Harga Satuan Sni Tahun 2011

72
A. PEKERJAAN PERSIAPAN 0.012 m3 Kayu 5/7 (glugu) 3,500,000.00 Rp 42,000.00 Rp 0.020 Kg Paku biasa 2" - 5" 15,000.00 Rp 300.00 Rp 0.007 m3 Kayu sengon papan 3/20 2,200,000.00 Rp 15,400.00 Rp 0.100 OH Pekerja 32,500.00 Rp 3,250.00 Rp 0.100 OH Tukang Kayu 42,500.00 Rp 4,250.00 Rp 0.010 OH Kepala Tukang 45,000.00 Rp 450.00 Rp 0.005 OH Mandor 45,000.00 Rp 225.00 Rp JUMLAH 65,875.00 Rp HARGA SATUAN 65,875.00 Rp 0.100 OH Pekerja 32,500.00 Rp 3,250.00 Rp 0.050 OH Mandor 45,000.00 Rp 2,250.00 Rp JUMLAH 5,500.00 Rp HARGA SATUAN 5,500.00 Rp 0.150 m3 Batu belah 15/20 114,200.00 Rp 17,130.00 Rp 0.090 m3 Batu pecah 5/7 209,484.33 Rp 18,853.59 Rp 0.010 m3 Pasir pasang 107,800.00 Rp 1,078.00 Rp 1.000 OH Pekerja 32,500.00 Rp 32,500.00 Rp 0.050 OH Mandor 45,000.00 Rp 2,250.00 Rp JUMLAH 71,811.59 Rp HARGA SATUAN 71,811.59 Rp B. PEKERJAAN TANAH 0.750 OH Pekerja 32,500.00 Rp 24,375.00 Rp 0.025 OH Mandor 45,000.00 Rp 1,125.00 Rp JUMLAH 25,500.00 Rp 1 m2 Membuat jalan sementara SNI 03-2835-2002 BAHAN TENAGA TENAGA 1 m 3 Galian tanah biasa sedalam 1 meter SNI : 2835:2008 1 m 2 Membersihkan lapangan dan perataan SNI 03-2835-2002 BAHAN 1 m' Pengukuran dan Pasang bouwplank SNI 03-2835-2002 ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN TAHUN 2011 TENAGA TENAGA

description

sni

Transcript of Harga Satuan Sni Tahun 2011

Page 1: Harga Satuan Sni Tahun 2011

A. PEKERJAAN PERSIAPAN

0.012 m3 Kayu 5/7 (glugu) 3,500,000.00Rp 42,000.00Rp

0.020 Kg Paku biasa 2" - 5" 15,000.00Rp 300.00Rp

0.007 m3 Kayu sengon papan 3/20 2,200,000.00Rp 15,400.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.100 OH Tukang Kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 65,875.00Rp

HARGA SATUAN 65,875.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 5,500.00Rp

HARGA SATUAN 5,500.00Rp

0.150 m3 Batu belah 15/20 114,200.00Rp 17,130.00Rp

0.090 m3 Batu pecah 5/7 209,484.33Rp 18,853.59Rp

0.010 m3 Pasir pasang 107,800.00Rp 1,078.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 71,811.59Rp

HARGA SATUAN 71,811.59Rp

B. PEKERJAAN TANAH

0.750 OH Pekerja 32,500.00Rp 24,375.00Rp

0.025 OH Mandor 45,000.00Rp 1,125.00Rp

JUMLAH 25,500.00Rp

1 m2 Membuat jalan sementara SNI 03-2835-2002

BAHAN

TENAGA

TENAGA

1 m3 Galian tanah biasa sedalam 1 meter SNI : 2835:2008

1 m2 Membersihkan lapangan dan perataan SNI 03-2835-2002

BAHAN

1 m' Pengukuran dan Pasang bouwplank SNI 03-2835-2002

ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI

BANGUNAN GEDUNG DAN PERUMAHAN

TAHUN 2011

TENAGA

TENAGA

Page 2: Harga Satuan Sni Tahun 2011

HARGA SATUAN 25,500.00Rp

0.900 OH Pekerja 32,500.00Rp 29,250.00Rp

0.045 OH Mandor 45,000.00Rp 2,025.00Rp

JUMLAH 31,275.00Rp

HARGA SATUAN 31,275.00Rp

1.050 OH Pekerja 32,500.00Rp 34,125.00Rp

0.067 OH Mandor 45,000.00Rp 3,015.00Rp

JUMLAH 37,140.00Rp

HARGA SATUAN 37,140.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

0.032 OH Mandor 45,000.00Rp 1,440.00Rp

JUMLAH 33,940.00Rp

HARGA SATUAN 33,940.00Rp

1.500 OH Pekerja 32,500.00Rp 48,750.00Rp

0.060 OH Mandor 45,000.00Rp 2,700.00Rp

JUMLAH 51,450.00Rp

HARGA SATUAN 51,450.00Rp

1.200 OH Pekerja 32,500.00Rp 39,000.00Rp

0.045 OH Mandor 45,000.00Rp 2,025.00Rp

JUMLAH 41,025.00Rp

HARGA SATUAN 41,025.00Rp

0.050 OH Pekerja 32,500.00Rp 1,625.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 1,850.00Rp

HARGA SATUAN 1,850.00Rp

0.330 OH Pekerja 32,500.00Rp 10,725.00Rp

0.010 OH Mandor 45,000.00Rp 450.00Rp

JUMLAH 11,175.00Rp

HARGA SATUAN 11,175.00Rp

1 m3 Urugan kembali tanah biasa galian sedalam 1 meter 25,500.00Rp 8,500.00Rp

1 m3 Urugan kembali tanah biasa galian sedalam 2 meter 31,275.00Rp 10,425.00Rp

1 m3 Urugan kembali tanah biasa galian sedalam 3 meter 37,140.00Rp 12,380.00Rp

0.500 OH Pekerja 32,500.00Rp 16,250.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 18,500.00Rp

HARGA SATUAN 18,500.00Rp

BAHAN 1.200 m3 Pasir urug 80,500.00Rp 96,600.00Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.010 OH Mandor 45,000.00Rp 450.00Rp

JUMLAH 106,800.00Rp

HARGA SATUAN 106,800.00Rp

TENAGA

TENAGA

1 m3 Galian tanah keras sedalam 1 meter SNI : 2835:2008

SNI : 2835:2008

TENAGA

1 m3 Galian tanah biasa sedalam 3 meter SNI : 2835:2008

TENAGA

1 m3 Galian tanah biasa sedalam 2 meter SNI : 2835:2008

1 m2 Stripping tebing setinggi 1 meter SNI : 2835:2008

SNI : 2835:2008

TENAGA

1 m3 Galian tanah lumpur sedalam 1 meter

TENAGA

Membuang 1 m3 tanah sejauh 15 meter SNI : 2835:2008

TENAGA

TENAGA

Mengurug kembali dihitung dari 1/3 kali dari indeks pekerjaan galian

Memadatkan 1 m3 tanah (per 20 cm) SNI : 2835:2008

1 m3 Urugan kembali

1 m3 Urugan pasir SNI : 2835:2008

TENAGA

1 m3 Galian tanah cadas sedalam 1 meter SNI : 2835:2008

Page 3: Harga Satuan Sni Tahun 2011

BAHAN 1.100 m3 Tanah urug 55,000.00Rp 60,500.00Rp

0.250 OH Pekerja 32,500.00Rp 8,125.00Rp

0.025 OH Mandor 45,000.00Rp 1,125.00Rp

JUMLAH 69,750.00Rp

HARGA SATUAN 69,750.00Rp

BAHAN 1.200 m3 Sirtu 108,000.00Rp 129,600.00Rp

0.250 OH Pekerja 32,500.00Rp 8,125.00Rp

0.025 OH Mandor 45,000.00Rp 1,125.00Rp

JUMLAH 138,850.00Rp

HARGA SATUAN 138,850.00Rp

C. PEKERJAAN PONDASI

1.200 m3 Batu putih 84,600.00Rp 101,520.00Rp

163.000 Kg PC 1,050.00Rp 171,150.00Rp

0.520 m3 Pasir pasang 107,800.00Rp 56,056.00Rp

1.500 OH Pekerja 32,500.00Rp 48,750.00Rp

0.750 OH Tukang batu 40,000.00Rp 30,000.00Rp

0.075 OH Kepala Tukang 45,000.00Rp 3,375.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 414,226.00Rp

HARGA SATUAN 414,226.00Rp

1.200 m3 Batu putih 84,600.00Rp 101,520.00Rp

117.000 Kg PC 1,050.00Rp 122,850.00Rp

0.561 m3 Pasir pasang 107,800.00Rp 60,475.80Rp

1.500 OH Pekerja 32,500.00Rp 48,750.00Rp

0.750 OH Tukang batu 40,000.00Rp 30,000.00Rp

0.075 OH Kepala Tukang 45,000.00Rp 3,375.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 370,345.80Rp

HARGA SATUAN 370,345.80Rp

1.200 m3 Batu putih 84,600.00Rp 101,520.00Rp

61.000 Kg PC 1,050.00Rp 64,050.00Rp

0.147 m3 Kapur pasang 170,000.00Rp 24,990.00Rp

0.492 m3 Pasir pasang 107,800.00Rp 53,037.60Rp

1.500 OH Pekerja 32,500.00Rp 48,750.00Rp

0.750 OH Tukang batu 40,000.00Rp 30,000.00Rp

0.075 OH Kepala Tukang 45,000.00Rp 3,375.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 329,097.60Rp

HARGA SATUAN 329,097.60Rp

1.200 m3 Batu putih 84,600.00Rp 101,520.00Rp

0.432 m3 Pasir urug 80,500.00Rp 34,776.00Rp

0.780 OH Pekerja 32,500.00Rp 25,350.00Rp

0.390 OH Tukang batu 40,000.00Rp 15,600.00Rp

0.039 OH Kepala Tukang 45,000.00Rp 1,755.00Rp

BAHAN

TENAGA

1 m3 Urugan Tanah

BAHAN

TENAGA

1 m3 Pondasi batu belah 1PC : 6 PP SNI : 2836:2008

TENAGA

1 m3 Pondasi batu putih 1PC : 4 PP

1 m3 Sirtu padat untuk peninggian lantai bangunan SNI : 2835:2008

SNI : 2836:2008

SNI : 2835:2008

TENAGA

1 m3 Pondasi batu kosong (aanstamping) SNI : 2836:2008

BAHAN

TENAGA

1 m3 Pondasi batu belah 1PC : 3 KP : 10 PP SNI : 2836:2008

BAHAN

TENAGA

Page 4: Harga Satuan Sni Tahun 2011

0.039 OH Mandor 45,000.00Rp 1,755.00Rp

JUMLAH 180,756.00Rp

HARGA SATUAN 180,756.00Rp

0.480 m3 Batu putih 84,600.00Rp 40,608.00Rp

194.000 Kg PC 1,050.00Rp 203,700.00Rp

0.312 m3 Pasir Beton 116,000.00Rp 36,192.00Rp

0.468 m3 Kerikil Beton 180,000.00Rp 84,240.00Rp

126.000 kg Besi Beton 9,250.00Rp 1,165,500.00Rp

1.800 Kg Kawat Beton 14,000.00Rp 25,200.00Rp

3.400 OH Pekerja 32,500.00Rp 110,500.00Rp

0.850 OH Tukang batu 40,000.00Rp 34,000.00Rp

0.085 OH Kepala Tukang 45,000.00Rp 3,825.00Rp

0.170 OH Mandor 45,000.00Rp 7,650.00Rp

JUMLAH 1,711,415.00Rp

HARGA SATUAN 1,711,415.00Rp

0.450 m3 Batu putih 84,600.00Rp 38,070.00Rp

194.000 Kg PC 1,050.00Rp 203,700.00Rp

0.312 m3 Pasir Beton 116,000.00Rp 36,192.00Rp

0.468 m3 Kerikil Beton 180,000.00Rp 84,240.00Rp

2.400 OH Pekerja 32,500.00Rp 78,000.00Rp

0.800 OH Tukang batu 40,000.00Rp 32,000.00Rp

0.080 OH Kepala Tukang 45,000.00Rp 3,600.00Rp

0.119 OH Mandor 45,000.00Rp 5,355.00Rp

JUMLAH 481,157.00Rp

HARGA SATUAN 481,157.00Rp

D. PEKERJAAN DINDING

140.000 bh Batu bata 500.00Rp 70,000.00Rp

26.550 kg PC 1,050.00Rp 27,877.50Rp

0.093 m3 Pasir pasang 107,800.00Rp 10,025.40Rp

0.600 OH Pekerja 32,500.00Rp 19,500.00Rp

0.200 OH Tukang batu 40,000.00Rp 8,000.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.030 OH Mandor 45,000.00Rp 1,350.00Rp

JUMLAH 137,652.90Rp

HARGA SATUAN 137,652.90Rp

70.000 bh Batu bata 500.00Rp 35,000.00Rp

14.370 kg PC 1,050.00Rp 15,088.50Rp

0.040 m3 Pasir pasang 107,800.00Rp 4,312.00Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.100 OH Tukang batu 40,000.00Rp 4,000.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 69,275.50Rp

HARGA SATUAN 69,275.50Rp

70.000 bh Batu bata 500.00Rp 35,000.00Rp

11.500 kg PC 1,050.00Rp 12,075.00Rp

0.043 m3 Pasir pasang 107,800.00Rp 4,635.40Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

BAHAN

1 m3 Pondasi siklop, 60% beton camp. 1 PC : 2 PB : 3 KR & 40% batu

belah SNI : 2836:2008

BAHAN

BAHAN

TENAGA

TENAGA

TENAGA

1 m3 Pondasi Sumuran, diameter 100 cm SNI : 2836:2008

TENAGA

TENAGA

1 m2 Dinding Bata merah tebal

1/2 bata 1PC : 4PP SNI : 6897:2008

BAHAN

1 m2 Dinding Bata merah tebal 1 bata 1PC : 4PP SNI : 6897:2008

BAHAN

1 m2 Dinding Bata merah tebal

1/2 bata 1PC : 3PP SNI : 6897:2008

TENAGA

Page 5: Harga Satuan Sni Tahun 2011

0.100 OH Tukang batu 40,000.00Rp 4,000.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 66,585.40Rp

HARGA SATUAN 66,585.40Rp

70.000 bh Batu bata 500.00Rp 35,000.00Rp

8.320 kg PC 1,050.00Rp 8,736.00Rp

0.049 m3 Pasir pasang 107,800.00Rp 5,282.20Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.100 OH Tukang batu 40,000.00Rp 4,000.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 63,893.20Rp

HARGA SATUAN 63,893.20Rp

70.000 bh Batu bata 500.00Rp 35,000.00Rp

4.500 kg PC 1,050.00Rp 4,725.00Rp

0.015 m3 Kapur pasang 170,000.00Rp 2,550.00Rp

0.050 m3 Pasir pasang 107,800.00Rp 5,390.00Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.100 OH Tukang batu 40,000.00Rp 4,000.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 62,540.00Rp

HARGA SATUAN 62,540.00Rp

30.000 bh Terawang (roster) 2,500.00Rp 75,000.00Rp

11.000 kg PC 1,050.00Rp 11,550.00Rp

0.035 m3 Pasir pasang 107,800.00Rp 3,773.00Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.150 OH Tukang batu 40,000.00Rp 6,000.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 107,423.00Rp

