.00 40,000.00 40,000.00 95,000.00 95,000.00 46,000.00 46,000.00 100,100.00 100,100.00

30,000.00 30,000.00

Page 17: HPS PU KOTA PKU.xls

25,000.00 25,000.00 25,000.00 25,000.00 800.00 800.00 600.00 600.00

6,250.00 6,250.00

8,000.00 8,000.00 10,000.00 10,000.00 11,400.00 11,400.00 10,500.00 10,500.00 9,000.00 9,000.00 9,500.00 9,500.00 8,000.00 8,000.00 10,500.00 10,500.00 8,000.00 8,000.00 11,250.00 11,250.00

40,000.00 33,000.00 7,100.00 7,769.67 58,000.00 63,800.00 42,500.00 42,500.00 47,500.00 47,500.00 6,300.00 6,882.34 6,450.00 7,617.05 25,000.00 30,250.00 18,500.00 20,350.00 115,000.00 126,500.00 397,247.46 432,202.00 377,897.65 411,625.15 320,453.72 310,993.02 - 137,887.71 25,000.00 25,000.00 7,500.00 8,224.18 5,000.00 5,000.00 28,600.00 28,600.00 176,000.00 176,000.00 216,500.00 216,500.00 412,500.00 412,500.00 13,000.00 11,000.00 14,500.00 12,100.00 60,000.00 66,387.71 372,276.35 372,276.35 197.52 197.52 45,000.00 45,000.00 12,600.00 12,600.00

Page 18: HPS PU KOTA PKU.xls

120,000.00 120,000.00 32,500.00 32,500.00 16,500.00 16,500.00 60,000.00 13,581.63 16,000.00 16,000.00 6,237.00 6,237.00 3,000.00 3,000.00 325,000.00 325,000.00 15,000.00 15,000.00 13,200.00 11,000.00 13,500.00 12,100.00 13,800.00 12,100.00 86,000,000.00 86,000,000.00 97,000,000.00 97,000,000.00 124,000,000.00 124,000,000.00 157,000,000.00 157,000,000.00 168,000,000.00 168,000,000.00 192,000,000.00 192,000,000.00 1,500,000.00 1,500,000.00 5,000.00 5,000.00 75,000.00 75,000.00 900,000.00 900,000.00 56,000.00 56,000.00 1,000.00 1,000.00 150,000.00 150,000.00 50,000.00 50,000.00 1,500,000.00 1,500,000.00 1,650,000.00 1,650,000.00 1,850,000.00 1,850,000.00 1,000,000.00 1,000,000.00 1,200,000.00 1,200,000.00 275,000.00 275,000.00 400,000.00 400,000.00 45,000.00 45,000.00

Pekanbaru, Januari 2012

KEPALA DINAS PEKERJAAN UMUMKOTA PEKANBARU

Ir. H. DEDI GUSRIADI, MTNip. 196408121990071001

Page 19: HPS PU KOTA PKU.xls

### 100 62,500.00

### 8.3333333 70,833.33

Page 20: HPS PU KOTA PKU.xls

130

260

208333.33

Page 21: HPS PU KOTA PKU.xls