HARGA SATUAN 107,423.00Rp

E. PEKERJAAN PLESTERAN

7.776 kg PC 1,050.00Rp 8,164.80Rp

0.023 m3 Pasir pasang 107,800.00Rp 2,479.40Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.150 OH Tukang batu 40,000.00Rp 6,000.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 27,744.20Rp

HARGA SATUAN 27,744.20Rp

1 m2 Dinding Bata merah tebal

1/2 bata 1PC : 3 KP : 10PP

1 m2 Dinding Bata merah tebal

1/2 bata 1PC : 6PP SNI : 6897:2008

SNI : 6897:2008

BAHAN

TENAGA

TENAGA

1 m2 Plesteran , 1PC : 3PP tebal 15 mm SNI : 2837:2008

BAHAN

TENAGA

1 m2 Plesteran , 1PC : 4PP tebal 15 mm SNI : 2837:2008

BAHAN

1 m2 Dinding terawang (roster) uk. (12x11x24) cm, 1PC : 4PP SNI : 6897:2008

BAHAN

TENAGA

TENAGA

Page 6: Harga Satuan Sni Tahun 2011

6.240 kg PC 1,050.00Rp 6,552.00Rp

0.024 m3 Pasir pasang 107,800.00Rp 2,587.20Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.150 OH Tukang batu 40,000.00Rp 6,000.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 26,239.20Rp

HARGA SATUAN 26,239.20Rp

4.416 kg PC 1,050.00Rp 4,636.80Rp

0.027 m3 Pasir pasang 107,800.00Rp 2,910.60Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.150 OH Tukang batu 40,000.00Rp 6,000.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 24,647.40Rp

HARGA SATUAN 24,647.40Rp

3.000 kg PC 1,050.00Rp 3,150.00Rp

0.005 m3 Kapur pasang 170,000.00Rp 850.00Rp

0.020 m3 Pasir pasang 107,800.00Rp 2,156.00Rp

0.360 OH Pekerja 32,500.00Rp 11,700.00Rp

0.120 OH Tukang batu 40,000.00Rp 4,800.00Rp

0.012 OH Kepala Tukang 45,000.00Rp 540.00Rp

0.018 OH Mandor 45,000.00Rp 810.00Rp

JUMLAH 24,006.00Rp

HARGA SATUAN 24,006.00Rp

8.320 kg PC 1,050.00Rp 8,736.00Rp

0.032 m3 Pasir pasang 107,800.00Rp 3,449.60Rp

0.400 OH Pekerja 32,500.00Rp 13,000.00Rp

0.200 OH Tukang batu 40,000.00Rp 8,000.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.022 OH Mandor 45,000.00Rp 990.00Rp

JUMLAH 35,075.60Rp

HARGA SATUAN 35,075.60Rp

0.500 kg PC 1,050.00Rp 525.00Rp

0.013 m3 Pasir pasang 107,800.00Rp 1,401.40Rp

0.080 OH Pekerja 32,500.00Rp 2,600.00Rp

0.400 OH Tukang batu 40,000.00Rp 16,000.00Rp

0.040 OH Kepala Tukang 45,000.00Rp 1,800.00Rp

0.004 OH Mandor 45,000.00Rp 180.00Rp

JUMLAH 22,506.40Rp

HARGA SATUAN 22,506.40Rp

4.320 kg PC 1,050.00Rp 4,536.00Rp

0.006 m3 Pasir pasang 107,800.00Rp 646.80Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.100 OH Tukang batu 40,000.00Rp 4,000.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 20,057.80Rp

HARGA SATUAN 20,057.80Rp

1 m2 Plesteran , 1PC : 2Kp : 8Ps tebal 15 mm SNI : 2837:2008

1 m' Plesteran Skoning, 1PC : 2PP lebar 10 mm #REF!

BAHAN

TENAGA

TENAGA

1 m2 Plesteran , 1PC : 4PP tebal 20 mm SNI : 2837:2008

BAHAN

TENAGA

1 m2 Plesteran ciprat (kamprot), 1PC : 2PP SNI : 2837:2008

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 Plesteran , 1PC : 6PP tebal 15 mm SNI : 2837:2008

BAHAN

BAHAN

TENAGA

Page 7: Harga Satuan Sni Tahun 2011

BAHAN 6.340 kg PC 1,050.00Rp 6,657.00Rp

0.012 m3 Pasir pasang 107,800.00Rp 1,293.60Rp

0.300 OH Pekerja 32,500.00Rp 9,750.00Rp

0.150 OH Tukang batu 40,000.00Rp 6,000.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 25,050.60Rp

HARGA SATUAN 25,050.60Rp

BAHAN 3.250 kg PC 1,050.00Rp 3,412.50Rp

0.200 OH Pekerja 32,500.00Rp 6,500.00Rp

0.100 OH Tukang batu 40,000.00Rp 4,000.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.010 OH Mandor 45,000.00Rp 450.00Rp

JUMLAH 14,812.50Rp

HARGA SATUAN 14,812.50Rp

F. PEKERJAAN BETON

230.000 kg PC 1,050.00Rp 241,500.00Rp

0.638 m3 Pasir beton 116,000.00Rp 73,991.43Rp

0.761 m3 Kerikil beton 180,000.00Rp 136,933.33Rp

200.000 liter Air 40.00Rp 8,000.00Rp

1.200 OH Pekerja 32,500.00Rp 39,000.00Rp

0.200 OH Tukang batu 40,000.00Rp 8,000.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.060 OH Mandor 45,000.00Rp 2,700.00Rp

JUMLAH 511,024.76Rp

HARGA SATUAN 511,024.76Rp

371.000 kg PC 1,050.00Rp 389,550.00Rp

0.499 m3 Pasir beton 116,000.00Rp 57,834.29Rp

0.776 m3 Kerikil beton 180,000.00Rp 139,600.00Rp

215.000 liter Air 40.00Rp 8,600.00Rp

1.650 OH Pekerja 32,500.00Rp 53,625.00Rp

0.275 OH Tukang batu 40,000.00Rp 11,000.00Rp

0.028 OH Kepala Tukang 45,000.00Rp 1,260.00Rp

0.083 OH Mandor 45,000.00Rp 3,735.00Rp

JUMLAH 665,204.29Rp

HARGA SATUAN 665,204.29Rp

10.500 kg Besi beton (polos/ulir) 9,250.00Rp 97,125.00Rp

0.150 kg Kawat beton 14,000.00Rp 2,100.00Rp

0.070 OH Pekerja 32,500.00Rp 2,275.00Rp

0.070 OH Tukang besi 40,000.00Rp 2,800.00Rp

0.007 OH Kepala Tukang 45,000.00Rp 315.00Rp

0.004 OH Mandor 45,000.00Rp 180.00Rp

JUMLAH 104,795.00Rp

HARGA SATUAN 104,795.00Rp

1 kg -------------------> 10,479.50Rp

BAHAN

TENAGA

Pembesian 10 kg dengan besi polos atau ulir SNI : 7394:2008

BAHAN

TENAGA

1 m3 Beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 SNI : 7394:2008

TENAGA

1 m2 Finishing siar pas. Batu kali adukan 1 PC : 2 PP SNI : 2837:2008

TENAGA

1 m2 Acian SNI : 2837:2008

TENAGA

BAHAN

1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm SNI : 7394:2008

Page 8: Harga Satuan Sni Tahun 2011

0.040 m3 Kayu kelas III 2,200,000.00Rp 88,000.00Rp

0.300 kg Paku 5 cm - 10 cm 15,000.00Rp 4,500.00Rp

0.100 liter Minyak bekisting 19,000.00Rp 1,900.00Rp

0.520 OH Pekerja 32,500.00Rp 16,900.00Rp

0.260 OH Tukang kayu 42,500.00Rp 11,050.00Rp

0.026 OH Kepala Tukang 45,000.00Rp 1,170.00Rp

0.026 OH Mandor 45,000.00Rp 1,170.00Rp

JUMLAH 124,690.00Rp

HARGA SATUAN 124,690.00Rp

0.045 m3 Kayu kelas III 2,200,000.00Rp 99,000.00Rp

0.300 kg Paku 5 cm - 10 cm 15,000.00Rp 4,500.00Rp

0.100 liter Minyak bekisting 19,000.00Rp 1,900.00Rp

0.520 OH Pekerja 32,500.00Rp 16,900.00Rp

0.260 OH Tukang kayu 42,500.00Rp 11,050.00Rp

0.026 OH Kepala Tukang 45,000.00Rp 1,170.00Rp

0.026 OH Mandor 45,000.00Rp 1,170.00Rp

JUMLAH 135,690.00Rp

HARGA SATUAN 135,690.00Rp

0.040 m3 Kayu kelas III 2,200,000.00Rp 88,000.00Rp

0.400 kg Paku 5 cm - 12 cm 15,000.00Rp 6,000.00Rp

0.200 liter Minyak bekisting 19,000.00Rp 3,800.00Rp

0.015 m3 Balok kayu kelas II 5,100,000.00Rp 76,500.00Rp

0.350 lbr Plywood 65,000.00Rp 22,750.00Rp

2.000 btg Dolken 9,000.00Rp 18,000.00Rp

0.660 OH Pekerja 32,500.00Rp 21,450.00Rp

0.330 OH Tukang kayu 42,500.00Rp 14,025.00Rp

0.033 OH Kepala Tukang 45,000.00Rp 1,485.00Rp

0.033 OH Mandor 45,000.00Rp 1,485.00Rp

JUMLAH 253,495.00Rp

HARGA SATUAN 253,495.00Rp

0.040 m3 Kayu kelas III 2,200,000.00Rp 88,000.00Rp

0.400 kg Paku 5 cm - 12 cm 15,000.00Rp 6,000.00Rp

0.200 liter Minyak bekisting 19,000.00Rp 3,800.00Rp

0.018 m3 Balok kayu kelas II 5,100,000.00Rp 91,800.00Rp

0.350 lbr Plywood 65,000.00Rp 22,750.00Rp

2.000 btg Dolken 9,000.00Rp 18,000.00Rp

0.660 OH Pekerja 32,500.00Rp 21,450.00Rp

0.330 OH Tukang kayu 42,500.00Rp 14,025.00Rp

0.033 OH Kepala Tukang 45,000.00Rp 1,485.00Rp

0.033 OH Mandor 45,000.00Rp 1,485.00Rp

JUMLAH 268,795.00Rp

HARGA SATUAN 268,795.00Rp

0.040 m3 Kayu kelas III 2,200,000.00Rp 88,000.00Rp

0.400 kg Paku 5 cm - 12 cm 15,000.00Rp 6,000.00Rp

0.200 liter Minyak bekisting 19,000.00Rp 3,800.00Rp

0.015 m3 Balok kayu kelas II 5,100,000.00Rp 76,500.00Rp

0.350 lbr Plywood 65,000.00Rp 22,750.00Rp

6.000 btg Dolken 9,000.00Rp 54,000.00Rp

0.660 OH Pekerja 32,500.00Rp 21,450.00Rp

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 bekisting untuk kolom SNI : 7394:2008

BAHAN

TENAGA

1 m2 bekisting untuk balok SNI : 7394:2008

TENAGA

1 m2 bekisting untuk plat lantai SNI : 7394:2008

BAHAN

1 m2 bekisting untuk pondasi SNI : 7394:2008

BAHAN

TENAGA

1 m2 bekisting untuk sloof SNI : 7394:2008

Page 9: Harga Satuan Sni Tahun 2011

0.330 OH Tukang kayu 42,500.00Rp 14,025.00Rp

0.033 OH Kepala Tukang 45,000.00Rp 1,485.00Rp

0.033 OH Mandor 45,000.00Rp 1,485.00Rp

JUMLAH 289,495.00Rp

HARGA SATUAN 289,495.00Rp

0.030 m3 Kayu kelas III 2,200,000.00Rp 66,000.00Rp

0.400 kg Paku 5 cm - 12 cm 15,000.00Rp 6,000.00Rp

0.150 liter Minyak bekisting 19,000.00Rp 2,850.00Rp

0.015 m3 Balok kayu kelas II 5,100,000.00Rp 76,500.00Rp

0.350 lbr Plywood 65,000.00Rp 22,750.00Rp

2.000 btg Dolken 9,000.00Rp 18,000.00Rp

0.660 OH Pekerja 32,500.00Rp 21,450.00Rp

0.330 OH Tukang kayu 42,500.00Rp 14,025.00Rp

0.033 OH Kepala Tukang 45,000.00Rp 1,485.00Rp

0.033 OH Mandor 45,000.00Rp 1,485.00Rp

JUMLAH 230,545.00Rp

HARGA SATUAN 230,545.00Rp

0.0264 m3 Kayu kelas III 2,200,000.00Rp 58,080.00Rp

0.600 kg Paku 5 cm - 12 cm 15,000.00Rp 9,000.00Rp

0.500 btg Dolken 9,000.00Rp 4,500.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.050 OH Tukang kayu 42,500.00Rp 2,125.00Rp

0.005 OH Kepala Tukang 45,000.00Rp 225.00Rp

0.008 OH Mandor 45,000.00Rp 360.00Rp

JUMLAH 79,165.00Rp

HARGA SATUAN 79,165.00Rp

0.002 m3 Kayu bekisting 2,200,000.00Rp 4,400.00Rp

0.010 kg Paku biasa 5 - 12 cm 15,000.00Rp 150.00Rp

3.000 kg Besi beton 9,250.00Rp 27,750.00Rp

0.045 kg Kawat beton 14,000.00Rp 630.00Rp

4.000 kg PC 1,050.00Rp 4,200.00Rp

0.006 m3 Pasir beton 116,000.00Rp 696.00Rp

0.009 m3 Kerikil beton 180,000.00Rp 1,620.00Rp

0.180 OH Pekerja 32,500.00Rp 5,850.00Rp

0.020 OH Tukang batu 40,000.00Rp 800.00Rp

0.020 OH Tukang kayu 42,500.00Rp 850.00Rp

0.020 OH Tukang besi 40,000.00Rp 800.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.009 OH Mandor 45,000.00Rp 405.00Rp

JUMLAH 48,421.00Rp

HARGA SATUAN 48,421.00Rp

1 m3 4,001,735.54Rp

0.003 m3 Kayu bekisting 2,200,000.00Rp 6,600.00Rp

0.020 kg Paku biasa 5 - 12 cm 15,000.00Rp 300.00Rp

3.600 kg Besi beton 9,250.00Rp 33,300.00Rp

0.050 kg Kawat beton 14,000.00Rp 700.00Rp

5.500 kg PC 1,050.00Rp 5,775.00Rp

0.009 m3 Pasir beton 116,000.00Rp 1,044.00Rp

0.015 m3 Kerikil beton 180,000.00Rp 2,700.00Rp

0.297 OH Pekerja 32,500.00Rp 9,652.50Rp

0.033 OH Tukang batu 40,000.00Rp 1,320.00Rp

0.033 OH Tukang kayu 42,500.00Rp 1,402.50Rp

0.033 OH Tukang besi 40,000.00Rp 1,320.00Rp

BAHAN

TENAGA

1 m2 bekisting untuk tangga SNI : 7394:2008

BAHAN

TENAGA

1 m2 bekisting jembatan untuk pengecoran beton SNI : 7394:2008

BAHAN

TENAGA

1 m1 Kolom praktis beton bertulang (12 x 12) cm SNI : 7394:2008

BAHAN

TENAGA

1 m' Balok latei beton bertulang, (10 x 15) cm SNI : 7394:2008

TENAGA

Page 10: Harga Satuan Sni Tahun 2011

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH 65,239.00Rp

HARGA SATUAN 65,239.00Rp

1 m3 2,718,291.67Rp

0.003 m3 Kayu bekisting 2,200,000.00Rp 6,600.00Rp

0.020 kg Paku biasa 5 - 12 cm 15,000.00Rp 300.00Rp

#REF! kg Besi beton 9,250.00Rp #REF!

0.050 kg Kawat beton 14,000.00Rp 700.00Rp

5.500 kg PC 1,050.00Rp 5,775.00Rp

0.009 m3 Pasir beton 116,000.00Rp 1,044.00Rp

0.015 m3 Kerikil beton 180,000.00Rp 2,700.00Rp

0.297 OH Pekerja 32,500.00Rp 9,652.50Rp

0.033 OH Tukang batu 40,000.00Rp 1,320.00Rp

0.033 OH Tukang kayu 42,500.00Rp 1,402.50Rp

0.033 OH Tukang besi 40,000.00Rp 1,320.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.015 OH Mandor 45,000.00Rp 675.00Rp

JUMLAH #REF!

HARGA SATUAN #REF!

1 m3 #REF!

TENAGA 4.000 OH Pekerja 32,500.00Rp 130,000.00Rp

JUMLAH 130,000.00Rp

HARGA SATUAN 130,000.00Rp

1 m3 Pondasi Footplat Beton mutu f'c = 19,3 Mpa, uk. 100x100 cm, tul. Ф 12 mm - 20 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

4.0000 m2 Bekisting untuk pondasi 498,760.00

0.2500 m3 Membongkar bekisting 32,500.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Sloof Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 Ф 12 mm, begel Ф 6 - 20 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

5.8333 m2 Bekisting untuk sloof 791,525.00

0.5000 m3 Membongkar bekisting 65,000.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Sloof Beton mutu f'c = 19,3 Mpa, uk. 20x30 cm, tul. 6 Ф 16 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

5.0000 m2 Bekisting untuk sloof 678,450.00

0.5000 m3 Membongkar bekisting 65,000.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 30x40 cm, tul. 12 Ф 16 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

#REF! m2 Bekisting untuk kolom #REF!

1 m3 Membongkar bekisting 45,000Rp

BAHAN

TENAGA

TENAGA

1 m' Ring gunung beton bertulang, (12 x 15) cm SNI : 7394:2008

Page 11: Harga Satuan Sni Tahun 2011

0.5000 m3 Membongkar bekisting 65,000.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 30x30 cm, tul. 8 Ф 16 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

#REF! m2 Bekisting untuk kolom #REF!

0.5000 m3 Membongkar bekisting 65,000.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 Ф 12 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

#REF! m2 Bekisting untuk kolom #REF!

0.6250 m3 Membongkar bekisting 81,250.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 15x20 cm, tul. 4 Ф 12 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

#REF! m2 Bekisting untuk kolom #REF!

0.6571 m3 Membongkar bekisting 85,428.57

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 15x25 cm, tul. 4 Ф 12 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

#REF! m2 Bekisting untuk kolom #REF!

0.7000 m3 Membongkar bekisting 91,000.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 15x15 cm, tul. 4 Ф 12 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

6.6667 m2 Bekisting untuk kolom 1,689,966.67

0.5000 m3 Membongkar bekisting 65,000.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 RingBalok Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 Ф 12 mm, begel Ф 6 - 20 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

#REF! m2 Bekisting untuk balok #REF!

0.6250 m3 Membongkar bekisting 81,250.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 15x25 cm, tul. 6 Ф 12 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

Page 12: Harga Satuan Sni Tahun 2011

#REF! kg Besi beton #REF!

6.6667 m2 Bekisting untuk balok 1,791,966.67

0.6250 m3 Membongkar bekisting 81,250.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 20x35 cm, tul. 8 Ф 16 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

6.6667 m2 Bekisting untuk balok 1,791,966.67

0.8000 m3 Membongkar bekisting 104,000.00

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 25x45 cm, tul. 10 Ф 16 mm, begel Ф 8 - 15 cm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

5.1111 m2 Bekisting untuk balok 1,373,841.11

0.8214 m3 Membongkar bekisting 106,785.71

JUMLAH #REF!

DIBULATKAN #REF!

1 m3 Plat Beton mutu f'c = 19,3 Mpa, tebal 12 cm, tul. Ф 8 mm

1.0000 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 665,204.29

#REF! kg Besi beton #REF!

#REF! m2 Bekisting untuk plat #REF!

1.0000 m3 Membongkar bekisting 130,000.00

JUMLAH #REF!

DIBULATKAN #REF!

G. PEKERJAAN KAYU

1.100 m3 Kayu jati, balok 18,000,000.00Rp 19,800,000.00Rp

1.250 Kg Paku biasa 2" - 5" 15,000.00Rp 18,750.00Rp

1.000 Kg Lem kayu 12,000.00Rp 12,000.00Rp

7.000 OH Pekerja 32,500.00Rp 227,500.00Rp

21.000 OH Tukang Kayu 42,500.00Rp 892,500.00Rp

2.100 OH Kepala Tukang 45,000.00Rp 94,500.00Rp

0.350 OH Mandor 45,000.00Rp 15,750.00Rp

JUMLAH 21,061,000.00Rp

HARGA SATUAN 21,061,000.00Rp

1.200 m3 Kayu kamper, balok 7,500,000.00Rp 9,000,000.00Rp

1.250 Kg Paku biasa 2" - 5" 15,000.00Rp 18,750.00Rp

1.000 Kg Lem kayu 12,000.00Rp 12,000.00Rp

6.000 OH Pekerja 32,500.00Rp 195,000.00Rp

18.000 OH Tukang Kayu 42,500.00Rp 765,000.00Rp

1.800 OH Kepala Tukang 45,000.00Rp 81,000.00Rp

0.300 OH Mandor 45,000.00Rp 13,500.00Rp

JUMLAH 10,085,250.00Rp

HARGA SATUAN 10,085,250.00Rp

1.200 m3 Kayu bangkirei, balok 7,800,000.00Rp 9,360,000.00Rp

BAHAN

TENAGA

1 m3 Membuat dan memasang kusen pintu/jendela kayu bangkirei SNI : 3434:2008

BAHAN

BAHAN

TENAGA

1 m3 Membuat dan memasang kusen pintu/jendela kayu kamper SNI : 3434:2008

1 m3 Membuat dan memasang kusen pintu/jendela kayu jati SNI : 3434:2008

Page 13: Harga Satuan Sni Tahun 2011

1.250 Kg Paku biasa 2" - 5" 15,000.00Rp 18,750.00Rp

1.000 Kg Lem kayu 12,000.00Rp 12,000.00Rp

6.000 OH Pekerja 32,500.00Rp 195,000.00Rp

18.000 OH Tukang Kayu 42,500.00Rp 765,000.00Rp

1.800 OH Kepala Tukang 45,000.00Rp 81,000.00Rp

0.300 OH Mandor 45,000.00Rp 13,500.00Rp

JUMLAH 10,445,250.00Rp

HARGA SATUAN 10,445,250.00Rp

0.417 Kg Paku biasa 2" - 5" 15,000.00Rp 6,250.00Rp

0.333 Kg Lem kayu 12,000.00Rp 4,000.00Rp

2.000 OH Pekerja 32,500.00Rp 65,000.00Rp

6.000 OH Tukang Kayu 42,500.00Rp 255,000.00Rp

0.600 OH Kepala Tukang 45,000.00Rp 27,000.00Rp

0.100 OH Mandor 45,000.00Rp 4,500.00Rp

JUMLAH 361,750.00Rp

HARGA SATUAN 361,750.00Rp

0.040 m3 Kayu jati, papan 20,000,000.00Rp 800,000.00Rp

0.500 Kg Lem kayu 12,000.00Rp 6,000.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

3.000 OH Tukang Kayu 42,500.00Rp 127,500.00Rp

0.300 OH Kepala Tukang 45,000.00Rp 13,500.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 981,750.00Rp

HARGA SATUAN 981,750.00Rp

0.040 m3 Kayu kamper, papan 8,300,000.00Rp 332,000.00Rp

0.500 Kg Lem kayu 12,000.00Rp 6,000.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

3.000 OH Tukang Kayu 42,500.00Rp 127,500.00Rp

0.300 OH Kepala Tukang 45,000.00Rp 13,500.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 513,750.00Rp

HARGA SATUAN 513,750.00Rp

0.040 m3 Kayu bangkirei, papan 8,650,000.00Rp 346,000.00Rp

0.500 Kg Lem kayu 12,000.00Rp 6,000.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

3.000 OH Tukang Kayu 42,500.00Rp 127,500.00Rp

0.300 OH Kepala Tukang 45,000.00Rp 13,500.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 527,750.00Rp

HARGA SATUAN 527,750.00Rp

BAHAN 0.167 Kg Lem kayu 12,000.00Rp 2,000.00Rp

0.333 OH Pekerja 32,500.00Rp 10,833.33Rp

1.000 OH Tukang Kayu 42,500.00Rp 42,500.00Rp

0.100 OH Kepala Tukang 45,000.00Rp 4,500.00Rp

0.017 OH Mandor 45,000.00Rp 750.00Rp

JUMLAH 60,583.33Rp

HARGA SATUAN 60,583.33Rp

TENAGA

1 m2 Membuat dan memasang daun pintu panel kayu bangkirei SNI : 3434:2008

TENAGA

BAHAN

TENAGA

1 m2 Membuat dan memasang daun pintu panel kayu kamper SNI : 3434:2008

BAHAN

BAHAN

TENAGA

1 m2 Memasang daun pintu panel lama SNI : 3434:2008

Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru

Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru

TENAGA

1 m2 Membuat dan memasang daun pintu panel kayu jati SNI : 3434:2008

BAHAN

BAHAN

TENAGA

1 m3 Memasang kusen pintu/jendela lama SNI : 3434:2008

Page 14: Harga Satuan Sni Tahun 2011

0.024 m3 Kayu jati, papan 20,000,000.00Rp 480,000.00Rp

0.300 Kg Lem kayu 12,000.00Rp 3,600.00Rp

0.800 OH Pekerja 32,500.00Rp 26,000.00Rp

2.400 OH Tukang Kayu 42,500.00Rp 102,000.00Rp

0.240 OH Kepala Tukang 45,000.00Rp 10,800.00Rp

0.040 OH Mandor 45,000.00Rp 1,800.00Rp

JUMLAH 624,200.00Rp

HARGA SATUAN 624,200.00Rp

0.024 m3 Kayu kamper, papan 8,300,000.00Rp 199,200.00Rp

0.300 Kg Lem kayu 12,000.00Rp 3,600.00Rp

0.800 OH Pekerja 32,500.00Rp 26,000.00Rp

2.400 OH Tukang Kayu 42,500.00Rp 102,000.00Rp

0.240 OH Kepala Tukang 45,000.00Rp 10,800.00Rp

0.040 OH Mandor 45,000.00Rp 1,800.00Rp

JUMLAH 343,400.00Rp

HARGA SATUAN 343,400.00Rp

0.024 m3 Kayu bangkirei, papan 8,650,000.00Rp 207,600.00Rp

0.300 Kg Lem kayu 32,500.00Rp 9,750.00Rp

0.800 OH Pekerja 32,500.00Rp 26,000.00Rp

2.400 OH Tukang Kayu 42,500.00Rp 102,000.00Rp

0.240 OH Kepala Tukang 45,000.00Rp 10,800.00Rp

0.040 OH Mandor 45,000.00Rp 1,800.00Rp

JUMLAH 357,950.00Rp

HARGA SATUAN 357,950.00Rp

0.100 Kg Lem kayu 45,000.00Rp 4,500.00Rp

0.267 OH Pekerja 32,500.00Rp 8,666.67Rp

0.800 OH Tukang Kayu 42,500.00Rp 34,000.00Rp

0.080 OH Kepala Tukang 45,000.00Rp 3,600.00Rp

0.013 OH Mandor 45,000.00Rp 600.00Rp

JUMLAH 51,366.67Rp

HARGA SATUAN 51,366.67Rp

0.064 m3 Kayu jati, papan 20,000,000.00Rp 1,280,000.00Rp

0.500 Kg Lem kayu 12,000.00Rp 6,000.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

3.000 OH Tukang Kayu 42,500.00Rp 127,500.00Rp

0.300 OH Kepala Tukang 45,000.00Rp 13,500.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 1,461,750.00Rp

HARGA SATUAN 1,461,750.00Rp

0.040 m3 Kayu kamper, papan 8,300,000.00Rp 332,000.00Rp

0.500 Kg Lem kayu 12,000.00Rp 6,000.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

3.000 OH Tukang Kayu 42,500.00Rp 127,500.00Rp

0.300 OH Kepala Tukang 45,000.00Rp 13,500.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 513,750.00Rp

HARGA SATUAN 513,750.00Rp

TENAGA

BAHAN

TENAGA

1 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu kamper SNI : 3434:2008

BAHAN

BAHAN

TENAGA

1 m2 Membuat dan memasang daun pintu/jendela kaca kayu bangkirei SNI : 3434:2008

1 m2 Memasang daun pintu/jendela kaca lama SNI : 3434:2008

Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru

TENAGA

1 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu jati SNI : 3434:2008

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 Membuat dan memasang daun pintu/jendela kaca kayu kamper SNI : 3434:2008

1 m2 Membuat dan memasang daun pintu/jendela kaca kayu jati SNI : 3434:2008

Page 15: Harga Satuan Sni Tahun 2011

0.040 m3 Kayu bangkirei, papan 8,650,000.00Rp 346,000.00Rp

0.500 Kg Lem kayu 12,000.00Rp 6,000.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

3.000 OH Tukang Kayu 42,500.00Rp 127,500.00Rp

0.300 OH Kepala Tukang 45,000.00Rp 13,500.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 527,750.00Rp

HARGA SATUAN 527,750.00Rp

0.025 m3 Kayu kamper, papan 8,300,000.00Rp 207,500.00Rp

0.030 kg Paku 1 cm - 2,5 cm 15,000.00Rp 450.00Rp

0.500 kg Lem kayu 12,000.00Rp 6,000.00Rp

1.000 lbr Plywood 65,000.00Rp 65,000.00Rp

0.700 OH Pekerja 32,500.00Rp 22,750.00Rp

2.100 OH Tukang Kayu 42,500.00Rp 89,250.00Rp

0.210 OH Kepala Tukang 45,000.00Rp 9,450.00Rp

0.035 OH Mandor 45,000.00Rp 1,575.00Rp

JUMLAH 401,975.00Rp

HARGA SATUAN 401,975.00Rp

0.0256 m3 Kayu kamper, papan 8,300,000.00Rp 212,480.00Rp

0.030 kg Paku 1 cm - 2,5 cm 15,000.00Rp 450.00Rp

0.500 kg Lem kayu 12,000.00Rp 6,000.00Rp

1.000 lbr Plywood 65,000.00Rp 65,000.00Rp

0.800 OH Pekerja 32,500.00Rp 26,000.00Rp

2.400 OH Tukang Kayu 42,500.00Rp 102,000.00Rp

0.240 OH Kepala Tukang 45,000.00Rp 10,800.00Rp

0.040 OH Mandor 45,000.00Rp 1,800.00Rp

JUMLAH 424,530.00Rp

HARGA SATUAN 424,530.00Rp

0.060 m3 Kayu jati, papan 20,000,000.00Rp 1,200,000.00Rp

0.150 Kg Paku kecil 22,000.00Rp 3,300.00Rp

0.670 OH Pekerja 32,500.00Rp 21,775.00Rp

2.400 OH Tukang Kayu 42,500.00Rp 102,000.00Rp

0.200 OH Kepala Tukang 45,000.00Rp 9,000.00Rp

0.335 OH Mandor 45,000.00Rp 15,075.00Rp

JUMLAH 1,351,150.00Rp

HARGA SATUAN 1,351,150.00Rp

0.060 m3 Kayu kamper, papan 8,300,000.00Rp 498,000.00Rp

0.150 Kg Paku kecil 22,000.00Rp 3,300.00Rp

0.670 OH Pekerja 32,500.00Rp 21,775.00Rp

2.400 OH Tukang Kayu 42,500.00Rp 102,000.00Rp

0.200 OH Kepala Tukang 45,000.00Rp 9,000.00Rp

0.335 OH Mandor 45,000.00Rp 15,075.00Rp

JUMLAH 649,150.00Rp

HARGA SATUAN 649,150.00Rp

0.060 m3 Kayu bangkirei, papan 8,650,000.00Rp 519,000.00Rp

0.150 Kg Paku kecil 22,000.00Rp 3,300.00Rp

1 m2 Memasang jalusi kusen kayu bangkirei SNI : 3434:2008

BAHAN

BAHAN

TENAGA

1 m2 Memasang jalusi kusen kayu kamper SNI : 3434:2008

BAHAN

TENAGA

1 m2 Membuat dan memasang pintu dan jendela jalusi kayu bangkirei SNI : 3434:2008

1 m2 Memasang jalusi kusen kayu jati SNI : 3434:2008

BAHAN

TENAGA

1 m2 Membuat dan memasang daun pintu plywood rangkap, rangka

ekspose, kayu kamper SNI : 3434:2008

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 Membuat dan memasang daun pintu lapis (plywood) rangkap,

rangka tertutup, kayu kamper (lebar s/d 90 cm) SNI : 3434:2008

Page 16: Harga Satuan Sni Tahun 2011

0.670 OH Pekerja 32,500.00Rp 21,775.00Rp

2.400 OH Tukang Kayu 42,500.00Rp 102,000.00Rp

0.200 OH Kepala Tukang 45,000.00Rp 9,000.00Rp

0.335 OH Mandor 45,000.00Rp 15,075.00Rp

JUMLAH 670,150.00Rp

HARGA SATUAN 670,150.00Rp

1.100 m3 Kayu bangkirei, balok 7,800,000.00Rp 8,580,000.00Rp

5.600 Kg Paku biasa 2" - 5" 15,000.00Rp 84,000.00Rp

15.000 Kg Besi strip 9,250.00Rp 138,750.00Rp

4.000 OH Pekerja 32,500.00Rp 130,000.00Rp

12.000 OH Tukang Kayu 42,500.00Rp 510,000.00Rp

1.200 OH Kepala Tukang 45,000.00Rp 54,000.00Rp

0.200 OH Mandor 45,000.00Rp 9,000.00Rp

JUMLAH 9,505,750.00Rp

HARGA SATUAN 9,505,750.00Rp

2.000 OH Pekerja 32,500.00Rp 65,000.00Rp

6.000 OH Tukang Kayu 42,500.00Rp 255,000.00Rp

0.600 OH Kepala Tukang 45,000.00Rp 27,000.00Rp

0.100 OH Mandor 45,000.00Rp 4,500.00Rp

JUMLAH 351,500.00Rp

HARGA SATUAN 351,500.00Rp

1.100 m3 Kayu bangkirei, balok 7,800,000.00Rp 8,580,000.00Rp

3.000 Kg Paku biasa 2" - 5" 15,000.00Rp 45,000.00Rp

15.000 Kg Besi strip 9,250.00Rp 138,750.00Rp

2.400 OH Pekerja 32,500.00Rp 78,000.00Rp

7.200 OH Tukang Kayu 42,500.00Rp 306,000.00Rp

0.720 OH Kepala Tukang 45,000.00Rp 32,400.00Rp

0.120 OH Mandor 45,000.00Rp 5,400.00Rp

JUMLAH 9,185,550.00Rp

HARGA SATUAN 9,185,550.00Rp

3.000 Kg Paku biasa 2" - 5" 15,000.00Rp 45,000.00Rp

15.000 Kg Besi strip 9,250.00Rp 138,750.00Rp

2.400 OH Pekerja 32,500.00Rp 78,000.00Rp

7.200 OH Tukang Kayu 42,500.00Rp 306,000.00Rp

0.720 OH Kepala Tukang 45,000.00Rp 32,400.00Rp

0.120 OH Mandor 45,000.00Rp 5,400.00Rp

JUMLAH 605,550.00Rp

HARGA SATUAN 605,550.00Rp

0.014 m3 Kaso-kaso (5/7), kayu bangkirei 7,800,000.00Rp 109,200.00Rp

0.0036 m3 Reng (2/3), kayu bangkirei 5,000,000.00Rp 18,000.00Rp

0.250 Kg Paku biasa 2" - 5" 15,000.00Rp 3,750.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.100 OH Tukang Kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

BAHAN

TENAGA

SNI : 3434:2008

BAHAN

TENAGA

1 m2 Rangka atap genteng keramik, kayu bangkirei SNI : 3434:2008

TENAGA

1 m3 Konstruksi Gording lama SNI : 3434:2008

1 m3 Memasang kuda-kuda lama SNI : 3434:2008

Pemasangan kuda-kuda lama dipakai koefisien 50% tenaga kerja

TENAGA

1 m3 Konstruksi Gording kayu bangkirei

TENAGA

1 m3 Memasang kuda-kuda kayu bangkirei SNI : 3434:2008

BAHAN

BAHAN

TENAGA

Page 17: Harga Satuan Sni Tahun 2011

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 141,150.00Rp

HARGA SATUAN 141,150.00Rp

0.014 m3 Kaso-kaso (5/7), kayu kruing 5,800,000.00Rp 81,200.00Rp

0.0036 m3 Reng (2/3), kayu jati 6,650,000.00Rp 23,940.00Rp

0.250 Kg Paku biasa 2" - 5" 15,000.00Rp 3,750.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.100 OH Tukang Kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 119,090.00Rp

HARGA SATUAN 119,090.00Rp

0.014 m3 Kaso-kaso (5/7), kayu bangkirei 7,800,000.00Rp 109,200.00Rp

0.0072 m3 Reng (3/4), kayu bangkirei 5,000,000.00Rp 36,000.00Rp

0.250 Kg Paku biasa 2" - 5" 15,000.00Rp 3,750.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.100 OH Tukang Kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 159,150.00Rp

HARGA SATUAN 159,150.00Rp

BAHAN 0.250 Kg Paku biasa 2" - 5" 15,000.00Rp 3,750.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.100 OH Tukang Kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 13,950.00Rp

HARGA SATUAN 13,950.00Rp

0.0154 m3 Kayu kruing, balok 5,800,000.00Rp 89,320.00Rp

0.200 Kg Paku biasa 2" - 5" 15,000.00Rp 3,000.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.300 OH Tukang Kayu 42,500.00Rp 12,750.00Rp

0.030 OH Kepala Tukang 45,000.00Rp 1,350.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 114,670.00Rp

HARGA SATUAN 114,670.00Rp

0.0154 m3 Kayu meranti, balok 5,100,000.00Rp 78,540.00Rp

0.200 Kg Paku biasa 2" - 5" 15,000.00Rp 3,000.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.300 OH Tukang Kayu 42,500.00Rp 12,750.00Rp

0.030 OH Kepala Tukang 45,000.00Rp 1,350.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 103,890.00Rp

HARGA SATUAN 103,890.00Rp

0.0163 m3 Kayu kruing, balok 5,800,000.00Rp 94,540.00Rp

TENAGA

1 m2 Rangka langit-langit, kayu kruing uk. (60x60) cm SNI : 3434:2008

BAHAN

TENAGA

1 m2 Rangka langit-langit, kayu meranti uk. (50x100) cm SNI : 3434:2008

BAHAN

BAHAN

TENAGA

1 m2 Rangka atap genteng keramik, kaso kruing reng jati SNI : 3434:2008

1 m2 Rangka langit-langit, kayu kruing uk. (50x100) cm SNI : 3434:2008

BAHAN

TENAGA

1 m2 Rangka atap genteng beton, kayu bangkirei SNI : 3434:2008

BAHAN

TENAGA

1 m2 Rangka atap genteng keramik, kayu lama SNI : 3434:2008

TENAGA

Page 18: Harga Satuan Sni Tahun 2011

0.250 Kg Paku biasa 2" - 5" 15,000.00Rp 3,750.00Rp

0.200 OH Pekerja 32,500.00Rp 6,500.00Rp

0.300 OH Tukang Kayu 42,500.00Rp 12,750.00Rp

0.030 OH Kepala Tukang 45,000.00Rp 1,350.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 122,265.00Rp

HARGA SATUAN 122,265.00Rp

0.0163 m3 Kayu meranti, balok 5,100,000.00Rp 83,130.00Rp

0.250 Kg Paku biasa 2" - 5" 15,000.00Rp 3,750.00Rp

0.200 OH Pekerja 32,500.00Rp 6,500.00Rp

0.300 OH Tukang Kayu 42,500.00Rp 12,750.00Rp

0.030 OH Kepala Tukang 45,000.00Rp 1,350.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 110,855.00Rp

HARGA SATUAN 110,855.00Rp

0.0120 m3 Kayu kruing, balok 5,800,000.00Rp 69,600.00Rp

0.100 Kg Paku biasa 2" - 5" 15,000.00Rp 1,500.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.250 OH Tukang Kayu 42,500.00Rp 10,625.00Rp

0.025 OH Kepala Tukang 45,000.00Rp 1,125.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 91,100.00Rp

HARGA SATUAN 91,100.00Rp

0.0060 m3 Kayu meranti, balok 5,100,000.00Rp 30,600.00Rp

0.060 Kg Paku biasa 2" - 5" 15,000.00Rp 900.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.250 OH Tukang Kayu 42,500.00Rp 10,625.00Rp

0.025 OH Kepala Tukang 45,000.00Rp 1,125.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 51,500.00Rp

HARGA SATUAN 51,500.00Rp

0.0120 m3 Kayu kruing balok 5,800,000.00Rp 69,600.00Rp

0.100 Kg Paku biasa 2" - 5" 15,000.00Rp 1,500.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.250 OH Tukang Kayu 42,500.00Rp 10,625.00Rp

0.025 OH Kepala Tukang 45,000.00Rp 1,125.00Rp

0.075 OH Mandor 45,000.00Rp 3,375.00Rp

JUMLAH 91,100.00Rp

HARGA SATUAN 91,100.00Rp

0.0108 m3 Kayu bangkirei, papan 8,650,000.00Rp 93,420.00Rp

0.100 Kg Paku biasa 2" - 5" 15,000.00Rp 1,500.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.200 OH Tukang Kayu 42,500.00Rp 8,500.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 107,795.00Rp

HARGA SATUAN 107,795.00Rp

BAHAN

TENAGA

1 m2 Rangka langit-langit, kayu lama uk. (100x100) cm SNI : 2002

1 m1 Memasang Lisplank uk. (3x20) cm kayu bangkirei SNI : 3434:2008

BAHAN

TENAGA

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 Rangka langit-langit miring, kayu meranti uk. (100x100) cm SNI : 2002

TENAGA

1 m2 Rangka langit-langit, kayu kruing uk. (100x100) cm SNI : 2002

BAHAN

TENAGA

1 m2 Rangka langit-langit, kayu meranti uk. (60x60) cm SNI : 3434:2008

BAHAN

Page 19: Harga Satuan Sni Tahun 2011

0.0030 m3 Kayu Kruing papan 5,800,000.00Rp 17,400.00Rp

0.050 Kg Paku biasa 2" - 5 " 15,000.00Rp 750.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.200 OH Tukang Kayu 42,500.00Rp 8,500.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 31,025.00Rp

HARGA SATUAN 31,025.00Rp

0.0020 m3 Kayu bangkirai papan 8,650,000.00Rp 17,300.00Rp

0.050 Kg paku biasa 2"- 5" 15,000.00Rp 750.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.200 OH Tukang Kayu 42,500.00Rp 8,500.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 30,925.00Rp

HARGA SATUAN 30,925.00Rp

H. PEKERJAAN PENUTUP ATAP

BAHAN 25.0000 bh Genteng kodok 1,700.00Rp 42,500.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.075 OH Tukang Kayu 42,500.00Rp 3,187.50Rp

0.008 OH Kepala Tukang 45,000.00Rp 360.00Rp

0.008 OH Mandor 45,000.00Rp 360.00Rp

JUMLAH 51,282.50Rp

HARGA SATUAN 51,282.50Rp

BAHAN 25.0000 bh Genteng palentong/paris 900.00Rp 22,500.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.075 OH Tukang Kayu 42,500.00Rp 3,187.50Rp

0.008 OH Kepala Tukang 45,000.00Rp 360.00Rp

0.008 OH Mandor 45,000.00Rp 360.00Rp

JUMLAH 31,282.50Rp

HARGA SATUAN 31,282.50Rp

9.0000 bh Genteng beton 8,000.00Rp 72,000.00Rp

0.0300 kg Paku biasa 2"-5" 15,000.00Rp 450.00Rp

0.200 OH Pekerja 32,500.00Rp 6,500.00Rp

0.100 OH Tukang Kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.010 OH Mandor 45,000.00Rp 450.00Rp

JUMLAH 84,100.00Rp

HARGA SATUAN 84,100.00Rp

1.0200 lbr Genteng metal 70,000.00Rp 71,400.00Rp

0.2000 kg Paku biasa 2"-5" 15,000.00Rp 3,000.00Rp

0.200 OH Pekerja 32,500.00Rp 6,500.00Rp

0.100 OH Tukang Kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.010 OH Mandor 45,000.00Rp 450.00Rp

JUMLAH 86,050.00Rp

BAHAN

TENAGA

SNI : 03-3436-2002

1 m1 Memasang winvier uk. (2x10) cm kayu bengkirei SNI : 3434:2008

BAHAN

TENAGA

1 m2 Memasang atap genteng metal SNI : 03-3436-2002

BAHAN

TENAGA

1 m2 Memasang atap genteng kodok/glazzur SNI : 03-3436-2002

TENAGA

1 m2 Memasang atap genteng palentong/paris, kecil

TENAGA

1 m2 Memasang atap genteng beton SNI : 03-3436-2002

BAHAN

TENAGA

1 m1 Memasang riuter uk. (2x15) cm kayu kruing SNI : 3434:2008

Page 20: Harga Satuan Sni Tahun 2011

HARGA SATUAN 86,050.00Rp

5.0000 bh Bubung genteng kodok 3,000.00Rp 15,000.00Rp

8.0000 kg PC 1,050.00Rp 8,400.00Rp

0.0320 m3 Pasir pasang 107,800.00Rp 3,449.60Rp

0.400 OH Pekerja 32,500.00Rp 13,000.00Rp

0.200 OH Tukang Kayu 42,500.00Rp 8,500.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.002 OH Mandor 45,000.00Rp 90.00Rp

JUMLAH 49,339.60Rp

HARGA SATUAN 49,339.60Rp

5.0000 bh Bubung genteng palentong/paris 3,000.00Rp 15,000.00Rp

8.0000 kg PC 1,050.00Rp 8,400.00Rp

0.0320 m3 Pasir pasang 107,800.00Rp 3,449.60Rp

0.400 OH Pekerja 32,500.00Rp 13,000.00Rp

0.200 OH Tukang Kayu 42,500.00Rp 8,500.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.002 OH Mandor 45,000.00Rp 90.00Rp

JUMLAH 49,339.60Rp

HARGA SATUAN 49,339.60Rp

3.5000 bh Nok genteng beton 13,000.00Rp 45,500.00Rp

0.0500 kg Paku biasa 2"-5" 15,000.00Rp 750.00Rp

10.8000 kg PC 1,050.00Rp 11,340.00Rp

0.0320 kg Pasir pasang 107,800.00Rp 3,449.60Rp

1.0000 m3 Semen warna 2,025.00Rp 2,025.00Rp

0.400 OH Pekerja 32,500.00Rp 13,000.00Rp

0.200 OH Tukang Kayu 42,500.00Rp 8,500.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.002 OH Mandor 45,000.00Rp 90.00Rp

JUMLAH 85,554.60Rp

HARGA SATUAN 85,554.60Rp

1.1000 bh Nok genteng metal 5,000.00Rp 5,500.00Rp

0.0500 kg Paku biasa 1/2"-1" 15,000.00Rp 750.00Rp

0.250 OH Pekerja 32,500.00Rp 8,125.00Rp

0.150 OH Tukang Kayu 42,500.00Rp 6,375.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.013 OH Mandor 45,000.00Rp 585.00Rp

JUMLAH 22,010.00Rp

HARGA SATUAN 22,010.00Rp

0.6000 lbr Asbes gelombang 82,400.00Rp 49,440.00Rp

0.1200 bh Paku pancing 22,000.00Rp 2,640.00Rp

0.140 OH Pekerja 32,500.00Rp 4,550.00Rp

0.075 OH Tukang Kayu 42,500.00Rp 3,187.50Rp

0.008 OH Kepala Tukang 45,000.00Rp 360.00Rp

0.008 OH Mandor 45,000.00Rp 360.00Rp

JUMLAH 60,537.50Rp

HARGA SATUAN 60,537.50Rp

0.7250 lbr Asbes gelombang 51,500.00Rp 37,337.50Rp

0.1200 bh Paku pancing 22,000.00Rp 2,640.00Rp

0.140 OH Pekerja 32,500.00Rp 4,550.00Rp

1 m2 Pasang atap asbes gelombang (1,5 x 0,92 m) x 5 mm SNI : 03-3436-2002

BAHAN

TENAGA

1 m2 Pasang atap asbes gelombang (2,25 x 0,92 m) x 5 mm SNI : 03-3436-2002

BAHAN

TENAGA

TENAGA

1 m1 Memasang bubung genteng palentong/paris SNI : 03-3436-2002

BAHAN

TENAGA

TENAGA

1 m1 Memasang nok genteng metal SNI : 03-3436-2002

1 m1 Memasang bubung genteng kodok/ glazzur SNI : 03-3436-2002

BAHAN

BAHAN

TENAGA

1 m1 Memasang nok genteng beton SNI : 03-3436-2002

BAHAN

Page 21: Harga Satuan Sni Tahun 2011

0.070 OH Tukang Kayu 42,500.00Rp 2,975.00Rp

0.007 OH Kepala Tukang 45,000.00Rp 315.00Rp

0.007 OH Mandor 45,000.00Rp 315.00Rp

JUMLAH 48,132.50Rp

HARGA SATUAN 48,132.50Rp

0.3500 lbr Asbes gelombang 63,900.00Rp 22,365.00Rp

0.1200 bh Paku pancing 22,000.00Rp 2,640.00Rp

0.140 OH Pekerja 32,500.00Rp 4,550.00Rp

0.070 OH Tukang Kayu 42,500.00Rp 2,975.00Rp

0.007 OH Kepala Tukang 45,000.00Rp 315.00Rp

0.007 OH Mandor 45,000.00Rp 315.00Rp

JUMLAH 33,160.00Rp

HARGA SATUAN 33,160.00Rp

0.4400 lbr Asbes gelombang 53,600.00Rp 23,584.00Rp

0.1200 bh Paku pancing 22,000.00Rp 2,640.00Rp

0.140 OH Pekerja 32,500.00Rp 4,550.00Rp

0.070 OH Tukang Kayu 42,500.00Rp 2,975.00Rp

0.007 OH Kepala Tukang 45,000.00Rp 315.00Rp

0.007 OH Mandor 45,000.00Rp 315.00Rp

JUMLAH 34,379.00Rp

HARGA SATUAN 34,379.00Rp

0.5100 lbr Asbes gelombang 46,300.00Rp 23,613.00Rp

0.1200 bh Paku pancing 22,000.00Rp 2,640.00Rp

0.140 OH Pekerja 32,500.00Rp 4,550.00Rp

0.067 OH Tukang Kayu 42,500.00Rp 2,847.50Rp

0.007 OH Kepala Tukang 45,000.00Rp 315.00Rp

0.007 OH Mandor 45,000.00Rp 315.00Rp

JUMLAH 34,280.50Rp

HARGA SATUAN 34,280.50Rp

2.4000 lbr Bubung stel gelombang 48,400.00Rp 116,160.00Rp

6.0000 bh Paku sekrup 3,5" 500.00Rp 3,000.00Rp

0.084 OH Pekerja 32,500.00Rp 2,730.00Rp

0.125 OH Tukang Kayu 42,500.00Rp 5,312.50Rp

0.013 OH Kepala Tukang 45,000.00Rp 585.00Rp

0.004 OH Mandor 45,000.00Rp 180.00Rp

JUMLAH 127,967.50Rp

HARGA SATUAN 127,967.50Rp

2.1000 lbr Bubung stel gelombang 28,300.00Rp 59,430.00Rp

6.0000 bh Paku sekrup 3,5" 500.00Rp 3,000.00Rp

0.084 OH Pekerja 32,500.00Rp 2,730.00Rp

0.125 OH Tukang Kayu 42,500.00Rp 5,312.50Rp

0.013 OH Kepala Tukang 45,000.00Rp 585.00Rp

0.004 OH Mandor 45,000.00Rp 180.00Rp

JUMLAH 71,237.50Rp

HARGA SATUAN 71,237.50Rp

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm SNI : 03-3436-2002

BAHAN

TENAGA

1 m' Pasang bubung stel gelombang 1,05 m SNI : 03-3436-2002

BAHAN

TENAGA

1 m2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm SNI : 03-3436-2002

TENAGA

1 m2 Pasang atap asbes gelombang (3,0 x 1,05 m) x 4 mm SNI : 03-3436-2002

BAHAN

TENAGA

1 m' Pasang bubung stel gelombang 0,92 m SNI : 03-3436-2002

Page 22: Harga Satuan Sni Tahun 2011

0.7000 lbr Seng gelombang 65,000.00Rp 45,500.00Rp

0.0200 bh Paku payung 22,000.00Rp 440.00Rp

0.120 OH Pekerja 32,500.00Rp 3,900.00Rp

0.060 OH Tukang Kayu 42,500.00Rp 2,550.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.006 OH Mandor 45,000.00Rp 270.00Rp

JUMLAH 52,930.00Rp

HARGA SATUAN 52,930.00Rp

0.3000 lbr Seng plat 3" x 6" bjls 25 39,600.00Rp 11,880.00Rp

0.0400 bh Paku payung 22,000.00Rp 880.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.070 OH Tukang Kayu 42,500.00Rp 2,975.00Rp

0.008 OH Kepala Tukang 45,000.00Rp 360.00Rp

0.008 OH Mandor 45,000.00Rp 360.00Rp

JUMLAH 21,330.00Rp

HARGA SATUAN 21,330.00Rp

BAHAN 1.0500 m2 Sisalation/ aluminium foil 7,500.00Rp 7,875.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.050 OH Tukang Kayu 42,500.00Rp 2,125.00Rp

0.005 OH Kepala Tukang 45,000.00Rp 225.00Rp

0.008 OH Mandor 45,000.00Rp 360.00Rp

JUMLAH 15,460.00Rp

HARGA SATUAN 15,460.00Rp

I. PEKERJAAN LANGIT-LANGIT

1.1000 lbr Asbes semen 11,300.00Rp 12,430.00Rp

0.0100 kg Paku kecil 22,000.00Rp 220.00Rp

0.030 OH Pekerja 32,500.00Rp 975.00Rp

0.070 OH Tukang Kayu 42,500.00Rp 2,975.00Rp

0.007 OH Kepala Tukang 45,000.00Rp 315.00Rp

0.004 OH Mandor 45,000.00Rp 180.00Rp

JUMLAH 17,095.00Rp

HARGA SATUAN 17,095.00Rp

5.8000 lbr Akustik 25,000.00Rp 145,000.00Rp

0.0500 kg Paku kecil 22,000.00Rp 1,100.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.100 OH Tukang Kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 154,275.00Rp

HARGA SATUAN 154,275.00Rp

0.3750 lbr Tripleks 45,000.00Rp 16,875.00Rp

0.0300 kg Paku kecil 22,000.00Rp 660.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.100 OH Tukang Kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 25,710.00Rp

BAHAN

TENAGA

1 m2 Memasang langit-langit akustik uk. (30 x 60) cm SNI : 2839:2008

1 m2 Memasang langit-langit tripleks uk. (120 x 240) cm, tebal 3 mm SNI : 2839:2008

1 m' Pasang atap nok seng SNI : 03-3436-2002

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 Memasang langit-langit asbes semen, tebal 4 mm, 5mm, 6 mm SNI : 2839:2008

1 m2 Pasang atap seng gelombang SNI : 03-3436-2002

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 Pasang aluminium foil/ Sisalation SNI : 03-3436-2002

TENAGA

Page 23: Harga Satuan Sni Tahun 2011

HARGA SATUAN 25,710.00Rp

0.3640 lbr Gypsum board 60,000.00Rp 21,840.00Rp

0.1100 kg Paku sekrup 22,000.00Rp 2,420.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.050 OH Tukang Kayu 42,500.00Rp 2,125.00Rp

0.005 OH Kepala Tukang 45,000.00Rp 225.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 30,085.00Rp

HARGA SATUAN 30,085.00Rp

1.0500 m' List gypsum profil 12,000.00Rp 12,600.00Rp

0.1500 kg Tepung gypsum 3,500.00Rp 525.00Rp

0.060 OH Pekerja 32,500.00Rp 1,950.00Rp

0.060 OH Tukang Kayu 42,500.00Rp 2,550.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.003 OH Mandor 45,000.00Rp 135.00Rp

JUMLAH 18,030.00Rp

HARGA SATUAN 18,030.00Rp

1.0500 m' List kayu profil 3,000.00Rp 3,150.00Rp

0.1000 kg Paku 15,000.00Rp 1,500.00Rp

0.050 OH Pekerja 32,500.00Rp 1,625.00Rp

0.050 OH Tukang Kayu 42,500.00Rp 2,125.00Rp

0.005 OH Kepala Tukang 45,000.00Rp 225.00Rp

0.003 OH Mandor 45,000.00Rp 135.00Rp

JUMLAH 8,760.00Rp

HARGA SATUAN 8,760.00Rp

J. PEKERJAAN PENUTUP LANTAI & DINDING

11.8700 bh Ubin keramik 30x30 3,181.82Rp 37,768.18Rp

10.0000 kg PC 1,050.00Rp 10,500.00Rp

0.0450 m3 Pasir pasang 107,800.00Rp 4,851.00Rp

1.5000 kg Semen warna 2,025.00Rp 3,037.50Rp

0.700 OH Pekerja 32,500.00Rp 22,750.00Rp

0.350 OH Tukang batu 40,000.00Rp 14,000.00Rp

0.035 OH Kepala Tukang 45,000.00Rp 1,575.00Rp

0.035 OH Mandor 45,000.00Rp 1,575.00Rp

JUMLAH 96,056.68Rp

HARGA SATUAN 96,056.68Rp

11.8700 bh Ubin keramik 30x30 anti slip 3,545.45Rp 42,084.55Rp

10.0000 kg PC 1,050.00Rp 10,500.00Rp

0.0450 m3 Pasir pasang 107,800.00Rp 4,851.00Rp

1.5000 kg Semen warna 2,025.00Rp 3,037.50Rp

0.700 OH Pekerja 32,500.00Rp 22,750.00Rp

0.350 OH Tukang batu 40,000.00Rp 14,000.00Rp

0.035 OH Kepala Tukang 45,000.00Rp 1,575.00Rp

0.035 OH Mandor 45,000.00Rp 1,575.00Rp

JUMLAH 100,373.05Rp

HARGA SATUAN 100,373.05Rp

1 m2 Memasang lantai keramik uk.(30x30) cm anti slip SNI : 7395:2008

BAHAN

TENAGA

TENAGA

1 m2 Memasang lantai keramik uk.(30x30) cm SNI : 7395:2008

BAHAN

TENAGA

BAHAN

TENAGA

1 m1 Memasang list langit-langit kayu profil SNI : 2839:2008

BAHAN

1 m2 Memasang langit-langit gypsum board, uk. (1200 x 2400 x 9) mm SNI : 2839:2008

BAHAN

TENAGA

1 m1 Memasang list gypsum profil SNI : 2839:2008

Page 24: Harga Satuan Sni Tahun 2011

11.8700 bh Ubin keramik 30x30 anti slip 3,545.45Rp 42,084.55Rp

10.0000 kg PC 1,050.00Rp 10,500.00Rp

0.0450 m3 Pasir pasang 107,800.00Rp 4,851.00Rp

1.5000 kg Semen warna 2,025.00Rp 3,037.50Rp

0.700 OH Pekerja 32,500.00Rp 22,750.00Rp

0.350 OH Tukang batu 40,000.00Rp 14,000.00Rp

0.035 OH Kepala Tukang 45,000.00Rp 1,575.00Rp

0.035 OH Mandor 45,000.00Rp 1,575.00Rp

JUMLAH 100,373.05Rp

HARGA SATUAN 100,373.05Rp

26.5000 bh Ubin keramik 20x20 1,520.00Rp 40,280.00Rp

10.4000 kg PC 1,050.00Rp 10,920.00Rp

0.0450 m3 Pasir pasang 107,800.00Rp 4,851.00Rp

1.6200 kg Semen warna 2,025.00Rp 3,280.50Rp

0.700 OH Pekerja 32,500.00Rp 22,750.00Rp

0.350 OH Tukang batu 40,000.00Rp 14,000.00Rp

0.035 OH Kepala Tukang 45,000.00Rp 1,575.00Rp

0.035 OH Mandor 45,000.00Rp 1,575.00Rp

JUMLAH 99,231.50Rp

HARGA SATUAN 99,231.50Rp

3.5300 bh Plint keramik 1,060.61Rp 3,743.94Rp

1.1400 kg PC 1,050.00Rp 1,197.00Rp

0.0030 m3 Pasir pasang 107,800.00Rp 323.40Rp

0.1000 kg Semen warna 2,025.00Rp 202.50Rp

0.090 OH Pekerja 32,500.00Rp 2,925.00Rp

0.090 OH Tukang batu 40,000.00Rp 3,600.00Rp

0.009 OH Kepala Tukang 45,000.00Rp 405.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 12,621.84Rp

HARGA SATUAN 12,621.84Rp

26.5000 bh Keramik dinding 20x20 1,520.00Rp 40,280.00Rp

9.3000 kg PC 1,050.00Rp 9,765.00Rp

0.0180 m3 Pasir pasang 107,800.00Rp 1,940.40Rp

1.9400 kg Semen warna 2,025.00Rp 3,928.50Rp

0.090 OH Pekerja 32,500.00Rp 2,925.00Rp

0.450 OH Tukang batu 40,000.00Rp 18,000.00Rp

0.045 OH Kepala Tukang 45,000.00Rp 2,025.00Rp

0.045 OH Mandor 45,000.00Rp 2,025.00Rp

JUMLAH 80,888.90Rp

HARGA SATUAN 80,888.90Rp

21.2000 bh Keramik dinding 20x25 2,000.00Rp 42,400.00Rp

9.3000 kg PC 1,050.00Rp 9,765.00Rp

0.0180 m3 Pasir pasang 107,800.00Rp 1,940.40Rp

1.5520 kg Semen warna 2,025.00Rp 3,142.80Rp

0.090 OH Pekerja 32,500.00Rp 2,925.00Rp

0.450 OH Tukang batu 40,000.00Rp 18,000.00Rp

0.045 OH Kepala Tukang 45,000.00Rp 2,025.00Rp

0.045 OH Mandor 45,000.00Rp 2,025.00Rp

JUMLAH 82,223.20Rp

HARGA SATUAN 82,223.20Rp

TENAGA

1 m2 Memasang dinding keramik uk.(20x20) cm SNI : 7395:2008

TENAGA

1 m2 Memasang dinding keramik uk.(20x25) cm

BAHAN

TENAGA

1 m1 Memasang plint keramik uk.(10x30) cm

BAHAN

TENAGA

1 m2 Memasang lantai keramik uk.(20x20) cm SNI : 7395:2008

SNI : 7395:2008

BAHAN

BAHAN

SNI : 7395:2008

BAHAN

TENAGA

1 m2 Memasang lantai keramik uk.(30x30) cm SNI : 7395:2008

Page 25: Harga Satuan Sni Tahun 2011

1.1000 m2 Batu tempel hitam 60,000.00Rp 66,000.00Rp

11.7500 kg PC 1,050.00Rp 12,337.50Rp

0.0350 m3 Pasir pasang 107,800.00Rp 3,773.00Rp

0.700 OH Pekerja 32,500.00Rp 22,750.00Rp

0.350 OH Tukang batu 40,000.00Rp 14,000.00Rp

0.035 OH Kepala Tukang 45,000.00Rp 1,575.00Rp

0.035 OH Mandor 45,000.00Rp 1,575.00Rp

JUMLAH 122,010.50Rp

HARGA SATUAN 122,010.50Rp

K. PEKERJAAN BESI

BAHAN 1.1500 bh Besi profil 12,500.00Rp 14,375.00Rp

0.060 OH Pekerja 32,500.00Rp 1,950.00Rp

0.060 OH Tukang las konstruksi 40,000.00Rp 2,400.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.003 OH Mandor 45,000.00Rp 135.00Rp

JUMLAH 19,130.00Rp

HARGA SATUAN 19,130.00Rp

BAHAN 1.1500 bh Besi baja IWF 15,000.00Rp 17,250.00Rp

0.060 OH Pekerja 32,500.00Rp 1,950.00Rp

0.060 OH Tukang las konstruksi 40,000.00Rp 2,400.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.003 OH Mandor 45,000.00Rp 135.00Rp

JUMLAH 22,005.00Rp

HARGA SATUAN 22,005.00Rp

1.0000 ltr Solar 4,500.00Rp 4,500.00Rp

0.1000 ltr Minyak pelumas 32,200.00Rp 3,220.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.100 OH Tukang besi konstruksi 40,000.00Rp 4,000.00Rp

0.001 OH Kepala Tukang 45,000.00Rp 45.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

ALAT 0.800 Jam Sewa alat 10,000.00Rp 8,000.00Rp

JUMLAH 23,240.00Rp

HARGA SATUAN 23,240.00Rp

15.0000 kg Besi siku L 30.30.3 12,500.00Rp 187,500.00Rp

32.8000 kg Besi plat baja 15,000.00Rp 492,000.00Rp

0.0500 kg Kawat las 22,000.00Rp 1,100.00Rp

1.050 OH Pekerja 32,500.00Rp 34,125.00Rp

1.050 OH Tukang las biasa 40,000.00Rp 42,000.00Rp

0.105 OH Kepala Tukang 45,000.00Rp 4,725.00Rp

0.0520 OH Mandor 45,000.00Rp 2,340.00Rp

JUMLAH 763,790.00Rp

HARGA SATUAN 763,790.00Rp

0.4000 kg Kawat las listrik 22,000.00Rp 8,800.00Rp

0.3000 liter Solar 4,500.00Rp 1,350.00Rp

0.0400 liter Minyak pelumas 32,200.00Rp 1,288.00Rp

0.040 OH Pekerja 32,500.00Rp 1,300.00Rp

BAHAN

TENAGA

1 m2 Memasang dinding batu tempel hitam SNI : 7395:2008

TENAGA

1 kg Pasang rangka kuda-kuda baja IWF SNI : 7393:2008

TENAGA

BAHAN

BAHAN

TENAGA

10 cm Pengelasan dengan las listrik SNI : 7393:2008

TENAGA

1 m2 Pintu besi plat baja tebal 2 mm rangkap, rangkap baja siku SNI : 7393:2008

100 kg Pekerjaan perakitan SNI : 7393:2008

BAHAN

TENAGA

1 kg Pasang besi profil SNI : 7393:2008

Page 26: Harga Satuan Sni Tahun 2011

0.020 OH Tukang besi konstruksi 40,000.00Rp 800.00Rp

0.002 OH Kepala Tukang 45,000.00Rp 90.00Rp

0.002 OH Mandor 45,000.00Rp 90.00Rp

ALAT 0.170 Jam Sewa alat 50,000.00Rp 8,500.00Rp

JUMLAH 22,218.00Rp

HARGA SATUAN 22,218.00Rp

BAHAN 1.0000 m2 Pintu gulung besi 150,000.00Rp 150,000.00Rp

1.200 OH Pekerja 32,500.00Rp 39,000.00Rp

1.200 OH Tukang kayu 42,500.00Rp 51,000.00Rp

0.120 OH Tukang las biasa 40,000.00Rp 4,800.00Rp

0.006 OH Mandor 45,000.00Rp 270.00Rp

JUMLAH 245,070.00Rp

HARGA SATUAN 245,070.00Rp

BAHAN 1.0000 m2 Pintu lipat 400,000.00Rp 400,000.00Rp

0.440 OH Pekerja 32,500.00Rp 14,300.00Rp

0.440 OH Tukang 42,500.00Rp 18,700.00Rp

0.044 OH Kepala Tukang 40,000.00Rp 1,760.00Rp

0.022 OH Mandor 45,000.00Rp 990.00Rp

JUMLAH 435,750.00Rp

HARGA SATUAN 435,750.00Rp

BAHAN 1.0000 m2 Sunscreen aluminium 35,000.00Rp 35,000.00Rp

0.080 OH Pekerja 32,500.00Rp 2,600.00Rp

0.800 OH Tukang 42,500.00Rp 34,000.00Rp

0.080 OH Kepala Tukang 40,000.00Rp 3,200.00Rp

0.00400 OH Mandor 45,000.00Rp 180.00Rp

JUMLAH 74,980.00Rp

HARGA SATUAN 74,980.00Rp

BAHAN 1.0000 m2 Rolling door aluminium 250,000.00Rp 250,000.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

1.000 OH Tukang khusus aluminium 42,500.00Rp 42,500.00Rp

0.100 OH Kepala Tukang 40,000.00Rp 4,000.00Rp

0.050 OH Mandor 45,000.00Rp 2,250.00Rp

JUMLAH 331,250.00Rp

HARGA SATUAN 331,250.00Rp

1.1000 m' Profil aluminium 60,000.00Rp 66,000.00Rp

2.0000 buah Skrup fixer 1,000.00Rp 2,000.00Rp

0.0600 tube Sealant 8,000.00Rp 480.00Rp

0.043 OH Pekerja 32,500.00Rp 1,397.50Rp

0.043 OH Tukang khusus aluminium 42,500.00Rp 1,827.50Rp

0.0043 OH Kepala Tukang 40,000.00Rp 172.00Rp

0.0021 OH Mandor 45,000.00Rp 94.50Rp

JUMLAH 71,971.50Rp

HARGA SATUAN 71,971.50Rp

4.4000 m' Profil aluminium 60,000.00Rp 264,000.00Rp

14.6000 m' Alluminium strip 2,000.00Rp 29,200.00Rp

0.085 OH Pekerja 32,500.00Rp 2,762.50Rp

0.085 OH Tukang khusus aluminium 42,500.00Rp 3,612.50Rp

TENAGA

SNI : 7393:2008

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 Pasang pintu aluminium strip lebar 8 cm SNI : 7393:2008

TENAGA

1 m2 Pasang pintu lipat (folding gate) SNI : 7393:2008

TENAGA

1 m2 Pasang rolling door aluminium SNI : 7393:2008

TENAGA

1 m' Pasang kusen pintu aluminium

TENAGA

1 m2 Pasang pintu rolling door besi SNI : 7393:2008

1 m2 Pasang sunscreen alluminium SNI : 7393:2008

Page 27: Harga Satuan Sni Tahun 2011

0.0085 OH Kepala Tukang 40,000.00Rp 340.00Rp

0.0042 OH Mandor 45,000.00Rp 189.00Rp

JUMLAH 300,104.00Rp

HARGA SATUAN 300,104.00Rp

4.4000 m Profil aluminium 60,000.00Rp 264,000.00Rp

4.5000 m Profil kaca 7,000.00Rp 31,500.00Rp

0.2700 tube Sealant 8,000.00Rp 2,160.00Rp

0.085 OH Pekerja 32,500.00Rp 2,762.50Rp

0.085 OH Tukang aluminium/ kaca 42,500.00Rp 3,612.50Rp

0.009 OH Kepala Tukang 40,000.00Rp 360.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 304,620.00Rp

HARGA SATUAN 304,620.00Rp

6.1770 kg Besi strip 9,250.00Rp 57,137.25Rp

27.0800 cm Pengelasan 2,000.00Rp 54,160.00Rp

1.670 OH Pekerja 32,500.00Rp 54,275.00Rp

1.670 OH Tukang kayu 42,500.00Rp 70,975.00Rp

0.167 OH Kepala Tukang 40,000.00Rp 6,680.00Rp

0.083 OH Mandor 45,000.00Rp 3,735.00Rp

JUMLAH 246,962.25Rp

HARGA SATUAN 246,962.25Rp

1.1000 m2 Kawat nyamuk 15,000.00Rp 16,500.00Rp

11.1100 cm Pengelasan 2,000.00Rp 22,220.00Rp

1.7160 kg Baja strip (0,2 x 2) cm 9,250.00Rp 15,873.00Rp

0.100 OH Pekerja 32,500.00Rp 3,250.00Rp

0.100 OH Tukang 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 40,000.00Rp 400.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 62,718.00Rp

HARGA SATUAN 62,718.00Rp

1.1000 m2 Jendela nako (rangka + kaca 5 mm) 15,000.00Rp 16,500.00Rp

10.0000 bh Paku skrup 150.00Rp 1,500.00Rp

7.0000 m' Besi strip 9,250.00Rp 64,750.00Rp

0.200 OH Pekerja 32,500.00Rp 6,500.00Rp

0.200 OH Tukang 42,500.00Rp 8,500.00Rp

0.020 OH Kepala Tukang 40,000.00Rp 800.00Rp

0.010 OH Mandor 45,000.00Rp 450.00Rp

JUMLAH 99,000.00Rp

HARGA SATUAN 99,000.00Rp

1.0500 m' Seng plat 39,600.00Rp 41,580.00Rp

0.0150 kg Paku 1 cm - 2,5 cm 22,000.00Rp 330.00Rp

0.0190 m3 Papan kayu Klas II/ III 2,200,000.00Rp 41,800.00Rp

0.200 OH Pekerja 32,500.00Rp 6,500.00Rp

0.400 OH Tukang 42,500.00Rp 17,000.00Rp

0.025 OH Kepala Tukang 40,000.00Rp 1,000.00Rp

0.010 OH Mandor 45,000.00Rp 450.00Rp

JUMLAH 108,660.00Rp

HARGA SATUAN 108,660.00Rp

1.0500 m' Seng plat 15,000.00Rp 15,750.00Rp

BAHAN

TENAGA

1 m' Pasang talang datar/ jurai seng BJLS 28 lebar 90 cm SNI : 7393:2008

BAHAN

TENAGA

1 m' Pasang talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cm SNI : 7393:2008

BAHAN

1 m2 Pasang kawat nyamuk SNI : 7393:2008

BAHAN

1 m2 Pasang terali besi strip (20 x 3) mm SNI : 7393:2008

TENAGA

1 m2 Pasang pintu kaca rangka aluminium SNI : 7393:2008

TENAGA

BAHAN

BAHAN

TENAGA

1 m2 Pasang jendela nako dan tralis SNI : 7393:2008

TENAGA

Page 28: Harga Satuan Sni Tahun 2011

0.0100 kg Paku 1 cm - 2,5 cm 22,000.00Rp 220.00Rp

0.5000 kg Besi strip 9,250.00Rp 4,625.00Rp

0.150 OH Pekerja 32,500.00Rp 4,875.00Rp

0.300 OH Tukang 42,500.00Rp 12,750.00Rp

0.030 OH Kepala Tukang 40,000.00Rp 1,200.00Rp

0.008 OH Mandor 45,000.00Rp 360.00Rp

JUMLAH 39,780.00Rp

JASA 10% 3,978.00Rp

HARGA SATUAN 43,758.00Rp

L. PEKERJAAN SANITAIR

1.0000 bh kloset duduk/monoblok 1,000,000.00Rp 1,000,000.00Rp

6% Harga kloset Perlengkapan 60,000.00Rp

3.300 OH Pekerja 32,500.00Rp 107,250.00Rp

1.100 OH Tukang batu 40,000.00Rp 44,000.00Rp

0.001 OH Kepala Tukang 45,000.00Rp 45.00Rp

0.1600 OH Mandor 45,000.00Rp 7,200.00Rp

JUMLAH 1,218,495.00Rp

HARGA SATUAN 1,218,495.00Rp

1.0000 bh kloset jongkok 120,000.00Rp 120,000.00Rp

6.0000 kg PC 1,050.00Rp 6,300.00Rp

0.0100 m3 Pasir pasang 107,800.00Rp 1,078.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

1.500 OH Tukang batu 40,000.00Rp 60,000.00Rp

1.500 OH Kepala Tukang 45,000.00Rp 67,500.00Rp

0.1600 OH Mandor 45,000.00Rp 7,200.00Rp

JUMLAH 294,578.00Rp

HARGA SATUAN 294,578.00Rp

1.0000 bh Urinoir 225,000.00Rp 225,000.00Rp

30% harga urinoir Perlengkapan 67,500.00Rp

6.0000 kg PC 1,050.00Rp 6,300.00Rp

0.0100 m3 Pasir pasang 107,800.00Rp 1,078.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

1.000 OH Tukang batu 40,000.00Rp 40,000.00Rp

0.100 OH Kepala Tukang 45,000.00Rp 4,500.00Rp

0.1000 OH Mandor 45,000.00Rp 4,500.00Rp

JUMLAH 381,378.00Rp

HARGA SATUAN 381,378.00Rp

1.0000 bh Washtafel 225,000.00Rp 225,000.00Rp

12% hrg Washtafel Perlengkapan 27,000.00Rp

6.0000 kg PC 1,050.00Rp 6,300.00Rp

0.0100 m3 Pasir pasang 107,800.00Rp 1,078.00Rp

1.200 OH Pekerja 32,500.00Rp 39,000.00Rp

0.750 OH Tukang batu 40,000.00Rp 30,000.00Rp

0.070 OH Kepala Tukang 45,000.00Rp 3,150.00Rp

0.1100 OH Mandor 45,000.00Rp 4,950.00Rp

JUMLAH 336,478.00Rp

HARGA SATUAN 336,478.00Rp

BAHAN

TENAGA

1 buah washtafel SNI : 2002

BAHAN

TENAGA

TENAGA

1 buah urinoir SNI : 2002

BAHAN

1 buah Pasang kloset jongkok SNI : 2002

BAHAN

BAHAN

TENAGA

TENAGA

1 buah Pasang kloset duduk/monoblok SNI : 2002

Page 29: Harga Satuan Sni Tahun 2011

252.000 bh Batu bata 500.00Rp 126,000.00Rp

120.000 kg PC 1,050.00Rp 126,000.00Rp

0.3000 m3 Pasir pasang 107,800.00Rp 32,340.00Rp

108.900 bh Keramik 20x20 1,520.00Rp 165,528.00Rp

6.0000 kg Semen nat 2,025.00Rp 12,150.00Rp

6.000 OH Pekerja 32,500.00Rp 195,000.00Rp

3.000 OH Tukang batu 40,000.00Rp 120,000.00Rp

0.300 OH Kepala Tukang 45,000.00Rp 13,500.00Rp

0.3000 OH Mandor 45,000.00Rp 13,500.00Rp

JUMLAH 804,018.00Rp

HARGA SATUAN 804,018.00Rp

234.000 bh Batu bata 500.00Rp 117,000.00Rp

114.000 kg PC 1,050.00Rp 119,700.00Rp

0.1840 m3 Pasir pasang 107,800.00Rp 19,835.20Rp

0.0330 m3 Batu koral 125,000.00Rp 4,125.00Rp

4.8500 kg Besi beton 9,250.00Rp 44,862.50Rp

0.1200 m3 Pasir beton 116,000.00Rp 13,920.00Rp

2.160 OH Pekerja 32,500.00Rp 70,200.00Rp

0.720 OH Tukang batu 40,000.00Rp 28,800.00Rp

0.072 OH Kepala Tukang 45,000.00Rp 3,240.00Rp

0.108 OH Mandor 45,000.00Rp 4,860.00Rp

0.1000 OH Tukang gali 32,500.00Rp 3,250.00Rp

JUMLAH 429,792.70Rp

HARGA SATUAN 429,792.70Rp

1.2000 m' Pipa galvanis 12,666.67Rp 15,200.00Rp

35% Harga pipa Perlengkapan 4,433.33Rp

0.054 OH Pekerja 32,500.00Rp 1,755.00Rp

0.090 OH Tukang batu 40,000.00Rp 3,600.00Rp

0.009 OH Kepala Tukang 45,000.00Rp 405.00Rp

0.0270 OH Mandor 45,000.00Rp 1,215.00Rp

JUMLAH 26,608.33Rp

HARGA SATUAN 26,608.33Rp

1.2000 m' Pipa PVC 3,500.00Rp 4,200.00Rp

35% Harga pipa Perlengkapan 1,225.00Rp

0.036 OH Pekerja 32,500.00Rp 1,170.00Rp

0.060 OH Tukang batu 40,000.00Rp 2,400.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.0018 OH Mandor 45,000.00Rp 81.00Rp

JUMLAH 9,346.00Rp

HARGA SATUAN 9,346.00Rp

1.2000 m' Pipa PVC 4,625.00Rp 5,550.00Rp

35% Harga pipa Perlengkapan 1,618.75Rp

0.036 OH Pekerja 32,500.00Rp 1,170.00Rp

0.060 OH Tukang batu 40,000.00Rp 2,400.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.0018 OH Mandor 45,000.00Rp 81.00Rp

JUMLAH 11,089.75Rp

HARGA SATUAN 11,089.75Rp

1.2000 m' Pipa PVC 6,250.00Rp 7,500.00Rp

35% Harga pipa Perlengkapan 2,187.50Rp

0.036 OH Pekerja 32,500.00Rp 1,170.00Rp

BAHAN

TENAGA

BAHAN

TENAGA

1 m1 Pasang pipa PVC tipe AW dia 1" SNI : 2002

BAHAN

TENAGA

BAHAN

TENAGA

1 m1 Pasang pipa PVC tipe AW dia 3/4" SNI : 2002

1 m1 Pasang pipa PVC tipe AW dia 1/2" SNI : 2002

1 m1 Pasang pipa galvanis dia 1/2" SNI : 2002

TENAGA

1 buah bak kontrol batu bata uk. (60x60) cm, tinggi 65 cm SNI : 2002

BAHAN

TENAGA

BAHAN

1 buah bak mandi batu bata vol. 0,3 m3 SNI : 2002

Page 30: Harga Satuan Sni Tahun 2011

0.060 OH Tukang batu 40,000.00Rp 2,400.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.0018 OH Mandor 45,000.00Rp 81.00Rp

JUMLAH 13,608.50Rp

HARGA SATUAN 13,608.50Rp

1.2000 m' Pipa PVC 8,750.00Rp 10,500.00Rp

35% Harga pipa Perlengkapan 3,062.50Rp

0.036 OH Pekerja 32,500.00Rp 1,170.00Rp

0.060 OH Tukang batu 40,000.00Rp 2,400.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.0018 OH Mandor 45,000.00Rp 81.00Rp

JUMLAH 17,483.50Rp

HARGA SATUAN 17,483.50Rp

1.2000 m' Pipa PVC 23,750.00Rp 28,500.00Rp

35% Harga pipa Perlengkapan 8,312.50Rp

0.036 OH Pekerja 32,500.00Rp 1,170.00Rp

0.060 OH Tukang batu 40,000.00Rp 2,400.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.0018 OH Mandor 45,000.00Rp 81.00Rp

JUMLAH 40,733.50Rp

HARGA SATUAN 40,733.50Rp

1.2000 m' Pipa PVC 38,750.00Rp 46,500.00Rp

35% Harga pipa Perlengkapan 13,562.50Rp

0.036 OH Pekerja 32,500.00Rp 1,170.00Rp

0.060 OH Tukang batu 40,000.00Rp 2,400.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.0018 OH Mandor 45,000.00Rp 81.00Rp

JUMLAH 63,983.50Rp

HARGA SATUAN 63,983.50Rp

1.0000 m' Kran 25,000.00Rp 25,000.00Rp

0.0250 bh Seal tape 2,000.00Rp 50.00Rp

0.010 OH Pekerja 32,500.00Rp 325.00Rp

0.100 OH Tukang batu 40,000.00Rp 4,000.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.0050 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 30,050.00Rp

HARGA SATUAN 30,050.00Rp

BAHAN 1.0000 m' Floordrain 15,000.00Rp 15,000.00Rp

0.010 OH Pekerja 32,500.00Rp 325.00Rp

0.100 OH Tukang batu 40,000.00Rp 4,000.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.0050 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 20,000.00Rp

HARGA SATUAN 20,000.00Rp

M. PEKERJAAN PENGGANTUNG & PENGUNCI

BAHAN 1.0000 bh Kunci tanam besar 225,000.00Rp 225,000.00Rp

0.010 OH Pekerja 32,500.00Rp 325.00Rp

TENAGA

BAHAN

TENAGA

1 m1 Pasang floordrain

TENAGA

TENAGA

1 m1 Pasang kran dia 1/2" dan 3/4" SNI : 2002

SNI : 2002

1 buah Pasang kunci tanam biasa (besar) SNI : 2002

TENAGA

1 m1 Pasang pipa PVC tipe AW dia 1,25" SNI : 2002

SNI : 2002

BAHAN

BAHAN

TENAGA

1 m1 Pasang pipa PVC tipe AW dia 4" SNI : 2002

BAHAN

TENAGA

1 m1 Pasang pipa PVC tipe AW dia 3"

Page 31: Harga Satuan Sni Tahun 2011

0.500 OH Tukang kayu 42,500.00Rp 21,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 247,250.00Rp

HARGA SATUAN 247,250.00Rp

BAHAN 1.0000 bh Kunci tanam kecil 100,000.00Rp 100,000.00Rp

0.010 OH Pekerja 32,500.00Rp 325.00Rp

0.500 OH Tukang kayu 42,500.00Rp 21,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.005 OH Mandor 45,000.00Rp 225.00Rp

JUMLAH 122,250.00Rp

HARGA SATUAN 122,250.00Rp

BAHAN 1.0000 bh Kunci silinder 65,000.00Rp 65,000.00Rp

0.005 OH Pekerja 32,500.00Rp 162.50Rp

0.500 OH Tukang kayu 42,500.00Rp 21,250.00Rp

0.005 OH Kepala Tukang 45,000.00Rp 225.00Rp

0.0025 OH Mandor 45,000.00Rp 112.50Rp

JUMLAH 86,750.00Rp

HARGA SATUAN 86,750.00Rp

BAHAN 1.0000 bh Engsel pintu 17,500.00Rp 17,500.00Rp

0.015 OH Pekerja 32,500.00Rp 487.50Rp

0.150 OH Tukang kayu 42,500.00Rp 6,375.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.00075 OH Mandor 45,000.00Rp 33.75Rp

JUMLAH 25,071.25Rp

HARGA SATUAN 25,071.25Rp

BAHAN 1.0000 bh Engsel jendela 15,000.00Rp 15,000.00Rp

0.010 OH Pekerja 32,500.00Rp 325.00Rp

0.100 OH Tukang kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.00050 OH Mandor 45,000.00Rp 22.50Rp

JUMLAH 20,047.50Rp

HARGA SATUAN 20,047.50Rp

BAHAN 1.0000 bh Engsel jendela kupu-kupu 7,500.00Rp 7,500.00Rp

0.010 OH Pekerja 32,500.00Rp 325.00Rp

0.100 OH Tukang kayu 42,500.00Rp 4,250.00Rp

0.010 OH Kepala Tukang 45,000.00Rp 450.00Rp

0.00050 OH Mandor 45,000.00Rp 22.50Rp

JUMLAH 12,547.50Rp

HARGA SATUAN 12,547.50Rp

BAHAN 1.0000 bh Grendel pintu 10,000.00Rp 10,000.00Rp

0.020 OH Pekerja 32,500.00Rp 650.00Rp

0.200 OH Tukang kayu 42,500.00Rp 8,500.00Rp

0.020 OH Kepala Tukang 45,000.00Rp 900.00Rp

0.00100 OH Mandor 45,000.00Rp 45.00Rp

JUMLAH 20,095.00Rp

TENAGA

1 buah Pasang grendel pintu SNI : 2002

TENAGA

1 buah Pasang kunci silinder SNI : 2002

TENAGA

1 buah Pasang engsel pintu

TENAGA

1 buah Pasang engsel jendela kupu-kupu SNI : 2002

TENAGA

TENAGA

SNI : 2002

TENAGA

1 buah Pasang engsel jendela SNI : 2002

1 buah Pasang kunci tanam biasa (kecil) SNI : 2002

Page 32: Harga Satuan Sni Tahun 2011

HARGA SATUAN 20,095.00Rp

BAHAN 1.0000 bh Grendel jendela 7,500.00Rp 7,500.00Rp

0.015 OH Pekerja 32,500.00Rp 487.50Rp

0.150 OH Tukang kayu 42,500.00Rp 6,375.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.00050 OH Mandor 45,000.00Rp 22.50Rp

JUMLAH 15,060.00Rp

HARGA SATUAN 15,060.00Rp

BAHAN 1.0000 bh Hak angin 15,000.00Rp 15,000.00Rp

0.015 OH Pekerja 32,500.00Rp 487.50Rp

0.150 OH Tukang kayu 42,500.00Rp 6,375.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.00075 OH Mandor 45,000.00Rp 33.75Rp

JUMLAH 22,571.25Rp

HARGA SATUAN 22,571.25Rp

BAHAN 1.0000 bh Pegangan pintu 95,000.00Rp 95,000.00Rp

0.050 OH Pekerja 32,500.00Rp 1,625.00Rp

0.500 OH Tukang kayu 42,500.00Rp 21,250.00Rp

0.050 OH Kepala Tukang 45,000.00Rp 2,250.00Rp

0.00250 OH Mandor 45,000.00Rp 112.50Rp

JUMLAH 120,237.50Rp

HARGA SATUAN 120,237.50Rp

BAHAN 1.0000 bh Pegangan jendela/ handel 10,000.00Rp 10,000.00Rp

0.015 OH Pekerja 32,500.00Rp 487.50Rp

0.150 OH Tukang kayu 42,500.00Rp 6,375.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.00015 OH Mandor 45,000.00Rp 6.75Rp

JUMLAH 17,544.25Rp

HARGA SATUAN 17,544.25Rp

BAHAN 1.0000 bh Door closer 250,000.00Rp 250,000.00Rp

0.050 OH Pekerja 32,500.00Rp 1,625.00Rp

0.500 OH Tukang kayu 42,500.00Rp 21,250.00Rp

0.050 OH Kepala Tukang 45,000.00Rp 2,250.00Rp

0.00250 OH Mandor 45,000.00Rp 112.50Rp

JUMLAH 275,237.50Rp

HARGA SATUAN 275,237.50Rp

BAHAN 1.1000 bh Kaca bening 3 mm 40,000.00Rp 44,000.00Rp

0.015 OH Pekerja 32,500.00Rp 487.50Rp

0.150 OH Tukang kayu 42,500.00Rp 6,375.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.00075 OH Mandor 45,000.00Rp 33.75Rp

JUMLAH 51,571.25Rp

HARGA SATUAN 51,571.25Rp

BAHAN 1.1000 bh Kaca bening 5 mm 60,000.00Rp 66,000.00Rp

0.015 OH Pekerja 32,500.00Rp 487.50Rp

0.150 OH Tukang kayu 42,500.00Rp 6,375.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.00075 OH Mandor 45,000.00Rp 33.75Rp

TENAGA

1 m2 Pasang kaca bening 3 mm SNI : 2002

TENAGA

1 m2 Pasang kaca bening 5 mm SNI : 2002

TENAGA

1 buah Pasang grendel jendela SNI : 2002

TENAGA

1 buah Pasang hak angin

1 buah Pasang door closer

TENAGA

1 buah Pasang pegangan jendela/handel SNI : 2002

TENAGA

SNI : 2002

TENAGA

1 buah Pasang pegangan pintu/ door holder SNI : 2002

SNI : 2002

Page 33: Harga Satuan Sni Tahun 2011

JUMLAH 73,571.25Rp

HARGA SATUAN 73,571.25Rp

BAHAN 1.1000 bh Kaca reyben 5 mm 65,000.00Rp 71,500.00Rp

0.015 OH Pekerja 32,500.00Rp 487.50Rp

0.150 OH Tukang kayu 42,500.00Rp 6,375.00Rp

0.015 OH Kepala Tukang 45,000.00Rp 675.00Rp

0.00075 OH Mandor 45,000.00Rp 33.75Rp

JUMLAH 79,071.25Rp

HARGA SATUAN 79,071.25Rp

N. PEKERJAAN CAT

0.1500 kg Plamir 17,500.00Rp 2,625.00Rp

0.1700 kg Cat dasar 51,000.00Rp 8,670.00Rp

0.1700 kg Cat penutup 51,000.00Rp 8,670.00Rp

0.070 OH Pekerja 32,500.00Rp 2,275.00Rp

0.075 OH Tukang cat 40,000.00Rp 3,000.00Rp

0.008 OH Kepala Tukang 45,000.00Rp 337.50Rp

0.0025 OH Mandor 45,000.00Rp 112.50Rp

JUMLAH 25,690.00Rp

HARGA SATUAN 25,690.00Rp

0.2000 kg Cat meni 17,500.00Rp 3,500.00Rp

0.1500 kg Plamir 17,500.00Rp 2,625.00Rp

0.1700 kg Cat dasar 51,000.00Rp 8,670.00Rp

0.2600 kg Cat penutup 51,000.00Rp 13,260.00Rp

0.070 OH Pekerja 32,500.00Rp 2,275.00Rp

0.009 OH Tukang cat 40,000.00Rp 360.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 270.00Rp

0.0025 OH Mandor 45,000.00Rp 112.50Rp

JUMLAH 31,072.50Rp

HARGA SATUAN 31,072.50Rp

0.1200 kg Cat dasar 15,000.00Rp 1,800.00Rp

0.1800 kg Cat penutup 15,000.00Rp 2,700.00Rp

0.028 OH Pekerja 32,500.00Rp 910.00Rp

0.042 OH Tukang cat 40,000.00Rp 1,680.00Rp

0.004 OH Kepala Tukang 45,000.00Rp 189.00Rp

0.0025 OH Mandor 45,000.00Rp 112.50Rp

JUMLAH 7,391.50Rp

HARGA SATUAN 7,391.50Rp

0.1000 kg Plamir 12,000.00Rp 1,200.00Rp

0.1000 kg Cat dasar 15,000.00Rp 1,500.00Rp

0.2600 kg Cat penutup 15,000.00Rp 3,900.00Rp

0.020 OH Pekerja 32,500.00Rp 650.00Rp

0.063 OH Tukang cat 40,000.00Rp 2,520.00Rp

0.006 OH Kepala Tukang 45,000.00Rp 283.50Rp

0.0025 OH Mandor 45,000.00Rp 112.50Rp

JUMLAH 10,166.00Rp

HARGA SATUAN 10,166.00Rp

0.1200 kg Cat dasar 15,000.00Rp 1,800.00Rp

0.1800 kg Cat penutup 15,000.00Rp 2,700.00Rp

BAHAN

TENAGA

1 m2 Mengecat bidang tembok lama SNI : 2002

BAHAN

BAHAN

TENAGA

BAHAN

TENAGA

1 m2 Mengecat plafon eternit/ gypsum SNI : 2002

1 m2 Mengecat bidang kayu lama SNI : 2002

BAHAN

1 m2 Mengecat bidang tembok baru SNI : 2002

TENAGA

1 m2 Mengecat bidang kayu baru SNI : 2002

1 m2 Pasang kaca reyben 5 mm SNI : 2002

TENAGA

Page 34: Harga Satuan Sni Tahun 2011

0.028 OH Pekerja 32,500.00Rp 910.00Rp

0.042 OH Tukang cat 40,000.00Rp 1,680.00Rp

0.004 OH Kepala Tukang 45,000.00Rp 189.00Rp

0.0025 OH Mandor 45,000.00Rp 112.50Rp

JUMLAH 7,391.50Rp

HARGA SATUAN 7,391.50Rp

BAHAN 0.2600 kg Cat genteng 21,250.00Rp 5,525.00Rp

0.020 OH Pekerja 15,000.00Rp 300.00Rp

0.063 OH Tukang cat 32,500.00Rp 2,047.50Rp

0.006 OH Kepala Tukang 40,000.00Rp 252.00Rp

0.0025 OH Mandor 45,000.00Rp 112.50Rp

JUMLAH 8,237.00Rp

HARGA SATUAN 8,237.00Rp

O. PEKERJAAN LINGKUNGAN

0.0060 m3 Pas. Bata merah 1PC : 4 Ps 66,585.40Rp 399.51Rp

1.0000 m3 Got -U 20 35,000.00Rp 35,000.00Rp

TENAGA 0.700 OH Pekerja 32,500.00Rp 22,750.00Rp

JUMLAH 58,149.51Rp

HARGA SATUAN 58,149.51Rp

1.0500 m2 Conblock 34,500.00Rp 36,225.00Rp

0.1200 m3 Pasir Pasang 107,800.00Rp 12,936.00Rp

0.240 OH Pekerja 32,500.00Rp 7,800.00Rp

0.080 OH Tukang batu 40,000.00Rp 3,200.00Rp

0.008 OH Kepala Tukang 45,000.00Rp 360.00Rp

0.012 OH Mandor 45,000.00Rp 540.00Rp

JUMLAH 61,061.00Rp

HARGA SATUAN 61,061.00Rp

1.0500 m2 Conblock 55,000.00Rp 57,750.00Rp

0.1200 m3 Pasir Pasang 107,800.00Rp 12,936.00Rp

0.240 OH Pekerja 32,500.00Rp 7,800.00Rp

0.080 OH Tukang batu 40,000.00Rp 3,200.00Rp

0.008 OH Kepala Tukang 45,000.00Rp 360.00Rp

0.012 OH Mandor 45,000.00Rp 540.00Rp

JUMLAH 82,586.00Rp

HARGA SATUAN 82,586.00Rp

P. PEKERJAAN ME

15.000 m' Kabel NYA 1 x 2,5 mm 2,000.00Rp 30,000.00Rp

1.200 btg Pipa pralon 5/8" 10,000.00Rp 12,000.00Rp

1.000 bh Stop kontak + indoos 17,500.00Rp 17,500.00Rp

0.050 OH Pekerja 32,500.00Rp 1,625.00Rp

0.500 OH Tukang listrik 40,000.00Rp 20,000.00Rp

0.050 OH Kepala Tukang 45,000.00Rp 2,250.00Rp

JUMLAH 83,375.00Rp

HARGA SATUAN 83,375.00Rp

12.000 m' Kabel NYA 1 x 2,5 mm 2,000.00Rp 24,000.00Rp

BAHAN

BAHAN

TENAGA

1 m2 Memasang konblok, tebal 8 cm SNI :……………………………

BAHAN

BAHAN

BAHAN

TENAGA

1 titik Pasang Saklar tunggal SNI : ……………………..

TENAGA

1 titik Pasang Stop kontak SNI : ……………………..

1 m2 Mengecat genteng SNI : 2002

TENAGA

1 m1 Memasang got U - 20 cm SNI : ……………………….

1 m2 Memasang konblok, tebal 6 cm SNI :……………………………

TENAGA

Page 35: Harga Satuan Sni Tahun 2011

2.000 btg Pipa pralon 5/8" 10,000.00Rp 20,000.00Rp

1.000 bh Saklar tunggal + indoos 15,000.00Rp 15,000.00Rp

TENAGA 0.050 OH Tukang listrik 40,000.00Rp 2,000.00Rp

JUMLAH 61,000.00Rp

HARGA SATUAN 61,000.00Rp

18.000 m' Kabel NYA 1 x 2,5 mm 2,000.00Rp 36,000.00Rp

2.000 btg Pipa pralon 5/8" 10,000.00Rp 20,000.00Rp

1.000 bh Saklar ganda 17,500.00Rp 17,500.00Rp

TENAGA 0.050 OH Tukang listrik 40,000.00Rp 2,000.00Rp

JUMLAH 75,500.00Rp

HARGA SATUAN 75,500.00Rp

BAHAN 1.000 bh Lampu TL 20 watt 45,000.00Rp 45,000.00Rp

0.010 OH Pekerja 32,500.00Rp 325.00Rp

0.020 OH Tukang listrik 40,000.00Rp 800.00Rp

0.005 OH Kepala Tukang 45,000.00Rp 225.00Rp

JUMLAH 46,350.00Rp

HARGA SATUAN 46,350.00Rp

1.000 bh Lampu SL 18 watt 30,000.00Rp 30,000.00Rp

1.000 bh Fiting keramik 12,000.00Rp 12,000.00Rp

0.010 OH Pekerja 32,500.00Rp 325.00Rp

0.020 OH Tukang listrik 40,000.00Rp 800.00Rp

0.005 OH Kepala Tukang 45,000.00Rp 225.00Rp

JUMLAH 43,350.00Rp

HARGA SATUAN 43,350.00Rp

1.000 bh Lampu pijar 25 watt 10,000.00Rp 10,000.00Rp

1.000 bh Fiting keramik 12,000.00Rp 12,000.00Rp

0.010 OH Pekerja 32,500.00Rp 325.00Rp

0.020 OH Tukang listrik 40,000.00Rp 800.00Rp

0.005 OH Kepala Tukang 45,000.00Rp 225.00Rp

JUMLAH 23,350.00Rp

HARGA SATUAN 23,350.00Rp

1.000 bh Panel Box + MCB 125,000.00Rp 125,000.00Rp

12.000 m' Kabel NYA 1 x 2,5 mm 2,000.00Rp 24,000.00Rp

1.000 bh Isolasi 12,000.00Rp 12,000.00Rp

1.000 OH Pekerja 32,500.00Rp 32,500.00Rp

1.000 OH Tukang listrik 40,000.00Rp 40,000.00Rp

0.005 OH Kepala Tukang 45,000.00Rp 225.00Rp

JUMLAH 233,725.00Rp

HARGA SATUAN 233,725.00Rp

Q. PEKERJAAN BONGKARAN

6.667 OH Pekerja 32,500.00Rp 216,677.50Rp

0.333 OH Mandor 45,000.00Rp 14,985.00Rp

JUMLAH 231,662.50Rp

HARGA SATUAN 231,662.50Rp

BAHAN

BAHAN

1 buah Pasang Lampu TL 20 watt SNI : ……………………..

TENAGA

1 buah Pasang Lampu SL 18 watt SNI : ……………………..

BAHAN

TENAGA

1 m3 Membongkar beton bertulang SNI : 2002

TENAGA

TENAGA

1 buah Pasang Lampu Pijar 25 watt SNI : ……………………..

BAHAN

TENAGA

1 buah Pasang Panel box + MCB SNI : ……………………..

BAHAN

1 titik Pasang Saklar ganda SNI : ……………………..

Page 36: Harga Satuan Sni Tahun 2011

2.000 OH Pekerja 32,500.00Rp 65,000.00Rp

0.090 OH Mandor 45,000.00Rp 4,050.00Rp

JUMLAH 69,050.00Rp

HARGA SATUAN 69,050.00Rp

0.050 OH Pekerja 32,500.00Rp 1,625.00Rp

0.025 OH Mandor 45,000.00Rp 1,125.00Rp

JUMLAH 2,750.00Rp

HARGA SATUAN 2,750.00Rp

0.040 OH Pekerja 32,500.00Rp 1,300.00Rp

0.020 OH Mandor 45,000.00Rp 900.00Rp

JUMLAH 2,200.00Rp

HARGA SATUAN 2,200.00Rp

0.050 Oh Pekerja 32,500.00Rp 1,625.00Rp

0.200 Oh Tukang kayu 42,500.00Rp 8,500.00Rp

0.005 Oh Kepala Tukang 45,000.00Rp 225.00Rp

0.010 Oh Mandor 45,000.00Rp 450.00Rp

JUMLAH 10,800.00Rp

HARGA SATUAN 10,800.00Rp

6.000 Oh Pekerja 32,500.00Rp 195,000.00Rp

4.000 Oh Tukang kayu 42,500.00Rp 170,000.00Rp

0.600 Oh Kepala Tukang 45,000.00Rp 27,000.00Rp

0.200 Oh Mandor 45,000.00Rp 9,000.00Rp

JUMLAH 401,000.00Rp

HARGA SATUAN 401,000.00Rp

0.100 Oh Pekerja 32,500.00Rp 3,250.00Rp

0.250 Oh Tukang kayu 42,500.00Rp 10,625.00Rp

0.015 Oh Kepala Tukang 45,000.00Rp 675.00Rp

0.005 Oh Mandor 45,000.00Rp 225.00Rp

JUMLAH 14,775.00Rp

HARGA SATUAN 14,775.00Rp

TENAGA

TENAGA

SNI Rev. : 2005

1 m2 Membongkar rangka plafon dipakai lagi SNI Rev. : 2005

TENAGA

1 m3 Membongkar plesteran dinding SNI Rev. : 2005

TENAGA

1 m3 Membongkar genteng dipakai lagi SNI Rev. : 2005

TENAGA

1 m3 Membongkar reng/kaso-kaso dipakai lagi SNI Rev. : 2005

TENAGA

1 m3 Membongkar kuda-kuda/gording dipakai lagi

1 m3 Membongkar dinding tembok bata merah SNI Rev. : 2005

Page 37: Harga Satuan Sni Tahun 2011
Page 38: Harga Satuan Sni Tahun 2011
Page 39: Harga Satuan Sni Tahun 2011
Page 40: Harga Satuan Sni Tahun 2011
Page 41: Harga Satuan Sni Tahun 2011
Page 42: Harga Satuan Sni Tahun 2011
Page 43: Harga Satuan Sni Tahun 2011
Page 44: Harga Satuan Sni Tahun 2011
Page 45: Harga Satuan Sni Tahun 2011
Page 46: Harga Satuan Sni Tahun 2011
Page 47: Harga Satuan Sni Tahun 2011
Page 48: Harga Satuan Sni Tahun 2011
Page 49: Harga Satuan Sni Tahun 2011
Page 50: Harga Satuan Sni Tahun 2011
Page 51: Harga Satuan Sni Tahun 2011
Page 52: Harga Satuan Sni Tahun 2011
Page 53: Harga Satuan Sni Tahun 2011
Page 54: Harga Satuan Sni Tahun 2011
Page 55: Harga Satuan Sni Tahun 2011
Page 56: Harga Satuan Sni Tahun 2011
Page 57: Harga Satuan Sni Tahun 2011
Page 58: Harga Satuan Sni Tahun 2011
Page 59: Harga Satuan Sni Tahun 2011
Page 60: Harga Satuan Sni Tahun 2011
Page 61: Harga Satuan Sni Tahun 2011
Page 62: Harga Satuan Sni Tahun 2011
Page 63: Harga Satuan Sni Tahun 2011
Page 64: Harga Satuan Sni Tahun 2011
Page 65: Harga Satuan Sni Tahun 2011
Page 66: Harga Satuan Sni Tahun 2011
Page 67: Harga Satuan Sni Tahun 2011
Page 68: Harga Satuan Sni Tahun 2011
Page 69: Harga Satuan Sni Tahun 2011
Page 70: Harga Satuan Sni Tahun 2011
Page 71: Harga Satuan Sni Tahun 2011
Page 72: Harga Satuan Sni Tahun 2011